Loading...
HomeMy WebLinkAboutMiscellaneous - 100 CRICKET LANE 4/30/2018l 4 C) K Fl- o PV (D rt r P) e t Lot & Street .0 /p „(�/C r �� Map/Parcel CONSTRUCTION APPROVAL Has plan review fee been paid: YE NO Permit l 7 , Plan Approval- Dat : Approved Designer: /'')� yam, L _ �'- Plan Date: Conditions: Water Supply- rl vn -- Well. - Well Permit: _..Driller: Well Tests: Chdrrucal Bacten'a I 4 Bacteria"H, Plumbing Sign -Off. Comments: Date Approved Date -Approved Date Approved -- -Wiring Sign -Off rorm --u-. Approv : Approval to-Issk�, YES O Date Issued By: Conditions: Final Approval: All Permits Paid? NO Well Construction Approval?Septic System Construction Approval? jO N0 Certification?N Other NO Any Variance Needed? YES 1V0 FINAL BOARD OFHE TH APPROVAL: DATE: APPROVED BX . �� SEPTIC SYSTEM INSTALLATION Is the installer licensed? NO Type of Construction: *YES REPAIR New Construction- _.._Certified Plot Plan Review NO -Floor Plan Review YES NO _—_ - Conditions of Approval from Form U YES NO _Issuance of DWC permit- - YES NO _DWC Permit Paid? — YES NO . ---DWC_Permit # - i- Installer: %n M - BegfiLInspection:_ _ _ NO Excavation Inspection: Needed: —Passed: Z U Construction Inspection: Needed: As -Built -Plan Satisfactory: YES. - Approval of Backfill: ---Final Grading Approval: IN Date: By: � �1-e f Date: Z2 By: Final Construction Approval- Date - Certificate of Compliance: Approval: Date: NG TI BUILDING CORNER A B SEPTIC TANK = 199.43 16.1' 38.5' PUMP TANK LEACH LINE #2 29.4 FNn DIST. BOX = 14F 77 29.4' 32.3' CORN. LEACH FIELD #1 31.4 31.8 CORN. LEACH FIEL #2 60.7' 62.6' CORN. LEACH FIELD #3 57.4' 75.6' CORN. LEACH FIELD #4 21.9' 54.5' ..,-1ujNG E SEMEN T l 4" PIPE @ FDTN. = 200.12 SEPTIC TANK IN = 199.88 SEPTIC TANK OUT = 199.67 UIJ I. bUA IIV = I DIST. BOX OUT = 199.43 END LEACH LINE 1 = 199.21 END LEACH LINE #2 = 197.75 FNn I FA( -.H I INF _41 = 14F 77 LOT #10 AREA=44,242 S.F. AS -BUILT NOTE: THIS PLAN & CERTIFICATION IS NOT OF A WARRANTY OF THE SUBSURFACE DISPOSAL SYST. IT IS AOF THE SUBSURFACE DISPOSAL SYSTEM AND ELEVATION OF THEDEXISTING SYSTEM LOCATION LOCATED IN COMPONENTS. NORTH ANDOVER, MA. AS PREPARED FOR COPLEY DEVELOPMENT 50 COPLEY DRIVE METHUEN, MA. 01844 SCALE: 1"=20' DATE: JUNE 20, 2000 SUBDIVISION LOT #10 CRICKET LANE MERRIMACK ENGINEERING SERVICES PROFESSIONAL ENGINEERS • LAND SURVEYORS PLANNERS 66 PARK STREET • ANDOVER, MASSACHUSETTS 01810 • TEL. (978) 475-3555 • FAX (978) 475-1448 BUILDING CORNER A B SEPTIC TANK 16.1' 38.5' PUMP TANK DIST. BOX OUT 29.4 END LEACH LINE 1 DIST. BOX END LEACH LINE J2 29.4' 32.3' CORN. LEACH FIELD #1 31.4 31.8 CORN. LEACH FIELD #2 60.7' 62.6' CORN. LEACH FIELD #3 57.4' 75.6' CORN. LEACH FIELD #4 1 21.9' 54.5' 1ro SEMEN T l T 1 11 L V' 1 V 1 1 1 . SEPTIC TANK IN SEPTIC - L V v. I If - = 199.88 SEPTIC TANK OUT = 199.67 PUMP TANK IN PUMP TANK OUT DIST. BOX IN = 199.59 DIST. BOX OUT = 199.43 END LEACH LINE 1 = 199.21. END LEACH LINE J2 = 197.75= END LEACH LINE #3 = 196.27 - AS -BUILT OF SUBSURFACE DISPOSAL SYSTEM LOCATED IN NORTH ANDOVER, MA. AS PREPARED FOR COPLEY DEVELOPMENT 50 COPLEY DRIVE METHUEN, MA. 01844 SCALE: 1"=20' DATE: JUNE 20, 2000 SUBDIVISION LOT ,#10 CRICKET LANE LOT X10 AREA=44,242 S.F. NOTE: THIS PLAN & CERTIFICATION IS NOT A WARRANTY OF THE SUBSURFACE DISPOSAL SYSTEM. IT IS A RECORD OF THE LOCATION AND ELEVATION OF THE EXISTING SYSTEM COMPONENTS. MERRIMACK ENGINEERING SERVICES PROFESSIONAL ENGINEERS • LAND SURVEYORS • PLANNERS 66 PARK STREET • ANDOVER, MASSACHUSETTS 01810 • TEL. (978) 475-3555 • FAX (978) 475-1448 Commonwealth of Massachusetts - = City/Town of System Pumping Record ' UIAN 12014 f' Form 4 d TOWN L wr ,,, d ANDOVER HEAP;' D:_?Ar.T1,FNT .1 DEP has provided this form for use -by local Boards of Health. Other forms may be used, but the information must be substantially the same as that provided here. Before using.this form, check with your local Board of Health to determine the form they use. The System Pumping Record must be submitted to the local Board of Health or other approving authority. A. Facility. Information 1. System Locatio�Left�igh nt of Nous Left / Right rear of house, Left/ right side of house, Left/ Right side of buidin9 , Left /Right 01R-67 building, Left / Right rear of building, Under deck Address City/Town State Trp Code 2. System Owner. Name Address (d different from location) City/Town State � C7jD ode +: Telephone Number B. Pum -ping Record C Jlv� i 1. Date of Pumping Date 2. Quantity Pumped: Ganons 3. Type of system: ❑ Cesspoo!