Loading...
HomeMy WebLinkAboutBuilding Permit #276-13 - 50 ROYAL CREST DRIVE 10/9/2012 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received Date Issued: IMPORTANT:Applicant must complete all items on this age � LOCATION f' —Ronal Crest BUILDING # /-7 Print PROPERTY OWNER AIMCO Royal Crest Estates LLC UNIT# 02 r. Print MAP NO:d PARCEL:ZONING DISTRICT: Historic District Cno Machine Shop Village TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition )<Two or more family ❑ Industrial ❑Alteration No. of units: Z ❑ Commercial �"epair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition --E],-Other D Se°tic Well' * ® loodplain ®�Wetlan s ®. ate'""rshed D sect -._Rater/.Sewer i. n DESCRIPTION OF WORK TO BE PES qRMED: (Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: Thomas H. Kinnal Phone: 978-360-0051 Address: 286 Broadway, Haverhill MA 01832 Supervisor's Construction License: CS 82747 Exp. Date: 6/20/201% Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$92.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ (e, ?ZS FEE: $ / Check No.: c,©7Sep Receipt No.: ,-71�y NOTE: Persons contracting with unregistered contractors do not have access to the guaranty and �Sign�� ent/®vvner atare#:ofkAg _ _ S.ignatureioff�contracto,r�..�:: .�.• .�M-•-� 4ri. Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ I Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments We-ter & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIREDEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS i I Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: I ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use I it I ❑ Notified for pickup - Date Doc:.Building Permit Revised 2008mi Building Department i The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit i Addition Or Decks ❑ Building Permit Application .❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New ConstructionSin le and Two Family) � 9 Y) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products VOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals :hat thea appeal period is over. Theapplicant pp p must then get this recorded at the Registry of Deeds. One copy and proof of recording nust be submitted with the building application Doc: Doc.Building Permit Revised 2008mi Location 4 6L"S/ .17 No. Z 7 6 -31 Date /,0 Z— TOWN OF NORTH ANDOVER Certificate of Occupancy $ • Building/Frame Permit Fee $ 0 Foundation Permit Fee $ Other Permit Fee $ TOTAL Check# 25794 Building Inspector NORTH own Of s E : 6 ndover O _��4 10011161 R. h ver Mass �d T O 441 COCHICHIWICK : S U BOARD OF HEALTH PERMIT T LD Food/Kitchen Septic System BUILDING INSPECTOR THIS CERTIFIES THAT ...... ..� :��.. ......... a..J.., ..... :........................................................ / r G'f�� Foundation has permission to erect ........................... buildings on ./..`�/.17e4.41...G.�.f��.......�s:���.��.... �` be occupied as .....Y..�.F,�?�GF. fr. t. � :^..: ::. �(� �/.--- to `. Chimney .... ......... ............. ....................... Rough provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. _ PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTIO S ARTS Rough Service ............ ...... �.... ................................. Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE I w AI mc o To: Tom Kinnal at East Coast General Contracting From: MATULA, DAN, Executive Vice President Redevelopment&Construction Services ORGAN, TONY,Vice President of Construction,Construction Services STEICH, MATTHEW, Regional Director of Construction, Construction Services Milinazzo, Dan, Project Manager, Construction Services Date: September 26,2012 Re: Executed Contract and Related Matters Attached is your copy of the executed contract with AIMCO NORTH ANDOVER, L.L.C., an affiliate of Apartment Investment and Management Company("Aimco"),for construction services at Royal Crest Estates (North Andover). We want to take this opportunity to inform you that Aimco is committed to conducting its business in accordance with applicable laws, rules and regulations and the highest standards of business ethics. If during the period of your business relationship with Aimco, you believe the Aimco team members with whom you are dealing are not living up to these standards,we ask that you report such conduct to one of the following: • MATULA,DAN, Executive Vice President Redevelopment&Construction Services: (303) 691-4547 • COHN,LISA, Executive Vice President and General Counsel: (303)691-4416 • HANSON,MIKE,Vice President—I ntemal Audit: (303)691-4376 If you prefer to remain anonymous, you may make a report using Aimco's anonymous and confidential reporting system, MySafeWorkplace, which is available 24 hours a day, seven days a week via the Internet at www.MySafeWorkplace.com or by calling 1-888-481-7123. We encourage you to use MySafeWorkplace only if you do not feel comfortable reporting issues directly to an Aimco representative. We would also like to remind you that Aimco has a Code of Business Conduct and Ethics,which prohibits Aimco employees from accepting meals, entertainment, services or gifts from anyone who does business with Aimco unless the amount of such item is less than $25. AIMCO Construction Services has a$0 policy. This provision is to specifically include, but is not limited to, suppliers or other contracted labor utilized under this project. It is the responsibility of this Contractor to advise any subcontracts or suppliers of the AIMCO Code of Business Conduct and Ethics. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 ' II GENERAL CONSTRUCTION SERVICES ONE-PAGE CONTRACT Contract Number:14629-404879-CP-00002 Contractor: East Coast General Contracting ProRoyal Crest Estates North Andover Address: 286 Broadway Street Location: 50 Royal Crest Drive Haverhill,MA 01823- North Andover,MA 01845 Representative: Tom Kinnal Issuing Office: AIMCO Regional Office Telephone: 978 360-0051 Address: Two Greenwood Square 3331 Street Road Facsimile: 978 372-4215 Bensalem,PA 19020 E-mad: tkinnal@comcast.net Contract Sum: $6,925.00 Contract Type: Lump Sum This General Construction Services One Page Contract("Contract")is CONTRACTOR shall purchase and maintain,at its sole expense,commercial effective as of 9/26/12,by and between"CONTRACTOR"(as Identified general liability insurance with limits of no less than $500,000.The liability above)and AIMCO NORTH ANDOVER,L.L.C.,("OWNER')for construction insurance shall cover all labor,materials,or services furnished hereunder and and services to be performed and/or material to be supplied for the property shall include a contractual liability endorsement.CONTRACTOR shall furnish known as Royal Crest Estates(North Andover)(the"Property").In OWNER with a certificate of insurance, naming the Indemnified Parties as consideration of the acceptance of CONTRACTOR's bid and/or proposal for additional insureds. CONTRACTOR shall also purchase and maintain furnishing supplies,goods and/or services to the Property,CONTRACTOR workers compensation insurance as required by Laws and shall furnish agrees to perform the following services and/or supply the following materials OWNER with evidence of such insurance. (the'Work"): See Exhibft A Nothing contained herein shad create any third party beneficiary rights in any CONTRACTOR acknowledges that the Work shall be for the benefit of both person not a signatory to this Contract except OWNER will be third party OWNER as well as the beneficial owner of the Property.The Work shall be beneficiaries of CONTRACTOR's agreements with all of its subcontractors performed in accordance with the following dates (the "Construction and CONTRACTOR shall include or cause to be included similar provisions in Schedule"): each of the aforementioned agreements naming OWNER as third party Date of Commencement:10/08/2012 beneficiaries. The undersigned shall be solely responsible for the Date of Final Completion:10/22/2012 employment, control and conduct of its employees and nothing set forth herein shall have the effect of creating an employer-employee relationship This Contract does not establish an exclusive right to furnish supplies,goods between OWNER and any of CONTRACTOR's employees. and/or services to the Property and OWNER reserves the right to terminate All trade discounts,rebates and refunds and all returns from sales of surplus this Contract at any time without cause. materials and equipment shall belong to and accrue for the benefit of All services,materials and employees used by CONTRACTOR shall comply OWNER. with all applicable federal,state and local laws and regulations,including,by CONTRACTOR is prohibited from providing gifts or other things worth more way of illustration and not limitation, the Americans with Disabilities Act than$25 to OWNER or any of its employees.CONTRACTOR's violation of ("LawsJ. this precept shall constitute grounds for immediate termination. To the fullest extent permitted by law,CONTRACTOR shall indemnify, CONTRACTOR's obligation to properly and timely perform and complete the protect,defend and hold OWNER,the beneficial owner of the Property, Work shall be absolute.CONTRACTOR shall carry on the Work during all their affiliates, parent and subsidiary entities, including, without disputes or disagreements with OWNER. limitation,Apartment Investment and Management Company(AIMCO), and any of AIMCO's subsidiaries and affiliates that may directly or Conflict of Interest: Although CONTRACTOR and its contractors, indirectly own or manage the property at or for which CONTRACTOR subcontractors,consultants and vendors may employ relatives of employees performs any Work,and their respective partners,managers,members, of the OWNER,its affiliates,parent and subsidiary entities,including,without employees, officers, directors, trustees, shareholders, counsel, limitation,AIMCO and any of AIMCO's subsidiaries and affiliates that may representatives, agents, successors and assigns (the Indemnified directly or