Loading...
HomeMy WebLinkAboutBuilding Permit #514 - 60 WILLOW STREET 4/1/2009BUILDING PERMIT o I- b ��t�eD TOWN OF NORTH ANDOVER �i`b� h APPLICATION FOR PLAN EXAMINATION * e^ t X04 _,I* Permit NO: Date Received �SSAc►+us�� Date Issued: l TO IMP�ORjTANT: Applicant must complete all items on this page LOCATION f/*4z1J Print PROPERTY OWNER Print MAP NO: PARCEL: //' ZONINGDISTRICT: Historic District yes no Machine Shop Villaqe ves no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addition Two or more family Industrial Alteration No. of units: Commercial Repair, replacement Assessory Bldg Others: Demolition Other Septic Well Floodplain Wetlands Watershed District Water/Sewer DESCRIPTION OF WORK TO BE PREFORMED: Identification Please Type or Print Clearly) OWNER: Name: I hl^«,, 9. (-I C p�,4,) l r vf�+x� Phone: ? n - 44"w - /,5*qq Address: 66 w c(Ia,, s•F, ,v©. ,, ,&g�h V -e-v � o -v*-i- � ' "S 0 V 174- t„w , cam. CONTRACTOR Name: , ar L,�, t� 4, Gov�v�j Phone: sox - c,,s - i rt Address:/,/, -Tj5a a tc?t.c a�asl�; . �k Supervisor's Construction License: �3' 64 p Exp. Date: Home Improvement License: Exp. Date: ARCH ITECT/ENGINEER./xR,•5�,,;�,Q��r_j�tj , D,_,g hone: soS Address: 8,<liter»q,_�4,91 k&44 tI2 i 74 J Reg. No. 6a( l FEE SCHEDULE: BULDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ 3 / �, 3 96 • tea FEE: $,/ Check No.: /D Receipt No.: al< D % NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Signature -of A ent/Owne Signature of contractor Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private (septic tank, etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH t, COMMENTS s1P Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Conservation Decision: Com Comm Water & Sewer Connection/Sinature & Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signatureldate COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2008 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application L3 Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses Li Copy of Contract ❑ Floor Plan Or Proposed Interior Work Li Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Li Building Permit Application ❑ Certified Surveyed Plot Plan o Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract Li Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Building Permit Revised 2008 Location No. Date L TOWN OF NORTH ANDOVER ,. Certificate of Occupancy $ cMus t� Building/Frame Permit Fee $ 5�7 Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check /O �� ! • 2 u�� Building Inspector m m m m YI m EP mm LrJ .... a O O O co CD CO) 'O CD a O 7 C7 CD 0 rt CD CD CO! CD CO) 1 O CCD O CCD C 0 O 0 CD O A O C13 CLm USc N 4 CAN m CO) C) m T Mn N S R O �• N C Q N w- aGo m=Cmn es n m CD �' _N O d d y a a "b cn O m � O N O -.,a G rL 0 m CD CD N m 0: O� .Oi O O N CD .=k: =r nN 5. CL m H CD 71 O O CL 1 CD CA d CO) Q O. p=j C W O. �CCD m CD H N N .Osrt 'O CO) C) m T Mn N S R O rp " w- aGo o :a °=• CD �' � 3 w c ^' "b cn O o �► T G rL 0 � N . O a x tri � . 0M CL's Cl) � CD ^' c o' So ;'T, R O rp " w- aGo rA M °=• �' lT1 C" y w G a' "b cn O w C T G rL 0 a[❑j cn rf I O b n' O a x tri � z 0 H 0 9 Industrial Facilities Design, Inc. CONSTRUCTION CONTROL AFFIDAVIT (ARCHITECTURAL) (PRIOR TO START OF CONSTRUCTION) PROJECT LOCATION: 60 Willow Street, North Andover, MA PROJECT DESCRIPTION: Rohm & Haas — HVAC Improvements In accordance with Section 116.0 of the Massachusetts State Building Code, Seventh Edition, being a registered ARCHITECT, I hereby certify that I have prepared or directly supervised the preparation of the plans and specifications for the above named project and that, to the best of my knowledge, such plans and specifications meet the applicable provisions of the Massachusetts Sate Building Code, all acceptable architectural practices and all applicable laws pertaining to the proposed project. I further certify that I shall perform the necessary professional services and be present on the construction site on a periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and shall be responsible for the following as specified in section 116.2.2: 1. Review of shop drawings, samples and other submittals of the contactor as required by the construction contract documents as submitted for building permit, for conformance to the design concept. 2. Review of the quality control procedures for all code required controlled materials. 