HomeMy WebLinkAboutBuilding Permit #512 - 97 SAW MILL ROAD 2/16/2010TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: / Y Date Received
Date Issued:
IMPORTANT: Applicant must complete all items on this page
LOCATION ' 17' S o_w vin k
A if Print
PROPERTY OWNER ivVL(V MOALc-
Print
MAP NO: ) Vi PARCEL: 16 ZONING DISTRICT: Historic District
Machine Shop
yes
[I-
TYPE
i
TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non- Residential
New Building
One famdi�
Addition
Two or more family
Industrial
Alteration
No. of units:
Commercial
epair, replacement
Assessory Bldg
Others:
Demolition
Other
Septic Well
Floodplain Wetlands
Watershed District
Water/Sewer
�y U ,t:KIF I IUN OF
A s 77!�J� . - —Irs. V-�- ,,i ae �- , VaA
OWNER: Name:
A(irirPgc• � � Jc�-w �k� `��-
)KK TO BE PERFORMED:
(wSj( , b./I 1S
Please Type or Print Clearly)
)ne: -791-7S,9-(&-57
CONTRACTOR Name: WC ►1-9- u Phone:
'Address: 57 i i'e-yKvy�, �
Supervisor's Construction License: °( Exp. Dater aol
Home Improvement License: 15 W -"5 �3 -Exp. Date:
ARCHITECT/ENGINEER
Address:
Phone:
Reg. No
FEE SCHEDULE: BULDING PERMIT: $12.00 PER $1000.00 OF THE TOTAL ESTIMATED COST BASED ON $125.00 PER S.F.
Total Project Cost: $ °l762,5,°-cl FEE: $ f 1�-
Check No.: % (� I--4- Receipt No.:
NOTE: Persons contracting with unregistered contractors do not have access to the guaranty fund
m
Signature of Agent/Owner Signature of contractor
jl�
A.
Plans Submitted Plans Waived Certified Plot Plan Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer
Tanning/Massage/Body Art
Swimming Pools
Well
Tobacco Sales
Food Packaging/Sales
Private (septic tank, etc.
Permanent Dumpster on Site
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
PLANNING & DEVELOPMENT
Cie U i1i�lT1i40w
CONSERVATION
COMMENTS
HEALTH
o�
COMMENTS
DATE REJECTED DATE APPROVED
Reviewed on Signature
Reviewed on Signature
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision:
Conservation Decision:
Comments
Comments
Water & Sewer Connection/Signature & Date Driveway Permit
DPW Town Engineer: Signature:
Located 384
FIRE DEPARTMENT - Temp Dumpster on site yes no
Located at 124 Main Street
Fire Department signature/date
COMMENTS
Street
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine
NOTES and DATA — (For department use)
❑ Notified for pickup - Date
Doc:.Building Permit Revised 2008
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculatbns (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc: Doc.Building Permit Revised 2008
Location_' J21
No. Date 42-/4 -.162
Check # /-)-
TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee $ '4
TOTAL $
2 2 L U O
Building Inspector
i
rA
rA
cz
q
q
N Z
o
�
mNmc
o ao
=
m�w
0
a
a
�
a
P
a
p
�¢'
.y
r-.
W LO
z
w
ryl
q
•N
W
p
�
o
�
a
a
�
or.
-o
.�
a
Uw
ro
►�
Ar
x
o4
a�'
w
w
"
W
,,,�
np
C2
v
cn
M
w
w
a�'
cd
w
w
w
,,
v
rA
6
z
U)cn
Q
o
Tic 0oc
1.� 0 e
N
0
v V
r; ena ev
Q® c
r
�o i
Ea
•� c
mw
M o.
N
E c
0 CD
co
�• m c
CL=
O ccm
l o
i► N � m.J
Q.01
c�
. m
Co O
N
m
`Y=L `O!
y.. r... O
C O Q
911
0
O
_
5 AMEMP
W,
Rl
CO
COW
CD
O
co
� O
v
Z CO
CL
O y
C
O Om
I O
o
�y COCo
m
O co
LL
CD O:Ift
O � ;
0 0 0
cc O d
a CMa
C
c= c
CcCc
V
CL O .G3
COD Iz
C G3
OCL
V y
O C
C
C
_cc
0.
CO)
0
N Z
Q
mNmc
o ao
=
m�w
o
�
.y
r-.
W LO
•N
W
.E
V V
cm
V
m
CD
O 0= c
Vi
CL
o-5 Orm
.20
OM=
. C:s m
911
0
O
_
5 AMEMP
W,
Rl
CO
COW
CD
O
co
� O
v
Z CO
CL
O y
C
O Om
I O
o
�y COCo
m
O co
LL
CD O:Ift
O � ;
0 0 0
cc O d
a CMa
C
c= c
CcCc
V
CL O .G3
COD Iz
C G3
OCL
V y
O C
C
C
_cc
0.
CO)
0
m
i
O
O
�'
v
V
ao
2
Uo
y
Z
Llog N
do
.b
j
Z'
0.
G C. T } WCM
x` to
VJ�
LLJ _...
_
W w QQC
m G
r
Lu
W
W
m }Lu
J_
Q
_ tf) CO
i
Licensee Details Page 1 of 1
The Official Website of the Executive Office of Public Safety and Security (EOPS)
Mass. Gov Home
Public Safety
Department of Public Safety Licensee Complaints
License Type
Construction Supervisor
License #
96688
Restriction
00
Name
Wayne Huber
City, State, Zip
Billerica, MA, 01821
Expiration Date
1/29/2012
Status
Current
No complaints found for this Licensee.
