RE: Selective removal of 7 trees located within the Buffer Zone to Bordering Vegetated
Wetland.
This is a follow up letter pertaining to your request to remove seven (7) trees which are in close
proximity to your home at 100 Vest Way and are within the Buffer Zone to Bordering Vegetated
Wetland. Two trees are at the rear of the property (south west corner) were damaged and/or
knocked down during a storm in February of 2015. The remaining five trees are in the front
yard and are identified and shown in the attached photos. The trees were identified in a letter
from Mr. Mancuso with accompanying photos dated May 11, 2015 and identified and reviewed
during a site visit by the Conservation Department on May 13, 2015. The trees which are
permitted to be removed are identified in the attached photos. All seven trees approved for
removal were observed to be dying and/or damaged. A tree was requested to be
limbed/pruned, however upon inspection the limb appears to overhang the wetland and the
tree is within the 25' No -Disturb Zone and as such is not permitted to be limbed/pruned at this
time (see last photo).
*Determination of property ownership is the responsibility of the homeowner.
Due to the potential danger imposed by the trees, the Conservation Department will permit
their removal to prevent possible injury or property damage. These cutting activities shall be
limited to the seven trees identified and shown in the attached photographs.
During the site visit the Conservation Department observed two piles of debris consisting of
brush, lawn clippings and leaves within the 25' No Disturbance Zone as well as two sheets of
plywood within the wetland (see attached photos). According to C. 178.2 of the North Andover
Wetland Protection Bylaw, "No person shall engage in the following activities: removal, filling,
dredging, discharging into, building upon, or otherwise altering or degrading the wetland
resource areas..." including any 100 -foot buffer zone (see also Wetland Protection Act
Regulations 310 CMR 10.55). As such, please remove all debris and dispose of it at an approved
facility such as the Cyr Recycling Center on Sharpners Pond Road. Removal of debris must be
1600 Osgood Street, North Andover, Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.townofnorfhandower.com
completed by hand, no machinery is permitted to be within the resource area or the 25' No
Disturbance Zone.
The approved cutting will be subject to the following conditions:
❖ No machinery shall enter the 25' No Disturbance Zone.
❖ No work shall occur in resource areas.
❖ All tree limbs, brush, and other debris materials shall be taken off site and disposed of
properly.
❖ Stumps of the trees shall not be removed and shall be left in place. Stumps may be ground
down or cut flush with the landscape.
❖ Care shall be taken to prevent damage to surrounding trees during removal of the approved
trees.
❖ Upon completion of the tree removal, all disturbed areas shall be properly stabilized.
❖ The applicant shall notify this department immediately following completion of work for a
final site inspection.
❖ Areas within 100 -feet of wetland resource areas shall remain in a natural state and no further
vegetation shall be removed without the prior approval of the Conservation
Department/ Commission.
❖ This permit shall expire six months from the date of issue.
Please do not hesitate to contact me should you have any further questions or concerns in this
regard.
Sincerely,
NORTH ANDOVER CONSERVATION COMMISSION
Heidi Gaffney
Conservation Field Inspector
Cc: Jennifer Hughes, Conservation Administrator
Please see the attached photos.
1600 Osgood Street, North Andover, Mossoshosetts 01845
Phone 918.688.9530 Fox 918.688.9549 Web v vv.tovnoWrtl vervcm
i�r
M Phl
-
iL
lit
It
Vt
_9''
iS
�JK
Al�
Ilk
I 't va t
zi
a
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
Q
A. Project Information
1. This Certificate of Compliance is issued to:
Ken Stone
Name
100 Vest Way
Mailing Address
North Andover
City/Town
MA
State
DEP File Number:
AI A (Ir,41 a
r --Vu Vu uy vc r
01845
Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Ken Stone
Name
May 21, 2008
Dated
3. The project site is located at:
100 Vest Wav
Street Address
Mar) 104D
Assessors Map/Plat Number
NACC#39
DEP File Number
North Andover
City/Town
Parcel 19
Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for.-
11209
or:
Property Owner (if different)
Essex North
County
Certificate
11209
Book
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
9/22/08
Date
B. Certification
55
Page
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the above -referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above -referenced Order of Conditions have been satisfactorily completed. The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform Bb.doc • rev. 7/13/04 Page 1 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance
NACC#39
Ll' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above -referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
® Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
64
C. Authorization
Issued by:
North Andover
Conservation Commission
yds""P'
Da a of Iss ance
This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the
applicant and appropriate DEP Regional Office (See Attachment).
Sigi
wpaform 8b.doc • rev. 7/13/04 Page 2 of 4
it
Ll'Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8B — Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of
On this
Day
Essex North
Of Month
before me, the undersigned Notary Public, personally appeared
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Uescription of evidence of identification
DEP File Number:
NACC#39
Provided by DEP
Joe?
