Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #195-15 - 409 BLUE RIDGE ROAD 8/25/2014
NORTH BUILDING PERMIT of LED , qq. 32 5 `j' "6',6 0 TOWN OF NORTH ANDOVER o APPLICATION FOR PLAN EXAMINATION ' Permit No#: ' Date Received �gS0ArEv ACHus���� Date Issued: ZS IP RTANT: Applicant must complete all items on this page LOCATION lzl2 .f Print PROPERTY OWNER Se-ojT 4AM M a"o �-- Print 100 Year Structure yes nno MAP PARCEL:_ZONING DISTRICT: Historic District yes Machine Shop Village yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ?f One family ❑Addition ❑Two or more family ❑ Industrial Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District ❑Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: ,��o v/� ���i�it.T Pte- P�� � Ca�T►2%�t�iT' Identification- Please Type or Print Clearly OWNER: Name: Sc--'R HA,MM o QD Phone: 78►- 31S -,2 Address: Hv� j3LV ��� i?�. �V-,Lt�\ �/uD1vGtr T? oP,:f Contractor Name: Phone: 27 f rZ l Address: 2ATJ S'U'IN 1-1?Ce 9-V /V V:& &,Qovw— !0 01Nlf— Supervisor's Construction License: CSC /oS-0 Exp. Date:T�z/ Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ ST0 FEE: $ Check No.: Receipt No.: �_ NOTE: Person contracting with�unr gistered contractors do not have access to the guaranty fund Signature of Agent/Owner _ Signature of contractor Location v , I No. Date gSn dq • - TOWN OF NORTH ANE OVER Certificate of Occupancy $ Building/Frame Permit Fee $ �— Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check# '' uil ing Inspector Plans Submitted ❑ Plans Waived Certified Plot Plan ❑ Stamped Plans ❑ _T_YP_E_OESEWER A AGF,DI.SEOS.AL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swinuning Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature n COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) ❑ Notified for pickup Call Email Date Time Contact Name Doc.Building Pennit Revised 2014 Building Department The following is a list of the required forms to be filled-out-for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C: And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe:Building Permit Revised 2014 I Enter construction cost for fee cal - North Andover Fee Calcination Construction Cost $ X500.00 m $ - $ 438.00 Plumbing Fee $ 54.75 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 54.75 Total fees collected $ 647.50 Foundation 100 409 Blue RIDGE Road 195-15 on 8/25/14 Finish Basement TMK Remodeling 214 Sutton Hill Rd Contract CSL 105086 North Andover MA 01845 Hammond 409—Blue—Ridge—Basement—R2 HIC 165887 978 852-4491 RRP LR000106 www.tmkremodeling.com CONTRACTOR AGREEMENT THIS AGREEMENT made this A,,A 4.1 2011A by and between Theodore Kelley dba TMK Remodeling, Construction Supervisor License#105086,214 Sutton Hill Rd, North Andover MA 01845 hereinafter called the Contractor, and Scott&Sarah Hammond hereinafter called the Owner. WITNESSETH,that the Contractor and the Owner for the consideration named herein agree as follows: ARTICLE 1.SCOPE OF THE WORK The Contractor shall perform all of the work described in the specifications entitled Exhibit A—Statement of Work,as annexed hereto as it pertains to work to be performed on property located at 409 Blue Ridge Rd North Andover MA 01845. ARTICLE 2.TIME OF COMPLETION The work to be performed under this Contract shall