Loading...
HomeMy WebLinkAboutBuilding Permit #273-15 - 77 ELM STREET 9/16/2014 BUILDING PERMIT of"�oT"�ti TOWN OF NORTH ANDOVER 02 ham - �°�, APPLICATION FOR PLAN EXAMINATION Permit No#: I Date Received 4q0 Qy �gSSACHUs���� Date Issued: l IMPORTANT:Applicant must complete all items on this page LOCATION Print PROPERTY OWNER esi Print 100 Year Structure' yes no MAP PARCEL ZONING DISTRICT. _ Historic District yes '-✓.l T _ -- CM Machine r_ Shop Village e no TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building , One family ❑Addition ❑Two or more family ❑ Industrial Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other Septic ❑Well ❑flood plan El Wetlands ❑ Watershed District 0 Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: geopM t ?Atn'b'm t✓M c. +o UW P143 16t &A9IE-.►d44 + ff-cw f_ aS 10- 64w5 rr kd- NP. V (n/ft t. V= .V. 1 tjA f LOW) _ �-t-�- ��ic►`o2 iu� ct� fur + AwnUIIMf-iZic &9-T114owML�,MMc c•n��;tiu �- Now i=•'kIVI .s t.'r.�.��7�. Cy-v� t QG Nd✓9a'f. 3� Fe.oryc. 6SH-r4�.►�c (,�a��w�� �1 av�;3 vc/h�'o,.0�—AX•oG ►0••x,�� �','Le -UV;rdte - A I&A D U:TtISs 4+1/lft )N A-1 ,rssz_t-6E'M s id 4 tAi4t z E9z Identification- Please Type or Print Clearly OWNER: Name: drA4$ji t * L..►Z. F;rm ucSV Phone:-1 g I-710 - 266 7 Address: CNS L, -t*+Ln,o V -A-rL,R 7-► c Lo C--NSYt0z::n`0AJ c. Contractor'Narne: -,- -Phone:,, Address: �.�. dXw �08 .-I.JISCy ,Gf bl - - Supervisor's Construction License:.-- 91(i_2- Exp. Dater Home Improvement License: ,� y D) _ _Y__. ..-Exp. Date: g -_U- 16- , ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE.BOLDING PERMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $�,05 3 ,005 3 ,0 FEE: $��3 -.— Check No.: Receipt No.: CW-1"O,f (p NOTE: Persons contracting with unregistered contractors do not have access to the ranty f d ignature of Agent/Owner_ ignature of contractor i Location 1 �. No. �r Date 11-4114 o - TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee ' Foundation Permit Fee $ Other Permit Fee $ TOTAL $ Check# 23026 Building Inspector Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS -HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIREDEPARTMENT - Temp Dumpster on site yes .no Located at 124 Main Street Fire'Department signature/date,_ _ COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: I ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine i NOTES and DATA— (For department use) to 1 ao ❑ Notified for pickup Call Email Date Time Contact Name Doc.Building Permit Revised 2014 Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application o Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work !❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks a Building Permit Application o Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract o Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) o Engineering Affidavits for Engineered products NOTE: All re dumpster permits p p quire sign off from Fire Department prior to Issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application Li Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stampthe decision from the Board of Appeals PP that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2014 Enter construction cost for fee cal- North Andover Fee Calculation Construction Cost $ 56,053.00 m $ - $ 672.64 Plumbing Fee $ 84.08 Gas Fee 100 comm. $ 100.00 Electrical Fee $ 84.08 Total fees collected $ 940.80 77 Elm Street 273-15 on 9/16/2014 Remodel Master Bedroom and Bathroom Remodel Third Floor Bathroom NORTFj own of t E : ,. ndover 0 r , � Z h oh ver, Mass, w COG KICKl WICK � rA �V a CRATED PPa,`'�� 7S V BOARD OF HEALTH Food/Kitchen PERMI.T T LD Septic System THIS CERTIFIES THAT Ln. fi.m.a 4.. .. .......................................................... BUILDING INSPECTOR Foundation has permission to erect .......................... buildings on ... ..............rolt 4r.......��"�'.......0................. Jry� A Rough to be occupied as ...�...o . '........ ..�.I.\ .. ./1.. '� r.. Chimney provided that the person accepting this permit shat In every re pect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCT10fi RTS Rough Service ............. .. ........................................................... Final BUILDING INSPECTOR GAS INSPECTOR Occupancy.Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final T No Lathing or Dry Wall o Be Done FIRE DEPARTMENT Until Inspected and Approved by the -Building Inspector. Burner Street No. Smoke Det. Tft e GCommonveaM offfamehusetts Departmint gfInd4sftIgI.AccId&-fy • , Office v,ffivestigafeoms ' 600 WasUngton Street ' Roston,.tom 02111 - yip.mass go-vIM work oxo'compewation bsurance Affidavit: AUUWant Please.PrktLeWhly Name(Businosdorgani'safion/1n,dMdi d): /��tJ41�1/71�G W� ��SNZIIC TI�UJ� TL � x Cz yIS�aE�/ 'p: L%�� 5�ij►2D,M�-D 1�L�Phon� I-? 2s0 A-r re yoj,ate.employer?Check. mia appropriate box: Type of pxojeet(requirecl� 1.U I a-na.a employer with_ `_� 4, [1 x am a general contractox and x 6, ��ey�c6nsiruc�oo employees(�ilJ att loxpaxE time}.T have,nedthe sub-contractors 2.E] 1 am a sole proprietor oxoattAcr listed on the attached sheet� 7• Remodeling ship and`havana.employees These sub-confractorshave 8. X?emolzfion working forme in.any'capacity. workers'compo.insurance• 9. []Building addition PTO work-ars'comp.insurance S. ❑�l e axe a havcore exercised cis and its 10.0 Blectricalrepairs or additions xecluixed.] officers lave exexcised.tlteir 3.