HomeMy WebLinkAboutBuilding Permit #416 - Millpond 1/9/2009 AORTH
BUILDING PERMIT
TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
Permit NO: Date Received �4"�q,T.o,•P �5
�SSACHIIs��
Date Issued:
MPORTANT:Applicant must comple all items on this page
LOCATION U .
PROPERTY OWNER—Vtk
Pint
MAP NO: PARCEL; PV ZONING DISTRICT: Historic District yes no
f .Machine-Shop Village �,yes no
TYPE Of7UPROVEMENT PROPOSED USE
Residential Non- Residential
New Building One family
i
Addition Two or more family Industrial
ql No. of units: Commercial
e air relacement Assessory Bldg Others:
Demolition Other
Septic Well Floodplain Wetlands Watershed District
Water/Sewer
SCRIP.TION OF WO TO BE PREFORQiAIrD'
•I
Iden it ti onA Ple s T or Print Clearly) �� ��
OWNER: Name: �- Phone:
Address:
� .- - -� = �
CONTRACTOR :Name., Phone:
i .Address: -
s
i .Supervisor's Construction License: ' Exp. 'Pate.:. 1 '
i Home Improvement License: p
Ex Gate.
ARCHITECT/ENGINEER Phone:
l
Address: Reg. No.
FEE SCHEDULE:BOLDING PERMIT:$12.00 E 1 00.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F.
Total Project Cost: $ 0 ~� FEE: $ *© �—
Check No.: 4(ZReceipt No.:
{ NOTE: Persons contracting with unregistered contractors do not have a ess tot gu ty u d
m
1 signature of Agent/Owner Signature of contract 4 .
nom::
.3
j Building Department
The following is a list of the required forms to be filled out for the appropriate permit to be obtained.
Roofing, Siding, Interior Rehabilitation Permits
❑ Building Permit Application
❑ Workers Comp Affidavit
❑ Photo Copy Of H.I.C. And/Or C.S.L. Licenses
❑ Copy of Contract
❑ Floor Plan Or Proposed Interior Work
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
Addition Or Decks
❑ Building Permit Application
❑ Certified Surveyed Plot Plan
❑ Workers Comp Affidavit
❑ Photo Copy of H:I.C. And C.S.L. Licenses
❑ Copy Of Contract
❑ Floor/Crossection/Elevation Plan Of Proposed Work With Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Mass check Energy Compliance Report (If Applicable)
❑ Engineering Affidavits for Engineered products f
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of.Bldg Permit
New Construction (Single and Two Family)
❑ Building Permit Application
❑ Certified Proposed Plot Plan
❑ Photo of H.I.C. And C.S.L. Licenses
❑ Workers Comp Affidavit
❑ Two Sets of Building Plans (One To Be Returned) to Include Sprinkler Plan And
Hydraulic Calculations (If Applicable)
❑ Copy of Contract
❑ Mass check Energy Compliance Report
❑ Engineering Affidavits for Engineered products
NOTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit
In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals
that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. One copy and proof of recording
must be submitted with the building application
Doc:Building Permit Application
Revised 2.2008
i
Plans Submitted Plans Waived Certified Plot Plan Stamped Plans
TYPE OF SEWERAGE DISPOSAL
Public Sewer Tanning/Massage/Body Art Swimming Pools '
, .
Well Tobacco Sales
Food Packaging/Sales
Private(septic tank,etc. Permanent Dumpster on Site
THE FOLLOWING SECTIONS FOR OFFICE USE ONLY
INTERDEPARTMENTAL SIGN OFF - U FORM
DATE REJECTED DATE APPROVED
PLANNING & DEVELOPMENT
COMMENTS
CONSERVATION Reviewed on Signature
COMMENTS
HEALTH Reviewed on Signature
COMMENTS
^L
F
Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes
Planning Board Decision: Comments
Conservation Decision: Comments
Water & Sewer Connection/Signature & Date Driveway Permit
DPW Town Engineer: Signature:
Located 384 Osgood Street
''IRE 'DEPARTMENT - Temp Dumpster on site ,yes no i-
Located at 124 Main Street
Fire Department signature/state _ v
COMMENTS _ - r
, i
{
Dimension
Number of Stories: Total square feet of floor area, based on Exterior dimensions.
