Loading...
HomeMy WebLinkAboutBuilding Permit #045-15 - 624 BOXFORD STREET 7/14/2014 NORTH BUILDING PERMIT D�St L.ED TOWN OF NORTH ANDOVER 02. •a O APPLICATION FOR PLAN EXAMINATION h 'M Permit No#: J�� Date Received Date Issued: jS IMPORTANT: Applicant must complete all items on this page LOCATION' Print PROPERTY OWNER . -_ Print 1od Year Structure � yes h6 MAP Tlc�PARCELZ r ZONING DISTRICT: Historic District ye no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building P;One family ❑Addition b Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial aepair, replacement ❑Assessory Bldg ❑ Others: rfDemolition 0 Other 0 Septic El Well' 0 Floodplain ❑Wetlands El Watershed District- 0 Water/Sewer DESCRIPTION F WORK TO BE PERFORMED: &21—Q J ( ��✓ t O Identification- Please Type or Print Clearly OWNER: Name: Phone: —3 � Address: u -4; C"4— Skc Contractor Name Phone: " ..: 2 Address: r _ Supervisor's Construction Date:L-,icense: __t� � ��► �P__ Exp. _�4 1� HmJI oe.Improvement License ._.:_ / Exp. Date:. ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. e r e Total Project Cost: $ (0 FEE: $ t } Check No.: Receipt No.: �-- NOTE: Persons contracting with unregistered contractors do not have access to e ua ty fund ma nature of Agent/Owner_ _ _ Signature of contrac or SigI Location No. Date . • TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ `L TOTAL $ Che k# -2 G 772 Building Inspector Location (02.1 �z-/4_ � �� ... No. `s" G G! Date ���Y�y f i r • • TOWN OF NORTH ANDOVER F„ Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check#00i,o� 3 0 t.2 Building ln'spector Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body ArtT. Food ing Pools Well Tobacco Salesackaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street 'FERE DE-PARTMENT Temp Dt�mpsterpn s�i a yes _ no _- Located'.at 124 Main Street r Fare Departmentsignature/•date 5 1 v, lar .a t Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) ❑ Notified for pickup Call Email Date Time Contact Name Doe.Building Pen-nit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks o Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe:Building Permit Revised 2014 f N�D7M 4 e 1 N A •i i i ,SSACHUSEt CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 045-2015 on 7/14/2014 Date: May 23, 2016 THIS CERTIFIES THAT THE BUILDING LOCATED at 624 Boxford Street MAY BE OCCUPIED AS an single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Joyce Bradshaw 624 Boxford Street North Andover,MA 01845 t M Building nspector Fee: $100.00 Receipt: 30423 Check : 2282 r of,,ORIN' � v + l a 'Ji"Oa.na "ay �SSACHU54 CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 045-2015 on 7/14/2014 Date: May 23, 2016 THIS CERTIFIES THAT THE BUILDING LOCATED at 624 Boxford Street MAYBE OCCUPIED AS an single family home IN ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: Joyce Bradshaw 624 Boxford Street North Andover,MA 01845 Building nspector Fee: $100.00 Receipt: 30423 Check : 2282 t4ORTH Town tE No. ; LK-ow * _ ' h ver, Mass I O • 1 7 V .Q coc.uC.a rt w.cw 1' tJ BOARD OF HEALTH PERMIT T Food/Kitchen LD l Septic System THIS CERTIFIES THAT �� J��, „✓„ ,p�;j (�✓ BUILDING INSPECTOR has permission to erect .... buildings on �. �0� d'j--- Foundation g ....(.�a-. .....1�..... ............ ..................... Rough to be occupied as ...k..r` � ca. �'� Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR / UNLESS CONSTRUCT TS Rough Service ............... ................................ Final BUILDING INSPECTOR GAS INSPECTOR Occupancy Permit ReAuired to Occupy Buildinz Rough Display in a Conspicuous Place on the Premises — Do Not Remove Fina' No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ 60,776.00 m $ - $ 729.31 Plumbing Fee $ 91.16 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 91.16 Total fees collected $ 1,011.64 624 Boxford Street 045-15 on 7/14/2014 Remodel The Commonwealth of Massachusetts .Department of Industrial.Accidents '--�, Office of Investigations _ 600 Washington Street Boston,MAA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applican,t Information ]Please Print Legib Name(Business/Organization/Wividual): y C. " City/State/Zip: t t/� Phone#: MY-7 e Are you an employer?Chee the app opriate box: Type-of project(required): 1.