indirectly own or manage the property at or for which Parties")free and harmless from any and all liabilities,claims,demands, CONTRACTOR performs any WORK (the "AIMCO Employees"), actions,costs(including reasonable attorneys'fees),suits or matters CONTRACTOR shall immediately so inform OWNER as soon as known,or arising from or related to(i)injuries to persons or damage to property discovered.OWNER reserves the right to require that CONTRACTOR and/or (excluding the Work),(ii)any alleged violation of any Laws and(iii)a its contractors,subcontractors,consultants,and any vendors to modify work notice or claim of lien.CONTRACTOR's obligations under this Contract, assignments of the AIMCO Employee's relative where a conflict of interest,or including its indemnity obligations,shall not be limited by a limitation the appearance thereof,is deemed by OWNER to exist.CONTRACTOR shall on the amount or type of damages payable by or for CONTRACTOR under worker's or workman's compensation acts. include this provision in any of its subcontracts and material agreements. CONTRACTOR waives and releases all claims for or right to any CONTRACTOR acknowledges, understands and agrees that OWNER may consequential, incidental, exemplary, punitive or special damages. execute this Contract by an authorized representative. Notwithstanding CONTRACTOR shall not bring claims or lawsuits against any principals, anything contained herein to the contrary, such authorized representative employees,agents,officers,directors,stockholders,partners or affiliates of and/or its affiliates shall not incur any liability,or other obligation, under this OWNER,the beneficial owner of the Property,AIMCO,AIMCO Properties, Agreement to CONTRACTOR,for any reason,including,but not limited to,for L.P., or AIMCO-GP, Inc. CONTRACTOR further agrees that the sole and any payments that may be due CONTRACTOR hereunder. exclusive remedy of CONTRACTOR for payment and/or performance of this This Contract entered into as of the day and year first written above. Contract shall be against the assets of OWNER. OWNER:AIMCO NORTH ANDOVER,L.L.C. CONTRACTOR:East Coast General C ai By STE ICH,MATT as authooed tat f W ER Signature: ,&y i Signature: Print Name: Matt Steich Print Name: Tom Kinnal Print Title: Regional Director of Construction Print Title: President 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 EXHIBIT"A" SCOPE OF WORK For Contract:14629-404879-CP-00002 CONTRACTOR shall perform the following Work in strict accordance with the temr.of the Contract: 1.0 WORK SYNOPSIS Interior Restoration Post-Abatement-Unit 17-2 2.0 SCOPE OF WORK Construction Requirements: The work of the CONTRACTOR and their employees shall be performed in a good and workmanlike manner.Workmanlike quality is defined as workmanship that meets or betters those criteria indicated in applicable building codes,using materials and installation methods identified in the construction plans and this Scope of Work. Code Requirements: All jobs shall conform to those standards stipulated in the building code, health code, mechanical code, plumbing code, and electrical code applicable in the local jurisdiction. All construction on the OWNER'S properties shall meet or exceed NAHB Performance and Building Standards. CONTRACTOR is responsible for acquiring any and all needed permits/certificates for the work and any associated costs. Safety: CONTRACTOR agrees to comply with OSHA and/or any other governmental agency's safety rules and regulations. Should any citations, fines, and/or penalties, etc., be incurred by the OWNER due to the negligence of the CONTRACTOR, the CONTRACTOR agrees to indemnify the OWNER for any and all penalties,fines,etc., incurred. CONTRACTOR shall perform the following Work in strict accordance with the terms of the Contract: Location: Royal Crest Estates-North Andover, 17 Royal Crest Drive, Unit 2, North Andover, MA Turnkey Job: The CONTRACTOR will furnish all equipment,supervision, material and labor necessary to deliver a finished project/product which completes the scope of work and successfully addresses the projects intentions. Intent: Restore unit and building damage resulting from moisture damage and ACM/Mold abatement procedures in Unit 17-2 to the OWNER'S quality standards,such that the unit and building can be used and occupied comfortably after the work. Scope of Work: 1. Remove bath vanities, mirrors,light bars, and toilets prior to demolition,save for re-installation after repairs. 2. Remove specified door trim prior to demolition, save for reinstallation after repairs. 3. Provide and apply Drylock foundation coating to interior of exposed foundation. 4. Provide and install unfaced fiberglass batt insulation in approximately 500 sf of exposed exterior walls. 5. Provide and install approximately 500 sf of 6 mil poly vapor barrier over installed insulation. 6. Provide and install approximately 1,250 sf of M.R.sheetrock on all areas removed by others. 