Loading...
HomeMy WebLinkAboutBuilding Permit #701-11 - 667 SALEM STREET 4/19/2011Permit NO: Date Issued: W., TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION ORTANT: Date Received must comblete all items on this c1 e-/— ,� ,� PrW7 PROPERTY OWNER �/) (G44�/ � Print MAP NO: -�—r—PARCEL:ZONING DISTRICT: Historic District yes no Machine Shop Village ye no r TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building C-eSne family ❑ Addition ❑ Two or more family ❑ Industrial Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition ❑ Other p`Sept c Welt U FM dplau ❑Wetlands {� `Watershed District { _- - BW O/S .,e,) Of - �- . - A -- - - -- k"& (l f Ni-", S �� OWNER: Name: Address: (� 6 DESC TION U ' WORKTU U lir; F o , IL, 1,. / 11 (ayr�' r ce.` bk 1 -1 dbo i Id e tin tion Please Type riot Ci 2 ( (- IB'e", ( c CONTRACTOR Name: Address: 733 / r / ,arly) Phone: oilPhone: � 7� 2 7 J ? - '87 �33 91 Supervisor's Construction License l Exp. Date: Home Improvement License: Exp. Date: 1. ARCHITECT/ENGINEER Phone: �v Address: Reg. No. FEE SCHEDULE: BULDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $ �S FEE: $ f 1" Check No.: , Receipt No.: r-40 NOTE: Person, contracting with unregistered contractors do not have access to the guaran fund SianaturetofAaerit/®irvnerx r, � _ Sia`natureaof�co`nfracto ,. �, „ M Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses r ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products MOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2008mi Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private (septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMME CONSERVATION COMMENTS HEALTH COMMENTS Reviewed on Signature Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Siinature & Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA —(For department use Notified for pickup - Date Doc:.Building Permit Revised 2008 Location 3 sf No. r41 Date r� MORTry TOWN OF NORTH ANDOVER 9 Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee C TOTAL Check # 24b� 3 Building Inspector 8 a This sachusetts IItorie Ininl4Ovement•Sample Cogtract satisfies all basic requirements of the state's Dome itnprovemeuit'Contractor Law to protect homeowners. Seek legal advice If necessar • An (MGL chapter ]A2A), but does not include standard setts consumer guide to home imprpvement" before agreeing to any wok on your re iiaence.you maymen should obta n smfree copy by calling the ts �onsumet Affairs and Business Regulation's Consumer Information Hotlino at 617-973-87G7 or 1=may obtain a . copy i "a f -Homeowner Information _ Contractor information "O��,4�t Jew e- i� z +N uue �r c)(8,-( yQ•-C) ....IV— f<"e t q- e� �Z livi-e- 01-1. 0� . �t I nequtred.Yermits - The foliowin*'builcling permits are required Praprased Start and Completion Schedule- The following schedule will and ill be secured by the contractor as the homeowner's agent, be adhered to unless circumstances beyond the connactot's control arise (O;vers who secure their own permits will be exclpded from,the Guarant3i Fund provisions' of I MGL chapter 142A.) ' (� Date when contactor will begin contracted work, Date when contracted work will be substantially completed. Total Contract Price and Payment Schedule The Connector agrees to perform the work, fiirnish the materia( and labor specified above for the total sum of Payn{eiits will be tn�de according to the following schedule:*) • upon signing'contract (riot to exceed 1/3 of the'total contract rice ar • ' 1 �Q p the cost of'special order items, whichever is greater) -----f--�- — by �_ �l or upon completion of • • by ��, •or upon completion of • upon completion of the contract (Law forbids demanding full pay' mentuntil contract is completed to both party's satisfaction) The following material/equipment must be special $ ordered before the contracted wad: begins in order $ to be paid for to meet the completion schedule,(**) to be paid for NOTES: (*) ]ncluding all finance charges (**) Law requires that any deposit or down- a not exceed the greater• of (a) one-third of the total contract price or p yment required by the contractor before work begins may which must be special oideredin advance to meet the competion schedule. made cost of any special equipment or custom made material -----bron ni - r ue�ontrby th agrees to be solely responsible for codapletion of the work described regardless of the actions of he third°ct party/subcontractor utilized by the contractor. no