HomeMy WebLinkAboutBuilding Permit #458 - 60 WILLOW STREET 3/5/2009TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non- Residential
New Building
One family
Addition
Two or more family
Industrial.
teration
No. of units:
ommercial
Repair, replacement
Assessory Bldg
Others:
Demolition
Other
Septic Well
Floodplain Wetlands
Watershed Distract
Water/Sewer
DESCRIPTION OF WORK TO BE PREFORMED:
Identification Please Type or Print
OWNER: Name:_j
Address: 6D W't
CONTRACTOR Name: A. A Cnokk f 71u►c. Phone- 979- 44M • 03~30
Address: Zb Sc., Aec AU 2_ Mf y a ni 4
Supervisor's Construction 'License: Exp. Dater 11 2G • ZO 1 t
Home
ARCHITECT/ENGINEER TiNcWe4 A 5;c'\ —CS O&& Phone: ��• 541k• 1645
Address: 55 //rv\ � I�OPVv.•kr,. Ac, _Reg. No.
FEE SCHEDULE: BOLDING PERMIT., $12.00 PER $1000.00 OF THE TOTAL ESTIMATED CST BASED ON $125.00 PER S.F.
Total Project Cost: $ �'`� °� FEE: $
Check No.: Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
C__-1 Ir
Plans Submitted Plans Waived Certified Plot Plan Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer
Tanning/Massage/Body Art
Swimming Pools
Well
Tobacco Sales
Food Packaging/Sales
Private (septic tank, etc.
Permanent Dumpster on Site
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
- INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Signature
I
COMMENTS
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision:
Comments
Conservation Decision: Comments
Water & Sewer Connection/Signature & Date Driveway Permit
DPW Town Engineer: Signature:
FIRE DEPARTMENT - Temp Dumpster nn site
Located at 124 Main Street
Fire Department signatureldate
COMMENTS
Located 384 Osgood Street
Yesno
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
rvv i tb ana UA I A — (For department use
❑ Notified for pickup - Date
Doc -Building Permit Revised 2008
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
o Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: INSPECTIONAL SERVICES DEPARTMENT:BPFORM07
Revised 2.2008
4 n, r5< s
Location
No. Date
NaR,M TOWN OF NORTH ANDOVER
i • OL
9
Certificate of Occupancy $
- _ 6--7 yf-- --F
SC • ttn Building/Frame Permit Fee $
Mus
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check #
Building Inspector
JM COULL, INC.
Building Yow Vision
To: Gerald Brown
Town of North Andover
1600 Osgood Street
North Andover, MA 01845
Ph: (978)688-9545 Fax: (978)688-9542
Subject: Building Permit Check
WE ARE SENDING YOU r Attached
r Shop drawings r Prints
F- Copy of letter I- Change order
20 Powder Mill Road
Maynard, MA 01754
Ph :(978) 461-0330
Letter of Transmittal
Transmittal #: 30
Date: 3/5/2009
Job: 09-JMC-482 Rohm & Haas North Andover
r Under separate cover via None the following items:
F Plans r Samples
r Specifications (e, Check
Document Type
Copies
Date
No.
Description
Other
1
3/4/09
1
Building Permit Check
r
Returned for corrections r Return _ corrected prints
r
For review and comment
r
THESE ARE TRANSMITTED as checked below:
I✓
For approval
r
Approved as submitted r Resubmit _ copies for approval
r
For your use
r
Approved as noted r Submit _ copies for distribution
r
As requested
r
Returned for corrections r Return _ corrected prints
r
For review and comment
r
Other
r
FOR BIDS DUE
r
PRINTS RETURNED AFTER LOAN TO US
Remarks:
Copy To:
From: Dan Cobb (J.M. Coull, Inc.)
Signature:
If enclosures are not as noted, kindly notify us at once. Page 1 of 1
JM COULL, INC.
Building Year Irtsion
To: Town of North Andover
1600 Osgood Street
North Andover, MA 01845
Ph: (978)688-9545 Fax: (978)688-9542
Subject: Building Permit Application
WE ARE SENDING YOU r Attached
r Shop drawings r Prints
r Copy of letter r Change order
20 Powder Mill Road
Maynard, MA 01754
Ph:(978) 461-0330
Letter of Transmittal
Transmittal #: 1
Date: 2/25/2009
Job: 09-JMC-484 Rohm & Haas Mat'Is Relocation
r Under separate cover via None the following items:
r Plans G Samples
r Specifications I✓ Other
Document Type
Copies
Date
No.
Description
Other
1
2/26/09
1
Town of North Andover Building Permit Application
Other
1
2/26/09
1
Workers Comp Insurance Affidavit
_
Other
1
2/26/09
1
Copy of Construction Supervisors License
Other
1
2/25/09
1
JMC Proposal
Other
2
2/17/09
1
Plans & Specifications
Other
1
2/26/09
1
Architectural & Engineering Affidavits
THESE ARE TRANSMITTED as checked below:
r
For approval
r
Approved as submitted r Resubmit _ copies for approval
I–
For your use
r
Approved as noted r Submit— copies for distribution
r
As requested
ri
Returned for corrections r Return _ corrected prints
r
For review and comment
r
Other
r
FOR BIDS DUE
r
PRINTS RETURNED AFTER LOAN TO US
Remarks: Please review all documents and contact JMC with questions. Thank you.