Year
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of
EF�PDONNA M. WEDGE
NOTARY PUBUC
),,�'ALTM OF F.S:�.`�2' �I 17TTS
! G ; ;m. Expires Au". ._u09
wpaform 8b.doc • rev. 7/13/04
North Andover
Cityrrown
Place notary seal and/or any stamp above
Conservation Commission
. 1(' "
Signature of Notary Public
D&?,,2,4 M A/474�-
Printed Name of Notary Public
My CCoo�mmi sion xpires (Date)
Si ature of Notary Public
Page 3 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance Ll
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 NACC#39 by
Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
-------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
100 Vest Way NACC#39
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date
Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaform 8b.doc • rev. 7/13/04 Page 4 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments, payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
Acton
Charlton
Hopkinton
DEP Western Region
Adams Colrain
Hampden
Monroe
Pittsfield
Tyringham
436 Dwight Street
Agawam Conway
Hancock
Montague
Plainfield
Wales
Suite 402
Alford Cummington
Hatfield
Monterey
Richmond
Ware
Amherst Dalton
Hawley
Montgomery
Rowe
Warwick
Springfield, MA 01103
Ashfield Deerfield
Heath
Monson
Russell
Washington
Phone: 413 784-1100
Becket Easthampton
Hinsdale
Mount Washington
Sandisfield
Wendell
Fax: 413-784-1149
Belchertown East Longmeadow
Holland
New Ashford
Savoy
Westfield
Oakham
Bernardston Egremont
Holyoke
New Marlborough
Sheffield
Westhampton
Littleton
Blandford Erving
Huntington
New Salem
Shelburne
West Springfield
Grafton
Brimfield Florida
Lanesborough
North Adams
Shutesbury
West Stockbridge
Blackstone
Buckland Gill
Lee
Northampton
Southampton
Whately
Chademont Goshen
Lenox
Northfield
South Hadley
Wilbraham
Cheshire Granby
Leverett
Orange
Southwick
Williamsburg
Townsend
Chester Granville
Leyden
Otis
Springfield
Williamstown
Princeton
Chesterfield Great Barrington
Longmeadow
Palmer
Stockbridge
Windsor
Milford
Chicopee Greenfield
Ludlow
Pelham
Sunderland
Worthington
Dartmouth
Clarksburg Hadley
Middlefield
Peru
Tolland
20 Riverside Drive
DEP Central Region
Acton
Charlton
Hopkinton
Millbury
Rutland
Uxbridge
627 Main Street
Ashburnham
Clinton
Hubbardston
Millville
Shirley
Warren
Worcester, MA 01608
Ashby
Athol
Douglas
Hudson
New Braintree
Shrewsbury
Webster
Dudley
Holliston
Northborough
Southborough
Westborough
Phone: 508-792-7650
Auburn
Dunstable
Lancaster
Northbridge
Southbridge
West Boylston
Fax: 508 792-7621
Ayer
East Brookfield
Leicester
North Brookfield
Spencer
West Brookfield
TDD: 508-767-2788
Barre
Fitchburg
Leominster
Oakham
Sterling
Westford
Bellingham
Gardner
Littleton
Oxford
Stow
Westminster
Berlin
Grafton
Lunenburg
Paxton
Sturbridge
Winchendon
Blackstone
Groton
Marlborough
Pepperell
Sutton
Worcester
Bolton
Harvard
Maynard
Petersham
Templeton
Boxborough
Hardwick
Medway
Phillipston
Townsend
Boylston
Holden
Mendon
Princeton
Tyngsborough
Brookfield
Hopedale
Milford
Royalston
Upton
DEP Southeast Region
Abington
Dartmouth
Freetown
Mattapoisett
Provincetown
Tisbury
20 Riverside Drive
Acushnet
Dennis
Gay Head
Middleborough
Raynham
Truro
Lakeville, MA 02347
Attleboro
Dighton
Gosnold
Nantucket
Rehoboth
Wareham
Avon
Duxbury
Halifax
New Bedford
Rochester
Wellfleet
Phone: 508-946-2700
Barnstable
Eastham
Hanover
North Attleborough
Rockland
West Bridgewater
Fax: 508-947-6557
Berkley
East Bridgewater
Hanson
Norton
Sandwich
Westport
TDD: 508-946-2795
Bourne
Easton
Harwich
Norwell
Scituate
West Tisbury
Brewster
Edgartown
Kingston
Oak Bluffs
Seekonk
Whitman
Bridgewater
Fairhaven
Lakeville
Orleans
Sharon
Wrentham
Brockton
Fall River
Mansfield
Pembroke
Somerset
Yarmouth
Carver
Falmouth
Marion
Plainville
Stoughton
Chatham
Foxborough
Marshfield
Plymouth
Swansea
Chilmark
Franklin
Mashpee
Plympton
Taunton
DEP Northeast Region
Amesbury
Chelmsford
Hingham
Merrimac
Quincy
Wakefield
1 Winter Street
Andover
Chelsea
Holbrook
Methuen
Randolph
Walpole
Boston, MA 02108
Arlington
Ashland
Cohasset
Hull
Middleton
Reading
Waltham
Concord
Ipswich
Millis
Revere
Watertown
Phone: 617-654-6500
Bedford
Danvers
Lawrence
Milton
Rockport
Wayland
Fax: 617 556-1049
Belmont
Dedham
Lexington
Nahant
Rowley
Wellesley
TDD: 617-574-6868
Beverly
Dover
Lincoln
Natick
Salem
Wenham
Billerica
Dracut
Lowell
Needham
Salisbury
West Newbury
Boston
Essex
Lynn
Newbury
Saugus
Weston
Boxford
Everett
Lynnfield
Newburyport
Sherborn
Westwood
Braintree
Framingham
Malden
Newton
Somerville
Weymouth
Brookline
Georgetown
Manchester -By -The -Sea
Norfolk
Stoneham
Wilmington
Burlington
Gloucester
Marblehead
North Andover
Sudbury
Winchester
Cambridge
Groveland
Medfield
North Reading
Swampscott
Winthrop
Canton
Hamilton
Medford
Norwood
Tewksbury
Woburn
Carlisle
Haverhill
Melrose
Peabody
Topsfield
wpaform8b.doc • DEP Addresses • rev. 9/18108 Page 1 of 1
Important:
When filling
out forms on
the computer,
use only the
tab key to
move your
cursor - do not
use the return
key.
vemon
L
WPA Form 5 -.Order- of Conditions
A. General Information
1. From'
North Andover
MassDEP File Number:
NACC#39
Conservation Commission
2. This issuance is for (check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
3. To: Applicant:
Ken
a. First Name
c. Organization
100 Vest Way
d. Mailing Address
North Andover
e. City/Town
4. Property Owner (if different from applicant):
Same
a. First Name
c. Organization
d. Mailing Address
Stone
b. Last Name
MA
f. State
b. Last Name
e. City/Town f. State
5. Project Location:
100 Vest Way North Andover
01845
g. Zip Code
g. Zip Code
a. Street Address
b. City/Town
Map 104D
Parcel 19
c. Assessors Map/Plat Number
d. Parcel/Lot Number
Latitude and Longitude, if known:
e. Latitude f. Longitude
6. Property recorded at the Registry of Deeds
for (attach additional information if more than one parcel):
Essex North
a. County
b. Certificate Number (if registered land)
2605
76
c. Book
3/28/08
Dates:
d. Page
7.
a. Date Notice of Intent Filed
b. Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Proposed Subsurface Sewage Disposal System
Plan
a. Plan Title
New England Engineering Services, Inc.
