Loading...
HomeMy WebLinkAboutBuilding Permit #061-14 - 58 BERKELEY ROAD 7/17/2013 I TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO:-- Date Received Date Issued: - IMPORTANT:Applicant must complete all items on this page 1 LOCATION. Print PROPERTY OWNER_ _- ✓� `Z __ - _ _ _. - __ Print 1 00.Year Old'Structure yes.. MAP N0: PARCEL: _ZONING'DIS,TrRICT: Historic,Distrief yes no Machine;Shop Village, yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other D Septic. ❑Weil' ❑ Floodplain D Wetlands ❑ Watershed:District' D Water/Sewer, DESCRIPTION OF WORK TO BE PERFORMED: 6;� ,L� S ty 1✓I .-�-� �. pi-, <L., Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: 5�e 'SLS CONTRACTOR Name: Phone: -- _ - Address: t Supervisor'sl.Construction License: U�tS 3 '-rl Exp: 'Date:. .. Home Improvement.License: Las E�52, Exp. Datera 8 Z�,ot!' - 1 r ARCHITECT/ENGINEER c5 `"A. Phone: Address: Reg. No. �L�tc P,i. —a- FEE SCHEDULE:BULDING PERMIT:$12.00 PER$100400 OF TIE MTOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ ?S�� � FEE: Check No.: (4 t) � �`I Receipt No.: jNOTE: Persons contracting with unregistered contractors do not have access to the guarantyfund ;Signature ofAgent/0 erSignature of_contractor, Plans Submitted Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans i Location e ti.. L .40�n No. / L Date . - TOWN OF NORTH ANDOVER • �; rsy6' � ;4 2 Certificate of Occupancy $ Building/Frame Permit Fee $ w s Foundation Permit Fee $ Other Permit Fee $ - :a TOTAL $ Check#� k 7( / 26633 Building Inspector Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature n COMMENTS n ti I Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments -Water & Sevier Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Os ood Street FIRE'DEPARTMENT -.Temp Dumpster on site yes . no I Located at*124;Main`Street .. ` Fire Departrnenf=§ignaturb1date'' ` COMMENTS i Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$10041000 fine NOTES and DATA— (For department use I I i I I I ® Notified for pickup - Date E { f Doc.Building Permit Revised 2010 J. Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application o Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses o Copy of Contract ❑ Floor Plan Or Proposed Interior Work o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application I o Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application o Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract o Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit i_ In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application I Doc: Doc.Bui?ding permit Revised 2012 I -Pr i 't October 21sT, 2013 SolarCity-Marlborough RE: Structural Engineering Approval Letter Project: Moritz, Raymond 58 Berkeley Rd. North Andover, MA 01845 Project#:018294 To Whom It May Concern, On the above referenced project, SolarCity reviewed photographs of the installation that were specified in the plan. The purpose of the review was to verify the installation and their conformance with the specifications and that any modifications were acceptable. After review it is our opinion that the PV panels were installed in general conformance with the plans and specifications for this project, and the installation complies with the provisions of Massachusetts Residential Code, 8th Edition. Should you have any further questions or requirements pertaining to this project, please do not hesitate to contact the office. Sincerely, _JJA OF ANA Off' YOO J!N K No.4 Z AL 57 Yoo An Kim, P.E. Digit y signed by Yoo Jin Kim Date:2013.10.21 13:36:40 Civil Engineer -07'00' 3055 Clearview Way San Mateo,CA 94402 T(650)638-1028 (888)SOL-CITY F(650)638-1029 SOLARCITY.COM AZ ROC 243771., CA CSL8 888104,CO EC 8041, OR CCB 180448,TX TOLR 27006 Enter construction cost for fee cal - North Andover Fee Cakulat/on Construction Cost m $ - $ 429.60 Plumbing Fee $ 53.70 ............. .............................. Gas Fee 100 comm. $ 100.00 ....... ................:......... Electrical Fee $ 53.70 Total fees collected $ 637.00 58 Berkeley Road 061-14 on 7/17/13 Solar Panels Install � �10RTii Town ofAndover o :�.. , O„ No. 061-- Iq h ,� ver, Mass, A- COCHIC"EWICK 9�A�RATEO ►'P�`�.(5 S U BOARD OF HEALTH PERMIT T LD Food/Kitchen Septic System THIS CERTIFIES THAT V. .........M.Q.hAs....................................... BUILDING INSPECTOR has permission to erect .......................... buildings on ... ....�� ,. ....e.. Foundation .......r............. Q Rough to be occupied as ......"..!t.. ...... b.'J........ a ....... ................ .......................... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final que PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCT I STA TS Rough Service ............... .. ........ ................................................ Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. WHERE ALL TERMINALS OF THE DISCONNECTING ALL ELECTRICAL WORK SHALL COMPLY WITH 2011 AC ALTERNATING CURRENT MEANS MAY BE ENERGIZED IN THE OPEN NEC. AND MASS AMENDMENTS BLDG BUILDING POSITION, A SIGN WILL BE PROVIDED WARNING CONC CONCRETE OF THE HAZARDS PER ART. 690.17. DC DIRECT CURRENT 2. EACH UNGROUNDED CONDUCTOR OF THE EGC EQUIPMENT GROUNDING CONDUCTOR MULTIORE BRANCH CIRCUIT WILL BE IDENTIFIED (E) EXISTING BY PHASE AND SYSTEM PER ART. 210.5. EMT ELECTRICAL METALLIC TUBING 3. A NATIONALLY—RECOGNIZED TESTING GALV GALVANIZED LABORATORY SHALL LIST ALL EQUIPMENT IN GEC GROUNDING ELECTRODE CONDUCTOR COMPLIANCE WITH ART. 110.3. GND GROUND 4. CIRCUITS OVER 250V TO GROUND SHALL HDG HOT DIPPED GALVANIZED COMPLY WITH ART. 250.97, 250.92(B) I CURRENT 5. DC CONDUCTORS EITHER DO NOT ENTER Imp CURRENT AT MAX POWER BUILDING OR ARE RUN IN METALLIC RACEWAYS Isc SHORT CIRCUIT CURRENT OR ENCLOSURES TO THE FIRST ACCESSIBLE DC kVA KILOVOLT AMPERE DISCONNECTING MEANS PER ART. 690.31(E). kW KILOWATT 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN LBW LOAD BEARING WALL RELIEF AT ALL ENTRY INTO BOXES AS MIN MINIMUM REQUIRED BY UL LISTING. (N) NEW 7. MODULE FRAMES SHALL BE GROUNDED AT THE NTS NOT TO SCALE UL—LISTED LOCATION PROVIDED BY THE OC ON CENTER MANUFACTURER USING UL LISTED GROUNDING PL PROPERTY LINE HARDWARE. POI POINT OF INTERCONNECTION 8. MODULE FRAMES, RAIL, AND POSTS SHALL BE PV PHOTOVOLTAIC BONDED WITH EQUIPMENT GROUND CONDUCTORS SCH SCHEDULE AND GROUNDED AT THE MAIN ELECTRIC PANEL. SS STAINLESS STEEL 9. THE DC GROUNDING ELECTRODE CONDUCTOR STC STANDARD TESTING CONDITIONS SHALL BE SIZED ACCORDING TO ART. TYP TYPICAL 250.166(B) & 690.47. UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Vac VOLTAGE AT OPEN clRculT W WATT VICINITY MAP INDEX 3R NEMA 3R, RAINTTGHT PVl COVER SHEET PV2 SITE PLAN * PV3 STRUCTURAL VIEWS PV4 THREE LINE DIAGRAM LICENSE GENERAL NOTES CPV5 ut ELECTRICAL CALCULATIONSM � CutELECTRICAL Attached X1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED POWER—CONDITIONING INVERTER. 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. 3. PHOTOVOLTAIC SOURCE AND INPUT CIRCUITS AND INVERTER INPUT CIRCUIT ARE UNGROUNDED. rt 4. SOLAR MOUNTING FRAMES ARE TO BE GROUNDED. MODULE GROUNDING METHOD: SLEEKMOUNT 5. ALL ELECTRICAL WORK SHALL COMPLY WITH THE AHJ: North Andover 2011 NATIONAL ELECTRIC CODE. 14 REV BY DATE COMMENTS 6. ALL WORK TO BE DONE TO THE 8TH .EDITION OF REV A NAME 7/12/2013 COMMENTS MA STATE BUILDING CODE. ' * * * * UTILITY: National Grid USA (Massachusetts Electric) 1 * * * JB-01 8294 0 0 PREMISE OM�IER: DESCRPnON: DEIGN: CONFIDENTIAL— THE INFORMATION HEREIN Joe NUMBER: RAYMOND MORITZ RESIDENCE Justin Martin CONTAINED SHALL NOT E USED FOR THE MORITZ, mil BENEFIT OF ANYONE EXCEPT SOLARCIIY INC., MOUNTING SYSTEM: O�� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array o PART TO OTHERS OUTSIDE THE RECIPIENT'S uaouLEs: NORTH ANDOVER MA 01845 ORGANIZATION, EXCEPT IN CONNECTION WITH r 24 St.Martin Drive,Building 2.Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE—Z 60 PAGE NAME SHEET: REV: DATE Marlborough,MA 01752 SOLAPERMISSION OFlsSOLMOTYirlC. THE WRITTEN MUTER: 978 494-0415 PV 1 7/12/2013 (tl )T.(SOL-C50)BT�ie5-2489j6wmsdarpty.�anr Multiple Inverters COVER SHEET PITCH: 30 ARRAY PITCH:30 MP1 AZIMUTH: 126 ARRAY AZIMUTH: 126 MATERIAL:Comp Shingle STORY: 2 Stories PITCH: 30 ARRAY PITCH:30 MP2 AZIMUTH:216 ARRAY AZIMUTH:216 MATERIAL:Comp Shingle STORY: 2 Stories PITCH: 30 ARRAY PITCH:30 MP3 AZIMUTH: 126 ARRAY AZIMUTH: 126 MATERIAL: Comp Shingle STORY: 2 Stories 7/tz 3 .A Pitch P33 ^ MP1 LEGEND N Q (E) UTILITY METER & WARNING LABEL In ; ; ; Inv ; (LC)I — I _ C i ln� INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS ' © DC DISCONNECT & WARNING LABELS C M - A� © AC DISCONNECT & WARNING LABELS 1 A JUNCTION BOX ' Q DC COMBINER BOX & WARNING tH OF i Q DISTRIBUTION PANEL & WARNING o't YOO JIN Front Of House ' LG LOAD CENTER & WARNING LABELS VI y i 58 Berkeley Rd No.4 7 , O DEDICATED PV SYSTEM METER T CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR A4 GATE/FENCE --- INTERIOR EQUIPMENT Digit y signed by Yoo Jin Kim Date:2013.07.1208:00:57 07'00' SITE PLAN 2 Scale: 1/8" = 1' 01' 8' 16' s J B-018 2 9 4 0 0 PREMISE OWNER: DESCRIPTION: DESIGN:CONFIDENTIAL- THE CONTAINED SHALL NOT BE USED FOR THE ATION HERON JOB NUMBER: MORITZ, RAYMOND MORITZ RESIDENCE Justin Martin BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: �� S01�� �� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array PART TO OTHERS OUTSIDE THE RECIPIENT'S MODULES NORTH ANDOVER MA 01845 ORGANIZATION, EXCEPT IN CONNECTION WITH , 24 St.Martin Drive,Bu1d'mg 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE-Z 60 PAGE NAME SHEEL REY PATE Marlborough,MA 01752 SOLAPERMISSION EQUIPMENT, FIISOLLAARCITTY INC. THE WRITTEN INVERTER. 978 494-0415 PV 2 7/12/2013 (888) (��a (765-2489)s��arcitya«n Multiple Inverters ( � SITE PLAN (E) 1 x8 �yt4t OF p Y00 JIN f� K � �I 4f S3 No.4 7 S2 AL Digitall igned by Yoo Jin Kim 12' 01Date:2013.07.12 08:01:07-07'00' 14'-2" (E) LBW (E) LBW SIDE VIEW OF MP2 RAFTER: (E) 2x8 @ 16" O.C. SIDE VIEW OF MP3 RAFTER: (E) 2x6 ® 16" O.C. B NTS CEILING JOIST: (E) 2x6 ® 16" O.C. (: C CEILING JOIST: (E) 2x6 © 16" O.C. MAX SPAN: 14'-2" NTS RIDGE: (E) 2x8 RIDGE BOARD MAX STANDOFF DISTANCE: 64" O.C. MAX SPAN: 12'-0" MAX STANDOFF DISTANCE: 64" O.C. (E) 1x8 PV MODULE 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS LOCATE RAFTER, MARK HOLE ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP ARRAY SKIRT (6) HOLE. S 1 (4) (2) SEAL PILOT HOLE WITH POLYURETHANE SEALANT. ZEP COMP MOUNT C ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (1) (4) PLACE MOUNT. 13'-7" (E) ROOF DECKING U (2) INSTALL LAG BOLT WITH (E) LBW @5) 5/16" DIA LAG BOLT (5) S ALING WASHER. WITH SEALING WASHER LOWEST MODULE SUBSEQUENT MODULES (6) BOLT & WASHERS. INSTALL LEVELING FOOT WITH (2-1/2" EMBED, MIN) SIDE VIEW O F M P 1 RAFTER: (E) 2x8 @ 16" O.C. A NTS CEILING JOIST: (E) 2x6 @ 16" O.C. (E) RAFTER RIDGE: (E) 2x10 RIDGE BOARD c i STANDOFF MAX SPAN: 13'-7" MAX STANDOFF DISTANCE: 64" O.C. JB-018294 0 0 PROAL OWNER. DESCRIPTTOt1: DESIGN: CONFlDEN7IAL— THE INFORMATION HEREIN JOB NUMBER ��•"-� CONTAINED SHALL NOT BE USED FOR THE MORITZ RAYMOND MORITZ RESIDENCE Justin Martin �- BENEFIT OF ANYONE EXCEPT SOEARCITY INC., MOUNTING SYSTEM 'I' SolarCity. NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 58 BERKELEY RD 9.555 KW PV Arra PART TO OTHERS OUTSIDE THE RECIPIENTS Comp Mount Type C y ORGANIZATION,EXCEPT IN CONNECTION HATH MODUIES: NORTH ANDOVER, MA 01845 24 SL Martin Drive,Building z Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE—Z 60 SHEEP REV DATE Maribarough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME T: (650)638-1028 F. (650)638-1029 PERMISSION of SOLARCITY INC. INVERTER: (978) 494-0415 STRUCTURAL VIEWS PV 3 7/12/2013 (888)--SCI-CITY(765-2489) www.sdaraity.aam Multiple Inverters GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #8 GEC TO (E) GROUND ROD E 150A MAIN SERVICE PANEL Inv 1: DC Ungrounded INV I -(1)POWER-0 NE#AURORA PN-6000-OUTD-US-Z -(39)YINGLI # YL245P-29b YGE-Z 60 AT PANEL WITH IRREVERSIBLE CRIMP �E; 150/2P MAIN CIRCUIT BREAKER Inv 2: DC Ungrounded Inverter 6000w, 24OV, 96.5% PV Module; 245W, 221.6W PTC, H4, 46mm, Black Frame, ZEP Enabled Panel Number:Gould Tie-In: Supply Side Connection INV 2-(1)POWER-ONE/AURORA PVI-3.0-OUTD-S-US Meter Number:n/a Inverter, Zigbee, 3000W, 24OV, 96% Voc: 37,8 Vpmax: 30.2 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER AMPHENOL MAIN SERVICE PANEL Y Branch Connector I CUTLER-HAMMER SOLARGUARD Inverter 1 IND DC+ (E) WIRING BRYANT DO NOT ADJUST MIN.ACTIVATION V LTAGE Disconnect CUTLER-HAMMER METER 5 a Dc- 9 Disconnect B Load Center 6 POWER-ONE Dc+ 2 String(s)Of 8 On MP 3 I Dc- B 50A AURORA PVI-6000-OUTD-US-Z I D C I E 35A/2P 14ov r---------- ------ -- ----------- ZEGC---------=------- U A Lt I DC+DO NOT ADJUST MIN.ACTIVATION V LTAGE 150A/2P f3 L2 GFP/GFCI DC+ T N DC- I 4 ❑A c' (E) LOADS GND – ____ GND _ –– GND – _ _EGC/ __ DC+ FGSC 2 String(s)Of 7 On MP 1 I r GEC Q DC- �j r—–_J I w U11UTY DISCONNECT I Z , --------------� I I ♦J (1)Conduit Kit; 1"EMT N , I Inverter 2 PAR I EGC/GEC I i ' 7 POWER-ONE 20A/2P AURORA PVI-3.0-OUTD-S-US --- GEOGrC� 1 i L1 zaov T rd'E GFP/GFCI TO 120/240V SINGLE PHASE I I L_ EGC/ DC+ 3 DC+DO NOT ADJUST MIN.ACTIVATION V LTAGE UTILITY SERVICE __ -- pC_ DC- I I GND EGC – EGC––––1S[ri---9 –MP2_---, I I I I I I OTT (2)ILSCO/IPC 4/0-/6 (1)CUTLER-HAMMER i DG222NRB A (2)AMPHENOL H4YX DC 1 Insulation Piercing Connector; Main 4/0-4, Top 6-14 B Disconnect; 60A,gg24OVac, Fusible, NEMA 3R AC Y Branch Connector, H4, Female -(2)Ground Rod; 5/8" x 8', Copper -(1)�Grailnd�Meutral� it D60�100A,General Duty(DG) -(2)AY Bralnh Connector tor, H4, Male E (1)BRYANT/BR816LI25RP -(1)ClasEsRRH uMse�Kit DS16FK Load Center; 125A, 120/24OV, NEMA 3R -(2)FERRAZ SHAWMUTTTR50R PV BACKFEED OCP -(1)CUTLER-HAMMgt /BR235 Fuse; 50A, 25OV, Class RK5 Breaker, 35A/2P, 2 Spaces -(1)CUTLER-HAMM /BR220 C SdarGuard Monitoring System Breaker, 20A 2P!2 Spaces S SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE D (I CUTLER-HAMMER #DG222URB � AS $E& E RATED_EF>iNEC Disconnect; 60A, 24OVoc,Non-Fusible, NEMA 3R 1 AWG#6, THMI-2 Black - - ER Y DG100NB (2)AWG/10, PV WIRE, Black Voc =264.6 VDC Isc =17.26 ADC (4)AWG 110, PV WIRE, Black Voc =302.4 VDC Isc =8.63 ADC ®�(1)AWG/6, THWN-2 Red Gramd eutral Kit; 60-100A, General Duty(DG) ® (I)AWG#10, Solid Bare Copper EGC Vmp =211.4 VDC Imp=16.22 ADC O (1)AWG#10, Solid Bare Copper EGC Vmp =241.6 VDC Imp=8.11 ADC (1)AWG#6, THWN-2, White NEUTRAL VmP =240 VAC Imp=42.5 AAC (�'�(1)AWG#8, THWN-2, Black . . . . ... . ... .. .. . . . . .. .. . -(1 AWG A.TFIWN-2,Green .. T99/9P.7(1)Conduit.Kit;.3/4"EMT, ,•• O)q�(1)AWG/8, THWN-2, Red '(2)AWG/1Q PV NARE, Black... . .. Voc =302.4 VDC Isc =17.26 ADC .. . . . (4)AWG#10, PV WIRE, Black Voc =264.6 VDC Isc =8.63 ADC (1)AWG/6, THNM-2, Blade 6 �����zLLL(1)AWG/10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=28 AAC O (1)AWG/10, Solid Bare Copper EGC Vmp 241.6 VDC Imp=16.22 ADC O f(1)AWG/10, Solid Bare Copper EGC Vmp =211.4 VDC Imp=8.11 ADC O 1)AWG6, THWN-2, Red IIIJJJ 9 IIL���LLL (I)AWG -.(1 AWG/8..T}LWN-2,.Green •. EGC/GEC-(1)Conduit•Kit;.3/4�EMT. . . ..., . . (1)AWG 16, THWM-2, White NEUTRAL Vmp =240 VAC Imp= AAC (1)AWG/10, THWN-2, Black V (2)AWG/10, PV WIRE, Black Voc =340.2 VDC is =8.63 ADC ... ._.•7.(j)AWG/6,.Solid Bare.Copper, GEC, , , -(1)Conduit•Kit•3/4"EMT _. . . ._ . O (1)AWG/10, THWN-2, Red O (1)AWG/10, Solid Bare Copper EGC VmP =271.8 VDC Imp=8.11 ADC (1)AWG 110, THWN-2, White NEUTRAL VmP =240 VAC Imp=14.5 AAC • . •• . . .. (1)Conduit Kit;,3/4".EMT. .. . .. . ...• •. • .••. • •. . , . , , , ....•..-(1)AWG#8,.T11"72,,Green .. EGC/GEC-(1)Conduit.Kit;.3/4'.EMT••••••. J B-018294 0 0 OWNER. OESCPoPIION: DESIGN: CONFIDENTIAL- THE INFORMATION HEREIN doe NUMBER: Justin Martin '� CONTAINED SHALL NOT BE USED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE .��,�O �� BENEFIT OF ANYONE EXCEPT SOLARCIIY INC., MOUNTING$YSIEM: � NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array ty. PART TO OTHERS OUTSIDE THE RECIPIENT'S MODUIEs ORGANIZATION, EXCEPT IN CONNECTION WITH NORTH ANDOVER, MA 01845 24 St Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE-Z 60 PACE NAME SHEET: REµ DAIS Marlborough,MA 01752 SOLAPERMIR`STMON EQUIPMENT, FISSOOLLAARCITTY INC. THE WRITTEN Iw�tTE� 978 494-0415 PV 4 7/12/2013 (118ej(�,aT338-(i 2824F: 6638-1029 -it cam Multiple Inverters THREE LINE DIAGRAM 1. Conductor must hperave Art deg. ELECTRICAL CALCULATIONS a. Conductor must have 30 deg. C ampacity >= 125% of continuous current. b. Conductor must have (after corrections for conditions of use) >= Module: 30 Yin li YL245-29b YGE-Z 221.6 Inv Power WPTC Voltage Drop Calculations Version 5_8.0 continuous current per Table 310.16. Inverter 1: 1 Power-One PVI-6000-S 0.965 6000 6415.32 Vdrop= Imp) * 2*Len th Resistance / (Vmp) Module: 9 Yin li YL245-29b YGE-Z 221.6 1 Imp A Max.Length ftWire Inverter 2: 1 Power-One PVI-3.0-S 0.96 3480 1914.62 String: 8.11 20 1 AWG_10 at Max Ave Hi:86 deg F c. Evaluate conductor temperature at terminations per 110.14(C). Module: Vdrop= 8.11 '40 "0.001240hms / 190.4714 0.21 Ampacity of wire derated for conditions of termination must be >= Inverter 3: Branch: 16.22 5o AWG_10 at Max Ave Hi:86 deg F continuous current*1.25. All string terminations are rated at 90* C. Module: Vdrop "loo 0.00124pnms) / 190.4714 1.06 ------------------------------------------ Inverter 4: Total volts a dro in DC conductors= 1.27 Inverter: 16.22 10 AWG_8 at 240V 2. OCP Sizing per Art 690.8(8)(1) Vdrop= (16.22 20 0.00078Ohms / 240 V 0.10543 a. Round up to next size per Art 240.4(B) Total: 39 Modules Total Inv Pwr:l 9480 8329.94 PTC Combined: 24.33 20 1 AWG_6 at 240V ------------------------------------------- Photovoltaic Module Electrical Specifications: Total STC:l 9555 Vdrop= (24.33 "40 0.00049 Ohms) / 240 V 0.198695 3. Conductor Sizing per Art 690.8(A) Voc: 37.8 V deg F deg C a. Conductor must have 30 deg. C ampacity >= 125% of continuous Vmp: 30.2 V Record Low Temp: 1 -17 Total voltage drop in AC conductors= 0.3 current. Isc: 8.63 A Max Average Hi Temp: 86 30 Total voltage drop in AC and DC conductors= 1.57 Imp: 8.11 A Record Hi Temp:189 132 b. Conductor must have (after corrections for conditions of use) >= Tvoc: -0.12474 V/deg C Tisc:1 5.178 mA/deg C continuous Current per Table 310.15(B)(16). String Type A and 2 Combined Strings Type A Voc Correction Method: Manuf Tvoc data Branch Circuit Type A 1 way wire length: 50 Power-One PVI-6000-5 Voc Correction Factor: 2 strings per branch 1 2 strings per branch 2 c. Evaluate conductor temperature at terminations per Art 110.14(C). Inverter Min Vdc Input: 120 7 Yingli YL245-29b YdGE 7 modules per series string 81M dules per series string Ampacity of wire derated for conditions of termination must be >= Voc= 264.6 Min Vmp at Max Temp: 190.47 Voc= 264.6 V Voc= 302.4 V continuous current*1.25. All branch terminations are rated at 75' C Max Voc at Min Temp: 301.27 Vmp= 211.4 Vmp= 211.4 V Vmp= 241.6 V min. Isc= 8.63 Inverter Max Vdc Input: 600 Isc= 17.26 A Isc= 17.26 A ------------------------------------------ Imp= 8.11 Max String Size: 13 Imp=p_ 16.22 A Imp= 16.22 A 4. OCP Sizing Icont= 10.79 Art 690.8(A)(1) 1-way wire length: 20 (cont= 21.58 A Icont= 21.58 A Art 690.8(A)(1) a. Round up to next size per Art 240.4(B) 1.a Conductor: AWG-10 PV Wire 2.a Conductor 1: AWG_10 PV Wire Conductor 2: AWG_10 PV Wire 5. Conductor Sizing per Art 690.8(A) Icont*1.25=(Amps) 13.48 Conductor 1 Conductor 2 a. Conductor must have 30 deg. C ampacity >= 125% of continuous 30 deg C ampacity= 401 Icont*1.25=(Amps) 26.97 26.97 Current. 