Loading...
HomeMy WebLinkAboutBuilding Permit #588-12 - 54 PHILLIPS COURT 2/6/2012 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: /Z Date Received Date Issued: z IMPOR'T'ANT:Applicant must complete all items on this page 'L LOCATION Print PROPERTY OWNER r U P n el e r Unit# � Print MAP NO: ARCEL:3 SZONING DISTRICT: Historic District yes n Machine Shop Village yes n 100 year-old structure yes n TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑9ne family ❑AdditionJXTwo or more family 11 Industrial C(Alteration No. of units: ❑ Commercial Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑Other };-S p is ,0 LOU",; � ooclp ain '., ❑r Weal ds =Oi Watdrs en�� v t V,la� C '�ater/Sewer w s'.'a.. DESCRIPTION OF WORK TO BE PERFORMED: HLIAC i (Identification Please Type or Print Clearly) OWNER: Name: /Z � .�,j�r�s( r- Phone: Address: SW 422c CONTRACTOR Name: ��i%& t Qcl46 Phone: P?gyp Address: A2 aa Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$9200 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F. Total Project Cost: $_-MSc- G C/ FEE: $. Check No.: � Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund t natureof:Agent/Owner . 4 . _a .{_ F f �S►gnatac,0f-ft ontractor Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit o Photo Copy of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract o Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster,permits require sign off from Fire Department prior to issuance of Bldg Permit Addition or Decks ❑ Building Permit Application ❑ Certified Surveyed.Plot Plan. a Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract Q Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) Li Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract o Mass check Energy Compliance Report o Engineering Affidavits for Engineered products N OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2008mi Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Swimming Pools ❑ Tanning/MassageBody Art ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ I COMMENTS CONSERVATION Reviewed on Signature COMMENTS _ HEALTH Reviewed on Siqnature COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$10041000 fine NOTES and DATA— For department use i Ll Notified for pickup - Date Doc:.Building Permit Revised 2011 June/mi I Location �l r � t el ,-s _1 No. Date -~2 G �- + ' TOWN OF NORTH ANDOVER �r e • Certificate of Occupancy $ Building/Frame Permit Fee $ t . ., Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check# 25011 BuilOing Inspector ' •� Np R Tiy _ Town ofo over 0 .� VA dover, MassC T O LAKE �• T COCMICKEWICK V ✓�S RATE D p �Cl E BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System BUILDING INSPECTOR THIS CERTIFIES THAT.............. !.........�,�/.I .E'.Ya/e�.......................................................................................... Foundation � a74— has permission to erec ...........:.:.......................... buildings on . ..... .... ... ........................................ Rough to be occupied as ................................... l/. .:.... is!Y�I.....r......1...F.:.q�. ............... ...... Chimney provided that the person accepting this permit shafl in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in'the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS EI;ECTRICAL INSPECTOR UNLESS CONSTRUCTIONS TS Rough _ Service BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIR_E.DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner - Street No. SEE REVERSE SIDE Smoke Det. r Fold,Then Detach Along All Perforations :I COMMONWEALTH OF MASSACHUSETTS BOARD SHEET METAL WORKERS SM AS`°A'-MASTER-UNRESTRICTED ISSUES THE ABOVE LICENSE T01- TYPE HARD`'H DUPRE ' M1 90HALE ST HAVERH'ILL MA 01830.