Loading...
HomeMy WebLinkAboutBuilding Permit #575-13 - 45 KEYES WAY 5/1/2018 NORTH q BUILDING PERMIT .�.; TOWN OF NORTH ANDOVER 0 0 APPLICATION FOR PLAN EXAMINATION Permit NO: J3 Date Received Date Issued: �9SSrep A IMPORTANT:Applicant must complete all items on this page LOCATION L( S !CG V( s hIdLi Print PROPERTY OWNER_ (~y A vr7c5 Print MAP NO: PARCEL2Y2FONING DISTRICT: Historic District yes n. Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building IN One family ❑Addition ❑Two or more family ❑ Industrial 9Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑ Well ❑ Floodplain, ❑Wetlands ❑ Watershed District ❑Water/Sewer Zhs�u 1 39 duvre1r at, a232�C r2:e r'_xl'r/-;J4T Lives. d'e- i F1 fc.,-cootlee f e e{ Identification Please Type or Print Clearly) OWNER: Name: / a&rry 4 ,yre,s Phone: 781-30 -o2-go Address: Ll � CONTRACTOR Name: 9-7 t-zis-z3SR Phone: 7TH-zz(-o,?,[s O ri lir r (/OV b Address: 2H •S-- - I d i c4ell by vo u r,ti Supervisor's Construction License: Exp. ate: gzs y� � 51/1-3 Home Improvement License: Exp. Date: 5 ARCHITECT/ENGINEER 7rcy LeIco Phone: 51l1 -79Y - cf[Scf Address: i S5 /►! -. Re &e Ave— rg -d 6 R 477ot Reg. No. CI52 5 6 FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ 5, Ooo FEE: $ Check No.:_ / (� Receipt No.: Q _ NOTE: Persons contra ting with unregistered contractors do not have ac ess to the guaranty fund Signature of Ag,pnt/Owner Sc e Cvw� _Signature of contractor /j/� TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received Date Issued: IMPORTANT:Applicant must complete all items on this page L-OCATION'. PROPERTY OWNER Print 100 Year:Old`Structure yes-. no MAP NO' PARCELZONING'D:ISaTRICT: Historic District yes no. - _ Machine:Shop Village yes. no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other Septic ❑Well' ❑ Floodplain ❑Wetlands. ❑. Watershed',District El Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: .CONTRACTOR Name.: _ Phone: Address: . - Supervi or's'Construction License: Exp. Date: Home Improvement'License: Exp. Date:_ ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of A' ent/Owiiert Si nature�of�contractor�i _ Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ i Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ i COMMENTS CONSERVATION Reviewed on Signature } COMMENTS I HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sevier Connection/Signature& Date Driveway Permit DPW Tow, Engineer: Signature: Located 384 Osgood Street FIRE'DEPARTMFNT -.Temp Dumpster on site yes no I Located at'124 MainStreet Fire Departmerif signature/date" COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANCER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ® Notified for pickup - Date Doc.Building Permit Revised 2010 Building Department r The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application o Workers Comp Affidavit o Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract o Floor Plan Or Proposed Interior Work o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application ❑ Certified Surveyed Plot Plan a Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application o Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses Li Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) j o Copy of Contract ❑ Mass check Energy Compliance Report o Engineering Affidavits for Engineered products 4 NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording � must be submated with the building application I Doc: Doc.Bui?ding Permit Revised 2012 I I I / ECLIPSE ENGINEERINGINC. 421 W. RNERSIDE AVE, STE 71.7 PH: (509) 921-7731 SPOKANE, WA 99201 FAX: (509 921-5704 WWW. ECLI PSE = ENGI NEERL. NG . 00M Structural Memorandum #1 Date: May 8, 2013 Project: Ayers Residence—Project#018200 45 Keyes Way North Andover, MA 01845 To: Brad Taylor r Solar City, Inc. 3055 Clearview Way `' OYES` F San Mateo,CA 94402 H0.43256 5 / 13 From: SushilShenoy, E.I.T., LEED AP BD+C AL Re: As-Built Letter Brad, As requested we have reviewed your construction pictures for the above noted residence. The purpose of our review of these pictures was to verify that the basic design intent was achieved based on the original design scope. From the pictures we were able to verify that the basic layout and installation methods were consistent with our structural letter dated February 9th, 2013. Please call with any specific questions associated with this project. Thank you for this opportunity to provide structural services. Sincerely, ; Digitally signed by Troy E.Leistiko - _ ON:O="VeriSign,Inc.",OU=VeriSign Trust Network, OU="www.verisign.com/repository/RPA Incorp.by I. Ref.;LIAB.LTD(c)98",OU=Persona Not Validated, TroE. Leistiko OU=Digital ID Class 1-Microsoft Full Service, Y CWTroy E.Leistiko,E=troy)@eeimt.com Sushil Shenoy, E.I.T. Reason;lagree tothe terms defined bythe placement of my signature in this document Location: 'Dale:2013/05/08 13:20a7-0700' i END OF STRUCTURAL MEMORANDUM #1 Q ECLIPSE ENGINEERING INC. 421 W. RIVERSIDE AVE, STE_717 PH: (509) 921-7731 SPOKANE, WA 99201 FAX:: (509 921-5704 WWW. ECLI PSE - ENGINEERLNG . 00M. Structural Memorandum #1 Date: May 8, 2013 Project: Ayers Residence—Project#018200 45 Keyes Way North Andover, MA 01845 To: Brad Taylor , Solar City, Inc. .� 3055 Clearview Way `' OYe San Mateo, CA 94402 GiVll NO.4321iti 5 / 13 From: Sushil Shenoy, E.I.T., LEED AP BD+C /oMAt E� Re: As-Built Letter Brad, As requested we have reviewed your construction pictures for the above noted residence. The purpose of our review of these pictures was to verify that the basic design intent was achieved based on the original design scope. From the pictures we were able to verify that the basic layout and installation methods were consistent with our structural letter dated February 91h, 2013. Please call with any specific questions associated with this project. Thank you for this opportunity.to provide structural services. Sincerely, Digitally signed by Troy E.Leistiko DN:0="VeriSign,Inc.",OU=VeriSign Trust Network, OU="www.verisign.com/repository/RPA Incorp.by Ref.,LIAI3.LTD(c)98",OU=Persona Not Validated, Tro E. L2I$tlk0 OU=Digital ID Class 1-Microsoft Full Service, y CN=Troy E.Leistiko,E=troyl@eeimt.com Sushil Shenoy, E.I.T. Reason:I agree to the terms defined by the placement of my signature in this document Location: - Date:2013/05/08 13:20:17-07'00' END OF STRUCTURAL MEMORANDUM #1 o ► 0 15 �'�13 l � �e E ECLIPSE ENGINEERING INC. 421 W. RIVERSIDE AVE, STE 717 PH: (509) 921-7731 SPOKANE, WA 99201 FAX: (509 921-5704 WWW. ECLI PSE - ENGI N EERING . 00M Structural Memorandum #1 Date: May 8, 2013 Project: Ayers Residence—Project#018200 45 Keyes Way North Andover, MA 01845 To: Brad Taylor 4 Solar City, Inc. �� 3055 Clearview Way OYE. T San Mateo,CA 94402 CMLNo.43258 5 / 13 From: Sushil Shenoy, E.I.T., LEED AP BD+C 0ra4� KarAll Re: As-Built Letter Brad, As requested we have reviewed your construction pictures for the above noted residence. The purpose of our review of these pictures was to verify that the basic design intent was achieved based on the original design scope. From the pictures we were able to verify that the basic layout and installation methods were consistent with our structural letter dated February 9th, 2013. Please call with any specific questions associated with this project. Thank you for this opportunity to provide structural services. Sincerely, Digitally signed by Troy E.Leistiko DN:0="VeriSign,Inc.",OU=VeriSign Trust Network, OU="www.vedsign.com/repository/RPA Incorp.by Ref.,LIAB.LTD(c)98",OU=Persona Not Validated, Tro E. Leistiko OU=Digital ID Class 1-Microsoft Full Service, Y CN=Troy E.Leistiko,E=troy)@eeimt.com Sushil Shenoy, E.I.T. Reason:I agree to the terms defined by the placement of my signature in this document Location: Data:2013/05/08 13:20:17-07'00' END OF STRUCTURAL MEMORANDUM #1 o ► . 0 Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost 35,000.00 m $ - $ 420.00 Plumbing Fee $ 52.50 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 52.50 Total fees collected $ 625.00 45 Keyes Way 575-13 on 2/27/13 Installation of 39 solar electric panels on roof, to be connected to home's electricals stem OORYty Town ofAndover p 0 40 h ver, Mass, COCHICNIWICM 1' pOR ATE 0 S U BOARD OF HEALTH P, E.. RM. IT T L D Food/Kitchen Septic System 4 THIS CERTIFIES THAT ........U*!C!r... ..���............... .................................. BUILDING INSPECTOR �. Foundation has permission to erect.......... ............... buildings on ...........y.r......r.4 A....... . .. ...A....... Rough to be occupied a. ..3q...... S.0 L*f M.....fo ......*.*a............ ................. Chimney provided that the person accepting this permit shall in every respect conform to the terms of application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final all . PERMIT EXPIRES IN 6. MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRU ON RTS Rough Service- ......... ....... .... ........ Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in'a'Conspicuous Place, on the Premises - Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and. Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE r T ABBREVIATIONS ELECTRICAL NOTES INDEX LICENSE JURISDICTION NOTES A AMPERE 1. WHERE ALL TERMINALS OF THE DISCONNECTING PV1 COVER SHEET - ALL WORK SHALL COMPLY WITH AC ALTERNATING CURRENT MEANS MAY BE ENERGIZED IN THE OPEN PV2 SITE PLAN THE MASSACHUSETTS STATE BUILDING BLDG BUILDING POSITION, A SIGN WILL BE PROVIDED WARNING PV3 STRUCTURAL VIEWS CONIC CONCRETE OF THE HAZARDS PER ART. 690.17. PV4 STRUCTURAL VIEWS CODE. 2. EACH UNGROUNDED CONDUCTOR OF THE PV5 THREE LINE DIAGRAM C COMBINER Box - ALL ELECTRICAL WORK SHALL D DISTRIBUTION PANEL MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PV6 ELECTRICAL CALCULATIONS DC DIRECT CURRENT BY PHASE AND SYSTEM PER ART. 210.5. CUTSHEETS ATTACHED COMPLY WITH THE 2011 NEC. EGC EQUIPMENT GROUNDING CONDUCTOR 3. A NATIONALLY—RECOGNIZED TESTING (E) EXISTING LABORATORY SHALL LIST ALL EQUIPMENT IN EMT ELECTRICAL METALLIC TUBING COMPLIANCE WITH ART. 110.3. G SOLAR GUARD METER 4. CIRCUITS OVER 250V TO GROUND SHALL GALV GALVANIZED COMPLY WITH ART. 250.97, 250.92(B) CUTSHEETS ATTACHED GEC GROUNDING ELECTRODE CONDUCTOR 5. DC CONDUCTORS EITHER DO NOT ENTER GND GROUND OR DNCLOSURESARE TORUN THE F RST METALLIC CCESS B ACCESSIBLERACEWAYS GENERAL NOTES HDG HOT DIPPED GALVANIZED I CURRENT DISCONNECTING MEANS PER ART. 690.31(E). 1. THIS SYSTEM IS GRID—INTERTIED VIA A Imp CURRENT AT MAX POWER 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN UL—LISTED POWER—CONDITIONING INVERTER. INVS INVERTERS RELIEF AT ALL ENTRY INTO BOXES AS 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. Isc SHORT CIRCUIT CURRENT REQUIRED BY UL LISTING. 3. PHOTOVOLTAIC SOURCE AND INPUT CIRCUITS kVA KILOVOLT AMPERE 7. MODULE FRAMES SHALL BE GROUNDED AT THE AND INVERTER INPUT CIRCUIT ARE kW KILOWATT UL—LISTED LOCATION PROVIDED BY THE UNGROUNDED. LBW LOAD BEARING WALL MANUFACTURER USING UL LISTED GROUNDING MIN MINIMUM HARDWARE. 4. SOLAR MOUNTING FRAMES ARE TO BE GROUNDED. MIR MIRROR 8. ALL EXPOSED METAL PARTS (MODULE FRAMES, , BOXES, ETC.) SHALL BE GROUNDED USING 5. ALL ELECTRICAL WORK SHALL COMPLY WITH NEW RAIL, THE 2011 NATIONAL ELECTRIC CODE NEC NATIONAL ELECTRIC CODE UL LISTED LAY—IN LUGS LISTED FOR THE 6. DESIGNED IN ACCORDANCE WITH THE 8TH NIC NOT IN CONTRACT PURPOSE. POSTS SHALL BE MADE EDITION OF MA STATE BUILDING CODE. NTS NOT TO SCALE ELECTRICALLY CONTINUOUS WITH ATTACHED OC ON CENTER RAIL. P PANEL BOARD 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE PL PROPERTY LINES BONDED WITH EQUIPMENT GROUND CONDUCTORS PV PHOTOVOLTAIC AND GROUNDED AT THE MAIN ELECTRIC PANEL. VC SUHALLBE SIZEDACCORDINGTO RT POLYVINYL CHLORIDE 10. CI ELECTRODE DDUCTOR SBPANEL VICINITY MAP SCH SCHEDULE 250.166(B) & 690.47. SS STAINLESS STEEL SSD SEE STRUCTURAL DRAWINGS STC STANDARD TESTING CONDITIONS SWH SOLAR WATER HEATER TYP TYPICAL LION UNLESS OTHERWISE NOTED PSpace P>3ce UPS UNINTERRUPTIBLE POWER SUPPLY , r V VOLT 4 Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT Ra W WATT 3R NEMA 3R, RAINTIGHT Ttal'asnrra lV / fm" �ro ,r- �a �piY 5t / ruanao $� REV BY DATE COMMENTS Fql� c CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-01 8200 0 0 PREMISE OWNER AHJ: North Andover DESCRIPTION: DESIGN: AYRES, LARRY DVENE CBENEFIT OF ONTAINED SHALL NOT E USOLARCITY SED FOR THE AYRES RESIDENCE Solarcity. NOR SHLL ITNBENDISCL�INN VMOLE ORCIN aaRES "009) 45 KEYES WAY �PART TO OTHERS OUTSIDE THE RECIPIENTS REST 39 TRINA SOLAR TSM-240PA05 9.12 KW PV Array ORGANIZATION, EXCEPT IN CONNECTION WITH SGT MANAGER: MOUNTING SYSTEM: NORTH ANDOVER, MA 01845 THE SALE AND USE OF THE RESPECTIVE ISC Yeti L—Foot U sl0 a SC ROTI3055 Clearview way San Mateo,CA SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAYMENT TYPE: INVERTER: PAGE NAME: SHEET: REV: DATE 94402 PERMISSION OF SOLARCITY INC. Multiple Inverters 781 308-0280 COVER SHEET PV 1 ( )T:(650)638-1028 F:(650)638-1029 PPA P 12 23 201 888-SOL-CITY(765-2489)www.solarcity.com PITCH: 39 ARRAY PITCH:39 i MP1 AZIMUTH:216 ARRAY AZIMUTH:216 es Way ; TroyMATERIAL:Com Shingle STORY:Two Stori Front Of House Troy e Leistiko PITCH: 39 ARRAY PITCH:39 � defined by the Leistiko I agree to the terms MP2 AZIMUTH:216 ARRAY AZIMUTH:216 placement of my MATERIAL:Com Shingle STORY. Two Stork P.E. - signature in this PITCH:39 ARRAY PITCH:39 document MP3 AZIMUTH:126 ARRAY AZIMUTH: 126 Structural Missoula, MT MATERIAL:Comp Shingle STORY: Two Stork t 45'to PL Only 2013.02.12 14:26:14 t l 1 �4<1N OF �+ T E 0 • �t env i r Cl IL ND. 3V -1— ' /„\ Q r-7 i* AC �a IAL •, , M LEGEND t ' Q (E) UTILITY METER & WARNING LABEL a INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS ° wpe PV4 FD-C-1 DC DISCONNECT & WARNING LABELS 55'to PL B� F © AC DISCONNECT & WARNING LABELS PV3 Q JUNCTION BOX /F F A® ® D019 ® cQ DC COMBINER BOX & WARNING ° M P2 45'to PL DISTRIBUTION PANEL & WARNING Lc LOAD CENTER & WARNING LABELS 40'to PL A PV3 O DEDICATED PV SYSTEM METER CONDUIT RUN ON EXTERIOR -- CONDUIT RUN ON INTERIOR GATE/FENCE C --- INTERIOR EQUIPMENT PV3 SITE PLAN Scale: 1/8" = V i 01' 8' 16' y1 5 CONFIDENTIAL— THE INFORMATION HEREIN q8 NUMBER — Pro"OMER: 411 North Andover OESCRIP110N J8 018200 00 °�' CONTAINED SHALL NOT BE USED FOR THE AYRES, LARRY AYRES RESIDENCE DVENE � i BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MARKET: MODULES: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN REST 39 TRINA SOLAR # TSM-240PA05 45 KEYES WAY 9.12 KW PV Arra SolarQV.PART TO OTHERSTTHE RECIPIENTS IMECTMAMAGER MOUNTING Ste: NORTH ANDOVER, MA 01845yINORGANIZATION, EXCECEPTT IN CONNECTION PATH THE SALE AND USE OF THE RESPECTIVE SC Yeti L-Foot U slo a SC Rail 3055 ClearWew Way San Mateo,ca SOLARCITY EQUIPMENT,MITHOUT THE WRITTEN PAYMENT TYPE: INVERTER PAGE NNE. 9M.. REV: DATE 94402 PEEZirIISSION OF SOLAROTY INC. PPA Multiple Inverters (781) 308-0280 T:(650rrY(76-2 89)w) .solar29 SITE PLAN P V 2 �2/23/201 (888)-SOL-CCfY(765-2489)www.solardry.com I 2x RI B 4' BETWEEN RIDGE BOARD FOOTINGS (STAGGERED) (E) 2x10 RAFTER ® 16' O.C. S1 (E) 2x8 ® 32" O.C. 1'-4" TYP (E) 2x10 CEILING (E) 2x10 RAFTERS - JOIST ® 16" O.C. FRONT VIEW OF MP TYP ® ,6" SPACING I i (E) LBW 1'-2" RAFTER: 200 SUPPORT: 2x10 ''— (E) 2x12 MAX SPAN: 11'-9" RIDGE BOARD SIDE VIEW OF MP2 (E) 2x10 RAFTER (:DC - ® 16" O.C. SCALE: 1/4" = 1' S1 (E) 2x8 ® 32" O.C. SOLAR PANEL INSTALLATION ORDER ATTACHED WITH MODULE NOTE: RAIL TO BE PLACED IN THE UPHILL DIRECTION CLAMPS, —1S BOLTS, LOCATE RAFTER, MARK HOLE ' (1) LOCATION, AND DRILL PILOT AND f" NUT HOLE. (E) 2x10 CEILING SOLARCITY SOLAR BR AIT _ _ _ _ _ — (3) (2) POLYURETHANE SEAL PILOT HOLE WITH SEA ANT. JOIST @ 16" O.C. YETI ( ) (E) COMP. SHINGLE (1)1p (3) INSERT ECOFASTEN FLASHING. (4) PLACE THE LEVELING FOOT. ECOFASTEN FLASHING (E) LBW (2) (5) INSTALL LAG WITH SEALING 1'_2 15'-8" S'A Of (E) ROOF DECKING WASHER. &" DIA LAG BOLT RAFTER: 2x10 OY SUPPORT: 2x10 IVI (2—f EMBED, MIN) (5) MAX SPAN: 15'-8" N 43 6 (E) RAFTER STANDOFF SIDE VIEW OF MP1 gra„ AL S+ Scale: 1 1/2" = 1' CONADENTIAL- THE INFOIW10N HEREIN Job mum8mJ -01 PROM OWNER: W. North Andover DESCRIPTION: DV".. CONTAINED SHALL NOT eE USED FOR THE �0 �� AYRES, LARRY AYRES RESIDENCE DVENE NOR nT(IF IT rn DISCLOSED T IN CIT INC.. MARKET: MODULE& RESI 39 TRINA SOLAR TSM-240PA05 45 KEYES WAY 9.12 KW PV Array PART TO OTHERS OUTSROE THE REaMrs SoiarCity.aRCANlzanaN. Exapr IN CONNECTION N9TH PRQECTMANAGER MOUN SYS NORTH ANDOVER, MA 01845THE SALE AND USE OF THE RESPECnvE SC Yeti L—Foot U slo a SC Roil 3o5s aearview way San Mateo,CA SOLARCITY EQUIPMENT, WITHOUT THE WRnTEN PAYMENT TYPE DIVEItTER PERMISSION of sOLARaTY INC' PPA Multiple Inverters (781) 308-0280 P STRUCTURAL VIEWS APV 3 REV.' D12/23/201 (888)-SOL 1 (E) 2x12 RIDGE BOARD (E) 2x10 RAFTER ® 16" O.C. (E) 2x8 ® 32" O.C. S1 (E) 2x10 CEILING JOIST ® 16" O.C. (E) LBW w OF it RAFTER: 2x10 F SUPPORT. 