Loading...
HomeMy WebLinkAboutBuilding Permit #446 - 83 OLYMPIC LANE 11/30/2011 TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: �`� Date Received 7 `� Date Issued: IMPORTANT:Applicant must complete all items on this page LOCATION �3 ��C 10, Print PROPERTY OWNER -i-Mr-,7- Ck fl - Gi>1 u A 11 Unit# Print MAP NO: /06PARCEL: 1,3q_ZONING DISTRICT: Historic District yes n Machine Shop Village yes no 100 year-old structure yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building XOne family )IaAddition ❑Two or more family ❑ Industrial ❑Alteration No. of units: ❑ Commercial ❑ Repair, replacement ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ Other ❑'Septic q Well ❑ Fl`oodplaih: I]�Wetland_'s.; ® Watershed4Disthct O'Water/Sewer DESCRIPTION OF WORK TO BE PERFORMED: geg is c-9- kc �u vA oec,� w i `tk -�,e_u) Y 2_e2- (Iden(Identification tification Please Type or Print Clearly) OWNER: Name: C, r i *K%'nktqn 6011n// ° Phone. Address: F3 ©j�, oal L I!ane N, liny�r� /MCS 0! �Y S CONTRACTOR Name: f Olctlor\lc J�'U �� �_ • Phone: 603) 26S-"—xd,0 _ Address: c� 1 X11 k `;�. l ip^r 1'✓Yyw �� IV- C �A4kP-5- SC:/}uiji/-- Supervisor's Construction License: 7 VP 36 Exp. Date: O 3 C )Wr--S. 5C#UL6M,), 3 6 Exp. Date: D / U Home Improvement License: ARCHITECT/ENGINEER Phone: Address: Reg. No. FEE SCHEDULE:BULDING PERMIT.•$92.00 PER$9000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ dam" //, wOr 04) FEE: $ 13l_ Check No.: S Receipt No.: ��4J-6­0 NOTE: ersons contr cting with unregistered contYactoYs do not have access to t gua•anty fund Sign _ OvvnerSignature_of contractor: Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swimming Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION Reviewed on I Signature COMMENTS s b2 o�mn s� t� 5 r; ao�a11-242 HEALTH Reviewed on 1f2111111Si nature COMMENTS e`er. �ti10 �� `r / -✓ r,2 Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use I ❑ Notified for pickup - Date Doc:.Building Permit Revised 2011 June/mi Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits o Building Permit Application o Workers Comp Affidavit o Photo Copy of H.I.C. And/Or C.S.L. Licenses o Copy of Contract o Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign offrom Fire Department prior to issuance of Bldg Permit Addition or Decks o Building Permit Application o Certified Surveyed Plot Plan o Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses o Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) o Mass check Energy Compliance Report (If Applicable) o Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) o Building Permit Application o Certified Proposed Plot Plan Li Photo of H.I.C. And C.S.L. Licenses o Workers Comp Affidavit o Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) o Copy of Contract o Mass check Energy Compliance Report o Engineering Affidavits for Engineered products VOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg .Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording :Bust be submitted with the building application Doc: Doc.Building Permit Revised 2008mi Location � No. Datev NpRTH TOWN OF NORTH ANDOVER F R 9 �o Certificate of Occupancy $ sscHus E<� Building/Frame Permit Fee $ Foundation Permit Fee $ c Other Permit Fee $ 'O 1 TOTAL $ Check # 24650 Building Inspector xAO R TFC Tovm Of ; , .1, Andover No. Co =. o , dover, Mass., • �0 • COC HIC ME OWICK y�. A '4 � ATED 1`S BOARD OF HEALTH Food/Kitchen PERMIT T D Septic System BUILDING INSPECTOR THIS CERTIFIES THAT...........�....�A..&. ' .......... .11`.t..:................................... ............. . ................... Foundation d has permission to erect...........:........, buildings on .... ....... . . ,pl, ....