HomeMy WebLinkAboutBuilding Permit #169-14 - 47 HIGH STREET 5/1/2018 TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received
Date Issued:
IMPORTANT:Applicant must com Tete all items on this page
LOCATION �t CNA T r-z-E (U+Q INS ti f`la
P .-tt
PROPERTY OWNER
Print 100 Year Old Structure yes no
MAP NO: PARCEL: ZONING DISTRICT: Historic District Qn no
Machine Shop Village no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building .0 One family
❑Addition ❑Two or more family ❑ Industrial
Iteration No. of units: ❑Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition 0 Other
❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District
❑Water/Sewer
DESCRIPTION OFf RK TO BE PERFORMED:
-o
Identifica ion Please Type or Print Clearly)
OWNER: Nam •� 4 qy\-cr,' Phone:
Address: J�� 3 �41v�► `f L
CONTRACTOR Name: 1111V Ssy� Phone:
Address: cf�QJ� ILS J L l
Supervisor's Construction License: �—c1 �— Exp. Date: L-V
Home Improvement License: Exp. Date:
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED GIN$125.00 PER S.F.
Total Project Cost: $ - 2 f 0 0 FEE:
Check No.: -31�i� Receipt No.: 2 7b�
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
Signature of Agent/Owner t__ Signature of contractor
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
f
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE.DISPOSAL
Public Sewer ❑ Tanning/Massage/BodyArt ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑ Food Packaging/Sales 11
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ []
COMMENTS
i
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
I
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes-.-
Planning
es .-Planning Board Decision: Comments
Conservation Decision: Comments
4
Water &, Sewer Connection/Signature& Date Driveway Permit
DPW To`v�! ]Engineer: Signature:
Located 384 Osgood Street
FIRE DEPART* MENT - Temp Dumpstr on site yes no
Located at 124 Main Street
Fire Departinefit-Signature/date
COMMENTS `:
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use
® Notified for pickup - Date
i
I r
Doc.Building Permit Revised 2010
Building Department
The following is a list of the required forms to be filled out for the appropriate.permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
u Building Pp Permit Application
u Workers Comp Affidavit
u Photo Copy Of H.I.C. And/Or C.S.L. Licenses
Li Copy of Contract
o Floor Plan Or Proposed Interior Work
a Engineering Affidavits for Engineered products
NOTE: All dumpster.permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
Li Building Permit Application
L3 Certified Surveyed Plot Plan
o Workers Comp Affidavit
o Photo Copy of H.I.C. And C.S.L. Licenses
o Copy Of Contract
o Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
u Mass check Energy Compliance Report (if Applicable)
o Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
o Building Permit Application
o Certified Proposed Plot Plan
u Photo of H.I.C. And C.S.L. Licenses
a Workers Comp Affidavit
o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
o Copy of Contract
Li Mass check Energy Compliance Report
u Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the app.al period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: Doc.Buil ling permit Revised 2012
d
�-EE
Location
41 ` 111 G-A�+ �lM � loZ 1Qa�a
No. Date
. - TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $ soy
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
n
Check#
h
168 ` Building Inspector
Location 4-1 C%J� T1
4
j (( I
No. "t Date
f
r
. - TOWN OF NORTH ANDOVER
. Certificate of Occupancy
Building/Frame Permit Fee $
Foundation Permit Fee $
w
Other Permit Fee $
TOTAL $
Check
26628
LAB ilding Inspector
0<,HO DTN 1N
• O
ti a
,SS1[Ht15Et .
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 169-14 on 8/22/2013 Date: September 9, 2013
THE BUILDING LOCATED ON 47 High Street— Suite 102
MAY BE OCCUPIED AS Tenant Fit up for FYFE Training LLC_IN ACCORDANCE
WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH
OTHER REGULATIONS AS MAY APPLY.
Certificate Issued to: RCG NA Mills, LLC
47 High Street
North Andover, MA.01845
Buil ii g In pec or
Fee: $100.00
Receipt: 26828
Check :1433
r , NORTki
_ ve-
0
h , ver, Mass, ��
O LAKI
COCHIC HlWK/[ y1.
