Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 10 GREAT LAKE LANE 4/30/2018
f C Location r e AT /CA/l No. Date 0/10 Hrr r j -o e le) 4F -1 -!� -I Check ") t>tte, TOWN OF NORTH ANDOVER Certificate of Occupancy Building/Frame Permit Fee Foundation Permit Fee Other Permit Fee.!��-t t- $ 2-�,P TOTAL $- Building Inspector 0 tom monweRlth of MassaChu'setts Sleet Metal Permit Date: 9 • ,M . ( (o Estimated Job Cost: $�Q , Plans Submitted: YTS NO Business License It 196 Business Information: Name: J&J Ileating. & Air Conditioning Street: 17 Arlington St'., City/Town: Dracut, MA 01826 Telephone: .97.8-454-8197 Photo I.D. required / Copy of Photo I.D. attached: J -J. / M -1 -unrestricted license Permit It D Permit Fee: $ Plans Reviewed: YES NO Applicant License It Property Owner / Job Location Information: Name: r 'Z_ L e. IE0 rea �- City/Town: North Andover, MA 01845 Tcicphon S'%, orb 3 YES NO ((cul 'nl J-2 / M-27restrictcd to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Res icten Condo / Tbwnhoiiscs Other Commercial: Office _ Retail Industrial Educational Institutional Other Square Footage: under 10,0.00 sq. fl. _✓ over 10,000 sq. ft. Number- of'.Stories: Sheet metal work to be coinpleted: New Work: i' Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: 2 —>! /til �7a 1 d u �7`� 0 o r A INSURANCE COVERAGE: have a current I iability insurance policy or Its equivalentwhich meets the requirements of M.G.L. Ch. 112 Yes WNo ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the Insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my ;signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxE], I hereby certify that all of the details and Information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and Installations performed under the permit issued for this application will be in compliance with all pertinent provlslon of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO ��l'ot?t'CS5 II1SpCCti0I15 1)atc Comments Final Inspection DaI c Comments By Title cilyrrown Permit 8 Fee $ Inspector Signature of Permit Approval Type of License: vlasler ❑ Master -Restricted ❑Joumeyperson ❑Journeyperson-Restricted Signature of Licensee License Number: 15% Check at www.mass.govldpl The Commonwealth of Massachusetts Department oflndustrialAccidents d I Congress Street, Suite 100 a" Boston, MA 02114-2017 M www mass.gov/dia lATorkers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE TILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): J & J Heating & Air Conditioning, Inc. Address: 17 Arlington Street City/State/Zip: Dracut. MA. 01826 Phone #: Are you an employer? Check the appropriate box: 978-454-8197 1.M I am a employer with 40 employees (full and/or part-time).* 2.❑ ].am a sole proprietor or partnership and have no employees working forme in any capacity. [No workers' comp. insurance required.] 3.❑ I am a homeowner doing all work myself. [No workers' comp. insurance required.] t 4.❑Tam a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers' compensation insurance or are sole proprietors with no employees. 5.❑ 1 am a general contractor and ] have hired the sub -contractors listed on the attached sheet. These sub -contractors have employees and have workers' comp. insurance.t 6. ❑ We are a corporation and its officers have exercised their right of exemption per MGL c. 152, § 1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 7. ❑ New construction 8. ❑ Remodeling 9. ❑ Demolition 10 ❑ Building addition 1 l.❑ Electrical repairs or additions 12. ❑ Plumbing repairs or additions 13.R.Roof repairs 14. ❑ Other ��'y -PPI 11.111 111aL OnecKs oox rr i must also tui out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: A.I.M. Mutual Insurance Policy # or Self -ins. Lie. #: WMZ-800-8006553--2016 Expiration Date: 6/2/17 Job Site Address: In �Q �_ L � City/State/Zip: L iF� m4 Attach a copy -of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to $1,500.00 and/or one- yeac in p�nmen$, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day agains e violator. Ay?y of this statement may be forwarded to the Office of Investigations of the DIA for insurance �Ido Itereb'y, ,i ndertheai,s nnsl penalti o perjury that the information provided above is true and correct. nature: a Date: Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone #: 0 /��S CERTIFICATECSFUABIL.ITY INSURANCE ATE (M"D/YYYY) r.6/2/2016 INDICATED, NOTMTHST'ANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT 'THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE: AFFORDED BY THE POLICIES BELOW. THIS, CERTIFICATE OF. INSURANCE DOES NOT .CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER; AND THE CERTIFICATE HOLDER. IMPORTANT: :It!he certlflcate holder Is'an ADDITIONAL INSURE[), the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subJect to the terms and Condition-, of.tha policy; certaln.policies may requlre.an endorsement. A statement on this certilleata does not confer.rIghtsto the certificate holder In Ileu of such endorsement(s). . PRODUCER A 1 � L6itxr( nce Hall, CIC Sennott Insurance Agency '16 PHONE 978 8874900 FAX C,.t•14.:EM1)........._...___� - - IM,,,Ctq)z (97Et)9d7 South Main- Street ' - �� ._....� -74tl4` . E-MAIL larryhall(�fien17D'r'r1115i1r<".inCE: 4�t9itt - A44?R.l S. ax P. 0.. 457 _ -- _.:,.. _ ...._._... ........ ! ......_ .............. el Topsfie�d t4A 01983 INSURER(SLABFO1JDINQCOVERAGE NAICN ..........._.. I( _ 6/1/2,016 6/1/ 017 I htEDEXP(An�one�oraon) > .........., .... ............................................ _.._._ _ INSURERA:Great Americ, Alliance 1116 Co 1 , 000, 000 INSURED GFNF.RA AGGTEGATE �2,000,000 - INSURERB SAfet7 Ins Co x,000,000L J&J Heating & Air. Conditioning, .Inc: ......__ INSURERc11.Z.i4, Mutual Ins Co �.:..._._ ....,.. 17 Arlington Street _ — LIABILITY INSURER D:. INSURER E S Dracut.._._ MA 01826 ..... __ ._._ _.r ;.:.. !.::...._.. _ ,......... i ANY A.JTO INSURER F; THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE PCLIGY PERIOD INDICATED, NOTMTHST'ANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSuEo OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS Or SUCH POLICIES. LIMITS SHOWN MAY HAVE _._..._...... ........ --------- BEEN REDUCED BY PAID CLAIMS, _...._ LTR TYPGOFINSURANCE 'WYAI POLICY NUMBER POUCYEFF POLICY EXP MM% D Y N LIMITS i X COMA4ERCIAL GENERAL LIABILITY OGCUH CLAIMS -MADE X � EACH OCCURnENCE x iSATd,�SE;T(S? ENTFtJr 1,000,000 _...._....... r...3 1._P,ZF.M[St.x.tG;ThQ.s,t�.u.Qnn)....................................................__.. 300,000 PAC5418906-10 6/1/2,016 6/1/ 017 I htEDEXP(An�one�oraon) > .........., ..... PERSONAL A ACV INJURY s 1 , 000, 000 GEN'LAGGREGATE LIMITAPPIIhSPER; JLOG'OLCfC GFNF.RA AGGTEGATE �2,000,000 : ; PRCOM�ONnGG S x,000,000L O't'NER� .... j AUTOMOBILE LIABILITY j f.:Mll U SIN(i;.E LIMI I S -. ` 1,000,000 13 ANY A.JTO i I BODILY IUJUnY (Por person) 4 ALL OWNED r I CHkI Ut GO AUTOS � X LAUTCIS 7414550 ! j 6/1%2016 - ��_ _._,._ _ 6/1/201.7 i BODILY NJURY(Peraccident) .... S ....... XHI}RED AUTOS }'..:! AUTOSWNED i !PROPERTY DAMAGE S g I'y1r S7� + nn} _Sk j X UMEIRELLA LIAn X OCCUR ( I i I EACH J OfCt1R R 2 400y000 A ....::........_... EXCESS LIAR _._.. I L LAI........2,000,000 -�— OF "D R ifNT' N f UMa641f3�J58�U9 I.6/1/2016 6/1/2017 i WORKERS COMPENSATION ! OTI I g AND EN110I OYRRS' LIABILITY: Y 1 N I j I X ,FTATUTE E!7 ..._ , I _ -� ANY PFlOPRI TOR/PAn r NERIEXE Gl1 i IVE i oFF1CF.,n'MCMJCn EXCLUDED? I N. H / A I E.L. EACH A GENT , $ � 1,000,000 _._. 000,000 C 1 (MandntnrylnNH)' d sulbe _ NMZ-Sob-Bat)65S3-2Q16 ! 