Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #866-15 - 60 Water Street 5/1/2015
�Iab�n��a�� BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Date Received TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential El New Building 0 One family il Addition NTwo or more family 11 Industrial I Alteration No. of units: l 11 Commercial 11 Repair, replacement 11 Assessory Bldg 11 Others: El Demolition 11 Other 77,7n, -M won W-9 OWNER: Name A Identification Please Type or Print Clearly) b -0 STE vtk S E7,G " Phone: 4P V ARCHITECT/ENGINEERS-ARK A7-44%'(ECT,�3;E Phone: lq76- Address: °�eaS_-ro-ri -Y\P,, 'Reg. No. FEE SCHEDULE. BOLDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ FEE: $ ol�o Z> Check No.: Receipt -No.: 71 -3"10 - NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund 5 BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit No#: Date Received Date Issued 1 NORTy\ O �tLeo .6*a'1•C TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑ Addition ❑ Two or more family ❑ Industrial ❑ Alteration No. of units: D Commercial ❑ Repair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition ❑ Other Septic ❑ 1/l/ell _ D Floodplana ❑ Wetlantls ❑ Watirshed kDistnct O Water/Sewer: DESCRIPTION OF WORK TO BE PERFORMED: Identification - Please Type or Print Clearly OWNER: Name: Address: Phone: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE. BULDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private (septic tank, etc. ❑ Permanent Dempster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS_ /�AJV - /7 vA//rf ,gS-U 2� y t•�- - 1J TTJ CONSERVATION Reviewed on Signature COMMENTS .HEALTH COMMENTS Reviewed Sianature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Com Conservation Decision: Comments Waster & Sewer Connection/Signature & Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT =Temp Durnpster onste yAes.t� `"'no�4 x. Loeated at 1*24 Maln" Street " u '�`'' Fire Department signature /date `;.. i�-A + a �."t , „a$. -'Fe•: �rc� :r..,-. �..�:.�.���'..�.�;...z...:1��€N��.f s atm a."xt`�` f<�; r;'1�a Ar a?i Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.:, ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANCER ZONE LITERATURE: Yes No, MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — (For department use) VIII C -g A�P ® Notified for pickup Call Email Date Time Contact Name Doc.Building Permit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits 4, Building Permit Application Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Building Permit Application Certified Surveyed Plot Plan �. Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses Copy Of Contract a. Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan An Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) Engineering Affidavits for Engineered products TE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) � Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses Workers Comp Affidavit Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) Copy of Contract 2012 IECC Energy code Engineering Affidavits for Engineered products TOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Building Permit Revised 2014 Date TOWN OF NORTH ANDOV9R Z X160 Certificate. of Occupancy Building/Frame Permit Fee Foundation Permit Fee Other Permit Pee ATV - TOTAL 3oifnL 2 8-714 �Building Inspector 3C\2 t $ 17M.7. 9 Town of No. NORTH E Andover 0 �.�. `•. �o h , ver, Mass, cochicHewicK A04ATEoPERM-'IT T LD S THIS CERTIFIES THAT ......... has permission to erect .......................... buildings on..Tl!:.�......................................... to be occupied as ............... .°... ......................:..7.. �............................. provided that the person accepting this permit shall in every respect conform to the terms of theapplication on file in this office, and to the,provisions of the Codes and By -Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. VIOLATION of the Zoning or Building Regulations Voids this Permit. PERMIT EXPIRES IN 6 MONTHS UNLESS CONSTRUCTI STARTS ............... .►.�0:::'............................... . BUILDING INSPECTOR Occupancy Permit Required to Occupy Building Display in a Conspicuous Place on the Premises — Do Not Remove No Lathing or Dry Wall To Be Done Until Inspected and Approved by the Building Inspector. Toy BOARD OF HEALTH Food/Kitchen Septic System BUILDING INSPECTOR Foundation Rough ChILig,ney ina G�-- PLUPAgING INSPECTOR Rough Final ELECTRICAL INSPECTOR Rough Service Final GAS INSPECTOR Rough Final FIRE DEPARTMENT Burner Street No. Smoke Det. over THIS CERTIFIES THAT = ' has permission to erect .......................... buildings on.............:::.....:...............:....................................... tobe occupied as ..................................... ...:.................................... .................:.............. ................... provided that the person accepting this permit shall in every respect conform to the terms of the application on file in this office, and to the provisions of the Codes and By -Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. VIOLATION of the Zoning or Building Regulations Voids this Permit. PERMIT EXPIRES IN 6 MONTHS UNLESS CONSTRUCTION STARTS .................................................................:............. BUILDING INSPECTOR Occupancy Permit Required to Occupy Buildinz Display in a Conspicuous Place on the Premises — Do Not Remove No Lathing or Dry Wall To Be Done Until Inspected and Approved by the Building Inspector. BOARD OF HEALTH Food/Kitchen Septic System BUILDING INSPECTOR Foundation Rough Chimney Final PLUMBING INSPECTOR Rough Final ELECTRICAL INSPECTOR Rough Service Final GAS INSPECTOR Rough Final FIRE DEPARTMENT Burner Street No. Smoke Det. pl.� 4vti �Iwti Rows h �� b057 4 �ti ri :, �.