Loading...
HomeMy WebLinkAboutBuilding Permit #750-11 - 66 ROCK ROAD 5/9/2011NoR rH BUILDING PERMIT o�sto ,bgti TOWN OF NORTH ANDOVER � APPLICATION FOR PLAN EXAMINATION Permit NO: Date Received � q°q.reo •PPS .h �SSACH15�� Date Issued: �-/; ' IMPORTANT: Applicant must complete all items on this page LOCATION ....Print PROPERTY OWNER ° A , -A t2 Print MAP210 PARCEL. ZONING DISTRICT: Historic Districtyes no Machine Shop Village yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addition Two or more family Industrial Alteration No. of units: Commercial Others: Repair, replacement Assessory Bldg Demolition Other Septic Well $ ° Floodplain Wetlands Watershed District Water/Sewer 1Jt,l:K11' i wN ur VVORK TO BE PREFORMED: Identification Please Type or Print Clearly) OWNER: Name: Phone: Address: y CONTRACTOR Name: a .ate Phone3 Address: , ^' ►, �- ''✓ �'' cm A- J J k%"4-3 Supervisor's Construction License: Jf OGS Exp. Date: (z (2 Horne Improvernent.'License: Exp. 'Date: i ARCHITECT/ENGINEER Address: Phone: Reg. No. FEE SCHEDULE: BOLDING PERMIT. $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $�, 3p ��� 6 o FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Building Permit Revised 2008 Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private (septic tank, etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT COMMENTS CONSERVATION COMMENTS HEALTH COMMENTS DATE REJECTED DATE APPROVED Reviewed on Signature Reviewed on - Signature Zoning Board of Appeals: Variance, Petition No: t ' Planning Board Decision: Conservation Decision: Comments Comments Zoning Decision/receipt submitted yes Water & Sewer Connection/Signature & Date Driveway Permit DPW Town Engineer: Signature: Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2010 Location -4-4- ,g 4 No. Date !/ i TOWN OF NORTH ANDOVER 1 00- 9 ° Certificate of Occupancy $ 9 Buildin /Frame Permit Fee $ `6f"_... s,�cMust Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check # /Building 5 -16r CA m X m U) m 9) EP C c?mo0 Qo_. N� -1 �• H = d0 S o .� CO) ® n CD C) O Cl d 0 m Z y' =ro y� co CD =r CL CL. m -4o an d p y V! � N Oso: CD ca 0 2 0 -00 C0I 2► O y . C12 CD C S� .�.ocol� C �m uo =r V] Amy: o G m. nCDc a y, CL C C V7 ® tC • H col �? ® d CD N CCD, x` � ; �C.) A p Wa o Vi CD � o r. C CDCD oq C o cu CD o C: cu CD m � o cn 77* d CO) to 0 R• C � cn o ;z a r n n? w CD n Z y � O CL � CM IW O d y n� -v �c cm CD o p CD o CL C7 a O � CD CCD O CD w E3 C O CZ co) CD CO) O O O co CD B CO) v O � CD Z o CD C CD C c?mo0 Qo_. N� -1 �• H = d0 S o .� CO) ® n CD C) O Cl d 0 m Z y' =ro y� co CD =r CL CL. m -4o an d p y V! � N Oso: CD ca 0 2 0 -00 C0I 2► O y . C12 CD C S� .�.ocol� C �m uo =r V] Amy: o G m. nCDc a y, CL C C V7 ® tC • H col �? ® d CD N CCD, x` � ; �C.) A p Wa o Vi CD � o r. C CDCD oq C o cu CD o C: cu CD m � o cn 77* d cn � a to 0 R• ro cn o ;z a r n n? w ;z 10 z w n .� Py a- ri a °* G7 C► C cn a cn al s rb tz d by H O � M H n z O x 0 c Massachusetts Home Improvement Sam la contract F This form sausfics all basic requiramenu of the state's Home improvement Contractor Law (MGL chapter 142A), but does not include stan�'he0.efCon ' iartguage to protect homeowners. Seek legal advice if necessa r}'. Any person planning home improvements should first obtain a copy -h Massachusetts consumer guide to homc,improvement" b fore agreeing to an}" work on your residence. You may obtain a free cop}" by cal3ingffiosumer Affairs and Business Regulation's Consumer Information Hotline at 617-973-S7S7 or 1 -88S -2S3-3757. R.. r -r---- -- - °N9 00a y---- ame Street Address (do not use a Post Office Box address)- AA-0o1jc=Y1 M4S5 l,iry%1t own State Zip Code Daytime Phone Fuming—Ph. Jvtailing