6/2/2016 i 6/2/2017FF'.'MP:OYE "AIf I,I:S�RIPTIQN fJr OPEriATi0Wbobw :. ( E.L. DISEASE •POLICY LIMIT S 11000,000 j I I DESCRIPTION or OPERATIONS I LOCATIONS VEHICLES (ACORD 101, Addltlonal Remarks Schedule, may be attached If more spac;e Is required) Re., .En'tezpriz;e. Bank Amherst Street, Nashua Project. Charter Brothers Construction, LLC and Enterprise Bank arra additional insured for both :on-going as well is products &. completed operations on a primary & nein-Contributory basis including:waiver of subrogation if required by written contract. CERTIFICATE/H101_0 � CANCELLATION SHOULD ANY OF THE ABOVE- DESCRIBED POLICIES BE CANCELLED BEFORE Charters I3iOti2EYS Construction,* UCtiOn, LLC THE. EXPIRATION DATE THEREOF, ,NOTICE WILL. BE .DELIVERED IN, 2'7 Main' Street ACCORDANCE WITH THIS POLICY PROVISIONS. banv.i::lle, N11 03919 AUTHORIZED REPRESENTATIVE L Hall,, CIC/L'—!2 J . (D 1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (201 ,i/Di) -the ACORD name and logo are registered marks of ACORD INS025 onwi+ i Load Short Form Job: lot 1 Great lakes -- wrightsofit� Date: March 11, 2016 Entire House By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1767. cfm 0.027 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area (ft2) 0 Btuh .0 Btuh 0 Btuh 1767 cfm 0.046 cfm/Btuh 0 in H2O 0.96 4878 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Eating 196 6092 3775 165 172 dinning 195 6275 4878 170 222 kitchen 228 5616 4933 152 224 foyer 143 3641 2533 99 115 living room 343 11024 8966 299 408 bath 54 2493 1913 68 87 master bed 623 9708 2708 263 123 bed 2i 132 2843 2269 77 103 2ndf hall 132 345 208 9 9 wi/cl 66 1207 324 33 15 M bed hall 99 1627 577 44 26 2nd bath 99 1627 577 44 26 Room15 255 4923 1738 134 79 bed 3 306 5716 2832 155 129 2 d fl f H our oyer 68 2012 603 55 27 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2016 -Sep -2710:12:24 9 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 1 ACCK ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Entire House 3039 65149 38834 1767 1767 Other. equip loads 0 0 Equip. @ 0.93 RSM 35960 Latent cooling 1489 TnTAI S QnQo CC nn nen nn . .. V.J IY.7 01-+,+y 1/0/ - I/b/ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2016 -Sep -27 10:12:24 - - wrightSOW Right -Suite® Universal 2015 15.0.23 RSU05790 Page 2 ACCK ...Desktop\M-J - Copy\topnotch lot3 aprils way. rup Calc = MJ8 Front Door faces: N Building Analysis Job: lot1Greatlakes WE`IghtSOft. y Date: March 11, 2016 Entire House By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 mom Btuh/ft2 % of load Walls Location: 10397 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 14.6 Indoor temperature (°F) 68 75 Elevation: 30 ft Ceilings Design TD (°F 56 13 Latitude: 420N 4.5 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range6 °F) - 15 ( L ) Method Simplified 0 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Average 0 Adjustments 0 • Total 1 -Component Btuh/ft2 Btuh % of load Walls 3.6 10397 16.0 Glazing 31.7 9508 14.6 Doors 21.7 1366 2.1 Ceilings 7.4 22526 34.6 Floors 4.5 13554 20.8 Infiltration 2.4 7798 12.0 Ducts 0 0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 65149 100.0 x��%. '� �.���F�^a 'a �� i ��'� R •� v w" - est -. tx � � �- - c ,-., �,^ �� 4z �� sem`^ ��.-�- �C�3�tfrti�•CtiOlie'1 �.� �. .�.. ��k�^�'�x��r ��_� �..�^���'k: -Component Btuh/ft2 Btuh % of load Walls 1.0 2861 7.4 Glazing 32.8 9841 25.3 Doors ' 10.3 651 1.7 Ceilings 6.7 20257 52.2 Floors 1.0 3047 7.8 Infiltration 0.3 947 2.4 Ducts 0 0 Ventilation 0 0 Internal gains 1230 3.2 Blower 0 0 Adjustments 0 Total 1 1388341 100.0 Latent Cooling Load = 1489 Btuh Overall U -value = 0.157 Btuh/ft2-°F Data entries checked. -- �. wrightsoftm g 2016 -Sep -27 10:12:24 Ri ht -Suite® Universal 2015 15.0.23 RSU05790 ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Page 1 MEW ME= n 12 0.570 0 31.7 380 Location: 214 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft n Design TD (°F) 0.570 56 13 2409 Latitude: 420N 1358 Relative humidity (%) a 50 50 0 Outdoor: Heating Cooling 1014 Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 140 Infiltration: 0 31.7 4437 31.7 Daily range (°F) - 15 ( L ) Method Simplified 0.570 0 Wet bulb (°F) - 72 1268 Construction quality Average all Wind speed (mph) 15.0 7.5 0.570 Fireplaces 0 9127 31.1 8968 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Wal I s 911 10.3 434 S 21 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 833 0.065 21.0 3.61 3010 0.99 828 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 625 0.065 21.0 3.61 2259 0.99 622 651 S 667 0.065 21.0 3.61 2411 0...99 663 w 540 0.065 21.0 3.61 1952 0.99 537 30.0 all 2665 0.065 21.0 3.61 9631 0.99 2650 12F-Osw: Fr'm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 2"x6" s 95 0.065 21.0 3.61 343 0.99 94 wood frm, 16" o.c. stud w 117 0.065 21.0 3.61 423 0.99 116 1.30 all 212 0.065 21.0 3.61 766 0.99 211 Partitions (none) Windows 1 D-c2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, n 12 0.570 0 31.7 380 17.9 214 1/4" thk; 6.67 ft head ht 1 D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, n 76 0.570 0 31.7 2409 17.9 1358 1/4" thk; 6.67 ft head ht a 32 0.570 0 31.7 1014 59.7 1911 s 140 0.570 0 31.7 4437 31.7 4432 s 40 0.570 0 31.7 1268 31.7 1266 all 288 0.570 0 31.7 9127 31.1 8968 Doors 11 DO: Door, wd sc type n 42 0.390 0 21.7 911 10.3 434 S 21 0.390 0 21.7 455 10.3 217 all 63 0.390 0 21.7 1366 10.3 651 Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-20 roof ins, 132 0.032 30.0 1.78 235 1.60 211 r-30 ceiI ins 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 1748 0.026 38.0 1.45 2527 1.30 2272 gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 6" thkns, 1/2" gypsum board 1159 0.307 1.0 17.1 19765 15.3 17774 int fnsh wri htSOft" ,AQ,_ g Right -Suite@ Universal 2015 15.0.23 RSU05790 2016 -Sep -2710:12:24 Page 1 ACCK ...Desktop\M-J - Copy\topnotch 1ot3 aprils way.rup Calc = MJ8 Front Door faces: N Floors 19A-Obstp: Part floor, tile fir fnsh, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-Obstp: Part floor, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-Obswp:: Part floor, hrd wd fir fnsh, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-30bscp: Part floor, carpet fir fnsh, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-30bstpi Part floor, tile fir fnsh, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-30bstp: Part floor, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh 19A-30bstp: Part floor, r-30 ins, frm flr, 6" thkns 21 B -28t: Bg'floor, light dry soil, prm int ins cov, 6.5' depth, r-3 ins 99 0.368 0 6.66 659 1.51 149 1583 0.368 0 6.66 10539 1.51 2388 66 0.295 0 6.16 407 1.40 92 195 0.034 30.0 1.59 309 0.36 70 478 0.034 30.0 1.59 758 0.36 172 343 0.034 30.0 1.59 544 0.36 123 143 0.034 30.0 1.59 227 0.36 51 132 0.015 3.0 0.83 110 0 0 1Nr1 htsOft' 2016 -Sep -2710:12:24 q -,g Right -Suite® Universal 2015 15.0.23 RSU05790 Page 2 ACOA ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N -- wr:ightsoft- Component Constructions Job: lot 1 Great lakes Date: March 11, 2016 Eating By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com .. .;Y orm'1 lowrt. .