[ r am a homeowner doing all work right of exemptionperl CIL 11..E.l'lnmbingxepaixs or additions myse7r.�90w9rke&comp. c.1.52,§1(4),andwehaveno 12.QR00fxePai9 insurarzcerectoixxed.� employees.[Nb workers' 13. 1 Other comp.ansuxancerecluixecl.� . Anyapplicanftlaatchecksbox# musEalso tlonitfleseefionhelovrsfio�ingtheirvlozkers'eompensatioapolicyinfQmiafion. iHomeownerswhosutmit=hkaffiidavitindicafingiillgdoing allworxandthenKiraoutside confracforsmus,submifanewafd"findicatingsuch. xContracfors�diafaTieakthisho�mnsfaffachedan.addifionalsheetshowingthenameofthesut}-cosfracforsand-theiFworkers'comp.poticyinformaizon. amara ernproyer fl at isproviclirag workers"co�npe�asafkn insuran or -a er�i`oyees, Mowi�tiiepalicy arad�ob,�ite ir2foa�rnatio�. . Tnsuxance CornpanyN'ame; 1n��`�O C,i�5+��� � Rolicy#or Sa ins.YIc. rob bite Address;^ `7 `�/A4) 5�' fCify(S�ate/Zip; A�I1f�aJ�L, O 1$y� Attach a copy compensationjioucydeclarationpage(showimg,thepoir.cymmber and expiration date). yatma to secure coverage as xequixeclunder Section 25'A ofMGL c.152 can,lead to the impositiorR of eriminalpenalties of a Imo up to$1,5000 andlor one-year xmpriso vnent,as well as civilpenalties in-die foam.of a STOP�!ORIS QRl7 and a fine ofup to$250.00 a day against the violatoz: Be advised that;a copy ofthis statement may be foxwardedto the Office of• .Investigations of the DIA for insumn Ge,coverage verification. do7iereby cez�fy ' e t e .irirag erg 'eof�e �urytriatieireo�rtntiox�p�oviet�at7oYe%s?ttueancieo�aet, - S`i afizre• Date• 7` 'hone#: 5 S ' Z3'O O eiaZ�cse�xaly, o not write in this area,to be eovVleted ry cid or 10Mof ciar City or Town: Bermit/1,icense# Doing Authoxity(circle one): .Board of ealth 2.BuildingDepaxtmmat I CityNowia Clerk 4.Blectxicalxnspeeton 5.Blumibingfuspector f.Other Information and instructions ., Massach isetts General saws chapter x52 xequires all employers to provide woxkexs'compensation for their employees. .Pursuait to this statute,an ernmoroyee is defatted as``..,evexypexson izithe service of mother under any c6fract oXhixe; ' express orimplied,oral oxwxiffele . .fin er�loye�is defined as"an individual,paztrtersbip,assoczafioxt,corporation o><otherlegal entity,ox anytwa oxznore. . ofthe�oxegoingengagedina,7ointenfezpxise,andincludingthelegaln:epxesentaL�.ves ofa'deceasede�n�nlg�ex,.orthe receiver oxfnisfee of"au indivzdua�paxGt�ershxp,associafzou ox other le entity,employing employees. owevexfhe owner of a dweEnghousehavingnotmore than,three apartments and who resides tbexein,or the occupant ofthe dwollinghouse of anOthOr who employs persons to do maintenance,construction orxepair work on such dwellinghouse or oathe grounds orbuilding appurtenantfheteto shaIlnbtbecause ofsuch em leyrrie the deemedto be an employe " MQL chapter 152,§25C(6)also states that"every state or Ideal lic-ensiug agency shall withhold tTze issuance ox renewal of a license or permit to operate a business or to coustxuet buildings lathe commonwealth for.any applicant who has notp educed acceptable e icienceofcompliancewiththeinsuraaeereoveragarequired" A dditionally;MOL chapter 152,§25C(7}states `l�eithex the commonwealth nor any of ifs political sub 61810ns sball enter into any contractfor the perfoxznance ofpublic worlsuntil accepfabla evidence of compliance with the zusuxance regairements of this chapterhave b eezzpreserted to the matraeft authozity:' Applicants Please fill out the workers'compensation affidavit completely,by checld g the boxes that apply to your Situation and,if iiecessaxy,supply sub-conlxactox(s}name(s),addresses)anclhonenumbex(s}alangwiththeir cexticate(s)of insuxanc� LimifedLiabilityCompanies(LLC}oxLimitedLiabilifyPartnerships(LLI'}v�%tb.no employees otliextbaftthe Members Or Partners,are notxequiredto canyworkers'compensation insurance. Ti anLLC orLLP employees of employees,apolicy%sxecluixed. 13eadvhedthattf6aiddavitmaybesubmittadtotheDepartmeutoflindustrial Accidents for coz rmatzon of insurance coverage. Also be sure to sign and date the afZdavi: Ila afgdavit should be retaxmd to the city or town thatthe application for the penazit or license is being reque,�ted,aq the DaTaltmeat of h(lustralAccidents. ShoWdyouhave,any quesHonsxegardingthelawoxzfyouarexecluixedfoobtainay,�oxkexs' compensationpolicy,pleasecalltheDepartmentatth�n,m,berlistedbelow: Self-h=ecicompaniessltouTdentextbeir self~insurartce incense number on the appropriate lice. pity or Town officials Please be sure that the az zdavzt is complete and Printed legibly.,The Department provided a space at the bottom oft aft"tdavit foxyou fo alt out lathe event the Office of lnvesfigatio`ns 7ias to contactyou regarding the applicant. Pleasebe-sagetcn"Itztttbepennzf/licensertumbextxrrhicltwillbowed asaxo,exencenumber..fn addition,anapplicattt thatniust submitznnitl�nle*iDit/11ceme applications is any givenyear,need only'sdMit one affx,davitludicating.cut'ent PORGY information(i rneeessary)anti wider"Tob,Site.A.ddress"the applicant shouldwxite`°all locations in ' (city ax town)"A copy of the affidavit tha�has been oidcially stamped oxmaxked by fihe city ox town xray be pxovided to the applieantaspzoofthatavalidaffzdavonftle oxfntozepermitsox]zcensGa. Ax<ewazddavitmustbeftlledouteach year W.