3. Where appropriate, review of critical building components requiring controlled materials or construction when specified in the accepted practice standards. Pursuant to section 116.2.3, I shall submit periodically progress reports together with pertinent comments to the building inspector. Upon completion of the work, I shall submit a report as to the satisfactory completion and readiness of the project for occupancy. C. rR;CN, 0 0 No. 6011 0)-,Yi tr NATICK, MASS rN or V Name 6011 SEAL Architect/Engineer Mass. Reg. # 85 Main Street Hopkinton MA 01748 Phone: 508-544-1695 Fax: 508-544-1694 Industrial Facilities Design, Inc. CONSTRUCTION CONTROL AFFIDAVIT (Structural Work Only) (PRIOR TO START OF CONSTRUCTION) PROJECT LOCATION: 60 Willow Street, North Andover, MA PROJECT DESCRIPTION: Rohm & Haas — HVAC Improvements In accordance with Section 116.0 of the Massachusetts State Building Code, Seventh Edition, I, being a registered STRUCTURAL ENGINEER, hereby certify that I have prepared or directly supervised the preparation of the plans and specifications for the above named project and that, to the best of my knowledge, such plans and specifications meet the applicable provisions of the Massachusetts Sate Building Code, all acceptable engineering practices and all applicable laws pertaining to the proposed project. I further certify that I shall perform the necessary professional services and be present on the construction site on a periodic basis to determine that the work is proceeding in accordance with the documents approved for the building permit and shall be responsible for the following as specified in section 116.2.2: 1. Review of shop drawings, samples and other submittals of the contactor as required by the construction contract documents as submitted for building permit, for conformance to the design concept. 2. Review of the quality control procedures for all code required controlled materials. 3. Where appropriate, review of critical building components requiring controlled materials or construction when specified in the accepted practice standards. Pursuant to section 116.2.3, I shall submit periodically progress reports together with pertinent comments to the building inspector. Upon completion of the work, I shall submit a report as to the satisfactory completion and readiness of the project for occupancy. H OF �G^ JAMES M. y� WOLAHAN igriature ' No. 31610 H STRUCTURAL IST s/ONAI Ep�'� Name -��? tf6 zf0 SEAL Architect/Engineer Mass. Reg. # 85 Main Street Phone: 508-544-1695 Hopkinton MA 01748 Fax: 508-544-1694 B1 IR BUILDING ENGINEERING RESOURCES, INC. MECHANICAL DESIGN AFFIDAVIT Date: March 31, 2009 Project: Rohm & Haas Electronics Materials, LLC HVAC Improvements 60 Willow Street North Andover, Massachusetts 1,, Steven A. Karan, PE, LEED AP, certify that to the best of my knowledge, information and belief that the above -referenced project was designed in accordance with the latest edition of the Massachusetts Building Codes and all Local and State Codes. The Engineer stated below was responsible for the MECHANICAL design and will provide Construction Administration for the project during construction. STEVEN A. KARAN, PE, LEED AP #34989 Engineer - MA Reg. Number BUILDING ENGINEERING RESOURCES, INC, Company 28 MAIN STREET NO, EASTON, MA Address (508) 230 - 0260 Telephone Number H OFM S STEVEN A. Z KARAN � MECHANICAL Engineer—Seal & Signature On this date March 31, 2009, before me, the undersigned Notary Public, personally appeared the above named Steven A. Karan, PE, LEED AP, proved to me through satisfactory evidence of identification which was personal knowledge to be the persons) whose name(s) is signed on the preceding or attached document in my presence, and who swore to me that the contents of the document are truthful and accurate to the best of his/her knowledge. 28 Main Street, Building 3A I North Easton, Massachusetts 02356 IT 508.230.0260 IF 508.230.0265 1 BER@BER-engincering.com B1 BUILDING ENGINEERING RESOURCES, INC. ELECTRICAL DESIGNAFFIDAVIT Date: March 31, 2009 Project: Rohm & Haas Electronics Materials, LLC HVAC Improvements 60 Willow Street North Andover, Massachusetts I, Marc R. Plante, PE, certify that to the best of my knowledge, information and belief that the above -referenced project was designed in accordance with the latest edition of the Massachusetts Building Codes and all Local and State Codes. The Engineer stated below was responsible for the ELECTRICAL design and will provide Construction Administration for the project during construction. MARC R. PLANTE, PE #38119 Engineer - MA Reg. Number BUILDING ENGINEERING RESOURCES, INC, Company 28 MAIN STREET NO. EASTON MA Address (508) 230 - 0260 Telephone Number Engineer Seal & Signature On this date March 31, 2009, before me, the undersigned Notary Public, personally appeared the above named Marc R. Plante, PE, proved to me through satisfactory evidence of identification which was personal knowledge to be the person(s) whose name(s) is signed on the preceding or attached document in my presence, and who swore to me that the contents of the document are truthful and accurate to the best of his/her knowledge. 