Town of North Andover
Office of the Conservation Department
Community Development and Services Division x
4r.e
27 Charles Street SS�cNuse
North Andover, Massachusetts 01845
Alison E. McKay Telephone (978) 688-9530
Conservation Administrator Fax (978) 688-9542
October 4, 2004
Albert Manzi, III
1028 Salem Street
North Andover, MA 01845
RE: ENFORCEMENT ORDER Sewer Connection for the Property at 1028 Salem Street
Violation of the Massachusetts Wetland Protection Act (MGL c.131 s.40) and North
Andover Wetland Protection ByLaw (c.178 of the Code of North Andover).
Dear Mr. Manzi:
On September 9, 2004 I received a revised plan entitled "Sewer Tie In Plan" prepared by
New England Engineering Services for a proposed sewer connection along Salem Street to
your property at 1028 Salem Street Typically, these sewer tie-in projects have been allowed
by the Commission without a Conservation filing and the Conservation Administrator is left
with the discretion to impose any conditions necessary for protection of any resource area
within 100 feet of the proposed work. However, in cases where sewer connections are
proposed near or within the 25' No -Disturbance Zone (pursuant to the North Andover
Wetlands Protection Bylaw) or the proposed project could potentially have a greater impact
on the wetlands resource area, a conservation filing would be necessary.
The submitted plan dated August 6, 2004 and revised September 8, 2004 indicates that
proposed work will be just outside of the 25' No -disturbance Zone of a protected Wetland
Resource area. This Enforcement Order is being issued to allow the proposed work without
a filing with the North Andover Conservation Commission (NACC) in accordance with the
approved plan and the special conditions outlined below.
Specific wetland resource areas affected by the project include the following:
• 100 -Foot Buffer Zone (North Andover Wetlands Protection Bylaw Section 1.3)
ORDER:
Acting as an Agent of the Commission under MGL C.40, S.21D and the Act (310 CMR
10.08(3)), enclosed please find an Enforcement Order mandating completion of the sewer tie-
in at the above referenced property in accordance with the revised plan dated September 8,
2004 and the conditions as described below.
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Installation of Erosion Controls
Prior to commencement of work activities, erosion controls consisting of staked
haybales backed by trenched silt fence shall be properly installed at the locations
depicted on the approved plan. Additional erosion controls (i.e. haybales) shall
surround all catch basins within 100 feet of the proposed work.
Environmental Monitoring
The applicant shall designate an "Erosion Control Monitor" to oversee any emergency
placement of controls and regular inspection or replacement of sedimentation control
devices. The name and phone number of the erosion control monitor must be
provided to the Conservation Department in writing by the hired professional in
the event that this person has to be contacted, due to an emergency at the site, during
any 24-hour period, including weekends. This person shall be given the authority
to stop construction for erosion control purposes. The erosion control monitor will
be required to inspect all such devices and oversee cleaning and the proper disposal
of waste products. Cleaning shall include removal of any entrapped silt For as long
as construction activities occurs on-site and for as long thereafter as the ground
remains unstabilized, the applicant shall submit a written report from the "Erosion
Control Monitor" to the NACC every day in which work is occurring certifying that,
to the best of his/her knowledge and belief based on a careful site inspection, all work
is being performed in compliance with this Order of Conditions and that approved.
setbacks are being adhered to. The erosion control monitor must visually inspect all
sedimentation/erosion control measures and assume responsibility for their
maintenance and that they are functioning as intended. In addition, all wetland
resource areas must be visually inspected for siltation, turbidity, and/or other water
quality impacts.
• Pre -Construction Meeting
Upon completion of the above, the applicant shall contact the Conservation
Department for a pre -construction meeting.
Post Construction
• Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion This shall be done
either by loaming and seeding according to SCS standards. If the latter course is
chosen, stabilization will be considered complete once vegetative cover has been
achieved. The Conservation Department shall be notified for a post
construction inspection once this has been completed.
• Upon approved site stabilization by Conservation staff, the erosion controls shall
be removed and properly disposed of and all exposed unvegetated areas shall be
seeded.
