Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit #Exception - 5 CHATHAM CIRCLE 10/13/2010
11fol. NORTH q BUILDING PERMIT (c TOWN OF NORTH ANDOVER Ot� y /%° APPLICATION FOR PLAN EXAMINATION �"(- r c Permit NO: �D Date Received o 5' SSiCHUSfc Date Issued: 41/10�9 / j�o �¢ IMPORTANT:Applicant must complete all items this page G-o�°-•!� U LOCATION- ct ' t •- arN�oI Cc�v �e-+�r11 PROPERTY OWNER G/ ?/ -PrinY. Print. MAP NO: / PARCEL: _ZONING DISTRICT: Historic District yes , Machine Shop Village yes 9 TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential < One family Addition Two or more family ��77 Industrial Alteration No. of units: Commercial Repair, replacement Assessory Bldg Others: Demolition Other Se ' er I Floodplain . Wetlands Watershed District ater/Sew DE RIPTION OF WORK TO BE PREFORMED: dentification PI ase Type or Print Clearly) OWNER: Name: A -* 4w P-ee PZ - 7/7--14-5L Phone: f18 `gyp 019F Address: 3 C/41" Z,-) .--AI64e.11� CONTRACTOR Name: Phone: Address: �-, Supervisor's Construction License: 21 Exp. Date:� �2� Home Improvement License: /0 Exp. Date: 5� ARCHITECT/ENGINEER_ 12ot1fer &Ill Phone: Address: r o±d Reg. No. FEE SCHEDULE.BULDING PPEMIT.$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. Total Project Cost: $ 00, 00c) .— FEE: $ Check No.: Receipt No.: NOTE: Persons contracting with u ere ontractors le-root have access to the guaranty fund zi ,Signature of Agent/Owne a of,contractor Plans Submitted Plans Waived Certified Plot Plan Stamped Plans TYPE OF SEWERAGE DISPOSAL Public Sewer Tanning/Massage/Body Art Swimming Pools Well Tobacco Sales Food Packaging/Sales Private(septic tank,etc. Permanent Dumpster on Site THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT COMMENTS DATE REJECTED DATE APPROVED CONSERVATION COMMENTS DATE REJECTED DATE APPROVED HEALTH COMMENTS Zoning Board of Appeals:Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Si nature&Date Driveway Permit Located at 384 Osgood Street FIRE DEPARTMENT -Temp Dumpster on site yes ✓ no Located at 124 Main Street S Fire Department signatureldate COMMENTS Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes No MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— For department use ❑ Notified for pickup - Date Doc.Building Permit Revised 2007 Building Department i The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits ❑ Building Permit Application ❑ Workers Comp Affidavit ❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses ❑ Copy of Contract ❑ Floor Plan Or Proposed Interior Work ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks ❑ Building Permit Application j Certified Surveyed Plot Plan ❑ Workers Comp Affidavit ❑ Photo Copy of H.I.C. And C.S.L. Licenses ❑ Copy Of Contract ❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Mass check Energy Compliance Report (If Applicable) ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) ❑ Building Permit Application ❑ Certified Proposed Plot Plan ❑ Photo of H.I.C. And C.S.L. Licenses ❑ Workers Comp Affidavit ❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And Hydraulic Calculations (If Applicable) ❑ Copy of Contract ❑ Mass check Energy Compliance Report ❑ Engineering Affidavits for Engineered products NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording must be submitted with the building application Doc:INSPECTIONAL SERVICES DEPARTMENT:BPFORM07 Revised 2.2007 i ROBERT / CONSULT T RE / '� � � MICNAEI. � �iscdewri� 1�.9idJ�D•ddYl! GILL m A Na.24181�� _ O �GIs ROGERT /M. GILL N.E. 54 a s AT AAWA- f '� � �1•�. �� `1 S l= �l�1.y L� � �• � f-i l�C k� l r�C.l 1..���. JJ° '> i._`-I \ Vii` 4--,r2�5 ei i_�?('Ti T;.. � I t`°•I �'. '� C� (��( o �' �� `� '�tom:� t ,���(7�5 �`Z'��.�� c f2G k r'1 44 I til -(2 cZ� - r • r s' Bk 110919 Ps 53 428370 09-21-2'007 a 01 -2 1 u FORM J Lot Release Form The undersigned being a majority ofthe Planning Board of the Town of North Andover,MA hereby certify that the requirements for work on the ground called for by the Conditional Approval dated August 1 20 00 and recorded in Essex North District Registry of Deeds,Book 5829 Page 209 (or registered in Land Registry District as Document No. and noted on Certificate of Title No.