Copy To
From: Josh Deming (J.M. Coull, Inc.)
Signature:
If enclosures are not as noted, kindly notify us at once. Page 1 of 1
E9 *
w
O
t4
o
w°5
a
94
0
w
>
E
U
m
w
a
0,
'�
x
a
pa�
w
W
"
O
�
m"
in
u,
w
C
d
i
Q
o
r�
c
ui
W
CL
x
F-
C
O
• m C
c v
: o �
c
O y
O
CJ V
Ca C
O
�CO)
Ea
.r v
�oa
y
.0z
co ""
G .AW C
O y W
O O
O y
CO3
m
cm
'E m
o.L�
y O O
z � o
cm- c
�oo�
607 h O
; �.00z
C, no
O H O C
W C ::s -O Al
W O D
.y 'd= O C
.E 3 v
w o oo�cm
F c
CL o
GO
m a v
CA O y..
CL r=., m
E
y
y
m
cm
m
0
CD
C
�C
N
CD
t
O
Z
O
aJ
F.
2
C/)
O
z
O
U
CC/)
ami
co
O
E
CO
L
O
ww+
ZW
O H
Q C
G3 CM
CD c
� Q 'O
E m m
0 ow
CL
a�
0 0
co
e_vv o a
Cl- CM <
h
c
O +_-� C
ev cc
Vca J .O
O
C CD
C.3 h
O
c
CO2
Q
0
W
W
19
W
C4
L v
Building Your Vision
February 25, 2009
Gardner Peters
Rohm & Haas Electronic Materials
60 Willow Street
North Andover, MA 01845
Re: Pyrophoric Material Storage & Product Reclaim Space renovations @
60 Willow Street in North Andover
Construction Services Proposal
Dear Gardner,
We are pleased to submit this lump sum proposal for renovating parts of your existing building
on Willow Street in North Andover, MA. This proposal is for the Pyrophoric Material Storage,
H2, and Product Reclaim spaces, and, except as qualified below, is based on the architectural
drawings (T-01 & 2, AD -01 & 2, A-01 ... A-09), structural drawing (S-01), mechanical drawings
(FP -01 & 02; P-01 & 02; M-01 ... M-04), and electrical drawings (E-01... E-05), technical
specifications, and two addenda (#1 & 2) prepared for JM Coull Inc. by Industrial Facilities
Design Inc. dated February 17, 2009. This proposal is also based on the competitive bids we
solicited and received from at least three trade subcontractors in a dozen trades including the
architectural, structural, mechanical, and electrical trades.
Our price, not including preconstruction & design -phase services that have already been
provided and paid for ($86,909), and in accordance with the construction documents and
as qualified below is Five Hundred Eighteen Thousand Seven Hundred Five dollars
($518,705). For a detailed breakdown of this proposed base price and the 2 alternate
prices, please refer to the attached divisional cost breakdown.
This proposal is based on the following qualifications:
We have included the following in our price:
a. building & trade permit fees
b. sales tax
c. supervision, project management, and construction administration, assuming this
project runs concurrently with the Lab & Model Shop project
d. general liability, completed operations, and other insurances (see our certificate)
e. provisions for daytime/weekday access to occupied spaces within the building
f. relocating and reusing existing metal casework
g. the new exhaust fan, and removal & salvage of the existing ACCU
a
1M COULL, INC.
Construction Managers ■ Design Builders
20 Powder Mill Road - Maynard, Massachusetts 01 754
TEL: 978-461-0330 ■ FAX: 978-461-0275 - WEB: jmcoull.com
A I !
Building Your Vision
2. We have not included the following in our price:
a. preconstruction and design -phase fees (already billed and paid)
b. painting (electrostatically or otherwise) the existing metal lab casework
c. provisions for weekend or nighttime access to occupied spaces within the bldg.
d. performance or payment bond premiums
e. testing for or abatement of hazardous building materials
f. repair or relocation of hidden/buried utilities that might get damaged during
demolition or floorslab sawcutting
g. replacement of the existing fire alarm masterbox (see Alternate price below)
h. interior or exterior permanent signage
i. window treatments (blinds, shades, film, etc.)
j. permanent racks, railings, or material handling equipment
k. appliances... refrigerators, microwave ovens, or glove boxes
I. paper towel dispensers or waste paper receptacles
m. voice or data systems cabling, devices, or equipment
n. security system cabling, devices, or equipment
o. provisions to repair/replace existing equipment on the roof
p. third -party commissioning or testing of new systems and/or materials
q. handling and/or storage of existing raw materials, inventory, equipment, furniture,
furnishings, etc.