7. Provide and apply compound to all new sheetrock as well as paintable caulking as necessary. 8. Sand smooth,prime and paint all new sheetrock surfaces and surfaces abutting new sheetrock two coats minimum. 9. Provide and install approximately 160 If of 3%,inch wooden baseboard. 10. Paint baseboard to match existing. 11. Patch/skim as necessary,ceilings where texture has been removed by others. 12. Prime ceiling with BIN primer and apply new matching popcorn texture to approximately 815 sf to match existing. 13. Paint new popcorn/texture 2 coats to match existing. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 3 of 2 14. Provide plastic floor and wall protection as necessary throughout the project. 15. Remove and replace existing bath exhaust fan and ductwork,including wiring hook-up/modifications as necessary for proper functioning. (Fan to be provided by Aimco Service Manager) 16. Clean up and removal of all job related debris. 17. Household cleaning of affected areas. 18. Provide plastic floor and wall protection as necessary. 19. Provide a written schedule for the project. 20. Provide a minimum 1 year workmanship warranty effective starting from the date of final acceptance by OWNER. Inspection Reports(if required by OWNER]: 1. The CONTRACTOR and the OWNER must walk the job together and complete the pre-work section of the inspection report(s)before work may begin.The pre-work section of the inspection report(s)must be signed-off by both parties. 2. The CONTRACTOR and the OWNER shall walk the job together and complete each section of the inspection report(s). 3. The CONTRACTOR and the OWNER must sign-off on all sections of the inspection report(s)attesting that the job is 100-percent complete and is correct per the job requirements found in this Scope of Work. The final section of the inspection report(s)must be completed and signed-off on by both parties. 4. The CONTRACTOR must correct any deficiency found during the inspections and the job must be 100-percent complete before payment will be made. Prosect Requirements: 1. Provide all materials,tools,equipment and labor, in appropriate quantities,to complete the following work in a workman-like manner to the best of industry standards,following all Manufactures(see contractors proposal) required material installation specifications 2. Provide protection of all surrounding areas, including, but not limited to landscaping, driveways, gutter systems, walkways, doors,roof overhangs,windows, masonry, etc.,from falling debris and or material maneuvers during work in progress,or any material storage. 3. Additional work(if required due to unforeseen conditions)must be brought to the attention of Construction Services and be approved in writing prior to the commencement of additional work outside of this scope. 4. All new materials must be installed securely, and show good appearance including, but not limited to being installed straight and true. 5. All work must follow CONTRACTOR provided schedule,with daily updates through the site management team,with a minimum of 48 hours notice of any changes to schedule. This allows management to notify residents that this work will be taking place and whatever restrictions to normal traffic and or pedestrian traffic flow. 6. All work related debris must be kept clear of walkways and must be cleaned-up and removed to the dumpster or to an area designated by the OWNER at the end of each day of work. CONTRACTOR is responsible for removing all scraps and debris and placing them in the dumpster or designated trash site. The job will not be considered complete and payment will not be issued until all trash and debris are removed from the house and/or site. 7. Upon passing inspection by Owners Rep(Construction Services Rep),contractor may request payment for work completed by submitting an invoice accompanied by a waiver of lien identifying the same dollar amount as invoiced and indicating the percent of the contract amount that is due and payable. 8. Building/Property will be occupied during the project. CONTRACTOR shall make all reasonable efforts to limit the disruption and impact on regular users of the Building/Property, including but not limited to,the OWNER and its employees, residents, guests,visitors,etc. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 4 of 3 y 9. CONTRACTOR is responsible to field verify all quantities,dimensions, and layouts. Actuals may not match those provided to the CONTRACTOR by the OWNER, or any third parties. Third party information may not be all-inclusive of the specified scope or the project intentions. 10. CONTRACTOR is responsible for temporary utilities,facilities,storage containers and signage as necessary unless otherwise specified. Some site utilities MAY be offered temporarily at the OWNERS discretion, but may be withdrawn by OWNER with minimal advanced notice. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 5 of 4 EXHIBIT"B" SPECIFICATIONS AND DRAWINGS For Contract:14629-404879-CP-00002 The Work shall conform to,and be performed,in strict compliance with the Specifications and Drawings identified below: 1.0 SPECIFICATIONS AND DRAWINGS Document Number Idle or Description Rev.No. GENERAL SPECIFICATIONS ROYAL CREST ESTATES NORTH ANDOVER UNIT RESTORATION PART 1 —GENERAL 1.1 SUMMARY A. Section Includes: 1. Insulation/Vapor Retarders 2. Finishes a. Wallboard b. Paint 1.2 DELIVERY, STORAGE,AND HANDLING A. Store materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturers, but not less than 50 deg F or more than 90 deg F. 1.3 QUALITY ASSURANCE A. All work is to be done by trained, experienced individuals. 1.4 PROJECT CONDITIONS A. Paint 1. Paints and solvents should be maintained at a temperature between 50 degrees Fahrenheit (F) and 90 degrees F, and stored in a well-ventilated area. Freezing temperatures may permanently damage water- based paints as may subjecting paint to frost. 2. Paints not stored within the recommended temperature range should be conditioned for at least 24 hours at a temperature of 65 degrees F to 85 degrees F. Paint materials should be mixed prior to delivery to the job and then hand-mixed just prior to use and periodically during application.Caution should be taken not to over mix, causing the incorporation of excess air. 3. Paint should be maintained at 65 to 85 degrees F at all times during application. Paint should not be applied when temperature is expected to freeze prior to drying. Paints should be applied at manufacturer's spreading rates. When successive coats are used, allow sufficient time for each coat to dry thoroughly before the following coat is applied. Materials below or adjoining the work should be covered or otherwise protected. 4. Surface and air temperatures should be between 50 and 90 degrees F for water-based coatings and 45 to 95 degrees F for other coatings unless the manufacturer stipulates otherwise. B. Paint 1. Painted or finished surfaces should present a smooth, unblemished, homogeneous appearance without drops, runs, lumps, streaking, or visible color variations. Each coat should be allowed to dry prior to the application of the next coat. 2. The final interior paint job will be inspected in both sunlight and normal room lighting. Any defect visible from a distance of 6 feet under these conditions will be considered unacceptable. C. Wallboard 1. Drywall panels should be cut to fit easily into place, with no gaps greater than 1/2 inch. Drywall should be securely fastened using fasteners of a type recommended for the intended application. Fasteners should be driven squarely and placed at least 3/8 inch from the edges and ends. Heads should be seated no deeper than 1/32 inch below board surface and should not break the facepaper. 2. The finished drywall should present a smooth, unblemished, homogeneous appearance with inconspicuous joining between boards and no visible fasteners. There should be no areas of raised fibers on the facepaper 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 6 of 5 due to over-sanding. Clearly visible nail pops, seam lines and cracks are considered unacceptable through the first-year Warranty period and are absolutely unacceptable at the completion of the job. PART 2-PRODUCTS 2.1 INSULATION A. Fiberglass Batt insulation B. Low expansion spray polyurethane around exterior wall openings 2.2 4-6 MIL POLYETHYLENE VAPOR RETARDER 2.3 FINISHES A. 5/8"TYPE-X GYPSUM WALLBOARD B. 5/8"MOLD RESISTANT GYPSUM WALLBOARD C. PAINT 1. Walls a. Non-Kitchen, Non-Bath: Single Tone Scheme: 1) Sherwin Williams 2) Flat, 3) ICI 1221, 4) Color to be site selected 2. Trim a. Sherwin Williams b. Semigloss, C. ICI 1427 d. Color to be site selected PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor plank. C. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. General 1. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. 2. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate. B. Doors/Windows 1. Protect all frames,jambs, and doors against warping delamination, and splitting. 2. DoorsNVindows shall be shimmed,squared,and plumbed. 3.3 INSTALLATION A. Doors/Windows 1. If any framed opening is not correctly sized, or is out of square or not level, and the CONTRACTOR cannot easily correct the problem,the OWNER should be immediately notified. 2. All windows and doors shall be installed so that they are centered in the framed opening and level within 1/16 of an inch.Casing trim margins shall be between 1/8 in.to%in. 3. Set and putty all nails in wood to receive paint or stain. Nail trim with finishing nails of proper size to hold the member firmly without splitting the wood. Pre-drill if necessary. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 7 of 6 4. Sand all finished wood surfaces to provide a uniformly smooth surface. Always sand in the direction of the grain. 