HomeMy WebLinkAboutBuilding Permit #359 - 395 CHESTNUT STREET 10/24/2011 TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: � l Date Received
Date Issued: 2q_(/
IMPORTANT:Applicant must complete all items on this page
LOCATION �9, ' C 1tic 6t fi uf_
PROPERTY OWNER"RC-b x_(�hn P * Unit#
Print
MAP NO: qko,PARCEL: 90 ZONING DISTRICT: Historic District yes noa
Machine Shop Village yes no
100 year-old structure yes
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building One family
❑Addition ❑Two or more family ❑ Industrial
2Alteration No. of units: ❑ Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
WjSeptic OWell ®Floodplain ®)Wetlands ®#,'WatershedlDlsirlct;.
D}Water/,Sewer;
DESCRIPTION OF WORK TO BE PER
ORMED:
.�.�C
- V
I�J_ I (Identification Pfl se Type or Print Clearly)
OWNER: Name: ,o i-to..e..d Phone !2 7�Y
Address: �� -'
CONTRACTOR Name: ACLr SK A r, ih.4hon( - S/
Address: (e ��' I�� /�! �1 `r e
Supervisor's Construction License: d� Z 3 )Exp. Date: I
Home Improvement License: U % S Exp. Date:
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE.BULDING PERMIT.,$12.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F.Total Project Cost: $ -3 q FEE: $ 4 (�
Check No.: C�� _ Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
�SLg nature_of Ag"ent/Owner,,6., -w�. w Signatureofacoritractor:�. 4.k._. n
Location -3' s c7-
No. Date
%ORTN TOWN OF NORTH ANDOVER
0
0 0
Certificate of Occupancy $
q15
Building/Franie Permit Fee $
ACHU
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check #
Building Inspector
24749
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ElSwimming Pools El
Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
I
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Siqnature
k
COMMENTS
Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/Signature& Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT -Temp Dumpster on site yes no
Located at 124 Main Street
Fire Department signature/date
COMMENTS
i
i
i
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— For department use
❑ Notified for pickup - Date
Doc:.Building Permit Revised 2011 June/mi
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
a Photo Copy of H.I.C. And/Or C.S.L. Licenses
a Copy of Contract
a Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition or Decks
❑ Building Permit Application
o Certified Surveyed Plot Plan
a Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
o Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
(VOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: Doc.Building Permit Revised 2008mi
FORTH ,
ToVM of
0
.VL 7i_ Andover ,
lover, Mass.,
COCHICHEWICK
BOARD OF HEALTH
PEIiMIT T D Food/Kitchen
Septic System
BUILDING INSPECTOR
w� J
THIS CERTIFIES THAT........... .... t�. /................... ............. Foundation
has.permission to erect.. .......... Kildings on ....... 4C.........IC��.Wr.........0+..• Rough
to be occupied as K L.......... *......................... Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IIT6 THIS
UNLESS
� _ ELECTRICAL INSPECTOR
NLESS CONST ��.�i
�.1S Rough
............................................. Service
t BUILDING INSPECTOR
Final
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry (Mall To Be Done FIREE_DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
i
i11:tssaCltusetts- Depar-turent of Public Safety
Board of Buildinu Re,Fulations and Standards
Construction Supervisor License
License: cs 58238
GLENN M GARY
507 W LOWELL AVE
HAVERHILL, MA 01832
i
Expiration: 9/15/201.3
('unmusivncr
Tr-#: 1556
r
GlennGary General Contractors
60 Island Street Builders Lic.# 058238&065519
Lawrence, MA 01840 Home Improvement Lic.#105965& 122124
Telephone 978-557-5981 978-469-0055
Lawrence Haverhill
Fax 978-557-5439
Glenn Gary Buddy Latham
CONTRACT PROPOSAL FORM
Prepared Rich&Chris Pineau
For:
Date: 06/08/2011 Telephone: (978)683-1569
Location 395 Chestnut Street North Andover Ma 01845
General Description of Project: Master bathroom &walk-in closet remodel
Demo
• Remove all drywall from walls and ceilings in the master bath and closet
• Remove floor covering down to the sub floor
• Remove three doors(bathroom, closet, and linen from main bath)
• Remove hallway window and frame in opening
• Remove all existing bathroom and closet components
Rough carpentry
• Frame bathroom/closet demising wall
• Frame in hallway opening
• Frame opening for new bathroom window
• Frame in linen closet doorway(main bath)
• Frame two pocket doors opening
• Frame in floor joist for new water closet location
• Install new window in master bath as per layout under(101 ui)
• Insulate exterior walls and ceiling in master bath and walk-in
Finishes
• Drywall bathroom and closet walls and tape three coats
• Install owner supplied bathroom floor tile
• Install owner supplied bathroom walls tile 4' up
• Install owner supplied tile to the shower interior
• Install casing to new bathroom window
• Install base board in new walk in closet
• Install pocket door casings
• Install baseboard in master at pocket doors
• Purchase and install cedar clapboard around new window and were hallway window
was
• Purchase and install base and wall cabinets(vanity and med-cabs)
• Supply and install granite wall cap for shower half wall.
