HomeMy WebLinkAboutBuilding Permit #484-11 - Exception 12/15/2010TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: ' Date Received
Date Issued: f
IMPORTANT• Applicant must complete all items on this page
Print
PROPERTY OWNER //ic;0S-.-A.) ��c C _
Prmt
MAP NO: 3 �U PARCEL: Q 0,,1-3 ZONING DISTRICT: Historic District yes no
Machine Shop Village yes no
TYPE OF IMPROVEMENT
❑ New Building
❑ Addition
❑ Alteration
Repair, replacement
❑ Demolition
PROPOSED USE
Residential
❑ One family
❑ Two or more family
No. of units:
❑ Assessory Bldg
eOther
DESCRIPTION OF WORK TO BE PERFORMED:
Non- Residential
❑ Industrial
®Commercial
❑ Others:
Identification Please Type or Print Clearly)
OWNER: Name: tt % Cs}7S�.c1 Phone• - 7Y !972 04�'S'
Address: Ole)
CONTRACTOR Name:
Address: A-'
Supervisor's Construction License: 73W 7Exp. Date: 41117/74
Home Improvement License: Exp. Date:
ARCHITECT/ENGINEER Phone:
Address: Reg. No
FEE SCHEDULE. BULDING PERMIT: $12.00 PER $9000.00 OF THE TOTAL ESTIMATED COST BASED ON $925.00 PER S.F.
Total Project Cost:$ �ee.)O,a FEE: $
Check No.:Receipt No.:
NOTE: Pers o s contracting with unregistered cont'r4clors do not h v ccess to the guaranty fund
contractor
Signature:of.__;F
Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
- Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H.I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (if Applicable)
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
dOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
n all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
hat the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
last be submitted with the building application
Doc: Doc.Building permit Revised 2008mi
Plans Submitted ❑ - Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑
E
WERAGE DISPOSAL
❑ Tanning/MassageBody Art ❑ SwimmingPools
❑ Tobacco Sales ❑Food Packaging/Salesc tank, etc. ❑ Permanent Dumpster on Site ❑
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT ❑ ❑
COMMENTS
CONSERVATION
COMMENTS
HEALTH
COMMENTS
Reviewed on Siqnature
Reviewed on Signature
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water & Sewer Connection/Signature & Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
FIRE DEPARTMENT - Temp Dumpster on site yes no
Located at 124 Main Street
Fire Department signature/date
COMMENTS
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:,
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No,
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA — For department use
El Notified for pickup - Date
Doc:.Building Permit Revised 2008
LocationV-6 12� X—Op
No. Date
J '%J ,1,D
TOWN OF NORTH ANDOVER
Certificate of Occupancy $
Building/Frame Permit Fee $
Foundation Permit Fee $
Other Permit Fee $
'j TOTAL $
Check #✓
2 3 7 b 9 Building Inspector
m
m
m
X
m
CA
m
E
O
I
C_
O
0
Z
C
m
0
0
co
O
C
c
<o
W
CD
c
0
N
C
0
G
N
5
N
CD
c?gymN
dZ.O N
CO2
a® 0 m n
N Cli � d C m
Ko TI
� n
^. c m
iw
CO ca o CO)
�mm' m a
0
t m
O N
n y ' :ft
CIL
m m N
CD CD:
,3
m
� N
�N
N
ca
9 ;
d fmCo
OD
00
CD Q
� 3 :�►
COD
.O.f, �
O
� CD m
O N
sm �
�M:
-o
ca0
c o
O
cn
El
v
a1
�i
y
'v
C
�
'Yrl
�'
cn
�y
O
M
�
CD
c� Z
y
O
0r
'v
0
P-0
CL
ClC
n
y
y
p
O.