5. Windows shall be square, plumb,and level to 1/8 in. and shall operate freely and latch securely. B. Paint 1. All nicks, gouges, scrapes, damage, etc., should be repaired, treated, or otherwise taken care of before painting begins,both in the drywall and trim. 2. All nail holes in trim are to be filled with wood filler, sanded, and smoothed. All nail holes in drywall shall be repaired with drywall mud, not caulk. 3. Excess damage to drywall,trim, or doors is to be reported immediately to the OWNER. 4. All interior trim paint shall be applied with a brush and shall have two(2)coats. 5. Paint drippings and spills must be cleaned from tubs, showers,countertops, and all other areas. 6. All over-spray on window glass and aluminum window trim (inside and outside) must be wiped off with a damp rag before it dries. Aluminum window trim, especially the white baked-on finish, is easily damaged by razor blades and other items when the cleaners try to remove dried paint over-spray. 7. Paint drippings or spills on vinyl or wood flooring must be cleaned immediately without damage to the vinyl or wood flooring. 8. The final interior paint job will be inspected in both sunlight and normal room lighting.Any defect visible from a distance of 6 feet under these conditions will be considered unacceptable. 9. The CONTRACTOR is to take care not to damage work done by other CONTRACTORS. If any sink is used for washing brushes, etc., the sink shall be cleaned of any paint residue prior to the job being considered complete. 10. Exterior paint shall be specified by OWNER. 11. Exterior paint shall be two(2)coats, both of which may be sprayed. 12. Exterior trim paint shall be specified by OWNER. 13. Exterior trim paint shall be two(2)coats,both of which must be brushed. 14. All exterior areas to be painted, including the foundation, shall be free of dirt, mud, excess caulking, and any other foreign matter. 15. No thin spots in either interior or exterior paint are allowed. 16. Finishes shall be uniform and smooth,with no lumps, drips, runs,streaking, or visible color variations. 17. Any over-painting on trim must be cleaned from surrounding area.. 18. Paint must be cleaned from all hinges and other hardware. 19. All door painting must be smooth,with no lumps, bumps,runs,color variations,and of a uniform appearance. Any defect visible from a distance of 6 feet in sunlight and normal lighting is unacceptable. 20. Over-spray must be cleaned from any brick,stucco,or other finish. 21. Decks, porches, outside handrails, etc., are a part of the outside paint package and shall be painted, stained, or left untreated per plan. 22. Any defect in outside paint (walls, trim, etc.) visible from a distance of 6 feet in normal sunlight will be considered unacceptable. 23. Interior handrail coatings shall be uniform with no drips, runs, light spots, etc. Any defect visible from a distance of 6 feet in sunlight and normal lighting is unacceptable. 24. All interior base, casing,shoe molding,door, and window jams,crown molding,chair rail and any other wood trim will be caulked. 25. All exterior siding joints, corner boards, fascia boards, overhangs, cantilevers, windows, doors, vents, and any other wood trim or siding shall be caulked. On houses with brick fronts, all gaps between the brickmold and brick will be caulked. 26. All thresholds must be caulked to prevent moisture and insects from entering the house. 27. All exposed metal lintels shall be wire-brushed to remove any rust and painted with a black,rust-proof paint 28. All doors that have been taken down to paint shall be rehung, straight, level,and undamaged. C. Wallboard 1. Seam lines and cracking can be minimized by avoiding large gaps during installation and by installing panels in a manner that avoids conspicuous butt-end joints. When butt-end joints must occur, they should be staggered and as far from the center of walls and ceilings as possible. Whenever possible, panel ends and edges that are parallel to supporting members should fall on those members. 2. Measurements should be taken accurately at the point of installation to allow for irregularities in framing. Cut edges should be smoothed to fit accurately. Ceiling panels should be placed first and cut so as to fit easily into place without forcing. Tapered panel edges should butt tapered edges and square job-cut or mill-cut ends should butt other square-cut ends. 3. Fasteners should be applied starting in the middle of the panel and moving toward the outside. Nails or screws should be seated squarely while the board is held in firm contact with the framing support. Where adhesive is used,bonding surfaces should be free of dirt,grease, oil, or other foreign materials. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 8 of 7 4. All beads must be installed per the manufacturer's instructions. All comers, ceiling lines, etc., must be straight with no hairline cracks. 5. Three coats of joint compound are required: an embedding coat to bond the tape and two finishing coats over the tape. Each coat must be thoroughly dry before the next is applied to ensure that the surface incurs maximum shrinkage and can be readily sanded. For the final coat, sufficient lighting must be utilized to ensure a quality finish. 