-3972 3918 60 06/28/13 :3918 julaTune .• Fold,Then Detach Along All Perforations i Fold,Then Detach Along All Perforations COMMONWEALTH OF MASSACHUSETTS : BOARD SHEET METAL WORKERS SM AS`A BUSINESS ISSUES THE ABOVE LICENSE To:. TYPE - RICHARD %M DUPRE NORTHEAST HEATING AND COOLING I '; -B 23 MAIN: ST ' ` `NORTH': ANDOVER MA 01845`-`0&01 968727 E 13 07/29/12 968727 r Fold,Then Detach Along All Perforations i 0 IVA 0 D Heating & Cooling Haverhill, MA 0 o oilG°�l��g(�G 0 0 SALES 8 SERVICE � 1-800-691-0122 , � www.northeasthc.com 0 0 0 9 Load Short Form Job: Wrl htsoft Date: Jan 26,2012 Entire House By Northeast Heating & Cooling, INC. a90 Hale Street,Haverhill,MA 01830 Phone:978-691-5822 Fax 978-374-9500 Email:Rich@northeastheatingandcooling.com web:www.NortheastHeatingandCooling.com QFor: Ryan Schruender 54 Philips Court, North Andover, MA 01845 D - • o 0 a Htg Clg Infiltration Outside db(°F) 12 87 Method Simplified Inside db(°F) 70 70 Construction quality Average Design TD (°F) 58 17 Fireplaces 0 a Daily range - L Inside humidity (%) 30 50 Moisture difference(gr/Ib) 25 36 HEATING EQUIPMENT COOLING EQUIPMENT a Make Trane Make Trane Trade XR95 Trade XB13 Model TUH16060A9H3 Cond 4TTB3030D1 AHRI ref no. Coil 4TXCB032BC3+*UH1B060A9H3 AHRI ref no5007506 Efficiency 90AFUE Efficiency 12.0 EER, 14 SEER Heating input 0 Btuh Sensible cooling 19880 Btuh Heating output 0 Btuh Latent cooling 8520 Btuh Temperature rise 0 *F Total cooling 28400 Btuh Actual air flow 947 cfm Actual air flow 947 cfm Air flow factor 0.028 cfm/Btuh Air flow factor 0.038 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O 7 Space thermostat Load sensible heat ratio 0.93 �+ ROOM NAME Area Htg load Clg load Htg AVF ClgAVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor p 541 17999 16412 497 632 1st floor p 632 16290 11239 450 433 Entire House d 1173 34289 24609 947 947 Other equip loads 0 . 0 Equip. @ 0.92 RSM 22689 Latent cooling 1782 TOTALS 1173 34289 24471 1 947 1 947 a 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. WCI htsoft" 2012-Feb-06 08:age 1 g Right-Suite®Universal 8.0.24 RSU14276 Page 1 C:\UserslNortheast\Documents\wrightsoft HVAC\Roger.rup Calc=MJS Front Door faces: N 9 Load Multizone Summary Report Job: o wri htsoft Date: Jan 26,2012 By: Northeast Heating & Cooling, INC. 90 Hale Street,Haverhill,MA 01830 Phone:978-6131-5822 Fax:978-374-9500 Email:Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com 0 Heating Cooling ZONENAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft' ft3 cfm Btuh/ft' 2nd floor 4328 0.56 40 4 . 9 4328 0 .29 21 0. 7 lst floor 5056 0. 60 50 4 . 9 5056 0 .31 26 0.7 aEntire House 9384 0.58 91 4 . 9 9384 0 .30 47 0. 7 ROOMNAME Area Htg load Clgload HtgAVF C1gAVF ftZ Btuh Btuh cfm cfm I Bedroom 1 182 6304 4929 174 190 Bedroom 2 99 3324 3203 92 123 Hall 57 0 0 0 0 Bath 110 3536 3343 98 129 Room14 93 4835 4936 134 190 a 2nd floor 541 17999 16412 497 632 Bathroom 36 1195 1202 33 46 Pantry 36 1195 1202 33 46 Kitchen 224 6374 4908 176 189 Living 336 7526 3926 208 151 1st floor 632 16290 11239 450 433 Entire House 1173 34289 24609 947 947 wrlghtSOW Right-Suite®Universal 8.0.24 RSU14276 2012-Feb-06 08:24:13 Page 1 C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N 9 ® Loads for e Orientations Job: wri htsoft MultipplitiDate: Jan 26,2012 Entire House By: Northeast Heating & Cooling, INC. 90 Hale Street,Haverhill, MA 01830 Phone:978-691-5822 Fax:978-374-9500 Email:Rich@northeastheatingandcooling.com web:www.NortheastHeatingandCooling.com 0 0 