Benjamin C. Osgood, Jr., P. E.
b. Prepared By
c. Signed and Stamped by
3/25/08, revised 4/16/08
1" = 20'
d. Final Revision Date
e. Scale
f. Additional Plan or Document Title
g. Date
wpaform5.doc • rev. 2/27/08 Page 1 of 10
WPA-Form 5 - Order of Conditions
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
MassDEP File Number:
NACC #39
Following the review of the above -referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available)
a. linear feet
Resource Area
Proposed
Permitted
Proposed
Permitted
Alteration
Alteration
Replacement
Replacement
4. ❑
Bank
a. linear feet
b. linear feet
c. linear feet
d. linear feet
5. ❑
Bordering Vegetated
Wetland
a. square feet
b. square feet
c. square feet
d. square feet
6. ❑
Land Under Waterbodies
a. square feet
b. square feet
c. square feet
d. square feet
and Waterways
e. c/y dredged
f. c/y dredged
wpaform5.doc • rev. 2/27/08
Page 2 of 10
LI) WPA Form 5 - Order of Conditions
MassDEP File Number:
NACC #39
B. Findings (cont.)
❑
Barrier Beaches
13.
Resource Area
Proposed
Permitted
Proposed
Coastal Dunes
Alteration
Alteration
Replacement
7. ❑ Bordering Land
❑
Rocky Intertidal Shores
17.
Subject to Flooding
a. square feet
b. square feet
c. square feet
Cubic Feet Flood Storage
e. cubic feet
f. cubic feet
g. cubic feet
8. ❑ Isolated Land Subject
to Flooding
a. square feet
b. square feet
Cubic Feet Flood Storage
c. cubic feet
d. cubic feet
e. cubic feet
9. ❑ Riverfront area
a. total sq. feet
b. total sq. feet
Sq ft within 100 ft
c. square feet
d. square feet
e. square feet
Sq ft between 100-200 ft
g. square feet
h. square feet
i. square feet
Coastal Resource Area Impacts:
Check all that apply
below. (For Approvals Only)
10. ❑ Designated Port Areas
Indicate size under
Land Under the Ocean, below
11 ❑ Land Under the Ocean
12.
❑
Barrier Beaches
13.
❑
Coastal Beaches
14.
❑
Coastal Dunes
15.
❑
Coastal Banks
16.
❑
Rocky Intertidal Shores
17.
❑
Salt Marshes
18.
❑
Land Under Salt Ponds
19. ❑ Land Containing
Shellfish
20. ❑ Fish Runs
21. ❑ Land Subject to Coastal
Storm Flowage
Permitted
Replacement
d. square feet
h. cubic feet
f. cubic feet
f. square feet
j. square feet
a. square feet b. square feet
c. c/y dredged d. c/y dredged
Indicate size under Coastal Beaches and/or Coastal Dunes below
a. square feet b. square feet c. c/y nourishmt. d. c/y nourishmt.
a. square feet
b. square feet
b. linear feet
a. linear feet
a. square feet
b. square feet
a. square feet
b. square feet
a. square feet
b. square feet
c. c/y dredged d. c/y dredged
c. c/y nourishmt. d. c/y nourishmt.
c. square feet d. square feet
Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a. c/y dredged
a. square feet
b. c/y dredged
b. square feet
wpaform5.doc • rev. 2127108 Page 3 of 10
WPA Form 5 _ Order of Conditions
MassDEP File Number:
NACC #39
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MassDEP"]
"File Number
NACC #39 "
wpaform5.doc • rev. 2/27/08 Page 4 of 10
L. LAJ CiGU VI I%%-JWUI
L)TI
WPA Form 5 - Order of Conditions
MassDEP File Number:
NACC #39
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the property
subject to this Order and to any contractor or other person performing work conditioned by this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. The work associated with this Order is (1) ® is not (2) ❑ subject to the Massachusetts
Stormwater Policy Standards. If the work is subject to the Stormwater Policy, the following
conditions apply to this work and are incorporated into this Order:
a) No work, including site preparation, land disturbance, construction and redevelopment, shall
commence unless and until the construction period pollution prevention and erosion and
sedimentation control plan required by Stormwater Standard 8 is approved in writing by the issuing
authority. Until the site is fully stabilized, construction period erosion, sedimentation and pollution
control measures and best management practices (BMPs) shall be implemented in accordance with
the construction period pollution prevention and erosion and sedimentation control plan, and if
applicable, the Stormwater Pollution Plan required by the National Discharge Elimination System
Construction General Permit.
wpaform5.doc • rev. 2/27/08 Page 5 of 10
WPA Form 5 - Order of Conditions
MassDEP File Number:
NACC #39
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
b) No stormwater runoff may be discharged to the post -construction stormwater BMPs until written
approval is received from the issuing authority. To request written approval, the following must be
submitted: illicit discharge compliance statement required by Stormwater Standard 10 and as -built
plans signed and stamped by a registered professional engineer certifying the site is fully stabilized;
all construction period stormwater BMPs and any illicit discharges to the stormwater management
system have been removed; and all post -construction stormwater BMPs were installed in accordance
with the plans (including all planting plans) approved by the issuing authority, and have been
inspected to ensure they are not damaged and will function properly.
c) Prior to requesting a Certificate of Compliance, the responsible party (defined in General
Condition 18(e)) shall submit to the issuing authority an Operation and Maintenance (O & M)
Compliance Statement for the Stormwater BMPs. This Statement shall identify the responsible party
for implementing the Operation and Maintenance Plan and also state that: 1. "Future responsible
parties shall be notified in writing of their continuing legal responsibility to operate and maintain the
stormwater management BMPs and implement the Pollution Prevention Plan; and 2. The Operation
and Maintenance Plan for the stormwater BMPs is complete and will be implemented upon receipt of
the Certificate."
d) Post -construction pollution prevention and source control shall be implemented in accordance
with the long-term pollution prevention plan section of the approved Stormwater Report and, if
applicable, the Stormwater Pollution Prevention Plan required by the National Discharge Elimination
System Multi -Sector General Permit.
e) Unless and until another party accepts responsibility, the issuing authority shall presume that the
responsible party for maintaining each BMP is the landowner of the property on which the BMP is
located. To overcome this presumption, the landowner of the property must submit to the issuing
authority a legally binding agreement acceptable to the issuing authority evidencing that another entity
has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be
treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through
18(k) with respect to that BMP. Any failure of the proposed responsible party to implement the
requirements of Conditions 18(f) through 18(k) with respect to that BMP shall be a violation of the
Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving
more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the
stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the
required operation and maintenance must be submitted along with the legally binding agreement.
