Loading...
HomeMy WebLinkAboutBuilding Permit #500-15 - 76 GREENE STREET 11/25/2014BUILDING PERMIT TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION I Date Received Date Issued: I / v tt LLV /6* ryO\ PROPOSED USE 10 Residential Non- Residential 0 New Building 0 One family TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential 0 New Building 0 One family 0 Addition 0 Two or more family ❑ Industrial ❑ Alteration No. of units: ❑ Commercial 0 Repair, replacement ❑ Assessory Bldg ❑ Others: ❑ Demolition 0 Other 0 Septic, ❑.Well 0 Floodplain ,❑ Wetlands D. Distract O Wates/Sewer. -Watershed OWNER: Name: Contractor Name 1Jtsc;N1- i 1UN OF WORK TO BE PERFORMED: Identification - Please Type or Print Clearly Ph 4 &Avr Phone: /l �T�l�•�AY���1-'i��•''t �, \I/�1:\J ,�.., • -S Z. k -t ''LFA!^n1{Q{� 'F"k'+.c / N'.r � rAYtF '7'.`�IdF•M _-.'.71 f w p .� SLS. .r,.Jl � i1'{: �. �, icbt Exp'Date fion License � . Y t e` ^�•_.. As.lt 3r -,;X—p It 4,..w1. ' 9� f wi.��t� Tziome=lmprovement_License >%LGt/l�' , Ex ,Date.=w ARCH ITECT/ENGINEE Phone: Address: Reg. No. FEE SCHEDULE. BULDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F. Total Project Cost: $�S FEE: $ &S 1 I Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ! • ' ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales . ❑ Private (septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On COMMENTS CONSERVATION COMMENTS t HEALTH d COMMENTS Signature Reviewed on Signature Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Planning Board Decision: Comments Conservation Decision: Comments ning Decision/receipt submitted yes Water & Sewer Connection/Signature & Date Driveway Permit DPW Town Engineer: Signature: FIRE DEPARTMENT Temp Dumpster on site yes Located at. -124 Main Street h` Fire. Department signature/date Al*v t_ocatea 3tM4 usgooa bireet Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine NOTES and DATA — (For department use ❑ Notified for pickup Call Emai Date Doc.Building Pennit Revised 2014 Time Contact Name No I Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H. I. C. And C. S. L. Licenses ❑ Copy Of Contract Li Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doe: Building Permit Revised 2014