Loading...
HomeMy WebLinkAboutBuilding Permit #522-11 - 614 CHICKERING ROAD 1/5/2011TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: �ZZ—/ Date Issued: Il�IPORT'ANT: Applicant must LOCATION ` 7 tom` 6&L ( 41 Print / / UZ.i � Date Received i r Print MAP NO: 0 y PARCEL: ZONING DISTRICT; all items on this page / v o voe— I o Historic District yes o Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑ Addition ❑ Two or more family ❑ Industrial Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition ❑ Other 0�-Septic° �'VJell � � ! r®Floodplain - `®�Wetlands� ; ©;'UVatershed�Distnct I -- OWNER: Name: - Address: Nam`e`- Address:7 JUV11UN Ur W Utc1L t v tsr, r.Gxr kJ1MV 1L: Identification Please Type or Print CIearly) L A A -IL, lk� AllA,-�fcc) CONTRACTOR Name: Address: /o?- Supervisor's yZ �,,,t Phone: Supervisor's Construction License: Cf a P?J� ,C Exp. Date: Home Improvement License: Exp. Date. ARCHITECT/ENGINEER Phone: CS Fql-�16 Address: Reg. No. ISQ F3V it/Z 01" FEE SCHEDULE: BOLDING PERM: $12.00 PER $9000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $0 6� FEE: $ Check No.:i Receipt No.:��'.� NOTE: PeYsons contacting with unregistered contYactoYs do not have access to the�guaYanty fund Location G / Id C hoc /tel No. Z- — Date TIy TOWN OF NORTH ANDOVER f w 9 Certificate of Occupancy $ -, CRUSE<� Building/Frame Permit Fee $ 0 Foundation Permit Fee $ Other Permit Fee $ —� TOTAL $ `;3' Check # 2 " %6 7 Building Inspector Plans Submitted ❑ - Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ wen ❑ Private (septic tank, etc. ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION COMMENTS HEALTH COMMENTS Reviewed on Signature Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Conservation Decision: Comments Comments Water & Sewer Connection/Signature 8 Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMIVIENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — For department use ® Notified for pickup - Date Doc:.Building Permit Revised 2008 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit - Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Muss check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products DOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit n all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals iat the appeal period is over. The applicant must then_ get this recorded at the Registry of Deeds. One copy and proof of recording lust be submitted with the building application Doc: Doc.Building permit Revised 2008mi Ted Grab — Interior Renovations 1029 Humphrey Street Swampscott, Massachusetts 01907 781-430-0415 781-454-5609 (cell) MA Home Improvement Contractors Registration # 140838 — Exp 11/28/11 Construction Supervisor License # 89566 — Exp 11/24/11 Proposal To Renovate Kitchen, Flooring, Main Floor, Additional Electrical in Bedrooms December 28, 2010 HOME OWNER: Earline Mango 1 614 Chickering Rd. North Andover, MA PROJECT DESCRIPTION Demolition and Disposal 1. Remove and dispose of existing tile in main hallway and dining area. 2. Remove and wrap existing carpet and padding in Living Room. Home owner may use this carpet in new basement room. 3. Remove and dispose of existing sliding doors in closet. 4. Remove and dispose of shutter doors inside closet. 5. Remove and dispose of baseboard heat units in living room and main hallway. 6. Remove and dispose of existing baseboard. 7. Partially remove wall adjacent to refrigerator space. (PLEASE NOTE THAT REMOVAL OF SUPPORTING WALL ADJACENT TO DINING AREA AND REMOVAL OF HALF WALL WOULD REQUIRE MAJOR ELECTRICAL RECONFIGURATION. THIS WOULD BECOME COST PROHIBITIVE.) Kitchen Renovation 1. Electrical work in Kitchen for: a. Dishwasher b. Garbage disposal c. Electric stove d. Recessed Lighting: 4 six inch recessed lights e. Electrical Outlets f. Electrical switches. g. Telephone Connections h. New baseboard heat 2. Plumbing work in Kitchen for: a. Install plumbing supply and draining for dishwasher b. Install plumbing supply and drain for sink c. Install faucet for sink d. Install garbage disposal e. Install clean out per code under sink f. Install water supply for Automatic Ice Maker g. Install ice maker shut off under sink area 3. Prepare floor to accept hardwood flooring. 