Loading...
HomeMy WebLinkAboutBuilding Permit #028 - 45 WEYLAND CIRCLE 7/24/2006 an TOWN OF NORTH ANDOVER NORTFt APPLICATION FOR PLAN EXAMINATION pt,t�•� •;��o o p Permit NO: Date Received 0 ..Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION Print PROPERTY OWNER Print VtAP '�IO.: PARCEL: `aS C1 ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF INIPROVEMENT PROPOSED USE Resi ential Non- Residential New Building 2/One family - Addition Two or more family = Industrial C Alteration No. of units: Repair, replacement Assessory Bldg Commercial Demolition i. Moving(relocation) Other - Others: -: Foundation only DESCRIPTION OF WORK TO BE PREFORMED � J Id ntification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: �,?��< �„�e�iP��' �� ��.� Phone: \ddress: 430-7 4 Supervisor's Construction License: 07a41,V Exp. Date: O 'Ionic Improv anent License: /3,6©,ZqExp. Date: 6 ” i 1RCI-11TECT.ENGINEER Namc: Phone: Address: Reg. No. FEE SCHED[LE:BULDING PERMIT. 510.00 PER.SI200.00 OF THE TOTAL ESTIMATED COST BASED OA ,$125.00 PER S.F. Total Project Cost :$ 65T7 x12.004EE:$ do Check No.: ' Receipt No.: hig,e i of..a TYPE OF SEWERAGE DISPOSAL _ Tanning/Massage,Body Art i Swimming Pools Public Sewer _ Tobacco Sales Food Packaging Sales Well - __ Permanent Dumpster on Site Private(septic tank,etc. _ Electric Meter location to project NOTE: Persons contracting with mmregiMered contractors do not have access to the gmtran{p fund Signature of Agent/Owner Signature of contract Plans Submitted Plans Waived '7 Certified Plot Plan Sta ped Plans THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF- U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ ❑Water Shed Special Permit ❑ Site Plan Special Permit ❑ Other COMMENTS DATE REJECTED DATE APPROVED CONSERVATION COMMENTS a DATE REJECTED DATE APPROVED HEALTH ] J COMMENTS Zoning Board of Appeals: Variance, Petition No: Z_.uninuDecision-receiptSubmitted des i'lanning Board Decision: Comments Conservation Decision: Conmwnts Nater& Sewer connection,Signature& Date Driveway Permit Temp Dempster on site yesno Fire Department signature;date Building Setback (ft.) Front Yard Side Yard Rear Yard Required Prox.ided Required Provides RegL tired Provided Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: NO" ES DA FA—1 For departnICIlt LISO ICLS!)I-PARTPA LN I'AWI(;6,:.'.105 '1C Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work Addition Or Decks ❑ Building Permit Application ❑ Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) New Construction (Single and Two Family) o Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) Copy of Contract ❑ ;Mass check Energy Compliance Report In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPIA I ZONAL SERN ICES DETARl'NIENTAIPFOR\105 Location 7' � w� �G,H, No. 0220 Date MORT►y TOWN OF NORTH ANDOVER O Certificate of Occupancy $ CM�s t� Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # �` Building Inspector NORTH Town o Andover o dower, Mass. '07 . ZY' C : `A f COCHICME WICK RATE O PY BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System AOLBUILDING INSPECTOR THISCERTIFIES THAT................... S.4r..%1..........�:Q../ ..,/ .. ... .................................................... .................: + Foundation has permission to erect........................................ buildings on ...7. .. �ilJ�. C.�! ........CI.I.Lr/.1.0....... Rough to be occupied as ... .... 40..�. ........' '...... Tw� Chimney ...... .. . .... . . . . . . provided that the person acceptin this permit shall in every respect confo�m to the terms o the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final p��a PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRU STARTS_ Rough 011LOMi .. 1110001 Service .............Itloor.. BUILDING INSPECTOR Final Occupancy .Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry (Nall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. CHANGE ORDER GC Contracting 52 Stiles Rd Salem NH 03079 Full Service Woodworking Carl Grenier Licensed Insured Tel: (603) 870-9000 Fax(603)983-1050 Order Submitted To: Date: 7-18-06 Abbas Street: Job name:01 45 We land Circle City,State Zip Code: Job Location: North Andover Telephone: All prices are based on estimated stock price, availability and quantities. We hereby submit specifications and estimates for CHANGE ORDER: Carpentry*Carpenters responsibilities requested by customer above and beyond original proposal • Demo back wall siding and sheathing $ 1,300.00 • Dispose of materials(includes two dumps)+1 $ 650.00 • Replace OSB with %2"CDX Fur approximately 26 sheets $ 2,200.00 • Structural reinforcement of wall with 2"x 10"s,2"x 6"s,2"x 4"s $ 1,800.00 • Remove moldy Batts, spot insulate R19,R13 where needed to correct energy envelope up to MA building codes. $ 1,200.00 • Replace exterior window trims with 5/4"stock,necessary flashing to prevent water damage and gable stock with pigion returns $ 1,350.00 • Install new cedar siding(primed finger jointed)to match existing %i"x 6"over 1,300 sq ft(deductions already made from original proposal) $ 6,840.00 • Install new 6' replacement of basement door(FELLA)with existing transom necessary hardware included with foot lock $ 3,897.00 • Jack and dislodge deck from dwelling to repair rim joist, ledger plate and sheathing. Replace all KD stock with new materials and lag correctly to stud framing. When completed,may remove temporary jacks and stabilizers (Flashing and finishes already included in original proposal) $ 3,400.00 All items on this Change Order are in addition to and not included on original Proposal. Original Proposal still exists with balances. TOTAL LABOR FEES $22,637.00 CHANGE ORDER,,: CHANGE ORDER hereby to furnish material and labor—complete in accordance with Massachusetts Building Codes and in a manner compliant with standard practice. Estimated Completion Date: 12 working day Payment to be made as follows: $10,000.00 down completed items monies will be due at receiving of invoice other change order items will be invoiced at later time(*means completed item)$13,820.00 before completion of job and balance on proposal at end of job. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Prices estimated on current lumber and material values.Changes in stock prices will the responsibility of the customer and will be reflected in the final bill. Balances unpaid for a period of(30)days will have a finance charge assessed,computed at a periodic rate of 1.5%per month which is an APR of 18%also including any and all legal fees accrued during the collection process. Owner to carry fire,tornado and other necessary insurance.Our workers are fully covered by liability insurance. Authorized Signature: Acceptance of change order:The above prices,specification and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above. Date of Acceptance: 7 1 `r p 6 Signature Signature