3. The drawings referenced above describe renovations and improvements in accordance
and compliance with the 6th edition of the Mass State Building Code which was in affect
when the project was designed and priced. Rohm & Haas acknowledges that the State
is adopting a 7th edition of the Building Code which goes into affect in a few days. We
have started the building permit application process by obtaining the Fire Department's
formal approval; we will be formally applying for the Building Permit by week's end.
Should the Building Department surprise us and not be willing to issue a permit based
on the Code's 6th edition, the current design may have to be revised significantly to be in
compliance with the new Code.
4. Our price assumes that, for and during construction, we can draw electrical power and
water, free of charge, from the existing building's systems. We also assume that we can
use an existing telephone line and existing toilet facilities for and during construction.
5. This proposal is based on the use of Rohm & Haas' standard fixed priced (lump sum)
construction contract between an owner and a design-builder/contractor. Retainage
from monthly progress payments will be limited to 5%, and payments will be due within
45 days of the date of the invoice.
6. Although shown on the drawings, we have not included the steel framing and/or
polycarbonate screening on the right (south) side of the process equipment area outside
the building between column lines E & F. There is an existing -to -remain chain link fence
with vinyl slats alongside the walkway.
Page 2 of 3
Building Your Vision
7. Although we've discussed and the fire protection drawings call for a "Met -L -X" dry
chemical fire suppression system in the proposed Pyrophoric Storage Rm, we're
proposing and have carried a "Met-L-KyI" dry chemical system as designed by Ansul and
proposed by Fire Equipment Inc. According to Fire Equipment Inc. and Ansul, the Met -
L -X agent will not suppress a pyrophoric fire as well as the Met-L-KyI agent. We're still
investigating the applicability and cost difference of the Met -L -X agent.
8. Our base price is based on the Pyrophoric Storage Rm having a demising partition with
a fire shutter and one 3000# dry chemical fire suppression skid. To eliminate the
demising wall & the fire shutter in the Storage Room and to add a 2nd 3000# dry
chemical skid outside, add $49,742 to our base price (alternate price #2).
9. To replace the existing hard -wired fire alarm masterbox with a new radio masterbox as
requested by the Fire Department, add $7,834 to our base price (alternate price #1).
10. Our pricing is based on being authorized to proceed with this project by Friday March 6th
so that it runs concurrently with the Lab & Model Shop project.
Sincerely,
J.M. Coull, Inc.
6i0190
4>
Charlie Spicer
Preconstruction Project Manager
Cc: Jeff Tremont, Tom Dube, Dan Cobb
Page 3 of 3
Nla„achusetts - Dep.u-tnunt of Public safety
Bom-d of Buildim, Re-,ulatiuns and St.indartls
y Construction Supervisor License
License: CS 85181
Restricted to: 00
RICHARD M MINER 4.
13 INDEPENDENCE RD
PEPPERELL, MA 01463 !
Expiration: 11/26/2010
( nnmi..i u�cr Tr#: 9409
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
d 600 Washington Street
Boston, MA 02111
M s� www.massgov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business/Organization/Individual):. J J1^�' G
Address: 2.0 � ar Alk VJ
City/State/Zip: - - A4y awrf k A)k of? 54 Phone.#: 4111 • q(.(- 633b
Are you an employer? Check the appropriat�e b x:
1. ❑ I am a employer with
Mr 4. am a general contractor and I
employees (full and/or part-time).*
have hired the sub -contractors
2. ❑ I am a sole proprietor or partner-
listed on the attached sheet.
ship and have no employees
These sub -contractors have
working for me in any capacity.
employees and have workers'
[No workers' comp. insurance
comp. insurance.# '
required.]
5. E] We are a corporation and its
3. ❑ 1 am a homeowner doing all work
officers have exercised their
myself. [No workers' comp.
right of exemption per MGL
insurance required.] t
.c. 152, § 1(4), and we have no
employees. [No workers'
comp, insurance required.]
Type of project (required):.
6. ❑ New construction
7. 5(Re*modeling
8. Fl. Demolition
9. ❑ Building addition
10.❑ Electrical repairs or additions
11.0 Plumbing repairs or additions
12.❑ Roof repairs
13.❑ Other
*Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have
employees. If the sub -contractors have employees, they must provide their workers' comp. policy number.
I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: }.
Policy # or Self -ins. Lic. #:
Expiration Date:
Job Site Address:---- �ob (,p'." gCw� City/State/Zip: A 6 o A J
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure. to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine Lip to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coveraee verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
Signature: Date: Z. • Z,5 • Cyr,v —
Phone M o330 >C, 129
Official use only. Do not write in this area, to be completed by city or town official
City or Town: Permit/License #
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone #:
In
"AC -OW. CERTIFICATE OF LIABILITY INSURANCE
os/oaji o'
PRODUCER (978) 392-4567 FAX (978) 392-9696
E.J. Wells Insurance Agency, Inc.
Regency Park
9 Y
238 Littleton Road
Westford, MA 01886
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
INSURERS AFFORDING COVERAGE NAIC #
INSURED
I.M. Coul l , Inc.
20 Powder Mill Road
Maynard, MA 01754
INSURER A: Travelers Indemnity Co.
