HomeMy WebLinkAboutBuilding Permit #257-14 - 70 COMPASS POINT ROAD 9/15/2014 L
BUILDING PERMIT pORTFr
'O�At
TOWN OF NORTH ANDOVER �2 ry�., h_ 6 0�
APPLICATION FOR PLAN EXAMINATION
( O
Permit No#: Date Received 4,pATEo �(y�
< i
SSACHU`'�
Date Issued: .
MP RTANT: Applicant must complete all items on this page
q6A ' ,1
LOCATION acjS
Print
PROPERTY OWNER
Print 100 Year Structure yes 1
MAP p _PARCEL: ZONING DISTRICT:S�i -Historic District yes
Machine Shop Village yes
I
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
[�Wew Building ❑ One family
❑Addition Two or more family ❑ Industrial
❑Alteration No. of units: El Commercial
❑ Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition ❑ Other
El Septic []Well ❑ Floodplain 0 Wetlands ❑ Watershed District
Water/Sewer
DES RIPTIQN OF WORK TQ PE f�F1pRMED:
ci (4 ((�a
a u-cacAp
Identification-,,Please Type or Prim Clearly
OWNER: Name: ILA �tc + A-unu k Mo(, Phone: a) SS t 34S
Address: L
Contractor Name: �Jj( Phone Sb,Oj 3c-�O
Address: �
'MU• ox's 6T)
Supervisor's Construction License: mac[ >s�S Exp. Date:
Home Improvement License:_ Exp. Date:
ARCHITECT/ENGINEER '��I �-� Phone: ��� J� Sa S o�
Address: 1� )tje� 1Lt�l• �'1 'f� 1 ' ICS. • _Reg. No. �
FEE SCHEDULE:BULDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
� (OO .
Total Project Cost: $ �1 1 S FEE: $ �Sa(C@ �Ob ('. 6
Check No.: Receipt No.:
akoo�
NOTE: Persons contracting with unreg' tered contractors do not have access to the uara fund
Signature of Agent/Own µr ignature of contract r
- �- r
Location 36 COM P' `n '—
//—
No. s Date S
. - TOWN OF NORTH ANDOVER
fa &
Certificate of Occupancy $
Building/Frame Permit Fee
-- Foundation Permit Fee $
Other Permit Fee $
TOTAL [�
Check n 4
(,:�,
4- a0
Building Inspector
J
v
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑
Private(septic tank, etc. ❑ Permanent Dumpster on Site ❑
i
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
PLANNING & DEVELOPMENT Reviewed On Signature_
COMMENTS
CONSERVATION Reviewed on 9 111 Si nature
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
i
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
I
Conservation Decision: Comments
qDl�-
Water& Sewer Connection/si nature& Date Drivewlf Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT - Temp Dumpster on site yes no
Located at 124 Main.Street �
Fire Department signature/date
COMMENTS
Dimension
Number of Stories:_Total square feet of floor area, based on Exterior dimensions. a.1 77-S
Total land area, sq. ft.:
i
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use)
❑ Notified for pickup Call Email
i
I Date Time Contact Name 3
Doc.Building Permit Revised 2014
t
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
o Building Permit Application
o Workers Comp Affidavit
Li Photo Copy Of H.I.C. And/Or C.S.L. Licenses
o Copy of Contract
Li Floor Plan Or Proposed Interior Work
o Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
o Building Permit Application
o Certified Surveyed Plot Plan
o Workers Comp Affidavit
o Photo Copy of H.I.C. And C.S.L. Licenses
o Copy Of Contract
o Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
o Mass check Energy Compliance Report (If Applicable)
Li Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
Li Building Permit Application
o Certified Proposed Plot Plan
o Photo of H.I.C. And C.S.L. Licenses
Li Workers Comp Affidavit
o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
o Copy of Contract
o Mass check Energy Compliance Report
o Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doe:Building Permit Revised 2014
7
1 O,Noor°1ro
o — �
� o a
■ r
3'S hCNUSE�
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 257-15 on 9/15/2014 Date: September 10, 2015
THIS CERTIFIES THAT
THE BUILDING LOCATED at 70 Compass Point
MAY BE OCCUPIED AS IN a single family home ACCORDANCE WITH THE PROVISIONS
OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS
AS MAY APPLY.
Certificate Issued to: 114 Realty Trust
70 Compass Point
North Andover,MA 01845
Building Inspector
Fee: PrePaid$100.00
Receipt: 28008
Cheek : 7776
NORTH _
Town of �.. E ,, ndover
0
No. -
h ver, Mass,
COC NICNl WICK �1.
A04ArED 'PP�,�S
S U
BOARD OF HEALTH
Food/Kitchen
PERMIT T LD Septic System
THIS CERTIFIES THAT ......... .�.. ....... ..... .. .. .... .......................................%..... .....
BUILDING INSPECTOR
has permission to erect .......................... buildings on ..-�0......C,��.0�...... .K.. ..... FO
o /�
/� �1�!!4//�/�
to be occupied as ... .�i�tM,
�..� ......Co ........... ...�.� .........� ............. Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application ina
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and C ��
Construction of Buildings in the Town of North Andover. �N 1� ( u ING IN P T R
-� Rough �
VIOLATION of the Zoning or Building Regulations Voids this Permit. �,
Final i'4s'5
tI1�C1�
�2 PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTRUCTI STA
R ougm� a
1 O� Service
.............. .. ... .. . Fin I
BUILDING INSPECTOR '
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises - Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPART ENT
Until Inspected and Approved by the Building Inspector. r - 11 v y,-
Street No.
Smoke Det. 7.1a���___
O� c--
It NORT/{
t O
APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION
00
Qq iOCwli lwicw y1` T
TED
Cm
U5 5 BUILDING PERMIT # 7 - 15
9SSACH �� °—�
ADDRESS/LOCATION OF PROPERTY: i O cw3g,&. S
Map Parcel Lot Number
SUBDIVISION:
DATE REQUESTED FILED/READY FOR INSPECTION:
CLOSING DATE ON PROPERTY:
FIVE(5) DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED
ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A
REINSPECTION FEE OF TWENTY DOLLARS ($20.00) ILL L-c RGED IF THE STRUCTURE
DOES NOT MEET ALL APPLICABLE CODES.
APPLICANT SIGNATURt
Permit Issued to: °-T-ro
Address: 51 M
ROUTING
TOWN ENGINEER; SITE PL —DRE-WAY REVIEW F1CONSERVATION �t1`o�`
PLANNING ❑
DPW-WATER METER
SEWER CONNECTION '
DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO
SUBMITTAL OF THE OCCUPANCY/INSPECTION REQUEST
DPW
SIGNATURE
File:Application for OC form revised Jan 2007/2011
Final Construction Control Document
a v To be submitted at completion of construction by a
a
d Registered Design Professional
a
h
for work per the 8h edition of the
� Ve
e
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: MERRIMACK TOWNHOMES Date: 4/29/15 Permit No. 255,256,257,258-15
Property Address: 68, 70, 72 &74 COMPASS PONT, NORTH ANDOVER, MA
Project: Check one or both as applicable: X] New construction ❑ Existing Construction
Project description: wood framed, fire sprinkled,three story town homes in a row of three in the building named "F"
with u/g_gas, electric water and sewer services
I KANAYO LALA MA Registration Number: 33710-C Expiration date: JUNE 30, 16 , am a
registered design professional, and I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning:
[ ] Architectural [ ) Structural [ ] Mechanical
[ ] Fire Protection [ ] Electrical [X] Other: ALL DESCIPLINES
for the above named project. I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or Munnvo
electronic signature and seal: LALA
N
No.33714C
fSS10
AL
Phone number: 978-337-5252 -- Email: kanayolala@gmail.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 06 11 2013
■
y
4
It
a
` . X ,
tv .
�Rh r.t!. k.,:Y,u :.F: say-� rk` 'a :. 713 a,- �..# .•:Y.t.
:s
#♦.. F: 19 R v6" 3;Y 7&' f �'> �',dh'.9h. � i}' '«Mkt
'If A 't.
�F .a
i
;
50 Washington Street
Suite 3000
Westborough,MA 01581
t 508.836.9500
Conner ation f 508.870.5975
Services Group www.csgrp.com
IECC 2009 & MA Stretch Energy Code Duct Tightness Verification
Pass ail
Date: July 10th,2015 f
Permit No.:
Street Address:70 Compass Point `
North Andover, MA 01845
Total conditioned floor area: 2,175 Square Feet
Source of Area Calculation: Builder
HERS Rater: Nicholas Abreu
Certification Number: 8368122
Signature: --
Builder: Tim Barlow
Builder Contact: TB Building
HVAC Contractor: J&1 Heating and Air Conditioning
2009 IECC-New Construction
Post-construction test
® Total Leakage—12 cfm/100 ft2 maximum allowed
❑ Leakage to outdoors—8 cfm/100 ft2 maximum allowed
Testing result: 11.3 cfm/100 ft2
Rough-in test
Total leakage
Air Handler Installed?
❑ Yes—6 cfm/100 ft2 maximum allowed
❑ No-4 cfm/100 ft2 maximum allowed
Testing result: cfm/100 ft2
MA Stretch Energy Code—401.3 Prescriptive Option for Residential Additions and
401.5 Prescriptive Option for Alterations,Renovations or Repairs
Applies to all systems except those in which the air handler and all ducts are located within
conditioned space
❑ Leakage to outdoors-4 cfm/100 ft2 maximum allowed
Testing result: cfm/100 ft2
Results apply to the system as tested on the date above.Compliance is void if any changes are made to
the duct system.
REScheck Software Version 4.5.0
Compliance Certificate
Project 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E_NAndover
Energy Code: 2009 IECC
Location: North Andover, Massachusetts
Construction Type: Multi-family
Project Type: New Construction
Conditioned Floor Area: 2,326 ft2
Glazing Area 12%
Climate Zone: 5 (6322 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
70-D2
North Andover, MA
Compliance: Passes using UA trade-off
Compliance: 3.2%Better Than Code Maximum UA: 344 Your UA: 333
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont. Glazing
Assembly or R-Vallue R-Value or Door UA
Perimeter U-Factor
Floor 1st Floor:All-Wood joist/Truss:Over Unconditioned Space 450 30.0 0.0 0.033 15
Wall 1st Separation: Wood Frame, 16"D.C. 140 15.0 0.0 0.077 11
Wall 1st Ext 2x6:Wood Frame, 16" o.c. 768 21.0 0.0 0.057 39
Window Dh:Vinyl Frame:Double Pane with Low-E 32 0.290 9
Door Front Ground Fir entry: Glass 20 0.260 5
Door Back:Glass 20 0.260 5
Door Metal: Solid 18 0.170 3
Floor 2nd Over garage:All-Wood joist/Truss:Over Unconditioned Space 467 30.0 0.0 0.033 15
Floor 2nd Over entry:All-Wood j oist/Truss:Over Outside Air 39 30.0 0.0 0.033 1
Wall 2nd Floor 2x6:Wood Frame, 16"D.C. 810 21.0 0.0 0.057 36
Window DH:Vinyl Frame:Double Pane with Low-E 120 0.290 35
Window Fix:Vinyl Frame:Double Pane with Low-E 19 0.280 5
Window CSMT:Vinyl Frame:Double Pane with Low-E 12 0.260 3
Door Slider: Glass 34 0.290 10
Wall 2nd Fir Separation:Wood Frame, 16" D.C. 324 15.0 0.0 0.077 25
Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0
Wall 3rd Floor:Wood Frame, 16"D.C. 704 21.0 0.0 0.057 34
Window DH:Vinyl Frame:Double Pane with Low-E 102 0.290 30
Project Title: 140707 Trust_MerrimackCondos BldgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbe Iing_Ed\140707 Trust_MerrimackCondos BldgF_UnitsB-E- Page 1 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
I
Gross Area Cavity Cont. Glazing
Door
Perimeter U-Factor
Window Awn:Vinyl Frame:Double Pane with Low-E 7 0.270 2
Wall 3rd Separation: Wood Frame, 16"o.c. 288 15.0 0.0 0.077 22
Ceiling Main: Flat Ceiling or Scissor Truss 936 38.0 0.0 0.030 28
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Notes:
Building D
Project Title: 140707 Trust MerrimackCondos_BldgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: 5:\Ebbeling_Ed\140707 Trust_MerrimackCondos BldgF_UnitsB-E- Page 2 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
REScheck Software Version 4.5.0
Inspection Checklist
Energy Code: 2009 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.2 ;Construction drawings and ,❑Complies
[PR111 'documentation demonstrate ❑Does Not
;energy code compliance for the ❑Not Observable
building envelope.
❑Not Applicable
103.2, ;Construction drawings and j❑Complies
403.7 :documentation demonstrate DDoes Not
[PR311 ;energy code compliance for i
;lighting and mechanical systems. s❑Not Observable
,Systems serving multiple i❑Not Applicable
;dwelling units must demonstrate i
;compliance with the commercial
code.
403.6 Heating and cooling equipment is,; Heating: Heating: ;❑Complies
[PR2]2 sized per ACCA Manual S based Btu/hr Btu/hr :❑Does Not
on loads per ACCA Manual J or ' Cooling: Cooling:
other approved methods. Btu/hr Btu/hr ,❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BldgD_U nits B-E-E NAnclover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 3 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD 70.rck
2009 IECC Foundation Inspection Complies? Comments/Assumptions
303.2.1 A protective covering is installed to ❑Complies
[FO11]2 protect exposed exterior insulation '❑Does Not
and extends a minimum of 6 in. below
U ,❑Not Observable
grade.
❑Not Applicable
403.8 ,Snow-and ice-melting system controls;❑Complies
[FO12]2 installed. ;❑Does Not
J ;❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BldgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 4 of 9
E_NAndover\REScheck\140909_Trust_Merri mac_BldgD_Un itD_70.rck
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Door U-factor. U- U- ;❑Complies See the Envelope Assemblies
402.3.4 E❑Does Not table for values.
[FR1]1 ;
❑Not Observable
❑Not Applicable
402.1.1,
.Glazing U-factor(area-weighted ; U- U- ;❑Complies 'See the Envelope Assemblies
402.3.1, ;average). :❑Does Not 'table for values.
402.3.3,
402.5
;
❑Not Observable
[FR2]1 ; :❑Not Applicable
� I
I
303.1.3 ;U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance #❑Does Not
;with the NFRC test procedure or
;taken from the default table. I❑Not Observable
❑Not Applicable
402.3.5 :Sunrooms enclosing conditioned U- U- ;❑Complies
[FR8]1 space have a maximum ❑Does Not
;fenestration U-factor of 0.50 in
10 ;Climate Zones 4-8. New glazing ❑Not Observable
separating the sunroom from ;❑Not Applicable
conditioned space must meet
:code requirements.
402.3.5 ;Sunrooms enclosing conditioned ; U- U ;❑Complies
[FR9]1 :space have a maximum skylight ;❑Does Not
LI-factor of 0.75 in Climate Zones
;4-8 !❑Not Observable
j❑Not Applicable
402.4.4 ;Fenestration that is not site built i❑Complies
[FR20]1 :is listed and labeled as meeting '❑Does Not
AAMA/WDMA/CSA 101/I.S.2/A440 ti
;or has infiltration rates per NFRC ❑Not Observable
1400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures �❑Complies
[FR16]2 sealed at housing/interior finish E❑Does Not
and labeled to indicate <_2.0 cfm
leakage at 75 Pa. ;❑Not Observable
❑Not Applicable
403.2.1 ;Supply ducts in attics are R- R- ;❑Complies
[FR12]1 :insulated to>_R-8.All other ducts ; R- R- ;❑Does Not
!in unconditioned spaces or
;outside the building envelope are; ;❑Not Observable
!insulated to>_R-6. ; ;❑Not Applicable
403.2.2 ;All joints and seams of air ducts, �❑Complies
[FR13]1 :air handlers,filter boxes, and ❑Does Not
:building cavities used as return
;ducts are sealed. ,❑Not Observable
`❑Not Applicable
403.2.3 'Building cavities are not used for l❑Complies
[FR15]3 supply ducts. f❑Does Not
9 , {
❑Not Observable
R❑Not Applicable
403.3 HVAC piping conveying fluids R- R- ;❑Complies
[FR17]2 'above 105°F or chilled fluids ;❑Does Not
below 55°F are insulated to >_R-
3 !❑Not Observable
❑Not Applicable
403.4 Circulating service hot water R- R- ;❑Complies
[FR18]2 pipes are insulated to R-2. ; ;❑Does Not
J ! '❑Not Observable
! ;❑Not Applicable
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 5 of 9
E_NAndover\REScheck\140909_Trust_Merrimac_BIdgD_UnitD_70.rck
I
I
Section
Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
403.5 ;Automatic or gravity dampers are, ❑Complies
[FR19]1 installed on all outdoor air ❑Does Not
J
intakes and exhausts.
'❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust MerrimackCondos_BldgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707-Trust-MerrimackCondos BIdgF_UnitsB-E- Page 6 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 All installed insulation is labeled ❑Complies
[IN13]2 or the installed R-values ❑Does Not
J provided. i
❑Not Observable
❑Not Applicable
402.1.1, ;Floor insulation R-value. ; R- R- j❑Complies I See the Envelope Assemblies
402.2.5, ;❑ Wood ❑ Wood ;❑Does Not ;table for values.
402.2.6 ;❑ Steel ❑ Steel
[IN1]1
.El Observable
❑Not Applicable
303.2, j Floor insulation installed per ❑Complies
402.2.6 ;manufacturer's instructions, and ❑Does Not
[IN2]1 in substantial contact with the
underside of the subfloor. ❑Not Observable
❑Not Applicable
402.1.1, ;Wall insulation R-value. If this is a; R- R- ;❑Complies See the Envelope Assemblies
402.2.4, :mass wall with at least 1/2 of the ❑ Wood ❑ Wood ;❑Does Not table for values.
402.2.5 wall insulation on the wall
[IN3]1 ;exterior,the exterior insulation ❑ Mass E] Mass ;❑Not Observable
requirement applies. ;E] Steel EJ Steel ;❑Not Applicable
119 : 1 ;
303.2 ;Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. i❑Does Not
❑
Not Observable
1
bNot Applicable
402.2.11 ;Sunroom wall insulation has a ; R R- ;❑Complies
[IN8]1 :minimum R-value of R-13. New ;❑Does Not
;walls separating the sunroom
19 ;❑Not Observable
;from conditioned space must
meet code requirements. ;❑Not Applicable
303.2 ;Sunroom wall insulation installed i❑Complies
(IN9]1 :per manufacturer's Instructions. ;❑Does Not
; ❑Not Observable
I❑Not Applicable
402.2.11 ;Sunroom ceiling minimum R- R- ;❑Complies
[IN10]1 :insulation R-value of R-19 in ;❑Does Not
;Climate Zones 1-4, and R-24 in
;Climate Zones 5-8. ❑Not Observable ,
❑Not Applicable
303.2 ;Sunroom ceiling insulation is ❑Complies
[IN11]1 installed per manufacturer's ❑Does Not
instructions.
❑Not Observable
j !❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 140707 Trust MerrimackCondos BIdgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos BldgF_UnitsB-E- Page 7 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, ;Ceiling insulation R-value. Where R- R- ❑Complies See the Envelope assemblies
402.2.1, :> R-30 is required, R-30 can be ❑ Wood ❑ Wood ;❑Does Not table for values.
402.2.2 :used if insulation is not ;❑ Steel E] Steel
[FI1]1 ;compressed at eaves. R-30 may ; ❑Not Observable
be used for 500 ft2 or 20% ;❑Not Applicable
(whichever is less)where
;sufficient space is not available.
303.1.1.1, ;Ceiling insulation installed per ---]❑Complies
303.2 ;manufacturer's instructions. ❑Does Not
[F1211 Blown insulation marked every
300 ft2. ❑Not Observable
3❑Not Applicable
402.2.3 ;Attic access hatch and door R- R- ;❑Complies
[F13]1 insulation >_R-value of the :❑Does Not
;adjacent assembly. :QNot Observable
:❑Not Applicable
402.4.2, ;Building envelope tightness ACH 50 = ACH 50 = ;❑Complies
402.4.2.1 :verified by blower door test result j❑Does Not
[F117]1 :of<7 ACH at 50 Pa.This
;requirement may instead be met ; ;❑Not Observable ;
:via visual inspection, in which ; j❑Not Applicable
:case verification may need to
;occur during Insulation
I Inspection.
402.4.3 ;Wood-burning fireplaces have UComplies
[FI 8]2 'gasketed doors and outdoor Z❑Does Not
.combustion air.
❑Not Observable
]❑Not Applicable
403.2.2 ;Post construction duct tightness cfm cfm ;❑Complies
[F14]1 :test result of<_8 cfm to outdoors, : :❑Does Not
or<_12 cfm across systems.Or,
rough-in test result of<6 cfm ;❑Not Observable
:across systems or:54 cfm : ❑Not Applicable
without air handler. Rough-in test: :
;verification may need to occur
(during Framing Inspection. ;
403.1.1 Programmable thermostats ❑Complies
[FI 9]2 installed on forced air furnaces. ❑Does Not
J t �❑Not Observable
i❑Not Applicable
403.1.2 ;Heat pump thermostat installed t1Complies
[F1 10]2 !on heat pumps. 4❑Does Not
J
{QNot Observable
❑Not Applicable
403.4 ;Circulating service hot water ?❑Complies
[FI 11]2 :systems have automatic or `❑Does Not
accessible manual controls. }QNot Observable ;
❑Not Applicable
403.9.1 Readily accessible switch on '❑Complies
[F112]3 heaters for swimming pools. `❑Does Not
A•
❑Not Observable
�E]Not Applicable
403.9.2 Timer switches on pool heaters ❑Complies
[F119]3 land pumps are present. ❑Does Not
A I
❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust MerrimackCondos_BldgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos BldgF_UnitsB-E- Page 8 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
403.9.3 Heated swimming pools have a ❑Complies
[F120]3 cover. Covers on pools heated ❑Does Not
0 over 90°F are insulated to R-12.
❑Not Observable
i❑Not Applicable
404.1 :50%of lamps in permanent T ❑Complies
[F16]1 fixtures are high efficacy lamps. y ❑Does Not
II `❑Not Observable
1❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
[FI7]2 ❑Does Not
J 3❑Not Observable
�❑Not Applicable
303.3 :Manufacturer manuals for []Complies
[F118]3 Imechanical and water heating I �❑Does Not
J equipment have been provided.
{ �❑Not Observable
I❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: 5:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 9 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitD_70.rck
2009 IECC Energy
Efficiency Certificate
Insulation .
Wall 21.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass&Door Rating U.Factor SHGC
Window 0.29
Door 0.29
Cooling
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
o,NORTH,H
M Y
r Y
r`19
�7S ACH�SE4
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Permit Number 257-15 on 9/15/2014 Date: September 10, 2015
THIS CERTIFIES THAT
THE BUILDING LOCATED at 70 Compass Point
MAY BE OCCUPIED AS IN a single family home ACCORDANCE WITH THE PROVISIONS
OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS
AS MAY APPLY.
Certificate Issued to: 114 Realty Trust
70 Compass Point
North Andover, MA 01845
Building Inspector
Fee: PrePaid $100.00
Receipt: 28008
Check : 7776
t%O R T#1 r�
Town o ? �.. t E : ,, ndover
No. 0 -� -
h ver, Mass,
A_ COC NICHT WICK
1ps 4A TE D
V BOARD OF HEALTH
Food/Kitchen
PERMIT T LD Septic System
THIS CERTIFIES THAT ......... . ...... ..... .. .. ...... .......................................�..... .....
BUILDING INSPECTOR
has permission to erect .......................... buildings on ....70.....60-r#%0*JA......#44, . 6� c� 3�
A-♦ O3 .^
to be occupied as ... ..� c�...... �►g%�...... ?;! ..a.rwokr......... ............. Chimney
i
provided that the person accepting this permit shall in every respect conform to the terms of the application
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and ina �
Construction of Buildings in the Town of North Andover. uN IT ' u ING IN T R
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
�Z PERMIT EXPIRES IN 6 MONTH_ S ELECTRICAL INSPECTOR
UNLESS CONSTRUCTI ST - o h _. a 0 ;� :rd
Service
..............(D ...............................
BUILDING INSPECTOR
Fi�nl
� .•
GAS INSPECTOR
Occupancy Permit Required to Occupy Occupancy Required t° Occupy Building Rough 41.,11-Ir
l
�!
Display in a Conspicuous Place on the Premises — Do Not Remove Final rx
No Lathing or Dry Wall To Be Done FIRE DEPART ENT
Until Inspected and Approved by the Building Inspector.
Street No.
Smoke Det. 7 -A�_ _s
O� c—
Enter construction cost for fee cal - North Andover Fee Cakulatlon
Construction Cost
$ 271 ,875.00 m
$ - $ 3,262.50
Plumbing Fee $ 407.81
Gas Fee 100 comm. $ 100.00
Electrical Fee $ 407.81
Total fees collected $ 4,178.13
70 Compass Point Building D
257-14 on 9/15/14
Single Family Home
F
Town
NORTH t . 1, ndover
_
o1
No. 9�6711h
- = - h
O �
ver, Mass,
A_R COCHIC.t.ICN y1.
7,9 AERATE t)
`r U BOARD OF HEALTH
Food/Kitchen
Septic System
PERMIT T
41 1 BUILDING INSPECTOR
Sr
THISCERTIFIES THAT ......... . . ...... ..... .. .. .....�N. ......................................�..... .....
Foundation
has permission to erect .......................... buildings on ..�C�......C�•V!!!! �......�� N••• •••
Rough
to be occupied as ...3-64d......C'.tl ..... ...a. .........C. �.. 4R�Il.............. Chimney
i
provided that the person accepting this permit shall in every respect conform to the terms of the application
Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and PLUMBING INSPECTOR
Construction of Buildings in the Town of North Andover. Uv
Rough
VIOLATION of the Zoning or Building Regulations Voids this Permit. Final
33(olPERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
-UNLESS CONSTRUCTICNST Rough
'
0
0 Service
.. 96Final
BUILDING INSPECTOR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Fina'
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
ea�;�;a �es
N. ctOaGo
lev
tyo°
61 sot
e
Vol AA31
� NOM�pP•: I2A�A 1� ,
�
S�C",��
Massachusetts -Department of Public Safety
Board of Building Regulations and Standards
Ctenstructiore Supervisor
License: CS-059359
TIMOTHY M.BAI,O
P.O.BOX#12
South Grafton MA 01
\
W` Expiration :.
Commissioner 01/24/2016
A� CERTIFICATE OF LIABILITY INSURANCE (
4/7/)14
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to
the terns and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
NAME:
Coonan Insurance Agency, Inc. PHONE 508 987-7122 In N ; (sos) 987-7152
267 Main Street F-MAILs: cindv@coonaninsurance.com
Oxford, MA 01540 INSURERS)AFFORDIN^u COVERAGE NAIC#
INSURER A:Travelers
INSURED I NSURER B:
TJK, Inc. INSURERC:
PO Box 12 INSURERD:
South Grafton, MA 01560 INSURER E:
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADDL SUBR POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE POLICY NUMBER MIDDry MMMIYYYYY LIMITS
A GENERAL LIABILITY 680-335M1703-13 11/3/13 11/3/14 EACH OCCURRENCE $ 1,000,000
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTEDPREMISES(Ea oocunence) $ 300,000
CLAIMS-MADE a OOCUR MED EXP(Ary one person) $ 5,000
PERSONAL&ADVINJURY $ 11000,000
GENERAL AGGREGATE $ 2,000,000
GEN'LAGGREGATELIMITAPPLIESPER PRODUCTS-OOMP/OPAGG $ 2,000,000
X POLICY PRO-CT FLOC
AUTOMOBILE LIABILITY Co
aMBINEDIdet INGLELIMIT $
ANY AUTO BODILY INJURY(Per person) $
ALLOWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS AUTOS
NON-OWNED PROPERTY DAMAGE $
HIRED AUTOS _AUTOS eracadeM
UMBRELLA LIM OCCUR EACH OCCURRENCE $
EXCESS LIAB 17 CLAIMS-MADE AGGREGATE $
DED RETENTION$ $
A WORKERS COMPENSATIONIE-17B-9914N01-3-14 1/26/14 1/26/15 X WCSTATU- DTH-
AND EMPLOYE75 LIABILITYY/N
ANY PROPRIETOR/PARTNERIEXECUiNE
OFFICERMIEMBER EXCLUDED? 7N N/A EL EACH ACCT CENT $ 100,000
(Mandatory In NH) EL.DISEASE-EA EMPLOYEE $ 100,000
If yyes describe under
DESCRIPTIONOFOPERATIONS below EL.DISEASE-POLICY LIMIT $ 500,000
A Contractors Equipment QT-660-2D283058 5/8/13 5/8/14 scheduled 100,000
equipment
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks SdredWe,B more space Is regdred)
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS.
120 Main Street
North Andover, MA 01845 AU7HORIZED REPRESENTATIVE
Cindy Davis
0 1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25(2010105) The AC ORD name and logo are registered marks of ACORD
Phone: Fax: E-Mail: tbbuilding@aol.com
REScheck Software Version 4.5.0
Compliance Certificate
Project 140707 Trust MerrimackCondos_BIdgD_UnitsB-E-E_NAndover
Energy Code: 2009 IECC
Location: North Andover, Massachusetts
Construction Type: Multi-family
Project Type: New Construction
Conditioned Floor Area: 2,326 ft2
Glazing Area 12%
Climate Zone: 5 (6322 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
58-F1
North Andover, MA
Compliance: 3.2%Better Than Code Maximum UA: 344 Your UA: 333
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Glazing
Cavity Cont.
Assembly or or Door UA
Perimeter U-Factor
Floor 1st Floor:All-Wood joist/Truss:Over Unconditioned Space 450 30.0 0.0 0.033 15
Wall 1st Separation:Wood Frame,16"D.C. 140 15.0 0.0 0.077 11
Wall 1st Ext 2x6:Wood Frame, 16"o.c. 768 21.0 0.0 0.057 39
Window Dh:Vinyl Frame:Double Pane with Low-E 32 0.290 9
Door Front Ground Fir entry: Glass 20 0.260 5
Door Back: Glass 20 0.260 5
Door Metal:Solid 18 0.170 3
Floor 2nd Over garage:All-Wood Joistlrruss:Over Unconditioned Space 467 30.0 0.0 0.033 15
Floor 2nd Over entry:All-Wood Joist/Truss:Over Outside Air 39 30.0 0.0 0.033 1
Wall 2nd Floor 2x6:Wood Frame, 16"o.c. 810 21.0 0.0 0.057 36
Window DH:Vinyl Frame:Double Pane with Low-E 120 0.290 35
Window Fix:Vinyl Frame:Double Pane with Low-E 19 0.280 5
Window CSMT:Vinyl Frame:Double Pane with Low-E 12 0.260 3
Door Slider: Glass 34 0.290 10
Wall 2nd Fir Separation:Wood Frame, 16"D.C. 324 15.0 0.0 0.077 25
Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0
Wall 3rd Floor:Wood Frame,16"D.C. 704 21.0 0.0 0.057 34
Window DH:Vinyl Frame:Double Pane with Low-E 102 0.290 30
Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_Bldg F_UnitsB-E- Pagel of 9
E_NAndover\REScheck\140909 Trust Merrimac_BIdgD_UnitFl_58.rck
� I
` I
Gross Area Cavity Cont. Glazing
Assembly or R-Value R-Value or Door UA
Perimeter U-Factor
Window Awn:Vinyl Frame:Double Pane with Low-E 7 0.270 2
Wall 3rd Separation:Wood Frame,16"o.c. 288 15.0 0.0 0.077 22
Ceiling Main:Flat Ceiling or Scissor Truss 936 38.0 0.0 0.030 28
Compliance Statement. The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.5.0 and to.comply with the mandatory requirements listed.in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Notes:
Building D
ProjectTitle: 140707_Trust_MerrimackCondos Bld D UnitsB-E-E NAndover Report 14 date: 09 09_ 9 _ P / /
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos_BldgF_UnitsB-E- Page 2 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BIdgD_UnitFl 58.rck
REScheck Software Version 4.5.0
Inspection Checklist
Energy Code: 2009 IECC
Requirements: 0.0%were addressed directly in the REScheck software
Text in the"Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.2 ;Construction drawings and ❑Complies
[PR111 'documentation demonstrate ❑Does Not
:energy code compliance for the
;building envelope. ioNot Observable
❑Not Applicable
103.2, ;Construction drawings and :❑Complies
403.7 documentation demonstrate t Does Not
[PR3]1 ;energy code compliance for
;lighting and mechanical systems. ❑Not Observable
Systems serving multiple ❑Not Applicable
dwelling units must demonstrate
;compliance with the commercial =
;code.
403.6 Heating and cooling equipment is; Heating: ; Heating: ;❑Complies
[PR2]2 .sized per ACCA Manual 5 based Btu/hr ; Btu/hr ;❑Does Not
1 on loads per ACCA Manual J or
J
!other approved methods. Cooling: Cooling: ;❑Not Observable
; Btu/hr Btu/hr ;❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust MerrimackCondos_BIdg0_UnitsB-E-E_NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos_Bldg F_UnitsB-E- Page 3 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BldgD_UnitFl_58.rck
009 IECC Foundation Inspection Complies? Comments/Assumptions
303.2.1 A protective covering is installed to ;❑Complies
[FO11]2 protect exposed exterior insulation UDoes Not
Q and extends a minimum of 6 in, below
grade. ❑Not Observable
;❑Not Applicable
403.8 Snow-and ice-melting system controls;❑Complies
[FO12]2 installed. j❑Does Not
❑Not Observable
j❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier3)
Project Title: 140707 Trust MerrimackCondos_BIdgD_UnitsB-E-E_NAndover Report date: 09/0.9/14
Data filename: S:\Ebbeling_Ecl\140707 Trust MerrimackCondos_BldgF_UnitsB-E- Page 4 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BIdgD_UnitFl_58.rck
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Door U-factor. U- U- ;❑Complies ;See the Envelope Assemblies
402.3.4 i T❑Does Not ;table for values.
[FR111
UNot Observable
I
T❑Not Applicable
402.1.1, ;Glazing U-factor(area-weighted ; U- ; U- ;❑Complies ;See the Envelope Assemblies
402.3.1, average). ; I❑ ;table for values.
402.3.3, Does Not
402.5 � '❑Not Observable
[FR211 T❑Not Applicable
;
303.1.3 ;U-factors of fenestration products ❑Complies
[FR411 :are determined in accordance I ❑Does Not
:with the NFRC test procedure or ❑Not Observable
;taken from the default table. ❑Not Applicable
402.3.5 ;Sunrooms enclosing conditioned ', U- U- ;❑Complies
[FR811 ;space have a maximum T❑Does Not
:fenestration U-factor of 0.50 in
;Climate Zones 4-8.New glazing ;❑Not Observable
separating the sunroom from ; :[]Not Applicable T
conditioned space must meet
:code requirements.
402.3.5 ;Sunrooms enclosing conditioned U- U- ;❑Complies
[FR9]1 space have a maximum skylight ❑Does Not
U-factor of 0.75 in Climate Zones
4-8 ;❑Not Observable
T❑Not Applicable
402.4.4 :Fenestration that is not site built ❑Complies ;
[FR20]1 :is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/LS.2/A440 E ❑Not Observable
or has infiltration rates per NFRC i
400 that do not exceed code ;❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures, ❑Complies
[FR16]2 sealed at housing/interior finish I ❑Does Not
D and labeled to indicate<_2.0 cfm
,leakage at 75 Pa. ❑Not Observable
❑Not Applicable j
403.2.1 ;Supply ducts in attics are R- ; R- ;❑Complies
[FR12]1 :insulated to>_R-8.All other ducts : R_ R_ T❑Does Not
in unconditioned spaces or T
:outside the building envelope are: ❑Not Observable
'insulated to>_11-6. T❑Not Applicable T
403.2.2 ;All joints and seams of air ducts, ❑Complies ;
[FR1311 air handlers,filter boxes,and E❑Does Not
building cavities used as return
;ducts are sealed. ;[]Not Observable
i ❑Not Applicable
403.2.3 'Building cavities are not used for '!! !❑Complies
[FR15]3 ;supply ducts. i ❑Does Not
❑Not Observable
i❑Not Applicable
403.3 HVAC piping conveying fluids R- R- ;❑Complies
[FR17]2 above 105 QF or chilled fluids ; T❑Does Not
Q below 55 QF are insulated to>_R-
3 ;❑Not Observable
❑Not Applicable
403.4 Circulating service hot water R- R- ;❑Complies
[FR18]2 pipes are insulated to R-2. T❑Does Not
J T❑Not Observable
;❑Not Applicable
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E_NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BIdgF_UnitsB-E- Page 5 of 9
E_NAndover\REScheck\140909 Trust Merrimac_BldgD_UnitFl_58.rck
Section Plans Verified Field Verified
# Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions
& Req.ID
403.5 Automatic or gravity dampers are i ❑Complies
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts. I
i ;❑Not Observable ;
❑Not Applicable
Additional Comments/Assumptions:
i
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E_NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BIdgF_UnitsB-E- Page 6 of 9
E_NAndover\REScheck\140909 Trust Merrimac BIdgD_UnitFl_58.rck
i
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
&Req.ID
303.1 All installed insulation is labeled ❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided.
; ;❑Not Observable ;
I ❑Not Applicable j
402.1.1, ;Floor insulation R-value. ; R- R- ❑Complies ;See the Envelope Assemblies
402.2.5, ;❑ Wood ❑ Wood ;❑Does Not ;table for values.
16
(IN11E]❑ Steel Steel ;❑Not Observable
INlj
❑Not Applicable
1 I 1
1
303.2, ;.Floor insulation installed per !E]Complies
402.2.6 manufacturer's instructions,and '❑Does Not
[IN2]1 in substantial contact with the 1
119 :underside of the subfloor. ❑Not Observable
❑Not Applicable
402.1.1, ;Wall insulation R-value.If this is a; R- R- ;❑Complies ;See the Envelope Assemblies
402.2.4, mass wall with at least 1/2 of the :❑ Wood ;EJWood ;❑Does Not ;table for values.
402.2.5 ;wall insulation on the wall ❑ Mass ❑ Mass ;❑Not Observable
[IN3]1 ;exterior,the exterior insulation ;
requirement applies. ;[:] Steel ❑ Steel :❑Not Applicable
1
I
303.2 ;Wall insulation is installed per ;E]Complies
[IN4]1 manufacturer's instructions. ❑Does Not
1
;❑Not Observable
j❑Not Applicable
402.2.11 ;Sunroom wall insulation has a R- R- j❑Complies
[IN8]1 !minimum R-value of R-13.New ;❑Does Not
:walls separating the sunroom
;from conditioned space must ❑Not Observable ;
meet code requirements. ❑Not Applicable
303.2 ;Sunroom wall insulation installed I ;❑Complies ;
[IN9]1 per manufacturer's Instructions. ❑Does Not
0 ❑Not Observable
❑Not Applicable
402.2.11 ;Sunroom ceiling minimum R- R- ;❑Complies
[IN10]1 :insulation R-value of R-19 in ;❑Does Not
:Climate Zones 1-4,and R-24 in
Climate Zones 5-8. : ;❑Not Observable
I
;❑Not Applicable
303.2 ;Sunroom ceiling insulation is y {❑Complies
[IN11]1 installed per manufacturer's ; ❑Does Not
instructions.
1 ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 140707_Trust_MerrimackCondos_BldgD_UnitsB-E-E_NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BldgF_UnitsB-E- Page 7 of 9
E_NAndover\REScheck\140909_Trust_Merrimac_BldgD_UnitF l_58.rck
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
&Req.ID
1
402.1.1, ;Ceiling insulation R-value.Where R- ; R- ❑Complies !See the Envelope Assemblies
402.2.1, 1>R-30 is required,R-30 can be E] Wood ;F1 Wood ❑Does Not ;table for values.
