HomeMy WebLinkAboutBuilding Permit #Exception - 45 WOODBERRY LANE 5/1/2018 BUILDING PERMIT NORTFI
0 ('-&D f,$
TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit No: Date Received
�SSgcHus��
Date Issued:
IMPORTANT:Applicant must complete all items on this page
LOC- TION
f
Pf20f ERTY`0WNER ' h �
MAF: 10 PAM-C=L ZO 1 iG DlST{R1C Fri onc istnc 4yep i'o
r.
",. MachineStaopVallage yes o k
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
New Building One family
Addition Two or more family Industrial
Alteration No. of units: Commercial
Repair, replacement Assessory Bldg Others:
Demolition Other
peptic �1/ell Fl4odpla�n f� ltland Wershe�l Dist�c#
�&�
m . DESCRIPTION OF WORK TO PREFORMED:
Identification Please Type or Print Clearly)
OWNER: Name: Phone:
Address:
CONT�RA �OR: 1�7ara�e. ._> =� �� 'Pone, � 0
s
.Address §� ����`�'-�' �� �� ...?5�'
S perviso"s Constract ora ILice
Horn Impovenaent L�cense:� Jul F Epp Datev
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
Total Project Cost: $ � � FEE: $
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
77,
Signaturexof Agent/Owner 5gnature of contrator
i
i n
�f/-),yt
i
IIF
i
� ,$�
f �
r
1 ..
� J
't
�5Jti17l2004 EIo: 0 5089660604 PHiIV,. -
F'fiic 11i
(
LOT 6 1
A=38,902 ► E'RC3P{?SEn !
I ROADWAY
j EA5El'rlEh`T
tiv
du (
(
(
V
250. �L
DB , R-Y
LA
7�TE
THIS CERIVTCAT10N 15 MADE TO WELLS FARGO HOME MORTGA;E WITH REGARD TO L07 6 AS SHOKN O;q
PLAN 7397
1
HE",- Y CERTIFY THAT rri€BI;iLp1kG(5) 5°IaWP1 ON TI♦IS PLAN ARE
LOCA70 CIV THE GROUND AS SHOO AND C0IFOpkAjr0 To rrir
OIMEN8W94AL RECUIREAIENTS Of TK ZONINO 3Y>LAHS Ori TtfE' MORTGAGE INSPECTION
Or XOMW AMV4, MASS WKV CONSTUCTO 09 MAY BE ki!j A- FROM
HOLAMN ENFORCEMENT ACTMW UNDER MASS, GE-NwRAL LAWS CHAPTERI PLOT PLAN
40A SEC. 7.
I ALSO CERTIFY THAT THE SUrLCIkG(5) SHOW?d HEREON OG NOT LIE 8Yr7HIN i IN
A FEDERALLY DESIONA7M F1000 HAZAHO AREA AS REFIMCD ON THE, i
FEMA. FLOOD HAZARD BOL*IDAR'Y MAP FOR TM{ MW4/0TY OF fink H AXDDVM �
. MASS.
THIS PLAN WAS NOT MADE FROM AN INSTRUMENT SURVEY AND /S FOR T � 1VORTH ANDOVER, AfAS.S:
MGRMGE PURPOSES ONLY. FURT)fgR1dW, 17 IS NOT TO t3£ USED FOR
THE ESTABLISHMENT OF PROPERTY UNM FEN= PLANTINGS, ETC., OR PAUL Scale 1' _ 50'
IKOMSMW71ON Ly ADDITIONAL STRUCTURES ON r,Z LOT G.
JOSE P WSON
THIS CERAFlCA70V 15 BASED UPON 7HE' LEGAL D£5CWP-nCN(S) OF rw
No. 35035 P.N. ^$SGGIATE1fvG.
PR£bIS€S $HO'W HEREON WHICH WERE PROWDED BY THE CLIENT, AND
DOE'S Nat PURPORT TO REVCAL ANY WCaWSISTENCES ANVIOR P.O. Box 693
ENCROACHMENTS W11CH MAY BE DIWOKM W H A FULL AND COA0PLE7E � i �F f'romingham, Moss.
777LE SEARCH, EYAMINAMY OF ABUT'"NO DEEDS, CR C*dPLFTE (}
INSTAVAIEWT SURVEX NO CERTIFICATION IS HEREBY W: MADE V17H REVEC7 508-958-297414
TO ANY C7?J R PROVMCNS OF SAID BY-LA
P.N. Assoclaies, Ina. fDate `7 IL' Fax 508-231-5281
{
TPM CONSTRUCTION LLC
20 WHEELER AVE
SALEM,NH 03079
(603)898-0864
PROPOSAL SUBMITTED TO: PHONE:cell#(978)208-8507
Brenda Faulkner
47 Woodberry lane
N Andover, Ma.
Date: June 30, 2009
We hereby submit specifications and estimates for: Labor to build 14'x8' Deck
• New Construction
• Install New deck 14'x8' / 2"x8" pressure treated frame to code
• Install 3 footing to code $600.00
• Install 1 — 4' wide stair case to patio
• Install pvc trim on box and stair framing
• Install Timber Tex decking screwed to pressure treated frame
• Install Radiance railing on deck and staircase to code
• Install lattice to enclose exposed sides of deck and stair case
• Provide drawing for deck project for town hall
All Materials for deck project are not included in contract price. Materials for this deck
project will be billed separately @ TPM Construction Prices. Estimated coast for material
$4,800.00 NO sales tax for materials.
• Labor to complete this project as outlined in contract $2,040.00
• Disposal of any construction debris for deck project$55.00
M
r
b.
r ' A Z& TPM CONSTRUCTION LLC
20 WHEELER AVE
t& SALEM,NH 03079
(603)898-0864
We propose hereby to furnish material and labor complete in accordance with above specifications for the
sum of:
Fore Thousand Six Hundred and Fifty Dollars $4,640.00
Payment to be made as follows:
At start of Job: $2,320.00 Job Half
Done: $0.00 Upon Completion: $2,320.00
All material is guaranteed to be as specified. All work to be completed in a Authorized
workmanlike manner according to standard practices. Any alteration or deviation Signature
from above specifications involving extra costs will be executed only upon written
orders,and will become an extra charge over and above the estimate. All agreements
contingent upon strikes,accidents or delays beyond our control. Owner to carry fire, NOTE: This proposal may be withdrawn by us if not
tornado and other necessary insurance. Our workers are fully covered by Workman's accepted within days.
Compensation Insurance.
Acceptance Of Proposal—The above price(s)specifications and
conditions are satisfactory and are hereby accepted. You are authorized to do the Signature:
work as specified. Payment will be made as outlined above. Any additions to the scope
of work as outlined above after acceptance of this proposal will be billable at 2 men
$85.00/hour. Signature:
Date of Acceptance: