HomeMy WebLinkAboutBuilding Permit #560-15 - 4 High Street Suite 175 MVLC 12/16/2014 BUILDING PERMIT NORTH
o0�z,Eo ,b qti
o
y..
T
OWN OF NORTH ANDOVER o m
APPLICATION FOR PLAN EXAMINATION
Permit No#: Date Received �s re°
VS US Date Issued: �1Q
IMPORTANT: Applicant must complete all items on this page
LOCATION '* z r- AE
r Print
PROPERTY OWNER C �7 CS
r Print 100 Year Structure yes no
MAP _PARCEL: ZONING DISTRICT: Historic District es no
Machine Shop Village kyes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building ❑ One family
0 Addition ❑Two or more family ❑ Industrial
gAlteration No. of units: iKCommercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District
❑Water/Sewer
DESCRIPTION OF WORK TO BE PERFORMED:
460h-A ® u17 VACbNi' S461-8 PCR A7Tf)eJ4J_4
Identification- Please Type or Print Clearly
OWNER: Name: A V 1 D -S 7- t P4`9 t +Q Cr /-/ Phone:
Address: �4v !'3' o a� L V A Lp
Contractor Name: Phone: Yt e guq UHL-''LAN b / a -Y g2.-� 7} f _
Address: C N 1`7 OSA ��i�, Irl bu I H, I ®Zl �
Supervisor's Construction License: C S 3.3 4 Exp. Date: q /
Home Improvement License: ! 3 ( Exp. Date: ,. q 3 iJ (6
ARCHITECT/ENGINEER S n Phone:_
-� l�
Address:_ � SILK t`D W1�� -� r , ��� ®&) Reg. No. I $ 0
FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. r
Total Project Cost: $ t 'L� /4-G k FEE: $ �`b?,01) �00
Check No.: Receipt No.: Z-&�
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
Signature of Agent/Owner Signature of contractor
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑
Food Packaging/Sales ❑
Private(septic tank,etc. ❑ permanent Dumpster on Site ❑
I
I
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
PLANNING & DEVELOPMENT Reviewed On Signature_
COMMENTS
CONSERVATION Reviewed on Siqnature
COMMENTS
HEALTH Reviewed on Signature
_.; COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
ly
Water & Sewer Connection/Signature& Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT - Temp Dumpster to yet no
Located at 124 Main Street
Fire Department signature/date
' COMMENTS f�!/f✓�/
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use)
Ir
❑ Notified for pickup Call Email
Date Time Contact Name
Doc.Building Permit Revised 2014
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
a Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. License_ s
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
{ ❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:Building Permit Revised 2014
Location
^ ��>
Date
No.
a �
t
. = TOWN OF NORTH ANDOVER
Certificate of Occupancy $ 12..
Building/Frame Permit Fee $
.»
Foundation Permit Fee $
Other Permit Fee $
•►r , TOTAL $ tOuL
i
Check#
4 U v 0
Building Inspector
i
F
o`NORTH,4
e,
SSACHU
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 560-15 Date: June 16, 2015
THIS CERTIFIES THAT
Merrimac Valley Library Consortium
THE BUILDING LOCATED at RCG WEST MILL 4 High Street Suite 9175
MAY BE OCCUPIED AS IN ACCORDANCE WITH THE PROVISIONS OF THE
MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY
APPLY.
Certificate Issued to: MVLC
4 High Street Unit 175
North Andover MA 01854
i
Bui ding Inspector
Fee: $100
Receipt: 28366
Check : 1956
NORTH
own o-"f 2 ndover
O `1. •�
No. 64b'e
h ver, Mass,
.Q
CONIC Ml W�CM 1.
RATED ^P����S
S U
BOARD OF HEALTH
Food/Kitchen
P -ERMIT T LD!� Septic System
THIS CERTIFIES THAT ....... �� ..... Q"'1. ��........Lue BUILDING INSPECTOR
.... .......... ... ................... .......................
v` �! .Foundations
has.permission to erect .......................... buildings on .. .` ..G { ' 'i•... . . . e....�. `��...
` '` ou 6
k vw
to be occupied as ........... . ► ........ ...... 14 ...'................. .. . . .�...................... Chimney
provided that the person accepting this permit shall in ese respect confo m to the terms f the application p p p g p rY pp C(,K
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. LUMBING 7r�'
c OR
40"
Rough I�
VIOLATION of the Zoning or Building Regulations Voids this Permit. ��Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION T TS
Service
............................................................ ..................