2x10 N iI JS MAX SPAN: 15'-8" Z 7 8MN AT. D SIDE VIEW OF MP3 SCALE: 1/4" = 1' t J B-018 2 0 0 0 0 PREMISE G AHS North Andover DESIXLPTION. OEM CONFIDENTIAL A THE INFORMATION HEREIN JOB NUMBEk AYRES, LARRY DVENE CONTAINED shat NOT BE USED FOR THE AYRES RESIDENCE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MARKET. MODULES; .�. NOR SHALL IT BE ODISCLOSEDIN wtGLF IN REST 39 TRINA SOLAR TSM-240PA05 45 KEYES WAY 9.12 KW PV Array ��� SolarCity. PART TO OTHERS OUTSIDE 19DE THE RECIPFNrS ORGANIZATION,EXCEPT IN CONNECTION WITH PRQECT MANAGER. MDUNTING SYSTEM; NORTH ANDOVER, MA 01845 THE SALE AND USE OF THE RESPECTIVE SC Yeti L—Foot U Sl0 e / SC Rail 3055 dearview Way San Mateo,CA SOLARCITY EQUIPMENT. WITHOUT THE WRITTEN PAYMENT TYPE INVERTER: PAGE NAME: SHEET.. � OA>E 99402 0)638-1029 PERMISSION OF SOLARCITY INC. PPA Multiple Inverters (781) 308-0280 STRUCTURAL VIEWS PV 4 12/23/201 (888)-SOL-CTY765-2489)1028 Swww.solarcity.com I GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #6 GEC/EGC TO (N) GROUND (E 200A MAIN SERVICE PANEL Inv 1: DC Ungrounded INV 1 -(I)POWER-,ON-&IW ROR 95000-6000 -US LABEL A -39 py MoSdae R 0 TTM 240P 021B2yy PTC, NONNY Silver Frame ROD AT PANEL WITH IRREVERSIBLE CRIMP (E3 200/2P MAIN CIRCUIT BREAKER Inv 2: DC Ungrounded yy Voc: 37.2 BOND TO (E) GROUND ROD Panel Number:g404Omb12OO Tie-In: Supply Side Connection INV 2 -(1)Inve�er 3300 W 240V 96%3.0-OUTD-S-US LABEL B Vpmax:30.4 Meter Number:52 378 960 Underground Service Entrance INV 3 *MODULE CURRENT RATINGS ARE SHOWN AS Isc AND Imp IN THE DC STRINGS IDENTIFIER OF THE SINGLE LINE DIAGRAM. MAIN SERVICE PANEL CUTLER-HAMMER SOLARGUARD Inverter 1 IND (E) WIRING CUTLER-HAMMER BRYANT Disconnect METER . Load Center I DO NOT ADJUST MIN.ACTIVATION VMLTAGE7 Disconnect 6 4 POWER-ONE Dc+A 50A AURORA PVI-6000-OUTD-US DC- 1 Strings)Of 13 OnLA Ll C D 35A/2PEGc----------------- 200A/2P s Lz 1 GFP/GFCI DC* I EI IN DC- 1 2 DO (E) LOADS GND _ -- GND - ---- GND _ _ _ _EGC/ __ ;Dg DC+ NOT ADJUST MIN.ACTIVATION V LTAGE �• , r GEit I C ❑N DC- DC- 1 Strings)Of 14 On MP 1 r----J I w I GND __ EGC -- ----------------------- ----------- - EGC-----------------� I I Z I 1 ♦J (1)Conduit Kit; 3/4'EMT N 1 Inverter 2 PAR I 5 POWER-ONE 1 I AURORA PVI-3.0-OUTD-S-US 1 I 20A/2P GEC I I /ice Ll z4ov -I--f I /'I'� L2 DC+ TO 120/240V I I I N GFP/GFCI DC 3 SINGLE PHASE I I L_ ____ _EGC/ __ DC+ DC+DO NOT ADJUST MIN.ACTNATION V�Q'L'T�A(GGEE UTILITY SERVICE I I GEC 0 DC- DC- 1 String(s)Of 12 On MP 3 I ( , 1 1 /!_I 1 i I I GND __ EGC -------------------------------------- EGC -------_j ------------ I I I I tA�,S UPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. (S1)Ground Rod; 5/8' x W, Copper Q (1)CUTLER-HAMMER#OG222NRO (2)ILSCO/IPC 4/0-#6 Disconnect• 60A, 240Vaacc,�Fusible, NEMA 3RAC DC Insulation Piercing Connector, Main 4/0-4, Tap 6-14 -(1)CUTLER- Ztr&IMER DG10IXN8(1)BRYANT BR816L125RP Groundleutral Kit; 6D-100A, General Duty(DG) # -(1)CUTLER I MER#DS16FK Load Center 125A, 120 240V, NEMA 3R pass R Fuse Kit -(1)CUTLER-HAM�I #BR2 -(2)FERRAZ SHAWMUTT/TR50R PV BACKFEED OCP Breaker, 35A/22P, 2 Spaces-(1)CUTLER-HAMM #BR22o Fuse; 50A, 25OV,Class RK5 Breaker, 20A�P, 2 Spaces ���"(1)AWG , T}1WN_2 Black C (i)CUTLER-HAMMER I DG222URB ®INH(I)AWG #8THWN_2, Red Disconnect- ER 240Vac, Non-Fusible, NEMA 3R I�_LL_ -(1)W TLFR-klA(AMER�DG10IXd8 (1)AWG#10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=28 AAC Ground/Neutral it; 60-1100A, General Duty(DG) -(1 AWG THWN-2, Green EGC/GEC-(1)Conduit Ki• 3/4*EMT (1)AWG #10, THWN-2, Black B (1)AWG#10, THWN-2, Black (5FT) WIRES FOR SOLARGUARD METER 1F.0 2)AWG #10, PV WIRE, Black Voc =483.6 VDC Isc =8.37 ADC O (1)AWG #10, THWN-2, Red (1)AWG #10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=14.5 AAC -(1)AWG/10, TIiWN-2, Red (SFT) T ( Con #10, Solid Bare Copper EGC Vmp =395.2 VDC Imp=7.89 ADC )Conduit Kit;.3/47 EMT (I)AWG•�,.THWN-2, preen. EGC/GEC_-(1)Conduit Kit. 3/4'.EM IAWG #8, TFtWMJ-2, Black T -(1)AWG #10, TIiWN-2, Green (SFT) (2)AWG #10,PV WIRE, Black Voc =520.8 VDC Isc =8.37 ADC ( ) �o ©�(I)AWG#8 THWN-2 Red -(1)SOLARgTY#SG METER 2 .. .(1)AWG #10, Solid Bare Copper EGC Vmp =425.6 VDC Imp=7.89 ADC Monitorin 'Eaau(pment; 208/240 2-wire (1)Conduit Kit; 3/4"EMT. . . . . . . . .. .. .. (1)AWG#8, THWN-2, White NEUTRAL Vmp =240 VAC Imp=42,5 AAC -(I I-IOFFMAN 1 A6R64 (2)AWG #10, PV WIRE Black Voc =446.4 VDC Isc =8.37 ADC -.(1)AWG_#8, THWTI-2, Green EGC GEC-(1 Conduit Kit;. 3/4',EMT •. •, ,• , • Endosute NEMA 3R � -(2)Multl-Cable Connecta, 3 Part 1§H 1)AWG #10, Solid Bare Copper EGC Vmp =364.8 VDC Imp=7.89 ADC 7 (I)AWG#B, TH M-2, Black / ) #4-#14 AWG, Same side, Insulated IL IL O (1)AWG #6, THWN-2, Red . . .. . . .. .(1)Conduit Kit; 3/4' EMT... ... .. . . .. . . .. . . .. .. . . . . . . .. . . . . . .. . (1)AWG #6, THWN-2, White NEUTRAL Vmp =240 VAC Imp=42.5 AAC CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER JB-01 8200 0 0 PREMISE OWNER AHI r North Andover DESCRIPTION: DESIGN: -�,sr x CONTAINED SHALL NOT BE USED FOR THE 4► BENEFIT OF ANYONE EXCEPT saARgTY INC., MARKET: MapuLEs: AYRES, LARRY AYRES RESIDENCE DVENE ��' NOR MALL IT BE DISCLOSED IN WHOLE OR IN 45 KEYES WAY ��,�SolarCity PART TO OTHERS OUTSIDE THE RECIPIENTS REST 39 TRINA SOLAR TSM-240PA05 9.12 KW PV Array ORGANIZATION, EXCEPT IN CONNECTION WITH PACT MANAGER: MOUNTING SYSTEM: NORTH ANDOVER, MA 01845 THE SALE AND USE OF THE RESPECTIVE SC Yeti L-Foot Upslope / SC Rail 3055 aearview Way San Mateo,CA SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAYMENT TYPE IN PAGE NAME REV: DATE T:(650)638-1028 F(650)638-1029 02 PERMISSION OF SOLARgTY INC. Multiple Inverters 781 308-0280 PPA p THREE LINE DIAGRAM P V 5 2/23/201 (888)-SOL-CITY(765-2489)www.solarcity.com 1. Conductor must hRerave Art 690.8(6)(1) ELECTRICAL CALCULATIONS a. Conductor must have 30 deg. C ampacity >= 125% of continuous current per Art 215.2(A)(1). Module: 27 Trina TSM-240PA05 Silver 218.2 Inv Pwr W PTC StrLen Voltage Drop Calculations Version 5_9.1 Inverter 1: 1 Power-One PVI-0000-S 96.5% 6,000 5,685 Vdrop= (Imp) * (2*Length)*(Resistance) / (Vmp) b. Conductor must have (after corrections for conditions Of use) >= Module: 12 Trina TSM-240PA05 Silver 218.2 Imp(A) Max. Length(ft) Wire COntlrlUOUS current per Table 310.15(6)(16). Inverter 2: 1 Power-One PVI-3.0-S 96.0% 3,300 2,514 String: 7.89 25 1 C AWG 10 at Max Ave Hi: 89 deg F Module: Vdrop= (7.89 A * 50 ft *0.00124 Ohms) / 244 V= 0.20% c. Evaluate conductor temperature at terminations per 110.14(C). Inverter 3: Branch: 7.89 75 1 C AWG 10 at Max Ave Hi: 89 deg F Ampacity of wire derated for conditions of termination must be >= Module: Vdrop= (7.89 A * 150 ft *0.00124 Ohms) / 244 V= 0.60% continuous current*1.25. All string terminations are rated at 90' C. Inverter 4: Total voltage drop in DC conductors= ------------------------------------------ Inverter: 28.00 10 1 D AWG 081 at 240V 2. OCP Sizingper Art 690.8(6)(1) Total: 39 modules Total Inv Pwr 9,300 8,199 PTC Vdrop= (28.00 A * 2011 *0.00078 Ohms) / 240 V 0.18% P Photovoltaic Module Electrical Specifications: Total STC 9,360 Combined 42.50 10 E AWG 06 at 240V a. Round up to next size per Art 240.4(B) Voc= 37.2 V deg F deg C Vdrop= (42.50 A * 20 ft *0.00049 Ohms) / 240 V 0.17% ------------------------------------------- Vmp= 30.4 V Record Low Temp: 0 -17.7777778 Total voltage drop in AC conductors= 0.36% 3. Conductor Sizing per Art 690.8(B)(1) Isc= 8.37 A Max Average Hi Temp: 89 31.66666667 Total voltage drop in AC and DC conductors= a. Conductor must have 30 deg. C ampacity >= 125% of continuous Imp= 7.89 A Tvoc= -0.1302 V/deg C Power-One Strings: Individual MPPT current per Art 215.2(A)(1). Tisc= 4.185 mA/deg C String Type A and 2 Combined Strings Type A Voc Correction Method: Manuf Tvoc data Branch Circuit Type A 1-way wire length: 75 ft b. Conductor must have (after corrections for conditions of use) >= Power-One PVI-0000-S 1 strings per branch 1 1 strings per branch 2 _ continuous current per Table 310.15(B)(16). 9 Trina TSM-240PA05 Silver Inverter Min Vdc Input: 120 Vdc 9 modules per series string 12 modules per series strin Voc= 334.8 V Min Vmp at Max Temp: 244 Vdc Voc= 334.8 V 446.4 V C. Evaluate conductor temperature at terminations per Art 110.14(C). Vmp= 273.6 V Max Voc at Min Temp: 385 Vdc Vmp= 273.6 V 364.8 V Ampacity of wire derated for conditions of termination must be >= Isc= 8.37 A Inverter Max Vdc Input: 600 Vdc Isc= 8.37 A 8.37 A P Y Imp= 7.89 A Max String Size: 14 Imp= 7.89 A 7.89 A continuous current*1.25. All branch terminations are rated at 75' C Icont= 10.46 A Art 690.8(A)(1) 1-way wire length: 25 It (cont= 10.46 A 10.46 A Art 690.8(A)(1) min. 1.a Conductor: C AWG 10 PV Wire 2.a Conductor 1:C AWG 10 PV Wire ------------------------------------------ Conductor 2:C AWG 10 PV Wire 4. OCP Sizina Conductor 1:Conductor 2: a. Round up t0 next size per Art 240.4(B) Icont*1.25= (Amps) 13.08 Icont*1.25=(Amps) 13.08 13.08 ------------------------------------------ 30 deg C ampacity= 40 E 30 deg C ampacity= 40 40 5. Conductor Sizing per Art 690.8(6)(1) 1.b (cont= (Amps) 10.46 2.b (cont=(Amps) 10.46 10.46 o. Conductor must have 30 deg. ampacity >= 125% of continuous Start ampacity ° 4o Start ampacity 40 40 g P y Temperature derate( =F) 0.76 Temp.derate( =F) 0.76 0.76 current. per Art 215.2(A)(1). Conduit fill aerate(%_#) 1 Cndt.fill derate(%=#) 0.8 0.8 Derated ampacity 30.40 Derated ampacity 24.32 24.32 b. Conductor must have (after corrections for conditions of use) >= Term 1 Term 2 continuous current per Table 310.15(B)(16). 1.c Icont*1.25=(Amps) 13.08 Temp table 90degC 90degC Ampacity 40 2.c Icont*1.25=(Amps) 13.08 13.08 Ampacity 40 40 C. Evaluate conductor temperature at terminations per Art 110.14(C). 1.d Icont*1.25=(Amps) 13.08 2.d EGC C AWG 10 C AWG 10 Art.250.122 Ampacity of wire derated for conditions of termination must be >= OCP size= 1s OCP size= 15 15 continuous current*1.25. All inverter output terminations are rated at 75' C. Inverter Type A Output Combined Inverter Output ------------------------------------------- Power-One PVI-0000-S 1-way wire length: loft Service Voltage= 240 Volts 6. OCP Sizing Icont= 28.00 A Art 690.8(A)(1) Total Inverter Powe- 9,300 Nameplate Watts 1-way wire length: 10 It a. Round up to next size per Art 240.4(B) 3.a Icont*1.25= (Amps) 35.00 A Art 690.8(B)(1) (cont=#of inverters*max inverter current Art 690.8(A)(1) OCP size= 35 A Art.240.6(A) (cont=(Amps) 42.50 3.b Conductor D AWG 08 THWN-2 at 90 deg C:Table 310.15(B)(16) 4.a Icont*1.25=(Amps) 53.13 A Art 690.8(8)(1) 7. Conductor Sizing per Art 690.8(B)(1) Icont*1.25=(Amps) 35.00 OCP size= 60 A Art.240.6(A) a. Conductor must have 30 deg. C ampacity >= 125% of Continuous 30 deg C ampacity= 55 E 4.b Conductor E AWG 06 THWN-2 at 90 deg C:Table 310.15(8)(16) current per Art 215.2(A)(1). 3.c Icont=(Amps) 28.00 Icont*1.25=(Amps) 53.13 Start ampacity 55 30 deg C ampacity= 75 b. Conductor must have (after corrections for conditions of use) >= Temperature derate(%=F) 0.96 4.c Icont=(Amps) 42.50 Conduit fill derate(%=#) 1 Start ampacity 75 continuous current per Table 310.15(B)(16). Derated ampacity 52.8 Temp.derate(%=F) 0.96 3.d Icont*1.25=(Amps) 35.00 Cndt.fill derate(%=#) 1 C. Evaluate conductor temperature at terminations per Art 110.14(C). Ampacity 50 Derated ampacity 72 Ampacity of wire derated for conditions of termination must be >= 3.e EGC/GEC = D AWG 08 Art.690.47(C)(3),250.166(8) 4.d Icont*1.25=(Amps) 53.13 continuous current*1.25. All inverter output terminations are rated at Ampacity 65 75' C min. JB-01 8200 0 0 PRaDSE OWNER aHJ: North Andover DESCRIPTION: DESIGN: CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBERAYRES, LARRY �VENE !� CONTAINED SHALL NOT EXCEPT USED FOR THE AYRES RESIDENCE SolarCity. NOR SHALL IBENEFIT OF TN BEN DISCLOSED INN MIROLE OR IN MARKET: "0D 9) 45 KEYES WAY ��ii' PART TO OTHERS OUTSIDE THE RECIPIENTS REST 39 TRINA SOLAR TSM-240PA05 9.12 KW PV Array ORGANIZATION, EXCEPT IN CONNECTION WITH PROJECT MANAGER: MOUNTING SYSTE11: NORTH ANDOVER, MA 01845 THE SALE AND USE OF THE RESPECTIVE SC Yeti L-Foot U slo a SC Rall 3055 Clearview Way San Mateo,CA SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAYMENT TYPE INVERTER Z PAGE NAME: SHEEP REV. DATE 94402 PERMISSION OF SOLARCITY INC. VERTE le Inverters 781 308-0280 T:(650)638-1028 F:(650)638-1029 PPA P ) ELECTRICAL CALCULATIONS PV 6 12/23/201 (898)-SOL-CITY(765-2489)www.solarcity.com • 0 0 0 ° o o Label Location: Label Location: (DC), (INV) (AC), (LC) �� ' • p Per Code: c - c Per Code: CEC 690.53, NEC 690.53 CEC 690.17, NEC 690.14 (4) MOO 0 ®© W4:Y-J�•i {� • •.• •• 1 1�1' 4'47 • • Wf�0• •• • Label Location: Label Location: • • 1L• (INV), (AC), (LC), (M) D 0 I (DC), (INV) Ily.RlllllLlk]� •o .�i •.