��� .................. Rough t0 be Occupied as.. Y... .......... ... moi . Chimney .................................................................. ........ Ch' e provided that the person accepting this per shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6—MONTES ELECTRICAL INSPECTOR UNLESS CONSTRU O TS Rough ........... ...... ................................................................................... Service BUILDING INSPECTOR Final Occupancy Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do- Not Remove Final No Lathing or Dry wall To Be Done FIRE-DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE Smoke Det. NORTH ANDOVER, MAS ACHUSETTS BUYER: PAUL FI SCALE: 1" = 40` NOVEMBER 29, 1983 \ v!o 'v 44 ` a0 rye, cp a s� m $ o m all i ,o • 334 viol NOTE: THIS IS .NOT A SURVEY- AND I + PURPOSES ONLY. S TO BE USED FOR MGRTGAGI a � j c" w N.B. - DO NOT USE OFFSETS FOR ESTABLISHING LOT LINES FOR THL ERECTION OF FENCES, WALLS, HEDGES, ETC. /.rta�. I HEREBY CERTIFY THAT THE BUILDING ON THIS PROPERTY IS �t LOCATED AS SHOWN ON PLAN AND COMPLIES WITH THE LOCAL ZONING SET BACK REQUIREMENTS. R ENGINEERING SERVICES INC. I FURTHER CERTIFY THAT,THE ABOVE 0 CANAL STREET IN A FLOOD HAZARD ZONE, DWELLING IS NOT LOCATED WRENCE,MASSACHUSETTS i i � 1 ! f r. 1 { v 41 l f .l 1, L_E VAT 140 N's. LNV PIPE A 5 U i l.,—r i civ PIPE DUTQF-S2�h11L-- ------_.— '" U � �D �J PG���►L- _ ��- �4]L�2---OF�1 P.�__----..'-- ;:_ ::_. __-_--,_ I ►tel aA SG4L� DqT F :_ z Q F2A?.4 V, G EA_ItJ 155octn.T�S A+�LE-tITEGTS A& D MILLWORK 42 ERIK STREET MERRIMACK,NH 03054 603-765-7020 admillwork@myfairpoint.net FIXED PRICE AGREEMENT DATE: SEPTEMBER 21, 2011 OWNER'S NAME: MR. & MRS. CHRIS GOLINI ADDRESS: 83 OLYMPIC LANE N. ANDOVER, MA 01845 PHONE: 978-208-0358 PROJECT NUMBER: 1608 I. PARTIES This contract(hereinafter referred to as "Agreement')is made and entered into on this twenty-first day of September 2011„ by and between Mr Chris and Kirsten Golini, (hereinafter referred to as "Owner');and A &D Millwork, (hereinafter referred to as "Contractor'). In consideration of the mutual promises contained herein, Contractor agrees to perform the following work: 11. GENERAL SCOPE OF WORK DESCRIPTION: NEW COMPOSITE DECK(10'x 20) DEMOLITION: DEMOLITION AND DISPOSAL OF EXISTING DECK FRAMING: BUILD NEW 10'X 20'DECK USING PRESSURE TREATED LUMBER FOR FRAME TREX COMPOSITE DECKING AND RAIL SYSTEM. COLOR OF DECKING AND RAIL TO BE DETERMINED BY CUSTOMER. DIRECTION OF STAIRS TO BE DETERMINED. CLEAN-UP DISPOSE OF ALL WASTE GENERATED BY JOB. CLEAN UP EACH NIGHT AND LEAVE JOB SITE IN A CLEAN"BROOM SWEPT' MANNER. Additional Scope of Work page(s)attached NO OWNER WILL CHECK SAMPLES AND/OR PICTURES BEFORE INSTALLATION OF MOULDINGS, FLOORING AND PAINT COLORS. NO CREDIT WILL BE GIVEN AFTER INSTALLATION BEGINS. LUMP SUM PRICE FOR ALL WORK ABOVE: $9,600-19,000.00 III. GENERAL CONDITIONS FOR THE AGREEMENT ABOVE A. EXCLUSIONS This Agreement does not include labor or materials for the following work at this time: 1. STANDARD EXCLUSIONS: Unless specifically included in the "General Scope of Work"section above, this Agreement does not include labor or materials for the following work:Plans, legal fees, engineering fees, or governmental permits and fees of any kind. Testing, removal and disposal of any materials containing asbestos (or any other hazardous material as defined by the EPA). Custom milling of any wood for use in project. Moving Owner's property around the site. Labor or materials required to repair or replace any Owner-supplied materials. Repair of concealed underground utilities not located on prints or physically staked out by Owner, which are damaged during construction. Surveying