be commenced on or before August 25,2014 and shall be substantially completed on or before October 03,2014. ARTICLE 3.THE CONTRACT PRICE The owner shall pay the Contractor for the labor and materials to be performed and supplied under the Contract the estimated sum of Thirty Six Thousand Five Hundred Dollars and No Cents($36,500.00),subject to additions and deductions pursuant to authorized change orders. The contract price includes two components; Fixed cost of Thirty Four Thousand Eight Hundred Twenty Dollars and No Cents($34,820.00)for the building materials and construction labor as specified in Exhibit A. Variable cost of One Thousand Six Hundred Eighty Dollars and No Cents($1,680.00)for the allowance items in Exhibit A Allowances and will be 110%of the actual invoice price paid by the Contractor to his suppliers. Exhibit A lists the allowance items and budget costs the Contractor will purchase for the Owner. Contractor will furnish and install all building materials,fixtures and finish items unless noted otherwise. ARTICLE 4. PROGRESS PAYMENTS Payments of the Contract price shall be paid in the following manner from the Owner to the Contractor: 33% upon contract acceptance and signature; $12,166.67 33% upon rough building inspection;$12,166.67 33% upon final building inspection and owner sign-off; $10,486.67 plus the actual contract price for allowance items as defined in Article 3. The contract cost for mutually agreed to change orders will be paid 50%at time of change order signature and 50%after completion and owner sign-off. ARTICLE 5.GENERAL PROVISIONS 1.All work shall be completed in a workmanship like manner and in compliance with all building codes and other applicable laws. 2.To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 3. Contractor may at its discretion engage subcontractors to perform work hereunder, provided Contractor shall fully pay said subcontractor and in all instances remain responsible for the proper completion of this Contract. Copyright TMK Remodeling 2014 Initials AR 'k.,0',(l'1 All Rights Reserved Page 1 TALK Remodeling 214 Sutton Hill Rd Contract CSL 105086 North Andover MA 01845 Hammond 409_Blue_Ridge_Basement_R2 HIC 165887 9788524491 RRP LR000106 www.tmkremodeling.com 4.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due. 5.All change orders shall be in writing and signed by both Owner and Contractor. The cost for mutually agreed to additional work, required due to unknown conditions or substantive change orders,will based on the current bill rates for the actual time used.Additional materials will be billed at contractor cost.All change 9 orders subject to 10%markup for overhead. 6. Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees and subcontractors. 7. Contractor shall at its own expense obtain all permits necessary for the work to be performed. 8. Contractor agrees to place all debris in an on-site trash receptacle(dumpster)and leave the premises in broom clean condition. 9. In the event Owner shall fail to pay any periodic or installment payment due hereunder, Contractor may cease work without breach pending payment or resolution of any dispute. 