Address (lt difrermt from above) The Contractor agrees to do the following work for the Ht Contractor Information At t U 4 �L ' ( &1&j / iCiGY� ontracfor/espersgn,/�tOwnerName iusiness ^urn ss (must mciude a sweet address) ,fib :�24 :ity/1-own State Zip Code M W14 3, 01 jo lusioess Phone edaal Emolwer ID or S.S. N m��rginres flbt mon Game int- I Home barnav ' C•omnar aeF. Mwfrr ent r�aaan h.vea tad mglraatiw vmohc Required Permits - The following building permits are required and will be secured by the contractor as the homeowner's agent, Proposed Start and Completion' Schedule - The following schedule will be adhered to unless circumstances (Owners who secure their own permits will be excluded from the Guaranty beyond the contractors control arise Fund provisions of MGL Chapter 142A.) Date when contractor will begin contracted work Total ContraetPrice and PaymentSchedWe Date when contracted work will __be/ substantially completed_ � W� 2��•`� " The Contractor agrees to perform the work, furnish the material and labor specified above for the total sum of: Payments will be made according to the following schedule: S upon signing contract (not to exceed 1/3 of the total contract price or the cost of special order ireins, whichever is greater) S - ley _� !_ or uponcompletion-of $ e�n s^ by _L_i_ or upon completion of upon completion of the contract (Law forbids demanding full payment until contract is completed to both a � p riy's satisfaction) The following material/eou{pmem most be special 5 to be paid for ordered before the contracted work begins in order $—�— to be paid for to meet the completion schedule.(**) NOTES: (•) including all finance chaises («•) Law requires that any deposit or vandown-pavmeat required by the contmuor before wort tregins may . not exceed the greater of (a) one-third of the total contract price or (b) the ac them cost of any special equipment or custom Waage material which must be special ordered in. advance to meet the completion schedule. EMEMs Wat-mm - Is on rest warranty beino rrtvided by the coormetor. No Yes all terms of the wa n� Subcontractors - The contractor agrees to be solely responsible for wm lotion of the work described remust be attached to the contras party/subcontractor utilized by the contractor. The contractor further e P gardless of the actions of env third materials and labor under is ent grecs to be solely responsible for all payments to all subcontrtictors for Contract Acceptance - Upon signing, this document becomes a binding contract under law. Unless otherwise noted within this document, the carefully before signing this contract contract shall not imply that any lien or other security interest has been placed on the residence, Review the following cautions and notices • Don't be pressured into signing the contract Take time to read and fully understand it Ask questions if something is unclear. • Make sure the contractor has a valid Home Improvement Contac or e ' t anon reeuires most home improve The law, improvement connectors and subcontractors m b registered with the Director of Home Improvement Contractor Registration. You may inquire about contractor registration by writing to the Director at One Ashburton Place, Room 1301, Boston, MA 02105 or by calling 617-727-3200 or I-800-223-0933. • Dors the contractor have insurance? Check to see that your contractor is properly insured. • Know your rights and responsibilities. Read the Important Infontmtion on the reverse side of this form and get a copy of the Consumer Guide to the Home Improvement Contractor Law. You may cancel this agreement if it has been signed at a piece other than the contractor's normal place of