that may be required to establish accurate property boundaries for setback purposes(fences and old stakes may not be located on actual property lines). Final construction cleaning(Contractor will leave site in "broom swept"condition). Landscaping and irrigation, paving, or street work of any kind. Temporary sanitation, power, or fencing. Removal of soils under house in order to obtain 18 inches(or code-required height)of clear space between bottom of joists and soil. Removal of filled ground or rock or any other materials not removable by ordinary hand tools(unless heavy equipment is specified in Scope of Work section above), correction of existing out-of-plumb or out-of-level conditions in existing structure. Correction of concealed substandard framing. Rerouting/removal of vents,pipes, ducts, structural members, wiring or conduits, steel mesh, which may be discovered in the removal of walls or the cutting of openings in walls. Removal and replacement of existing rot or insect infestation. Failure of surrounding part of existing structure, despite Contractor's good faith efforts to minimize damage, such as plaster or drywall cracking and popped nails in adjacent rooms or blockage of pipes or plumbing fixtures caused by loosened rust within pipes;construction of a continuously level foundation around structure (if lot is sloped more than 6 inches from front to back or side to side, Contractor will step the foundation in accordance with the slope of the lot). Exact matching of existing finishes. Public or private utility connection fees. Repair of damage to roadways, driveways, or sidewalks that could occur when construction equipment and vehicles are being used in the normal course of construction. ADDITIONAL AND/OR JOB SPECIFIC EXCLUSIONS: N/A C. DATE OF WORK COMMENCEMENT AND SUBSTANTIAL COMPLETION Commence work: Upon completion of exterior work as part of kitchen remodel. Construction time through substantial completion:Approximately 2 weeks, not including delays and adjustments for delays caused by. inclement weather, additional time required for Change Order work, and other delays unavoidable or beyond the control of the Contractor. D. CHANGE ORDERS: CONCEALED CONDITIONS AND ADDITIONAL WORK 1. CONCEALED CONDITIONS: This Agreement is based solely on the observations Contractor was able to make with the structure in its current condition at the time this Agreement was bid. If additional concealed conditions are discovered once work has commenced which were not visible at the time this proposal was bid, Contractor will stop work and point out these unforeseen concealed conditions to Owner so that Owner and Contractor can execute a Change Order for any Additional Work. 2. DEVIATION FROM SCOPE OF WORK: Any alteration or deviation from the Scope of Work referred to in this Agreement involving extra costs of materials or labor(including any overage on ALLOWANCE work and any changes in the Scope of Work required by governmental plan checkers or field building inspectors) will be executed upon a written Change Order issued by Contractor and should be signed by Contractor and Owner prior to the commencement of Additional Work by the Contractor. Contractor to supervise, coordinate, and charge 25%profit and overhead on Owner's separate Subcontractors who are working on site at same time as Contractor. Contractor's profit and overhead, and any supervisory labor will not be credited back to Owner with any deductive Change Orders (work deleted from Agreement by Owner). E.PAYMENT SCHEDULE AND PAYMENT TERMS 1. PAYMENT SCHEDULE: PAYMENTS DUE UPON SUBSTANTIAL COMPLETION OF THE FOLLOWING JOB PHASES. DUE TO THE DYNAMIC NATURE OF RENOVATIING, PAYMENTS MAY NOT ALWAYS FALL IN THE ORDER THEY APPEAR BELOW. $5,000.00-due upon start balance due upon completion TOTAL:$ 9,500-11,000.00 2. PAYMENT OF CHANGE ORDERS: Payment for each Change Order is due when the work is authorized by owner and Contractor submits invoice. 