402.2.2 �used if insulation is not ;❑ Steel ❑ Steel
[Fill' ;compressed at eaves.R-30 may ;❑Not Observable
;be used for 500 ft2 or 20% i ❑Not Applicable
(whichever is less)where ;
;sufficient space is not available. ;
303.1.1.1,:Ceiling insulation installed per ti❑Complies
303.2 manufacturer's instructions. ❑Does Not
[F12]' :Blown insulation marked every
300 ft2. i ❑Not Observable ;
❑Not Applicable
402.2.3 ;Attic access hatch and door R- I R- ;❑Complies
[F13]' :insulation 2--R-value of the ;❑Does Not
adjacent assembly.
;❑Not Observable
1 I
❑Not Applicable
402.4.2, ;Building envelope tightness ACH 50= ACH 50= ;❑Complies
402.4.2.1 verified by blower door test result; ;❑Does Not
[FI17]' :of<7 ACH at 50 Pa.This
requirement may instead be met I❑Not Observable
Evia visual inspection, in which ;❑Not Applicable
case verification may need to
occur during Insulation
Inspection.
402.4.3 'Wood-burning fireplaces have ❑Complies
[FI8]2 gasketed doors and outdoor ❑Does Not
combustion air.
❑Not Observable
❑Not Applicable
403.2.2 ;Post construction duct tightness cfm cfm ;❑Complies
[FI4]' test result of 5_8 cfm to outdoors, ❑Does Not
:or 5512 cfm across systems.Or,
rough-in test result of 5_6 cfm ;❑Not Observable
across systems or-54 cfm ;❑Not Applicable
without air handler.Rough-in test
;verification may need to occur
;during Framing Inspection.
• 5555....._.____.__ __
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed on forced air furnaces. i ❑Does Not
e I❑Not Observable
❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10]2 .on heat pumps. i ❑Does Not
❑Not Observable
❑Not Applicable
403.4 ,'Circulating service hot water ,'❑Complies
[FI11]2 'systems have automatic or ❑Does Not
accessible manual controls. }
E I❑Not Observable
❑Not Applicable
403.9.1 'Readily accessible switch on ❑Complies
[FI12]3 heaters for swimming pools. + ❑
Does Not
10 ❑Not Observable
} ❑Not Applicable
403.9.2 'Timer switches on pool heaters t ❑Complies
[FI 1913 and pumps are present. ❑Does Not
{
[_-]Not Observable
❑Not Applicable j
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 low Impact(Tier 3)
Project Title: 140707 Trust_MerrimackCondos BIdgD_UnitsB-E-E NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BidgF_UnitsB-E- Page 8 of 9
E_NAndover\REScheck\140909 Trust_Merrimac_BIdgD_UnitFl_58.rck
Section Plans Verified Field Verified
alValue Complies? Comments/Assumptions
& Req.ID
403.9.3 Heated swimming pools have a ❑Complies
[F120]3 cover.Covers on pools heated i ❑Does Not
over 90 4F are insulated to R-12. f
1❑Not Observable
❑Not Applicable
404.1 50%of lamps in permanent ❑Complies
[F1611 (fixtures are high efficacy lamps. ❑Does Not
i
1',❑Not Observable
{ ❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
[F17]2 ; (❑Does Not
❑Not Observable
❑Not Applicable
303.3 'Manufacturer manuals for ❑Complies
[FI18]3 :mechanical and water heating ? ❑Does Not
equipment have been provided.
❑Not Observable
I ❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 140707 Trust MerrimackCondos_BldgD_UnitsB-E-E_NAndover Report date: 09/09/14
Data filename: S:\Ebbeling_Ed\140707 Trust_MerrimackCondos_BIdgF_UnitsB-E- Page 9 of 9
E_NAndover\REScheck\140909 Trust Merrimac_BidgD_UnitFl_58.rck
2009 �ECC Energy
Efficiency Certificate
Wall 21.00
Floor 30.00
Ceiling/ Roof 38.00
Ductwork (unconditioned spaces):
Window 0.29
Door 0.29
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
i
i
s
Kanay6 Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T1
Supporting Floor,Wall,Attic&Point Load From TS
LOADS: DEAD LOAD 22.54 PSF 323.00 PLF Ce= 1 CF 1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 30.00 PSF 429.90 PLF qs= 29.10 Cd=1
TOTAL LOAD 753 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD 3510 LBS 3.25 FT
Ra= 2925 LBS 7341 LB=TOTAL REACTION
TRIBUTARY WIDTH 14.33 LF E= 2000000 PSI
JOIST/GIRDER SPAN 19.5 LF Fb= 2900 PSI
WIDTH- IN 10.50 PSULVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc-- 2700 PSI
Fcp= 750 PSI
MOMENT= 35786 LB-FT
MOMENT2= 9506 LB-FT 246.78 =S provided OK
S= 187.42 IN^3 1465.24 =
Deflection= 0.836 IN =U 240 For Total Load Required U240
Deflection2= 0.139 IN =U 421 For Live Load Required U360
Fcp'= 652 PSI OK 1.50 In Bearing Length
Fv'= 123 PSI OK
USE BETTER HEADEP465 (FLITCH BEAM) 2-LVLs 11718'WITH 1/2-STEEL PLATE
BOLTED WITH 5/8'DIA@12'O.C.IN TWO ROWS.
OF
KAN
H.
LALA
No.33710-C
9felSTf�
�� Ff41D aL 7%'
Kanayo Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T2
Supporting Floor,Wall&Attic
LOADS: DEAD LOAD 22.54 PSF 322.95 PLF Ce= 1 CF=1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 30.00 PSF 429.90 PLF qs= 29.10 Cd=1
TOTAL LOAD 753 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD LBS FT
Ra= 0 LBS 6211 LB=TOTAL REACTION
TRIBUTARY WIDTH 14.33 LF E= 2000000 PSI
JOIST/GIRDER SPAN 16.5 LF Fb= 2900 PSI
WIDTH- IN 7.00 PSL/LVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc= 2700 PSI
Fcp= 750 PSI
MOMENT= 25620 LB-FT
MOMENT2= 0 LB-FT 164.52 =S provided OK
S= 106.02 IN^3 976.83 =I
Deflection= 0.643 IN =U 308 For Total Load Required U240
Deflection2= 0.000 IN =U 540 For Live Load Required U360
Fcp'= 592 PSI OK 1.50 In Bearing Length
Fv'= 112 PSI OK
of
b
ra
LAL,► a
No.3anac
Kanayo Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T3
Supporting Floor &Point Load From T1&T2
LOADS: DEAD LOAD 20.00 PSF 360.00 PLF Ce= 1 CF 1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 30.00 PSF 540.00 PLF qs= 29.10 Cd=1
TOTAL LOAD 900 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD 16477 LBS 3.25 FT
Ra= 13327 LBS 7650 LB=TOTAL REACTION
TRIBUTARY WIDTH 18.00 LF E= 2000000 PSI
JOIST/GIRDER SPAN 17 LF Fb= 2900 PSI
WIDTH- IN 14.00 PSULVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc= 2700 PSI
Fcp= 750 PSI
MOMENT= 32513 LB-FT
MOMENT2= 43313 LB-FT 329.04 =S provided OK
S= 313.76 IN^3 1953.65 =1
Deflection= 0.433 IN =U 252 For Total Load Required U240
Deflection2= 0.378 IN =U 419 For Live Load Required 0360
Fcp'= 499 PSI OK 3.00 In Bearing Length
Fv'= 189 PSI OK
USE BETTER HEADER#84 (FLITCH BEAM) 3-LVLs 117/8'WITH 2-3/8'STEEL PLATE
BOLTED WITH 5/8'DIA @ 12-O.C.IN TWO ROWS. OF
wk%%
USE 2-LVLs 117/8"FOR BEAM T4. w�va
LU N
NO.33naC
I< fSnQ RL /
Kanayo Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T3-STEEL
Supporting Floor &Point Load From T1&T2
LOADS: DEAD LOAD 20.00 PSF 360.00 PLF Ce= 1 CF=1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 30.00 PSF 540.00 PLF qs= 29.10 Cd=1
TOTAL LOAD 900 PLF I= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD 16477 LBS 3.25 FT
Ra= 13327 LBS 7650 LB=TOTAL REACTION
TRIBUTARY WIDTH 18.00 LF E= 29000000 PSI
JOIST/GIRDER SPAN 17 LF Fb= 24000 PSI
WIDTH- IN 6.50 36KSI W12X30 12.34 IN = d Fv-- 16200 PSI
ROOF PITCH- N:12= Fc-- 24000 PSI
Fcp= 405 PSI
MOMENT= 32513 LB-FT
MOMENT2= 43313 LB-FT 38.60 =S provided OK
S= 37.91 IN"3 210.00 =I
Deflection= 0.278 IN =U 392 For Total Load Required U240
Deflection2= 0.242 IN =U 654 For Live Load Required U360
Fcp'= 359 PSI OK 9.00 In Bearing Length
FV= 10,200 PSI OK
W12X30,DEPTH=12.34"AND FLANGE WIDT14=6.5". OF
USE 2-LVLs 117/8"FOR BEAM T4. wNAYo
H.