❑ I am a with employer 4. ❑ I am a general contractor and I 6. F1 New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have g. O'Demolition working for me in any capacity. employees and have workers' 9 ❑Building addition [No workers' comp.insurance comp.insurance.: required.] 5. We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.[]Plumbing repairs or additions . myself.[No workers'comp. right of exemption per MGL 12.❑Roof repairs insurance required.]t c. 152, §1(4),and we have no 13.❑Other employees.[No workers' colnp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such. !Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am do ernployer Mat is providing workerscompensation insurance far my employees. Below is tit policy.andjob site information. Insurance Company Name: Policy#or Self-ins.Lie.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and eipiration date). Failure to secure coverage as required under Section 25A of MGL c.152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 andlor one year imp ' ent,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the viol or. e advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for ins e verage verification. Ido hereby certify under the pa' . ndpenalties of perjury Haat the information provided above is hue and correct. Si n ature• Date: G f Phone#: 4 Official use only. Ido not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: / ' DAM(MMIDWYYYY) '4�& CERTIFICATE OF LIABILITY INSURANCE 7/14/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder is an ADDITIONAL INSURED,the pollcy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on the Certificate does not confer fights to the certificale holder In lieu of such endcrsemen s PRODUCER wmar Sterling Insurance Agency, Inc. PHONE (978)922-6600 FAe (978)922-7650 SAM 306 Cabot Street P.O. Box 493 IN APFOROINGCOVERAGE NAIC0 Beverly MA 01915 INsuRERA:Commerce Ins. Cc INSURED INSURERS: INSURER C: Keenan Construction Co. Inc. INSURERD: 35 Pond Street INSU E: -Beverly MA 01915 INSu F: COVERAGES CERTIFICATE NUMBER*Iaster 14-15 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IMMI LTR TYPE OF INSURANCE POLICY EFF LIMITS GENEMIJASIUTY EACH OCCURRENCE s 1,000,000 DAMAX COMMERCIAL GENERAL LIASIL Y 8E^f S 100,0001 A CLAIMSMADE ❑X OCCUR 9/09/2013 1 09/09/2014 MED EXP(Anyone $ 5,0001 BX0282 PERSONAL s ADV NAM s 1,000,000 GENERAL AGGREGATE S 2,000 000 h nAGGREGATEUMITAPPLIESPER: PRODUCTS-COMPJOPAGO S 2,000,000 POLICY LOC OMINS NGIN LW A AuTOu R,E LIABILITY ED I ANY AUTO 5/21/2014 5/21/2015 SWU,Y INJURY(Per person) $ 250,000 ALLOMED X SCHEDULED 0231 BODILY INJURY(Per eoddenl) S 500,000 AUTOS HIRED AUTOS �4� PROPE AUTOS D s 100.000 s UMBRELLA UAB OCCUR EACH OCCURRENCE S EXCESSWU3 CMS.MAOE AGGREGATE $ oEo s TNORK@RSCWWOMATta1 SiATU-ITH AM EMPLOYE LIABILITY Y i n ANY PROPMETOMPARTNERNXEGUTIVEF-1 OFRCERJMEMBER EXCLUDED? NIA E L EACH ACCIDENT i (Myd,Y M t) E.L.DISEASE-EA EMPLOYEE S a RIPTION OF TIDNS Oebw E-L DISEASE-POLICY LIMIT I S DES(RUPTTON OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,AdMond Renwlrs Schedule,B scare space Is mqu(red) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. Attar: Gerald Brown 1600 Osgood Street auTN°r+»�DRIe'RESEHrATRrE North Andover, MA 01845 Liz Cahill/NANCY - ACORD 26(2010106) 01988-2010 ACORD CORPORATION. All rights reserved. INS026(zmoo4oi The ACORD name and logo are registered marks of ACORD Ds,art ne- it cif DI; ? L SEJ_ty r .3-oald o SuOdfng hteQuiai .Gt s anti Staild,tE S n �..�i±?SYfi�?GYirot)SRlI1�`Cti'd��11 .. EDWARD J iMUP AN Jit POBOX 131 BEVERLY MA iF1915 Exits Ston Car, ntsstarer 05114/2015 OSHA 002327504 Edgard Keenan a5 s.x.�e>3:s"��:x'.r'c'.M�a tr.t n,-O::�t^•'x:.t„a,t:cs c=ai ti£3`C^ . �-ami*-�C:iu'Se st flif F1 jY9ii YFr!§ ±'i 103S r�— 0r1:6Ia9� .- a ✓fe a.crroirt�rtcetifir� �ll2<;r�c�t:u,/�..: � �i Of€ice of Cowmaer Affairs&Bflsiness Iiegalatioa tUjk- !-'HOME IMPROVEMENT COM MOR f 1;4- '- Registration--_.._ _ rA_ 4 "{ Tye: •..: T 3€ `u•�n: 3 Br10 �mr e CoY¢o,mt of KEENAN CONSTR.00 INC EDWARD-10EENAAI 35 PONDT ST - BEVERLY,MA 01915 Undersecretary- . Office of Consumer Affairs&Business Regulation-Mass.Gov Page 1 of 1 The Official Website of the Office of Consumer Affairs&Business Regulation(OCABR) Consumer Affairs and Business Regulation Home Consumer Rights and Resources Home Improvement Contracting HIC Registration Complaints Registration# 159044 Home Improvement Contractor Registrant KEENAN CONSTR CO INC. Registration Home Page Name EDWARD KEENAN Address 35 PONDT ST City, State Zip BEVERLY, MA 01915 Expiration Date 03/28/2016 Complaints Details No complaints found for this registrant. You can also view arbitration and Guaranty Fund history. Back To Search http://services.oca.state.ma.us/hicAicdetails.aspx?txtSearchLN=60340 7/14/2014 Arbella Insurance Group 1100 Crown Colony Dr PO Box 699225 Quincy,Ma 02269 800 272 3552 x 2571 -617 773 4760 perek,Walker _aa.com-Arbella.com Est.Bldg R(C $399,253.00 Est.ACV $399,253.00 Insured : Joyce Bradshaw Type Of Loss : Water i Address : 624 Boxford St North Andover, MA 01845 Claim Number :033458144 Our File No. : 033468144 Adjuster : Derek Walker Policy No : 96050400002 Action Description Quantity/Unit Unit Cost RCVTotai DEPR ACV/Lose Interior Dwelling ! i General/Mise Conditions Special DemofTearout/Prep 10.00HR 40.00 400.00 40.00 360.00 Special Dumpster 20 Yard 1.00 E4 510.00 510.00 51.00 459.00 Special Ongoing and Post 2.00 HR 40.00 80.00 8.00 72.00 Construction Cleanup Special Permits&Fees 1.001-S 100.00 100.00 10.00 90.00 Special Apply Anti-Microbiaito affected 1,001-S 75.00 75.00 7.50 67.50 area Generat/Misc Conditions Total: 1165.00 116.50 1048.50 Rear Additions Room 1s'r x 11'r x 10'00 Replace Cell insulation 180,428F 1.50 270.63 27.06 243.57 Replace Wall insulation Batt 31/2 400.00SF 0.75 300.00 30.00 270.00 Replace Pine Tongue and Groove 180.42SF 4.98 898.49 69.85 808.64 Ceiling Board 1x6 Grade$ Remove/Reset Paddle Fan Average Quality 1,00EA 60.39 60.39 6.04 54.35 Replace PlasterWall(s)W/Bluebrd 42.25SY 27.00 1140.75 114.08 1026.67 Paint Piaster Wali(s)WBluebrd 280.00SF 1.00 280.00 28.00 252.00 Replace Custom Trim Set(s) 4.00 EA 202.63 810.52 81.05 729.47 Stan/Finish Custom Trim Sets} 5.00EA 50.00 250.00 25.00 225.00 Remove/Reset Window Treatment 3.00 EA 36.66 109.98 11.00 98.98 Remove/Reset outlet switch covers 9.00EA 10.00 90.00 9.00 81,00 Replace Carpet Pad 20.05SY 6,00 120.30 1203 108.27 Replace Carpet Wall To Wall 21.30SY 29.00 617.79 61.78 556.01 Rear Addtions Room Total: 4948.85 494.89 4453.96 Building Repair Esdmete Page 1 of 2 COPYRIGHT 1987--20f3 SJV { ... ..... .... ... _ ...... V Arbella Insurance Group INSURED. Joyce Bradshaw Policy No : 98050400002 Claim Number :033468144 Our Fft No. :033458144 Action Description Quantity A)n t Unit Cost RCVTotal DEPR ACWLoss SUB TOTAL $6,113.85 $611.39 $6,602.49 OVERHEAD a 10 % $811. $91.18 $660:28 $8,725.23 $6M63 $6,052.70 PROFIT 10 % $011.38 $61.14 $$60.24 $7,336.81 73733.87 ",802.94 SALES TAX 6.25 *A (On Materials Only} $128:20 $12 82 $113.68 $7,462 81 $748.29 $8,718.82 LESS DEDUCTIBLE $1,000,00 NET CLAIM $6,718.52 Bued4g Repair Estimate Page 2 of 2 COPYRIGHT 1987-2013 SJV Change Estimate Worksheet Estimated by C. E. Number#1 Edward Date 7/14/14 Job No Estimate#328 Direct Labor Expense (including benefits) Plumber or pipefitter journeyman manhours at$ per hour= $ Plumber or pipefitter supervisor manhours at$ per hour= $ Sheet metal journeyman manhours at$ per hour= $ Sheet metal supervisor manhours at$ per hour= $ Laborer journeyman manhours at$ per hour= $ Total Direct Labor Cost $ 5716.52 Indirect Costs Travel $ Subsistence $ Labor $ Total Indirect Cost $ Equipment and Tool Costs $ $ Total Equipment and Tool Cost $ Subcontract Costs $ $ $ Total Subcontract Cost $ 5716.52 R KEENAN CONSTRUCTION COMPANY, INC. 35 POND STREET BEVERLY, MA 01915 (978) 921-6416 Contractor Number 052466 HIC# 159044/265734 CONTRACTOR AGREEMENT THIS AGREEMENT made this 10 day of May, 2014, by and between Keenan Construction Company Inc., of 35 Pond Street, Beverly, Essex County, Massachusetts, a Massachusetts Corporation, hereinafter called the Contractor, and Joyce Bradshaw, hereinafter called the Owner, now or formerly of 624 Boxford Street, North Andover, Massachusetts. WITNESSETH, that the Contractor and the Owner for the consideration named herein agree as follows: ARTICLE 1. SCOPE OF THE WORK The Contractor shall furnish all the materials and�perform all of the work shown on the drawings and/or described in the specifications entitled Exhibit A and more particularly described and identified as Estimate numbers 328 and claim # 033424252 inclusive and as annexed hereto as it pertains to work to be performed on property located at 624 Boxford Road, North Andover, MA, 01845. 