3.ADDITIONAL PAYMENTS FOR ALLOWANCE WORK AND RELATED CREDITS: Payment for work designated in the Agreement as ALLOWANCE work has been initially factored into the Lump Sum Price and Payment Schedule set forth in this Agreement. If the actual cost of the ALLOWANCE work exceeds the line item ALLOWANCE amount in the Agreement, the difference between the cost and the line item ALLOWANCE amount stated in the Agreement will be written up by Contractor as a Change Order subject to Contractor's profit and overhead at the rate of 25%. If the cost of the ALLOWANCE work is less than the ALLOWANCE line item amount listed in the Agreement, a credit will be issued to Owner after all billings related to this particular line item ALLOWANCE work have been received by Contractor. This credit will be applied toward the final payment owing under the Agreement. Contractor profit and overhead and any supervisory labor will not be credited back to Owner for ALLOWANCE work. F.WARRANTY Contractor provides a limited warranty on all Contractor-and Subcontractor-supplied labor and materials used in this project for a period of one year following substantial completion of all work. No warranty is provided by Contractor on any materials furnished by the Owner for installation. No warranty is provided on any existing materials that are moved and/or reinstalled by the Contractor within the dwelling(including any warranty that existing/used materials will not be damaged during the removal and reinstallation process). One year after substantial completion of the project, the Owner's sole remedy(for materials and labor) on all materials that are covered by a manufacturer's warranty is strictly with the manufacturer, not with the Contractor. Repair of the following items is specifically excluded from Contractor's warranty: y Damages resulting from lack of Owner maintenance; dama es resulting from Owner g g abuse or ordinary wear and tear;deviations that arise such as the minor cracking of concrete, stucco and plaster;minor stress fractures in drywall due to the curing of lumber; warping and deflection of wood;shrinking/cracking of grouts and caulking, fading of paints and finishes exposed to sunlight. THE EXPRESS WARRANTIES CONTAINED HEREIN ARE IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY, HABITABILITY,OR FITNESS FOR A PARTICULAR USE OR PURPOSE.THIS LIMITED WARRANTY EXCLUDES CONSEQUENTIAL AND INCIDENTAL DAMAGES AND LIMITS THE DURATION OF IMPLIED WARRANTIES TO THE FULLEST EXTENT PERMISSIBLE UNDER STATE AND FEDERAL LAW. G.WORK STOPPAGE,TERMINATION OF CONTRACT FOR DEFAULT,AND INTEREST Contractor shall have the right to stop all work on the project and keep the job idle if payments are not made to Contractor in accordance with the Payment Schedule in this Agreement, or if Owner repeatedly fails or refuses to furnish Contractor with access to the job site and/or product selections or information necessary for the advancement of Contractor's work. Simultaneous with stopping work on the project, the Contractor must give Owner written notice of the nature of Owner's default and must also give the Owner a 14-day period in which to cure this default. if work is stopped due to any of the above reasons(or for any other material breach of contract by Owner) for a period of 14 days, and the Owner has failed to take significant steps to cure his default, then Contractor may, without prejudicing any other remedies