HomeMy WebLinkAboutBuilding Permit #157-2017 - 74 JEFFERSON STREET 8/17/2016 p,� %40RT/�
BUILDING PERMIT o°t`�!° '
TOWN OF NORTH ANDOVER ° : o
APPLICATION FOR PLAN EXAMINATION ....
Permit NO: i Date Received
m ��SSAGHUS���
Date Issued: (1 I �-{�a
IM ORTANT: Applicant must cot Tete al items on this page
LOCATION CT
NO
PROPERTY UNNER..
Print
MAPNO: PARCE'L ZON1'NG D6STRICT: 'Historic District yes no
Machine Shop Village yes no
TYPE OF IMPROVEMENT PROPOSED USE
Residential Non- Residential
❑ New Building i One family
Addition ?fw-o or more family ❑ I dustrial
❑� eration No. of units: Commercial
Vm Repair, replacement ❑Assessory Bldg ❑ Others:
❑ Demolition �❑ Other
n Septic u Well EIFloodplain z Wetlands 0 Watershed District
Q Water/Sewer
i f .
Identification Please Type or Print Clearly)
OWNER/ Name: Phon .I V11
Address: / Lna
CONTRACTOR Name.: s (hone.
Address:
r e
Supervisor's.Construction Licens- : Exp. ate: F
Home Improvement License.:. f� Exp.. Date:—�
ARCHITECT/ENGINEER Phone: `
Address: Reg. No.
FEE SCHEDULE:BOLDING PERMIT:$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
p
D
Total Project Cost: e , 6 (� ?� FEE: $ �
Check No.: �7) 4 1 1Q1 Receipt No.:
NOTE: Persons contracting wit nre ,ist d contractors do not have access to ae gu rantyfund
Signature of Agent/Owne _ Signature of contractor
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales _- ❑ Food Packaging/Sales ❑
Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT b
COMENTS �I-& P � !j Ix
CONSERVATION ❑ ❑
COMMENTS
DATE REJECTED DATE APPROVED
HEALTH ❑ ❑
COMMENTS
Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water& Sewer Connection/Signature& Date Driveway Permit
Located at 384 Osgood Street
FIRE DEPARTMENT Temp Dempster on stte yes Y no.
.;Located at!2 Main Street I
Fire Department signature/date„ _
COMMENTS _. . K
r
Location
41
No. 'Date aV R
TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee
TOTAL
Chec
BU-i1dihg ltispector
660
MORTN
Town of 2 _ 6Andover
O to
No.
. y
� Z
o h ver, Mass,
coc"Sc"aw.c.. y1'
7dA�R4rE0
S U
BOARD OF HEALTH
Food/Kitchen
PER I LD Septic System
THIS CERTIFIES THAT ....... ............... BUILDING INSPECTOR
.l. .. ... .... .. ..!�•
. . . ., .. Foundation
has permission to erect .......................... buildings on .... .. . �.. `moi . �....F .. .-.�
Rough
to be occupied as ........................ .... .. ... ....... . . . s...............p............
... Chimney
provided that the person accepting this permitshall i eve� res ect conform to the of the application
Final
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONS CTION Rough
Service
"' "' ' "" Final
BUILDING IN C OR
GAS INSPECTOR
Occupancy Permit Required to Occupy Building Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
UEORGOULIS ROOFING & CONSTRUCTION, INC.
96 Agm*�m Fsvtr
AI Greene,Diiectorof Field Opernfions
1-97S-453-4242;,affict .
t-�'r8-t388-1'7t3fl'EeII ..,
:gulksl�l'du"�ao!coui:. _.
CONTRACT
Wile Green East Condo Assoc. 07/27/16
ckProperty Management of Andover
P.O.$ax 488
And over,. .
1€td—aoQa pmandover,cpiri Job l pcatiow village Green East Condo Assoc.N.Andover,MA
. ..Scope of Work: (Roof'Replacements)
R�oye.all layers of roofing down to plywood deck on entire shingled roofs of all buildings,as specified in bid Specs.,
cully.tarping the work areas to.fVfy.protect the house bodies,decks,and landscaping.Re-nail plywood decking as needed.
r.l,emove existing siding from all sides of cheek wall locations to accept new ice/water shield and aluminum step flashing.
Aewoye,existing 1 x 3 shadow board from all eave lines,tub ice/water shield onto fascia board 3",re-install I x 3 trim board.
]Grace Select i6dwater shield underlayment 9'across all roof eaves,4%' in all valleys,3'up rakes at all,
caf#o wa31 locations,.around all roof protrusions;.and-curbing up onto a] face and sidewails a minimum of 2': Insiall.new 6"
overthe newly"installed drip edge forproper and added watertightness.
$ lI new.0.19"aluminum step flashing at all roof to wall. ocations..,in conjunction with ice/water.shield.Install new roll
bang at,all;liorzontai:face walls in conjunction with ice/wnter shield.
ill GAF Deck Armor synthetic underlayment over remaining exposed i oof deck surfaces.
X18"`.,025 gauge heavy duty brown aluminum drip edge on entire'roof perimeters.
,i<a�talI GAF Pro Start starter strips across,all eaves and up all rakes.
mall GAF.Timberline HD Lifetime Architectural.shingles with Timbertex Hip/Ridge caps on roof,cutting ridge
ry fo ensure dere is a l opening on eachside of ridge pole and extending the entire length of ridge.
mall new.heavy duty stack pipe boots.on all plumbing,pipes.