f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the
design plans, the Operation and Maintenance Plan section of the approved Stormwater Report, and
the Massachusetts Stormwater Handbook.
g) The responsible party shall:
1. Maintain an operation and maintenance log for the last three years including inspections,
repairs, replacement and disposal (for disposal the log shall indicate the type of material and
the disposal location);
2. Make this log available to MassDEP and the Conservation Commission upon request; and
3. Allow members and agents of the MassDEP and the Conservation Commission to enter and
inspect the premises to evaluate and ensure that the responsible party complies with the
Operation and Maintenance requirements for each BMP set forth in the Operations and
Maintenance Plan approved by the issuing authority.
h) All sediments or other contaminants removed from stormwater BMPs shall be disposed of in
accordance with all applicable federal, state, and local laws and regulations.
i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are
prohibited.
wpaform5.doc • rev. 2/27/06 Page 6 of 10
Form 5 - Order of Conditions
LWPA
- -
MassDEP File Number:
NACC #39
C. General Conditions Under Massachusetts Wetlands Protection Act (cont.)
j) The stormwater management system approved in the Final Order of Conditions shall not be
changed without the prior written approval of the issuing authority. Areas designated as qualifying
pervious areas for purpose of the Low Impact Site Design Credit shall not be altered without the prior
written approval of the issuing authority.
k) Access for maintenance of stormwater BMPs shall not be obstructed or blocked. Any fencing
constructed around stormwater BMPs shall include access gates. Fence(s) shall be at least six inches
above grade to allow for wildlife passage.
Special Conditions (if you need more space for additional conditions, please attach a text document):
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover
Conservation Commission
hereby finds (check one that applies):
a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
1. Municipal Ordinance or Bylaw
2. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final
Order of Conditions is issued.
b. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetland Protection Bylaw Chapter 178
1. Municipal Ordinance or Bylaw 2. Citation
3. The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space
for additional conditions, attach a text document):
See attached
wpaform5.doc • rev. 2/27/08
Page 7 of 10
NACC #39
Therefore, the North Andover Conservation Commission (hereafter the "NACU) hereby
finds that the following conditions are necessary, in accordance with the Performance
Standards set forth in the State Regulations, the local Bylaw and Regulations, to protect those
interests noted above. The NACC orders that all work shall be performed in accordance with
said conditions and with the Notice of Intent referenced below. To the extent that the
following conditions modify or differ from the plans, specifications or other proposals
submitted with the Notice of Intent, the conditions shall control.
GENERAL CONDITIONS
18. Failure to comply with all conditions stated herein, and with all related statutes and other
regulatory measures, shall be deemed cause to revoke or modify this Order.
19. This Order does not grant any property rights or any exclusive privileges; it does not
authorize any injury to private property or invasion of property rights. However, the
NACC, agent of the NACC or the Department of Environmental Protection (DEP)
reserves the right to enter and inspect the property at all reasonable times until a
Certificate of Compliance is issued, to evaluate compliance with this Order of Conditions,
the Act (310 CMR 10.00), the North Andover Wetland Bylaw and Regulations, and may
require any information, measurements, photographs, observations, and/or materials, or
may require the submittal of any data or information deemed necessary by the NACC for
that evaluation. Further, work shall be halted on the site if the NACC, agent or DEP
determines that any of the work is not in compliance with this Order of Conditions.
Work shall not resume until the NACC is satisfied that the work will comply and has so
notified the applicant in writing.
20. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-laws or
regulations.
21. The work authorized hereunder shall be completed within three years from the date of
this order.
22. This Order may be extended by the issuing authority for one or more periods of up to one
year each upon application to the issuing authority at least thirty days (30) prior to the
expiration date of the Order (Refer to Section 8.3 (p.37) of the North Andover Wetland
Regulations).
23. The NACC reserves the right to amend this Order of Conditions after a legally advertised
public hearing if plans or circumstances are changed or if new conditions or information
so warrant.
C:\Winword\OOC\93RaleighTavern.doc I NACC 5/14/2008
NACC #39
24. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission shall be a
party to all agency proceedings and hearings before the Department.
25. This Order of Conditions is issued under DEP File No. 242-1388.
26. The conditions of this decision shall apply to, and be binding upon, the applicant, owner,
its employees and all successors and assigns in interest or control. These obligations shall
be expressed in covenants in all deeds to succeeding owners of portions of the property.
27. The term "Applicant" as used in this Order of Conditions shall refer to the owner, any
successor in interest or successor in control of the property referenced in the Notice of
Intent, supporting documents and this Order of Conditions. The NACC shall be notified
in writing within 30 days of all transfers of title of any portion of property that takes place
prior to the issuance of a Certificate of Compliance.
28. The proposed work includes: the installation of a subsurface septic system and
associated grading within the Buffer Zone to an isolated vegetated wetland/vernal
pool.
29. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: Ken Stone
100 Vest Way
North Andover, MA 01845
Received Date April 18, 2008
New England Engineering Services, Inc. (Representative)
1600 Osgood Street
Building 20, Suite 2-64
North Andover, MA 01845
Site Plans prepared by: New England Engineering Services, Inc., entitled
"Proposed Subsurface Sewage Disposal System",
consisting of sheets 1 & 2, dated March 25, 2008. Stamped
& signed by Benjamin C. Osgood, Jr., P.E. on 4-16-08.
30. The following wetland resource areas are affected by the proposed work: Buffer Zone to
isolated vegetated wetland/vernal pool. These resource areas are significant to the
interests of the Act and Town Bylaw as noted above and therein. The applicant has not
attempted to overcome the presumption of significance of these resource areas to the
identified interests.
31. The NACC agrees with the applicant's delineation of the wetland resource areas on the
site as shown on the plans dated referenced herein.
