Loading...
HomeMy WebLinkAboutBuilding Permit #Exception - 525 TURNPIKE STREET 5/1/2018 ------ y OE NORT11 BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: " Date Received 0, : ,> « Date Issued: �1SCHUS IMPORTANT:Applicant must complete all items on this page LOCATION- /,Xe A! *2117 -<7- Print ,- Print PROPERTY OWNEea —T�/a-- Print MAP NO: PARCEL: ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial Alteration No. of units: i Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District ❑Water/Sewer Identification Please Type or Print Clearly) OWNER: Name:/ �,sz�-ej��7,¢0, IeA Phone: Address: 4 em,r�./ `7�i�r ups �� t/,AaL ie- dr 3 Qo6 �yzaalr. CONTRACTOR Name: I Phone: Address: Supervisor's Construction License: ` d�8y27 Exp. Date: Home Improvement License: Exp. Date: ARCH ITECT/ENGINEER_Auee__ 14m,! /► Phone: led_? Address:��/� l0y `71 Z�iv, /7//- D3471 Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. 1. Total Project Cost: 0-o`d FEE: $ 133)' , ori Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund ,Signature of Agent/Owner Signature of contractor - K Architecture 401.- J;1[1 Land Planning Interior Design BRUCE I 3D Visualization RONAYNE HAMILDDN ARCHITECTS TO: Gerald Brown I FROM: Laurie Henault DATE: August 1, 2014 RE: Rite Aid#10117, 525 Turnpike St, North Andover, MA See summary notes: All remodel work will be within the existing building footprint; there will not be any structural revisions. 1. A new Consultation Room will be constructed utilizing approximately 66 s.f, of the current Pharmacy 2. Door from Sales to Rear Corridor will be removed for improved access/egress. 3. Photo Department cabinetry will be removed near the front Manager's Office and will be replaced with a Single-user(self-serve) Kiosk/Desk. 4. Sales Area Flooring will be replaced in some areas. 5. Sales Area signage to be upgraded and wall surfaces will be repainted. Some areas will receive new Marlite Wall Laminates (at"touchable" surfaces). 6. The plans that we've developed include Floor Plans of the affected areas. There will not be any upgrades to the existing electrical service size, but outlets,phone and data boxes will be relocated as necessary. Power will also be supplied to new Sales Area display units located at the ends of some gondola fixtures (Lighted displays, Convenience Coolers and Freezers, relocate ATM, etc...). 7. The shelving layout for the Sales Area will also be adjusted as part of the renovation work. This new layout is shown on the plans. Some existing gondolas will be re-used and others will be replaced. 8. The General Contractor has not been chosen yet, that's why I am acting as an"Agent" for Rite Aid Corporation in order to help expedite the Building Permit Process. Once the GC has been awarded this project, they will contact you in order to provide to you any necessary Insurance Information, and to coordinate their schedule with you. 833 Turnpike Road P.O. Box 104 New Ipswich, NH 03071 T (603) 878-4823 F (603) 878-4834 W W W.BRHARCH.COM I 9. Separate Permits required for Electrical, etc... will be applied/paid for by the General Contractor. The plans I've included are as follows (along with die Building Permit Application): 3 prints each of Sheets CS-1, EX-1, A-1,A-2,A2.1,A-3,A-4,A-5 (stainped/signed). If you have any questions, please feel free to contact me. Tliwik you! Laurie Henault I