Loading...
HomeMy WebLinkAboutBuilding Permit #484-11 - Exception 12/15/2010TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION Permit NO: ' Date Received Date Issued: f IMPORTANT• Applicant must complete all items on this page Print PROPERTY OWNER //ic;0S-.-A.) ��c C _ Prmt MAP NO: 3 �U PARCEL: Q 0,,1-3 ZONING DISTRICT: Historic District yes no Machine Shop Village yes no TYPE OF IMPROVEMENT ❑ New Building ❑ Addition ❑ Alteration Repair, replacement ❑ Demolition PROPOSED USE Residential ❑ One family ❑ Two or more family No. of units: ❑ Assessory Bldg eOther DESCRIPTION OF WORK TO BE PERFORMED: Non- Residential ❑ Industrial ®Commercial ❑ Others: Identification Please Type or Print Clearly) OWNER: Name: tt % Cs}7S�.c1 Phone• - 7Y !972 04�'S' Address: Ole) CONTRACTOR Name: Address: A-' Supervisor's Construction License: 73W 7Exp. Date: 41117/74 Home Improvement License: Exp. Date: ARCHITECT/ENGINEER Phone: Address: Reg. No FEE SCHEDULE. BULDING PERMIT: $12.00 PER $9000.00 OF THE TOTAL ESTIMATED COST BASED ON $925.00 PER S.F. Total Project Cost:$ �ee.)O,a FEE: $ Check No.:Receipt No.: NOTE: Pers o s contracting with unregistered cont'r4clors do not h v ccess to the guaranty fund contractor Signature:of.__;F Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit - Addition Or Decks ❑ Building Permit Application ❑ Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (if Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products dOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit n all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals hat the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording last be submitted with the building application Doc: Doc.Building permit Revised 2008mi Plans Submitted ❑ - Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ E WERAGE DISPOSAL ❑ Tanning/MassageBody Art ❑ SwimmingPools ❑ Tobacco Sales ❑Food Packaging/Salesc tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMMENTS CONSERVATION COMMENTS HEALTH COMMENTS Reviewed on Siqnature Reviewed on Signature Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature & Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPARTMENT - Temp Dumpster on site yes no Located at 124 Main Street Fire Department signature/date COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.:, ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No, MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA — For department use El Notified for pickup - Date Doc:.Building Permit Revised 2008 LocationV-6 12� X—Op No. Date J '%J ,1,D TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ 'j TOTAL $ Check #✓ 2 3 7 b 9 Building Inspector m m m X m CA m E O I C_ O 0 Z C m 0 0 co O C c <o W CD c 0 N C 0 G N 5 N CD c?gymN dZ.O N CO2 a® 0 m n N Cli � d C m Ko TI � n ^. c m iw CO ca o CO) �mm' m a 0 t m O N n y ' :ft CIL m m N CD CD: ,3 m � N �N N ca 9 ; d fmCo OD 00 CD Q � 3 :�► COD .O.f, � O � CD m O N sm � �M: -o ca0 c o O cn El v a1 �i y 'v C � 'Yrl �' cn �y O M � CD c� Z y O 0r 'v 0 P-0 CL ClC n y y p O. tzO M oil+J O o p CD CDCL O Q CD CD O CD C CCDCD y� CL CO2 O (Q CD I CO2 v O 'v CD O CD C CD E O I C_ O 0 Z C m 0 0 co O C c <o W CD c 0 N C 0 G N 5 N CD c?gymN dZ.O N CO2 a® 0 m n N Cli � d C m Ko TI � n ^. c m iw CO ca o CO) �mm' m a 0 t m O N n y ' :ft CIL m m N CD CD: ,3 m � N �N N ca 9 ; d fmCo OD 00 CD Q � 3 :�► COD .O.f, � O � CD m O N sm � �M: -o ca0 c o O cn El C/) (�D a1 �i M� qty w '�7 G 'Yrl �' cn �y M � O � to w ?