1.b Icont=(Amps) 10.79 30 deg C ampacity= 40 40 Start ampacity 40 2.b Icont=(Amps) 21.58 21.58 Temperature derate(%=F) 0.71 Start ampacity 40 40 b. Conductor must have (after corrections for conditions of Use) >= Conduit fill derate(%_#) 1 Temperature derate(%=F) 0.76 0.76 Continuous Current per Table 310.15(8)(16). Derated ampacity 28.4 Conduit fill derate(%_#) 0.8 0.8 1.c Derated ampacity 24.321 24.321 F c. Evaluate conductor temperature at terminations per Art 110.14(C). (cont*1.25=(Amps) 13.48 2.c Term 1 Term 2 Ampacity of wire derated for conditions of termination must be >= Ampacity 4o Temp table 75degC 75degC P Y Icont*1.25=(Amps) 1 26.97 26.97 continuous current*1.25. All inverter output terminations are rated at 1.d Icont*1.25=(Amps) 13.48 Ampacity 1 35 35 75' C. OCP Size= 15 ------------------------------------------- Inverter Type A Output 2.d OCP Size= 301 30 6. OCP Sizing Power-One PVI-6000-S 1 way wire length: 10 ft Combined Inverter Output a. Round up to next size per Art 240.4(B) Icont= zs A Art 690.8(A)(1) Service Voltage= 3.a Icont*1.25=(Amps) 35 Art 690.8(B)(1) Total Inverter Powe- I way wire length= 20 OCP Size= 35 Art 240.6 A Icont=#of inverters*max inverter current Art 690.8(A)(1) 7. Conductor Sizing per Art 690.8(A) Icont=(Amps) 3.b Conductor: AWG_8 THWN-2 at 90 deg C:Table 310.16 a. Conductor must have 30 deg. C ampacity >= 125% of continuous 4.a Icont*1.25=(Amps) 53.12 Art 690.8(B)(1) 30 dIcon *eg C ampacity 55 current. =(Amps) 35 OCP size= 55 Art 240.6(A) 30 d = 3.c (cont=(Amps) 28 4.b Conductor: I AWG.6 THWN-2 at 90 deg C:Table 310.16 b. Conductor must have (after corrections for conditions of use) >= Start ampacity 55 Icont*1.25=(Amps) 53.12 continuous current per Table 310.15(B)(16). Temperature derate(%=F) 0.91 4.c 30 dlcon9(Amps)city= 42.5 75 F Conduit fill derate(%_#) 1 Start ampacity 75 Derated ampacity 50.05 c. Evaluate conductor temperature at terminations per Art 110.14(C). 3.d Icont*1.25=(Amps) 35 Temperature aerate(%=F) 0.91 Ampacity of wire derated for conditions of termination must be >= Ampacity 50 Conduit fill derate(%=#) 1 continuous current*1.25. All inverter output terminations are rated at Derated ampacity 68.25 75* C min. 4.d Icont*1.25=(Amps) 53.12 Ampacity 65 J B-018 2 9 4 0 0 "" OWNER: DESCPoPIIDN: DESIGN:CONFIDENTI '.,,, ' CONTAINED ASHALL NOT BINFERUSED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE Justin Martin �� BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array SolarCity. PART TO OTHERS OUTSIDE THE RECIPIENT'S Mo°uLEs NORTH ANDOVER MA 01845 ORGANIZATION, EXCEPT IN CONNECTION WITH 24 St.Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE-Z 60 sNEEr: REk DAZE Marlborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME T. (650)638-1028 F: (650)638-1029 PERMISSION OF SOLARCITY INC. 1N1ulti (978) 494-0415 ELECTRICAL CALCULATIONS PV 5 7/12/2013 (888)-SOL-CITY(765-2489) www.solarcity.com Multiple Inverters , 4 YG Z 60 YL250P-29b ® YGE - Z 6® CELL SERIESeYL245P-29bPowered by YINGLI CELL SERIES YL240P-29b YIN ll, CLAR YL235P-296 ELECTRICAL PERFORMANCE YL230P-29b U.S.Soccer Powered by Yingli Solar ° 's GENERAL CHARACTERISTICS I YL235P-29b YL230P-29b Dimensions 164.96 in(165omm)/38.98 in(M mm)/ Module � - YL250P-296 YL245P-296 YL240P-296 f 1.81 n(46 mm) type Power out t P W 250 1 245 240 235 230 ...._ _ Power output tolerances AP W -0/+5 Weight 45.2 lbs(20.5 kg) • Ideal for residential Module efficiency rim % F 15.3 I 15.0 - 14.7 _. 14.4 14.1 -- --------- -- -and commercial applications where cost savings, °"a9eatPm.._ --- - -`- 3°'- --3°:2 - 2'.5 - -.5 . 29.S___ CarrantatP_ +Imp A 824 1 8.11 8.14 7.97 7.80 PACKAGING SPECIFICATIONS installation time, and aesthetics matter most: Open-cir<utvoitage _ V_ fl V 38.4 37,8- - -37.5 37.0_ 37.0_ Number of modules per pallet I 22 Shortcircuit current _ I. A8.79 8.63- 8.65 Y 8.54 8.40 - Number of pallets per 53'container! 36 STC:1000W/m2 irradiance,25°C cell tempe-re,AMI.59 spectrum according to EN 60904-3 - • • Average relative efficiency reduction of 5.0%at 200W/m2 according to EN 609041 Packaging box dimensions(L/W/H) 67 in(1700 mm)/45 in 0150 mm)/ 47 in(1190 mm) ►Lower balance-of-system costs with Ze . P - - - •.- - •.: _ • -,_ ,.. Box weightS 707616s(488 kg) Compatible"frame. Power output P".. W 181.1 177.9 174.3 -1-70.7. 167.0 _ � �� ►Reduce on-roof labor costs by more than 25%. Voltage at P,... V_ V 27.6 27.2 26.6 26.6 26.6 Units:inch(mm) ►Leverage the built-in grounding system- \ Current at Pm _ imps A^,6.56 654 _-6.56 6_42 _'6.29 \ O t voltage V: V 35.4 34.5 34.2 33.8 33.8 38.98 990 if it's mounted,it's grounded. \ pen-arca ge Shortcircu f<went _ I" A � 7.12._..� 6.99 _ 7.01 _ 6.92 - 6.81 _ 36.85 936 1.81(46) ►Lower your parts count-eliminate rails,screws, mounting clips,and grounding hardware. NOCTopen-circvitm°duleoperation temperamreat800W/m2irradiance,20'Cambient tempemnre,1m/s wind speed m THERMAL CHARACTERISTICS ►Design and permit projects easily with access , Nominal operating cell temperature NocT� •C 46./-2 8 to layout calculator and stamped drawings. - Temperature coefficient of P. 9 �Y✓'C• •0.45 - • - • 0 • Temperature coefficient of V. Bs«. %/•C• -0.33 ►Lower installation costs with savings across Temperature coefficient of I.. a % C 0.06 Groundingho1es0 a equipment and labor. % c .0.45 a 4 Temperature coefficient of V p, B wr -- ---- ►Minimize roof penetrations while maintaining m � $ the system's structural integrity. OPERATING CONDITIONS ►Invest in an attractive solar array that includes Max.system voltage - - 600V- Mounting ehols 4-0,256x hole(6.5x8) a black frame,low mounting profile,and Max.series fuse rating 15A aesthetic array skirt. LimitingDrainage Holes reverse Current 15A ►Increase energy output with flexible module Operating temperature range .40 to 194`F(-40 to 90•C) 8-0.12x0.315(3x8) layouts(portrait or landscape). -- U 390(100) COMPATIBLEZEP Max.static load,front(e.g.,snow and wind) 50 psf(2600 Pa) - ►Trust in the reliability and theft-resistance of Max.static load,back(e.g.,wind) 50 ps(12400 Pa) 0.471121------ the Zep Compatible"system. Leading limited power warranty'ensures Hailstone impact 1 in(25 mm)at 51 mph(23 m/s) 91.2%of rated power for 10 years,and 80.7% of rated power for 25 years. 0 t11 CONSTRUCTION MATERIALS C Th SOLUTION OPTION - - - -� Y Front cover(material/type/thickness) Low-iron glass/tempered/3.2 mm i SECTION C-C The YGE-Z Series is now available as 10-year limited product warranty. I Gla::may have anti-reflective Dating i an Enphase Energized"AC Solution. cell(4uanr6r/maten a1/type/dimensions/ 60/polysi<on/multicrys aIIine enphaseThis solution delivers optimum area/# / of busbars) I 156 mm x 156 mm/243.3 cm2/2 or 3 % @Z9;a at 'In compliance with our warranty terms and conditions. Encapsulant(material) d Ethylene vinyl acetate(EVA) performance and integrated intelligence ------ The Enphase M215-Z Zep Compatible Microinverter Frame(material/color) -i- material/color) rt Anodized aluminum alloy/black dry n� r�.,�- /ry Warning:Read the Installation and User Manual in its entirety is designed to connect directly into the Z Series module V Junction box(protection degree) aIP65 -. -_ t before handling,installing,and operating Yingli modules+ groove,eliminating the need for tools or fasteners- Cable(type/length/gauge/outside diameter)-yFV Wire/43.31 in(1100 mm)/12 AWG/0.244 in(6.2 mm) all with One easy step. UL 1703 and ULC 1703,CEC,FSEC,ISO 9001:2008, Plug connector II Amphenol/H4/IP68 Our Partners ISO 14001:2004,BS OHSAS 18001:2007,SA8000 (manufacturer/type/protection degree) _ .e�..f. W u` Ds �+ CERT �� The specifications in this datasheet are not guaranteed and are subject to change without prior notice. �+sa7� This datasheet complies with EN 50380:2003 requirements. Intelligent real-time e.,o.oLISTEEDrrowrEl *-•`' monitoring at the system 44DO «- - and module level with - ® Enlighten. Yingli Green Energy Americas,Inc. info@yingliamericas.com Tel:+1 (888)686-8820 YINli#01 LA R YINGLISOLAR.COM/US NYSE:YGE aLf� Y I N G L I S O L A R.COM/USI Yingli Americas ®Yingli Green Energy Holding Co.Ltd. YGEZ60CellSedes2Ol2-EN-201206 V01 U.S.Soccer Powered by Yingli Solar ao�re-o�►e= W/Renewable Energy Solutions AURORA 1 1 1 • • 1 1/ • • Nominal Output Power W 5000 6000 Maximum Output Power W 5000 6000 Rated Grid AC Voltage V 208 _ 240 277 208 240 277 Input Side(DC) Number of Independent MPPT Channels 2 2 PVI-5000—TL _ Maximum Usable Power for Each Channel W 4000 4000 --''a"; �"� ... .�`� +,�. O Absolute Maximum Voltage(Vmax) V 600 600 I�Ty�r lr��'.lri� Start-UpVoltage(Vstart) V 200 (adj.120-350) 200 (adj.120-350) Il ���/�®®® Y IL Full Power MPPT Voltage Range V 200-530 . 200-530 t1�Y Operating MPPT Voltage Range V 0.7xVstart-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 36 36 Maximum Usable Current per Channel A 18 18 GENERAL SPECIFICATIONS , Maximum Short Circuit Current Limit per Channel A 22 22 k� Number of Wire Landing Terminals Per Channel 2Pairs 2Pairs Arra Wiring Termination Terminal block,Pressure Clamp,AWG8-AWG4 Out _ OUTDOOR MODELS y g �::� Output Grid Connection Type - - - _ 10/2W Split-0/3W 10/2W 10/2W Split-0/3W 10/21N �1 AdjustableVoltage Range(Vmin-Vmax) V 183-228 211-264 244-304 183-228 211-264 244304 Grid Frequency Hz 60 60 �I Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 Maximum Current(lacmax) A— 27 23 20 30 28 24 Power Factor >0.995 >0.995 Total Harmonic Distortion At Rated Power %- <2 <2 Designed for residential and small commercial PV installations,this I i Contributory Fault Current- AA/A­ 36.25/25.63 36.5/25.81 31.75/22.45 36.25/25.63 36.5/25.81 31.75/22.45 g Grid Wiring Termination Type - Terminal block Pressure Clamp,AWG8-AWG4 inverter fills a specific niche in the Aurora product line to cater for I Protection Devices A those installations producing between 5kW and 20kW. s Input Reverse Polarity Protection Yes Yes I Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 for each channel This inverter has all the usual Aurora benefits,including dual input PV Array Ground Fault Detection Pre start-up Riso and dynamic GFDI Pre start-up Riso and dynamic GFDI i (Requires Floating Arrays) (Requires Floating Arrays) section to process two strings with independent MPPT,high speed Output and precise MPPT algorithm for real-time power tracking and a ' I Anti-Islanding Protection Meets UL 1741/IEE1547 requirements Meets UL 1741/IEE1547 requirements energyharvesting, as well as transformerless operation for high I Over-Voltage Protection Type Varistor,2(L,-L,/L-G) Varistor,2(h-L: L,-G) g' P g { Maximum AC OCPD Rating A 35 30 25 40 35 30 performance efficiencies of up to 97.1%. Y Efficiency l Maximum Efficiency - % 97.1 97.1 CEC i The wide input voltage range makes the inverter suitable to IOW J Operating % 96 96.5 96.5 96 96.5 96.5 P 9 9 a � Operating Performance power installations with reduced string size.This outdoor inverter a ' i Stand-by Consumption Wn <8 <8 has been designed as a completely sealed unit to withstand the Night time consumption w— <0.6 <0.6 Communication harshest environmental conditions. 1 User-Interface 16 characters x 2 lines LCD display Remote Monitoring(1xR5485 incl.) (opt.)AURORA-UNIVERSAL ` Wired Local Monitoring(IxRS485 incl.) PVI-USB-RS485-232(opt.),PVI-DESKTOP(opt.) { - Wireless Local Monitoring _ PVI-DESKTOP(opt.)with PVI-RADIOMODULE(opt.) J ,, raw Environmental i l -13 to+140(-25 to+60) Amble nt Air Operating Temperature Range °F(°C) -13 to+140(-25 to+60) with derating above 122(50) _ - ..... - ... ... i ( � Ambient Air Storage Temperature Range °F(°C) -40 to 176(40 to+80) -40 to 176(40 to+80) Relative Humidity %RH 0-100 condensing 0-100 condensing . Acoustic Noise Emission Level db(A)@im <50 <50 t Maximum Operating Altitude without Derating ft(m) 6560(2000) 6560(2000) - -__- Mechanical Specifications - - I - , Enclosure rating NEMA 4X NEMA 4X Cooling Natural Convection Natural Convection i • Each inverter is set on specific grid codes which can be selected in the field I Dimensions INxWxD) in(mm) 41.4x12.8x8.6(1052x325x218) • Single phase output Weight Ib(kg) <59.5(27.0) <59.5(27.0) • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented Shipping Weight Ib(kg) <78(35.4) <78(35.4) Mounting System Wall bracket Wall bracket ' in different directions I Conduit Connections Trade Size Kos:(tea x 1/2) Trade Size Kos:(tea x 1/21 and(tea x 1-1/4,3 places side,front,rear) and(tea x 1-1/4;3 places side,front,rear) •Wide input range DC Switch Rating-(Per Contact) AN 25/600 25/600 i • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting safety - • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance Isolation Level Transformerless(Floating Array) Transformerless(Floating Array) t Safety and EMC Standard UL 1741,CSA-C22.2N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 across the entire input voltage and output power range Safety CSA. Approval j •Outdoor enclosure for unrestricted use under any environmental conditions War anty CSA. • RS-485 communication interface(for connection to laptop or datalogger) Standard warranty - years 10 _ 10 Extended Warranty years a 15&20 15&20 •Compatible with PVI-RADIOMODULE for wireless communication with Aurora PVI-DESKTOP P Available Models L Standard-With DC Switch-Floating Array PVI-5000-OUTD-US PVIfi000-OUTD-US _— —_w—�— --- — - — _ — -- 'All data is subject to charge without notice —1mverter can apply that much current-Breaker will open Group Cerfificate of Compliance Certificate: 1841082 Master Contract: 173688 Project: 2550432 Date Issued: August 20,2012 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C'and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. ® Bry Agc�Cu-waL Issued by: Brij Aggarwal,P.Eng. c us PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-6000-OUTD-US,PVI-6000-OUTD-US-W and PVI-5000-OUTD-US, permanently connected. Notes: 1. All above models in this series may include expansion board with wireless antennae option and will be identified with model designation including"—Z"suffix at the end. 2. For details related to rating,size,configuration,etc.reference should be made to the CSA Certification Record,Annex A of the Certificate of Compliance,or the Descriptive Report. DQD 507 Rcv.2012-05-22 Pagel aowe�o�►e� WRenewable Energy Solutions AURORA 1 • ' P&&04995&a • ' _ Nominal Output Power W 3000 3600 4200 m. .. .T.--"-.- -- F^-^^_` _�--*_ °^-� --^�-^• - -- - -_--�^- -- - -- - "-"'= - "'Yv """" Maximum Output Power W 3000 3300** 3300** 3600 4000** 4000** 4200 4600** 4600** Rated Grid AC Voltage V 208 240 _ 277 208 240 _277_ 208 240 277 Input Side(DCI Number of Independent MPPT Channels 2 _2 2 Y •®�{I L.Ir'��I�i L _ Maximum Usable Power for Each Channel W 2000 3000 3000 'r�yr�r Absolute Maximum Voltage(Vmax) V 600 600 600 Start-Up Voltage(Vstart) V 200(adj.120-350) 200(adj.120-350) 200(adj.120-350) PW ��� Full Power MPPT Voltage Range V 160-530 120-530 140-530 • Operating MPPTVoltage Range V 0.7xVstart-580 0.7xVstart-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 20 32 32 M-4 ���� Maximum Usable Current per Channel A 10 16 16 • '">t- Maximum Short Circuit Current Limit per Channel A 12.5 20 _ 20 Number of Wire Landing Terminals Per Channel 2Pairs(Ion-S version) 2Pairs(1on-5 version) 2Pairs(Ion-S version) GENERAL SPECIFICATIONS Array Waring Termination Terminal block,Pressure Clamp,AWGIO-AWG4 s"°"..r..r...,-....,,,.,,,,...,..,. 