10. The Contractor and the Owner hereby mutually agree in advance that in the event that the Contractor and Owner has a dispute concerning this contract,the Contractor may submit such dispute to a private arbitration service which has been approved by the Office of Consumer Affairs and Business Regulation and the Contractor and Owner shall be required to submit to such arbitration as provided in MGL c 142A. 11. Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials,or inclement weather. 12. Contractor warrants all work for a period of 12 months following completion. 13. Contractor may post small signage(18x24")on property advertising services during the duration of the project. 14. The Contractor and subcontractors shall be registered and any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza, Suite 5170 Boston, MA 02116 Phone: (617)973-8700 15. The Contractor or Owner may terminate this contract at any time for any reason by giving 3 days notice in writing to the other party. If either party terminates the contract as provided herein,the contractor will be paid a fair payment for work(labor and materials)completed as of the date of termination plus any materials or equipment that are special ordered and not delivered. Fair payment is defined as actual ' c f h P PY job costs for e project plus 10%overhead charge. The Contractor will refund any funds paid by the Owner that are a remaining balance for the labor and materials used as of the date of termination plus any materials or equipment that are backordered and not delivered. The contractor will provide a written report detailing actual job costs plus overhead for payment or refund. The Contractor will make arrangements for the special ordered items to be delivered to the Owner. The Owner is responsible for any restock fees for returned materials or fees related to special orders or canceled orders. Copyright TMK Remodeling 2014 Initials ��(y�(i6�C I' All Rights Reserved Page 2 TMK Remodeling 214 Sutton Hill Rd Contract CSL 105086 North Andover MA 01845 Hammond-409 Blue—Ridge—Basement—R2 HIC 165887 978 852-4491 RRP LR000106 www.tmkremodeling.com ARTICLE 6.OTHER TERMS ARTICLE 7.ACCEPTANCE Signed this'y�day of .&uwVT- , 20A. Owner Co tractor 7% NOTICE: The signatures of parties above apply only to the agreement of the parties to alternate dispute resolution initiated by the c tractor. The owner may initiate alternative dispute resolution even where this section is not signed separately by the parties. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES Copyright TMK Remodeling 2014 Initials All Rights Reserved Page 3 TMK Remodeling 214 Sutton Hill Rd Exhibit A- Statement of Work CSL 165086 North Andover MA 01845 Hammond 409_Blue_Ridge_Basement_R2 HIC 165887 978 852-4491 RRP LR000106 www.tmkremodeling.com To: Scott&Sarah Hammond scotthammond(aamail.com 409 Blue Ridge Rd North Andover MA 01845 781315-2804 Estimate Date: 7/18/2014 Revision: 2 Exhibit A-Statement of Work Ground Floor fit out to finished space approx 658 SF. Construct 163 LF of partitions. Install 7 doors w/frames and trim. Install finished floors and ceilings. Install electrical.fixtures and devices. Install slop sink on new vent and ejection tank. Install built-in shleving. 1.00 Planning&Design 1.01 Construction Drawings for building permit application. 