C:\Winword\OOC\93RaleighTavern.doc 2 NACC 5/14/2008
NACC #39
32. The NACC finds that the intensive use of the upland areas and buffer zone proposed on
this site will cause further alteration of the wetland resource areas. In order to prevent
any alteration of wetland resource areas a twenty-five foot (25') No -Disturbance Zone
and a fifty -foot (50') No -Construction Zone shall be established from the edge of the
adjacent wetland resource area except in those locations that are shown on the approved
plan as already disturbed. The Conservation Administrator and/or other agents of the
NACC do not have the authority to waive these setbacks as established under the local
bylaw. No disturbance of existing grade, soils or vegetation is permitted in the No -
Disturbance zone. (See Section 3.4 & Appendix F of the local Regulations).
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors, subcontractors, and
other personnel performing the permitting work are fully aware of the permits terms and
conditions. Thereafter, the contractor will be held jointly liable for any violation of this
Order resulting from failure to comply with its conditions.
34. The owners of the project and their successors in title, in the event they proceed to alter
areas subject to the Commission's jurisdiction under the order, agree that the Order does
not in itself impose upon the Town any responsibility to maintain the proposed drainage
system and that said Town shall not be liable for any damage in the event of failure. By
acceptance of this Order, the owners agree to indemnify and hold harmless to the Town
and its residents for any damage attributable to alterations undertaken on this property
pursuant to the Order. Maintenance of the drainage system, if accepted by the Town as
part of a public way, becomes the responsibility of the Town.
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form of
water damage.
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order have
elapsed or, if such an appeal has been filed, until all proceedings before the Department
or Court have been completed.
37. This Order shall be recorded by the applicant at the Registry of Deeds immediately after
the expiration of all appeal periods. No work shall be undertaken until the Final Order
has been recorded in the Registry of Deeds or the Land Court for the district in which the
land is located, within the chain of title of the affected property. In the case of recorded
land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of
registered land, the Final Order shall also be noted on the Land Court Certificate of Title
C:\Winword\OOC\93RaleighTavern.doc 3 NACC 5/14/2008
NACC #39
of the owner of the land upon which the proposed work is to be done. The recording
information shall be submitted to the North Andover Conservation Commission on the
form at the end of this Order prior to commencement of the work. Any Order not
recorded by the applicant before work commences may be recorded by the NACC at
the applicant's expense.
38. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "NACC File Number 39."
39. Any changes in the submitted plans caused by the applicant, another Board's decision or
resulting from this Order of Conditions must be submitted to the NACC for approval
prior to implementation. If the NACC finds said changes to be significant, the NACC will
call for another public hearing (at the expense of the applicant). Within 21 days of the
close of said public hearing the NACC will issue an amended or new Order of Conditions.
Any errors found in the plans or information submitted by the applicant shall be
considered as changes. The proposed project may be still under review by other local or
state boards or agencies. This may result in changes to the project plans or wetland
impacts. If any such changes occur a revised plan and an explanation of the revisions shall
be submitted to the NACC for review and approval prior to the start of construction. No
work shall begin on a project until written approval has been granted by the NACC.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and referenced
documents before commencement of construction.
41. Prior to any work commencing on-site, the applicant shall submit to the NACC for
approval, a detailed sequence of construction, including the installation of erosion control
devices and re -vegetation to be completed before other work begins on-site.
42. Wetland flagging shall be checked prior to start of construction and shall be re-established
where missing. All wetland flagging shall remain visible and enumerated per the
approved plan(s) throughout the life of the project and until a Certificate of Compliance is
issued so that erosion control measures can be properly placed and wetland impacts can
be monitored. The proposed limit of work shall be shall be clearly marked with stakes or
flags and shall be confirmed by the NACC. Such markers shall be checked and replaced
as necessary and shall be maintained until all construction is complete. Workers should
be informed that no use of machinery, storage of machinery or materials, stockpiling of
soil or construction activity is to occur beyond this line at any time. All flags used for the
above purposes shall be of a color different from other flagging used on the site.
43. A row of staked hay bales backed by trenched siltation fence shall be placed between
all construction areas and wetlands as shown on the approved plan referenced herein.
The erosion control barrier will be properly installed and placed as shown on the plans
approved and referenced herein and shall be inspected and approved by the NACC prior
C:\Winword\OOC\93RaleighTavern.doc 4 NACC 5/14/2008
NACC #39
to the start of construction and shall remain intact until all disturbed areas have been
permanently stabilized to prevent erosion. All erosion prevention and sedimentation
protection measures found necessary during construction shall be implemented at the
direction of the NACC. The NACC reserves the right to impose additional conditions on
portions of this project to mitigate any impacts which could result from site erosion, or
any noticeable degradation of surface water quality discharging from the site. For
example, installation of erosion control measures may be required in areas not shown on
the plan(s) referenced in this Order of Conditions. Should such installation be required
by the NACC, they shall be installed within 48 hours of the Commissions request.
44. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 5 hay bales and sufficient stakes for staking these bales or
an equivalent amount of silt fence. Said bales shall be used only for the control of
emergency erosion problems and shall not be used for the normal control of erosion.
45. A check payable to the Town of North Andover shall be provided in the amount of $500,
which shall be in all respects satisfactory to Town Counsel, Town Treasurer, and the
NACC, and shall be posted with the North Andover Town Treasurer through the NACC
before commencement of work. Said deposit of money shall be conditioned on the
completion of all conditions hereof, shall be signed by a party or parties satisfactory to the
NACC, and Town Counsel, and shall be released after completion of the project, provided
'that provisions, satisfactory to the NACC, have been made for performance of any
conditions which are of continuing nature. The applicant may propose a monetary
release schedule keyed to completion of specific portions of the project for the NACC's
review and approval. This condition is issued under the authority of the local Bylaw.
46. The applicant shall designate a Qualified Professional Wetland Scientist as an "Erosion
Control Monitor" to oversee any emergency placement of controls and regular inspection
or replacement of sedimentation control devices. The name and phone number of the
erosion control monitor must be provided to the NACC in the event that this person has
to be contacted, due to an emergency at the site, during any 24-hour period, including
weekends. Proof of the retained monitor must be submitted to the Conservation
Department on letterhead by the retained consulting firm for subsequent review and
approval by the NACC or agent thereof. This person shall be given the authority to
stop construction for erosion control purposes. The erosion control monitor will be
required to inspect all such devices and oversee cleaning and the proper disposal of waste
products. Cleaning shall include removal of any entrapped silt.
