Loading...
HomeMy WebLinkAboutBuilding Permit #970-15 - 60 COMPASS POINT ROAD 5/27/2015%AORT11 �3 Lr-- BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION 4t 0 Permit No#: Date Received ACHU Date Issued: IMPORTANT: Applicant must complete all items on this page LOCATION (OnfY��� PC) 10+ 610 011 PROPERTY OWNER Mf( -Q LJL�L— Print 100 Year Structure yes r�K MAP PARCEL: D(C� ZONING DISTRICT: Historic District yes 94 Machine Shop Village yes qpC TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential El New Building El One family El Addition WTwo or more f ily 0 Industrial El Alteration No. of units: q El Commercial El Repair, replacement El Assessory Bldg 0 Others: El Demolition E]Other- -'—ff��ic - DWe- 047106d ..611ain U Wetlands 0 W@te�rshecl, District , ewer Oter/S - 001 OWNER: Name: DESCRIPTION OF WORK TO BE PERFORMED: )r Print Clearly Address: (b LD)� �J -S,. (,�)-&&-kcsq iylLx. C-�ASaQ phnna. a-79-) 34SIO ARCH ITECT/ENGI NEER Phone:— Address: Ut\Oef Reg. No. 331 k b FEE SCHEDULE. BULDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COSTBASED ON $125.00 PER S.F. T71 01 S FEE:$ 00 Total Project Cost: $ 10 0 Check No.: Receipt No.: NOTE: Persons contracting kithjmregktered contractors do not have access to the guaraqfyfund Locationl� 0 eo,-A a& Jew No. Date Check 4t TOWN OF NORTH ANDOVER Certificate of Occupancy Building/Frame Permit Fee Foundation Permit Fee Other Permit Fee $ ---------------- TOTAL $ Building Inspector Plans Submitted Plans Waived Certified Plot Plan Stamped Plans F1 TYPE OF SEWERAGE DISPOSAL Public Sewer TanniugfMassage/Body A -it 0 SwiDlming POOIS 0 well Tobacco Sales 11 Food Packaging/Sales El Private (septic tank, etc. El Pennanent Dumpster on Site El THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature' COMMENTS CONSERVATION COMMENTS HEALTH COMMENTS Reviewed /�) — t �--( �� r �rj Sianature Reviewed on Siqnature Zoning Board of Appeals. Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Copservation Decision: Comm�n Water & Sewer Con nection/signature & Dat Drivewav Permit -DP-W.-Town Engineer: SiLynature: Located �84 Osdbod Street j�A e . IR, F , 1 PPIR: FIRE-fff R,!Tk—q— M E 4" (1 00 it M M E! Dimension Number of Stories: 3 _. Total square feet of floor area, based on Exterior dimensions. -C-)- 17S Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — (For department use) 0 Noti fied for pickup Call —Email Date Time Contact Name Doc.Building Pennit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits 4. Building Permit Application 4, Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses 4. Copy Of Contract Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (if Applicable) 4. Mass check Energy Compliance Report (if Applicable) Engineering Affidavits for Engineered products TE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (if Applicable) Copy of Contract 2012 IECC Energy code Engineering Affidavits for Engineered products IOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe: Building Permit Revised 2014 41 AC CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 970-2015 on 5/27/2015 Date: November 2, 2016 THIS CERTIFIES THAT THE BUILDING LOCATED at 60 Compass Point — Building G MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Berry Co. LLC 51 Mt. Joy Drive Tewksbury, MA 01560 IN 4 11, VT - Building Inspector Fee: PrePaid $100.00 Receipt: 28838 Check: 7876 45 CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 970-2015 on 5/27/2015 Date: November 2, 2016 THIS CERTIFIES THAT THE BUILDING LOCATED at 60 Compass Point — Building G MAY BE OCCUPIED AS a single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Berry Co. LLC 51 Mt. Joy Drive Tewksbury, MA 01560 ZIF- Building Inspector Fee: PrePaid $100.00 Receipt: 28838 Check: 7876 OIZ 0 0 -0 -*L =r --I 0 " 0 2) 0 = 0 cr cn Wo r- (n =:5. CD 70 Fn > CD CL 0 CD 0 —1 . m 0 m 5 CL 0 a cn --I M o E =--o 0 U) 03 -- T. =5 -h r -IL CD 0 0 0 CL m CD (j) CD U) 0 N ID CD 0 -N > (n CD 0 CL cm 0 0 103 CD CD In, CD CL .3, 0 to cc 5)- 0 (D 0 cc CD o 0 cr -I. = a 0 U) < CL 0 ra 0 0 CL U) < (ID CD Cl) U) CD C<D CL U) CD CD FL - CD p- 44 aq W- -n x 5 . 0 fu r_ an -n 5' RL n �;o -n 0 2� 0.%, C: 3 0- zr z n CD C 0) -71 m m CD CBO)%%L 3 0 0 0 > CD CD C.) w co 2 G) CL C: Ln m GI z (A M 0 m Zk 0 U F M rn 0 r) zi, m 0 > 0 0 CD 0 z U) V. -Il. CD 0-0 Z z CL C—), r� r- m a) r- m = o C/) CL r- cn — > (J) 0 --I 0 m 0 z x 0 Cl) 0 0 CD CD 0 m CL U) Cr Z CD CD 0 Z'm CD 0 E3 a CD Z z CD S" 0 = co Cl) CM CD 0 U) _0 z CD 0 0 r -IOL 0 X c): CD cn: 0 < m 0 CD --I: 0. 