�.exea.hozneavmexorcztizenisobfazningalicenseoxpermitnotxelafedtoanybusinessoxcommercialventuxe (i.e.a dog license orpezmit to burn leaves etc.)said p erson s N-t]T xogE*ed to complete this affidavit. The Office of htvestigatiOna would I&D to thank you iu advance fox your coop exaflon and should you have aay questions, " Please do xto l.hesitafe to give us a call, The Depart melLfs address,telephone atd faxnumber: Tb. G4n �aZ o11jsatly � , ?�paximMt QCfTAJU*!aJ AccldWq ,ti01 t4 617-72,'F-490 0 PA 0,6 Q 1x•84 kN+S„i ROME Y-P Rovised5 z6-4S Fax#617"727-7749 � DHosseobmsetts -DepartnnantoYpmblxnSafety ~m� Board ofBuilding Regdabomsand Standards Office ofRegulation ME — cvu^r,v'dvu ���cniw`r -'--'' CONTRACTOR— - CS � 14*4O1 Type:License: 62 �bun� O DBA .��~ Craig Tarbox � � � ~�= ATLANTIC WALLBOARD CONST CO. 209 Forest Road Wflkmm000 @3O86: � ~ CRA\GTAR8DX 5�� 137OLD vVESTrORDRD `` MA '/ '^ Exp�ratimn CHELMSFORD, ouoem^c,^wr/ Commissioner 00/0912016 EPA R rfifid or ����2 ~~ ' � | / . \ oep°vnen'mLabor Twbox 137 Old WeSdDrd Rd- Zj � ^ _ ��-~. m ~ —� ' / Training Course Fj*hw:312512915 - construction Safety&Health This is to certif*that Craig Tarbox has received the prescribed training required and is quifified to operate the ITW Raimset/Red Head Powder Actuated tods"d below. Read Date issued: 6/28/2007 it 721,M70,MD380,1-1600,HD22,RS22,Rocket ( --------'— -- , '> � ` _�~~ AC oR0 CERTIFICATE OF LIABILITY INSURANCE DATE( W014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the pol(cy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Lisa Leary NAME: Wilson Insurance Agency PHONE . (781)665-1034 1 FA NC:(781)662-0301 105 West Foster Street E-MAIL INSURERS AFFORDING COVERAGE NAIC# Melrose MA 02176 INSURERA:Scottsdale Insurance Co. INSURED INSURERB:Wesco Insurance Company 26135 Atlantic Wallboard Construction Services Inc. INSURER C: P.O. BOX 68 INSURER 0: INSURER E: Chelmsford MA 01824 INSURER F: COVERAGES CERTIFICATE NUMBER:CL145802023 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED N ED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DO"�LWITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED S SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAPS. /NSR ADDTYPE OF INSURANCE LSUBR POLICY EFF POL Y P LIMITS LTR POLICY NUMBER MMIDD (MMI K GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 AMAGE TO COMMERCIAL GENERAL LIABILITY PREM SES(Ea occurrence) $ 50,000 A J CLAIMS-MADE DOCCUR CPS1915252 /,N2014 /7/2015 MED EXP fAny one person) $ 1,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ 2,000,000 X POLICY PRO JECT LOC ++II $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per accident $ X UMBRELLA UABOCCUR I) EACH OCCURRENCE $ 4,000,000 A EXCESS LIAB HCLAIMS-MADE AGGREGATE $ 4,000,000 DED I I RETENTIONS S0030097 5/7/2014 /7/2015 $ B WORKERS COMPENSATION I WCSTATU- 0TH• AND EMPLOYERS'LIABILITY !N FR ANY PROPRIETORIPARTNERrEXECUT NIA E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBEREXCLUDED? 3D88410 !17/2014 5/17/2015 (Mandatory in NH) E.L.DISEASE-EA EMPLOYE S 1,000,000 F es,describe under DESCRIPTION OF OPE eI. E.L.DISEASE-POLICY LIMIT $ 11000,000 Q t% DESCRIPTION OF dkRAnoNs I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,ff more space Is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN FOR VERIFICATION PURPOSES ONLY. . .. ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE dank ACORD 25(2010/05) O 1988- 0 0 ACORD CORPORATIOMAItgreserved. INS025(201005).01 The ACORD name and logo are registered marks of ACORD ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 THIRD FLOOR GENERAL LAYOUT 2 of 2 77 Elm Street North Andover,MA 09/01/14 Interior Renovation Project Not To Scale W V � QO u� W IzN 1- 0 MdB.B:B x.O:Z O J 'a J Q N Z F- U = W < Wo CuV Cu .�Z .8:4 EP �P N b 6 40 g O 00 = u� 0 c+� 0 r 1 m _ W J F U. ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 3RD FLOOR BATHROOM WORK 5 of 5 77 Elm Street North Andover,MA 08/30/14 INTERIOR RENOVATION PROJECT Not To Scale 6'-1" — Replace — 6'-1 existing �— exaust _ a fan/vent (ew:Tjoi'le' 00 �-- 2,-Q I, CIO Relocate sewage � N t 00 exaust located op 'p(� inside of wall � ' ' - �� chase area O ew 'nk - OO 2-9 (to be confirmed). & ani M CV = � -Q, �� 4— 2=4"x 6'-8"PD 2'-4"x s=s" Custom Shower 2!8" New Pocket Door 2 -8�� 3�1�� enclosure (system)n o be �� sourced for the dimensions of 8-Q the location. Details of pan &panel — —8-Q11 system to be confirmed. New plumbing lines in left partition wall. EXISTING PROPOSED DEMO: Demo most walls/ceiling. BATHROOM Disconnect/remove toilet, sink, BATHROOM shower, fixtures, floor&entry door NOTICE: All designs contained on this document are the property of Atlantic WB Const.and are protected by law. Reprint,copying,or transmittal of any portion of the information contained herein is an infringement of Federal Copyright Laws. The purpose of this document is pursuant to contractual work with the listed Client and this General Contracting Corp.Any use beyond this purpose by the Client,or any other entity,is strictly prohibited. ATLANTIC WB CONSTRUCTION SERviCES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.#144401 EXISTING BEDROOM& KITCHEN 1 of S 77 Elm Street North Andover,MA 08/30/14 INTERIOR RENOVATION PROJECT Not To Scale HALLWAY n 7,40" /I L 8,_J n -70rI T-4"x s,-8" 2 f x 6,8" Cl- 2'-s"x s'-a^ N IV CL C Y --� — O T-s"x s'-8" 01 „ 01 O $W-2n C�� 00O W X o1 C' 00 KITCHEN BEDROOM °° AREA w CO 3'-7"x 5'-8" 2'-7"x 3'-4" 3'-3"x 2'-7" 3'-7-x5-8- 16'-0" 7"x5 8"96'-0" 16'-0" NOTICE: All designs contained on this document are the property of Atlantic WB Const.and are protected bylaw. Reprint,copying,or transmittal of any portion of the information contained herein is an infringement of Federal Copyright Laws. The purpose of this document is pursuant to contractual work with the listed Client and this General Contracting Corp.Any use beyond this purpose by the Client,or any other entity,is strictly prohibited. ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 PROPOSED—M.BEDROOM&OFFICE 3 of S 77 Elm Street North Andover,MA 08/30/14 INTERIOR RENOVATION PROJECT Not To Scale HALLWAY '' 1a-1011 , - -s=1„ Infill Door Opening—\ 2'-6"x 6-8" 2-8"x 6t-B' J ------ --------------------- 9 Existing C EY N xistin Shelve Ne undry CL Closet o 2'-8"x6'-8" = Install salvaged >o°xs'-e" 2-6"x 6'8" 2-6"x6'-8" 74T30"x SO" -- 00 - f� 8_2„ Door Slab into V- 'I Existing Door Frame %�� Hardwood Floors to Be sanded&refinished N Install Salvaged ..� Repair Door&Frame Wx affected v 0. M wall&ceilingn MASTER HOMElocati BEDROOM New 2x4 OFFICE Partition Wall – --------- 01 - Ch New Ductless HVAC System I" 00 Location To Be Determined JJI Repair/replace --- Window Trim& [!1I ILING: Install coffered CEILING: Finish New Baseboard Trim ing Trim Moldings to GWB Surface Smooth tch existing ceiling sn 3'-7"x 5'-8" 2'-T'x 34" 3-3"x2-7" 3'_7"x 5'-8" 23=10" � -8'-1"— NOTICE: 8'-1"—NOTICE: All designs contained on this document are the property of Atlantic WB Const.and are protected by law. Reprint,copying,or transmittal of any portion of the information contained herein is an infringement of Federal Copyright Laws. The purpose of this document is pursuant to contractual work with the listed Client and this General Contracting Corp.Any use beyond this purpose by the Client,or any other entity,is strictly prohibited. -�-, t� ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 BEDROOM &KITCHEN DEMO 2 of 5 77 Elm Street North Andover,MA 08/30/14 INTERIOR RENOVATION PROJECT Not To Scale HALLWAY +-----T-10" 8,-l" -5r-0" �' I Z-10" I/ �I 2=s"x s'-8"Co 2'-8"x s'-8"co2'-8"x s=8" --------------------- N C Y CT1 O 2'-s^x s'-a^ j "' Demo Op � � Half Wall � Disconnect/Demo Sink, 8;2rr /I/ to ,- Faucet&Drain Lines. 00 O Demo Kitchen Cabinets, IL Remove&save Countertop+Faux Old Door frame Brick acksplash 0 materials � v Demo/Remove Lic.Plumber to Disconnect, V a M Demo/Remove J4 Ceiling Tiles Recess&Cap Stove Gas line. Non-loadbearing CD ! ! Demo/Remove Tear-out&remove Parition Wall Materials Lic.Electrician to safely disconnect& carpet,pad&tack strips o laminate Ile flooring terminate electrical outlets/lines& fixtures as needed. V7 �' DD BEDROOM KITCHEN AREA _--4r 61`7? 3'-7"x5W8" 2'-7"x3 4" 3'-3"x2=7" 3'-7"x5=8" ,fr 1" M--0" �'� 16'-0"- /r 't- NOTICE: All designs contained on this document are the property of Atlantic WB Const.and are protected by law. Reprint,copying,or transmittal of any portion of the information contained herein is an infringement of Federal Copyright Laws. The purpose of this document is pursuant to contractual work with the listed Client and this General Contracting Corp.Any use beyond this purpose by the Client,or any other entity,is strictly prohibited. ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 2ND FLOOR BATHROOM WORK 4 of 5 77 Elm Street North Andover,MA 08/30/14 INTERIOR RENOVATION PROJECT Not To Scale HALLWAY HALLWAY ----------------------- ----------------------- • X s•-8- � x e•-8- LINEN New LINEN p CLOSET Toilet Install Ceiling CLOSET M CV M Exhaust Fan& M 2=s"xs=s- vent to exterior 2'-5'x 6'8' 4—s New Pedestal a.1 Half GO O Sink Wall ice- New Bathtub !" Ra Tato ' Ra iator is 40L s/qnl r M„O� Iinet x30"W -10 s- °ca•-10'X&-s^c D101xs•-s•ca•-10^xs-8r*CC 9� .t n + W-1" EXISTING PROPOSED BATHROOM BATHROOM NOTICE: All designs contained on this document are the property of Atlantic WB Const.and are protected by law. Reprint,copying,or transmittal of any portion of the information contained herein is an infringement of Federal Copyright Laws. The purpose of this document is pursuant to contractual work with the listed Client and this General Contracting Corp.Any use beyond this purpose by the Client,or any other entity,is strictly prohibited. ATLANTIC WB CONSTRUCTION SERVICES-INC. P.O. Box 68 Chelmsford, MA 01824 MA. CS#085162 MA Reg.# 144401 SECOND FLOOR GENERAL LAYOUT 1 of 2 77 Elm Street North Andover,MA 09/01/14 3=1-x 5=R• Interior Renovation Project Not To Scale W J � 00 H 0 -----B:Z . . 6 N H co 0 0 .f -a *k Q L M L O O 3p LU /yN� •- F– O — O y(� W � �./ ui LLQ r- �M _ W W 0 o � aC9 � c 0 " w j 60 .B:B x.B:Z �` �..- W N Is- LL LL N 60 2'-R^x F'-R• 2'-4"x R•'-R' U Q x.B:Z M Z J *k J V � ui W O ' I. 5 LL U- Q Z = O z U. ca m 0 j t- LL 1 #4904 AnANr1C W8 CONSTRUCTION Services - Inc. P.O. BOX 68 Chelmsford, MA 01824 Tele: 978-250-0919 - Fax: 603-654-9200 A Full-Service Licensed and Insured General Contracting Corp. MA. CS#085162 MA Reg.#144401 CONTRACT: AGREEMENT DATE: September 2,2014 SUBMITTED TO: Liz&Jamie Fennesy Tele: 77 Elm Street Cell:781-710-2667 North Andover, MA 01845 Email:lizettafennesy@yahoo.com We, Atlantic WB Construction Services Inc. , hereby propose to supply the materials, and perform the labor necessary for the completion of: INTERIOR RENOVATION PROJECT: As Requested by Clients Refer To;Client Original 3-page Project-Scope List(Received 06/04/14),Atlantic Proposal#4866 & #4890+ Revised Client Notes from Proposal#4866.Also Refer To;Atlantic diagrams and floor plans,with notes,from 08/30/14 and 09/01/14. Project work is based on(2)preliminary reviews of visible interior living space surfaces, and on standard renovation processes. All work is conceptual;Including some project-aspects,that will required demolition related work(material removals.)and additional onsite inspections,in order to confirm the actual work required&finalize costs. LOCATION# 1: 2°D FLOOR BEDROOM - DEMO:Remove 13'-5"Wall x 8'-6"H separation wall.Attempt to salvage/save baseboard&ceiling molding trim(as is possible).Remove baseboard,molding and trim casings sections,along areas of removed walls. Remove (2)entry door frames,and set-aside(1 for use at New Office space entry).Remove carpeting,pad&tack strips. -WALLPAPER REMOVAL(Conceptual):Attempt to remove wallpaper along specific wall locations(where new drywall will meet old bedroom wall locations).Exact scope of work is unknown and to be fully determined. -GENERAL FRAMING:Infill(1)right-side entry door location opening.Perform in-fill framing at removed separation wall locations(as needed). -ELECTRICAL:Wire&install new outlets to code(along new wall surfaces). -PLUMBING:Disconnect/remove(1)cast iron radiator(leave for Client).Leave(1)other radiator as-is,in-place (TBC). -HVAC:Install(1)wall-mounted ductless heating/cooling unit.Exact install details&locations to be confirmed. -INSULATION:Insert insulation into(1)exterior wall bay(at remove partition wall area—if needed),and around new wall-mounted heating/cooling unit. -DRYWALL: Install new 1/2"GWB at(2)removed separation wall locations and along ceiling surface.Install V2" GWB at(1)in-filled entry door opening(right side).Wall surface repair work(cracks,chips,glue,stains,blemishes, and other prep repair work)may be required on other wall/ceiling surfaces. 1his is Unlwown at time o documentation&remains to be fully determined. -DOOR INSTALLATIONS:Install salvaged door frame(for left-hand in-swing operation—TBC).Modify Client provided LH 30"x 80"door slab&install into the salvaged door frame(with existing,installed door knobs). -WALL FINISH CARPENTRY:Install new 1"x 8"baseboard+2" cap-molding sections along affected wall surfaces&new wall locations. -CEILING FINISH CARPENTRY:Install new clear-pine 1"x 2.5"+'/z"cove trim(coffered ceiling moldings)onto new ceiling surface. -FINISH CARPENTRY(At Existing Closet):Remove existing closet shelving.Install new shelving at(1)existing closet location(shelving arrangement details to be reviewed and finalized—TBD). -OPTIONAL PAINT WORK:Most existing walls possess wallpaper. These walls,and other project-affected wall surfaces will require drywall related work(exact scope of drywall work is TBD).Exact scope of prep work is also TBD(unknown at time of documentation). See Section O. -FLOORING:Inspect existing hardwood floor condition.Strip and refinish flooring(Conceptual-TBC/TBD). Initial 2 #4904 LOCATION#2: HOME-OFFICE+LAUNDRY CLOSET - DEMO:Remove ceiling tiles.Remove(1)5'-8"W x 48"H(1)half wall.Remove kitchen cabinets,countertop sections,brick veneer wall materials(to studs),sink&related parts:Remove baseboard,molding,and trim casing sections,along areas of removed walls. Remove carpeting,pad&tack strips.Remove linoleum floor materials(and inspect hardwood condition). -FRAMING:Install new 2x4 framing to create(1)new 36"x 6' laundry Closet space+(1) Storage alcove(to left of laundry).Install 2x4 framing to create new office separation wall area(approx. 13'-5"x 8'-6"). -ELECTRICAL:Remove half-wall location wiring.Wire&install washer/drier outlets.Install additional wiring and data lines(as needed),for office space area(this to be fully determined). -PLUMBING:Modify existing plumbing,and install additional plumbing lines to/for,laundry appliance locations (in new closet area).If applicable,disconnect and cap gas line for old stove(TBC/TBD). -HVAC:At time of documentation,heating&cooling plans are not know,and yet to be finalized/determined. -INSULATION:Not assumed/planned. -DRYWALL:Install new 3/8"GWB onto 14'x 16' ceiling area&finish smooth.Install'/z"GWB onto new office separation wall surfaces(both sides)and onto interior/exterior of new Laundry Closet location&storage alcove. -DOOR INSTALLATIONS:Install(1)Client-provided RH,or LH,door slab&salvaged RH,or LH door frame (with existing installed door knobs). -FINISH CARPENTRY:Install new 1"x 8"baseboard+2"cap-molding sections along affected wall surfaces& new wall locations.Install salvaged door panel&frame(with installed knob)at new office entry location.Install new 5'x 80"double-door at Laundry Closet location.Install similar(as existing)4-7/8"trim casings&6"x 5" rosettes at;doors&storage alcove openings.Install interior closet basic trim&casing moldings. -OPTIONAL PAINT WORK:Most existing walls possess wallpaper. These walls,and other project-affected wall surfaces will require drywall related work(exact scope of drywall work is TBD).Exact scope of prep work is also TBD(unknown at time of documentation). See Section 0. -FLOORING:Inspect existing hardwood floor condition. Strip and refinish flooring(TBC/TBD). LOCATION#3: 2nd FLOOR BATHROOM -DEMO:Disconnect,remove&dispose of, toilet,floor tile,bathtub+tub/shower wall tile surfaces,baseboard, door/window trim casings,vanity with sink/parts,bathtub with faucet/parts,half wall at bathtub,half wall cabinet, linoleum flooring.Leave existing radiator as-is,in-place -WALLPAPER REMOVAL(Conceptual):Attempt to remove wallpaper along wall surfaces(TBD). -FRAMING:None Assumed/planned.Client to inform Atlantic of type of medicine cabinet(in-wall,or surface mount).In wall install would require framing alterations to wall location(TBD). -ELECTRICAL:Wire&install new GFCI outlet to code.Install light switch to code.Install new ceiling exhaust fan/light combination unit&control switch.Wire&install electric radiant floor heat-mat with control thermostat. Install(2)Client provided wall light sconce fixtures. -PLUMBING:Inspect existing rough plumbing.Install bathtub drain line.Install new Client provided;shower- valve kit,faucet,drain trim kit,trip-plate—at same location.Install Client provided bathtub,pedestal sink,faucet, and drain trim—at same location.Install new Client provided toilet at same location.Test and set tub/shower water temperature. -DRYWALL:Install new GWB along specific wall locations+(ceiling work also required,due to exhaust fan and ducting work). Wall sur ace repair work(cracks,chips,glue,stains,blemishes,and other prep repair work)may be required on other wall/ceiling surfaces.This is unknown at time of documentation&remains to be fully determined. -FINISH CARPENTRY:Install new Atlantic provided window/door trim casings(type,dimension,profile— TBC/TBD).No work assumed/planned on existing closet interior location,or existing doors. -TILE WORK:Install '/a"Cement board over bathroom main subfloor surface and V2"onto tub/shower walls. Install Client provided floor/wall tile(5'H),including band+base accent tiles.Apply tile/grout sealer if requested. -OTHER WORK: Connect duct to new ceiling van unit,and attempt to run to exterior vent cover location(TBD). Install Client provided medicine cabinet over sink location.Install new Client provided shelves&towel rods/hooks. Install new Client provided shower curtain rod&wall/ceiling mounts. -OPTIONAL PAINT WORK:Most existing walls possess wallpaper. These walls,and other project-affected wall surfaces will require drywall related work(exact scope of drywall work is TBD).Exact scope of prep work is also TBD(unknown at time of documentation). See Section 0. (Continued on page 31 Initial 3 #4904 [Continued from page 2] LOCATION#4: 3rd FLOOR BATHROOM -DEMO:_Disconnect,remove&dispose of; toilet,shower components,vanity&sink,wall hardware,door& frame/parts,baseboard&trim casings,linoleum floor materials.Remove wall&ceiling surface materials.Remove and set-aside toilet for possible re-use(TBC).Remove wall materials(to right of bath entry door).Remove bathroom main subfloor to access plumbing lines.Remove 3'-1"x 8'-6"section of wall(for new pocket door frame) -OTHER DEMO:Removal of 32"x 33"wall area(at location of cast iron vent stack). This remains to be confirmed. -FRAMING:If able to relocate vent stack,attempt to re-frame location to increase bathroom floor space.At time of documentation,it is unknown if other framing is.required/desired by Clients(TBC/TBD). -ELECTRICAL:Wire&install new GFCI outlet to code.Install light switch to code.Provide&install new ceiling exhaust fan/light combination unit&control switch.Wire&install electric radiant floor heat-mat with control thermostat.Install(2)Client provided wall light sconce fixtures. -PLUMBING:Inspect existing rough plumbing.If Possible—Relocate shower to current sink location,and vanity to current shower location(TBC/TB). Install Client provided sink,faucet,and drain trim.Install new Client provided toilet at same location.Test and set shower water temperature. Install shower drain line and Client provided shower pan&wall-panel kit(no glass).Install new Client provided; shower-valve kit,drain trim kit.Install Client provided vanity sink,faucet,and drain trim.Install new Client provided toilet at same location(or reinstall salvaged toilet).Test and set shower water temperature. -OTHER PLUMBING:Attempt to alter and reroute existing cast iron vent stack(This is to be Determined). -INSULATION: Insulate exposed(accessible)wall&ceiling bays,as is possible(using typical fiberglass-TBD). -DRYWALL:Install new GWB along bathroom interior ceiling&wall surfaces+(1)hallway wall location. -DOOR INSTALLATION: Install 28"x80'Pocket Door System and new door slab with locking pull-latch system. -FINISH CARPENTRY: Install new 32"x 80"RH bathroom entry door slab into pocket-door frame(type of door profile and material