Total land area, sq. ft.:
ELECTRICAL: Movement of Meter location, mast or service drop requires approval of.
Electrical Inspector Yes No
DANGER ZONE LITERATURE: Yes No
MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine
NOTES and DATA— (For department use
❑ Notified for pickup - Date
Doc.Building Permit Revised 2008
Location wU 0
No. Date
&ORT" TOWN OF NORTH ANDOVER
f 9
+ ; ; Certificate of Occupancy $
•�,b+, '� ; , �,�
cMusE`� Building/Frame Permit Fee $
Foundation Permit Fee $ Ar
Other Permit Fee $
TOTAL $
Check # ` 11
4
2 ! % 66 _ k
Building Inspector
NORTH
® of
LCON © dower, Mass. O
O
COC
MIC HE WICK
V
7 ADRATED
BOARD OF HEALTH
Food/Kitchen
PERMIT T D Septic System
BUILDING INSPECTOR
If.h.111 end:.....THIS CERTIFIES THAT....... l ►...a.......................................................................... Foundation
has permission to erect........................................ buildings on ....$�..:..1� .....M I�L � Rough
............ ... .. ..................
t0 be occupied as... w �.. ��do.�. �... 4 Chimney
provided that the person accepting this lit shall in every respect conform to the terms of the application on file in Final
this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of
Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS
� LESS CONSTRU TS ELECTRICAL INSPECTOR
U 1 r Rough
...................... ................................................... Service
... ...........
BUILDING INSPECTOR
Final
Occupancy Permit Required to Occupy Building GAS INSPECTOR
Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
SEE REVERSE SIDE Smoke Det.
ACORD CERTIFICATE OF LIABILITY INSURANCE OPGREAT 9 D01/07/09
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Chase 6 Lunt LLC ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
P O Box 590 HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR
47 State Street ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Newburyport MA 01950
Phone:978-462-4434 Fax:978-465-6204 INSURERS AFFORDING COVERAGE NAIC#
DISURED Great North Property Managemen INSURERA The Travelers 39357
Management
JGCA Holding Corp. INSURERS: National onion Fire ins. Co.
JGCA Inc.
JGCA Holding Corp, JGCA Inc INSURER C: Federal Insurance Company
95 Brewery Lane INSURER D
Portsmouth NH
INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING
ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
MbK POUCY EFFECTIVE POLICY EXPIRATION
LTR INSR1 TYPE OF INSURANCE POLICY NUMBER DATE MMIDDIYY DATE LIMITS
GENERAL LIIABILITY EACH OCCURRENCE $
COMMERCIAL GENERAL LIABILITY I
PREMISES(Ea occurence) $
X CLAIMS MADE F—I OCCUR MED EXP(Any one person) $
C X Errors & Omission EBU3900861 02/16/08 06/01/09 PERSONAL&ADV INJURY $
GENERAL AGGREGATE $1000000
GEN'LAGGREGATE LIMITAPPLIESPER:
PRODUCTS-COMP/Op AGG $
POLICY JEa LOC Ea Claim 1000000
AUTOMOBILE LI1ABILRY
COMBINED SINGLE LIMIT $1000000
A ANY AUTO BA-0822M284-08-SEL 06/01/08 06/01/09 (Eaaoaeerd)
ALL OWNED AUTOS BA-1245M498-08-SEL 06/01/08 06/01/09 BODILY INJURY
SCHEDULED AUTOS (Per person) $
X HIRED AUTOS
BODILY INJURY $
X NON-OWNED AUTOS (Per accident)
PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $
ANY AUTO
OTHER THAN ENP`CC $
AUTO ONLY: AGG $ -
EXCESSIUMBRELLALIABILIT/ EACH OCCURRENCE $3000000
B X OCCUR -1 CLAIMS MADE 82097170 02/19/08 02/19/09 AGGREGATE $3000000
$
DEDUCTIBLE
E
RETENTION $ $
WORKERS COMPENSATION AND TORY LIMITSI ER
EMPLOYERS IUA8ILITY
ANY PROPRIETORIPARTNERIEXECUTIVE E.L.EACH ACCIDENT $
OFFICERIMEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYEE E
H describe under
SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $
OTHER
C Fiduciary 82097516 02/16/08 06/01/09 combined 1,000,000
Liability
maximum
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
Evidence of coverage
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLIOS BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR To MAIL 10 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO Do So SHALL
TO Whom@ 1 t may concern IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR
REPRESENTATIVES.