Back To Search
667-TL7-32c<-)
http://db.state.ma.us/dps/licdetails.asp?txtSearebLN=CSL96688 2/15/2010
m
Ln
651
4
Laundry room
5' x 5-6'
27.5 SQ FT
WASHER/
DRYER
a02
BATH ROOM
6' x 5'-6"
® 33 SQ FT
a
651
4
1 st FLOOR LAUNDRY/BATHROOM
SCALE: 1/4 = 1 ' —0"
MARY HONAN
97 SAWMILL ROAD
NORTH AN DOVER, MA
Customer: Regina Reis
781-789-6657
Address: 97 Saw Mill Road
North Andover, MA
Huber Home Improvements
(978)994-5000
Revised 2nd floor full bathroom estimate
Bathroom demo / Frame
Brief job description:
Remove old toilet, vanity, tub, and shower tile.
Demo tile floor and baseboard trim.
Demo sheet rock on the vanity wall.
Remove wall paper.
Plastering
Brief job description:
Install blue board and plaster all exposed bathroom walls
Tile floor
Brief job description:
Install 1/4" Durock underlayment to the subfloor.
Install 12" x 12" tile on the bathroom floor. (54 Sq ft)
Grout and seal the floor tile.
Tub and shower tile
Brief job description:
Install 1/2" Durock underlayment to the shower wall and ceiling.
Install 6" x 6" tile to the shower walls and ceiling. (92 Sq ft)
Install 4 corner shelves to the shower.
Grout and seal the floor tile
11/5/2009 Pg 1
CSL # 96688
HIC # 154358
Fully Insured
Demo/Frame job cost $ 600.00
Plaster job cost $ 600.00
Tile floor job cost $ 860.00
Shower tile job cost $ 1,544.00
Pg 2
Finish carpentry
Brief job description:
Install baseboard around the perimeter of the bathroom.
Install vanity cabinets.
Install new window casing trim.
Install all the bathroom hardware. ( Towel holder, towel ring, tissue holder)
Install two Framed mirrors.
Bathroom accessories supplied by other
Floor 12"x12" tile and grout. Qty 54 sq ft
Shower 6"x6" tile and grout. Qty 92 sq ft
Shower bull nosing. Qty 20 If
Shower comer shelves. Qty 4
Vanities
Bathroom hardware.
Finish carpentry job cost $ 680.00
Dumpsterand permits $ 655.00
Bathroom complete job total $ 4,939.00
Payment schedule
$500.00 First payment due upon signing of contract.
$1,800.00 Second payment due upon start of job.
$1,500.00 Third payment due after rough inspections.
$1,139.00 Final payment due on completion of job and walk through.
Huber Home Improvements will schedule and oversee sub -contractors to insure the job flows with minimal interruptions.
Weekly meetings will be held with homeowners to go over the progress and if there are any unforeseen problems that
may have occurred. All payments will be received according to the payment schedule to insure that the job is completed
on time. Any adds or changes to the contract after its signed may lea to additional charges. '
*CuomerWt Date HH1 Signature Date
Customer: Regina Reis
781-789-6657
Address: Mary Honan
97 Saw Mill Road
North Andover, MA
Huber Home Improvements
(978) 994-5000
1st floor Bathroom and Laundry room
Bathroom demo
Brief job description:
Remove old toilet, vanity.
Demo tile floor and baseboard trim.
Demo the sheet rock from the walls discussed in the meeting.
Demo Laundry room doors and door openings.
Framing
Brief job description:
Frame for a new 36" pocket door entering the new bathroom.
Frame for a new 32" pocket door entering the new laundry room.
Plastering
Brief job description:
Install blue board and plaster all exposed bathroom walls and ceilings.
Smooth finish on the ceiling.
Tile floor
Brief job description:
Install 1/4" Durock underlayment to the subfloor.
Install 12" x 12" tile on the bathroom floor. (48 Sq ft)
Remove and install new tile where existing heat was located.
Grout and seal the floor tile.
12/16/2009
CSL # 96688
HIC # 154358
Fully Insured
Demo job cost $ 400.00
Framing job cost $ 650.00
Plaster job cost $ 1,600.00
Tile floor job cost $ 482.00
Pg 1
+► ,
Finish carpentry
Brief job description:
Install baseboard around the perimeter of the bathroom and laundry room.
Install vanity cabinets.
Install new door casing trim.
Install two pocket door with hardware and trim.
Install all the bathroom hardware. ( Towel holder, towel ring, tissue holder)
Install one mirrors.
Install laundry room shelving.
Finish carpentry job cost $ 1,100.00
Bathroom accessories supplied by other
12"x12" tile and grout. Qty 48
Vanity
Mirror
15yd Dumpster and permit $ 595.00
Bathroom complete job total $ 4,827.00
Payment schedule
$1,000.00 First payment due upon start of job.
$2,400.00 Third payment due after rough inspections.
$1,427.00 Final payment due on completion of job and walk through.
Huber Home Improvements will schedule and oversee sub -contractors to insure the job flows with minimal interruptions.
Weekly meetings will be held with homeowners to go over the progress and if there are any unforeseen problems that
may have occurred. All payments will be received according to the payment schedul to insure that the job is completed
on time. Any adds or changes to the contract after its signed may ad additional harges.
Customer Signat re DateHH Signature Date
.
92
2ND FLOOR FULL BATHROOM
SCALE: 1/4 1 0
MARY HONAN
97 SAWMILL ROAD
NORTH ANDOVER, MA