business, provided you notify the contractor in writing at his/her main office or branch office by ordinary [nail posted by telecomm sent or by delivery, third business day following. the signing of this agteemenL See the anached notice of cancellation form for an explanatoion of this riter than ght, of the DO NOT SIGN THIS CONTRACT IF THERE ARE ANI' BLANK SPACES!!! Two idatdul tnpies of the r�ntner must be completed and signed One ropy should i go to the homeowna. The other copv should be kept by die m,,mooi. Homeo er'� ign re - n ctor s S' ((( ( S Lal Date� Date Contractor Arbitration The Home Improvement Contractor Law provides homeowners with the right to initiate an arbitration action (as an alternative to court action) if they have a dispute with a contractor. The same right is not automatically afforded to a contractor, however. The contractor would have to resolve any dispute he/she has with as homeowner in court unless both parties agree to the optional clause provided below. This clause would give the contractor the same right to arbitration as is afforded to the homeowner by the Home Improvement Contractor Law. The contractor and the homeowner hereby mutually agree in advance that in the event the contractor has a dispute concerning this contract, the contractor may submit the dispute to a.private arbitration firm which has been approved by the Secretary of the Executive Office of Consumer Affairs and Business Regulation and the consumer shall be required to mit to such arbitrati as provided In Massachusetts General LaAchapterRomeo s Signature reNOT CE. The signatures of the parties above apply only to the agreem five dispute -resolution initiated by the contractor. The homeowner may initiate alternative dispute resolution even where this section is not separately sinned by the navies. Homeowner's Rights A homeowner's rights under the Home Improvement Contractor Law (MGL chapter ]42A) and other consumer protection laws (Le. MGL chapter 93A) may not be waived in any way, even by agreement. However, homeowners may be excluded from certain rights if the contractor they choose is not properly registered as prescribed by law. Homeowners who secure their own building permits are automatically excluded from all Guaranty Fund. provisions of the Home Improvement Contractor Law. The contractor is responsible for completing the work as described, in a timely and workmanlike manner. Homeowners may be entitled to other specific legal rights if the contractor guarantees or provides an express warranty for workmanship or materials. In addition to guarantees or warranties provided by the contractor,.all goods sold in Massachusetts carry an implied warranty of merchantability and fitness for a.particular -F. purpose. An enumeration of other matters on which the homeowner and contractor lawfully agree may be added to the terms of the contract as long as they do not restrict a homeow'ner's basic consumer rights. If you have questions about your consumer/homeowner rights, contact the Consumer Information Hotline (fisted below). Execution of Contract The contract must be executed in dtmlicate and should not be signed until.a copy of all exhibits and referenced documents have been attached. Parties are also advised not to sign the document until all blank sections have been filled .in or marked as void, deleted, or not applicable. One original signed copy of the contract with attachments is to be given to the owner and the other kept by the contractor. Any modification .to the original contract must be in writing and agreed to by both parries. Contacted work may not begin until both parties have received a fully executed copy of the contract,and