-----__,in Registration Book Paga )have been completed to the satisfaction of the Planning Board as to the following enumerated lots shown on Plan entitled Chatham Crossing recorded with said Deeds,Plan Book Plan 13801(or registered in said Land Registry District,Plan Book ,Plan�) and said lots are hereby released from the restrictions as to sale and building specified thereon. Lots designated on said Plan as follows: Lots 5 and. 6 (To be attested by a Registered Land Surveyor) I hereby certify that lot number(s)5 and 6 on Nantucket Drive and Chatham Circlo-n^ Street(s)do conform to layout as shown on Definitive Pian entitled" Chatham Cros s insz Section Sheets) 2 Reghteidtakia Surveyor —,Z,/ Majority Of 11,flf�$0 The PlanningGREGORY R. Board Of The `-� CORCORAN No. 38034 Town of gra slA�, � North Andover ,, COMMONWEALTH OF MASSACHUSETTS ss. 20 Cr Then personally appeared Q one of the above-named members of the Planning Board.of the Town of North Ando , MA, and acknowledged the foregoing instrument to be the free act and deed of said Planning Board,before e, Notary Publi My Commission A NSI WSJ eVOMMA Js lu03 s lE t Maty Leary•tAPalito -01 ��AM gel {/1 rt t NotaryQaba CWnonweatth of Massachusetts MY commission Wes May 16,2014 Sep. 23. 2010 10:40AM AJ HEATING & A/C, INC Vc, ;919 P. 1 To: Cormier Andover .Attn: Ray Cormier From: Arthur Hinkley FAX: 978-474-0975 Pages: 7 Phone: 97U54-8197 Date: 9/23/2010 Re: GC: X Urgent ❑ For Review ❑Please Comment ❑Please Reply ©Please Recycle Sep, 23, 2010 10:40AM J&J HEATING & A/C, INC N , 1919 I' 2 REScheck Software Version 4.3,1 Compliance Certificate Project Title: Lot 5 Duplex Energy Code: 2009 IECC Location: Andover,Massachusetts Construction Type: Single Family Building Orientation: Bldg.faces 160 deg.from North Conditioned FloorAroa: 5026 V Glazing Area Percentage: 10% Heating Degree Days: 6322 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: Chatham Crossing Cormier Andover Const J&J Heating&Air Cond Andover,MA 3 Crenshaw 17 Arlington St Andover,MA Dracut,MA 01$26 9794,54-8197 Compliance:0.51k Better Than Code 110 .. Ceiling 1:Flat Ceiling or Scissor Truss 2112 38,0 0.0 63 Wall 1:Wood Frame,16"o.c. 1914 20.0 0.0 99 Orientation:Front Window 1:Vinyl Frame0oublo Pane 211 0.320 68 SHGC:0,29 Orientation-Front Door 1:Solid 21 0.360 8 Orisn.Wgn,;Front Well 2:Wood Frame,16"o-c. 1044 20,0 0.0 57 Orientation:Left Side Window 2:Vinyl Frame:Double Pane 38 0.320 12 SHGC;0,29 Orientation:Left Side Door 2:Solid 39 0.360 14 Orientation:Left Side Wall 3:Wood Frame,,16"o.c. 1044 20.0 0.0 58 Orientation:Right Side Window 3:Vinyl Frame:Double Pane 50 0.320 16 SHGC:0.29 Orientation:Right Side Door 3,Solid 18 0.360 6 Orientation:Right Side Wall 4:Wood Frame,16"O.C. 1914 20.0 0.0 97 Orientation,Back Window 4:Vinyl Frame;Double Pane 274 0.:120 88 SHGC:0.29 Orientation:Baric Floor 1:All-Wood JoistlTruss:Over Unconditioned Space 2112 30-0 0.0 70 Air Conditioner t:Electric Central Air 13 SEER Fumace 1;Forced Hot Air 95 AFUE Compliance Statemept: The proposed building design deeorlbed here is consistent with the building pians,spec cations,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IEC:C:requirements in REScheck Verslon 4.3.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Report date,D9/23! Project Title:Lot 5 Duplex Sep. 23. 2010 10 40AM J&J HEATING & A/C, INC L7919 P. 3 Name•Title Signature pate Project Notes: 9123!10 Report dat®^09/23110 Project Title,1,0t S duplex Sep. 23. 2010 10:40AM X HEATING & A/C, INC Nc. 7919 P. 4 I I REScheck Software Version 4.3.1 Inspection Checklist Ceilings: ❑ Ceiling 1;Flat Ceiling or Scissor Truss,R-38.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1;Wood Frame,16"o.c.,R-20.0 cavity insulation Comments: -- ❑ Wall 2;Wood frame,16"o.c.,R-20.0 cavity insulation Comments: -- ❑ Wall 3:Wood Frame,16"o c.,R-20.0 cavity insulation Comments: - ❑ Well 4:Wood Frame,16"o.c.,R-20,0 cavity Insulation Comments: — -- Windows: ❑ Window 1:Vinyl Frame:Double Pane,U-factor!0.320 For windows without labeled U-factors,describe features: #Panes—Frame Type Thermal Break?