HomeMy WebLinkAboutBuilding Permit #463 - Exception 12/8/2011TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received
Date Issued:
IMPORTANT: Applicant must complete all items on this page
LOCATION 27 C'_ 6reAclon STP -e -T
PROPRRW OWNER /YV,[(-e- �`
Print
MAP NO: _PARCEL: ZONING DISTRICT:
Historic District yes no
Machine Shop Villages �0 �(/
TYPE OF IMPROVEMENT
PROPOSED USE
Residential
Non- Residential
❑ New Building
❑ One family
❑ Addition
ewo or more family
❑ Industrial
❑ Alteration
No. of units:
❑ Commercial
epair, replacement
❑ Assessory Bldg
❑ Others:
❑ D_emolition
❑ Other
{(]S,eptic Well
(jFloodplairi ❑ Wetlands
I] WatershedDistr`ct
-
D Water/Sewer
ICRIPTl N OF WORK TO BE PERFOE-MED:
s (JQ- n -kly; A l a e cx
OWNER: Name:
72 688
Address: 2.1
CONTRACTOR Name: %��.` �" U" ` Phone:
Address:e-I T & P � �A
Supervisor's Construction License: C, S Cn3 /6 9 Exp. Date: / 2"
Home Improvement License: A * Exp. Date:
ARCHITECT/ENGINEER Phone:
Address: Reg. No.
FEE SCHEDULE. BULDING PERMIT. $12.00 PER $9000.00 OF THE TOTAL ESTIMATED COST BASED ON $925.00 PER S.F.
Total Project Cost: $ J�SUf� FEE: $ 67
Check No.: Receipt No.:
NOTE: Persons contracting wjt# unregistered contractors do not have access to t4q guarant(Lfynd
ireof.AaeritLOwiie'�� '
Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
TYPE OF SEWERAGE DISPOSAL
Public Sewer ❑ Tanning/MassageBody Art ❑ Swimming Pools ❑
Well ❑ Tobacco Sales ❑
Food Packaging/Sales ❑
Private (septic tank, etc. ❑ permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENT
CONSERVATION
COMMENTS
0
HEALTH
COMMENTS
Reviewed on Signature
Reviewed on Signature
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Commen
Conservation Decision: Comments
Water & Sewer Connection/Signature & Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT - Temp Dumpster on site yes no
Located at 124 Main Street
Fire Department signature/date
COMMENTS
Dimension
Number of Stories:_ Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A —F and G min.$100-$1000 fine
NOTES and DATA -- For department use
® Notified for pickup - Date
Doc:.Building Permit Revised 2008
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
- Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior, to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
Chat the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
Must be submitted with the building application
Doc: Doc.Building permit Revised 2008mi