HomeMy WebLinkAboutMiscellaneous - 0 Pond Streeti
N
4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important:
When filling
out forms on
the computer,
use only the
tab key to
move your
cursor - do not
use the return
key.
VQ
ietmn
A. General Information
North Andover
1. From: Conservation Commission
2. This issuance is for (check one): a. ® Order of Conditions
3. To: Applicant:
Jim Nason
a. First Name b. Last Name
Stone House Farm Realty Trust No.
c. Organization
276 Washington Street
d. Mailing Address
West Boxford MA
e. City/Town
4. Property Owner (if different from applicant):
f. State
MassDEP File Number:
242-1431
b. ❑ Amended Order of Conditions
01885
g. Zip Code
a. First Name b. Last Name
c. Organization
d. Mailing Address
e. City/Town f. State g. Zip Code
5. Project Location:
0 Pond Street North Andover
C
7
s
a. Street Address
b. City/Town
Map 90C
Parcel 27
c. Assessors Map/Plat Number
d. Parcel/Lot Number
Latitude and Longitude, if known:
42-42'-46"N 71-05'-05"W
e. Latitude f. Longitude
Property recorded at the Registry of Deeds
for (attach additional information if more than one parcel):
Essex North
a. County
b. Certificate Number (if registered land)
d. Page
c. Book
5/28/08
8/13/08 8/15/08
Dates: a. Date Notice of Intent Filed
b. Date Public Hearing Closed c. Date of Issuance
Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Site Plan
a. Plan Title
Xeriscape Design, LLC
b. Prepared By
May 19, 2008, revised June 26, 2008
d. Final Revision Date
f. Additional Plan or Document Title
Thad D. Berry, P. E.
c. Signed and Stamped by
1"=20'
e. Scale
g. Date
wpaform5.doc • rev. 2/27/06 Page 1 of 10
if1,
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
MassDEP File Number:
242-1431
Following the review of the above -referenced Notice of Intent and based on the information provided .
in this application and, presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available) a. linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a. linear feet b. linear feet c. linear feet d. linear feet
5. ❑ Bordering Vegetated
Wetland a. square feet b. square feet c. square feet d. square feet
6. ❑ Land Under W aterbodies a. square feet b. square feet c. square feet d. square feet
and Waterways
e. c/y dredged f. c/y dredged
wpaform5.doc • rev. 2/27/08 Page 2 of 10
`11
i
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
MassDEP File Number:
242-1431
B. Findings (cont:)
❑
Barrier Beaches
13.
Resource Area
Proposed
Permitted
Proposed
Coastal Dunes
Alteration
Alteration
Replacement
7. ❑ Bordering Land
❑
Rocky Intertidal Shores
17.
Subject to Flooding
a. square feet
b. square feet
c. square feet
Cubic Feet Flood Storage
g. cubic feet .
e. cubic feet
f. cubic feet
8. ❑ Isolated Land Subject
to Flooding
a. square feet
b. square feet
Cubic Feet Flood Storage
e. cubic feet
c. cubic feet
d. cubic feet
9. ❑ Riverfront area
a. total sq. feet
b. total sq. feet
Sq ft within 100 ft
e. square feet
c. square feet
d. square feet
Sq ft between 100-200 ft
i. square feet
g. square feet
h. square feet
Coastal Resource Area Impacts:
Check all that apply
below. (For Approvals
Only)
10. ❑ Designated Port Areas
Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean
b. square feet
a. square feet
12.
❑
Barrier Beaches
13.
❑
Coastal Beaches
14.
❑
Coastal Dunes
15.
❑
Coastal Banks
16.
❑
Rocky Intertidal Shores
17.
❑
Salt Marshes
18.
❑
Land Under Salt Ponds
19. ❑ Land Containing
Shellfish
20. ❑ Fish Runs
21. ❑ Land Subject to Coastal
Storm Flowage
Permitted
Replacement
d. square feet
h. cubic feet
f. cubic feet
f. square feet
j. square feet
Indicate size under Coastal Beaches and/or Coastal Dunes below
a. square feet b. square feet c. c/y nourishmt. d. c/y nourishmt.
a. linear feet b. linear feet
a. square feet b. square feet
a. square feet b. square feet
c. c/y dredged d. c/y dredged
Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a. square feet b. square feet
wpaform5.doc • rev. 2/27/08 Page 3 of 10
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
MassDEP File Number:
242-1431
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number 242-1431
wpaform5.doc • rev. 2/27/08 Page 4 of 10
r
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
MassDEP File Number:
242-1431
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the property
subject to this Order and to any contractor or other person performing work conditioned by this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been.fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission,. which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. The work associated with this Order is (1) ® is not (2) ❑ subject to the Massachusetts
Stormwater Policy Standards. If the work is subject to the Stormwater Policy, the following
conditions apply to this work and are incorporated into this Order:
a) No work, including site preparation, land disturbance, construction and redevelopment, shall
commence unless and until the construction period pollution prevention and erosion and
sedimentation control plan required by Stormwater Standard 8 is approved in writing by the issuing
authority. Until the site is fully stabilized, construction period erosion, sedimentation and pollution
control measures and best management practices (BMPs) shall be implemented in accordance with
the construction period pollution prevention and erosion and sedimentation control plan, and if
applicable, the Stormwater Pollution Plan required by the National Discharge Elimination System
Construction General Permit.
wpaform5.doc • rev. 2/27/08 Page 5 of 10
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
MassDEP File Number:
242-1431
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
b) No stormwater runoff may be discharged to the post -construction stormwater BMPs until written
approval is received from the issuing authority. To request written approval, the following must be
submitted: illicit discharge compliance statement required by Stormwater Standard 10 and as -built
plans signed and stamped by a registered professional engineer certifying the site is fully stabilized;
all construction period stormwater BMPs and any illicit discharges to the stormwater management
system have been removed; and all post -construction stormwater BMPs were installed in accordance
with the plans (including all planting plans) approved by the issuing authority, and have been
inspected to ensure they are not damaged and will function properly.
c) Prior to requesting a Certificate of Compliance, the responsible party (defined in General
Condition 18(e)) shall submit to the issuing authority an Operation and Maintenance (0 & M)
Compliance Statement for the Stormwater BMPs. This Statement shall identify the responsible party
for implementing the Operation and Maintenance Plan and also state that: 1. ``Future responsible
parties shall be notified in writing of their continuing legal responsibility to operate and maintain the
stormwater management BMPs and implement the Pollution Prevention Plan; and 2. The Operation
-and Maintenance Plan for the stormwater BMPs is complete and will be implemented upon receipt of
the Certificate."