BUILDING.
INSPECTOR.
Z'
INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
i
Enter construction cost for fee cal - North Andover Fee Calculation
Construction Cost
$ 125,146.00 m
$ - $ 1,501.75
Plumbing Fee $ 187.72
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 187.72
Total fees collected $ 1,977.19
4 High Street Suite 175 MVLC
560-15 on 12/16/14
Tenant Fit Up
i
i
I
I
1
i
n _N4RT�
F
owe o n over
0 0%
o h 01,
over, Mass, I
coc"Icnewic« y
�,es R�TEO pPP��S
U BOARD OF HEALTH
Food/Kitchen
PERMIT T LD AR4
Septic System
Or%THIS CERTIFIES THAT G ..��`,....... BUILDING INSPECTOR
........... .. ....... .............. . . . .................
. . . . V"'�� Foundation
has permission to erect .......................... buildings on .. ...... .` ..Grf :... : . . e....�. '�.�... ��
� � 6,u � .
to be occupied as ...........1.e.h,�.. ............ ..... ..................... 4
... . . .iv.+�+!::�:�:... . . `!1�l'................ cni ney
provided that the person accepting this permit shall in eSery respect co m to the terms f the application ai
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. LUMBIN IN QCJOR
Rough ,
VIOLATION of the Zoning or Building Regulations Voids this Permit. r
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION T TSRq,ugh - .•-m � ► r
Service m //
..............................................
BUILDING.INSPECTOR"
INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det. ���
n NORTH
Town o'f: : _ ndover
No.
�h over, Mass
0A COCNIC tWICK`y1'
S u
BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
THIS CERTIFIES THAT ....... LLO,
BUILDING INSPECTOR
. _�?:.......`l.�!.Q ..... !.... .... -: :. ............. .... ................ ..... .. . ... ...
., i V� Foundation
has permission to erect ..................
........ buildings on .. .- -�,.` ..Grf ... . . :e....�.� .. ,
ou� J
to be occupied as 1.1e.r.,►!:-�``+ .n ..... . .�v y
........... ............. ... ........................ . l+l:t .. . . .(!.............
Chi ne
provided that the person accepting this permit shall in a ery respect confo m to the terms f the application ai 6 1�/j�
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. LUMBINjGIN c OR
P3—
VIOLATION of the Zoning or Building Regulations Voids this Permit. Roug93'�?Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION T T LIRugh ;
Service
.............................................. Fina aA 15
BUILDING INSPECTOR
INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No. `d
Smoke Det.
•i :M
��9�C H15Et49
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 560-15 Date: June 16, 2015
THIS CERTIFIES THAT
Merrimac Valley Library Consortium
THE BUILDING LOCATED at RCG WEST MILL 4 High Street Suite #175
MAY BE OCCUPIED AS IN ACCORDANCE WITH THE PROVISIONS OF THE
MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY
APPLY.
Certificate Issued to: MVLC
4 High Street Unit 175
North Andover MA 01854
Building Inspector
Fee: $100
Receipt: 28366
Check : 1956
f
F NORTH
own o s � Andover
p :. - 0
64ti-O Is
Yf P h ver, Mass, ,
A- CO[NIC"IWICK �1'
Jds
OAT EED)
V BOARD OF HEALTH
Food/Kitchen
PERMIT T LD G
WA4
1 Septic System
THIS CERTIFIES THAT !rls- ..�..`1... BUILDING INSPECTOR
......... � .... ... ....... ............ .... ..................
has permission to erect ....... buildings on 4.. � .. ... .1M.7.e....�.�ra... Mv�� Foundation
�n Rough
to be occupied as �.le f4 TIV..... ............................................................................ Chimney
........... .. .......
provided that the person accepting this permit shall in esery respect conform to the terms of the application
p p g Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTION, T TS Rough
Service
....................... ........................................................ Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
OFFICE OF BUILDING INSPECTOR
+ '� 4 TOWN OF NORTH ANDOVER
-�_ CONSTRUCTION CONTROL
PROJECT NUMBER: 1406002.08
PROJECT TITLE: Merrimac Valley Library Consortium
PROJECT LOCATION: 4High Street, Suite 175, North Andover
NAME OF BUILDING: West Mill
NATURE OF PROJECT: Tenant Fit Out
IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE,
I, Undg S. Similgy REGISTRATION NO. 1Q080
BEING A REGISTERED PROFESSIONAL ENGINEERIARCHITECH HEREBY CERTIFY THAT I
HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,
COMPUTATIONS AND SPECIFICATIONS CONCERNING:
ENTIRE PROJECT ❑ ARCHITECTURAL STRUCTURAL ❑ MECHANICAL ❑
FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER(SPECIFY)
FOR THE ABOVE NAMED PROJECT AND THAT,TO THE BEST OF MY KNOWLEGE,SUCH PLANS,
COMPUTATIONS AND SPECIFICATIONS MEET THE APPUCABLE PROVISION OF THE MASSACHUSETTS
STATE BUILDING CODE,ALL ACCEPTABLE ENGINEERING PRATICES.
AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B
EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0
1. Review,for conformance to the design concept,shop drawings,samples and other submittals
which are submitted by the contractor in accordance with the requirements of the construction
documents.
2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become,generally familiar
with6the progress and quality of the work and to determine,in general, if the work is being
performed in a manner consistent with the constnjc ion documents.
PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT
TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR.
UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE
SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR 07CIC
y� RE
BSCRIBE13D SWORN TO BEFORE ME THIS f U DAY OF 9
JflAM A ��
ARY PURL C MYCOMMISSION Nora�r P�ar�o
�TM OF
My � EWW"
NOTICE NOTICE
Z
TO a a TO
EMPLOYEES EMPLOYEES
�M s�
Theomm�onwealth of Massachusetts
C
DEPARTMENT OF INDUSTRIAL ACCIDENTS
1 Congress Street, Suite 100, Boston, Massachusetts 02114-201.7
617-727-4900 - http://www.state.ma.us/dia
As required by Massachusetts General Law;, Chapter 152, Sections 21, 22 &30,this will give you notice
that I(we)have provided for payment to our injured employees under the above-mentioned chapter by
insuring with:
LIBERTY MUTUAL FIRE INSURANCE COMPANY
NAME OF INSURANCE COMPANY
175 BERKELEY STREET, BOSTON, MA 02116 (617)357-9500
ADDRESS OF INSURANCE COMPANY
WC2-31 S-601698-014 _ 2/17/2014-2/17/2015
POLICY NUMBER EFFECTIVE DATES
NAME OF INSURANCE AGENT ADDRESS PHONE#
31 RICHMONT STREET
JK CONTRACTING LLC WEYMOUTH MA 02188
EMPLOYER ADDRESS
EMPLOYER'S WORKERS' COMPENSATION OFFICER(IF ANY) DATE
MEDICAL TREATMENT
The above named insurer is requiredin cases of personal injuries arising out of and in the course of
employment to furnish adequate and reasonable hospital and medical services in accordance with the
provisions of the Workers' Compensation Act. A copy of the First Report of Injury must be given to the
injured employee. The employee may select his or her oN,,•n physician. The reasonable cost of the ser-
vices provided by the treating physician will be paid by the insurer, if the treatment is necessary and
reasonably connected to the work related injury. In cases requiring hospital attention, employees are
hereby notified that the insurer has arranged for such attention at the
NAME OF HOSPITAL ADDRESS
TO BE POSTED BY EMPLOYER
Massachusetts -Department of Public Safety
Board of Building Regulations and Standards
r
Construction Supervisor
License: CS-066334
IS
IQERAN T WHEIAN •�%
31 RICHMOND ST s
WEYMOUTH MA
r �
Expiration
Commissioner 09/26/2015
t�
t
Standard Form of Agreement between Owner and
RCG LLC where the basis of payment is the Cost
of the Work Plus a Fee without a Guaranteed
Maximum Price
Date: O'tober 14, 2014
Owner: RCG West,Mill NA LLC
:.'C/o RCG LLC
17 Ivaloo Street, Suite 100
Somerville, MA 02143
Contractor: J & K Contracting LLC
Architect: SRAM Architects
Project Name: MVLC
+:High Street
,,Suite 175
u .
The Owner and Contractor agree to the terms stated by this contract. This contract
supersedes any prior agreements, representations, or negotiations, oral or written. No
liquidated damages shall apply to this agreement. This contract consists of the following
documents:
1. Obligations of the Parties
2. Contract Sum
3. Project Schedule
4. Signatures
Exhibits
Exhibit A: Estimated Cost of Work
Exhibit B: Project Schedule
Exhibit C: Drawings
i
Page 1 of 5
I
1
1. Obligations of the Parties
Obligations of the Contractor:
The Contractor accepts the relationship of trust and confidence established by this Agreement and
covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and
judgment in furthering the interests of the Owner; to furnish efficient business administration and
supervision; to furnish at all times an adequate supply of workers and materials; and to perform
the Work in an expeditious and economical manner consistent with the Owner's interests and in
compliance with all applicable governmental codes and regulations.