4. Prepare walls and ceiling prior to installation of Blue Board. 5. Plaster walls and ceiling. 6. Install hardwood floor. 7. Install finish baseboard. f Please note that this proposal does not include installation of cabinets or appliances. This cannot not be determined until cabinets and appliances are chosen. It may be advisable to have cabinet supplier to install the cabinets. It is sometimes less expensive to have the retailer install cabinets) Main Hallway / Dining Area Renovation 1. Prepare floor to accept hardwood floor. 2. Install hardwood floor. 3. Install new baseboard heat (2). 4. Install new 6 panel sliding doors in closet. 0 z I M= W W uml am c c m c c � O L ■: ; C y O C ' � O v V CL C �C O CD C �L O O i � E a m c O o. GOE :cam :mc E :a= N � N E 3 c m � .o m •` y CCU C �JO S VEo �i Lamm C: :5:5 O cm: Co. C C O Q 'D N ' d C t m 0 �: V LO -3 Z O H Oy CL C �C CL CD MD cc yr C •N dt O G Z uj �E E •N o y a93 g _ L. 210 N•O C) I- CK M l f 06 a R CD O CD O s Z CD CL O y D c O CM CO2 O O �— y O O .E m m CD CD CL CD +� 3 -a � � L a CL Ca .o o Cc .0 CA C Z tsO C- y C C ■� C C. y O W Ck U) W 19 W W C9 W U) w a 0 w F � w 0 :1 A w C2 CJ) ao id cc nnw uml am c c m c c � O L ■: ; C y O C ' � O v V CL C �C O CD C �L O O i � E a m c O o. GOE :cam :mc E :a= N � N E 3 c m � .o m •` y CCU C �JO S VEo �i Lamm C: :5:5 O cm: Co. C C O Q 'D N ' d C t m 0 �: V LO -3 Z O H Oy CL C �C CL CD MD cc yr C •N dt O G Z uj �E E •N o y a93 g _ L. 210 N•O C) I- CK M l f 06 a R CD O CD O s Z CD CL O y D c O CM CO2 O O �— y O O .E m m CD CD CL CD +� 3 -a � � L a CL Ca .o o Cc .0 CA C Z tsO C- y C C ■� C C. y O W Ck U) W 19 W W C9 W U) 5. Install new light fixture to code in closet (separate switch is not possible). 6. Install finish baseboard. 7. Replace ALL existing electrical outlets and switches. Living Room Renovation 1. Prepare floor to accept hardwood floor. 2. Install hardwood floor. 3. Install new baseboard heat. 4. Install finish baseboard. 5. Replace ALL existing electrical outlets and switches. Hardwood Floor Contractor shall supply all solid hardwood flooring materials needed to completed cover main hallway, kitchen area, dining area and living room. Samples shall be submitted to homeowner for approval. Additional Electrical Work in Bedroom(s) 1. Contractor will install new light fixtures (to code) in 3 closets situated in the 2 bedrooms. 2. Contractor will install separate switches for the new closet light fixtures. 3. Contractor will install 6 six inch recessed lights in Master Bedroom. 4. Contractor will install separate switch to control recessed lights. 5. This electrical work is in addition to all previously agreed upon electrical work involving the 2 bedrooms. ' Project Investment Payment Due with Agreement Payment Due when rough Electrical Work is completed Balance upon completion Commencement Date $ 4700.00 $4000.00 (33%) $11617.00 Project shall begin on or about Wedmesday 29, 2010 and shall be completed on or about Friday January 28, 2011. These dates are approximate. Accepted by: t� Date: Earline Mango a f� Accepted by: Date Ted Grab — Interior Renovations Ted Grab — Interior Renovations Advanced Basement Finishing 1029 Humphrey Street Swampscott, Massachusetts 01907 781-430-0415 781-454-5609 (cell) MA Home Improvement Contractors Registration # 140838 — Exp 11/28/11 Construction Supervisor License # 89566 — Exp 11/24/11 Proposal To Renovate Basement December 24, 2010 HOME OWNER: Earline Mango 614 Chickering Rd. North Andover, MA PROJECT DESCRIPTION 1. Areas to be created in unfinished basement CONTRACTOR SHALL supply all new materials needed to erect, according to State and Local Building Codes, build all walls along walls to create and finish areas as designated on scale drawing. The areas are as follows. ➢ Family Room / Home Entertainment Area ➢ Laundry Room (unfinished interior) ➢ Closet Garage (finished interior) 2. Ceiling and Soffit Preparation ❑ 1" x 3" spruce strapping shall be installed (as needed) on ceiling joist 16" on center to support weight of new drywall ceiling. 