(s) eptic Tank ❑ Tight Tank ❑ Other (describe): 4. Effluent Tee Filter present? ❑ Yes 9_V0 If yes, was it cleaned? ❑ Yes ❑ No; 5. Condition f stem: 6. System Pumped By: Neil Bateson Name Bateson Enterprises Inc Company 7. Location where contents -were disposed: GL Lowell Waste Water it 06=4.doo- 06/03 F5821 Vehicle License Number Date System Pumping Record • page 1 of 1 ICN Commonwealth of City/Town of System Pumping Form 4 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. ISI ED EC03Z007 v1 w dP R ME _ .. 0 3 2007 rwrc i ;� ANDQVFR. cPRTMENT DEP has provided this form for use by local Boards of Health. Other forms may be used, but the information must be substantially the same as that provided here. Before using this form, check with your local Board of Health to determine the form they use. The System Pumping Record must be submitted to the local Board of Health or other approving authority. A. Facility Information 1. System Locatiory , ` '::; " � C �- Address , on /` � City/Town 2. System Owner: Name Address (if different from location) City/Town B. Pumping Record 1. Date of Pumping _Lv� . ate V`-6AA'- L'(- l 6 -U7 Date Zip Code State Zip Code Telephone Number 2. Quantity Pumped: Gallons 3. Type of system: ❑ Cesspool(s) eptic Tank ❑ Tight Tank ❑ Other (describe): ,� 4. Effluent Tee Filter present? [I Yes L� Ivo If yes, was it cleaned? ❑ Yes ❑ No 5. Condition of SXs 1) ( A, � 6. System Pumped By: Name Vehicle License Number Company 7. Location where contents re disposed: L___C" Date t5form4.doc- 06/03 System Pumping Record • Page 1 of 1 �'.r I �4� �5��11J,�sF�•1 Y'F�`��'Ei 7rirY V=�'f S111�{ar '�S'i�{ rta �il •liR atyy r 1 __.�.__.__._. __.. _ I 1 • r ' ',1 . rt { �.. it t. •t � .. 0 R!T AI�'DOVER. SYSTSM PUMPING RECORD iVI'EM UWNFR:& ADDRESS w SYSTCM LOCATION. (�-XMPN: IQr1 from of houstf . Yn ch `x r t] ' U I OF PUMJ'IN�;' QUANTITY�PUMPQ. /� �J�l { Lc; ;. I'UUL 'N0 .YES SEPTIC TANK. N0 X YES NATURE OF:SERYLCE, 'ROUTINE `X EMERGENCY UR 1 ATJ0.NV1 v Y� CQ,Nlll1'LON F'ULL:TU CUVCIt' aII'XYY CR9-A 131'' :.BAFFLES IN I'lrACl LEACHFICLD RUNUAC'K.,• CXCESSIYE:SQI�IRS..: F1.00.DEDl 501T}7yy;Iu,��CARnYOYER , 1JWHFR (EXPLA-IN) • = 1 y 1, YS 4t�t1�i15,� .=1w'�r�11tr�i(.Ia t \.*;ti'!� ;i JY�lri l} t�{7 'C I t; r:i ��; ` •J I,, � • t r ' (,U)"IM • r .'t DEED Walnut Ridge Development LLC of North Andover, Essex County, Massachusetts ("Grantor"), for consideration of $569,900.00, grants to Andrew R. Lynch and Deborah C. Lynch, (-f J5band and W,+e as renlinrS by of 141 Warren Avenue, Boston, MA 02116 with QUITCLAIM COVENANTS: wia, f kz b4d.1i I 4,Mo. a certain parcel of landrin North Andover, Massachusetts, being shown as Lot.10 on a plan entitled "Definitive Plan Walnut Ridge North Andover, Mass.", by Merrimack Engineering Services, Inc., 66 Park Street, Andover, MA 01810, filed with the Essex North Registry of Deeds as Plan No. 13447 (the "Plans"). Containing 44,242 s.f. of land, more or less, according to the Plans. Together with the benefit of the following: 1. The right to use Cricket Lane, as shown on the Plans, in common with others entitled thereto, for all purposes which streets and ways are commonly used in the Town of North Andover; and 2. A grading easement, appurtenant to Lot 10, in and over Lot I IA, in the area identified as Proposed Septic System Easement and labeled "A" (the "Lot 10 Septic Easement Area") on plan entitled "Septic System Easement Plan Walnut Ridge, North Andover, Mass." Dated December 15, 1999 and recorded with the Essex North Registry of Deeds as Plan No. 13636 (the "Easement Plan") for the purpose of grading and regrading the Lot 10 Septic Easement Area, and access thereto, in connection with the installation, repair and maintenance of the subsurface waste disposal system servicing and located on .Lot 10. Lot 11A is shown on a plan entitled "Plan of Land in North Andover, Mass. Prepared for Atlantic Realty Trust" Dated March 25, 1999 and filed with the Essex North Registry of Deeds as Plan No. 13634. This conveyance is subject to the following: L The right of Grantor, which Grantor expressly reserves from the conveyance hereunder, to dedicate or convey to the Town of North Andover as a public way at such time as the Town is willing to accept such dedication or conveyance, the way shown as Cricket ...