Loading...
HomeMy WebLinkAboutBuilding Permit #780 - 510 DALE STREET 5/29/2007BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received Z G Date Issued: v DESCRIPTION OF WORK TO BE PREFORMED: �nsC1�5 CXr57W (, D, Sb TNPr- 1. "r g Cowl E5 Ac 09E C- ayls-A-k I 1 4.,,- ```r / 9 rzo e exd d PA r n im , OWNER: Name: Address: Please Type or Print Clearly) ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE: BULDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ 23r��2 • g5 FEE: $ all Check No.: aI3 Receipt No.:C` d NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature of Agent%E)vuner , w;_�S�gnature of contactor Location ✓`rl�%a~ f�""' No. V Date TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ _ Other Permit Fee $ Iq TOTAL Check #S— :�- 20248 Building inspector Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private (septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED /PLANNING & DEVELOPMENT ❑ —416.7 al -a Pde-1-0' COMMENTS 'Tho- wait it- �Z^ #.. A& Q rbc Zfty— mor- Z4 w.rP4 . u.IP �. �, � .. ,r1la isl�cs . T4s ps fiof ria PAA dais.. , �rAr, E REJECTED DATE APPROVED CONSERVATIO " 0 I 1 1 099 COMMENTS HEALTH ❑ COM(V'ENTS DATE REJECTED DATE APPROVED Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Conservation Decision: Comments Comments Water & Sewer Connection/Signature & Date Driveway Permit �'b Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — For department use Los- bita ❑ Notified for pickup - Date Doc.Building Permit Revised 2007 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application Certified Surveyed Plot Plan ❑ Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (if Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2007 T O C ro A n� 6 z ui am o o O N 0 CL C O R7 � W m C 7Z � r yOr m �a 1 :m z � r N C : 0 m Ac y /� m s "V c E N r ` m � y r O N � Nto o : y ro m fKE �nm`m a N cr Cz 0 Uao 0 m Z c . o c ca CL C Nd= m c o m 3 N = r ~ ICE. Z d, az .- z acLu E vovNim o CO3 a 5 = v a��� O F- = .o. a r m z O U 0 v P4 .a a LLI Y/ 19 W W 19 W N a � � v v w q a � a U � C ui am o o O N 0 CL C O R7 � W m C 7Z � r yOr m �a 1 :m z � r N C : 0 m Ac y /� m s "V c E N r ` m � y r O N � Nto o : y ro m fKE �nm`m a N cr Cz 0 Uao 0 m Z c . o c ca CL C Nd= m c o m 3 N = r ~ ICE. Z d, az .- z acLu E vovNim o CO3 a 5 = v a��� O F- = .o. a r m z O U 0 v P4 .a a LLI Y/ 19 W W 19 W N