A PRES
ACORD 25(2001108) 0 ACORD CORPORATION 1988
The Commonwealth of Massachusetts
>^; 1 Department of Industrial Accidents
••-G Office of Investig
r � eations
600
;� •";% �' Washington Street
Boston, M4 02111
{ www.n:ass.gov/dia
Workers' Compensation Insurance.A#fi"vitrEnilders/Conitractors/ElectriciansTiumbers
A. licant Information
Please Print Leaibfv
Name (Business/Organization/Individual): � � i/�
Address C7 0 v
City/State/Zip: Z11 Akl�_Phont#:
Are you an employer?Check the appropriate box:
1.❑ 1 am a employer with 4. ❑ I am a Q Type of project(required);
�enera.l contractor and I
employees(full and/or part-time).* have hired the sub-contractors 6. ❑ New construction
2.❑ 1 am a sole proprietor or partner- Iisted otut the attached sheet 7• ❑ Remodeling
ship and have no employees These su _
b contracto
rs have g.
workingfor me in an capacity. workers, ❑ Demolition
Y P �'� comp. insurance.
[No workers' comp. insurance 5. ❑ We are a corporation and its 9' ❑ Building addition
required.] officers have exercised.their 10:❑Electrical repairs or additions
3.❑ t an a homeowner doing all work right of exemption per MGL 11.❑ Plumbing repairs or additions
myself. [No workers' comp. C. 152, §1(4),and we have no
insurance required.] t employees. [No.workers' 12.[] Roof repairs
comp. insurance required.] 1.3.7 Other
t*Any apphc ant that checks box#I.must also fill out the section below showing their workers`compensation policy information.
.
,iomeownets who submii.flris a;�.idavit indicative tilej'at=-uuiu_• l.arc:r;;t„�E;c�him outside conir,u furs rnusi submii x new ainuav
$Contractors that check this box must attached an adduionat sheet showing r-mdMatingsuch,
the name of the sub"cont[`aeton and their workers'com
p,policy information,
I am ann employer that is providing workers'compensation insurance
information for m!'employees. Below is the Policy and job site
Insurance Company Name:
_JAi_CX_tL� a-.,-
Policy#or Self-.ins. Lio.9: K 0�Q-jam J 60
Expiration Date: O( b( (( 0
Sob Site Address: I _A)
City/State/Zip:
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
.Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition
fine u to$1 500.0 osition'of criminal
p 0 and/or one-year im r P moral penalties of a
y p tsonment,as well as civil penalties to the form of a ST P
of u to S250.00 a against P WO
P day a=atnst the violator. BeBadvised that a copyRK ORDER and a fine
investigations of the for insurance coverage verification. of this statement may be forwarded to the Office of
I do hereby cern e the pains pe es Iperim”) that the information provided above is true and correct
Sisrtature: d `
Date:
Phone#: Z.
Official use only. Do not write inthis area,to be.completed bj, city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1. Board of Health 2. Building Department 3. City/TownClerk 4. Electrical Inspector S. Plumbing Inspector
6.Other
Contact Person:
Phone#:
Information and Instructions
Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees.
Pursuant to this statute,an employee is defined as"..ever-y person in the service of another under any contract ofhire,
express or implied,oral or written."
An employer is defined as`pan individual,partnership;association, corporation or other legal entity,or any two or more
of the foregoing engaged in a joint enterprise,and includin.g the legal representatives of a deceased employer,or the
receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the
owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the
dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house
or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer."
_ MGL chapter 152, §25C(6)also states that"every state o r local licensing agency shall withhold the issuance or
renewal of a license or permitto operate a business or to construct buildings in the commonwealth for any
applicant who has not produced acceptable evidence o►f compliance with the insurance coverage required."
Additionally, MGL chapter 152, §25C(7) states"Neither the commonwealth nor any of its political subdivisions shall
enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance
requirement of this chapter have been presented to the contracting authority.'.