�d A0RATEO PPP��S
S IJ
BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
THIS CERTIFIES THAT �C 6 .... ��. l.. 1 ..... C ............................................ BUILDING INSPECTOR
...... . .. ...... ................
has permission to erect . buildings on J v'�� ...........
FFoun
f��' 1,do....................�... ...... ... . ........ ....... .. ...................to be occupied as ...�..�::tvn'��r�c „1`��(� / f;vl" f{ ,�� �'
.... ......... ........................ f.. .,A,....f................. �'.....
provided that the person accepting this permit shall in every respect conform to the terms of the application cl
in0 0113
A-
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. m PLUMBING I SPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECT
UNLESS CONSTRUCTI N TARTS 3A ��'
................................. Service
........ ...... .'�' '1 Final
BUILDING INSPECTOR O
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
SEE REVERSE SIDE - -�
Enter construction cost for fee cal - North Andover Fee Calculation
Construction Cost
$ 229000.00 m
$ - $ 264.00
Plumbing Fee $ 33.00
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 33.00
Total fees collected $ 430.00
47 High Street Suite 102
169-14 on 8/22/2013
Tenant Fit Up
r 1NORTH -
. w: .. . 1E c ve. .
No.
*� h , ver, Mass, ��
COCKICKIWICK
dLA0 AT E D PIf %_
7S u
BOARD OF HEALTH
P E T T
RMI L D
Food/Kitchen
Septic System
THIS CERTIFIES THAT ... �,�, / �, � , ,�?, BUILDING INSPECTOR
... . ................. ... ...... ...........................................................
has permission to erect .......................... buildings onv�,fi „ Z,,,......,,, Foundation
�— Rough
to be occupied as C6' / f
... ....................�..... .......................... /�„�,�r,.,,..,, er�yl. .. �........... Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTI N TARTS Rough
Service
...............................
........ ...... . Final
BUILDING INSPECTOR
a GAS INSPECTOR
Occupancy Permit Required to Occupy Buildinz Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
IFSEE EVERSE SI E Smoke Det.
ry ��� 1(► N /f "�'�:.>f!/-"�N N, f►' N N• N N' �► N N N N M. "M N � i � .
IUL
r
�, fir_.. •_ .... � �
r � yob �� �:.
on
4
Massachusetts- Depai-trnerit of Public Sil'eh` x
90a1-d of Building Regulations and Standards
Construction Supervisor License
n
License: CS 66334
_ a
KIERAN T WHELAN V�
31 RICHMOND ST ``-f .
WEYMOUTH, MA.02188
Expiration: 9/26/2013
(ommissioui�: Tr#: 6168 .
Standard Form of Agreement between Owner and
RCG LLC where the basis of payment is the Cost
of the Work Plus a Fee without a Guaranteed
Maximum Price
Date: August 18 2013
Owner: ..RCG North Andover Mills LLC
C/o RCG LLC
17 Ivaloo Street, Suite,100
Somerville, MA 02143,
Contractor: J & K Contracting ,LLC
Architect: Stantec
Project Name: Fyfe Training LLC
47 High Street Suite 102
The Owner and Contractor agree to the terms stated by this contract. This contract
supersedes any prior agreements, representations, or negotiations,oral or written. No
liquidated damages shall apply to this agreement. This contract consists of the following
documents:
1. Obligations of the Parties
2. Contract Sum
3. Project Schedule
4. Signatures
Exhibits
Exhibit A: Estimated Cost of Work
Exhibit B: Project Schedule
Exhibit C: Drawings
Page 1 of 5
4
1. Obligations of the Parties
Obligations of the Contractor:
The Contractor accepts the relationship of trust and confidence established by this Agreement and
covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and
judgment in furthering the interests of the Owner; to furnish efficient business administration and
supervision; to furnish at all times an adequate supply of workers and materials; and to perform
the Work in an expeditious and economical manner consistent with the Owner's interests and in
compliance with all applicable governmental codes and regulations.