�y For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/lb) 42.7 InfMe 15 ( L ) hodd 72 7.5 Construction quality Btuh/ft2 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Average 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 311 0.36 ft' Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 93 0.065 21.0 3.61 336 0.99 gypsum board int fnsh, 2"W' wood frm, 16" o.c, stud a 18 0.065 21.0 3.61 65 0.99 92 18 w , 126 0.065 21.0 3.61 455 0.99 125 all 237 0.065 21.0 3.61 857 0.99 236 Partitions (none) Windows (none) Doors 11 DO: Door, wd sc type Ceilings C part ceiling,: C part ceiling, frm flr, 6" thkns, 1/2" gypsum board int fnsh Floors 19A-30bstp: Part floor, tile fir fnsh, r-30 ins, frm flr, 6" thkns, 1/2" gypsum board int fnsh n 42 0.390 0 196 0.307 1.0 196 0.034 30.0 21.7 911 10.3 434 17.1 3342 15.3 3006 1.59 311 0.36 70 Wri htsoftA PF 2016 -Sep -2710:12:24 9 Right -Suite@ Universal 2015 15.0.23 RSU05790 ACCK ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Page 3 wrl htsoft`� Component Constructions Job: lot 1 Great lakes 9 Date: March 11, 2016 dinning By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.iiheatac.com _ Nro ect inormation - For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Location: BostonLogan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N OutdoorHeating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/Ib) 8 Infiltration: 15 (L ) Method 72 7.5 Construction quality Btuh/ft2 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27:8 Simplified Average 0 III 11111110M � Construction descriptions Or Area U -value Insul R Htg HTM Loss 99Tf Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 2"W' s 95 0.065 21.0 3.61 343 0.99 94 wood frm, 16" o.c. stud w 117 0.065 21.0 3.61 423 0.99 116 all 212 0.065 21.0 3.61 766 0.99 211 Partitions (none) Windows 1 D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, s 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceilin6,: C part ceiling, frm flr, 6" thkns, 1/2" gypsum board int fnsh i Floors 1 9A-30bscp:: Part floor, carpet flr fnsh, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh 40 0.570 0 195 0.307 1.0 195 0.034 30.0 31.7 1268 31.7 1266 17.1 3325 15.3 2990 1.59 309 0.36 70 ti Wit F1tSQft' 2016 -Sep -2710:12:24 9 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 4 k6A ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N - - wrightsoft- Component Constructions Job: lot Great lakes kitchen Date: March.11, 2016 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com • • • For: TKZ LLC 78 Great pond Rd, N Andover,. Ma 01826 Location: Boston Logan Int'I AP, MA, US Indoor: Heating Indoor temperature (°F) 68 Cooling 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Outdoor: Relative humidity (%) 50 50 Heating Cooling Dry bulb (°F) 12 Moisture difference (gr/Ib) 42.7 27.8 88 Daily range (°F) - 15 ( L ) Infiltration: Wet bulb (°F) - 72 Method Simplified Wind speed (mph) 15.0 7.5 Construction quality Average Fireplaces 0 Construction descriptions Or Area 1.1-value Insul R Htg HTM Loss Clg HTM . Gain Walls ft2 Btuh/ft2-°F ftz-°FBtuh RAM Btuh Btuh/112 Btuh 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 159 0.065 21.0 3.61 575 0.99 158 gypsum board int fnsh, 2"W' wood frm, 16" o.c. stud Partitions (none) Windows 1D-c2ov: 2 glazing, clr outr, air gas, vni frm mat, cir innr, 1/4" gap, n 1/4" thk; 6.67 ft head ht 12 0.570 0 31.7 380 17.9 214 Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 6" thkns, 1/2" gypsum board 228 0.307 1.0 int fnsh Floors 19A-30bstp: Part floor, tile fir fnsh, r-30 ins, frm fir, 6" thkns, 1/2" 228 0.034 30.0 gypsum board int fnsh wrightsoft® Right -Suite@ Universal 2015 15.0.23 RSU05790 ACCP ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N 17.1 3888 15.3 3496 1.59 362 0.36 82 2016 -Sep -27 10:12:24 Page 5 wri htsoft - Component Constructions Job: lot 1 Great lakes 9 Date: March 11, 2016 foyer By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 16kid11}CAriditic Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor:.Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb °F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area 1.11 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz °F ft2-°FBtuh Btuh/ftz Btu ROM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 78 0.065 21.0 3.61 282 0.99 78 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors 11 DO: Door, wd sc type Ceilings C part ceiling,: C part ceiling, frm fir, 6" thkns, 1/2" gypsum board int fnsh Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 6" thkns s 21 0.390 0 143 0.307 1.0 143 0.034 30.0 21.7 455 10.3 217 17.1 2439 15.3 2193 1.59 227 0.36 51 2016 -Sep -27 10:12:24 -�- wrightsoft" Right-Suite(g) Universal 2015 15.0.23 RSU05790 Page 6 ACCA ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: lot 1 Great lakes wr;ights4ft`� p Date: March 11, 2016 living room By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com For: TKZ LLC i Great •• • '• N Andover,01826 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/Ib) 8 InfMe 15 (L ) Mod 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Average 0 m Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 0 31.7 ft2 Btuh/ftz-°F ftz-°FBtuh Btuh/ftz Btu Btu hN Btu Walls 38.7 3094 343 0.307 1.0 17.1 5849 15.3 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 187 0.065 21.0 3.61 676 0.99 186 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 93 0.065 21.0 3.61 336 0.99 92 W 36 0.065 21.0 3.61 130 0.99 36 all 316 0.065 21.0 3.61 1142 0.99 314 Partitions (none) Windows 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, e 1/4" thk; 6.67 ft head ht s all Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 6" thkns, 1/2" gypsum board int fnsh Floors 19A-30bstp: Part floor, r-30 ins, frm flr, 6" thkns, 1/2" gypsum board i nt fnsh 20 0.570 0 31.7 634 59.7 1195 60 0.570 0 31.7 1902 31.7 1899 80 0.570 0 31.7 2535 38.7 3094 343 0.307 1.0 17.1 5849 15.3 5260 343 0.034 30.0 1.59 544 0.36 123 wri htsoft 2016 -Sep -27 10:12:24 9 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 7 ACOA ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: lot 1 Great lakes -- wr'ightsoft- Date: March 11, 2016 bath By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jiheatac.com Ilnfo'rrn von - For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Partitions! (none) Windows 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 6" thkns, 1/2" gypsum board int fnsh Floors 19A-30bstp: (Part floor, tile fir fnsh, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh n 12 0.570 0 31.7 380 17.9 214 e 12 0.570 0 31.7 380 59.7 717 all 24 0.570 0 31.7 761 38.8 931 54 0.307 1.0 17.1 921 15.3 Location: 54 0.034 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 19 Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - Wet bulb (°F) - 15 (L ) 72 Method Simplified Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Average 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftl-°FBtuh Btuh/ftz Stuh Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 69 0.065 21.0 3.61 249 0.99 69 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 42 0.065 21.0 3.61 152 0.99 42 all 111 0.065 21.0 3.61 401 0.99 110 Partitions! (none) Windows 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/4" thk; 6.67 ft head ht Doors (none) Ceilings C part ceiling,: C part ceiling, frm fir, 6" thkns, 1/2" gypsum board int fnsh Floors 19A-30bstp: (Part floor, tile fir fnsh, r-30 ins, frm fir, 6" thkns, 1/2" gypsum board int fnsh n 12 0.570 0 31.7 380 17.9 214 e 12 0.570 0 31.7 380 59.7 717 all 24 0.570 0 31.7 761 38.8 931 54 0.307 1.0 17.1 921 15.3 828 54 0.034 30.0 1.59 86 0.36 19 2016 -Sep -27 10:12:24 „� -- wrightsOft' Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 8 ACCK ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N a Component Constructions Job: lot 1 Great lakes wrightsoft- Date: March 11, 2016 master bed By: J&J Heating & Air Conditioning 17 Arlington slt, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com lt1#grmatignn ... iFor: TKZ LLC78 Great pond Rd, N Andover, Ma 01826 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/Ib) 8 InfMe 15 ( L ) hods 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Average 0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftz-°F/Btuh Btuh/ftz Btuh MOM Btuh Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 207 0.065 21.0 3.61 748 0.99 206 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 81 0.065 21.0 3.61 293 0.99 81 S 207 0.065 21.0 3.61 748 0.99 206 W 279 0.065 21.0 3.61 1008 0.99 277 all 774 . 