71 ARTICLE 2. TIME OF COMPLETION The Contractor shall commence the work to be performed within 30 days from 5/10/14, and shall complete the work 120 days thereafter, or by Sept.10,2014, whichever comes later. If Contractor deems it necessary to extend the duration of the project due to unforeseen orlfnusual occurrences, Contractor shall notify Owners in writing stating the reason for the delay and projected completion date. It is agreed by and between the parties that any unforeseen delay shall automatically extend the duration of this agreement by the length of said delay. ARTICLE 3. THE CONTRACT PRICE The owner shall pay the Contractor for the material and labor to be performed under the Contract the sum of$55,059.79 Dollars subject to additions and deductions pursuant to authorized change orders. ARTICLE 4. PROGRESS PAYMENTS Payments of the Contract price shall be paid as follows: Payments shall be disbursed based on the attached schedule of values designated as EXHIBIT B of this contract. Within three days of notification by the Contractor of each stage of completion, the Owner or its designee will inspect and approve the work, or request any necessary adjustments in the work. The Owner agrees to make payments to the Contractor within five calendar days after notification of completion of work. Except as provided herein, no other payment schedule is contemplated or agreed to. IT IS A VIOLATION OF MASSACHUSETTS LAW FOR A CONTRACTOR TO REQUIRE AN ACCELERATION CLAUSE IN ANY CONTRACT FOR HOME REPAIR OR REMODELING. ARTICLE 5. GENERAL PROVISIONS 1. All work shall be completed in a workmanship like manner. Contractor will further comply with all applicable building code regulations and ordinances whether or not covered by the specifications and drawings for work to be done as outlined in any attached exhibits 2. To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 3. Contractor may at its discretion engage subcontractors to perform work hereunder, provided Contractor shall fully pay said subcontractor and in all instances remain responsible for the proper completion of this Contract. 4. Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due. 5. All change orders shall be in writing and signed by both Owner and Contractor. 6. Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees and subcontractors and shall supply proof of same upon request. 7. Contractor agrees to remove all debris and leave the premises in broom clean condition at completion of the contracted project. 8. In the event Owner shall fail to pay any periodic or installment payment due hereunder, Contractor may cease work without breach pending payment or resolution of any dispute. 9. To the extent practical, the Contractor agrees to adhere to the reasonable wishes of the Owners in relation to deliveries of materials and working schedules. 10. This contract and all its terms shall be subject to and under the jurisdiction of the laws of the Commonwealth of Massachusetts. 11. Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials. 12. The Contractor shall protect, defend and indemnify the Owner from any claims for unpaid work, labor or materials 13. The Contractor shall protect all work adjacent to the Contract site from any damage resulting from the work of the Contractor and shall repair or replace any damaged work at his expense. ARTICLE 6. USE OF UTILITIES The Owners shall permit the Contractor to use at no cost, power and water necessary to the carrying out and completion of the work. ARTICLE 7. ASSIGNMENT OF CONTRACT The contractor agrees not to assign the Construction Contract without the written consent of the Owner. ARTICLE 8. INSPECTION The Owner shall have the right to inspect all work performed under this contract. As well it shall be a condition of this contract that all work that needs to be inspected or tested and certified by an engineer or inspected and certified by the local code enforcement officer, health officer, or other like inspector, it shall be done at each necessary stage before further construction can continue. All inspection and certification will be done at the Owner's expense. Failure to follow this requirement will be grounds for termination of the contract. Any delay resulting due to scheduling of and inspection of the premises by any required inspector shall in no way be construed as foreseeable by the Contractor, and will extend for a reasonable period of time the duration of this project. ARTICLE 9. PERMIT NOTICE Contractor shall be responsible for obtaining all permits necessary