'w, 2 Output Side(AC) _-1 4-414. a...Y,.r al► 10/2W Split- 10/2W 10/2W Split10/2W 10/2W Split- 10/2W OUTDOOR MODELS Grid Connection Type 0/3W 0/3W 0/3W t Adjustable Voltage Range(Vmin-Vmax) V 183-228 211-264 244304 183-228 211-264 244304 183-228 211-264 244-304 Grid Frequency Hz 60 60 60 Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 57-60.5 • Q Maximum Current(lacmax) Aires 14.5 14.5 12 17.2 16 16 20 20 20 Power Factor >0.995 >0.995 >0.995 The most common residential inverter is the ideal size for an average- 7 Total Harmonic Distortion At Rated Power % <2 <2 <2 sized family home. This family of single-phase string inverter Grid Wiring Termination Type Terminal block,Pressure Clamp,AWG10-AWG4 complements the typical number of rooftop solar panels,allowing I Input Protectionoevices Input _ home-owners to get the most efficient energy harvesting for the i Reverse Polarity Protection Yes Yes Yes 1 sizeof the property.This rugged outdoor inverter has been designed Over-Voltage Protection Type Vadstor,2for each channel Varistor,2 for each channel Varistor,2 for each channel + PV Array Ground Fault Detection Pre start-up Riso and dynamic GFDI(Requires Floating Arrays) as a completely sealed unit to withstand the harshest environmental J Output Meets UL 1741/lEE1547 Meets UL 1741/IEE1547 Meets UL 1741/IEEI547 conditions. Anti-Islanding Protection s requirements requirements requirements Over-Voltage Protection Type Varistor,2(L,-L,/L,-G) Varistor,2(Li-Lz/L,-G) Varistor,2(L'-L,/L,-G) One of the key benefits of the Uno family of single-phase inverters Maximum ACOCPDRating A 20 20 15 25 20 20 25 25 25 is the dual input section to process two strings with independent E-- Efficiency Maximum Efficiency % 96.9 97 97 MPPT especially useful for rooftop installations with two different , ++ CEC Efficiency % 96 96 96 I orientations(ie East and West).The high speed MPPT offers real-time Operating Performance �� Stand-by Consumption Woes <8 <8 <8 power tracking and improved energy harvesting. i Nighttime consumption W., <0.6 <0.6 _ <0.6 Communication splay The transformerless operation gives the highest efficient of u to Remote Moniracetoring 16chUROR AURORA-UNIVERSAL P 9 9 Y P , f I Remote Monitoring(1xR5485 incl.) AURORA-UNIVERSAL(opt.) 97.0%. The wide input voltage range makes the inverter suitable to + Wired Local Monitoring(1xRS48S incl.) PVI-USB-RS485-232(opt.),PVI-DESKTOP(opt.) Wireless Local Monitoring _ PVI-DESKTOP(opt.)with PVI-RADIOM_ODULE(opt.) __ low power installations with reduced string size. ! Environmental - [ -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with j Ambient Air Operating Temperature Range °F(°Q derating above 131(55) derating above 131(55) derating above 113(45) a Ambient Air Storage Temperature Range *F("Q -40 to 176(40 to+80) -40 to 176(-40 to+80) -40 to 176(-40 to+80) Relative Humidity %RH 0-100 condensing 0.100 condensing 0-100 condensing Acoustic Noise Emission Level db(A)@Im <50 <50 <SO Maximum Operating Altitude without Derating ft(m) 6S60(2000) 6560(2000) 6560(2000) U �a ISI:J LI Lcc�1 Mechanical Specifications - - - - - - - Enclosure rating NEMA 4X NEMA 4X NEMA 4X • Each inverter is set ons specific rid codes which can be selected in the field cooling Natural convection Natural Convection Natural Convection P 9 Dimensions(HxWxD) in(mm) 33.8x12.8x 8.7(859 x 325 x 222)-S Version • Single phase output Weight Ib/(kg) <47.3(21.3)-S version <47.3(21.3)-S version <47.3(21.3)-S version • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arras oriented in I Mounting System Wall bracket Wall bracket Wall bracket 1 P p p� 9Y 9 Y Trade size KOs:(tea it 1/21 and Trade size KOs:(tea x 1/21 and Trade size KOs:(tea x 1/2")and different directions Conduit Connections-- (2ea x 1-1/4;3 places side,front, (2ea x 1-1/4;3 places side,front, (tea x 1-1/4,3 places side,front, rear) rear) rear) • Wide input range _ - M -r DC Switch Rating{Per Contact) _AN_ 25/600 2.5/600 2.5/600 • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting I Safety ( • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance across Isolation Level Transformerless(Floating Array) Transformerless(Floating Array) Transformerless(Floating Array) Safety and EMC Standard UL 1741,CSA-C22.2 N.107.1-01 UL 1741,CSA-C22.2 N.107.1-01 UL 1741,CSA-C22.2 N.107.1-01 the entire input voltage and output power range safetyapproval - cCSA,, CSA. xCSAu, • Outdoor enclosure for unrestricted use under any environmental conditions warranty • Integrated DC disconnect switch in compliance with international Standards(-S Version) standard warranty years_ 10 10 10 9 P Extended Warranty years 15&20 _ 15&20 15&20 • RS-485 communication interface(for connection to laptop or datalogger) Available Modelf • Compatible with PVI-RADIOMODULE for wireless communication with Aurora PVI-DESKTOP Standard-Without DC Switch and Wiring Box7 PVI-3.0-0UTD-US PVI-3.6-OUTD-US PVI-4.2-OUTD-US With DC Switch and Wiring Box PVI-3.0-0UTD-5-US PVI-3.6-0UTD-S-US PVI-4.2-0UTD S-US 'All data is subject tochange without notice Al '•Capability enabled at nominal AC wltage and with sufficient DC power available _•_ • *"When equipped with optional DC Switch and Wiring Box ••• • SA CSA INTERNATIONAL eItice Of o i ce Certificate: 2096477 Master Contract: 173688 Project: 2439385 Date Issued: July 19,2011 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C'and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. C Roar}f e rn�stor�v Issued by: Rob Hempstock,AScT. PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-4.2-OUTD-US,PVI-3.6-OUTD-US,PVI-3.0-OUTD-US,PVI-4.2- OUTD-S-US,PVI-3.6-OUTD-S-US,PVI-3.0-OUTD-S-US,PVI-4.2-OUTD-US-W,PVI-3.6-OUTD-US-W and PVI-3.0-OUTD-US-W;provided with two DC input channels,permanently connected. For details related to ratings,reference should be made to the CSA Certification Record,Appendix 1 or the Descriptive Report. APPLICABLE REQUIREMENTS CSA-C22.2 No.107.1-01 - General Use Power Supplies UL Std No. 1741-Second Edition - Inverters,Converters,Controllers and Interconnection System Equipment for Use With Distributed Energy Resources(January 28,2010) DQD 507 Rev.2009-09-01 Page.I ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. WHERE ALL TERMINALS OF THE DISCONNECTING ALL ELECTRICAL WORK SHALL COMPLY WITH 2011 AC ALTERNATING CURRENT MEANS MAY BE ENERGIZED IN THE OPEN NEC. AND MASS AMENDMENTS BLDG BUILDING POSITION, A SIGN WILL BE PROVIDED WARNING CONC CONCRETE OF THE HAZARDS PER ART. 690.17. DC DIRECT CURRENT 2. EACH UNGROUNDED CONDUCTOR OF THE EGC EQUIPMENT GROUNDING CONDUCTOR MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED (E) EXISTING BY PHASE AND SYSTEM PER ART. 210.5. EMT ELECTRICAL METALLIC TUBING 3. A NATIONALLY—RECOGNIZED TESTING GALV GALVANIZED LABORATORY SHALL LIST ALL EQUIPMENT IN GEC GROUNDING ELECTRODE CONDUCTOR COMPLIANCE WITH ART. 110.3. GND GROUND 4. CIRCUITS OVER 250V TO GROUND SHALL HDG HOT DIPPED GALVANIZED COMPLY WITH ART. 250.97, 250.92(B) I CURRENT 5. DC CONDUCTORS EITHER DO NOT ENTER Imp CURRENT AT MAX POWER BUILDING OR ARE RUN IN METALLIC RACEWAYS Isc SHORT CIRCUIT CURRENT OR ENCLOSURES TO THE FIRST ACCESSIBLE DC kVA KILOVOLT AMPERE DISCONNECTING MEANS PER ART. 690.31(E). kW KILOWATT 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN LBW LOAD BEARING WALL RELIEF AT ALL ENTRY INTO BOXES AS MIN MINIMUM REQUIRED BY UL LISTING. (N) NEW 7. MODULE FRAMES SHALL BE GROUNDED AT THE NTS NOT TO SCALE UL—LISTED LOCATION PROVIDED BY THE OC ON CENTER MANUFACTURER USING UL LISTED GROUNDING PL PROPERTY LINE HARDWARE. POI POINT OF INTERCONNECTION 8• MODULE FRAMES, RAIL, AND POSTS SHALL BE PV PHOTOVOLTAIC BONDED WITH EQUIPMENT GROUND CONDUCTORS SCH SCHEDULE AND GROUNDED AT THE MAIN ELECTRIC PANEL. SS STAINLESS STEEL 9. THE DC GROUNDING ELECTRODE CONDUCTOR STC STANDARD TESTING CONDITIONS SHALL BE SIZED ACCORDING TO ART. TYP TYPICAL 250.166(B) & 690.47. UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT VICINITY MAP INDEX 3R NEMA 3R, RAINTIGHT PV1 COVER SHEET ��. PV2 SITE.PLAN PV3 STRUCTURAL VIEWS p PV4 THREE LINE DIAGRAM LICENSE GENERAL NOTES • PV5 Cut ELECTRICAL CALCULATIONS '� CutELECTRICAL Attached 1. THIS SYSTEM IS GRID—INTERTIED VIA A , r • UL—LISTED POWER—CONDITIONING INVERTER. • ' 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. 4 3. PHOTOVOLTAIC SOURCE AND INPUT CIRCUITS AND INVERTER INPUT CIRCUIT ARE UNGROUNDED. 4. SOLAR MOUNTING FRAMES ARE TO BE GROUNDED. MODULE GROUNDING METHOD: SLEEKMOUNT 5. ALL ELECTRICAL WORK SHALL COMPLY WITH THE AHJ: North Andover 2011 NATIONAL ELECTRIC CODE. 114 REV BY DATE COMMENTS 6. ALL WORK TO BE DONE TO THE 8TH EDITION OF A REV A NAME 7/12/2013 COMMENTS MA STATE BUILDING CODE. a * * * * UTILITY: National Grid USA (Massachusetts Electric) • 1 i�• : i r • � � L 11 � � � � � 1 ` � * * * s PREMISE CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: JB-01 8294 00 � DESCRIPTION' DESIGN: `�►P#01 CONTAINED SHALL NOT BE USED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE Justin Martin -*' '� BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYS1F11: � $0 NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array o PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES: NORTH ANDOVER MA 01845 ORGANIZATION, EXCEPT IN CONNECTION HATH 24 St.Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE—Z 60 ��: DnTE Madbareuyh,MA 01752 SOLARCITY EQUIPMENT,WITHOUT THE WRITTEN PAGE NAME is (650)638-1028 R (650)638-1029 PERMISSION OF soLARgTY INC. Multiple Inverters (978) 494-0415 COVER SHEET PV 1 7/12/2013 (666)-SOL-CITY(765-2469) w"-solarcitya«n PITCH: 30 ARRAY PITCH:30 MP1 AZIMUTH: 126 ARRAY AZIMUTH: 126 MATERIAL:Comp Shingle STORY: 2 Stories PITCH: 30 ARRAY PITCH:30 MP2 AZIMUTH:216 ARRAY AZIMUTH:216 MATERIAL:Comp Shingle STORY: 2 Stories PITCH: 30 ARRAY PITCH:30 MP3 AZIMUTH:126 ARRAY AZIMUTH: 126 MATERIAL:Comp Shingle STORY: 2 Stories Ptd, 3 -v .p B Ptd, P33 MP1 LEGEND N \ ' ^ , (E) UTILITY METER & WARNING LABEL In , ; , Inv ; LCAT _ _ INVERTER W/ INTEGRATED DC DISCO `-- ---- — C ' m� & WARNING LABELS L e eliFDC DC DISCONNECT & WARNING LABELS AC 1 C © M ' _�; e el L © AC DISCONNECT & WARNING LABELS A Q JUNCTION BOX l � 1 � DC COMBINER BOX & WARNING i .IH OF 1 i O DISTRIBUTION PANEL & WARNING off' YOO JIN Front Of House LOAD CENTER & WARNING LABELS VI y i 58 Berkeley Rd � No.4 T , O DEDICATED PV SYSTEM METER A t i T I ICONDUIT RUN ON EXTERIOR Al GATE/FENCE ON INTERIOR --- INTERIOR EQUIPMENT Digit y signed by Yoo Jin Kim Date:2013.07.12 08:00:57-07'00' SITE PLAN 2 Scale: 1/8" = 1' O1' 8' 16' s F JB-01 8294 00 " OWNER-- DESCRIPTION:- DESIGN: CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: ��• �� CONTAINED SMALL NOT USED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE Justin Martin ���� SolarC t o BENEFIT OF ANYONE EXCEPT SOI.ARCITY INC., MOUNTING SYSTEM: � NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION VATH NORTH ANDOVER, MA 01845 24 SL Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # .YL245P-29b YGE-Z 60 PAGE NAME: SHEET- REµ DATE Marlborough,MA 01752 SOLARCITY 638-1029 PERMISSIONEOFISOLMCITY INT THE WRITTEN INVERTER u 978 494-0415 PV 2 7/12/2013 (8118)(SOL'CITY(76582489)F. 65 w,.sdarcitycom Multiple Inverters � � SITE PLAN (E) 1x8 �tN�F AI 021 Y00 JIN K VI ti S3 No.41 7 S2 CP,ItL Digitall igned by Yoo Jin Kim 12' Date: 2013.07.12 08:01:07-07'00' 14—2 (E) LBW (E) LBW SIDE VIEW OF MP3 . RAFTER: (E) 2x6 @ 16" O.C. SIDE VIEW OF MP2NTs RAFTER: (E) 2x8 @ 16" O.C. 6 CEILING JOIST: (E) 2x6 ® 16" O.C. (Dc - CEILING JOIST: (E) 2x6 0 16" O.C. MAX SPAN: 14'-2" NTS RIDGE: (E) 2x8 RIDGE BOARD MAX STANDOFF DISTANCE: 64" O.C. MAX SPAN: 12'-0" MAX STANDOFF DISTANCE: 64" O.C. (E) 1x8 PV MODULE 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS LOCATE RAFTER, MARK HOLE ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT i ZEP ARRAY SKIRT (6) HOLE. S 1 (4) (2) SEAL PILOT HOLE WITH ZEP COMP MOUNT C POLYURETHANE SEALANT. ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (4) PLACE MOUNT. 13'-7" (1) (E) ROOF DECKING V (2) INSTALL LAG BOLT WITH 1 (E) LBW 5/16" DIA LAG BOLT (5) (5) SEALING WASHER. WITH SEALING WASHER LOWEST MODULE SUBSEQUENT MODULES (6) INSTALL LEVELING FOOT WITH SIDE VIEW OF MP1 RAFTER: (E) 2x8 @ 16" O.C. (2-1/2" EMBED, MIN) BOLT & WASHERS. A " NTS CEILING JOIST: (E) 2x6 @ 16 O.C. (E) RAFTER RIDGE: (E) 2x10 RIDGE BOARD #-5T!�N DOFF MAX SPAN: 13'-7"MAX STANDOFF DISTANCE: 64" O.C. JB-018294 0 0 PREMISE DV"'ER: DESCRIPTIM: DESIGN: ��•"'' CONTAINED L— THE INFORMATION HEREIN jm NUMBERJustin Martin CONTAINED SHALL NOT BE USED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE ��� SD�aCC�t o BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES NORTH ANDOVER MA 01845 ORGANIZATION,EXCEPT IN CONNECTION VWTH 24 St.Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE—Z 60 SHEET. REV. DATE71 Marlborough,MA 01752 SOtARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME T: (650)638-1028 F. (650)638-1029 Multiple Inverters PERMISSION OF SOLARCITY INC. INVERTER: (978) 494-0415 STRUCTURAL VIEWS PV 3 7/12/2013 a (888)-SOL-CITY(765-2489) www.sclarcity.com GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #8 GEC TO (E) GROUND ROD (E 150A MAIN SERVICE PANEL Inv 1: DC Ungrounded INV 1 -(I)POWER-ONE}AURORA PN-6000-QUTD-us-z -(39)YINGLI YL245P-29b YGE-Z 60 AT PANEL WITH IRREVERSIBLE CRIMP (E3 150/2P MAIN CIRCUIT BREAKER Inv 2: DC Ungrounded Inverter, 600dW, 240v, 96.5% PV Module; 245W, 221.6W PTC, H4, 46mm, Black Frame, ZEP Enabled Panel Number:Gould Tie-In: Supply Side Connection INV 2 -(1)POWER-ONE/AURORA PN-3.0-OUTD-S-US Meter Number:n/a Inverter, Zigbee, 3000W, 240v, 96% Voc: 37.8 Vpmax: 30.2 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER AMPHENOL MAIN SERVICE PANEL Y Branch Connector I CUTLER-HAMMER SOLARGUARO Inverter 1 IND DC-DO NOT ADJUST MIN.ACTIVATION V LTAGE (E) WIRING BRYANT Disconnect CUTLER-HAMMER METER s �A DC 9 Disconnect B Load Center fi POWER-ONE DC+ 2 String(s)Of 8 On MP 3 I B 50A AURORA PVI-6000-OUTD-US-Z DC- I D C I E 35A/2P —----------- ----------- 2EGC-----------------� A L7 2aav r— ------ 150A/2P I DC+DO NOT ADJUST MIN.ACTIVATION V LTAGE B L2 GFP/GFCI Oc. I N DC- I 4 C- (E) LOADS GND _ ____ GND _ —— GND — —, r_ _EGC/ __ DC+ C+ 2 String(s)Of 7 On MP 1 I //L��• I I GEC Q DC- C- J _ I W I GND __ EGC __ --------- ------------ ------------ GC ------————— ——————U UTILITY DISCONNECT I Z I I I ♦J (I)Conduit Kit; 1"EMT fN , I Inverter 2 PAR I C/GEC POWER-ONE o --- AURORA PVI-3.0-OUTD-S-US 20A/2P CGEC� y i m L1 7-v L2 GFP/GFCI TO 120/240V , , I SINGLE PHASE , GC/ __ DC+ 3 DC+DO NOT ADJUST MIN.ACTIVATION V LTAGE U1ILITY SERVICE , , TT–––– –GEC O pC_ DC- 1 Strings)Of 9 On MP 2 GND __ EGC —–—–––––––––––—–––––––––––—– EGC-- I 1 I I I OI (2)ILSCO f,IPC 4/0—/6 B (I)CURER—HAMMER Y DG222NRB /fj A (2)AMPHENOL IIIH4YX Insulation Piercing Connector, Main 4/0-4, Tap 6-14 Disconnect; 60A, 24OVac,Fusible, NEMA 3R A Y Branch Connector, H4, Femde DC —(2)Ground Rod; 5/8' x V, Copper —(1)W(,Y710uE^jAeeuuttrral it; 60-100A,General Duty(DG) —(2)pY Braancchh Connector; H4, Male E —(1)CUTLER—HAMMER,#DS16FK (I)BRYANT/BR816LI25RP Class R Fuse Kit Load Center, 125A, 120/24OV, NEMA 3R —(2)FERRAZ SHAWMUTTTR50R PV BACKFEED OCP —(I CUTLER—HAMMgt If BR235 Fuse; 50A, 250V, Class IRKS Breaker, 35A/2P, 2 Spaces —(1)CUTLER—HAMMER /BR220 C SdarGuard Monitoring System Breaker, 20A/2P, 2 Spaces VS(�A!; DSUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE (1)CUTLER—HAMMER III DG222URB Disconnect; 60A, 24OVac, Non—Fusible, NEMA 3R 1 16, THWN_2, Black — R—tt M ER Y D (2)AWG/10, PV WIRE. Black Voc =264.6 VDC Isc =17.26 ADC (4)AWG/10, PV WIRE Black Voc =302.4 VDC Isc =8.63 ADC ®6F� Ground eutrol it; 60-100A,General Duty(DG) � lu l—(1)AWG/6, THWN-2, Red ®IcF—(1)AWG /10, Solid Bare Copper EGC Vmp =211.4 VDC Imp=16.22 ADC 1 (I)AWG/10, Slid Bare Capper EGC Vmp =241.6 VDC Imp=8.11 ADC L (1)AWG/6, THWN-2, White NEUTRAL Vmp =240 VAC Imp=42.5 AAC (1)AWG S8, THWN-2, Black IIJJ -(1 AWG/8.T}tWN-2,.Green .. EGC/GEC-(1)Conduit.Kit;-.3/4'EMT.,...,, ., , 6 (1)AWG/8, THWN-2, Red (2)AWG f1Q, PV WIRE, Black .Voc. 302.4 VDC Isc =17.26 ADC . . . . L[�(4)AWG/10, PV WIRE, Black Voc 264.6 VDC Isc =8.63 ADC (1)AWG/6, THWN-2,Black (1)AWG#10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=28 AAC O 1)AWG;10, Solid Bare Copper EGC Vmp 241.6 VDC Imp=16.22 ADC O f4H(i)AWG/10, Solid Bare Copper EGC Vmp =211.4 VDC Imp=8.11 ADC O (1)AWG/6, THWN-2,Red �I ( _ II�JJ . . . .. . .-.(1 AWG/8,,Tt1_YN-2..Green ,, EGC/GEC,-(1)Conduit,Kit;.3/.4 EMT. .... . ... . . . . . . . ... ... . ... ... .. . . .. .. ... . .. .. .. .... .. .. .. . . . . . . .. .. .. . ... . .. . . . . . . . .2 x (1)AV1G/6, THWN-2, White NEUTRAL Vmp =240 VAC Imp=42.5 AAC (i AWG/10, 7HWN-2,Black � ( )AWG X10, PV YdRE, Black Voc =340.2 VDC Isc =8.fi3 ADC ... ,. ,,-(1)AWG/6,,Solid Bare,Copper. GEC.,_..-0).Cop it.Kit;.3/4'.EMT. .. . . .. ... OIgF (1)AWG/10, 1HWN-2,Red (I)AWG 00, Solid Bare Copper EGC Vmp =271.8 VDC Imp=8.11 ADC L�1 (1)AWG#10, THWN-2, White NEUTRAL VmP =240 VAC Imp=14.5 AAC .... .__ , (1)Conduit Kit;.3/y.EMT, ,,, , , , ,, , , ,,,, ,,,,,, , , ,, 7.(! AN/8,.THWN-?,.Preen .. EGC/GEC,-0)Conduit,Kit;.3/4'.EMT. .... .... . JB-01 8294 O O PREMIA OWNER DESCRIPTION: DESIGN: CONFIDENTIAL— THE INFORMATION HEREINJustin Martin CONTAINED SHALL NOT USED FOR THE ,IoB NUMBER: MOR.ITZ, RAYMOND MORITZ RESIDENCE .��,$D�a� t o BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: � NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array PART TO OTHERS OUTSIDE THE RECIPIENTS MaDu<� NORTH ANDOVER MA 01845 ORGANIZATION, EXCEPT IN CONNECTION WITH 24 St.Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLI # YL245P-29b YGE—Z 60 SHEET: REV: DATE Marlborough,MA 01752 SOLARCITY EQUIPMENT,WITHOUT THE WRITTEN INVERTER PAGE NAME: T: (650)638-1028 F: (650)638-1029 PERMISSION OF SOLARCITY INC. Multiple Inverters (978) 494-0415 THREE LINE DIAGRAM PV 4 7/12/2013 (888)-SCI-CITY(765-2489) www.sdorcitycom 1. Conductor Sizing per Art deg690.8(A)CELECTRICAL CALCULATIONS a. Conductor must have 30 deg. C ampacity >= 125% of continuous current. b. Conductor must have (after corrections for conditions of use) >= Module: 30 vin li YL245-29b YGE-Z 221.6 Inv Power WPTC Voltage Drop Calculations Version 5_8.0 continuous current per Table 310.16. Inverter 1: 1 Power-One PVI-6000-S 0.965 6000 6415.32 Vdrop= Imp) * 2*Len th * Resistance / (Vmp) Module: 9 Yin li YL245-29b YGE-Z 221.6 Imp A Max.Length ftWire c. Evaluate conductor temperature at terminations per 110.14(C). Inverter 2: 1 Power-One PVI-3.0-5 0.96 3480 1914.62 String: 8.11 20 AWG_10 at Max Ave Hi:86 deg F P P Module: Vdrop= 8.11 "40 "0.00124Dhms / 190.4714 0.21 Ampacity of wire derated for conditions of termination must be >= Inverter 3: Branch: F16.22 50 1 AwG_10 at Max Ave Hi:86 degF . continuous current*1.25. All string terminations are rated at 90' C. Module: Vdrop= (16.22 "Total "0.0012DC conms) / ors= 14 1.06 -------------------------=---------------- Inverter 4: Total Volta a aro in DC conductors= 1.27 Inverter: 16.22 10 AWG_8 at 240V 2. OCP Sizing per Art 690.8(8)(1) Vdrop= (16.22 20 0.000780hms) 240 V 0.10543 a. Round up t0 next size per Art 240.4(B) Total: 39 Modules Total Inv Pwr: 9480 8329.94 PTC Combined: 24.33 20 a. at 240V ------------------------------------------- Photovoltaic Module Electrical Specifications_ Total STC: 9555 Vdrop= 24.33 "40 0.00049 Ohms) / 240 V 0.198695 3. Conductor Sizing per Art 690.8(A) Voc: 37.8 V deg F deg C a. Conductor must have 30 deg. C ampacity >= 125% of continuous Vmp: 30.2 V Record Low Temp: 1 -17 Total voltage drop in AC conductors= 0.3 current. Isc: 8.63 A Max Average Hi Temp:1 86 130 Total voltage drop in AC and DC conductors= E1.57 Imp: 8.11 A Record Hi Temp:189 132 b. Conductor must have (after corrections for conditions of use) >= Tvoc: -0.12474 V/deg C Tisc: 5.178 mA/deg C continuous current per Table 310.15(B)(16). String Type A and 2 Combined Strings Type A Voc Correction Method: Manuf Tvoc dataP�BrannchrcuitType A 1 way wire length: 50 Voc Correction Factor:Power-One PVI-6000-5 2 strings per branch 1 �strings per branch 2 c. Evaluate conductor temperature at terminations per Art 110.14(C). Inverter Min Vdc Input: 1207 Yingli YL245-29b YGE Z modules per series string 8 modules per series string Ampacity of wire derated for conditions of termination must be >= Voc= 264.6 Min Vmp at Max Temp: 190.47c= 264.6 V Voc= 302.4 V continuous current*1.25. All branch terminations are rated at 75* CMax Voc at Min Temp: 301.27 Vmp= 211.4 Inverter Max Vdc Input: 600 Vmp= 211.4 V Vmp= 241.6 V min• Isc= 8.63 Max String Size: 13 Isc= 17.26 A Isc= 17.26 A ------------------------------------------ Imp= 8.11 Imp= 16.22 A Imp= 16.22 A 4. OCP Sizing Icont= 10.79 Art 690.8 A)1) 1-way wire length: 20 Icont= 21.58 A Icont= 21.58 A Art 690.8(A)(1) a. Round up to next size per Art 240.4(B) 1.a Conductor: AWG_10 PV Wire 2.a Conductor 1: AWG_10 PV Wire ____________ __ _______ __________________ Conductor 2: AWG_10 PV Wire 5. Conductor Sizing per Art 690.8(A) (cont*1.25=(Amps) 13.48 Conductor 1 Conductor a. Conductor must have 30 deg. C ampacity >= 125% of continuous 30 deg C ampacity= 401 Icont*1.25=(Amps) 26.97 26.97 current. 1.b Icont=(Amps) 10.79 30 deg C ampacity= 40 40 Start ampacity 40 2.b Icont=(Amps) 21.58 21.58 Temperature derate(%=F) 0.71 Start ampacity 40 40 b. Conductor must have (after corrections for conditions of use) >= Conduit fill derate(%_#) 1 Temperature derate(%=F) 0.76 0.76 continuous current per Table 310.15(8)(16). Derated ampacity 28.4 Conduit fill derate(%_#) 1 0.81 0.8 1.c Derated ampacity 1 24.321 24.32 1 1 c. Evaluate conductor temperature at terminations per Art 110.14(C). Icont*1.25=(Amps) 13.48 2.c Term 1 Term 2 Ampacity of wire derated for conditions of termination must be >= Ampacity 4o Temp table 75degC 75degC P Y Icont*1.25=(Amps) 26.97 1 .97 continuous current*1.25. All inverter output terminations are rated at 1.d Icont*1.25=(Amps) 13.48 Ampacity 351 35 75' C. - OCP Size= 15 ___________________________________________ Inverter Type A Output 2.d OCP Size= 30 30 6. OCP Sizing Power-One PVI-6000-5 1 way wire length: 10 ft Combined Inverter Output a. Round up to next size per Art 240.4(B) Icont= 28 JA Art690.8(A)(1) Service Voltage= 3.a Icont*1.25=(Amps) 35 Art 690.8(B)(1) Total Inverter Powe- 1 way wire length= 20 OCP Size= 35 Art 240.6(A) Icont=#of inverters*max inverter current Art 690.8(A)(1) 7. Conductor Sizing per Art 690.8(A) 3.b Conductor: AWG_8 THWN-2 at 90 deg C:Table 310.16 Icont=(Amps) a. Conductor must have 30 deg. C ampacity >= 125% of continuous (cont*1.25=(Amps) 35 4.a Icont*1.25=(Amps) 53.12 Art 690.8(B)(1) Current. 30 deg C ampacity= 55 r OCP size= 55 Art 240.6(A) 3.c Icont=(Amps) 28 4.b Conductor: AWG_6 THWN-2 at 90 deg C:Table 310.16 b. Conductor must have (after corrections for conditions of use) >= Start ampacity 55 (cont*1.25=(Amps) 53.12 continuous current per Table 310.15(6)(16). Temperature derate(%=F) 0.91 q,c 30 dIcon9(Amps)city 42.5 Conduit fill derate(%_#) 1 Derated ampacity 50.051 Start ampacity 75 c. Evaluate conductor temperature at terminations per Art 110.14(C). 3.d Icont*1.25=(Amps) 35 Temperature aerate(%=F) 0.91 Ampacity of wire derated for conditions of termination must be >= Ampacity so Conduit fill derate(%_#) 1 continuous current*1.25. All inverter output terminations are rated at Derated ampacity 68.25 75' C min. 4.d Icont*1.25=(Amps) 53.12 Ampacity 65 CONFIDENTIAL- THE INFORMATION HERON JOB NUMBER JB-01 8294 00 OWNER: DESCRIPTION: It?I: CONTAINED SHAUANYONE NOTCE USED FOR THE MORITZ, RAYMOND MORITZ RESIDENCE Justin Martin ��ii�SOIa 't BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MWN7ING SYSTOA: NOR SHALL IT BE DISCLOSED IN MOLE OR IN Comp Mount Type C 58 BERKELEY RD 9.555 KW PV Array PART TO OTHERS OUTSIDE THE RECIPIENTS y. 11 ORGANIzanoN,EXCEPT IN CONNECTION MATH MODULES: NORTH ANDOVER, MA 01845 24 St.Martin Drive,Building z Unit 11 THE SALE AND USE OF THE RESPECTIVE (39) YINGLU # YL245P-29b YGE-Z 60 SHEET: REV: DATE Marlborough,MA 01752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME T. (650)638-1028 P (650)638-1029 PERMISSION of SOLARCITY INC. IN`ERTER. (978) 494-0415ELECTRICAL CALCULATIONS PV 5 7/12/2013 (M)-SCI-CITY(765-2489) .msdarcity.a«n Multiple Inverters YL250P-29b YGE - Z 60 YL245P-29b .] [� � YG E e Z 60CELL SERIES Powered by YINGLI CELL SERIES YL240P-296 YIN G�JI oLAR YL235P-29b „ \ ELECTRICAL PERFORMANCE '- YL230P-296 U.S.Soccer Powered by Yingli Solar - _ GENERAL CHARACTERISTICS Module type YL250P-29b tr YL245P49b YL240P-296 YL235P-29b,YL230P-29b Dimensions(V W/H) 64.96 in(1650 mm)/38.98 in(990 mm) 1 / Power output - - Pm„• W - 250 r_ 245 240 ° 235 230 81 in(46 mm) Ideal for residential Power output tl rances Ap- W -0/+5 eight 45.2 lbs(20.5 kg) • Module efficiency qm % 15.3 15.0 _ 14.7 r 14.4 - 14.1 - - - - - --- - --- - --- - - and commercial applications where cost savings, _VoltageatP..._ Vin" �_- 0.4 -3°.z µ 29•5 29.5 29_5 - -- - CurrentatP.- 1- A 8.24 1 8.11 8.14 7.97 _ 7.80 PACKAGING SPECIFICATIONS installation time, and aesthetics matter most. Open-circuit voltage V..I V 38.d 3Z8 - 37=5 - -- - 37.0 Numher of modules per pallet 'i 22 Shortcireuit current _ 6_ A 8.79 _ 8.63 - 8.65 y 8.54 _� 8.40_- Number of pallets per 53'container Y 36 STC:1000W/m'irradiance,25°C cell temperature.AM1.5g spectrum according to EN 6090x-3 [ - - - - _ • _ • UUMF i Average relative effc e,cy,ed,ct on of 5 0%at 200W/m'a ording to EN 60904.1 Packaging box dimensions(L/W/H)I 67 in(1700 mm)/45 in(1150 mm)/ ►Lower balance-of-system costs with Zep _47i"(1190-)8 kg . .. - •.- - • '. Box weight - -- 70761bs(488 kg) -Compatible'"frame. p Power output Pm,. W 181.1 177.9 174.3 170.7 167.0 ►Reduce on-roof labor costs by more than 25a/a. Voltage at P... V„m, V 27.6 + 27.2 26.626.6 26.6 Units:inch(mm) ►Leverage the built-in grounding system- Current at Pm Im, A 6.56 6.sa 6.56 6.42 6.29 ..- _- _. .. ...... ._._ _ 38.98990 Opertcircuit voltage V- V 35.4 4 34.5 34.2 33.8 33.8 if it's mounted,it's grounded. \ ( 36.es 936 a1(a6) `� ShoK_circuiT curtent - IK A 7.12 - 6.99 7.01 6.92 � -6.81 8 ►Lower your parts count-eliminate rails,screws, mounting clips,and grounding hardware. NOCT:open-arcuitmodeleoperation tempe,atureat800Wim=o-radiance,20'Cambient temperature,1m/swind:peed M ►Design and permit projects easily with access THERMAL CHARACTERISTICS Nominal operating cell temperature NOCT. •C 46+/-2 $ to layout calculator and stamped drawings. + - Temperature coefficient of P. y %/•C -0.45 O O Temperature coefficient of V. 0-?%/°C -0.33 ►Lower installation costs with savings across Temperature coefficient of I.. %a/'C 0.06 i Grounding holase an. ) _ 6-00.236(6) a equipment and labor. Temperature coefficient of Vm P-I%/•C� .0.45 ►Minimize roof penetrations while maintaining the system's structural integrity. ® OPERATING CONDITIONS -- - - - - ►Invest in an attractive solar array that includes Max.system voltage eoovoc Mounting holes 4-0m2560315(&5.8) a black frame,low mounting profile,and Max.series fuse rating 15A OMPN OMP aesthetic array skirt. Limiting reverse current Y 15A - F Drainage holes ►Increase energy output with flexible modulepea g p range - - e 0.12x0.3 s t3xe) O r tin temperature ran -40 to 194°F(-40 to 90°C) ° layouts(portrait or landscape). W-,A Max.static load,front(e.g.,snow and wind) S0 psf(2d00 Pa) 3.94(100) ►Trust in the reliability and theft-resistance of Max.static load,back(e.g.,wind) 50 Ps((2400 Pa) U47(12) the Zep Compatible'"'system. Leading limited power warranty*ensures Hailstone impact 1 in(25 mm)at 51 mph(23 m/s)91.2%of rated power for 10 years,and 80.7%of rated power for 25 years. 0CONSTRUCTION MATERIALSTh SOLUTION OPTION ecFront cover(materialrtype/thickness) Low-iron glass/tempered/3.2 mm SECTION C C I The YGE-Z Series is now available as 10-year limited product warranty. . Glass may have anti-reflective coa8ng i an Enphase Energized`"AC Solution. Cell(quantity/materiaVtype/dimensions/ 60/polysilicon/multicrystalline/ enphase area/#of busbars) 156 mm x 156 mm/243.3 cm'/2 or 3 This solution delivers optimum _ . [W P warranty Encapsulant(material) Ethylene vinyl acetate(EVA) / a `In compliance with our warren terms and conditions. t.38(35) i performance and integrated intelligence. The Enphase M215-Z Zep Compatible Microinverter Frame(material/color) Anodized I malloy/bl k W Read h Installation dU p p p - -- - -- --- - - - - - - - - -- - -- - -- armng� ea the an ser Manual in its entirety is designed to connect direct) into the Z Series module, . Junction box(protectiondegree) aIP65 before handling,installing,and operating Yingli modules. groove,eliminating the need for tools Or fasteners- Cable(type/length/gauge/outside diameter) PVwire/43.31 in(1100 mm)/12 AWG/0.244 in(6.2 mm) all with One easy Step. UL 1703 and ULC 1703,CEC,FSEC,ISO 9001:2008, Plug connector Amphenol/H4/IP68 Our Partners ISO 14001:2004,BS OHSAS 18001:2007,SA8000 (manufacturer/type/protection degree) _ The specifications in this datasheet are not guaranteed and are subject to change without prior notice. - C LO US %'A�I CERT ®'., 7 This datasheet complies with EN 50380:2003 requirements. intelligent real-time ma.o aS,TvcEDi adult 'v--•'.`7/ w+� monitoring at the system 44DD and module level with - - Enlighten. Yingli Green Energy Americas,Inc. info@yingliamericas.com • Tel:+1 (888)686-8820 YINGLI SE OIAR ' YINGLISOLAR.COM/USI NYSE:YGE � Y I N G L I S O L A R.COM/U S Yj ngl i Americas ®Yngli Green Energy Holding Co.Ltd. I YGEZ60CellSedes2Ol2-EN-201206 VO1 U.S.Soccer Powered by Yingli Solar �r,,` aowe-oae= Renewable Energy Solutions AURORA 'C7.t��1 C ''' • ' ''' ' ' Nominal Output Power W 5000 6000 Maximum Output Power W 5000 6000 Rated Grid AC Voltage V 208 2.40 277 208 240 277 Input Side(DC) Number of Independent MPPT Channels 2 2 tSf'T Maximum Usable Powerfor Each Channel W 4000 4000 P tl®/y O-5®®®—)J �''`''\ �" �-.�,,;�, v,.4�tk�,,.,, Absolute Maximum Voltage(Vmax) V 600 600 P110-6000—TL fy�y •°""a"� Start-Up Voltage(Vstart) V 200 (adj.120-350) 200 (adj.120-350) 11 110-6®®® TL Full Power MPPT Voltage Range V 200-S30 start- 200-530 Operating MPPT Voltage Range V 0.7xVstart-580 0.7xVstart-580 Maximum Current(ldcmax)for both MPPT in Parallel A 36 36 Maximum Usable Current per Channel A 18 18 GENERAL SPECIFICATIONS Maximum Short Circuit Current lper Channel A 22 22 "�� Number of Wire Landing Terminals s P Per Channel 2 Pairs 2 Pairs • Array Wiring Termination Terminal block,Pressure Clamp,AWG8-AWG4 OUTDOOR MODELS " output Side(AC) - GridConnectionType 10/2W Split-0/3W 10/2W 10/2W Split-0/31N 10/2W AdjustableVoltage Range(Vmin-Vmax) V 183-228 211-264 244-304 183-228 211-264 244-304 Grid Frequency Hz 60 60 i Adjustable Grid Frequency Range Hz 57-60.5 57-60.5 Maximum Current(lacmax) Aws 27 23 20 30 28 24 Power Factor >0.995 >0.995 E ( I Total Harmonic Distortion At Rated Power % <2 <2 Designed for residential and small commercial PV installations,this ( Contributory Fault Current- A„/Aa 36.25/25.63 36.5/25.81 31.75/22.45 36.25/25.63 36.5/25.81 31.75/22.45 Grid Wiring Termination Type Terminal block,Pressure Clamp,AWG8-AWG4 inverter fills a specific niche in the Aurora product line to cater for i Protection Devices those installations producing between SkW and 20kW. Input � Reverse Polarity Protection Yes Yes Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 for each channel This inverter has all the usual Aurora benefits,including dual input PV Array Ground Fault Detection Pre start-up Risoand dynamic GFDI Pre start-up Risoand dynamic GFDI (Requires Floating Arrays) (Requires Floating Arrays) section to process two strings with independent MPPT,high speed Output and precise MPPT algorithm for real-time power tracking and 1 6 Anti-Islanding Protection Meets UL 1741/IEE1547 requirements Meets UL 1741/IEE1547 requirements Oveenergy harvesting, as well as transformerless operation for high J I Maximum Protection a varistoc2(L,-L,/L-G) Varistor,2(L,-L,7L,-G) , Maximum AC OCPD Rating A 35 30 25 40 35 30 performance efficiencies of up to 97.1%. Efficiency 1 Maximum Efficiency % 97.1 97.1 J CEC Efficiency % 96 96.5 96.5 96 96.5 96.5 The wide input voltage range makes the inverter suitable to low , Operating Performance power installations with reduced string size.This outdoor inverter a Stand-by Consumption waMr <a <8 has been designed as a completely sealed unit to withstand the Nighttime consumption W- <0.6 <06 i � Communication r j harshest environmental conditions. 1 User-Interface 16 characters x 2 lines LCD display J Remote Monitoring(1xR5485 incl.) AURORA-UNIVERSAL(opt.) Wired Local Monitoring(1xRS485 incl.) PVI-USB-RS485-232(opt.),PVI-DESKTOP(opt.) ' I Wireless Local Monitoring PVI-DESKTOP(opt)with PVI-RADIOMODULE(opt.) Environmental Ambient Air Operating Temperature Range 'FVC) -13 to+140(-25 to+60) -13 to+140(-25 to+60) with derating above 122(SO) - -- - - - --- - - - + `• 1 Ambient Air Storage Temperature Range 'F CC) -40 to 176(-40 to+80) 40 to 176(-40 to+80) i Relative Humidity %RH 0-100 condensing 0-100 condensing � _ Acoustic Noise Emission Level db(A)@1 m <50 <50 Maximum Operating Altitude without Derating y film) _6560_(20.0.0) _ 6560(20.00) Mechanica_ISpecifications Enclosure rating NEMA 4X NEMA 4X specific rid codes which can be selected in the field Cooling Natural Convection Natural Convection • Each inverter is set ons p 9 Dimensions(H x W x D) in(mm) 41.4 x 12.8 x 8.6(1052 x 325 x 218) • Single phase output Weight Ib(kg) <59.5(27.0) <59.5(27.0) 1 • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented i Shipping Weight lb(kg) <78(35.4) <78(35.4) 1 Mounting System Wall bracket Wall bracket indifferent directions Conduit Connexions Trade Size Kos:(tea x 1/2') Trade Size Kos:(2ea x 1/2") •Wide input range and(2ea x 1-1/4,3 places side,front,rear) and(2ea x 1-1/4'3 places side,front,rear) DC Switch Rating-(Per Contact) AN 25/600 25/600 • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting safety • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance Isolation Level Transformerless(Floating Array) Transformerless(Floating Array) across the entire input voltage and output ower range Safety and EMC Standard UL 1741,CSA-C22.2 N.107.1-01 UL 1741,CSA-C22.2 N.107.1-01 P 9 P P g I Safety Approval CSA", CSA”, •Outdoor enclosure for unrestricted use under any environmental conditions I Warranty • RS-485 communication interface(for connection to laptop or datalogger) Standard Warranty years 10 10 Extended Warranty years _ 15_&20 15&2.0 • Compatible with PVI-RADIOMODULEfor wireless communication with Aurora PVI-DESKTOP 1 Available Models - I Standard-With DC Switch-Floating Array PVI-5000-OUTD-US PVI-6000-OUTD-US •Alidata is subject to change without notice "Inner can appy that much anent-Breaker will open S� Gs up Cerfificate o Compliance Certificate: 1841082 Master Contract: 173688 Project: 2550432 Date Issued: August 20,2012 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C'and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. ® Bry Aggamct, Issued by: Brij Aggarwal,P.Eng. Ci UJ PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI-6000-OUTD-US,PVI-6000-OUTD-US-W and PVI-5000-OUTD-US, permanently connected. Notes: 1. All above models in this series may include expansion board with wireless antennae option and will be identified with model designation including'—Z"suffix at the end. 2. For details related to rating,size,configuration,etc.reference should be made to the CSA Certification Record,Annex A of the Certificate of Compliance,or the Descriptive Report. DQD 507 Rev.2012-05-22 Page:l power-oae� AURORA �Renewob/e Energy Sa/utions ► 1 t • ► • ► • ► _. . Nominal Output Power W 3000 3600 4200 Maximum Output Power W 3000 3300** 3300** 3600 4000** 4000** 4200 4600** 4600** Rated Grid AC Voltage V -2_0.8 2.40 277 208 2_40 2.77 2.08 240 277 . Input Side(DC) Number of Independent MPPT Channels 2 2 _ 2 PV9-3•0 -Tn Maximum Usable Power for Each Channel W 2000 3000 3000 LL Absolute Maximum Voltage(Vmax) V 600 600 600 / Start-Up Voltage(Vstart) V 200(adj.120-350) 200(adj.120-3S0) 200(adj.120-350) rI� l V O-3•f�Y-7 L Full Power MPPT Voltage Range V 160-530 120-530 140-530 YY C7 Operating MPPT Voltage Range V 0.7xVstart-580 0.7xVstart-580 0.7xVstart-580 � w e�_ ^/VI1• _�n p... Maximum Current pdcmax)for both MPPT in Parallel A 20 32 32 \!7/ IIIL Maximum Usable Current per Channel A 10 16 16 'n.:. Maximum Short Circuit Current Limit per ChannelA 12.5 20 20 ' Number of Wire Landing Terminals Per Channel 2Pairs(lon-S version) 2Pairs(1on-S version) 2Pairs(Ion-S version) GENERAL SPECIFICATIONS Array Wiring Termination Terminal block,Pressure Clamp,AWG10-AWG4 r Output Side(AC) OUTDOOR MODELS """�'�J'a; �.,y ..