0.065 21.0 3.61 2797 0.99 770 Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceiI ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 6" thkns, 1/2" gypsum board int fnsh 623 0.026 38.0 1.45 901 1.30 810 623 0.368 0 6.66 4148 1.51 940 +wrightsoft- Right-SuiteO Universal 2015 15.0.23 RSU05790 2016 -Sep -27 10:12:24Page 9 ��+ ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: lot 1 Great lakes wrightsoft" Date: March 11, 2016 bed 2 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax 978-454-8615 Email: office@jjheatac.com Web: www.jiheatac.com i For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Partitions (none) Windowsl 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, s 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 6" thkns, 1/2" gypsum board int fnsh 40 0.570 0 132 0.026 38.0 132 0.368 0 31.7 ! - o e • e 1266 1.45 Location: 1.30 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 199 Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Average Fireplaces 0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ft' Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/112 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 68 0.065 21.0 3.61 246 0.99 68 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windowsl 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, s 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 6" thkns, 1/2" gypsum board int fnsh 40 0.570 0 132 0.026 38.0 132 0.368 0 31.7 1268 31.7 1266 1.45 191 1.30 172 6.66 879 1.51 199 wrightsoft' Right -Suite® Universal 2015 15.0.23 RSU05790 2016 -Sep -27 10:12:24Page 10 ACCP+ ... Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N om onent Constructions Job: lot 1 Great lakes Wrightsoft- CC P Date: March 11, 2016 df hall By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax 978-454-8615 Email: officeC?jjheatac.com Web: www.ilheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btu h/112 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-20 roof ins, r-30 ceiI ins Floors 2113-28t: Bg floor, light dry soil, prm int ins cov, 6.5' depth, r-3 ins 132 0.032 30.0 1.78 132 Location: 3.0 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily; range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - Wind'speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btu h/112 Btu Btuh/ft2 Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-20 roof ins, r-30 ceiI ins Floors 2113-28t: Bg floor, light dry soil, prm int ins cov, 6.5' depth, r-3 ins 132 0.032 30.0 1.78 132 0.015 3.0 0.83 235 1.60 211 110 0 0 A 2016 -Sep -27 10:12:24 ".Mti WrightSOft Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 11 ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: lot 1 Great lakes -- wrightsoft- Date: March 11, 2016 Wild By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@ihp3tac.com Web: www.jjheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Construction descriptions or Area U -value Insul R Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US L2 Indoor temperature (°F) 68 75 Elevation: 30 ft Btu h/ftz Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: 195 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 63 Construction descriptions or Area U -value Insul R Htg HTM Loss Clg HTM Gain L2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu In Btu h/ftz Btu Walls 12F-Osw: F�m wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 54 0.065 21.0 3.61 195 0.99 54 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud w 63 0.065 21.0 3.61 228 0.99 63 all 117 0.065 21.0 3.61 423 0.99 116 Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad:Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obswp; Part floor, hrd wd flr fnsh, frm flr, 6" thkns, 1/2" gypsum board int fnsh I� 66 0.026 38.0 66 0.295 0 -9- :wriqhtSOft' Right -Suite® Universal 2015 15.0.23 RSU05790 ACCP. '.:.Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: h: i 1.45 95 1.30 6.16 407 - 1.40 86 92 2016 -Sep -27 10:12:24 Page 12 . r 51P Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Average 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz °F ft2-°F/Btuh Btuh/ftz Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 6b 0.065. 21.0 3.61 249 0.99 69 gypsum board int fnsh, 2"4" wood frm, 16" o.c. stud Partitions (none) Windows 1D-c2ow: 2,glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, n 12 0.570 0 31.7 380 17.9 214 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 99 0.026 38.0 1.45 143 1.30 129 gypsum board int fnsh Floors 19A-Obstp: Part floor, tile flr fnsh, frm flr, 6" thkns, 1/2" gypsum 99 0.368 0 6.66 659 1.51 149 board int fnsh .' wrightsoft" Right-SuiteO Universal 2015 15.0.23 RSU05790 2016 -Sep -27 10:12:24Page 13 .�iCC% ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N - - wrightsoffi Component Constructions Job: lot 1 Great lakes Date: March 11, 2016 2nd bath By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com Nro-ectrinfdrmation For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Partitions (none) Windows 1D-c2ow: 2,glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, n 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling, asphalt shingles roof mat, r-38 cell ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 6" thkns, 1/2" gypsum board int fnsh 12 0.570 0 99 0.026 38.0 99 . 0.368 0 31.7 380 17.9 214 1.45 143 1.30 129 6.66 Location: 1.51 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-'FBtuh Btuh/ft2 Btu Btuh/112 Btu Walls Im 12F-Osw: F wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 69 0.065 21.0 3.61 249 0.99 69 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows 1D-c2ow: 2,glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, n 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 1613-38ad:Attic ceiling, asphalt shingles roof mat, r-38 cell ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 6" thkns, 1/2" gypsum board int fnsh 12 0.570 0 99 0.026 38.0 99 . 0.368 0 31.7 380 17.9 214 1.45 143 1.30 129 6.66 659 1.51 149 2016 -Sep -27 10:12:24 wrightsoft' Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 14 ACCP. ... Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N k wri htsoft Component Constructions Job: lot 1 Great lakes g Date: March 11, 2016 Room 15 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.iiheatac.com Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry,bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Average 0 Construction descriptions Or Area 0 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 113 0.065 21.0 3.61 408 0.99 112 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud a 135 0.065 21.0 3.61 488 0.99 134 all 248 0.065 21.0 3.61 896 0.99 247 Partitions (none) Windows 1D-c2ow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, n 40 0.570 0 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 255 0.026 38.0 gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 6" thkns, 1/2" gypsum board int fnsh 255 0.368 0 31.7 1268 17.9 715 1.45 369 1.30 332 6.66 1698 1.51 385 2016 -Sep -27 10:12:24 1. WrlghtsOfit* Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 15 RCCA ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N • w I'; Component Constructions -- r Job: lot 1 Great lakes ghtsoft- Date: March 11, 2016 bed 3 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 11M M,0- • MEN e • e Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-•F ft2-•F/Btuh MON Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 162 0.065 21.0 3.61 585 0.99 161 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud s 113 0.065 21.0 3.61 408 0.99 112 w 36 0.065 21.0 3.61 130 0.99 36 . al I 311 0.065 21.0 3.61 1124 0.99 309 Partitions (none) Windows 1 D -clow: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, s . 