1.02 A-1 Construction Plan 1.03 F-1 Finish Plan 1.04 E-1 Electrical Plan 1.05 2.00 Demolition 2.01 All construction debris to be removed to be placed in dumpster on-site. 2.02 2.03 2.04 3.00 Construction 3.01 Construction Rough In 3.02 Frame 44 LF of Partition Type 1 STD 3.03 Frame 128 LF of Partition Type 3 STD 3.04 Frame 6 RO for doors per schedule STD 3.05 3.06 Rough Building Inspection. 3.07 Construction Finish 3.08 Install 7 Doors,frames and trim per schedule STD 3.09 Install wall finishes per schedule STD 3.10 Install finished floors per schedule STD 3.11 Install finished ceilings per schedule STD 3.12 Painted Concrete floor(approx 404 SF) Fabricate and install 4 levels of built-in shelving in closet 3.13 Final Building Inspection. 4.00 HVAC 4.01 HVAC Rough In 4.02 _NAA_ It E LAU Are- r►-vd 7�N4 4.03 e kF' Vi �Ac.-1 �iO6 n� w j 0 Ni_ OTUP-i A 11Z 4.04 HVAC Finish C 41 4.05 IVA. %NSiAl.L Cp�uzcS 4.06 Copyright©TMK Remodeling All Rights Reserved Page 4 Unlawful to distribute without permission TMK Remodeling 214 Sutton Hill Rd Exhibit A - Statement of Work CSL 105086 North Andover MA 01845 � Hammond 409 Blue_Ridge_Basement R2 HIC 165887 978 852-4491 RRP LR000106 www.tmkremodeling.com 5.00 Electrical 5.01 Electrical Rough In 5.02 Install boxes and wires for 12 receptacles STD 5.03 Install boxes and wires for 16 recessd light fixtures STD 5.04 Install boxes and wires for 4 surface mounted light fixtures STD Install boxes and wires for 3 coax and hdmi connections STD 5.05 Rough Electrical Inspection 5.06 Electrical Finish 5.07 Install all fixtures,devices and trims. 5.08 Final Electrical Inspection. 6.00 Plumbing 6.01 Plumbing Rough In 6.02 Install vent, supply,waste line and ejection tank for slop sink 6.03 Note:Vent will be tied into first floor powder room sink vanity wall. Wall will be repaired and painted. 6.04 Rough Plumbing Inspection. 6.05 Plumbing Finish 6.06 Install slop sink,faucet and ejection tank 6.07 Final Plumbing Inspection. 7.00 Allowances 7.01 Carpet&Pad 560 SF @ 3/SF 1680 7.02 Allowances Total 1680 8.00 Permits&Inspections 8.01 Building 444 8.02 Electrical 90 8.03 Plumbing 55 8.04 8.05 9.00 Pricing: 9.01 Planning&Design $ 380 9.02 Demolition $ _ 9.03 Construction $ 1,900 9.04 HVAC $ 1,800 9.05 Electrical $ _ 9.06 Plumbing $ 1,380 9.07 Allowances $ 1,680 9.08 Building Materials $ 546 9.09 Standard Costs $ 24,407 9.10 Permits&Inspections $ 589 9.11 Dumpster/Disposal $ 500 9.12 Overhead $ 3,318 9.131 Total $ 36,500 Owner Approval: Date: 9, Lr/ Contractor Approval: IJ64'�- Date: Copyright©TMK Remodeling All Rights Reserved Page 5 Unlawful to distribute without permission ne Commonwealth ofHamehuseUs - be�r���nen�o,f.Inc��c,�s�ic�l.Accitlen�� • . O.flee of.Investigafeons 600 Washington Street Boston,.tom 02111 Mpip-mass gov1dia Wgrkeyoi CoinpexwationbsivanceAffidavit: °'u aerolConti-acfors)FIectr elansl�Z*bero ,APPReant Worcm.a-don Please.Print Leobly . ' �O�a�e(BasinesstOrganizationndvduaD , Address: U /9L'ate,171 : /V e "O GCe— M+ Phone : ??yy"1�Z Are orx 2n employer?C�.eekthe appropxiateloox: Type of project(required.): 1. I am a employer with 4. U Z am a general contractor and I 6. []New constrimtion f Xemployees(.LUM(V0xpa1ttime}.T have liiredthe sub-contractors 2.E1 I am a sole proprietor or pari[er listed on the attached sheet� I. El Remodeling ` These mh-contractorshave 8. rlmmouon ship andlava worldug, forma in any capacity. workers'comp.insurance. 