Applicants
Please fill out the workers'compensation affidavit comp;-etely,by checking the boxes that apply to your situation and, if
necessary,supply sub-contractors)name(s), address(es)and phone number(s)along with their certificates)of
insurance. Limited Liability Companies (LLC)or Limited Liability Partnerships(LLP)with no employees other than the
members or partners,are not required to carry workers'compensation insurance. If an.LLC yr LLP does have __
employees, a policy is required_ Be advised that this af5ciavit may submitted to.the Department of Industrial
Accidents for confirmation of insurance coverage. Also be sure to sign and slate the affidavit. The affidavit should
be returned to the city or town that the application for the permit or license is being requested,not the Department of
Industrial Accidents. Should you have any questions re<__•-ding the lav, or if you are required to obtain a workers'
compensation policy,please call the Department at the ntaanber.Iis+.ed below. Self insured companies should enter their
self-insurance license number on the appropriate line.
City or Town Officials
Please be sure that th`eaffidavit is complete and printed legibly. The Department has provided a space at the bottom
of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant.
Please be sure to fill in the permit/license number which will be used as a reference number. In addition, an applicant
that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current
policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in (city or
town)." A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the
applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each
year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture
(i.e. a dog license or pen-nit to burnleaves etc.)said person is NOT required to complete this affidavit.
The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions,
please do not hesitate to give us a call.
The Department's address,telephone and fax number:
The Commonwealth of Massachusetts
Department of 1`ridustrial Accidents
Office of Investigations
600 Washington Street
Boston; MA 02111
Tel. 4 617-727-4900 ext 406 or 1-877-MASSAFE
Revised 5-26=05
Fax#617-727-7749
WW"Mass.Dov/dia
Jan 07 2009 10: 17PM HP LASERJET FAX 9784656607 P. 1
19d8 wi.
Qi0g1J1'1 :Uafe�icix3
r'neiwi�
H.ID1H Bt
3s � Rlr Nuvri
+. 9ZLge SO
Sipa�}al.JOOtNadn$ua6�3n�}s+s�ta� t
r��rjS.P+�'su�#upjn�ra 1u�p��n8 Jo te.ttra8
T 3?!pS iryynd.16 luawlirdap- J1.lRnt�aabsi�
W
' z
Y �
MILLPOND HOMEOWNERS ASSOCIATION/JGCA
ROOFING SPECIFICATION AND CONTRACT
This contract is made between Millpond Homeowners Association,Inc. (the
Association)and JGCA,Inc.(the Contractor)in relation to the replacement of
roofing and associated siding.
DATE OF DOCUMENT
The date of this document is November 8,2007.
SCHEDULE
This contract is for Zone 2 and Zone 3 building restoration services. Zone 2 services are
to start not before 15 November 2007. This is to be followed by starting Zone 3
beginning no later than 1 January 2009 and completing all work by 31 December 2009.
Should there be a need to work on Zone 3 buildings prior to the completion of Zone 2,
prior approval of the Association is required.
I
SCOPE OF WORK
Roofing and associated siding on Buildings 6,1,2,3,18,13 (52 units,Zone 2)and
Buildings 12,14,15,16,17,the Clubhouse and Mail Center Buildings(31 units,two
common buildings,Zone 3)are to be repaired according to the specifications contained
herein and are to be completed by December 31,2008,and December 31,2009,
respectively.Modifications to the scope of work and contract must be mutually agreed
upon in writing in advance by the Association and the Contractor.
REPORTING
Thirty(30)days after each building is completed,the Contractor will deliver to the
Association a summary of the roofing,and associated costs for the repair of the building.
This report can be part of reports provided for Siding replacement.
SPECIFICATIONS
The following specification is the minimum standard of work to be performed by the
Contractor regarding the replacement of all shingle and rubber roofing at Millpond.
e
1. Step and re-roof all asphalt and rubber roofing. Strap any wood siding that touches the
roof or needs to be removed in order to properly flash the roof/siding. Replace any
plywood that is rotted or weak. Re-nail all plywood prior to installation of materials. If
structural issues are encountered,contact the property manager or construction supervisor
immediately for agreement on resolution. Remove all insulation board beneath the
rubber membrane. Repair/replace any plywood decking as needed.