d) Post -construction pollution prevention and source control shall be implemented in accordance
with the long-term pollution prevention plan section of the approved Stormwater Report and, if
applicable, the Stormwater Pollution Prevention Plan required by the National Discharge Elimination
System Multi -Sector General Permit.
e) Unless and until another party accepts responsibility, the issuing authority shall presume that the
responsible party for maintaining each BMP is the landowner of the property on which the BMP is
located. To overcome this presumption, the landowner of the property must submit to the issuing
authority a legally binding agreement acceptable to the issuing authority evidencing that another entity
has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be
treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through
18(k) with respect to that BMP. Any failure of the proposed responsible party to implement the
requirements of Conditions 18(f) through 18(k) with respect to that BMP shall be a violation of the
Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving
more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the
stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the
design plans, the Operation and Maintenance Plan section of the approved Stormwater Report, and
the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three years including inspections,
repairs, replacement and disposal (for disposal the log shall indicate the type of material and
the disposal location);
2. Make this log available to MassDEP and the Conservation Commission upon request; and
3. Allow members and agents of the MassDEP and the Conservation Commission to enter and
inspect the premises to evaluate and ensure that the responsible party complies with the
Operation and Maintenance requirements for each BMP set forth in the Operations and
Maintenance Plan approved by the issuing authority.
h) All sediments or other contaminants removed from stormwater BMPs shall be disposed of in
accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are
prohibited.
wpaform5.doc • rev. 2/27/08 Page 6 of 10
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1431
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
j) The stormwater management system approved in the Final Order of Conditions shall not be
changed without the prior written approval of the issuing authority. Areas designated as qualifying
pervious areas for purpose of the Low Impact Site Design Credit shall not be altered without the prior
written approval of the issuing authority.
k) Access for maintenance of stormwater BMPs shall not be obstructed or blocked. Any fencing
constructed around stormwater BMPs shall include access gates. Fence(s) shall be at least six inches
above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text document):
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
1. Municipal Ordinance or Bylaw 2. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final
Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetland Protection Bylaw Chapter 178
1. Municipal Ordinance or Bylaw 2. Citation
3. The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space
for additional conditions, attach a text document):
See attached
wpaform5.doc • rev. 2/27/08 Page 7 of 10
DEP FILE # 242 - 1431
Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent, the conditions shall control.
11 GENERAL CONDITIONS
18. The proposed work includes: Construction of a single family home, paved driveway,
retaining walls and steps, associated drainage structures, and grading within the 100 -foot
buffer zone to Bordering Vegetated Wetlands.
19. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: Derosa Environmental Consulting, Inc.
46 North Main Street
Ipswich, MA 01938
Site Plans prepared by: Xeriscape Design, L.L.C.
18 Oak Street
Reading, MA 01867
Titled "Notice of Intent, Town of North Andover"
Signed by: Thad D. Berry
Dated: 5/19/08 and revised 6/26/08
Other Record Documents: Letter from Division of Fisheries & Wildlife
Thomas W. French, Ph.D
Re: NHESP Tracking No. 08-25919
Dated: July 18, 2008
Construction Sequence Lot 1 Pond Street North Andover MA
Submitted via email on 8/11/2008 by Thad Berry, Xeriscape
Design, L.L.C.
20. The term "Applicant' as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
in writing within 30 days of all transfers of title of any portion of property that takes
place prior to the issuance of a Certificate of Compliance.
CAWinword\00C\boi1er1.doc 1 NACC 8/15/2008
DEP FILE # 242 -1431
21. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
22. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
23. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not incompliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
24. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws or
regulations.
25. The work authorized hereunder shall be completed within three years from the date of
this order.
26. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least t
days (30) prior to the expiration date of the Order (Refer to Section VIII (B)(p.33) of the
North Andover Wetland Regulations).
27. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant
28. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department
29. Any future project which proposes a wetland crossing in order to access certain portions
of the property will not be qualified as a limited project roadway under 310 CMR
10.53(e).
30. The following wetland resource areas are affected by the proposed work: Buffer Zone to
Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests
CAWinword\00C\boilerl.doc 2 NACC 8/15/2008
DEP FILE # 242 - 1431
of the Act and Town ByLaw as noted above and therein. The applicant has not attempted
to overcome the presumption of significance of these resource areas to the identified
interests.
31. The NACC agrees with the applicant's delineation of the wetland resource areas on the
site as shown on the plans dated referenced herein.
32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twen five foot (25') No -Disturbance Zone and
a fifty foot (50') No -Construction Zone shall be established from the edge of the adjacent
wetland resource area. The Conservation Administrator and/or other agents of the
NACC do not have the authority to waive these setbacks as established under the local
bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No -
Disturbance zone. (See Section III(D) & Appendix G of the local Regulations).
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
34. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Issuance of these Conditions does not in any way imply or certify
that the site or downstream areas will not be subject to flooding, storm damage or any
other form of water damage. Maintenance of the drainage system, if accepted by the
Town as part of a public way, becomes the responsibility of the Town.
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
I J
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
37. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
CAWinword\00C\boi1er1.doc 3 NACC 8/15/2008
DEP FILE # 242 - 1431
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at the
applicant's expense.
38. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP, File Number 242-1431."
39. Any changes in the submitted plans caused by the applicant, another Board's decision or
resulting from this Order of Conditions must be submitted to the NACC for approval
prior to implementation. If the NACC finds said changes to be significant, the NACC
will call for another public hearing (at the expense of the applicant). Within 21 days of the
close of said public hearing the NACC will issue an amended or new Order of
Conditions. Any errors found in the plans or information submitted by the applicant shall
be considered as changes. No work shall begin on a project until written approval has
been granted by the NACC.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
41. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval, a detailed sequence of construction, including the construction of compensation
and retention areas, installation of sedimentation/erosion control devices and re -
vegetation to be completed before other work begins on-site.
42. Wetland flagging shall be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and enumerated
per the approved plan(s) throughout the life of the project and until a Certificate of
Compliance is issued so that erosion control measures can be properly placed and
wetland impacts can be monitored. The proposed limit of work shall be shall be clearly
marked with erosion controls or temporary fencing and shall be confirmed by the NACC.
Such barriers shall be checked and replaced as necessary and shall be maintained until all
construction is complete. Workers should be informed that no use of machinery, storage
of machinery or materials, stockpiling of soil, or construction activity is to occur beyond
this line at any time.