9, ❑Building addition. [No worT�exs'comp.ansuxance 5. ❑We are a corporation and its 1011 Blectricalrepairs or additions required.] officers have exerelseatherr right of e�em tion exMGL 11..[]I'lumbingrepaixs or additions 3.[] I am a homeowner doing allwork g p p MyseL.[No workers'comp. c.152,§1(4),and.wehaven.o 12.PX9ofrePalr8 insuraucare ed.]i employees.[No workers' aE l Other comp.insurance required•] MWapplicantt]iazchecks box Zmusialso;?Ilouithesectionbel6wshowingthekworkers'compmsationpolicyinformation. Someownerswlho submitthisaffidavitindicatingiheyatedoingallworXandthen hire outside contractors musesubmitanew affidavit indicatingsuch, TCoatcacfors that checktbh bog must attached anadditionalsheet showingthelame of the sub.-contractors andthokworkers'comp.policy information. _Taman ernjl�oyePthcCL`Z5`pYaviC�ilZgl o��GeP�*coPnpellyagon,j suPll7ZcefoYTnyeXl2prayee5 $Era}ViSihe�laZicytt72llJob si�`e inf4mation. Insurance CompanyName�/ Policy#or Sela"•ins.-MG.# 5VO 1 7 Expiration Date: l'ob Sita Addres,9' Attaell a copy o#t�eworkers'comp ensationTolzcy declaxatiom page(showing•the policy nuamlaer and exppiratloa crate). Failure to secures covexage as requixedunder Section ofMGL o.152 cart lead to the impositionn,of criminalpmalties of a f e up to$1,500.00 and/or ones-year hnvd.90nment,as well-Rs"Penalties ia the foam of a STOP WORK ORDER and a fins ofup to$250.00 a day against tl7 e violator: Ba advised that a copy of this statement maybe forwarded to the Office of Investigations of the DSA.for insurance coverage verification. do hereby ceYtEfy uricie tlieccxtcipenczXties afpepjPry t at Erie' ortatiox�pYoviciec�move is true and coz eek. Si afore: . Date; Z• / I'htone#: J offacicd use ogy. .Do not V410At Aiis afea,to die coxrcp"Od by c%ty or town 0 leial: City or Town: PerxnMicense 9 Issuing.Axttliaritgr(circle omo): 1.Board offfealth 2.BuildingDepartmend 3.CitylTowaa Clerk 4.Electrical Inspector S.J°XurrabingJfnspector f.Other - ~ ~ CL � OPEN �o 4 OPEN ACr New slop sink w/ 2 z :W AFF ejection tank 3 __GYP_______ 2 __i_______'. 1 , wFl 2 - - - ------------------- -------- Up 7 -------------- --- 3 ACT p Cr GYP $"AFF 1 M"AFF 1 M ------------------ Z 3 8^ O 5T3 Built-in shelves,3:"sanded birch plywood,screen mold edge on 1 x 4 cleat Hammond Residence 409 Blue Ridge Rd SIZE FSCM NO DWG NO REV North Andover MA 01845 TMK Remodeling DRAWN TMK SK-2-Ground Floor Layout 3 214 Sutton Hill Rd North Andover MA 01845 978 852-4491 ISSUED June 29,2014 SCALE 1/8"=1'-0" ©Copyright TMK Remodeling SHEET 3 OF 3 CS LIC#105086 0 Copyright TMK Remodeling All Rights Reserved Unlawful to distribute without permission 38'-0" 22'-0" 17'-0" 3'-5" f,!:e�%r�i'//'•!/,,..'/,f//.'lfl F..I.i;/r,� r''1r':ri;r j' ZD '!/r+'•:•rr,f,,{, /;'/�Jf/'f✓j'%/,.:'f`f}f!'r` fr%'+j'rr;f;.,.�,r.�. ////''•`/r'//t,rr/:!`r'f,r rJ ''`f`�', '`/'f r,/'/:!f'fr'�rr,�/ M r f r! '!r'r r, f r/r/rr r' �, -f t �j',F//ri fj` /r'r }f:�r!//�!/ //�,,.``f�.`/`/,.`ir,:r:`!` ,f/ff/!��`/f •/, .-� .f,`r ,/.:r�f `fff'ir/r rf.��/�f}`f,r'r`r/.ff/f'l///,�1�/"'rrfr'.%r'! �, r �J 'J 'f •r:'rrf/,I r f fr f: /'/f%/.r!f/„ff.r r / r f'//Jr: .r.!/ f �!,rr' /�' 'r'' {r'./l./•'f! / t ' r f / ,fi':I //�r�.`rfrf'f. ,!