Final completion of all related sewer installation activities within jurisdictional resource
areas (10(Y buffer zone) shall commence on October 12, 2004 and shall be completed by
October 14, 2004 (weather permitting) and shall take no longer than 2 days to complete.
3
Failure to complete work within this time frame will result in administrative fines and/or
penalties of up to $100 per day per violation retroactive from the date of failed compliance
and will also result in a Cease and Desist Order and the filing a Notice of Intent.
Any violations to this Enforcement Order as documented herein are subject to a $100 per day
penalty' until such time as the Enforcement Order is fully complied with. Each day or
portion thereof during which any violation continues shall constitute a separate offense. At
this time this Department has not elected to levy a fine. However, we reserve the right to
take additional action in the future should this Enforcement Order not be complied with
retroactive from the date we were first made aware of the violations.
Failure to comply with this Order and the deadlines referenced herein will result in the
issuance of additional penalties. MGL C.131 S.40 and the North Andover Wetland Bylaw,
C.178 authorizes the Conservation Commission to seek injunctive relief and civil penalties
per day of violation. In addition, a violation of the Massachusetts Wetland Protection Act
and the North Andover Wetland Bylaw constitutes a criminal act, which is subject to
prosecution and the imposition of criminal fines, also per day. This Enforcement Order shall
become effective upon receipt.
Your anticipated cooperation is appreciated.
Sincerely,
Alison E. McKay
Conservation Administrator
End.
CC: NACC
Ms. Heidi Griffin, Community Development Director
Ben Osgood, Jr., New England Engineering Services
Tom Sawyer, Arco Excavators
DEP-Northeast Region
file
1 In accordance with the provisions of MGL c.40 s.21D and Section 178.10 of the North Andover Wetland
Protection ByLaw (REV May 1993/REV October 1998)
Massachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection - Wetlands
'+ WPA Form 9A - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Violation Information
Important:
When filling out This Enforcement Order is issued by:
forms on the
North Andover
10-4-04
computer, use
Conservation Commission (Issuing Authority)
Date
only the tab
key to move
To:
your cursor -
do not use the
Albert Manzi III
return key.
Name of Violator
1028 Salem Street
Address
1. Location of Violation:
Property Owner (if different)
Street Address
North Andover
01845
Cityfrown
Zip Code
Map 104D
32
Assessors Map/Plat Number
ParceULot Number
2. Extent and Type of Activity:
Completion of a sewer connection along Salem
Street to 1028 Salem Street without a valid Order of
Conditions.
B. Findings
The Issuing Authority has determined that the activity described above is in violation of the Wetlands
Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because:
® the activity has been/is being conducted without a valid Order of Conditions.
❑ the activity has been/is being conducted in violation of the Order of Conditions issued to:
Name Dated
File Number Condition number(s)
wpaform9a.doc • rev. 12115/00 Page 1 of 3
Massachusetts Department of Environmental Protection DEP File Number
Bureau of Resource Protection - Wetlands
WPA Form 9A - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Findings (cont.)
® Other (specify):
Work activities within 100' of a jurisditional wetland resource area shall comply with the specified
conditions (see attached letter). These activities shall commence on October 12, 2004 and be
completed by October 14, 2004 (weather permitting) and shall not take longer than 2 working
days to complete.
C. Order
The issuing authority hereby orders the following (check all that apply):
❑ The property owner, his agents, permittees, and all others shall immediately cease and desist
from the further activity affecting the Buffer Zone and/or wetland resource areas on this property.
❑ Wetland alterations resulting from said activity should be corrected and the site returned to its
original condition.
❑ Complete the attached Notice of Intent. The completed application and plans for all proposed
work as required by the Act and Regulations shall be filed with the Issuing Authority on or before
Date
No further work shall be performed until a public hearing has been held and an Order of Conditions
has been issued to regulate said work.