contractor further bgree$ to be solel3' responsible for all a eteria s and labor under this -a cement Contkact Acceptance - U on si g g P yuients to all subcontractors for P grin ,this documentbecomes a liindin contract under law. Unless otherwise noted within this document, the • contract shall not imply that any lien or outer security intcresthas been placed on the residence• Review the following cautions and notices carefully before signing this contract • Don't be pressured into signing the contract Take time to read and fully understand it. Ask questions if some • ' ke sur a contrec o has a valid Home T subcontractors to be registered with the Director ofHotrle Impron1 ut Contractor lie strateq you May thing is unclear• rio The law requires most home improvement contractors and registration by,writyng to the Director at One Ashburton Place, Rootn 1301 13astp MA 02108 orb May quir 1:800-223-0933. � Y inquire about contractor • Does the contractor have insurance? Check to see that your contractor is properly insured.Y g 727-3200 or Know your rights and responsibilities' Road the important Infori lotion on the reverse side of this form and get a copy of the Consumer Guide to the Home Improvement Contractor Law, ; You may cancel this agreement if it has been signed at a place orrice than the contractor's. normal contractor in writing at his/her main office or branch affice by ordinary maiTposted, b tele third business day following,the sl place ofbusiness, provided you notify the fining of this agreement See the atlnched notice of ancella os. form for deliveryn of l of this right DO NOT SIG delivery not Later than midnight of the Two • ndcat copies ofthe• N THIS CONTRACT W T`]EtERE A R F t r r P contractmustbecnmpletedandsigned, one capyshonldgotothbh.- x BLANKSP ltl meawnc_ Thcotherco ACES... ' py should be kept by the conhactor. e- 4551 Homeowner' Signature r' r: ontrac o IS Signatu Date Gj Dat 1 Contractor Arbitration The Home Improvement Contractor Law provides homeowners witlr'the right to initiate an arbitration action s � ' F alternative to -court action)'if they have a dispute with a contractor. The same right is not automatically afforde�to a' contractor, however. The contractor would have th a er i to resolve any dispute he/she has wihomeowt both parties agree to the optional clause provided below. This clause would give the contractor thnn court e same right unless ton arbitration anis afforded to the homeowMer by the Home Improvement Contractor Law. The contractor and the homeowner hereby mutually agree in• advance that in'the event the contractor has a dispute concerning this- contract, the contractor may submit the dispute to'a private afbitration firm which has been apprpved,hy the Secretary. ofthe•Executive. Office -of Consumer Affairs and Business Regulation and consum shall. be required Xtosu mit ch arb' ratio s pro ided In Massachusetts General Laws, chapter j4eowner's Signature Contr s Signa NOTICE: The signatures of the parties above appkonly to the agreement of the parties. to alternative dispute resolution initiated by the contractor. The homeowner may initiate alternative dispute resolution even where this separately signed by the parties. - section is not Homeowner's Riglbts ; 'A. homeowner's rights under the Home Improvement Contractor Law CMCTIL chapter 142A) and other consumer protection laws' (i.e. MGL chapter 93A) may not be waived. in any way, .even by agreement. However', homeowners may be excluded from certain rights if the contractor they choose is not properly registered as prescribed.by law, 'Homeowiners who secure their own building permits are automatically excluded from all GuaraniyPund provisions of the Home Improvement Contractor Law. The contractor is responsible for completing the work as described, in a timely and workmanlike manner. Homeowners may be entitled -to other specific legal rights if the contractor guarantees or provides an express vrwarraniy for workmanship or materials. In addition to guarantees or warranties provided,by the contractor, all goods sold in Massachusetts early an implied warranty of merchantability and fitness for a partic lar purpose: An enumeration of other mattes on which the homeowner and contractor lawfully agree may be adde� to the term§ of the contract as long as they do not restrict a homeowner's basic consumer rights. If you have questions!, ab6ut your cansumn ,dhomeowner rights, contact the Consumer