40 0.570 0 1/4" thk; 6.67 ft head ht Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 6" thkns, 1/2" gypsum board int fnsh 306 0.026 38.0 306 0.368 0 31.7 1268 31.7 1266 1.45 442 1.30 398 6.66 2037 1.51 462 r wre htSof' Right-SuiteO Universal 2015 15.0.23 RSU05790 2016 -Sep -27 10:12:24 Page 16 ACC% ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: lot 1 Great lakes g a Date: March 11, 2016 2nd floor foyer By: J&J Heating & Air Conditionirr7 �esiakl ,, anditir Location: 243 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1.51 Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Average 0 Construction descriptions Or Area 1.1 -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftz-°F/Btuh Btuh/ftz Btu MOM Btu Walls 12F-Osw: Ffm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 108 0.065 21.0 3.61 390 0.99 107 gypsum board int fnsh, 2"x6" wood frm, 16" o.c. stud Partitions (none) Windows (none) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 6" thkns, 1/2" gypsum board int fnsh 168 6.026 38.0 168 0.368 0 1.45 243 1.30 218 6.66 1118 1.51 253 -2016-Sep-27 10:12:24 rF wrightsoft' Right -Suite® Universal 2015 15.0.23 RSU05790 Page 17 ACCP ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N Project Summar Job: lot 1 Great lakes -- wCightsoft� y Date: March 11, 2016 Entire House By: J&J Heating & Air Conditioning Arlington17 ��=-. ,tea 4�' P 5� � � �a�fir: x� s � �� �a :�.< a,�=a� E ;; ,.,� r �k . Pro ectlnformation a� r ,. For: TKZ LLC 78 Great pond Rd, N Andover, Ma 01826 Notes: u'777777777, _11 m _ q �� D`esrnlnforthatian Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 65149 Btuh Structure 38834 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 65149 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 35960 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 1489 Btuh Ducts 0 Btuh Heating Cooling Central vent (0 cfm) - 0 Btuh Area (ft2) 3039 3039 Equipment latent load 1489 Btuh Volume (W) 27351 27351 Air changes/hour 0.28 0.15 Equipment total load 37449 Btuh Equiv. AVF (cfm) 128 68 Req. total capacity at 0.70 SHR 4.3 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency . 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 1767 cfm Actual air flow 1767 cfm Airflow factor 0.027 cfm/Btuh Air flow factor 0.046 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.96 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - - wrightsoft'" 2016 -Sep -27 10:12:24 I.—:— Right -Suite® Universal 2015 15.0.23 RSU05790 Page 1 ...Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJS Front Door faces: N ., , AED Assessment Job: lot 1 Great lakes wrig�htsoft, Date: March 11, 2016 Entire House By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jlheatac corn Web: www.jjheatac.com �� ,Ma ..r Nro eCt,lnfo rlla�t� inF . w:.. For: TKZ LLC 78 Great pond Rd, N Andover, IVI a 01826 J es an :Cnntlitic Location: Boston Logan Int'I AP, MA, US indoor: Indoor temperature (°F) Heating 68 Cooling 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Dailyrange °F) - 15 (L ) We bulb (°F� - 72 Wind speed (mph) 15.0 7.5 m4i .'TisUlAeTbA -� yae r Hourly Glazing Load Hour of Dav / Hourly d Average / AEDIIm Maximum hourly glazing load exceeds average by 35.2%. House does not have adequate exposure. diversity (AED), based on AED limit of 30%. AED excursion: 658 Btuh (PFG-1.3*AFG) 2016 -Sep -27 10:12:24 - wrightsoft° Right -Suite® Universal 2015 15.0.23 RSU05790 Page 1 ...D Isktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N - - wvrightsoft, Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office(@jjheatac.com Web: www.jjheatac.com 1 -30b Room name Entire House Eating 2 Exposed wall 360.0 ft 31.0 ft 3 Room height 9.0 ft 9.0 ft heat/cool 4 Room dimensions .:. ,0 311 1.0 x 196.0 ft 5 Room area 3039.0 ft2 196.0 ft2 .0.034 Ty Construction U -value Or HTM Area . (ft2) Load Area (ft2) Load _._ 0_ number (Btuh/W2'F) (Btuh/ft2) or , perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N,/P/S Heat Cool Gross N/P/S Heat Cool _ ...:0 0. F 21 '28t .:' ��,- . 0.015. 6 .,..._0.36 0 $3 12F Osw '0.065 n 3.61 0:99 963 833 3010 828 135 '' 93 336 92 1 D c2ov 0.570. n 31.69 17.87 12 0 380 214 0"` 0 0 0 1 D c2ow "`0.570 n 31:69 17.87 76 0 2409 1358 0, 0 0 0 D, 11 D0 1 s , 0.390. n 21.68 10.34 2 42 911 434 42 - 911 ,434. 11 12F-Osw 0.065 a 3.61 0.99 57 fi 625 2259 622 18 _42 18 65 18 i D-c2ow.. 0 570 e 31.6.9 59.73 32 0 1014 1911 0 0 0 0 12F Osw 1D c2ow 0 065 0.570 s s 3.61 31.69 0.99 31.66140 k 828 667 0 2411 4437 663 ' 0 0 0 0 4,11D0 658 ,0.390 s;:. 21,68 , 10.34 21 21 455 4432 217 0 0 0 0 0 0 0. 0, t-G12F-Osw 36657 0.065 s 3.61 0.99 135 95 343 94 0 0 ...... 0 0 W12F-Osw. 1 D clow _ 0.570 s 1.69 33,61 6 30.99 - 0 1268 _. 1537 c _ _..125 0 _ M , 0 065 w , 0 .. . '540 540 ' 1952 Occupants @ 126 ' 126 455 . W 12F-Osw 0.065 w 3.61 0.99 117 117. 423 .. 116 0 0 0 0 C 16B-30ad l 0 032 1,, 0 Subtotal (lines 6 to 13) 0 _. 38834 0 45 1.30 1748 2527 2272 0 0 0 0 C art-ceiln , - ,`, g 307 , -, „ 17.05 95;34 1159. _1748 °1159 19765. 17774 i96 i mac,.,' 196 3342,0 -0 3006. F 19A-Obstp 0.368 6.66 1.51 9999 659 149 0 0 ,_ 0 0 F _.......,19A-Obsp, . 0.368 6.66 _._x 151 .. _ 1583 .A . 10539 2388 , 0 b s0 -_... F 19A-Obswp 19A 0.295 6.161.40 66 .1,583 66 407 92 .._. ... 0 0 0 _m0 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed Awrightsoft- 2016 -Sep -2710:12:24 �� Right -Suite@ Universal 2015 15.0.23 RSU0579014CPage 1 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N ._ F scp _ 19A-30bstP m •0.034 0.034 - 1.59 1.59 0.36 0.36 ......-196 195 478 309 _ 758 70 172 _ 0 ';, 196 _ ._-__..0 .................. , 196 .:. ,0 311 6 70 F 19A-30bstp . .0.034 . - 1.59 .. _. 0.36. w ,478 X343 343 544 123 _ ' 0 ; _._ 0_ F 19A-30bstp 0.034 . - 1.59 - - .... 227 51 .. , 0 _ 0 �.::0 0 _ ...:0 0. F 21 '28t .:' ��,- . 0.015. _� . .,..._0.36 0 $3 0.00. q,,143 132 ; _143 132 1i0 0 .,,. .. ....... 77 ....... _. i .... ....,.. ___,. II x, 6 c) AED excursion 658 -52 Envelope loss/gain 57351 36657 5421 3694 12 a) Infiltration 7798. 947 671 82 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 1 230 0 0 Appliances/other 1000 0 Subtotal (lines 6 to 13) 65149 38834 6092 3775 Less external load 0 0 0 0 Less transfer0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 65149 38834 6092 3775 15 Duct loads 0% 0% 0 0 -0% 0% 0 0 Total room load 1 65149 38834 6092 3775 Air required (cfm) - . 1767 1767 1651 172 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed Awrightsoft- 2016 -Sep -2710:12:24 �� Right -Suite@ Universal 2015 15.0.23 RSU0579014CPage 1 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N I -M+ wrightsoft' Right -J® Worksheet Entire House J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com Job: lot 1 Great lakes Date: March 11, 2016 By: 1 Room name dinning kitchen 2 Exposed wall 28.0 ft 19.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 5 Room'idimensions Room.area 15.0 x 13.0 ft 195.0 ft2 19.0 x 12.0 ft 228.0 ft2 171..77 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load 0 570 number (Btuh/ft2-°F) 17:870 (Bt ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool LfD 1D clow 3883 0,570 6 12F-Osw 0 065 n., 3.61 0.99 ... _. 0 0 _ .. 0 ...... _........ ..._ 171..77 1.59 575 158 1 D c2ov 0 570 n 31:69 17:870 c) AED excursion 0 266 0 0 12 0 380 5669 214 LfD 1D clow 3883 0,570 .n 31.69 17:87 607 0 0 412 0 0 b) Room ventilation 0 0 0 0 0 0 13 11D0_. :. 0 0.390 m 21,68 , tr X1.0.34 ..... ,0 0 0 i Appliances/other 0 0 0 0 O 0 11 VL 12F Osw 4878 0.065 a 3.61 0.99 0 0 0 0 0 0 0 0 Less transfer 0 _... 0 0 -, (.. 1 D c2ow 0 0.570 e 31.69 59,73 0 0 0 0 0 14 0 0 6275 0 0. 5616 4933 12F Osw Duct loads 0.065 ' sj 3.61 _ 0.99 -0% 0 0 0 0 0 ... _ 0 .. 0 0 4933 p Air required (cfm) I D c2ow 170 0.570 s 31.69 31.66 224 0 0 0 0 0. 0 0 0 �-D 11 D0 _0.390 ' s 21.68 10.34 _ .: 0 0 0 . 0 0 , ...,..., 0 0 ._,.,..,.:0 W 12F Osw 0.065 s 3.61 0.99 135 95 _ 343 _ 94 ... 