(K0209599.1) 71 l Lane on the Plans, including the right to convey to the Town the fee interest of the land in said way; 2. The right of Grantor, which Grantor expressly reserves from the conveyance hereunder, to .grant rights and easements for access, utilities, drainage and such other purposes as Grantor ip its sole discretion deems advisable, in, on and over said Cricket Lane; 3. Master Declaration of Walnut Ridge in North Andover; Massachusetts, Reservations and Restrictions, recorded with Essex North Registry of Deeds at Book 5637, Page 281; 4. Form M Easement to the Town of North Andover recorded with Essex North Registry of Deeds at Book 5393, Page 229; 5. Easement to Massachusetts Electric Company recorded with Essex North Registry of Deeds at Book 5637, Page 275; 6. An easement, for the benefit of and appurtenant to Lot 9, as shown on the Plans, in and over Lot 10 in the area identified as Proposed Septic System Easement and labeled "B" (the "Lot 9 Septic Easement Area") on the Easement Plan for the purpose of grading and regrading the Lot 9 Septic Easement Area, and access thereto, in connection with the installation, repair and maintenance of the subsurface waste disposal system servicing and located on Lot 9; and 7. Such other easements, restrictions, reservations and other matters of record that are in force and applicable. For grantor's title see deed recorded with Essex North Deeds in Book 5393; Page 220. The address of the grantee and the property hereby conveyed is 100 Cricket Lane, North Andover, MA 01845. WITNESS our hands and seals this day 20of June, 2000. WALNUT RIDGE DEVELOPMENT LLC By NORTH ATLANTIC REALTY CORP., Manager 2 (K02095".1) ESSEX, SS. B kolas D. Laudani, its President and Treasurer By COPLEY DEVELOPMENT CORPORATION, INC., Manager B Marie Pitocchelli, 'ts President and Treasurer COMMONWEALTH OF MASSACHUSETTS June Z f , 2000 Then personally appeared the above-named Thomas D. Laudani, President and Treasurer of North Atlantic Realty Corp., Manager as aforesaid, and acknowledged the foregoing instrument to be the free act and deed of Walnut Ridge Development LLC, before me, ESSEX, SS. James J. Burke Not Public NOTARY PUBLIC My comndon e4tes Feb. 16,2007 My commission expires: -1 l COMMONWEALTH OF MASSACHUSETTS June 2 F, 2000 Then personally appeared the above-named Marie Pitocchelli, President and Treasurer of Copley Development Corporation, Inc., Manager as aforesaid, and acknowledged the foregoing instrument to be the free act and deed of Walnut Ridge Development LLC, before me, James J. Burke NOTARY PUBLIC �conurtissionexp�es�eb 16 2007 Notary Public My commission expires: 2- 3 Town of North Andover, Massachusetts H BOARD OF HEALT DESIGN APPROVAL FOR SOIL ABSORPTION SEWAGE DISPOSAL SYSTEM Applicant%,e• Test No. Site Location Reference Plans and Spe K Form No. 2 Permission is granted for an individual soil absorption sewage disposal system to be installed in accordance with regulations of Board of Health. Fee V'/aqj_— CHAIRMAN, BOARD OF HEALTH Site System Permit No. / TOWN OF NORTH ANDOVER BOARD OF HEALTH CERTIFICATE OF COMPLIANCE DATE OF COMPLIANCE: 6/29/00 This is to certify that the individual subsurface disposal system constructed (X ) or repaired ( ) by William Sawyer at 100 (lot 10) Cricket Lane has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the North Andover Board of Health regulations. The Issuance of this certificate shall not be construed as a guarantee that the system will function satisfactorily. —,-d"&JL/L Board of Health Inspector Mar -23-99 10:26A Paul D. Turbide, PE/PLS 508-465-0313 P.03 March 22, 1999 Sandra Starr North Andover Board of Health Administrator Office of Community Development and Services 30 School St. North Andover, MA 01845 RE: Title V second review for Lot 10 Cricket Lane ' Dear Sandra, I find that all the concerns outlined in my report of February 9, 1999 have been addressed except the following: • 310 CMR 247(2) states that for a minimum of 2" of 1/8 to'/z inch stone is to be placed on the top of the leaching bed. The plan design calls for a layer of filter fabric to be laid on top this stone. There is no regulation that I could find that allows filter fabric to be laid over the peastone, and therefore I would recommend that the filter fabric be removed from the design. If you have any questions or comments please feel free to contact me. Sincerely Carlton A. Brown, PE/PLS Civil Engineers & Land Surveyors One Harris Street Newburyport, MA 019511 (978)465-8594 6 Z y '�QADAATE D WPP/ Applic Site Location Engineer Town of North Andover, Massachusetts BOARD OF HEALTH 13 19 —1, - Form No. 1 APPLICATION FOR SITE TESTING/INSPECTION Test/Inspection Date and Time Fee k CHAIRMAN, BOARD OF HEALTH Test No. a t 4 S.S. Permit No. D.W.C. No. C.C. Date Plbg. Permit No. Town of North Andover, Massachusetts BOARD OF HEALTH g T �ti4Ao E ,oP ^: APPLICATION FOR SITE TESTING/INSPECTION Form No. 1 19 Applicant NAME ADDRESS TELEPHONE Site Location Engineer NAME ADDRESS TELEPHONE Test/Inspection Date and Time CHAIRMAN, BOARD OF HEALTH F S.S. Permit No. D.W.C. No. C.C. Date Test No. Plbg. Permit No. ag � WE mes Af QL woo.' Q& 0 Ct -A 4.11 0 Q VQ U9 LLJ 0 (11) LU YJ AS -BUILT CHECKLIST LOT NUMBER, STREET NAME ASSESSORS