0 0 -0 -*L =r --I 0 " 0 2) 0 = 0 cr cn Wo r- (n =:5. CD 70 Fn > CD CL 0 CD 0 —1 . m 0 m 5 CL 0 a cn --I M o E =--o 0 U) 03 -- T. =5 -h r -IL CD 0 0 0 CL m CD (j) CD U) 0 N ID CD 0 -N > (n CD 0 CL cm 0 0 103 CD CD In, CD CL .3, 0 to cc 5)- 0 (D 0 cc CD o 0 cr -I. = a 0 U) < CL 0 ra 0 0 CL U) < (ID CD Cl) U) CD C<D CL U) CD CD FL - CD p- 44 0 rD rD aq Cl -n x 5 . 0 fu r_ an -n 5' RL n �;o -n 0 2� 0.%, C: 3 0- zr z n CD C 0) -71 m m CD CBO)%%L 3 0 0 0 > CD CD C.) w co 2 G) CL > 0 rD rD aq :�o 0 C O*Q -n x 5 . 0 fu r_ an -n 5' RL n �;o -n 0 2� 0.%, C: 3 0- V) -n (D 0 �o 0 0- z n m m I—D 3 m m 2 G) V- > Ln m GI z (A M 0 m Zk 0 U F M rn 0 r) zi, m 0 > I 0 4' 6N( APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION ATIED BUIELDING PERMIT # Cl' CHUS,- ADDRESS/LOCATION OF PROPERTY: Map_AQ_�o Parcel 0 63 —Lot Number- SU13DIVISION:-,Me,(r"tfnc,,t-V- Uz)nao DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: FIVE(5) DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN -OFFS MUST BE COMPLETED WITHIN TIRS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00) WILL BE CHARGED IF THE -STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: -1—rusA &S�f u(±j fj Address: V -S �vf 4 VO 7) 1 I - ROUTING TOWNENGINEER, SITE PLAN - DRIVE -WAY REVIEW CONSERVATION PLANNING F] 11111ko DPW-WATERMETER SEWER CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW SIGNATURE File: Application for OC fonn revised Jan 2007/2011 CLEAResult 50 Washington Street Westborough, MA 01581 IECC 2009 & IECC 2012 Duct Tightness Verification Fail Date: January 1 1th 2016 Permit No.: Street Address: 60 Compass Point North Andover, MA 01845 Total conditioned floor area: 2,400 SqFt Source of Area Calculation: Builder HERS Rater: Nicholas Abreu Certification Number: 8368122 Signature: Client: Tim Barlow 2009 IECC - New Construction Post -construction test El Total Leakage — 12 cfm/100 ft' maximum allowed Leakage to outdoors — 8 CfM/100 ft2 maximum allowed Testing result: CfM/100 ft2 Rough -in test Total leakage Air Handler Installed? El Yes -6 CfM/100 ft2 maximum allowed M No -4 CfM/100 ft2 maximum allowed Testing result: CfM/100 ft2 2012 IIECC - New Construction Post -construction test 0 Total Leakage — 4 CfM/100 ft2 maximum allowed Testing result: CfM/100 ft2 Rough -in test - Total leakage Air Handler Installed? X Yes -4 CfM/100 ft2 maximum allowed El No -3 CfM/100 ft2 maximum allowed Testing result: 2.83 CfM/100 ft2 Results apply to the system as tested on the date above. Compliance is void if any changes are made to the duct system. 50 Washington Street, Suite 3000 Westborough, MA 01581 IECC 2012 402.4.2.1 Testing option Blower Door Testing Date of test: November 1, 2016 G / Fail Street Address: 60 Compass Point North Andover, MA 01845 Total conditioned floor area: 2,400 Square Feet Total conditioned volume: 21,074 Cubic Feet Source of area and volume calculations: Builder Rater —X Other HERS Rater: Nicholas Abreu Certification Number: 8368122 Signature: Builder: TB Building Builder Contact: Tim Barlow Tested Air Leakage Requirement: 3 Air Changes per hour at 50 pascals (ACH50) or less Measurement: ACH50: 2.98 CLEAResult @ 2015 Project Title: Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 MERRIMACK TOWNHOMES Date: 10/08/16 Permit No. 805-15 Property Address: G1 - 60 COMPASS PONT, NORTH ANDOVER, MA Project: Check one or both as applicable: X1 New construction 0 Existing Construction Project description: Wood framed, fire sprinkled, three story town homes in a TOW Of four in the building named "G" with u/g gas, electric, water and sewer services. I KANAYO LALA MA Registration Number: 33710-C Expiration date: JUNE 30, 18 am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural [ ] Mechanical FireProtection Electrical [X] Other: ALL DESCIPLINES for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: I . Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibilitv regarding the provisions of 780 CMR 107. Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 978-337-5252 Email: kanayolala@gmail.