® The property owner shall take the following action to prevent further violations of the Act:
See Attached Cover Letter
Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts
General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a)
shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not
more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not
to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing
violation shall constitute a separate offense.
wpaform9a.doc - rev. 12H5MO Page 2 of 3
Massachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection - Wetlands
WPA Form 9A - Enforcement Order
IL Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Appeals/Signatures
An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of
Environmental Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be directed to:
Alison E. McKay, Conservation Administrator
Name
978-688-9530
Phone Number
8:30 AM to 4:30 PM, Monday - Friday
Hours/Days Available
Issued by:
North Andover
Conservation Commission
In a situation regarding immediate action, an Enforcement Order may be signed by a single member or
agent of the Commission and ratified by majority of the members at the next scheduled meeting of the
Commission.
Signature
Signature of delivery person or certified mail number
wpaform9a.doc - rev. 12/15/00 Page 3 of 3
2466
APPLICATION FOR SEWER SERVICE CONNECTION
North Andover, Mass. ��' 2,,,4
Application by the undersigned is hereby made to connect with the town sewer main inStreet,
subject to the rules and regulations of the Division of Public Works.
The premises are known as No. L ¢tea'Gw Street
or subdivision lot no.
Owner i
ti C O
Contractor
Gf!ze _.
Address
Address
Appis is Signature
PERMIT TO CONNECT WITH SEWER MAIN
The Division of Public Works hereby grants permission to
to make a connection with the sewer main at
subject to the rules and regulations of the Division of Public Works..
Inspected by
Date
By
See back for rules and regulations
c
6 1�
Street
Division of Public Works
/
OrdLr Gd
la y ny
PERMIT TO CONNECT WITH SEWER MAIN
The Division of Public Works hereby grants permission to
to make a connection with the sewer main at
subject to the rules and regulations of the Division of Public Works..
Inspected by
Date
By
See back for rules and regulations
c
6 1�
Street
Division of Public Works
Town of North Andover °f No TFt
' Office of the Conservation Department 0 p
Community Development and Services Division
27 Charles Street ass"�H�Set
North Andover, Massachusetts 01845
Alison E. McKay Telephone (978) 688-9530
Conservation Administrator Fax (978) 688-9542
October 4, 2004
Albert Manzi, III
1028 Salem Street
North Andover, MA 01845
RE: ENFORCEMENT ORDER: Sewer Connection for the Property at 1028 Salem Street
Violation of the Massachusetts Wetland Protection Act (MGL c.131 s.40) and North
Andover Wetland Protection Bylaw (c.178 of the Code of North Andover).
Dear Mr. Manzi:
On September 9, 2004 I received a revised plan entitled "Sewer Tie In Plan" prepared by
New England Engineering Services for a proposed sewer connection along Salem Street to
your property at 1028 Salem Street Typically, these sewer tie-in projects have been allowed
by the Commission without a Conservation filing and the Conservation Administrator is left
with the discretion to impose any conditions necessary for protection of any resource area
within 100 feet of the proposed work. However, in cases where sewer connections are
proposed near or within the 25' No -Disturbance Zone (pursuant to the North Andover
Wetlands Protection Bylaw) or the proposed project could potentially have a greater impact
on the wetlands resource area, a conservation filing would be necessary.
The submitted plan dated August 6, 2004 and revised September 8, 2004 indicates that
proposed work will be just outside of the 25' No -disturbance Zone of a protected Wetland
Resource area. This Enforcement Order is being issued to allow the proposed work without
a filing with the North Andover Conservation Commission (NACC) in accordance with the
approved plan and the special conditions outlined below.
Specific wetland resource areas affected by the project include the following:
• 100 -Foot Buffer Zone (North Andover Wetlands Protection Bylaw Section 1.3)
ORDER:
Acting as an Agent of the Commission under MGL C.40, S.21D and the Act (310 CMR
10.08(3)), enclosed please find an Enforcement Order mandating completion of the sewer tie-
in at the above referenced property in accordance with the revised plan dated September 8,
2004 and the conditions as described below.
BOARD OF APPEALS -688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
2
• Installation of Erosion Controls
Prior to commencement of work activities, erosion controls consisting of staked
haybales backed by trenched silt fence shall be properly installed at the locations
depicted on the approved plan. Additional erosion controls (i.e. haybales) shall
surround all catch basins within 100 feet of the proposed work.