� viz �-��a✓lam -�, 5 lel I 9 w -�, 5 lel I 9 Location No. �-Gcp — Date Check It SGO 121 TOWN OF NORTH ANDOVER Certificate of Occupancy Building/Frame Permit Fee Foundation Permit Fee Other Permit Fee:Pc s 2 1 c) -5 - TOTAL A7 �ujlding Inspector of µ0RTM TOWN OF NORTH ANDOVER 0L OFFICE OF p BUILDING DEPARTMENT �a e 1600 Osgood Street yes p, Building 20 Suite 2-36 s"`""s North Andover, Massachusetts 01845 Telephone (978) 688-9545 Gerald A. Brown Fax (978) 688-9542 Inspector of Buildings AFFIDAVIT FOR FINAL COST OF CONSTRUCTION In accordance with the provisions o the Massachusetts State Building Code, Article 1, Section 110.4 and 114.2, the total estimated cost of the construction including all related construction costs* of the building located atice-amounts to 1, hnvic4 %+Omb identified below, do made in good faith. eing the person referred to as the owner e herein are strictly true and correct and *Related construction costs included all work done with or concurrently with the work contemplated by the Building Permit including demolition, plumbing, heating, electrical, air conditioning, painting, carpentry, landscaping, site improvement, etc. Furnishings and portable equipment are not part of the total construction_ costs. Signatu �Own�er� COMMONWEALTH OF MASSACHUSETTS = 1C s.s.Gam_ A0 20j fc-, Then personally appeared the able named 5 -eln Aerih and ` . Made an oath that the above statement is true. JOHN T. SMOLAK Notary Public Commonwealth of Massachusetts My Commission Expires November 28, 2019 OFFICIAL USE: Final Cost: Original Estimate cost of general work: Cost Difference: o Additional Fee Required: TO AMEND FEE UNDER PERMIT NO.: Before,=Me, Notary Public Inspectional services Department 2005 F:\Finalcostaffidavitfonn Strict code enforcement makes the town safer Before buying, renting, leasing check zoning BOARD OF APPEALS 688-9541 CONSERVATION 688-9530 HEALTH 688 -K40 PLANNING 688-9535 Final Construction Control Document To be submitted at completion of construction by a w Registered Design Professional for work per the 8' edition of the S„e Massachusetts State Building Code, 780 CMR, Section 107 Project Title: West Mill Residential Units Phase 1 Date:01/27/16 PermitNo.866-15 Property Address: 4 High Street, North Andover Project: Check (x) one or both as applicable: New construction X Existing Construction Project description: Renovation of an existing 4 -story heavy timber structure for conversion to Residential Units, and new construction of a steel framed Pedestrian Bridge I Linda S. Smiley, MA Registration Number: 10080 Expiration date: 08/31/16 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 978-518-9939 Email: linda@saam-arch.com Building Official Use Only Building Official Name: Permit No.: Date: Final Constructi®n Control Document To be submitted at completion of construction by a d Registered Design Professional h for work per the 8th edition of the Massachusetts .State Building Code, 780 CMR, Section 107 Project Title: West Mills Residences Date: 12/4/2015 Permit No. Property Address: 4 High Street North Andover, MA Project: Check (x) one or both as applicable: New construction X Existing Construction Project description: 2nd, 3rd and 4`'' Mechanical renovations. I David H. Mahoney, MA Registration Number: 46846 Expiration date: 6/30/2016, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 781-233-4808 Building Official Name: Permit No.: Version 06 11 2013 Email: Mahoney@CSI-Engineers.com Date: Building Official Use Only I H OF gygssgO DAVID MAHONEY Nn ME�PANJFAL y Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8' edition of the Massachusetts State Building Code, 7801 CMR, Section 107 Project Title: MVLC West Mill Lofts Date: 02/02/16 Permit No. 11159 .Property Address: 4 .High St, North Andover, MA Project: Check (x) one or both as applicable: Project description: 2" d, 3rd, & 0' .Floor apartments New construction X Existing Construction I, Andrew W. Arsenault, MA ,Registration Number: 50816 Expiration date: 06/30/16, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical X Other: Describe Plumbing for the above named project. 1, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor .in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a "wet" or 4 =w electronic signature and seal:.t tAULT Phone number: 207-337-2473 Email: aNvallc@maine.n-.com maine.n•.com `* Q21 Building Official Use Only Building Official Name: Permit No.: Date: Version 06 1.1 2013 Project Title: Property Address: Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8`h edition of the Massachusetts State Building Code, 780 CMR, Section 107 West Mill 4 High Street, North Andover, MA. Date: January 29, 2016 This affidavit covers the feeders to the existing subpanels in the unit, as well as the unit's electrical distribution. This affidavit does not cover the power supply from the switch gear or the power supply installed in the new electric room; due to the fact that Richard D Cummings Jr did not do the design for these. . Project: Check (x) one or both as applicable: X New construction X Existing Construction Project description: Electrical Installation for Apartment Tenant Fit -Up I, Richard D Cummings Jr, PE, MA Registration Number: 49023 Expiration date: 6/16, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project. 1; or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 978-658-2616 Building Official Name: Permit No.: Version 06 1 1 2013 Email: cummingseng@comcast.net Date: Building Official Use Only RICHARD D. CU MIMINGS JR. /�? .. p APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION F.Z 'R^Tap �r .1 BUILDING PERMIT # �SSACH05,E' ADDRESS/LOCATION OF PROPERTi':_�n U %�i'� //_�/ S,/ A10/7j(/(`/ U t�� / Map Parcel U OV t Lot Number SUBDIVISION: DATE REQUESTED FILEDIREADY FOR INSPECTION: CLOSING DATE ON PROPERTY: FIVE (5) DAYS NOTICE PRIOR TO CLOSING DATE IS RE QUIRE, D ALL WORK AND SIGN -OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00) WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: WC6 Lde%-::S /7 /z/sc,� Address:()%7��/_�f ROUTING TOWN ENGINMER; SITE PLAN — DRIVE—WAY REVIEW— l CONSERVATION 1/I1L 'Ij?`,116 PLANNING l7 vjuir5 av-ru� r-z-zolt ,,,DPW-WATERAMTER ? re'�e, if C'xl'z� SEWER CONNECTION �J DPW MUST INDICATE TAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST DPW File: Application for OC form revised Ian 2007/2011 SIGNATURE t IiN Final Construction Control Document _ To be submitted at completion of construction by a n � x ' d Registered Design Professional W 4�< for work per the 8a' edition of the n v`O .,O Massachusetts State Building Code, 780 CMR, Section 107 Project Title: West Mill Date: 1/27/16 Permit No.. 1406002.09 Property Address: 4 High Street, North Andover Project: Check one or both as applicable: W New construction ® Existing Construction Project description: Renovation of an existing 4 -story heavy timber structure for conversion to Residential Units, and new construction of a steel framed Pedestrian Bridge. I Carmine Guarracino, P.E. MA Registration Number: 40104 Expiration date: June 2016 , am.a registered design professional, ,and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [X] Structural [ ] Mechanical ] Fire Protection [ ] Electrical [ ] Othen for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my .designee:. 