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06112013 CONSTRUCTION CONTRACTOR REPORT MASSACHUSETTS BUILDING CODE SECTION REPORT NO: Eighteen Bldg.G - #805-15 TO: Building Commissioner- Permit Nun-ber Bldg.H - #506-15 400 Osgood Street, N Andover, MA Bldg. I - #505-15 Bldg. J - #072-2016 Merrimack Condominiums PROJECT NAME OR NUMBER: ,604,62, 64, & 66 Compass Point, Units GI, G2, G3, & G4 STREET ADDRESS: 52 & 50 Compass Point, Units HI & H2 48 & 46 Compass Point, Units 11 & 12 TOWN/CITY: North Andover MA WORK: GENERAL CONTRACTOR: TRUST CONSTRUCTION CORPORATION CONSTRUCTION SUPERINTENDENT: Timothy Barlow LICENSE 4 CS 059359 UP DATE PREVIOUS IS S DATES COVERED: CONDITIONS April 178 2015 through July 23, 2015 Partial Sunny Spring Day - 64F Buiding "D" is 70% complete. COMMENTS: Installation of electric & plumbing rough -ins are in progress in Building "H" & ?fill WORKIN PROGRESS -Puilding "I" - framing is 90% complete. Building "H" - framing is 90% complete. Building "G" - framing is 60% complete. In Reneral low soffit in izarage should be limited to 2' width off walls. SITE VISITS: Inspected on July 23 for the excavation for "J" & progressing work in D, G, H & 1. RELATED ISSUES: ACTION REQUIRED: ADDITIONS TO FILED PLANS: STATUS OF COMPLETION: % 48% of the all 15 buildings REPORTING ARCHITECT: Kanayo Lala IN COMPLIANCE WITFI MASSACHUSETTS STATE BUILDING CODE, SECTION 107.6.4 CONSTRUCTION CONTROL AND APPROVED PLANS Kanayo Lala ULY 23, 2015 ARCHITECT OF RECORD: .0FP-- , w __PA7E: J Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost $ 271,875.00 m $ - $ 3,262.50 Plumbing Fee $ 407.81 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 407.81 Total fees collected $ 4,178.13 60 Compass Point 970-15 on 5/27/15 New Townhome :5 oo-q 0 o 0 = 0 r r -ft o C,% < U) = M. CD CD CL 0 CD ;;o a CD 0 -n C) z 0) 0 :u m 0 0 CL ::h 03 CL CD a- ID Cn 0 N P CD o CD 0 to to 1, 0 0 0 r CWD (CD (D 0 CD 0 rD 0 CM to c CD 0 U) 0 -h C: co S. W= z 2) o Cr 0 CD 0 < 0 o 0 CL 20 U) 0 0 U) rqL CD < : : -1 6- 2: CD CD 0 *< CD rL. Q) -o CD Z: 3 0 :3 CL r- o- r� 0 Irl m 2) 2) It m 0 = (D CD Cl) r cn CD ul%4� :r 0 =0 cn 0 .L > O.m 0 < -< x z 0 CD 0 -Z z 0 - :r C<D o m CL m Cl) cr 0 Z CD r- m Z5 (1) 0 w 3 ou CD a 0 CD M Z z o c CL CD 03 0 a' 0 = U) > cn CO 41D CO) _0 M iq CD 0 (A 0 0 CD m 2 Z cn: 0 M: m 0 0 LA :5 oo-q P o 0 = 0 r r -ft W r- > < U) = M. CD CD CL 0 CD ;;o a CD 0 -n C) z 0) 0 :u m 0 0 CL ::h 03 CL CD a- ID Cn 0 N P CD o CD 0 to to 1, 0 0 0 r CWD (CD (D 0 CD 0 rD 0 CM to c CD 0 U) 0 -h C: co S. W= z 2) o Cr 0 U) 0 < 0 o 0 CL 20 U) (D C<D U) 0 U) rqL CD < : : -1 6- 2: CD CD a *< CD rL. Q) -o CD 3 0 :3 U) -IL o- 0 to rD 0 (D CD :3 (D 0- cn CD ul%4� :r 0 =0 MU 0 m m cn m Of 0 Ln P =r CD W w -n Ln ;;o -n 0 0) :u m U) CL p- 41 C "(m 4 OI)V&% l b 0 -4 ir Ln Ln co -n W -n Ln ;;o -n :;o :u m U) 3 -- Ej . 0 0 0 0 0 (D 0 0 rD = 2L c 2L C: E- 2L 0 77 (D (D aq 3 :3 o- rD rD :3 (D 0- Ln 0 < -< ID 0 0 - :r m M (D rD r- m r- w 3 M c c 03 0 m > 2 (A m 2 z LA 0 z m Ln M M m m 0 m m m > z r) 0 0 0 0 0 H .1 4c Wa 0 ,qm low-, 7�4 0 c3l a 0 11N� c33o c34 c3b 0 C37 C.50 c c36 9' * 12( 110' 48 2' —69 CERTIFIED PLOT PLAN PC: GTHM UN WrOM mmwim um mm Emom cam am m= am m ff"mul 0 : 7ZW ---� C40�v �o C4 0. 1 11 VIMA'm ANY REQUOMMOM ROGAR= SYRUCYURE M PR34MTY LDE VWNWAFFUWXr' OFFMI CK Hucxn: FMXMM Tm mm is NOT TD K U= To ERM I f0cm GNER AmcnLARY [Mal STRLCYUZM M FMR LANDSCAPTNG LDam m ouxt im vcm TCMKCRRF. w on TM =TW=T=4 N ka*-TR0GFZRRAKL AND IS MrM KVX VM THE PROVIMN YNAT THE DFMMTIM MW NO ZM4 AWMTELY FURMED VY AM= K" & Lar 4h THE VWWM YU TKM f= IOM -63 oor FOUNDATION.AS-BUILT.BUILDING.#G* ANam MERRIMAC CONDOMINIUMS ROUTE 114.. NORTH ANDOVER, MASS, Wr t. I- PROJECT NO; NAND13 SCALE�i 1*=4(r DRAWN BY, PCG DATEl 5/1/15 A CHECKED BY, SC SHTo I L- REVISED, 1 rlFs I REScheck Software Version 4.6.1 Compliance Certificate Project 150527—Trust—Merrimac_BldgG_UnitGl—ModelB Energy Code: 2012 IECC Location: North Andover, Massachusetts Construction Type: Multi -family Project Type: New Construction Conditioned Floor Area: 2,326 ft2 Glazing Area 12% Climate Zone: 5 (6322 HDD) Permit Date: 0.0 Permit Number: 40 Construction Site: Owner/Agent: Designer/Contractor: Bldg G, Unit Gl North Andover, MA Compliance: 0.0% Better Than Code Maximum UA: 327 Your UA: 327 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home. Envelope Assemblies Floor Ist Floor: All -Wood J oi stfrruss: Over Unconditioned Space 416 30.0 0.0 0.033 14 Wall Ist Separation: Wood Frame, 16" o.c. 96 15.0 0.0 0.077 7 Wall lst Ext 2x6: Wood Frame, 16" o.c. 812 21.0 0.0 0.057 40 Window Dh: Vinyl Frame:Double Pane with Low -E 32 0.290 9 Door Front Ground Fir entry: Glass 20 0.260 5 Door Back: Glass 34 0.290 10 Door Metal: Solid 18 0.160 3 Floor 2nd Over garage/entry: All -Wood J oist/Truss: Over Unconditioned Space 481 30.0 0.0 0.033 16 Floor 2nd Over entry: All -Wood JoistfTruss: Over Outside Air 39 30.0 0.0 0.033 1 Wall 2nd Floor 2x6: Wood Frame, 16" o.c. 855 21.0 0.0 0.057 39 Window DH: Vinyl Frame:Double Pane with Low -E 100 0.290 29 Window Fix: Vinyl Frame:Double Pane with Low -E 19 0.280 5 Window CSMT: Vinyl Frame:Double Pane with Low -E 12 0.260 3 Door Slider: Glass 34 0.290 10 Wall 2nd Fir Separation: Wood Frame, 16" o.c. 279 15.0 0.0 0.077 21 Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0 Wall 3rd Floor: Wood Frame, 16" D.C. 749 21.0 0.0 0.057 36 Window DH: Vinyl Frame:Double Pane with Low -E 86 0.290 25 Project Title: 150527—Trust—Merrimac—BldgG_UnitGl—modelB Report date: 05/27/15 Data filenanne: S:\Ebbeling_Ed\150507 Trust—MerrimacCondos—BidgG_UnitsBB- Pagel of 9 BB—NAndoverNRescheck\150527—Trust—Merrimac—BidgG_UnitGl_ModelB.rck I Window Awn: Vinyl Frame:Double Pane with Low -E 7 0.270 2 DoorFrench: Glass 18 0.260 5 Wall 3rd Separation: Wood Frame, 16" o.c. 243 15.0 0.0 0.077 19 Ceiling Main: Flat Ceiling or Scissor Truss 936 38.0 0.0 0.030 28 Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name - Project Notes: Building G Signature Date Project Title: 150527 — Trust — Merrimac — BldgG_UnitG1 — ModelB Report date: 05/27/15 Data filename: S:\Ebbeling Ed\150507—Trust MerrimacCondos BIdgGLUnitsBB- Page 2 of 9 BB—NAndover\Rescheck\l�-0527—Trust—Merri—mac—BidgG_UnitG!_ModelB.rck RESc eck Software Version 4.6.1 Inspection Checklist C�J( Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plans Verified Pre-inspection/Plan Review Value Field Verified Value Complies? Comments/Assumptions & Req.113 103.1, ;Construction drawings and OComplies 103.2 'documentation demonstrate IODoes Not [PR111 energy code compliance for the EJNot Observable :building envelope. :E]Not Applicable 103.1, ;,Construction drawings and ElComplies 103.2, clocumentation demonstrate ElDoes Not 403.7 (PR311 :.energy code compliance for Jighting and mechanical systems. EINot Observable :Systems serving multiple ONot Applicable dwelling units must demonstrate compliance with the IECC !Commercial Provisions. 302.1, Heating and cooling equipment is , Heating: Heating: ZIComplies 403.6 sized per ACCA Manual S based Btu/hr Btu/hr UlDoes Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: bNot Observable Q) Manual J or other methods Btu/hr :approved by the code official. Btu/hr T]Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) - 13 1 Low lmpa-c-t-(7T-ie-r-3--)--] Project Title: 150527 - Trust-Merrimac-BldgG-UnitGl-Mode[B Report date: 05/27/15 Data filename: S:\Ebbeling_Ed\150507-Trust-MerrimacCondos-BidgG_UnitsBB- Page 3 of 9 BB-NAndover\Rescheck\150527-Trust-Merrimac-BldgG_UnitGl-ModelB.rck 2012 IECCI Foundation Inspection I Complies? Comments/Assumptions 303.2.1 A protective covering is installed to ;Ekomplies [FO1112 protect exposed exterior insulation UDoes Not ;and extends a minimum of 6 in. below : 14 grade. UNot Observable: UNot Applicable 403.8 �Snow- and ice -melting system controls; E]Com plies [FO12]2 installed. E]Does Not �,[:]Not Observable: TINot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impa Project Title: 150527 — Trust J Merrimac — BldgGLUnitG1 — ModelB Report date: 05/27/15 Data filename: S:\Ebbeling Ed\150507—Trust MerrimacConclos BldgGLUnitsBB- Page 4 of 9 BB—NAndover\Rescheck\l��-0527—Trust—Merri—mac—BldgG_UnitG!_ModelB.rck Section i # Framing / Rough -I Plans Verified Value Field Verified Value Complies? Comments/Assumptions Req.11) J'02.1.1, ;Door U -factor. U_ U_ LIComplies :See the Envelope Assemblies 402.3.4 Z]Does Not table for values. (FR111 :E]Not Observable ;,E]Not Applicable 402.1.1, :Glazing U -factor (area -weighted U- U_ E]Complies See the Envelope Assemblies 402.3.1, ;average). :E]Does Not table for values. 402.3.3, 402.3.6, 1 :E]Not Observable 402.5 TINot Applicable [FR211 303.1.3 :U -factors of fenestration products ElComplies [FR4]1 :are determined in acc '!E]Does Not 0 ;with the NFRC test procedure i or E]Not Observable Uken from the default table. EINot Applicable 402.4.1.1 Air barrier and thermal bar�ier Elcomplies (FR23]1 :installed per manufact ElDoes Not instructions. �E]Not Observable EINot Applicable 402.4.3 :,Fenestration that is not site built ElComplies [FR2011 is listed and labeled as meeting AAMA /WDMA/CSA 101/i.S.2/A440 ElDoes Not jor has infiltration rates per NFRC EINot Observable 400 that do not exceed code ONot Applicable �Iimits. 