� - O O n y t�D p O. tzO M oil+J z 0 NO 4 y 0 9 0 c NEW ENGLAND ENGINEERING SERVICES INC Albert P. Manzi, Jr., Chairman North Andover Conservation Commission Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 120 Holt Road, North Andover Dear Mr. Chairman: December 1, 1999 DEC 3 1999 Please accept this letter and the enclosed restoration plan for the above referenced project as a response to an enforcement order issued by the Conservation Commission Agent on November 8, 1999. This office has been retained by J.T.and C. Construction to supervise the restoration of this filled wetland. A representative of this office will be at your meeting tonight to discuss this matter. Sincerely, lam- �r Benj C. Osgood, J ., EIT President Enclosures 60 BEECHWOOD DRIVE -NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 -FAX (978) 685-1099 WETLAND RESTORATION PLAN 120 HOLT ROAD NORTH ANDOVER, MA SITE DESCRIPTION The property located at 120 Holt Road consists of an existing concrete block structure and gravel parking areas which are currently used as a contractors yard and a storage area for towed vehicles. The site was created many years ago by filling both upland and wetland areas. The site is located on the south side of Holt Road and is bordered by the Lawrence municipal airport on the south and east sides. The site borders a vegetated wetland associated with an intermittent stream that flows on the west side of the property. Bordering vegetated wetlands abut the filling on the west and most of the south sides of the parking areas. In the area of recent filling the wetlands vegetation consists primarily of a Red Maple tree layer with Cinnamon Fern, Sensitive Fern and wetlands grasses as ground cover. The wetlands in the area of the filling lacks a shrub and sapling layer. Currently the fill at the rear of the property in the area of the violation is approximately 8 feet higher than the wetlands at the base of the fill. VIOLATION DESCRIPTION According to the property owner the filling occurred in conjunction with cleaning and squaring off the parking area at the rear of the building. The existing slope was cleaned of debris that had been stored along the top off and on the slope. Small saplings and underbrush were also removed. The parking area was then extended approximately ten feet into the wetlands. None of the wetland soil was removed before the filling occurred. PROPOSED RESTORATION PLAN PHASE 1: Phase 1 would consist of removing the new fill in an area of approximately 300 square feet in size. The fill would be removed with an excavator in a manner that would leave the old wetland soil in place. New loam would be added to areas where the depth of the wetlands soil was insufficient for supporting wetland vegetation. This phase would be supervised at all times by BAG land consultants. BAG land consultants is a full service environmental firm from Concord New Hampshire. The staff of BAG land consultants consists of botanists and biologists whose specialty is working as environmental monitors and overseers monitoring creation of wetlands- ,- s. Towns that BAG Land Consulting has done work in include Wellesley, Bedford, and Lexington. WIM3 04 cot\5�i (6n) Phase 2 would consist of coustrAction_a boulder retaining wall to stabilize the slope around the restored area. Also a guard rail would be installed along the top of the slope to prevent further intrusion into the area in the future. PHASE 3: Phase three would consist of restoring the vegetation to the restored area. The addition of the following plant material will be planted under the supervision of BAG Land Consulting. 3 Red Maple Saplings 10 Cinnamon Ferns wetland seed mix Plant material would be obtained from available nursery stock or from upland areas on the site. Plant material selection would be done by BAG Land Consultants. The wetland seed mix specification would be done by BAG Land Consultants. TIMETABLE: Phase 1 and 2 would be done within 2 weeks. The planting would be done in the springy: K/elf) J I' ;'/ � �'�O� I � \ f � � � � 160 \\ �st.5 _ � a J"' I � S J � i •1 Ward k— / Chadw ck aCHANGE 111 _v��'rd. I �� Por3 �� \ r 1;/ •�� tA.4 i %�� IJJ I ) .\' �AVE�RIILL � i ��/ �- j :-� 77,, , � ( \ '/, _ �\ Golf \ - nurse L ' -51 11.0 ( O 50 Water k �\ \ : ✓\ 3 ~ . 30 HOLT' SHORE O BM, \ 46.5 • �. / . �1 - QPM , � I LAWRENCE/ UNICIPAL AIBP \_J ��\ \\IIB, — "1 �._ / �� :\ 55 _ �' //,� `� f BM \ sta i 510 5-4 11125 33 r •i' - - .