LALA N
No.33noC
�,,"Fc►sna ��
i
Kanayo Lala, P.E. .............03/03/2014 C
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T5
Supporting Floor&Wall
LOADS: DEAD LOAD 24.00 PSF 240.00 PLF Ce= 1 CF=1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 30.00 PSF 300.00 PLF qs= 29.10 Cd=1
TOTAL LOAD 540 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD LBS FT
Ra= 0 LBS 3510 LB=TOTAL REACTION
TRIBUTARY WIDTH 10.00 LF E= 2000000 PSI
JOIST/GIRDER SPAN 13 LF Fb= 2900 PSI
WIDTH- IN 3.50 PSL/LVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc-- 2700 PSI
Fcp= 750 PSI
MOMENT= 11408 LB-FT
MOMENT2= 0 LB-FT 82.26 =S provided OK
S= 47.20 IN"3 488.41 =
Deflection= 0.355 IN =U 439 For Total Load Required U240
Deflection2= 0.000 IN =U 790 For Live Load Required U360
Fcp'= 669 PSI OK 1.50 In Bearing Length
Fv'= 127 PSI OK
ALSO USE 3-LVLs 117/8"FOR BEAM T6.
tN�
VANAYO
H.
LN• N
Na 337160
AL
aE
i
i
Kanayo Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS 2nd Floor Seam S1
Supporting Floor&Wall
LOADS: DEAD LOAD 24.00 PSF 240.00 PLF Ce= 1 CF=1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 40.00 PSF 400.00 PLF qs= 29.10 Cd=1
TOTAL LOAD 640 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD LBS FT
Ra= 0 LBS 4160 LB=TOTAL REACTION
TRIBUTARY WIDTH 10.00 LF E= 2000000 PSI
JOIST/GIRDER SPAN 13 LF Fb= 2900 PSI
WIDTH- IN 3.50 PSULVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc-- 2700 PSI
Fcp= 750 PSI
MOMENT= 13520 LB-FT
MOMENT2= 0 LB-FT 82.26 =S provided OK
S= 55.94 IN^3 488.41 =I
Deflection= 0.421 IN =U 371 For Total Load Required U240
Deflection2= 0.000 IN =U 593 For Live Load Required LJ360
Fcp'= 396 PSI OK 3.00 In Bearing Length
Fv'= 150 PSI OK
OF
KAMYo
�
t
N
No.33naC
f gEClSTEa
j J fssto kl i
F r
Kanayo Lala, P.E. .............03/03/2014
PROJECT: Merrimack Condominiums
D-TYPE BB-Compass Point,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS 2nd Floor Beam S2
Supporting Floor&Point Load From S1
LOADS: DEAD LOAD 15.00 PSF 19.95 PLF Ce= 1 CF=1.00
SNOW LOAD PSF 0.00 PLF Cq= 1 Cs=
LIVE LOAD 40.00 PSF 53.20 PLF qs= 29.10 Cd=1
TOTAL LOAD 73 PLF 1= 1 Cm=1
WIND SPEED 100 MPH 29.10 PSF
POINT LOAD 4160 LBS 3.25 FT
Ra= 3467 LBS 713 LB=TOTAL REACTION
TRIBUTARY WIDTH 1.33 LF E= 2000000 PSI
JOIST/GIRDER SPAN 19.5 LF Fb= 2900 PSI
WIDTH- IN 3.60 PSULVL 11.875 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc= 2700 PSI
Fcp= 750 PSI
MOMENT= 3477 LB-FT
MOMENT2= 11267 LB-FT 82.26 =S provided OK
S= 61.01 IN^3 488.41 =
Deflection= 0.244 IN =U 318 For Total Load Required U240
Deflection2= 0.493 IN =U 437 For Live Load Required U360
Fcp'= 398 PSI OK 3.00 In Bearing Length
Fv'= 151 PSI OK
�of
H.
LALA
No.33n6C
Kanayo Lala,P.E. .............03/03/2014
PROJECT: Merrimack Condominimums
D-TYPE-BB-Compass Ponit,N Andover,MA
DESIGN FOR-GIRDERS/JOISTS/RAFTERS Garage Door Header S3
Supporting Two,Floors,Roof,Wall&Point Load From.T1
LOADS: DEAD LOAD 73.72 PSF 718.75 PLF Ce= 1 CF=0.96
SNOW LOAD 38.50 PSF 375.38 PLF Cq= 1 Cs=
LIVE LOAD 70.00 PSF 682.50 PLF qs= 29.10 Cd=1.15
TOTAL LOAD 1777 PLF 1= 1 Cm=1
WIND SPEED 90 MPH 29.10 PSF
POINT LOAD 4900 LBS 6 FT
Ra= 3118 LBS 14657 LB=TOTAL REACTION
TRIBUTARY WIDTH 9.75 LF E= 2000000 PSI
JOIST/GIRDER SPAN 16.5 LF Fb= 2900 PSI
WIDTH- IN 5.25 PSULVL 18 IN = d Fv= 285 PSI
ROOF PITCH- N:12= Fc= 2700 PSI
Fcp= 750 PSI
MOMENT= 60461 LB-FT
MOMENT2= 18709 LB-FT 350.00 =S provided OK
S= 284.87 IN^3 2228.94 =
Deflection= 0.665 IN =U 240 For Total Load Required U240
Deflection2= 0.160 IN =U 403 For Live Load Required U360
Fcp'= 677 PSI OK 5.00 In Bearing Length
Fv'= 245 PSI OK
USE 2-LVLs 11 7/8"FOR BEAM S4. `N 6r
i K4MY
H.
LAAA
w
W.337160
fS�a Al ,
1 _
KANAYO LALA, P.E........-03/03/2014
SPECIFIC CALCULATIONS
FOR THE WOOD CONSTRUCTION IN
100MPH WIND ZONE
68,70,72&74 COMPASS POINT,NORTH ANDOVER,MA
BUILDING"D"UNIT D1, D2, D3&D4 26'X 36'
BASIC LOADS:
GROUND SNOW LOAD 50 PSF
LIVE LOAD 40 PSF
WIND LOAD 18 PSF
Building Length 36 ft
Building Width 26 ft Building Aspect Ratio= 1.38
Building Area 936 sf Shear End Wall= 11,664 224 PLF
Building Mean Height 36 ft Shear Long Wall= 8,424 117 PLF
Total Height 45 ft
Dead Load of Building 65,520 lbs 1/2"A.BOLT SHEAR 801 LB
DL Moment End Wall 1,179,360 LB-FT 4 FT SPACING FOR 1/2"A.BOLTS
DL Moment Long Wall 851,760 LB-FT WITH TWO 2X SYP PLATES
NET
Wind Moment End Wall 209,952 End Wall M -969408 NO UPLIFT
Wind Moment Lon Wall 151,632 Lon W M -700128 NO UPLIFT
9 9
I.E. NO UPLIFT EXISTS AT THE BASE OF THE BUILDING. SHEAR ANCHORS ARE ADEQUTE.