0 0 0 0 -.._G. 1D c2ow.. 31.69 31.66 40 0 1268 1266 0 0, W _ _„ I2F>OsW . r, '._.0.065 w 3;61 _ . , .:0.99 _._ 0 0 _ __. u . 0 0 _. . 0, _,... -.. W0 P _._ ....,,..0 0 . � ____ 0- W 12F-Osw 0.065 w 3.61 0.99 117 __ 117 423 116 _ 0 . 0 0 0 C .. ; 1,168 30ad 0;032 . '-, 1.,78 1.60 . 0 0 :..,:;' 0 0 0 0 0 C 1613-38ad 0.026 1.45 1.30 _ 0 0 0 0 0 . 0 C..' ._, .0 part.ceilm ,_,.. g _.._ 0 307 a-,, 17.05 195 195 3325 2990 228'.:: „ , "0 , _0 3496 19A -obs 0 368 6.66 1 .51 0 0 0 0 p , „_,228 ,.3888 0 0 t p _. 0.368 _-._ 6.66 , 1•.51 ;.,0 0 0 0 w 0 __0 0 0 �0 F , 19A-0bstp Wp 0.295 6.16 1.40 0 0 0 0 0 0 0 0 F_ .. 'r19A`-30bscp ". 0.034 1._59 0.36 195 .195 309 70 O ; 0,:,".,... 0 0 F 19A-30bstp_ 0.034 1.59 6.36... 0 0 0 0 228 ..-., 228 F_.:19A-3obstp _- . :"�_., --. 0034 ,- . _ F. 1.59 -0.136 - 0 0 0 :: 0.-..... 0 , ,.y _„362 „ _ .,._.. ,82 F._ __. �. 19A-30bsto 0.034 - 1.59 0.36 _.. 0 0 _0 0 0 . 0 0 ._0 0 v_'.:._;0 0. F _ 218-261::., .. . _:.0 015 . .-:: 0.83 -._. 0..00 _ 0 O _ c D o � ,a 0 _... 0 : _,__ .. 0 ..., _.. . _ _.._ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft� 2016 -Sep -27 10:e 2 Right-SuiteOO Universal 2015 15.0.23 RSU05790 Page 2 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N 6 c) AED excursion 266 -68 Envelope loss/gain 5669 4804 5205 3883 12 a) Infiltration 607 74 412 50 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 i Appliances/other 01 1000 Subtotal (lines 6 to 13) 6275 4878 5616 4933 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 6275 4878 5616 4933 15 Duct loads -0% 00/. 0 0 -0% 0% 0 0 Total room load 6275 4878 5616 4933 Air required (cfm) 170 j 222 j 152 224 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft� 2016 -Sep -27 10:e 2 Right-SuiteOO Universal 2015 15.0.23 RSU05790 Page 2 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N - wrightsoft, Right -J® Worksheet Job: lot 1'Great lakes Entire House Date: March 11, 2016 J&J Heating & Air Conditioning By: 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com 1 Room name foyer living room 2 Exposed wall 11.0 ft 44.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions .11.0 x 13.0 ft 1.0 x 343.0 ft 5 Room "area 143.0 ft2 343.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz*F) (Bt ft2) or perimeter (ft) (Btuh) or perimeter (ft) (13tuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 72F-Osw _ 0 065 n .... 3,61 0 9@ �._0 'd" -. ._ 0 0 .. _.. O ._._ 0'. 0 1 D-c2ov 0.570 n? 31.69 17.87 0 0 0 0 0 0 0 0 1 D-c2ow 0.570 n 31.69 17:87 0 0 0 0 0 0 0 0 11D0 0.390 n 21.68 10:34 0 0 0 0 0 0' 0 0 11 W 12F-Osw 0.065 a 3.61 0.99 0 0 0 0 207 187 676 186 I_ --G 1 D c2ow 0.570 e_. 31.69 59"73 0 0. 0 0 20 -0 634 1195, _ 12F Osw 76.-b65 s - 3.61 7 0.99 99 w r 78 282 78 153 93 336 w 92 1 D clow " .0.570 s 31.69 .31.66 0 0 0 0 60 0 i 902 1899 _ D 11 '_._0.390 s 21,68..:.:._10.34 21 21...._455 217 0 00 0 12F-Osw 0.065 s 3.61 0.99 0 0 0 0 0 0 .._ 0 0 1D-c2ow__. 0.570 s 31_.69 31.66 0 0 0 0 0 R. ,12F-Osw _ 0.065 w.;, •- •..3.61 _ 0.99 9 ...:.:. 0 ........... 0 _ - _ "_ ._ .0 0 36 ...___.._..0 36 '. W 12F-Osw 0.065 w 3.61 0.99 0 0 0 0 0 .:... 0 .:._330 0 0 It .., •> , 16B, 30ad.. ., ., x 0 032 .... 1.78 1.60 .. _.-0 _ _ . _ -0 ,... ... _0 ._ . 0 ,,.. W. _0 0 ��:_ 0 - ....,, O C 1613-38ad , 0.026 1.45 1.30 0 6 0 0 0. 0 0 0 C , , , C part ceiling , ., ..:, 0307 , 1.7.05 15.34 _ , _. _143 .:143 " 2439 2193 343: 343'; 5260 171---l- 19A-Obstp 0.368 6.66 0 0 O 0 _ ...5849 ...� 19A Obsfp'.. 0 368 ..- _ - 6.66 . ..1.51 .. ;1,51 �_0- :._:0 0 0 O .. _._._ m. _..0 . 0. _-.. _ .q �0 .............0 Q 119ATObswi) 0 0. . O 0 O 0 0 .. _�.. 0- F. 119A30bsCp .0.295 0034 - 6.59.... 0 6 o" 0 0 _. 0 ;.. 0 ;:... 0b 0 F ,19A-30bstp 0 034 - 1.59 0.36 0 0 0 0 F ... ,19A=30bstp ___ :. 0.034 • - 1:59 _ 6,36 0 0 0 343 343. "544.. F. F21 19A Ob _... 0 034 -_., 1.59 .... 0.36 143 .:.... 143 ..... 227 51 0 _ ... _ 0 0 .... .123 ....0. B 28t 0.015 L0.83 0.00 0 0 0 0 0 0 0 0. - . ....... _....... . _.,. . ... ... ... w.,............. ... 16,) .. .... ., _. .A «. ... ..... , AED excursion -35 59 i Envelope loss/gain 3403 2504 10071 8850 12 a) Infiltration 238 29 953 116 b) Room ventilation 0 0 0 0 13 Intemal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 3641 25331 11024 8966 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 3641 2533 11024 8966 15 Duct loads -0% 01/6 0 0 _0% 01/6 0 0 Total room load 3641 2533 11024 8966 Air required (cfm) 99 1151 299 408 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .4C�P. wrightsoft" 2016 -Sep -27 10:e 3 Right-SuiteC� Universal 2015 15.0.23 RSU05790 Page 3 ...Desktop\M-J - Copy\topnotch lot3 aprils. way.rup Calc = MJ8 Front Door faces: N -- wrightsoft' Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 J&J Heating & Air Conditioning By: 17 Arlington St, Dracut, MA 01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com 1 Room name bath master bed 2 Exposed wall 15.0 ft 86.0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 9.0 x 6.0 ft 1.0 x 623.0 ft 5 Room area 54.0 ft2 623.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2°F) (Btuh/ft2) or perimeter (ft) (Btuh) or erimeter (ft) (Btuh) Calculations approved by ACCA to meet all requirements of Manual J 8th Ed �4CFk wrightsoft 2016 -Sep -2710:12:24 CA Right -Suite® Universal 2015 15.0.23 RSU05790 Page 4 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N P 6 i c).AED excursion -16 Heat Cool Gross N/P/S Heat Cool Gross N/P/S 2168 Heat Cool 6 12F Osw 2482 0.065 � n 3.61 0.99 325 69 249 69 � 207 207 226 748 206 1 D c2ov 0 0.570 ri 31.69 17.87 81 0 0 0 0 0 0 0 0 0 1 D c2ow 0.570 n 31.69 17.87 .12 0 380 214 0 0 0 0 D_ 11 D07 0.390 n 21,68 _ 10.34 w,,. _ . 0 0 0 0 :. 0 0 `. ' 0 11 0 12F Osw Less transfer 0.065 a 3.61 0.99 54 42 152 42 81 81 Redistribution 293 .:.:0. 81 0 0 1 D ,clow_ ._ .___0.570 e„ 31.69 59.73 12 0 380 717 0 0 0 0 2708 15 12F-Osw 1 D-c2ow 0% 0.065 0.570 s s 3.61 31.69 , 0.99 31.66 '= 0 0 0 0 ........ 0 0 0 0 W'' 207 LL 20Z o 748 208 1913 0.390 S_., _21.68. 10.34 ....___` 0 0 0 0 0 0 0 0 0 0 0. 12F-Osw 0.065 s 3.61 0.99 0 0 0 0 0 0 0 0 1D-o2owr w ,.., 0.570.....6......_.__31.69 31,.66 0 0 4........ 0 0 W_. _ __ _ 0.065 : w , a61 . 0.99 _., 0 ., _.._,._ 0 ;.:.... 0 0 .._.._ .._o._._...... 279. .0 279 ....... ......... 1008 ......0. 277 12F-Osw 0.065 w 3.61 0.99 0 _ 0 0 0_ 0 0 .._ 0 0 Y Oa y .032 - 0 _ 0 0 0 0 C C ., .:'C 168-38ad part ceiling, 0 026 0.307 1.45 17.05 1.30 15.34 0 ,.. , ::.54 0 54 0 921 0 828 _ 623 _ 0 _ 623 3 0 1 901 , 0 _0 _ ,61,0 0 F, ., 19A-Obstp _-...,...._.. _ _ , 0.368 6.66 1.51 0 0 0 0 _ 0 0 0 F ,... _; ;19A-Obstp _ ..:,....'.. 0.368 . - 6.66 A41 W 0 „; 0 0 0 623 623. 4148 „0 940 F 19A Obs o 0 295 6.16 1.40 0 0 _ _ 0 0 ,_-_ 0 0 0 0 �P �.0 034 1.59 0.36 0 0 0 0 0. 0 0 tP 0 034 1.59 0.36 54 54 86 19 0 0 .m:0 0 F 19A 30bs t P 0 034 1.59 0:36 - '. O O 0 0 , .. 0 :......._..._ _ _ - 0 _.,.0 0„ _0 F 19A-30bsto_ _ 0.034 1.59 0.36 0 0 _ 0 0 0 0 0 ... 0.015.._.. ...- , 0._83 0.00 0 _ .. -<^. 0 0 .. 0 0, 0' 0 , ., ..... _0. _...:......0. _. Calculations approved by ACCA to meet all requirements of Manual J 8th Ed �4CFk wrightsoft 2016 -Sep -2710:12:24 CA Right -Suite® Universal 2015 15.0.23 RSU05790 Page 4 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N 6 i c).AED excursion -16 -37 Envelope loss/gain 2168 1874 7846 2482 12 a) Infiltration 325 39 1863 226 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 2493 1913 9708 2708 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2493 1913 9708 2708 15 Duct loads 0% 0% 0 0 -0% 0% 0 0 Total room load 2493 1913 9708 2708 Air required (cfm) 68 87 263 123 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed �4CFk wrightsoft 2016 -Sep -2710:12:24 CA Right -Suite® Universal 2015 15.0.23 RSU05790 Page 4 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N -- wrightsoft, Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 By: J&J Heating & Air Conditioning 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.iiheatac.com 1 Room'name bed 2 2ndf hall 2 Exposed wall 12.0 it 0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 12.0 x 11.0 ft 1.0 x 132.0 it 5 Room area 132.0 ft2 132.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ftz) Load number (Btuh/ftMF) (Btuh/ft2) I or perimeter (ft) (Bt h) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 " 12F Oswr. 0.065 . n_... 3.61 0.99 0 0 0 O ._... .....0 . t) 0 W 0 i D c2ov= 0.570 n 31.69 17.87 0 0 0 0 0' 0 0 0 1D clow 0.570 n 31.69 17.87 0 0 0 0 0 6 0 0 p 11D0 ': ��. 0.390 .n 21,68 1034 0 '0 . °_`°: 0 0 �a.. ;0 � 0 0. 11 \12F-0sw 0.065 a 3.61 0.99 0 0 .0 0 0 0 0 _ 0 0 1D clow 0.570 e.. 31.69 59.73 0 0 0 0 0 0 0 0 Vhf 12F Osw 1D c2ow 0.065 0.570 s s ,• __• 3.61 31.69 0.99 31.66 108 40 68 0 246 1268 68 1266 _O 0 .r ` p 0 _.... 0 0 __....O. 0 D 11D0..=;'s _..:. . 0.390 S .__..:.21:68 10.34.. 0 0 0 0 0 0 0 0 Vy �-G 12F-0sw 0.065 s 3.61 0.99 0 0 0 0 0 0 0 0 1D-c2ow _..y0.570 s_w _._31,69 31.66 0 0 0 0 0. 0 0 0 W ....... ,12F 0sw?_w. • 3.61 ,• ,.. 4.99 • 0 , .,... 0 __- 0 0 .. . _... 0 0 0 _-....0 W 12F-0sw 0.065 w_ 3.61 0.99 0 0 0 0 0 0 0 0 0.032 .:.:: 1.78 >, 1.60 0 0 0 0 132 132 235 211' C ._ „16B-38ad 0.026 1.45 1.30 132 132 191 172 0 _ 0 0 rr part:ceihng,. ..:: „ 0.307 . r_ r x,17 05 ..., t5.34 �, . 0 0 0 0 0 0 q 0 F 19A-Obstp 0.368 6.66 1.51 0 0 0 .. 0 0 0 0 .-- .:.0 0 F, _,.... 0.368 666'._ 1.51 132 132 879 ,. 199 „- 0 0 v 0 0 F 19A-0bswp 0.295 . -.. 6.16 0 0 0 .. : 19A.,3Qbs.cp 0.034__1.40 _ t) 0 0 _ F 19A Itp .� .. .. 1:59 0.36 0 0 ..... - O b .. •. 4 0- 3�b 0.034 1.59 36 0 0 0 0- 0. 0 0 F. _� _ 216 28t;ne . �: _ 0.015 ` _�_ 0,83 0 00 0 0 _. _...... --0 ... _.._ ...:... 0 . _ 132 • . .: 132-� _ _'110 ,.� ,-..0. 0 _._„_ . . rv __. ... .... _ __u _....... �.._ 6 c) AEDexcursion 302 3 Envelope_foss/gain 2583 2007 345 208 12 a) Infiltration 260 32 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 1 230 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 2843 2269 345 208 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2843 2269 345 208 15 Duct loads -01/. 0% 0 0 -0% 0% 0 0 Total room load 2843 2269 345 208 Air required (cfm) I77 103 1 9 9 Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed. wrightsoft® 2016 -Sep -2710:12:24 Right -Suite@ Universal 2015 15.0.23 RSU05790 Page 5 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N r ' 1 - wrightsoft' Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 J&J Heating & Air Conditioning By: 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Email: office@jjheatac.com Web: www.jjheatac.com 1 Room name wi/cl M bed hall 2 Exposed wall 13.0 ft 9 0 ft 3 Room height 9.0 ft heat/cool 9.0 ft heat/cool 4 Room dimensions 6.0 x 11.0 ft 9.0 x 11.0 ft 5 Room area 66.0 ft2 99.0 ft2 Ty Construction U -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ftz°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 q_. 12F Osw: W 0 065 n`3.61 0.99 54 54 195 54' 81 69 •249 69 I -G i D c2ov 0.570 n 31.69 17.87 0 0 0 0 0 .0 0 0. 1D-c2ow 0.1570 m 31.69 17.87 0 0 0 0 12 0 .380 214 14_-G D11D0 0.390 In; 21.68 10.34 0 0 0 "0- 0 0:0 11 12F Osw 0.065 a 3.61 0.99 0 0 0 0 .. _.A.,:, 0 0 0 0 1D-c2ow _ ._ 0.570 e. 31,.69 59.73 0 0 0. 0......., 4 0 0 12 , Osw;; iD c2ow. 0.065 (0.570 s s 3.61 31:69 0.99 31.66 Y 0 0 -- 0 0 _ .. 0_ 0 ,...._... 0 :: O 0: 0 ......__..-....0 0 0 0 0 . 0 0 W 11b0 ...._.; I12F Osw 0.390 0.065s s 21:68 3.61 10.34 0.99 a_,:'0::..:. 0 0 0 0 0 0 .:-•.. 0 0 0 0 0 _...:.0 0 _ . _....0 0 �G i D clow_ 0.570 ., s_ 31,69 ____31.66 0 0 0........ 0 0 0 0 0 W . ..: 112F.Osw.: 6.065 w 3.61. 0.99 63 ........ _ 63 _. 228. ... 63 ,T 0 _ 0 _ 0 0: W 1 12F-Osw0 - _ 065 w 3.61 0.99 0 0 0 0 0 0 0 0 .16B-30ad , ,..,:;: 0 032 ,, .>;: 1.78. 1:60 _. >.. 0 0 0;0 0 0 _ 0 0' C 166-38acl -_ 0 026 1.45 1.30 66 66 95 86 99 143 129 C part ceiling, .: _ - 0307 '::. 17.05 _ 15.34 �._. ,0 0 0, _ 0 0 „_, , "99 _7- _0 ,. 0 F„ - 19A-0bstp 0.368 6.66 1_.51 0 _� 0 0 , 0 _ 99 _ ...... _0 F ,. _ : 19A=0bstp .. 0 368. ,, :_.. _..6,.66.. , ' 1 •.51 .-- ..._ . 0 , -_ .. ::..:: - 0 0 -�-. 0.:..: :. 0 - .-_99 0 _659. 0 _ '_ -149 0 F_ . _... 19A-Obswp _ ",. _ 0.295 - 6.16 140 66 66 407 _:_ 92 0 0 0 .` _ P. 0 .. .. 0 0 ... 0 0 .... 0 ... 0 rv_..._..._0 0 1.59 0.36 36 0 0 0 .__ 0 0,. 0 0 0 F 19A 30bstq p 0 034, - _: 159 0.36 0 0 0 0 0 d 0 F . ,19A-30bstp „ �.-. 0.034 _. -_ 1,59 0,36 0. 0 _.. 0 ... .... 0 0 0. _ _:. _ _0. 0 �21)3-2$t- _ 0 015 ,:r.., ,'0.83 ...._._O.QO 0 ._ ._ 0 _ 0 .. _ _0 P.- .. 7. _ ... _ ,„... ........... .. ......... _... ,._...... ...... . _. ._.._ ...._. 6 c) AED excursion -4 -8 Envelope loss/gain 925 290 1432 553 12 a) Infiltration 282 34 195 24 b) , Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 1 0 Subtotal (lines 6 to 13) 1207 324 1627 577 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1207 324 1627 577 15 Duct loads -00/0 0% 0 0 -0°/C 0% 0 0 Total room load 1207 324 1627 577 Air required (cfm) 33 15 44 26 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft" 2016 -Sep -2710:12:24 � Right-SuiteO Universal 2015 15.0.23 RSU05790 Page 6 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: 'J -- wrightsoft, Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 J&J Heating & Air Conditioning By: 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax 978-454-8615 Email: office@jjlheatac.com Web: www.iiheatac.com 1 Room name I -8 2nd bath -24 Room15 2 Exposed wall 553 4230 1654 12 9.0 ft 32.0 ft 24 3 Room`height 693 84 b) Roam ventilation 9.0 _ft . heat/cool 9.0 ft heat/cool 4 Room dimensions 13 Internal.gains:: Occupants @ 230 0 0 9.0 x 11.0 ft 17.0 x 15.0 ft 5 Room area 0 99.0 ft2 0 255.0 ft2 Subtotal (lines 6 to 13) Ty Construction U -value Or HTM Area. (ft2) 1738 Load Area (ft2) 0 Load number (Btuh/ftz°F) (6t W) or perimeter •(ft) 0 (Btuh) or perimeter (ft) 0 (Btuh) Redistribution 0 0 Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 4923 12F-Osw 0 065,"""'k n < 3.(i1 0.99 0 81 "- 69 0 249 69 i53 113"406 1627 -112 1 D c2ov = 1738 0 570 n" 31.69 17'8 44 0 0 0 0 0 0, 0 .0 1Dc2ow° 11D0 0570 "ns1,88 31.69 1787120 _,� .. 380 214 40 :; 0. 1266 ,715, fl 390 10.3E1 0 0 . _ 0 0 0 '0 0,, Q 11 V 12F Osw 0.065 e 3.61 0.99 0 0 0 0 135 135 488 134 '--(i 1 D clow 0.570 a 310 59.73 0 0I 0 0 0 0 0 0 12F-0sw ' 0.065 s" 3.61 0.99 0 0 " "_.., 0 _ 0 0' 0 ~0 0 1 D clow 0.570 S 31.69 31.66 0 0 0 0 0 0 0 0 D. 11DO ,.. ;. 0:390 s 21:68 10.34 0. _.... 0 0 0 0'....._.., 0._ 0 �j 12F Osw 0.065 s 3.61 0.99 0 0 0 0 0 0 0 0 i --G ,1 D clow 0 570 s 31._69 31, 66 0 0 0.--- 0 0 0. 0 0, W .,. .. 12F Osw, :0065 w;' w. .. 3:61 W 0.99 _ 0 0, 0 _ 0 0 W 12F Osw0.065 w 3.61 0.99 0 0 0 0 0 0 0 .. 0 C 16B. 30ad. �. "0'.082 1.78 1 60 " 0 0 0 0 0. `, 0 0 C C 16B-38ad 'Cpart ceiling, '.. `: 0 026 0307 ,.:.` 1.45 17_05 1 30 34, 99 C 99 „_ : "°6 143 0 129 255 255 ��... 369 332 F . Obstp 0.368 -_ _ 6.66 M�15 1.51 .,. 0 0 0 0 0 :. 0 0 �0' 0 0 0 - �s .0 0. F a19A 19A-Obsfp , ,,, ... " . ; <0 368 .:. 6.66 1.5.1 _-... 99 99 659 149 , 255 ;° 255 rom" 1698 385 F 19A-Obswp 0.295 6.16 1.40 0 0 0 0 0 0 0 0 F ,. ,,' [,19A-30b.cp , ,. " , _0.034 - 1.59 ... 17.36 0 0 0 A 0 .;�„ 4. 0 �.� D. F _19A-30bstp 0.034 - 1.59 0.36 0 0 0 0 0 0 _ 0 0 .119A-30bsip 23�r 0.034 :: i.59 . " 0.36 0 0 0' 0 0_'...0. F 19A-30bstp 0 034 1.59 0.36 0 _ . 0 _. 0 _`_. 0 0 0 _. .0 0, '218-28tµ0 0,83 ., .,..0.00 A. b 0 : 0 p ;;. 