—Yes No Comments, - ❑Window 2:Vinyl Frame;double Pane.U-factor 0.320 For windows without labeled U-factors,describe features; #Panes—Frame Type Thermal Break?—Yes r No Comments: - ❑ Window 3 Vinyl FromwDouble Pane,LI-factor:0.320 For windows without labeled U-factors,describe features: #Panes—Frame Type - Thermal Break?r.--Yes—No Comments: ❑ Window 4:Vinyl Frame:Qouble Pane,U-factor;0,320 For windows without labeled U-factors,describe features: #Panes—Frame Type Thermal Break?—Yes—No Comments; "a Doors; ❑ Door 1:Solid,U-factor:0.260 Comments: This door is exempt from the U-factor requirement. Ea Door 2;Solid,U-factor;0.360 Comments: ❑ Door 3:Solid,U-factor:0.360 Comments: - Floors: ❑ Floor 1:All-Wood JoistfTruss:Ovar Unconditioned Space,R-30.0 cavity Insulation Comments: - Floor Insulation is installed in permanent contact with the underside of the subloor decking. Project Title:Lot 5 Duplex Report date:09123/10 Sep. 23. 2010 10:41AM J&J HEATING & A/C, INC lc, 11919 5 Heating and Cooling Equipment: ❑ Air Conditioner 1:Electric Central Alt 13 SEER or higher Make and Model Number — ❑ Furnace 1,Forced Hot Air:95 AFUE or higher Make and Model Number: - --- --- Air Leakage: ❑ Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,Basketed,wealherstripped or otherwise sealed with an air barrior material,suitable film or solid material. Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/shower;,and in openings between window/door jambs and framing. Recessed lights in the building thermal envelope are 1)type IG rated end ASTM E283 labeled and 2)sealed with a gasket or caulk between the housing and the interior wall or telling covering. Access doors separating conditioned from unconditioned space are weather-stopped and insulated(without insulation compmeslon or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffte or retainer is installed to maintain insulation application. Q Wood-buming fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: ❑ Building envelope air tightness and Insulation installation oomplles by either 1)a post rough-in blower door tia_a result of less then 7 ACH at 33.5 psf OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier:Installed on outside of air-permeable Insulation and breaks or Joints in the air barrier are filled or repaired, (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit Is substantially aligned with insulation and any gaps are sealed, (o)Above-grade walls:Insulation i6 installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation, (e)Plumbing and wiring;Insulation is placed between outside and pipes.Batt insulation Is cut to fit around wiring and plumbing,or sprayedlblown insulation extends behind piping and wiring. M garners,headers,narrow framing cavities,and rim Jolsts are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunroom5: ❑ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 4.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements, Vapor Retarder: ❑ Vapor retarder is installed on the warm-in-winter side of all non-vented framed ceilings,walls,and floors;or it ties boon determined that moisture or Its freezing will not damage the materials;or other approved means to avoid condensation are provided. Comments: — Materials Identification and Installation: ❑ Materials and equipment are Installed in accordanoe with the manufacturer's installation instructioma. ❑ Insulation is installed in substantial contact with the surface being Insulated and in a manner that achieves the rated R-value. Materials and equipment are identified so that Compliance can be determined. ❑ Manufacturer manuals for all installed heating and cooling equlpment and service water heating equipment have been provided. ❑ Insulation R-values,glazing U factors,and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: ❑ Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insu,tated to at least R-6. Duct Construction and Testing: Lj Building framing cavities are not used as Supply ducts. ❑ All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as