- _ � ���. �/— _ � \ ` \',+ 11 \\\ � _ i i �✓i � .� l � � \ _ • p�� _ • SUTFQ � � o r; //-�_-_ � / ' � S \ \ \.� I \ 9s � iy �� �` \ =� 1 ��� ouple�ecky /J/ �, I r L F°ur�Acrts� BM1 06f VAS �� ndr w p 2.0 45 �Ygr ul. ♦ �_ 55.0 43.6 \' St ch .� .� �• `CAY7 34.5 olf ( i idOHS S�lh in �� %' urse �� 1 \I iv0_— P m ing 374 I to 'ch S ;i ch • I Sand , 48 6 1 Holy ep Ichr 1 P�� so Massachusetts Department of Environmental Protection rr' 1)L L76 R a ^� Bureau of Resource Protection - Wetlands WPA.:Form 9A - Enforcement Order and North Andover Wetland Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Protection Bylaw. Order The Issuing Authority hereby orders the following (check all The property owner shall take the following action to that apply): prevent further violations of the Act ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. Wetland alterations resulting from said activity shall be orrected and the site returned to its original condition. ❑ Complete the attached Nodce of Intent. The completed application and plans for all proposed work as required by the Act and regulations shall be filed with the Issuing Authority on or before (date). No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work 0 Appeals/Signatures An Enforcement Order issued.by a conservation commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: '��►�"�� 66% - as 5 0 RM MAW Har,VaysAvailade Issued byA )a r44, XN 0y 4a conservation Commission In a situation requiring immediate action, an Enforcement Order may be signed by a single member or agent of the commission and ratified by a majority of the members at the next scheduled meeting of the commission. Ha-lb"L.S k^1 5CL,Nd"14 � Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provisions of this section shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years or both Each day or portion thereof of continuing violation shall constitute a separate offense." Sigmm ofdelimype5on ormfied mail w1bT Massachctsetts Department of Environmental Protection DEP File Number Bureau of Resource Protection - Wetlands l ao Ht, -C WPA Form 9A - Enforcement Order for DEP use only Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 and North Andover wetland Protection Bylaw. Violation Information This ��Ejnforcement Order is issued by: NU(��, RAljd.jel— Common Commizion psmingAurhariry) To: STG (� rJ51''U LT i 0 C- o Z-oe I, Name ofVialamr Location of Violation: (2D H0 i +-- RC.,J A)or�A- A&;Jove� ',7 to 03� Com? 3 A Sw=MwAht/ aarc�rca Date of Issuance: 0o Dare Extent nand type of activity: �t��er�.tc�� Iii ekw: >re-�cij f-ce. cue S� z A CJ f f Findings The Issuing Authodry has determined that the activity tp Other (specify): described above is in violation of the Wetlands Protection Act A fr�;� O� (M.G.L. c. 131. §40) and its regulations (310 CMR 10.00), /1't because: frd the activity has beerdis being conducted withoutavalid C! er of Conditions. ❑ the activity has beerdis being conducted in violation of �� �NTarLe��t ij the Order of Conditions issued to: Name Dared File NUMW CondrttonmmWS) n.. ,Winn �i(a.11cie�i a5 q A&,Gkan) 1S V\ teSrwr•ce a«��. _ Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9 - Enforcement Order and North Andover Wetland Massachusetts Wetlands. Protection Act M.G.L. c. 131,.§40 Protection Bylaw. Order The Issuing Authority hereby orders the following (check all Iii The property owner shall take the following action to that apply): prevent further violations of'the 1 Act: �`-' M e r�n� to IJ ❑ The property owner, his agents, permittees, and all �� �" •� __:. • others shall immediately cease and desist from the further ;� ll R1 (r �0 �k - activity affecting the Buffer. Zone and/or wetland resource epo „Q r e , ck( oA 0 q u rpt, e U areas on this property. _ weR-h\ck 10kolou\^-3 ' kc) Wetland alterations resulting from said activity shall be �cA�e r N ► V0,M6II r corrected and the site returned to its original condition.. . ❑ .Complete the