tzO
M
oil+J
O
o p
CD
CDCL
O
Q
CD
CD O
CD
C CCDCD
y�
CL
CO2
O
(Q CD
I
CO2
v
O
'v
CD
O
CD
C
CD
E
O
I
C_
O
0
Z
C
m
0
0
co
O
C
c
<o
W
CD
c
0
N
C
0
G
N
5
N
CD
c?gymN
dZ.O N
CO2
a® 0 m n
N Cli � d C m
Ko TI
� n
^. c m
iw
CO ca o CO)
�mm' m a
0
t m
O N
n y ' :ft
CIL
m m N
CD CD:
,3
m
� N
�N
N
ca
9 ;
d fmCo
OD
00
CD Q
� 3 :�►
COD
.O.f, �
O
� CD m
O N
sm �
�M:
-o
ca0
c o
O
cn
El
C/)
(�D
a1
�i
M�
qty
w
'�7
G
'Yrl
�'
cn
�y
M
�
O
�
to
w
?�
-
O
O
n
y
t�D
p
O.
tzO
M
oil+J
z
0
NO
4
y
0
9
0
c
NEW ENGLAND ENGINEERING SERVICES
INC
Albert P. Manzi, Jr., Chairman
North Andover Conservation Commission
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: 120 Holt Road, North Andover
Dear Mr. Chairman:
December 1, 1999
DEC 3 1999
Please accept this letter and the enclosed restoration plan for the above referenced project
as a response to an enforcement order issued by the Conservation Commission Agent on
November 8, 1999. This office has been retained by J.T.and C. Construction to supervise
the restoration of this filled wetland.
A representative of this office will be at your meeting tonight to discuss this matter.
Sincerely,
lam- �r
Benj C. Osgood, J ., EIT
President
Enclosures
60 BEECHWOOD DRIVE -NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 -FAX (978) 685-1099
WETLAND RESTORATION PLAN
120 HOLT ROAD
NORTH ANDOVER, MA
SITE DESCRIPTION
The property located at 120 Holt Road consists of an existing concrete block structure
and gravel parking areas which are currently used as a contractors yard and a storage area
for towed vehicles. The site was created many years ago by filling both upland and
wetland areas. The site is located on the south side of Holt Road and is bordered by the
Lawrence municipal airport on the south and east sides. The site borders a vegetated
wetland associated with an intermittent stream that flows on the west side of the property.
Bordering vegetated wetlands abut the filling on the west and most of the south sides of
the parking areas.
In the area of recent filling the wetlands vegetation consists primarily of a Red Maple tree
layer with Cinnamon Fern, Sensitive Fern and wetlands grasses as ground cover. The
wetlands in the area of the filling lacks a shrub and sapling layer.
Currently the fill at the rear of the property in the area of the violation is approximately 8
feet higher than the wetlands at the base of the fill.
VIOLATION DESCRIPTION
According to the property owner the filling occurred in conjunction with cleaning and
squaring off the parking area at the rear of the building. The existing slope was cleaned of
debris that had been stored along the top off and on the slope. Small saplings and
underbrush were also removed. The parking area was then extended approximately ten
feet into the wetlands. None of the wetland soil was removed before the filling occurred.
PROPOSED RESTORATION PLAN
PHASE 1:
Phase 1 would consist of removing the new fill in an area of approximately 300 square
feet in size. The fill would be removed with an excavator in a manner that would leave
the old wetland soil in place. New loam would be added to areas where the depth of the
wetlands soil was insufficient for supporting wetland vegetation. This phase would be
supervised at all times by BAG land consultants. BAG land consultants is a full service
environmental firm from Concord New Hampshire. The staff of BAG land consultants
consists of botanists and biologists whose specialty is working as environmental monitors
and overseers monitoring creation of wetlands- ,- s. Towns that BAG Land
Consulting has done work in include Wellesley, Bedford, and Lexington.
WIM3 04
cot\5�i (6n)
Phase 2 would consist of coustrAction_a boulder retaining wall to stabilize the slope
around the restored area. Also a guard rail would be installed along the top of the slope to
prevent further intrusion into the area in the future.