The Contractor shall keep full and detailed accounts and exercise such controls as may be
necessary for proper financial management under this Contract.
The Contractor shall keep full and detailed records of all books, records, permits, licenses,
correspondence, receipts, instructions, data, and drawings associated with the Project including all
Subcontractor contracts, invoices, vouchers, insurances, lien waivers, and other correspondence.
The Owner and Owner's Accountants shall have access to review, audit, and copy all Contractor
documentation. The Contractor shall retain these documents for a period of three years after final
payment.
The Contractor shall maintain insurance at the following levels with the Owner listed as a co-
insured:
Type of Insurance Limit of Liability
aQ � T�
Upon request, and at the cost of the Owner, the Contractor shall obtain a performance bond up to
the total Cost of Work. Such costs shall be added to the Construction Volume.
The Contractor understands that the Project will be financed by a construction lender and, then, by
a permanent lender. The Owner may assign any of its rights under this Contract to the construction
lender and the Contractor hereby consents to any such transfer provided no such assignment shall
relieve the Owner of any of its obligations under this Contract, unless agreed to in writing by the
Contractor. The Contractor shall execute any certificates, lien waivers, releases, receipts, and other
documents as may be reasonably required by the construction lender or permanent lender including
a subordination of its mechanic's lien rights to the construction lender's and permanent lender's
mortgage or deed of trust. The construction lender for the Project will be:
AW
Obligations of the Owner:
The Owner agrees to furnish or approve, in a timely manner, information required by the
Contractor and to make payments to the Contractor in accordance with the requirements of this
Agreement.
Dispute Resolution:
Claims, disputes or other matters in question between the parties to this Agreement shall be
resolved by mediation or by arbitration. Prior to arbitration, the parties shall endeavor to reach
settlement by mediation.
Page 2 of 5
2. Contract Sum
Cost of Work:
The Contractor shall provide a detailed estimated Cost of Work to the Owner(see Exhibit A). The
sum of these costs, including the fee is as shown below:
$
Change Orders:
The Contractor does not guarantee the Contract Sum in any form. In the event of changes to the
Contract Sum, the Contractor will present written changes to the owner for costs that exceed the
Contract Sum in the form of a Change Order. The Contractor will review all Subcontractor Change
Orders before submittal to the Owner and Architect and make a recommendation for payment or
non-payment. The Contractor's Fee will be calculated including any approved Change Orders.
The Owner, Architect and Contractor will negotiate disputed Change Orders in good faith.
Contractor's Fee:
10% of total construction volume. This includes pre-construction and project management
services, and field personnel and associated management overhead.
The fee is based on actual costs incurred, with final true up, and is billed monthly in arrears. Total
Construction Volume excludes permits and fees, which shall be paid directly by the Owner.
Construction management labor, standard tools and equipment, and labor-related overhead are
covered within the fee. Specialty tools or equipment and any trade labor supplied by J&K
personnel shall be charged separately.
If a project is terminated or suspended by the Owner prior to completion, J&K shall be
compensated for the actual cost of services provided prior to receipt of notice of termination or
suspension from the Owner.
Subcontractors:
The Contractor plans to hire Subcontractors to perform the majority of construction associated with
this project. The Contractor shall provide the Owner and Architect information on all of the bids
received by Subcontractors and the names of the Subcontractors selected. Owner shall have the
right to reject a proposed Subcontractor; however, in the event that this leads to a higher Cost of
Work, the Owner shall pay for the difference. The Contractor reserves the right to reject any
Subcontractor, even if it is the lowest bid, and to dismiss Subcontractors from the job that have
been previously approved by the Owner.
Payments:
The Owner shall make progress payments on the Contract Sum according to the Requisition
process described below.