for the work to be performed. Any Owner who secures their own construction related permit, or deals with an unregistered contractor, shall be excluded from access to the Guarantee Fund. It is the obligation of the Owners are responsible for securing all variances, special permits and/or zoning decisions prior to commencement of work. Contractor shall secure at his expense all licenses and any other permits required to perform work. ARTICLE 9. WARRANTEE The Contractor shall remedy any defect due to faulty material or workmanship and pay for any damage to other work resulting therefrom which shall appear within the period of one year from completion of work. Further, the Contractor will furnish Owner with all manufacturer's and supplier's written guarantees and warranties covering materials and equipment furnished under this Contract. Owner further has specific rights, remedies and warranties as specified n M.G.L. c. 142A ARTICLE 10. DISPUTE RESOLUTION All claims, disputes, and other matters in question arising out of, or relating to, the Contract Documents or the breach thereof, except for claims which have been waived by the making and acceptance of final payment, shall be decided by Arbitration in accordance with the construction Industry Arbitration Rules of the American Arbitration Association (or other arbitration rules) and as provided for in Massachusetts General Law Chapter 142A. This agreement to arbitrate shall be specifically enforceable under the prevailing arbitration law. The award rendered by the arbitrators shall be final, and judgment may be entered upon it in any court having jurisdiction thereof. Any award shall provide for payment within 30 days of the date of the award. Clue, (-21.�11 ,1111 Ownr Owner Co tract ARTICLE 11. CONTRACTOR REGISTRATION NOTICE All home improvement Contractors in the Commonwealth of Massachusetts are required to be registered in the Commonwealth. Any and all inquires about a contractor and/or subcontractor relating to registration should be directed to: Registration Division, Program Coordinator One Ashburton Place Room 1301 Boston, Ma 02108 Tel: (617) 727-3200 ext. 25239 ARTICLE 12. TAXES The Owners hereby agree to supply the Contractor with their tax-exempt number for relief of sales tax on purchase of materials if applicable. ARTICLE 13. RIGHT OF CANCELLATION Under the Laws of the Commonwealth of Massachusetts, the Owner his/her agent or assigns or any other person entering into this contract on your behalf has the legal right under M.G.L c. 93 § 48; M.G.L c. 140D § 10 or M.G.L c. 255D § 14 as may be applicable to cancel this contract within three (3) days of signing. THIS IS A LEGALLY BINDING CONTRACT, IF YOU DO NOT FULLY UNDERSTAND THE PROVISION CONTAINED IN THIS CONTRACT, YOU HAVE THE RIGHT TO CONSULT, AND SHOULD CONSULT WITH AN ATTORNEY PRIOR TO SIGNING THIS AGREEMENT. IN WITNESS WHEREOF, THE OWNERS AND THE CONTRACTOR HAVE EXECUTED THIS CONTRACT AS OF THE DATE FIRST WRITTEN ABOVE. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. (Irz O n Owner Co trac Page: 1 Keenan Construction Company, Inc �v 35 Pond Street (� Beverly,Ma.01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount This estimate will cover the following and shadow claim number 033424252: remove all the baseboard heat throughout the house install new baseboard heat throughout the house remove one pressure tank for the well system install one new pressure tank to match exsisting install new heating system to match Basement area: remove the basement floor remove paneling walls remove exsisting ceiling grid remove 100 amp panel install new vynal plank install new paneling in the old areas install new ceiling grid and drop in tiles The trimming of any bushes around the house will be extra work.The cost will be$1600.00 Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before any work to get rid of any mold or dirt.This will be extra work Page: 2 Keenan Construction Company, Inc �v 35 Pond Street (� Beverly,Ma.01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount install new 100 amp panel pressure wash the walls prime and paint the exposed walls Basement stairs: remove walls and ceiling install new walls and ceiling with 1/2"blueboard prime one coat and paint to cover clean and wash stairs-may have to be replaced do to damage Foyer.