The Contractor shall keep full and detailed accounts and exercise such controls as may be
necessary for proper financial management under this Contract.
The Contractor shall keep full and detailed records of all books, records, permits, licenses,
correspondence, receipts, instructions, data, and drawings associated with the Project including all
Subcontractor contracts, invoices, vouchers, insurances, lien waivers, and other correspondence.
The Owner and Owner's Accountants shall have access to review, audit, and copy all Contractor
documentation. The Contractor shall retain these documents for a period of three years after final
payment.
The Contractor shall maintain insurance at the following levels with the Owner listed as a co-
insured:
Type of Insurance Limit of Liability
Commercial General Liabilit $1,000"OOb,0 t=e v
�.���� a71
�,9 164"
Upon request, and at the cost of the Owner, the Contractor shall obtain a performance bond up to
the total Cost of Work. Such costs shall be added to the Construction Volume.
The Contractor understands that the Project will be financed by a construction lender and, then, by
a permanent lender. The Owner may assign any of its rights under this Contract to the construction
lender and the Contractor hereby consents to any such transfer provided no such assignment shall
relieve the Owner of any of its obligations under this Contract, unless agreed to in writing by the
Contractor. The Contractor shall execute any certificates, lien waivers, releases, receipts, and other
documents as may be reasonably required by the construction lender or permanent lender including
a subordination of its mechanic's lien rights to the construction lender's and permanent lender's
mortgage or deed of trust. The construction lender for the Project will be:
Obligations of the Owner:
The Owner agrees to furnish or approve, in a timely manner, information required by the
Contractor and to make payments to the Contractor in accordance with the requirements of this
Agreement.
Dispute Resolution:
Claims, disputes or other matters in question between the parties to this Agreement shall be
resolved by mediation or by arbitration. Prior to arbitration, the parties shall endeavor to reach
settlement by mediation.
Page 2 of 5
i
s�
2. Contract Sum
Cost of Work:
The Contractor shall provide a detailed estimated Cost of Work to the Owner(see Exhibit A). The
sum of these costs, including the fee is as shown below:
$ 126,846.50
Change Orders:
The Contractor does not guarantee the Contract Sum in any form. In the event of changes to the
Contract Sum, the Contractor will present written changes to the owner for costs that exceed the
Contract Sum in the form of a Change Order. The Contractor will review all Subcontractor Change
Orders before submittal to the Owner and Architect and make a recommendation for payment or
non-payment. The Contractor's Fee will be calculated including any approved Change Orders.
The Owner, Architect and Contractor will negotiate disputed Change Orders in good faith.
Contractor's Fee:
10% of total construction volume. This includes pre-construction and project management
services, and field personnel and associated management overhead.
The fee is based on actual costs incurred, with final true up, and is billed monthly in arrears. Total
Construction Volume excludes permits and fees, which shall be paid directly by the Owner.
Construction management labor, standard tools and equipment, and labor-related overhead are
covered within the fee. Specialty tools or equipment and any trade labor supplied by J&K
personnel shall be charged separately.
If a project is terminated or suspended by the Owner prior to completion, J&K shall be
compensated for the actual cost of services provided prior to receipt of notice of termination or
suspension from the Owner.
Subcontractors:
The Contractor plans to hire Subcontractors to perform the majority of construction associated with
this project. The Contractor shall provide the Owner and Architect information on all of the bids
received by Subcontractors and the names of the Subcontractors selected. Owner shall have the
right to reject a proposed Subcontractor; however, in the event that this leads to a higher Cost of
Work, the Owner shall pay for the difference. The Contractor reserves the right to reject any
Subcontractor, even if it is the lowest bid, and to dismiss Subcontractors from the job that have
been previously approved by the Owner.
Payments:
The Owner shall make progress payments on the Contract Sum according to the Requisition
process described below.
The Contractor shall, at the conclusion of each calendar month on the project, present to the
Owner an application for payment(Requisition) for costs incurred during that month. The
Requisition shall include all invoices, vouchers, partial releases of liens, expense reports, and any
other evidence to support the validity of the Requisition amount. The Contractor may requisition
for completed, but unpaid work based on an expectation of payment upon receipt of funds. The
Owner, the Architect, or their representatives shall be afforded five (5) business days to review
such application and question the Contractor about its contents. In the event there are no
disputes, the Owner shall pay the Contractor within 10 business days of receipt of the Requisition.