402.4.4 k -rated recessed lighting fixtures! �Ilcomplies [FR16]2 � sealed at housing/interior finish PDoes Not 9 :and labeled to indicate -s2.0 cfm leakage at 75 Pa. �E]Not Observable EINot Applicable 403.2.1 Supply ducts in attics are R- R_ TIComplies [FR1211 insulated to �t[1-8. All other ducts R- R- :E]Does Not 0 in unconditioned spaces or :E]Not Observable ;outside the building envelope are: :E]Not :insulated to a:11-6. Applicable 403.2.2 !All joints and seams of air ducts �E]Complies [FR1311 air handlers, and filter boxes ar� I ElDoes Not :sealed. tlNot Observable EINot Applicable 403.2.3 ;Building cavities are not used as IlComplies [FR15]3 :ducts or plenums. ElDoes Not E]Not Observable EINot Applicable 403.3 MVAC piping conveying fluids R-_ R- ;DComplies [FR17]2 I above 105 QF or chilled fluids ;DDoes Not ;below 55 QF are insulate d to a -R - ;E]Not Observable :3. ;E]Not Applicable 403.3.1 :Protection of insulation on HVAC 'ElComplies [FR2411 piping. j'E]Does Not �E]Not Observable �'E]Not Applicable 403.4.2 Mot water pipes are insulated to R- R- :E]Complies [FR18]2 :2:11-3. E]Does Not �E]Not Observable �E]Not Applicable 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: 150527—Trust—Merrimac — BldgGLUnitG1_Modell3 Report date: 05/27/15 Data filenarne: S:\Ebbeling_Ed\150507—Trust — MerrirnacCondos_BldgGLUnitsBB- Page 5 of 9 BB—NAndover\Rescheck\150527—Trust—Merrimac—BldgG_UnitGI—ModelB.rck Framing / Rough -In Inspection Plans Verified Field Verified Complies? Comments/Assumptions I I I Value Value & Rea.11) 403.5 Automatic or gravity dampers are [FR19]2 installed on all outdoor air ,intakes and exhausts. Additional Comments/Assumptions: E]Does Not E]Not Observable E]Not Applicable 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) 1 Project Title: 150527—Trust—Merrimac_BldgG—UnitG.1—ModelB Report date: 05/27/15 Data filenarne: S:\Ebbeling_Ed\150507—Trust — MerrimacCondos BldgG_UnitsBB- Page 6 of 9 BB NAndover\Rescheck\15 05 27—Trust—Merri mac—Bld gG_U n itG !_Model B. rck Section Insulation Inspection � Plans Verified Value Field Verified Value I Complies? Comments/Assumptions & Req.ID 303.1 �All installed insulation is labeled ElComplies (IN13]2 or the installed R -values DDoes Not provided. 'UNot Observable EINot Applicable 402.1.1, Floor insulation R -value. R- R-- ;E]Complies ;See the Envelope Assemblies 402.2.6 E] Wood Wood UDoes Not : table for values. [IN111 E] Steel E] Steel :E]Not Observable 0 UNot Applicable 303.2, ;Floor insulation installed per 'ElComplies 402.2.7 :manufacturer's instructions, and ElDoes Not [IN211 � in substantial contact with the !underside of the subfloor. E]Not Observable 'E]Not Applicable 402.1.1, Vall insulation R -value. If this is a;, R-- R- �E]Complies 1 See the Envelope Assemblies 402.2.5, :mass wall with at least 1/2of the 0 Wood E] Wood UDoes Not table for values. 402.2.6 [IN311 :wall insulation on the wall :exterior, the exterior insulation E] mass 0 mass ;E]Not Observable :requirement applies (FRIO). E] Steel F] Steel :E]Not Applicable 303.2 Wall insulation is installed per �OComplies [IN411 manufacturer's instructions. E]Does Not EINot Observable ONot Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 L o w I m p a c:t::(:T:-:ie: :r =3) Project Title: 150527 — Trust — Merrimac — BldgG_UnitGI — ModelB Report date: 05/27/15 Data filename: S:\Ebbeling Ed\150507 Trust MerrimacCondos—BidgGLUnitsBB- Page 7 of 9 BB—NAndover\Rescheck\l�-0527—Trust—Merti—mac—BidgG_UnitGl_ModelB.rck section # Final Inspection Provisions Plans Verified Value T Field Verified Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R -value. R- R- ElComplies :See the Envelope Assemblies 402.2.1, E] Wood Wood ODoes Not table for values. 402.2.2, 402.2.6 Steel E] Steel :E]Not Observable [F1111 UNot Applicable 303.1.1.1, ;Ceiling insulation installed per 11" �Elcomplie s 303.2 manufacturer's instructions. ElDoes Not (F1211 :Blown insulation marked every 300 fl:2. �[]Not Observable j0Not Applicable 402.2.3 Nented attics with air permeable !E]Complies [F122 ]2 insulation include baffle adjacent ElDoes Not to soffit and eave vents that over insulation. C]Not Observable -extends 1EINot Applicable 402.2.4 :Attic access hatch and door , R-_ R- ;E]Complies [F1311 "insulation �tR-value of the ElDoes Not :adjacent assembly. :E]Not Observable �E]Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 ACH 50 '.ElComplies [FI17]1 ach in Climate Zones 1-2, and UDoes Not <=3 ach in Climate Zones 3-8. :E]Not Observable 'E]Not Applicable 403.2.2 Duct tightness test result of <=4 cfm/100 cfm/100-E]Complies [F1411 cfm/100 fl:2 across the system or ft2 ft2 UDoes Not <=3 cfm/100 fl:2 without air handier @ 25 Pa. For rough -in 1EINot Observable ;tests, verification may need to 1ONot Applicable occur during Framing Inspection. 