attached Notice of Intent. The completed _ application and plans for all proposed work as required by - - 3heActand re ulations,shall be filed .with the. Issuing—­­77-- ....,_... Authority on or before (date). ti No further work shall be performed until a public hearing. has been held and an Order of Conditions has been issued Failure to comply with this Order may constitute grounds = to.regulate said work. for additional legal action. Massachusetts General Laws. Chapter 131, Section 40 provides: "Whoever violates any provisions of this section shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment -"- . for riot more than two years or both. Each day or portion thereof of continuing violation shall constitute a separate - offense." . - = -Appeals/Signatures ' An Enforcement Order issued by a conservation commisswn cannot be appealed.to the Department of Environmental Signa tures• • Protection, but may be filed in Superior Court. _ Questions regarding this Enforcement Order should be - directed to -.,—: 5 i --. Phone Numb ..Nouts Days Available by a( �" N OVer Issued Conservation Commission In a situation requiring immediate action, an Enforcement 3� b Order may be signed.by a single member or agent of the Signature oldeiveypewnorceni6ed mail number commission and ratified by=a;majority of the members at the next scheduled meeting of:the:commission. n.-.,) ..fn Massachusetts Department of Environmental Protection DEP File Number /�/ /c, Bureau of Resource Protection - Wetlands . WPA Form 9A - Enfercement.Order for DEP use only Massachusetts Wetlands Protection Act M.G.L. c.. 131,X40 and North Andover Wetland Protection Bylaw.__ Violation Information This Enforcement Order is issued by: Extent and type of activity: ,�� d fo o� o 0�ieAJ Cora wion Commission (Issuing Authority) w:e4,L �2souCce . GZre� To: ST L CoNsa d-ko 4 _ . _rr nn coo Toe- Ct rIS��,�d, \ Cc)QS,S oT t N I v` Name of Violator WrcJ6 V Cr, t-oJej VJQ�I Location of Violation: C� 4 Streetdress CitylTown _ 2w�d3W OoZ3 - - Assessors Maµ/Plat f . Parce/Kot f _ Date of issban6e- 4S. we Findings The Issuing Authority has determined that the activity W Other (specify): described above is in violation of the Wetlands Protection Act //��,j - .-....:;_ le -... ti (M.G.L. c. 131, §40) and its regulations (310 CMR 10.00), !'I because: re50"J,rcZ Gr e the activity has beenlis being conducted without a'valid . - - -- - -4der of Conditions. r 0 the activity has been/is being conducted in violation of &I r V Q Qa��t V d 4 6, V W , the Order of Conditions issued to: et NEW ENGLAND ENGINEERING INC Albert P. Manzi, Jr., Chairman North Andover Conservation Commission Town Hall Annex 27 Charles Street North Andover, MA 01845 Re: 120 Holt Road, North Andover Dear Mr. Chairman: SERVICES December 1, 1999 DEC 1 1999 ((��((�� �jr-t'��--,_i 1�" ".•.nor F-C� pr..n� Please accept this letter and the enclosed restoration plan for the above referenced project as a response to an enforcement order issued by the Conservation Commission Agent on November 8, 1999. This office has been retained by J.T.and C. Construction to supervise the restoration of this filled wetland. A representative of this office will be at your meeting tonight to discuss this matter. Sincerely, c Benja C. Osgood, J ., EIT President Enclosures 60 BEECHWOOD DRIVE - NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 - FAX (978) 685-1099 WETLAND RESTORATION PLAN -120 HOLT ROAD NORTH ANDOVER, MA SITE DESCRIPTION The property located at 120 Holt Road consists of an existing concrete block structure and gravel parking areas which are currently used as a contractors yard and a storage area for towed vehicles. The site was created many years ago by filling both upland and wetland areas. The site is located on the south side of Holt Road and is bordered by the Lawrence municipal airport on the south and east sides. The site borders a vegetated wetland associated with an intermittent