2. Install Grace or GAF Ice and Water Shield or equivalent six feet up from the edge of
the roof. Install Ice and Water shield 18 inches around any vent piping protruding
through the roof. Install Ice and Water Shield 18 inches up any sidewall that abuts the
MHA/JGCA 1 11/8/2007
h�`.
roof. Where the asphalt shingles meet the rubber-roofing, install 3 feet of Ice and Water
Shield. There will be no ridge vent wherever asphalt and rubber meet.
3. Install premium Berger Paper or equivalent on all sheathing areas not covered by Ice
and Water Shield.
4. Install 8-inch(white)aluminum drip edge on all roof edges.
5. Install step flashing along all walls that abut the roofline. Use any additional flashing
deemed necessary.
6. Install 50 year,Owens Corning Oakridge Pro Slatestone Gray architectural shingles as
chosen by the Association.
7. Install new insulation board, screwed to the decking. Install new epdm60 rubber
membrane. Install flashing on all edges and then glue rubber over all flashing. Flashing
must be bronze,black or a color agreed upon by the association. Where the rubber meets
the asphalt at the ridge,overlap the rubber and glue the rubber to the asphalt. Overlap
should be 12 inches. Berger must be under this section of roof but not to adversely affect
the seal of the rubber. The rubber roofing also includes all chimney caps.
8. Use step flashing along all sidewalls even though there is 18 inches of Ice and Water
Shield. Once the roofing is complete, install a 5/4 pressure treated skirt board where the
roof and sidewall meet.Flash the entire rake board. Install Berger Wrap or chosen
material over the entire wall and over the flashing. Install new 1x6 pine shiplap siding as
chosen by Millpond. Use stainless steel ring nails only. Siding will be pre-primed. All
cut edges must be re-primed prior to installation.Nail guns may be used. No nail heads
will be allowed to penetrate face of siding.
9. There are three types of a/c protrusions through the roof. Two have built in sidewalls
and the aforementioned siding and flashing spec will suffice. The Yd format,of which
there are 80,is an a/c unit that sits on the asphalt shingle. This structure must be removed
and rebuilt.
10.While prepping the sheathing for the 3`d format,install six 2x4 pressure treated blocks
onto the sheathing. This block will require flashing and will be completely covered by
Ice and Water Shield. The entire sheathing coverage area below this unit will be covered
with Grace Ice and Water Shield. The frame of the new structure to surround the a/c unit
will be built upon these six blocks. All nail heads going into these blocks must be sealed
with Henry Roofing Tar or similar product. The framing will be similar to what currently
exists with a similar louver system. The frame must be elevated from the roof. There is
no roof on these units. All framing wood must be pressure treated lumber.
11. If the soffit overhang on a unit needs to be replaced,it will be done by building a new
structure of 2x6 framing sitting on a 2x4 cleat. The 2x4 cleat will then be covered by the
soffit board. A new fascia board will be installed and the entire unit will be adequately
MHA/JGCA 2 11/8/2007
r - s
nailed into the frame of the building. Contractor will use best efforts to align the
plywood to meet the existing roofline.
12. All materials such as plywood,siding,nails,Berger paper and ice shield used in
connection with the siding will be paid for by Millpond at cost with no additional
markup. Contractor shall provide Millpond with copies of original invoices for materials
on a monthly basis to enable Millpond to confirm that there is no markup on the
materials. The roofs will be installed on the buildings and garages at a rate of $385.00
per square for calendar year 2008 and for$405.00 per square for calendar year 2009 for
architectural shingles, and $1000.00 per square for the calendar year 2008 and for
$1050.00 for calendar year 2009 for epdm roofing. All carpentry work not related to the
specific roof installation will be paid to the Contractor at a rate of $42.00 per hour for
calendar year 2008 and $43.75 for calendar year 2009. Any rate changes will require a
60-day notification in writing with justification to the Association.
NOTE: Carpentry costs not included as part of the per square roof costs include the A/C
mountings and enclosures, sheathing replacement as needed,overhang and soffit
rebuilding and repair, skirtboards,rakeboards,trim,any other necessary siding repair or
replacement, and rot remediation.