PHASE 3:
Phase three would consist of restoring the vegetation to the restored area. The addition of
the following plant material will be planted under the supervision of BAG Land
Consulting.
3 Red Maple Saplings
10 Cinnamon Ferns
wetland seed mix
Plant material would be obtained from available nursery stock or from upland areas on
the site. Plant material selection would be done by BAG Land Consultants. The wetland
seed mix specification would be done by BAG Land Consultants.
TIMETABLE:
Phase 1 and 2 would be done within 2 weeks. The planting would be done in the springy:
K/elf)
J I' ;'/ � �'�O� I � \ f � � � � 160 \\ �st.5 _ � a J"' I � S J � i •1
Ward
k— / Chadw ck
aCHANGE 111 _v��'rd. I �� Por3
�� \
r 1;/
•�� tA.4 i %�� IJJ I ) .\' �AVE�RIILL � i ��/ �- j :-�
77,, , � ( \ '/, _ �\ Golf
\ - nurse L '
-51
11.0
( O 50
Water k �\ \ : ✓\ 3 ~ .
30 HOLT'
SHORE
O
BM,
\ 46.5
• �. / . �1 - QPM , � I
LAWRENCE/
UNICIPAL AIBP
\_J ��\ \\IIB, —
"1 �._ / �� :\ 55 _ �' //,� `� f
BM \ sta i 510
5-4
11125
33 r •i' - - .- _ � ���. �/— _ � \ ` \',+
11 \\\ � _ i i �✓i � .� l � � \ _
• p�� _ • SUTFQ � � o r; //-�_-_ � / ' � S \ \ \.� I \ 9s � iy �� �` \ =� 1 ���
ouple�ecky /J/ �, I r L F°ur�Acrts�
BM1 06f VAS �� ndr w p
2.0 45
�Ygr ul. ♦ �_
55.0
43.6 \'
St
ch .� .� �•
`CAY7
34.5
olf
( i idOHS S�lh in �� %' urse
�� 1 \I iv0_— P m ing 374
I
to
'ch
S
;i ch
• I
Sand
,
48 6
1 Holy ep Ichr 1 P�� so
Massachusetts Department of Environmental Protection rr' 1)L L76 R a ^�
Bureau of Resource Protection - Wetlands
WPA.:Form 9A - Enforcement Order
and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Protection Bylaw.
Order
The Issuing Authority hereby orders the following (check all The property owner shall take the following action to
that apply): prevent further violations of the Act
❑ The property owner, his agents, permittees, and all
others shall immediately cease and desist from the further
activity affecting the Buffer Zone and/or wetland resource
areas on this property.
Wetland alterations resulting from said activity shall be
orrected and the site returned to its original condition.
❑ Complete the attached Nodce of Intent. The completed
application and plans for all proposed work as required by
the Act and regulations shall be filed with the Issuing
Authority on or before (date).
No further work shall be performed until a public hearing
has been held and an Order of Conditions has been issued
to regulate said work
0 Appeals/Signatures
An Enforcement Order issued.by a conservation commission
cannot be appealed to the Department of Environmental
Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be
directed to:
'��►�"�� 66% - as 5 0
RM MAW
Har,VaysAvailade
Issued byA )a r44, XN 0y 4a
conservation Commission
In a situation requiring immediate action, an Enforcement
Order may be signed by a single member or agent of the
commission and ratified by a majority of the members at the
next scheduled meeting of the commission.
Ha-lb"L.S k^1 5CL,Nd"14 �
Failure to comply with this Order may constitute grounds
for additional legal action. Massachusetts General Laws
Chapter 131, Section 40 provides: "Whoever violates any
provisions of this section shall be punished by a fine of not
more than twenty-five thousand dollars or by imprisonment
for not more than two years or both Each day or portion
thereof of continuing violation shall constitute a separate
offense."