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, ps applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a mariner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its res ility regarding the provisions of 780 CMR 107. v. OF ij. Enter in the space to the right a "wet" or J CAR , E electronic signature and seal: U GU+40 Rtp URAL Phone number: 617-628-17 0 Izo Guarracino@rgeng.com 'aAfAL Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Lo co - CD C LS, 0) C�, 0 ao c 4- a) a, E 4- s= +J m v N N bn C =a c V) N 4.10 c v 0 N a� L .3 a� 3 s= E u a) CL x a) I v Y U m Q W S_ O N m (6 Q V) sZ � � O L O to v v s= s= +•� O O +J N O N O � a-+ N 4 , ca N N O M .=1 E N Q (� E Ln N L 0 0 N v Y M U m CL C - M N 0 •N � N L 7 N U s= N O >•• CU 1= � � 4J '3 s= vi s= C O > M M C Y SZ� CU L CLCU CU O E +d M (V CL E Q to 0 > N co � R: O 0 N +, n M +, r -I O c � � = (] Y N N N N Q f6 O L N L 4a CU E N + Ln O (J m E O s= V O O L N a+ E � C N i CL � 4J > > O a i > O4- N CN C C O m N V O N N L a•.+ fC 7 N Ln E E N CCS 0 +.+ m O -1 O cif L N 4U O N- cu L L N Q L w O O L1 E cn •= c O O v M O 3 O r+ >% 0 L U CU CC O +' CCS CC > Q i+ C t z3 N a cu L L 3': U (OE E ^ o O O toQ Z C O C W E + N m t QJ QJ00 Y .� c 0 0) U >> 0=3 .- i 1= Ln EO 3 «.- 2m L i LL to N N A n n n n U n n n n n n n n n C N U L CL N f 3 > Q Q s qj 0 N 4 M 3E (n > f6 = 41 M + L Ln� N 0 C:7 c a, 4- 0 aj E N E O a cV N = v t E r v Ln J 3 C U L U M C N L 0 t� O �F — Ol Lr) m N u C @J oN t ate+ ++ s a� Cu t (U u ri N O 04 --Zn f rl J ++ Q O -p U Cu S N 4J N In O N O V _ m CL f C V 0 0 COA m� CL +L N N CU L +� CU e C o 7 o N E N Q. M a N `^ C Ln O m a aj m ^ E v c N 0 N O O c to C 7 0 V +' 04 > N S0 ti c I O S L E O O a _ Co N N 1= +- +J to N ,° o a( + M N>- `-� @1 a ++ < S C CU O N CU > N N CU O> 0 >' N >• t 0 4n to U Q E Q V) N ao i Lr� 0E s= c c 2 vco c O rl L + O + N E C ++ N >' C H N L O C= s OQj O L U Qj o O m E N +� o v o z ai M N L L c 7 ++ Cl) L T L T Q M v- 0 7 4' N i +' mO O O N O v Y CCS O O 0 CU H N CV U O C U � L > N C j 'L7 c +•� - C n L t C �� 0 a) = (U m i O O 0 L N O U o C H = sL ++ C �n �n n �n A c �i cn u voi Cn V) n n n n A n n n n n n n n v Y U m Q W S_ O N m (6 Q V) sZ � to v v s= s= +•� +J N O N O � a-+ 4 , ca N O M .=1 f0 N Q (� L 0 ajajUOL Y M m CL - M •N � N L 7 N U O >•• CU 1= � � 4J '3 s= C O > M V � SZ� CLCU +d M (V CL E to 0 > N co � R: O 0 N +, n M +, r -I c � � Y N N N N f6 O L N CU E N Ln O E O s= u0 O O L N a+ E � C N � 4J > > O a i > O4- N CN C O m N O O N N L a•.+ fC L N Ln E E N CCS +.+ O -1 O cif L N 4U O N- s o O + 4- N Q L w O O N E cn •= c O o v M O 3 O r+ >% 0 L U CU CC O +' CCS CC Q i+ t z3 N a Q L L O (OE E Q. +� M o CU 0 O toQ Z C O C W E N m t QJ QJ00 Y .� c 0 0) U >> 0=3 .- i 1= «.- 2m i LL to N A n n n n n n n n n n n n n n N O Ln U a o_ U a 0 U CF > E E O U E O a-+ C O Ln f0 .c� C W N H A n 0 4- a� L v O O O 0 L � O � C L t O C N 0 O C Ln 3 O O N 4- 4- @> 0 7, C u O N C C N O C to t L Y O L 3 E NO U Z i f6 4� U a- 0 A n fu E > O t O C Y O O N U 4- i 3 n 4- a C_ l -I N O Ln O N V J N NOR7ry 0� Town of North Andover Machine Shop Village Neighborhood Conservation District Commission 1600 Osgood Street North Andover, MA 0184,5 'SSACMUSE Application For Certificate to Alter Instructions: Fill out the form below and submit to the Machine Shop Village NCD Commission Chairperson(contact info below). The goal of this application is to provide a clear understanding of the proposed alterations, and how they vary from the existing conditions. Your application must include photos or plans of the existing conditions, and plans or drawings of the proposed changes. Include product & material descriptions for both existing and proposed conditions. Discussions with the Building Dept. or MSV NCD Commission are not a substitute for filing an application. Date: I� Contact Name & Address: r4r-L' UA LUL C.,' jo S ly. �:�4 l"" oval m slpres� S+0!' /on <an^ � �nll fe t"014 07 -14 - Project Address: �f �'l t s1Lf 1't�LrrC SZ 1NG(�C'r�'�'Y1''tX 1 Project Description (attach additional pages, if needed): Information Provided: Photo/Drawing of Existing Conditions Photo/Drawing of Proposed Conditions Description of Existing Materials E�v3�hk& $irlGGe- + RDS' vloahie 41,m krq 1 S Description/Catalog Cuts of Proposed Materials to be used U Other Information (describe): �taS e�1sro SSU1 /�%t c�' t'CWi S �es,r ucl� �e�inc� aCX EOvq C—%4 o� G ►G9bs i,11�1 +yt �t(rPrtln��a . I _ 10. It -}a-KLIL C&A" .u3s tcA Cs C ? (a8 GYC AdVAAACZd. MSV NCDC Current Chair: Liz Fennessy, 77 Elm Street, lizettafennessy@yahoo.com, 978-688-2915 vo 6 0 J El f 012 e SI 9 U) CD LO CD Lf) (0 C14 G) o m ' m o m �LO 00 p O O LL. lL n v Fb N c TT u� wAOo?S Lug ILU r4, 0 1111. PtiFSa&a6t6�€tlraaa� c�a �a � €�€iB k lts: "Ill 199x!6$ 1 lilt �RE M v O {a k 4 z 1. z Y tl Y R x aY w 4a z 999 0 PtiFSa&a6t6�€tlraaa� c�a nr� '�7 H IM 5 F. eII U �431 a FUF '�7 H IM 5 F. eII FUF '�7 H 9 IM 5 9 s z O q4 wQ P ° It lilt §c INS 1 sgya anyy � F ' Jai Ni \\ �•464F 0 �55i%GGWH iiii ^11111gi H 1 - O U q /ti H lilt §c INS 1 sgya anyy � ' Jai Ni � W �•464F �55i%GGWH iiii ^11111gi H 1 - I r O F Lam_ I .L�''04, , NORTH o No �,��n ,6� ° °A �2: y Town of North Andover ::- Machine Shop Village Neighborhood Conservation District Commission �9S q,rEo .e���y SACHt 1600 Osgood Street North Andover, MA 01845 Application For EXCLUSION From Certificate to Alter Certain alterations are excluded from review by the Machine Shop Village Neighborhood Conservation District Commission in accordance with the Bylaw. Applicants for exempt projects must fill out the form below and submit to the Commission Chairperson (contact info below). Date: Contact Name & Address: Project Address: Project Description (attach additional pages, if needed): Exclusion From Review Requested For: ❑ 1. Interior Alterations ❑ 2. Storm windows and doors, screen windows and doors. ❑ 3. Removal, replacement or installation of gutters and downspouts. ❑ 4. Removal, replacement or installation of window and door shutters. ❑ S. Accessory buildings of less than 100 square feet of floor area. ❑ 6. Removal of substitute siding. ❑ 7. Alterations not visible from a public way. ❑ 8. Ordinary maintenance and repair of architectural features that match the existing conditions including materials, design and dimensions. ❑ 9. Replacement of existing substitute doors, substitute siding or substitute windows with new materials that are substantially similar to the existing condition. ❑ 10. Replacement of original fabric windows or doors with substitute windows or doors that maintain the architectural integrity with respect to form, fit and function of the original windows or doors. ❑ 11. Reconstruction, substantially similar in exterior design, of a building, damaged or destroyed by fire, storm or other disaster, provided