return clucts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 1813 and are labeled according to the duct construction.Metal duct connections with equipment andfor fittings are mechanically fastened.Crimp joints for round metal ducts have a contact tap of at least 1 112 inches and are fastened with a minlrnum of three equally spaced shoot-metal screws. Project Title:Lot 5 Duplex P Report date: 09123/1 Dann A o$R Sep. 23, 2010 10:41AM J&J HEATING & A/C, INC No. ?919 P, 6 Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially Inaccessible duct connection exists,mechanical fasteners can be equally spaced on the!exposed portion of the joint so as to prevent a hinge effect. Continuously welded and lecking•type longitudinal joints and rAams on ducts operating at less than 2 In.%Y.g.(500 Pa). Lj Duct tightness test has been performed and meets one of the following test criteria' (1)Postoonstruction leakage to outdoors test:Less than or equal to 402.1 cfm(8 cfm per 100 ft2 of conditioned floor area)- (2)Po9tconsiruction total leakage test(Including air handler enclosure).Less than or equal to 603.1 cfrn(12(;tm per 100 ft2 of conditioned floor area)pressure differential of 0.1 inches w.g, (3)Rough4n total leakage test with air handler Installed:Less than or equal to 301.6 ctm(6 cfm per 100 ft2 of conditioned floor area) when tested at a pressure differential of 0.1 inches w-9- (4)Rough-in total leakage test without air handler installed:Less than or equal to 201.0 cfm(4 cfm per 100 02 of conditioned floor area). Temperature Controls: Ll At least one programmable thermostat is installed to control the primary heating system and has set-points iriilialized at 70 degrae F for the heating cycle and 78 degree F for the cooling cycle. Heating and Cooling Equipment Sizing: L] Additional requirements for equipment siting are included by on Inspection for compllance with the International Residential Code. For systems Serving multiple dwelling units documentation has been submltted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: ❑ Circulating service hot water pipes Are insulated to R-2. L:l Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: MVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: Q Heated swimming pools have an onloff heater switch, C] Pool heaters operating on natural gas or LPG have an electronic pilot light. ❑ Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. ❑ Heated swimming pools have a over on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Cxcepdbns: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: ❑ A minimum of 50 percent of the lamps In permanently Installed lighting fixtures can be categorized as One of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage e=15 (d)50 lumens per watt for lamp wattage>15 and-40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: ❑ Snow-and Ice-malting systems with energy sdpplled from the service to a building shall include automatic controls capable of shutting Off the system when a)the pavement temperature Is above 50 degrees F,b)no preclpitation is falling,and o)the outdoor temperature Is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement V). Certlticate: A permanent certificate Is provided on or In the electrical distdbutlon panel listing the predominant insulatioin R-values;window U-factors;type and efficiency of space-conditioning and water heating equipment.The certificate does not ever or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. Report date:09/23110 Project Title:Lot 5 Duplex Sep. 23. 2010 10:41AM AJ HEATING & A/C, INC Nc. 1-1919 ". 7 • NOTES TO FMA=(Sullding Department Use Only) Project Title: Lot 5 Duplex Report date:D9/23110 _. ..._ _.. „.--- . ., . ...... .._,. D. R of R Sep, 23. 2010 10:41AM J&J HEATING & A/C, INC NG, 1919 8 s 2009 IECC Energy Efficiency Certificate Calling I Roof 39.00 Wall 20.00 Floor I Foundation 30.00 Ductwork(unconditioned spaces): Door Rating LI-Factor, SHk Window 0.32 0,29 Door 0,36 NA Cooling Electric Central Air Conditioner 13 SEER Forced Hot Air Furnace 95 AFUE Water Heater: I Name: Date: Comments: