Loading...
HomeMy WebLinkAboutBuilding Permit #255-15 - 74 COMPASS POINT ROAD 9/15/2014 T%ORTH BUILDING PERMIT °��zLEo bq�o TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION y y T t Permit No#: Date Received ATED �y 9 SACHU`S Date Issued: gS IMPORTANT: Applicant must complete all items on this page LOCATIONM?ffl ( U -/ Print PROPERTY OWNER --�� Print 100 Year Structure yes MAP _PARCEL:ZONING DISTRICT� Historic District yes Machine Shop Village yes n TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential �1 New Building ❑ One family /❑`Addition %.Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑ Septic ❑Well ❑ Floodplain ❑Wetlands ❑ Watershed District Water/Sewer DE CRIP ION OF WORK TO BE R ORMEDI 1 t� \ Identific tion- le se Ty a or Print Cleprly OWNER: Name: 'T"C�5 t r Phone: Ch 3� $� Address: S Ao _1 `T" Contractor Name:1_SY_'xnC _ Phone: Address: PO �e)x. la- _ fry C7�S�� Supervisor's Construction License: �S � Exp. Date: Home Improvement License: 1 Exp. Date: -i Q ARCHITECT/ENGINEER V)2k(YkSl i-) L4- Phone: MRS 337 sa Sa Address:_ iec 'Qt� ;tGC1 1�C., Reg. No. FEE SCHEDULE:BOLDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ O�� , X15 FEE: $ 3c� Check No.: Receipt No.: NOTE: Persons contracting with unregist red contractors do not have access to the g ranty fund Signature of Agent/Owner Signature of contractor Location _� �`� 7-: ///, r • �t No. 1 �f- _ L Date - L_—//. . - TOWN OF NORTH ANDOVER Certificate of Occupancy $ . Building/Frame Permit Fee $ - Foundation Permit Fee $ Other Permit Fee $ TOTAL $ .1 _ Check# 7� 7 Building Inspector Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art ❑ Swiimning Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on 17)1t l Si nature �6 COMMENTS " — �� �� HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Si nature& Date DrivewaV Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street � p' C_/2 Fire Department signature/date COMMENTS Dimension Number of Stories:_Total square feet of floor area, based on Exterior dimensions. S Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA — (For department use) ❑ Notified for pickup Call Email Date Time Contact Name Doe.Building Permit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application u Workers Comp Affidavit u Photo Copy Of H.I.C. And/Or C.S.L. Licenses o Copy of Contract u Floor Plan Or Proposed Interior Work u Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks u Building Permit Application o Certified Surveyed Plot Plan u Workers Comp Affidavit o Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract o Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) u Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) L3 Building Permit Application o Certified Proposed Plot Plan o Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) a Copy of Contract o Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe:Building Permit Revised 2014 O4 NORY:1N 3?d•_r�.a , .� Y Sa�cRuse CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 255-15 on 9/15/2014 Date: September 14, 2015 THIS CERTIFIES THAT THE BUILDING LOCATED at 74 Compass Point MAY BE OCCUPIED AS IN a single family home ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: 114 Realty Trust 74 Compass Point North Andover,MA 01845 Building Inspector Fee: PrePaid $100.00 Receipt: 28010 Check : 7776 µORTH Town of 2 t ndover INTO. 4Z66,00P .Y h O IAKE h ver, Mass, COC NIC MI WICK �1' �qs RATEo U BOARD OF HEALTH Food/Kitchen PERMIT T D Septic SystU THIS CERTIFIES THAT ....... .......... BUILDING INSPECTOR has permission t .......................... ..7..`./.. C' . ' ? ....A..�!..:�!. .................... Foundation o erect buildings on ug to be occupied as ......... .��'°�/.t ..........-.......... V �j —���>,`.:..... ,v„Gv„ ......;r>�":�..................... g r provided that the person accepting this permit shall in every respe conform to the terms of the application / Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and l Construction of Buildings in the Town of North Andover. PLUMBING INSPECTO VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR .UNLESS CONSTRUC�TI N STARTS Rough 0k 'r ' y / Service ... ....... �C r+................................... BUILDING INSPECTOR Fina Q V,, 4' 9,10-1 S A�Z�o /7/c)j Occu anc Permit Re uired to Occu Buildin el,�G Occupancy q Occupy Rough Display in a Conspicuous Place on the Premises — Do Not Remove Fina' peel--� _� No Lathing or Dry Wall To Be Done FIRE DEPAR141ENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. HORTM � :M 4 'Y �SSFlCN1`'fi CERTIFICATE OF USE & OCCUPANCY TOWN OF NORTH ANDOVER Building Permit Number 255-15 on 9/15/2014 Date: September 14, 2015 THIS CERTIFIES THAT THE BUILDING LOCATED at 74 Compass Point MAY BE OCCUPIED AS IN a single family home ACCORDANCE WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND SUCH OTHER REGULATIONS AS MAY APPLY. Certificate Issued to: 114 Realty Trust 74 Compass Point North Andover, MA 01845 i Building Inspector Fee: PrePaid$100.00 Receipt: 28010 Check : 7776 NORTH F own o ndover 0 : : - : 1 10 No. 4Z66T ,t - T hver, Mass, �t- COCHIC"IWICK y1. S tJ BOARD OF HEALTH Food/Kitchen PERMIT T LD r� Septic Sys THIS CERTIFIES THAT ....... .......... ��`S BUILDING INSPECTOR has permission to erect .......................... buildings on ..7.G/..Ob.: ' ? :: ...�.01,".V /_.................... Foundation / .. ug . to be occupied as .........�.1� ..G ......................�� ...'� �'.'..` ....... Cv„/V,�414r�r'..................... n g provided that the person accepting this permit shall in every respe conform to the terms of the application / Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECT0 VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough Service ... ....... .............. Fina 'o V_ q'?o—( S BUILDING INSPECTOR GASI SP T Occupancy Permit Required to Occupy Buildins 4' /� j't - py q UV Rough Display in a Conspicuous Place on the Premises — Do Not Remove Fina. pI No Lathing or Dry Wall To Be Done FIRE DEPART&NT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. NoRrh q bt 6 OL . APPLICATION FOR CERTIFICATE OF OCCUPANCYANSPECTION Area CHUs cy BUILDING PERMIT # �SSAGHE� ADDRESS/LOCATION OF PROPERTY: 1H W m p�S — Map Parcel Lot Number SUBDIVISION: fqlef(,Yy)ckc V1_ cvy-)1>s DATE REQUESTED FILED/READY FOR INSPECTION: CLOSING DATE ON PROPERTY: FIVE (5) DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFFS MUST BE COMPLETED WITHIN THIS TIME FRAME. A REINSPECTION FEE OF TWENTY DOLLARS ($20.00) WILL BE CHARGED IF THE STRUCTURE DOES NOT MEET ALL APPLICABLE CODES. APPLICANT SIGNATURE Permit Issued to: r Address: S 1 �( 7e� kS L�rLNA ROUTING TOWN ENGINEER; SITE PLA —DRIVE-WAY REVIEW ❑ CONSERVATION PLANNING VA DPW-WATER METER SEWER CONNECTION CONNECTION DPW MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO SUBMITTAL OF THE OCCUPANCYANSPECTION REQUEST DPW Al- 13, SIGNATURE File:Application for OC form revised Jan 2007/2011 Final Construction Control Document a To be submitted at completion of construction by a d Registered Design Professional A f r for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: MERRIMACK TOWNHOMES Date: 4/29/15 Permit No. 255,256,257,258-15 Property Address: 68, 70, 72 &74 COMPASS PONT, NORTH ANDOVER, MA Project: Check one or both as applicable: X New construction D Existing Construction Project description: wood framed, fire sprinkled, three story town homes in a row of three in the building named 7" with u/g gas, electric, water and sewer services. I KANAYO LALA MA Registration Number: 33710-C Expiration date: JUNE 30, 16 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [X] Other: ALL DESCIPLINES for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. OF Enter in the space to the right a"wet"or �f i WYO electronic signature and seal: "u LM No.337140 fSSt0 hL / Phone number: 978-337-5252 Email: kanayolala@gmail.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 c3 "• a .. P., i 0# a 7 " 4 PROPOSED swo-W/ CERTIFIED PLOT PL tz tzeVay . "m =TM AS.SWW= PLO 33 OT 'MM UM TO W= ftt= On= u=to ro �. mvd u� m jaw xv TM CMTWSCATM IS 4�0 to � baa� r r 43 FOUNDATION-AS-BUILT-BUILDING-' MERRIMAC CONDOMINIUMS ROUTE 114, NORTH ND ` `R, MASSV Pyyy=yy9. 11=401 00"'A MAWR Its PCG DAM /2/14 CHECK BYa SC SHT, Ytu REVISED, art ' CLEAResult 50 Washington Street Westborough, MA 01581 IECC 2009 & IECC 2012 Duct Tightness Verification Pass / Fail Date:September 1", 2015 Permit No.: Street Address: 74 Compass Point North Andover MA, 01845 Total conditioned floor area: 2,175 Square Feet Source of Area Calculation: Builder HERS Rater: Nicholas Abreu Certification Number: 8368122 Signature: Client: Tim Barlow 20091ECC-New Construction Post-construction test ® Total Leakage—12 cfm/100 ft2 maximum allowed ❑ Leakage to outdoors—8 cfm/100 ft2 maximum allowed Testing result: 8.46 cfm/100 ft2 Rough-in test Total leakage Air Handler Installed? ❑ Yes—6 cfm/100 ft2 maximum allowed ❑ No-4 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 2012 IECC-New Construction Post-construction test ❑ Total Leakage—4 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 Rough-in test-Total leakage Air Handler Installed? ❑ Yes-4 cfm/100 ft2 maximum allowed ❑ No-3 cfm/100 ft2 maximum allowed Testing result: cfm/100 ft2 Results apply to the system as tested on the date above. Compliance is void if any changes ar to the duct system. REScheck Software Version 4.5.0 Compliance Certificate Project 140707 Trust MerrimackCondos_BIdgD_UnitsB-E-E_NAndover Energy Code: 2009 1ECC Location: North Andover, Massachusetts Construction Type: Multi-family Project Type: New Construction Conditioned Floor Area: 2,326 ft2 Glazing Area 12% Climate Zone: 5 (6322 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: North Andover, MA .• . Compliance: 3.2%Better Than Code Maximum UA: 344 Your UA: 333 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Glazing Assembly or Cavity Cont. or Door UA Floor 1st Floor:All-Wood joist/Truss:Over Unconditioned Space 450 30.0 0.0 0.033 15 Wall 1st Separation: Wood Frame, 16"o.c. 140 15.0 0.0 0.077 11 Wall 1st Ext 2x6: Wood Frame, 16"o.c. 768 21.0 0.0 0.057 39 Window Dh:Vinyl Frame:Double Pane with Low-E 32 0.290 9 Door Front Ground Fir entry: Glass 20 0.260 5 Door Back:Glass 20 0.260 5 Door Metal: Solid 18 0.170 3 Floor 2nd Over garage: All-Wood joist/Truss:Over Unconditioned Space 467 30.0 0.0 0.033 15 Floor 2nd Over entry:All-Wood joist/Truss:Over Outside Air 39 30.0 0.0 0.033 1 Wall 2nd Floor 2x6:Wood Frame, 16" o.c. 810 21.0 0.0 0.057 36 Window DH:Vinyl Frame:Double Pane with Low-E 120 0.290 35 Window Fix:Vinyl Frame:Double Pane with Low-E 19 0.280 5 Window CSMT:Vinyl Frame:Double Pane with Low-E 12 0.260 3 Door Slider: Glass 34 0.290 10 Wali 2nd Fir Separation:Wood Frame, 16" o.c. 324 15.0 0.0 0.077 25 Ceiling Bay Win: Flat Ceiling or Scissor Truss 6 30.0 0.0 0.035 0 Wail 3rd Floor:Wood Frame, 16"o.c. 704 21.0 0.0 0.057 34 Window DH:Vinyl Frame:Double Pane with Low-E 102 0.290 30 Project Title: 140707_Trust MerrimackCondos BldgD UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707—Trust—MerrimackCondos_BldgF UnitsB-E- Page 1 of 9 E NAndover\REScheck\140909_Trust Merrimac_BldgD_UnitFl_58.rck . t Gross Area Cavity Cont. Glazing Assembly Perimeter U-Factor Window Awn:Vinyl Frame:Double Pane with Low-E 7 0.270 2 Wall 3rd Separation: Wood Frame, 16" o.c. 288 15.0 0.0 0.077 22 Ceiling Main: Flat Ceiling or Scissor Truss 936 38.0 0.0 0.030 28 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.5.