/•fJ/`F fr :�'`r/{':�''i.':rrf` f !`//f%.,r'r'f�,,t £/ ,!``r•,�.r:!`r` /'/'''fr ` !/r'' . ! /!f ,.`•/% f. '` rr'r' r/r'if ref '`.f`•/'''/■' `'. ---- -- ------ — ' ',�/" '/ ' f/r,[�r/��';/f •',!/•''r,/! ,i/i''// rrr`,r/` r;� .ti.•/ '/':r f•;f`/ f,r / /�f�� !f/f'f;/f/'i ffr /rF i/ rf ! f r f1'r / 'r f f /! // /I ! %/r !/ r!/% �i 'fes f;/•./M-- Main supply and f ! /. te return air ducts a HVAC '/ '/'_%'{ -1�/!•! ' ,/ /r 11�l •� �+'f,•'' r_ ri'.'_ �f 1 —�-- -- — — LVL BEAM AFF N ;r'r,' '%'rP. ;!'i;r'rl ! .++,r/.' '` / J!f//' f r r•. / o .A/f r{' , .r':.%//, .'://,1: r !rf/ /r• :// f /!./r / r' /,ji.r :l;` ' / Ff ! jr r ,• :'/r•`r:/ //' Ceiling Height is �' , /'f,r rrlf r ,• //rfF''r`r.'r': ,r'//f ! '''f r%jfr�`lf:! /!r'r;Fr',•`' ilr AFF to bottom of joist r;!'!�'r, f r �f f,rr:• r r`'f.'//!'''/+ r' % r'£.f f� f r,r f'/ ,r ,/�,/`_a/f'`f f 'J'{:;/�//�'/f!rrf' f'f /'.i�,.,.:'•i`.r ! ,,l, �/!' t rrf/,.!//;1,/%t,,�• i`'�f.f, /lr� ,, f r .:, r'.s''r"i:!f',.r',.. r :•: : iV 13'-0" 10'-4" Hammond Residence 409 Blue Ridge Rd SIZE FSCM NO DWG NO REV North Andover MA 01845 TMK Remodeling DRAWNTMK E-1—Existing Ground Floor Plan 3 214 Sutton Hill Rd North Andover MA 01845 978 852-4491 ISSUED June 29,2014 SCALE 1/8"=1'-0" ©Copyright TMK Remodeling SHEET 1 OF 3 CS LIC#105086 ®Copyright TMK Remodeling All Rights Reserved Unlawful to distribute without permission 38'-0" 22'-0" 17'-0" T-5" ZD - : r Storage - r�r'�'��f `�` ''?%'•/'�;'./f�/{/r{�•%i' '%'f''„'`£/�/,,/.,�',r'�;�,'';/`j'fr f ;flf - ti � /' •{ : { �f;!` 'i,i { ,if%ff , `•j• r! ' 235 sq;:ft / `// / ,• :19 fi •; 16'o"/• ,, •f { r•fr` '• /rf{•. J`1'. �.� ,r•r /` {fr,/,{f:�f� f1�/! fIr'�/ .•/,r' '{rr� ff f - - - - - _ _ � utility./// i f�j •/ /JJfr .'f `rf/ •'/ - r•r 't. /�`. 9r • f ,4"Sq'ftirr { r,rl'f/rf r/, f/ {,, /, ,/`f rrfr• /r ,{ rrr, 4 ' /• • {/rr r /J /{'!• •/'/f � 1Y}1,1�(rKC�0;4T1/,rrr" • / .orf rhe • • f{',:r fY.'rf. co r •frfj/ r. {f�n N OPN N 1,15 ft { r. ' ;j,`/ . ,r f'' ; 'f f, `'r/;f/''/' 'i'r•. •�f{i�Z22'-912" rr •/.f/fr/_ Closet 6 s ft. • C o et//•t 4 q' iV 13 sq. ft. 13'-0” 10'-4" Hammond Residence 409 Blue Ridge Rd North Andover MA 01845 SIZE FSCM NO DWG NO REV TNM Remodeling DRAWN TMK SK-1 -Ground Floor Block Diagram 3 214 Sutton Hill Rd North Andover MA 1845 978 852-4491 ISSUED June 29,2014 1 SCALE 1/8"=1'-0" ©Copyright TMK Remodeling SHEET 20173 C5 LIC 4105086 0 Copyright TMK Remodeling All Rights Reserved Unlawful to distribute without permission NORTH own Of 2 t E : ndover o - TO No. '-T yah ver, Mass, 1 [OC LAKI - 4- KEwKw �1' S U BOARD OF HEALTH Food/Kitchen PERMIT T LD Septic System THIS CERTIFIES THAT ....................... BUILDING INSPECTOR . . . . . . ..... ..... .. .. A Foundation has permission to erect .......................... buildings on ..... .. � ... 1. ... . !` .. p. Rough j y� g t0 be occupied as ... ...M ....1.... �.... ... .........�............. .. ......... ..................... Chimney provided that the persori�ccepting this permits all in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR Rough VIOLATION of the Zoning or Building Regulations Voids thiser it. Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTIO ST TS Rough Service ................ .. .. ......... ...:.................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det.