28 Main Street, Building 3A I North Easton, Massachusetts 02356 IT 508.230.0260 IF 508.230.0265 1 BER@BER-engineering.com Date: Project: B R BUILDING ENGINEERING RESOURCES, INC. PLUMBING DESIGN AFFIDA VIT March 31, 2009 Rohm & Haas Electronics Materials, LLC HVAC Improvements 60 Willow Street North Andover, Massachusetts I, Steven A. Karan, PE, LEED AP, certify that to the best of my knowledge, information and belief that the above -referenced project was designed in accordance with the latest edition of the Massachusetts Building Codes and all Local and State Codes. The Engineer stated below was responsible for the PLUMBING design and will provide Construction Administration for the project during construction. STEVEN A KARAN PE LEED AP #34989 Engineer - MA Reg. Number BUILDING ENGINEERING RESOURCES INC, ��P�I" OFM S Companyogo� S A KARAN MECHANICAL 28 MAIN STREET NO. EASTON, MA No. 31*9 Address (508) 230 - 0260 / Telephone Number Enginee Seal & Signature On this date March 31, 2009 before me, the undersigned Notary Public, personally appeared the above named Steven A. Karan, PE, LEED AP, proved to me through satisfactory evidence of identification which was personal knowledge to be the person(s) whose name(s) is signed on the preceding or attached document in my presence, and who swore to me that the contents of the document are truthful and accurate to ' 28 Main Street, Building 3A I North Easton, Massachusetts 02356 IT 508.230.0260 IF 508.230.0265 1 BER@BER-engineering.com BUILDING ENGINEERING RESOURCES, INC. Rohm & Haas HVAC Improvements 60 Willow Street North Andover, MA FIRE PROTECTION CONSTRUCTION DOCUMENTS 1. a. Basis (Methodology) of Design: Section 1 — Building Description: a) The existing building consists of B- Use Group Office, Laboratory Research and Testing Lab, F-1 Factory Moderate Hazard, and Hazardous H-2 perimeter and inside areas as allowed for in an "Unlimited Area" building as defined by CMR 780. b) The total square footage of the building is 53,830 square feet, of which 53,830 square feet is occupied by the subject tenant. c) The main building height above grade is approximately 20 feet to the ridge, 32 feet to the top of the Maintenance Mezzanine. d) The building has a total of (1) one story above grade. e) There are no floors below grade. f) There is 53,830 square feet on the first floor. g) The occupancy types are: B, F-1, and H-2. h) The type of construction is 2C, Non Combustible, Unprotected with Automatic Fire Suppression System. i) The proposed chemicals to be used in the Laboratories and Model Shop include materials in excess of the exempt amounts listed in 780CMR Tables 307.8(1) and (2), (list to be provided by Rohm and Haas). J) The building will not include any high pile storage. k) Emergency response vehicles and personnel can access the building directly from 3 sides on paved parking areas. 28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER@BER-engineering.com Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 2 Section 2 — Applicable Laws, Regulations and Standard: The following regulatory codes and standards are applicable to this project: a) 780 CMR (2005) Section 903.11 b) NFPA 13 (2007) Installation of Sprinkler System c) NFPA 72 (2007) National Fire Alarm Code d) NFPA 101 (2006) Life Safety Code e) 521 CMR — Architectural Access Board Section 3 — Design Responsibility for Fire Protection Systems: a) The professional engineer (PE) fully designs (complete layout and calculations) and specifies the fire protection system or systems to be installed, reviews and approves the Installing Contractor's shop drawings. The PE is considered the engineer of record and certifies system installation for code compliance at completion. Section 4 — Fire Protection Systems to be Installed: a) Water supply and hydrants: 1. Two fire hydrants will be located within 50 feet of the building. 2. Water supply information. Static Pressure: psi Residual Pressure: psi Flow: gpm Pitot: psi Location: b) Automatic sprinkler systems and components: The existing wet sprinkler system is fed from an existing main, located in the street. The existing 8" sprinkler main is brought into the building in the mechanical room. The system contains an existing 6" double check valve assembly and 6" alarm valve. All areas which are Ordinary Hazard will have a sprinkler spacing of a maximum of 130 square feet. The Extra Hazard Labs will have a sprinkler spacing of a maximum of 100 square feet. The existing sprinkler system is currently gridded with 4" mains and 2" cross branches. The existing 4" storz fire department connection is located near the fire service entrance. 28 Main Street, Building 3A ( North Easton, Massachusetts 02356 T 508.230.0260 F 508.230.0265 BER:,^a,,B1iR-1'( .com P:\07150\Correspondence\Narrative HVAC Improvements (Fire Protection) 03.30.09.doc Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 3 c) Standpipe systems and components: The building does not have any standpipes. d) Fire alarm systems and components: The building is presently equipped with an existing addressable fire alarm system. The existing fire alarm control panel is located at the rear main entrance and an LCD remote annunciator is located at the front main entry lobby. Building occupant notification of a fire alarm is accomplished via audio/visual (horn/light) appliances. These appliances will sound automatically based on an alarm condition initiated by smoke/heat detectors, manual pull stations, sprinkler flow or lab hood ansul system discharge. Detection devices include smoke/heat detectors, manual pull stations, and new of existing duct mounted smoke detectors. In addition, addressable monitor