INSURER B: Charter , Oak Fire(Travelers)
INSURERc: Travelers Property Casualty Co.
INSURER D:
INSURER E:
rnVFRO(:FS
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSRD'
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
POLICY EXPIRATION
09/01/2008
LIMITS
GENERAL LIABILITY
DT -CO -463D5003 -IND -07
09/01/2007
EACH OCCURRENCE $ 1,000,000
X COMMERCIAL GENERAL LIABILITY
_
DAMAGE TO RENTED $ 300,000
CLAIMS MADE a OCCUR
MED EXP (Any one person) $ S'000
A .
PERSONAL & ADV INJURY $ 1,000,000
GENERAL AGGREGATE $ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $ 2,000,000
POLICY JPE
XCOT LOC
AUTOMOBILE LIABILITY DT
0-810-463D5015-COF-07
09/01/2007
09/01/2008
COMBINED SINGLE LIMIT
X ANY AUTO
(Ea accident) $ 1,000,000
ALL OWNED AUTOS
BODILY INJURY
$
SCHEDULED AUTOS
(Per person)
B
BODILY INJURY $
X HIRED AUTOS
X NON -OWNED AUTOS
(Per accident)
PROPERTYDAMAGE $
(Per accident)
GARAGE LIABILITY
AUTO ONLY - EA ACCIDENT $
OTHER THAN EA ACC $
ANY AUTO
AUTO ONLY: AGG $
EXCESSIUMBRELLA LIABILITY DT
M -CUP -463D5040 -IND -07
09/01/2007
09/01/2008
EACH OCCURRENCE $ 10, 000, 000
X OCCUR F] CLAIMS MADE
AGGREGATE $ 10, 000, 000
C
$
$
DEDUCTIBLE
X RETENTION $ 10,00
$
WORKERS COMPENSATION AND
UB -5635L515-07
09/01/2007
09/01/2008
X wR TORY IlMrr FR
A
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE
E.L. EACH ACCIDENT $ 1,000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
OFFICERIMEMBER EXCLUDED?
IF yes, describe under
SPECIAL PROVISIONS below
E.L. DISEASE -POLICY LIMIT $ 1,00-0,000
OTHER
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
5040$
ohm & Haas Electronic Materials are listed as additional insured with respect to General
Liability where required by written contract.
Except for 10 days for non payment of premium
Rohm & Haas Electronic Materials
Gardner Peters
60 Willow Street
North Andover, MA 01845
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
*30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
Paul Coffey/TMV
ACORD 25 (2001/08) OACORD CORPORATION 1988
IFDI
Industrial Facilities Design, Inc.
CONSTRUCTION CONTROL AFFIDAVIT (ARCHITECTURAL)
(PRIOR TO START OF CONSTRUCTION)
PROJECT LOCATION: 60 Willow Street, North Andover, MA
PROJECT DESCRIPTION: Rohm & Haas — Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code, Sixth Edition, being a
registered ARCHITECT, I hereby certify that I have prepared or directly supervised the preparation of
the plans and specifications for the above named project and that, to the best of my knowledge, such
plans and specifications meet the applicable provisions of the Massachusetts Sate Building Code, all
acceptable architectural practices and all applicable laws pertaining to the proposed project.
I further certify that I shall perform the necessary professional services and be present on the
construction site on a periodic basis to determine that the work is proceeding in accordance with the
documents approved for the building permit and shall be responsible for the following as specified in
section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contactor as required by the
construction contract documents as submitted for building permit, for conformance to the
design concept.
2. Review of the quality control procedures for all code required controlled materials.
3. Where appropriate, review of critical building components requiring controlled materials or
construction when specified in the accepted practice standards listed in Appendix B of the
Massachusetts State Building Code, Sixth Edition.
Pursuant to section 116.2.3, I shall submit periodically progress reports together with pertinent
comments to the building inspector. Upon completion of the work, I shall submit a report as to the
satisfactory completion and readiness of the project for occupancy.
CIO
No. 6011 p
NATICK,
MAS$. /
rH OF a
IFDI
Industrial Facilities Design, Inc.
CONSTRUCTION CONTROL AFFIDAVIT (Structural Work Only)
(PRIOR TO START OF CONSTRUCTION)
PROJECT LOCATION: 60 Willow Street, North Andover, MA
PROJECT DESCRIPTION: Rohm & Haas — Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code, Sixth Edition, I, being a
registered STRUCTURAL ENGINEER, hereby certify that I have prepared or directly supervised the
preparation of the plans and specifications for the above named project and that, to the best of my
knowledge, such plans and specifications meet the applicable provisions of the Massachusetts Sate
Building Code, all acceptable engineering practices and all applicable laws pertaining to the proposed
project.
I further certify that I shall perform the necessary professional services and be present on the
construction site on a periodic basis to determine that the work is proceeding in accordance with the
documents approved for the building permit and shall be responsible for the following as specified in
section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contactor as required by the
construction contract documents as submitted for building permit, for conformance to the
design concept.