13. Work areas will be cleaned daily. Care will be taken to prevent debris from being
blown over the property. Any fallen debris,especially roofing nails,will be cleaned up
and removed from the property daily. Ladders and other equipment, except pump
staging,must be taken down from buildings and stored neatly behind the building being
! worked on,or stored in an area designated by the property manager.
14. All workmanship shall be consistent with approved construction standards and all
work shall be performed in a good and workmanlike manner. All materials,including but
not limited to all shingles,rubber roofing,ice and water shield and flashing shall be
installed in accordance with all manufacturers' recommendations. In addition,all such
materials shall be installed in such a manner that the manufacturers' warranties shall be in
full force and effect. To the extent that any paperwork or documentation must be
prepared or submitted to implement or validate any manufacturer's warranty, Contractor
shall prepare and submit all such documentation and shall deliver copies of all
manufacturers'warranties to the Association.
15. Skylights will be installed in accordance with the manufacturer's specifications. The
! Contractor will not be responsible to perform any work inside the unit as part of this
installation
j
AGREEMENT TO COMPLY
The Contractor will procure the building permits required for this project and will comply
with the State Building Code as part of this contract.
PAYMENT SCHEDULE
The Association will be invoiced as work is completed and the Association will pay these
invoices within 30 days.
MHA/JGCA 3 11/8/2007
f
TERMINATION
The Association reserves the right to terminate this contract with or without cause at any
time without liability on the part of the Association. Any and all valid outstanding
invoices will be paid at termination.
INSURANCE
Contractor shall maintain during the term of this Agreement sufficient Workman's
Compensation,Public Liability and Property Damage insurance policies with respect to
the Property sufficient to cover any foreseeable damage caused by the performance
and/or the failure to perform said Agreement. For purposes of this Agreement,the
commercial general liability coverage provided by the Contractor shall provide for
coverage of not less than$1,000,000.00 per occurrence or claim and not less than
$2,000,000.00 for general aggregate. The Contractor shall deliver to the Association a
Certificate of such insurance referencing the Association as a Certificate Holder. The
Certificate shall provide that the insurer will notify the Association at least thirty(30)
days prior to any modifications or prior to cancellation. No work will be performed,nor
payments made to the Contractor until such insurance certificate has been provided to
Great North Property Management and insurance is in effect.
WARRANTIES
The Contractor hereby warrants and guarantees that the work being performed by him
will be in a workmanlike manner and guarantees said workmanship and labor for a period
of two(2) years after the completion of this Agreement. This is in addition to any
materials warranties supplied by the manufacturers. The Contractor will not be held
responsible or liable for any damage to any portion of the common elements that are not
repaired or replaced as part of this project,unless such damage is caused by the
Contractor's willful negligence. Nor will the Contractor be held responsible or liable for
any damage or breakage of any personal possessions of individual unit owners,inside or
outside,resulting from the construction project,unless such damage is likewise caused by
the Contractor's willful negligence. Any such work shall commence within a thirty(30)
day period after notice to Contractor of said damages.
ARBITRATION
Any controversy or claim arising out of or relating to this contract or the breach of it shall
be submitted to arbitration in accordance with the rules of the American Arbitration
Association and any award may be enforced in the Massachusetts Superior Court having
jurisdiction.
ASSIGNMENT
The contractor may not assign or delegate any of its rights and duties under this
agreement without the prior written consent of the Association.
CHANGES
Any deviation from this minimum standard must be reported to the property manager for
consultation and must be agreed upon in writing in advance by the Association.
MHA/JGCA 4 11/8/2007
POINTS OF CONTACT
Contractor: Property Manager:
Mark Audette Bruce Raider
JGCA,Inc. Great North Property Management
P.O.Box 1480 182 Newbury Street
Newburyport,MA 01950 Peabody,MA 01960
978-278-4000
Millpond Homeowner's Association
President of the Association
Currently,Beth Mazin
19 Millpond
North Andover,MA
978-623-8401 ext. 33
This is a binding contract and is to be governed by the laws of the Commonwealth
of Massachusetts.