such reconstruction is begun within one year thereafter. MSV NCDC Page 1 Current Chair: Liz Fennessy, 77 Elm Street, lizettafennessy@yahoo.com, 978-688-2915 NORTH q O �tTen ras6rY0 F= 5. �0 Town of North Andover- c + Machine Shop Village Neighborhood Conservation District Commission 1600 Osgood Street North Andover MA 01845 �ygOAnre° f SACHUS Application For EXCLUSION From Certificate to Alter For Items 9,10 or 11, provide the following documentation: Photos/drawings of existing doors, windows or siding, as applicable Description/Catalog Cuts of proposed materials to be used for doors, windows or siding Plan and elevation of reconstruction for Item 11 Determination: This project is determined to be ❑ exempt ❑ not exempt from review by the Machine Shop Village Neighborhood Conservation District Commission. Projects that are not exempt must complete the Application for Certificate to Alter, available from the Building Department and be reviewed by the Commission. Determination made by: Signature Neighborhood Conservation District Commission Date MSV NCDC Page 2 Current Chair: Liz Fennessy, 77 Elm Street, lizettafennessy@yahoo.com, 978-688 2915 A, 1*sl i5 �� Final [igh Street 17 Condos Building Permit 866-15 on 5/1/2015 rens' ° Building'_t Electical: Plumbing/Gas Notes F7777777 1'Rough Final "fur°V'r'� 2 Rough . Final 3 Rough �11, Final _ a 4 Rough Final,, f S. Afougla Final 6 Rough Final,- 30'' 7 Rough . .f Final 8 Rough final 9. Rough -_ ..- Final p 10 Rough Final; I 11 Rough .. Final .,. 12 Rough Final :u. 13 Rough,, Final 14 Rough Final 15 Rough;° �� Final Building Electrical ' Plumbi'+ng/GasNotes �.. ,- 16 Rough ' 17Ro,.ugh Final ,S Y � ' > .f -ark .efit r y v" �u Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost $ 2,2117597.00 m $ - $ 26,539.16 Plumbing Fee $ 3,317.40 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 3,317.40 Total fees collected $ 33,273.96 4 High Street 866-15 on 5/7/15 17 units f—q"' H n +-' C � O O r S U E uQ LL O o m C: E O ... CL H Z O Z O m O W CL Z C7 z O J O W y Z V U W O U W H Z a C7 W Q W W U Y O 0 LLN � n O_ a)O co LLL d' N u s i 7 t0 0 U: v N LL K LL m O zN N O Y N n +-' C � O O r S U E 2 14 °' m 1 Yz O r+ E Q O O L m LA a .0 O O > 0 O - cn N O Q .2r � 0Eo ca O Z CL U) , cn CD ®� mo= ® � TO o a� '> o c �. CL m cc w c M O .� O Mob CL _ w0 m O V m as 00 'O O O W �=- CLD e6 i O w •� = O Z LL! E v v O O ° O 0-0 .O w O. .� ~J cocd Z. M 0 0 ti N ►1 lw 01- 00 ®O O CL co MCa J '0 O O Z CLN , and the Contractor. (Natne, legal status, address and other information) 1-.Mdmexk Structures Corp. 282"Montvale Avenue Woburn, MA 41801. for the fol lowlrlg-Protect: 0Vame, location and detailed description) Conversion ofapproximately 15;006Sq. Ft: of existing office•space into 17 residential apartments located at building 7A ofthe West lVli11, 60 Water Street, North Andover, lti%1A VIM. The Architect: (Name, legal status, address: and other -information) Saam :Architecture 655 Summer Street t Boston, MA 02210 The Owner and Contractoragree as follows. kA DOament A101: - 2007 American. Instituteof Arcl Treaties. Unauthorized. ral ,penalties, and wi11 beprl User Note— lht 0 1915, 1918; 1925,.1937, 1951, 1958,. 1961; 1863, All rights reserved. WmrngG: :Th".AiA"`. Document -is m or distribution ofthis Eili Document, or aay.port to the mexamum:extent possible uader.t.he law: 1974; 1977, 1987, 1991, .1997 and 2007 by The Ad by U.S. Lar and Iutotnatioftal 'may result in sevare cavil and eiialnal 1 (1266234179) TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK'OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE I THE :CONTRACT DOCUMENTS The Contract Documents :consist of this Agreement, Conditions of the Contract (General, Supplementary and _othef Conditions), Drawings, Specifications, Addenda'issued prior to execution of this Agreement, other documents listed in this Agreement :and Modifications issued after execution of this Agreement, ail of which form theContract, and are as ,fully: a part of the Contract as if attached to this Agreement. or repeated.herein. The Contract represents the entire and integrated agreement between the parties'hereto and:supersedes prior negotiations, representations or agreements, either written or oral. An enumeration, of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE2 THE WORK OF THIS CONTRACT The Contractor shall fully: execute the Work described intheContract Documents, except as specifically indicated in the Contract Documents to be the responsibility of:others. A. RTICLE'3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3.9 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision .is made for the date to be fixed in a notice to proceed issued b.y the Owner (Insert the date of commencement if f it differs from the date of this.Agreement or, if applicable, state that the date will be faxed in a notice to proceed.) Date of commencement shall be the later of 10 days after the contractor receives a notice to proceed or an unrestricted building permit is issued. If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: §3 2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than two hundred forty ( 240 ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date maybe used when coordinated with the date of commencement If appropriate, insert requirements for earlier Substantial Completion of certaimportions of the Work,) AXA Docmmut A261" - 2007. Copyright 0 1915, i918,-1925 N60,rican Institute of Architects. All tights reserved. 1 Treaties. Utiauthori:zed reproduction or•:distribntion of:. penalties, and will be prosecuted to the maxim -extent User Notes: -1951, 1958, 1961, 1963; 1867, 1914, 1977, 1987; 1991, .1997 and 2007 by The is This Alk Dotumant is protected by VA:Copyright,Lav and International D*wUOOnt, or any portica.of it, may result in.seeefe Civil and orJoi.nal Fe -under the law. (12662341791 E, 1 subject to adjustments of this Contract Time as provide&in the Contract Documents. ansertprovisions, if, any, for liquidated damages:relating'to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work) N/A ARTICLE4 ONTRACTSUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of tlhe Contract The -:Contract Sum shall be two milIion two hundred`eleven thousand five .hundred ninety seven Dollars ($2,211.;W.00), subject to additions and; deductions as:provided.in the:ContractDocuments. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract. :alternates showing the amount for each and the. date when that amount expires.) NIA 4.3 Unit prices, if any: (Identify and state the .uni 1 price; tate quantity limitations, if . %.;to ivhkh the unit price .will be applicable:) Rem NIA Units and Limitations Price Per Unit § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, if any, from the allowance prise) Item Refer to Exhibit E Price ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1 .1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. AIA Document A101a 2067. Copyright 4D 1915, 1918, 1425,. 1937, 1951, 1958-; 1961, 1963,. 2967, 1974, 1977, 1981; 1991, 1991 and 2067 by the American institute of Architects. All rights reserved: WAPIMIG.. ;'Phis Ale Document is protected by V.S.. Copyright Saw and Intela ttional treaties. Unauthorised reproduction or-distribction of .this Al Documant, or aiy.portion of it, "y icemat in _severe ciV 1 and czimiaal 3' penalties, and will be pzo9ecuted to ahe .nazimum extant:possible under the lar. - - tine: im;t (1266234179) §.5.1.2 The periodscovered by each Application for Payment shall be one caiendar month ending oathe last day: of the month, or as follows: § 5.1.3'Provided that an Application for Payment is received by the.Architect-not-later than the 30th day of a month, the Owner shall make payment of the.certified amount to the:Contractor not later than the 30th day of the. following month. If an Application €or fayment is received by the Architect after the application date fixed above; payment shall; be "made by the Owner not later than 30 days after the Architect. receives the Application for Payment: state or or local laws may:require:payment within a certain period oft ne.) § 5.1.4.Eash Application for Payment shall be based on the<most recent >schedule .of values submitted by the Contractor.in.accordance with the Contract Documents. The schedule ofvalues shall allocate the entire contract Sum among the vanous.portions :of the W ork. The schedule. of -values shall be prepared in such form.. supported by tach data to substantiate its accuracy=as the Architect may require. This schedule, unless objected to b e Architect;:shall be'used as a basis for reviewing th Contractor's Applications for Payment: 5.1.5 Applicationsfor Payment :shall: show the percentage of completion of each portion: of the Work as of the end of the period covered by the Application for Payment. § 5.1.5 Subject to other provisions of the Contract Documents, the. amount of each progress payment shall be computed -as follows: .1 Take thatponion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage: completion of each portion of the Work by the. share .of.the Contract Sum allocated. to-thatportion of the Work in the schedule of values, lessretainage of five percent (;51%). Pending final. determination of cost.to the Owner of changes in the Work, amounts nol;in dispute shall be included asprovided in Section 7:3:4 of AIA Do A20IT'"=2007, General Conditions of'the Contract for'Construction; J Add that portion of the Contract Sun properly allocable to materials and equipment delivered and suitably stored at tbio site for subsequent incorporation in the completed construction (materials stored off site cannot IN included'in requisition for.payment), less retainage of five percent.( 5 0/6); .3 sti tract the aggregate of previouspayments made by the Owner, and .4 Subtract amounts; if any, for which the Architect has. withheld or nullified a Certificate for Payment asprovidedin Section 9.5 of AIA Document A201-2007. §:6.11Th: aprogress payment amount determined in accordance with Section 5:1:6 shall be further modified under the following circumstances: .1 Add, upon;Substantfa! Completion of the Work; a sum sufficient to increase the total payments to Ahe full amount of -the Contract Sum, less such amounts as the Architect shall -determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section R8.5 ofAIA Document A20,1-2,007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, iffinal-completion of the Work is thereafter materially' delayed through no fault ofthe Contractor, any additional amounts payable in accordance with Section -9. iO3of AIA Document A201-2007. § 5.1.8 Reduction or limitation of retainage,.ifany, shall be as follows: (if it is intended,. prior to Substantial Completion of the.entire Work, to reduce or limit the retainage. resulting from the percentages inserted' n Sections 5.1.6 fi and 5.1.6.2 above, and this is not explained:elsewhere in the Contract Documents, insert here provisions for such reduction or limitation) N/A § 519:Except with the Owner's prior: approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. ATA Docent A101 - 2007. Copyright, ® 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1391, 1997 and 2007 3y. -The Ame=icar. Institute of Architects. All rights reserved. :5iA1iUTNG: Tla341Aa .Doeumant is protected by U.$. -Copyright Lar and Interoational Rzeatiea. zUnauthorized reproduction erdistribution of thib Ate Doamoni, or any portion of it, .inay zesnit in Severe civil and.erimiaal •.ponaltias, and`.irill be psoaaciited to -th4 meximam:exteat pobsible uneler the law. :User .Notes; (126623417.9) 152 FINAL PAYMENT § 5.2.1 Final:payment, constituting die entire unpaid"balance of the Contract Sum, shall be madebythe Ownerto :the Contractor when. .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of Al Document A201-2007 and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.22 The Owner's final. payment to the Contractor shall be made no .later than 30 days after the :issuance of the Architect's final Certificate for Payment, or as follows:. ARTICLE S DISPUTE RESOLUTION 6.1 INITIAL DECISION MAKER 'The Architect will serve as 4nitial.Decision.Makerpursuant to Section 15.2 of AIA Document A201-2007iVnless the parties appoint below another ndlvidual, not a party to this Agreement, to serve as Initial Decision Mak�c, of the parties mutually agree; insert the name, address and other contact information of the'Initial Decision Il2akei , if other than the Architect.) Architect to be the initial decision maker. 