HomeMy WebLinkAboutBuilding Permit #045-15 - 624 BOXFORD STREET 7/14/2014 NORTH
BUILDING PERMIT D�St L.ED
TOWN OF NORTH ANDOVER
02. •a O
APPLICATION FOR PLAN EXAMINATION
h 'M
Permit No#: J�� Date Received
Date Issued: jS
IMPORTANT: Applicant must complete all items on this page
LOCATION'
Print
PROPERTY OWNER . -_
Print 1od Year Structure � yes h6
MAP Tlc�PARCELZ r ZONING DISTRICT: Historic District ye no
Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building P;One family
❑Addition b Two or more family ❑ Industrial
❑Alteration No. of units: ❑ Commercial
aepair, replacement ❑Assessory Bldg ❑ Others:
rfDemolition 0 Other
0 Septic El Well' 0 Floodplain ❑Wetlands El Watershed District-
0 Water/Sewer
DESCRIPTION F WORK TO BE PERFORMED:
&21—Q J ( ��✓ t O
Identification- Please Type or Print Clearly
OWNER: Name: Phone: —3 �
Address: u -4; C"4— Skc
Contractor Name Phone: " ..:
2
Address: r _
Supervisor's Construction Date:L-,icense: __t� � ��► �P__ Exp. _�4 1�
HmJI
oe.Improvement License ._.:_ / Exp. Date:.
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE:BULDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
e r e
Total Project Cost: $ (0 FEE: $ t }
Check No.: Receipt No.: �--
NOTE: Persons contracting with unregistered contractors do not have access to e ua ty fund
ma nature of Agent/Owner_ _ _ Signature of contrac or
SigI
Location
No. Date
. • TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee $
`L TOTAL $
Che k# -2
G 772 Building Inspector
Location (02.1 �z-/4_ � ��
... No. `s" G G! Date ���Y�y
f i r
• • TOWN OF NORTH ANDOVER
F„ Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee $
TOTAL $
Check#00i,o�
3 0 t.2 Building ln'spector
Plans Submitted Plans Waived Certified Plot Plan Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer Tanning/Massage/Body ArtT. Food
ing Pools
Well Tobacco Salesackaging/Sales
Private(septic tank,etc. Permanent Dumpster on Site
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/Signature& Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
'FERE DE-PARTMENT Temp Dt�mpsterpn s�i a yes _ no _-
Located'.at 124 Main Street r
Fare Departmentsignature/•date
5 1
v,
lar
.a t
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use)
❑ Notified for pickup Call Email
Date Time Contact Name
Doe.Building Pen-nit Revised 2014
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
o Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doe:Building Permit Revised 2014
f N�D7M
4 e 1 N
A
•i i
i
,SSACHUSEt
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 045-2015 on 7/14/2014 Date: May 23, 2016
THIS CERTIFIES THAT
THE BUILDING LOCATED at 624 Boxford Street
MAY BE OCCUPIED AS an single family home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Joyce Bradshaw
624 Boxford Street
North Andover,MA 01845
t
M
Building nspector
Fee: $100.00
Receipt: 30423
Check : 2282
r
of,,ORIN'
� v
+ l a
'Ji"Oa.na "ay
�SSACHU54
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 045-2015 on 7/14/2014 Date: May 23, 2016
THIS CERTIFIES THAT
THE BUILDING LOCATED at 624 Boxford Street
MAYBE OCCUPIED AS an single family home IN ACCORDANCE WITH THE
PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER
REGULATIONS AS MAY APPLY.
Certificate Issued to: Joyce Bradshaw
624 Boxford Street
North Andover,MA 01845
Building nspector
Fee: $100.00
Receipt: 30423
Check : 2282
t4ORTH
Town tE
No. ; LK-ow
* _
' h ver, Mass I
O • 1 7 V
.Q
coc.uC.a rt w.cw 1'
tJ BOARD OF HEALTH
PERMIT T
Food/Kitchen
LD l Septic System
THIS CERTIFIES THAT �� J��, „✓„ ,p�;j (�✓ BUILDING INSPECTOR
has permission to erect .... buildings on �. �0� d'j--- Foundation
g ....(.�a-. .....1�..... ............ .....................