JGCA,Inc. Date
Lo
Mill and HomeownAs As iation DAte
MHA/JGCA 5 11/8/2007
MILLPOND HOMEOWNERS ASSOCIATION/JGCA
SIDING SPECIFICATION AND CONTRACT
This contract is made between Millpond Homeowners Association,Inc. (the Association)
and JGCA,Inc. the Contractor in relation to the replacement of siding and building rot.
DOCUMENT DATE
The date of this document is November 08,2007.
SCHEDULE
This contract is for Zone 2 and Zone 3 building restoration services.Zone 2 services are to start
not before 15 November 2007. This is to be followed by starting Zone 3 beginning no later than
1 January 2009 and completing all work by 31 December 2009. Should there be a need to work
on Zone 3 buildings prior to the completion of Zone 2,prior approval of the Association is
required.
SCOPE OF WORK
Defective siding and structural elements on Buildings 6,1,2,3,18,13 (52 units,Zone 2)and
Buildings 12,14, 15, 16, 17,the Clubhouse and Mail Center Buildings(31 units,2 common
buildings,Zone 3)are to be repaired according to the specifications contained herein.
Modifications to the scope of work and contract must be mutually agreed upon in writing in
advance by the Association and the Contractor.
REPORTING
Thirty(30)days after each building is completed,the Contractor will deliver to the Association a
summary of the siding, and associated costs for the repair of the building. This report may be
submitted along with the roofing contract report.
SPECIFICATIONS
The following specification is the minimum standard of work to be performed by the contractor
regarding the repair of rot and the replacement of siding at Millpond.
1. Where rot is found, strip the siding to uncover the rot. Make all necessary repairs to the rot
and structural elements. Install all necessary sheathing. Install Berger Paper or equivalent prior to
installation of siding. Install siding as provided by Millpond and nail with stainless steel ring
nails. Pneumatic nailers may be used. (No nail heads will be allowed to penetrate the face of the
siding.) All ends of cut siding must be primed prior to installation.
2. When deciding upon the amount of siding to be removed, a"best judgment"practice to only
remove up to the seam of the next highest board shall be used. If the rot is beyond this level,
remove the siding to the next seam, and so on. Where practical,do not remove any more siding
than required to perform the work unless specifically instructed to by either the Association
President or the Contractor, specifically Mr. Mark Audette.
MHA/JGCA Siding Contract 1 11/8/2007
3. When replacing siding that is deficient,make every effort to only replace the board to the next
nearest seam. If a majority of a wall has failed,then seek permission, from either the
Association Board Presidcnt or the Contractor Mr. Mark Audette to replace the entire wall.
4. When replacing windows and siding,replace siding that is necessary to make the building
weather tight. In all cases,when practicable, use Berger Paper behind all new siding. If window
trim of previously installed windows is encountered and it is found that it has not been properly
flashed,make every effort to replace the trim and properly flash the window. This applies to
sliders as well.
5. If a unit owner purchases new windows and/or sliders,the contractor will install the windows
or sliders but will only be required to make the exterior of the building weather tight. No interior
work other than normal cleanup will be required.
6. All siding that abuts any roof surface will be replaced. A 5/4 pressure treated skirt board will
be installed over the roof flashing. Flashing will be placed over the 5/4 pressure treated board
prior to the installation of new siding. The Contractor will not be responsible to prime any
pressure treated materials.
7. The Contractor shall have the latitude to use whatever flashing; ice shield or materials will
make the repair as weather tight as possible.
8. Garage passage doors in poor condition will be replaced. Doors will be provided by Millpond.
Any rot found on the garages will be repaired. Skirt boards may be installed at the discretion of
the Contractor.
9. Any rot found on fencing will be repaired by the Contractor. Cutting rot at the base and
installing a pressure treated skirt board is an acceptable repair option.
10.Any landscaping that is in the way of the work will be reported to the owner of the unit and
the property manager. If it is deemed to impede the repair/replacement work,the unit owner will
be informed that the landscaping must be removed. In no event will permission be withheld and
the Contractor will not be held responsible for any damage to the landscaping.
11.All materials will be provided by Millpond. The Contractor will be paid at a rate of $42.00
per hour for the construction year 2008 (January 1,2008 through December 31,2008)and
increase to $43.75 for the construction year 2009(January 1,2009 through December 31,2009).