47. ON EVERY MONDAY of each week, or otherwise arranged by the NACC, in which
construction activities occurs on-site and for as long thereafter as ground remains
unstable, it is the applicant's responsibility to ensure that the Environmental/ Erosion
Control Monitor (EMC) monitor the site and submit written reports to the NACC. The
EMC shall certify that, to the best of his/ her knowledge and belief based on a careful
site inspection, all work is being performed in compliance with this Order of
Conditions and that approved setbacks are being adhered to. The EMC must visually
C:\Winword\OOC\93RaleighTavern.doc 5 NACC 5/14/2008
NACC #39
inspect all sedimentation/ erosion control measures and assume responsibility for their
maintenance on a weekly basis and that they are functioning as intended. In addition,
all wetland resource areas must be visually inspected for siltation, turbidity, and/or
other water quality impacts. Monitoring reports shall include current condition of
erosion and sedimentation controls; describe any erosion or sedimentation repair and/
or replacement, and describe any erosion or sedimentation problems and mitigation
measures implemented.
48. Prior to construction, the applicant shall permanently mark the edge of the existing tree
line/delineated wetland line with five (5) markers spaced evenly every 30 -feet
incorporating the following text, "Protected Wetland Resource Area". These markers
can be purchased at the North Andover Conservation Department. This will designate
their sensitivity and assure no further inadvertent encroachment into the wetland. These
permanent markers are subject to review and approval by the Conservation
Department. The applicant shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the applicant.
49. The applicant and/or the legal owner of that portion of land upon which these Orders of
Conditions have been placed shall provide to the NACC prior to transferring, or
assigning any portion of said land to another party, subject to said Orders of
Conditions, the "Compliance Certification Form Affidavit" attached via "Appendix A"
signed under the pains and penalties of perjury, stating that said applicant and/or
owner has read these Orders of Conditions and is in compliance with each and every
condition. This document shall apply to each of the conditions referenced herein and
shall be provided to the Conservation Department at least five (5) business days after to
the closing of said land transaction.
50. Once these above mentioned pre -construction requirements are complete, the applicant
shall contact the Conservation Department prior to site preparation or construction and
shall arrange an on-site conference with a representative from the department, the
contractor, the engineer, wetland scientist and the applicant to ensure that all of the
Conditions of this Order are understood. This Order shall be included in all construction
contracts, subcontracts, and specifications dealing with the work proposed and shall
supersede any conflicting contract requirements. The applicant shall assure that all
contractors, subcontractors and other personnel performing the permitted work are fully
aware of the permit's terms and conditions. Thereafter, the contractor will be held jointly
liable for any violation of this Order of Conditions resulting from failure to comply with
its conditions. The applicant or contractor shall notify the NACC in writing of the
identity of the on-site construction supervisor hired to coordinate construction and to
ensure compliance with this Order. A reasonable period of time shall be provided as
notice of the pre -construction meeting (e.g. 72 hours).
DURING CONSTRUCTION
C:\Winword\OOC\93RaleighTavern.doc 6 NACC 5/14/2008
NACC #39
51. Accepted engineering and construction standards and procedures shall be followed in the
completion of the project.
52. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of any
resource area, or outside of the erosion control line.
53. Approved de -watering activities anticipated shall be supervised and witnessed by the
designated erosion control monitor. This designee must be on-site while work is
occurring. De -watering activities shall be conducted as shown on the approved plans and
shall be monitored daily by the erosion control monitor to ensure that sediment laden
water is appropriately settled prior to discharge toward the wetland resource areas. No
discharge of water is allowed directly into an area subject to jurisdiction of the Wetlands
Protection Act and/or the North Andover Wetland Bylaw. If emergency de -watering
requirements arise, the applicant shall submit a contingency plan to the Commission for
approval, which provides for the pumped water to be contained in a settling basin, to
reduce turbidity prior to discharge into a resource area.
54. Any fill used in connection with this project shall be clean fill, containing no trash, refuse,
rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,
cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing.
55. No exposed area shall remain unfinished for more than thirty (30) days, unless approved
by the NACC.
56. Washings from concrete trucks, or surplus concrete, shall not be directed to, any drainage
system, or wetland resource area.
57. All waste generated by, or associated with, the construction activity shall be contained
within the construction area, and away from any wetland resource area. There shall be no
burying of spent construction materials or disposal of waste on the site by any other
means. The applicant shall maintain dumpsters (or other suitable means) at the site for
the storage and removal of such spent construction materials off-site. However, no trash
dumpsters will be allowed within 50' of areas subject to protection under the Act or
local Bylaw.
58. During and after work on this project, there shall be no discharge or spillage of fuel, or
other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication or maintenance is
to be done within 100 feet of a. resource area.
C:\Winword\OOC\93RaleighTavern.doc 7 NACC 5/14/2008
NACC #39
AFTER CONSTRUCTION
59. No underground storage of fuel oils shall be allowed on any lot within one hundred (100)
feet of any wetland resource area. This condition shall survive this Order of Conditions
and shall run with the title of the property. This condition is issued under the authority
of the Town's Wetland protection Bylaw.
60. Fertilizers utilized for landscaping and lawn care shall be slow release, low -nitrogen types
(< 5%), and shall not be used within 25 feet of a resource area. Pesticides and herbicides
shall not be used within 100 feet of a wetland resource area. This condition shall survive
this Order of Conditions and shall run with the title of the property. This condition is
issued under the authority of the Town's Wetland Protection Bylaw and shall remain in
perpetuity.
61. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done either
by loaming and seeding according to SCS standards. If the latter course is chosen,
stabilization will be considered complete once vegetative cover has been achieved.
62. Upon approved site stabilization by Conservation staff, the erosion controls shall be
removed and properly disposed of and all exposed areas shall be seeded.
63. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
a. WPA Form SA - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from the individual property owners shall be submitted with
the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their property.
e. The name and address of the individual/ trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/ parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying that the
work has been conducted as shown on the plan(s) and documents referenced
above, and as conditioned by the Commission.