2. Review of the quality control procedures for all code required controlled materials.
3. Where appropriate, review of critical building components requiring controlled materials or
construction when specified in the accepted practice standards listed in Appendix B of the
Massachusetts State Building Code, Sixth Edition.
Pursuant to section 116.2.3, I shall submit periodically progress reports together with pertinent
comments to the building inspector. Upon completion of the work, I shall submit a report as to the
satisfactory completion and readiness of the project for occupancy.
A" OF M s
a JAMES M.
j WOLAHAN
No. 31610
STRUCTURAL
�Aycr 9FGlST1:R�� .
�i �'ONAL
SEAL
85 Main Street
Hopkinton MA 01748
Name
Architect/Engineer Mass. Reg. #
Phone: 508-544-1695
Fax: 508-544-1694
DATE:
PROJECT LOCATION:
NATURE OF PROJECT:
B R
BUILDING ENGINEERING RESOURCES, INC.
Construction Control Affidavit
(Prior to Start of Construction)
February 19, 2009
60 Willow Street - North Andover, Massachusetts
Rolim & Haas - Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code,
I, Steven A. Karan, PE, LEED, Massachusetts Registration No. #34989 being a Registered Professional-Axc4iited/Engineer hereby
certify that. I have prepared or directly supervised the preparation of all Design Plans, Computations and Specifications concerning:
ENTIRE PROJECT___ ARCHITECTURAL STRUCTURAL ___ MECHANICAL
FIRE PROTECTION ELECTRICAL OTHER PLUMBING XX
For the above named project and that, to the best of my knowledge, such Plans, Computations and Specifications meet the applicable
provisions of the Massachusetts State Building Code, all acceptable Engineering practices and all applicable Laws and Ordinances for the
proposed use and occupancy.
I, further certify that. I shall perforin the necessary Professional Services and be present on the Construction Site on a regular and periodic
basis to determine that the work is proceeding in accordance with the Documents approved for the Building Permit and shall be
responsible for the following as Specified in Section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by die construction contract documents as
submitted for building permit, and approval for conformance to the design concept.
2. Review and approval of the quality control procedures for all code required controlled materials.
3. Special architectural or engineering professional inspection if critical construction components requiring controlled materials or
construction specified in die accepted engineering practice standards listed in Appendix A.
Pursuant to Section 116.2.2.3, I shall submit periodically, a Progress Report together with pertinent comments to the Building Inspector.
Upon completion of the work, I shall submit a Final Report as to the satisfactory completion and readiness of the project for
Signature/Seal
rare, 2009.
My Commission Expires: April 6, 2012
H OFM S
`�c STEVEN A.
o� KARAN
MECHANICAL
No.34989
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER@BER-engineering.com
DATE:
PROJECT LOCATION:
NATURE OF PROJECT:
BUILDING ENGINEERING RESOURCES, INC.
Construction Control Affidavit
(Prior to Start of Construction)
February 19, 2009
60 Willow Street - North Andover, Massachusetts
Rolim & Haas - Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code,
I, Steven A. Karan, PE, LEED, Massachusetts Registration No. #34989 being a Registered Professional ° ��-�*�^t�Enginecr hereby
certify that I have prepared or directly supervised die preparation of all Design Plans, Computations and Specifications concerning:
ENTIRE PROJECT___ ARCHITECTURAL STRUCTURAL MECHANICAL XX
FIRE PROTECTION ELECTRICAL OTHER
For the above named project and that, to the best of my knowledge, such Plans, Computations and Specifications meet the applicable
provisions of the Massachusetts State Building Code, all acceptable Engineering practices and all applicable Laws and Ordinances for the
proposed use and occupancy.
I, further certify that I shall perforin the necessary Professional Services and be present on the Construction Site on a regular and periodic
basis to determine that the work is proceediing in accordance with the Documents approved for the Building Permit and shall be
responsible for the folloAing as Specified in Section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by die construction contract documents as
submitted for building permit, and approval for conformance to the design concept.
2. Review mid approval of the quality control procedures for all code required controlled materials.
3. Special architectural or engineering professional inspection if critical construction components requiring controlled materials or
construction specified in the accepted engineering practice standards listed in Appendix A.
Pursuant to Section 116.2.2.3, I shall submit periodically, a Progress Report together with pertinent comments to the Building Inspector.
Upon completion of the work, I shall submit a Final Report as to the satisfactory completion and readiness of the project for
N OF M S
o�a STEVEN A.
KARAN
MECHANICAL
, No.84989
Signature/Seal
Subscribed and sworn to befoyc�mc this, 1"y of February, 2009.
My Commission Expires: April 6, 2012
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER@BER-engineering.com
DATE:
PROJECT LOCATION:
NATURE OF PROJECT:
_, B_ _J
BUILDING ENGINEERING RESOURCES. INC.
Construction Control Affidavit
(Prior to Start of Construction)
February 19, 2009
60 Willow Street - North Andover, Massachusetts
Rohm & Haas - Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code,
I, Marc R. Plante, PE, Massachusetts Registration No. #38119 being a Registered Professional-ATehitecVEngineer hereby certify that I
have prepared or directly supervised the preparation of all Design Plans, Computations and Specifications concerning:
ENTIRE PROTECT___ ARCHITECTURAL STRUCTURAL ___ MECHANICAL
FIRE PROTECTION ELECTRICAL XX OTHER
For the above named project and that, to the best of my knowledge, such Plans, Computations and Specifications meet the applicable
provisions of the Massachusetts State Building Code, all acceptable Engineering practices and all applicable Laws and Ordinances for the
proposed use and occupancy.
I, further certify that I sliall perform the necessary Professional Services and be present on the Construction Site on a regular and periodic
basis to determine that. the work is proceeding in accordance with the Documents approved for the Building Permit and shall be
responsible for the following as Specified in Section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as
submitted for building permit, and approval for conformance to the design concept.
2. Review and approval of the quality control procedures for all code required controlled materials.
3. Special architectural or engineering professional inspection if critical construction components requiring controlled materials or
construction specified in the accepted engineering practice standards listed in Appendix A.
Pursuant to Section 116.2.2.3, I shall submit periodically, a Progress Report together with pertinent comments to the Building Inspector.
Upon completion of the work, I shall submit a Final Report as to the satisfactory completion and readiness of the project
MARCR.
EWCTN RIC
NO-38119
Subscribed and sworn to before me this,119 qay of February, 2009.
My Commission Expires: April 6, 2012
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER@BER-engineering.com
1C i"
PROJECT' LOCATION:
NATURE OF PROJECT:
�
BUILDING ENGINEEA7NG RESOUtt-cEs, INC.
Construction Control Affidavit
(Prior to Start of Construction)
February 19, 2009
60 Willow Street -'North Andover, Massachusetts
Rohm & Haas - Laboratory Renovation
In accordance with Section 116.0 of the Massachusetts State Building Code,
I, Steven A. Karan, PE, LEED, Massachusetts Registration No. #34989 being a Registered Professional- teft/Engineer hereby
certify that I have prepared or directly supervised the preparation of all Design Plans, Computations and Specifications concerning:
ENTIRE PROJECT ARCHITECTURAL STRUCTURAL �__ MECHANICAL
FIRE PROTECTION XX ELECTRICAL OTHER
For the above named project and that, to the best of my knowledge, such Plans, Computations and Specifications meet the applicable
provisions of the Massachusetts State Building Code, all acceptable Engineering practices and all applicable Laws and Ordinances for the
proposed use and occupancy.
I, further certify that I shall perform the necessary Professional Services and be present on the Construction Site on a regular and periodic
basis to determine that the work is proceeding in accordance with the Documents approved for the Building Permit and shall be
responsible for the following as Specified in Section 116.2.2:
1. Review of shop drawings, samples and other submittals of the contractor as required by the construction contract documents as
submitted for building permit, and approval for conformance to the design concept.
2. Review and approval of the quality control procedures for all code required controlled materials.
3. Special architectural or engineering professional inspection if critical construction components requiring controlled materials or
construction specified in the accepted engineering practice standards listed in Appendix A.
Pursuant to Section 116.2.2.3, I shall submit periodically, a Progress Report together with pertinent comments to the Building Inspector.
Upon completion of the work, I shall submit a Final Report as to die satisfactory completion and readiness of the project
Signature/Seal
Subscribed and sworn to before me t) is, Aft day of February, 2009.
My Commission Expires: April 6, 2012
N
01vJ9c
STEVEN A.
^. n KARAN
MECHANICAL
A No. 34989 O <
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER@BER-engineering.com
B,E R
BUILDING ENGINEERING RESOURCES, INC.
Rohm & Baas
Product Reclaim / Raw Material Storage
-60 Willow Street
North Andover, MA
FIRE PROTECTION CONSTRUCTION DOCUMENTS
1. a. Basis (Methodology) of Design:
Section 1— Building Description:
a) The existing building consists of B- Use Group Office, Laboratory Research and
Testing Lab, F-1 Factory Moderate Hazard, and Hazardous H-2 perimeter and inside
areas as allowed for in an "Unlimited Area" building as defined by CMR 780.
b) The total square footage of the building is 53,830 square feet, of which 53,830 square
feet is occupied by the subject tenant.
c) The main building height above grade is approximately 20 feet to the ridge, 32 feet to
the top of the Maintenance Mezzanine.
d) The building has a total of (1) one story above grade.
e) There are no floors below grade.
f) There is 53,830 square feet on the first floor.
g) The occupancy types are: B, F-1, and H-2.
h) The type of construction is 2C, Non Combustible, Unprotected with Automatic Fire
Suppression System.
i) The proposed chemicals to be used in the Reclaim Room and Pyrophoric Storage
R000m include materials in excess of the exempt amounts listed in 780CMR Tables
307.8(1) and (2), (list to be provided by Rohm and Haas).
j) The building will not include any high pile storage.
k) Emergency response vehicles and personnel can access the building directly from 3
sides on paved parking areas.
