Loading...
HomeMy WebLinkAboutMiscellaneous - 10 Hay Meadow Road,.�. _1 f ~� 0 x w m a a 0 E� z o, a� 1R� OP H&O i pi NclTN /JtiIi�VEI�, MA, l aT �A 11tl�04 DO c.✓ 'tel 30 wATG S� PP(7 p TdWnl Cl LUE..t_ ,6PovD lYJTC SS WTIC Sys ;EM vEsl� ,a PPi�ov ev DI5APPTl v5p RQS,oNs pwi�' 94 Te /PiT�oUlNG /UThok�)Ty ColivIT- 105 SYSTCM W S -VA LLATIOA J cX/,iv4Tco�1 JtiSP�.G 1 roti D/J-rC �rNAL t tiSp�Tlo� 4PPRO \)E7 DI;APPh�Dv�V RC,6`50 NS •) Da rC" FwAL APPF�DVAL D,orE Q PASS ❑ F4►L- APPr�ovrn1G ��r�toi�iTy r� I Ns M( t ct. Board' of. F,ealth BEPTIC 325TIIi NorthoAnit)� aas. INSTALLATICK CHHCS LIST LOT . AVAT ON OK FAIL o nn -n 'n AT Q nT . PRam OK 1. Distance To: a. Wetlands b. Drains c. Well 2. Water Line Location 3- No PPC Pipe 2t. Septic Tank a. _Tess --Length & To Clean flat Covers. b. Cement Pipe to Tank -- On Both -Sides of Tank 5. Distribution Box a. Covers & Box - No Cracks b. All Lines Flowing Espial Amounts c. No Back Flow 6.- Leach Field or Trench a. Di%ensions b. Stone Depth c. Capped'Ends d. Clean Double Washed Stone' 7. Leach s a. sions b. ne Depth c. lash Pads d. Teas e. Cement Pipe to Pit - Both Sides. f. Clean Double Washed Stone 8. No Garbage Disposal 9. -Final Grading Inspection 10. Barricading Covered System 11. As Built Submitted. a. Lot Location.- b, ocation b. Dimensions of System c. Location with Aegard_to Pere Test d. Elevations e: Water Table TO: �14o. AV -A DO "/ r-- 0'e>AV-L> C ->v FROM: rp-Ai-JY-- C— "AS Assoc— TNc-- NORTH 7�14"DOVER, rtz�SS- I BOARD OF HE.7=1' DESIGN E14GIIIEER Re: soil Absorption. Sewage Disposal System This is to certify that I have inspected the construction materials of said dispGsal system at T HAY M LA D(�::)\-/ SITE LOCATION North Andover, Mass. are as specified in my plans and The grades and construction materials specifications dated Reg. J Prof. - Enginee'rj-.-.Reg. Sanitarian SUBSfJRFACE DISPOSAL SYSTEM CHECK` I rST��""' NORTH ANDOVER BOARD OF HEALTH 17 OVED DATE PROVIDED 7/j6/7g Title 5 Reg. 2.5 Reg. 6 Fail DISAPPROVED DATE TIME REASON . "� K167 The submitted plan must show as a minumum: (a) the lot to be served (area,dimensions,l.ot ;#,abutters) (Planning Board files) (b) location and log of deep observation holes -distance to ties `_-(c) location and results of percolation tests -distance to ties '-(d).design calculations & calculations showing required leaching area ' (e) location and dimensions sf system (including reserve area) (f) existing and proposed contours �(g)) location of any wet areas within 100' of the sewage disposal system or disclaimer (check wetlands mapping) (h) surface and subsurface drains within 100' of sewage disposal system or'disclaimer (i) location of any drainage easements within 100' of sewage disposal system or disclaimer (planning board files) (j) known sources of water supply within 200' of sewage disposal system or disclaimer --'(k) location of any proposed well to serve the lot (100' from leaching facility) ---ri) location of water lines on property (10' from. leaching facilities) m) location of benchmark n) driveways o) garbage disposers no PVC is to be used in construction (q) a profile of the system (elevations of basement, plumbei pipe septic tank, distribution box inlets and outlets, distribution field piping and any other elevations) (r) maximum ground water elevation in area of sewage dispose .system (s) plan must be prepared by a Professional Engineer or other professional authorized by law to prepare such plans Sematic Tanks (a) Capacities - 150% of flow, water table, tees, depth of tees, access, pumping, b) Cleanout c) 10' from cellar wall or inground swimming pool d) 25' from subsurface drains SOIL PROFILE & PERCOLATION TEST DATA 4 S North Andover., ss. No.&Street^ T Lot No. 3� Loc. Plan Owner y,,A�yhS Investigator , /. / P %�� r ��tri�� L/1 -i --observer ' n ,4 /�Yi e� J Drop of 311 -Time- SOIL PROFILES -DATE 1. Elev. 2. Elev. 3. -Eley. _ 4'Elev. 0 0 0 Mins.lst- 311D op 0 Mins . 2nd 3"Dro Percolation Rate Ties to Test fits 2 2 2 2 3 3 3 -------- 4 = '6�4� -- 4 _ 4 5 6 7 8 9 1C Benchmark Elevation 5 6 7 8 9 10 5 6 7 8 9 10 Location Datum Percolation Tests -Date - % 9 Pit Number 1 2 3 4 S Start Saturation 2.'Z Soak -Mins. Start Test -Time Drop of 311 -Time- Z. S3 Drop of 6" -Time 3 :10 _ Mins.lst- 311D op /U V., Y, Mins . 2nd 3"Dro Percolation Rate fi 5 Notes & Sketches on Back 6 JN!V -aRc QuT OF H.59i--- - - - yea* -- �N Fob � F ;Z/% r R