C:\Winword\OOC\93RaleighTavern.doc 8 NACC 5/14/2008
NACC #39
An "As -Built" plan prepared and signed and stamped by a Registered Professional
Civil Engineer (and/or Registered Professional Land Surveyor) of the
Commonwealth, for the public record. This plan will include:
➢ "As -Built" post -development elevations and grades of all filled or altered
wetland resource areas including the encompassing buffer zone, which is
regulated as a resource area under the local Wetland Protection Bylaw.
➢ Distances from structures to wetland resource areas. Structures include (but
are not limited to) septic systems, additions, fences, sheds, stone walls,
pools, retaining walls, subsurface utilities and decks.
➢ A line showing the limit of work and the extent of existing erosion control
devices. "Work" includes anv disturbance of soils or vegetation.
➢ Location of all subsurface utilities entering the property.
64. The following special conditions shall survive the issuance of a Certificate of Compliance
(COC) for this project:
➢ 25' No -Disturbance Zone and a 50' No -Construction Zone shall be
established from the edge of adjacent wetland resource areas except in those,
locations approved under this filing. Future work within 100' of existing
wetland resource areas will require a separate filing with the NACC. The
Conservation Administrator and/or other agents of the NACC do not have
the authority to waive these setbacks as established under the local Bylaw
(Condition #32);
➢ Discharge or spillage of pollutants (Condition #59);
➢ Prohibition of underground fuels (Condition #60);
➢ Limitations on the use of fertilizers, herbicides and pesticides (Condition
#61).
C:\Winword\OOC\93RaleighTavern.doc 9 NACC 5/14/2008
NACC #39
I,
1)
APPENDIX A — AFFIDAVIT
on oath do hereby depose and state:
(authorized agent of applicant and / or owner)
(PLEASE CHECK AT LEAST ONE BLOCK)
I am the of
(position with applicant)
the applicant upon whom the Order of Conditions
(applicant's name)
(DEP or NACC File #)
have been
placed upon by the North Andover Conservation Commission (NACC).
2) I am the
(position with owner)
and / or
of
(owner)
the owner upon whose land Order of Conditions
(DEP or NACC File #)
placed upon by the NACC.
have been
♦ I hereby affirm and acknowledge that I have received said Order of Conditions and
have read the same and understand each and every condition, which has been set
forth in said Order of Conditions.
♦ I hereby affirm and acknowledge that on this day of
20___, I inspected said property together with any and
all improvements, which have been made to the same and hereby certify that each
and every condition set forth in the Order of Conditions are presently in
compliance.
♦ I hereby affirm and acknowledge that this document will be relied upon by the
NACC, as well as any potential buyers of said property, which is subject to the
Order of Conditions.
Signed under the pain and penalties of perjury this day of 20
(Authorized agent of applicant or owner)
C:\Winword\OOC\93RaleighTavern.doc 10 NACC 5/14/2008
ILI
WPA Form 5 - Order of Conditions
E. Issuance
MassDEP File Number:
NACC #39
This Order is valid for three years, unless otherwise specified as a special S1,V 6P
condition pursuant to General Conditions #4, from the date of issuance. 1. Date of issuance
Please indicate the number of members who will sign this form: 4
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
11101,
Notary Acknowledgement
Commonwealth of Massachusetts County of
Essex North
"?3 k4 ,4 �6v8
On this Day Of Month Year
Before me, the undersigned Notary Public, /7Z.4e r P A4,0zi, T,e
personally appeared Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
Alnrfh Anrinwnr
As member of
DONNA M. WEDGE �`
' NOTARY PUBLIC
COMMONWEALTH OF 1.'.`CS.: "=TTS
My Comm. Expires Au ;1,9SQ G; 5 Q54iii
City/Town
Place notary seal and/or any stamp above
This Order is issued to the applicant as follows:
❑ by hand delivery on
Date
Conservation Commission
pip
Signature of Notary Public
Dw w'4 x G> nb6 c -
Printed Name of Notary Public
P /-7 /.9419'
My Commission Expires (Date)
Date
by certified mail, return receipt requested, on
wpaform5.doc • rev. 2/27/08 Page 8 of 10
bu - ...,......... _.-- -
WPA Form 5 - Order of Conditions
G. Recording Information
MassDEP File Number:
NACC #39
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on
this page shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
100 Vest Wa
Project Location
NACC #39
MassDEP File Number
Has been recorded at the Registry of Deeds of:
Essex North
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc • rev. 2/27/08 Page 10 of 10
WPA Form 5 - Order of Conditions
F. Appeals
MassDEP File Number:
NACC #39
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of
Conditions. The request must be made by certified mail or hand delivery to the Department, with the
appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided
in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the
request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission
and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's
Superseding Order associated with this appeal will be required to demonstrate prior participation in the review
of this project. Previous participation in the permit proceeding means the submission of written information
to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order
or Determination, or providing written information to the Department prior to issuance of a Superseding
Order or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.doc • rev. 2/27/08
Page 9 of 10
w
CONSERVATION DEPARTMENT
Community Development Division
May 20, 2015
Stephen Mancuso
100 Vest Way
North Andover, MA 01845
RE: Selective removal of 7 trees located within the Buffer Zone to Bordering Vegetated
Wetland.
This is a follow up letter pertaining to your request to remove seven (7) trees which are in close
proximity to your home at 100 Vest Way and are within the Buffer Zone to Bordering Vegetated
Wetland. Two trees are at the rear of the property (south west corner) were damaged and/or
knocked down during a storm in February of 2015. The remaining five trees are in the front
yard and are identified and shown in the attached photos. The trees were identified in a letter
from Mr. Mancuso with accompanying photos dated May 11, 2015 and identified and reviewed
during a site visit by the Conservation Department on May 13, 2015. The trees which are
permitted to be removed are identified in the attached photos. All seven trees approved for
removal were observed to be dying and/or damaged. A tree was requested to be
limbed/pruned, however upon inspection the limb appears to overhang the wetland and the
tree is within the 25' No -Disturb Zone and as such is not permitted to be limbed/pruned at this
time (see last photo).
'Determination of property ownership is the responsibility of the homeowner.
Due to the potential danger imposed by the trees, the Conservation Department will permit
their removal to prevent possible injury or property damage. These cutting activities shall be
limited to the seven trees identified and shown in the attached photographs.
