Loading...
HomeMy WebLinkAboutBuilding Permit #258 - 586 MASSACHUSETTS AVENUE 10/4/2006 APPROVE TOWN OF NORTH ANDOVER NORTH ION FOR PLAN EXAMINATION p`,t,•o o p Permit NO: Date Received 4 Date Issued: s 6 '� ACHU t IMPORTANT: Applicant must complete all items on this page LOCATION-55(e MaSa Ch 4e—+�S &VGU'e-, Pr tt — (. �. PROPERTY OWNER Fimt Cakyafq �'X j)fi�f C►u yak) - MAPNO.: 4553 PARCEL: 06 ZONING DISTRICT: L4�ALLr� II TYPE AND USE OF BUILDING HISTORIC DISTRICT YES ❑ TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential E New Building ,�One family ❑ Addition a Two or more family D Industrial ❑ Alteration No. of units: Repair, replacement ❑ Assessory Bldg ❑ Commercial r Demolition Moving(relocation) L7 Other Others: G Foundation only ((� 45W-AV+IA ESCRIPTION OF WORK TO BE PKEFO ED i K&JUtl W a,nkirpt iMidz S le.. nc hR((¢d ch rum M l s+ Ftc�r. Identification Please Type or Print Clearly) OWNER. Name.-ri rst 6dVaf Y(�hii m Phone: Q-70 (¢K- 1Z 2 Address: e5ftS CkUS'S � a� eliki CONTRACTOR Name&z7� Phone: gl5f-MO *547 Address: Supervisor's Construction License: Exp. Date: Home Improvement License: Exp. Date: �1��n ARCHITECT/ENGINEER VCt��C..,6Y� Name: Phone:-7�j) •R32-Zq{p1 Address:V7Q'FCWff CIjkGC T�,VJabWt)I MA Reg. No.4-2--1 l2-7 FEE SCHEDULE:BULDING PERMIT.SI ER$1000.00 OF TytiE TOTAL ESTIMATED COST BASED ON,5125.00 PER S.F. Total Project Cost : ° pjJ FEE:$ �. n' 38zq ,164*0 Check No.:# 2$al � •�a1 Receipt No.:. I I I'igc hof•! i Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses u Copy of Contract ❑ Floor Plan Or Proposed Interior Work Addition Or Decks J Building Permit Application U/ Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract d Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And OJIN,Hydraulic Calculations (If Applicable) V Mass check Energy Compliance Report (If Applicable) New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Due:INSPECTIONAL SF.RVI( ES DI:P.�R'I'�IE.N'I':13PFORM115 Pnar$iif 1 TYPE OF SEWERAGE DISPOSAL Tanning/Massage/Body Art F=-- -Swi-mm'ing-Pools 011 Public Sewer u A Tobacco Sales Food Packaging/Sales inSales ❑ NIA Well Q�' Permanent Dumpster on Site iJ Private(septic tank,etc. ❑ Electric Meter location to project NOTE: Persons contracting wills unregistered contractors do not leave access to the guaranty fund Signature of Agent/Owner Signature of contractor Plans Submitted Tans Waived Certified Plot Plan 'NJ Stamped Plans THE.FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF- U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ [�/j ' 3 0 []Water Shed Special Permit ❑ Site Plan Special Permit ❑ Other COMMENTS U ` z . fQ u��� r DATE REJECTED DATE APPROVED 4 f CONSERVATION ❑ _ ❑ , COMMENTS V 9 , t DATE REJECTED DATE APPROVED HEALTH F1 F COMMENTS Zoning Board of,-Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water&Sewer connection/Signature& Date Driveway Permit Temp Dumpster on site yes__no" Fire Department signature/date L Building Setback (ft.) Front Yard Side Yard Required Provided Re aired Rear Yard Provides Re aired Provided Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area,sq. ft.: NOTES and DATA—(For department useI r I I i e s I` I I _ i P;Ige 3 of'-1 Doc:INSPECTIONS\L SFRVICC•)DLPa\R'FMEN'I':13PORM F05 C reared.INC.Jain._lUi)A Location IG111-C--y- No. Date t k TOWN OF NORTH ANDOVER � MaRTM 1 s f 9 • Certificate of Occupancy $ s�CMus Building/Frame Permit Fee $ Foundation Permit Fee $ 3� S Other Permit Fee $ R: TOTAL $ , /at v -, Check # a' 19649 a Building Inspector NORTH Town of Andover No. �A6 dover, Mass., �� • • 0 (90 co MIC HE WICK y�. S BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System 60. �• BUILDING INSPECTOR THIS CERTIFIES THAT T`..M..�a....=I......���A. ...�Q�II. ..... ...:1f j...........� .I.'r... ........ Foundation has permission to erect........................................ buildings on.. U..... ... .t..,..:....................... Rough to be occupied as.......(1mXos....... A. .t.hn. ....tott*R dA.....S.t- n. ..(A................. Chimney provided that the person accepting this permit shall in every respect conform to the ter1application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough momFinal PERMIT EXPIRES IN 6 MONTHS � ELECTRICAL INSPECTOR UNLESS CONSTRU00 -., ,..ARough ...... ............ .. .. ........... Service BUILDING INSPE TSR Final Occupancy Permit Required to Ocatpy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. IL SEE REVERSE SID1E Smoke Det. i TYPE OF SEWERAGE DISPOSAL Public Sewer F] Tanning/Massage/Body Art ❑ Swimming Pools Well Tobacco Sales El Food Packaging/Sales -1 ❑ ❑ Permanent Dempster on Site Private(septic tank,etc. Electric Meter location to project NOTE: Persons contracting with unregistered contractors do not have access to the guar a tyfund Signature of Agent/Owner Signature of contractor Plans Submitted ❑ lans 'Waived ❑ Certified Plot Plan ❑ Stamped Plans THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF-U FORM DATE REJECTED DATE APPROVED PLANNING& DEVELOPMENT ❑ ❑ CWater Shed Special Permit Q Site Plan Special Permit Cl Other COMMENTS DATE REJECTED DATE APPROVED CONSERVATION C ❑ COMMENTS DATE REJECTED DATE APPROVED HEALTH ❑' COMMENTS Zoning Board of Appeals: Variance,Petition No: Zoning Decision/receipt submitted yes Planning Board Decision:__ Comments Conservation Decision: _ Comments Water&Sewer connection/Signature&Date Drive«av Permit Temp Dempster on site yes no Fire Department signature;elate I The Commonwealth of Massachusetts Department of Industrial Accidents Office of Invesidgations kv 600 Washington Street Boston,MA 02111 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization4ndividual): Timberline Construction Corp Address: 82 Parlanan Street City/State/Zip: Dorchester Phone#: 617-822-1000 Are you an employer?Check the appropriate box: Type of project(required): 1.®I am a employer with 42 4. ❑ I am a general contractor and I 6. E] New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet.1 7• ❑Remodeling ' ship and have no employees These sub-contractors have 8. Q Demolition working for me in any capacity. workers' comp.insurance. 9. Q Building addition [No workers' comp.insurance 5. ❑ We arc a corporation and its required.] officers have exercised their 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.Q Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4),and we have no 12.E]Roof repairs insurance required.]t employees. [No workers' 13.n comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. iContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Namc:_St Paul Travelers Indemnity Ince Co Policy#or Self-ins.Lic.#: 734913363 Expiration Date: 3/12/07 Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce under tha, geed enallies of perjury that the information provided above is true and correct, Si afore: -- Contract Manager Date:05/24/06 Phone M 617-822-1000 Offtcial use only. Do not write in this area,to be completed by city or town offciaL City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone M I ° 4� ✓!e 1°ammeare«.ea/.C/a�,/�aaaaac/uaella BOARD OF BUILDING REGULATIONS License: CONSTRUCTION SUPERVISOR Number: CS 073818 Birthdate: 01/29/1968 Expires:01/29/2008 Tr.no: 19674 Restricted: 00 t STEVEN P KELLY ` 47 ADDISON ST BRAINTREE, MA 02184 Commissioner Steven Bosworth TIMBERLINE Project Manager 82 Parkman Street Dorchester,MA 02122 CONSTRUCTION Office: (617)822-1000 x116 Fax:(617)929-0200 CORPORATION Cell: 438-5676 sbosworth@timberiineconstruction.com September 15,2006 Nick Scarfo T-Mobile 15 Commerce Way Norton,MA 02766 RE: 4BO-0020-A— 1 s`Calvary Church 586 Massachusetts Ave.,North Andover,MA 01845 Dear Mr. Scarfo: Timberline Construction Corp.hereby proposes to provide turnkey construction services for the above-referenced T-Mobile site.This proposal is based on the drawings provided by Bay State Design rev 0 dated 08-25-06. General Conditions: $6,396 T-Mobile Equipment Room Build-Out: $13,881 HVAC: $10,467 Electric: $33,349 Antenna/Coax Install: $35,907 Total Price: $100,000 Very Truly Yours TIMBERLINE CONSTRUCTION CORP. Steven Bosworth Sr.Project Manager/Chief Estimator T-Mobile 1st Calvary Church Tentative Construction Schedule Timbeline Construction North Andover, MA Oct 8,'06 Oct 15,'06 Oct 22,'06 Oct 29,'06 1 Nov 5,'06 Nov 12,'0 ID Start S I M I T I W T F S S M I T W T F S S M T W T F S S M T W T F S S M T I W I T I F' J S I S I M I T- 2 Mon 10/9/06 ilize(Tentative) 1 Tue 10/10/06 Electrical 4 Tue'10/10106 Equipment Room Build-Out 5 Tue 10%24/06 Coaxial Cables wh y; 6 Mon 10/16!06 Remove Existing Steeple(Tentative) 7 Wed 10/18/06 Off-Site Stee le Work b others 3 Wed 11/8/06 Re-s teeple 8 Thu 11(9/06 Co ete Antenna/Coax Wor 9 Tue 11/14/06 Fin Task ' x. Milestone ♦ External Tasks 'i Project:estimated schedule Split Summa External Milestone ,rh Date:9115/06 Summary Progress Project Summary Deadline I\1> Page 1 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION NaRT" OE,t4ao °'�a is ,�•._ - '°°o�c 0 A 9 Permit NO: 1kr Date Received "�, •r Date Issued: wc►+ust�� IMPORTANT:Applicant must complete all items on this-page LOCATION yvS,AC�'L(�<,e� -) (,4enu . PROPERTY OWNER(_ CG{' Pj(, �- Print MAP NO.: PARCEL: ZONING DISTRICT: TYPE AND USE OF BUILDING HISTORIC DISTRICT YES 0 TYPE OF IMPROVEMENT PROPOSED USE Residential Non-Residential I-New Building C One family Addition L Two or more familyL..Industrial G Alteration No.of units: L Repair,replacement C Assessory Bldg ( Commercial C Demolition l C Moving relocation I OtherE Others: L.:..:Foundation only DESCRIPTION OF WORK TO BE PREFORMED Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: CONTRACTOR Name: 1tM�'1?