Sigmm ofdelimype5on ormfied mail w1bT
Massachctsetts Department of Environmental Protection DEP File Number
Bureau of Resource Protection - Wetlands l ao Ht, -C
WPA Form 9A - Enforcement Order for DEP use only
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 and North Andover wetland
Protection Bylaw.
Violation Information
This ��Ejnforcement Order is issued by:
NU(��, RAljd.jel—
Common Commizion psmingAurhariry)
To: STG (� rJ51''U LT i 0
C- o Z-oe I,
Name ofVialamr
Location of Violation:
(2D H0 i +-- RC.,J
A)or�A- A&;Jove�
',7 to 03� Com? 3
A Sw=MwAht/ aarc�rca
Date of Issuance:
0o
Dare
Extent
nand type of activity:
�t��er�.tc��
Iii ekw: >re-�cij f-ce. cue
S� z A CJ f f
Findings
The Issuing Authodry has determined that the activity tp Other (specify):
described above is in violation of the Wetlands Protection Act A fr�;� O�
(M.G.L. c. 131. §40) and its regulations (310 CMR 10.00), /1't
because:
frd
the activity has beerdis being conducted withoutavalid C! er of Conditions.
❑ the activity has beerdis being conducted in violation of �� �NTarLe��t ij
the Order of Conditions issued to:
Name
Dared
File NUMW
CondrttonmmWS)
n.. ,Winn
�i(a.11cie�i a5 q A&,Gkan) 1S V\
teSrwr•ce a«��. _
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
and North Andover Wetland
Massachusetts Wetlands. Protection Act M.G.L. c. 131,.§40 Protection Bylaw.
Order
The Issuing Authority hereby orders the following (check all
Iii The property owner shall take the following action to
that apply):
prevent further violations of'the
1 Act:
�`-' M e r�n� to IJ
❑ The property owner, his agents, permittees, and all
�� �" •�
__:. • others shall immediately cease and desist from the further
;� ll
R1 (r �0 �k
- activity affecting the Buffer. Zone and/or wetland resource
epo „Q r e , ck( oA
0 q u rpt, e U
areas on this property.
_
weR-h\ck 10kolou\^-3 ' kc)
Wetland alterations resulting from said activity shall be
�cA�e r N ► V0,M6II r
corrected and the site returned to its original condition.. .
❑ .Complete the attached Notice of Intent. The completed
_ application and plans for all proposed work as required by
- -
3heActand re ulations,shall be filed .with the. Issuing—77--
....,_...
Authority on or before (date).
ti No further work shall be performed until a public hearing.
has been held and an Order of Conditions has been issued
Failure to comply with this Order may constitute grounds
= to.regulate said work.
for additional legal action. Massachusetts General Laws.
Chapter 131, Section 40 provides: "Whoever violates any
provisions of this section shall be punished by a fine of not
more than twenty-five thousand dollars or by imprisonment
-"- .
for riot more than two years or both. Each day or portion
thereof of continuing violation shall constitute a separate
-
offense." .
- = -Appeals/Signatures
' An Enforcement Order issued by a conservation commisswn
cannot be appealed.to the Department of Environmental
Signa tures•
• Protection, but may be filed in Superior Court.
_
Questions regarding this Enforcement Order should be
- directed to -.,—:
5 i
--.
Phone Numb
..Nouts Days Available
by a( �" N OVer
Issued
Conservation Commission
In a situation requiring immediate action, an Enforcement
3� b
Order may be signed.by a single member or agent of the
Signature oldeiveypewnorceni6ed mail number
commission and ratified by=a;majority of the members at the
next scheduled meeting of:the:commission.