•�im Label Location: m• _ • �( p o• •• • a [ I (CB) 17:I11.L•t'�S• • "•�lA`.UF.C�1t7.LUL'La — -- Label Location: 0 0 0 • moo Gr�Cop - o o Label Location: • o��o �I e o (POI) ►' • . ° (POI) o KOWN Mw OEM"ISM300MM&W W. i�� •••t�C•L I�[1E C�i,C�:7•.11ID Labe ILocation:; N- o (AC) D Per Code: CEC 690.8.A.3 &CEC 690.54, NEC 690.14 (c)(2) 1 ' Label Location: • (CB) (AC):AC Disconnect Label Location: (C): Conduit (C) (CB): Combiner Box 0 0 (D): Distribution Panel (DC): DC Disconnect (IC): Interior Run Conduit (INV): Inverter With Integrated DC Disconnect (LC): Load Center (M): Utility Meter (POI): Point of Interconnection CONFIDENTIAL— THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED 1�.d•,I 3055 Cleaview way IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, Labels �� San Mateo,CA 94402 29 EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE �,'�SolarCityi -SOLCrry(76-2 89) w .solar K SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. (888)-50L{I7Y(765-2489)www.solarcity.com The SolarCity Yeti with Eco-Fasten GreenFasten flashing optimizes strength,performance and aesthetics while structurally attaching solar panels to composition shingle roofs. This engineered connection uses 0.378THRUALL Eco-Fasten's patented,IAPMO-certified"green fasten"technology to achieve a watertight seal. 6000 PRIOR TO series aluminum offers superb structural and fatigue strength,which in conjunction with anodization COUNTERSINK offers excellent corrosion resistance even in coastal environments. 1.92 { • IAPMO-ES-certified for waterproofing—Tested to ICC ac286 • Tested in accordance with UL 441—Waterproofing for rooftop penetrations • Anodized for long term corrosion resistance and best aesthetics • No shingle cutting required 2.53 • Fast and error-proof installation reduces overall impact on roof • Compatible with SolarCity Canopy Rail 3.75 • Rail is attached using Stainless Steel Fasteners .380±.010 Components Installation Instructions A. 5/16"Lag Screw 1. Drill pilot hole in rafter B. Stainless Steel+EPDM Sealing Washer 2. Seal pilot hole with roofing sealant 1.94 C. Yeti(L-foot) 3. Insert Eco-Fasten flashing under upper layer of D. Eco-Fasten GreenFasten Flashing shingle 3.00 4. Place SolarCity Yeti S. Install lag with sealing washer i rrr- A a o \ g D ���Sola�ity �VSolarCity TSM-PC05 / TSM-PA05 THE UNIVERSAL SOLUTION Mono Multi Solutions DIMENSIONS OF PV MODULE TSM-PC/PA05 .TSM-235 TSM-240 TSM-245 TSM-250 ELECTRICAL DATA @ STC PC/PA05 PC/PA05 PC/PA05 PC/PA05 usm - PIC05m941mm ( P)/Jj { Peak Power Watts-P"va w 235 240 245 250 Power Output Tolerance-P­(%) 0/+3 0/+3 0/+3 0/+3 -1-S M Box Maximum Power Voltage-VmP(V) 29.3 29.7 30.2 30.3 O 0115 Maximum Power Current-IMrr(A) 8.03 8.10 8.13 8.27 o �s ,c xo�e Open Circuit voltage -Voc IV) 37.2 37.3 37.5 37-6 Short Circuit Current-Isc(A) 8.558.62 8.68 8.85 THEUNIVERSAL SOLUTION - Module Efficiency rim(%) 14.4 14.7 15.0 15.3 Values at Standard Test Conditions STC(Air Mass AM1.5.Irradiance 1000W/m-,Cell Temperature 25°C). Power measurement tolerance:±3% 0 3 m 3 3 ELECTRICAL DATA @ NOCT TSM-235 TSM-240 TSM-245 TSM-250 PC/PA05 PC/PA05 PC/PA05 PC/PA05 •�07 Maximum Power-P-x(Wp) 171 174 178 181 mwnnixc rorB Maximum Power Voltage-Vmp(V) 26.4 26.6 26.8 27.0 MAX EFFICIENCY -0B r.B L A Maximum PowerCurrent-IMPP(A) 6.48 6.55 6.64 6.70 Open Circuit Voltage(V)-Voc(V) 34.0 34.1 34.2 34.3 Short Circuit Current(A)-Isc(A) 6.97 7.04 7.10 7.25 2,5oA/�a�/JJ p , 812mm l8U NOCT:Irradiance at 800W/m',Ambient Temperature 20°C,Wind Speed lm/s. Module can bear snow loads up to 5400Pa and Back View Power measurement tolerance:±3% MAX POWER OUTPUT wind loads up to 24001'a MECHANICAL DATA Solar cells Multicrystalline 156 x 156mm(b inches) ® �2 /� n Cell orientation 60 cells(b*10) ILr��/�U`\l IIh�[ Guaranteed power output r Module dimensions 1650 x 992-40mm(64.95•39.05 x 1.57 inches) 3� A-A Weight 19.5kg(43.0 lb) PRODUCT WARRANTY 0-+3% i ssmm Glass High transparency solar glass 3.2mm(0.13 inches) /� ^ Frame Anodized aluminium alloy 25 V E gyp\ lc I-V CURVES OF PV MODULE TSM-245 PC/PA05 Cables IP 65 rated QQQQ���� Il IILLS���Irl 111111���111 Cables Photovoltaic Technology cable 4.Omm'(0.006 inches'), 0. - _,_ 1000mm(39.4 inches) LINEAR POWER WARRANTY �, High performance under low light conditions 19.1-_t000w/m=_-__- -_ O 0 Cloudy days, mornings and evenings 7a'- Connector Mc4BOOW/m'- - -- _ --- -�-_-� emu" Founded in 1997 Trina Solaris one of the world's leading PV companies.Since its '4.-P 400w/m= - --- - - TEMPERATURE RATINGS MAXIMUM RATINGS IPO on the NYSE in 2006,Trina Solar has developed a vertically integrated business Manufactured according to International Quality 2.0°x-20OW/m' .- _-- _-- Nominal Operating Cell 45-C(±2'C) Operational Temperature -40-+85°C model, stem Standards Maximum System 1000VDc(IEC)/a monand multicrystallinetechnologies.Its 1$09001, 1$014001 with in-house production of ingots, tw _ __ _ _, Temperature(NOCT) !SO and Environment Management Sy wafers,cells and solar panels in both 0°i - --Po '°°° -- 4°°° Temperature Coefficient of Pve -0.43%/°C Voltage 600V DC(UL) o 2Q°° 3°°° manufacturing capacity for solar panels Voitaga(V) Temperature Coefficient of Voc -0.32%/°C Max Series Fuse Rating 15A will be 2.4GW by the end of 2012,making Temperature Coefficient of Isc 0.047%/°C it one of the largest solar manufacturers in the world.Trina Solar's extensive portfolio includes panels for all kinds of applications- Average efficiency reduction of 4.5%at 200W/m' residential,utility,off rid,BIPV as well as according to EN 60904-1. v g Approved original MC4 Photovoltaic connector WARRANTY innovative system solutions. used with highest reliability 10 year workmanship warranty With 20 branch offices around the world, Trina Solar is serving leading installers, 25 year linear performance warranty distributors,utilities and developers in all (Please refer to product warranty for details) major PV markets.Trina Solar is committed to driving down the cost of solar and CERTIFICATION r making it more affordable for all. LINEAR PERFORMANCE WARRANTY ( ► <Ou Trina Solar Limited ^SA PACKAGING CONFIGURATION 10 Year Product Warranty•25 Year Linear Power Warranty ' J KIM avus Modules per box:24 pcszi i www.trinasolar.com `100% Ir Modules per 40'container:672 pcs it1 (E coos Pv ercte o Addit/o0al vclue it tmto 1%.V ~ I 90% °MTrfnaSol o °r's linear warranty Tirowmsolar0,Ba% Trow-asolar CAUTION:READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. "--"'--' ©2012 Trina Solar Limited.All rights reserved.Specifications Included in this dotasheet are subject to change The power behind the panel Years 5 10 IS 20 25 The power behind the panel without notice. Indusu�ntondard �Trina Solar ao�er-ore= AURORA Renewable Ener Solutions .ffn P&MWSMOD4M °,,, • Nominal Output Power W 5000 6000 Maximum Output Power W 5000 6000 a Rated Grid AC Voltage V 208 _ 240 277 208 240 277 Input Side(DC) - M_50 0 0 �� o Number ofIndependent MPMChannels 2 - 2 Maximum Usable Power for Each Channel W 4000 4000 �`•:�`�, \t.`.'cc�.` ) o Absolute Maximum Voltage(Vmax) V 600 600 tom,„ a....J� Start-UpVoltage(Vstart) V 200 (adj.120-350) 200 (adj.120-350) ���r_6®®® u LR Full Power MPPT Voltage Range V 200-530 200-530 i' Operating MPPT Voltage Range V 0.7xVstart-580 0.7xvstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 36 _ _ 36 _ Maximum Usable Current per Channel A 18 - 18 GENERAL SPECIFICATIONS �� Maximum Short Circuit Current Limit per Channel A 22 22 >xm Number of Wire Landing Terminals_Per Channel 2 Pairs 2 Pairs OUTDOOR MODELS AY`-spa Array Wiring Termination Terminal block Pressure Clamp,AWG8-AWG4 ,Output Side(AC) - - Grid Connection Type - - - -- 10/2W _- Split-0/3W 10/2W _ 10/2W _ Split-0/3W 10/2W AdjustableVoltage Range(Vmin-Vmax) - _ V 183-228 211-264244304 _183-2.28 _21.1-264 244304 Grid Frequency -- -- - Hz _ .fio.-.. - - 60 - -- _ Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 Maximum Current(lacmax) ARMS 27 23 2.0 30 28 _ 24 Power Factor _ _ >0.995 ___ __ _ >0.995 Total Harmonic Distortion At Rated Power % .. . <2 - - -_-�- <2 Designed for residential and small commercial PV installations,this Contributory Fault Current*" Ap,/ARrns 36.25/25.63 36.5/25.81 31.75/22.45 36.25/25.63 36.5/25.81 31.75/22.45 Grid Ter inverter fills a specific niche in the Aurora product line to cater for Protectlionring Devi_cesationType - Terminal block,Pressure Clamp,AWGB-AWG4 those installations producing between 5kW and 20kW. Input Reverse Polarity Protection Yes _ _ Yes t ° Over-Voltage Protection Type __ _ Varistor,2foreachchannel Varistor,2 for each channel _ This inverter has all the usual Aurora benefits,including dual input I Pre start-upRiso and dynamiicGFDI Pre start-upRiso and dynamic GFDI PV Array Ground Fault Detection section to process two strings with independent MPPT,high speed _ _ output (Requires Floating Arrays) (Requires Floating Arrays) flfl and precise MPPT algorithm for real-time power tracking and •. Anti-Islanding Protection _- Meets UL_1.741/IEE1547 re-quirements 4Meets UL 1741/IEEI547 requirements me_n t s energy harvesting, as well as transformerless operation for high Over-Voltage Protection Type Varistor,z :/ rJ ) vanstor,2(L, L rG) Maximum AC Rating A 35 30 25 40 30 performance efficiencies of upto 97.1° . Efficiency Maximum Efficiency % 97.1 97,1 The wide input voltage range makes the inverter suitable to low s CEC Efficiency — y 96 965 96.5- i - 96 96.5 1. - 96.5 operating Performance ___ power installations with reduced string size.This outdoor inverter t stand-by Consumption w � - <s - - <a- — r tion <0.6 WRra: a.-- - <0..6 - ------ - has been designed as a completely sealed unit to withstand the Nighttime consumption 4� -_� _ation__P - .. � _ Communic �T harshestenvironmenta conditions. User-Interface 16 characters x 2 lines LCD display " Remote Monitoring(1xRS485incIJ _ AURORA-UNIVERSAL(opt) Wired Local Monitoring(1xRS48S incl.) - - PVI-USB-RS485 232(opt.),PVI-DESKTOP(opt.) _Wireless 9 Local Monitoring _ _ _ _ _ _ PVI-DESKTOP(opt)with PVI-RADIOMODULE(opt.) Environmental _ „' 13 to+140( to+60) - Ambient Air Operating Temperature Range F(°CJ -13 to+140(-25 to+60) _with derating a-25 ve 122(50) Ambient Air Storage Temperature Range °F(°C) -40 to 176(40 to+80) 40 to 176(-40 to+80) I. ���yy,, {7 Relative Humidity %RH 0-100 condensing 0-100 condensing Acoustic 50 rem � Maximum Operating sAlt Altitude without Derating ;n Level db it @1 m <(2 <(2 - - -. .._ .. ft(m)_�...�. „6560(2000) 6560(2000)---- --- - Mechanical Specifications - i Enclosure rating NEMA 4X NEMA 4X • Each inverter is set on specific grid codes which can be selected in the field Cooling Natural Convection Natural convection _ + Dimensions(H x W x D) in(mm) 41.4 x 12.8 x 8.6(1052 x 325 x 218) • Single phase output Weight Ib(kg) <59.5(27.0) <59.5(27.0) • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented shipping Weight lb(kg) <78(35.4) <78(35.4) rMounting System _ _ Wall bracket Wall bracket • Wide input range Indifferent directions Conduit Connections - - Trade Size Kos:(2ea x 1/2' Trade Size Kos:(tea x 1/21 and(tea x 1-1/4,3 places side,front rear) and(2ea x 1-1/4",3 places side,front,rear) DC • High speed and precise MSaPPT algorithm for real time power tracking and improved energy harvesting ! Switch Rating(PerContact) AN 25/600 25/600 .Sa(ety _ • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance Isolation Level _ -_ -- - -Transformerless(Floating Array) Transformerless(Floating Array) across the entire input voltage and output power range Safety and EMC Standard UL 1741,CSA-C22.2 N.107.1-01 UL 1741,CSA-C22.2 N.107.1-01 • Outdoor enclosure for unrestricted use under any environmental conditions I Safe ^Approval � CSA, _ CSA, • RS-485 communication interface(for connection to laptop or datalogger) `' Standard Warranty - years - 10 _ - io ' •Compatible with PVI-RADIOMODULE for wireless communication with Aurora P ,Avvtendeeailable Models I Ey years — is azo is azo - J odels els _ Standard-With DC Switch-Floating Array _ PVI-5000-OUTD-US _ PVI-6000-OUTD-US -All dam is subject to charge without notice s°=X[opine T "Inverter can appy that much current-Breakerwill open aower�one� AURORAW Renewable Energy Solutions * t • e . • Nominal Output Power W 3000 3600 4200 Maximum Output Power W 3000 3300** 3300** 3600 4000** 4000** 4200 4600'* 4600** • Rated Grid AC Voltage V 208 240 277 208 2_40 _277 208_ 240 277 Input Side(DC) Number of Independent MPPT Channels 2 2 2 PV ®�� t Maximum Usable Power for Each Channel W 2000 3000 3000 • Absolute Maximum Voltage(Vmax) V 600 600 600 M-3.6-7L � ♦ .�7. Start-Up Voltage(Vstart) V 200(adj.120-350) 200(adj.120-350) 200(adj.120-3S0) IyrQ®���•ry��11 Full Power MPPT Voltage Range V 160-530 120-530 140.530 11 C7 Wi+ U Operating MPPTVoltage Range V 0.7xVstart-580 0.7xVstart-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 20 32 32 M-4.2-7L Maximum Usable Current per Channel A 10 16 16 • Maximum Short Circuit Current Limit per Channel A 12.5 20 20 Number of Wire Landing Terminals Per Channel 2Pairs(1on-S version) 2Pairs(lon-S version) 2Pairs(Ion-S version) GENERAL SPECIFIC ATI O N S " Array Wiring Termination Terminal block,Pressure Clamp,AWGI0.AWG4 ""'•+^--••- •�''^ ,Output Side(AC) -- OUTDOOR MODELS Grid Connection Type 10/2W Split- 10/2W 10/2W Split- 10/2W 10/2W Split- 0/3W 0/3W 0/3W 10/2W _- - _ _ _- - _ -_ ___.,__ - _-..• ___ ._.---___�� �{ FT Adjustable Voltage Range(Vmin-Vmax) - V 183-228 211-264 244304 183-228 211-264 244304 183-228 . 211-264 244304 Grid Frequency Hz 60 60 60 Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 57-60.5 O Maximum Current(lacmax) A— 14.5 14.5 12 17.2 16 16 20 20 20 The most common residential inverter is the ideal size for an average- Power Factor >os95 >o.99s >o.99s Total Harmonic Distortion At Rated Power % <2 <2 <2 sized family home. This family of single-phase string inverter Grid Wiring Termination Type - Terminal block,Pressure Clamp,_ AWGIo-AWG4 complements the typical number of rooftop solar panels,allowing r Protection Devices Input _ home-owners to get the most efficient energy harvesting for the Reverse Polarity Protection Yes Yes Yes size of the property.This rugged outdoor inverter has been designed _ ! Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 for each channel Varistor,2 for each channel PV Array Ground Fault Detection Pre start-up Riso and dynamic GFDI(Requires Floating Arrays) as a completely seated unit to withstand the harshest environmental conditions. onep•t 1 � - Anti-Islanding Protection Meets UL requirements /IEE1547 Meets UL requirements /IEE1547 Meets UL equine/IEE1547 requirements- requirements � requirements I Over-Voltage Protection Type Varistor,2(L,-L,/Li-G) Varistor,2(L,-L2/L,-G) '' Varistor,2(L,-Lz/L,-G) One of the key benefits of the Uno family of single-phase inverters Maximum ACOCPDRating _ u�L A -_ 20 20 is 25 20 20 2s _. is the dual input section to process two strings with independent Efficiency w - - _ — zs zs i Maximum Efficiency % 96.9 97 97 MPPT especially useful for rooftop installations with two different , I CEC Efficiency % 96 96 96 orientations(ie East and West).The high speed MPPT offers real-time '- ; Operating Performance_ - I c - _ - power tracking and improved energy harvesting. + i Stand-by Consumption Was <8 <8 <8I Night time consumption Waris <0.6 <0.6 <0.6 Communication -- -- - The transformerlesso operation gives the highest efficient of u to I User-Interface 16 charactersx2linesLCDdisplay p 9 9 y p Remote Monitoring(IxRS485 incl.) AURORA-UNIVERSAL(opt.) 97.0%. The wide input voltage range makes the inverter suitable toWired Local Monitoring(1xRS485 incl.) PVI-USB-RS485_232(opt.),PVI-DESKTOP(opt.) f low power Installations with reduced string Size. Wireless Local Monitoring - _ PVI-DESKTOP(opt.with PVI-RADIOMODULE(opt.) _ _. _. Environmental Ambient Air Operating Temperature Range =F(•C) .- -13 to+140(-25 to+60)with__ -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with- .� derating above 131(55) derating above 131(55) derating above 113(45) * (� Ambient Air Storage Temperature Range °F CC) -40 to 176(-40 to+80) -40 to 176(-40 to+80) -40 to 176(40 to+80) Relative Humidity %RH 0-100 condensing 0-100_condensing 0-100 condensing k��u,�,�� I Acoustic Operating acing on Level db ft(m) 0(2 0(2 0 50 (2 IIJr�-�� IIUj"I'���-�L.7uC Maximum Operating AHitude without Derating h(m) 6560(20.00) 6.560(2000) 6560(2000) Mechanical Specifications - Enclosure rating 4 NEMA 4X NEMA 4X NEMA 4X • Each inverter is set on specific grid codes which can be selected in the field Cooling Natural Convection Natural Convection Natural Convection Dimensions(H x W x D) in(mm) 33.8 x 12.8 x 8.7(859 x 325 x 222)-S Version is Single phase output Weight Ib/(kg) <47.3(21.3)-S version <47.3(21.3)-5 version <47.3(21.3)-5 version • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented in Mounting system Wall bracket Wall bracket Wall bracket different directionsTrade size KOs:(tea x 1/21 and Trade size KOs:(tea x 1/21 and Trade size KOs:(tea x 1/2'7 and Conduit Connections (tea x 1-1/4",3 places side,front (tea x 1-1/4;3 places side,front, (tea x 1-1/4,3 places side,front, • Wide input range rear) rear) rear) V i DC Switch Rating-(Per Contact) AN 25/600 25/600 25/600 • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting safety • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance across I Isolation Level Transformerless(Floating Array) Transformedess(Floating Array) Transformerless(Floating Array) the entire input voltage and output power range Safety and EMC Standard UL 1741,CSA-C22.2 N.107.1-01 UL1741,CSA-C22.2N.107.1-01 UL1741,CSA-C22.2N.107.1-01 Safety Approval CSAR, xCSA_ XSA. is Outdoor enclosure for unrestricted use under any environmental conditions I Warranty _ - • Integrated DC disconnect switch in compliance with international Standards(-S Version) li Standardwarraney years 10 10 to i • RS 485 communication interface(for connection to laptop or datalogger) Extended Warranty years 15&20 15&20 15&20 Available 5&20Available Models • Compatible with PVI-RADIOMODULE for wireless communlcatlonwith AuroraPVI-DESKTOP % Standard-Without DC Switch and Wiring Box - PVI-3.0-OUTD-US PVI-3.6-OUTD-US PVI-4.2-OUTD-US t With DC Switch and Wiring Box PVI-3.00UTD-S-US PVI-3.6-OUTD-5-US PVI-4.2-OUTD-S-US - - - . 'All data is subject to changewithout ratite ••Capability enabled at nominal AC wltage and with sufficient DC power available _49RIGKIPM[Our* '••When equipped with optional DC Switch and Whing fox &r••• • 4201 CSA INTERNATIONAL fluo ceff-tuReate ®f COMPHOance Certificate: 2096477 Master Contract: 173688 Project: 2439385 Date Issued: July 19,2011 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C'and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. p Rain HevnPst-ack, Issued by: Rob Hempstock,AScT. CIP us PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-4.2-OUTD-US,PVI-3.6-OUTD-US,PVI-3.0-OUTD-US,PVI-4.2- OUTD-S-US,PVI-3.6-OUTD-S-US,PVI-3.0-OUTD-S-US,PVI-4.2-OUTD-US-W,PVI-3.6-OUTD-US-W and PVI-3.0-OUTD-US-W;provided with two DC input channels,permanently connected. For details related to ratings,reference should be made to the CSA Certification Record,Appendix 1 or the Descriptive Report. APPLICABLE REQUIREMENTS CSA-C22.2 No.107.1-01 - General Use Power Supplies UL Std No. 1741-Second Edition - Inverters,Converters,Controllers and Interconnection System Equipment for Use With Distributed Energy Resources(January 28,2010) DQD 507 Rev.2009-09-01 Page:I • 0 0 0 o{ o o Label Location: Label Location: (DC), (INV) (AC), (LC) Il• 0M OREM Per Code: o o Per Code: ® CEC 690.53, NEC 690.53 CEC 690.17, NEC 690.14 (4) L�YJ111:LJ©_ soma • �� �[� 000 0 DIE--] m°° Clll■J •.• ti71a�h7 1 Label Location: Label Location: MOM v @Td ftw i (INV), (AC), (LC), (M) D 0 0 (DC), (INV) • 33. . . GAJ 4 •l7y Emig Label Location: (; • o ■ o � • (CB) Label Location: Label Location: . 0 0 0 •• • (POI) (POI) o o mom pow RK ul t o 000MR6609600 w �� o••p[•1 rutS/1:Il • •o oopm Label Location: O. .{, N o ■ - 0 0 0 o o (AC), (D), (LC) o_ -• • o C� • - r �'j - y ' • o Per Code: CEC 690.8.A.3&CEC 690.54, NEC 690.14 (c)(2) Label Location: (CB) (AC): AC Disconnect (C): Conduit Label Location: (CB): Combiner Box • o o - (C) (D): Distribution Panel - (DC): DC Disconnect (IC): Interior Run Conduit (INV): Inverter With Integrated DC Disconnect (LC): Load Center (M): Utility Meter (POI): Point of Interconnection CONFIDENTIAL— THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR % 3055 Mateo, Cw way ����'� San Mateo,CA 94402 THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED i T:(650)638-1028 F:(650)638-1029 IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, Labels •��� $Q�a �t EXCEPT IN CONNECTION IWTH THE SALE AND USE OF THE RESPECTIVE �►� (868)-SOL CITv p65-2489)www.solarcity.com 0 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. } :; ..' - ® �; � .. • • �L.J�.J17��1.1 V V Lr`:JC:JIJ V� • . l�Jl7�l�J V � • MOVE lmilligivalil, AN S The SolarCity Yeti with Eco-Fasten GreenFasten flashing optimizes strength,performance and aesthetics while structurally attaching solar panels to composition shingle roofs. This engineered connection uses 0.378TNRUALL Eco-Fasten's patented,IAPMO-certified"green fasten"technology to achieve a watertight seal. 6000 r— PRIOR TO / COUNTERSINK series aluminum offers superb structural and fatigue strength,which in conjunction with anodization offers excellent corrosion resistance even in coastal environments. 1.92 {I • IAPMO-ES-certified for waterproofing–Tested to ICC ac286 `{ • Tested in accordance with LIL 441–Waterproofing for rooftop penetrations • Anodized for long term corrosion resistance and best aesthetics 2.53 • No shingle cutting required • Fast and error-proof installation reduces overall impact on roof 3.7.5 • Compatible with SolarCity Canopy Rail • Rail is attached using Stainless Steel Fasteners .380:010 Components Installation Instructions A. 5/16"Lag Screw 1. Drill pilot hole in rafter B. Stainless Steel+EPDM Sealing Washer 2. Seal pilot hole with roofing sealant 1..94 C. Yeti(L-foot) 3. Insert Eco-Fasten flashing under upper layer of D. Eco-Fasten GreenFasten Flashing shingle 3.00 4. Place SolarCity Yeti 5. Install lag with sealing washer IhA CD a i� 8 D - SolarCity FIG TSM-PC05 / TSM-PA05 THE UNIVERSAL SOLUTION Mono Multi Solutions DIMENSIONS OF PV MODULE TSM-PC/PA05 ELECTRICAL DATA @STC TSM-235 TSM-240 TSM-245 TSM-250 PC/PA05 PC/PA05 PC/PA05 PC/PA05 r�_L, ❑ V 941 mm Peak Power Watts-R. 245 250 Power Output Tolerance-PI.x(%) 0/+3 0/+3 0/+3 0/+3 www���]]]///111 \`\.��/• noN o Maximum Power Voltage-Vmr(V) 29.3 29.7 30.2 30.3 D nn , Nu,,err"rl. J Maximum Power Current-IMry(A) 8.03 8.10 8.13 8.27 wN,nwec NJte Open Circuit Voltage-Voc(V) 37.2 37.3 37.5 37.6 3 Short Circuit Current-Isc(A) 8.55 8.62 8.68 8.85 THE UNIVERSAL SOLUTION i Module Efficiency 4.4 14.7 15.0 15.3 � Values at Standard Test Co Conditions STC(Air Mass AMI.S,Irradiance 1000W/m',Cell Temperature 250C). 0 F a Power measurement tolerance:i3% 0 3 ELECTRICAL DATA @ NOCT TSM-235 TSM-240 TSM-245 TSM-250 PC/PA05 PC/PA05 PC/PA05 PC/PA05 �IiI (� �vp/y Maximum Power-PM (Wp) 171 174 178 181 Y ill•3,O Maximum Power Voltage-V-(V) 26.4 26.6 26.8 27.0 YYY OY '�= 6A�lGPUVHOtNL HJIF MAX EFFICIENCY A- A Maximum Power Current-IMry(A) 6.48 6.55 6.64 6.70 „-0w,�N Nntr --- - Open Circuit Voltage(V)-Vac(V) 34.0 34.1 34.2 34.3 Short Circuit Current(A,-Isc(A) 6.97 7.04 7.10 7.25 ���� 812mm 180 Power Irradiance n BOleranc Ambient Temperature 20°C,Wind Speed Im/s. Power measurement tolerance:33% Module can bear snow loads up to 5400Pa and Back View MAX POWER OUTPUT wind loads up to 24001'a MECHANICAL DATA Solar cells Multicrystalline 156 x 156mm(6 inches) Cell orientation 6cells(b•10) 1 ® YEAR Module dimensions 166 50><992 x 40mm(64.95•39.05•1.57 inches) Guaranteed power output Weight 19.5kg(43.0 lb) PRODUCT WARRANTY 3% 0-+37. 3�rnrn I A-A Glass High transparency solar glass 3.2mm(0.13 inches) Frame Anodized aluminium alloy 25 YEAK CPhotovoltaic I-V CURVES OF PV MODULE TSM-245 PC/PA05 ted BoxIP 65 Cables Photovoltaic Technology cable 4.Omm2(0.006 inches'), 1000mm(39.4 inches) LINEAR POWER WARRANTY Q; High performance under low light conditions 1°m: Q e.m.--touow/mr - .-_._... _-______.� Connector M C 4 Cloudy days, mornings and evenings a '- - --- _800W/m, .._� ,.w.v°w. v 6.00 600W/m°.._ Founded in 1997,Trina Solar is one of the 6' r world's leading PV companies.Since its 4.�- 400w/m=------ - - TEMPERATURE RATINGS MAXIMUM RATINGS IPO on the NYSE in 2006,Trina Solar has "3'w - - - --__ _ - ' developed a vertically integrated business Manufactured according to International Quality2oow(=_ __ ___ Nominal Operating Cell 45°C(±2°C) Operational Temperature -40-+85°C z'� 1 Temperature(NOCT) model,with in-house production of ingots, 'SQ and Environment Management System Standards o.1, -- _ ---- p Maximum System 100VV C(LIL) )/ wafers,cells and solar panels in both a�0. ---- -- Temperature Coefficient of Prvx -0.43%/°C Voltage 600V OC(UL) p o.°° Tn^° zap° 3n^° an°° mono and multicrystalline technologies.Its ISO9001, IS014001 Temperature Coefficient of Voc -0.32%/°C Max Series Fuse Rating 15A manufocturing capacity for solar panels Volt sge(V) will be 2AGW by the end of 2012,making Temperature Coefficient of Isc 0.047%/°C it one of the largest solar manufacturers in . the world.Trina Solar's extensive portfolio Average efficiency reduction of 4.5%at 200W/m2 includes panels for all kinds of applications- according to EN 60904-1. residential,utility,offgrid,BIPV as well as O Approved original MC4 Photovoltaic connector WARRANTY innovative system solutions. used with highest reliability 10 year workmanship warranty M1e°rgmal With 20 branch offices around the world, 25 year linear performance warranty Trina Solar is serving leading installers, (Please refer to product warranty for details) distributors,utilities and developers in all major PV markets.Trina Solar is committed to driving down the cost of solar and CERTIFICATION r making it more affordable for all. LINEAR PERFORMANCE WARRANTY PACKAGING CONFIGURATION 10 Year Product Warranty•25 Year Linear Power Warranty ' ' O� e SAus Modules per box:24 pcs w Trina S010r Limited A ,�� Modules per 40'container:672 pcs www.trinasolar.com 100% Addiflo t!a �E eU�L us PVR g nal value fro m rrrna sa o so% lar's linear warranty O ��o��solar a ao% 4Pow-asolar CAUTION READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USINGTHE PRODUCT. 2012 Trina Solar Limited.All rights reserved.Specifications included In this datasheet are subject to change The power behind the panel Years 5 10 15 20 25 The power behind the panel without notice. Industryst.wdaid Trina Solar powel'a, ne= Renewable Energy Solutions AURORA ''' • ' '"' ' ' Nominal Output Power W 5000 6000 -. - _ _ -.-... .. . ... .. Maximum Output Power W 5000 6000 Rated Grid AC Voltage V 208 240 277 208 240 277 Input Side(DQ 'rl�y®® qPM ' Number of Independent MPPT Channels 2 2 Y r7 ��.d+®®® �� 9 _ Maximum Maxim mVoltage(VmPower for Each Channel W 4000 4000 '�„���`^�`'�.v'�s '�'r,.v. Absolute Maximum Voltage(Vmax) V 600 600 [y Start-Up Voltage(Vstart) V 200 (adj.120-350) 200 (adj.120-350) PI�i E�6000—T L Full Power MPPT Voltage Range V 2 200-530 Operating MPPT Voltage Range V 0.7xVstart-start-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 36 36 Maximum Usable Current per Channel A 18 .18 Maximum Short Circuit Current Limit per Channel A 22 22 GENERAL SPECIFICATIONS Number of Wire Landing Terminals Per Channel 2 Pairs 2 Pairs OUTDOOR MODELS Array Wiring Termination Terminal block,Pressure Clamp,AWG8-AWG4 Output Side(AC) Q Grid Connection Type 10/2W Split-0/3W 10/2W 10/2W Split-0/3W 10/2W AdjustableVoltage Range(Vmin-Vmax) V 183-228 211-264 244-304 183-228 211-264 244304 _.-_ - _ -_. - . — - - - _. —- - -- ._ -_ • Grid Frequency Hz 60 60 Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 Maximum Current(lacmax) Anus 27 23 20 30 28 24 Power Factor >0.995 >0.995 Total Harmonic Distortion At Rated Power % <2 <2 Designed for residential and small commercial PV installations,this Contributory Fault Current*' Ao/Anus 36.25/25.63 36.5/25.81 31.75/22.45 36.2S/25.63 36.5/25.81 31.75/22.45 I Grid Wiring Termination Type Terminal block,Pressure Clamp, AWGS-AWG4 inverter fills a specific niche in the Aurora product line to cater for Protection Devices those installations producing between 5kW and 20kW. Input Reverse Polarity Protection Yes Yes + Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 for each channel This inverter has all the usual Aurora benefits,including dual input PV Array Ground Fault Detection Pres(Re upesFloaso ddynrrays) DI Pres(Re upesFloaso ddynamisGFDI section to process two strings with independent MPPT,high speed output (RequiresHoating Arrays) (Requires Floating Arrays) ' Anti-Islanding Protection Meets UL 1741/IEE1547 requirements Meets UL 1741/IEE1547 requirements and precise MPPT algorithm for real-time power tracking and Over-Voltage Protection Type _ Varistor,2(L,-L,/L,-G) Varistor,2(L,-L2/L,-G) energy harvesting, as well as transformerless operation for high Maximum ac OCPD Racing A 35 _ 30 25 40 35 30 performance efficiencies of up to 97.1%. I Efficiency . -- r _. I I Maximum Efficiency % _ 97.1 97.1 { - CEC Efficiency _ __% •96 96.5 96.5 96 96.5 96.5 I[ The wide input voltage range makes the inverter suitable to low b operating Performance Stand-bpower installations with reduced string size.This outdoor inverter a ` Night time econsumptioConsumption Wwas <8 <. I � Night time consumption Wnru <0.6 <0.6 has been designed as a completely sealed unit to withstand the I Communication I .. - --- • -- --- - - ----- - 16 charsx2 lines display harshest environmental conditions. User-Interface Remote Monitoring(1xR5485incl.) AURORA-UNIVERSAL(opt.) 1 Wired Local Monitoring(IxRS485 incl.) PVI-USB-RS48_32(opt.),PVI-DESKTOP(opt.) Wireless Local Monitoring _- PVI-DESKTOP(opt.)with PVI-RADIOMODULE(opt.) 1 swnhaw; Mee%J Environmental- -13 to+14 -25 to+60 o- Ambient Air Operating Temperature Range °F(°C) -13 to+140(-25 to+60) with derating above 122(50) Ambient Air Storage Temperature Range ° (°Q -0 F 0 to 176(40 to+80) -40 to 176(-40 to+80) - , Acoustic eHoiseEm %RH 0-100 condensing 0-100 condensing S � Acoustic Noise Emission Level db(A)@7 m <50 <50 Q Maximum Operating Altitude without Derating h(m) 6560(2000) 6560(2000) Mechanical Specifications _ -------�--- - - -- - ----- _ - NEMA 4X - NEMA 4X ' -- Enclosure rating Coong Natural Convection Natural Convection + • Each inverter is set on specific grid codes which can be selected in the field Dimensions(HxwxD) in(mm) 41 A x 12.8 x 8.6(1052 x 32S x 218) I • Single phase output Weight lb(kg) <s9.5(27.0) <59.5(27.0) • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented shippingwelghc Ib(kg) <7s(3s.a) <7s(3s.ke p p p gy g Y Wall bracket Wall bracket j Mounting System In different directions Trade Size Kos:(tea x 1/2) Trade Size Kos:(2ea x 1/2'1 Conduit Connections and(2ea x 1-1/4,3 places side,front,rear) and(2ea x 1-1/4,3 places side,front,rear) I •Wide input range DC I • High speed and precise MPPT algorithm for real time powertracking and improved energy harvesting i Safety ch Rating(Per Contact) AN 25/600 25/600 _ Safety •Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance Isolation Level Transformerless(Floating Array) Transformerless(Floating Array) volts handout output owerran a Safety and EMC Standard UL 1741,CSA-022.2 N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 across the entire inputg P P 9 Safety Approval rCSA°, CSA„ •Outdoor enclosure for unrestricted use under any environmental conditions Warranty Standard Warranty years 10 10 • RS-485 communication interface(for connection to laptop ordatalogger) Extended Warranty years 15&20 t • Compatible with PVI-RADIOMODULE for wireless communication with Aurora PVI-DESKTOP 0-OU Available Models l� Standard-With DC Switch-Floating Array PVI-5000-OUTD-US PVI-6000-OUTD-US •--- - – - -- ` —`�'–" - - - - – -- - - -- 'All data is subjectto charge without notice "Inverter can appy that much current-Breaker will open n .