6. Drywall is to be installed either vertically or horizontally depending on the most efficient use of the material. 7. CONTRACTOR will keep waste to a minimum. 8. Ceilings will be stippled unless notified otherwise. Stipple shall be uniform with no thin or missed spots. Stipple must be uniform from room to room. 9. All comers, lines of tray, and vault ceilings shall have beads and be installed per the manufacturer's instructions. 10. Drywall should be cut accurately and should fit together with a maximum 1/2-inch gap between sheets. 11. No cut-on-site edges shall be used in vault ceilings. Factory-cut edges must be used at the peak of the vault. 12. Drywall should be firmly attached to all framing using nails, screws, and adhesive. There should be no give, bows, or warps in any board. 13. Heads of fasteners should be seated no deeper than 1/32 inch below board surface and should not break the facepaper. Fasteners shall be installed every 16 inches on center. 14. All drywall edges shall be smooth and clean. Drywall shall not be cut with anything that leaves a ragged edge. 15. Hairline cracks in comers are unacceptable. 16. There should be no areas of raised fibers due to over-sanding. 17. All electrical boxes are to be free and clean of any drywall debris or mud before the CONTRACTOR leaves the job. 18. Drywall installed around tubs and showers shall fit snugly with no gaps larger than 1/4 inch. 19. Drywall around the fireplace box, any door, window, or electrical box shall fit level and snug against jacks, fireplace box, or electrical boxes. If drywall is broken around electrical boxes, it shall be cut and patched with drywall to fit snugly around the box. 20. The CONTRACTOR and its employees are not to stand on tubs, sinks, or countertops, or place any materials on them. Any fasteners dropped on tubs and sinks shall be picked up so as not to damage the finish of tubs and sinks. 21. The CONTRACTOR shall not leave any holes in storage rooms, around heating units, etc. All areas that receive drywall shall be taped, mudded, and sanded. 22. After primer coat of interior paint is applied to walls, CONTRACTOR is responsible for touch-up on walls and ceilings at no additional charge. 23. CONTRACTOR is responsible for a final touch-up,as required, after the OWNER's walk-through. 24. The CONTRACTOR shall furnish heaters as required.The CONTRACTOR is not required to leave his or her own heaters overnight unless they are returning the next day. If the job requires heat overnight notify the OWNER. 3.4 CLEANING AND PROTECTION A. Comply with manufacturer's written instructions for cleaning and protection of materials. B. Perform the following operations immediately after completing material installation: 1. Remove adhesive and other blemishes from exposed surfaces. 2. Sweep and vacuum surfaces thoroughly. 3. Damp-mop surfaces to remove marks and soil. C. Protect products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. D. Unit is to be left clean and broom-swept. 1 Page Form,GC,Lump Sum,Contract,2-Jan-12 9 of 8 tT The Commonwealth of Massachusetts ,Department ofindustrial.Accidents Office oflnvestdgations 600 Washington,Street Boston,MA. 02111 yvww.mass gov/dia Workers, Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly N31rie(Business/Organization/lndividuat): �R,:pr co* ��/r�-��I (f Oy�zAc f�-�� Address:— 2-Y6 6 U4011,41 City/State/Zip: �J-K�/16 If, 14 0 t T,7 Z- Phone#: 9 79' :96 G 0a-� Are you an employer?Check the appropriate box: Type ofproject(required): 1.,KI am a employer with_ 4• ❑ I am a general contractor and I 6. El New construction employees(full and/or part time).' have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet.t 7. ❑Remodeling . ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity, workers'comp.insurance. g• ❑Building addition. [No workers'comp.insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑Electrical repairs or additions 3.❑.I am a homeowner doing all work right of exemption per MGL 11.[]Plumbing,repairs or additions myself. [No workers'comp. c.152,§1(4),and we have no 12.❑Roofrepairs insurance required.]t employees.[No workers' 13.❑Other comp.insurance required.] *Any applicant that checks box#1 must also fial out the section below showing their workers'compensation policy inonnation T Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. lam an employer that isproWding workers'compensation insurancefor my employees Below is the policy and job site TnfOYll2atlon. Insurance Company Name: [ w Policy#or Self-inn.Lie.