• Environmental Monitoring
The applicant shall designate an Erosion Control Monitor' to oversee any emergency
placement of controls and regular inspection or replacement of sedimentation control
devices. The name and phone number of the erosion control monitor must be
provided to the Conservation Department in writing by the hired professional in
the event that this person has to be contacted, due to an emergency at the site, during
any 24-hour period, including weekends. This person shall be given the authority
to stop construction for erosion control purposes. The erosion control monitor will
be required to inspect all such devices and oversee cleaning and the proper disposal
of waste products. Cleaning shall include removal of any entrapped silt. For as long
as construction activities occurs on-site and for as long thereafter as the ground
remains unstabilized, the applicant shall submit a written report from the "Erosion
Control Monitor" to the NACC every day in which work is occurring certifying that,
to the best of his/her knowledge and belief based on a careful site inspection, all work
is being performed in compliance with this Order of Conditions and, that approved
setbacks are being adhered to. The erosion control monitor must visually inspect all
sedimentation,/erosion control measures and assume responsibility for their
maintenance and that they are functioning as intended. In addition, all wetland
resource areas must be visually inspected for siltation, turbidity, and/or other water
quality impacts.
• Pre -Construction Meeting
Upon completion of the above, the applicant shall contact the Conservation
Department for a pre -construction meeting.
Post Construction
• Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion This shall be done
either by loaming and seeding according to SCS standards. If the latter course is
chosen, stabilization will be considered complete once vegetative cover has been
achieved. The Conservation Department shall be notified for a post
construction inspection once this has been completed.
• Upon approved site stabilization by Conservation staff, the erosion controls shall
be removed and properly disposed of and all exposed unvegetated areas shall be
seeded.
Final completion of all related sewer installation activities within jurisdictional resource
areas (100' buffer zone) shall commence on October 12, 2004 and shall be completed by
October 14, 2004 (weather permitting) and shall take no longer than 2 days to complete.
�. 3
Failure to complete work within this time frame will result in administrative fines and/or
penalties of up to $100 per day per violation retroactive from the date of failed compliance
and will also result in a Cease and Desist Order and the filing a Notice of Intent.
Any violations to this Enforcement Order as documented herein are subject to a $100 per day
penalty' until such time as the Enforcement Order is fully complied with. Each day or
portion thereof during which any violation continues shall constitute a separate offense. At
this time this Department has not elected to levy a fine. However, we reserve the right to
take additional action in the future should this Enforcement Order not be complied with
retroactive from the date we were first made aware of the violations.
Failure to comply with this Order and the deadlines referenced herein will result in the
issuance of additional penalties. MGL C.131 S.40 and the North Andover Wetland Bylaw,
C.178 authorizes the Conservation Commission to seek injunctive relief and civil penalties
per day of violation. In addition, a violation of the Massachusetts Wetland Protection Act
and the North Andover Wetland Bylaw constitutes a criminal act, which is subject to
prosecution and the imposition of criminal fines, also per day. This Enforcement Order shall
become effective upon receipt.
Your anticipated cooperation is appreciated.
Sincerely,
Alison E. McKay
Conservation Administrator
Encl.
CC: NACC
Ms. Heidi. Griffin, Community Development Director
Ben Osgood, Jr., New England Engineering Services
Tom Sawyer, Arco Excavators
DEP-Northeast Region
file
1 In accordance with the provisions of MGL c.40 s.21D and Section 178.10 of the North Andover Wetland
Protection Bylaw (REV May 1993/REV October 1998)
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 9A - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Violation Information
Important:
When filling out This Enforcement Order is issued by:
DEP File Number
rrovioeo vy utr
forms on the
North Andover
10-4-04
computer, use
only the tab
key to move
your cursor -
do not use the
Conservation Commission (Issuing Authority)
To:
Albert Manzi III
Date
return key.
Name of Violator
1028 Salem Street
�+
Address
1. Location of Violation:
Property Owner (if different)
Street Address
North Andover
01845
City/Town
Map 104D
Zip Code
32
Assessors Map/Plat Number Paroel/Lot Number
2. Extent and Type of Activity:
Completion of a sewer connection along Salem Street to 1028 Salem Street without a valid Order of
Conditions.