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Notes: Building D Project Title: 140707 Trust MerrimackCondos BldgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 2 of 9 E_NAndover\REScheck\140909_Trust Merrimac_BldgD_UnitFl_58.rck REScheck Software Version 4.5.0 Inspection Checklist Energy Code: 2009 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Se ctson Plans Verified field Verified # Pre-inspection/Plan Review value Vaiue Complies? Comments/Assumptions & Re .1D 103.2 ;Construction drawings and ❑Complies [PR1]1 documentation demonstrate I❑Does Not energy code compliance for the i❑Not Observable ; building envelope. t❑Not Applicable 103.2, ;Construction drawings and 111Complies 403.7 documentation demonstrate !❑Does Not [PR3]1 :energy code compliance for I ❑Not Observable i`'� Righting and mechanical systems. y .,Systems serving multiple ']❑Not Applicable dwelling units must demonstrate 1 compliance with the commercial code. l 403.6 ;Heating and cooling equipment is; Heating: Heating: ;❑Complies [PR2]2 .sized per ACCA Manual S based Btu/hr Btu/hr ![]Does Not on loads per ACCA Manual J or Cooling: Cooling: ;❑Not Observable other approved methods. j Btu/hr Btu/hr ❑Not Applicable ; ; ; Additional Comments/Assumptions: 1 High Impact(Tier 1) Z Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: 140707 Trust MerrimackCondos BldgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 3 of 9 E_NAndover\REScheck\140909_Trust_Merrimac_BldgD_UnitFl_58.rck .009 IEC Foundation inspection Complies? Comments/Assumptions 303.2.1 A protective covering is installed to ;❑Complies [FO11]2' 'protect exposed exterior insulation ;❑Does Not ;and extends a minimum of 6 in. below ; F❑ grade. Not Observable; []Not Applicable 403.8 .'Snow-and ice-melting system controls:E]Com plies [FO12]2 ?installed. :❑Does Not i ;❑Not Observable; ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BldgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 4 of 9 E_NAndover\REScheck\140909 Trust Merrimac_BidgD_UnitFl_58.rck Section Plans Verified Field Verified # Framing!Rough-In Inspection Complies? Comments/Assumptions Vale Value &Re .10 402.1.1, ;Door U-factor. U- U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ;❑Does Not table for values. [FR1]1 ❑Not Observable j❑Not Applicable 402.1.1, ;Glazing U-factor(area weighted U- U- ;❑Complies :See the Envelope Assemblies 402.3.1, average). ❑Does Not ;table for values. 402.3.3, 402.5 [:]Not Observable [FR2]1 ❑Not Applicable 303.1.3 ;,U-factors of fenestration products ;❑Complies [FR4]1 ;are determined in accordance ;❑Does Not i ;with the NFRC test procedure or ❑Not Observable ;taken from the default table. ❑Not Applicable 402.3.5 :Sunrooms enclosing conditioned ', U- U- ❑Complies I [FR8]1 space have a maximum E❑Does Not ;fenestration U-factor of 0.50 in ;Climate Zones 4-8. New glazing []Not Observable ,separating the sunroom from ❑Not Applicable ;conditioned space must meet .code requirements. 402.3.5 ;Sunrooms enclosing conditioned ', U- U- ;❑Complies [FR9]1 space have a maximum skylight ❑Does Not U-factor of 0.75 in Climate Zones ;4-8 ❑Not Observable ❑Not Applicable 402.4.4 ;Fenestration that is not site built ? ❑Complies ; [FR20]1 :is listed and labeled as meeting t $❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable ! ;or has infiltration rates per NFRC '400 that do not exceed code !❑Not Applicable 7 ;limits. 402.4.5 ;IC-rated recessed lighting fixtures i ❑Complies [FR16)?' :sealed at housing/interior finish ❑Does Not 2 ;and labeled to indicate 52.0 cfm 'leakage at 75 Pa. a❑Not Observable F ' f❑Not Applicable ; 403.2.1 ;Supply ducts in attics are R- R- `❑Complies [FR12]1 ;insulated to 2-11-8. All other ducts R- R- ❑Does Not in unconditioned spaces or outside the building envelope are; []Not Observable insulated to aR-6. ;❑Not Applicable 403.2.2 ;All joints and seams of air ducts, j❑Complies [FR13]1 :air handlers,filter boxes, and ❑Does Not :building cavities used as return ;ducts are sealed. []Not Observable 1 ❑Not Applicable 403.2.3 Building cavities are not used for i❑Complies [FR15]a :supply ducts. 