MAP & PARCEL NUMBER l� LOT LINES & LOCATION OF DWELLINGS LOCATIONS & DIMENSIONS OF SYSTEM, vto�j- 55 INCLUDING RESERVE TIES TO LOT LINES & DWELLING WELLS a. FROM SEPTIC TANK b. FROM LEACH AREA _Z LOCATIONS OF DEEP HOLES & PERC TESTS `-� ELEVATIONS OF DISPOSAL SYSTEM TOP OF FDN ELEVATION LOCATIONS OF WELLS, DRAINS, WATERCOURSES WITHIN 150' OF SYSTEM LOCATION OF WATER, GAS, ELECTRIC LINES, CABLE DISTANCES FROM CORNERS OF HOUSE TO CENTER OF TANK & D -BOX / ✓ ORIGINAL STAMP & SIGNATURE IMPERVIOUS AREAS - DRIVEWAYS, ETC. % V NORTH ARROW ' LOCATION & ELEVATIONS OF BENCHMARK USED Jun -14-00 10:01 North Andover Com. Dev. 508 688 9542 P.02 Gv INSPECTION CHECKLIST FOR SEPTIC SYSTEMS Yes NO Initials A. Bottom of Bed depth 1. Excavation to proper eP 2 With Wenches, sides of excavation are beneath B horizon 3. Edge of excavation specified distance from foundation. eec. Comments: g. Retaining Wail 1. Wall height and width as specified 2, Waterproofed ching facili tY 3. Wall minimum 0"toilea plan 4. Wall meets spec Comments: C. Building Sewer 1. Pipe diameter minimuas 4' 2. Schedule 40 pipe 3. Watertight joints 4. Inlet to tank cemented foot minimum 5. Slope minimum 0.01 or 1/8' per 6. pipe properly set on compact firm base 7. Pipe laid on continuous grade in straight lime 8. Cleanouts precede all change in alignment and grade 9. Manholes at any 900 change t0. t0' minimum offset to water line Comments: D. Septic Tank 1. Level 2 1,500 gal minimum 3. Gas laa$le present on outlet 4. Manhole to grade 5. Manholes over center and each tee 6. 3-20" manholes 7. Inlet tree minimum 12" under invert S. Outlet tee minimum 14" under invert 9. Outlet line cemented. 10. Air space 3" above tees 11. 2" — 3" drop froth inlet to outlet 12. Pipe set 13. Compact base With 6" of/." crushed stone under tank 14. Tank is watertight Comments: v` v 7 �_ sAPPL A 'Jun -I4-00 10:01 North Andover Com. Dev. 508 688 9542 Yes NO E. Pump Chamber 1. if separate from tank, compact base with 6" of 14" stone underneath 2_ Minimum 2" pipe to d-bax if gravity system 3. 20" access manhole 4. Tank level 5. Watertight 6. Tank size agrees with plan specification 7. Manhole to grade S. Check valve and bleeder hole present 9. Alarm in building on separate circuit !0. Alarm functions i t . Manual operating switch 12. Pump delivers liquid to d -box Comments: F. Distribution Box 1. D -box level 2. Minimum 0.17' (2") drop from inlet to outlet 3. Minimum 6" slump v / 4. outlet pipes show equal distribution 5. Compact base with 6" of stone beneath box r/ 6. Box is watertight 7. All lines cemented with hydraulic cement 8. Schedule 40 pipe --�--- Comments: G. Solt Absorption system 1. All stone double washed -'/.' - t '/z'• Pea stone Bucket test done? 2. Minimum 2" of pea stone above distribution lines 3, Minimum 6" stone beneath pipe - V V 4. DismUtion lines capped or connected together ✓ -- -- 5. Grading meets 3:1 slope -.-.-- 6. Minimum of 9" of fill graded over system 7. Toe of slope stops minimum 5' from edge of property; if not, then swab Comments: Leach: Trenches � 1. Min trenches 2. Length of trenches agree with plan. (Max. length 100') 3. Width of trenches agree with plan - Minimum 2'; maximum - 4' 4. Vent present if <50 feet or specified 5. Distance between trenches minimum 4' and maximum of 6' 6. Minimum distance between trenches 10' 7. Pipe slope minimum 0.005 or 6" per 100' S. Depth of trenches below outlet invert minimum of 6". P.03 ''Jun -24-00 10:02 North Andover Com. Dev. 508 688 9542 A Yes NO 9. Pipes set an stable base. Comments: 1. Leach Field 1. Maximum length of field 100' 2. Pipe slope minimum 0.005 or 6" per 100' 3. Separation between -pipe 6' maximum 4. Pipes connected at end 5. Separation between adjacent fields 10' minimum 6. Pipes set on stable base 7. Maximum 4' separation from edge of field to first line 8: Minimum two distribution lines 9. Maximum pert rate 29 mpi Comments: I Leaching Pits 1. Minimum inlet pipe 4" 2. Pits of concrete 3. Sidewall between 12" and 48" wide 4. Access manholes on each pit 5. Pipes cemented with hydraulic cement Comments, K. Final Grade 1. Slope ovcr soil absorption system minimum 0.02 2. All system components covered by at least 9" soil 3. Cover soil free of stones larger than 6" 4. Grading slopes away from dwelling 5. No areas over system that may pond P.04 TOWN OF NORTH AINMOVER SEWAGE DISPOSAL SYSTEM INSTALLATION CERTIFICATION Tne undersigned hereby certify that the Sewage Disposal System (constructed; ( ) repaired; by :_.: located at tr 10-1 /0 all Che -e' r was installed.in conformance with the North Andover Board of Heath approved plan, System Desian.Pe.