Loading...
HomeMy WebLinkAboutMiscellaneous - 105 BONNY LANE 4/30/2018 (2)} PUAhn180 80��10 �, TOWN OF NORTH ANDOVER A MASSACHUSETTS Any appeal shall be filed within (20) days after the date of filing of this Notice in the Office of the T vvo Clerk. NOTICE OF DECISION -; - '33 GCT . 11) '-_.) i t• Date. ,october.4, 1993 Au9usU31,I1993 Date of Hearing September.21..1993 Petition Of Thomas_ J:. Thomas:. Trustee:. HOLSAM. Realty. Trust.. ...... .... • ... , . Premises affected lis. Bonn, Lane . ... . Referring to the above petition for a special permit from the requirements of theNorth. Andover. Zonin. BXlaw,. Section 4: . . . . 136:Paragraph5Watershed Protection • District. so as to permit the construction of an addition to an existing structure within ... .. . . 250 ft. of the annual mean high water mark of Lake Cochictiewick ..................................................................... After a public hearing given on the above date, the Planning Board voted CONDITIONALLY t0 APPROVE ... , .. „the .. SPECIAL .PERMIT .. . cc: Director of Public Works Building Inspector Conservation Administrator Health Agent Assessors Polcie Chief Fire Chief Applicant Engineer File Interested Parties based upon the following conditions: Signed lu6z'�- 6-16 Richard A.. Nardella, Chairman . Jo...hn Sim.ons..., .. . Vice . . .. Chairman . . . . . . ............ John .Dra...p .er. .......................... . .. Rich..ar..d.Rowen ........................ John Daghlian, Associate Member �lannin� Board • OF HORTNI KAREN H.P. NELSON o Director a Town Of 120 Main Street, 01845 •' NORTH ANDOVER (508) 682-6483 BUILDING CONSERVATION ,ssA°~ 5EDIVISION OF PLANNING PLANNING & COMMUNITY DEVELOPMENT October 4, 1993 Mr. Daniel Long, Town Clerk Town Building 120 Main Street North Andover, MA 01845 Re: Special Permit - Watershed Protection District - 115 Bonny Lane Dear Mr. Long: The North Andover Planning Board held a public hearing on August 31, 1993 upon the application of Thomas J. Thomas, Trustee, Holsam Realty Trust, c/o Domenic Terranova, Esq., One Elm Square, Andover, MA requesting a Special Permit under Section 4.136, Paragraph 5 of the North Andover Zoning Bylaw. The legal notice was properly advertised in the North Andover Citizen on August 11 and August 18, 1993 and all parties of interest were duly notified. The following members were present: Richard Nardella, Chairman, John Simons, Vice -Chairman, Richard Rowen, John Draper and John Daghlian, Associate Member. The petitioner was requesting a special permit for the construction of an addition to an existing structure within 250 ft. of the annual mean high water mark of Lake Cochichewick within the Watershed Protection District. The premises affected is located at 115 Bonny Lane in a Residential -1 (R-1) Zoning District. Mr. Rowen read the legal notice to open the public hearing. Domenic Terranova, Attorney, told the Board that the house has been on the site for more than 10 years. The owners want to enlarge the master bedroom suite. The total addition is less than 10%. The porch will be enclosed. The existing porch is presently open. A roof will be put over it and the stairway will be moved slightly. A hip roof over porch with a better foundation. Will add gutters and spouts to a dry well. Mr. Simons asked if there would be any additional bathrooms. The answer was "no". Excavation for the addition needs to be added on the plan. Put fertilizer limits in the decision. Page 2: 115 Bonny Lane Will need limit of work shown and silt fences/hay bales. On a motion be Mr. Rowen, seconded by Mr. Draper, the Board voted to continue the public hearing to September 21, 1993. Mr. Nardella asked when the sewer was going to go in. Staff to ask D.P.W. Mr. Rowen will draft decision, Ms. Bradley will draft. give him a On September 21, 1993 the Planning Board held a regular meeting. The following members were present: Richard Nardella, Chairman, John Simons, Vice -Chairman, John Draper, Richard Rowen and John Daghlian. Mr. George Latulippe was present for the applicant to answer any questions the Board might have. Mr. Nardella questioned when the sewer would be available for the area. Staff to check with D.P.W. Mr. Latulippe told the Board that a sewer line is being put in now, during the construction of the addition so when the sewer becomes available the site will just have to tie in. The existing dry well shall be located on the plans. On a motion by Mr. Rowen, seconded by