•.. a = S� CSA p Ceirdfleate ®f COMPUnnee Certificate: 1841082 Master Contract: 173688 Project: 2550432 Date Issued: August 20,2012 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. 0 Brij A Wa.L Issued by: Brij Aggarwal;P.Eng. Ci US PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-6000-OUTD-US,PVI-6000-OUTD-US-W and PVI-5000-OUTD-US, permanently connected. Notes: 1. All above models in this series may include expansion board with wireless antennae option and will be identified with model designation including"—Z"suffix at the end. 2. For details related to rating,size,configuration,etc.reference should be made to the CSA Certification Record,Annex A of the Certificate of Compliance,or the Descriptive Report. DQD 507 Rev.2012-05-22 Page:1 aowe-one® q .MAAWMI[Flm Renewable Energy Solutions ���O I a a Nominal Output Power W 3000 3600 4200 Maximum Output Power W 3000 3300** 3300** 3600 4000** 4000** 4200 4600"' 4600** - - - - o Rated Grid AC Voltage V 208 240 277 208 240 277 208 240 277 Input Side(DC) J Number of Independent MPPT Channels 2 2 2 ���_�•®_�� j , Maximum Maxim mVaIPowerfge(Vm channel W 2000 3000 3000 Absolute Maximum Voltage(Vmaz) V 600 600 600 O Start-Up Voltage(Vstart) V 200(adj.120-350) 200(adj.120-350) 200(adj.120-350) M-3.6-TL 5 Full Power MPPT Voltage Range V 160-530 start- 120-530 140-530 t Operating MPPT Voltage Range V 0.7xVstart-580 0.7xVstart-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 20 32 32 M-4.2-7L tt p�_AJ�L cl• 7 L Maximum Usable Current per channel A 1 16 16 tlC'l6 Maximum Short Circuit Current Limit per Channel A 12..5 20 20 Number of Wire Landing Terminals Per Channel 2 Pairs(1 on-S version) 2 Pairs(1 on-S version) 2 Pairs(1 on-S version) GENERAL S P EC I F I C ATI O N S Array Wiring Termination Terminal block,Pressure Clamp,AWG10-AWG4 fir-.-, __, Output Side(AC) OUTDOOR MODELS " Split- Split- W Grid Connection Type 0/3 0/3W 0/3W 0/3W 10/2W 10/2W 10/2W 10/2W 10/2W Split- Adjustable Voltage Range(Vmin-Vmaz) V 183-228 211-264 244304 183-228 211-264 244304 183-228 211-264 244304 Grid Frequency Hz 60 60 60 1 Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 S7-60.5 Q Maximum Current 0acmax) Aims 14.5 9912 17.2 1616 20 20 20 > Power Factor 5 >0.995 >0.99S The mostcommon residential inverter isthe ideal sizeforan average- i Total Harmonic Distortion At Rated Power No <2 <2 <2 i Grid Wiring Termination Type Terminal block,Pressure Clamp,AWG70-AWG4 sized family home. This family of single-phase string inverter Protection Devices 1 complements the typical number of rooftop solar panels,allowing Input home-owners to get the most efficient energy harvesting for the Reverse Polarity Protection Yes Yes Yes size of the property.This rugged outdoor inverter has been designed Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 h channel Varistor,2 for each channel ' PV Array Ground Fault Detection Pre start-up Riso and dynamic is GFDI(Requires Floating Arrays) GF as a completely sealed unit to withstand the harshest environmental - Output - Meets UL 1741/IEE1547 Meets UL 1741/IEE1547 Meets UL 1741/IEE1547 conditions. J Anti-Islanding Protection requirements requirements requirements « r ) Over-Voltage Protection Type Varistor,2(L,-L,/Li-G) Varistor,2(Li-Lz/Li-G) Varistor,2(L,-L,/L,-G) One Of the key benefits of the Uno family of single-phase inverters Maximum AC OCPD Rating A 2.0 20 1s 25 20 20 25 25 25 Efficis the dual input section to process two strings with independent i Maximum - 96 p p g p Maximum Efficiency 4'n 96.9 97 97 MPPT especially useful for rooftop installations with two different eECE%ngPerciency _ � 96 9e orientations(ie East and West).The high speed MPPT offers real-time Operating Performance g p " Stand-by Consumption Warns <8 <8 <8 power tracking and improved energy harvesting. « Nighttimeconsumption W., `<0.6 <0.6 <0.6 ` Communication User-Interface 16 characters x 2 lines LCD display The transformerless operation gives the highest efficiency of up to Remote Monitoring(ixRS485incl.) AURORA-UNIVERSAL(opt) 97.0%. The wide input voltage range makes the inverter suitable to Wired Local Monitoring(1xRS485 incl.) PVI-USB RS485_232(opt.),PVI-DESKTOP(opt.) Wireless Local Monitoring _ _ - _ _ _ _ _._ _ PVI-DESKTOP(opt.)with PVI-RADIOMODULE(opt.) low power installations with reduced string size. 111 I Environmental t -13 to+140(-2s to+60)with -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with Ambient Air Operating Temperature Range 'F('C) derating above 131(55) derating above 131(SS) derating above 113(45) Ambient Air Storage Temperature Range 'F('C) -40 to 176(-40 to+80) -40 to 176(-40 to+80) -00 to 176(-40 to+80) - _._ ----- ----- ------- - ----- - Relative Humidity %RH 0-100 condensing 0-100 condensing 0-100 condensing 4 - SO Acoustic Noise Emission Level db(A)@1 m <50 <SO <(2000) �C,� v�Stt rt rryva =- Maximum Operating Altitude without Derating ft(m) 6S60(2000) 6560(2000) 6560(2 IlJrf�� VISIlu�111IUII���N1J MechanicalSpecifications pecifications - - 1 I Enclosure rating NEMA 4X NEMA 4X NEMA 4X --- - ---- - -- - --- - -- - - -- -- ----- Cooling Natural Convection Natural Convection Natural Convection a • Each inverter is set on specific grid codes which can be selected in the field Dimensions(H x x DI in(mm) 33.8 x 12.8 x 8.7(859 x 325 x 222)-S Version • i Weight Ib/(kg) <47.3(21.3)-S version <47.3(21.3)-S version Single phase output <47.3(21.3)-5 version • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrayWall bracket s oriented in Mounting size Rea size size Trade size KOs:(tea x 1/2'�and Trade size KOs:(tea x 1/2')and Trade site KOs:(tea x 1/2")and Conduit connections— (tea x 1-1/4°3 places side,front, (tea x 1-1/4,3 places side,front, (tea x 1-1 X,3 places side,front, different directions rear) rear) rear) • Wide input range 1 DC Switch RatingiPer Contact) AN 25/600 25/600 25/600 • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting safety Isolation Level Transformerless(Floating Array) Transformedess(Floating Array) Transformerless(Floating Array) • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance across Safety and EMC Standard UL 1741,CSA-C22.2N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 the entire input voltage and output power range Safety Approval CSAa csa, csA, • Outdoor enclosure for unrestricted use under any environmental conditions warranty 10 Standard Warranty years 10 10 • Integrated OC disconnect switch in compliance with international Standards(-S Version) Extended Warranty years 15&20 15&20 15&20 • RS-485 communication interface(for connection to laptop or datalogger) Available Models S • Compatible with PVI-RADIOMODULE for wireless communication with Aurora PVI-DESKTOP standard-withoutoc Switchandwiringeox PVI-3.0-OTD-S-U PVI -OU D-S-U PVI-4.2- US-U �r With DC Switch and Wiring Box PVI-3.0-OUTD-S-US PVI-3.6-OUTD-S-US PVI-4.2-OUTD-S-US •AII data is subject to change without notice '•Capability enabled at nominal AC voltage and with sufficient DC power available ,•„ • t •••' 4M 9 1 When equipped with optional DC Switch and Wiring Rox s� CSA INTERNATIONAL C 0K, RUIl���� � � �IlaIlIl11ce Certificate: 2096477 Master Contract: 173688 Project: 2439385 Date Issued: July 19,2011 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. icp p �Zo�-�ew�ato�k. Issued by: Rob Hempstock,AScT. C US PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-4.2-OUTD-US,PVI-3.6-OUTD-US,PVI-3.0-OUTD-US,PVI-4.2- OUTD-S-US,PVI-3.6-OUTD-S-US,PVI-3.0-OUTD-S-US,PVI-4.2-OUTD-US-W;PVI-3.6-OUTD-US-W and PVI-3.0-OUTD-US-W;provided with two DC input channels,permanently connected. For details related to ratings,reference should be made to the CSA Certification Record,Appendix I or the Descriptive Report. APPLICABLE REQUIREMENTS CSA-C22.2 No.107.1-01 - General Use Power Supplies UL Std No. 1741-Second Edition - Inverters,Converters,Controllers and Interconnection System Equipment for Use With Distributed Energy Resources(January 28,2010) DQD 507 Rev.2009-09-01 Page:1 � Y Office of Consumer A airs nd�Busme/jsasf/eugu9ation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration - 7 Registration: 168572 l -� _- Type: Supplement Card �'= — -•e Jr Expiration: 3/8/2015 SOLARCITY CORPORATION NOLAN RICHARDSON 24 ST. MARTIN STREET BLD 2 UNIT MARLBOROUGH, MA 01752 `r\ Update Address and return card.Mark reason for change. Address [j Renewal E] Employment Lost Card SCA 1 0 20M-05/11 �/ �p / j VEC t(071 yno)?"Jeat(li ( \_ ffice of Consumer Affairs&Business Regulation License or registration valid for individul use only ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation egistration: 168572 Type: 10 Park Plaza-Suite 5170 Expiration: 3/8/2015 Supplement Card Boston,MA 02116 SOLARCITY CORPORATION NOLAN RICHARDSON 24 ST MARTIN STREET BLD 2UN1 WNI-BOROUGH,MA 01752 Undersecretary Not valid without signature Massachusetts- Department of Public Safeth Board of Building Regulations and Standards Construction Supervisor License License: CS 92597 WIN". LESTER E WILT JRA 10 RANGER CIRCLE SO WEYMOUTH, MA 02190 Expiration: 11/8/2013 (unuuis�iuner Tr#: 7422 ECLIPSE ENGINEERING INC. February 9,2013 Andrew Oesterreicher SolarCity,Inc. 3055 Clearview Way OY E. I IKo San Mateo,CA 94402 IVI .ass Re: Ayres Residence—Project#018200 �� raros►1 45 Keyes Way North Andover,MA 01845 Andrew, As requested,we have reviewed the solar array connection to the roof structure at the above noted residence. The purpose of our review is to determine the required spacing of the connection points to the existing roof structure and verify that the existing roof structure can support the required loads. The solar array will be located on the structure as shown on the sheet PV 2 provided by SolarCity,Inc. A jobsite observation of the condition of the existing framing system was performed by an audit team from SolarCity. All attached structural calculations are based on these observations and the following design criteria: Design Criteria: ■ Building Jurisdiction: North Andover,Massachusetts ■ Applicable Codes: 2009 International Building Code,ASCE7-05 ■ Ground Snow Load: 50 psf ■ Roof Snow Load: 23.7 psf(reduced for slope) ■ Basic Wind Speed: 100 mph,Exposure C • Solar Modules: 3.5 psf-As shown on the plans provided by SolarCity We find that the solar array connections and the existing roof framing members are adequate to support the required loading of the above noted jurisdiction plus the additional dead weight of the solar panels. We have only reviewed the adequacy of the connection to the existing roof and the roof structure to support the required vertical and lateral loads from the solar array system. We do not take responsibility for any other portion of the solar array support system,any other structural elements not contained within this letter,or the integrity of the structure as a whole. Sincerely, Troy E. Leistiko Eclipse Engineering,Inc. Troy I agree to the terms Leistiko, defined by the placement of my Sushil Shenoy,EIT P.E. _ signature in this Junior Project Manager document Structural Missoula, MT Enclosed: Supporting CalculationsO n I y 4313 .02.12 14:26: 155 NE REVERE AVENUE,SUITE A.BEND.Olt 97701 PHONE:(541)389-9659 SAX:(541)312-8708 WWW.ECLIPSE-ENGINEERING.CUM � 1 I i ECLIPSE ENGINEERING INC. C Structural Calculations Roof Mount Solar PV Attachment PROJECT:� • 14 CF PRO �.�J a Ayres Residence - Job# 01845 r CI"Il. 45 Keyes Way 110. North Andover, MA 01845 Client: Larry Ayres, 781-308-0280 Eclipse Engineering, Inc. has reviewed only the adequacy of the solar panel attachment and roof framing at the solar panels to support the vertical and lateral loads of the above noted project. We neither take responsibility for any other element not contained within this package nor the integrity of the structure as a whole. Calculations Prepared For: Calculations Prepared By: SolarCity, Inc. Eclipse Engineering, Inc. 3055 Clearview Way 155 NE Revere Ave. San Mateo, California 94402 Bend, OR 97701 888-465-2489 541-389-9659 155 NF REVERE AVENUE.SUITE A.BEND.OR 97701 ' PHONE:(541)389-9659 FAX:(541)312-8708 WMUCLIPSE-ENGINEERING.COM ® . is Eclipse Engineering, Inc Solar City 2/9/2013 Consulting Engineers Calculations SBS Project: Ayres Residence. Client: Solar City EEI Proj.M 13-02-132 Solar City Proj.M 018200 Date: 2/9/2013 Roof Angle: 39 deg Wind A: 1.35 Building Dept.: North Andover Ground Snow: 50 psf Wind Speed: 100 mph-3 sec gust ROOF LOADING ESTIMATES DL Roof- DL st) Comp.Shingles(2-layers) 4.0 2x6 rafters @ 16"oc 2.8 Insulation 1.6 1/2"gyp.Ceiling 2.2 5/8"Plywood Shtg 1.8 Misc 2.0 Total: 14.4 psf Use: 15.0 psf DL Solar Panel- Panel Length 65.0 in Panel Width 39.0 in Hardware Weight 6.668 lbs Panel Weight 55 lbs Panel DL 3.503034 psf Total: 3.5 psf Use: 3.5 psf 4 � Eclipse Engineering, Inc 2/9/2013 Consulting Engineers Calculations SBS ROOF SNOW LOAD - Per 2009 IBC Section 1608&ASCE 7-05 Roof Design Criteria Roof Pitch a= 39 deg Ground Snow Load- Pg= 50 psf ,Existing Roof Snow Load-Per ASCE 7-05,Section 7.3 Exposure Factor- Ce= 1 Per ASCE Table 7-2 Thermal Factor- Co= 1.1 Per ASCE Table 7-3 Importance Factor- I= 1 Per ASCE Table 7-4 CAT II Slope Factor- Csf= 1 Per ASCE Figure 7-2 Non-Slippery Flat Roof Snow Load- Pfr= 38.5 psf Pf,. = 0.7*Ce *Cti *I *Pg . Minimum Flat Roof Load- Pfrm;n= 20 psf Per ASCE 7.3 Pfrmin = 20psf*I Flat Roof Design Snow Load- Pf= 38.5 psf Sloped Roof Design Snow Load- Psf= 38.5 psf Ps1 = Csi *Pf New Roof Snow Load-Per ASCE 7-05,Section 7.4 New Thermal Factor- Cf2= 1.2 Per ASCE Table 7-3 New Slope Factor- C52= 0.56 Per ASCE Figure 7-2 Non-Slippery-7.2b Flat Roof Snow Load- Pf2= 42 psf Pfr2 = 0.7*Ce *Ct2 *1 *Pg Minimum Flat Roof Load- Pfm,;n= 20 psf Pfrmin = 20psf*1 Flat Roof Design Snow Load- Pf2= 42 psf Sloped Roof Design Snow Load- P52= 23.7 psf Ps2 = Cs2 *Pf Estimated weight of Solar Panels Ws= 3.5 psf Net Increase in Load on Roof Wt= 27.2 psf Wt = Ps2 +Ws %Increase in Load on Roof -29.4% wt-P51 * 100 PSI Note:The increase in load on the roof