Rough
to be occupied as ...k..r` � ca. �'� Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
/ UNLESS CONSTRUCT TS Rough
Service
............... ................................ Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit ReAuired to Occupy Buildinz Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Fina'
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
Enter construction cost for fee cal- North Andover Fee Calculation
Construction Cost
$ 60,776.00 m
$ - $ 729.31
Plumbing Fee $ 91.16
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 91.16
Total fees collected $ 1,011.64
624 Boxford Street
045-15 on 7/14/2014
Remodel
The Commonwealth of Massachusetts
.Department of Industrial.Accidents
'--�, Office of Investigations
_ 600 Washington Street
Boston,MAA 02111
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applican,t Information ]Please Print Legib
Name(Business/Organization/Wividual): y C. "
City/State/Zip: t t/� Phone#: MY-7 e
Are you an employer?Chee the app opriate box: Type-of project(required):
1.❑ I am a with employer 4. ❑ I am a general contractor and I
6. F1 New construction
employees(full and/or part-time).* have hired the sub-contractors
2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling
ship and have no employees These sub-contractors have g. O'Demolition
working for me in any capacity. employees and have workers' 9 ❑Building addition
[No workers' comp.insurance comp.insurance.:
required.] 5. We are a corporation and its 10.❑Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.[]Plumbing repairs or additions .
myself.[No workers'comp. right of exemption per MGL 12.❑Roof repairs
insurance required.]t c. 152, §1(4),and we have no 13.❑Other
employees.[No workers'
colnp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such.
!Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am do ernployer Mat is providing workerscompensation insurance far my employees. Below is tit policy.andjob site
information.
Insurance Company Name:
Policy#or Self-ins.Lie.#: Expiration Date:
Job Site Address: City/State/Zip:
Attach a copy of the workers'compensation policy declaration page(showing the policy number and eipiration date).
Failure to secure coverage as required under Section 25A of MGL c.152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 andlor one year imp ' ent,as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the viol or. e advised that a copy of this statement maybe forwarded to the Office of
Investigations of the DIA for ins e verage verification.
Ido hereby certify under the pa' . ndpenalties of perjury Haat the information provided above is hue and correct.
Si n ature• Date: G f
Phone#: 4
Official use only. Ido not write in this area,to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
/ ' DAM(MMIDWYYYY)
'4�& CERTIFICATE OF LIABILITY INSURANCE 7/14/2014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUCIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: if the certificate holder is an ADDITIONAL INSURED,the pollcy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on the Certificate does not confer fights to the
certificale holder In lieu of such endcrsemen s
PRODUCER wmar
Sterling Insurance Agency, Inc. PHONE (978)922-6600 FAe (978)922-7650
SAM
306 Cabot Street
P.O. Box 493 IN APFOROINGCOVERAGE NAIC0
Beverly MA 01915 INsuRERA:Commerce Ins. Cc
INSURED INSURERS:
INSURER C:
Keenan Construction Co. Inc. INSURERD:
35 Pond Street INSU E:
-Beverly MA 01915 INSu F:
COVERAGES CERTIFICATE NUMBER*Iaster 14-15 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
IMMI LTR TYPE OF INSURANCE POLICY EFF LIMITS
GENEMIJASIUTY EACH OCCURRENCE s 1,000,000
DAMAX COMMERCIAL GENERAL LIASIL Y 8E^f S 100,0001
A CLAIMSMADE ❑X OCCUR 9/09/2013 1 09/09/2014 MED EXP(Anyone $ 5,0001
BX0282 PERSONAL s ADV NAM s 1,000,000
GENERAL AGGREGATE S 2,000 000
h
nAGGREGATEUMITAPPLIESPER: PRODUCTS-COMPJOPAGO S 2,000,000
POLICY LOC OMINS
NGIN LW
A AuTOu R,E LIABILITY ED I
ANY AUTO 5/21/2014 5/21/2015 SWU,Y INJURY(Per person) $ 250,000
ALLOMED X SCHEDULED 0231 BODILY INJURY(Per eoddenl) S 500,000
AUTOS
HIRED AUTOS
�4� PROPE
AUTOS D s 100.000
s
UMBRELLA UAB OCCUR EACH OCCURRENCE S
EXCESSWU3 CMS.MAOE AGGREGATE $
oEo s
TNORK@RSCWWOMATta1 SiATU-ITH
AM EMPLOYE LIABILITY Y i n
ANY PROPMETOMPARTNERNXEGUTIVEF-1
OFRCERJMEMBER EXCLUDED? NIA E L EACH ACCIDENT i
(Myd,Y M t) E.L.DISEASE-EA EMPLOYEE S
a RIPTION OF TIDNS Oebw E-L DISEASE-POLICY LIMIT I S
DES(RUPTTON OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,AdMond Renwlrs Schedule,B scare space Is mqu(red)
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS.