modules provide fire alarm system monitoring of the buildings sprinkler flow and tamper valves and lab hood fire suppression systems (ansul systems). A new duct mounted smoke detector (with remote test station) will be installed in the supply duct of the new HVAC rooftop unit. Upon the initiation of any manual or automatic alarm device, the North Andover Fire Department will be notified via the existing municipal connection. A new radio Master Box is to be installed under a separate project. When a fire starts, the fusible links at the sprinkler heads are melted, allowing water to flow from the system. A flow or pressure switch triggers an alarm within the building. The fire alarm panel will notify the fire department. e) Automatic fire extinguishing systems: Each new lab hood installed within the area of renovation will be equipped with an individual automatic dry chemical fire suppression system. These systems will be connected to the fire alarm control panel via addressable monitor modules to activate the building's fire alarm system upon activation. f) Manual suppression systems: Manual fire extinguishers are provided throughout the facility in accordance with NFPA 10. g) Smoke control/management systems: The space does not require a smoke control or exhaust system. 28 Main Street, Building 3A North Easton, Massachusetts 02356 T 508.230.0260 ( F 508.230.0265 1 BER ii BER -en =ink eeringxom P:\07150\Correspondence\Narrative HVAC Improvements (Fire Protection) 03.30.09.doc Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 4 h) Kitchen cooking equipment and exhaust systems: The space does not possess any kitchen cooking equipment and therefore an exhaust system is not required. i) Emergency power equipment: A new diesel fueled kW standby generator will be installed under a separate project to provide standby power only to the new Clean Room exhaust system. Emergency lighting is provided by self-contained emergency battery units with low voltage lamps, L.E.D. exit signs with integral battery back-up and by certain light fixtures equipped with integral emergency ballasts. All emergency lighting equipment is designed to provide emergency lighting for 90 minutes. j) Hazardous material monitoring equipment: The space does not require hazardous material monitoring equipment. k) Seismic consideration: All installations shall comply with 780 CMR Chapter 16. The fire protection system that is to be installed for this project is a modification to an existing system to incorporate the new Laboratory layouts and spaces. This layout is required by 780 CMR to provide 100% protection. Section 5 — Features used in the Design Methodology: a) Building occupant notification of a fire alarm is accomplished via audio/visual (horn/light) appliances. These appliances will sound automatically based on an alarm condition initiated by existing and new smoke/heat detectors, manual pull stations or sprinkler flow. b) All responding emergency personnel will be directed to the existing main fire alarm control panel or the remote annunciator at either the front or rear entrance. This panel will advise emergency personnel of the location of the fire and the device that initiated the alarm condition. 28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER rdMER-engineerine.com P:\07150\Correspondence\Narrative HVAC Improvements (Fire Protection) 03.30.09.doc Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 5 c) All construction work will be performed in a manner that is safe and in compliance with applicable codes. The existing fire alarm and sprinkler systems will remain operational throughout construction. In the event the Contractor is required to temporarily disable the system(s), a minimum of (72) hours notice must be given to the North Andover Fire Department. d) All future testing shall be conducted in accordance with NFPA 72 and NFPA 13. This will include quarterly testing of 25% of fire alarm components. Any device/appliance found to be faulty and re -tested. All testing will be coordinated with the North Andover Fire Department prior to initiation of testing. Section 6 — Special Consideration and Description: At this time, the designer does not require a waiver or variance. The fire protection design is in accordance with 780 CMR 1. b. Sequence of Operation Section 1: The fire alarm system shall operate automatically to sound all interior building evacuation alarms and flash all alarm strobes upon activation from pull stations, detectors, or sprinkler water flow devices. Upon initiation of any manual or automatic alarm device, the Fire Department shall be notified via the building existing municipal connection. (A new radio Master Box will be installed under a separate project.) When a fire starts, the fusible links at the sprinkler heads are melted, allowing water to flow from the system. A flow or pressure switch triggers an alarm within the building. The existing fire alarm panel and municipal connection will notify the fire department. (A new radio Master Box will be installed under a separate project.) An alarm condition will notify the North Andover Fire Department via the existing municipal connection. A tamper (supervisory) condition will notify the local fire department via the existing municipal connection but horn/lights appliances within the building will not be activated. (A new radio Master Box will be installed under a separate project.) 