Mr. Daghlian, the Board closed the public hearing. The Board reviewed the draft decision prepared by Ms. Bradley Colwell and Mr. Rowen. Item 1B to be changed. Under Findings of Facts in the 4.136 section, the Board asked that the reasons why be more explicit, i.e. no additional bedrooms to be added. On a motion by Mr. Rowen, seconded by Mr. Simons, the Board voted to approve the Special Permit as drafted and amended. Attached are those conditions. Sincerely, North Andover Planning Boarfd Richard A. Nardella, Chairman ) Page 3: 115 Bonny Lane cc: Director of Public Works Building Inspector Conservation Administrator Health Agent Assessors Police Chief Fire Chief Applicant Engineer File 115 Bonny Lane Special Permit - Watershed Protection District The Planning Board, makes the following findings regarding the application of Holsam Realty Trust, c/o D.S. Terranova, Esq., One Elm Square, Andover, MA. 19810, requesting a Special Permit under Section 4.136, Paragraph 5 of the North Andover Zoning Bylaw to allow for the construction of an addition to an existing structure within 250 feet of the annual high water mark of Lake Cochichewick within the Watershed Protection District. FINDINGS OF FACT: In accordance with Section 10.31 of the North Andover Zoning Bylaw: 1. The Planning Board finds that the specific site is an appropriate location for an addition as there is an existing house; 2. The construction of the addition will not adversely affect the neighborhood; 3. There will be no nuisance or serious hazard to vehicles or pedestrians; 4. Adequate and appropriate facilities are provided for the proper operation of the proposed use; 5. The Planning Board also makes a specific findings that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw. In accordance with Section 4.136 of the North Andover Zoning Bylaw: 1. The proposed construction of the addition will not cause any significant degradation of the quality of water in or entering Lake Cochichewick. 2. No additional bedrooms to be added to the existing structure or the proposed addition. Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following conditions: SPECIAL'CONDITIONS: 1. Prior to issuance of a Building Permit, the plans must be revised to include the following: a). gutters and downspouts for all roofed areas; b). a dry well and piping to collect runoff from the roof. The dry well shall be on the street side of the existing house and shall be located practically to maximize the distance from the lake. c). The limits of excavation and location of hay bales and silt fences. d). The revised plans must be submitted within fourteen days of the Board's vote, and prior to the filing of this decision with the Town Clerk. 2. Prior to Construction: a). Silt fence and hay bales must be placed along the limit of work. b). The site shall have received all necessary permits and approvals from the North Andover Conservation Commission, Board of Health, and the Department of Public Works. c). The applicant must provide a written certification by a Registered Professional Engineer that the construction of the addition will not cause any significant degradation to the quality or quantity of water in or entering Lake Cochichewick as required by the North Andover Zoning Bylaw, Section 4.136(7)(c). d). The applicant must provide evidence that all on-site operations including, but not limited to, construction, wastewater disposal, fertilizer applications and septic systems will not create concentrations of Nitrogen in groundwater greater than the Federal limit of 10 mg/liter at the downgradient property boundary as required by Section 4.136(7)(d). e). All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain lines during construction. 3. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 4. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 5. This permit shall be deemed to have lapsed' after a two (2) year period from the date on which the Secial Permit was granted unless substantial use or construction has commenced. Therefor the permit will expire on October 4, 1995 6. The following Plans shall be deemed as part 'of this decision: a). Plan of Land in North Andover, Mass. Surveyed for: Holsam Realty Trust Scale: 1" = 20' Dated: August, 1993 Revised: Stowers Associates Inc. Reg. Land Surveyors Methuen, MA _ cc: Director of Public Works Building Inspector Health Agent Assessors Conservation Administrator Police Chief Fire Chief Applicant Engineer File