Loading...
HomeMy WebLinkAboutBuilding Permit #397-12 - 75 PARK STREET 11/4/2011 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: , /7—/1 Date Received Date Issued: IMPORTANT:Applicant must complete all items on this page 1 LOCATION 95 ?Pak taecT ` Print II PROPERTY OWNER LPN p MAA k 5taA rye S o e p Unit# Print MAP NO: J0 PARCEL: /3 ZONING DISTRICT: Historic District yes no Machine Shop Village yes no 100 year-old structure yes no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Addition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: 41 Demolition ❑ Other �JSeptc '®iWell?f DFloodpla f O,Wetlands (j1 Watersh� Distnct ! 'Water/SewerF j DESCRIPTION OF WORK TO BE PERFORMED: emOV2 4NID S °Se 0!- tWptTet- DR e>, k�, cov-eziOct z ie 4cx�%1"s R\Oq_ 9 DNA Pang ree,��, /1 /4�5 ule ,'�an (Identifi i n Please 14e or Print ea y) tF OWNER: Name: L A No"e.ke S+�.ut�Nom`S Phone: 7 8 r'" 9 54`(aY5 1 DDI Address: CONTRACTOR Name: d➢D[ �e�-vete 1` VAS T�� Phone: Address: 0 0 MApVe AA M b l o Supervisor's Construction License: i 0 LlW5 Exp. Date: 11 I 2014 Home Improvement License: 5'0' Exp. Date: //z.? Zo 12 ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE.BULDING PERMIT.$92.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ 5-L 00 FEE: $ `7. 2 0 Check No.: 6u S Receipt No.: Z" 7 y NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund SignatureofAgent/Owneri Signaturegflcontractor i r J Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Cons—-- ;- , Decision: Comments Water o Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS ti Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ❑ Notified for pickup - Date Doc:.Building Permit Revised 2011 June/mi Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition or Decks j ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract o Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc: Doc.Building Permit Revised 2008mi NORTH Town ® -0 E over No. 3?1 • s 10• dover, Mass.,_ AL Q •CLAKE' COC HIC HE WICK � 0R4-rED RATED P' 5 U BOARD OF HEALTH Food/Kitchen PERMIT T Septic System ^p 1 S`7� •�Cfv �r'� `� '(''�r'"'��J BUILDING INSPECTOR THISCERTIFIES THAT................ `` ................................................................x ..............................:..................................... Foundation ................ buildings on .......... has permission to erect....................... 7-s . ...lf.�.. .�......S..�......................................... Rough {�Ul l=....��i" G!✓ Er (if�d nizz Chimney to be occupied as............�! 5: ��. !�.:.: .-y ... .........�.................... ..... .............................................. Ch' provided that the person accepting this permit shall in every respect conform to thof the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION STARTS Rough �.c �'r'`� _..................................... Service .� BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE-DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. SEE REVERSE SIDE , ---_ Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR f; Registrations h`.158439 Expiration :,'1/23/2012 Tr# 292500 _ i Type:,:=r Pnv�te Corporation A! .x GO GREEN INDUSTRIES -; STEPHEN CUZZIERE - . - 2 DORIS RD. WESTFORD,MA 01886 Undersecretary _ N'lassachusetts- Depal-tment Alf Pul;lic Safeh I` " Bt►ai-d"itf Building Relyulations and St�indard , Construction Supervisor License License: CS 104385 STEPHEN CUZZIERE 2 DORIS RD WESTFORD, MA 01886 . —, Expiration: 4/18/2014 . (' aiani.�i rncr. Tr#:,9..04385' e TOWN OF NORTH ANDOVER .ICOH ,. Office of the Building Department pF NO 7TH '91, Community Development and Services o 024�` ,— op 1600 Osgood Street, Bldg. 20,Suite 2035 North Andover, MA 01845 w 7. Ss Gerald Brown, Inspector of Buildings August 20,2012 John T.Smolak, Esq. Smolak&Vaughan LLP East Mill, 21 High Street,Suite 301 North Andover, MA 01845 Re:Stevens Corner,75 Park Street (Assessors Map 85, Lot 13)—Comprehensive Permit Decision dated October 8, 2008. Dear Attorney Smolak, You have requested that I provide you with a determination of whether the Applicant,Stevens Corner LP, has complied with all the preconditions to the issuance of certificate of compliance as described in the Zoning Board of Appeals' Comprehensive Permit Decision, dated October 8,2008. In reviewing the Comprehensive Permit Decision,there are several conditions that must be satisfied prior to the issuance of a certificate of compliance for the Project, including the following: (a)approval of Monitoring Agreement (Para.6); (b)approval of an Operation & Maintenance Plan, or Management Plan (Para.12); (c)provide as-built plans to the Board of Appeals and Department of Public Works(Para.17); (d)completion of the construction of infrastructure, common facilities and common improvements (Para.22); (e)cessation of the use of any temporary construction or marketing trailer(Para.30);and, (f)approval of Management Company once the Project is constructed and rent stabilized (Para. 31). Based upon my review of these conditions as well as my records for this Project in February, 2012, 1 determined that Stevens Corner had complied with all the listed preconditions for the issuance of a Certificate of Occupancy for the building, including all 42 rental units.Accordingly, a final Certificate of Occupancy for the project (for Building Permit No.055-2011)was issued by me on February 3, 2012. It has been a pleasure working with Stevens Corner LP. Please let me know if I can be of further assistance. Sincer ly, G raid Brown, Building Commissioner i Deems, Maura P14,,, From: Eleanor Cox <ecox@corcoranmgmt.com> Sent: Monday,June 02, 2014 11:09 AM To: Deems, Maura Cc: Paul Kaeller Subject: FW: Stevens Corner Dry Well Findings Attachments: 20140531_100023jpg; 20140531_100124jpg;20140531_105741jpg; 20140531_ 110546jpg;20140531_112145jpg; 20140531_112616jpg; 20140531_120121jpg Hello Maura- As discussed a few moments ago, it appears that water is being discharged from the dewatering operation at the construction site above us. The water is traveling from the construction site through the fence, across the lawn, into the dry well, across the lot, down the sidewalk to the back right corner of the building. Please find attached photos of the current conditions. We would greatly appreciate the prompt attention of your building inspector addressing this situation. Sincerely, Eleanor Cox Rental Manager Stevens Corner Apartments Telephone (978) 794-1800 ExchangeDefenuderMessage Security: Check Authenticity Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records.For more information please refer to: hftp://www.sec.state.ma.ustpre/preidx.htm. Please consider the environment before printing this email. orto (Z� e m ct-, ✓Lin cJ�-"� `� 1 '� '�'� 1 Location 7r No. 9 Date HpRTiy TOWN OF NORTH ANDOVER O 0 AL0. A + s Certificate of Occupancy $ Building/Frame Permit Fee $ �2 a sACHUSE Foundation Permit Fee $ s Other Permit Fee $ TOTAL $ Check # Aw 24792 Building Inspector