Informatioh Hotline (listed below). Execution of Contract w The connect must be executedin dulica'te and should not. be signed until• a copy of all exhibits and referenced documents have been.attached. Parties Are -also advised not to sign the document until all'blank sections have been filled-in or marked as void, deleted, or not applicable. One original signed copy of the contract with attachments' is to - .be given to the owner•'and the other kept by the contractor. Any modification to the original contract must be in writing and agreed to by both parties. Contracted work may not begin uritil both parties have received a frilly executed copy o£ the contract,. and the three day recission period has expirecl. Acce'Ierated Payments A contractor may not demand"payments in advance of the dates specified on the payment schedule in cases where the homeowner deems him/herself to be fuiancially insecure. I-Iowever; in instances where a contractor deems 4im/ljers4 'to be financially insecure, the contractor may require that the balance of funds not yet due be placed iri a joint e�crpw account as a prerequisite to continuing the contracted work.• Withdrawal of funds from said account would require the signatures of both parties, Additional Information If you have general questions or need additional inforrnation about the Home Improvement Contractor Law or other consumer rights, or'tf you wish to obtain a free copy ,of A Consumer Guide to the Rome Improvement ContraGt`or Law, contact: .. , .. Cdnsumer Information Hotiibe ` Office of Consumer Affairs and Business'Regulation .10 Park PIaza, Room 5170, Boston,; MA 02116 (617) 973-8787ror 1(8.88) 2833757 .i Ifyou want to verify the registration of a contractor or if you have questiont5 or need additiDnal about the contractor registration component of 'tile Home -Improvement Contractor da ddifiota l nfortnation specifically IDirectoz of Home Improvement Contractor Registration Bureau of Building Regulations and Standards ! One•Ashburtoir Place, koom.1.301, Boston, MA 02108 ' (617) 727-3200 or 1-800-223-0933. For assistance with informal mediation of disputes,or to register formal complaints against a business, call: ' Consumer Complaint Section Office of the Attorirey General (617)727-8400 AND/OR •BeiterBusiness Buteau (508) 652-4800 ' (508)7j5-2548 (413) 734-3114 U) m m m V/ m CA F, m I F Crr7 cn cn n O V J r" -q- i- : i- O H r1oftlerm, V J rr 0 z cn a� H IV cn r d v, CO 'v C � G � � g5 Jr - R. n H 7d n? CD C7 Z CO) CCD O 'v CL r. c. CC) E =• CO) *ZMCO C* v CD CD CLQ CD CDo CD E, 00 w C CD CL v y `vhf CD C ca CD E CA v O 'OCD n Z CDCDO C CD I F Crr7 cn cn n O V J r" -q- i- : i- O H r1oftlerm, V J rr 0 z cn a� H IV cn r d cn o CO H z °� 117VZ oGa � � g5 Jr - R. n H 7d n? ;u ar r ?, w n R ` �, x n. h7 C/) ^ C/)G) rD al a. C rD O z O O 0 c Schedule: Start of project approximately Tuesday (4-19-11); duration will be approximately 3 weeks and will be continuous until completion per abbreviated agreement 61 ldt� � 4. i (P,lI Approved by: Richard and Denise Roche l_ r Steve McCullough Red Tail Richard and Denise Roche 4/11/11 Create a finished back room --full use, Remove living room carpet and sand and polyeurothane the front living room floors; tooth -in wood floors at old closet location. Scope Of Work Highlights Segemented Costs Permits, Buildable Plans, Dum ster, Demo Work, Total Project Clean-up/debris removal $2,040 Frame in new walls, frame for qty 3 windows and a new slider door, install new siding to match $2,100 New Anderson windows installed --new construction double hungs, new 6' slider installed --Exterior Tyvek, new plywood sheathing $2,100 Insulate throughout all walls, ceiling, and floor joists $1,300 Blueboard and skim throughout the back new room plus the existing damaged playroom $2,420 Update and install Electrical outlets and switch(es) per code --reuse the existing recessed --new trim kits $1,300 extend the existing heat loops $380 Trim and paint full coverage of all affected inside and affected exterior $2,040 Remove carpet and sand front liv floors $948 Install plywood underneath new room --create weather and insect seal $650 Total for Entire Project --new back room full use, fix playroom, sand living room floors J$15,278 If Approved and Acceptable --Payment Schedule: Upon Signing V $4,800 Upon Start of Exterior Siding $3,900 Upon Start Of Blueboard $3,900 Upon Start of Painting $1,400 Upon Substantial Completion $600 Project Complete $678