43. Two rows of staked hay bales backed by trenched siltation fence shall be placed between
all construction areas and wetlands. The erosion control barrier will be properly installed
CAWinword\00C\boi1er1.doc 4 NACC 8/15/2008
DEP FILE # 242 - 1431
and placed as shown on the plans approved and referenced herein and shall be inspected
and approved by the NACC or its agent prior to the start of construction and shall remain
intact until all disturbed areas have been permanently stabilized to prevent erosion. A
second row of erosion controls is specifically required under this order due to steep
slopes and large volumes of fill required. All erosion prevention and sedimentation
protection measures found necessary during construction shall be implemented at the
direction of the NACC or its agent The NACC reserves the right to impose additional
conditions on portions of this project to mitigate any impacts which could result from site
erosion, or any noticeable degradation of surface water quality discharging from the site.
For example, installation of erosion control measures may be required in areas not shown
on the plan(s) referenced in this Order of Conditions. Should such installation be
required by the NACC, they shall be installed within 48 hours of the Commission's
request
44. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 15 hay bales] and sufficient stakes for staking these bales (or
an equivalent amount of silt fence,1 hay bale to equal 3 feet of fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be used for the
normal control of erosion.
45. The applicant shall submit an Engineers Fill Compaction Report
46. A check payable to the Town of North Andover shall be provided in the amount of $3,000
which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the
NACC, and shall be posted with the North Andover Town Treasurer through the NACC
before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to
the NACC, and Town Counsel, and shall be released after completion of the project,
provided that provisions, satisfactory to the NACC, have been made for performance of
any conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local ByLaw.
47. The applicant shall be responsible for placing signs on each parcel, where there is more
than one (1) lot, designating the applicable lot number as depicted on the plans approved
and referenced herein.
48. The applicant shall designate a Wetland Scientist (or other environmental professional as
approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee any
emergency placement of controls and regular inspection or replacement of sedimentation
control devices. The name and phone number of the erosion control monitor must be
provided to the NACC in the event that this person has to be contacted, due to an
emergency at the site, during any 24-hour period, including weekends. This person shall
be given the authority to stop construction for erosion control purposes. The erosion
control monitor will be required to inspect all such devices and oversee cleaning and the
proper disposal of waste products. Cleaning shall include removal of any entrapped silt.
C:\Winword\OOC\boilerl.doc 5 NACC 8/15/2008
DEP FILE # 242 - 1431
At least once during each week in which construction activities occurs on-site and for as
long thereafter as ground remains unstabilized, the applicant shall submit a written
report from the "Erosion Control Monitor" to the NACC certifying that, to the best of
his/her knowledge and belief based on a careful site inspection, all work is being
performed in compliance with this Order of Conditions and that approved setbacks are
being adhered to. The erosion control monitor must visually inspect all
sedimentation/ erosion control measures and assume responsibility for their maintenance
on a weekly basis and that they are functioning as intended. In addition, all wetland
resource areas must be visually inspected for siltation, turbidity, and/or other water
quality impacts.
49. Prior to construction, the applicant shall permanently mark the edge of the "25' No -
Disturbance Zone" with ten (10) signs or markers spaced evenly every 30 feet
incorporating the following text: "Protected Wetland Resource Area". This will
designate their sensitivity and assure no further inadvertent encroachment into the
wetland. These permanent markers are subject to review and approval by the NACC.
The applicant shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the applicant.
These markers shall remain posted and be replaced as necessary in perpetuity.
50. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of Conditions,
the "Compliance Certification Form Affidavit' attached via "Appendix A" signed under
the pains and penalties of perjury, stating that said applicant and/or owner has read
these Orders of Conditions and is in compliance with each and every condition. This
document shall apply to each of the conditions referenced herein and shall be provided to
the Conservation Department at least five (5) business days prior to the closing of said
land transaction.
51. Once these above mentioned pre -construction requirements are complete, the applicant
shall contact the Conservation Office prior to site preparation or construction and shall
arrange an on-site conference with an NACC representative, the contractor, the engineer,
wetland scientist and the applicant to ensure that all of the Conditions of this Order are
understood. This Order shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors and
other personnel performing the permitted work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order of Conditions resulting from failure to comply with its conditions. The applicant
or contractor shall notify the NACC in writing of the identity of the on-site construction
supervisor hired to coordinate construction and to ensure compliance with this Order. A
reasonable period of time shall be provided as notice of the pre -construction meeting (e.g.
72 hours).
CAWinword\000boilerl.doc 6 NACC 8/15/2008
DEP FILE # 242 - 1431
IISTORMWATER MANAGEMENT CONDITIONS in
52. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
53. Water quality in down gradient BVW's shall not differ significantly following completion
of the project from the pre -development conditions. There shall be no sedimentation into
wetlands or water bodies from discharge pipes or surface runoff leaving the site.
54. The applicants, owners, and their successors and assignees, shall maintain all culverts,
collections basins, traps, outlet structures, subsurface storage areas, and other elements of
the drainage system in order to avoid blockages and siltation which might cause failure
of the system and/or detrimental impacts to on-site or off-site resource areas, and shall
maintain the integrity of vegetative cover on the site.
DURING CONSTRUCTION
55. IMPORTANT: Immediately upon completion of the dwelling foundation, and prior to
further construction activities associated with the site, the applicant shall complete a plan
prepared by a Registered Professional Land Surveyor of the Commonwealth (R.P.L.S.)
which accurately depicts the foundation location and it's proximity to wetland resource
areas as approved under this Order of Conditions. Said plan shall be submitted to the
Conservation Administrator for approval.
56. Upon beginning work, the applicant shall submit written progress reports weekly
detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction sequence.
57. Dewatering activities are not approved under the Order of Conditions for this site. If
emergency de -watering requirements arise, the applicant shall submit a contingency plan
to the Commission for approval, which provides for the pumped water to be contained in
a settling basin, to reduce turbidity prior to discharge into a resource area.
58. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing.
59. No exposed area shall remain unfinished for more than thirty (30) days, unless approved
by the NACC.
CAWinword\00C\boi1er1.doc ? NACC 8/15/2008
DEP FILE # 242 -1431
60. No re -grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical).
Slopes of steeper grade shall be rip -rapped to provide permanent stabilization
61. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any
resource area.
62. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area.
63. All waste generated by, or associated with, the construction activity shall be contained
within the limit of work, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site for
the storage and removal of such spent construction materials off-site. However, no trash
dumpsters will be allowed within 50' of areas subject to protection under the Act or local
ByLaw.