• Relocate central vac port
Execution of Contract
The contract must be executed in duplicate and should not be signed until a copy of all
exhibits and referenced
documents have been attached. Parties are also advised not to sign the document until
all blank sections have been
filled in or marked as void, deleted, or not applicable. One original signed copy of the
contract with attachments is to
be given to the owner and the other kept by the contractor. Any modification to the
original contract must be in writing
and agreed to by both parties. Contracted work may not begin until both parties have
received a fully executed copy of
the contract, and the three day rescission period has expired.
Accelerated Payments
A contractor may not demand payments in advance of the dates specified on the
payment schedule in cases where the
homeowner deems him/herself to be financially insecure. However, in instances where a
contractor deems him/herself
to be financially insecure, the contractor may require that the balance of funds not yet
due be placed in a joint escrow
account as a prerequisite to continuing the contracted work. Withdrawal of funds from
said account would require the
signatures of both parties.
Additional Information
If you have general questions or need additional information about the Home
Improvement Contractor Law or other
consumer rights, or if you wish to obtain a free copy of"A Massachusetts Consumer
Guide to Home Improvement"
contact:
Consumer Information Hotline
Office of Consumer Affairs and Business Regulation
10 Park Plaza, Room 5170, Boston, MA 02116
617-973-8787, 888-283-3757 or visit the OCABR website at http://www.mass.gov/ocabr/
If you want to verify the registration of a contractor or if you have questions or need
additional information specifically
about the contractor registration component of the Home Improvement Contractor Law,
contact:
Director of Home Improvement Contractor Registration
Office of Consumer Affairs and Business Regulation
10 Park Plaza, Room 5170, Boston, MA 02116
617-973-8787, 888-283-3757 or visit the HIC website at http://www.mass.gov/ocabr/
Go online to view the status of a Home Improvement Contractor's Registration:
http:l/db.state.ma.us/homeimprovement/Iicenseelist.asp
For assistance with informal mediation of disputes or to register formal complaints
against a business, call:
Consumer Complaint Section
Office of the Attorney General
617-727-8400
AND/OR
Better Business Bureau
508-652-4800, 508-755-2548 or 413-734-3114
Electrical
Bathroom
• Demo of existing electrical
• Supply and install(2)20amp GFCI circuit for new tub
• Supply and install (1)20A circuit with (2)vanity outlets for Chris and one for Rich
• Supply and install (1)exhaust fan only
• Supply and install (1) recessed light over shower
• Supply and install (2) recessed lights over tub
• Supply and install(2) recessed lights in bathroom for general lighting
• Supply and install(2) recessed lights in bathroom for general lighting (switched
separately)
• Wire and install(2)customer supplied wall sconces for vanity
• Supply and install(5)switch locations
• Supply and install wiring for toe-kick heater power only(not its own separate zone)
Plumbing
• Purchase and install all bathroom components listed on the Peabody Supply quote#
242003 Dated 06/24/2011 ( please note there are no counter tops included on this
quote this item can be added T&M).
Purchase and install 36"x48"copper pan for shower
Toe kick heater controlled by second floor thermostat(not its own separate zone)
Painting
• Prep, prime and paint new master bathroom walls, trim, and ceiling
• Prep, prime and paint new walk-in closet walls, trim, and ceiling
Acceptance of Proposal Upon Completion
$17,200.00 $17,200.00
Glenn Gary General Contractors shall not be held liable for delays due to circumstances beyond
our control.Glenn Gary General Contractors shall not be held liable for any pre-existing conditions
including but not limited to insect damage,unforseen rot,mold,mildew,unforseen damage,
undersized framing,improper flashing,or inadequate support.Though our greatest effort will be
put forth to protect and preserve the beauty and curb apeal of your property Glenn Gary General
Contractors may not be held liable for any damages to landscaping,driveway,or walkways
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner.according to standard
practices.Any alteration or deviation from above specifications involving extra costs will be executed only upon written
orders,and will become an extra charge over and above the estimate.All agreements.are contingent upon strikes,
accidents or delays beyond our control.Owner to carry all required insurance on the property being worked by the
contractor.Contractor will provide full Workmen's Compensation Insurance for the employees used at the site.