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to; but not resolved by; mediation pursuant to Section 15:3 of AIA Document 11.201-2007;: die :method :of bindng•dispute:resolution shall be.as follows: (Check the appropriate.box If the (honer and Contractor do not select a: method;of binding dispute resolution ;below, or do not subsequently agree in writing to.a binding dispute: resolution method other than litigation, Claims will be resolved by litigation in a eourt ofcompetent jurisdiction) X ]Arbitration pursuant to Section 15.4 of AIA Document A201-2007 I Litigation in a court of competent jurisdiction Other (Spec) :ARTICLE 7 TERMINATION OR SUSPENSION §'7.1 The Contract may be terminated by the Owner or the. Contractor as provided in Article 14 of AIA Document A201-2007. § 7.2 The Work maybe suspended by. the Owner as provided in Article 14 of AlA Document A201-2007. ARTICLE 8 MISCELLANEOUS PROVISIONS §;8.1 inhere reference is made in this Agreement to a provision of AIA Document.A201 2007 or another Contract Document, the reference refers to thatVision as amended. or supplemented by other provisions of the Contract Documents. §'8.2 Payments due and unpaid under -the Contract shall bear interest from the date payment is due at the. rate;stated below, or in the absence -thereof, at the legal rate:prevailing from time to time at place where the Project is located. (Insert rate of interest agreed upon, if any.) I% per month. :ATA Document A101-- 2007. Copyright 9 1 >Anerican-_nstltute of Architects. All Ll Treaties'. unauthorized reproduction or -d :.ponalties;: 'and will be prosennted to .the 1916, 1925, 1937, 1952, 1958, 1961, 150, 1967; 1974, 1477, 1987; 3991,'1997 arsd 2007 by 'Th, reserved.. WARNING: This ATA:.- Document La protected by U.S. Copyright Law and Intarnatiohal butlon:of this ATA! :Document, or any"portion:of it, may result in severe civil and crrizimal it e -extent possible under the lay. User :Notes: _ (1266234179) § 9 3 The Owner's representative: (Mame, address: and: other information) Mr. David. Steinbergt ACG West Mill NA, LLC 17`Ivaloo Street Somerville'.MA .02143 8.4`The Contractor's representative: Vftwe, address and other; information) MnWilliam Glasser, President Landmark Structures Corp.. 282:Montvale Avenue. Woburn, MA 018.Or1 § 8.5 Neither the .:Owner's:nor the; .Contractor's representative shalt be changed without ten :days written notice to the other party. 8A Other provisions: Owner reserves the right:to:: present other requested modifications to the contract form from Its Lender ani Contractor agrees to review and requested changes and.to:respond.reasonably in accordance with industry standards. A. RTICL I ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The ,Contract . Documents, except for: Modifications issued after execution of this. Agreement, are enumeratedin the sections below. § 9.1.1 The Agreement -is this executed AIA Document A1012007, Standard Form of Agreement Between Owner and. Contractor. § 9.1.2 The General Conditions are AIA Document A2012007, General Conditions oft he Contract for Construction. 9:1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages NIA § 9.1 A The Specifications: (Either list the Specifications 'here or refer to an exhibit attached to- this. Agreement.) Refer to:Exhibit A %§ 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement) Refer to Exhibit B :AIA Document Aloin! - 2007. Copyright 6.1915, 1918; 1925, 193i, 1951, 19s8.; 1963, 1963, 1967, -F9.' -I9 19??/ 1987, 1991, 1997 and 2007 by Thi American- :Institute of Architects. A11 rights reserved. . -WARNING: This AIAe Document is.. protected by 6.3. Copyright Law and -DotnLeroatiottal Treaties.-U-nadth0ri�ted reproduction or :distriDntioc o£ UH AIA. cument,-or.any portioh ol.it, may -remit in -severe civil and criminal .penalties, add will be prosecuted to .the maximum extent ua possible d.r the Sar. User Notes: (1266239179} 9.1:6 `the Addenda, if any: Number Date Pages NIA Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9♦ §t1.7 Additional documents, ifany, forming part of the Contract Documents: AIA Document E201r"L2007, Digital Data Protocol Exhibit, ifcompleted by the parties, or the following. 2 Other documents, if any, listed below: (List here any additional documents Shat are intended to form part. of the Contract Documents. AIA Document AM 2007 provides that bidding requirements such as advertisement:or invitation to:bicl Instructions to. Bidders, sample forms and the Contractor's bd.are not part of the Contract DDcurnetzls unless: enumerated in: this Agreement. They should be listed here only if intended to be Pal t ofthe;Controct Documents.) Exhibit - Schedule of Values Exhibit F -,insurance=Certificate Exhibit D - Landn axles Bid Qualifications dated 3123115 Exhibit G - Lien Waiver Form Exhibit E - Allowances Exhibit H.- Addendum to Construction Contract ARTME 0 INSURANCE AND BONDS The Contractor shall purehase and maintain insurance and provide :bonds as set forth in Article 11 of AIA Document A20120.07 (State bonding requirements, if any and: limits of liability for insurance required in Article l i of ALI Document A201 2007) Refer to Exhibit F This Agreement entered into as of the day and year first written above L rporation : igna#t!`e : R OWNI(Signature) CONTRAC V 1 l91 y� gq hr,,o, z �� William J. Glasser, President (Printed name and title) (_\j I (Printed name and.titl6) AIA Document A101".- 2007. Copyright :j 1915; 1918, 1925, .1937, 1951, 1958; 1961; 1'963; 1%7, 1974, 1977, 3997, 1991; -1994 and 2007 by the American Institute of Architects. All :rights reserved_ WARNING: Rhis:AJM Document is.protected-by U.S.-Copyright Lav and Interhat onal Treaties. DpauthorizOd reproduction or distribution of this AIA° Dgeiment,'oi any portion or it, may result in a&Vete civil and criminal .penaltres, and Will.be prosecuted to .the. maximi extent extent .possible under the law. user Notes: (1266234179) I Exhibit A Building 7A Apts., West Mill Specifications West Mill Lofts Specifications Pages 1 of 1 Cover Sheet 1 Floors 1 Kitchens 4 Appliances:and Laundry 3 Lighting 4 Bathroom 5 • Closets / HVAC 1 Common Areas 1 1 of 1 =f, Exhibit B Building 7A Apts., West Mill Drawings Page Number Title Date Ap00_RES Cover Sheet 02/05/15: A001—RES Schedules, Details, Notes 02/05/15 A200—R. ES Second floor Plan 02/10/15 A300 RES Third Floor Plan 02/10/15. A400 RAS Fourth Floor Pian 02/10/1:5 ASD1_RES Door, Frame Typos, Hardware Sets 02/05/15 A602_RES Enlarged Plans &-Details 02/05/15 A603 .RES Millwork Details 02/05(:15 A604—RES, Enlarged'. Stair Plans and Details 02/05/15 P-1 1si Floor Plumbing Plan 02/12/15 P-2 2nd Floor Plumbing'Plan 02/12115 P:-3 3rd Floor Plumbing Plan 02/12/15 P-4 4th Floor Plumbing Plan 02112/15 P-5 1st Floor Plumbing Plan. 02/12/15 H1.0 HVAC Legend 02/24/15 H2.:0: HVAC Second Floor Plan 02/24/15 H2A HVAC Third Floor Plan 02/24/15 H3,0 HVAC Fourth Floor Plan 02/247.1.5 H3:1 HVAC -controls 02/24/15 H4.0 HVAC Schedules 02/24/15 H50 HVAC Specifications 02/24/15 E1 Power and Lighting 2nd Floor 02/271:15 E2 Power and Lighting 3rd Floor 02/27/15 E3 Power and Lighting 4th Floor 02/27/15 FA1 Fire Alarm and Emergency Services 2nd Floor 02/27/15 FA2 Fire Alarm and Emergency Services 3rd Floor 02/27/15 FA3 Eire Alarm and Emergency Services 4th Floor 02/27/15 4 Exhibit C 1i West Mill lofts North Andover, MA sov $10000 mobilization $45,300 Demolition $61,000. Allowance Bridge Allowance Rough Carpentry (stair opening) :$I 0,00o: All ance Interior Wood Stairs $15,000. misc. metal railing Rough Carpentry $8i500 Finish Carpentry membrane Roofing. $000 Wood. Doors .701 I $38il Q — Building. Entrances $6,499 Windows $245,328 Sound mat F & I $85,102 plywood Subfloorf & I $36;8851 :Sound sealant.1from above 1,0001f j $3,500 Gyp Board Assemblies $20.6i800 Tile $33,558 .Vinyl 'Plank Flooring 12 Mil $39,852 Resilient Flooring $.7,108 Carpet $19,328 Pointing $35,175 Misc. Specialties Ibelowl $15,260 Fire Extinguishers Postal Specialties Toilet Accessories Closet Specialties Residential Kitchen Appliances. W/D $47,863 Kitchen Cabinets / countertops $57,204 Fire Protection .$22,600 Plumbing $182,870 HVAC $279,407 Electrical $249,400 :Building Permit $26,539 General Conditions $194,123 .Overhead $105,816 Profit $63,583 Total: 1: $2,211,597 OFFICE OF BUILDING INSPECTOR w2+TOWN OF NORTH ANDOVER s 1� CONSTRUCTIONC, QNTROL PROJECT NUM13ER: 1406002.09 PROJECT TITLE: Residential Units - Phase 1 Construction PROJECT LOCATION: _4 High Street, North Andover NAME OF BUILDING: West Mill NATURE OF PROJECT: IN ACCORDANCE WITH ARTICLE 116 OF THE MASSACHUSETTS STATE BUILDING CODE, 1,_Linda _S. Swiley REGISTRATION NO. 10080 BEING A REGISTERED PROFESSIONAL ENGINEERtARCHITECH HEREBY CERTIFY THAT 1 HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICATIONS CONCERNING: ENTIRE PROJECT ❑ ARCHITECTURAL E STRUCTURAL ❑ MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER (SPECIFY) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISION OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRATICES. AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A.REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116.0 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code -required controlled materials. 3. Be present at Intervals appropriate to the stage of construction to become, generally familiar with6the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. PURSUANT TO SECTION 116.2.2 1 SHALL SUBMIT WEEKLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER BUILDING INSPECTOR. 0 UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. rolr IO TURE SUBSC ED AND SWORN TO BEFORE ME THIS /'0DAY OF 19 oc)) NOTARY PUBLIC MY COMMISSION EXPIK— PAe RICIA E BARKER * Notary Public COMMONNJEALTH OF MASSACHUSETTS �y My Commission Expires � A��usta, _ota r .te a UrrIUM Ur AJUILIANU INUPF-UTC R TOWN OF NORTH ANDOVER CONSTRUCTION CONTROL ENTIRE PROJECT ❑ ARCHITECTURAL ❑ STRUCTURAL R MECHANICAL FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER {SPECIFY} FOR THE ABOVE NAMED`PROJECT AND THAT, TO THE BEST OF MY KNOWLEGE, SUCH PLANS,' COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE °PROVISION OF THE MASSACHUSETTS STATE BUILDING. CODE, ALL ACCEPTABLE ENGINEERING PRATICES, AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USEANDOCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND B EPRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 118:0 1. Review, for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the ''construction documents. 2. .Review and approval of the quality control procedures for all code=required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar withS#tte progress and quality of the work and to determine, In general, If the work is ging performed in a manner consistent with the construction documents. PURSUANT TO SECTION 118;2.2 I SHALL SUBMIT WEEKLY, A'PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE NORTH ANDOVER'BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT:A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR UPANCY. sIGNATU IE SUBSCRIBED AND SW0jk1N TO BEFORE ME THIS l i0 DAY OF &e tL r L_ Zt�T ` — BRIAN 5. MANNING Notary Public NOTARY PUBLIC MY COMMISSION EXPI�'rwealth of pAussuchusetts commission cxpireas��ren-thee Lb. 2015 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional r for work per the 8`I' edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: West Mill Date: 03/09/1.5 Property Address: 4 High St. North Andover, MA Project: Check (x) one or both as applicable: New construction x Existing Construction Project description: Drop heads into new ceilings per new tenant layout per NFPA 1.3 1 Michael DiMeo MA Registration Number: 32201 Expiration date: 06/30/2016 , am a registered designprofessional, and I have prepared or directly supervised the" preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical x Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: I . Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 508-481-8242 Building Official Name: Permit No. Email: bobl@platinumfireprotection.com Date: Building Official Use Only MithlAEt: Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If 'other' is chosen, provide a description. Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8`" edition of the M Massachusetts State Building Code, 780 CMR, Section 107 Project Title: MLVC West Mill Lofts Date: 04/13/15 Property Address: 4 High Street, North Andover, MA Project: Check (x) one or both as applicable: X New construction Existing Construction Project description: Apartment Building 1, Andrew W. Arsenault, MA Registration Number: 50816 Expiration date: 06/30/16, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection Electrical X Other: Plumbing for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: I . Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, .I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a "wet" or electronic signature and seal: ` ' itsEwd. s EWAULT 11ANIGAL sti 1t .50810 Phone number: 207-337-2473 Email: awallc@maine.n-.com t Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If `other' is chosen, provide a description. Version 06 11 2013 A Project Title: West Mill Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Property Address: 4 High Street, North Andover, MA Date: April 14, 2014 Project: Check (x) one or both as applicable: New construction X Existing Construction Project description: Residential Fire Alarm Fit -Up. I Richard D Cummings, Jr. MA Registration Number: 49023 Expiration date: 6/16 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning Architectural Structural Mechanical Fire Protection Electrical X Other: Fire Alarm for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance .with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present At intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 978 658 2616 Email: cummingseng@comcast.net Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If `other' is chosen, provide a description. Version 06 11 2013 A Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the ,ewr Massachusetts State Building Code, 780 CMR, Section 107 Project Title: West Mill Date: April 14, 2014 Property Address: 4 High Street, North Andover, MA Project: Check (x) one or both as applicable: .New construction X Existing Construction Project description: Residential Electrical Alarm Fit -Up. I Richard D Cummings, Jr. MA Registration Number: 49023 Expiration date: 6/16 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning'. .Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: I . Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document' Enter in the space to the right a "wet" or electronic signature and seal: Phone number: 978 658 2616 Email: cummingseng@comcast.net Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If `other' is chosen, provide a description. Version 06_1 1 2013 Initial Construction Control Document To be submitted with the building permit application by a N Registered Design Professional a� for work per the 8`h edition of the yJ~� Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Norfolk House Date:2/24/2015 Property Address: 4 High St.North Andover, MA Project: Check (x) one or both as applicable: New construction X Existing Construction Project description: 2nd, 3`d and 4`h Mechanical renovations. I, David H. Mahoney, MA Registration Number: 46846 Expiration date: 06/30/2016, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural X Mechanical Fire Protection Electrical X Other: Plumbing for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. Enter in the space to the right a "wet" or electronic signature and seal: Email: Mahoney@CSI-Engineers.com Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If `other' is chosen, provide a description. ACOR" CERTIFICATE OF. LIABILITY INSURANCE DATEIMM/DU/YYYY) 2/12/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE. HOLDER..THIS. CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If.SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holderin lieu of such endorsement(s). PRODUCER - . CONTACT Rim O'Shaughnessy PHONE (SO8) 656-1400 FAX (AIC Nol, (508)656-1499 G H Dunn Insurance Agency, Inc. P.O. BOX 497 E-MAIL ADDRE S: INSURERS AFFORDING COVERAGE NAIC# 64 Fairhaven Road INSURER AArbella. Protection Ins. Co. 41360 Mattapoisett MA 02739 INSURED INSURER BArbella Mutual Insurance Co. - 17000 INSURERC:Torus National Insurance Co. 25496 Landmark Structures Corporation INSURER D: 282 Montvale Ave INSURER E : 1/1/2016 INSURER F: Woburn MA 01801 .. COVERAGES CERTIFICATE NUMBER:CL14121111736 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR - TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MM/DDIYYYY POLICY EXP MM/DD/YYYY - LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1, 0 0 0, 0 0 0 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE FX_1 OCCUR 850006344 1/1/2015 1/1/2016 DAMAGE TO RENTED . $ 0 0 , 0 00 PREMISES Ea occurrence $ MED EXP (Any one person) $ 5,000 PERSONAL &ADV INJURY $ 1,000,.000 - GENERAL AGGREGATE $ 2,000,000 - - GE N'L AGGREGATE LIMIT APPLIES PER: PRODUCTS -.COMP/OP AGG $ 2,000,000 POLICYX PRO- RO LOC JECT $ AUTOMOBILE LIABILITY - - COMBINED SINGLE LIMIT Ea accident 1 000 000 BODILY INJURY (Per person) $ B ANY AUTO - ALL OWNEDIxSCHEDULED AUTOS AUTOS X1020036348 01 - 1/1/2015 1/1/2016 BODILY INJURY (Per accident) $ DAMAGE $ Peaccident) XHIRED AUTOS A0T0.OWNED c LIMBRELLA LIAB X OCCUR - - EACH OCCURRENCE $ 10,000,000 AGGREGATE $ 10,000,000 (; X EXCESS LIAB CLAIMS -MADE - _ DED RETENTION - - $ - 20176150ALI 1/1/2015 1/1/2016 B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY. Y/NER X WC STATU- -0TH- I Toy TS FIR ANY PROPRIETOR/PARTNER/EXECUTIVEE.L. OFFICER/MEMBER EXCLUDED? (Mandatory in NH) N/A 9114 5501 15 1/21/2015 1/21/2016 EACH ACCIDENT $ 11000,000 E.L. DISEASE - EA EMPLOYE $ 1, 000, 000 If yes, describe under DESCRIPTION OF OPERATIONS below I E.L. DISEASE - POLICY LIMIT $ 11000,000 DESCRIPTION OF OPERATIONS / LOCATIONS /VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) _ Subject to policy forms, terms and conditions. CERTIFICATE HOLDER CANCEL I ATION ACORD 25 (2010105) INS02.5 (9ntnnF)n ©1988-2010 ACORD CORPORATION. All rights reserved. Tho ARrwn nnmo and Innn aro ronie4ororl mance of Ar`(1Rr1 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN FOR YOUR INFORMATION ACCORDANCE WITH THE POLICY PROVISIONS. - - - - AUTHORIZED REPRESENTATIVE - David Dunn/KIM/v w ACORD 25 (2010105) INS02.5 (9ntnnF)n ©1988-2010 ACORD CORPORATION. All rights reserved. Tho ARrwn nnmo and Innn aro ronie4ororl mance of Ar`(1Rr1 �F Massachusetts - Department of Public Safety Board of Building Regulations and Standards License: CS -084537 DEN IS A CARSl 14 ARCADIA RD% BILLERICA MA7018i t •I, `1 Expiration 03/14/2017 Commissioner Deems, Maura From: Dennis Carsno <dCarsno@landmarkstructures.com> Sent: Thursday, January. 28, 2016 1:07 PM To: Deems, Maura Subject: Unit numbersWest Mills Lofts 60 Water Street Hi Moria, A4 #2001 \ #2002 #2004 #2005 #2006 #3001 #3002 #3003 #3004 #3005 #3006 #4001 #4002 #4003 #4004 #4005 #4006 Thanks Dennis 1 Deems, Maura From: Enright, Jean Sent: Monday, February 08, 2016 10:39 AM To: Deems, Maura Subject: RE: 4 High Street now 60 Water Street Maura, Since they were permitted under 4 High Street I think they should stay there. Hopefully, once the Assessor's Office enters the new address with unit #s (like condo units) future permits for each Individual unit can then be scanned to the correct corresponding address with the unit #, Sincerely, Jean Enright Assistant Director Community and Economic Development Town of North Andover 1600 Osgood Street, Suite 2035 North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: ienright@townofnorthandover.com Web: www.TownofNorthAndover.com '� w[Wilx,p °baa t r From: Deems, Maura Sent: Tuesday, February 02, 2016 2:27 PM To: Enright, Jean Subject: 4 High Street now 60 Water Street Jean, The 17 units in the mill building were originally using 4 High Street as the address. We have been informed that the address is now 60 Water Street. The unit no#s are as follows: 2001,2002,2004, 2005, 2006, 3001, 3002, 3003, 3004, 3005, 3006, 4001, 4002, 4003, 4004, 4005, 4006. Do you want to delete the permits that exist now in 4 High Street and rescan them to 60 Water Street? Maybe there is a way to move them? Let me know what you would like to do. Thanks, Mauro Maura Deems Building Department Assistant Town of North Andover 1600 Osgood Street Bldg. 20 Suite 2035 North Andover, MA 01845 Phone 978.688.9545 Fax 978.688.9542 Email mdeems@townofnorthandover.com Web www.TownofNorthAndover.com