During the site visit the Conservation Department observed two piles of debris consisting of
brush, lawn clippings and leaves within the 25' No Disturbance Zone as well as two sheets of
plywood within the wetland (see attached photos). According to C. 178.2 of the North Andover
Wetland Protection Bylaw, "No person shall engage in the following activities: removal, filling,
dredging, discharging into, building upon, or otherwise altering or degrading the wetland
resource areas..." including any 100 -foot buffer zone (see also Wetland Protection Act
Regulations 310 CMR 10.55). As such, please remove all debris and dispose of it at an approved
facility such as the Cyr Recycling Center on Sharpners Pond Road. Removal of debris must be
1600 Osgood Street, North Andover, Massachusetts 01845
Phone 918.688.9530 fax 918.688.9542 Web www.townofnorthandover.com
completed by hand, no machinery is permitted to be within the resource area or the 25' No
Disturbance Zone.
The approved cutting will be subject to the following conditions:
❖ No machinery shall enter the 25' No Disturbance Zone.
❖ No work shall occur in resource areas.
❖ All tree limbs, brush, and other debris materials shall be taken off site and disposed of
properly.
❖ Stumps of the trees shall not be removed and shall be left in place. Stumps may be ground
down or cut flush with the landscape.
❖ Care shall be taken to prevent damage to surrounding trees during removal of the approved
trees.
❖ Upon completion of the tree removal, all disturbed areas shall be properly stabilized.
❖ The applicant shall notify this department immediately following completion of work for a
final site inspection.
❖ Areas within 100 -feet of wetland resource areas shall remain in a natural state and no further
vegetation shall be removed without the prior approval of the Conservation
Department/ Commission.
❖ This permit shall expire six months from the date of issue.
Please do not hesitate to contact me should you have any further questions or concerns in this
regard.
Sincerely,
NORTH ANDOVER CONSERVATION COMMISSION
�� g,�
Heidi Gaffney
Conservation Field Inspector
Cc: Jennifer Hughes, Conservation Administrator
Please see the attached photos.
1600 Osgood Street, North Andover, Massachusetts 01845
Phone 978.688.9530 Fax 978.688.9542 Web www.townofnorthandover.com
A
0
yF. y M7 Iry
{
rf j�
4 1 #
A
0
✓ 'sy r
{� �' .�' "'•�, t�A R'a`t 3�f \ -� � �- � C�'^� `_� ; '.< � r i ' ^ - ✓ {� �:
���, _.y �s,�/ra. �.ip' � a :.Y y '1 y I "� ✓ :t�I �•�. i. ��{v` r. � j i .
- r, •F >`.» Fk 4`t` — " w #,nom,.- ' I'
yr x r -V
ti
r 7111
}
r
__ _X3. gyp^ 4 r �►� *�.iy"� ice„
`•� ';. �>' \�XW
t,�y{ tMR
t �g s �5 . ,� � �y Jr �. ,.����.'yy .. , . 3R _-c°�K'�.t 4
r- -
46
jrC".,'-.`� �y ("r^-'� a dad `„E ,+.• '�1F4 '�' 1 �¢ cR".k �" ?1 �i�'.c '" t•ALa
INA
—"1�
1y4 `C.e�`r .a@t. �y�+f"'.+w-- .'' `'��'� J I.f—••..r�Fr �r \+ �•�&o
;z': t t•' st �,� � s I�s +� �,' matp
y'- - _ ,,r ', "�•�`� 'ryj� � � �F��c:'�
: . ,,j,✓ f? Jt' � �.�� .rt�si►-s.«-i.. ,� +� Y � -411;.. i..
74
North Andover Conservation Department
1600 Osgood Street
Suite 2035
North Andover, MA 01845
RE: Tree Removal Request— 100 Vest Way— North Andover, MA
Dear Conservation Department:
MAY 1120415
NORTH ANDOVER
CONSERVATION COMMISSION
May 11, 2015
I am writing you today to request permission to remove trees from my property located at 100 Vest
Way. The work to be done is as follows:
1. In February 2015, during a storm with high winds, a tree was knocked down in the woods
next to my yard. The tree came down and with it, knocked a smaller adjacent tree down as
well. I need to have the trees removed from the property (Picture 1). This will be done
using a bobcat to drag the trees out from the back yard and to the truck for removal. The
tree company stated they will take into account my septic system when they remove the
tree.
2. In front of the house are four (4) trees, 2 oak and 2 maple (Picture 2). 2 -of the trees, closest
to the house (-20 feet), are leaning toward my house and limbs are over the walk way
(Picture 3). The other two trees have damage due to infestation and have large cracks in the
trunk (Picture 4). 1 was advised by Ferris Tree Service that these trees should be removed as
well. These 4 trees will be cut and stumped to allow for planting of shrubs, plants or
flowers.
3. Another tree, situated in the woods is leaning at a severe angle and shows signs of damage.
(Picture 5) This tree will just be cut, no stumping required.
4. Lastly, there is a tree limb which is hanging over my driveway. The limb needs to be
removed. Only the limb will be touched, the tree is fine. (Picture 6).
On May 7, 2015 1 met with Dan Ferris of Ferris Tree Service who provided me with a quote and
description of the work to be done. I have included that with this request. Thank you for your time and
consideration. If you have any questions please feel free to call me at 978-204-4246.
P
;♦IVk.7t
t1w
,
At.
t4v. ii4l
it
I
t1w
,
t4v. ii4l
it
I
-kr ��, -a >ti i ..,� � fie' ,� � s Y•, i ` �� YV ' � „�
n�
ra .-
FERRIS TREE SERVICE INC.
242 Chandler Road
Andover, MA 01810
(978)685-8789
dan@fenistreeservice.com
ADDRESS
Steve Mancuso
100 Vest Way
North Andover, MA 01845
SALES REP
Dan Ferris
A
DATE. ACTIVITY AMOUNT
05/07/2 Remove 2 maples and 2 oaks in front middle island, grind 4 stumps with cleanup. Remove 2,800.00
015 small leaning oak front right, no stump. Remove hanger in oak left of garage. Remove fallen
pine top and damaged standing maple butt back right. Septic right side to backyard. Stay far
with cat.
Accepted By
office use only:
bucket ( ) loader O crane O dump ( )
bg ( ) sg ( ) tractor ( ) other ( ) nifty ( )
Accepted Date