0 , 0 M 6 c) AED excursion -8 -24 Envelope loss/gain 1432 553 4230 1654 12 a) . Infiltration 195 24 693 84 b) Roam ventilation 0 0 0 0 13 Internal.gains:: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1627 577 4923 1738 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 15 Subtotal Duct loads 1627577 4923 1738 0% 0% 0 0 -0% 0% 0 0 Total room load 1627 577 4923 1738 Air required (cfm) 44 26 134 79 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed wrightsoft" 2016 -Sep -2710:12:24 .4�CE� Right -Suite® Universal 2015 15.0.23 RSU05790 Page 7 ..Desktop\M-J - Copy\topnotch lot3 aprils way.rup Calc = MJ8 Front Door faces: N wrightsoft0 Right -J® Worksheet Job: lot 1 Great lakes Entire House Date: March 11, 2016 J&J Heating & Air Conditioning By: 17 Arlington St, Dracut, MA01826 Phone: 978-454-8197 Fax: 978-454-8615 Einail: office@;jheatac.com Web: www.jjheatac.com 1 Room name :;ed 3 2nd floor foyer 2 Exposed wall 39.0 ft 12.0 ft 3 Room height 9.0' ft heat/cool 9.0 ft heat/cool 4 Roomdimensions 17.0 x 18.0 ft 12.0 x 14.0 ft 5 Room `area 306.0 ft2 168.0 ft2 Ty Construction Ll -value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Bt W) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 ; i 2F Osw,_ :0065 n= 3.61 099 0 0 � 0 0 0 � � 0 0 ;1 D-o2ov 0 570 n 31.69 1787 0 0 0 0 0 ,0 0 0. ow„ 570 ..31.69 O0 D. ± 1 DO W _. M . 0.390 .sri; 21.88 i 0.34 :.. 0 0 0 0 0.:0 11 VLG 12F-Osw 0.065 a 3.61 0.99 162 162 585 161 0 0 0 0 . , 1 Dc2ow 0 570 n, e 31 69 59 73 0 0 0 0 0 0 0 0 112E Osw 0 065 s 3,61 0:99 _ _ 153 113, .... 408 112 108 , . 108 890 07 ;I1D clow, 0.570 s 31.69 31,68 40 .... 0 1266 1266' 0 0 0 0 ."0.390 ' s 2168 . '7034 _._ 0;r;<`- 0 _ ,_. 0,'A I 12F-Osw 0.065 s 3.61 0.99 0 0 - -A 0 0 0 0 0 0 -G1 D clow 0.570 s 31.69 31.66 0 0_ 0. 0 0 0 0 0 3.61 0.99 36 36 130 _ 0 : r . ..,0 W 1217 Osw 0.065 w 3.61 0.99 0 0 0 0 0 ...,0 0 0 0 C 16B 30ad _ _; 0032 ,.u, ,' .. .1.78.....: 7.600 0 0 0 C 16B-38ad 0.026 1.45 1.30 306 306 442 _ 398 168 168 243 218 Part.ng + 7.66 16.66 9 W `V F F 19A-Obst' 0.368 . ... „1 _ 306 306 2037 462 168 .168 11118 X353 9. Obswp 0.295 6.16 1.40 O 0 ...... 6 0 0 0 0 0 OA -3i , 0.034 cz 1:59 0,36 _,e 0 - 0 0 0 0 ,t,,, p a _... F 19A-30bstp 0.034 - 1.59 0 36 00 0 0 0 0 0 F 19A-30bSIp .,„ 'rt. _ - 0.034 _ 1.59 0.6 . „ .':.0 0 0 :..:.. 0 1. Or 0 •: 0 .:,., i0 F „ ,_ 19A-30bstp 0.034 1.59 0.36 0 0 0 0 0- 0 - r 0 0 28t: 0.015 .,° 083 O,Ob , , r � y W- . ._.� 7711 ...T _ 7 ....... ....�. q .....,.. .. ,,.. .. x- .. .... .., ., ... µms.,, . .. 6 c) AED excursion 295 -8 Envelope loss/gain 4871 2730 1752 571 12 a) infiltration 845 103 260 32 b) 'Room ventilation 0 0 01 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal:(iines,6 to 13) 5716 2832 2012 603 Less external load0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 5716 2832 2012 603 15 Duct loads -0% 0°h 0 0 -O% 0% 0 0 Total room load Air required (cfm) I 5716 2832 2012 603 155 129 55 27 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed wrightsoft@ 2016 -Sep -27 10:12:24 ACCP Right -Suite® Universal 2015 15.0.23 RSU05790 Page 8 ...Desktop\M-J - Copy\topnotch lot3 aprils way. rup Calc = MJ8 Front Door faces: N The Commonwealth of Massachusetts Department of Industrial.A-ccidents I Congress Street, Suite 100 Boston, MA 02114-2017 www mass.gov/dia Compensationlnsurance Affidavit: Builders/Contractors/Electricians/Plumbers. TOBEFRED WITH TBE PSIl)NGA7THORITX. Name (Business/Orgariizationllndividual): W Address: City/State/Zip: / �` �J Phone #: Axe you an employer? Check the appropriate box: L am a employer with employees (full and/or part time).* 2.0am a sole proprietor or partnership and have no employees Working forme in any capacity. [No workers' comp. insurance required.] 3.E] I am a homeowner doing all work myself. [No workers' comp. insurance required.] t <1 I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers' compensation insurance or are sole proprietors with no employees. 5-11-1I am a general contractor and I have hired the sub -contractors listed on the attached sheet. These sub -contractors have employees and have workers' comp. insurance.* 6.❑ We are a corporatio;i and its, officers have exercised their right of exemption per MGL c. 1 4 and we have no employees. [No workers' comp. insurance required] rf W_? _/S-6 Type o roject (required). 7. [ NeWdonstri d- ion 8. ElRemodeling 9. ❑ Demolition 10 ❑ Building addition 11.❑ Electrical repairs or additions 12. QPlumbing repairs or additions 13,. [] Ro6f repairs 14.n Other *Arty applicant that checks box #i, must also fill out the section below showing their workers' compensation policy information: Homeowners who submit this affirm attached ftindicating d additional heyae doing the all work name of the sen hire tub-contractode rs and state whethrsinust submit r or new poi fh° eme tit? have such. —in actors that checkthis box A,,nlnvrec- 7fthe sub -contractors have employees, they must provide their workers' comp. policy number. X acre an employer th at is providing workers' information. Insurance Company Name: # Self -ins Lic. compensation insurancefor my employees. Below is thepou andyoh sate Expiration Date-. Policy or -- ------ Job Site Address: %fir 2te 144101 City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and e7cpiratxon date). e by a fiftb up to $1,500-00 Failure to secure coverage as requixed under enaltiesGL c.zin the form of criminal TIOP WORK ORDERand a fine of up to $250.00 a and/or one-year imprisonment, as well ascivilp day against the violator. A copy of this statement may be forwarded to the Office of Investigations of the DIA. for irisur'e, coverage verification. Ido Hereby cert nder tl e pains andpenalt' s of erjury that the information provided above is tr e and correct. Official use only. Do not -write in this area, to he completed by city or town officiaL City or Town: Permit/License Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other Phone #- Contact Person: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute, an employee is defined as "...every person in the service of another under any contract of hire, express or implied, oral or written." An employer is defined as "an individual, partnership, association, corporation or other legal entity, or any two or more of the foregoing engaged in a joint enterprise, and including the legal representatives of a deceased employer, or the receivbi br trustee Of an individual, partnership, association or other legal entity, employing emplbyees:. However the owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter 152, §25C(6) also states that "every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant wbio has'not produced -acceptable evidence of compliance with the insurance coverage required." Additionally, MGL chapter 152, §25C(7) states "Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if necessary, supply sub=contractors) name(s), address(es) and phone number(s) along with their certificates) of insurance. Limited Liability Companies (LLC) or Limited Liability Partnerships (LLP) with no employees other than the members or partners, are not required to carry workers' compensation insurance. If an LLC or LLP does have employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested, not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy, please call the Department at the number listed below. Self-insured companies should enter their self -insura'nc'e license number on the appropriate line. City or Town. Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition, an applicant that must submit multiple permit/license applications in any given year, need only submit one affidavit indicating current policy information (if necessary) and under "Job Site Address" the applicant should write "all locations in (city or town)." A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e. a dog license or permit to burn leaves etc.) said person is NOT required to complete this affidavit. The Department's address, telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Boston, MA 02114-2017 Tel. # 617-727-4900 ext. 7406 or 1-877-NUSSAFE Fax # 617-727-7749 Revised 02-23-15 wwwmass.gov/dia