TBC/TBD).Install new Client provided door knob.Install new basic baseboard.Install new Client provided vanity base-cabinet and countertop with side&backsplash(as applicable) -TILE WORK:Install✓4"Cement board over bathroom main subfloor surface.Install Client provided floor tile & grout.Apply tile/grout sealer if requested. -OTHER WORK: Connect duct to new ceiling van unit,and attempt to run to exterior vent cover location(TBD). Install Client provided medicine cabinet,or mirror,over sink location.Install new Client provided shelves&towel rods/hooks.Install new Client provided shower curtain,or shower glass door kit. -OPTIONAL PAINT WORK:Most existing walls possess wallpaper.These walls,and other project-affected wall surfaces will require drywall related work(exact scope of drywall work is TBD).Exact scope of prep work is also TBD(unknown at time of documentation). See Section 0. LOCATION#4: COMMON HALLWAY FLOORING WORK -DRYWALL:Install new GWB along bathroom interior ceiling&wall surfaces+(1)hallway wall area. -REMOVALS:Remove Carpet,pad&tack strips.Inspect condition of underlying hardwood flooring(approx. 57.07 SF). -FLOOR WORK: Strip and refinish flooring(TBC/TBD). -Flooring related work will require paint-work,along baseboard locations(Such work unknown at time of documentation—related costs are not yet provided). See Section 0. OTHER ASPECTS: PROJECT PLAN DRAWINGS:Atlantic to create work-location(3)Existing Floor Plans(for 3 locations only)+(3) Proposed Floor Plans(for 3 locations only).Locations to be;(2)bathrooms+(1)Master Bedroom&Office areas. OTHER DRAWINGS: Creation of whole-house drawings(required for Smoke/CO2 detector locations,by the local Fire Dept.—would be a separate cost(from the listed project work).Any other drawings,plans,created details and documentation(that is not specifically listed)—may be performed for an added cost. PERMITS:A Building Permit(+Plumbing&Electrical Permits)are required for the project work scope.A dumpster permit will also be required,along with other possible permits(TBC&TBD). [Continued on page 4] Initial 4 #4904 [Continued from page 31 DEBRIS DISPOSAL:Project generated debris&waste,would be removed off-property,and disposed of at a legal recycling facility.This would be based on the use of a rented dumpster container(places on property).See Section Q Location for dumpster placement is to be determined. Size of dumpster and costs are a conceptual estimate. FLOOR REPAIRS:If Applicable—Subfloor&Finish Floor Carpentry-Repair Work would be an added cost. SMOKE,CO2&HEAT DETECTORS:At time of documentation,the exact scope of work that would be required for alarm related work is not known.All such costs(including permit&inspection fees),would be separate from the listed project work. CLIENT PROVIDED MATERIALS&COMPONENTS: Certain components&materials are esthetic in nature. These require the Client's specific reviews,selections&finalization. If requested,some components/materials may be able to be picked-up,transported/delivered to property for an added cost(pending details&Supplier locations). MASTER BEDROOM: o Bedroom main entry-door(Frame with parts,door-slab,hinges&knobs). Compatible with Location. OFFICE AREA: o Office main entry-door(Frame with parts,door-slab,hinges&knobs).Compatible with Location. LAUNDRY CLOSET: o Washing Machine(compatible with location&with existing utilities) o Drier(compatible with location&with existing utilities).Drier flex-duct connection-section&clamps. SECOND FLOOR BATHROOM:All components should be discussed with Atlantic,prior to ordering by Clients o New toilet+seat o New Bathtub(in-wall unit,with right-side drain&compatible with location and floor plan layout) o New Bathtub faucet. o New Shower Valve Kit(complete with controls,shower-head,trim kits,etc.) o New bathtub trip-plate+drain&trim-kit. o Pedestal sink(and all related parts). o New sink drain-trim,and faucet. o Floor Tile&Grout o All Wall Tile(including;bullnose,accentiboarder,floor-base,soap&other specialized tile sections). o Color-matched caulking(for corner-wall locations). II� o Bathroom entry-door threshold stone segment. o Any other stone components related to tile areas and/or vanity top(and side/back splashes). o Medicine cabinets and/or wall mirror with mounting hardware. o Bathroom Wall Light Fixture Sconces or wall-mounted light bar. o Bathroom wall-hardware(towel rods,hooks,shelves,etc.). THIRD FLOOR BATHROOM:All components should be discussed with Atlantic,prior to ordering by Clients o New Toilet+seat(if applicable).. o Shower Kit;Pan+Shower-Panel Wall Kit System(compatible with location dimensions&layout). o Shower Valve Kit(complete with controls,shower-head,trim kits,etc.) o Shower drain&trim kit. o Pedestal sink(and all related parts)—OR—See next line. o Vanity base cabinet+filler strips,toe-kick trim&parts.Also vanity sink,sink-drain-trim,and faucet. o Any other stone components related to tile areas and/or vanity top(and side/back splashes). o Floor Tile&Grout o Bathroom entry-door threshold stone segment. o Medicine cabinets and/or wall mirror with mounting hardware. o Bathroom Wall Light Fixture Sconces or wall-mounted light bar. o Bathroom wall-hardware(towel rods,hooks,shelves,etc.) Initial 33 #4904 , The contracted work would be completed for the sum: $46,053.05 ' Forty-Six Thousand and Fifty-Three Dollars and Five Cents. ISI Payments would be made as follows: Progress Payment Schedule PAYMENT#1: $500.00 - At Contract Agreement(Permit Fees Due When Main Permit is Issued)2 PAYMENT#2: $13,750.00 - At Start of Project Work. s PAYMENT#3: $13,750.00 - At Completion of Framing Related Work. a PAYMENT#4: $13,750.00 - At Completion of Drywall Work. 5 PAYMENT#5: $4,303.05 - At Completion of Original Listed Project Work. 6 �!