64. Accepted engineering and construction standards and procedures shall be followed in
the completion of the project
65. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance
is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
66. No underground storage of fuel oils shall be allowed on any lot within one -hundred
(100) feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under the
authority of the Town's Wetland protection ByLaw.
67. Fertilizers utilized for landscaping and lawn care shall be slow release, low -nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within 100 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection ByLaw and
shall remain in perpetuity.
68. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
CAWinword\00C\boi1er1.doc 8 NACC 8/15/2008
!.
DEP FILE # 242 - 1431
69. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
70. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/ trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An "As -Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
➢ "As -Built" post -development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area. NOTE: If portions of the stormwater systems exist partially within
the Buffer Zone than the entire structure must be depicted to accurately
verify compliance.
➢ "As -Built" post -development elevations and grades of all filled or altered
Wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes a_y disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
71. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project~
C AWinword\00C\boiled . doc
NACC 8/15/2008
I,
DEP FILE # 242 -1431
➢ 25' No -Disturbance Zone and a 50' No -Construction Zone shall be
established from the edge of adjacent wetland resource areas except in those
locations approved under DEP # 242-1431. Future work within 100' of
existing wetland resource areas will require a separate filing with the
NACC (refer to Section XI (page 18) of the Regulations for performance
standards within these zones) The Conservation Administrator and/or
other agents of the NACC do not have the authority to waive these setbacks
as established under the local ByLaw;
➢ Resource Area Markers (Condition #49);
➢ Discharge or spillage of pollutants (Condition #65);
➢ Prohibition of underground fuels (Condition #66);
➢ Limitations on the use of fertilizers, herbicides, and pesticides (Conditions
#67).
CAWinword\OOC\boiled.doc 10
NACC 8/15/2008
K
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands'
1 WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
MassDEP File Number:
242-1431
This Order is valid for three years, unless otherwise specified as a special ?/, 516 ,
condition pursuant to General Conditions #4, from the date of issuance. 1. Date of Issuance
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of,the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand. delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
Acknowledgement
Commonwealth of Massachusetts County of
Essex North
On this � of Iq U L)
Day Month Year /
Before me, the undersigned Notary Public, S(2,4X_J i% �p,Umg 6j
personally appeared Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
North Andover
As member of NNott A Conservation Commission
Cityf
Place notary seal and/or any stamp above
This Order is issued to the applicant as follows:
0 by hand delivery on
Date
Signature of Notary Public
Printed Name of Notary Public
PJ7%,009
My Commission Expires (Date)
Eeby certified mail, return receipt requested, on
Date
Ph V/0 ?
wpaform5.doc • rev. 2/27/08 Page 8 of 10
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands MassDEP File Number:
WPA Form 5 - Order of Conditions 242-1431,
Massachusetts Wetlands -Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of
Conditions. The request must be made by certified mail or hand delivery to the Department, with the
appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided
in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the
request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's
Superseding Order associated with this appeal will be required to demonstrate prior participation in the review
of this project. Previous participation in the permit proceeding means the submission of written information
to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order
or Determination, or providing written information to the Department prior to issuance of a Superseding
Order or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.doc • rev. 2/27/08 Page 9 of 10
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
MassDEP File Number:
242-1431
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions..The recording information on
this page shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
--------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
0 Pond Street 242-1431
Project Location MassDEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc - rev. 2/27/08
Page 10 of 10
f
•e
DEP FILE # 242 - 1431
I,
APPENDIX A - AFFIDAVIT
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. I am the of
( position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
&/or
2. I am the of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File #) and every condition which has been set forth
in said Order of Conditions.
4. I hereby affirm and acknowledge that on this day of 19
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File #)
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File #)
Signed under the pains and penalties of perjury this day of 19
(Signature - authorized agent of applicant or owner)
C:\Winword\00C\boi1er1.doc 11 NACC 8/15/2008
Massachusetts Department of Environmental Protection
Provided by MassDEP:
Bureau of Resource Protection - Wetlands
MassDEP File #:242-1431
WPA Form 5 - Order of Conditions
L7,
eDEP Transaction #:601959
City/rown:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
1. Conservation Commission NORTH ANDOVER
2. Issuance a. p OOC b.je Amended OOC
3. Applicant Details
a. First Name JIM b. Last Name
NASON
c. Organization STONE HOUSE FARM REALTY TRUST
d. Mailing Address 276 WASHINGTON STREET
e. City/Town WEST BOXFORD f State MA
g. Zip Code 01885
4. Property Owner
a. First Name ERIC b. Last Name
PETERSON
c. Organization
d. Mailing Address 202 HIGH STREET
e. City/Town NORTH ANDOVER f. State MA
g. Zip Code 01938
5. Project Location
a.Street Address 0 POND STREET
b.City/Town NORTH ANDOVER c. Zip Code
d. Assessors Map/Plat# 90C e. Parcel/Lot#
27
f. Latitude 42.71298N g. Longitude
71.08483W
6. Property recorded at the Registry of Deed for:
a. County b. Certificate c. Book
d. Page
NORTHERN ESSEX 03747
0043
7.Dates
a. Date NOI Filed: 5/23/2008 b. Date Public Hearing Closed: 9/25/2013 c. Date Of
Issuance: 10/8/2013
8.Final Approved Plans and Other Documents
a. Plan Title: b. Plan Prepared by: c. Plan Signed/Stamped by: d. Revised Final Date: e. Scale:
SITE PLAN, POND ASB DESIGN GROUP,
STREET, NORTH THAD D. BERRY, P.E. 09.302013 I"=201
LLC
ANDOVER, MA
B. Findings
1.Findings pursuant to the Massachusetts Wetlands Protection Act
Page 1 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 -Order of Conditions eDEP Transaction #:601959Ciry/Town:NORTx ANDOVER
Lll��_
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Following the review of the the above -referenced Notice of Intent and based on the information provided in this application and
presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of
the Wetlands Protection Act.
Check all that apply:
a. o Public Water Supply b. o Land Containing Shellfish c. o Prevention of Pollution
' d. o Private Water Supply e. o Fisheries f. o Protection of Wildlife Habitat
g. o Ground Water Supply h. o Storm Damage Prevention i. o Flood Control
2. Commission hereby finds the project, as proposed, is:
Approved subject to:
a. o The following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.
This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following
General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control.