The Contractor shall, at the conclusion of each calendar month on the project, present to the
Owner an application for payment(Requisition)for costs incurred during that month. The
Requisition shall include all invoices, vouchers, partial releases of liens, expense reports, and any
other evidence to support the validity of the Requisition amount. The Contractor may requisition
for completed, but unpaid work based on an expectation of payment upon receipt of funds. The
Owner, the Architect, or their representatives shall be afforded five (5) business days to review
such application and question the Contractor about its contents. In the event there are no
disputes, the Owner shall pay the Contractor within 10 business days of receipt of the Requisition.
Payment by the Owner does not represent that the Owner or Architect have made a detailed
examination of the documentation, inspection of the work, or verification of the accounting.
Page 3 of 5
1
At the completion of the project, the Owner shall make a final payment to the Contractor based on
a final Cost of Work with a truing up of fees. If further corrections to work are required that are not
covered under warranties with Subcontractors, or that are not the outcome of negligence or poor
workmanship by the Contractor, the Owner shall pay the Contractor for any work associated with
performing the corrections based on the hourly rate agreed to in this contract.
Retainage:
The Owner shall not hold back any fees to the Contractor to ensure completion of the work. The
Contractor will be expected to hold back fees from Subcontractors to ensure their performance
based on the terms below:
Termination of Contract:
The Owner shall reserve the right to terminate or suspend the Contract at its sole discretion.
Within 15 days of termination or suspension, the Contractor shall present an accounting of all its
costs incurred for reimbursement by the Owner. If the Owner elects to proceed with the project
without the Contractor, the Owner shall have the right to assume the Subcontracts and
agreements related to the Project.
3. Project Schedule
Date of Commencement:
The Contract Time shall be measured from the date of commencement. The date of
commencement of the Work shall be the date of this Agreement, unless a different date is stated
below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
us3� 201�i ar swch me tC at fila ifJ a# #s Jit d t 0D = ,y.
e ,
Contract Time:
The Contractor shall provide to the Owner a Project Schedule (see Exhibit B). This Schedule is
based on assumptions reached prior to the signing of this contract, which assumptions the
Contractor shall attempt to clarify in the Schedule. However, the Schedule always assumes the
Owner and the Architect respond promptly to requests for information and do not request any
significant changes to the construction program. In the event that the Owner or Architect find any
discrepancies with the Schedule or its Assumptions, they will promptly notify the Contractor, who
shall make adjustments to the Schedule as necessary.
According to the attached Schedule, the Contractor shall achieve Substantial Completion of the
entire Work as follows:
The Contractor does not guarantee the date of completion. However, the Contractor shall not be
entitled to additional fees based on delays in the project unless those delays can be shown to
incur extra costs for the Contractor and were caused by the actions or requests of the Owner or
Architect.
The Contractor shall present an updated Project Schedule to the Owner and Architect on a weekly
basis for their review.
Page 4 of 5
`I
4. Signatures
The Owner's representative is:
�,�a�ti�a�i SteanYierg ,� a7n�' e
RCG�NbrthAnd� fl+li[��,LL:C
17 I�alao stc et I's IW 00
§ 14.4 The Contractor's representative is:
I KieraWh �'a,
P an,d
�R�C�1� O,r1t��St eet
This agreement is entered into as of the day and year first written above and is executed in at
least three original copies, one for the Owner, one for the Contractor, and one for the Architect.
Owner C ntractor
Signature Signature
k Q r� \nt QUA C. K►S
Printed Name and Title �.► .�.�Z--- Printed Name and Title 6, L.-k
i
I
Page 5 of 5
• it
i
Fyfe Training LLC Estimated Cost
Schedule of Values 8/18/2013
General Conditions $ 2,000.00
Demolition $ 2,000.00
Frame walls, drywall and tape, prime and paint $ 6,000.00
Supply and install new doors $ 1,000.00
Cabinetry& Countertops $ 3,000.00
Plumbing $ 400.00
Sprinkler Work within space $ 1,600.00
Electrical $ 3,000.00
HVAC $ 1,000.00
Sub-total $ 20,000.00
Construction Management fee $ 2,000.00
Total $ 22,000.00
Plus Building Permit $ 264.00
i