Attar: Gerald Brown
1600 Osgood Street auTN°r+»�DRIe'RESEHrATRrE
North Andover, MA 01845
Liz Cahill/NANCY -
ACORD 26(2010106) 01988-2010 ACORD CORPORATION. All rights reserved.
INS026(zmoo4oi The ACORD name and logo are registered marks of ACORD
Ds,art ne- it cif DI;
? L SEJ_ty r
.3-oald o SuOdfng hteQuiai .Gt s anti Staild,tE S
n �..�i±?SYfi�?GYirot)SRlI1�`Cti'd��11 ..
EDWARD J iMUP AN Jit
POBOX 131
BEVERLY MA iF1915
Exits Ston
Car, ntsstarer 05114/2015
OSHA 002327504
Edgard Keenan
a5 s.x.�e>3:s"��:x'.r'c'.M�a tr.t n,-O::�t^•'x:.t„a,t:cs c=ai ti£3`C^ .
�-ami*-�C:iu'Se st
flif F1 jY9ii YFr!§ ±'i 103S r�— 0r1:6Ia9�
.- a ✓fe a.crroirt�rtcetifir� �ll2<;r�c�t:u,/�..: �
�i Of€ice of Cowmaer Affairs&Bflsiness Iiegalatioa
tUjk- !-'HOME IMPROVEMENT COM MOR
f
1;4- '- Registration--_.._ _ rA_
4 "{ Tye: •..:
T 3€ `u•�n: 3 Br10 �mr e CoY¢o,mt of
KEENAN CONSTR.00 INC
EDWARD-10EENAAI
35 PONDT ST -
BEVERLY,MA 01915
Undersecretary- .
Office of Consumer Affairs&Business Regulation-Mass.Gov Page 1 of 1
The Official Website of the Office of Consumer Affairs&Business Regulation(OCABR)
Consumer Affairs and Business Regulation
Home Consumer Rights and Resources Home Improvement Contracting
HIC Registration Complaints
Registration# 159044
Home Improvement Contractor
Registrant KEENAN CONSTR CO INC. Registration Home Page
Name EDWARD KEENAN
Address 35 PONDT ST
City, State Zip BEVERLY, MA 01915
Expiration Date 03/28/2016
Complaints Details
No complaints found for this registrant.
You can also view arbitration and Guaranty Fund history.
Back To Search
http://services.oca.state.ma.us/hicAicdetails.aspx?txtSearchLN=60340 7/14/2014
Arbella Insurance Group
1100 Crown Colony Dr
PO Box 699225
Quincy,Ma 02269
800 272 3552 x 2571 -617 773 4760
perek,Walker _aa.com-Arbella.com
Est.Bldg R(C $399,253.00
Est.ACV $399,253.00
Insured : Joyce Bradshaw Type Of Loss : Water
i
Address : 624 Boxford St
North Andover, MA 01845 Claim Number :033458144
Our File No. : 033468144
Adjuster : Derek Walker
Policy No : 96050400002
Action Description Quantity/Unit Unit Cost RCVTotai DEPR ACV/Lose
Interior Dwelling !