#: Expiration Date: rob Site Address: J5-0 AC-fU5 7 0,�2. City/State/Zip: A(/f" /gym Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine ofup to$250.00 a day against the violator. Be advised that a copy ofthis statementmay be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ceTtify under thepains an penalties ofpePjury that the information provided above is true and correct Si afore: Date: 6 /,5-//Z Phone n ✓��a �Q� Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing A.ufhority(circle one): 1.Board ofHealth 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other ContactPeMon: . Phone#: Ace CERTIFICATE OF LIABILITY INSURANCE ���2"N�°°"�"r' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to certain policies may require an endorsement A statement on this certificate does not confer rights to the the terms and conditions of the policy, po Y eq certificate holder in lieu of such endorsement(s). CONTACT PRODUCER NAME ArdreaGallaglter Fred C.Church.Inc. PHONE978 3227172 NoAIC 878 4541865 41 Wellman Street Ext Lowell,MA 01851 ADDRESS com (808)2251865 INSURER(S)AFFORDING COVERAGE NAIC! INSURER A: Peerless Insurance Company 24188 INSURED INSURER B: Thomas H Kinnal DBA East Coast General Contacting INSURER C 288 Broadway INSURER D HaverNO.MA 01832-2908 INSURER E INSURER F COVERAGES CERTIFICATE NUMBER:21125 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 1TYPE OF INSURANCE POLICY NUMBER MMI CY YY TR EFF MMfLICY EXP LIMITS GENERAL LIABILITY EACH OCCUR_ $ 1.000,000 DAMAGE X COMMERCIAL GENERAL LIABILITY PREMISES Ea oocummoe $ 100.000 CLAIMS-MADE a OCCUR MED EXP Arty one person) $ 5•� A COPS384091 2/152012 2FISM13 PERSONAL d ADV INJURY $ 1'ODO'ODO GENERAL AGGREGATE $ 2'000'000 GEN'LAGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOPAGG $ 2.000.000 POLICY PRO- RO LOC $ JECTAUTOMOBILE LIABILITY COMBINED Ident SINGLE LIMIT 1,0110000 ANYAUTO BODILY INJURY(Per person) $ A ALL D X ACHED LED BA03OZ1391 21132012 2/132013 BODILY INJURY(Per accMerd) $ X HIRED AUTOS X AUTOS ® PROPERTY DAMAGE $ Per rt $ UMBRELLA UAB C>CCUR EACH OCCURRENCE $ EXCESS LIAB CLAIM:-MADE AGGREGATE $ DED RETEN110N $ WORKERS COMPENSATION WC STA �� AND EMPLOYERS'LIABILITY ANY PROPRIETORIPARTNERIEXECUTIVE YINN/A E.L.EACH ACCIDENT $ OFFICERIMEMBEREXCLUDED? (Mandatory In NH) E.L.DISEASE-FA EMPLOYEE $ If yyeess.�describe under DESCRIPTION OF OPERATIONS below E.L DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more speer,is required) Property Name:Royal Crest Estates(North Andover) Contract No-14829-404879-CP-00002 CovenW mchrdes owner as Additional insured CERTIFICATE HOLDER CANCELLATION AIMCO NORTH ANDOVER LLC 5o Royal Crest Drive SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Nath Andover MA 01846 THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE p �`t -� /Il .tit CAMs MS<# 21125 Cert Holder# ®1888-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD ACC) CERTIFICATE OF LIABILITY INSURANCE DATE(Nr/DDlYYY1f7 9/2712012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLIER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed. if SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER FRED C CHURCH INC CONTACT NAME: CONNECTOR PARK 41 WELLMAN ST PHONE(Aft.No. 8 1 FAX Ar No): 9 454-1865 LOWELL, MA 01851 EMAIL ADDRESS: INSURER AFFORDING COVERAGE NAIL Nr INSURER A: Liberty Mutual Insurance INSURED INSURER a: THOMAS H KINNAL DBA EAST COAST GENERAL CONTRACTING INSURER C: 286 BROADWAY INSURERD; HAVERHILL MA 01832 INSURER E: INSURER F• COVERAGES CERTIFICATE NUMBER: 14235761 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE POLICY NUMBER M POLICY EFF M UCY P UNITS GENERAL LIABILITY EACH OCCURRENCEDAE To S COMMERCIAL GENERAL LIABILITY PREM61 ES - E CLAIMS-MADE FI OCCUR MED EXP(Arty one arson) $ PERSONAL 8 ADV INJURY S GENERALAGGREGATE S GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ POLICY PRO• LOC S SIROEE AUTOMOBILE LIABILITY Ea ax dED ent LIMIT s ANY AUTO BODILY INJURY(Per person) $ ALLOWNED SCHEDULED BODILY INJURY(Peraccdent) g AUTOS AUTOS ��® WaWMMAGE aHREDAUTOSBAO $ UMBRELLA LIA13 HOCCUR EACH OCCURRENCE $ EXCESS UAB CLAIMS-MADE AGGREGATE $ — DED RETENTIONS $ a s A WORKERS COMPENSA71ON VYC5-31S-353816-022 2/23/2012 2/23/2013 W STAT AND EMPLOYERS'LIABILITY TORY LIMITS _ ANY PROPRIETOR/PARTNEWEXECUTIVE YIN N E.L.EACH ACCIDENT S 500000 OFFICER/MEMBEREXCLUDED? a NIA (Mandatory In NH) EL.DISEASE-EA EMPLOYEE $ 50 If yes,describe under DESCRIPTION OF OPERATIONS bebw E.L.DISEASE-POUCY LIMIT I s 500000 DESCMP710H OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACORD 101,Addidonal Remarks Schedub,If mon space Is required) Workers compensation insurance coverage applies only to the workers compensation laws of the state MA. CERTIFICATE HOLDER CANCELLMION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE AIMCO NORTH ANDOVER L.L.C. THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELIVERED IN 50 ROYAL CREST DRIVE ACCORDANCE WITM TME POLICY PROVISIONS. NORTH ANDOVER MA 01845 AIJTHORt2ED REPRESENTATVE Jeff Eldridge ®1888-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD CART NO.: 14235761 Katherine Nicholos 9/27/2012 2:02:10 PM Page 1 of 1 This certificate cancels and supersedes ALL previously issued certificates. 1 Massachusetts -Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS-082747 THOMAS H KINNx1L 286 BROADWAY_'" HAVERBUL MA 01831 . - r T `,l Expiration Commissioner 06/20/2014 I a