^�it dated rtiith an approved design How of gallons per day. The materials used were in conformance with those specified on. the ar#oved plan; the system was installed in accordance with the provisions of 310 Q/2,15.000, Title 5 and local regulations, and the final grading agrees substantially with the approyed plan. All worn is accurately represented on the As -built which has been submitted to the Board of Health. Bed inspection date: Final inspection date: Installer: Design E: Engineer Re -.re enzative F 6�ne,.r epfesentative Date: 6-26 —Zyoo Date:6�2 " 6D 2 ce LU Cl. Z O U N Z O U N Y C4 3 J Q N O G. N *1 z a C � O Z O Q a O J � H O N m IS i, Q c � o Z �- Ui a > o � C. W i Q O Q a� p c � 0 0 U � 0 3 LA � A aE W LA �T N Q Z t rC C O N � • �+ b0 Q N z a APPLICATION FOR DISPOSAL WORKS CONSTRUCTION PER HT DA'Z'E: CURRENT P STALLER'S LICENSE# %!K-0 LOCATION: _r��1 L��'• %��� /�r��✓(� LICEINSED INSTALLER: Q Cam SIGNATURE: TELEPHONE# 2Z CMCK ONE: REPAM:_ NEW CONSTRUCTION: IF NEW CONSTUCTION, PLEASE ATTACH FOUNDATION AS -BUILT. i 5.:;0 Fee Attached? Foundation As -Built? Fioor Plans? Aptiroval Administrative Use Only Date: Yes No Yes V - No Yes ✓ No Date: Z -,-,i- lD 27 Charles Street North Andover, MA 01845 Telephone#(978)688-9540 Fax#(978)688-9542 FaX To:Y--J 14 From: �G Fax: ///0 Pages: Phone: Date: Re: CC: ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle • Comments: o , J 00 • a oo 0 c- _ � o � ' ' X .0 ` �. 0 m 9 >> 66 Gf/ 7 moo 00 CD x 00 aicr�s o10 s c OO.i • CV FOIrCa ek� O ? \�. \ .0 0 0 V) Q p p. °D M o00 0 C7� rYn o� Ix 00 a Lo p� ^F m m w 0) in ago i• TP_ 105q �`I Qo r � / 4 , 242 S.F.o • �- egg \ 0 J i .02 AC. CBA 4 --�1 2 S. F �; 4 3. 4. INSTALLER PROJECT MANAGEMENT OBLIGATIONS As the North Andover licensed installer for the construction of the septic system for the property at r;�r ,✓p relative to the application of Alrl�w S dated /— 2iWo for plans byPf'r1.;tU and dated with revisions dated I understand and agree to the following obligations for management of this project: As the installer I am obligated to call for any and all inspections. If homeowner, contractor, project manger, or any other person not associated with my company schedules an inspection and the system is not ready then item two shall be applicable . As the installer I am required to have the necessary work completed prior to the applicable inspections as indicated below. I understand that requesting an inspection, without completion of the items in accordance with Title 5 and the Board of Health Regulations may result in a $50.00 fine being levied against my company. a) Bottom of Bed — generally first inspection unless there is a retaining wall which should be done first. Installer must request the inspection but does not have to be present. b) Final Inspection — Engineer must first do their inspection for elevations, ties, etc. As -built or verbal OK from engineer must be submitted to BOH, after which installer calls for inspection time. Installer must be present for this inspection. With pump system all electrical work must be ready and able to cause pump to work and alarm to function. c) Final Grade — Installer must request inspection when all grading is complete. Does not have to be on site. As the installer I understand that persons or companies not associated with my company may not perform the work required by my company to complete the installation of the system identified in the attached application for installation. I fitrther understand that work by others unlicensed to install septic systems in North Andover can constitute reasons for denial of the system, and/or revocation or suspension of my license in the Town of North Andover plus significant fines to all persons involved. As the Installer I understand that I must be on site during the performance of the following construction steps: a) Determination that the proper elevation of the excavation has been reached b) Inspection of the sand and stone to be used. c) Final inspection by Board of Health staff. d) Installation of tank, D -box, pipes, stone, vent, pump chamber, retaining wall and other components. 5. As the installer I understand that I am solely responsible for the installation of the system as per the approved plans. No instructions by the homeowner, general contractor, or any other persons shall absolve me of this obligation. Undersigned Lice d Septic Installer r Date: MAY Feb -09-99 1O:16A Paul D. Turbide, PE/PLS ODT INGINHIRING civil EIi'giiieels & Land Surveyors Newburyport, MA 0050 (97b) 46"544 February 9, 1999 Sandra Star North Andover BoardTof,�Healt?h Administrator Vi3j�.