403.2.2.1 Air handier leakage designated !E]Complies [F124]1 by manufacturer at <=2% of ElDoes Not :design air flow. 1E]Not Observable i tlNot Applicable i 403.1.1 Programmable thermostats flComplies [FI9]2 installed on forced air furnaces. ElDoes Not 10) UNot Observable EINot Applicable 403.1.2 'Heat pump thermostat installed ElComplies l F 10]2 on heat pumps. ElDoes Not EJNot Observable I E]Not Applicable 403.4.1 Circulating service hot water ElComplies [F111]2 systems have automatic or ;E]Does Not accessible manual controls. E]Not Observable IE]Not Applicable 403.5.1 All mechanical ventilation system �,E]Complies (F125]2 Jans not part of tested and listed IE]Does Not HVAC equipment meet efficacy ONot Observable and air flow limits. E]Not Applicable 404.1 75% of lamps in permanent ElComplies [9611 fixtures or 75% of permanent E]Does Not I fixtures have high efficacy lamps. I Does not apply to low -voltage i 'lighting. E]Not Observable "EINot Applicable 111 High Impact. (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) 1 Project Title: 150527 — Trust — Merrimac — BldgG — UnitG1 — ModelB Report date: 05/27/15 Data filename: S:\Ebbeling Ed\150507—Trust MerrimacCondos—BldgG_UnitsBB- Page 8 of 9 BB—NAndover\Rescheck\l�;-0527—Trust—Merri—mac—BidgG�_UnitGl—ModelB.rck Section # Final Inspection Provisions Plans Verified Value Field Verified Value Complies? Comments/Assumptions & Req.ID 404.1.1 Fuel gas lighting systems have ElComplies fF123]3 no continuous pilot light. E]Does Not tlNot Observable "E]Not Applicable 401.3 Compliance certificate posted. ElComplies (F17]2 UDoes Not i[]Not Observable 1E]Not Applicable 303.3 Manufacturer manuals for ElComplies [FI18]3 mechanical and water heating E]Does Not :systems have been provided. �E]Not Observable EINot Applicable Additional Comments/Assumptions: I I I High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 3 1 Low lmpaict �(Tier 3�) Project Title: 150527 — Trust — Merrimac — BldgG_UnitGl — ModelB Report date: 05/27/15 Data filename: S:\Ebbeling—Ed\150507—Trust—MerrimacCondos—BldgGLUnitsBB- Page 9 of 9 BB—NAndover\Rescheck\150527 Trust—Merrimac—BidgG_UnitGl—ModelB.rck 0 2012 �ECC Energy Efficiency Certificate Above -Grade Wall 21.00 Below -Grade Wall 0.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.29 Heating System: Cooling System: Water Heater: Name: Date: Comments Kanayo Lala, P.E . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERS/JOISTS /RAFTERS Third Floor Beam T1 Supporting Floor, Wall, Attic & Point Load From T5 LOADS: DEAD LOAD 22.54 PSF 323.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 429.90 PLF qs= 29.10 Cd= 1 TOTALLOAD 753 PLF I= 1 Cm=1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 3510 LBS 3.25 FT Ra= 2925 LBS 7341 LB =TOTAL REACTION TRIBUTARY WIDTH 14.33 LF E= 2000000 PSI JOIST/GIRDER SPAN 19.5 LF Fb= 2900 PSI WIDTH- IN 10.50 PSULVL 11.875 IN = d Fv= 285 PSI ROOF PITCH - N:12 Fc= 2700 PSI Fcp= 750 PSI MOMENT= 35786 LB -FT MOMENT2= 9506 LB -FT 246.78 =S provided OK S= 187.42 IN A 3 1465.24 = I Deflection 0.836 IN = U 240 For Total Load Required U240 Deflection2 0.139 IN = U 421 For Live Load Required U360 Fcp'= 652 PSI OK 1.50 In Bearing Length Fv'= 123 PSI OK USE BETTER HEADER#65 (FLITCH BEAM) 2-LVLs 11 7/8" WITH 1/2"STEEL PLATE BOLTED WITH 5/8"DIA@12"O.C. IN TWO ROWS. OF KANAYO H. LALA RL -�7 - ------- - Kanayo Lala, P.E . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERS/JOISTS /RAFTERS -Third Floor Beam T2 Supporting Floor, Wall & Attic LOADS: DEAD LOAD 22.54 PSF 322.95 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 429.90 PLF qs= 29.10 Cd= 1 TOTALLOAD 753 PLF I= 1 Crn=1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD LBS FT Ra= 0 LBS 6211 LB =TOTAL REACTION TRIBUTARY WIDTH 14.33 LF E= 2000000 PSI JOIST/GIRDER SPAN 16.5 LF Fb= 2900 PSI WIDTH- IN 7.00 PSULVL 11.875 IN = d Fv= 285 PSI ROOF PITCH - N:12 Fc= 2700 PSI Fcp= 750 PSI MOMENT= 25620 LB -FT MOMENT2= 0 LB -FT 164.52 =S provided OK S= 106.02 IN A 3 976.83 = I Deflection 0.643 IN = L/ 308 For Total Load Required L/240 Deflection2 0.000 IN = U 540 For Live Load Required U360 Fcp'= 592 PSI OK 1.50 In Bearing Length Fv'= 112 PSI OK MNAYO H. L&A N0.33710 -C Kanayo Lala, RE . ............. 03/03/2014 PROJECT: Merrimack Condominiums. G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERSMOISTS /RAFTERS Third Floor Beam T3 Supporting Floor & Point Load From TI& T2 LOADS: DEAD LOAD 20.00 PSF 360.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 540.00 PLF qs= 29.10 Cd= 1 TOTALLOAD 900 PLF I= 1 Crn=1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 16477 LBS 3.25 FT Ra= 13327 LBS 7650 LB =TOTAL REACTION TRIBUTARY WIDTH 18.00 LF E= 2000000 PSI JOIST/GIRDER SPAN 17 LF Fb= 2900 PSI WIDTH- IN 14.00 PSULVL 11.875 IN = d Fv= 285 PSI ROOF PITCH - N:12 Fc= 2700 PSI Fcp= 750 PSI MOMENT= 32513 LB -FT MOMENT2= 43313 LB -FT 329.04 =S provided OK S= 313.76 IN A 3 1953.65 = I Deflection 0.433 IN = U 252 For Total Load Required U240 Deflection2 0.378 IN = U 419 For Live Load Required U360 Fcp'= 499 PSI OK 3.00 In Bearing Length Fv'= 189 PSI OK USE BETTER HEADER#84 (FLITCH BEAM) 3-LVLs 11 7/8" WITH 2-3/8"STEEL PLATE BOLTED WITH 5/8" DIA @ 112"O.C. IN TWO ROWS. USE 2-LVLs 11 7/8" FOR BEAM T4. Kanayo Lala, RE . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERS/JOISTS /RAFTERS Third Floor Beam T3 -STEEL Supporting Floor & Point Load From T1& T2 LOADS: DEAD LOAD 20.00 PSF 360.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 540.00 PLF qs= 29.10 Cd= 1 TOTALLOAD 900 PLF I= 1 Cm=1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 16477 LBS 3.25 FT Ra= 13327 LBS 7650 LB =TOTAL REACTION TRIBUTARY WIDTH 18.00 LF E= 29000000 PSI JOIST/GIRDER SPAN 17 LF Fb= 24000 PSI WIDTH- IN 6.50 36KSI W12X30 12.34 IN = d Fv= 16200 PSI ROOF PITCH - N:12 Fc= 24000 PSI Fcp= 405 PSI MOMENT= 32513 LB -FT MOMENT2= 43313 LB -FT 38.60 =S provided OK S= 37.91 IN A 3 210.00 =I Deflection 0.278 IN = U 392 For Total Load Required U240 Deflection2 0.242 IN = L/ 654 For Live Load Required U360 Fcp'= 359 PSI OK 9.00 In Bearing Length Fv'= 10,200 PSI OK W I 2X30, DEPTH= 12.34" AND FLANGE WIDTH=6.5 L USE 2-LVLs 11 7/8" FOR BEAM T4. : U 3710 N Kanayo Lala, RE . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERSMOISTS /RAFTERS Third Floor Beam T5 Suwortina Floor & Wall LOADS: DEAD LOAD 24.00 PSF 240.00 PLIF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 300.00 PLF qs= 29.10 Cd= 1 TOTALLOAD 540 PLF I= 1 Crn=1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD LBS FT Ra= 0 LBS 3510 LB =TOTAL REACTION TRIBUTARY WIDTH 10.00 LF E= 2000000 PSI JOIST/GIRDER SPAN 13 LF Fb= 2900 PSI WIDTH- IN 3.50 PSULVIL 11.875 IN = d Fv= 285 PSI ROOF PITCH - N:12 Fc= 2700 PSI Fcp= 750 PSI MOMENT= 11408 LB -FT MOMENT2= 0 LB -FT 82.26 =S provided OK S= 47.20 IN A 3 488.41 =I Deflection 0.355 IN = U 439 For Total Load Required L/240 Deflection2 0.000 IN = U 790 For Live Load Required 1-1360 Fcp'= 669 PSI OK 1.50 In Bearing Length Fv'= 127 PSI OK ALSO USE 3-LVLs 11 7/8" FOR BEAM T6. VANAY0 H. LALA No. 33710-C Kanayo Lala, P.E . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERSMOISTS /RAFTERS LOADS: DEAD LOAD 24.00 PSF SNOW LOAD PSF LIVE LOAD 40.00 PSF TOTALLOAD WIND SPEED 100 MPH POINT LOAD LBS Ra= 0 LBS TRIBUTARY WIDTH 10.00 LF JOIST/GIRDER SPAN 13 LF WIDTH- IN 3.50 PSL/LVL 11.875 ROOF PITCH - N:12 = ON 2nd Floor Beam S1 SuDDortina Floor & Wall 240.00 PLIF Ce= 1 0.00 PLIF Cq= 1 400.00 PLIF qs= 29.10 640 PLF 1= 1 29.10 PSF FT 4160 LB =TOTAL REACTION E= 2000000 PSI Fb= 2900 PSI IN = d Fv= 285 PSI Fc= 2700 PSI Fcp= 750 PSI CF= 1.00 Cs= Cd= 1 Cm= 1 MOMENT= 13520 LB -FT MOMENT2= 0 LB -FT 82.26 =S provided OK S= 55.94 IN A 3 488.41 =I Deflection 0.421 IN = U 371 For Total Load Required U240 Deflection2 0.000 IN = L/ 593 For Live Load Required U360 Fcp'= 396 PSI OK 3.00 In Bearing Length Fv'= 150 PSI OK or KAMAVO H LAL'A a. 33710-C ST or Kanayo Lala, P.E . ............. 03/03/2014 PROJECT: Merrimack Condominiums G -TYPE BB -Compass Point, N Andover, MA DESIGN FOR - GIRDERSMOISTS /RAFTERS LOADS: DEAD LOAD 15.00 PSF SNOW LOAD PSF LIVE LOAD 40.00 PSF TOTALLOAD WIND SPEED 100 MPH POINT LOAD 4160 LBS Ra= 3467 LBS TRIBUTARY WIDTH 1.33 LF JOIST/GIRDER SPAN 19.5 LF WIDTH- IN 3.50 PSULVL 11.875 ROOF PITCH - N:12 = 2nd Floor Beam S2 Supporting Floor & Point Load From S1 19.95 PLF Ce= 1 0.00 PLF Cq= 1 53.20 PLF qs= 29.10 73 PLF I= 1 29.10 PSF 3.25 FT 713 LB =TOTAL REACTION E= 2000000 PSI Fb= 2900 PSI IN = d Fv= 285 PSI Fc= 2700 PSI Fcp= 750 PSI CF= 1.00 Cs= Cd= 1 Cm= 1 MOMENT= 3477 LB -FT MOMENT2= 11267 LB -FT 82.26 =Sprovided OK S= 61.01 IN A 3 488.41 =I Deflection 0.244 IN = U 318 For Total Load Required L/240 Deflection2 0.493 IN = U 437 For Live Load Required L/360 Fcp'= 398 PSI OK 3.00 In Bearing Length Fv'= 151 PSI OK Kanayo Lala, RE . ............. 03/03/2014 PROJECT: Merrimack Condominimums G -TYPE -BB -Compass Ponit, N Andover, MA DESIGN FOR - GIRDERS/JOISTS /RAFTERS Garage Door Header S3 Supporting Two Floors, Roof, Wall & Point Load From T1 LOADS: DEAD LOAD 73.72 PSF 718.75 PLF Ce= 1 CF= 0.96 SNOW LOAD 38.50 PSF 375.38 PLF Cq= 1 Cs= LIVE LOAD 70.00 PSF 682.50 PLF qs= 29.10 Cd= 1.15 TOTALLOAD 1777 PLF I= 1 CM=1 WIND SPEED 90 MPH 29.10 PSF POINT LOAD 4900 LBS 6 FT Ra= 3118 LBS 14657 LB =TOTAL REACTION TRIBUTARY WIDTH 9.75 LF E= 2000000 PSI JOIST/GIRDER SPAN 16.5 LF Fb= 2900 PSI WIDTH- IN 5.25 PSULVL 18 IN = d Fv= 285 PSI ROOF PITCH - N:12 Fc= 2700 PSI Fcp= 750 PSI MOMENT= 60461 LB -FT MOMENT2= 18709 LB -FT 350.00 =S provided OK S= 284.87 IN A 3 2228.94 = I Deflection 0.665 IN = U 240 For Total Load Required U240 Deflection2 0.160 IN = U 403 For Live Load Required U360 Fcp'= 677 PSI OK 5.00 In Bearing Length Fv'= 245 PSI OK USE 2-LVLs 117/8" FOR BEAM S4. KANAYO LALA, P.E ........ . 03/03/2014 SPECIFIC CALCULATIONS FOR THE WOOD CONSTRUCTION IN 10OMPH WIND ZONE 60,62,64 & 66 COMPASS POINT, NORTH ANDOVER, MA BUILDING "G" UNIT G1, G2, G3 & G4 26' X 36' BASIC LOADS: GROUND SNOW LOAD 50 PSF LIVE LOAD 40 PSF WIND LOAD 18 PSF Building Length 36 ft Building Width 26 ft Building Aspect Ratio= 1.38 Building Area 936 sf Shear End Wall= 11,664 224 PLF Building Mean Height 36 ft Shear Long Wall= 8,424 117 PLF Total Height 45 ft Dead Load of Building 65,520 lbs 1/2"A.BOLT SHEAR 801 LB DL Moment End Wall 1,179,360 LB -FT 4 FT SPACING FOR 1/2" A.BOLTS DL Moment Long Wall 851,760 LB -FT WITH TWO 2X SYP PLATES NET Wind Moment End Wall 209,952 End Wall M -969408 NO UPLIFT Wind Moment Long Wall 151,632 Long W M -700128 NO UPLIFT I.E. NO UPLIFT EXISTS AT THE BASE OF THE BUILDING. SHEAR ANCHORS ARE ADEQUTE SHEAR WALL CAPACITY BY TABLE 2306.2.1(1) Y2" OSB / CDX PLY WITH 8D NAILS AT 6" ON EDGES AND 6" ON FIELD - 270PLF< 224 PLF REQUIRED FOR THREE STORY HEIGHT- OK SHEAR WALL REQUIREMENT BY TABLE R602.10.1.2(l) Y2" OSB WITH 6D NAILS AT 6" ON EDGES AND 12" ON FIELD PER TABLE R602.3(3) 13 FT CONTINUOUS SHEATHING AVAILABLE ALONG LONG WALL = 19 FT THE MOMENT SHEAR AT THE OPENINGS IS RESISTED BY THE METAL CONNECTION PLATES AS DETAILED ON THE PLANS. FOR A TYPICAL 6'WIDE OPENING IN END WALL AT 224 PLF SHEAR: AT THE OPENING CORNER 673 LBS. A SIMPSON PC66 POST CAP - LATERAL CAPACITY 1285LBS - OK THE CALCULATIONS ABOVE MEET THE REQUIREMENTS OF THE IRC2009 R602.10 AND 780CMR51 AMENDMENTS TO IRC2009. A400REP CERTIFICATE OF LIABILITY INSURANCE (MMIDDIYYYY) 7 2/10/15 , THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUrHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERrIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(tes) must be endorsed. If SUBROGA71ON IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsemengs). PRODUCER Coonan Insurance Agency, Inc. 267 Main Street Oxford, MA, 01540 CONTACT NAME: PHONE x (AIC.NaFAi- (508) 987-7122 ,1: (508) 987-7152 FM4VIAIL ADDRESS: cindy@coonaninsurance.com INSURERS) AFFORDING COVERAGE NAIC # GENERAL LIABILITY MERCIAL GENERAL LIABILITY 7 CLAIMS -MADE I—XI OCCUR INSURER A: Travelers INSURED TJK, Inc. PO Box 12 South Grafton, MA 01560 INSURER B: INSURERC: INSURERD: INSURER E: [INSURERF: _ PERSONAL& ADVINJURY $ 11000,000 COVERAGES CERTIFICATE N UMBER: REVISION NUMBER - THIS IS TO CERTIFY THAT THE POLICES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INS URED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADIDL INSR SUM WVD POLICY NUMBER POLICY EFF (MMIDDIYYYYI _P0_UCY EXP (MMIDDIYYYY) LIMITS A GENERAL LIABILITY MERCIAL GENERAL LIABILITY 7 CLAIMS -MADE I—XI OCCUR Cindy Davis 680-33SM1703-14 11/3/14 11/3/15 . EACH OCCURRENCE $ 1,000,000 — DAMAGE TO RENTED PREMISES (Ea occurrenc'4 $ 300,000 MED EXP (Afy one perscn) $ 5,000 _ PERSONAL& ADVINJURY $ 11000,000 GENERAL AGGREGATE $ 2.000,000 GENT AGGREGATE LIMIT APPLES PE R 7X POLICY 7 IRO- LOC XCT PRODUCTS - ODMPIOP AGG $ 2,000,000 $ AUTOMOBILE LIABILITY ANYAUTO ALLOWNED SCHEDULED AUTOS AUTOS NON -OWNED HIREDAUTOS AUTOS COM13INED SINGLE Lili (E a accide rt) $ BODILY INJURY (Per pefson) $ BODILY INJURY (Per arcident) $ PROPElg;�DAMAGE (PL r., $ $ UAABRELLA LIM EXCESSLIAB OCCUR CLAIMS -MADE EACH OCCURRENCE $ AGGREGATE $ DED RETENTION $ $ A WORKERS COMPENSATION AND EMPLOYERS' UABIUTY YIN ANY PROPRIETORIPARTNERIEXECUTIVE OFFICERIMEMBER EXCLUDED? 7N (Mandabry In NH) Sddescribe under RIPTION OF OPERATIONSbftw NIA IE—UB-9914NOl-3-15 1/26/15 1/26/16 X I TN JOTH ".C,�TATU EfR__ E.L. EACH ACCI DENT $ 100,000 EL. DISEASE - EA EMPLOYEE $ 100,000 r= -L- DISEASE - POLICY LIMIT s 500,000 F DESCRIPTION OFOPERATIONS I LOCATIONS /VEHICLES (Aftach ACORD 1101, AdMonal Renarks Schedule, ffmorespece isrequired) CERTIFICATE HOLDER CANCELLATION @ 1988-20 10 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD Phone: Fax: E -Mail: tdbuilding@aol.COM SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIO NS. 120 Main Street AU7HORIZED REPRESENTATIVE North Andover, MA, 01845 Cindy Davis @ 1988-20 10 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD Phone: Fax: E -Mail: tdbuilding@aol.COM Massachusetts - Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS -059359 TIMOTHY M BA"W. P.O. BOX # 12 South Grafton.MA Expiration Commissioner 01124/2016 4Lness Regulation Office of Consumer Affairs & Busi ME IMPROVEMENT CONTRACTOR gistration: - 1'�'3758 Type". xpiration: 7/29/20.16- DBA BARLOW UILDING TIM BARLOW 13 DEPOT ST S. GRAFTON, MA 01560 0 Undersecretary e