-::::.st, Type Split- Split- Split- Grid Connection e - 10/2W 0/3W 10/2W 10/2W 0/3W 10/2W 10/2W 0P3W 10/2W Adjustable Voltage Range(Vmin-Vmax) V 183-228 211-264 244-304 183-228 211-264 244304 183-228 211-264 . 244304 - Grid Frequency Hz 60 60 60 - Adjustable Grid Frequency Range Hz 57-60.S 57-60.5 S7-60.5 O Maximum Current(lacmax) Aaw 14.5 14.5 12 17.2 16 16 20 20 20 � The most common residential inverter Is the Ideal size for an average- Power Factor >0.995 >0.99S >0.995 ,��JJ Total Harmonic Distortion At Rated Power % <2 <2 <2 sized family home. This family of single-phase string inverter ! 75 Grid Wiring TerminationType Terminal block Pressure Clamp,AWG10-AWG4 complements the typical number of rooftop solar panels,allowing !I ` 1 ;routection Devices j home-owners to get the most efficient energy harvesting for the Reverse Polarity Protection Yes Yes Yes size of the property.This rugged outdoor inverter has been designed Over-Voltage Protection Type Varistor,2 for each channel Varistor,2 for each channel Varistor,2 for each channel + PV Array Ground Fault Detection Pre start-up Riso and dynamic GFDI(Requires Floating Arrays) as a completely sealed unitto withstand the harshest environmental Output conditions. Anti-Islanding Protection Meets UL 1741AEEIS47 Meets UL 1741/IEEIS47 Meets UL 1741/IEE1547 requa s I Over-Voltage Protection Type Varistor,2l(Li-L, L,-G) Varistor,2rements i(L requirements Lt G) Varistor,2 requirements, G) One of the key benefits of the Uno family of single-phase inverters I Maximum ACOCPDRating A 20 20 1s 25 20 20 25 25 25 is the dual input section to process two strings with independent C- {1 Efficiency MPPT especially useful for rooftop Installations with two different ! Maximum Efficiency % 96.9 97 97 p Y P , CEC Efficiency % 96 96 96 orientations(ie East and West).The high speed MPPT offers real-time . Operating Performance power tracking and improved energy harvesting. Stand-by Consumption Wwns <8 <8 <8 Nighttime consumption _ ,Warns ._ <0.6 <0.6 <0.6 Communication The transformerless operation gives the highest efficiency of up to UsRemote 16 characters x2lines LCD display Monitoring(1xRS48S incl.) AURORA-UNIVERSAL(opt.) 97.0%. The wide input voltage range makes the inverter suitable to Wired Local Monitoring(1xRS48S incl.) PVI-USB-RS485-232(opt.),PVI-DESKTOP(opt) low power installations with reduced string size. Wireless Local Monitoring _ PVI-DESKTOP(opt.)with PVI-RADIOMODULE(opt.) J Environmental 1 Ambient Air Operating Temperature Range •F(=C) -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with -13 to+140(-25 to+60)with fff + derating above 131(55) derating above 131(55) derating above 113(45) is Ambient Air Storage Temperature Range -F(°q -40 to 176(-40 to+80) 1 -40 to 176(-40 to+80) -40 to 176(-00 to+80) Relative Humidity %RH 0-100 condensing 0-100 condensing t 0-100 condensing Acoustic Noise Emission Level db L (A) m < < < 0�1111JJJ��� Maximum Operating Altitude without Derating ft(m)) 6560(2(2000) 6560(2(2000) 6S60(2000)(2000) Mechanical Specifications .- _ _ - Enclosure rating _ NEMA4X _ � NEMA4X NEMA4X z • Each inverter is set on specific grid codes which can be selected in the field Cooling Natural Convection Natural Convection Natural Convection Dimensions(H x W x D) in(mm) 33.8 x 12.8 x 8.7(859 x 325 x 222)-S Version • Single phase output Weight Ib/(kg) <47.3(21.3)-S version <47.3(21.3)-S version <47.3(21.3)-5 version • Dual input sections with independent MPPT,allows optimal energy harvesting from two sub-arrays oriented in Mounting System Wall bracket Wall bracket Wall bracket different directions Trade size KOs:(tea x 1/21 and Trade size KOs:(2ea x 1/21 and Trade size KOs:(tea x 1/2`1 and Conduit Connections.«. (2ea x 1-1/4,3 places side,front, (2ea x 1-1/4,3 places side,front (2ea x 1-1/4;3 places side,front, • Wide input range rear) rear) rear) - y • High speed and precise MPPT algorithm for real time power tracking and improved energy harvesting DC Switch Rating{Per Contact) AN 25/600 25/600 25/600 Safety 5/600Safety - • Flat efficiency curves ensure high efficiency at all output levels ensuring consistent and stable performance across Isolation Level Transformerless(Floating Array) Transformedess(Floating Array)_Transformerless(Floating Array) the entire input voltage and output power range Safety and EMC Standard UL 1741,CSA-C22.2N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 UL 1741,CSA-C22.2N.107.1-01 Safety Approval cCSA.a .CSA., cCSA�, • Outdoor.enclosure for unrestricted use under any environmental conditions Warranty • Integrated DC disconnect switch in compliance with international Standards(-S Version) Standard Warranty years 10 10 10 • RS 485 communication interface(for connection to laptop or datalogger) Extended Warranty years 15&20 15&20 15&20 Available 5&20Available Models - - - - - • Compatible with PVI-RADIOMODULE for wireless communication with Aurora PVI-DESKTOP Standard-Without DC Switch and Wiring Box i _ PVI-3.00UT6D-US -PVI-3.6-0UTD-U5 V PVI-4.2-OUTD-VS - _ With DC Switch and Wiring Box PV1-3.0-OUTD-S-US PVI-3.6-0UTD-5-US PVI-4.2-0UTD-5-US 'All data is subject to change without notice "Capability enabled at nominal AC w,ltage and with sufficient DC poweravailxble PAN-• a 'When equipped with optional DC Switch and Wiring Box ••• • sA CSA INTERNATIONAL Cterfiffileate f Compliance Certificate: 2096477 Master Contract: 173688 Project: 2439385 Date Issued: July 19,2011 Issued to: Power-One,Inc 740 Calle Plano Camarillo,CA 93012 USA Attention:Robert White The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C'and 'US'for Canada and US or with adjacent indicator 'US'for US only or without either indicator for Canada only. CP® Ro-1r�f en�stor,Tv Issued by: Rob Hempstock,AScT. C US PRODUCTS CLASS 531109 -POWER SUPPLIES-Distributed Generation Power Systems Equipment CLASS 531189 -POWER SUPPLIES-Distributed Generation-Power Systems Equipment -Certified to U.S.Standards Utility Interactive Inverter,Models PVI4.2-OUTD-US,PVI-3.6-OUTD-US,PVI-3.0-OUTD-US,PVI-4.2- OUTD-S-US,PVI-3.6-OUTD-S-US,PVI-3.0-OUTD-S-US,PVI-4.2-OUTD-US-W,PVI-3.6-OUTD-US-W and PVI-3.0-OUTD-US-W;provided with two DC input channels,permanently connected. For details related to ratings,reference should be made to the CSA Certification Record,Appendix I or the Descriptive Report. APPLICABLE REQUIREMENTS CSA-C22.2 No.107.1-01 - General Use Power Supplies UL Std No. 1741-Second Edition - Inverters,Converters,Controllers and Interconnection System Equipment for Use With Distributed Energy Resources(January 28,2010) DQD 507 Rev.2009-09-01Page:1 t � !�-"-Wsolaraty SolarPPA 3055 Clearview Way, San Mateo, CA 94402 T(888) SOL-CITY F(650) 560-6460 SOLARCITY.COM SUMMARY Homeowner Name and Address Co-Owner Name(If Any) Installation Location Contractor License Raymond Moritz 58 Berkeley Rd MA HIC 168572 58 Berkeley Rd North Andover, MA 01845 North Andover, MA 01845 Estimated Solar Energy Production First Year Annual Production: 9,612 kWh Initial Term Total Production: 183,377 kWh Payment Terms Amount Due at Contract Signing: $0 Amount Due when Installation Begins: $0.00 Amount Due following Bldg. Inspection: $0.00 Average Cost per kWh: $0.1222 Price per kWh Annual Increase: 0.0 % Estimated First Year Monthly SolarCity Bill: $97.90 SolarCity's Promises to You: Your Prepayment, Purchase and Transfer Choices • SolarCity will insure, maintain, and repair the System During the Term: (including the inverter) at no additional cost to you as . If you move, you may transfer this agreement to the specified in the agreement. purchaser of your Home, as specified in the • SolarCity will provide 2417 web-enabled monitoring at agreement. no additional cost to you, as specified in the agreement. . At any time during the Term when you sell your home • SolarCity will provide a money-back production you may prepay the remaining payments (if any) at a guarantee, as specified in the agreement. discount. • SolarCity will warranty your roof against leaks and restore your roof at the end of the agreement as At certain times, as specified in the agreement, you specified in the agreement. may purchase the System. Your Choices at the End of the Initial Term: • SolarCity will remove the System at no additional cost to you. . You can upgrade to a new System with the latest solar technology under a new contract. . You may purchase the System from SolarCity for its fair market value. • You may renew your agreement for up to ten (10) years in two (2) five (5) year increments. • Otherwise, the agreement will automatically renew for an additional one (1) year term at 10% less than the then-current average rate charged by your local utility Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. 1. Introduction. (iii) SolarCity's estimate of the amount of power This Power Purchase Agreement (this "Power Purchase that is expected to be produced by the System in Agreement" or "PPA") is the agreement between you the first year of the Term; (iv) SolarCity's and SolarCity Corporation (together with its successors estimate of the amount of power that is expected and assigns, "SolarCity" or "we"), covering the sale to to be produced by the System over the entire you of the power produced by the solar panel system Initial Term; (v)your monthly payments for the (the "System") described below. SolarCity agrees to first year(or your prepayment); and (vi) your sell to you, and you agree to buy from SolarCity, all of guaranteed power production and repayment the power produced by the System on the terms and price for underproduction. Your estimated conditions described in this Power Purchase monthly payments are the product of (A)the Agreement. The System will be installed by SolarCity price per kWh multiplied by (B) the estimated at the address you listed above. This Power Purchase annual kWh output divided by(C)twelve (12) Agreement will refer to this address as the "Property" ("Monthly Payments"). You will pay no Monthly or your "Home." This Power Purchase Agreement is Payments if you are fully prepaying this PPA. twelve (12) pages long and has up to three (3) Monthly Payments are due on the first of the Exhibits depending on the state where you live. month for the previous calendar month. SolarCity provides you with a Limited Warranty(the Because these are calendar Monthly Payments "Limited Warranty"). The Limited Warranty is (billed after the calendar month is over) based attached as Exhibit 2. This is a legally binding on estimated production, the amount you agreement with disclosures required by law, so please actually pay for each month may be more or less read everything carefully. If you have any questions than the estimated amount based on the regarding this Power Purchase Agreement, please ask System's actual production in each calendar your SolarCity sales consultant. month. Monthly Payments may change if your price per kWh changes over the Term of this 2. Term. PPA. Any such changes are set forth in Schedule A. Within 45 days of the end of each SolarCity agrees to sell you the power generated by the calendar year, SolarCity will compare the System for 20 years (240 months), plus, if the System's actual production and the estimated Interconnection Date is not on the first day of a production and either (i) send you a refund for calendar month, the number of days left in that partial any overpayments you made; or(ii) invoice you calendar month. We refer to this period of time as the for the extra power the System produced. You "Term." The Term begins on the Interconnection will have regular access to the System's Date. The "Interconnection Date" is the date that the production via your SolarCity online account. System is turned on and generating power. SolarCity Actual production will vary from estimated will notify you by email when your System is ready to production due to weather and other conditions, be turned on. but SolarCity guarantees you will not pay for power the System does not actually produce. See Schedule A for details. Payments due upon installation are due immediately prior to commencement of installation. 3. Intentionally Left Blank. (c) Payment Reconciliation. If (i) the System is off line for more than seven (7) full twenty-four (24) 4. Power Purchase Agreement Payments hour days cumulatively during the Term (for Amounts. example, you remove the System to do (a) Power Price. You are purchasing the power the renovations to your Home); or (ii) you take some action that significantly reduces the output of System produces. The price of that power is set the System; or(iii) you don't trim your bushes or forth on the value statement attached as trees to their appearance when you signed this Schedule A. PPA to avoid foliage growth from shading the (b) Payments. Schedule A details, among other System, then SolarCity will reasonably estimate � the amount of power that would have been things, (i) the price per kWh you will be charged; delivered to you during such outages or reduced (ii) the annual percentage price increase (if any); production periods and shall consider that as Solar Power Purchase Agreement version 5.0 0 2008-2013 SolarCity Corporation.All Rights Reserved. • t actual production for purposes of this paragraph. (xi) return any documents we send you for You will not be charged for the System being off signature (like incentive claim forms) line due to SolarCity's fault, or if it's due to grid within seven (7) days of receiving them; failure or power outages caused by someone and other than you. (xii) maintain and make available, at your cost, a functioning indoor Internet 5. Power Purchase Agreement Obligations. connection with one available wired (a) System, Home and Property Maintenance Ethernet port and standard AC power outlet within eighty (80) feet of the You agree to: System's AC/DC inverter(s). See section (i) only have the System repaired pursuant 2(c)of the Limited Warranty for details. to the Limited Warranty and reasonably (b) System Construction, Repair, Insurance and cooperate when repairs are being made; SolarCity's obligations: (ii) keep trees, bushes and hedges trimmed so that the System receives as much sunlight as it did when SolarCity installed it; SolarCity agrees to: (iii) not modify your Home in a way that (xiii) schedule the installation of the System shades the System; at a mutually convenient date and time; (iv) be responsible for any conditions at your (xiv) construct the System according to Home that affect the installation (e.g., written plans you review; blocking access to the roof, or removing a tree that is in the way); (xv) provide you with a web-enabled meter to accurately measure the amount of power (v) not remove any markings or the System delivers to you; identification tags on the System; (xvi) notify you if the System design has to be (vi) permit SolarCity, after we give you materially changed so that you can reasonable notice, to inspect the System review any such changes; for proper operation as we reasonably determine necessary; (xvii) clean up after ourselves during the construction of the System; (vii) use the System primarily for personal, family or household purposes, but not to (xviii) insure the System against all damage or heat a swimming pool; loss unless (A)that damage or loss is caused by your gross negligence; or (B) (viii) not do anything, permit or allow to exist you intentionally damage the System; any condition or circumstance that would cause the System not to operate (xix) repair the System pursuant to the as intended at the Property; Limited Warranty and reasonably cooperate with you when scheduling (ix) notify SolarCity if you think the System repairs; is damaged or appears unsafe; if the System is stolen; and prior to changing (�) create a priority stream of operation and your power supplier; maintenance payments to provide enough cash flow in our financing (x) have anyone who has an ownership transactions to pay for the Limited interest in your Home sign this Power Warranty obligations and the repair and Purchase Agreement; maintenance of the System in Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. Y accordance with this PPA even if amount you will pay for taxes over the Term is SolarCity ceases to operate; and $0.00. (xxi) not put a lien on your Home or Property. (f) No Alterations (c) Home Renovations or Repairs You agree that you will not make any If you want to make any repairs or improvements modifications, improvements, revisions or to the Property that could interfere with the additions to the System or take any other action System (such as repairing the roof where the that could void the Limited Warranty on the System is located), you may only remove and System without SolarCity's prior written consent. replace the System pursuant to the Limited If you make any modifications, improvements, Warranty. revisions or additions to the System, they will become part of the System and shall be (d) Automatic Payment, Fees; Late