stream that flows on the west side of the property. Bordering vegetated wetlands abut the filling on the west and most of the south sides of the parking areas. In the area of recent filling the wetlands vegetation consists primarily of a Red Maple tree layer with Cinnamon Fern, Sensitive Fern and wetlands grasses as ground cover. The wetlands in the area of the filling lacks a shrub and sapling layer. Currently the fill at the rear of the property in the area of the violation is approximately 8 feet higher than the wetlands at the base of the fill. VIOLATION DESCRIPTION According to the property owner the filling occurred in conjunction with cleaning and squaring off the parking area at the rear of the building. The existing slope was cleaned of debris that had been stored along the top off and on the slope. Small saplings and underbrush were also removed. The parking area was then extended approximately ten feet into the wetlands. None of the wetland soil was removed before the filling occurred. PROPOSED RESTORATION PLAN PHASE 1: Phase 1 would consist of removing the new fill in an area of approximately 300 square feet in size. The fill would be removed with an excavator in a manner that would leave the old wetland soil in place. New loam would be added to areas where the depth of the wetlands soil was insufficient for supporting wetland vegetation. This phase would be supervised at all times by BAG land consultants. BAG land consultants is a full service environmental firm from Concord New Hampshire. The staff of BAG land consultants consists of botanists and biologists whose specialty is working as environmental monitors and overseers monitoring creation of wetlands of wetlands. Towns that BAG Land Consulting has done work in include Wellesley, Bedford, and Lexington. PHASE 2: Phase 2 would consist of construction a boulder retaining wall to stabilize the slope around the restored area. Also a guard rail would be installed along the top of the slope to prevent further intrusion into the area in the future. PHASE 3: Phase three would consist of restoring the vegetation to the restored area. The addition of the following plant material will be planted under the supervision of BAG Land Consulting. 3 Red Maple Saplings 10 Cinnamon Ferns wetland seed mix Plant material would be obtained from available nursery stock or from upland areas on the site. Plant material selection would be done by BAG Land Consultants. The wetland seed mix specification would be done by BAG Land Consultants. TIMETABLE: Phase 1 and 2 would be done within 2 weeks. The planting would be done in the springy. /I, S-h• .1 h ' - \ �\ 1BM '%' t 1� b o +��'r(\ c l W/LLpiy yW_` u✓ I r' � o, i ��. ` ;fl \ \ ;\ 1�5 ` l I bn •its i � i � I � 1, Tiee U < Ward Ht ) \ 1 ;:♦ ( � I ,�� fir _�;'�� .�`' _..VA,o-- .� C�i�_ --- - \\ ravel f ! j D (:1ladtu ck CHANGE / Mat;$ \j l t\i id 1'on( M_Av_ERliltl Golf ' nurse ! ( O p - 3 Hi '•i i-- `% %�, Water k L - . ROAD-- z i HOLT l 5 \... II \ _. I SHORE 8fer z BM ) ,� � �O� ! \• • - 5a,2 ��� 46.5 Pi / _ P LAWRENCE � / \ �, �\ •.�� • � a - UNICIPAL AIR Tj j o f Seo Dlspo - -----� -1B- o / 5.5 r Hr ' ..Bea `54.0 �\UI~�I .O�i .\ /�� \133 ". - - \I \!._ _\1 � `r \ •1 i..- ST O�/ Irl \• i - ^�ie5 � ,. \ \ � \, \ \+ �. ,sun Z c o (� ti Rus. /P •` j Four \\\ ndr w .-ruplfe�eck:. , % \ BMt o.f' ` Acr s \ �• , j �y�� 45 aygP.�. �..".r T I 55.0. i 43.6St �.� •. �. NON aela Sc ch Z4 sm •N E - - - �1' 34.