28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER C,BER-eneineerine.com P:\07150\Correspondence\Narrative HVAC Improvements (Fire Protection) 03.30.09.doc Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 6 1. c. Testing Criteria Section 1 — Testing Criteria Personnel: a) The Construction Manager in association with the Electrical and Fire Protection Contractor will coordinate the actual test dates. This date will be based upon completion of installation of all components. b) Upon completion of a successful pre-test, the Contractor shall notify the Professional in Charge that all systems are ready for a final test. The Contractor will provide the professional with documentation that all equipment was 100% tested and that the system is ready for a final acceptance test. As part of the pre-test, the Contractor shall ensure that the graphic annunciator has been updated to reflect all changes performed under this contract. c) Upon receipt of the aforementioned confirmation letter, the Professional in Charge will direct the Construction Manager to proceed with notifying all interested parties (Contractor, Distributors, and Code Officials) that all Life Safety systems have passed a pre-test and are ready for a final test. The Construction Manager will then proceed to coordinate a mutually agreeable time for all parties to witness the final test. d) The following paperwork needs to be submitted to the North Andover Fire Department prior to Final Testing. 1) Affidavits by Designer. Letter certifying system has been installed according to Plans and Specifications and has been witnessed that it is 100% operational and ready for Final Testing. 2) Affidavits by the Electrical Contractor. Letter certifying system is complete. 3) The Fire Alarm Manufacturer. Certification of complete system. 4) Copy of the Manufacturer's Program Notes. 5) Copy of the stamped Drawings (As-builts if available). Section 2 — Equipment and Tools: a) All equipment required to perform a 100% test of the fire protection and detection systems will be furnished by the Contractor. This equipment shall be available at the time of the test. A listing of the equipment that is to be supplied will be forwarded to all "Final Test participants" prior to the test occurring so as to allow for comments. Typical equipment supplied would include the following: 28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BER WER-engineering.com P:\07150\Correspondence\Narrative HVAC Improvements (Fire Protection) 03.30.09.doc Rohm & Haas — North Andover, MA Re: HVAC Improvements March 30, 2009 Fire Protection Narrative - Page 7 Manufacturer's instructions Specifiers' special instructions Approved Narrative Report, sequence of operation section Sound meters Smoke detector aerosol tester Flow measuring devices Gauges Voltage meters Magnets Communication radios Fire department equipment Special tools Notification announcements Section 3 — Approval Requirements: a) Upon viewing a successful test of all fire protection and fire detection equipment, the code official(s) shall "sign off' on the Building Department Inspection Card. This act will confirm the code official has witnessed the test and accepts the building as satisfactorily complete. b) In the event a piece of equipment fails during the final test, the affected Contractor will make a reasonable effort to replace the defective equipment immediately so the test may continue. In the event this action is not possible, the Contractor shall procure the piece of equipment as soon as possible. The Contractor will be responsible for re- scheduling the test with all attendees. c) Upon successful completion of all tests, the Contractors and Distributors will provide documentation attesting to the fact that they have performed, witnessed and successfully completed a test of all Life Safety systems. The Professional in Charge will provide construction affidavits which acknowledge tests have been witnessed in addition to periodic site visits and that recommendation is made to the Local Official that a Certificate of Occupancy be provided. d) In accordance with 780 CMR Chapter 903.4, all documentation listed in paragraphs 1, 2 and 3 shall be furnished to the building official and the head of the fire department. e) At the initiation of the construction phase of the project, the General Contractor will provide all parties with a list of personnel who will respond to an emergency situation at the project. This list will include addresses and cell phone numbers. 28 Main Street, Building 3A I North Easton, Massachusetts 02356 1 T 508.230.0260 1 F 508.230.0265 1 BEft c BER-engineerine.com P:\07150\Correspondence\Narrative 14VAC Improvements (Fire Protection) 03.30.09.doc