n.-.,) ..fn
Massachusetts Department of Environmental Protection DEP File Number /�/ /c,
Bureau of Resource Protection - Wetlands
. WPA Form 9A - Enfercement.Order for DEP use only
Massachusetts Wetlands Protection Act M.G.L. c.. 131,X40 and North Andover Wetland
Protection Bylaw.__
Violation Information
This Enforcement Order is issued by: Extent and type of activity:
,��
d fo o� o 0�ieAJ
Cora wion Commission (Issuing Authority)
w:e4,L �2souCce . GZre�
To: ST L CoNsa d-ko 4 _ . _rr nn
coo Toe- Ct rIS��,�d, \ Cc)QS,S oT t N I v`
Name of Violator WrcJ6 V Cr, t-oJej VJQ�I
Location of Violation:
C� 4
Streetdress
CitylTown _
2w�d3W OoZ3 - -
Assessors Maµ/Plat f . Parce/Kot f _
Date of issban6e-
4S.
we
Findings
The Issuing Authority has determined that the activity
W Other (specify):
described above is in violation of the Wetlands Protection Act
//��,j - .-....:;_
le
-...
ti (M.G.L. c. 131, §40) and its regulations (310 CMR 10.00),
!'I
because:
re50"J,rcZ
Gr e
the activity has beenlis being conducted without a'valid .
- - -- - -4der of Conditions.
r
0 the activity has been/is being conducted in violation of
&I r V Q
Qa��t
V d 4 6, V W
,
the Order of Conditions issued to:
et
NEW ENGLAND ENGINEERING
INC
Albert P. Manzi, Jr., Chairman
North Andover Conservation Commission
Town Hall Annex
27 Charles Street
North Andover, MA 01845
Re: 120 Holt Road, North Andover
Dear Mr. Chairman:
SERVICES
December 1, 1999
DEC 1 1999
((��((�� �jr-t'��--,_i 1�" ".•.nor F-C� pr..n�
Please accept this letter and the enclosed restoration plan for the above referenced project
as a response to an enforcement order issued by the Conservation Commission Agent on
November 8, 1999. This office has been retained by J.T.and C. Construction to supervise
the restoration of this filled wetland.
A representative of this office will be at your meeting tonight to discuss this matter.
Sincerely,
c
Benja C. Osgood, J ., EIT
President
Enclosures
60 BEECHWOOD DRIVE - NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 - FAX (978) 685-1099
WETLAND RESTORATION PLAN
-120 HOLT ROAD
NORTH ANDOVER, MA
SITE DESCRIPTION
The property located at 120 Holt Road consists of an existing concrete block structure
and gravel parking areas which are currently used as a contractors yard and a storage area
for towed vehicles. The site was created many years ago by filling both upland and
wetland areas. The site is located on the south side of Holt Road and is bordered by the
Lawrence municipal airport on the south and east sides. The site borders a vegetated
wetland associated with an intermittent stream that flows on the west side of the property.
Bordering vegetated wetlands abut the filling on the west and most of the south sides of
the parking areas.
In the area of recent filling the wetlands vegetation consists primarily of a Red Maple tree
layer with Cinnamon Fern, Sensitive Fern and wetlands grasses as ground cover. The
wetlands in the area of the filling lacks a shrub and sapling layer.
Currently the fill at the rear of the property in the area of the violation is approximately 8
feet higher than the wetlands at the base of the fill.
VIOLATION DESCRIPTION
According to the property owner the filling occurred in conjunction with cleaning and
squaring off the parking area at the rear of the building. The existing slope was cleaned of
debris that had been stored along the top off and on the slope. Small saplings and
underbrush were also removed. The parking area was then extended approximately ten
feet into the wetlands. None of the wetland soil was removed before the filling occurred.
PROPOSED RESTORATION PLAN
PHASE 1:
Phase 1 would consist of removing the new fill in an area of approximately 300 square
feet in size. The fill would be removed with an excavator in a manner that would leave
the old wetland soil in place. New loam would be added to areas where the depth of the
wetlands soil was insufficient for supporting wetland vegetation. This phase would be
supervised at all times by BAG land consultants. BAG land consultants is a full service
environmental firm from Concord New Hampshire. The staff of BAG land consultants
consists of botanists and biologists whose specialty is working as environmental monitors
and overseers monitoring creation of wetlands of wetlands. Towns that BAG Land
Consulting has done work in include Wellesley, Bedford, and Lexington.