No rate changes are allowed without providing 60 days written notice and ensuing justification
to the Association.
12. Work areas will be cleaned daily. Care will be taken to prevent debris from being blown over
the property. Any fallen debris,especially nails,will be cleaned up and removed from the
property daily. Ladders and other equipment, except pump staging,must not be left standing
MHA/JGCA Siding Contract 2 11/8/2007
Aside buildings,and must be stored neatly behind the building being worked on,or stored in an
area designated by the property manager.
13.All workmanship shall be consistent with approved construction standards and all work shall
be performed in a good and workmanlike manner. All materials,including but not limited to all
shingles,rubber roofing, ice and water shield and flashing shall be installed in accordance with
all manufacturers' recommendations. In addition, all such materials shall be installed in such a
manner that the manufacturers' warranties shall be in full force and effect. To the extent that any
paperwork or documentation must be prepared or submitted to implement or validate the any
manufacturer's warranty, the Contractor shall prepare and submit all such documentation and
shall deliver copies of all manufacturers' warranties to the Association.
AGREEMENT TO COMPLY
The Contractor will procure the building permits required for this project and will comply with
the State Building Code as part of this contract.
PAYMENT SCHEDULE
The Association will be invoiced as work is completed and the Association will pay these
invoices within 30 days.
TERMINATION
The Association reserves the right to terminate this contract with or without cause at any time
without liability on the part of the Association. Any and all outstanding valid invoices will be
paid at termination.
INSURANCE
The Contractor shall maintain during the term of this Agreement sufficient Workman's
Compensation,Public Liability and Property Damage insurance policies with respect to the
Property sufficient to cover any foreseeable damage caused by the performance and/or the failure
to perform said Agreement. For purposes of this Agreement, the commercial general liability
coverage provided by the Contractor shall provide for coverage of not less than$1,000,000 per
occurrence or claim and not less than$2,000,000 for general aggregate.The Contractor shall
deliver to the Association a Certificate of such insurance referencing the Association as a
Certificate Holder. The Certificate shall provide that the insurer will notify the Association at
least thirty(30)days prior to any modifications or prior to cancellation. No work will be
performed,nor payments made to the Contractor until such insurance certificate has been
provided to Great North Property Management and insurance is in effect.
WARRANTIES
The Contractor hereby warrants and guarantees that the work being performed by him will be in
a workmanlike manner and guarantees said workmanship and labor for a period of two(2)years
after the completion of this Agreement. This is in addition to any materials warranties supplied
by the manufacturers. The Contractor will not be held responsible or liable for any damage to
anonion of the common elements that are not repaired or replaced as art of this project,
Y P eP � P P J
unless such damage is caused by the Contractor's willful negligence. Nor will the Contractor be
held responsible or liable for any damage or breakage of any personal possessions of individual
MHA/JGCA Siding Contract 3 11/8/2007
unit owners,inside or outside,resulting from the construction project,unless such damage is
likewise caused by the Contractor's willful negligence. Any such work shall commence within a
thirty(30)day period after notice to Contractor of said damages.
ARBITRATION
Any controversy or claim arising out of or relating to this contract or the breach of it shall be
submitted to arbitration in accordance with the rules of the American Arbitration Association and
any award may be enforced in the Massachusetts Superior Court having jurisdiction.
ASSIGNMENT
The contractor may not assign or delegate any of its rights and duties under this agreement
without the prior written consent of the Association.
CHANGES
Any deviation from this minimum standard must be reported to the property manager for
consultation and must be agreed upon in writing in advance by the Millpond Homeowners'
Association.
POINTS OF CONTACT
Contractor: Property Manager:
Mark Audette Bruce Raider
JGCA,Inc. Great North Property Management
P.O.Box 1480 182 Newbury Street
Newburyport,MA 01950 Peabody,MA 01960
978-278-4000
Millpond Homeowner's Association
President of the Association
Currently,Beth Mazin
19 Millpond
North Andover,MA
978-691-0086
This is a binding contract and is to be governed by the laws of the Commonwealth of
Massachusetts.
r-g -oma
JGCA,Inc. Date
Millnd Homeowner's AiAociation Date
President
MfWJGCA Siding Contract 4 11/8/2007