the three day recission period has expired. Accelerated Payments A contractor may not demand payments in advance of the dates specified on the payment schedule in cases where the homeowner deems him/herself to be financially insecure. However, in instances where a contractor deems him/herself to be financially insecure, the contractor may require that the balance of funds not yet due be placed in a joint escrow account as a prerequisite to continuing the contracted work. Withdrawal of funds from said account would require the. signatures of both parties. Additional Information If you have general questions or need additional information about the Home Improvement Contractor Law or other consumer rights, .or if you wish to obtain a free copy of "A .Consumer Guide to the Home Improvement Contractor Law," contact:: Consumer Information Hotline Office of Consumer Affair; and Business Regulation 10 Park Plaza, Room 5170, Boston, MA 02116 (617).973-8787 or 1-(888) 2833757 If you want to verify the registration of a contractor or if you have questions or need additional information specifically about the contractor registration component of the Home Improvement Contractor Law, contact: Director of Home Improvement Contractor Registration Bureau of Building Regulations and Standards One Ashburton Place, Room 1301, Boston, MA 02108 (617) 727-3200 or 1-800-223-0933 For assistance with informal mediation of disputes or to register formal complaints against a business, call: Consumer Complaint Section Office of the Attorney General (617) 727-8400 AND/OR Better Business Bureau (508)652-4800 (508) 755-2548 (4I3) 734-3114 V'j Conslyuction j Licen%e.- CS Sp120 Restricted to: 00 1 JOHN W LANZAFAMF 30 TEMPLE DR METHUEN, MA01844 -------------- yn Office of Consumer Affairs and Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement CQAtr4ctor Registration Registration: 137057 Type: 08A ExDirsfjon: 101212012 ALL UNDER ONE ROOF JOHN LANZAFAME 166 A MERRIMACK ST. METHEUN, MA 01844 S-C.'A Officr of Con sister k' "Mer Affairs & B HOME IMPROVEMENT CONTRACTOR iY Registration: 137067 Type -- v Expiration: IOJW012 OBA ALL UNDER ONE ROOF JOHN LANZAFAME 166 A MERRIMACK STi, METHELIN. MA 01644 Undersecretary Tr# 204021 t)pdate Address and return Vard. Mark reason for Chtjnge. Address i Renewal! I : FmPlOYment : Lost card License or registration valid for individul use on I% before the txili"60D date. If found return to: Office of Consumer Affairs and Business Regulation 10 Park Pinza - Suite 5170 Boston. MA 02116 C- - Not vvalfwd without si 011� rom.PERRY INSURANCE AUENLY ACERTIFICATE OF LIABILITY INSURANCE 'QTY tnsur anCe A9e1cY etttckelingRoad *Mih Amdovw, NIA 01$45 JOHN LANZAFAME DSA ALL UNDER ONE ROOF 30 TEMPLE DR tMETHUEN, AAA 01844 7t1lea+svRw+.� ••' tRit�M1RS UPONTIE AND DOES NOT AMEND Ai.'�R Tiff �,ir AF>ttD M1l TiIE t�t3f QRS AFFORDIt"O COVERAGE kt ER A AnANTTlU CASUALTY INSURANCE A AW t� `tg8 DF 4NSURl+NCE L{BT'EO Bf10W HAVE BEEN tSc+UE#7 FC�'it^!E li+tStJPiE£J N! FL$� F+DfF 4� POi1CY PER)IIE} #Pt pRl ANT, T� O R C� DICA Of ANY CiiRTRACTt7R OTitERON� T LLTTHE TERMS, IEXCLUSKWNST TO WMCMTHtS � ®TCI TFW INSUPAN A W $Y T GRtB UY PAtn rIAM S. DATE lis)NR.1DryY" I D0 912 0 0 !ORMATtON RTIFICATE ttfiND OR I NA)C A UED OR MAY Of SUCH �ti6ICiES e �A L00 AgC3i�6#R6 t 1Vlrczs Ls �nvrcY.. n� 1'YfoB lliPdif#[I1l6 • ollbt�ui>vLeRLeTT COLdAfER.CUIi ag p} -RAL LdAgRITY ctA+Ms MAOk aeCUR , u.-•• --- -- ►OtX: IIR Ly t8 27 9l11t24)10 - 9/11/2011 L.IMITB - 300.000 00 EAc"QcvRRRt-tcz s . S 50 ox 00 mAl i*D EV lA<Ifr as vEq$ONAL L ADV INAgy' 300 mo 00 rt _ GENERAL AGGREGATE � s 6W, W0 Ile ....