3. Wall Structure ➢ Contractor shall make wall alterations as indicated (approximately, as needed) on scale drawing. All wall structure shall be built according to state & local building requirements. S. Insulation ➢ All exterior walls shall be insulated so that all living areas and spaces are insulated according to code (as needed). The insulation value is R-13. 6. Electrical Work ➢ A Massachusetts Licensed Master Electrician shall perform all electrical work. This project shall include the following. ❑ Up to 5-6 inch recessed lights in living areas. ❑ Up to 6 switches to control all lighting ❑ Light fixtures for all unfinished areas separately switched. ❑ Up to 1 cable/broadband wall connections. ❑ Up to 1 telephone wall connections. ❑ 1—electric baseboard heat units with wall mounted thermostat. ❑ Electrical outlets through living area per code. These outlets are controlled by a GFI (ground fault) breaker. ❑ Please note, it is very difficult to determine the amount of new circuit breakers needed to upgrade service to basement until the electrician is on site. An additional -charge will occur for any new circuit breakers required. ❑ Town may require a new circuit breaker panel. This will require an additional cost if town requires this. 7. Finished Walls. Ceilinjzs & Soffits ➢ All walls, ceiling and soffit of finished areas shall be enclosed with %2 inch "blue board". ➢ All blue board shall be veneer plastered to a smooth finish on walls and ceiling. 8. Doors ➢ All hinged doors shall be "6 PANEL" ➢ Closet sliding doors will be flush luan doors. ➢ All doors shall include standard hardware and doorknobs. ➢ All doors to be installed with casing similar to existing casing on the first floor. 9. Laundry Room /Hot Water Heater Area ➢ Contractor will move all requisite plumbing and electrical work to facilitate the moving of the laundry area as indicated on scale drawing. 10. Baseboard, Door/Casing ➢ Contractor will supply and install new baseboard, door casing for all finished areas. 11. Materials Su Mlied by Contractor ➢ Contractor will supply and install all materials and fixtures. However the fixture listed below shall be supplied by homeowner and installed by contractor. *not applicable 12. Stairwav ➢ Contractor will open left hand stairwell wall to create angled half wall. 13.Floorin ➢ This proposal allows for no flooring. 14. Painting ➢ This proposal allows for no painting. 1 S. Permits ➢ All permit fees shall be reimbursed to the contractor by the homeowner. Homeowners acknowledge that 2 permits are required: Building, and Electrical and Plumbing. 16. Scale Drawing ➢ Scale drawing attach shall be construed as an integral part of the proposal and agreement. All measurement are approximate and homeowners acknowledge the changes may be required due to building codes and obstacles in the unfinished basement. Project Investment 17. Payment Due with Agreement 18. Payment Due when rough Electrical Work is completed 19.Balance upon completion Commencement Date $ 8971.00 $ 4000.00 $3000.00 (33%) Project shall begin on or about Monday, December 27, 2010 and shall be completed on or about Friday January 28, 2011. These dates are approximate. Accepted by: �t C�ale,Date: Earline Mango Accepted by: Date ` �✓�G ��� Ted Grab Interior Renovations Advanced Basement Finishing 8'9 4'7 4'2 cw k8'9