B. Findings
The Issuing Authority has determined that the activity described above is in violation of the Wetlands
Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because:
® the activity has been/is being conducted without a valid Order of Conditions.
❑ the activity has been/is being conducted in violation of the Order of Conditions issued to:
File Number
wpaformga.doc • rev. 12!15100
Dated
Condition number(s)
Page 1 of 3
rt
Massachusetts Department of Environmental Protection DEP File Number.
Bureau of Resource Protection - Wetlands
WPA Form 9A - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Findings (cont.)
® Other (specify):
Work activities within 100' of a jurisditional wetland resource area shall comply with the specified
conditions (see attached letter). These activities shall commence on October 12, 2004 and be
completed by October 14, 2004 (weather permitting) and shall not take longer than 2 working
days to complete.
C. Order
The issuing authority hereby orders the following (check all that apply):
❑ The property owner, his agents, permittees, and all others shall immediately cease and desist
from the further activity affecting the Buffer Zone and/or wetland resource areas on this property.
❑ Wetland alterations resulting from said activity should be corrected and the site returned to its
original condition.
❑ Complete the attached Notice of Intent. The completed application and plans for all proposed
. work as required by the Act and Regulations shall be filed with the Issuing Authority on or before
Date
No further work shall be performed until a public hearing has been held and an Order of Conditions
has been issued to regulate said work.
® The property owner shall take the following action to prevent further violations of the Act:
See Attached Cover Letter
Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts
General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a)
shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not
more than two years, or both, such fine and imprisonment; or (b) shall be subject to a civil penalty not
to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing
violation shall constitute a separate offense.
wpaform9a.doc - rev. 12M 5= Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 9A - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Appeals/Signatures -
An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of
Environmental Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be directed to:
Alison E. McKay, Conservation Administrator
Name
978-688-9530
Phone Number
8:30 AM to 4:30 PM, Monday - Friday
Hours/Days Available
Issued by:
North Andover
Conservation Commission
In a situation regarding immediate action, an Enforcement Omer may be signed by a single member or
agent of the Commission and ratified by majority of the members at the next scheduled meeting of the
Commission.
Signature
Signature of delivery person or certified mail number
wpaform9a.doc • rev. 12/15/00 Page 3 of 3
2466
APPLICATION FOR SEWER SERVICE CONNECTION
North Andover, Mass.
Application by the undersigned is hereby made to connect with the town sewer main in fit'! Street,
subject to the rules and regulations of the Division of Public Works.
The premises are known as No. - _ L '_'�37,G' � w Street
or subdivision lot no.
Owner ' I
eco
Contractor
�' !� e
Address
Address
App is is Signature
-A"�%ttST
Cuw�p t,��
�ytrcen,e�►+
Order e -d
i0 y o y
PERMIT TO CONNECT WITH SEWER MAIN
The Division of Public Works hereby grants permission to
to make a connection with the sewer main at
subject to the rules and regulations of the Division of Public Works..
Inspected by
Date
By
See back for rules and regulations
got ( r
Street
Division of Public Works
NEW ENGLAND ENGINEERING
INC
September 7, 2004
Ms. Alison McKay, Administrator
North Andover Conservation Commission
27 Charles Street
North Andover, MA 01845
Re: 1028 Salem Street, North Andover, MA
Revised Sewer Tie -In Plan
Dear Ms. McKay,
SERVICES
RECEIVED
SEP 0 7 2004 110
NORTH ANDOVER
CONSERVATION COMMISSION
The following plans for the above referenced property are being submitted for your
review.
1. (2) Copies of the Revised Sewer Tie -In Plans.
If you have any comments or questions please do not hesitate to contact this office.
Sincerely,
"'6h&10'_ _
Steven E. Pouliot
Project Manager
60 BEECHWOOD DRIVE -NORTH ANDOVER, MA 01845 - (978) 686-1768 - (888) 359-7645 - FAX (978) 685-1099
ml
A. ARTIMOVICH
MAP 104D, LOT 30
.1L
#
4,264'
S. CYR
MAP 65, LOT 54
C, V15
Y16 _
NEW POLE—
#2436 1/2 `
W. GRADY
MAP 65, LOT 19