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BERBER-engineering.com
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 2
Section 2 — Applicable Laws, Regulations and Standard:
The following regulatory codes and standards are applicable to this project:
a) 780 CMR (2005) Section 903.11
b) NFPA 13 (2007) Installation of Sprinkler System
c) NFPA 72 (2007) National Fire Alarm Code
d) NFPA 101 (2006) Life Safety Code
e) 521 CMR — Architectural Access Board
Section 3 — Design Responsibility for Fire Protection Systems:
a) The professional engineer (PE) fully designs (complete layout) and specifies the fire
protection system or systems to be installed, reviews and approves the Installing
Contractor's shop drawings. The PE is considered the engineer of record and certifies
system installation for code compliance at completion.
Section 4 — Fire Protection Svstems to be Installed:
a) Water supply and hydrants:
1. Two fire hydrants will be located within 50 feet of the building.
2. Water supply information.
Static Pressure: psi
Residual Pressure: psi
Flow: gpm
Pitot: psi
Location:
b) Automatic sprinkler systems and components:
The existing wet sprinkler system is fed from an existing main, located in the street.
The existing 8" sprinkler main is brought into the building in the mechanical room.
The system contains an existing 6" double check valve assembly and 6" alarm valve.
All areas which are Ordinary Hazard will have a sprinkler spacing of a maximum of
130 square feet. The Extra Hazard Labs will have a sprinkler spacing of a maximum of
100 square feet. The existing sprinkler system is currently gridded with 4" mains and
2" cross branches. The Pyrophoric Storage Room will have the existing wet sprinkler
system removed in its entirety. The Fire Department has accepted this. There will be a
complete dry chemical flooding suppression system installed in lieu of a wet system.
Dry chemical system shall tie into Base Building fire alarm system.
The existing 4" storz fire department connection is located near the fire service
entrance.
28 Main Street, Building 3A North Easton, Massachusetts 02356 T 508.230.0260 F 508.230.0265 1 BERa BER-eneineerine.com
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 3
c) Standpipe systems and components:
The building does not have any standpipes.
d) Fire alarm systems and components:
The building is presently equipped with an existing addressable fire alarm system. The
existing fire alarm control panel is located at the rear main entrance and an LCD remote
annunciator is located at the front main entry lobby. Building occupant notification of a
fire alarm is accomplished via new and existing audio/visual (horn/light) appliances.
These appliances will sound automatically based on an alarm condition initiated by
smoke/heat detectors, manual pull stations, sprinkler flow or lab hood ansul system
discharge. Detection devices include smoke/heat detectors, manual pull stations, and
duct mounted smoke detectors. In addition, addressable monitor modules provide fire
alarm system monitoring of the buildings sprinkler flow and tamper valves and lab
hood fire suppression systems (aasul systems).
Upon the initiation of any manual or automatic alarm device, the North Andover Fire
Department will be notified via the existing municipal connection.
When a fire starts, the fusible links at the sprinkler heads are melted, allowing water to
flow from the system. A flow or pressure switch triggers an alarm within the building.
The fire alarm panel will notify the fire department.
e) Automatic fire extinguishing systems:
Each new lab hood installed within the area of renovation will be equipped with an
individual automatic dry chemical fire suppression system. These systems will be
connected to the fire alarm control panel via addressable monitor modules to activate
the building's fire alarm system upon activation.
f) Manual suppression systems:
Manual fire extinguishers are provided throughout the facility in accordance with
NFPA 10.
g) Smoke control/management systems:
The space does not require a smoke control or exhaust system.
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER wBER-en ing eering.com
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 4
h) Kitchen cooking equipment and exhaust systems:
The space does not possess any kitchen cooking Equipment and therefore an exhaust
system is not required
i) Emergency power equipment:
A new diesel fueled kW standby generator will be installed to provide standby power
only to the new Clean Room exhaust system.
Emergency lighting is provided by new and existing self-contained emergency battery
units with low voltage lamps, L.E.D. exit signs with integral battery back-up and by
certain light fixtures equipped with integral emergency ballasts. All emergency
lighting equipment is designed to provide emergency lighting for 90 minutes.
j) Hazardous material monitoring equipment:
The space does not require hazardous material monitoring equipment.
k) Seismic consideration:
All installations shall comply with 780 CMR Chapter 16.
The fire protection system that is to be installed for this project is a modification to an
existing system to incorporate the new Laboratory layouts and spaces. This layout is
required by 780 CMR to provide 100% protection.
Section 5 — Features used in the Design Methodology:
a) Building occupant notification of a fire alarm is accomplished via new and existing
audio/visual (horn/light) appliances. These appliances will sound automatically based
on an alarm condition initiated by existing and new smoke/heat detectors, manual pull
stations or sprinkler flow.
b) All responding emergency personnel will be directed to the existing main fire alarm
control panel or the remote annunciator at either the front or rear entrance. This panel
will advise emergency personnel of the location of the fire and the device that initiated
the alarm condition.
c) All construction work will be performed in a manner that is safe and in compliance
with applicable codes. The existing fire alarm and sprinkler systems will remain
operational throughout construction. In the event the Contractor is required to
temporarily disable the system(s), a minimum of (72) hours notice must be given to the
North Andover Fire Department.