` V1 C'ti'iiii`Za' =unity i�ellip�iivni aq+siA .3vrviwu 30 School St. North Andover, MA 01845 RE: Title V review for Lot 10 Cricket Lane Dear Sandra, 508-465-0313 P.O8 Enclosed find the "Checklist. for North Andover Septic System Plans" for the above- mentioned site. The follo x ing is a list of all the `Problem' areas and deficiencies Port Engineering has found. • .l 10 C1VEK 247(2) states teat'or a,rainiri►ur; of 2" of lig to 1� ina, stone. is to be placed on the top of the leaching bed. The pian design cans for a layer of filter fabric to be laid on top this stone. There is no regulation that i could find that allows filter fabric to be laid over the peastone, and therefore i would recommend that the filter fabric be removed from the design. • The septic tank detail should show that the inlet tee is to extend a minimum of 10 inches below the flow line (227(6)), and that there is to be a 3 -inch air space above the inlet and outlet tees (227(4))_ • L%te 13 states that benchmarks are to be place + within 75 feet of thee disposal arp--a before conrtuction. A condition of approval of this design should be th the benchmark will be set as noted. • The fill required around the system runs right to the property line at land of Parker. The toe of slope is required to be 5' off the lot line (255(2)). • Trenches #I and #2 do not have 4' separation between ESHW and bottom of system because of the following: 1, Trench #1 has a highest existing grade elevation of about 195.5. Assuming ESHW is 34" down, the elevation of ES14W is therefore about 192.7'. The bottom of syste r Should be 4 feet above this elevation, or 196.1'. The plans call for the bottom of system to be at clevatic, n 195.5' (1.2 feet too logv). 2. Trench #2 has a highest existing grade elevation of about 194.0'. As,Unuing ES1fW is 34" down, the elevation of ESh1W is therefore about 1971.2', The bottom of system should be 4 feet above this elevation, or 195.2'. The plans call for the bottom of system to be at elevation 194.75' (0.45 feet too low}. If you have any questions or comments please feel free to contact me. Sincerely CarltCi- & Brown, PFJPLS FORM U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. ************ APPLICANT FILLS OUT THIS SECTiON''""�* APPLICANT w6-//I/4�f�IGI ae,✓� L G C_ LOCATION: A,sse�ssoes Map Number SUBDIVISION i✓a �iv u, �� �l t?, STREET 691 <- 4&/ 2 *** OFFICIAL USE ONLY RECOMMENDATIONS OF TOWN AGENTS: CONSERVATION ADMINISTRATOR COMMENTS DATE APPROVED DATE REJECTED PHONE 971 7D, e2SS7 PARCEL 4," LOT (S) /O ST. NUMBER_! L ,C-,b5ej i' �Co^r �fV(le L T0" TOWN PLANNER DATE APPROVED DATE REJECTED COMMENTS FOOD INSPECTOR -HEALTH DATE APPROVED DATE REJECTED I tCTOR-HEALTH DATE APPROVED ,,SEFY DATE REJECTED COMMENTS PUBLIC WORKS - SEWERIWATER CONNECTIONS D� 2 DRIVEWAY PERMIT e FIRE RECEIVED BY BUILDING INSPECTOR DATE Revised 9197 jm WILLIAM J. SCOTT Director (978)688-9531 L'�Tf / C7 Town of North Andover * NORTH OFFICE OF �a ° �< �° L COMMUNITY DEVELOPMENT AND SERVICES x 27 Charles Street North Andover, Massachusetts 01845 March 25, 1999 Les Godin Merrimack Engineering 66 Park Street Andover, MA 01810 Re: Lots 1-10 Cricket Lane, North Andover Fax(978)688-9542 Dear Sir: This letter will serve as your notification that the proposed septic plans for the lots specified above have been approved for dwellings with a maximum of nine (9) rooms. If you have any questions, please do not hesitate to contact this office. Very truly yours, Sandra Starr, Administrator SS/gb cc: Copley Development BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 SEPTIC PLAN SUBMITTAL FORM " LOCATION: 4y. � K` 016 KE—T Z A aE—::' NEW PLANS: YES $125.00/Plan REVISED PLANS: YES $ 60.00/Plan SITE EVALUATION FORMS INCLUDED: YES NO DATE: S— I/ —q DESIGN ENGINEER: I PZ -Z( t-- 1 A 6 k—' I kf 6r,01 L6 DATE TO CONSULTANT: *If you want your plans expedited, please submit four plans and included a stamped envelope with the correct amount of postage to mail plans to Port Engineering. When the submission is all in place, route to the Health Secretary. SEPTIC PLAN SUBMITTAL FORM LOCATION: (moi ( 10 �,A kfit— ( L. A Z Iry i ID6 Y 9L)2 NEW PLANS: YES $125.00/Plan REVISED PLANS: YES $ 60.00/Plan SITE EVALUATION FORMS INCLUDED: YES NO DATE: ) —0-1—V DESIGN ENGINEER: H aZl l`I A C::�- 15A46. S ',W &C- ' DATE TO CONSULTANT: *If you want your plans expedited, please submit four plans and included a stamped envelope with the correct amount of postage to mail plans to Port Engineering. When the submission is all in place, route to the Health Secretary. T OF NO, I A ��,OvcR% lU BOARD OF HEALTH FEB - I W 1t No...................................... Commonwealth of Massachusetts Wo9TH AwwvER , Massachusetts FORM 11 - SOIL EVALUATOR FORM Page 1 Performed By: .... W.I..LLI.AM........DV-F9.. S .. ................ WitnessedBy:.:::..p.N1:.A:::::S.R.R:::..:.:.:::::::....:.:::_.:.:......:.::::::::::::::.::. tAn wn Addrai or iwr 10 cetei:�aT L-A)WE. New Construction Repair ❑ Office Review eleph , VW TekProw 0 r MOT14Vr—Nt, MA. at 1y Published Soil Survey Available: No ❑ Yes Year Published ...NO.)- Publication Scale Soil Map Unit .C..F�.� � �C M-110 Drainage Class ....f'....... Soil Limitations ......M�.p ?-..................................................... . Surficial Geologic Report Available: No ❑ Yes ❑ Year Published Publication Scale .................. GeologicMaterial (Map Unit).....�....-............................................................................................................................... Landform ..................................................... ................................................_......................................................................................................... .... Flood Insurance Rate Map: 200 qJ3 Above 500Y ear flood boundary No ❑ Yes Within 500 year flood boundary No Yes ❑ Within Y ithin 100 year flood boundary No Yes ❑ Wetland Area: National Wetland Inventory Map (map unit) .......Q1S.l...... .►. i .....1� .!-!EA'fi off4................ Wetlands Conservancy Program Map (map unit) ................................................................................................... Current Water Resource Conditions (USGS): Month AVNs -r Range : Above Normal ❑ormal I Below Normal ❑ Ukssumeo Other References Reviewed: V.5.6.,9, MAPS 10SA 16 (1- pf FORM It - SOIL EVALUATOR FORM Page 2 On-site Review Deep Hole Number jja5.A.1.196A Date: Time:T..n.A Weather .3P.......5 Location (identify on site plan) �j ................................................ Land Use Slope (%I Surface Stones .... ....................................... I ............... Vegetation.... W.-O.P.D.ZZ ................................................................................................................................................................................................. LandformMOW.141E................................................ I .............................................................................................................................................. Positionon landscape (sketch.on the back) ..................... . .............................................................................................................................. Distances from: Open Water Body .......10 fteet Drainage way -A -00-t feet Possible Wet Area feet Property Line .....1.0..+. feet Drinking Water Well .100-t feet Other ......................................... DEEP OBSERVATION HOLE LOG Depth from Surface Unchesl Soil Horizon Soil Texture (USDA) Soil Color (Munselli Soil Mottling Other (Structure, Stones, BoulOem, Consistency, % Gravel) A 3pq 4, Bw sal JZ 4(("' . . .... - ------ -34 10" sir & Lt A P c R- 7 Z-SN'916' E', a L U ljc)L Parent Material (geologic) ...... .............................................. . - Depth to Bedrock: P.W.&I ...It ....... Depth to Groundwater: Standing Water in the Hole: .464 .... . Weeping from Pit Face: ...'UJA.. Estimated Seasonal High Ground Water: 'tJ4."). �.L( FORM 11 - SOIL EVALUATOR FORM Page 3 Determination for Seasonal High Water Table Method Used: ❑ Depth observed standing in observation hole inches ❑ D pth weeping from side of observation hole inches Depth to soil mottles `�'� inches ❑ Ground water adjustment ..... feet Index Well Number Reading Date ................... Index well level ................... Adjustment factorAdjusted ground water level .............-...................................... Depth of Naturally Occurring Pervious Material Does at least four feet of naturally occurring pervious material exist in all areas observed throughout the area proposed for the soil absorption system? If not, what is the depth of naturally occurring pervious material? Certification I certify that on �''%��� (date) I have passed the examination approved by the Department of Environmental Protection and that the above analysis was performed by me consistent with the required training, expertise and experience described in 310 CMR 15.017. Date Signature t--��-� �- �— _ FORM 12 - PERCOLATION TEST COMMONWEALTH OF MASSACHUSETTS WoM AUWVMC, Massachusetts Site Passed 0S'ite Failed El ........................ ..... ( -1. ................................................... . ...... ....... Performed By: tr-S 6 Witnessed BY: SU SA u — Comments:....... Feb -09-99 1O:15A Paul D. Turbide, PE/PLS February 9, 1999 Sandre Starr North Axdover Board ofu=lth Administrator Office of Com- rnunity aDevelopruen t and Sc: vicvss 30 School St. North Andover, MA 01845 RE: Title V review for Lot 9 Cricket Lane Dear Sandra, 508-465-0313 P.O7 Enclosed find the "Checklist for North Andover Septic System Plans" for the above- mentioned Qitp. The following is a list of all the `Problem' areas and deficiencies Port Engineering bas fou=nd. Civil Engineers & Carlton. Brown, PEIPLS Land Surveyors ` One Harris Street /�v- Newburyport, MA 01950 (978)465-8594 i 310 CMR 247(2T) sWes IlWt for it t11iinatum of 2" of Iro to it Inch stone. is to be placed on the top of the leaching bed. The plan design calls for a layer cif Biter fabric to be laid on top this stone. There is no regulation that I couid find that allows filter fabric to be laid over the peastone, and therefore I would recommend that the filter fabric be removed from the design. • The septic tank detail should show that the inlet tee is to extend a minimum of 10 inches below the flow line (227(6)), and that there is to be a 3 -inch air space above the inlet and outlet tees (227(4))_ Note 13 states that benchmar4w are to be placed within 75 feet of the disposal area before construction. A condition of approval of this design would be that the benchmark will be sei as noted. The fill required around the system encroaches onto the abutting lot (Lot 10). There should be a slope easement around this encroaching fill. (255(2)). (Note that there is shared fill between Lot 8 and Lot 9. Each lot needs the fill that is on the other lot. A slope easement is probably not required over Lot 8-9). p The trenches are proposed to be stepped. The slope of the pipe connecting the d - box and the lower trench will be more than 12%- Note that 314 Clot 15.232(3)(a) states thlat if the slope ofthe a pipe leading to the d -box is more than 8% then there should be a bate to dissipate the velocity of the effluent ruinxing into the d -box. My processional opinion is that there should be a velocity -reducer located at the high end of the lower trench (The velocity -reducer could be arnather d- ox and baffle). a Pown It � If you have any questions or comments please feel free to contact me. INGINEIMING Sincerely Civil Engineers & Carlton. Brown, PEIPLS Land Surveyors ` One Harris Street /�v- Newburyport, MA 01950 (978)465-8594 WILLIAM J. SCOTT Director (978)688-9531 Town of North Andover f NORTH OFFICE OF �ao�```eO �oL COMMUNITY DEVELOPMENT AND SERVICES ° 27 Charles Street �09 North Andover, Massachusetts 01845 February 25, 1999 Les Godin Merrimack Engineering 66 Park Street Andover, MA 01810 RE: Lots 1-10 Cricket Lane Dear Mr. Godin: Fax(978)688-9542 This is to inform you that the plans for the septic systems proposed for the subdivision of Walnut Ridge have been disapproved for the following reasons: • The septic tank detail does not show the inlet tee extending a minimum of 10 inches below the flow line, nor that there needs to be a 3 inch space above the tees. (3 10 CMR 15.227(6) and 15.227(4))- • There are no benchmarks shown within 75 feet of the septic systems. (3 10 CMR 15.220(q)). In addition, for Lot 1: • Abutters' names are not shown. (NA 8.02j) • Design specifications for the proposed retaining wall are missing. (3 10 CMR 15.255(2)). For Lot 3: • The high water alarm for the pump chamber is not specified as to be located in the house. (3 10 CMR 15.231(9)) • Slope easement is required from Lot 4. (3 10 CMR 15.255(2)) • The slope of the two lower trenches will be in excess of 8% and at minimum a baffle is required to decrease the velocity. (3 10 CMR 15.232(3)(a)) Please consider a velocity reducer at the high end of the two lower trenches. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Lot 4: • Please note that the septic tank is drafted incorrectly. Lot 5 and Lot 6: • Scale of the Plan view is not shown. Lot 7: • The scale of the Plan view is not shown. • Pump Note #4 neglects to state that the high water alarm is to be located in the house. (310 CMR 15.231(9)). Lot 8: • The estimated seasonal high water elevation- has not been adjusted to the highest existing grade. This results in the leaching area being less than 4 feet to groundwater. (3 10 CMR 15.212 a&b). Lot 9: • Slope easement required from Lot 10. (310 CMR 15.255(2)) • Slope to d -box exceeds 8%, therefore, at minimum, a baffle is required. (3 10 CMR 15.232(3)(a)) Lot 10: • Fill around system runs to property line of abutter. Toe of slope required to be 5 feet off the lot line. (310 CMR 15.255(2)) • Trenches #I and #I do not show 4 foot separation to groundwater. (3 10 CMR 15.212 a & b). Please feel free to call the Health Office with any questions you may have. Sincerely, Sandra Starr, R.S. Health Administrator Cc: W. Scott File