i
General/Mise Conditions
Special DemofTearout/Prep 10.00HR 40.00 400.00 40.00 360.00
Special Dumpster 20 Yard 1.00 E4 510.00 510.00 51.00 459.00
Special Ongoing and Post 2.00 HR 40.00 80.00 8.00 72.00
Construction Cleanup
Special Permits&Fees 1.001-S 100.00 100.00 10.00 90.00
Special Apply Anti-Microbiaito affected 1,001-S 75.00 75.00 7.50 67.50
area
Generat/Misc Conditions Total: 1165.00 116.50 1048.50
Rear Additions Room 1s'r x 11'r x 10'00
Replace Cell insulation 180,428F 1.50 270.63 27.06 243.57
Replace Wall insulation Batt 31/2 400.00SF 0.75 300.00 30.00 270.00
Replace Pine Tongue and Groove 180.42SF 4.98 898.49 69.85 808.64
Ceiling Board 1x6 Grade$
Remove/Reset Paddle Fan Average Quality 1,00EA 60.39 60.39 6.04 54.35
Replace PlasterWall(s)W/Bluebrd 42.25SY 27.00 1140.75 114.08 1026.67
Paint Piaster Wali(s)WBluebrd 280.00SF 1.00 280.00 28.00 252.00
Replace Custom Trim Set(s) 4.00 EA 202.63 810.52 81.05 729.47
Stan/Finish Custom Trim Sets} 5.00EA 50.00 250.00 25.00 225.00
Remove/Reset Window Treatment 3.00 EA 36.66 109.98 11.00 98.98
Remove/Reset outlet switch covers 9.00EA 10.00 90.00 9.00 81,00
Replace Carpet Pad 20.05SY 6,00 120.30 1203 108.27
Replace Carpet Wall To Wall 21.30SY 29.00 617.79 61.78 556.01
Rear Addtions Room Total: 4948.85 494.89 4453.96
Building Repair Esdmete Page 1 of 2 COPYRIGHT 1987--20f3 SJV
{ ... ..... .... ... _ ......
V
Arbella Insurance Group
INSURED. Joyce Bradshaw
Policy No : 98050400002 Claim Number :033468144 Our Fft No. :033458144
Action Description Quantity A)n t Unit Cost RCVTotal DEPR ACWLoss
SUB TOTAL $6,113.85 $611.39 $6,602.49
OVERHEAD a 10 % $811. $91.18 $660:28
$8,725.23 $6M63 $6,052.70
PROFIT 10 % $011.38 $61.14 $$60.24
$7,336.81 73733.87 ",802.94
SALES TAX 6.25 *A (On Materials Only} $128:20 $12 82 $113.68
$7,462 81 $748.29 $8,718.82
LESS DEDUCTIBLE $1,000,00
NET CLAIM $6,718.52
Bued4g Repair Estimate Page 2 of 2 COPYRIGHT 1987-2013 SJV
Change Estimate Worksheet
Estimated by C. E. Number#1
Edward
Date 7/14/14 Job No Estimate#328
Direct Labor Expense (including benefits)
Plumber or pipefitter journeyman manhours at$ per hour= $
Plumber or pipefitter supervisor manhours at$ per hour= $
Sheet metal journeyman manhours at$ per hour= $
Sheet metal supervisor manhours at$ per hour= $
Laborer journeyman manhours at$ per hour= $
Total Direct Labor Cost $
5716.52
Indirect Costs
Travel $
Subsistence $
Labor $
Total Indirect Cost $
Equipment and Tool Costs
$
$
Total Equipment and Tool Cost $
Subcontract Costs
$
$
$
Total Subcontract Cost $
5716.52
R
KEENAN CONSTRUCTION COMPANY, INC.
35 POND STREET
BEVERLY, MA 01915
(978) 921-6416
Contractor Number 052466
HIC# 159044/265734
CONTRACTOR AGREEMENT
THIS AGREEMENT made this 10 day of May, 2014, by and between Keenan
Construction Company Inc., of 35 Pond Street, Beverly, Essex County,
Massachusetts, a Massachusetts Corporation, hereinafter called the Contractor,
and Joyce Bradshaw, hereinafter called the Owner, now or formerly of 624
Boxford Street, North Andover, Massachusetts.