Contractor may have, give written notice of termination of the Agreement to Owner and demand payment for all completed work and materials ordered through the date of work stoppage, and any other loss sustained by Contractor, including Contractor's Profit and Overhead at the rate of 25%on the balance of the incomplete work under the Agreement. Thereafter, Contractor is relieved from all other contractual duties, including all Punch List and warranty work. G. DISPUTE RESOLUTION AND ATTORNEY'S FEES Any controversy or claim arising out of or related to this Agreement involving an amount of less than$5,000(or the maximum limit of the court)must be heard in the Small Claims Division of the Municipal Court in the county where the Contractor's office is located. Any controversy or claim arising out of or related to this Agreement which is over the dollar limit of the Small Claims Court must be settled by binding arbitration administered by the American Arbitration Association in accordance with the Construction Industry Arbitration Rules. Judgment upon the award may be entered in any Court having jurisdiction thereof. The prevailing party in any legal proceeding related to this Agreement shall be entitled to payment of reasonable attorney's fees, costs, and expenses. THE CONTRACTOR AND THE HOMEOWNER HEREBY MUTUALLY AGREE IN ADVANCE THAT IN THE EVENT THE CONTRACTOR HAS A DISPUTE CONCERNING THIS CONTRACT,THE CONTRACTOR MAY SUBMIT SUCH DISPUTE TO PRIVATE ARBITRATION SERVICE WHICH HAS BEEN APPROVED BY THE OFFICE OF CONSUMER AFFAIRS AND BUSINESS REGULATIONS AND THE CONSUMER SHALL BE REQUIRED TO SUBMIT TO SUCH ARBITRATION PRIVIDED IN MGL.142A. OWNER'S SIGNATURE: .-,Z-, CONTRACTOR'S SIGNATURE: NOTICE: THE SIGNATURES OF THE PARTIES ABOVE APPLY ONLY TO AGREEMENT OF THE PARTIES ALTERNATE DISPUTE RESOLUTION INITIATED BY CONTRACTOR. THE OWNER MAY INITIATE ALTERNATE DISPUTE RESOLUTION EVEN WHERE THIS SECTION IS NOT SIGNED BY THE PARTIES. H. EXPIRATION OF THIS AGREEMENT This Agreement will expire 30 days after the date at the top of page one of this Agreement if not first accepted in writing by Owner. I. ENTIRE AGREEMENT This Agreement represents and contains the entire agreement between the parties. Prior discussions or verbal representations by the parties that are not contained in this Agreement are not a part of this Agreement. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES! J.ADDITIONAL LEGAL NOTICES REQUIRED BY STATE OR FEDERAL LAW See page(s) attached: Yes -L1--/No K.ADDITIONAL TERMS AND CONDITIONS See page(s) attached: Yes �No I have read and understood, and 1 agree to, all the terms and conditions contained in the Agreement above. D e CONTRA R'S SIGNATURE Dat WNER'S SIGNATURE 06091 411 aauoissnuwo £L0Z/ll/Z :uo1;ejldx3 ��� � qr 9tQ LO VVY 'NOlNlAdOH 1S a00M£9 L H3-inHOS 21 S3-16VHO g£ObL SO :asua:)I-1 asuaOl-1 JOSIAJadnS uol;on.i;suoO s'ParPurlS Pur. suolarin„aa r',ulplmg.lo paro8 ';a,;rs -)lltlnd.lo Iuamjrdad -sllasnyz)rssrW d eo'f�C` �°"emrVi�e`� cl;din A�r`tC°etta g --- Offic o onsumer airs mess e u a ion License or registration valid for individul use only HOME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Registration: 8161236 Type: i Office of Consumer Affairs and Business Regulation Expiration 1Ot1j,,�012 Individual 10 Park Plaza-Suite 5170 Boston,MA 02116 C ES R SCH,YI2�1R CHARLES SCHUkEI 153 WOOD ST V� ,p HOPKINTON,MA _y a_ m- Undersecretary of valid wit out sign ure _} i N�us� c�,�o��r� ao►�� x��4 �Gp6�r2 �oA�O srcu�c� 7 r}vu,sC wI rrp '/' x 6 KO i o,c u .,o S -ugs 05T G (fiD0L DST 12-6 i 'o ALL , '�f'xy`� PusT� /�-+ Lwo l 3&q M ' R TAcrre p To Id'' oi jiviom o( i n � '(Zesie c e ca06Wrr i�TNKs - /d" F�3 O1 m i c. I.rk-h e,