$46,""053:05--TOTAL'`` �-- STANDARD PAYMENT POLICY# 1:In the event of any kind of delay,an invoice would be submitted for the work completed up to the start of the delay,or,comparable difference in the Progress Payment Schedule.Payment would be due at that time for the invoiced charge(s).All Progress milestone descriptions should be recognized as an approximation of the described work,and its level of completion+/-. , STANDARD PROJECT WORK POLICY#2: In the event,that the scope of work changes substantially(whether by Client request,Town/Building Code requirements,worksite&existing dictated conditions,or other causes)— overall project costs may revert to a Time&Materials charge basis(Various other standard policies would apply). In order to meet a timely schedule of progress, the following Materials & Components, must be acquired & provided by the Clients (onsite,to, read to use and install) - prior to the specific phase of work it is needed for: - Refer To List on Page 4 of this Agreement. Clients to consult with Atlantic regarding; Quantities, Totals, Dimensions, etc. -To ensure compatibility and sufficient amounts are properly procured, in a timely manner. The following Building Permits would be required: Building + Electrical + Plumbing + Gas +HVAC i -THANK YOU FOR YOUR BUSINESS- i Amount Reflects Lower Estimated Cost Range total as listed on (32 Page as would be affected b a Exhaust Work Y Sewage . g ) Z Payment#1 represents a deposit amount of$500.00,and covers costs related the following; Administrative work related to permit acquisition,past labor related to creation of(7)drawings,client-meetings,.and initial work planning process. The listed Penni.CEe.e-cost4are-base.d-on-va.nous-Estimatzd-T-own-Rer-mit-Fee"ctual,-Final-Cost Total-o"fl-nccessar)r-P-ermit-Fe�-s-may Adjust(+/-)at time of permit acquisition,and/or at time of completion of project work. 3 Start of Project Work is defined as the start of any portion of the listed work(including the start of material removals,or,the window&bulkhead entry door replacement process). 4 Completion of Framing Work is defined as the completion of the Original Contract stipulated framing work-as is possible. Such work may not include any additional requested framing work,that is beyond the original project scope.This progress milestone payment is not contingent on any Town related inspection-visits,approvals,and permit sign-offs. 5 Completion of Drywall Work is defined as the completion of the Original Contract stipulated Drywall work-as is possible. Such work may not include any additional requested drywall area work,that is beyond the original project scope. 6 Completion of Contract work is defined as the Original project scope,and is not contingent on the completion of any additionally requested(added)work.This process includes(1)effort(visit)to address the Client's punch list item(s),or point(s), (as discussed and compiled in written format),between Atlantic&Clients. Additional punch list efforts(visits)may be performed,but would not hold up the final payment. 7 Total amount listed does not include any additional costs that may be incurred from;changes,adjustments,upgrades, Smoke/CO2 related work,Client-provided materials/components,Paint-work,etc.(Also refer to various Document Notes). Initial 40 #4904 HOUSE/STRUCTURE INFORMATION: Property Owner/Client testifies to the best of their knowledge,that the age of the home,or structure, listed in this contract,and,to be worked on-is as stated below. (Per TSCA Section 402) YEAR OF O GINAL BUILD or Age of Structure l� Home Owner's Signature Date ACCEPTANCE OF CONTRACT: The listed prices,specifications and conditions are satisfactory and are hereby accepted.Atlantic WB Construction Services Inc.is authorized to do the work as specified. Payment will be made as outlined in this document. Home 03P&s Signature Date Property Owner's Representative's Signature Date General Contractor's Signature Date NOTE TO CLIENTS: Atlantic recognizes that either one(1) of the signing agent(s), listed Owners (of Town Record),or authorized Owner Representative - is individually, duly, approved (as the Representative, Client, or Owner)to make decision(s) related to specific worksite aspects & choices. In the event that a decision is made related to project details, by one(1) of the authorized agents,whose name&signature may appears above or listed as a to ownership of 9 g Y pp ( party p the project address),Atlantic will accept the decision as final, and proceed with the work process. Atlantic may likely not attempt to contact all individuals involved with the overall project, or, all Owners of the property, prior to continuing work-based on the provided decision. Initial