from the addition of the solar panels is less than 5%as allowed by the IEBC;therefore,the existing structure is adequate to support the additional solar panel weight. Eclipse Engineering, Inc 2/9/2013 Consulting Engineers Calculations SBS SOLAR ARRAY CONNECTION TO EXISTING ROOF Wind Zone 2 Wind Loading -ASCE STANDARD -ASCE 7-05 Section 6.4.2.2-Wind Loads on Components and Cladding-Simplified Method: 3 Second Wind Gust V= 100 mph Importance Factor I= 1 Net Design Wind Pressure-Figure 6-3 Pnet30= 21 psf 10 SQ FT Velocity Pressure Exp.Coefficient-Figure 6-3 A= 1.35 Up to 20ft above grade-exp C Topographic Factor 6.5.7.2&Figure 6-4 KZt= 1 (1 +Kl *KZ *K3)2 Kt =0, K2=0, K3=0 Velocity Pressure-6.5.10 pnet= 28.4 psf A*Kt*f*P1et30 Length of Solar Panel LP= 33 in Max load is half of panel Spacing of Base Supports Sb= 48 in Every other rafter Height of Solar Rack HP= 3 in Worst case Area of Solar Panel @ support AP= 11 ft` LP *Sb Worst Case for Offset Panel Uplift per Bracket Tb= 312 lbsPnet *Ap Shear Force per Bracket Vb= 28 lbs Pnet*hp *Sp Number of Screws per Bracket NS= 1 Tension per Screw TS= 312 lbs Tb N, Shear per Screw VS= 28 lbs VbNs Angle of Component Loading 0= 84.8 deg tan-1 Ts VS Component Load on Screw ZC= 313 lbs �T2 +Vsa Duration Factor Cd= 1.6 Shear&Withdraw]-5/16"Lag Z= 208 lbs 130*Cd Withdraw]Capacity per Inch W= 205 lbs/in Depth of Screw p=1 2.25 in Withdrawl Capacity T= 738 lbs Cd *P*W Capacity of(1)Lag Screw Za= 722.9 lbs T*Z T*COS 02 +Z*sin 02 Capacity of So]arCity Base- "Yeti" Zb 615 lbs Checks Zb>Tb Za>Z, OK! OK! USE: 5/16"DIAMETER LAG SCREWS spaced a maximum 48"on center across the slope with two rails per panel down the slope Eclipse Engineering, Inc 2/9/2013 Consulting Engineers Calculations SBS SOLAR ARRAY CONNECTION TO EXISTING ROOF Wind Zone 3 Wind Loading -ASCE STANDARD -ASCE 7-05 Section 6.4.2.2-Wind Loads on Components and Cladding-Simplified Method: 3 Second Wind Gust V= 100 mph Importance Factor I= 1 Net Design Wind Pressure-Figure 6-3 Pnet30= 21 psf 10 SQ FT Velocity Pressure Exp.Coefficient-Figure 6-3 X= 1.35 Up to 20ft above grade-exp C Topographic Factor 6.5.7.2&Figure 6-4 Kt= 1 (1 +Kl *K2 *K3)2 Kt =0, K2=0,K3=0 Velocity Pressure-6.5.10 Pnet= 28.4 psf A*&t *I*Pnet30 Length of Solar Panel LP= 16.5 in Max load is quarter of panel Spacing of Base Supports Sb= 48 in Every other rafter Height of Solar Rack HP=; 3 in Worst case Area of Solar Panel @ support AP= 5.5 ft` LP *Sb Worst Case for Offset Panel Uplift per Bracket Tb= 156 lbs 1p,,t *Ap Shear Force per Bracket Vb= 28 lbs pnet *hp *Sp Number of Screws per Bracket NS=� 1 Tb Tension per Screw TS= 156 lbs — NS , Shear per Screw VS= 28 lbs VbN, Angle of Component Loading 0= 79.7 deg tan-1 TsVS Component Load on Screw ZC= 158 lbs FT,2+Vsz Duration Factor Cd=, 1.6 Shear&Withdrawl-5/16"Lag Z= 208 lbs 130*Cd Withdrawl Capacity per Inch W= 2KIbs/in Depth of Screw p= 2.25 in Withdrawl Capacity T= 738 lbs Cd *p*W Capacity of(1)Lag Screw Za= 682.4 lbs T*Z T*COS 02 +Z*sin 02 Capacity of SolarCity Base- "Yeti" Zb= 615 lbs Checks Zb>Tb Za>Zc OK! OK! USE:5/16" DIAMETER LAG SCREWS spaced a maximum 48"on center across the slope with two rails per panel down the slope 1 ,p %,MYg SolarPPA�" I IomPgwner Name.and Address Co-Owner Na ne(If An-y) Installation Localion Coritractnr License Larry Ayres 45 Keyes Way MA HIC 168572 45 Keyes Way North Andover, MA 01845 North Andover, MA 01845 i 1. Introduction. (a) Power Price. You are purchasing the power the This Power Purchase Agreement (this "Power Purchase System produces. The price of that power is set Agreement" or "PPA") is the agreement between you forth on the value statement attached as and SolarCity Corporation (together with its successors Schedule A. and assigns, "SolarCity" or "we"), covering the sale to (b) Payments. Schedule A details, among other you of the power produced by the solar panel system things, (i)the rice per kWh you will be charged; P p Y the S stem described below. SolarCit a rees to y g sell to you, and you agree to buy from SolarCity, all of (ii)the annual percentage price Increase (If any); (iii) SolarCity's a ate of the amount of power the power produced by the System on the terms and conditions described in this Power Purchase that is expected to be produced by the System in Agreement. The System will be installed by SolarCity the first year of the Term; (iv) SolarCity's at the address you listed above. This Power Purchase estimate of the amount of power that is expected Agreement will refer to this address as the "Property" to be produced by the System over the entire Initial Term; (v)your monthly payments for the or your Home. This Power Purchase Agreement is first year(or your prepayment); and.(vi)your twelve (12) pages Tong and has up to three (3) guaranteed power production and repayment Exhibits depending on the state where you live. price for underproduction. Your estimated SolarCity provides you with a Limited Warranty(the monthly payments are the product of (A) the Limited Warranty"). The Limited Warranty is price per kWh multiplied by(B)the estimated attached as Exhibit 2. This is a legally binding annual kWh output divided by (C)twelve (12) agreement with disclosures required by law, so please ("Monthly Payments"). You will pay no Monthly read everything carefully. If you have any questions you Payments if are full regarding this Power Purchase Agreement, please ask y Y Y prepaying this PPA. your SolarCity sales consultant. Monthly Payments are due on the first of the month for the previous calendar month. Because these are calendar Monthly Payments 2. Term. (billed after the calendar month is over) based SolarCity agrees to sell you the power generated by the on estimated production, the amount you System for 2Lyears (240 months), plus, if the actually pay for each month may be more or less Interconnection Date is not on the first day of a than the estimated amount based on the calendar month, the number of days left in that partial -System's actual production in each calendar calendar month. We refer to this period of time as the month. Monthly Payments may change if your "Term." The Term begins on the Interconnection price per kWh changes over the Term of this Date. The "Interconnection Date" is the date that the PPA. Any such changes are set forth in System is turned on and generating power. SolarCity Schedule A. Within 45 days of the end of each will notify you by email when your System is ready to calendar year, SolarCity will compare the be turned on. System's actual production and the estimated production and either(i)send you a refund for 3. Intentionally Left Blank. any overpayments you made; or (ii) invoice you for the extra power the System produced.You will have regular access to the System's 4. Power Purchase Agreement Payments: Amounts. production via your SolarCity online account. Power Purchase Agreement(Residential)June 8,2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 1 ' I ' Actual production will vary from estimated NO permit SolarCity, after we give you production due to weather and other conditions, reasonable notice, to inspect the System but SolarCity guarantees you will not pay for for proper operation as we reasonably power the System does not actually produce. determine necessary; See Schedule A for details. Payments due upon installation are due immediately prior to (vii) use the System primarily for personal, commencement of installation. family or household purposes, but not to heat a swimming pool; (c) Payment Reconciliation. If (i)the System is off line for more than seven (7) full twenty-four (24) (viii) not do anything, permit or allow to exist hour days cumulatively during the Term (for any condition or circumstance that example,you remove the System to do would cause the System not to operate renovations to your Home); or(ii)you take some as intended at the Property; action that significantly reduces the output of the System; or(iii)you don't trim your bushes or (ix) notify SolarCity if you think the System trees to their appearance when you signed this is damaged or appears unsafe; if the PPA to avoid foliage growth from shading the System is stolen; and prior to changing System, then SolarCity will reasonably estimate your power supplier; the amount of power that would have been delivered to you during such outages or reduced (x) have anyone who has an ownership production periods and shall consider that as interest in your Home sign this Power actual production for purposes of this paragraph. Purchase Agreement; You will not be charged for the System being off line due to SolarCity's fault, or if it's due to grid (xi) return any documents we send you for failure or power outages caused by someone signature (like incentive claim forms) other than you. within seven (7) days of receiving them; and I 5. Power Purchase Agreement Obligations. (xii) maintain and make available,at your cost, a functioning indoor Internet (a) System, Home and Property Maintenance connection with one available wired You agree to: Ethernet port and standard AC power outlet within eighty(80) feet of the (i) only have the System repaired pursuant System's AC/DC inverter(s). See section to the Limited Warranty and reasonably 2(c)of the Limited Warranty for details. cooperate when repairs are being made; (b) System Construction, Repair, Insurance and (ii) keep trees, bushes and hedges trimmed SolarCity's obligations: so that the System receives as much sunlight as it did when SolarCity installed it; (iii) not modify your Homein a way that SolarCity agrees to: shades the System; (xiii) provide you with a Home Energy (iv) be responsible for any conditions at your Evaluation: Home that affect the installation (e.g., blocking access to the roof, or'removing (xiv) schedule the installation of the System a tree that is in the way); at a mutually convenient date and time; (v) not remove any markings or (xv) construct the System according to identification tags on the System; written plans you review; Power Purchase Agreement(Residential)June 8,2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 2 (xvi) provide you with a web-enabled meter to (ii) Returned Check Fee: $25(or such lower accurately measure the amount of power amount as required by law)for any the System delivers to you; check or withdrawal right that is (xvii) notify you if the System design has to be returned or refused by your bank; materially changed so that you can (iii) Late Payments: accrue interest at the review any such changes; lesser of twelve percent(12%) annually or the maximum allowable by applicable (xviii) clean up after ourselves during the law; and construction of the System; (iv) Product Change Fee: if after you sign (xix) insure the System against all damage or this Power Purchase Agreement, but loss unless(A)that damage or loss is before we begin installation, you decide caused by your gross negligence; or(B) you would prefer an alternative SolarCity you intentionally damage the System; product(a SolarLease, or a prepaid PPA, etc.)you will pay a $250 change fee. (xx) repair the System pursuant to the Limited Warranty and reasonably (e) Estimated Taxes cooperate with you when scheduling repairs; You agree to pay any applicable sales or use taxes on the Monthly Payments(or prepayment, (xxi) create a priority stream of operation and as applicable)due under this PPA. If this PPA maintenance payments to provide contains a purchase option at the end of the enough cash flow in our financing Term,you agree to pay any applicable tax on the transactions to pay for the Limited purchase price for the System. You also agree Warranty obligations and the repair and to pay as invoiced any applicable personal maintenance of the System in property taxes on the System that your local accordance with this PPA even if jurisdiction may levy. The total estimated SolarCity ceases to operate; and amount you will pay for taxes over the Term is $0.00. (xxii) not put a lien on your Home or Property. (f) No Alterations (c) Home Renovations or Repairs If you want to make any repairs or improvements You agree that you will not make anymodifications, improvements, revisions or to the Property that could interfere with the System (such as repairing the roof where the additions to the System or take any other action System is located),you may only remove and that could void the Limited Warranty on the replace the System pursuant to the Limited System without SolarCity's prior written consent. Warranty. If you make any modifications, improvements, revisions or additions to the System, they will (d) Automatic Payment, Fees; Late Charges become part of the System and shall be In addition to the other amounts you agree to SolarCity's property. pay in this Power Purchase Agreement, you (g) Access to the System agree to pay the following: (i) You grant to SolarCity and its (i) Automatic Payment Discount: All prices employees, agents and contractors the include a $15 monthly discount for right to reasonably access all of the using automatic payment. You will not Property as necessary for the purposes receive a $15 monthly discount if you of(A) installing, constructing, operating, do not make automatic Monthly owning, repairing, removing and Payments through your checking or replacing the System or making any savings account; additions to the System or installing complementary technologies on or about the location of the System; (B) enforcing Power Purchase Agreement(Residential)June 8,2012 Copyright 0 2009-2012 SolarCity Corporation.All Rights Reserved. 