PHASE 2:
Phase 2 would consist of construction a boulder retaining wall to stabilize the slope
around the restored area. Also a guard rail would be installed along the top of the slope to
prevent further intrusion into the area in the future.
PHASE 3:
Phase three would consist of restoring the vegetation to the restored area. The addition of
the following plant material will be planted under the supervision of BAG Land
Consulting.
3 Red Maple Saplings
10 Cinnamon Ferns
wetland seed mix
Plant material would be obtained from available nursery stock or from upland areas on
the site. Plant material selection would be done by BAG Land Consultants. The wetland
seed mix specification would be done by BAG Land Consultants.
TIMETABLE:
Phase 1 and 2 would be done within 2 weeks. The planting would be done in the springy.
/I, S-h• .1 h ' - \ �\ 1BM '%' t 1� b o +��'r(\ c l W/LLpiy yW_` u✓ I r'
� o, i ��. ` ;fl \ \ ;\ 1�5 ` l I bn •its i � i � I � 1,
Tiee U <
Ward Ht ) \ 1
;:♦ ( � I ,�� fir _�;'�� .�`' _..VA,o-- .� C�i�_
--- - \\ ravel
f ! j D (:1ladtu ck
CHANGE / Mat;$ \j l t\i id 1'on(
M_Av_ERliltl
Golf
' nurse
! ( O p
- 3
Hi
'•i i-- `% %�, Water k L - .
ROAD-- z
i HOLT l 5 \... II \
_. I SHORE
8fer
z
BM ) ,� � �O� ! \• • - 5a,2 ��� 46.5
Pi
/ _ P
LAWRENCE � / \ �, �\ •.�� • � a -
UNICIPAL AIR Tj j o
f Seo
Dlspo
- -----�
-1B- o
/ 5.5
r
Hr '
..Bea
`54.0
�\UI~�I .O�i .\ /�� \133 ". - - \I \!._ _\1 � `r \ •1 i..-
ST
O�/ Irl \• i - ^�ie5 � ,. \ \ � \, \ \+ �.
,sun Z c o (� ti Rus. /P
•` j Four \\\ ndr w
.-ruplfe�eck:. , % \ BMt o.f' ` Acr s \ �• ,
j �y��
45
aygP.�. �..".r
T I
55.0. i
43.6St
�.� •. �.
NON aela
Sc
ch
Z4 sm
•N E - - -
�1'
34.\ \ _ O .,
\\ olf l )•
T
addle Hr urse ( Q'
Sth ��. It ��ISpAT `� i "-�, •• � I 1-l'.
P ming 37 4 p
I ,� �l • ? /•� to , �Out
/
Sch \ 6 `\./'
\ - -----•-- ---- F\ �i FEAR J
- -- G 48 6 ,
1 Holy ep Ichr
f Town of North Andover N�RTM
OFFICE OF h `
COMMUNITY DEVELOPMENT AND SERVICES
27 Charles Street
North Andover, Massachusetts 01845
WILLIAM J. SCOTT
Director
(978) 688-9531
March 9, 2000
JTC Construction
c/o Joe Christaldi
120 Holt Road
North Andover, MA 01845
VIA Certified Mail # Z 370 627 463
RE: Wetland Restoration at 120 Holt Road
Dear Benjamin:
Fax(978)688-9542
This Department is in receipt of the Wetland Restoration Plan dated December 1, 1999
and hereby approves the document with the following instructions:
• Install trenched silt fence, remove existing haybales to prevent a berm from forming
and schedule a pre -construction inspection with this Department prior to commencing
any work.
• Complete the restoration work approved in the Restoration Report dated December 1,
1999 by no later than June 1, 2000.
• A Replication/Restoration As -Built plan prepared by a Registered Professional Land
Surveyor must be submitted to this Department within 30 days upon completion of
the approved referenced work. The plan shall including one -foot contours, spot
elevations, surface area and plant locations.