0 For: Ryan Schruender , 54 Phipps Court, North Andover, MA 01845 a Location: Indoor: Heating Cooling Boston, MA, US Indoor temperature(°F) 70 70 Elevation: 30 ft Design TD (°F) 58 17 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 24.6 35.9 Dry bulb(°F) 12 87 Infiltration: Daily range(°F) - 15 ( L ) Wet bulb(°F) - 71 Wind speed (mph) 15.0 7.5 Front Door North Northeast East Southeast South Southwest West Northwest Sensible Load (Btuh) 22689 23663 23994 24229 22124 22502 22456 23157 Latent Load (Btuh) 1782 1782 1782 1782 1782 1782 1782 1782 n Total Load (Btuh) 24471 25444 25775 26010 23906 24284 24238 24939 Heating AVF (cfm) 947 947 947 947 947 947 947 947 Cooling AVF (cfm) 947 947 947 947 947 947 947 947 Building Orientation Cooling Load 30000 a a 25000 0 ( 20000 -do m 4 15000 10000 5000 D 0 N NE E SE S SW W NW Direction Front Door faces Current Orientation: Front Door faces North aHighest Cooling Load: Front Door faces Southeast Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft® Right-Suite®Universal 8.0.24 RSU14276 2012-Feb-06 08:24:13 Page ag1 1 af�iCp1 C:\Users\Northeast\Documents\wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N WI'1911t50ft® g nay Building Analysis Job: Date: Jan 26,2012 n Entire House By: J Northeast Heating & Cooling, INC. 90 Hale Street,Haverhill,MA 01830 Phone:978-691-5822 Fax:978-374-9500 Email: Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com e e • i For: Ryan Schruender 54 Philips Court, North Andover, MA 01845 Location: Indoor: Heating Cooling Boston, MA, US Indoor temperature(°F) 70 70 Elevation: 30 ft Design TD (°F) 58 17 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 24.6 Dry bulb(°F) 12 87 Infiltration: Daily range °F)- 15 ( L ) Method Simplified Wet bulb(°F� - 71 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Component Btuh/ft2 Btuh % of load rub Walls 5.3 5384 15.7 walls /Ducts Glazing 33.1 4033 11.8 Doors 22.6 950 2.8 Ceilings 14.8 8399 24.5 Gann9___ _ Floors 6.4 4062 11.8 Infiltration Infiltration 4.9 5781 16.9 Ducts 5680 16.6 °o° Piping 0 0 Humidification 0 0 Floors Ventilation 0 0 Ceilings Adjustments 0 Total 34289 100.0 I • • • 777771 Component Btuh/ft2 Btuh % of load Walls 2.4 2418 9.8 Walls Internal Gains Glazing 47.1 5745 23.3 Doors 12.1 509 2.1Ducts Ceilings 13.9 7899 32.1 Floors 1.9 1205 4.9 Glazing._ Infiltration 0.7 887 3.6 . . .Inflltrati°n Ducts 4746 19.3 Ventilation 0 0 '"`Floors Internal gains 1200 4.9 Blower 0 0 Dors Adjustments 0 Total 24609 100.0 Ceilings Latent Cooling Load = 1782 Btuh Overall U-value= 0.214 Btuh/ft2-°F Data entries checked. wrightsoft- 2012-Feb-06 08:24:14 Right-Suite®Universal 8.0.24 RSU14276 Page 1 ACCA C:\Users\Northeast\Documents\wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N L.i 1_J li Component Constructions °b -�- wrightsoft° Date: Jan 26,2012 Entire House By: Northeast Heating & Cooling, INC. 90 Hale Street, Haverhill, MA 01830 Phone 978-691-5822 Fax 978-374-9500 Email:Rich@northeastheatingandcooling.com V1kb www NortheastHeatingandCooling.com For: Ryan Schruender n 54 Philips Court, North Andover,MA 01845 Location: Indoor: Heating Cooling Boston, MA, US Indoor temperature(OF) 70 70 Elevation: 30 ft Design TD (°F) 58 17 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 24.6 35.9 f� Dry bulb (°F) 12 87 Infiltration: ILEI Daily range(°F) 15 ( L ) Method Simplified Wet bulb (°F) - 71 Construction quality .Average Wind speed (mph) 15.0 7.5 Fireplaces 0 a Construction descriptions or Area U-value Insul R Htg HTM Loss Clg HTM Gain a ft Btuh/ft'-"F ft?"F/Btuh Btuh/R' Btu Btuh/ft' Bluth Walls 12C-Osw:Frm wall,vnl ext,3/8"wood shth,r-13 