Charges SolarCity's property. In addition to the other amounts you agree to pay in this Power Purchase Agreement, you (g) Access to the System agree to pay the following: (i) You grant to SolarCity and its employees, agents and contractors the (i) Automatic Payment Discount: All prices right to reasonably access all of the include a $15 monthly discount for Property as necessary for the purposes using automatic payment. You will not of (A) installing, constructing, operating, receive a $15 monthly discount if you owning, repairing, removing and do not make automatic Monthly replacing the System or making any Payments through your checking or additions to the System or installing savings account; complementary technologies on or about the location of the System; (B) enforcing (ii) Returned Check Fee: $25 (or such lower SolarCity's rights as to this Power amount as required by law) for any Purchase Agreement and the System; check or withdrawal right that is (C) installing, using and maintaining returned or refused by your bank; electric lines and inverters and meters, necessary to interconnect the System to (iii) Late Payments: accrue interest at the your electric system at the Property lesser of twelve percent (12%) annually and/or to the utility's electric or the maximum allowable by applicable distribution system; or (D) taking any law; and other action reasonably necessary in connection with the construction, (iv) Product Change Fee: if after you sign installation, operation, maintenance, this Power Purchase Agreement, but removal or repair of the System. This before we begin installation, you decide access right shall continue for up to refer an alternative SolarCity You would P y ninety (90) days after this Power product (a SolarLease, or a prepaid PPA, Purchase Agreement expires to provide etc.) you will pay a $250 change fee. SolarCity with time to remove the System at the end of the Power (e) Estimated Taxes Purchase Agreement. SolarCity shall provide you with reasonable notice of its You agree to pay any applicable sales or use need to access the Property whenever taxes on the Monthly Payments (or prepayment, commercially reasonable. as applicable) due under this PPA. If this PPA contains a purchase option at the end of the (ii) During the time that SolarCity has Term, you agree to pay any applicable tax on the access rights you shall ensure that its purchase price for the System. You also agree access rights are preserved and shall not to pay as invoiced any applicable personal interfere with or permit any third party property taxes on the System that your local to interfere with such rights or access. jurisdiction may levy. The total estimated You agree that the System is not a Solar Power Purchase Agreement version 5.0 0 2008-2013 SolarCity Corporation.All Rights Reserved. fixture, but SolarCity has the right to file the following items having been completed to its any UCC-1 financing statement or reasonable satisfaction: fixture filing that confirms its interest in the System. (i) completion of(A)the engineering site audit (a thorough physical inspection of (h) Indemnity the Property, including, if applicable, geotechnical work), (B)the final System To the fullest extent permitted by law, you shall design, and (C) real estate due diligence indemnify, defend, protect, save and hold to confirm the suitability of the Property harmless SolarCity, its employees, officers, for the construction, installation and directors, agents, successors and assigns from operation of the System; any and all third party claims, actions, costs, expenses (including reasonable attorneys' fees (ii) approval of this Power Purchase and expenses), damages, liabilities, penalties, Agreement by one of SolarCity's losses, obligations, injuries, demands and liens financing parties; of any kind or nature arising out of, connected with, relating to or resulting from your (iii) confirmation of rebate, tax credit and negligence or willful misconduct; provided, that renewable energy credit payment nothing herein shall require you to indemnify availability in the amount used to SolarCity for its own negligence or willful calculate the Monthly Payments set misconduct. The provisions of this paragraph forth in this Power Purchase Agreement; shall survive termination or expiration of this Power Purchase Agreement. (iv) confirmation that SolarCity will obtain all applicable benefits referred to in (i) Payments Section 9; Schedule A describes your payment obligations (v) receipt of all necessary zoning, land use under this PPA. SUBJECT TO SECTION 4(b) and building permits; and ABOVE, YOU AGREE THAT THE OBLIGATION TO PAY ALL PAYMENTS AND ALL OTHER (vi) completion of any renovations, AMOUNTS DUE UNDER THIS PPA SHALL BE, improvements or changes reasonably ABSOLUTE AND UNCONDITIONAL UNDER ALL required at your Home or on the CIRCUMSTANCES AND SHALL NOT BE Property (e.g., removal of a tree or SUBJECT TO ANY ABATEMENT, DEFENSE, necessary roof repairs to enable us to COUNTERCLAIM, SETOFF, RECOUPMENT OR safely install the System). REDUCTION FOR ANY REASON WHATSOEVER, IT BEING THE EXPRESS INTENT OF THE SolarCity may terminate this Power Purchase PARTIES THAT ALL AMOUNTS PAYABLE BY Agreement without liability if, in its reasonable YOU HEREUNDER SHALL BE, AND CONTINUE judgment, any of the above listed conditions (i) TO BE, PAYABLE IN ALL EVENTS INCLUDING through (vi) will not be satisfied for reasons BY YOUR HEIRS AND ESTATE AND, EXCEPT beyond its reasonable control. Once SolarCity AS SET FORTH BELOW IN SECTIONS 6, 23 starts installation, however, it may not terminate AND 24, YOU HEREBY WAIVE ALL RIGHTS this Power Purchase Agreement for your failure YOU MAY HAVE TO REJECT OR CANCEL THIS to satisfy conditions (i) through (vi) above. PPA, TO REVOKE ACCEPTANCE OF THE SYSTEM, OR TO GRANT A SECURITY (b) Amendments, Your Right to Terminate for INTEREST IN THE SYSTEM. Material Changes. 6. Conditions Prior to Installation of the System: Change Both parties will have the right to terminate this Orders. PPA, without penalty or fee, if SolarCity determines after the engineering site audit of (a) SolarCity's obligation to install the System and your Home that it has misestimated by more sell you the power it produces is conditioned on than ten percent (10%) the System's annual production. Such termination right will expire at Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. r the earlier of (i) one (1) week prior to the CREDITS, GREEN TAGS, CARBON OFFSET CREDITS, scheduled System installation date and (ii) one UTILITY REBATES OR ANY OTHER NON-POWER (1) month after we inform you in writing of the ATTRIBUTES OF THE SYSTEM ARE THE PROPERTY revised production estimate. If neither party OF AND FOR THE BENEFIT OF SOLARCITY, USABLE exercises their right to terminate this PPA AT ITS SOLE DISCRETION. SOLARCITY SHALL HAVE following a ten percent (10%) change in the THE EXCLUSIVE RIGHT TO ENJOY AND USE ALL System's production, then any changes to the SUCH BENEFITS, WHETHER SUCH BENEFITS EXIST System will be documented in an amendment to NOW OR IN THE FUTURE. YOU AGREE TO REFRAIN this PPA. You authorize SolarCity to make FROM ENTERING INTO ANY AGREEMENT WITH corrections to the utility paperwork to conform to YOUR UTILITY THAT WOULD ENTITLE YOUR UTILITY this PPA or any amendments to this PPA we TO CLAIM ANY SUCH BENEFITS. YOU AGREE TO both sign. REASONABLY COOPERATE WITH SOLARCITY SO THAT IT MAY CLAIM ANY TAX CREDITS, 7. Warranty. RENEWABLE ENERGY CREDITS, REBATES, CARBON YOU UNDERSTAND THAT THE SYSTEM IS OFFSET CREDITS OR ANY OTHER BENEFITS FROM WARRANTED SOLELY UNDER THE LIMITED THE SYSTEM. THIS MAY INCLUDE TO THE EXTENT WARRANTY ATTACHED AS EXHIBIT 2, AND THAT ALLOWABLE BY LAW, ENTERING INTO NET THERE ARE NO OTHER REPRESENTATIONS OR METERING AGREEMENTS, INTERCONNECTION WARRANTIES, EXPRESS OR IMPLIED, AS TO THE AGREEMENTS, AND FILING RENEWABLE MERCHANTABILITY, FITNESS FOR ANY PURPOSE, ENERGY/CARBON OFFSET CREDIT REGISTRATIONS CONDITION, DESIGN, CAPACITY, SUITABILITY OR AND/OR APPLICATIONS FOR REBATES FROM THE PERFORMANCE OF THE SYSTEM OR ITS FEDERAL, STATE OR LOCAL GOVERNMENT OR A INSTALLATION, LOCAL UTILITY AND GIVING THESE TAX CREDITS, RENEWABLE ENERGY/CARBON CREDITS, REBATES 8. Transfer. OR OTHER BENEFITS TO SOLARCITY. SolarCity works with banks, large companies and other significant financing parties to finance your System. 10. Purchasing the System Prior to the End of the Term. As a result, SolarCity will assign this PPA to one of its In addition to purchasing the System at the end of the financing parties. Thus, to finance your System, you Term (see Schedule A), you have the option to agree that SolarCity may assign, sell or transfer the purchase the System prior to the end of the Term. To System and this Power Purchase Agreement, or any exercise this option you must be in good standing part of this Power Purchase Agreement or the exhibits, under this Power Purchase Agreement and you need to without your consent. Assignment, sale or transfer generally means that SolarCity would transfer certain give us at least one (1) month's, but not more than three (3) months' prior written notice. You can of its rights and certain of its obligations under this Power Purchase Agreement to another party. This purchase this System: assignment does not change SolarCity's obligation to (i) on the five (5) year anniversary of the maintain and repair your System as set forth in the beginning of the Term and every annual Warranty. anniversary after the five (5) year 9. Ownership of the System: Tax Credits and Rebates. anniversary; and You agree that the System is SolarCity's personal (ii) at any time after the five (5) year property under the Uniform Commercial Code. You anniversary of the beginning of the understand and agree that this PPA is not a contract to Term, when you sell your Home; and sell or lease the System to you. SolarCity owns the System for all purposes, including any data generated (iii) if SolarCity ever ceases its operations. from the System. You shall at all times keep the System free and clear of all liens, claims, levies and In each of (i), 00 and (iii) above, the price you will pay legal processes not created by SolarCity, and shall at for the System will be the greater of the System's fair your expense protect and defend SolarCity against the market value ("FMV") and the amount shown on same. Schedule A. The interests of any financing party shall not be taken into account when determining the FMV; YOU UNDERSTAND AND AGREE THAT ANY AND ALL a third party independent appraiser will be retained to TAX CREDITS, INCENTIVES, RENEWABLE ENERGY compute the System's FMV. SolarCity's maintenance Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. ' 1 and repair obligations will end when you purchase the execute and provide the same access and System unless you enter into a new maintenance and ownership rights to SolarCity as provided repair agreement with SolarCity, provided that you will for in this PPA and provide any third party have no less than a ten (10) year warranty on the consents or releases required by SolarCity System beginning on the Interconnection Date that in connection with the substitute guarantees that the System will be free from defects in premises. workmanship or defects in, or breakdown of, materials or components. (iii) Prepay this Power Purchase Agreement and Transfer only the Use of the System 11. Renewal, At any time during the Term, you can You have the option to renew your PPA for up to ten prepay this Power Purchase Agreement (10)years in two (2) five (5) year renewal periods. We (see Schedule A) and add the cost of the will send you renewal forms three (3) months prior to PPA to the price of your Home. The the expiration of the Term, which forms shall set forth Person buying your Home will only need to the new Monthly Payments due under the renewal PPA, sign a transfer agreement to assume your based on our assessment of the then current fair market rights and non-Monthly Payment value of the System. If you want to renew and you are obligations under this PPA. The System in compliance with this PPA, complete the renewal stays at your Home, the person buying forms and return them to us at least one (1) month prior your Home does not make any Monthly to the end of the PPA. In the event that you do not Payments and has only to comply with the agree to the new Monthly Payments this PPA shall non-Monthly Payment portions of this expire by its terms on the termination date. If we don't PPA. The prepayment amount set forth in hear back from you after we send you the renewal forms, Schedule A reflects a five percent (5%) then this PPA shall renew for an additional one (1)year discount rate for early payment. term at ten percent (10%) less than the then-current average rate charged by your local utility and shall (b) You agree to give SolarCity at least fifteen (15) continue to renew for one (1) year terms at that same days but not more than three (3) months' prior rate until we hear from you at least thirty (30) days prior written notice if you want someone to assume to a renewal term that you do not wish to renew. your PPA obligations. In connection with this assumption, you, your approved buyer and j 12. Selling Your Home. SolarCity shall execute a written transfer of this PPA. Unless we have released you from your (a) If you sell your Home you can: obligations in writing, you are still responsible for performing under this PPA. If your buyer (i) Transfer this Power Purchase Agreement defaults on this PPA and we have not yet signed and the Monthly Payments the transfer agreement, you will be responsible for their default. We will release you from your If the person buying your Home meets obligations under this PPA in writing once we SolarCity's credit requirements, then have a signed transfer agreement with the where permitted by the local utility, the person buying your Home (provided such person has been approved as a transferee by SolarCity person buying your Home can sign a in writing). transfer agreement assuming all of your rights and obligations under this Power (c) If you sell your Home and can't comply with any Purchase Agreement. of the options in subsection (a) above, you will (ii) Move the System to Your New Home be in default under this Power Purchase Agreement. Section 12(a) includes a Home sale If you are moving to a new home in the by your estate or heirs. same utility district, where permitted by (d) EXCEPT AS SET FORTH IN THIS SECTION, the local utility, the System can be moved YOU WILL NOT ASSIGN, SELL, PLEDGE OR IN to your new home pursuant to the Limited ANY OTHER WAY TRANSFER YOUR INTEREST Warranty. You will need to pay all costs IN THE SYSTEM OR THIS PPA WITHOUT OUR associated with relocating the.System, Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. r PRIOR WRITTEN CONSENT, WHICH SHALL (a) you fail to make any payment when it is due and NOT BE UNREASONABLY WITHHELD. such failure continues for a period of ten (10) days; 13. Loss or Damage. (b) you fail to perform any material obligation that you have undertaken in this PPA (which includes (a) Unless you are grossly negligent or you doing something you have agreed not to do, like intentionally damage the System, SolarCity will alter the System) and such failure continues for bear all of the risk of loss, damage, theft, a period of fourteen (14) days after written destruction or similar occurrence to any or all of notice; the System. Except as expressly provided in this PPA, no loss, damage, theft or destruction will (c) you or your guarantor have provided any false or excuse you from your obligations under this PPA, misleading financial or other information to including Monthly Payments. obtain this Power Purchase Agreement; (b) If there is loss, damage, theft, destruction or a (d) you assign, transfer, encumber, sublet or sell similar occurrence affecting the System, and you this PPA or any part of the System without are not in default of this PPA, you shall continue SolarCity's prior written consent; or to timely make all Monthly Payments and pay all other amounts due under the PPA and, (e) you or any guarantor makes an assignment for cooperate with SolarCity, at SolarCity's sole cost the benefit of creditors, admits in writing its and expense, to have the System repaired insolvency, files or there is filed against you or it pursuant to the Limited Warranty. a voluntary petition in bankruptcy, is adjudicated bankrupt or insolvent or undertakes or 14. Limitation of Liability. experiences any substantially similar activity. (a) No Consequential Damages 16. Remedies in Case of Default. SOLARCITY'S LIABILITY TO YOU UNDER THIS If this Power Purchase Agreement is in default, we POWER PURCHASE AGREEMENT SHALL BE may take any one or more of the following actions. If LIMITED TO DIRECT, ACTUAL DAMAGES the law requires us to do so, we will give you notice ONLY. YOU AGREE THAT IN NO EVENT SHALL and wait any period of time required before taking any EITHER PARTY BE LIABLE TO THE OTHER of these actions. We may: FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE, EXEMPLARY, SPECIAL OR (a) terminate this PPA; INDIRECT DAMAGES. (b) take any reasonable action to correct your (b) Actual Damages default or to prevent our loss; any amount we pay will be added to the amount you owe us and EXCEPT FOR CLAIMS UNDER SECTION 5(I), will be immediately due; NEITHER PARTY'S LIABILITY TO THE OTHER WILL EXCEED AN AMOUNT EQUAL TO THE (c) require you, at your expense, to return the MAXIMUM AMOUNT THAT COULD BE System or make it available to us in a reasonable PAYABLE BY YOU UNDER SECTION 