3 SolarCity's rights as to this Power Schedule A,describes your payment obligations Purchase Agreement and the System; under this PPA. SUBJECT TO SECTION 4(b) (C) Installing, using and maintaining ABOVE, YOU AGREE THAT THE OBLIGATION electric lines and inverters and meters, TO PAY ALL PAYMENTS AND ALL OTHER necessary to interconnect the System to AMOUNTS DUE UNDER THIS PPA SHALL BE, your electric system at the Property ABSOLUTE AND UNCONDITIONAL UNDER ALL and/or to the utility's electric CIRCUMSTANCES AND SHALL NOT BE distribution system; or(D)taking any SUBJECT TO ANY ABATEMENT, DEFENSE, other action reasonably necessary in COUNTERCLAIM, SETOFF, RECOUPMENT OR connection with the construction, REDUCTION FOR ANY REASON WHATSOEVER, installation, operation, maintenance, IT BEING THE EXPRESS INTENT OF THE removal or repair of the System. This PARTIES THAT ALL AMOUNTS PAYABLE BY access right shall continue for up to YOU HEREUNDER SHALL BE, AND CONTINUE ninety(90) days after this Power TO BE, PAYABLE IN ALL EVENTS INCLUDING Purchase Agreement expires to provide BY YOUR HEIRS AND ESTATE AND, EXCEPT SolarCity with time to remove the AS SET FORTH BELOW IN SECTIONS 6, 23 System at the end of the Power AND 24, YOU HEREBY WAIVE ALL RIGHTS Purchase Agreement. SolarCity shall YOU MAY HAVE TO REJECT OR CANCEL THIS provide you with reasonable notice of its PPA, TO REVOKE ACCEPTANCE OF THE need to access the Property whenever SYSTEM, OR TO GRANT A SECURITY commercially reasonable. INTEREST IN THE SYSTEM. (ii) During the time that SolarCity has 6. Conditions Prior to Installation of the System: Change access rights you shall ensure that its Ores. access rights are preserved and shall not interfere with or permit any third party to interfere with such rights or access. (a) SolarCity's obligation to install the System and You agree that the System is not a sell you the power it produces is conditioned on fixture, but SolarCity has the right to file the following items having been completed to its any UCC-1 financing statement or reasonable satisfaction: fixture filing that confirms its interest in the System. (i) completion of(A)the engineering site audit(a thorough physical inspection of (h) Indemnity the Property, including, if applicable, geotechnical work), (B) the final System To the fullest extent permitted by law, you shall design, and (C) real estate due diligence indemnify' defend, protect save and hold to confirm the suitability of the Property harmless SolarCity, its employees, officers, for the construction, installation and operation of the System; directors, agents, successors and assigns from any and all third party claims, actions, costs, expenses (including reasonable-attorneys'fees (ii) approval this Power Purchase and expenses), damages, liabilities, penalties, Agreementt by one of SolarCity's losses, obligations, injuries, demands and liens financing parties; of any kind or nature arising out of, connected with, relating to or resulting from your (iii) confirmation of rebate, tax credit and negligence or willful misconduct; provided, that renewable energy credit payment nothing herein shall require you to indemnify availability in the amount used to SolarCity for its own negligence or willful calculate the Monthly Payments set misconduct. The provisions of this paragraph forth in this Power Purchase Agreement; shall survive termination or expiration of this Power Purchase Agreement. (iv) confirmation that SolarCity will obtain all applicable benefits referred to in (i) Payments Section 9; Power Purchase Agreement(Residential)June 8, 2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 4 (v) receipt of all necessary zoning, land use SolarCity works with banks, large companies and other and building permits; and significant financing parties to finance your System. As a result, SolarCity will assign this PPA to one of its NO completion of any renovations, financing parties. Thus, to finance your System, you improvements or changes reasonably agree that SolarCity may assign, sell or transfer the required at your Home or on the System and this Power Purchase Agreement, or any Property(e.g., removal of a tree or part of this Power Purchase Agreement or the exhibits, necessary roof repairs to enable us to without your consent. Assignment, sale-or transfer safely install the System). generally means that SolarCity would transfer certain of its rights and certain of its obligations under this SolarCity may terminate this Power Purchase Power Purchase Agreement to another party. This Agreement without liability if, in its reasonable assignment does not change SolarCity's obligation to judgment, any of the above listed conditions(i) maintain and repair your System as set forth in the through (vi) will not be satisfied for reasons Warranty, beyond its reasonable control. Once SolarCity 9. Ownership of the System;Tax Credits and Rebates, starts installation, however, it may not terminate this Power Purchase Agreement for your failure You agree that the System is SolarCity's personal to satisfy conditions(i)through (vi) above. property under the Uniform Commercial Code. You understand and agree that this PPA is not a contract to (b) Amendments, Your Right to Terminate for -sell or lease the System to you. SolarCity owns the Material Changes. System for all purposes, including any data generated from the System. You shall at all times keep the Both parties will have the right to terminate this System free and clear of all liens, claims, levies and PPA, without penalty or fee, if SolarCity legal processes not created by SolarCity, and shall at determines after the engineering site audit of your expense protect and defend SolarCity against the your Home that it has misestimated by more same. than ten percent(10%)the System's annual production. Such termination right will expire at YOU UNDERSTAND AND AGREE THAT ANY AND ALL the earlier of (i) one (1)week prior to the TAX CREDITS, INCENTIVES, RENEWABLE ENERGY scheduled System installation date and (ii)one CREDITS, GREEN TAGS, CARBON OFFSET CREDITS, (1) month after we inform you in writing of the UTILITY REBATES OR ANY OTHER NON-POWER revised production estimate. If neither party ATTRIBUTES.OF THE SYSTEM ARE THE PROPERTY exercises their right to terminate this PPA OF AND FOR THE BENEFIT OF SOLARCITY, USABLE following a ten percent(10%) change in the AT ITS SOLE DISCRETION. SOLARCITY SHALL HAVE System's production, then any changes to the THE EXCLUSIVE RIGHT TO ENJOY AND USE ALL System will be documented in an amendment to SUCH BENEFITS, WHETHER SUCH BENEFITS EXIST this PPA. You authorize SolarCity to make NOW OR IN THE FUTURE. YOU AGREE TO REFRAIN corrections to the utility paperwork to conform to FROM ENTERING INTO ANY AGREEMENT WITH this PPA or any amendments to this PPA we YOUR UTILITY THAT WOULD ENTITLE YOUR UTILITY both sign. TO CLAIM ANY SUCH BENEFITS. YOU AGREE TO REASONABLY COOPERATE WITH SOLARCITY SO 7. Warranty. THAT IT MAY CLAIM ANY TAX CREDITS, YOU UNDERSTAND THAT THE SYSTEM IS RENEWABLE ENERGY CREDITS, REBATES, CARBON WARRANTED SOLELY UNDER THE LIMITED OFFSET CREDITS OR ANY OTHER BENEFITS FROM WARRANTY ATTACHED AS EXHIBIT 2, AND THAT THE SYSTEM. THIS MAY INCLUDE TO THE EXTENT THERE ARE NO OTHER REPRESENTATIONS OR ALLOWABLE BY LAW, ENTERING INTO NET WARRANTIES, EXPRESS OR IMPLIED, AS TO THE METERING AGREEMENTS, INTERCONNECTIONgGREEMENTS, AND FILING RENEWABLE MERCHANTABILITY, FITNESS FOR ANY PURPOSE, ENERGY/CARBON OFFSET CREDIT REGISTRATIONS CONDITION, DESIGN, CAPACITY, SUITABILITY OR AND/OR APPLICATIONS FOR REBATES FROM THE . PERFORMANCE OF THE SYSTEM OR ITS FEDERAL, STATE OR LOCAL GOVERNMENT OR A INSTALLATION. LOCAL UTILITY AND GIVING THESE TAX CREDITS, 8. Transfer. RENEWABLE ENERGY/CARBON CREDITS, REBATES OR OTHER BENEFITS TO SOLARCITY. Power Purchase Agreement(Residential)June 8,2012 Copyright 0 2004-2012 SolarCity Corporation.All Rights Reserved. 5 average rate charged by your local utility and shall 10.Purchasine the System Prior to the End of the Term. continue to renew for one(1)year terms at that same rate until we hear from you at least thirty(30)days prior In addition to purchasing the System at the end of the to a renewal term that you do not wish to renew. Term (see Schedule A), you have the option to purchase the System prior to the end of the Term. To 12. Selling Your Home. exercise this option you must be in good standing under this Power Purchase Agreement and you need to (a) If you sell your Home you can: give us at least one(1) month's, but not more than three (3) months' prior written notice. You can purchase this System: (i) Transfer this Power Purchase Agreement (i) on the five (5)year anniversary of the and the Monthly Payments beginning of the Term and every annual If the person buying your Home meets anniversary after the five (5)year SolarCity's credit requirements, then anniversary; and where permitted by the local utility, the person buying your Home can sign a (ii) when you sell your Home(See Section transfer agreement assuming all of your 12 for more details); and rights and obligations under this Power Purchase Agreement. (iii) if SolarCity ever ceases its operations. In each of(i), (ii) and (iii) above, the price you will pay (ii) Move the System to Your New Home for the System will be the greaterof the System's fair If you are moving to a new home in the market value ("FMV")and the amount shown on same utility district, where permitted by Schedule A. The interests of any financing party shall the local utility, the System can be moved not be taken into account when determining the FMV; to your new home pursuant to the Limited a third party independent appraiser will be retained to Warranty. You will need to pay all costs compute the System's FMV. SolarCity's maintenance associated with relocating the System, and repair obligations will end when you purchase the execute and provide the same access and System unless you enter into a new maintenance and ownership rights to SolarCity as provided repair agreement with SolarCity, provided that you will for in this PPA and provide any third party have no less than a ten (10)year warranty on the consents or releases required by SolarCity System beginning on the Interconnection Date that in connection with the substitute guarantees that the System will be free from defects in premises. workmanship or defects in, or breakdown of, materials or components. (iii) Prepay this Power Purchase Agreement 11. Renewal. and Transfer only the Use of the System At any time during the Term, you can You have the option to renew your PPA for up to ten prepay this Power Purchase Agreement (10)years in two (2)five (5) year renewal periods. We (see Schedule A) and add the cost of the will send you renewal forms three (3) months prior to PPA to the price of your Home. The the expiration of the Term, which forms shall set forth Person buying your Home will only need to the new Monthly Payments due under the renewal PPA, sign a transfer agreement to assume your based on our assessment of the then current fair market rights and non-Monthly Payment value of the System. If you want to renew and you are obligations under this PPA. The System in compliance with this PPA, complete the renewal stays at your Home, the person buying forms and return them to us at least one (1) month prior your Home does not make any Monthly to the end of the PPA. In the event that you do not Payments and has only to comply with the agree to the new Monthly Payments this PPA shall non-Monthly Payment portions of this expire by its terms on the termination date. If we don't PPA. The prepayment amount set forth in hear back from you after we send you the renewal forms, Schedule A reflects a five percent(5%) then this PPA shall renew for an additional one (1)year discount rate for early payment. term at ten percent (10%) less than the then-current Power Purchase Agreement(Residential)June 8,2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 6 (b) You agree to give SolarCity at least fifteen (15) 14.Limitation of Liability. days but not more than three(3) months' prior written notice if you want someone to assume (a) No Consequential Damages your PPA obligations. In connection with this assumption,you, your approved buyer and SOLARCITY'S LIABILITY TO YOU UNDER THIS SolarCity shall execute a written transfer of this POWER PURCHASE AGREEMENT SHALL BE PPA. Unless we have released you from your LIMITED TO DIRECT, ACTUAL DAMAGES obligations in writing, you are still responsible ONLY. YOU AGREE THAT IN NO EVENT SHALL for performing under this PPA. If your buyer EITHER PARTY BE LIABLE TO THE OTHER defaults on this PPA and we have not yet signed FOR CONSEQUENTIAL, INCIDENTAL, the transfer agreement,you will be responsible PUNITIVE, EXEMPLARY, SPECIAL OR for their default. We will release you from your INDIRECT DAMAGES. obligations under this PPA in writing once we have a signed transfer agreement with the (b) Actual Damages person buying your Home(provided such person has been approved as a transferee by SolarCity EXCEPT FOR CLAIMS UNDER SECTION 5(I), in writing). NEITHER PARTY'S LIABILITY TO THE OTHER WILL EXCEED AN AMOUNT EQUAL TO THE (c) If you sell your Home and can't comply with any MAXIMUM AMOUNT THAT COULD BE of the options in subsection (a) above, you will PAYABLE BY YOU UNDER SECTION 16(F). be in default under this Power Purchase DAMAGES TO YOUR HOME, BELONGINGS OR Agreement. Section 12(a) includes a Home sale PROPERTY RESULTING FROM THE by your estate or heirs. INSTALLATION OR OPERATION OF THE SYSTEM ARE COVERED IN SECTION 6(C) OF (d) EXCEPT AS SET FORTH IN THIS SECTION, THE LIMITED WARRANTY. YOU WILL NOT ASSIGN, SELL, PLEDGE OR IN ANY OTHER WAY TRANSFER YOUR INTEREST 15.Default. IN THE SYSTEM OR THIS PPA WITHOUT OUR PRIOR WRITTEN CONSENT, WHICH SHALL You will be in default under this Power Purchase NOT BE UNREASONABLY WITHHELD. Agreement if any one of the following occurs: (a) you fail to make any payment when it is due and 13. Loss or Damage. such failure continues for a period of ten (1.0) days; (a) Unless you are grossly negligent or you intentionally damage the System, SolarCity will (b) you fail to perform any material obligation that bear all of the risk of loss, damage,theft, you have undertaken in this PPA(which includes destruction or similar occurrence to any or all of doing something you have agreed not to do, like the System. Except as expressly provided in this alter the System)and such failure continues for PPA, no loss, damage, theft or destruction will a period of fourteen (14) days after written excuse you from your obligations under this PPA, notice; including Monthly Payments. (c) you or your guarantor have provided any false or (b) If there is loss, damage, theft, destruction or a misleading financial or other information to similar occurrence affecting the System, and you obtain this Power Purchase Agreement; are not in default of this PPA, you shall continue to timely make all Monthly Payments and pay all (d) you assign, transfer,encumber, sublet or sell other amounts due under the PPA and, this PPA or any part of the System without cooperate with SolarCity, at SolarCity's sole cost SolarCity's prior written consent; or and expense, to have the System repaired pursuant to the Limited Warranty. (e) you or any guarantor makes an assignment for the benefit of creditors, admits in writing its insolvency, files or there is filed against you or it a voluntary petition in bankruptcy, is adjudicated Power Purchase Agreement(Residential)June 8,2012 Copyright 0 2009-2012 SolarCity Corporation.All Rights Reserved. 7 bankrupt or insolvent or undertakes or purchase option (if any)and you have not defaulted, experiences any substantially similar activity. then within ninety(90)days you agree to call SolarCity at the telephone number listed in Section 7 of Exhibit 16.Remedies in Case of Default. 