WITNESSETH, that the Contractor and the Owner for the consideration named
herein agree as follows:
ARTICLE 1. SCOPE OF THE WORK
The Contractor shall furnish all the materials and�perform all of the work shown
on the drawings and/or described in the specifications entitled Exhibit A and
more particularly described and identified as Estimate numbers 328 and claim #
033424252 inclusive and as annexed hereto as it pertains to work to be
performed on property located at 624 Boxford Road, North Andover, MA, 01845.
71
ARTICLE 2. TIME OF COMPLETION
The Contractor shall commence the work to be performed within 30 days from
5/10/14, and shall complete the work 120 days thereafter, or by Sept.10,2014,
whichever comes later. If Contractor deems it necessary to extend the duration of
the project due to unforeseen orlfnusual occurrences, Contractor shall notify
Owners in writing stating the reason for the delay and projected completion date.
It is agreed by and between the parties that any unforeseen delay shall
automatically extend the duration of this agreement by the length of said delay.
ARTICLE 3. THE CONTRACT PRICE
The owner shall pay the Contractor for the material and labor to be performed
under the Contract the sum of$55,059.79 Dollars subject to additions and
deductions pursuant to authorized change orders.
ARTICLE 4. PROGRESS PAYMENTS
Payments of the Contract price shall be paid as follows:
Payments shall be disbursed based on the attached schedule of values
designated as EXHIBIT B of this contract. Within three days of notification by the
Contractor of each stage of completion, the Owner or its designee will inspect
and approve the work, or request any necessary adjustments in the work. The
Owner agrees to make payments to the Contractor within five calendar days after
notification of completion of work. Except as provided herein, no other payment
schedule is contemplated or agreed to. IT IS A VIOLATION OF
MASSACHUSETTS LAW FOR A CONTRACTOR TO REQUIRE AN
ACCELERATION CLAUSE IN ANY CONTRACT FOR HOME REPAIR OR
REMODELING.
ARTICLE 5. GENERAL PROVISIONS
1. All work shall be completed in a workmanship like manner. Contractor will
further comply with all applicable building code regulations and ordinances
whether or not covered by the specifications and drawings for work to be done as
outlined in any attached exhibits
2. To the extent required by law all work shall be performed by individuals duly
licensed and authorized by law to perform said work.
3. Contractor may at its discretion engage subcontractors to perform work
hereunder, provided Contractor shall fully pay said subcontractor and in all
instances remain responsible for the proper completion of this Contract.
4. Contractor shall furnish Owner appropriate releases or waivers of lien for all
work performed or materials provided at the time the next periodic payment shall
be due.
5. All change orders shall be in writing and signed by both Owner and Contractor.
6. Contractor warrants it is adequately insured for injury to its employees and
others incurring loss or injury as a result of the acts of Contractor or its
employees and subcontractors and shall supply proof of same upon request.
7. Contractor agrees to remove all debris and leave the premises in broom clean
condition at completion of the contracted project.
8. In the event Owner shall fail to pay any periodic or installment payment due
hereunder, Contractor may cease work without breach pending payment or
resolution of any dispute.
9. To the extent practical, the Contractor agrees to adhere to the reasonable
wishes of the Owners in relation to deliveries of materials and working schedules.
10. This contract and all its terms shall be subject to and under the jurisdiction of
the laws of the Commonwealth of Massachusetts.
11. Contractor shall not be liable for any delay due to circumstances beyond its
control including strikes, casualty or general unavailability of materials.
12. The Contractor shall protect, defend and indemnify the Owner from any
claims for unpaid work, labor or materials
13. The Contractor shall protect all work adjacent to the Contract site from any
damage resulting from the work of the Contractor and shall repair or replace any
damaged work at his expense.
ARTICLE 6. USE OF UTILITIES
The Owners shall permit the Contractor to use at no cost, power and water
necessary to the carrying out and completion of the work.
ARTICLE 7. ASSIGNMENT OF CONTRACT
The contractor agrees not to assign the Construction Contract without the written
consent of the Owner.
ARTICLE 8. INSPECTION
The Owner shall have the right to inspect all work performed under this contract.
As well it shall be a condition of this contract that all work that needs to be
inspected or tested and certified by an engineer or inspected and certified by the
local code enforcement officer, health officer, or other like inspector, it shall be
done at each necessary stage before further construction can continue. All
inspection and certification will be done at the Owner's expense. Failure to follow
this requirement will be grounds for termination of the contract. Any delay
resulting due to scheduling of and inspection of the premises by any required
inspector shall in no way be construed as foreseeable by the Contractor, and will
extend for a reasonable period of time the duration of this project.
ARTICLE 9. PERMIT NOTICE
Contractor shall be responsible for obtaining all permits necessary for the work to
be performed. Any Owner who secures their own construction related permit, or
deals with an unregistered contractor, shall be excluded from access to the
Guarantee Fund. It is the obligation of the Owners are responsible for securing
all variances, special permits and/or zoning decisions prior to commencement of
work. Contractor shall secure at his expense all licenses and any other permits
required to perform work.
ARTICLE 9. WARRANTEE
The Contractor shall remedy any defect due to faulty material or workmanship
and pay for any damage to other work resulting therefrom which shall appear
within the period of one year from completion of work. Further, the Contractor
will furnish Owner with all manufacturer's and supplier's written guarantees and
warranties covering materials and equipment furnished under this Contract.
Owner further has specific rights, remedies and warranties as specified n M.G.L.
c. 142A
ARTICLE 10. DISPUTE RESOLUTION
All claims, disputes, and other matters in question arising out of, or relating to,
the Contract Documents or the breach thereof, except for claims which have
been waived by the making and acceptance of final payment, shall be decided by
Arbitration in accordance with the construction Industry Arbitration Rules of the
American Arbitration Association (or other arbitration rules) and as provided for in
Massachusetts General Law Chapter 142A. This agreement to arbitrate shall
be specifically enforceable under the prevailing arbitration law. The award
rendered by the arbitrators shall be final, and judgment may be entered upon it in
any court having jurisdiction thereof. Any award shall provide for payment within
30 days of the date of the award.
Clue, (-21.�11 ,1111
Ownr Owner
Co tract
ARTICLE 11. CONTRACTOR REGISTRATION NOTICE
All home improvement Contractors in the Commonwealth of Massachusetts are
required to be registered in the Commonwealth. Any and all inquires about a
contractor and/or subcontractor relating to registration should be directed to:
Registration Division, Program Coordinator
One Ashburton Place Room 1301
Boston, Ma 02108
Tel: (617) 727-3200 ext. 25239
ARTICLE 12. TAXES
The Owners hereby agree to supply the Contractor with their tax-exempt number
for relief of sales tax on purchase of materials if applicable.
ARTICLE 13. RIGHT OF CANCELLATION
Under the Laws of the Commonwealth of Massachusetts, the Owner his/her
agent or assigns or any other person entering into this contract on your behalf
has the legal right under M.G.L c. 93 § 48; M.G.L c. 140D § 10 or M.G.L c. 255D
§ 14 as may be applicable to cancel this contract within three (3) days of signing.
THIS IS A LEGALLY BINDING CONTRACT, IF YOU DO NOT FULLY
UNDERSTAND THE PROVISION CONTAINED IN THIS CONTRACT, YOU
HAVE THE RIGHT TO CONSULT, AND SHOULD CONSULT WITH AN
ATTORNEY PRIOR TO SIGNING THIS AGREEMENT.
IN WITNESS WHEREOF, THE OWNERS AND THE CONTRACTOR HAVE
EXECUTED THIS CONTRACT AS OF THE DATE FIRST WRITTEN ABOVE.
DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES.