cav ins, 1/2" a 296 0.091 13.0 5.28 1562 2.37 702 gypsum board int fnsh,2'W"wood frm s 521 0.091 13.0 5.28 2748 2.37 1234 w 203 0.091 13.0 528 1073 2.37 482 ILII all 1020 0.091 13.0 5.28 5384 2.37 2418 Partitions (none) Windows 1D-c2ov:2 glazing,clr outr,air gas,vnl frm mat,clr innr, 1/4"gap, a 40 0.570 0 33.1 1322 62.3 2494 1/8"thk s 66 0.570 0 33.1 2193 34.3 2274 w 16 0.570 0 33.1 518 62.3 977 all 122 0.570 0 33.1 4033 47.1 5745 n Doors 1LlI 11 D0:Door,wd sc type s 21 0.390 0 22.6 475 12.1 254 w 21 0.390 0 22.6 475 12.1 254 all 42 0.390 0 22.6 950 12.1 509 11 Ceilings 11 C part ceiling,:C part ceiling,hrd wd flr fnsh,frm flr, 10"thkns, 1/2" 569 0.255 1.0 14.8 8399 13.9 7899 gypsum board int fnsh a Floors 19A-Obswp:Part floor,hrd wd flr fnsh,frm flr, 10"thkns 632 0.295 0 6.43 4062 1.91 1205 ! ' Page wrightsoft" Right-Suite®Universal 8.0.24 RSU14276 2012-Feb-06 08:age 1 1 ACCA C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N i 0 9 ® Project Summa Wri htsoft Job:Date: Jan 26,2012 Entire House By: Northeast Heating 8r: Cooling, INC. 90 Hale Street,Haverhill,MA 01830 Phone 978-691-5822 Fax 978-374-9500 Email:Rich@northeaslheatingandcooling.com Web:www.Northeast Heat ingandCooling.com 5� For: Ryan Schruender 54 Philips Court, North Andover, MA 01845 aNotes: Weather: Boston, MA, US aWinter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 87 OF Inside db 70 OF Inside db 70 OF Design TD 58 OF Design TD 17 OF Daily range L Relative humidity 50 % Moisture difference 36 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 28609 Btuh Structure 19862 Btuh Ducts 5680 Btuh Ducts 4746 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 34289 Btuh Use manufacturer's data n Rate/swing multiplier 0.92 Infiltration Equipment sensible load 22689 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1143 Btuh Ducts 639 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft' 1173 1173 Equipment latent load 1782 Btuh Volume kft3) 9384 9384 Air changes/hour 0.58 0.30 Equipment total load 24471 Btuh Equiv.AVF (cfm) 91 47 Req. total capacity at 0.70 SHR 2.7 ton Heating Equipment Summary Cooling Equipment Summary Make Trane Make Trane Trade XR95 Trade XB13 a Model TUH1B060A9H3 Cond 4TTB3030D1 AHRI ref no. Coil 4TXCB032BC3+"UH1B060A9H3 AHRI ref no5007506 Efficiency 90AFUE Efficiency 12.0 EER, 14 SEER Heating input 0 Btuh Sensible cooling 19880 Btuh Heating output 0 Btuh Latent cooling 8520 Btuh Temperature rise 0 OF Total cooling 28400 Btuh Actual air flow 947 cfm Actual air flow 947 cfm Air flow factor 0.028 cfm/Btuh Air flow factor 0.038 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.93 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. i Wrl htsoft" 2012-Feb-O6 08:age 1 9 Right-Suite®Universal 8.0.24 RSU14276 Page 1 RCCA C:\Users\Northeast\Documents\wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N AED Assessment Job: - + wrightsoft® Date: Jan 26,2012 (� Entire House By: u Northeast Heating & Cooling, INC. 90 Hale Street,Haverhill, MA 01830 Phone:978-691-5822 Fax:978-374-9500 Email:Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com _777. I - • • i For: Ryan Schruender 54 Philips Court, North Andover, MA 01845 Location: Indoor: Heating Cooling Boston, MA, US Indoor temperature(°F) 70 70 Elevation: 30 ft Design TD (°F) 58 17 Latitude: 42°N Relative humidity (%) 30 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 24.6 35.9 Dry bulb (°F) 12 87 Infiltration: Daily range(°F) 15 ( L ) Wet bulb (°F) - 71 Wind speed (mph) 15.0 7.5 • � • - • • • D 0 Hourly Glazing Load 9,000 8,000 n 7,000 6,000 0 5,000 aN 4,000 Q 3,000-- 2,000-- 11,000- ,0002,0001,000 