\ \ _ O ., \\ olf l )• T addle Hr urse ( Q' Sth ��. It ��ISpAT `� i "-�, •• � I 1-l'. P ming 37 4 p I ,� �l • ? /•� to , �Out / Sch \ 6 `\./' \ - -----•-- ---- F\ �i FEAR J - -- G 48 6 , 1 Holy ep Ichr f Town of North Andover N�RTM OFFICE OF h ` COMMUNITY DEVELOPMENT AND SERVICES 27 Charles Street North Andover, Massachusetts 01845 WILLIAM J. SCOTT Director (978) 688-9531 March 9, 2000 JTC Construction c/o Joe Christaldi 120 Holt Road North Andover, MA 01845 VIA Certified Mail # Z 370 627 463 RE: Wetland Restoration at 120 Holt Road Dear Benjamin: Fax(978)688-9542 This Department is in receipt of the Wetland Restoration Plan dated December 1, 1999 and hereby approves the document with the following instructions: • Install trenched silt fence, remove existing haybales to prevent a berm from forming and schedule a pre -construction inspection with this Department prior to commencing any work. • Complete the restoration work approved in the Restoration Report dated December 1, 1999 by no later than June 1, 2000. • A Replication/Restoration As -Built plan prepared by a Registered Professional Land Surveyor must be submitted to this Department within 30 days upon completion of the approved referenced work. The plan shall including one -foot contours, spot elevations, surface area and plant locations. • Erosion control shall not be removed and shall remain fully intact until the area is fully stabilized as determined by the North Andover Conservation Commission (NACC) or an Agent thereof during a post construction inspection. Attached you will find an Enforcement Order as a mechanism to perform the above referenced work. Should you have any comments, questions, or concerns feel free to contact me at (978) 688-9530. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Thank you for your anticipated cooperation. Sim Brian J. LaGrasse Conservation Associate cc: NACC Members Richelle Martin, Conservation Administrator DEP-NERD File T nr. �Aj— Massachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order for DEP use only Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 and North Andover Wetland Protection Bylaw. Violation Information This Enforcement Order is issued by: Uor��N.NjjdJer consw ation Commission (Issuing Authority) To: "Z5 -TC- CO NS+!U c.7 k o O C-iJ 'SO2 Ginrt�t�luli Name of Viol" Location of Violation: 120 H00 KO - SVWAddms A) 0-, Ar"Jovei' City/Town 2-to103L( mswas Mappat t ParcdAot f Date of Issuance: 3 De I�119() Findings The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, §40) and its regulations (310 CMR 10.00), because: fthe activity has beenfis being conducted without a'valid order of Conditions. ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name Dated File Number Conditionmumber(s) Extent and type of activity: +er4(� +� �, C, +erAj tp Other (specify): W Q -n( --A ces yjrce o\,- if en, 1 Iris �ti�arce:v,,e..'� r?Jt'a� i� Ann o•s c\ McGkan)1s"n f e-Soyrce. C -,r , n...... ,i ..c n Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands ig WPA Form 9A - Enforcement Order and North Andover Wetland Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Protection Bylaw. Order The Issuing Authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. Wetland alterations resulting from said activity shall be orrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and regulations shall be filed with the Issuing. Authority on or before (date). No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. 0 Appeals/Signatures An Enforcement Order issued by a conservation commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: T a 1 �lt�N J • ���-CaSS2 � /�1c�NT " > cis3o Phone Number %, 30 - 4-, HWYDapAwilable , Issuedby. A)dr+k ANJOU./ Conservation Commission In a situation requiring immediate action, an Enforcement Order may be signed by a single member or agent of the commission and ratified by a majority of the members at the next scheduled meeting of the commission. 'K The property owner shall take the following action to prevent further violations of the Act: r frQ—Can!'tr-ocfko� t�s�cc can onnA� � f t'S�ra�i tum WCAA, GS CW rdj1A cn 1. Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provisions of this section shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not more than two years or both Each day or portion thereof of continuing violation shall constitute a separate offense." Signatur Ll J Signature of ddirey person orcnfied mail number n...... 1 ..t 1