Please review this Proposal and if acceptable plea n both copies and retain one for your files.If there are
any changes please modify thi poVyma g the nges and providing us with the document for review
and preparation of a final opos I Thopos may b i drawn if not accepted within 30 ays.
Accepted: By: Date: a 2i
—
Accepted:
rr.ai . %y�aFure)
Francis Lat�am Date r
(Contractors Si late e)
Contractor Arbitration
The Home Improvement Contractor Law provides homeowners with the right to initiate
an arbitration action (as an
alternative to court action) if they have a dispute with a contractor. The same right is not
automatically afforded to a
contractor, however. The contractor would have to resolve any dispute he/she has with a
homeowner in court unless
both parties agree to the optional clause provided below. This clause would give the
contractor the same right to
arbitration as is afforded to the homeowner by the Home Improvement Contractor Law.
The contractor and the homeowner hereby mutually agree in advance that in the event
the contractor has a dispute
concerning this contract, the contractor may submit the dispute to a private arbitration
firm which has been approved by
the Secretary of the Executive Office of Consumer Affairs and Business Regulation and
the consumer shall be required
to submit to such arbitration as provided In Massachusetts General Laws, chapter 142A.
Homeowner's Signature Contractor's Signature
NOTICE: The signatures of the parties above apply only to the agreement of the parties
to alternative dispute
resolution initiated by the contractor. The homeowner may initiate alternative dispute
resolution even where this
section is not separately signed by the parties.
Homeowner's Rights
A homeowner's rights under the Home Improvement Contractor Law(MGL chapter
142A) and other consumer
protection laws (i.e. MGL chapter 93A) may not be waived in any way, even by
agreement. However, homeowners
may be excluded from certain rights if the contractor they choose is not properly
registered as prescribed by law.
Homeowners who secure their own building permits are automatically excluded from all
Guaranty Fund provisions of
the Home Improvement Contractor Law. The contractor is responsible for completing the
work as described, in a
timely and workmanlike manner. Homeowners may be entitled to other specific legal
rights if the contractor
guarantees or provides an express warranty for workmanship or materials. In addition to
guarantees or warranties
provided by the contractor, all goods sold in Massachusetts carry an implied warranty of
merchantability and fitness for
a particular purpose. An enumeration of other matters on which the homeowner and
contractor lawfully agree may be
added to the terms of the contract as long as they do not restrict a homeowner's basic
consumer rights. If you have
questions about your consumer/homeowner rights, contact the Consumer Information
Hotline (listed below).
AORTH
® of
Y �[! }'- LAK o lover, Mass., (16 � r it
COC HICMEWICK
S RATED
BOARD OF HEALTH
PE� nMIT T D Food/Kitchen
Septic System
BUILDING INSPECTOR
THIS CERTIFIES THAT .�.....t...�.....J.....
........................................................................................hFoundation
has permission to erect.. ... buildinas aq.r.........o��.�........0+..9 Rough
to be occupied as........... M►. L.......... ....... W..#........................................................ ...... Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT' EXPIRES IN 6 THS
ELECTRICAL INSPECTOR
L)INLESS CONS SI_ Rough
Service
BUILDING INSPECTOR
Final
Oecac ancyPermit Rewired to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE-DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
600 Washington Street
Boston,MA 02111
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Avolicant Information Please Print Legibly
Nate (Business/Organization/Indivi dual): Ali f
Address: (00 14 6Q
City/State/Zip:��� �Cd� — Phone#:_60
Aire
pyrou an employer?Check t e appropriate box: Type of project(required):
I am a employer with 4. ❑ I am a general contractor and I
employees(full and/or part-time).* have hired the sub-contractors 6' El New construction
2. ❑ I am a sole proprietor or partner- listed on the attached sheet.t [ Remodeling
ship and have no employees These sub-contractors have 8. ❑Demolition
working for me in any capacity. workers'comp.insurance. 9. ❑Building addition
[No workers'comp.insurance 5. ❑ We are a corporation and its
10.[1 Electrical repairs or additions
required.] officers have exercised their
3.❑ I am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions
myself.[No workers' comp. c. 152,§1(4),and we have no 12.❑Roof repairs
insurance required.]t employees.[No workers' 13.❑Other
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
i Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such,
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: _J
Policy#or Self-ins.Lic.#: / Expiration Date:
Job Site Address: h �/ City/State/Zip: fi a-
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). I
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
Si nature: Date: /C)/Zi/
Phone#: 1�y,1 ?' �5 �
Official use only. Do not write in this area,to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector S.Plumbing Inspector
6.Other
Contact Person: Phone th