SHEAR WALL CAPACITY BY TABLE 2306.2.1(1)
'/"OSB/CDX PLY WITH 8D NAILS AT 6"ON EDGES AND 6"ON FIELD-270PLF< 224 PLF
REQUIRED FOR THREE STORY HEIGHT-OK
SHEAR WALL REQUIREMENT BY TABLE R602.10.1.2(1)
'/"OSB WITH 6D NAILS AT 6"ON EDGES AND 12"ON FIELD PER TABLE R602.3(3) 13 FT
CONTINUOUS SHEATHING AVAILABLE ALONG LONG WALL= 19 FT
THE MOMENT SHEAR AT THE OPENINGS IS RESISTED BY THE METAL CONNECTION PLATES AS
DETAILED ON THE PLANS.
FOR A TYPICAL 6'WIDE OPENING IN END WALL AT 224 PLF SHEAR:AT THE OPENING CORNER
673 LBS. A SIMPSON PC66 POST CAP-LATERAL CAPACITY 1285LBS-OK.
THE CALCULATIONS ABOVE MEET THE REQUIREMENTS OF THE IRC2009 R602.10 AND 780CMR51
AMENDMENTS TO IRC2009.
�yw os<
i� wuwYa
H.
LALA N
No.33710�C
�� fSS10 AL
6k/ft F
28
ra l
'it y'N5
I
�i
0
Loads: LC 3,ALL
Results for LC 3,ALL
Z-moment Reaction units are k and k-ft
KANAYO LALA - PE SK - 1
KL HIP ROOF PORCH Feb 22, 2013 at 12:10 PM
12115 BALCONY BRACKET 4'6" LONG@8' SPACING METAL BRACKET MERRIMACK.r...
Y ---— ---- ---
�Z �X
L, 6 3 ' 15 '
TU4X2.5
44 5
1.6
2 '
i
I
i CV
X
I D
i
I
3
I
1 '
1.9
ALL TUBESARE 1 / 8 " THICK
CK
i
KL MA
VMA cn=KL MA, o=KANAYO LALA, ou,
No.33710 "
STemail=KANAYOLALA@GMAIL.
'�fGIi� ���
kLCOM, c=US
2013.02.22 16:55:03 -05'00'
Results for LC 3.ALL.
Z-moment Reaction units are k and k-ft
KANAYO LALA- PE -- -- -- --- -- --------- - ----
KL SK- 2 —
BALCONY BRACKET Feb 22, 2013 at 4:51 PM
13000 BRACKET MEBER SIZES METAL BRACKET MERRIMACK-...
MERRIMACK BALCONY STEEL BRACKET TOP CHORD - 2/22/13
Beam: ' mi -- ---— -- --- ---- --
Shape: HSS4x2.5x2 .
Material: A500 Gr.46 DY - - - --- - in i
Length: 4.5 ft j
Joint: N2
J Joint: N5 Dz -- -_.-... .. --- — - in
LC 3: ALL
Code Check: 0.193 (bending)
Report Based On 97 Sections -.038 at 4.5 ft ;
A _ .__ k .884 at 0 ft
LL,
! I 1
V — ---- k l
y k
-2.792 at 0 ft -.931 at 3 ft
i
I
.68at3ft
!
T —----------- -- k-ft M ------ -------
Y k-ft;
Mz �14Z �. .. _�_ k_ft
-.094 at 1.453 ft
5.285 at 3 ft
ft ksi
fa w - --- ksi "
. i
% tik 5
-1.966 at 0 ft fc � AC4.
ksi
-5.285 at 3 ft
I
A/SC 14th(360-10): ASD Code Check
Direct Analysis Method
Max Bending Check 0.193 Max Shear Check 0.066 (y)
Location3 ft
3 ft Location
Equation H1-1b Max Defl Ratio L/1436
I !
Bending Flange Compact Compression Flange Non-Slender
Bending Web Compact Compression Web Non-Slender
FY 46 ksi y-y z-z
Pnc/om 32.445 k Lb 4.5 ft 4.5 ft
Pnt/om 39.114 k KL/r 52.716 36.607
Mny/om 2.938 k-ft
Mnz/om 4.315 k-ft
Vny/om 14.003 k L Comp Flange 4.5 ft
Vnz/om 8.251 k Warp Length NC
i Tn/om 2.95 k-ft L-torque 4.5 ft
i
Cb 2.498 Taub 1
Company KANAYO LALA-PE
Designer KL Feb 22, 2013
Job Number 13000 4:47 PM
BALCONY BRACKET
Checked By:
Hot Rolled Steel Pro erties
Label - E[ksi] G jksi] _
A36 Gr.36 Nu Therm-(\1E,..Densityjk/ft,., Yieldjks] _. Ry Fujksi] Rt
29000 1.1154-- _ 3 _ _ __55 _. .49 - 1,5
A572_Gr.50- 29000 11154 36
.3 - 65 - y -.49 _; 1.5 58 1.2
3 A992 29000 11.154 3 - 0
5 58 . 1.2
._A500 Gr.42 _ 5 - 49 - 50 . 1.5 _ - 58 1.2
- 4 29000 11.154_ _
5 A500 Gr.46- _. 29000_ _. 1.1154--- ,3 ,65 - 49 42 ;_ -1.5 _ -_ 58__.._ -- J.-
_ __3-- 49 46 _1._5 - . - 58 1.2
Hot Rolled Steel Section Sets
Label Shape Type Design List Material Design Rules A in2 I
1_.__-_ TU4X2.5_,-Hss4x2 5x2 Beam ._ Tube____iA500.Gr,46:_ T (cal [ ] YY[in4j Izz[ma] J[in4]
_2.__TlJ2X2.5__ tiSS2.5x2x2 t- - - Yp-._ _i_. _1.42 - i 1.49_
- - - -- " --- Beam - Tube---A500 Gr.46' _T - -- - - 3.09_ 3.23 -
-- Typical y __956 ---589- 833
Joint Coordinates and Temperatures
_ Label __
1 -- -- zIN _ Tem10.
2--- -
0 -__ -P _ Detach From Dia
k-4
-- N3 -- 3 0 - -0-- 0__- --- 3- - 0 -
-- 0
Member Prima Data
Label I Joint J Joint K Joint Rotate(deg) Section/Shape Type
2 - N, YP Design List Material Design Rules
N2" -�--- --- ----- _- -- TU4X2.5 --- � .Beam_
_M1 _ -
--- _ Tube __ IA500 Gr.46
- - - - 90- ---- TUX2.5- - _� Beam -- -,_ Typical_
3 M3 -
N3 N4 --- Tube - Ia500 Gr.46 yp
TU2X2.5 i Beam Tube IA500 Gr.46, Typical j
Member Distributed Loads (BLC 1 : DL
Member Label Direction__-_Start.Ma nit udejk/ft,F�_End Ma nitude k/ft F o
1 B--
-- --9_ j t,1 ._Start Locatio0Jfi) ---End Locationjft%o)_ _
- -- -- - 0-------j
Member Distributed Loads BLC 2 : SL
_Membe_r_Label__ - - Direction___"_Start Ma$nitude�k/ft,F�_End Ma nitude k/ft,F o
1_ _ Y - - - - 9 - J Start Locatio�ft/oJ "_End_Locationjft%j _
----M1--
-.039 - -
--- ----- --- - -0- ---- i
Member Distributed Loads BLC 3 : LL
1 Member Label Direction Start Magnitude[k/ft,F] End Magnitude[k/ft,Fj Start Locaationjft,%] i End Location[ft.%]
M1 I Y -.06 -.06
0
Load Combinations
Description Solve _PDelta SR-SS BLC Factor_BLC Factor,BLC_Factor-BLC Factor BLC Factor.BLC Factor_BLC Factor_BLC Factor
1 -- DL- a _Yes i Y 1 -8 ;-Y -1
2 - - L.L ; -Yes 1. _.-
L 3ALL Ll
Y Yes 3 8 -- - t
- - - _L1 1 L2 -1 -i 1
Joint Boundary Conditions
N1 X(win] Y[k/in] Z k/in
i i ] X -Fix-fUrad] Y Rot.[k-fUrad] Z Rot.(k-ft/radj Footing
Joint Label
' -- Fixed_ __
- Reaction .Reaction Fixed
-- - N2 Reaction - Reaction__ -- - - Fixed Reaction
- Fixed _ _- Fixed_
, Fixed Reaction _
RISA-31D Version 10.0.0 [C:\...\All Users\Documents\0-risa\METAL BRACKET MERRIMACK-2.r3d] Page 1