2 to schedule a convenient time for SolarCity to If this Power Purchase remove the System from your Home at no cost to you. Agreement is in default, we . may take any one or more of the following actions. If 18.Applicable Law:Arbitration. the law requires us to do so, we will give you notice PLEASE READ THIS SECTION CAREFULLY. and wait any period of time required before taking any of these actions. We may: ARBITRATION REPLACES THE RIGHT TOGO TO COURT, INCLUDING THE RIGHT TO A JURY AND THE (a) terminate this PPA; RIGHT TO PARTICIPATE IN A CLASS ACTION OR (b) take any reasonable-action to correct your SIMILAR PROCEEDING. IN ARBITRATION, A DISPUTE IS RESOLVED BY AN ARBITRATOR INSTEAD OF A default or to prevent our loss; any amount we pay will be added to the amount.you owe us and JUDGE OR JURY. will be immediately due; The laws of the state where your Home is located shall (c) require you, at your expense,to return the govern this PPA without giving effect to conflict of laws System or make it available to us in a reasonable principles. We agree that any dispute, claim or manner; disagreement between us (a "Dispute") shall be resolved exclusively by arbitration. (d) proceed, by appropriate court action, to enforce The arbitration, including the selecting of the performance of this PPA and to recover damages for your breach; arbitrator, will be administered by JAMS, under its Streamlined Arbitration Rules(the "Rules") by a single (e) turn off or take back the System by legal process neutral arbitrator agreed on by the parties within thirty or self-help, but we may not disturb the peace or (30) days of the commencement of the arbitration. violate the law; The arbitration will be governed by the Federal (f) recover from you (i)a payment equal to the Arbitration Act(Title 9 of the U.S. Code). Either party higher of(A)the prepay price and (B)the may initiate the arbitration process by filing the purchase price set both as forth in Schedule A necessary forms with JAMS. To learn more about plus(ii)all taxes, late charges, penalties, arbitration, you can call any JAMS office or review the interest and all or any other sums then accrued materials at www.jamsadr.com. The arbitration shall be or due and owing; or held in the location that is most convenient to your (g) use any other remedy available to us in this PPA Home. If a JAMS office does not exist in the county or by law. where you live, then we will use another accredited You agree to repay us for any,reasonable amounts we arbitration provider with offices close to your Home. pay to correct or cover your default.You also agree to If you initiate the arbitration, you will be required to reimburse us for any costs and expenses we incur pay the first$125 of any filing fee. We will pay any relating to the System's return resulting from early filing fees in excess of$125 and we will pay all of the termination. By choosing any one or more of these arbitration fees and costs. if we initiate the arbitration, remedies, SolarCity does not give up its right to use another remedy. By deciding not to use any remedy we will pay all of the filing fees and all of the should this Power Purchase Agreement be in default, arbitration fees and costs. We will each bear all of our SolarCity does not give up our right to use that remedy own attorney's fees and costs except that you are in case of a subsequent default. entitled to recover your attorney's fees and costs if you 17.System Removal; Return. prevail in the arbitration and the award you receive from the arbitrator is higher than SolarCity's last written At the end of the Term or the termination of this PPA, if you have not renewed this PPA or exercised your settlement offer. When determining whether your Power Purchase Agreement(Residential)June 8,2012 Copyright 0 2009-2012 SolarCity Corporation.All Rights Reserved. 8 award is higher than SolarCity's last written settlement PARTIES AND MAY BE ENTERED AND ENFORCED IN offer your attorney's fees and costs will not be ANY COURT HAVING JURISDICTION, EXCEPT TO THE included. EXTENT IT IS SUBJECT TO REVIEW IN ACCORDANCE Only Disputes involving you and SolarCity may be WITH APPLICABLE LAW GOVERNING ARBITRATION addressed in the arbitration. Disputes must be brought AWARDS. OTHER RIGHTS THAT YOU OR WE WOULD in the name of an individual person or entity and must HAVE IN COURT MAY ALSO NOT BE AVAILABLE IN proceed on an individual (non-class, non- ARBITRATION. representative) basis.The arbitrator will not award relief for or against anyone who is not a party. If either of us arbitrates a Dispute, neither of us, nor any other 19.Waiver. arbitrates person, may pursue the Dispute in arbitration as a class Any delay or failure of a party to enforce any of the action, class arbitration, private attorney general action provisions of this PPA, including but not limited to any remedies listed in this PPA,or to require performance or other representative action, nor may any such by the other party of any of the provisions of this PPA, Dispute be pursued on your or our behalf in any shall not be construed to(i) be a waiver of such litigation in any court. Claims regarding any Dispute provisions or a party's right to enforce that provision; or and remedies sought as part of a class action, class (ii) affect the validity of this PPA. arbitration, private attorney general or other 20.Notices representative action are subject to arbitration on an All notices under this PPA shall be in writing and shall individual (non-class, non-representative) basis, and be by personal delivery, facsimile transmission, the arbitrator may award relief only on an individual electronic mail, overnight courier, or certified or (non-class, non-representative) basis. This means that registered mail, return receipt requested, and deemed the arbitration may not address disputes involving other received upon personal delivery, acknowledgment of persons with disputes similar to the Disputes between receipt of electronic transmission, the promised delivery date after deposit with overnight courier, or you and SolarCity. five(5) days after deposit in the mail. Notices shall be The arbitrator shall have the authority to award any sent to the person identified in this PPA at theaddresses set forth in this PPA or such other address legal or equitable remedy or relief that a court could as either party may specify in writing. Each party shall order or grant under this agreement. The arbitrator, deem a document faxed to it as an original document. however, is not authorized to change or alter the terms 21. Entire Agreement: Changes. of this agreement or to make any award that would extend to any transaction other than yours. All statutes This PPA contains the parties' entire agreement regarding the sale and purchase of power generated by of limitations that are applicable to any dispute shall the System. There are no other agreements regarding apply to any arbitration between us. The Arbitrator will this PPA, either written or oral. Any change to this issue a decision or award in writing, briefly stating the PPA must be in writing and signed by both parties. If essential findings of fact and conclusions of law. any portion of this PPA is determined to be unenforceable, the remaining provisions shall be BECAUSE YOU AND WE HAVE AGREED TO enforced in accordance with their terms or shall be ARBITRATE ALL DISPUTES, NEITHER OF US WILL interpreted or re-written so as to make them HAVE THE RIGHT TO LITIGATE THAT DISPUTE IN enforceable. COURT, OR TO HAVE A JURY TRIAL ON THAT 22. Publicity. DISPUTE, OR ENGAGE IN DISCOVERY EXCEPT AS PROVIDED FOR IN THE RULES. FURTHER, YOU WILL SolarCity will not publicly use or display any images of NOT HAVE THE RIGHT TO PARTICIPATE AS A the System unless you initial the space below. If you initial the space below, you give us permission to take REPRESENTATIVE OR MEMBER OF ANY CLASS pictures of the System as installed on your Home to PERTAINING TO ANY DISPUTE. THE ARBITRATOR'S show to other customers or display on our website. DECISION WILL BE FINAL AND BINDING ON THE Power Purchase Agreement(Residential)June 8,2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 9 ,Customer Initials 23.NOTICE OF RIGHT TO CANCEL. YOU MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE YOU SIGN THIS CONTRACT. SEE EXHIBIT 1, THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. 24.ADDITIONAL RIGHTS TO CANCEL. IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL THIS PPA UNDER SECTIONS 6 AND 23, YOU MAY ALSO CANCEL THIS PPA AT NO COST AT ANY TIME PRIOR TO 5 P.M. OF THE 14T"CALENDAR DAY AFTER YOU SIGN THIS PPA. Power Purchase Agreement(Residential)June 8,2012 Copyright©2009-2012 SolarCity Corporation.All Rights Reserved. 10 SOLARCITY CORPORATION POWER PURCHASE AGREEMENT I have read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. Owner's Name: Larry Ayres Signature:, 4 Date: I z Z f I Z Co-Owner's Name (if any): Signature. Date: ru Power Purchasing Agreement Signature: Date: ) 2 SOLARCITY APPROVED LYNOON RIVE,CEO (PPA)Power Purchase Agreement *SolarCKY SOLARCITY CORPORATION POWER PURCHASE AGREEMENT Schedule A Value Statement Amount Due at Contract Signing: $0 Amount Due When Installation Begins: $2,500.00 Amount Due Following Bldg Inspection: $2,500.00 Installation Fee: $0 Average Cost per kWh: $0.1307 Estimated First Year Annual Production: 11,222 kilowatt hours(kWh) Estimated Initial Term Total Production: 214,094 kilowatt hours(kWh) Estimated First Year Monthly Payments: $100.35 Price per kWh Annual Increase: 0.0% Performance Guarantee Performance Prepay Purchase Option Guarantee Option End of Annual Price per kWh Guaranteed kWh Output Refund Estimated Minimum Cash Year at Year End Payment per Price to Purchase Price' kWh if Prepay the Guaranteed Remainder of Output Not Met the Initial Term' 1 $0.1073 11,222 $0.1307 $13,946 N/A 2 $0.1073 22,388 $0.1307 $13,446 N/A 3 $0.1073 33,498 $0.1307 $12,926 N/A 4 $0.1073 44,553 $0.1307 $12,386 N/A 5 $0.1073 55,552 $0.1307 $11,825 N/A 6 $0.1073 66,496 $0.1307 $11241 $11,241 7 $0.1073 77,386 $0.1307 $10,636 $10,636 8 $0.1073 88,221 $0.1307 $10,004 $10,004 9 $0:1073 99,002 $0.1307 $9,348 $9,348 10 $0.1073 109,729 $0.1307 $8,664 $8,664 11 $0.1073 120,402 $0.1307 $7,952 $7,952 12 $0.1073 131,022 $0.1307 $7,210 $7,210 13 $0.1073 141,589 $0.1307 $6,437 $6,437 14 $0.1073 152,103 $0.1307 $5,631 $5,631 15 $0.1073 162,565 $0.1307 $4,790 . $4,790 16 $0.1073 172,974 $0.1307 $3,912 $3,912 17 $0.1073 183,331 $0.1307 $2,997 $2,997 18 $0.1073 193,636 $0.1307 $2,041 $2,041 19 $0.1073 203,890 $0.1307 $1,043 $1043 20 $0.1073 214,093 $0.1307 $0 FMV 1) Per Section 10,the price you will pay to purchase the System will be the greater of the System's fair market value("FMV") and the amount shown above on Schedule A. 2) Per Section 12,the prepayment amounts shown above reflect a 5% discount rate. The Commonwealth of Massachusetts Print Form Department ofIndustrial Accidents Office of Investigations ,� � ` � •f 1 Congress Street, Suite 100 � r Boston, MA 02114-2017 '4 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/InSolarCity Corporationdividual): _ Address:3055 Clearview Way City/State/Zip: Mateo, CA 94402 Phone #:650 963-5100 Are you an employer? Check the appropriate box: Type of project(required): 1.0 I ant a employer with 1500 4..❑ I am,a general contractor and 1 employees(full and/or part-time).* have hired the sub-contractors 6. ❑ New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition workingfor me in an capacity. employees and have workers' Y P Y 9. ❑ Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions officers have exercised their I L Plumbing repairs or additions 3.❑ 1 am a homeowner doing all work re P myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.]1 c. 152, §1'(4), and we have no Solar PV employees. [No workers' 13. ✓❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. if the sub-contractors have employees,they must provide their workers'comp.policy number. I am«n employer that is providing workers'conrpens«tion insurance for my employees. Below is the policy andjob site information. insurance Company Name:Zurich American Insurance Company Policy#or Self-ins. Lic. #:WC96734670 Expiration Date:09/01/13 Job Site Address: 1�(e City/State/Zip: /V 4nW,MW O(Su45 Attach a copy of the workers' compensa ion policy decla ation page(showing the policy number and expiration date). Failure to secure.coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer ' u r r the �t ' s nu �e !ties of er'ury that the information provided above is true torr!correct. Si nature: Date: Phone#:978-215-2358 Official use on11,. Do not write in this area, to be completed by city or toren official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector G.Other Contact Person: Phone M ' a A� CERTIFICATE OF LIABILITY INSURANCE D08/16lDD1YYYY( 08/16/2012 i THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER,THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: I(the certificate holder Is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In(leu of such endorsoment s. PRODUCER 0726293 1-415-546-9300 CONTACT Brendan Quinlan Arthur J. Gallagher & Co. "--` Insurance Brokers of California, Inc., License #0726293 PHONE (K No); One Market Plaza, Spear Tower p 'MAIL brendan inlen®a Suits 200 ADDRESS: ..,_9u jg.Com San Francisco, CA 94105 INSURER{S)AFFORDING COVERAGE NAIC9 INSURER A: ZURICH AMER JNS CO 16535 INSURED INSURERS: LIBERTY INS CORP 42404 SolarCity Corporation INSURER C: UNDERWRITERS AT LLOYDS 32727 3055 Cloarview Way INSURER D: - San Mateo , CA 94402 INSUR[RE: INSURER F: i COVERAGES CERTIFICATE NUMBER: 28723200 REVISION NUMBER: THIS IS 10 CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER- _ ----"—� - _ POLICY EFF POLICY EXP LTR TYPE OF INSURANCE IN3R WVD POLICY NUMBER IMMIDDIYYYY1 IMMIDDIYYYY1 LIMITS A GENERAL LIABILITY ` 1OL0967364404 09/01/1. 09/01/13 EACH OCCURRENCE $1,000,000 X iDAMAGE 10 RENTED COMMFRCIAI,GENERAL LIABILITYS 11000,000 (Ea occurrence) _ CLAIMS-MADE [X I OCCUR . MED FXP(Anyone person) S 20,000 X Deductibles $25,000 PERSONAL 8 ADV INJURY $ 1,0001000 _ I GENERAL AGGRFC,ATL I$2,000,000 GEN't ACGREG_AIE LIMIT APPI IES PFR - PRODUCIS•COMPIOP AGG $2•000,000 X I POLICY PRO- LOC I -"-- -. _ is CT A AUTOMOBILE LIABILITY BAP902931702 6976171, 697c—k171-3 COMOINFoWNGLE LIMIT R (Ennocident) $1,000,000 ANY AUI O I _ OODII Y INJURY(Per pers(rn) $ " ALL OWNED SC L!F.() AUTOS AUTOS BODILY INJURY(Pro FMcidenl) $� i . NON•OWNF,O PROPERIY DAMAGE X (TIRED AUTOS i X ALITOS I (Por accident) I $ B X UMBRELLALIAB I X JOCCUR f ! TH7661066265012 09/01/1 09/01/13 EACHOCCURIAENCE $10,000,000 EXCESS LIAR CI AIMS-MAD_E_ AGGREGATE $10,000,000 OCD IX REIENIIUN 10,000 I $ WORKERS COMPENSATION ( I WC STATU- ' O'IH• A AND EMPLOYERS'LIA8I14 YIN { IWC967346704 09/01/1 09/01/13 Xi10RYLIMIISI ! EH - ANYPROPRIETORIPARINERIEXECUTIVEj E.L.EACH ACCIDENT $ 1,000,000 OFr10ERIMEMBERPXC100F.U7 LNJ{NIA , (Mandatory In NH) ' E.L.DISEASE•FA CMPLOYFP $ 1,000,000 If ns,t ascobe uncle, I "' DESCRIPTION OF OPERAI IONS bolmv E.L.DISEASE-POLICY LIMIT 1$ 1,000,000 C Errors and Omissions i1 :HO146LDUSA1204514 ` 09/01/1 09/01/13 Limit of Liability 5,000,000 f I I Aggregate 5,000,000 fi Deductible 100,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space is required) Certificate issued as proof of coverage. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Evidence of insurance Only THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENIATIVE ©1988.2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo aro rogistered marks of ACORD goksan 28723200 Location' C No.�e� r� DatqC4;::�/O' L? 0 . TOWN OF NORTH ANDOVER e - -- Certificate of Occupancy Building/Frame Permit Fee $ &I Foundation Permit Fee $ � ' Other Permit FeeA TI-9 $ TOTAL $ Check#// " 26173 VBuilding Inspector