16(H). manner; DAMAGES TO YOUR HOME, BELONGINGS OR PROPERTY RESULTING FROM THE (d) proceed, by appropriate court action, to enforce INSTALLATION OR OPERATION OF THE performance of this PPA and to recover damages SYSTEM ARE COVERED IN SECTION 6(C) OF for your breach; THE LIMITED WARRANTY. (e) disconnect, turn off or take back the System by 15. Default. legal process or self-help, but we may not disturb the peace or violate the law; ` You will be in default under this Power Purchase Agreement if any one of the following occurs: Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. (f) report such non-operational status of the System The laws of the state where your Home is located shall to your utility, informing them that you are no govern this PPA without giving effect to conflict of laws longer net metering; principles. We agree that any dispute, claim or (g) charge you a reasonable reconnection fee for disagreement between us (a "Dispute") shall be reconnecting the System to your utility or turning resolved exclusively by arbitration. your System back on after we disconnect or turn The arbitration, including the selecting of the off the System due to your default; arbitrator, will be administered by JAMS, under its (h) recover from you (i) a payment equal to the Streamlined Arbitration Rules (the "Rules") by a single higher of (A)the prepay price and (B)the neutral arbitrator agreed on by the parties within thirty purchase price set both as forth in Schedule A (30) days of the commencement of the arbitration. plus (ii) all taxes, late charges, penalties, The arbitration will be governed by the Federal interest and all or any other sums then accrued or due and owing; or Arbitration Act (Title 9 of the U.S. Code). Either party may initiate the arbitration process by filing the (i) use any other remedy available to us in this PPA necessary forms with JAMS. To learn more about or by law. arbitration, you can call any JAMS office or review the We may submit to credit reporting agencies (credit materials at www.jamsadr.com. The arbitration shall be bureaus) negative credit reports that would be held in the location that is most convenient to your reflected on your credit record if you do not pay any Home. If a JAMS office does not exist in the county amounts due under this PPA as required. where you live, then we will use another accredited repay us an arbitration provider with offices close to your Home. You agree to re for reasonable amounts we g PY pay to correct or cover your default. You also agree to If you initiate the arbitration, you will be required to reimburse us for any costs and expenses we incur pay the first $125 of any filing fee. We will pay any relating to the System's return resulting from early filing fees in excess of $125 and we will pay all of the termination. By choosing any one or more of these arbitration fees and costs. If we initiate the arbitration, remedies, SolarCity does not give up its right to use another remedy. By deciding not to use any remedy we will pay all of the filing fees and all of the should this Power Purchase Agreement be in default, arbitration fees and costs. We will each bear all of our SolarCity does not give up our right to use that remedy own attorney's fees and costs except that you are in case of a subsequent default. entitled to recover your attorney's fees and costs if you 17. System Removal; Return. prevail in the arbitration and the award you receive from the arbitrator is higher than SolarCity's last written At the end of the Term or the termination of this PPA, settlement offer. When determining whether your if you have not renewed this PPA or exercised your purchase option (if any) and you have not defaulted, award is higher than SolarCity's last written settlement then within ninety (90) days you agree to call SolarCity offer your attorney's fees and costs will not be at the telephone number listed in Section 7 of Exhibit included. 2 to schedule a convenient time for SolarCity to remove the System from your Home at no cost to you. Only Disputes involving you and SolarCity may be addressed in the arbitration. Disputes must be brought 18. Applicable Law; Arbitration. in the name of an individual person or entity and must PLEASE READ THIS SECTION CAREFULLY. proceed on an individual (non-class, non- ARBITRATION REPLACES THE RIGHT TO GO TO representative) basis. The arbitrator will not award relief COURT, INCLUDING THE RIGHT TO A JURY AND THE for or against anyone who is not a party. If either of us RIGHT TO PARTICIPATE IN A CLASS ACTION OR arbitrates a Dispute, neither of us, nor any other SIMILAR PROCEEDING. IN ARBITRATION, A DISPUTE person, may pursue the Dispute in arbitration as a class IS RESOLVED BY AN ARBITRATOR INSTEAD OF A action, class arbitration, private attorney general action JUDGE OR JURY. or other representative action, nor may any such Solar Power Purchase Agreement version 5.0 ©2008-2013 SolarCity Corporation.All Rights Reserved. Dispute be pursued on your or our behalf in any shall not be construed to (i) be a waiver of such litigation in any court. Claims regarding any Dispute provisions or a party's right to enforce that provision; or and remedies sought as part of a class action, class (ii) affect the validity of this PPA. arbitration, private attorney general or other 20. Notices. representative action are subject to arbitration on an All notices under this PPA shall be in writing and shall individual (non-class, non-representative) basis, and be by personal delivery, facsimile transmission, the arbitrator may award relief only on an individual electronic mail, overnight courier, or certified or (non-class, non-representative) basis. This means that registered mail, return receipt requested, and deemed the arbitration may not address disputes involving other received upon personal delivery, acknowledgment of receipt of electronic transmission, the promised persons with disputes similar to the Disputes between delivery date after deposit with overnight courier, or you and SolarCity. five (5) days after deposit in the mail. Notices shall be sent to the person identified in this PPA at the The arbitrator shall have the authority to award any addresses set forth in this PPA or such other address legal or equitable remedy or relief that a court could as either party may specify in writing. Each party shall order or grant under this agreement. The arbitrator, deem a document faxed to it as an original document. however, is not authorized to change or alter the terms 21. Entire Agreement; Changes. of this agreement or to make any award that would This PPA contains the parties' entire agreement extend to any transaction other than yours. All statutes regarding the sale and purchase of power generated by of limitations that are applicable to any dispute shall the System. There are no other agreements regarding apply to any arbitration between us. The Arbitrator will this PPA, either written or oral. Any change to this issue a decision or award in writing, briefly stating the PPA must be in writing and signed by both parties. If essential findings of fact and conclusions of law. any portion of this PPA is determined to be unenforceable, the remaining provisions shall be BECAUSE YOU AND WE HAVE AGREED TO enforced in accordance with their terms or shall be ARBITRATE ALL DISPUTES, NEITHER OF US WILL interpreted or re-written so as to make them HAVE THE RIGHT TO LITIGATE THAT DISPUTE IN enforceable. COURT, OR TO HAVE A JURY TRIAL ON THAT 22. Publicity. DISPUTE, OR ENGAGE IN DISCOVERY EXCEPT AS PROVIDED FOR IN THE RULES. FURTHER, YOU WILL SolarCity will not publicly use or display any images of the System unless you initial the space below. If you NOT HAVE THE RIGHT TO PARTICIPATE AS A initial the space below, you give us permission to take REPRESENTATIVE OR MEMBER OF ANY CLASS pictures of the System as installed on your Home to PERTAINING TO ANY DISPUTE. THE ARBITRATOR'S show to other customers or display on our website. DECISION WILL BE FINAL AND BINDING ON THE PARTIES AND MAY BE ENTERED AND ENFORCED IN Customer Initials. ANY COURT HAVING JURISDICTION, EXCEPT TO THE EXTENT IT IS SUBJECT TO REVIEW IN ACCORDANCE REST OF PAGE INTENTIONALLY LEFT BLANK WITH APPLICABLE LAW GOVERNING ARBITRATION AWARDS. OTHER RIGHTS THAT YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE AVAILABLE IN ARBITRATION. 19. Waiver. Any delay or failure of a party to enforce any of the provisions of this PPA, including but not limited to any remedies listed in this PPA, or to require performance by the other party of any of the provisions of this PPA, Solar Power Purchase Agreement version 5.0 0 2008-2013 SolarCity Corporation.All Rights Reserved. T 23. NOTICE OF RIGHT TO CANCEL. I have read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that I have YOU MAY CANCEL THIS CONTRACT AT ANY TIME received a complete copy of this Power Purchase PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY Agreement. AFTER THE DATE YOU SIGN THIS CONTRACT. SEE EXHIBIT 1, THE ATTACHED NOTICE OF Owner's Name: Raymond Moritz CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. 24.ADDITIONAL RIGHTS TO CANCEL. Signature: Ray and A.Moritz,Jr.(Jul 3,2013) IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO Date: CANCEL THIS PPA UNDER SECTIONS 6 AND 23, YOU MAY ALSO CANCEL THIS PPA AT NO COST AT raymoritz@yahoo.com ANY TIME PRIOR TO 5 P.M. OF THE 14TH CALENDAR DAY AFTER YOU SIGN THIS PPA. Co-Owner's Name (if any): Signature: Date: S®IaFU Power Purchase Agreement Signature: Date: Solar Power Purchase Agreement version 5.0 0 2008-2013 SolarCity Corporation.All Rights Reserved. SOLARCITY CORPORATION POWER PURCHASE AGREEMENT Schedule A Value Statement Amount Due at Contract Signing: $0 Amount Due When Installation Begins: $0.00 Amount Due Following Bldg Inspection: $0.00 Installation Fee: $0 Average Cost per kWh: $0.1222 Estimated First Year Annual Production: 9,612 kilowatt hours (kWh) Estimated Initial Term Total Production: 183,377 kilowatt hours (kWh) Estimated First Year Monthly Payments: $97.90 Price per kWh Annual Increase: 0.0 % Performance Guarantee Performance Prepay Purchase Option Guarantee Option End of Annual Price per kWh Guaranteed kWh Output Refund Estimated Minimum Cash Year at Year End Payment per Price to Purchase Price' kWh if Prepay the Guaranteed Remainder of Output Not Met the Initial Terme 1 $0.1222 9,612 $0.1222 $13,604 N/A 2 $0.1222 19,176 $0.1222 $13,116 N/A 3 $0.1222 28,692 $0.1222 $12,608 N/A 4 1 $0.1222 38,161 $0.1222 $12,083 N/A 5 $0.1222 47,582 $0.1222 $11,535 N/A 6 $0.1222 56,956 $0.1222 $10,966 $10,966 7 $0.1222 66,283 $0.1222 $10,374 $10,374 8 $0.1222 75,564 $0.1222 $9,760 $9,760 9 $0.1222 84,798 $0.1222 $9,119 $9,119 10 $0.1222 93,986 $0.1222 $8,452 $8,452 11 $0.1222 103,128 $0.1222 $7,757 $7,757 12 $0.1222 112,224 $0.1222 $7,033 $7,033 13 $0.1222 121,275 $0.1222 $6,279 $6,279 14 $0.1222 130,281 $0.1222 $5,493 $5,493 15 $0.1222 139,242 $0.1222 $4,673 $4,673 16 $0.1222 148,158 $0.1222 $3,817 $3,817 17 $0.1222 157,029 $0.1222 $2,923 $2,923 18 $0.1222 165,856 $0.1222 $1,991 $1,991 19 $0.1222 174,639 $0.1222 $1,017 $1,017 20 $0.1222 183,378 $0.1222 $0 FMV 1) Per Section 10, the price you will pay to purchase the System will be the greater of the System's fair market value ("FMV") and the amount shown above on Schedule A. 2) Per Section 12, the prepayment amounts shown above reflect a 5% discount rate. Solar Power Purchase Agreement version 5.0 2008-2013 SolarCity Corporation.All Rights Reserved. eeedav o. 3055 Clearview Way San Mateo,CA.94402 (888)-SOL-OTY(765-2489) www.solarcity.com July 11,2013 Project/Job#018294 RE: CERTIFICATION LETTER Project: Moritz Residence 58 Berkeley Rd North Andover, MA 01845 To Whom It May Concern, A jobsite� s e survey of the existing framing system was performed by an audit team from SolarCity. The attached structural calculations are based on site observations and design criteria listed below: Design Criteria: -Applicable Codes= MA Res.Co - de 8th Edition ASCE 7 05 and 2005 NDS S -Roof Dead Load = 10.5 psf(MP1&MP2) 10 psf(MP3) -Roof Live Load = 17 psf(MPI&MP2) 17 psf(MP3) -Ground Snow Load = 50 psf, Roof SL(PV Areas)= 21.6 psf, Roof SL(non-PV Areas) =35 psf -Risk Category= II,Wind Speed = 100 mph, Exposure Category C -Solar modules =As indicated in attached drawings. Note: per IBC 1613.1; Seismic check is not required because Ss = 0.33365 < 0.4g and Seismic Design Category(SDC) = C< D On the above referenced project,the structural roof framing has been reviewed for loading from the PV system on the roof.The structural review, including the plans and calculations only apply to the section of roof that is directly supporting the PV system and its supporting elements.After review it was determined that the existing structure is adequate to carry the PV system loading. I certify that the structural roof framing and the new attachments that directly support the gravity loading from PV modules have been reviewed and determined to meet or exceed requirements of the MA Res.Code 8th Edition. q , Please contact me with any further questions or concerns regarding this project. Sincerely, �µOF Yoo Jin Kim, P.E. �► Civil Engineer '� YQO JIN Main: 888.765.2489,x5743 K email: ykim@solarcity.com V! No.4 A AL Digital signed by Yoo Jin Kim Date:2013.07.11 16:18:32-07'00' esed4e 07.11.2013 s . 9a rtft i ty." I v 3055 Clearview Way San Mateo,CA.94402 (888)-SOL-CITY(765-2489)i www.solarcity.com Moritz Residence - Job # 018294 TABLE OF CONTENTS ORDER# CONTENT 1 Table Of Contents And 1/2-Mile Vicinity Map 2 Project Information, Mounting Structure & P V System Information 3 Calculation Of Design Wind Loads And Uplift Calculations 4 Calculation Of Roof Dead And Live Loads 5 Calculation Of Reduced Roof Snow Loads 6 Structural Framing Analysis Note: per IBC 1613.1; Seismic check is not required because Ss = 0.33365 < 0.4g and Seismic Design Category(SDC) = C< D 112-MILE VICINITY MAP 12 133 i 114 • A 13 • -• Y1 114 • • •• • 12 5 !' •— • 2 MaiiaMV03ELTA , yap ! • ry A �` — — • •— w. 58 Berkeley Rd, North Andover, MA 01845 Latitude:42.673874,Longitude: -71.121814,Exposure Category:C geodes pp�� 07.11.2013 ;i �" SleekMountTM PV System Version# 13.3 o Structural Design Software PROJECT INFORMATION Project Name: Moritz Residence AHJ: North Andover Job Number: 018294 Building Code: MA Res.Code,8th Edition System Size: 9.555 kW PV System Based On: .2009 IBC/IRC Customer Name: Moritz,Raymond ASCE Code: ASCE 7-05 Address: 58 Berkeley Rd Upgrades Req'd? No City/State: North,Andover, MA Stamp Req'd? Yes Zip Code 01845 PV Designer: Justin Martin Latitude: 42.673874 Calculations: Yoo Jin Kim, P.E. Longitude: -71.121814 Reviewer: Yoo Jin Kim, P.E. SC Office: Marlborough EOR:1 Yoo Jin Kim P.E. MOUNTING STRUCTURE & P V SYSTEM INFORMATION Mounting Structure Information Risk Category II Framing Type Stick Frame PV System Type SolarCity SleekMounVm Roofing Material Comp Roof Tile Attachment System Tile Roofs Only NA Tile Reveal SM Span Only NA Standing Seam Spacing SM Seam Only NA Roof Slope 300 Rafter Spacing 16"O.C. PV System Information Total Number of Modules 39 PV Module Orientation Landscape Spanning Vents No Total Area of Array 686 sf PV Module Width 3.2 ft PV Module Length 5.4 ft Attachment Type Comp Mount Type C Minimum Eave End Setback 12" Minimum Ridge Setback 12" Tile Spanner Bar Direction SM Span Only NA Tile Optimal Standoff Y-Spacing SM Span Only NA PV System Weight PV Module Weight 2.5 psf Hardware Assembly Weight 0.5 psf Total PV System Wei ht 3 Psf r � CALCULATION OF DESIGN WIND LOADS Wind Design Criteria Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 100 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 25 ft Section 6.2 Effective Roof Slope 300 Effective Rafter Spacing 16"O.C. Effective Wind Area 1 Module A 17.6 sf IBC 1509.7.1 Wind Pressure Calculation Coefficients Wind Pressure Exposure KZ 0.95 Table 6-3 Topographic Factor Krt 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh =0.00256(Kz)(Kzt)(Kd)(V^2)(I) Equation 6-15 20.6 psf Wind Zone Interior Zone 1 Design Wind Pressure p p=qh(GCP) Equation 6-22 Wind Pressure Up POP) -19.6 psf Wind Pressure Down P down 18.0 psf ALLOWABLE ATTACHMENT SPACINGS (IN.) X-Direction Y-Direction Max Allowable Foot Spacing Landscape 64" 39" Max Allowable Cantilever Landscape 24" NA Max Standoff Tributary Area TribCL 17 sf PV Assembly Dead Load WPV 3 psf DLPV PCL 52 lbs WLUP-0.6 DLPVcos(0) TCL -312 lbs Attachment Uplift Capacity Tallow 512 lbs TC allow DCRLand 60.9% CALCULATION OF ROOF DEAD AND LIVE LOADS - MOUNTING PLANE CATEGORY 1 Roof Dead Load Material Load Roof Category Description MPI &MP2 Roofing Material Comp Roof 5.0 psf #of Layers 2 Underlayment Roofing Paper 0.5 psf Plywood Sheathing Yes 1.5 psf Board Sheathing None 0.0 psf Rafter Size and Spacing 2 x 8 @ 16 in.O.C. 2.3 psf Vaulted Ceiling _ None 0.0 psf Miscellaneous Miscellaneous Items 1.2 psf Total Roof Dead Load 10.5 PSf(MP1&MP2 10.5 PSf Reduced Roof Live Load Symbol Value ASCE 7-05 Roof Live Load Lo 20.0 psf Table 4-1 Member Tributary Area At < 200 sf Roof Slope 7/12 Tributary Area Reduction Rl 1 Section 4.9 Sloped Roof Reduction R2 0.85 Section 4.9 Reduced Roof Live Load Lr L7= L.