11❑Does Not I I❑Not Observable I ❑Not Applicable 403.3 HVAC piping conveying fluids '. R- R- ;❑Complies [FR1712 .above 105 QF or chilled fluids ;❑Does Not s, ;below 55 QF are insulated to aR- 3, ;❑Not Observable ![]Not Applicable 403.4 :Circulating service hot water R- R- ;❑Complies [FR18)2 ;pipes are insulated to R-2. ❑Does Not ❑Not Observable ❑Not Applicable j 11 High Impact(Tier 1) 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust MerrimackCondos BldgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 5 of 9 E_NAndover\REScheck\140909_Trust Merrimac_BldgD_UnitFl_58.rck Section Plans VerMed Field Verified # Framing{Rough4n Inspection Complies Comments/Assumptions' Re .Ib Value Vaiue 403.5 ,Automatic or gravity dampers ares ❑Complies ' tFR1912 'installed on all outdoor air ❑Does Not ,j ;intakes and exhausts. i , �❑Not Observable ; []Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3'1 Low Impact(Tier 3) Project Title: 140707 Trust MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707 Trust MerrimackCondos BldgF_UnitsB-E- Page 6 of 9 E_NAndover\REScheck\140909 Trust Merrimac_BIdgD_UnitFl_58.rck Section. Plans Verified field Verified Insulation inspection Complies? Comments/Assumptions. & Re :ID Value Value 303.1 :All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values ° ?❑Does Not 0 `provided. ❑Not Observable ❑Not Applicable i 402.1.1, ;Floor insulation R-value. R- ; R- ;❑Complies ;See the Envelope Assemblies 402.2.5, ;❑ Wood ;❑ Wood ;❑Does Not ;table for values. 402.2.6 ❑ Steel ;❑ Steel [IN1]1 ;❑Not Observable ❑Not Applicable I 303.2, ;Floor insulation installedper }❑Complies 402.2.6 manufacturer's instructions, and J❑Does Not [IN2]1 ;in substantial contact with the § ;underside of the subfloor. �❑Not Observable ❑Not Applicable 402.1.1, ;Wall insulation R-value. If this is a;, R- R- ;❑Complies ;See the Envelope Assemblies 402.2.4, :mass wall with at least 1/i of the :❑ Wood ;❑ Wood ;❑Does Not ;table for values. 402.2.5 ;wall insulation on the wall ❑ Mass E] mass [IN3]1 ;exterior,the exterior insulation ;❑Not Observable :requirement applies. E] Steel ;❑ Steel ;❑Not Applicable 303.2 ;Wall insulation is installed per ❑Complies [IN4]1 manufacturer's instructions. I❑Does Not []Not Observable ❑Not Applicable 402.2.11 ;Sunroom wall insulation has a R- R ;❑Complies ; [IN8]1 :minimum R-value of R-13. New ;❑Does Not ;walls separating the sunroom .6 ;from conditioned space must ❑Not Observable meet code requirements. '❑Not Applicable 303.2 ;Sunroom wall insulation installed ❑Complies [IN9]1 ;per manufacturer's Instructions. ❑Does Not i []Not Observable I I❑Not Applicable 402.2.11 ;Sunroom ceiling minimum R- : R- ;❑Complies [IN10]1 insulation R-value of R-19 in ❑Does Not ;Climate Zones 1-4, and R-24 in ;Climate Zones 5-8. ;❑Not Observable ; ;,[:]Not Applicable 303.2 Sunroom ceiling insulation is '❑Complies [IN11]1 :installed per manufacturer's i (❑Does Not ;instructions. I❑Not Observable I❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) .2 Medium Impact(Tier 2) 3'Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos Bldg F_UnitsB-E- Page 7 of 9 E_NAnd over\REScheck\140909_Trust Merrimac_BldgD_UnitFl_58.rck Section Pians Verified Field Verified # Final Inspection Provisions complies? Comments/Assumptions Re .Ili ' VaWe Vaiue. . 402.1.1, Ceiling insulation R-value.Where ; R- R ;❑Complies ;See the Envelope Assemblies 402.2.1, > R-30 is required, R-30 can be ❑ Wood ;❑ Wood ;❑Does Not ;table for values. 402.2.2 ;used if insulation is not ❑ Steel ;❑ Steel i❑Not Observable [Fill' :compressed at eaves. R-30 may be used for 500 ftz or 20% ;❑Not Applicable (whichever is less)where :sufficient space is not available. 303.1.1.1, ;Ceiling insulation installed per g t❑Complies 303.2 :manufacturer's instructions. ❑Does Not [F1211 Blown insulation marked every I : ,# ,300 ft', r 1❑Not Observable ,. ;[]Not Applicable 402.2.3 :Attic access hatch and door R- R- illcomplies [F1311 "insulation >R-value of the ❑Does Not ;adjacent assembly. : ❑Not Observable ❑Not Applicable 402.4.2, 'Building envelope tightness ACH 50 = ACH 50 = ;❑Complies 402.4.2.1 verified by blower door test result; ;❑Does Not [FI17]1 of<7 ACH at 50 Pa.This 'requirement may instead be met ; :❑Not Observable ;via visual inspection, in which ; ;❑Not Applicable ;case verification may need to :occur during insulation Inspection. 