• Erosion control shall not be removed and shall remain fully intact until the area is
fully stabilized as determined by the North Andover Conservation Commission
(NACC) or an Agent thereof during a post construction inspection.
Attached you will find an Enforcement Order as a mechanism to perform the above
referenced work.
Should you have any comments, questions, or concerns feel free to contact me at (978)
688-9530.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Thank you for your anticipated cooperation.
Sim
Brian J. LaGrasse
Conservation Associate
cc: NACC Members
Richelle Martin, Conservation Administrator
DEP-NERD
File
T
nr. �Aj—
Massachusetts Department of Environmental Protection DEP File Number
Bureau of Resource Protection - Wetlands
WPA Form 9A - Enforcement Order for DEP use only
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 and North Andover Wetland
Protection Bylaw.
Violation Information
This Enforcement Order is issued by:
Uor��N.NjjdJer
consw ation Commission (Issuing Authority)
To: "Z5 -TC- CO NS+!U c.7 k o O
C-iJ 'SO2 Ginrt�t�luli
Name of Viol"
Location of Violation:
120 H00 KO -
SVWAddms
A) 0-, Ar"Jovei'
City/Town
2-to103L(
mswas Mappat t ParcdAot f
Date of Issuance:
3
De I�119()
Findings
The Issuing Authority has determined that the activity
described above is in violation of the Wetlands Protection Act
(M.G.L. c. 131, §40) and its regulations (310 CMR 10.00),
because:
fthe activity has beenfis being conducted without a'valid
order of Conditions.
❑ the activity has been/is being conducted in violation of
the Order of Conditions issued to:
Name
Dated
File Number
Conditionmumber(s)
Extent and type of activity:
+er4(� +� �, C, +erAj
tp Other (specify):
W Q -n( --A ces yjrce o\,- if en,
1 Iris �ti�arce:v,,e..'� r?Jt'a� i�
Ann o•s c\ McGkan)1s"n
f e-Soyrce. C -,r ,
n...... ,i ..c n
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
ig WPA Form 9A - Enforcement Order
and North Andover Wetland
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Protection Bylaw.
Order
The Issuing Authority hereby orders the following (check all
that apply):
❑ The property owner, his agents, permittees, and all
others shall immediately cease and desist from the further
activity affecting the Buffer Zone and/or wetland resource
areas on this property.
Wetland alterations resulting from said activity shall be
orrected and the site returned to its original condition.
❑ Complete the attached Notice of Intent. The completed
application and plans for all proposed work as required by
the Act and regulations shall be filed with the Issuing.
Authority on or before (date).
No further work shall be performed until a public hearing
has been held and an Order of Conditions has been issued
to regulate said work.
0 Appeals/Signatures
An Enforcement Order issued by a conservation commission
cannot be appealed to the Department of Environmental
Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be
directed to: T a 1
�lt�N J • ���-CaSS2 � /�1c�NT
" > cis3o
Phone Number
%, 30 - 4-,
HWYDapAwilable ,
Issuedby. A)dr+k ANJOU./
Conservation Commission
In a situation requiring immediate action, an Enforcement
Order may be signed by a single member or agent of the
commission and ratified by a majority of the members at the
next scheduled meeting of the commission.
'K The property owner shall take the following action to
prevent further violations of the Act: r
frQ—Can!'tr-ocfko� t�s�cc can onnA� �
f t'S�ra�i tum WCAA, GS CW rdj1A cn
1.
Failure to comply with this Order may constitute grounds
for additional legal action. Massachusetts General Laws
Chapter 131, Section 40 provides: "Whoever violates any
provisions of this section shall be punished by a fine of not
more than twenty-five thousand dollars or by imprisonment
for not more than two years or both Each day or portion
thereof of continuing violation shall constitute a separate
offense."
Signatur
Ll J
Signature of ddirey person orcnfied mail number