Denied because:
b. o The proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore,
work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are
adequate to protect interests of the Act, and a final Order of Conditions is issued. A description of the performance standards
which the proposed work cannot meet is attached to this Order.
c. o The information submitted by the applicant is not sufficient to describe the site, the work or the effect of the work on the interests
identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of
Intent is submitted which provides sufficient information and includes measures which are adequate to protect the interests of the
Act, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is
necessary is attached to this Order as per 310 CMR 10.05(6)(c).
3.o Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource 25
area specified in 310CMR10.02(1)(a). a. linear feet
Inland Resource Area Impacts: (For Approvals Only):
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. o Bank
a. linear feet b. linear feet c. linear feet d. linear feet
5. D Bordering Vegetated Wetland
a. square feet b. square feet c. square feet d. square feet
6. o Land under Waterbodies and Waterways
a. square feet b. square feet c. square feet d. square feet
e. c/y dredged ff, c/y dredged
7. o Bordering Land Subject to Flooding
a. square feet b. square feet c. square feet d. square feet
Page 2 of 10 * ELECTRONIC COPY
I
Massachusetts Department of Environmental Protection Provided by MassDEP:
? Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 - Order of Conditions eDEP Transaction #:601959
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:NORTHANDOVER
Cubic Feet Flood Storage
e. cubic feet f. cubic feet g. cubic feet h. cubic feet
8. o Isolated Land Subject to Flooding
Cubic Feet Flood Storage
9. o Riverfront Area
Sq ft within 100 ft
Sq ft between 100-200 ft
a. square feet b. square feet
c. cubic feet d. cubic feet e. cubic feet f. cubic feet
a. total sq. feet b. total sq. feet
c. square feet d. square feet e. square feet f. square feet
g. square feet h. square feet i. square feet j. square feet
Coastal Resource Area Impacts:
Proposed Permitted Proposed Permitted
Resource Area
Alteration Alteration Replacement Replacement
10. o Designated Port Areas
Indicate size under Land Under the Ocean, below
11. o Land Under the Ocean
a. square feet b. square feet
c. c/y dredged d. c/y dredged
12. o Barrier Beaches
Indicate size under Coastal Beaches and/or Coastal Dunes below
13. o Coastal Beaches
a. square feet b. square feet c. c/y nourishment d. c/y nourishment
14. o Coastal Dunes
a. square feet b. square feet c. c/y nourishment d. c/y nourishment
15. o Coastal Banks
a. linear feet b. linear feet
16. o Rocky Intertidal Shores
a. square feet b. square feet
17. p Salt Marshes
a. b. square feet square feet c. square feet d. square feet
18. o Land Under Salt Ponds
a square feet b. square feet
c. c/y dredged d. c/y dredged
19. o Land Containing Shellfish
a square feet b. square feet c. square feet d. square feet
Page 3 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 -Order of Conditions eDEP Transaction #:601959City/Town-.NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
20. o Fish Runs
21.n Land Subject to Coastal Storm Flowage
Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
c. c/y dredged d. c/y dredged
a. square feet b. square feet
22.
o Restoration/Enhancement (For Approvals Only)
If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been
entered in Section B.5.c & d or B. 17.c & d above, please entered the additional amount here.
a. square feet of BVW
23.
b. square feet of Salt Marsh
o Streams Crossing(s)
If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.
a. number of new stream crossings
b. number of replacement stream crossings
C. General Conditions Under Massachusetts Wetlands Protection Act
The following conditions are only applicable to Approved projects
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed
cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or
invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal,
state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following
apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less than five
years, from the date of issuance. If this Order is intended to be valid for more than three years, the
extension date and the special circumstances warranting the extended time period are set forth as a
special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the
issuing authority at least 30 days prior to the expiration date of the Order.
6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not exceed the issuance
date of the original Final Order of Conditions.
7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including
but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of
any of the foregoing.
8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken,
until all proceedings before the Department have been completed.
9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,
Page 4 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 - Order of Conditions eDEP Transaction #:601959
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 City/Town:NORTH ANDOVER
the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the
proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted
to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds,
prior to the commencement of work..
10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words,
" Massachusetts Department of Environmental Protection"
[or'MassDEP"]
File Number :"242-1431"
11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission
shall be a party to all agency proceedings and hearings before Mass DEP.
12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form
8A) to the Conservation Commission.
13. The work shall conform to the plans and special conditions referenced in this order.
14. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission
in writing whether the change is significant enough to require the filing of a new Notice of Intent.
15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to
enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this
Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that
evaluation.
16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and
to any contractor or other person performing work conditioned by this Order.
17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the
wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland
boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission.
18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or
other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her
designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant
shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary.
Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order.
NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS
19. The work associated with this Order(the "Project") is (1) o is not (2) o subject to the Massachusetts Stormwater Standards.
If the work is subject to Stormwater Standards, then the project is subject to the following conditions;
a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance
with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the
Stormwater Pollution Prevention Plan required by the National Pollutant Discharge Elimination System Construction General
Permit as required by Stormwater Standard 8. Construction period erosion, sedimentation and pollution control measures and
best management practices (BMPs) shall remain in place until the site is fully stabilized.
b) No stormwater runoff may be discharged to the post -construction stormwater BMPs unless and until a Registered
Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by
a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction
operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater
Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation,
including removal of all construction period sediment trapped in inlet and outlet control structures; ii.. as -built final construction
BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii.
any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater
Page 5 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 - Order of Conditions eDEP Transaction #:601959
City/Town:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Standard 10; iv. all post -construction stormwater BMPs are installed in accordance with the plans (including all planting
plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in
proper working condition; v. any vegetation associated with post -construction BMPs is suitably established to withstand
erosion.
c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed
responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the
responsible party (defined in General Condition 19(e)) shall execute and submit to the issuing authority an Operation and
Maintenance Compliance Statement ("O&M Statement") for the Stormwater BMPs identifying the party responsible for
implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the 0&M
Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.) the future responsible parties
shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and
implement the Stormwater Pollution Prevention Plan.
d) Post -construction pollution prevention and source control shall be implemented in accordance with the long-term pollution
prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan
required by the National Pollutant Discharge Elimination System Multi -Sector General Permit.
e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes
responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the
issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has
accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for
purposes of implementing the requirements of Conditions 19(f) through 19(k) with respect to that BMP. Any failure of the
proposed responsible party to implement the requirements of Conditions 19(f) through 19(k) with respect to that BMP shall
be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more
than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and
easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted
along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan,
and the requirements of the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs,
maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the
log shall indicate the type of material and the disposal location);
2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request, and
3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure
that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by
the issuing authority.
h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable
federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited.
j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written
approval of the issuing authority.
k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the
MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered
without the prior written approval of the issuing authority.
I) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around
stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage.
Special Conditions:
SEE ATTACHED.
Page 6 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
LIZ
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File #:242-1431
eDEP Transaction #:601959
City/Town:NORTH ANDOVER
Page 7 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
—� Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
1
WPA Form 5 -Order of Conditions eDEP Transaction #:601959
Massachusetts ANDOVER
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? o Yes o No
2. The Conservation Commission hereby check one that applies):
a. o DENIES the proposed work which cannot be conditioned to
meet the standards set forth in a municipal ordinance or bylaw
specifically:
1. Municipal Ordinance or Bylaw
2. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides
measures which are adequate to meet these standards, and a final Order or Conditions is issued. Which are necessary to
comply with a municipal ordinance or bylaw:
b. APPROVES the proposed work, subject to the following
0
additional conditions.
NORTH ANDOVER
1. Municipal Ordinance or Bylaw WETLANDS
PROTECTION
BYLAW
2. Citation CHAPTER 178
3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of
Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other
proposals submitted with the Notice of Intent, the conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows:
SEE ATTACHED.
Page 8 of 10 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
� Bureau of Resource Protection - Wetlands MassDEP File #.'J q?
WPA Form 5 - Order of Conditions eDEP Transaction #44 -f!?, -'q
!?$q
.t Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
L
E. Signatures /
This Order is valid for three years from the date of issuance, unless otherwise specified /
pursuant to General Condition #4. If this is an Amended Order of Conditions, the Amended 1. Date of Ori final Order
Order expires on the same date as the original Order of Conditions.
Please indicate the number of members who will sign this form. This Order must be signed by 2 Number of Signers
a majority of the Conservation Commission.
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed
or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing
electronically, and the property owner, if different from applicant.
Signatures:
C/ t X/1
r by hand delivery on
Date
F. Appeals
TAby certified mail, return receipt requested, on
/0/,P/ 13
Date
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten
residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP
Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the
Department, with the appropriate filing fee and a completed Request for Departmental Action Fee Transmittal Form, as provided in
310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be
sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant.
Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior
participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to
the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information
to the Department prior to issuance of a Superseding Order.
The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not
contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is
inconsistent with the wetlands regulations (3 10 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw,
and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Page 8 of 9 * ELECTRONIC COPY
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File #:242-1431
WPA Form 5 - Order of Conditions eDEP Transaction #:601959
7,-L
�`` City/Town:NORTH ANDOVER
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,
within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's
Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be
noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on
this page shall be submitted to the Conservation Commission listed below.
NORTH ANDOVER
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
......................................................................................................................................................................................................... .
To:
NORTH ANDOVER
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
0 POND STREET 242-1431
Project Location
Has been recorded at the Registry of Deeds of:
County Book
for:
Property Owner ERIC PETERSON
and has been noted in the chain of title of the affected property in:
Book
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
MassDEP File Number
Page
Page
Rev. 4/1/2010
Page 10 of 10 * ELECTRONIC COPY
DEP FILE # 242—1431(AMENDED)
Therefore, the North Andover Conservation Commission (hereafter the "NACC") hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local ByLaw and Regulations, to protect
those interests noted above. The NACC orders that all work shall be performed in
accordance with said conditions and with the Notice of Intent referenced below. To the
extent that the following conditions modify or differ from the plans, specifications or other
proposals submitted with the Notice of Intent, the conditions shall control.
11 GENERAL CONDITIONS
20. The proposed work includes: Construction of a single family home, garage, paved
driveway with turn -around, deck, retaining walls and steps, septic system, associated
drainage structures, and grading and landscaping portions of which are within the 100 -
foot buffer zone to Bordering Vegetated Wetlands.
21. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Owners/ Amendment
Applicants:
Eric & Chloe Peterson
202 High Street
North Andover, MA 01845
Notice of Intent filed by: Derosa Environmental Consulting, Inc.
46 North Main Street
Ipswich, MA 01938
Site Plans prepared by: Xeriscape Design, L.L.C.
18 Oak Street
Reading, MA 01867
Titled "Notice of Intent, Town of North Andover"
Signed by: Thad D. Berry
Dated: 5/19/08 and revised 6/26/08
Amendment Plans
Prepared by: ASB Design Group, LLC
363 Boston Street, Route 1
Topsfield, MA 01938
Titled: Site Plan, Pond Street, North Andover, MA
Dated: 09.12.2013 Revised 09.30.2013
Signed by: Thad D. Berry, P.E.
Other Record Documents: Letter from Division of Fisheries & Wildlife
Thomas W. French, Ph.D
242-1431, 0 Pond Street (AMENDED) 1 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
Re: NHESP Tracking No. 08-25919
Dated: July 18, 2008
Construction Sequence Lot 1 Pond Street North Andover MA
Submitted via email on 8/11/2008 by Thad Berry, Xeriscape
Design, L.L.C.
22. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
in writing within 30 days of all transfers of title of any portion of property that takes place
prior to the issuance of a Certificate of Compliance.
23. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
24. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
25. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland ByLaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not in compliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
26. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws or
regulations.
27. The work authorized hereunder shall be completed within three years from the date of
this order.
28. This Order may be extended by the issuing authority for one but not more than two
periods of up to one year each upon application to the issuing authority at least itty
days (30)12rior to the expiration date of the Order.
242-1431, 0 Pond Street (AMENDED) 2 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
29. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
30. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department.
31. Any future project which proposes a wetland crossing in order to access certain portions
of the property will not be qualified as a limited project roadway under 310 CMR 10.53(e)
32. The following wetland resource areas are affected by the proposed work: Buffer Zone to
Bordering Vegetated Wetland (BVW). These resource areas are significant to the interests
of the Act and Town ByLaw as noted above and therein. The applicant has not attempted
to overcome the presumption of significance of these resource areas to the identified
interests.
33. The NACC agrees with the applicant's delineation of the wetland resource areas on the
site as shown on the plans dated referenced herein.
34. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty five foot 25') No -Disturbance Zone and
a fifty foot 50') No -Construction Zone shall be established from the edge of the adjacent
wetland resource area. The Conservation Administrator and/or other agents of the
NACC do not have the authority to waive these setbacks as established under the local
bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No -
Disturbance zone.
35. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
36. The owners of the project and their successors in title agree that the Order does not in
itself impose upon the Town any responsibility to maintain the proposed drainage system
and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Issuance of these Conditions does not in any way imply or certify
that the site or downstream areas will not be subject to flooding, storm damage or any
242-1431, 0 Pond Street (AMENDED) 3 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
other form of water damage. Maintenance of the drainage system, if accepted by the
Town as part of a public way, becomes the responsibility of the Town.
37. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
11 PRIOR TO CONSTRUCTION
38. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all proceedings before the Department
or Court have been completed.
39. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain,of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at the
applicant's expense.
40. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP, File Number 242-1431."
41. Any changes in the submitted plans caused by the applicant, another Board's decision or
resulting from this Order of Conditions must be submitted to the NACC for approval
prior to implementation. If the NACC finds said changes to be significant, the NACC will
call for another public hearing (at the expense of the applicant). Within 21 days of the
close of said public hearing the NACC will issue an amended or new Order of Conditions.
Any errors found in the plans or information submitted by the applicant shall be
considered as changes. No work shall begin on a project until written approval has been
granted by the NACC.
42. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
242-1431, 0 Pond Street (AMENDED) 4 NACC 10/8/2013
DEP FILE # 242—1431(AMENDED)
43. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval, a detailed sequence of construction, including the construction of compensation
and retention areas, installation of sedimentation/ erosion control devices and re -
vegetation to be completed before other work begins on-site.
44. Wetland flagging shall be checked prior to start of construction and shall be re-established
where missing. All wetland flagging shall remain visible and enumerated per the
approved plan(s) throughout the life of the project and until a Certificate of Compliance is
issued so that erosion control measures can be properly placed and wetland impacts can
be monitored. The proposed limit of work shall be shall be clearly marked with erosion
controls or temporary fencing and shall be confirmed by the NACC. Such barriers shall
be checked and replaced as necessary and shall be maintained until all construction is
complete. Workers should be informed that no use of machinery, storage of machinery or
materials, stockpiling of soil, or construction activity is to occur beyond this line at any
time.
45. Two rows of staked hay bales backed by trenched siltation fence shall be placed between
all construction areas and wetlands. The erosion control barrier will be properly installed
and placed as shown on the plans approved and referenced herein and shall be inspected
and approved by the NACC or its agent prior to the start of construction and shall remain
intact until all disturbed areas have been permanently stabilized to prevent erosion. A
second row of erosion controls is specifically required under this order due to steep slopes
and large volumes of fill required. All erosion prevention and sedimentation protection
measures found necessary during construction shall be implemented at the direction of
the NACC or its agent. The NACC reserves the right to impose additional conditions on
portions of this project to mitigate any impacts which could result from site erosion, or
any noticeable degradation of surface water quality discharging from the site. For
example, installation of erosion control measures may be required in areas not shown on
the plan(s) referenced in this Order of Conditions. Should such installation be required
by the NACC, they shall be installed within 48 hours of the Commissions request.
46. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 15 hay bales and sufficient stakes for staking these bales (or an
equivalent amount of silt fence,1 hay bale to equal 3 feet of fence). Said bales shall be
used only for the control of emergency erosion problems and shall not be used for the
normal control of erosion.
47. The applicant shall submit an Engineers Fill Compaction Report.
48. A check payable to the Town of North Andover shall be provided in the amount of $3,000
which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the
NACC, and shall be posted with the North Andover Town Treasurer through the NACC
before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to the
NACC, and Town Counsel, and shall be released after completion of the project, provided
242-1431, 0 Pond Street (AMENDED) 5 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
that provisions, satisfactory to the NACC, have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local ByLaw.
49. The applicant shall designate a Wetland Scientist (or other environmental professional as
approved by the NACC or its agent) as an "Erosion Control Monitor" to oversee any
emergency placement of controls and regular inspection or replacement of sedimentation
control devices. The name and phone number of the erosion control monitor must be
provided to the NACC in the event that this person has to be contacted, due to an
emergency at the site, during any 24-hour period, including weekends. This person shall
be given the authority to stop construction for erosion control purposes. The erosion
control monitor will be required to inspect all such devices and oversee cleaning and the
proper disposal of waste products. Cleaning shall include removal of any entrapped silt.
At least once during each week in which construction activities occurs on-site and for as
long thereafter as ground remains unstabilized, the applicant shall submit a written
report from the "Erosion Control Monitor" to the NACC certifying that, to the best of
his/her knowledge and belief based on a careful site inspection, all work is being
performed in compliance with this Order of Conditions and that approved setbacks are
being adhered to. The erosion control monitor must visually inspect all
sedimentation/ erosion control measures and assume responsibility for their maintenance
on a weekly basis and that they are functioning as intended. In addition, all wetland
resource areas must be visually inspected for siltation, turbidity, and/or other water
quality impacts. The Erosion Control Monitor shall be on site during and/or following a
major storm event of 1/2" inch of rain or greater (24 hour event) to ensure that soils
remain stable, and erosion controls are adequate and secure
50. Prior to construction, the applicant shall permanently mark the edge of the "25' No -
Disturbance Zone" with ten (10) signs or markers spaced evenly every 30 feet
incorporating the following text: "Protected Wetland Resource Area". This will
designate their sensitivity and assure no further inadvertent encroachment into the
wetland. These permanent markers are subject to review and approval by the NACC.
The applicant shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the applicant.
These markers shall remain posted and be replaced as necessary in perpetuity.
51. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of Conditions,
the "Compliance Certification Form Affidavit" attached via "Appendix A" signed under
the pains and penalties of perjury, stating that said applicant and/or owner has read
these Orders of Conditions and is in compliance with each and every condition. This
document shall apply to each of the conditions referenced herein and shall be provided to
the Conservation Department at least five (5) business days prior to the closing of said
land transaction.
242-1431, 0 Pond Street (AMENDED) 6 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
52. Once these above mentioned pre -construction requirements are complete, the applicant
shall contact the Conservation Office prior to site preparation or construction and shall
arrange an on-site conference with an NACC representative, the contractor, the engineer,
wetland scientist and the applicant to ensure that all of the Conditions of this Order are
understood. This Order shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors and
other personnel performing the permitted work are fully aware of the permit's terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order of Conditions resulting from failure to comply with its conditions. The applicant or
contractor shall notify the NACC in writing of the identity of the on-site construction
supervisor hired to coordinate construction and to ensure compliance with this Order. A
reasonable period of time shall be provided as notice of the pre -construction meeting (e.g.