28 Main Street, Building 3A I North Easton, Massachusetts 02356 T 508.230.0260 F 508.230.0265 1 BEB@BER-eneineerina.com
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 5
d) All future testing shall be conducted in accordance with NFPA 72 and NFPA 13. This
will include quarterly testing of 25% of fire alarm components. Any device/appliance
found to be faulty and re -tested. All testing will be coordinated with the North Andover
Fire Department prior to initiation of testing.
Section 6 — Special Consideration and Description:
At this time, the designer does not require a waiver or variance. The fire protection design is in
accordance with 780 CMR
1. b. Sequence of Operation
Section 1:
The fire alarm system shall operate automatically to sound all interior building evacuation alarms
and flash all alarm strobes upon activation from pull stations, detectors, or sprinkler water flow
devices. Upon initiation of any manual or automatic alarm device, the Fire Department shall be
notified via the building existing municipal connection.
When a fire starts, the fusible links at the sprinkler heads are melted, allowing water to flow from
the system. A flow or pressure switch triggers an alarm within the building. The existing fire
alarm panel and municipal connection will notify the fire department.
An alarm condition will notify the North Andover Fire Department via the existing municipal
connection. A tamper (supervisory) condition will notify the local fire department via the existing
municipal connection but horn/lights appliances within the building will not be activated.
1. c. Testing Criteria
Section 1— Testing Criteria
Personnel:
a) The Construction Manager in association with the Electrical and Fire Protection
Contractor will coordinate the actual test dates. This date will be based upon
completion of installation of all components.
b) Upon completion of a successful pre-test, the Contractor shall notify the Professional in
Charge that all systems are ready for a final test. The Contractor will provide the
professional, with documentation that all equipment was 100% tested and that the
system is ready for a final acceptance test. As part of the pre-test, the Contractor shall
ensure that the graphic annunciator has been updated to reflect all changes performed
under this contract.
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BERBER-engineerina.conr
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 6
c) Upon receipt of the aforementioned confirmation letter, the Professional in Charge will
direct the Construction Manager to proceed with notifying all interested parties
(Contractor, Distributors, and Code Officials) that all Life Safety systems have passed a
pre-test and are ready for a final test. The Construction Manager will then proceed to
coordinate a mutually agreeable time for all parties to witness the final test.
d) The following paperwork needs to be submitted to the North Andover Fire Department
prior to Final Testing.
1) Affidavits by Designer. Letter certifying system has been installed according to
Plans and Specifications and has been witnessed that it is 100% operational and
ready for Final Testing.
2) Affidavits by the Electrical Contractor. Letter certifying system is complete.
3) The Fire Alarm Manufacturer. Certification of complete system.
4) Copy of the Manufacturer's Program Notes.
5) Copy of the stamped Drawings (As-builts if available).
Section 2 — Equipment and Tools:
a) All equipment required to perform a 100% test of the fire protection and detection
systems will be furnished by the Contractor. This equipment shall be available at the
time of the test. A listing of the equipment that is to be supplied will be forwarded to
all "Final Test participants" prior to the test occurring so as to allow for comments.
Typical equipment supplied would include the following:
Manufacturer's instructions
Specifiers' special instructions
Approved Narrative Report, sequence of operation section
Sound meters
Smoke detector aerosol tester
Flow measuring devices
Gauges
Voltage meters
Magnets
Communication radios
Fire department equipment
Special tools
Notification announcements
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER6WER-eneineerine.con
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc
Rohm & Haas — North Andover, MA
Product Reclaim / Raw Material Storage
February 18, 2009
Fire Protection Narrative - Page 7
Section 3 — Approval Requirements:
a) Upon viewing a successful test of all fire protection and fire detection equipment, the
-code official(s) shall "sign off' on the Building Department Inspection Card. This act
will confirm the code official has witnessed the test and accepts the building as
satisfactorily complete.
b) In the event a piece of equipment fails during the final test, the affected Contractor will
make a reasonable effort to replace the defective equipment immediately so the test
may continue. In the event this action is not possible, the Contractor shall procure the
piece of equipment as soon as possible. The Contractor will be responsible for re-
scheduling the test with all attendees.
c) Upon successful completion of all tests, the Contractors and Distributors will provide
documentation attesting to the fact that they have performed, witnessed and
successfully completed a test of all Life Safety systems. The Professional in Charge
will provide construction affidavits which acknowledge tests have been witnessed is
addition to periodic site visits and that recommendation is made to the Local Official
that a Certificate of Occupancy be provided.
d) In accordance with 780 CMR Chapter 903.4, all documentation listed in paragraphs 1,
2 and 3 shall be furnished to the building official and the head of the fire department.
e) At the initiation of the construction phase of the project, the General Contractor will
provide all parties with a list of personnel who will respond to an emergency situation
at the project. This list will include addresses and cell phone numbers.
28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BERGBER-en¢ineerine.co
P:\07150\07150.06\Correspondence\Narrative (Fire Protection) Feb 18 2009.doc