Stall GAF SnowCeuntry.ridgevent on.all inain.ridges.
ball newpre-primed cedar clapboards and/or cedar shakes on all roof to wall areas where removed to properly flash and
Painting or:staining.to be done by others and is not included in this contract.
infill new.032 gauge aluminum rain divert ers to replace any rain diverters currently in place.
fall new,lead flashing on all existing,brick chimneys,properly mortar lead seam,seal all others seams for water tightness,
toughly clean:and magnet.grounds,andremove alljob,related debris from property on a daily basis and at jobs .
tso rgledon
rgoulis Roofng,Jnc..will comply with all OSHA,ivMA;and federal safety work practices.As a GAP Master Elite Certified
tractor we will comply with GAF's product specification and installation-guidelines.
Iii:QO Per Sheet Extra.Cost.to replace any rotted or darnaged'plywood'decking(if needed).
aa_5r7.Per Lineal Foot Extra Cost to replace any rotted or damaged fascia,rake or shadow trim boards(if needed).
1is:Roofing,Jnc.is.a GAF Master Elite Certified Contractor
1 job iachidcx GAF's Systems Plus Warranty. First 40 Yrs.Is non-prorated,full labor and material coverage
--Vau GAF,against any material defect or installation'cause,'at no charge.
WE-PROPOSE hereby,to furniih material and labor complete in accordance with above specifications,
;i��saam-of•.
'tae=Handred.Thirty Thousand Eight Huai'idred Thirty Dollars $330,830,00
PAYMENT TO BE MADE AS FOLLOWS:
.INVOICING WILL OCCUR PER BUILDING COMI'I�ETION EACH INVOICE IT li � I'D AT F)O y
WITHIN 5 DAYS Or INVOICE SUBMISSION. IFA RETAINAGE Or tt}"/o ,1S W.I'THIiLLb AT:CNI)Ole
ENTIRE JOIL THIS WILL BE PAil)W.ITHIN 10 DAYS OF CONIPLETION OF ANY PUNCH LIST'ITFMS.
All material is guaranteed to be as specified.All work to be completed in a substantial workman like manner according-to specifications submitted
per standard practicer.Any alteration or deviation from above specifications involving extra costs will he executed only upon written orders,and will
become an extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry
fire,tornado and other necessary insurance.Our workers aro fidly covered by workers compensation insurance.
Gcorgoulis Authorized Signature
This proposal may be withdrawn by us if not accepted within 30 days.
Acceptance of Proposal-The above price,specifications are satisfactory and arebereby accepted. You are authorizedto do the work as specified.
Payment will be made As outlined abov .
acceptance
Date of
rrtt?
Signare J•t Signatttrc
Thefollowing is part of this contract:
Conti actor Re isfion.
A11 home improvement contractors must be'registered with the Commonwealth of Massachusetts.Contractor
Registration#1.17870 and Construction Supervisor License#058498:Inquires about registration should be made to:
Director,Home Improvement Contractor Registration,One Ashburton Place,Room 1301,Boston,MA 02108(617)
727=8598.Better Business Bureau,Inc. Georgoulis Construction,Inc.member IN35522.Contact the Better Business
Bureau(508)552-4888 or at me mberserv'ices ci hosbbb.rng:
General
Al outside work areas will be left rake clean.Roofing may result in dust or debris falling into the attic.This contract
cues not include clean up or protection of the contents in the attic. In the event a satellite dish should have to be
ieanoved to:co project,Georgoulis Construction,Inc,will not be responsible for repositioning after re-
trustalladon,should it be necessary.
11we.maximum down payment or advanced deposit allowed by Massachusetts-law is limited to whichever is larger: (A)
t� • .d of the total.contract or(I3) the entire cost of.any special order materials.Final payment is not required until
:thtr . .. .
fe date of completion of the project.Payment must be made within seven days from completion date.All Credit
Card Sales over$1,000.00,are Subject to a 2.0%Convenience,Fee.
ork.Schedule
The owner agrees the scheduling date is approximate.The contractor agrees to show good faith in meeting deadlines
are-29t:responsible for delays caused by weather. Suppliers,subcontractors,building officials. asbestos abatement,
hiddenbwA damages or conditions,accidents,acts of God or anything beyond our,control.
Chan e Orders
owner is aware that the work may contain hidden damage,defects,or conditions such as decay,.insect damage,or
substandard construction practices,that may require additional work not included in this contract. In this case,
GemoulisConstruction,Inc. will contact the owner and agree on an additional charge to the original contract price.In
est the owner can not be contacted,and it is crucial that work continue to protect the residence from the
(rain,snow,ect.)photographs will be taken to document the necessity of the additional work.The owner
ids that any additional work will delay the completion of the project.
1�Varran
The contractor,Georgoulis Construction,Inc. agrees to correct any work that fails to conform with the contract or
workmanship that is defective with in TEN(10)years from the substantial completion date of the project at NO
CHARGE to the homeowner.The homeowner agrees to notify Georgoulis Construction,Inc. specifying the nature of
any workmanship defect,immediately.No warranty is provided for ordinary wear and tear,fading,abuse,neglect or
casualty,or minor cracking/shrinking
of concrete or caulking..No'warrantyis provided for materials not directly
supplied by Georgoulis Construction,Inc.or for used,re-installed materials,(including skylights not installed by
Georgoulis Construction Inc)or work done by others.This warranty excluded consequential and incidental damages.
Contract Acceptance
Upon acceptance of the authorized parties at Georgoulis Construction,Inc.this contract and all work described herein
will constitute the entire agreement between Georgoulis Construction,Inc.and the Homeowner.
4