402.4.3 Mood-burning fireplaces have ❑Complies [FIBl rgasketed doors and outdoor 1❑Does Not ;combustion air. 1❑Not Observable ❑Not Applicable 403.2.2 Post construction duct tightness cfm cfm ;❑Complies [F14]1 test result of s8 cfm to outdoors, ❑Does Not ,or:512 cfm across systems. Or, rough-in test result of 6 cfm ;❑Not Observable s across systems or s4 cfm ;❑Not Applicable ;without air handler. Rough-in test ;verification may need to occur during Framing Inspection. 403 1.1 �Programmable thermostats {❑Complies [F19]2 installed on forced air furnaces. {❑Does Not s 1 ❑Not Observable j �❑Not Applicable i 4031.2 Heat pump thermostat installed ElComplies ; fF110]2 ion heat pumps. s i❑Does Not ] 1❑Not Observable ' ) ❑Not Applicable 403.4 ;Circulating service hot water ❑Complies [FIll]2 asystems have automatic or = ;❑Does Not :accessible manual controls. e i❑Not Observable ❑Not Applicable 403.9.1 ;Readily accessible switch on M ;❑Complies [Fi12]3 ;heaters for swimming pools. j_ I❑Does Not I❑Not Observable ❑Not Applicable i 403.9.2 „Timer switches on pool heaters `❑Complies [f119]3 ;and pumps are present. - ❑Does Not ❑Not Observable : I❑Not Applicable 11 High Impact(Tier 1) 2' Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust MerrimackCondos_BIdgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: S:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 8 of 9 E_NAndover\REScheck\140909_Trust Merrimac_BldgD_UnitFl_58.rck Section Plans Verified Field Verified # f=inal Inspection Provisions value Value Complies? Comments/Assumptions & Re .IID 403.9.3 iHeated swimming pools have a °,,❑Complies [F120]3 'cover. Covers on pools heated []Does Not Iover 90 QF are insulated to R-12. f❑Not Observable f '[]Not Applicable 404.1 ,50%of lamps in permanent '❑Complies [FI611 fixtures are high efficacy lamps. 1. 3❑Does Not t I❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. [ ;❑Complies [F17]2 ;❑Does Not J❑Not Observable [ ❑Not Applicable 303.3 ,Manufacturer manuals for ❑Complies [F118]3 mechanical and water heating 1❑Does Not -equipment have been provided. ❑Not Observable I ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 140707 Trust_MerrimackCondos BldgD_UnitsB-E-E NAndover Report date: 09/09/14 Data filename: 5:\Ebbeling_Ed\140707_Trust MerrimackCondos BldgF_UnitsB-E- Page 9 of 9 E_NAndover\REScheck\140909 Trust Merrimac_BldgD_UnitFl_58.rck 2009 0ECC Energy Efficiency Certificate Wall 21.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.29 MEME Heating System: Cooling System: Water Heater: MUMMUM Name: Date: Comments Enter construction cost for fee cal - North Andover Fee Calculation Construction Cost $ 271 ,8755.00 m $ - $ 3,262.50 Plumbing Fee $ 407.81 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 407.81 Total fees collected $ 4,178.13 74 Compass Point - Building D 255-15 on 9/15/14 Single Family Home NORTF{ Town of s E : ndover A664or ver, Mass, COCHIC"IWIC« 1• .QA \y S U BOARD OF HEALTH Food/Kitchen PERMIT T L ,D Septic System THIS CERTIFIES THAT ....... .......`..` ' ..�'S BUILDING INSPECTOR has permission to erect buildings on 7 4/ ��.�?'�?� ......o V t................. .. Foundation .......................... ................ .......... � .. Rough to be occupied as /� (a........................�� �` V �!,l'.!„J,iLf, /L�.l�,f'�..................... Chimney ................. . ................. ............ provided that the person accepting this permit shall in every respect Conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR -UNLESS CONSTRUCTI N STARTS Rough Service . ... `m ."....... .. .... ............. ... .. ...... Final BUILDI. .NG.INSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det.