- remove oyer:remove paneling walls remove hardwood floor remove exsisting trim around the doors install new hardwood to match: sand and three coats of poly install new paneling to match The trimming of any bushes around the house will be extra work.The cost will be$1500.00 Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before any work to get rid of any mold or dirt.This will be extra work Page: 3 Keenan Construction Company, Inc &"� 35 Pond Street Beverly,Ma.01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount reinstall old trim prime one coat and paint to cover Library: remove old carpet install new carpet Living Room: remove the ceiling remove all trim around the windows and doors remove all wall coverings remove all electrical plates remove the carpet and pad remove subfloor install new blue board throughout reinstall all the trim The trimming of any bushes around the house will be extra work.The cost will be$1600.00 Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before any work to get rid of any mold or dirt.This will be extra work Page:4 Keenan Construction Company, Inc �v , 35 Pond Street U� Beverly,Ma. 01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount reinstall new underlayment install new carpet prime one coat paint to cover reinstall electrical covers reset the one thermistate remove and replace insulation Dining Room: remove exsisting ceiling and trim remove all wall coverings down to the studs, including the ceiling remove all interior trim remove the carpet and pad remove insulation remove electrical fixtures and cover plates The trimming of any bushes around the house will be extra work.The cost will be$1500.00 Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before any work to get rid of any mold or dirt.This will be extra work Page: 5 Keenan Construction Company, Inc , 35 Pond Street Beverly,Ma.01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount install new insulation install new 1/2"blue board throughout install old trim and ceiling moling install new carpet and pad reinstall trim throughout reinstall electrical fixtures and cover plates Second floor bedroom rear right: sand and refinish the floor throughout supply dumpsters for the job site apply fungiside and anti bacterial to all affected areas pull building permit post construction clean up anything outside this scope of work and not verified is above the contract price 55,059.79 The back room not in the contract will be added as a change order The trimming of any bushes around the house will be extra work.The cost will be$1600.00 Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before any work to get rid of any mold or dirt.This will be extra work Page: 6 Keenan Construction Company, Inc a 35 Pond Street &&� Beverly,Ma.01915 Number: E328 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount extra work that may be proposed will be added under a change order Total $55,059.79 The trimming of any bushes around the house will be extra work.The cost will be$1600.00 Painting and power washing of the exterior of the house will be a cost of$6960.This should be done before any work to get rid of any mold or dirk This will be extra work i Keenan Construction Company, in( 35 Pond Street Beverly,Ma.01915 Number: 1082 Phone/Fax 1-978-921-6416 Contractors#052466 HIC 159044/265734 Date: May 10,2014 Bill To: Ship To: Joyce Bradshaw 624 Boxford Street North Andover,Ma, 01845 Description Amount This invoice will be marked as exhibit B: deposit 10,000.00 first payment:when commencment of the project 15,000.00 second payment when the house is gutted 15,000.00 Third payment:when the insulation, blueboard,trim reinstalled as well as the new base board heat is 10,000.00 installed fourth payment:when the painting and floors are finished 3,000.00 final payment:when the job is closed out 2,059.79 Total $55,059.79 This contract covers the cost of materials and labor mentioned.Anything that is not mentioned,is not covered.Any additional work that has to be performed above the contract price,will be an added cost of $60.00 per man per/hr plus the cost of materials.Any litigation that may arise from this contract will be the expense of the above stated party.This contract dosn't make provisions for the weather,ledge,special permits,mold,mildew,rodents,change orders and delays from the building dept.,homwe owners or others.The pricing for this job will be held for 15 days do to changing conditions.