0 8 9 10 11 12 13 14 15 16 17 18 19 20 Hour of Day /Hourly /Average /AED limit Maximum hourly glazing load exceeds average by 21.2%. House has adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 0 Btuh - - wrightsoft' Right-SudUniversal 8.0.24 RSU14276 2012-Feb-06 08-24e@ age 1 1 RCCA C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N Ali + wrightsoft° Right-J®Worksheet Job: Entire House Date: Jan 26,2012 Northeast Heating &Cooling, INC. By. 90 Hale Street,Haverhill,MA 01830 Phone:978-691-5822 Fax:978-374-9500 Email:Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com 1 Room name Entire House 2nd floor 2 Exposed wall 148.0 ft 66.0 ft 3 Ceiling height 8.0 ft d 8.0 ft p 4 Room dimensions 5 Room area 1173.0 ft2 541.0 ft' Ty Construction U-value Or HTM Area (ftp Load Area (ftp Load number (13tuh/ft'°F) (Btuh/ftj or perimeter (ft) (Btuh) or perimeter (ft) (8tuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Vel 12C-Osw 0.091 a 5.28 2.37 336 296 1562 702 112 92 486 218 I G 1D-c2ov 0.570 a 33.06 62.35 40 0 1322 2494 20 0 661 1247 12C-Osw 0.091 s 5.28 2.37 608 521 2748 1234 304 264 1393 626 1D-c2ov 0.570 s 33.06 34.29 66 0 2193 2274 40 0 1322 1371 11 11 DO 0.390 s 22.62 12.11 21 21 475 254 0 0 0 0 12C-0sw 0.091 w 5.28 2.37 240 203 1073 482 112 112 591 266 1 D-c2ov 0.570 w 33.06 62.35 16 0 518 977 0 0 0 0 11 DO 0.390 w 22.62 12.11 21 21 475 254 0 0 0 0 C C part ceilinq, 0.255 14.76 13.88 569 569 8399 7899 541 541 7986 7511 F 19A-Obswp 0.295 6.43 1.91 632 632 4062 1205 0 0 0 0 a o a 0 a 0 � a a6 c)AED excursion 0 1613 Envelope loss/gain 22828 17776 12439 12851 12 a) Infiltration 5781 887 2578 395 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 1200 0 Subtotal(lines 6 to 13) 1 28609 19862 1 15017 13247 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 28609 19862 15017 13247 15 Duct loads 20% 24% 5680 4746 20% 24% 2981 3165 Total room load 34289 24609 17999 16412 Air required(cfm) 947 947 4971 632 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wr'ightsoft" 2012-Feb-06 08:24:14 Right-Suite®Universal 8.0.24 RSU14276 Page 1 AC C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N U + wrightsoft° Right-J®Worksheet Job. Entire House Date: Jan 26,2012 Northeast Heating &Cooling, INC. By 90 Hale Street,Haverhill,MA 01830 Phone:978-691-5822 Fax 978-374-9500 Email: Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com D 1 Room name 1st floor 2 Exposed wall 82.0 ft 3 Ceiling height 8.0 ft p 4 Room dimensions 5 Room area 632.0 ft2 Ty Construction Ll-value Or HTM Area (ftp Load Area Load number (Btuh/ftl-°F) (Btuh/ft� or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VE—G 12C-0sw 0.091 a 5.28 2.37 224 204 1077 484 1 D-c2ov 0.570 a 33.06 62.35 20 0 661 1247 V�/ 12C-Osw 0.091 s 5.28 2.37 304 257 1355 608 L—Gp 1 D-c2ov 0.570 s 33.06 34.29 26 0 871 903 11 11D0 0.390 s 22.62 12.11 21 21 475 254 �j 12C-0sw 0.091 w 5.28 2.37 128 91 482 217 :C 1 D-c2ov 0.570 w 33.06 62.35 16 0 518 977 L—D 11 DO 0.390 w 22.62 12.11 21 21 475 254 C C part ceiling, 0.255 - 14.76 13.88 28 28 413 389 F 19A-Obswp 0.295 - 6.43 1.91 632 632 4062 1205 a � a Q 0 � o � a a6 c)AED excursion 843 Envelope loss/gain 10389 7380 12 a) Infiltration 3203 491 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 0 0 Appliances/other 1200 Subtotal(lines 6 to 13) 13592 9071 j Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 13592 9071 15 Duct loads 20% 24% 2698 2168 Total room load 16290 11239 Air required(cfm) 4501 433 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. _ wri2012-Feb-06 08:24:14 ght50ft` Right-Suite®Universal 8.0.24 RSU14276 Page 2 '�� C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N D Manual S Compliance Report Job: wrightsoft® Date: Jan 26,2012 DEntire House By: Northeast Heating & Cooling, INC. 90 Hale Street,Haverhill,MA 01830 Phone:978-691-5822 Fax:978-374-9500 Email:Rich@northeastheatingandcooling.com Web:www.NortheastHeatingandCooling.com � D µ r, _ • • • For: Ryan Schruender 54 Philips Court, North Andover, MA 01845 � D • e . • D Design Conditions tions 9 Outdoor design DB: 87.2°F Sensible gain: 22689 Btuh Entering coil DB: 71.7°F Outdoor design WB: 71.4°F Latent gain: 1782 Btuh Entering coil WB: 59.2°F Indoor design DB: 70.0°F Total gain: 24471 Btuh Indoor RH: 50% Estimated airflow: 947 cfm DManufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: Trane Model: 4TT63030D1+4TXCB032BC3+"UH1B060A9H3 Actual airflow: 947 cfm Sensible capacity: 0 Btuh 0% of load D Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% DDesign Conditions Outdoor design DB: 12.0°F Heat loss.- 34289 Btuh Entering coil DB: 68.5°F Indoor design DB: 70.0°F DManufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: Trane Model: TUH16060A91­13 Actual airflow: 947 cfm Output capacity: 0 Btuh 0% of load Temp. rise: 0 °F D The above equipment was selected in accordance with ACCA Manual S. li D 2012-Feb-06 0824:14 .� wrightsoft® Right-Suite(E)Universal 8.0.24 RSU14276 Page 1 ACCP. C:\Users\Northeast\Documents\Wrightsoft HVAC\Roger.rup Calc=MJ8 Front Door faces: N D L.I First Floor 0 a Living LJ 0 1 Unit 2 � a a a r Kitchen �r - Pantry Bathroom 1 � 0 Job M Northeast Heating & Cooling, INC. Scale: 1 : 59 Performed for: Page 1 Ryan Schruender 90 Hale Street Right-Suite®Universal 54 Philips Court Haverhill, MA 01830 8.0.24 RSU14276 North Andover, MA 01845 Phone: 978-691-5822 Fax: 978-374-9500 2012-Fel>0 08:24:33 www.NortheastHeatingandCooling.com Rich@no... ...uments\wrightsoft HVAC\Roger.rup I N Second Floor 0 i edroom 1 a � a � a a Bedroom 2' Unit � a Hall th a Room 14 � a a Job M Northeast Heating & Cooling, INC. Scale: 1 : 59 Performed for: Page 2 Ryan Schruender 90 Hale Street Right-Suite@ Universal 54 Philips Court Haverhill, MA 01830 8.0.24 RSU14276 North Andover, MA 01845 Phone: 978-691-5822 Fax: 978-374-9500 2012-Feb-06 08:24:33 www.NortheastHeatingandCooling.com Rich@no... ...uments\wrightsoft HVAC\Roger.rup Northeast y' + Heating &Cooling 90 Hale Street Haverhill, MA 01830 800 691-0122 Ryan Schruender January 4, 2011 Philips Court North Andover, MA 01845 We are pleased to quote you a price of $6,650.00 for the following, Equipment: 1. One Trane XR95 furnace 2. All needed PVC flue piping 3. All needed duct work and fittings 4. All PVC fittings for drain 5. Condensate pump 6. Two zones 1 st/2nd floor 7. One Trane condenser XB 13 and matching coil Services: 1. Set and install new Trane furnace in basement 2. Set new condenser at ground level 3. Set new evaporator coil on furnace 4. Install all needed duct work for new addition 5. Install PVC flue pipe to outside 6. Start and test operation of heating and air condition system 7. Install condensate drain line inside open drain Customer obligation: Any code updating will be an extra charge outside our scope of work Electrical by customer and gas by customer Extras 1. Add high efficiency air cleaner YES / NO ADD $450.00 2. Add humidifier to system YES / NO ADD $350.00 Warranty: One-year parts and labor by Northeast Heating & Cooling, INC. All warranty work will be done during normal business hours Manufactures warranty there after Payment as follows, 1/3 as a deposit, 1/3 when units arrive on job, balance due upon start up caner Northeast Heating and Co ing Quote valid for 30 days