(RI) 112) Equation 4-2 Reduced Roof Live Load Lr 17 psf(MP1&MP2 17.0 psf Ceiling Dead Load Material Load Ceiling Joist Size and Spacing 2 x 6 @ 16 in.O.C. 1.7 psf Insulation Yes 1.4 psf Finish 1/2"Gypsum Board 2.2 psf Miscellaneous Miscellaneous Items 1.7 psf Total Ceiling Dead Load 7.0 psf 1 � I CALCULATION OF ROOF DEAD AND LIVE LOADS - MOUNTING PLANE CATEGORY 2 Roof Dead Load Material Load Roof Category Description MP3 Roofing Material Comp Roof 5.0 psf #of Layers 2 Underlayment Roofing Paper 0.5 psf Plywood Sheathing Yes 1.5 psf board Sheathing None 0.0 psf Rafter Size and Spacing 2 x 6 @ 16 in.O.C. 1.7 psf Vaulted Ceiling None 0.0 psf Miscellaneous Miscellaneous Items 1.3 psf Total Roof Dead Load 10 psf MP3 10.0 PSf Reduced Roof Live Load Symbol Value ASCE 7-05 Roof Live Load Le 20.0 psf Table 4-1 Member Tributary Area At < 200 sf Roof Slope 7/12 Tributary Area Reduction Ri 1 Section 4.9 Sloped Roof Reduction RZ 0.85 Section 4.9 Reduced Roof Live Load Lr Lr= Lo (RI) (Rz) Equation 4-2 Reduced Roof Live Load Lr 17 psf MP3 17.0 PSf Ceiling Dead Load Material Load Ceiling Joist Size and Spacing 2 x 6 @ 16 in.O.C. 1.7 psf Insulation Yes 1.4 psf Finish 1/2"Gypsum Board 2.2 psf Miscellaneous Miscellaneous Items 1.7 psf Total Ceiling Dead Load 1 7.0 Psf I CALCULATION OF REDUCED ROOF SNOW LOADS ASCE Design Roof Snow Load Criteria Code Ground Snow Load p9 50.0 psf ASCE Table 7-1 Snow Load Reductions Allowed? Yes Effective Roof Slope 300 4 Horiz. Distance from Eve to Ridge W 15.0 ft Snow Importance Factor IS 1.0 Table 1.5-2 Snow Exposure Factor Ce Partially Exposed Table 7-2 1.0 Snow Thermal Factor Ct All structures except as indicated otherwise Table 7-3 1.0 Minimum Flat Roof Snow Load(w/ pf-min 35.0 psf 7.3.4&7.10 Rain-on-Snow Surcharge) Pr= 0.7(Ce)(Ct)(I)Pg; pf? Pf-min Eq: 7.3-1 Flat Roof Snow Load Pf 35.0 psf 70% ASCE Design Sloped Roof Snow Load Over Surrounding Roof Surface Condition of Surrounding � roof All Other Surfaces Figure 7-2 Roof 1.0 Design Roof Snow Load Over P.-ref=(Cs-roof) Pf ASCE Eq:7.4-1 Surrounding Roof Ps1°Of 3S.0 psf 70% ASCE Design Sloped Roof Snow Load Over PV Modules Surface Condition of PV Modules 4 Unobstructed Slippery Surfaces-P„ 0.6 Figure 7-2 Design Snow Load Over PV Ps-P"_ (CS-PV) Pf ASCE Eq: 7.4-1 Modules PS-PV 21.6 psf 43% t LAG SCREW CAPACITY CALCULATIONS (PER AWC/NDS) Lag Screw Withdrawal Capacity in Uplift Wind Specific Gravity of Wood G 0.42 Number of Lag Screws 1 Lag Screw Thread Diameter D 5/16" Lag Screw Overall Length L 41- Req. "Req. Minimum Embedment Tm;n 2.5" NDS Table L2 Lag Screw Embedment Length T-E 2.34" NDS Table L2 Kw Constant KN, 1800 NDS Withdrawal Capacity Per In. W W_ KW G(3/2)D(3/4) NDS 11.2-1 205 Ib/in Total Withdrawal Capacity WT WT=W*(T-E) 480 lbs Wind Load Duration Factor CD 1.60 Allowable Wind Withdrawal Capacity WWI Ww = (CD)W Total Allowable Wind Withdrawal W. 768 lbs Capacity Additional Safety Factor FS 1.50 Total Allowable Wind W. 512 lbs Withdrawal Capacity Note: Withdrawal Capacity Available From Testing Would Supercede the Above NDS Capacity Calculations. e y COMPANY PROJECT SolarCity Corporation WoodWorks® San Mateo, A Way San Mateo,CA 94402 SOFFWARF FOR WOOD MtGN July 11,2013 16:10 MP1.wwb Design Check Calculation Sheet Wood Works Sizer 9.3 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End DL Dead Full Area No 10.50 (16.0)* psf SL Snow Full Area Yes 21.60 (16.0)* psf PV DL Dead Partial Area No 1.33 12.67 3.00 (16.0)* psf *Tributary Width (in) Maximum Reactions(lbs), Bearing Capacities(lbs)and Bearing Lengths(in) : 17,45' 0' 1.17' 14.75' Unfactored: Dead 160 132 Snow 230 196 Factored: Total 390 328 Bearing: F'theta 516 516 Capacity Joist 677 387 Supports 586 586 Anal/Des Joist 0.58 0.85 Support 0.67 0.56 Load comb #2 #4 Length 0.50* 0.50* Min req'd 0.33** 0.50* Cb 1.75 1.00 Cb min 1.75 1.00 Cb support 1.25 1.25 Fcp sup 6251 1 625 *Minimum bearing length setting used:1/2"for end supports and 1/2"for interior supports **Minimum bearing length governed by the required width of the supporting member. Lumber-soft,S-P-F,No.1/No.2,2x8(14/2'W-1/4") Supports:All-Timber-soft Beam,D.Fir-L No.2 Roof joist spaced at 16.0"c/c;Total length:17.45';Pitch:7/12; Lateral support:top=full,bottom=at supports;Repetitive factor:applied where permitted(refer to online help); Analysis vs.Allowable Stress (psi)and Deflection (in)using NDS 2005: Criterion Analysis Value Desi n Value Analysis/Design Shear fv = 37 Fv' = 155 fvM' = 0.24 Bending(+) fb = 1031 Fb' = 1389 fb/Fb' = 0.74 Bending(-) fb = 28 Fb' = 1369 fb/Fb' = 0.02 Live Defl'n 0.44 = L/429 0.79 = L/240 0.56 Total Defl'n 0.91 = L/207 1.05 = L/180 0.87 ❑ WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN MP1.wwb WoodWorks®Sizer 9.3 Page 2 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.200 1.00 1.15 1.00 1.00 - 4 Fb'- 875 1.15 1.00 1.00 0.986 1.200 1.00 1.15 1.00 1.00 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - _ - E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 4 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 4 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 292, V design = 269 lbs Bending(+) : LC #4 = D+S (pattern: sS), M = 1129 lbs-ft Bending(-) : LC #2 = D+S, M = 31 lbs-ft Deflection: LC #4 = (live) LC #4 = (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc-concentrated E=earthquake All LC's are listed in the Analysis output Load Patterns: s=S/2, X=L+S or L+Lr, =no pattern load in this span Load combinations: ASCE 7-05 / IBC 2009 CALCULATIONS: Deflection: EI = 67e06 lb-int "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Bearing: Allowable bearing at an angle F'theta calculated for each support as per NDS 3.10.3 Design Notes: 1.Wood Works analysis and design are in accordance with the ICC International Building Code(IBC 2009),the National Design Specification(NDS 2005), and NDS Design Supplement. 2.Please verify that the default deflection limits are appropriate for your application. 3.Continuous or Cantilevered Beams:NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4.Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 5.SLOPED BEAMS:level bearing is required for all sloped beams. 6.The critical deflection value has been determined using maximum back-span deflection.Cantilever deflections do not govern design. i I COMPANY PROJECT SolarCity Corporation WoodWorks° San Mateo, CA Way San Mateo,CA 94402 SOMVAREEOR WOOD DESIGN July 11,2013 16:12 MP2.wwb Design Check Calculation Sheet Wood Works Sizer 9.3 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End DL Dead Full Area No 10.50 (16.0)* psf SL-PV Snow Partial Area Yes 0.00 9.25 21.60 (16.0)* psf PV DL Dead Partial Area No 0.00 9.25 3.00 (16.0)* psf SL Snow Partial Area Yes 9.25 14.94 35.00 (16.0)* psf *Tributary Width (in) Maximum Reactions(lbs), Bearing Capacities(lbs)and Bearing Lengths (in) : 17.65' 0' 0.75' 14.92' Unfactored• Dead 158 127 Snow 246 286 Factored: Total 405 412 Bearing: F'theta 516 516 Capacity Joist 677 412 Supports 586 625 Anal/Des Joist 0.60 1.00 Support 0.69 0.66 Load comb #2 #4 Length 0.50* 0.53 Min req'd 0.35** 0.53 Cb 1.75 1.00 Cb min 1.75 1.00 Cb support 1.25 1.25 Fcp sup 6251 1 625 *Minimum bearing length setting used:1/2"for interior supports **Minimum bearing length governed by the required width of the supporting member. Lumber-soft,S-P-F,No.1/No.2,2x8(1-1/2"x7-1/4") Supports:All-Timber-soft Beam,D.Fir-L No.2 Roof joist spaced at 16.0"c/c;Total length:17.65';Pitch:7/12; Lateral support:top=full,bottom=at supports;Repetitive factor:applied where permitted(refer to online help); Analysis vs.Allowable Stress (psi)and Deflection(in) using NDS 2005: Criterion Analysis Value Design Value Analysis/Design Shear fv = 45 Fv' = 155 fv/Fv' = 0.29 Bending(+) fb = 1232 Fb' = 1389 fb/Fb' = 0.89 Bending(-) fb = 13 Fb' = 1377 fb/Fb' = 0.01 Live Defl'n 0.63 = L/310 0.82 = L/240 0.77 Total Defl'n 0.98 = L/200 1.09 = L/180 0.90 WoodWorks® Sizer SOFTWARE FOR WOOD DESIGN MP2.wwb WoodWorks®Sizer 9.3 Page 2 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.200 1.00 1.15 1.00 1.00 - 4 Fb'- 875 1.15 1.00 1.00 0.992 1.200 1.00 1.15 1.00 1.00 - 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - - E. 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 4 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 4 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 355, V design = 325 lbs Bending(+) : LC #4 = D+S (pattern: sS), M = 1349 lbs-ft Bending(-) : LC #2 D+S, M = 14 lbs-ft Deflection: LC #4 = (live) LC #4 = (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load Patterns: s=S/2, X=L+S or L+Lr, =no pattern load in this span Load combinations: ASCE 7-05 / IBC 2009 CALCULATIONS: Deflection: EI = 67e06 lb-int "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Bearing: Allowable bearing at an angle F'theta calculated for each support as per NDS 3.10.3 Design Notes: 1.Wood Works analysis and design are in accordance with the ICC International Building Code(IBC 2009),the National Design Specification(NDS 2005), and NDS Design Supplement. 2.Please verify that the default deflection limits are appropriate for your application. 3.Continuous or Cantilevered Beams:NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4.Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 5.SLOPED BEAMS:level bearing is required for all sloped beams. 6.The critical deflection value has been determined using maximum back-span deflection.Cantilever deflections do not govern design. 1 1 COMPANY PROJECT SolarCity Corporation WoodWorks® San Mateo, CA Way San Mateo,CA 94402 i SOMWIF FOR WOOD nE51cN July 11,2013 16:14 MP3.wwb Design Check Calculation Sheet WoodWorks Sizer 9.3 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End DL Dead Full Area No 10.00 (16.0)* psf SL-PV Snow Partial Area Yes 0.00 9.25 21.60 (16.0)* psf PV DL Dead Partial Area No 0.00 9.25 3.00 (16.0)* psf SL Snow Partial Area Yes 9.25 12.77 35.00 (16.0)* psf *Tributary Width (in) Maximum Reactions (lbs), Bearing Capacities(lbs)and Bearing Lengths (in) : 15.05' 0' 0.75' 12.75' Unfactored• Dead 133 106 Snow 204 227 Factored: Total 337 333 Bearing: F'theta 518 518 Capacity Joist 680 389 Supports 586 586 Anal/Des Joist 0.50 0.86 Support 0.58 0.57 Load comb #2 #4 Length 0.50* 0.50* Min req'd 0.50* 0.50* Cb 1.75 1.00 Cb min 1.75 1.00 Cb support 1.25 1.25 Fcp sup 6251 1 625 *Minimum bearing length setting used:1/2"for end supports and 1/2"for interior supports Lumber-soft,S-P-F, No.1/No.2,2x6(1-1/2"x5-1/2") Supports:All-Timber-soft Beam,D.Fir-L No.2 Roof joist spaced at 16.0"c/c;Total length:15.05';Pitch:7/12; Lateral support:top=full,bottom=at supports;Repetitive factor:applied where permitted(refer to online help); Analysis vs.Allowable Stress (psi)and Deflection in using Nos 2005: Criterion Analysis Value Design Value Analysis/Design Shear fv = 48 Fv' = 155 fv/Fv' = 0.31 Bending(+) fb = 1453 Fb' = 1504 fb/Fb' = 0.97 Bending(-) fb = 22 Fb' = 1494 fb/Fb' = 0.01 Live Defl'n 0.69 = L/241 0.93 = L/180 0.74 Total Defl'n 1.10 = L/151 1.39 = L/120 0.79 i WoodWorks® Sizer SOFTWARE FOR WOOD DESIGN MP3.wwb WoodWorksO Sizer 9.3 Page 2 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.300 1.00 1.15 1.00 1.00 - 4 Fb'- 875 1.15 1.00 1.00 0.993 1.300 1.00 1.15 1.00 1.00 - 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 4 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 4 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 286, V design = 264 lbs Bending(+) : LC #4 = D+S (pattern: sS), M = 916 lbs-ft Bending(-) : LC #2 = D+S, M = 14 lbs-ft Deflection: LC #4 = (live) LC #4 = (total) D=dead L=live S=snow W-wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load Patterns: s=S/2, X=L+S or L+Lr, _=no pattern load in this span Load combinations: ASCE 7-05 / IBC 2009 CALCULATIONS: Deflection: EI = 29e06 lb-int "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Bearing: Allowable bearing at an angle F'theta calculated for each support as per NDS 3.10.3 Design Notes: 1.Wood Works analysis and design are in accordance with the ICC International Building Code(IBC 2009),the National Design Specification(NDS 2005), and NDS Design Supplement. 2.Please verify that the default deflection limits are appropriate for your application. 3.Continuous or Cantilevered Beams:NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4.Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 5.SLOPED BEAMS:level bearing is required for all sloped beams. 6.The critical deflection value has been determined using maximum back-span deflection.Cantilever deflections do not govern design. i The Commonwealth of Massachusetts Print Form Department of Industrial Accidents Office of Investigations 1 Congress Street,Suite 100 Boston, MA 02114-2017 www mass gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/individual):Solartity Corporation Address:3055 Clearview Way City/State/Zip:San Mateo, CA 94402 Phone#:650 963-5100 Are you an employer?Check the appropriate box: Type of project(required): 1.0 1 am a employer with 1500 4. n I am a general contractor and 1 employees(full and/or part-time).* have hired the sub-contractors 6. E] New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. [] Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9. E] Building addition [No workers' comp. insurance comp. insuraneeJ required.] 5. [] We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their I LEI Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.]t c. 152,§I(4),and we have no Solar PV employees. [No workers' 13.2] Other comp. insurance required.] *Any applicant that checks box#t must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an emplover that is providing workers'compensation insurance for my employees Below is lite policy and job site information. Insurance Company Name:Zurich American Insurance Company Policy#or Self-ins. Lic.4:WC96734670 Expiration Date:09/01/13 Job Site Address: 151� (ZA City/State/Zip: N ws Attach a copy of the workers' compensation policy declaration page(showing the policy number and expirati n dat Failure to secure coverage as required.under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I da hereby cer 7u r the ag,�2ndgvepwlties o er'ury that thein ornmliotr provided above is true and correct. Si nature: - - - — - -- — - -- -- -- Date I --h ((pIt - Phone#:978-215-2358 Official use only. Do not write in this area,to be completed by city or toxwtt official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: `OR& CERTIFICATE OF LIABILITY INSURANCE °oe/6/20 2�' A THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policAles)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 0726293 1-415-546-9300 CONTACT Arthur J. Gallagher 6 Co. NAME: Brendan Quinlan PHONE FAX Ineurattce Brokers of California, Inc., License 00726293 [AfC.No.EW:415-S36-4020 _I�Ajf�No): One Market Plata, Spear Tower =N brendan g.com Suite 200 ADDRESS: - .-____9uinlsnea ^ San Francisco, CA 94105 INSURER(S)AFFORDING;COVERAGE _ NAIC__! _ • INSII.RERA• ZURICH AMER INS CO 16535 INSURED INSURERS: LIBERTY INS CORP 42404 SolarCity Corporation - INSURERC: UNDERWRITERS AT LLOYDS 32727 3055 Clearview,Way INSURERD: San Mateo , CA 94402 INSURERS: _ IN URERF: _ - COVERAGES CERTIFICATE NUMBER: 28723200 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REOUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. /NSR TYPE OF INSURANCE DDLiSt16R - L � POLICY N POUCY EFF POLICY EXP - I : M 8ER ODJYYLIMITS A GENERAL LIABILITY :01-096736440409/01/1 09/01/13 EACH OCCURRENCE f 1,000,000 X }COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED 2,000,000 I PREWS€S.(Eaoccurrenw) f J I CLAIMSdMOE j X l OCCUR NF.D EXP(Mr one per*m) S 20,000 X i Deductiblel t25,000 PERSONAL&ADV INJURY f 2,000,000 A_ ( GENERAL AGGREGATE 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER L PRODUCTS-COMP/OP AGO 'S 2,000,000 X i POLICY PHO• LOC � f A AUTOMOBILE LIABILm BAP982931702 1 09/01/13 coMOwCD NGLE LIMIT SI X (Eaaarddent) f i 1,000,000 ANY AUT"O DODILY INJURY(Per personl ii f ALL OWNED SCHEDULED AUTOSAUTOSBODILY INJURY(Pet Aodd.M) f - X HIRED AlliOS X AUTOS FD PROPERTY DAMAGE (Per accwenq f s B X UMBRELLALIAB X OCCUR 'TM7661066265012 09/01/1 09/01/13 FACHOCCURRENCE f 10,000,000 EXCESS LIAR CLAIMS-MADE AGGREGATE f 10,000,_000 DED !X [RETENTION$10,000 S A WORKERS COMPENSATION WC967346704 09/01/13 X' WC STATU- ' AND EMPLOYERS'LIABILITY YfN 09/01/1 1 WCSTA U 105.1 ANYPROPRIETORRARI NER/EXECUTIVE� E.L.EACH ACCIDENT 'f 1,000,000 (MandatoryOFFICER/MIn NMIBER EXCtU0E0? L_"J NMi ) (Mandatory M NH) I If yes deacrft E L DISEASE-EA FMPLOYFV i 1,000,000 urPder DESCRIPTION Or OPERATIONS below E.L.DISEASE•POLICY LIMIT f 1,000,000 C Errors and Omissions :110146LDOSA1204514 09/01/1 09/01/13 Limit of Liability 5,000,000 Aggregate 5,000,000 `Deductible 100,000 DESCRIPTION OF OPERATIONS T LOCATIONS I VEHICLES(Attach ACORO 101,Addiltoold Remarks SehaduL,11 mon*pact Is rpuind) Certificate issued as proof of coverage. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Evidence of Insurance Only THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988.2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD goksan 28723200 �I?..L' ��CJI1l�??/:fJ//�C�f�C�`��fl- 0�'n���!SJC1'•G7(.tt'JC.'•�tJ � Office of Consumer Affairs And Business Regulation 10 Park Plaza - Suite 5170 e� Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 168572 Type: Supplement Card SOLARCITY CORPORATION Expiration: 3/8/2015 JASON QUINLAN 24 ST. MARTIN STREET BLD 2 UNIT 11 --- -- MARLBOROUGH, MA 01752 Update Address and return card.Mark reason for change. SCA 1 G 20M-05/11 (] Address [] Renewal 0 Employment Lost Card -Office of Consumer Affairs&Business Regulation License or registration valid for individul use only WIExpiratiOn.- ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation egistration: 168572 Type 10 Park Plaza-Suite 5170 3/8/2015 Supplement ::ard Boston,MA 02116 SOLARCITY CORPORATION JASON QUINLAN 17e 24 ST MARTIN STREET BLD ZUNII"hBOROUGH,MA 01752 Undersecretaryalid without signature Massachusetts -Department of Public Safety Board of Building Regulations and Sfandatdn t i-im rot 1wn Snitcn 1v,1 License- CS.098884 JASON R QUINLAN 190 WALL ST ^P77M BRIDGEWATER MA e Expiration Ctmtnwssinnet 12/02/2014