(Irz
O n Owner
Co trac
Page: 1
Keenan Construction Company, Inc �v
35 Pond Street (�
Beverly,Ma.01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
This estimate will cover the following and shadow claim number 033424252:
remove all the baseboard heat throughout the house
install new baseboard heat throughout the house
remove one pressure tank for the well system
install one new pressure tank to match exsisting
install new heating system to match
Basement area:
remove the basement floor
remove paneling walls
remove exsisting ceiling grid
remove 100 amp panel
install new vynal plank
install new paneling in the old areas
install new ceiling grid and drop in tiles
The trimming of any bushes around the house will be extra work.The cost will be$1600.00
Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before
any work to get rid of any mold or dirt.This will be extra work
Page: 2
Keenan Construction Company, Inc �v
35 Pond Street (�
Beverly,Ma.01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
install new 100 amp panel
pressure wash the walls
prime and paint the exposed walls
Basement stairs:
remove walls and ceiling
install new walls and ceiling with 1/2"blueboard
prime one coat and paint to cover
clean and wash stairs-may have to be replaced do to damage
Foyer.-
remove
oyer:remove paneling walls
remove hardwood floor
remove exsisting trim around the doors
install new hardwood to match: sand and three coats of poly
install new paneling to match
The trimming of any bushes around the house will be extra work.The cost will be$1500.00
Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before
any work to get rid of any mold or dirt.This will be extra work
Page: 3
Keenan Construction Company, Inc &"�
35 Pond Street
Beverly,Ma.01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
reinstall old trim
prime one coat and paint to cover
Library:
remove old carpet
install new carpet
Living Room:
remove the ceiling
remove all trim around the windows and doors
remove all wall coverings
remove all electrical plates
remove the carpet and pad
remove subfloor
install new blue board throughout
reinstall all the trim
The trimming of any bushes around the house will be extra work.The cost will be$1600.00
Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before
any work to get rid of any mold or dirt.This will be extra work
Page:4
Keenan Construction Company, Inc �v ,
35 Pond Street U�
Beverly,Ma. 01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
reinstall new underlayment
install new carpet
prime one coat
paint to cover
reinstall electrical covers
reset the one thermistate
remove and replace insulation
Dining Room:
remove exsisting ceiling and trim
remove all wall coverings down to the studs, including the ceiling
remove all interior trim
remove the carpet and pad
remove insulation
remove electrical fixtures and cover plates
The trimming of any bushes around the house will be extra work.The cost will be$1500.00
Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before
any work to get rid of any mold or dirt.This will be extra work
Page: 5
Keenan Construction Company, Inc ,
35 Pond Street
Beverly,Ma.01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
install new insulation
install new 1/2"blue board throughout
install old trim and ceiling moling
install new carpet and pad
reinstall trim throughout
reinstall electrical fixtures and cover plates
Second floor bedroom rear right:
sand and refinish the floor throughout
supply dumpsters for the job site
apply fungiside and anti bacterial to all affected areas
pull building permit
post construction clean up
anything outside this scope of work and not verified is above the contract price 55,059.79
The back room not in the contract will be added as a change order
The trimming of any bushes around the house will be extra work.The cost will be$1600.00
Painting and power washing of the exterior of the house will be a cost of$6980.This should be done before
any work to get rid of any mold or dirt.This will be extra work
Page: 6
Keenan Construction Company, Inc
a 35 Pond Street &&�
Beverly,Ma.01915 Number: E328
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
extra work that may be proposed will be added under a change order
Total $55,059.79
The trimming of any bushes around the house will be extra work.The cost will be$1600.00
Painting and power washing of the exterior of the house will be a cost of$6960.This should be done before
any work to get rid of any mold or dirk This will be extra work
i
Keenan Construction Company, in(
35 Pond Street
Beverly,Ma.01915 Number: 1082
Phone/Fax 1-978-921-6416
Contractors#052466 HIC 159044/265734 Date: May 10,2014
Bill To: Ship To:
Joyce Bradshaw
624 Boxford Street
North Andover,Ma, 01845
Description Amount
This invoice will be marked as exhibit B:
deposit 10,000.00
first payment:when commencment of the project 15,000.00
second payment when the house is gutted 15,000.00
Third payment:when the insulation, blueboard,trim reinstalled as well as the new base board heat is 10,000.00
installed
fourth payment:when the painting and floors are finished 3,000.00
final payment:when the job is closed out 2,059.79
Total $55,059.79
This contract covers the cost of materials and labor mentioned.Anything that is not mentioned,is not
covered.Any additional work that has to be performed above the contract price,will be an added cost of
$60.00 per man per/hr plus the cost of materials.Any litigation that may arise from this contract will be the
expense of the above stated party.This contract dosn't make provisions for the weather,ledge,special
permits,mold,mildew,rodents,change orders and delays from the building dept.,homwe owners or
others.The pricing for this job will be held for 15 days do to changing conditions.