-,----- 0D4 CC CG E . PRODUCTS . WmPIOP A 5 r,EAI'L AGGREGATE LIMIT APRIL" PER. POuCY PROJECT PER. j At/filT*omLf L)l►H/LfTY ANY Ai,L OWNED AUTOS � $G"E0UtE0 AUTOS MMED AUTOS NON -OWNED AUTOS I smr.LE LIMIT' ; {Ea aee:Otnl} gODIiY INJURY g {pf7 MOC18lM) ! rp$MY tWiUFIY_._._.- ,.�. PROPERTY OAMAGF Q^"Q,E i1R.f$AlTY ANY AUTO TO eMY . 8.A ACCIOfP T; EA A40 - Y A40 S -CILC92SAPAWRELLA LUL8 tff V OCCUR El CLA,,NIS MARE DEDUCTIRLP Rt f Tf 3 EACH OGGURRE"ce - s AGGREQATE � f .,.._ E � A qqt° ppppppPqq pp�Anata+�Aro CTat�CIdNT)EXGKR XE£ UTNE ly Ir d4Lt+Wi tM+QOr i�-,,.A rRov13$OM$ droa AWC7009' 64012010 1i/�1912010 11t(�l2ilit E L EACH ACCIDENT g `06 tK7J o Ll 04EASE CAeMKOVEE . s 1000000c ��W D wo oc E L. DISEASE - POLICY Lt T s OtwkR i 111DI?L AINT @P TMR Asa" mt"ww PoL eK9 s *E' 7.0 ft --k, VAye TlRIdtICM, TM OVUM MVJPM WWL WISIZAVOIt To mmL 30 DAYS WNITT6H NOTA To TILE CERTr-:CATS KoaxE1R NAmm ro THE LEFT, OUT FAILURE TO 00 60 $MALL s � ' SP'`G S a oroial Roofing; All Types Of C >i[H irn it IM 6°REBUILT-CAPPED Expert MasonryWork :z - Licensed & Insured 70 Mass Toll prep_ __... c,;,rr, c� :,;, d ��n�, License #034200 4 -800-WAIT-4-U5 _, Round (924-84871, p,��'ss Proposal To: Tony Barry Street: 66 Rock Rd. N. Andover, MA 01845 Roof proposal Date 4/6/2011 i. Protect house exterior and landscaping as best as possible. (tarps etc.) Z. Strip all shingles from entire roof 3. Inspect and re- nail any loose or lifted plywood. 4. Any compromised plywood will be replaced at an additional cost of $50.00 per sheet of 1/2" cdx fir. 5. Install heavy gauge 8" aluminum drip edge to all eaves and rakes. 6. Install 6' of WR Grace ice and water shield along all eaves, wall connections and top to bottom in all valleys. 6'MA state code . Best available against ice dams. 7. Install all new pipe boots. 8. Above the ice and water, install heavy 301b felt base sheet. 9. Install IKO Cambridge Limited Lifetime architec- tural shingles to entire roof. 10. Install (1) Gaf 1600SQ/FT cfm power vent with thermostat.on the rear roofline. Does not include electrical connection. 11. Counter flash chimney with ice and water shield and re -seal with clear sealant. 12. Building permit included. 13. Removal of all work related debris. 14. Shingles are covered by manufacturer " Iron Clad" Limited Lifetime warranty. (Pro -rated after 15 years.) 15. Contractor workmanship warranty =10 years un- der normal wind and rain conditions. Acceptance of Proposal—The above prices, cepted. You are authorized to do the work as nbarry@comcast.net 16. Right side gable: Remove existing cedar siding from bottom to middle of 2nd floor window on both side of chimney. 17. Inspect existing plywood sheathing. Any compro- mised sheets will be replaced at an additional cost and will be discussed and confirmed with homeowner be- fore work is to be performed. 18. Install breathable house wrap to sheathing. 19. Install pre -primed WR grade "A" smooth finish cedar clap boards fastened with stainless steel nails. Sealed and ready for paint or stain. 20. Replace (2) compromised existing window sills with composite bull nose sill. 21. Between house and garage: Remove existing clap board siding from front and rear eaves to ridge. 22. Install WR Grace ice and water shield along entire wall connection 23. Install breathable housewrap on house wall 24. Install all new aluminum step flashing. 25. Install new pre -primed Wr grade "A" smooth fin- isb cedar clapboards to match existing house. Sealed and ready for paint or stain. Roof: $ 9,200.00 Siding: $4,200.00 Total Cost: $ 13,400.00 Balance due upon completion I-Iip,hly rated member of the accredited BBB and Angies' List Thank You! ions and conditions are satisfactory and are herby ac- Paympwill be ined above. Y� '- �