Payment by the Owner does not represent that the Owner or Architect have made a detailed
examination of the documentation, inspection of the work, or verification of the accounting.
Page 3 of 5
a
At the completion of the project, the Owner shall make a final payment to the Contractor based on
a final Cost of Work with a truing up of fees. If further corrections to work are required that are not
covered under warranties with Subcontractors, or that are not the outcome of negligence or poor
workmanship by the Contractor, the Owner shall pay the Contractor for any work associated with
performing the corrections based on the hourly rate agreed to in this contract.
Retainage:
The Owner shall not hold back any fees to the Contractor to ensure completion of the work. The
Contractor will be expected to hold back fees from Subcontractors to ensure their performance
based on the terms below:
10%of billed costs, uniess otherwise approved'b the Owner
Termination of Contract:
The Owner shall reserve the right to terminate or suspend the Contract at its sole discretion.
Within 15 days of termination or suspension, the Contractor shall present an accounting of all its
costs incurred for reimbursement by the Owner. If the Owner elects to proceed with the project
without the Contractor, the Owner shall have the right to assume the Subcontracts and
agreements related to the Project.
3. Project Schedule
Date of Commencement:
The Contract Time shall be measured from the date of commencement. The date of
commencement of the Work shall be the date of this Agreement, unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
December 15, 2014 or such time that Notification td Proceed is&en by Owner
Contract Time:
The Contractor shall provide to the Owner a Project Schedule (see Exhibit B). This Schedule is
based on assumptions reached prior to the signing of this contract, which assumptions the
Contractor shall attempt to clarify in the Schedule. However, the Schedule always assumes the
Owner and the Architect respond promptly to requests for information and do not request any
significant changes to the construction program. In the event that the Owner or Architect find any
discrepancies with the Schedule or its Assumptions, they will promptly notify the Contractor, who
shall make adjustments to the Schedule as necessary.
According to the attached Schedule, the Contractor shall achieve Substantial Completion of the
entire Work as follows:
Date of Substantial Com letion to be no later than May 15;201
The Contractor does not guarantee the date of completion. However, the Contractor shall not be
entitled to additional fees based on delays in the project unless those delays can be shown to
incur extra costs for the Contractor and were caused by the actions or requests of the Owner or
Architect.
The Contractor shall present an updated Project Schedule to the Owner and Architect on a weekly
basis for their review.
Page 4 of 5
4. Signatures
The Owner's representative is:
DavidSte nbergh,,Manager
GILL
j171valoo Street, SUIte 100
5omerviile, MA,0'2143
§ 14.4 The Contractor's representative is:
Miran When
�rinc&
ipall
K Contracfm j LL CLL C
S1 Richmond Sheet
I'Veymouth,.R 02188'.
This agreement is entered into as of the day and year first written above and is executed in at
least three original copies, one for the Owner, one for the Contractor, and one for the Architect.
Owner Contractor
Sig ature Signature
Printed Name and Title( Printed Name and Title
I
�I
Page 5 of 5
. r
JK Contracting LLC Proposal
31 Richmond Street
Weymouth, MA 02188
Proposal Date: 12/11/2014
Proposal#: 86
Project:
Bill To:
David Steinbergh
MVLC,4 High St,
N.Andover, MA 01845
Description Est. Hours/Qty. Rate Total
Plans and Permits 1,700.00 1,700.00
Demo 6,000.00 6,000.00
Excavation 1,500.00 1,500.00
Concrete 500.00 500.00
Masonry 500.00 500.00
Frame,Drywall,Tape 14,000.00 14,000.00
Doors&Trim 11,000.00 11,000.00
Plumbing 5,000.00 5,000.00
Electrical &Lighting 12,190.00 12,190.00
Cabinets&Vanities 5,000.00 5,000.00
Floor Coverings 16,000.00 16,000.00
Floor and wall ceramic tile in bathroms 8,000.00 8,000.00
Prime and paint 7,500.00 7,500.00
5,000.00 5,000.00
Sprinkler 1,650.00 1,650.00
Heating &Cooling 19,775.00 19,775.00
Supervision 11,531.50 11,531.50
Thank you for the opportunity to bid this work. Total $126,846.50