72 hours).
STORMWATER MANAGEMENT CONDITIONS
53. There shall be no increase in the post development discharges from the storm drainage
system or any other changes in post development conditions that alter the post
development watershed boundaries as currently depicted in the Notice of Intent and
approved by this Order of Conditions, unless specifically approved in writing by the
Commission.
54. Water quality in down gradient BVW's shall not differ significantly following completion
of the project from the pre -development conditions. There shall be no sedimentation into
wetlands or water bodies from discharge pipes or surface runoff leaving the site.
55. The applicants, owners, and their successors and assignees, shall maintain all culverts,
collections basins, traps, outlet structures, subsurface storage areas, and other elements of
the drainage system in order to avoid blockages and siltation which might cause failure of
the system and/or detrimental impacts to on-site or off-site resource areas, and shall
maintain the integrity of vegetative cover on the site.
DURING CONSTRUCTION
56. IMPORTANT: Immediately upon completion of the dwelling foundation and retaining
wall, and prior to further construction activities associated with the site, the applicant
shall complete a plan prepared by a Registered Professional Land Surveyor of the
Commonwealth (R.P.L.S.) which accurately depicts the foundation and wall locations and
their proximity to wetland resource areas as approved under this Order of Conditions.
Said plan shall be submitted to the Conservation Administrator for approval.
242-1431, 0 Pond Street (AMENDED) 7 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
57. Upon beginning work, the applicant shall submit written progress reports weekly
detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction sequence.
58. Dewatering activities are not approved under the Order of Conditions for this site. If
emergency de -watering requirements arise, the applicant shall submit a contingency plan
to the Commission for approval, which provides for the pumped water to be contained in
a settling basin, to reduce turbidity prior to discharge into a resource area.
59. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing.
60. All exposed soil finish grade surfaces shall be immediately landscaped and stabilized, or
loamed, seeded and mulched, with a layer of mulch hay. All disturbed areas must be
graded, loamed and seeded prior to November 1St of each year. Outside of the growing
season, exposed soil finish grade surfaces shall be stabilized with a layer of mulch hay or
other stabilization method (as directed by the Conservation Department) until climate
conditions allow for seeding. During construction, any area of exposed soils that will be
left idle for more than 30 days shall be stabilized with a layer of mulch hay or other means
as directed by the NACC.
61. No re -grading in the buffer zone shall have a slope steeper than 2:1 (horizontal: vertical).
Slopes of steeper grade shall be rip -rapped to provide permanent stabilization.
62. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any
resource area.
63. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area. If truck washing is to occur onsite an area must be
approved by the Conservation Department prior to construction.
64. All waste generated by, or associated with, the construction activity shall be contained
within the limit of work, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site for
the storage and removal of such spent construction materials off-site. However, no trash
dumpsters will be allowed within 50' of areas subject to protection under the Act or local
Bylaw.
65. Accepted engineering and construction standards and procedures shall be followed in the
completion of the project.
242-1431, 0 Pond Street (AMENDED) 8 NACC 10/8/2013
DEP FILE # 242-1431(AMENDED)
66. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication, or maintenance
is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
67. No underground storage of fuel oils shall be allowed on any lot within one -hundred (100)
feet of any wetland resource area. This condition shall survive this Order of Conditions
and shall run with the title of the property. This condition is issued under the authority
of the Towns Wetland protection ByLaw.
68. Fertilizers utilized for landscaping and lawn care shall be slow release, low -nitrogen types
(< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides
shall not be used within 100 feet of a wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This condition is
issued under the authority of the Town's Wetland Protection ByLaw and shall remain in
perpetuity.
69. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done by
loaming and seeding according to NRCS standards. Stabilization will be considered
complete once full vegetative cover has been achieved.
70. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed unvegetated areas shall be seeded.
71. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/ trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/ parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
242-1431, 0 Pond Street (AMENDED) 9 NACC 10/8/2013
DEP FILE # 242—1431(AMENDED)
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
i. An "As -Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
➢ "As -Built" post -development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland resource
area. NOTE: If portions of the stormwater systems exist partially within the
Buffer Zone than the entire structure must be depicted to accurately verify
compliance.
➢ "As -Built" post -development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone which is
regulated as a resource area under the local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes as disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
72. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
➢ 25' No -Disturbance Zone and a 50' No -Construction Zone shall be
established from the edge of adjacent wetland resource areas except in those
locations approved under DEP # 242-1431. Future work within 100' of
existing wetland resource areas will require a separate filing with the NACC
(refer to Section XI (page 18) of the Regulations for performance standards
within these zones) The Conservation Administrator and/or other agents of
the NACC do not have the authority to waive these setbacks as established
under the local ByLaw;
➢ Resource Area Markers (Condition #50);
➢ Discharge or spillage of pollutants (Condition #66);
➢ Prohibition of underground fuels (Condition #67);
242-1431, 0 Pond Street (AMENDED) 10 NACC 10/8/2013
DEP FILE # 242 —1431 (AMENDED)
➢ Limitations on the use of fertilizers, herbicides, and pesticides (Conditions
#68).
242-1431, 0 Pond Street (AMENDED) 11 NACC 10/8/2013
DEP FILE # 242 -1431 (AMENDED)
APPENDIX A - AFFIDAVIT
on oath do hereby depose and state:
(authorized agent applicant and/or current owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
1. I am the
( position with applicant) (applicant name or company name)
the applicant upon whom Order of Conditions
have been placed upon by (DEP or NACC number)
the North Andover Conservation Commission.
2. I am the
&/or
of
(position with owner) (owner name)
the owner upon whose land Order of Conditions
have been placed up by (DEP or NACC number)
the North Andover Conservation Commission.
Z
3. I hereby affirm and acknowledge that I have received said Order of Conditions
and have read the same and understand each
(DEP File #) and every condition which has been set forth
in said Order of Conditions.
&
4. I hereby affirm and acknowledge that on this day of 19_
I inspected said property together with any and all improvements which have
been made to the same and hereby certify that each and every condition set
forth in Order of Conditions are presently in compliance.
(DEP File #)
&
5. I hereby affirm and acknowledge that this document will be relied upon by the
North Andover Conservation Commission as well as any potential buyers of
said property which is subject to said Order of Conditions
(DEP File #)
Signed under the pains and penalties of perjury this day of 19
(Signature - authorized agent of applicant or owner)
242-1431, 0 Pond Street (AMENDED) 12 NACC 10/8/2013