•al,�l,lG ��t�1ZtiGnp,d Phone: (et-1 022- NOVO li Address: L3Z gAre-V- #J 'TD-bT4 A �t2- �{ 02t2Z Supervisor's Construction License: GS !77351$ Exp. Date:_ Home Improvement License: 1521 y' Exp. Date: ARCHITECT/ENGINEER Name: Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERA11T.•SIZ.00 PER S1000.00 OF THE TOTAL ESTI.11.1 TED COST BASED O:Y S125.00 PER S.F. Total Project Cost :S x12.00=FEF: S Check No.: Receipt No.: Page I,)F4 I Ot OR 1a A z ; RECEIVED .1* `F SOF i�.,�. . ss4CHUSEt Town of North Andover 2006 JUL 21 Ptd 5: 3 4 Planning Department 1600 Osgood Street,Bldg.20,Suite 2-36 ►G +* i' North Andover,Massachusetts 01845 N 0.R.I li A-."-D J',' Phone: 978-688-9535 Fax: 978-688-9542 MAS S h O'' w-' NOTICE OF DECISION This is to certify that twenty(20)days have elapsed from date of decision,filed Any appeal shall be filed without filing of an appeal. Date--g9'��T alJOly within(20)days after the Jaya*A,Bradshaw date of filing this Notice Town Clerk in the office of the Town Clerk. Date: July 21, 2006 Date of Bearing: May 30, 2006&June 20, 2006 Petition of: Omnipoint Communications, Inc. 50 Vision Blvd. East Providence,R-1. 02914 Premises Affected: First Calvary Baptist Church, 586 Massachusetts Avenue, W North Andover,MA 01845 Referring to the above petition with provision of M.G.L., Chapter 40A, Section I 1 & Section 8.3) 8.9& 10.3 of the zoning bylaw for a Site Plan Review Special Permit in ^J order to allow for a 3 panel antenna concealed within the existing church spire. A smait} `; section of each of the four sides of the spire will be replaced with fiberglass panels to allow for the transmission of the antennas. And that the three proposed equipment cabinets are to be located within the building on the ground level floor in a proposed equipment room within the R4 zoning district. J At a public hearing given on the above date, the Planning Board voted to APPROVE a -� Site Plan Review Special Permit with a unanimous vote of 5-0 based on the following conditions: Signed: cc: Applicant Lincoln Daley, Town anner Engineer Richard Nardella, Chair Abutters John Simons, Vice Chair Town Departments Richard Rowen, acting Clerk Alberto Angles Jack Green ,aTMT: 1� Prue Copy 'f own Clerlc r T-Mobile USA,Inc./Omnipoint Communications,Inco V 1 Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site flan Special Permit The Planning Board herein approves the Special Permit to install three (3) panel antennas concealed within the existing church spire and three (3) equipment cabinets located within the building in a proposed equipment room located on the ground level. The premise affected is located at 586 Massachusetts Avenue, Map 45B, Parcel 18 within the Residential 4 (R4) Zoning District. This Special Permit was requested by Omnipoint Communications, Inc., 50 Vision Boulevard, East Providence, RI 02914. This application and additional documentation as cited herein was filed with the Planning Board on April 14,2006 with subsequent submittals on file. The Planning Board makes the following findings as required by the North Andover Zoning Bylaw Section 8.9: FINDINGS OF FACT: 1. The specific site is an appropriate location for the project as it is being located within an existing building. 2. The use as developed will not adversely affect the neighborhood as indicated by the analysis conducted by Ian Hopkins, Radio Frequency Engineer, T-Mobile Wireless, 50 Vision Boulevard, East Providence, RI 02914. 3. The carrier has demonstrated that the facility is necessary in order to provide adequate service to theP ublic. 4. The plan meets the requirements of the Wireless Service Facilities By-law section 8.9. 5. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. The visual impacts of the project will be diminutive and reserves the character and P P J p act integrity of the existing building and neighborhood. Finally the Planning Board finds that this project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 8.9 but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the applicant provided the following conditions are met: SPECIAL CONDITIONS: 1) Discontinuance Abandonment a) At such time that a licensed carrier plans to abandon or discontinue o operation p f wireless e ss service equipment, such carrier will notify the Town by certified.US mail of the proposed date of abandonment or discontinuation of operations. Such notice shall be given no less than 30 days prior to abandonment or discontinuation of operations. In the event that a licensed carrier fails to give such notice, the wireless service equipment shall be considered abandoned upon discontinuation of operations. 2 T-Mobile USA,Inc./Omnipoint Communications,Inc. 1st Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site Plan Special Permit b) Upon abandonment or discontinuation of use, the carrier shall physically remove the wireless service equipment placed on the site by the carrier within 90 days from the date of abandonment or discontinuation of use. "Physically remove" shall include, but not be limited to: i) Removal of antennas, mount, equipment shelters and security barriers installed by the carrier (unless the same will continue to be used by the owner) from the subject property. ii) Proper disposal of the waste materials generated by the carrier from the site in accordance with local and state solid waste disposal regulations. c) As a condition of any special permit for the placement, construction or modification of wireless service equipment at the site, the carrier shall place into escrow a sum of money to cover the costs of removing the facility from the subject property. Said amount shall be certified by an engineer, architect or other qualified professional registered to practice in the Commonwealth of Massachusetts. Said funds shall be held by an Independent escrow agent to be appointed by the carrier and the SPGA. The carrier shall authorize and, as necessary, shall obtain the authorization of the owner of the property to allow the escrow agent to enter upon the subject property to remove the facility when the facility has been abandoned or discontinued. In the event the posted amount does not cover the cost of demolition and/or removal the Town may place a lien upon the property covering the difference in cost. i d) The equipment shall be deemed to be abandoned or discontinued if it has not been used for the purpose for which it was originally constructed for a period of six (6) months or more. Once abandonment or discontinuance has occurred, the carrier shall remove the equipment placed by the carrier from the subject property within ninety days. In the event that the carrier fails to remove the equipment, the town shall give notice to the carrier and the independent escrow agent that the equipment shall be removed by the escrow agent forthwith and the escrow agent, after affording written notice seven days in advance to the carrier, shall remove the facility. 2) Term of Special Permit. a) A Special Permit issued for any wireless service facility shall be valid for three (3) years. The special permit may be renewed under the same criteria as the original special permit, provided that the application for renewal of the special permit is made prior to the expiration date of the original or any renewed special permit. Additional measures governing the administration of the special permit are found in Section 10.3 of the Zoning Bylaw. b) After the equipment on the facility is in operation, the applicant shall submit to the 3 T-Mobile USA,IncJOmnipoint Communications,Inc. 1"Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site Plan Special Permit SPGA, within 90 days of beginning operations and at annual intervals from the date of issuance of the Special Permit, preexistent and current RFR measurements. Such measurements shall be signed and certified by an RF engineer, stating that RER measurements are accurate and are in compliance or why the measurements fail to comply with all applicable FCC Guidelines as specified in Section 89(4)(c)(1) RFR Filing Requirements of this Bylaw. The measurements shall be submitted for the equipment proposed on this facility. This condition shall be in effect until such time as an additional carrier proposes equipment on this facility. At that time, this obligation will fall upon the proponent of the additional equipment so as to obtain a better measure of the cumulative effect of the facility. c) The applicant and co-applicant or their successor in interest shall maintain the wireless service equipment in good condition. Such maintenance shall include, but shall not be limited to,painting, structural integrity of the equipment. 3. Prior to the endorsement of the plans by the Planning Board, the applicant must comply with the following conditions: a) The applicant shall provide a map indicating the intended locations for testing as required above. b) A bond in the amount of$1,000 shall be posted for the purpose of insuring that a final as- built plan showing the location of all on-site structures. The bond is also in place to insure that the site is constructed in accordance with the approved plan. This bond shall be in the form of a check made out to the Town of North Andover. This check will then be deposited into an interest bearing escrow account. 4. Prior to the start of construction: a) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the site. 5. Prior to FORM U verification (Building Permit Issuance): a) The final site plan mylars must be endorsed and three(3) copies of the signed plans must be delivered to the Planning Department. b) A certified copy of the recorded decision must be submitted to the Planning Department. c) The associated equipment (cooling unit) located outside the church building must be concealed with no less than 3 additional plantings and be maintained in perpetuity. The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Board discretion will be added at the project owner's expense. 4 T-Mobile USA,IncJOmnipoint Communications,Inc. 1"Calvary Baptist Church,586 Massachusetts Avenue Map 4511,Lot 18 Site Plan Special Permit d)The applicant shall adhere to the following requirements of the North Andover Fire Department and the North Andover Building Department: 1. All structures must contain a commercial fire sprinkler system. The plans and hydraulic calculations for each commercial system shall be submitted for review and approval by the North Andover Fire Department. Plans and hydraulic calculations for each commercial system must also be supplied to the Building Department. 6. Prior to verification of the Certificate of Use and Occupancy: a) The applicant must submit a letter from the architect or engineer of the project stating that the construction and operations substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. b) All lighting (if applicable) placed by the carrier on the subject property shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Planning Office must approve any changes to the approved lighting plan as submitted by the applicant. c) The commercial fire sprinkler systems must be installed in accordance with referenced standard NFPA 13D and in accordance with 780 CMR, Chapter 9 of the Massachusetts State Building Code. Certification that the systems have been installed properly in accordance with the above referenced regulations must be provided from both the North Andover Fire Department and the North Andover Building Department to the applicant. The applicant must then provide this certification to the North Andover Planning Department. 7. Prior to the final release of security: a) A final as-built plan showing final construction and location of the wireless hardware shall be submitted to and reviewed by the Planning Staff. 8. Any stockpiling of materials (dirt, wood, construction material, etc.)must be shown on a plan and reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times to minimize any dust problems that may occur with adjacent properties. Any stockpiles to remain for longer than one week must be fenced off and covered. 9. In an effort to reduce noise levels, the applicant shall keep in optimum working order, through regular maintenance, any and all equipment that shall emanate sounds from the structures or site. 5 T-Mobile USA,IncJOmnipoint Communications,Inc. I"Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site Plan Special Permit 10. No equipment or other equipment that will emanate noise-exceeding levels cited herein shall be placed on the exterior of the structure. Such equipment shall be enclosed as shown on the plans. 11. All site lighting shall provide security for the site and structures however it must not create any glare or project any light onto adjacent residential properties. 12. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 13. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 14. Any action by a Town Board, Commission, or Department that requires changes in the plan or design of the building as presented to the Planning Board, may be subject to modification by the Planning Board. 15. Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed substantial, the applicant must submit revised plans to the Planning Board for approval. 16. This Special Permit approval shall be deemed to have lapsed after two years from the date permit granted unless substantial use or construction has commenced. Substantial use or construction will be determined by a majority vote of the Planning Board. 17. The following waivers were granted in determining this decision: a) 8.9.5(iii) — Siting Filing Requirements. A one-inch-equals-40 feet plan prepared by a Registered Professional Engineer in the Commonwealth of Massachusetts showing the following: b) 8.9.5(iii)(3) - Tree cover on the subject property and all properties directly abutting the subject property,by dominant species and average height. c) 8.9.5(iii)(9) - Contours at each 2 feet AMSL for the subject property and adjacent properties within 300 feet. d) 8.9.5(iii)(12) - Lines representing the sight line showing viewpoint (point from which view is taken) and visible point (point being viewed) from 'Sight Lines" subsection below. e) 8.9.5(iv)(1) - Sight line representation. A sight line representation shall be drawn from any public road within 300 feet and the closest facade of each residential building (viewpoint) within 300 feet to the highest point (visible point) of the wireless service facility. Each sight line shall be depicted in profile, drawn at one-inch equals 40 feet scale. The profiles shall show all intervening trees and buildings. In theevent there is only one (or more) residential building within 300 feet there shall be at least two sight lines from the closest habitable structures or public roads,if any. f) 8.9.5(iv)(3) - Proposed (after condition) photographs. Each of the preexistent condition photographs shall have the proposed wireless service facility superimposed on it to show 6 T-Mobile USA,IncJOmnipoint Communications,Inc. V Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site Plan Special Permit what will be seen from public roads and residential buildings if the proposed wireless service facility is built. g) 8.9.5(iv)(4) - Siting elevations or views at-grade from the north, south, east and west for a 50-foot radius around the proposed wireless service facility plus from all preexistent public and private roads that serve the subject property. Elevations shall be at either one- quarter inch equals one foot or one-eight inch equals one-foot scale and show the following: h) 8.9.5(iv)(4)(d) - Preexistent trees and shrubs at current height and proposed trees and shrubs at proposed height at time of installation, with approximate elevations dimensioned. Ili i) 8.9.5(v)(3) - Colors of the proposed wireless service facility represented by a color board showing actual colors proposed. Colors shall be provided for the antenna mounts, equipment shelters, cables as well as cable runs, and security barrier, if any. j) 8.9.5(v)(5) - Appearance shown by at least two photographic superimpositions of the wireless service facility within the subject property. The photographic superimpositions shall be provided for the antennas, mounts, equipment shelters, cables as well as cable runs, and security barrier, if any, for the total height, width and breadth. k) 8.9.5(v)(7) - During the public hearing process the applicant shall schedule with the Planning Board a balloon or crane test at the proposed site, at the expense of the applicant,to illustrate the height of the proposed facility. 18. The following information shall be deemed part of the decision: Plan titled: I't Calvary Church 586 Massachusetts Avenue,North Andover,MA 01845 4BO-0020-A Antennas Inside Steeple With Indoor Equipment Prepared for: Omnipoint Communications, Inc. /T-Mobile USA, Inc. 50 Vision Boulevard East Providence, RI 02914 Prepared by: Bay State Designs Associates, Inc. 70 Tower Office Park Woburn, MA 01801 Dated: February 6, 2006 Sheets: TI,Z 1 and Z2 Report: Omnipoint Communications, Inc. Proposed Wireless Facility 586 Massachusetts Avenue,North Andover, MA First Calvary Baptist Church Application Package April 13, 2006 Prepared for: Omnipoint Communications, Inc. 7 T-Mobile USA,Inc./Omnipoint Communications,Inc. V Calvary Baptist Church,586 Massachusetts Avenue Map 45B,Lot 18 Site Plan Special Permit Prepared by: Omnipoint Communications, Inc. /T-Mobile USA, Inc. 50 Vision Boulevard East Providence, RI 02914 cc. Applicant Engineer DPW Building Department i i 8 I 'E'Z':-) E X. P"I 'K I i I� i q Essen North County Registry of Leeds 381 Common Street Lawrence, Massachusetts 01840 I - VIMMA B VA AWE 1.1"A. � 88/18/06 T Yui- 200a_0 . L { ..Total _.._9r 392.00 3434 - ,..aMO., 3:�92 _ti0 i..!: