HomeMy WebLinkAboutMiscellaneous - 1077 OSGOOD STREET 4/30/2018 (9) • .r r AFM-.�
• 'r Y
r_
1
Cb C, f)o
©Vnr L!•'i' ❑ Nig+dip$ ❑AOB
ppptication
flied oA:
Hearing due on:
Decision due on:
_ .. =-
vim, -
l
A
f
.www wwin'+•� .�w
/ l
/ / �L
� �n ffvey
9�� � 7SDo5`�
/�,off/'cy�cFfff-�mi/�i.
� Gom .'
07
a
integrating design, expertise and technology
199 Newbury Street, Suite 115 • Danvers, MA 01923
978.777.7250 Ext. 12 • Fax 978.777.8650 Letter of
Transmittal
rbarthelmes@lynnfieldeng.com
To: Ms. Angela Ciofolo Date: January 8, 2013
Department Assistant Job No.: LEI No. 480-40
Zoning Board of Appeals Subject: Butcher Boy Marketplace
Town of North Andover 1077 Osgood Street
1600 Osgood Street Suite 2-36 North Andover MA
North Andover MA 01845
We Are Sending You: ® Attached ❑ Under separate Cover By Means of: Hand Deliver
❑ Prints ® Plans ❑ Samples
❑ Shop Drawings ❑ Copy of letter ❑ Change Order
❑ Specs ® Other:
COPIESDATE NO. DESCRIPTION
1 12/11/12 Preliminary Stormwater Analysis & Calculations Butcher Boy Markets
1 11/27/12 Traffic Impact and Access Study Proposed Branch Bank North
Andover MA prepared by Bayside Engineering Woburn MA
10 Sets Plan C-1 Plot Plan of Land; Plan A210 Exterior Elevations (Color)
prepared by Lloyd Architects Plymouth, MA; and Plan A211 Exterior
Elevations Color Lloyd Architects - 11" x 17"
1 Signed 1/8/13 C-1 Plot Plan of Land (Original Signed) 24" x 36"
1 Updated 1/7/13 A210 Exterior Elevations Color Lloyd Architects 24" x 36"
1 Updated 1/7/13 A211 Exterior Elevations Color Lloyd Architects 24" x 36"
Z For submission ❑ Approved as submitted ❑ Returned after loan ❑ Resubmit for approval
❑ For your use ❑ Approved as noted ❑ For review and comment ❑ Submit for distribution
❑ As discussed ❑ For Your Signature ❑ For bids due ❑ Return corrected prints
Remarks:
i
Richard Barthelmes, P.E.
If enclosures are not as noted, please notify us at once
K:\480-40\Corr\Ciofo10 A_010813_lot_pres.doc
OF NORTH 9�
16
O
SSq�H�SE"�
TOWN OF NORTH ANDOVER
MASSACHUSETTS
BOARD OF APPEALS
January 19, 1988
Thomas F. Caffrey
Attorney at Law, P.C.
P. 0. Box 1317 RE: Angus Realty Corp.
Lawrence, MA 01842 1077 Osgood St.
Petition: 39-85
Dear Attorney Caffrey:
The Board of Appeals held a discussion on your above-mentioned client's
request for an extension of Petition #39-85.
Whereas a certified copy of the Judgment in favor of Angus was recorded
in the Registry of Deeds on September 24, 1987, the Board voted, unanimously,
to EXTEND THE DECISION for one year, September 24, 1988 as allo ved by
Section 10.31, Paragraph 3 of the Zoning ByLaw.
If you have any questions regarding this matter, please call the office
at 683-7105. r
Sincerely,
BOARD OF APPEALS
Audrey . Taylor,
Secretary
cc: Mr. Kenneth W. Yameen
Mr. Archibald Maclaren
/awt
I
r
I ,
V
I '
.J
U
APPLICATION FOR A VARIANCE
TOWN OF NORTH ANDOVER
ZONING BOARD OF APPEALS
BUTCHER BOY MARKETPLACE
1077 OSGOOD STREET
._a
NORTH ANDOVER, MASSACHUSETTS
Prepared For:
Angus Realty Corporation
1077 Osgood Street
North Andover, Massachusetts 01845
Prepared By:
J Lynnfield Engineering, Inc.
199 Newbury Street, Suite 115
Danvers, Massachusetts 01923
July 18, 2012
J
�10RTN
Town of North Andover
N p
* ;* Office of the Planning Department
TEDR'' * C_'ommunity Development and Services Division
�,SSAGHUS�
Osgood Landing
1600 Osgood Street
Building#20,Suite 2-36
P(978)688-95.'5 North Andover,Massachusetts 01845
F(978)688-9542
To: Thomas Yameen
Angus Realty
From: Judy Tymon, Town Planner
Date: July 16, 2012
Subject: Pentucket Bank Proposal for Butcher Boy Plaza
Dear Mr. Yameen,
On behalf of the entire staff of the Community Development Department, I want to thank you for
attending our Technical Review Committee meeting(TRC) on June 13. We hope the meeting
was helpful to you and that your questions were answered.
At the meeting, I mentioned several items that the Planning Board would like to have addressed
if you apply for a Watershed and Site Plan Review Special Permits. A summary of those items
are as follows:
® Stormwater Management Standards: Any construction within the Watershed is required
to comply with best management practices for stormwater control, in order to prevent
degradation of the quality or quantity of water entering Lake Cochichewick. This is
especially important when new construction is proposed and when that construction is
within the Non-Discharge Zone, as is the case with your proposal. Over 20,000 sq. ft. of
new impervious surface is being proposed to be built on that portion of the parcel that is
closest to the Lake. Through the implementation of this Bylaw,the Planning Board is
charged with protecting the town's drinking water supply and they will perform this
function, as they have with other projects,with the utmost due diligence.
® North Andover Wetlands Bylaw: When your company applied for and received a
Watershed Special Permit from the Planning Board and an Order of Condition from the
Conservation Commission in July 2007,the project was required to comply with town's
Wetlands Protection Bylaw and the State Wetland's Protection Act. The project was
subject to Stormwater Management Policy and the stormwater provisions of that Bylaw.
At the time,the project did not meet all of the Policy requirements but it was not required
that all criteria be met. In 2008, MA DEP adopted that policy as a Standard, so that any
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
�` s
commercial project must now meet the state Stormwater Management Standards as well
as the local Bylaw standards.
® Traffic entering and exiting the site, as well as traffic circulation within the site will be
reviewed by the Planning Board under the Site Plan Review requirements of the town's
Bylaw. A drive-through facility will generate additional traffic and will require a traffic
study that will address traffic flow and traffic queuing for the teller windows and the
ATM. As you are aware,the site currently generates large volumes of traffic on Osgood
St. and existing parking spaces are well utilized. The traffic study should address all of
these issues and should demonstrate that the new use will not create additional traffic
problems.
If you have any questions,please let me know and I would be happy to review them with you.
t7ad d T aK
Judy Tymon
Town Planner, Town of North Andover
cc: Andrew Maylor, Town Manager
Curt Bellavance, Community Development Director
Jennifer Hughes, Conservation Administrator
Gerald Brown, Inspector of Buildings
Town of North Andover Zoning Board of Appeals
Town of North Andover Planning Board
U
n
u
TABLE OF CONTENTS
n
`J Town of North Andover Zoning Board of Appeals Application for a Variance
n
C-1 Plot Plan of Land
U
DRAWINGS
u SK-1 Proposed Schematic Layout Plan
F7 A210 Exterior Elevations
L' A211 Exterior Elevations
r�
SK-05 Preliminary Floor Plan
u
ATTAC H M E NTS
L, 1 Zoning Bylaw Review Form
2 Memorandum
Li 3 Abutters' List
4 Notice of Decision Site Plan Special Permit
n
u
n
u
r�
u
r•"i
Li
n
U
n
Li
n
u
u
-I-
n K:\480-40\Reports\071812_Variance App\toc.doc
v
n I .
t4RYry
is
t
f'9Ss �
TOWN OF NORTH VARIANCE E � r r -
ZONING BOARD OF APPEALS 2012 JUL 9
NAMEAngus Realty Corporation
ADDRESS OF APPEAL: 1077 Osgood`Street Town Cierk,46e�Stattp
n
Procedure &Requirements
for an Applications.for.a Variance.
Ten(10)copies of the following information must be STEP S:SCHEDULING OF HEARING AND
submitted thirty(30)days prior to the first public hearing. PREPARATION OF LEGAL NOTICE:'
Failure to submit the required-information within the time The Office of the76hing Board of Appeals schedules the
periods prescribed may result in a dismissal by the applicant for a hearing date and prepares the legal notice
Zonina Board of an application as incomplete.. for mailing to the parties in interest(abutters)and for
The information herein is an abstract of more publication in the newspaper. The petitioner is notified
that-the legal notice has been prepared and the cost of.
specific requirements listed in the Zoning Board
the Party 1n Interest fee.
Li Rules and Regulations and is not meant to
supersedethem. The-petitioner will complete items STEP 7:DELIVERYOF LEGAL NOTICE TO
r7 that are underlined NEWSPAPER
The petitioner picks up the legal notice from the Office of'
Lj
STEP 'I: ADMINISTRATOR PERMIT DENIAL: the Zoning Board of Appeals and delivers the legal notice
The petifioner applies for a Building Permif and-receivers to the local newspaper for publication.
a Zoning Bylaw Denial form completed by the Building
I Commissioner. STEP 8, PUBLIC HEARING BEFORE THE ZONING
! HOARD OF APPEALS:
STEP 2: VAR1A 4CE APPLICATION FORM- The petitioner should appear in his/her befialf,or be
-Pefitoner completes an application form to petition.the represented by an agent or attorney. In the absence of
Board of Appeals for a Variance. All information as any appearance without due cause on.beharf of the
required in items 1.through and including 11 shall be petition,the Board shall decide on the matter by using
the information it bas received to date.
completed.
Li
STEP 3: PLAN PREPARATION: STEP 9: DECISION:
-� Petitioner submits all of the required plan information as
After the hearing, a ropy of the Board's decision 1.111 be
cited in page 4,section 10 of this form. sent to all Parties in Interest. Any appeal of the Board's
decision may be made pursuant to Massachusetts
STEP 4: OBTAIN LIST OF PARTIES IN INTEREST: General Law ch.4.OA§ 17,within twenty(20)days after
; The petitioner requests the Assessor's Office to compile the decision is filed with the Town Clerk.
a certified list Df Parties in Interest(abutters).
STEP 10: RECORDING THE DECISION AND PLANS.
ri j STEP 5: SUBMIT APPLICATION:
The petitioner is responsible for recording certificafion of
i
one(1)original and ten(10)Xerox Petitioner submits the decision,the Mylar, and any accompanying plans at
j copies of all the required information to the Town Clerk's the Essex County, North-Registry of Deeds, 384
Office to be certified by the Town Clerk.with the time and Merrimack St.Suite#304, Lawrence MA, 01843 and
n date of fling. The original will be left at the Town Clerk's shall complete the Certification of Recording form and
office, and the 10 Xerox copies will be left with the forward itto the Zoning Board of Appeals and to the
`-' j Zoning-Board of Appeals secretary. Building Department.
IMPORTANT PHONE. NUMBERS: North Andover Town Hall
u ! 978-688--9533 Office of ommunity Dev.&Services 120 Main Street
1600 Osgood St.,Bldg.20,Suite 2-36 978-688-9501 Town Clerk's Office
n Forth Andover, MA 01845 978-688-9566 Assessor's Office
978-688-9542 fax for Community Development offices
`-' 978-688-9545 Building Department PAGE 1 of 4
I 978-688-9541- Zoning Board of Appeals office
r-•7 i
U •
�1
n
U PAGE 2 OF 4
n NORTH ANDOVER ZONING BOARD OF APPEALS application for a-VARIANCE
��������
:,F r=._'I. Petitioner: Name, Address and telephone number:
- Angus Realty Corporation
`J 1077 Osgood Street
n - 978-777-1511 .
`The petitioner shall be entered on the legal notice and the decision as entered above.
ri 2. Owners of Land: Name, Address, telephone number, and number of years under this
u ownership:
An us Realty Corporation
_ 1077 Osgood Street North Andover MA 01845
_._978-777-1511
Years Owned Land: Since 1959
Li
3. Location of Property:
n
Lj a. Street: 1077 Osgood street Zoning District: GB
•b. Assessors: flap number: 35 Lot Number: 27
c. Registry of Deeds: Book Number:• 912 Page Number.: 443
Li
4. Zoning Bylaw Section(s)* under which the petition for the Variance is-made.
u
. 4 . 136 3. C. Non-bisturbance- Buffer Zone - Construction of a New
n •
Permanent Structure
*Refer to the Zoning Bylaw Denial and Plan Review Narrative form as supplied by the Building Commissioner.
u
Describe the Varcal ce request:
u Construction- of a new permanent structure-
within the Watershed Non-Dis ur once u er
Li
The above description shall be used for the purpose of the-legal notice and decision. A more detailed description is required pursuant to the
M Zoning Board Rules and Regulation's as cited on page 4,section 9 of this application.Failure by the applicant to describe the request clearly
may result in a decision that does not address the intent of the applicant. The decision will be limited to the request by the applicant and will'
u not involve additional Items not included above.
rl 6 A. Difference from Zoning Bylaw requirements: indicate-the dimension(s).that will not meet
u current Zoning Bylaw Requirements. (Lines A and B are in case of a lot split)
rl Lot Area Open Space Percentage Lot Frontage Parking
Li 'Sq- Ft. Sq. Ft. Coverage Feet .Spaces Front Side A Side'B Rear
A.� %
n
B. % _..
u '
M
n
NORTH ANDOVER ZONING BOARD-OF APPEALS applic-atign for a v ARIANC E
u
6-B. Existing Lot:
n Lot Area Open Space Percent Lot Frontage Parking Minimum Lot Setback
Sq. Ft. Sq.Ft. - . Coverage Feet Spaces Front Side A Side B Rear
u !
I 320, 080 180,$41 .5% 679 N/A 192 .89 c;
n'
i 6 C. Proposed Lot(s)!
Lot Area Open Space Percent Lot Frontage Parking Minimum Lot Setback
Sq. Ft. Sq.Ft. Coverage Feet Spaces Front Side A Side B Rear
320, 080 10 . 7 % 679 ' 21 80.9 40.2 >500 • >3.00
6 D. Required Lot: (As required by Zoning Bylaw&Table 2)
Lot Area Open Space Percent Lot Frontage Parking Minimum Lot Setback
u. Sq. Ft. Sq.Ft. Coverage Feet Spaces Front Side A Side B Rear
n 25,000 N/A 35% 12 9)_ -25- _ 21; 21,
Lj 7A. Existing Building(s):
n Ground Floor Number of Height Total. Use of Number
Square feet Floors Sq.feet Building* ' of Uniis**
u
30, 495 1 20 ` 30, 495 Retail .9
-� *Reference Uses from the Zoning Bylaw&Table 1. "State number of units in building(s).
u .
78. Proposed Building(s):
n Ground Floor . Number of Height Total Use of Number
Square feet Floors Sq.feet Building* of Units"*
3, 672 1 .35 4 791 Bank with .drive—thru 1
Lj
r� *Reference Uses from the Zoning Bylaw&Table 1.
u **State number of units in building(s).
6. Petitioner and Landowner signature(s):
Every application fora Variance shall be made on this form,which is the official form of the Zoning Board of Appeals. Every
application shall be filed with the Town Clerk's Office. It shall be the responsibility of the petitioner to furnish all.supporting .
documentation with this application. The dated copy of this application received by the Town Clerk or the Zoning Board of Appeals
n does not absolve the applicant from this responsibility. The petitioner sl fall be responsible for all expenses for filing and legal
Li notification. Failure to comply with application requirements, as cited herein and in the Zoning Board Rules and Regulations may
result in a dismissal by the Zoning Board of this application as incomplete.
Si nature:
u
r_1 Type above narrteW here. Liam Yameei#i=
i
PAGE 40F 4
VARIANCE
9. WRITTEN DOCUMENTATION n Size of plan: Ten(10)paper copies of a plan not
Application for a Variance must be supported by a legibly to.exceed 11"x17", preferred scale of 1"=40'
uvMen or typed memorandum setting forth-in detail all II) One(1)Mylar,with one block for Regisfryy Use
facts relied upon. When requesting•a Variance from the Only, and one block for five(5)-ZBA signatures&date.
requirements of MGLA ch. 40A,Sec. 10.4 and the North III) Plan shall be prepared,stamped.and certified by a
Andover Zoning By-laws,.all dimensional requirements Registered.Professional Land Surveyor. Please note
shall be-clearly identified and factually supported: All that pians by.a Registered Professional Engineer,
• points,A-F,are required to be addressed wi th this Registered Architect, and/or a Registered Landscape
Li application. Architect.may be required for.Major Projects.
*10 C. *Required Features'On Plan:
n A. The particular-use proposed.for the land or structure. n Site Orientation shall include:
B. The circumstances relating to soil conditions, shape 1. north point
`J or topography of such'land or structures-especially 2. Zoning district(s)
affecting the property for which the Variance is 3. names of streets
n sought which do-not affect'generaliythe zoning 4. wetlands(if applicable)
Li district in which the property Is located. 5. abutters of property,within 300'radius
C. Facts which make up the substantial hardship, 6. locations of buildings on adjacent properties
n financial or otherwise,which results from literal within 50'from applicants proposed structure
enforcement of the-applicable•Zoning restrictions with 7. deed restrictions,easements.
Li respect to'the land or building for which the variance .a) . Legend &Graphic Aids shall include:
is sought. 1. .Proposed features in solid lines &outlined in red
n D, Facts relied upon to support a finding that relief 2. Existing features to be removed in dashed lines
sought will be desirable and without substantial 3. -Graphic Scales
`� detriment to the public good. 4. Date of Pian.
E. Facts relied upon to support a finding that relief 5. • Title-of Plan
sought may be.given.without nullifying or• . .6. Names addresses and phone numbers of the
substantially derogating from the intent br purpose of applicant,owner or record,and land.surveyor.
the Ordinance. .7. Locus
r_1F. Submit RDA-from Conservation Commission when 10 D. Minor Projects
Continuous R�!ildable Area is applied for in ZBA. Minor projects,such as decks,sheds,and garages,
application. shall require only the plan•info �� aeon as indicated v�u EE
an.asterisk(*). in some cases further information may
'7 i 10. PLAN OF LAND be required.
L, -Each application to the•Zoning Board of Appeals shall be 11. APPLICATION FILING FEES
accompanied by the following described plan. Pians
�- must be submitted with this application to the Town 11.A. Notification fees:Applicant shall provide a check
Clerk's Office and ZBA secretary at least thirty(30) days or money order to:`Town of North Andover'for the cost
u prior to the public hearing before the Zoning Board of of first class,certified, return receipt x#of all parties in
appeals. interest identified in MGLA ch.40A§11 on the abutter's
n list for the legal notice check. Also,the applicant shall
A set of building elevation plans by a Registered supply first class-postage stamps x the#of parties of
`—' Architect may be required when the application interest on the abutter's list for the decision mailing.
involves new construction/conversion/and/or a 11.13. Mailing labels:Applicant shall provide four.(4)
�l proposed change in use. sets of mailing labels no larger than 1x2-5/8"(3 copies
LJ for the Legal, and one copy for the Decision mailing).
10.A. Major Projects 11.C. Applicant shall provide a check or money order
---i Major projects are those,which involve one of the to:'Town of North Andover"per 2005 Revised FeeSchedule. •
following whethsr existing or proposed:
I)five(5)or more parking spaces,
II}three(3)or more dwelling.units, ® A Variance once granted by the ZBA will lapse in 7
III)2,000 square feet of building area. (ons)year if not exercised and anew petition must
be submitted.-4
LJ
Major Projects shall require, that in addition to ttie 108 &
10C features, that the plans show detailed utilities, soils,
and topographic information.
LJ *10:B. *P-1an Speclfications:
n
u
ryi
u
Z
H
I c 3 c 7 C 1 C C J C ] C 1 C 7 C 3 C J C 1 C 3 C 7 C 7 C 7
-31--L 3—C r C C L C C C C -1 c i c
F�
S-D
l3cl
ES
17
FF
pg21
fig8.
��� 8
8
trn
BUTCHER BOY MARKETPLACE LYNNFIELD ENGINEERING, INC.
rA PROPOSED SCHEMA 77C Na DAIr VMWMV R40=r
BY 1077 069M STREEr CONSKIM ENWROMMENTAL 04WEERS
LA YOU T PLAN "MIN ANDOWt MASS4CHUSEM M80
SCAM PREPARED FOR 109 NEWWRr 37RW, sunr its
NAW WALTY CaWMMW AANYM MASUCKMEM 0192)
a4m mrs4 sur NOM AMWt MA.10;7 06aVW SMW (978) "7-7250 FAX (078) ;77-8&W
MGMUMM
A :o
W W 61 W1
$0
bill 1 II III II
1 1
F -
,�
111 11 111 1 ' � $t�I�l,tl�l, I �
1111 ll�,llllllllllllllllllll 11111; 1 1 1 1 �, ..
111 IIII;Ih;�Illllllhlllll Ihh' 1 1 1 ,
11 II 111111111 11 -
Iii iiiiiiiililii lili . 1 111 11 1 � � � '. "
�II III IIIIIIIIIIIIIIIIIhI III II 111 '�1 � 1 � -
111 111111111 11
;w 1 VIII 111111 III 1 =. : _
Y
IIII : ..._ ...�.,•. ' X1,1,1, ' � -;•: � -
lii
1111 II 11111111l11 111111' ' 1
;�; Illllllllllllllllllllll l 111111 1 _ �11 11 _
y I
-
t .
IIE llllllllllli 111
,� �1 iE 11111111111111 I111111�1111•' 1 11 I i 'I � I' 1 ��
h1 he,
h 1111111 IIs 1 11
a 11 EI 1 1 1111!I tll 'IjEllt I _ �1 1 1 1� 1111 1 � � I 1
IE 11111 1 II I(c II
EI l111,1,1,11111
1 IIIIIIIIil1111E1 I
k al Illlilllllli !!1 t
I;IE;1;l�i 1M Ili ll ll�1;
I � ill I
E,hll�l; f�41EIlth �} 1 1 ;
Eih Ellf i1111,1Eft,ll � '` ,EI I
I �IlElll {ililll��lili 1 i � t t '' ' I
-
•:•G�Irrllllll
,I,llllt {IIIEIItI
Irlllhlllllll 11 os
1111,111lIIIIIsIIhhallh a 1 ill III II Illll h��i
EI 1, !,1 I,1,Ih;If1,l i l,I,I,EI111
�a rh i ! 111111
iri flllll;llll;;I;I;I;I;EI;1; 1 1 I,� I'I I' I'1'I 'I 11
II�t.1.1.�Ittl! IIkE11
I Elll � �Illhhl1111E1111 111 1.. .. ' I fNhN ',t�'il�fP P -
�,1,!
Elul :r•f rll�Ihllhhh�l i, 1 1
�hli l Hi:II�l;lllIl Ipii, 111 111 ,
�lll�yfl'IIIII�I:I ,EIfI
IYl
`, I—im ri'1'!'Ih1141i1i1i Ill! Ihh!� I �: ; �
-
-.
1 ;
—til lllll;l�;t�lil��ill;`I flll 11_ 'It ;1;
ESI lel Ill!li II�II�;11 111 1 i 1
��l ll'I 1��,t'h�llllltilill� Ili ' 1 � i
E 1 it i�'l 11�llllllllh Illt 1 5�y
�ll III;�III;I;NIII;I;1;1;1 1;11 1 _
1! III 1111 I Ih h ``
,I,i I,1 hht4lihhhhhh 4h 1 _
1;1; I�ll,Iltllllltllltll�tll� lyl 1 1 � =�,r
7th Illlltlllllllllllllll 111 Ihl ' 1 1 1 1
z 1111 1;Illllllillll'I1'I'I'I' ;1'I 11 1 ' 1 1,
ht t,t,h�hhhhhht111 tlt -11 1
NI;I IIIIIl111h;I11I1II11111 1111 11 11 '1 1
11 IZ
11 I 1111111 1111 11 11 ,m � ;�' I�—
m II 111111111111 II ...111 � 1 111 1 l j � Ifl �,
'' �• _ 11 III 11 I i � � .I. �� gC�
II
Dm( LLOYD ARC HZ TE CTS y o� 5
iV 0 < i a x Two Hi gh Cl iff,Plymouth MA 02360 g04�y 2 5�
O `� TEL:(508)746-4646W$ti
0
w
Z ,'p c PAX:(506)766-1276 y u u
'" E-MAIL:io forAllayde r h.comQ� entucke�t
co
'°-1�Y y.➢. 1 Y-,3;_r:Y_o 1;._Y�'_Y�1�`-C�`g'_H.�'_%-"%�`I_..._I_".tl_"_H�,-d_."`H..`C._,�I..�x.�.-I�`Y_"_�`"x'Y._"I-"�_'_I_"Y". ,\.
1 N tl A p I p N R A N N I N N N N tl N A N I N Y
©� � gyrlgll Y.11tlIM.1NIi1Y.N INN Y.IIYYYYIYMYN-Y RY L1_A IIl YII
A tl B A A Y 1 F Y ➢ A A Y �
d__d .d
Y�N a Ci�Y I-�N Y H Y 1 1%N I Y I Y I N p.+ p M rN TY I Y x N
NYAIAIAIIYNYNYIYNINA.N � NININYAYN N.N YNYA.Af1A1N.YNY.I.Y
-'-., ➢ A I Y i Y tl Y Y i i Y tl N Y N Y I l Y Y N M -Ip-7�
` g JL1l�I .d_Y_H_I Il x$H H C.3-Il�S➢._A..L_x�. -F -I_- 1-Y
�J �Ia I i I x d
a
C A Y tl tl tl N A C I M tl N N I N N I A Y N
„ ➢ N N A Y M
� �_. ➢ Y tl B A tl M Y Y A A tl Y Y IA ,Y HC Y I Y N
�FJI_�Y...T- JL.,� .x-Y�I_.,•-JI„_-x„-_Y
■IIIIIIIIIIII ,�IIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII r Illllllitll
■I t�trpttJimulunulnll rnnm rrnnuunllulII A 11I I I tl t ttt#fitH #t�1 IIIII`II 1
illiTl li l iI I I I I I I I li 1 1 1 1 1 1 1 111111111 illi_ N
... „� .� •..4. .<.,t;. Y e ..'s3s.. .,., .( r t. ;,.�,>r4 :.. ,;, ,., ,.^c ,.....: ,_.� ,":,Y7 :;kv� ,a 7'�Y'r3'?,,. -�« ..,;
.. .. � a a,. ..•a ,.. .. .;:.,Y.h ,.... .., ::.,. ,•.,.a e T,,.:k, ,.. ,., aa, rr.. [ ". ,"�" �yavo-',, n
1
_1
_b
I Y H-- Y I I x I. N M T. rI 1 x- T x x ➢ M ➢ 1- ' I -
I
IF -
St7TI:d7I C_-y.IYIYS:Y.4rNI1-_Yr➢I Al II IAg Y.AYIYr-1 HxIIC1I Y _ _ _ _ _ _ _ _
Y_I QT.I.I I I I..Y I I I 1 1 I I I I:1 Y I I Y 7 1 d Y I Y.I.I I x 1.Y I
."A.I, 1 -1 1Y
YIY II YY Y k Y [ Y ➢ Y Y I: I I I
A 1- fl I M I
n ..
.� III IIIIIIIIIII111 VIIIflll Illffllll Illi Illli IIII'�i luili T' iliinu� III11111]li illlllll Il lllf III IIJIM
■
JIM
E)CFERI
,. � � �� 11111111111111111191illllllllillllllllllllllllllllllll . IIIIIIIffitlt+tt#at�tttFlIIIIIIIII� IIIIIIIIIIIIIIIIIIII •_
�� ��� _ -- ill II I ■ lllllllllilllllllllllllllllllllllillllllll�llllllllll� 1 I �.f 1 fELEVATIONS
- • •-
. .. :�'_....al R :.r.... M,
,
i
5+
c
24'41 351331• 24'4Y,•
l,— os/lalz
�'"� 80'•0' Pim Revision 05/18/12
I I Pim/Elev/Htm 0522/12
l J Align wall 05/31/12
' •1 D
VAT 2 VAT I L TELLER WI
110*
d WETTE
E UP
Ono
__ 1 i
n, L__ J .
`I
VAT 21 SYSTEM=) I `
1 �
- 1
tv
I I I
ON__-___________{..��_ b
1t L��
,
I DRIVE-UP IN WALL ATM V401 ` !i
AFTER-HOURS DEPOSITORY 130901
BR GLASS TELLER NDOW
fz34d31
-41
t__1 net' r 9Y4' 4 a
b
i VAULT „
Dow FALSE NANDOW
R SAFE DEPOSIT I COUNTING —DUAHO
ROOM
Fi
F TELLERS OFFICE OFFICE ATM
u ---
� � 4
m zr; B
DOM
FLmmERJESj, :
rJ F
y n�n.n
L CER
I 20,d L
5b' TELLER STAT1ON W/
I PULL OUT COUNTER
R
BREAK L .RO
STIBULE Walk
ed
L� 1s r 4•S%•
WAITING AREA
F-� CO S
I L] Lj Li El
187 1q
12*w9 ,�—3's— *--3'a•r, PRINT/FAX
ALS WIND
(COD)U W
JANITOFEREN
3— SUPPLIE ROOM 4
/ice �� FFlCE O ICE ,
-- i
I I
F SPdINKLE MEN WOMEN MANAG R
ELE�TRIC �\ / � �/ SUPPLIES �
L" 1 0 1 If di?
lit
4011
LANDSCAPING PRELIMINARY
9w•
k FLOOR PLAN
rte' 40'-B'
AREA.
•14'd
27 3 6
86'd'BRICKCOURSING W611(
90-z
a FLOOR PLANSK-05
n
Li
n
L
n
u
n
Li
n
u
n
n ATTACHMENT NO. 1
n Zoning Bylaw Review Form
n
u
n .
n
u
n
n
u
n
U
n
V
n
,u
n
u
M
i C 1 C _I E _] L_ -_I L ] L I L I L I [_- J __J L E_ J L J C 7
NORTF,
Zoning Bylaw Review Form
` p Town Of North Andover Building Department
1600 Osgood St. Bldg 20 Suite 2-36
° North Andover, MA. 01845
Phone 978-688-9545 Fax 978-688-9542
Street: 1077 Osgood Street
Ma /Lot: Map 35/Lot 27
Applicant: William Yameen/Angus Realty Cor
Request: Construct Bank/Pentucket Bank.
Date: July 17„2012
Please be advised that after review of your Application and Plans that your Application is
DENIED for the following Zoning Bylaw reasons:
Zoning G-B
Item Notes Item Notes
A Lot Area F Frontage
1 Lot area Insufficient 1 Frontage Insufficient
2 Lot Area Preexisting 2 Frontage Complies X
3 1 Lot Area Complies X 3 Preexisting frontage
4 Insufficient Information 4 Insufficient Information
B Use 5 No access over Frontage
1 Allowed X G Contiguous Building Area
2 Not Allowed 1 Insufficient Area
3 Use Preexisting 2 Complies X
4 Special Permit Required 3 Preexisting CBA
5 Insufficient Information 4 Insufficient Information
C Setback H Building Height
1 All setbacks comply X 1 Height Exceeds Maximum
2 1 Front Insufficient 2 Complies X
3 Left Side Insufficient 3 Preexisting Height
4 Right Side Insufficient 4 Insufficient Information
5 Rear Insufficient I Building Coverage
6 Preexisting setback(s) 1 Coverage exceeds maximum
7 Insufficient Information 2 Coverage Complies X
D Watershed 3 Coverage Preexisting
1 Not in Watershed 4 Insufficient Information
2 In Watershed X i Sign
3 Lot prior to 10/24/94 1 Sign not allowed N/A
4 Zone to be Determined 2 Sign Complies
5 Insufficient Information 3 Insufficient Information
E Historic District K Parking
1 In District review required 1 1 More Parking Required
2 Not in district 2 Parking Complies X
3 Insufficient Information 1 3 Insufficient Information
4 Pre-existing Parkin
Remedy for the above is checked below.
Item# Special Permits Planning Board Item# Variance
X Site Plan Review Special Permit Setback Variance
Access other than Frontage Special Permit Parking Variance
Fronts a Exception Lot Special Permit Lot Area Variance
Common Driveway Special Permit Height Variance
Congregate Housing Special Permit X Variance ZBA Watershed Permit
Variance
Continuing Care Retirement Special Permit Special Permits Zoning Board
Independent Elderly Housing Special Permit Special Permit Non-Conforming Use ZBA
Large Estate Condo Special Permit Earth Removal Special Permit ZBA
Planned Development District Special Permit Special Permit Use not Listed but Similar
Planned Residential Special Permit Special Permit for Sign
R-6 Density Special Permit Special permit for preexisting
nonconforming
X I Watershed Special Permit
The above review and attached explanation of such is based on the plans and information submitted. No definitive
review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the
applicant serve to provide definitive answers to the above reasons for Any inaccuracies,misleading
information,or other subsequent changes to the information submitted by the applicant shall be grounds for this review to
be voided at the discretion of the Building Department.The attached document titled"Plan Review Narrative"shall be
attached hereto and incorporated herein by reference. The building department will retain all plans and documentation
for thea ove file.You m/uuss file a new permit application form and begi .the permitting process.
v✓'_ 2
Buildi g Department Official Signature Applic tion eceived Application Denied
Denial Sent: If Faxed Phone Number/Date:
Plan Review Narrative
The following narrative is provided to further explain the reasons for DENIAL for the
APPLICATION for the property indicated on the reverse side:
Item Reasons for
Reference
4.136 Watershed Protection Division
4.136 c. ii(3) Construction of a new permanent structure only after a Variance by
ZBA
8.3 Planning Board
Site plan review-Special Permit
4.136 c. ii Use allowed by Special Permit
Referred To:
Fire Health
Police X Zoning Board
X Conservation Department of Public Works
X Planning Historical Commission
Other I Building Department
N E
O M
Z =
L
ZQ
LU EV
H
Q
C- 3 C 3 C 3 C 1 C ] C 1 C J
n
U
n
L,
MEMORANDUM
n
L' TO: Town of North Andover
n
Zoning Board of Appeals
'Li; FROM Angus Realty Corporation
i n DATED: July 18, 2012
�►. RE: 1077 Osgood Street
n Variance Application, Points A - F
A. The Variance request is for the construction of an approximately 3,670 sf free-
standing retail bank with drive-thru in the southwesternmost corner of the site.
Li'
B. The Variance requested is for the Watershed District, which created a 250 foot Non-
n Disturbance Zone horizontally from the annual mean high water mark of Lake Cochichewick
(Lake).
The Variance should be granted because the proposed building will be consistent in all
n respects with the stated purpose of the Watershed District, which is "to preserve the purity
v of the groundwater, the Lake and its tributaries; to maintain the groundwater table, and to
maintain filtration and purification functions of the land; while conserving the natural
n environment; and protecting the public health, safety and welfare."
U
First, the proposed building will not affect in any way the groundwater, Lake or its
n tributaries. It will be located at the maximum distance from the Lake which the available
land will permit. No activity will be conducted in the building that is hazardous, or which is
`i specifically prohibited under the Bylaws.
M Second, the proposed building will not affect filtration or purification functions of the land,
LJ as the footprint will be very small.
T-1 With regard to specific matters of soil, topography and shape of the lot:
(1) Soil conditions are not at issue in this Variance Application.
(2) The particular circumstances of the lot relating to shape are that the lot is irregularly
shaped and the only logical place to site the proposed structure is within the location
presented. The building will be located at the maximum distance away from the Lake which
the available land will permit.
(3) The particular circumstances of the lot relating to topography, or to the structure
specifically affecting the property for which the Variance is sought, is that the proposed
structure and appurtenances will be constructed within an area previously approved for
Yexpansion of the existing parking lot and will not change the topography in a negative way
r1� of either the applicant's property or property of abutters. The proposed setbacks will remain
open and green, be suitably landscaped, unbuilt upon, unpaved and non-parked upon.
The forgoing conditions do not affect generally the Zoning District which the land is located.
K:\480-40\Rep orts 071812_Variance A North Andover Zoning Board of Appeals_me _txt.doc
\ pp\ m
Y
n
n
Li
C. The shape of the lot, wetland buffer zones, existing structures, parking spaces and
traffic circulation prevent the placement of the proposed building at other locations on the
`� lot. The failure to grant the Variance will result in substantial hardship, financial or
Li otherwise, which would result from the literal enforcement of the Zoning By-Law Section on
this land or use if this Variance relief is not granted.
n
U D. Granting of the Variance will allow the proposed structure to be constructed within
an area previously approved for a parking lot.
n
E. Approval of the proposed facility is desirable in providing additional banking services
to residents of the Town of Andover. The proposed facility will not interfere with abutters
which supports a finding that the relief sought may be given without nullifying or
n substantially derogating from the intent or purpose of the Zoning By-Law.
Li
F. Not applicable.
n
Li
n
u
Li
n
Li
n
Li
n
u
n
u
n
u
n
u - 2 -
K:\480-40\Reports\071812_Variance App\North Andover Zoning Board of Appeals_mem_txt.doc
Y .
M �
O �
Z `
L
Z �
V Q
Q
a
t t ==a r_ c- -1
n .
t Abutter to Abutter( ) Building Dept. O Conservation (X ) Zoning ( )
NORTH ANDOVER
n REQUIREMENT: MGL 40A,Section 11 states in part Tarbes in Interest as used In this chapter shall mean the petitioner,
abutters,owners of land directly oppositeon any public or private way,and abutters to abutters within
t three hundred(300)feet of the property line of the petitioner as they appear on the most recent applicable
tax list,not withstanding that the land of any such owner is located in another city or town,the planning
I j board of the city or town,and the planning board of every abutting city or town."
L) Subject Property:
MAP PARCEL Name Address
n 35 27 ANGUS REALTY CORP 1077 OSGOOD STREET,NORTH ANDOVER,MA 01845
t
Abutters Properties
i
map Parcel Name Address
ri 35 5 Frederik Fontein 1895 Great Pond Road,North Andover,MA 01845
35 6 Tobi McCarthy 1145 Great Pond Road,North Andover,MA 01845
35 7 1159 Osgood Street Trust 1159 Great Pond Road,North Andover,MA 01845
35 13 Edward Riemities 37 Stonecleave Road,North Andover,MA 01845
n 35 14 One Clark Street N.A. LLC 1660 Soldiers Field Road,Boston,MA 02135
35 15 Vincent Grasso 10 Commerce Way,North Andover,MA 01845
�y 35 16 Lawrence Airport Commission 1 492 Sutton Street,North Andover,MA 08145
J 35 20,213,3B,413,7B Great Pond Crossing,LLC 865 Turnpike Street,2nd fl,North Andover,MA 01845
35 20-1 B BVSS Realty,LLC 1019 Osgood Street,North Andover,MA 01845
35 20-5B R.Jude Realty,LLC 1007 Osgood Street„North Andover,MA 01845
35 20-66 Peter Devlin,DMD 1009 Osgood Streef,North Andover,MA 01845
U 35 21,28,&44 Town of North Andover 120 Main Street,North Andover,MA 01845
35 36 Haphey Realty Trust 44 Russell Street,North Andover,MA 01845
h 35 37 . Vincent Tyler 1149 Osgood Street,North Andover,MA 01845
35 47 Fourzol,LLC 480 Summer Street,Westwood,MA 02090
Lj 35 50 Osgood Properties,LLC 865 Turnpike Street,North Andover,MA 01845
35 51 Simonne Marchand 1881 Great Pond Road,North Andover,MA 01845
35 53 1140 Osgood Street Trust 1159 Osgood Street,North Andover,MA 01845
35 58 Paul Lawson 1925 Great Pond Road,North Andover,MA 01845
35 59 Frank Ragonese 1939 Great Pond Road,North Andover,MA 01845
35 61 &108 Joseph Pelich 1915 Great Pond Road,North Andover,MA 01845
35 72 Donna Mastrocola 40 French Farm Road,North Andover,MA 01845
n 35 90 Neal Shapleigh 75 French Farm Road,North Andover,MA 01845
35 91 Michael Salach,II 63 French Farm Road,North Andover,MA 01845
--35 92 Brian Mcanally 53 French Farm Road,North Andover,MA 01845
35 93 Fred Boucher,III 45 French Farm Road,North Andover,MA 01845
f- 35 94 Daniel Belbusti 33 French Farm Road,North Andover,MA 01845
35 92 Brian Mcanally 53 French Farm Road,North Andover,MA 01845
i,► Lake Cochichewick Commonwealth of MA 100 Cambridge Street,Boston,MA 02202
`f
This certifies that the names appearing on the
Lj rs fft
records of the Assessoce as of
D
Certified by: ' Date
u
n
I
M
u
M,
L
U
i
L
n
L
n
n ATTACHMENT NO. 4
Li
.� Notice of Decision Site Plan Special Permit
L
M
n
Li
n
u
n
n
u
r�
n
u
n
Li
n
Li
n
u
i
u
n
JUL-30-2007(MON) 09:36 Butchery Bay (FRX)9786855640 P. 009/015
U 1
Lioft
• �
Town of North Ai&dover
,. Office of the Planning Department
L' Division of Commun4 Developm lJUL Z3 Arl S► 26
1600 Osgood Street
+gwq{ui T oWGni GF
North Andover,Massachusetts 011 NORTH A14DDYER
mA,SSAGHUSMS
n
U
U
n NOTICE OF IMCISTON
Li
Any appesl shad be filed
n within (20)days aftar the
date of fling this notice in
the Wice of the Town Cleri..
Date: 3i ly 19, 2007
Date of Hearing(s):May 1,thru Duty 17, 2007
`j Date of Decision: My 17,2007
Petition of; Angus Realty Corporation, 1077 Osgood Street,North Andover,MA
01845
Premises A cted: 1077 Ospod Street,North Andover,MA 01845 within the General
u Business Zoning District, Assessors Map 55,Lot 27.
Referring to the above petition for a Site Plan Special Permit from the requirements of the North
Andover Zoning Bylaw, Sections 8.3, 10.3, and 10.31 and M(&C.40A,Sec, 9
So as to allow: to construct a sixty(60) space parking lot, installation of an underground storm water
managcmcnt and drainage system, minor roadvay inzgrovcrncaats to the main access way, site lishda&
.awoc.4 ted grading,vd=slve landscape work within the General Business Zoning District.
Atter a public inuring given on the above date=the Planning board voted to APPROVE A SUE
I� PLAN SPECIAL PERMIT fused upon the following conditions:
�Xoh Andover P ning Daae
Richard Nardella, Chairman
n John Simons,Vice Chairman
Alberta Angles, Clerk
Jennifer Kusek
JUL-30-2007(MON) 09:37 Butcher Bay (FAX)9766855640 P. 010f016
U
1 ?
n
1077 Osgood Street,Map 35 Lot 27
Site Plan Special Permit-moth of Parking Lot
Li laky 17,.7007
! On July 17,2007 upon a motion made by Solhn Simons and seconded by Jennifer Kusck,laic Planning
`J Board]herein APPROVED*c Site Plan Special Permit for the construction of a sixty(60)space parking
n lot,installation of an underground storm water management and drainage system.minor roadway
improvements to the roam' -access way,site lipping,associated grading,==sive laudscapta work and
U, other improvements shown on the"Plans"as decd below. The project lies in the General Business
Ze ning District and is located on real pr%xity shown on the North Andover Assessors D&p 35,Parcel 27
and consW ofapptoxitrately 320,080 s.f: (7.345 a0m)oftaud with frontage on Osgood Street aucl+Great
Pond Road,Tire:Special Permit vias requested by the Applicant,Amus 1iealty Corporation,'1077 Good
LJ Stmve Nom Andover,MA D)84$.
" This application was fled with tho Planning Boa d on March 26, 2007. litApplicant submitted a
u complete application which was noticed and reviewed in accordance with S=aons s3, 10.3,and 10.31 of
the Town of North Andover Zoning Byhrw and MGL c.40A, sec, p. The Applicant las filed w4b the
Pl=aiig Board all plans aid repots required under the North Andovcr Zoning Bylaws,including but not
limited to the in€ormadon required under Section 8.3 and 10.31 of the North Andover Zoning Bylaws.
`J Duzing the rerview process,the Applicant and its professional cons also acted various revisions
to the plans along with various supplcmeami memoranda and correspondence in response to requests by
the Planing Board,the Board's peer review consultants and by the various departments within the Town
of North Andover tot reviewed the project. All of these plans,reports and correspondence are contained
in the Planning Board's files and are hereby incorporated by reference into the public record for this
r1 hearing.
`J Tlhe Planning Board xnakes the following findings as required by the North Andover Zoning Bylaws
n Setion 8.3 and.10.3:
LJ I~MDIGS OF PACT:
r i 1) The specific site is as appropriate kx;adon for tize project as it is located in the Cenerai Business Zone
and involves the construction of a sixty (60) space pa-d* lot. Theproject is located witlhin an
`J extremely environmental sensitive arca and in close proximity to take Cochichewick. The fi=l
design reflects extensive discussions between the Town and applicant to ensure the continued
protection of Laic Cocbidrwick and the safety and welfare;of the residents of North Andover.
4
2) Thera will be no nuisance or serious bazard to vehicles or pedestrians. The applicant has
demonstrated that(1)the proposed access and egess point fits Osgood Street wr'll not sigtuficandy
increase traffic flow or volumes and(2) the parking lot design provides fear adequate t mmc flow,
safety,and sufficient pedestrian connections within the site.
3) The landscaping approved as part of this plan meets the rogaircmarts of Section 8.4 as amended by
the Planning Board,of the North Andover Zoning Bylaw.
r� 4) The sits drainage system and storm water m=aSernatt design we deigned is accordance with tho
Town Bylaw requirements and Best Engineering and Management Practices, and has been reviewed
by the outside consulting engineer, Vanasse,Hanger Brusdin,Inc. (VU B). Re w to letter dlatad Jutta
14, 2007 from VRB. Further, adequate. safeguards have been provided to mitigate pollututs from
entering,Lake Coehichewick.
5) An Emergency Response Plan has been incorporated as pmt of this decision.
2
n
JUL-30-2007(MON) W37 Butcher Boy (FAX)9786855640 P. 011/016
U
n 1077 Osgood Street,Map 35 Lot 27
Site Plan Special P'enmit—Caustnic tion of Parking Lat
LJ My I7,2007
n 6) The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of
the Zoning Bylaw;
L
7) Adequate and appropria#c facilities will be provided for the proper operation of the proposed use.
r? The projcat has been reviewed by the Division of Public Works and the outside consulting engineer,
U Vauasse,men Brusdin,Inc,
n 8) The applicant shall comply with the tercets and conditions refer=ced in this Special Permit, the
August 31, 1984 Site Plan Special Permit„and the Site Plan Special Permit Modification granted on
LJ September 27, 1991.
Finally the,Planning Beans finds that ibis project g==W)y complies with.the Town of North AMvvet
L, Zoning Bylaw requirements as listed in Section 8.3, but requires conditions in order to be fully in
compliance. The Planning Board hereby grants an approval to the applicant provided tha following
conditions ate met:
'-' SPECIAL COMMONS.-
1)
X'rIEONS.1) Permit Definitions:
A) TbG"L acus"rc£ct to the 320,080 s.£(7.348 acres)parcel of land with laad fronting on Osgood
n Street as shovm on Assessors Map 35,Iot 27,and also known as 1077 Osgood Street,north
Andover,Massachusetts.
u
D) 11="plans"rei'erto the plans prepared by Lynnfiold Engimecring dated April 311,2007,revised
n
5=7,51241117,and 7/5107 entitled`Butcher Boy Markctplace, 1077 Osgood Sit,North
L, Andover,Massachusetts 01845"and consisting of CI—C7,E1—E2,LTCr Cale,and LI
(revised 7151,07).
n
Q The`Pxxjece'or"1077 Osgood Sb=e infers to the construction of a shdy(60)space pmidng lot,
instant i.ou of an underground storm w=management and drainage systent,minor roadway
improvements to the main access way,site lighting,assaciared grading;e%tensive landscape work
and other improvements shcvm on the"Plans"as defined above.
D) The"Applicant"refers to Angus P=hy Corporin,the applicant for the Special Painit
ry
E) The`°Project Owner"refers to the person or entity holding the fec iaWrest to the title to the Locus
fi omt time to time,which can include but is not limited to the applicarrt,developer,and(wner.
2) The developer shall designate an independent Envirammeatal Monitor who shall be chosen in
c=sultation with the Planning and Community Development StaM The Environmental Monk=
must be available upon four (4)hours notice to inspect the site with the Planning Bawd designated
offrraal. The EwAronntenW Monitor shall make weekly inspections of the project and file reports on
the 4"Monday of cath month to the Planning Deparnhhcnt throughout the duration ofthe profect,71e
monthly reports shall detail arm of non•.compli3nee, if any and all actions taken to resolve'these
issues As part of the molly submissions,the Environ==Monitor will submit all onvironateatai
monitoring reports provided to Conservation Cornrnission as pant of their Order of Conditions. The
designated monitor may not be applicant andtor developer.
3) The applicant sball designate an independent construction monitor who shall be chosen in
3
JUL-30-2007(MON) 09:38 Butcher Boy €FAX19786855640 P. 012f016
un }
1
n 1077 Osgood Strec4 Map 35 LA 27
Site pU n.Special Ferltt—Consraredon of ParkingI At
U July 17,2007
n aansultntiorr vwith the Planning Depw at. The construction.monitor must be available upon four(4)
hours notice to inspect the site with the Planning Board designated official. The construction n'touitor
Lj shall make weekly inspections of the project and file reports on the a MondaY of ca month to the
Pl=ing bcpartrmea throughout the duration of the project. The monthly roports shalt detail arta of
n non-compliance,if any,and actions taken to resolve these issues.The designated monitor may not be
L applicant and/or developer.
4) The site,as'descdbed in.Condition 1(A)is permitted a maximum of two perraantst storage trafiers.
No additional pern=eut stomae of trailers will be allowed ca site. Temporary storage trailers maybe
Li allowed for up to two-weeks daring holidays and busy periods of aperatioa. M caaditim is su*r-t
to future zoning amendments pertaining to the outside storage of products/goods and the use trDers
r-I for this purpose: This decision slaU be in complianee with the most current Zoning and General.
I Li Bylaws far tile Town.
5) pries to the enders went of the plans by the P)sun iing Board,the applicW rntast cntuply with
the following conditions:
U A) The final plans must be reviewed and approved by the DPW and the Planning Depar=ent and be
M endorsed by the Plarming Board. The final plans must be submitted for review within ninety(90)
Li days. frailing submission of rquired final plans within 90 days wall render this Spacial Permit
nuU and void
if apPlioable, the applicant hcant must supply a l c of the approved Msssachusctts I-fighway
copy
u Departmemt permits necm=y for construction of the site to the Planning Department.
6) Prior to the start of construction'.
`J A) ,A, constriction schedule shall be submitted to the Planning Staff for the purpose of torching the
construction and informing the public of anticipated activities on the site.
B) All applicable erosion control measures as shown on the plan must be in place and reviewed and
approved by the Planning Department.
C) it shalt bo the responsibility of the developer to assure that no erosion on the site shall occur
which tm cause depasitja of sod or sediment upon adjacent properties or public Brays,except as
normally ancillary to off-site sewer or other off-site construction. Off-site erosion vW be a basis
far the Plaarting Baal maldog a finding that the project is scat in compliance with the plant;
provided,however,that the Plant it g Board shall give the developer written notice of any such
finding and ton days to Gare said condition.
D) Yellow"Caution"tape crust be placed along,the limit of clearing and grading as shaven on the
plan. The Planning Department mist be contacted prior-to any cutting and or clearing on site.
E) A pre-construction mecting must be hold with the developer, their construction emplaYces,
Planning Department, Building Depar=ent,and Conscrvv6on Department to discuss scheduling
of inspections and inspections to be conducted on the project.
F) The developer shall provide the Planning Board with copies of permits, plans and decisions
received*=ft Conservation Comnvac m Should the Town Planner find that plans approved
by the Conservation Commission su'bstax %axly differ from the appmcd plans of telae Plamning
4
i
n
JUL-30; 097(MDN) 09:43 Butcher Bou (FRX)9786855640 P. 013f016
U
n 1077 Osgood Street,Map 35 Lot 27
`
site Plan.specid peralk—Const mcdon Of Parking Lot
L Tuly 17,2007
Board,the developer is required to present the changes through a public hearing to the PIS
Board for a modtfichon to Site plan approval.
LJ
Cs) A site openinglerosion control bond sball be in the total amount of five thousand dollars
n ($!,000.00) for the purpose of covering any 000tingen6cs that might affect the public.welfare
U such as site opening,clean g,'erosion control and performance of any other condition conW ze d
herein. The Cie shall bo in the farm of a bond acptable to the Town and made payable
n to the 'Town of North Andover escrow =ount Upon f flfil ing the raquiromerft under said
bond,the said bond amount wdl be rolled over to CoxWon 45(R).
Li
H) A bond in the atrnount of ton thousand dollars ($l g,000) must be posted for the purpose of
`-I insuring that a final as-built plan showing for loo4on of AU ou-site uh'lit M struuares, Parking
U s,topography,and drainage facilities are submWe d. Tbz bond is also in p'hm to insurz that
the site is constructed in accordance v&h the approved pian. This bond should be in the forst
n acceptable to the Town and made payable to the Town of North Andover cacrow account.
LJ 1) A bond in the amount of Svc thousand dollars ($5,000.00) shall be posted for the purpose Of
covering any contingencies or emergency situations that may degrade or impactft quality of the
Town's drinking water supply,Lake Coehichewick. The Guarantee sWI be in the form of a bond
accxptable to the Town made payable to the Town of north Andover escrow account,and will be:
hold in pe t pe hoW. Should the property bo sola or transferred, the P1=1ag Department will
n requuirc tbat a bond be posted by the now owner and to be 1144 in perpeW4. Said bond will only
be utHized for the pmposes atatcd weaves.
Li
7) Prior to the iiisuance of a Building Permit
n
A) Three(3)copies of the signed,rwordod planes must be delivered to the planning Department.
ri 9) One certified copy of the recorded derision must be submitted to the Pbanning Dgxtrime nt.
L' C) To enssurz the con&ntcd protection of the health=d welfare of the residents of North Andover and
lessen the probability and possibility of con mi do 2 and incident to the Toves primary source of
r� drinking, the applicant shall be required to submit to the Planning Dqxwtx=t a comprehensive
Emergency Response Flat and Ivl mmance< Procedures. Tb t Planning Board shall rcvjzw and
appr=Said plan. Tltc Banal pians must be submitted 1br mvieww within ninety(9tl) days of filing
the decision with the Town Clerk. Failing submission of required Emergency Response Plan
within 90 cbtys will=dcr this Special Permit null and void. Said Enwr3=cy Rcsponsc Play and
llakumce Procedures will be distributed to the Town's Fire Department�Polices Department,
Planning Department, and the:project site where the docaweat(s)will be kept on:Me and easily
r� acccssi'ble in case of an emergency,
Li
8) During construction:
A) Faust matron and roadway cleaning must be perfbmed weeldy or more frequcntly as directed
by the Town Plammer ftoughout the construction process; especially at the corner of the
intersection wh=any ncwpmje=are being constructed,
B) The Board will strictly enforce the policy relative to the stock-piling of mau=Ws (dirt, wood,
construction material,a W.)and must be shown on a plan and leviavVed and approved by the Town
Planner. The de•velcper will make every effort to locate stockpiles on the site away from the Lake
I
n
JUL-30-2007(MON) 09:63 Butcher Boy (FRX)9786855664 P. 014/016
Li \
1
n 3.077 Osgood Street,MAp 35 Lot 27
Site Plan Special Pamt—fiction ofPa&mgLot
u .Poly 17,2007
n Cochicbe,%ick, Any approved piles must ternain covered at all times to mi =d=potential dust
and be required to install appropriate erasion control measares to mitigate potcutia# impacts to
`-' I.aIm Cooluchmck. Any sockpiles to rernaEin for longer ftft one week must be fenced off and
n
be seeded.
u Q In an effort to reduce noise levels, the developer shall keep in optmum working order,throuh
regular maintenance,any and all equipment that shah emanate sounds from the structure$or site
n
D) 'The Town Planner will pmform iii v eddy inspectdon of ft site during construction to cnscre
`J that the developer is w1hering to tsar conditions set forth in the decision.
M 9) Prior to the issuarrtce of a Certificate of E}osacr.
U A.) Tho applicant must submit a lobar from the architect and cn&eer of the project statins that the
n buildin&s*%laadscping,lrgbtmg and site layout subshmtally comply with the plans reTareziced
at the and of this decision as endorsed by the Planning Board. Alternatively,tbo applizvA andfor
`-' Property awm may provide g.bond,determined.by the Planning Board;to cover the full wo=of
tine laac wg maters=d insfaklat=if weather coriditicm do not permit the complotion ofthe
n landscaping prior to auticipated occupancy.
u
B) The Planning, Staff 6al3 approve all artifi=W lighting used t6 illuminate the site, All lighting
n shall have underground wiring and shall be so arranged that all direct rays from such lighting falls
esirely within the site and shall be shielded or recessed so as not to dune upon abutting
Li properties or streets. The planning 5taSE sball review the site. Any ebaages to the approved
lighting plan as may be reasonably r�ied by the Planning Staff be made at the ownees
�' eVense. All site lighting shall provide security for the site aad structures however it=ust not
create any glaro or project any light onto 4aocut residential properties.
M G) Emergency Response Plan to be filed and posted in obvious location such as Fite Department;Polies
Depaximentand Planning Dwartm=aLt
u
r�
10)Prior to the final release of all security and escrowed funds:
Li A) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Platming Staffwill be added at the Project Owner's zpense.
n
R) A f=W as-built plan showing final topography,the location of all on-site utilities,slz=tures,curb
cuts, pang spaces, and drainage structures and facilities must be submitted to the Planning
Department.The appliouz must subrait a letter from the architect and=&ccr of the project stating
said items substandally comply with the plans rebrenced at the end ofthis decisica as endorsed by
the Planair mrd.
11)General conditions:
A) Any plants,trees or shrubs that bave been incorporated into the Landscape Flan approved in this
decision that die must be replaced by ft project owner in..perpduity. .
IR) If applicable,tree cutting shall be kept to a minimum throughout the project to raauxiMIZc erosion.
and preserve the natural features of the site.
g
n
JUL-30-2007(RON) 09:44 Butcher Bou (FRX)4786855640 P. 0151016
n 1077 Orad Street,Map 35'LU 7.7
' She Plan Special Permit--Construction of PaOing Lot
u July 17,-7007
n C) Snow removal may be stored on the designated storages areas shown on said plans refiCreAced
below to the Went•possible, but must be trucked off site whenever snow exceeds on-sits storage
Li capacity.
n D) Should the Prosect Owner transfer ownership of the project andlor property,the buyer shay meet
U with the Planning Board to provide an update on the sterns ofthe project.
n B) The contractor shalt eon Dig Sa&at last 72 hours prior to commencing any excavation.
Li p) est Telephone, Cable and Electric utilities shalt be instaIlcd underground as specified by the
tC5peotzve.0 iW companies.
n
Li The hours for cousbuction shall be limited to between 7:04 a m. and 5:00 p.m.Money through
Friday and between,8:00 a.=and 5:00 p.m.on,Satu&y.
n
1-1) No open burning shall be done except as is permitted during burning season under the Fire
U Department regalations.
n 1) No underground fuel storage shall be installed.
1) The provisions of this conditional approval shall apply to and be binding upon the applicant its
i Mployees and all successors and assigns in interest or control,
LJ K) Depending on the allowed uses, the Planning Dowd reserves the right to modify the form and
rn frequency of manance testing and inspection.
,_J L) AUY action by a Town Board, Commission, or Department,which requires changes in 1hr.plan or
design ofthe parldng lvt, as presented to the Planning Board, may be subject to modification by
n the planning Board.
M) Dtpending on the allowed uses, the ftvming Board reserves the right to modify Mac fort and
frequency of mwntaaanoe testing and inspeodon to ensure the continued protection of Paha
n Caebichewiak.
N) Any revisions shall be submitted to the Town Planter for wvww If*&se revisions are deemed
n substantial,the developer must submit revised plans to the Planning Board for approval.
0) This Special Permit approval shall,be deemed to have lapsed two years after the date ofthe grant
of this spl permit (July 17, 2007), acclusivc of the -time required to pursae or await
determination of any appeals, unless substantial use or constm000n has commenced within said
two year period or for good.cause.
P) The applicant must comply with the conditions set forth in.the waurshed Special Perk*agprnved on
July I7,2007 related to this project,
This Site Plan Review Special lsezmh ttgprol is based upon the fallowing infomtion which is
n incogx aaed into this decision by rr:fa'cnoc:
Z. Flan titled: Butclux Bay M;arkctplacc
1077 Osgood Ser=
Forth Andover,MA
7
'-1
JUL-30-2001(MON) 89:44 Butcher. Boy (FRS)91$6855640 P. 0161016
Li
10.77 Osgood Suer4 Map 35 W 27
Sita Plan Special emit-Construction of Parking L"
u alp 17,2007
-i Prepared for. Angus Rcahy Cotparatic n
1077 Osgood Str=
No&Andover,MA.
RW=d by: Lyrraffold Etlgnrccrin&Inc.
199 Nmvb=y St wtc Suite 115
,, Danvm,MA 01923
Scale: 1"-40,and 1"=30`
Date: April 2007,Revised 480107,512V07
Sheets: Cl-C7,El-E2,LTG Calc,and L1 (mvised 7!5147)
Reporttitle& Respmes to Comments
Pwposed Padang Lout EVamc
Li 1077 Osgood Street
North Andover,MA
Prepared for: Angas Realty Corporation
Li 1 1077 Ospod.Street
North Andmr,MA
Preparcdby: LynnfieldEn&emirtg,,Inc.
199 Newbury Sheet; Suite 115
u Danvers,lV1A 01923
!nate: May 25,2007
1 A=chments: 12rcS
At whmea 1--Emergency Response plea
`-' Attachment 2-St xmwater Analysis and C*uWons
Attad=e=3-Inspe etka and IVLtint nauce Plan
u
Co: Dimc for of PubHo Works
13ading Insp r
Li T'om mannscr
Gonse-wrdou Administrator
,-I Plug Board
L, Police Chief
Fire Chief
Ertgirteer71, a t
File
srx err►
M,
LJ
i
I
i
Abutter to Abutter( J Building Dept. (J Conservation (X J Zoning ( )
NORTH ANDOVER
REQUIREMENT: MGL 40A,Section 11 states in part°Partles In Interest as used in this chapter shall mean the petitioner,
abutters,owners of land directly oppositeon any public or private way,and abutters to abutters within
three hundred(300)feet of the property line of the petitioner as they appear on the most recent applicable
I tax list,not withstanding that the land of any such owner is located in another city or town,the planning
board of the city or town,and the planning board of every abutting city or town."
Subject Property:
MAP PARCEL Name Address
35 27 ANGUS REALTY CORP 1077 OSGOOD STREET,NORTH ANDOVER,MA 01845
Abutters Properties
i Maw Parcel Name Address
35 5 Frederik Fontein 1895 Great Pond Road,North Andover,MA 01845
i 35 6 Tobi McCarthy 1145 Great Pond Road,North Andover,MA 01845
35 7 1159 Osgood Street Trust 1159 Great Pond Road,North Andover,MA 01845
! 35 13 Edward Riemities 37 Stonecleave Road,North Andover,MA 01845
35 14 One Clark Street N.A. LLC 1660 Soldiers Field Road,Boston,MA 02135
35 15 Vincent Grasso 10 Commerce Way,North Andover,MA 01845
35 16 Lawrence Airport Commission t 492 Sutton Street,North Andover,MA 08145
-135 20,2B,3B,4B,7B Great Pond Crossing,LLC 865 Turnpike Street,2nd fl,North Andover,MA 01845
35 20-1 B BVSS Realty,LLC 1019 Osgood Street,North Andover,MA 01845
35 20.5B R.Jude Realty,LLC 1007 Osgood Street,North Andover,MA 01845
I 35 20-6B Peter Devlin,DMD 1009 Osgood Street,North Andover,MA 01845
35 21,28,&44 Town of North Andover 120 Main Street,North Andover,MA 01845
35 36 Haphey Realty Trust 44 Russell Street,North Andover,MA 01845
35 37 . Vincent Tyler 1149 Osgood Street,North Andover,MA 01845
i 35 47 Fourzol,LLC 480 Summer Street,Westwood,MA 02090
35 50 Osgood Properties,LLC 865 Turnpike Street,North Andover,MA 01845
35 51 Simonne Marchand 1881 Great Pond Road,North Andover,MA 01845
35 53 1140 Osgood Street Trust 1159 Osgood Street,North Andover,MA 01845
35 58 Paul Lawson 1925 Great Pond Road,North Andover,MA 01845
35 59 Frank Ragonese 1939 Great Pond Road,North Andover,MA 01845
35 61&108 Joseph Pelich 1915 Great Pond Road,North Andover,MA 01845
! 35 72 Donna Mastrocola 40 French Farm Road,North Andover,MA 01845
j 35 90 Neal Shapleigh 75 French Farm Road,North Andover,MA 01845
35 91 Michael Salach,II 63 French Farm Road,North Andover,MA 01845
35 92 Brian Mcanally 53 French Farm Road,North Andover,MA 01845
35 93 Fred Boucher,III 45 French Farm Road,North Andover,MA 01845
35 94 Daniel Belbusti 33 French Farm Road,North Andover,MA 01845
35 92 Brian Mcanally 53 French Farm Road,North Andover,MA 01845
Lake Cochichewick Commonwealth of MA 100 Cambridge Street,Boston,MA 02202
i
This certifies that the names appearing on the
records of the Assessors ffice as of
D
Certified by: ' Date i .�
r�
LJ
1
Preliminary Stormwater Analysis & Calculations
Butcher Boy Markets
.J
1077 Osgood Street
LJ North Andover, Massachusetts
December 11, 2012
Owner/Applicant:
Angus Realty Corporation
1077 Osgood Street
North Andover, MA
Civil Engineer:
Lynnfield Engineering, Inc.
199 Newbury Street, Suite 115
'J Danvers, MA 01923
Prepared For:
North Andover Zoning Board of Appeals
: j
Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
n
n
M
U
n
Preliminary Stormwater Analysis & Calculations
n Butcher Boy Markets
Li
n
1077 Osgood Street
North Andover, Massachusetts
December 11, 2012
r�
Li
n
Owner/Applicant:
Angus Realty Corporation
`i 1077 Osgood Street
T-1 North Andover, MA
`J Civil Engineer:
., Lynnfield Engineering, Inc.
199 Newbury Street, Suite 115
Danvers, MA 01923
n
Prepared For:
n North Andover Zoning Board of Appeals
n
u
n
u
Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
v
u
U
n
n
U
n
TABLE OF CONTENTS
'7 Section 1 Stormwater Analysis and Calculations
Section 1.1 Calculation Objective
Section 1.2 Existing Conditions Analysis
n Section 1.3 Proposed Conditions Analysis
Section 1.4 Summary of Peak Runoff Rates
U
n
Attachment A Stormwater Model Calculations
Attachment A.1 Existing Conditions Analysis
n Attachment A.2 Proposed Conditions Analysis
Attachment B SCS Soils Report
Li Attachment C Existing Watershed Plan
n
Attachment D Proposed Watershed Plan
n
u
n
U
-1
LJ
n
M
LJ
n
n
u
......... ..,. .......,-- -.. .- �_ _ � _ ...
f-� Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
U
U
u
7
r7
u
Section 1.1 Calculation Objective
n
The purpose of this analysis is to present a preliminary design of a stormwater
management system that will reduce the Total Suspended Solids(TSS)within the
stormwater runoff and to reduce the peak flow rates from pre to post development
Lj conditions. The report is intended for presentation to the North Andover Zoning Board
of Appeals (ZBA). The stormwater system will meet the requirements of the
n Massachusetts Stormwater Regulations for work within a Zone A surface water
u protection area. The stormwater system will also meet the North Andover Planning
Board and Conservation Commission regulations. The analysis was completed in
n response to a request for additional information from the ZBA that a stormwater system
can be designed in accordance with the above stated regulations. A final site and
stormwater design will be as part of the Site Plan Special Permit and Watershed Special
--� Permit submittals to the Town.
`-' Section 1.2 Existing Conditions Analysis
The site is located at the intersection of Osgood Street and Great Pond Road. It is the
`i current location of the Butcher Boy Market complex. The site is comprised of one
commercial/retail building with associated parking area. The southwesterly portion of the
property contains an open detention area which is connected to the storm drain system
`-j within the parking area. The Butcher Boy storm drain system is connected to the Clark
,I Street system which ultimately discharges to the Merrimack River.
Li The SCS Soil Maps identify the area as WrB Woodbridge Fine Sandy Loam and Ur
Urban Land. Based on the SCS Soil Maps, a Hydrologic Soil Group(HSG) designation
of C is used in the stormwater analysis. The existing conditions was analyzed for the 1
U year, 10 year, and 100 year 24 storm events.
The rainfall amounts are as follows:
Rainfall Amounts*
1-year 24 hour storm event 2.5 inches
10-year 24 hour storm event 4.25 inches
100-year 24 hour storm event 6.5 inches
*based on TP-40
L, The peak rate analysis was analyzed at three locations. Design Point#1 is the drain pipe
reach connected to the parking area storm drain system to CB 1. Design Point#2 is
overland flow to Osgood Street from a small portion of the entrance driveway. Design
Point#3 is overland flow towards Great Pond Road.
u
-- ... ......_._
Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
u
n
u
7
u
rl
Li
The peak rate summary for the existing conditions analysis is as follows:
Li Design Point#I —Butcher Boy Parking Lot Storm Drain System
Peak Rate of Runoff Summary
Storm Event Peak Rate of Runoff(cfs)
L, 1-year 24 hour 0.4
10-year 24 hour 1.0
n 100-year 24 hour 1.9
LJ
Design Point#2—Overland from entrance drive
n Peak Rate of Runoff Summary
Storm Event Peak Rate of Runoff(cfs)
1-year 24 hour 0.0
n 10-year 24 hour 0.1
u
100-year 24 hour 0.1
Design Point#3 —Overland to Great Pond Road
L� Peak Rate of Runoff Summary
Storm Event Peak Rate of Runoff(cfs)
r1 l-year 24 hour 0.8
L, 10-year 24 hour 2.5
100-year 24 hour 4.9
n
u
.-
Lj
-1
aJ
r-I
U
L_!
U
n
Li
Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
V
n
U
n
U
I
Li
`-' Section 1.3 Proposed Conditions Analysis
The applicant proposes to construction a bank with associated parking and bituminous
Li concrete drive aisles. The preliminary site and stormwater management system design
has been developed to demonstrate to the North Andover Zoning Board of Appeals that
the site development will maintain the peak rate of runoff from existing to proposed
U conditions. The final site design will incorporate underground stormwater detention
basins in order to mitigate the peak rate of runoff. The stormwater management system
r, design depicts two (2) underground detention basins each consisting of ten (10), sixty
U foot(60') long,thirty inch (30") pipes. The detention basins will incorporate an outlet
control manhole which will have various outlets to control the rate of flow. The outlet
n control manholes also provide a convenient location to access the basins for inspection
and maintenance. The analysis utilized the same design points in order to compare the
peak rate of runoff between existing and proposed conditions.
Proposed Condition
Peak Rate of Runoff Summary
Storm Event Peak Rate of Runoff(cfs)
Li 1-year 24 hour 0.4
10-year 24 hour 0.8
rl 100-year 24 hour 1.9
Li
r7 Section 1.4 Summary of Peak Runoff Rates
Li
The final site design will incorporate a stormwater management system which will
include underground detention basins designed to maintain the peak rate of runoff from
u existing conditions to proposed conditions for the proposed development. The following
table summarizes the peak rate of runoff from existing to proposed conditions.
n
t, Comparison from Existing to Proposed Conditions
Peak Rate of Runoff Summary
n Storm Event Existing Peak Rate of Proposed Peak Rate Net Change in Peak
u Runoff(cfs) of Runoff(cfs) Rate of Runoff(cfs)
2-year 24 hour 0.4 0.4 0.0
M 10-year 24 hour 1.0 0.8 -0.2
u 100-year 24 hour 1.9 1.9 0.0
n
Li
n
Li
'-StormwaterAnalysis��But� ��,._�__.
cher Boy Markets
1077 Osgood Street, North Andover, MA.
U
n
U
-1
U
Li
Li
-1
Lj
-1
Attachment A
Stormwater Model Calculations
Li
-I
L--j
Li
Lj
Li
rmwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
Li
n
U
n
n
Li
Attachment A.l
n
Existing Conditions Analysis
n
Li
Li
Li
Li
Li
Li
Lj
n
n
n
n
n
n
n
............- -
n Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
f-I
L-1
r1
Lj
n
u
u
U
I"1
u
L1
n
u 38 %
n Flow to CB
Li 39P '
0
22 35
R
CB 41
Flow to Detention Basin
L;
i - Detention Area
r-"I Flow to DP#1 /CB
CB 53 )
n � 30C36
; ti
37
L
Flow to CB 53 � � 1--'
Flow to DP#2 Flow to DP#3
n
LJ
M
Li
n
u
M
, I
Li
n
LJ
M
! ti Drainage Diagram for EXISTING Butcher Boy
Li
Subcat; Reach on Link
\ Prepared by Eaglebrook Engineering&Survey, Printed 12/10/2012
n
1---'' HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
u
'-' EXISTING Butcher Boy Type X 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 C 2010 HydroCAD Software Solutions LLC
Summary for Subcatchment 30: Flow to CB 53
n
u
Runoff = 0.2 cfs @ 12.09 hrs, Volume= 520 cf, Depth> 1.36"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
u
Area(sf) CN Description
2,465 98 Paved parking,HSG C
2,130 79 50-75%Grass cover,Fair,HSG C
4,595 89 Weighted Average
2,130 46.35%Pervious Area
r1 2,465 53.65%Impervious Area
u
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
Subcatchment 30: Flow to CB 53
Hydrograph
0.19-" - ❑Runoff
n 0.2 cfs
018
0.17 Type III 24-hr 1 Year Storm
0.16: _ _ Rainfall=2.50"
0.15
0.14 Runoff.Area=4,595 sf.
013' - Runoff Volume=520 cf
0.12'
M 0.11 Runoff Depth>1.36
3 0., Tc=6.0 min
20.09
LL 0.08 CN=89
i--1 0.07
0.0s
Li
o.os.::
0.04
n, 0.03"
Li 0.02
0.01
0 5 6 7 8 9 10 11 1f2 13 14 15 16 17 18 19 20
Time (hours)
iJ
M
U
n
u
rZ
■
n
�s
�+ EXISTING Butcher Boy Type HI 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
rl HydroCAD®9.10 s/n 06609 0 2010 HydroCAD Software Solutions LLC
u Summary for Subcatchment 35: Flow to Detention Basin
n
Runoff = 0.3 cfs @ 12.10 hrs, Volume= 759 cf, Depth> 0.76"
�s
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
M Type III 24-hr 1 Year Storm Rainfall=2.50"
Area(sf) CN Description
r1 11,914 79 50-75%Grass cover,Fair,HSG C
Li
11,914 100.00%Pervious Area
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
u 6.0 Direct Entry,Overland Flow
�► Subcatchment 35: Flow to Detention Basin
Hydrograph
0.28 ❑Runoff
0.3 cfs
0.26-.
0.24 Type III 24-hr 1 Year Storm
M 0.22 Rainfall=2.50"
0.2..: Runoff Area=11,914 sf
0.18-1 Runoff Volume=759 cf
�? w 0.16 Runoff Depth>0.76"
0.,4 Tc=6.0 min
a _
LL 0.12 CN=79
r--a
0.,
0.08
0.06.::
0.04
0.02
0-
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
M
1_s
n
u
u
1
EXISTING Butcher Boy Type HI 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
—1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li Summary for Subcatchment 36: Flow to DP #2
Runoff = 0.0 cfs @ 12.09 hrs, Volume= 107 cf, Depth> 1.86"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
:s
Area(sf) CN Description
n 617 98 Paved parking,HSG C
78 74 >75%Grass cover,Good,HSG C
695 95 Weighted Average
78 11.22%Pervious Area
n 617 88.78%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Subcatchment 36: Flow to DP #2
Hydrograph
u
0.038: ❑Runoff
n, 0.036: 0.0 cfs
is
0.034, Type III 24-hr 1 Year Storm
0.032 Rainfall=2.50"
0.03 i,
—1 0.028, Runoff Area=695 sf
L; 0.026 Runoff Volume=107 cf
0.024
n 0.022 Runoff Depth>1.86".
-- 0.02 Tc=6.0 min
t o 0.018'
U. 0.016 CN=95
r 1 0.014:
0.012
a s 0.01
0.008
0.006
0.004
u
0.002`
0
r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
L—r
rl
LJ
r"T
U
Li EXISTING Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
r� HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 37: Flow to DP #3
M
Runoff = 0.8 cfs @ 12.10 hrs, Volume= 2,572 cf, Depth> 0.63"
U
Runoff by SCS TR-20 method,UH=SCS, Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
Area(so CN Description
n 26,850 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
'`' 49,069 76 Weighted Average
49,069 100.00%Pervious Area
;j Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
r� 6.0 Direct Entry,Overland Flow
Subcatchment 37: Flow to DP#3
Hydrograph
Ll
0.9- ❑Runoff
0.8 cfs
0.85
n 0,8=, Type III 24-hr 1 Year Storm
Li 0.75 Ra i nfa l l=2.50"
0.7 i
0.65 Runoff Area=49,069 sf
0.6 Runoff Volume=2,572 cf
Li 00.5:
05 Runoff Depth>0.63"
3 0.45 Tc=6.0 min
G
LL 0.4 CN=76
0.35::
0.3
n
0.25,:
u 0.2
0.15
0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
U
r'1
u
I
u
u
M
n
Li EXISTING Butcher Boy Type III 24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
'7 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u Summary for Subcatchment 38: Flow to CB
n
Runoff = 0.2 cfs @ 12.09 hrs, Volume= 613 cf, Depth> 1.43"
u
Runoff by SCS TR-20 method,UH=SCS, Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
Ls
Area(sf) CN Description
f1 3,075 98 Paved parking,HSG C
2,054 79 50-75%Grass cover,Fair,HSG C
Li 5,129 90 Weighted Average
2,054 40.05%Pervious Area
3,075 59.95%Impervious Area
u
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
U
Subcatchment 38: Flow to CB
Hydrograph
u
0.23 ❑Runoff
0.22+ 10.2 cfs
0.21-1
0.2 Type III 24-hr 1 Year Storm
�
0.19 j Rainfall=2.50"
0.18
0.17Runoff Area=5,129 sf
16
°15 Runoff Volume=613 cf
0.14
r, °13 Runoff Depth>1.43"
-- 0.12;''
0 0.11 Tc=6.0 min
LL 0.11'
1' CN=90
0.09-
0.08
0.07`I
-f 0.06=
0.05'.
0.04-
0.03
u 0.02
0.01;
n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
!J
n
U
1-1
u
n
l�
r'-T
n
Li
n
EXISTING Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li Summary for Reach 41R: Flow to DP #1
n
Inflow Area= 21,638 sf, 25.60%Impervious, Inflow Depth> 0.94" for 1 Year Storm event
U Inflow = 0.4 cfs @ 12.09 hrs, Volume= 1,701 cf
1 Outflow = 0.4 cfs @ 12.09 hrs, Volume= 1,701 cf, Atten=0%, Lag=0.0 min
Lj Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Reach 41R: Flow to DP #1
u Hydrograph
-- _— 0 Inflow
0.42- ❑Outflow
0.4 0.4 ifs
U Inflow Area=21 ,638 sf
0.38..:
0.36'.
n 0.34
0.32 it
U 0.3
0.28..
i) 0.26
w
0.24-
0.22.
c 0.24
u 0.18
0.16
0.14
L1 0.121
0.1
0.08
0.06- /
L1 0.04
0.02
0 . . : .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
rl
U
:-1
U
M
t-1
U
-1
u
n
L-1
r1
u
M
LJ
7
-+ EXISTING Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
�? HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Pond 21: CB 53
n
Inflow Area= 16,509 sf, 14.93%Impervious, Inflow Depth> 0.79" for 1 Year Storm event
Li Inflow = 0.2 cfs @ 12.10 hrs, Volume= 1,089 cf
Outflow = 0.2 cfs @ 12.10 hrs, Volume= 1,089 cf, Atten=0%, Lag=0.0 min
Primary = 0.2 cfs @ 12.10 hrs, Volume= 1,089 cf
LJ
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 129.62'@ 12.10 hrs
L1 Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.40'/ 128.11' S=0.0107'/' Cc=0.900 n=0.013
LJ
Primary OutFlow Max=0.2 cfs @ 12.10 hrs HW=129.61' (Free Discharge)
r`1 L1=Culvert (Inlet Controls 0.2 cfs @ 1.25 fps)
L1 Pond 21: CB 53
Hydrograph
)=1 Inflow
0.19, 1-6
.19: - 0 Primary
.-�
0.18 i
0.2 cfs Inflow.Area=16,509 sf
Li Peak Elev=129.62'
°.,5 15.0„
-1 0.14
01Round Culvert
LJ 0.122
42 0.111,
n=0.013
LL o.09 L=121 .0'
L1 0.08-1
0.07
S=0.0107 T
0.0s
Li 0.04: A _
0.03 %
1 0.02
0.01'.
U
0'.'
6 7 8 9< 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
�T
L1
u
1
v
r'1
u
n
U
u
'-1
EXISTING Butcher Boy Type III 24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Pond 22: Detention Area
n
Inflow Area= 11,914 sf, 0.00%Impervious, Inflow Depth> 0.76" for 1 Year Storm event
Inflow = 0.3 cfs @ 12.10 hrs, Volume= 759 cf
rn Outflow = 0.1 cfs @ 12.51 hrs, Volume= 568 cf, Atten=73%, Lag=24.8 min
Primary = 0.1 cfs @ 12.51 hrs, Volume= 568 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 129.59'@ 12.51 hrs Surf.Area= 1,223 sf Storage=300 cf
LJ Plug-Flow detention time=122.4 min calculated for 568 cf(75%of inflow)
Center-of-Mass det.time=58.9 min(875.7- 816.8)
n
u Volume Invert Avail.Storage Storage Description
#1 129.00' 10,090 cf Custom Stage Data(Irregular)Listed below(Recalc)
rl
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
LJ (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
129.00 55 39.0 0 0 55
130.00 2,963 219.0 1,141 1,141 3,753
v 131.00 4,295 254.0 3,608 4,749 5,091
132.00 6,461 303.0 5,341 10,090 7,281
Device Routing Invert Outlet Devices
u #1 Primary 129.43' 24.0" Round Culvert L=22.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.43'/ 129.40' S=0.0014'/' Cc=0.900 n=0.013
Primary OutFlow Max=0.1 cfs @ 12.51 hrs HW=129.59' (Free Discharge)
L1=Culvert (Barrel Controls 0.1 cfs @ 0.92 fps)
LJ
n
LJ
LJ
n
Li
M
LJ
n
n
r
u
n
n
EXISTING Butcher Boy Type III24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
"► HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Pond 22: Detention Area
n Hydrograph
Li [a Inflow
0.28: 0.3 Cfs ❑Primary
....--..__.... ._._
0.26- Inflow Area=11,914 sf
0.24.22 Peak Elev=129.59'
°0 21 Storage=300 cf
U 0.18
24.0
i
Round Culvert
3 0.14
LL 0.12 - n=0.013
n
0.1 L=22.0'
0.08- - 0.1 cfs
S=0.0014 '/'
_.
0.06...
n 0.04
0.02
0 Vxx
1�
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
� ) Time (hours)
u
t't
tJ
U
r7
U
n
U
'—i
u
1
n
,J
n
U
n
U EXISTING Butcher Boy Type III 24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Pond 39P: CB
r�
Inflow Area= 5,129 sf, 59.95%Impervious, Inflow Depth> 1.43" for 1 Year Storm event
U Inflow = 0.2 cfs @ 12.09 hrs, Volume= 613 cf
Outflow = 0.2 cfs @ 12.09 hrs, Volume= 613 cf, Atten=0%, Lag=0.0 min
Primary = 0.2 cfs @ 12.09 hrs, Volume= 613 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 129.86'@ 12.09 hrs
U Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.60'/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
U
Primary OutFlow Max=0.2 cfs @ 12.09 hrs HW=129.86' (Free Discharge)
,-) t-1=Culvert (Barrel Controls 0.2 cfs @ 1.85 fps)
U Pond 39P: CB
Hydrograph
U _._.....
..._. C1 Inflow
0.23 9 rfc ❑Primary
0.22: oz ifs
0.21 Inflow Area=5,129 sf
�
0.2
u 0.19 Peak Elev=129.86'
0.18-
12.0"
0.16::
015"'.
U 0.14: Round Culvert
w 0.13
-�
0.12 n=0.013
c 0 11
u
LL 01 L=85.0'
0.09..:
0.08
0.07,
S=0.0049 '/'
0.06 1
0.05
0.04 1
003`
n
0.02 f
0.01
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
U
n
r�
U
n
U
L' EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
^? HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 30: Flow to CB 53
u
Runoff = 0.4 cfs @ 12.09 hrs, Volume= 1,104 cf, Depth> 2.88"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(so CN Description
t1 2,465 98 Paved parking,HSG C
2,130 79 50-75%Grass cover,Fair,HSG C
4,595 89 Weighted Average
n 2,130 46.35%Pervious Area
2,465 53.65%Impervious Area
U
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
u
6.0 Direct Entry,Overland Flow
.� Subcatchment 30: Flow to CB 53
u
Hydrograph
0.4 ❑Runoff
r� 0.38 0.4 cfs
0.36 Type III 24-hr 10 Year Storm
t�S
0.34-
0.32 Rainfa11=4.25"
0.3 - Runoff Area=4;595 sf
0.28
`j 0.26Runoff Volume=1,104 Cf
-� 0.24 Runoff Depth>2.88"
„ 0.22
3 0.2 Tc=6.0 min
LL
0.181.
_ CN=89
0.16
n 0.14
U 0.12
0.1=
0.08=
r�
0.06
0.04
0.02-
0=, . . .
n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
V
J
n
u
'l
L' EXISTING Butcher Boy Type H124-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 35: Flow to Detention Basin
n
u
Runoff = 0.7 cfs @ 12.09 hrs, Volume= 2,001 cf, Depth> 2.02"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(so CN Description
n 11,914 79 50-75%Grass cover,Fair,HSG C
11,914 100.00%Pervious Area
rj Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
u 6.0 Direct Entry,Overland Flow
n Subcatchment 35: Flow to Detention Basin
u Hydrograph
❑Runoff
r-) 0.75. 0.7 CfS
°J 0.65Type III 24-hr 10 Year Storm
.:
n 06 Rainfall=4.25"
0.55 Runoff Area=11,914 sf
0.5- Runoff Volume=2,001 Cf
0.45 Runoff Depth>2.02"
= 04
3 Tc=6.0 min
LL 0.35
CN=79
!") 0.3
0.25-
0.2
n 0.15;
l__1 0.1
0.05
„': . . . , .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
`y Time (hours)
n
iJ
n
U
M
u
n
u
-1
EXISTING Butcher Boy Type HI 24-hr 10 Year Storm Rainfall=4.25"
_ Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 36: Flow to DP #2
n
u
Runoff = 0.1 cfs @ 12.09 hrs, Volume= 201 cf, Depth> 3.47"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
U
Area(so CN Description
617 98 Paved parking,HSG C
78 74 >75%Grass cover,Good,HSG C
Lj 695 95 Weighted Average
78 11.22%Pervious Area
617 88.78%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
-� (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Li
Subcatchment 36: Flow to DP#2
Hydrograph
v
❑Runoff
r1 0.065 0.1 cfs
0.06 Type III 24-hr 10 Year Storm
Rainfall=4.25
0.055
Runoff Area=695 sf
0.05
`i 0.045- Runoff Volume=201 cf
Runoff Depth>3.47"
0.04
Tc=6.0 min
u o 0.035 CN=95
LL 0.03-
n 0.025-
0.02-
0.015-
0.01:
.025-0.02 0.015-0.01
U 0.005
n 0.:. . . ,
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
LJ
n
u
n
r�
U
n
Li
17
`-' EXISTING Butcher Boy Type HI 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 (0 2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 37: Flow to DP #3
n
u
Runoff = 2.5 cfs @ 12.10 hrs, Volume= 7,308 cf, Depth> 1.79"
n Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(sf) CN Description
n 26,850 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
Lj 49,069 76 Weighted Average
r) 49,069 100.00%Pervious Area
Li Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
`J Subcatchment 37: Flow to DP#3
"-i Hydrograph
t__f ❑Runoff
2.5 cfs
Type III 24-hr 10 Year Storm
Rainfal l=4.25"
2 Runoff Area=49,069 sf
Runoff Volume=7,308 cf
Runoff Depth>1.79"
-7 3 Tc=6.0 min
u
U. CN=76
Li
n
u
o . . . . . . . . . . . . . . . : . . . . . . . . . : . . . . : . . . . . . . . . . : : .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
r-' Time (hours)
tJ
tJ
n
U
n
U
r-1
W
n
u
n
EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
r� HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 38: Flow to CB
n
Runoff = 0.4 cfs @ 12.09 hrs, Volume= 1,273 cf, Depth> 2.98"
r� Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(so CN Description
3,075 98 Paved parking,HSG C
U 2,054 79 50-75%Grass cover, Fair,HSG C
5,129 90 Weighted Average
n 2,054 40.05%Pervious Area
3,075 59.95%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
u 6.0 Direct Entry,Overland Flow
n Subcatchment 38: Flow to CB
Li Hydrograph
0.461. ❑Runoff
n 0.44.: 0.4 cfs ...
0.42'
o.a Type III 24-hr 10 Year Storm
u =.
0.38. Rainfall=4.25"
0.36
n 0.34 - - Runoff Area=5,129 sf
u 0.32
0.3 Runoff Volume=1,273 cf
n H 0.26 Runoff Depth>2.98"
0.24 Tc=6.0 min
u c 0.22
LL 0.2 CN=90
n0.18' -
0.16.. . . m
l ! 0.14;
0.12..
0.1-
0.08 .
.1 i
0.08, . ..
0.06
U 0.04=
0.02-
0 . .
S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Li
n
Li
n
U
n
Li
r-I
Lj
U
EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Reach 41R: Flow to DP #1
Inflow Area= 21,638 sf, 25.60%Impervious, Inflow Depth> 2.31" for 10 Year Storm event
`-' Inflow = 1.0 cfs @ 12.11 hrs, Volume= 4,167 cf
Outflow = 1.0 cfs @ 12.11 hrs, Volume= 4,167 cf, Atten=0%, Lag=0.0 min
U Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
1-1 Reach 41R: Flow to DP#1
,J Hydrograph
M-1-—fl-
❑Outflow
u 1.0 cfs ,_.... Inflow Area=21 ,638 sf
1 .
u
H
V
3
0
LL
LJ
Li f
r� 0
5 6 7 8 9 10 11 12 13 U 15 16 17 18 19 20
Time (hours)
u
u
'-1
u
L-3
n
U
r-1
u
:-1
u
�-' EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 C 2010 HydroCAD Software Solutions LLC
u
Summary for Pond 21: CB 53
n
Inflow Area= 16,509 sf, 14.93%Impervious, Inflow Depth> 2.10" for 10 Year Storm event
Inflow = 0.6 cfs @ 12.12 hrs, Volume= 2,894 cf
Outflow = 0.6 cfs @ 12.12 hrs, Volume= 2,894 cf, Atten=0%, Lag=0.0 min
Primary = 0.6 cfs @ 12.12 hrs, Volume= 2,894 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 129.82'@ 12.12 hrs
u Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
n
Inlet/Outlet Invert= 129.40'/ 128.11' S=0.0107'/' Cc=0.900 n=0.013
U
Primary OutFlow Max=0.6 cfs @ 12.12 hrs HW=129.82' (Free Discharge)
.r7 L1=Culvert (Inlet Controls 0.6 cfs @ 1.73 fps)
Li Pond 21: CB 53
Hydrograph
U ❑Inflow
O.T.. ---- ❑Primary
0.6 cfs
0.65 Inflow Area=16,509 sf
0.6 Peak Elev=129.82'
0.55,
n 0.5 15.0"
0.45- Round Culvert
0 0.4
n=0.013
3 0.35
LL 0.3-. L=121.0'
0.25 S=0.0107 T
0.2
U
0.15-
0.1
n 0.05 ,� ;•,
U 0.:
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
n
n
r-7
u
n
u
M
u
'-' EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
LJ
Summary for Pond 22: Detention Area
Inflow Area= 11,914 sf, 0.00%Impervious, Inflow Depth> 2.02" for 10 Year Storm event
`-' Inflow = 0.7 cfs @ 12.09 hrs, Volume= 2,001 cf
Outflow = 0.4 cfs @ 12.25 hrs, Volume= 1,790 cf, Atten=47%, Lag=9.4 min
Primary = 0.4 cfs @ 12.25 hrs, Volume= 1,790 cf
LJ
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
-� Peak Elev= 129.77'@ 12.25 hrs Sur£Area= 1,911 sf Storage=589 cf
Li Plug-Flow detention time=67.4 min calculated for 1,790 cf(89%of inflow)
Center-of-Mass det.time=33.8 min( 828.9-795.1 )
rl
Li Volume Invert Avail.Storage Storage Description
#1 129.00' 10,090 cf Custom Stage Data(Irregular)Listed below(Recalc)
Elevation Sur£Area Perim. Inc.Store Cum.Store Wet.Area
Li (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
129.00 55 39.0 0 0 55
130.00 2,963 219.0 1,141 1,141 3,753
L.J 131.00 4,295 254.0 3,608 4,749 5,091
132.00 6,461 303.0 5,341 10,090 7,281
r
Device Routing Invert Outlet Devices
Li #1 Primary 129.43' 24.0" Round Culvert L=22.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.431/ 129.40' S=0.0014'/' Cc=0.900 n=0.013
uPrimary OutFlow Max=0.4 cfs @ 12.25 hrs HW=129.77' (Free Discharge)
Ll=Culvert (Barrel Controls 0.4 cfs @ 1.54 fps)
_1
Li
n
u
Li
'-7
LJ
n
U
'_!
r-1
u
n
u
Li EXISTING Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
ri HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u Pond 22: Detention Area
l Hydrograph
1J _
El Inflow
0.75: 0.7 C ❑Primary
0.7 Inflow Area=11 ,914 sf
0.65: Peak Elev=129.77'
0.6
n 0.55 Storage=589 cf
24.011
0.45
n S 0.4 0.4 ifs - Round Culvert
Li LL 0.35 - n=0.013
0.3 L=22.0'
0.25=:
0.2
: : S=0:0014 '/'
0.15'
- 0.1
0.05;
v
0-
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
n
Li
n
u
n
u
n
u
n
u
n
u
n
U
n
U
r1
U
EXISTING Butcher Boy Type 11124-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
`J Summary for Pond 39P: CB
n
Inflow Area= 5,129 sf, 59.95%Impervious, Inflow Depth> 2.98" for 10 Year Storm event
U Inflow = 0.4 cfs @ 12.09 hrs, Volume= 1,273 cf
Outflow = 0.4 cfs @ 12.09 hrs, Volume= 1,273 cf, Atten=0%, Lag=0.0 min
7 Primary = 0.4 cfs @ 12.09 hrs, Volume= 1,273 cf
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 129.98'@ 12.09 hrs
u Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
n Inlet/Outlet Invert=129.60'/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
Li Primary Outflow Max=0.4 cfs @ 12.09 hrs HW=129.98' (Free Discharge)
,, L1=Culvert (Barrel Controls 0.4 cfs @ 2.23 fps)
iJ Pond 39P: CB
Hydrograph
'-i
- Ci Inflow
1__i 0.46: 1[1 Primary
0.44 0.4 cfs I r-1 o.az Inflow Area=5,129 sf
0.4:
LJ 0.36 Peak Elev=129.98'
0.36-.
0.34 12.0"
7 0.32.:
; 0.3
0.26
L Round Culvert
42 0.26
0.24 n=0.013
c 0.22:
li 0.2 } .. .
0.18.,:
L=85.0'.
�
0.14
S=0.0049 T
0.12'
u 0.,
0.0v
0.06
n 0.04-
0.02
o , .. _ . . , . .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
M
u
n
u
M
LJ
n
u
M
Li EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
r1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 30: Flow to CB 53
M
Runoff = 0.6 cfs @ 12.09 hrs, Volume= 1,890 cf, Depth> 4.93"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
Area(so CN Description
-� 2,465 98 Paved parking,HSG C
2,130 79 50-75%Grass cover,Fair,HSG C
4,595 89 Weighted Average
2,130 46.35%Pervious Area
n 2,465 53.65%Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
n
Subcatchment 30: Flow to CB 53
Hydrograph
0.65
0.6 cfs ❑Runoff
�1
0.6-, Type III 24-hr 100 Year Storm
0.55 Rainfall=6.50"
0.5 Runoff Area=4,595 sf
0.45; Runoff Volume=1,890 cf
_ 0.4 Runoff Depth>4.93"
N
0.35 Tc=6.0 min
0 0.3 CN=89
0.25
0.2
u
0.15-
r7 0.1
+J 0.05-
0--
n 5 6 7 8 9 10 11 12 1t3 14 15 16 17 18 19 20
Time (hours)
U
'-T
U
n
M
U
M
U
+, EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCADR 9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li Summary for Subcatchment 35: Flow to Detention Basin
1-1
Runoff = 1.3 cfs @ 12.09 hrs, Volume= 3,844 cf, Depth> 3.87"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
is
Area(so CN Description
n 11,914 79 50-75%Grass cover,Fair,HSG C
11,914 100.00%Pervious Area
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
u 6.0 Direct Entry,Overland Flow
rl Subcatchment 35: Flow to Detention Basin
U Hydrograph
�� ❑Runoff
1.3 cfs
Type III 24-hr 100 Year Storm
Rainfall=6.50"
Runoff Area=11,914 sf
�► 1 Runoff Volume=3,844 cf
riRunoff Depth>3.87"
N
Tc=6.0 min
`J g CN=79
LL
LJI
n
rJ
t 0 , . .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Ll
n
ri
r*
�s
n
Lj
r)
EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
�1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 36: Flow to DP #2
`7
Runoff = 0.1 cfs @ 12.09 hrs, Volume= 321 cf, Depth> 5.54"
lU
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
`y? Type III 24-hr 100 Year Storm Rainfall=6.50"
Li
Area(so CN Description
n 617 98 Paved parking,HSG C
78 74 >75%Grass cover,Good,HSG C
695 95 Weighted Average
78 11.22%Pervious Area
M 617 88.78%Impervious Area
LS
Tc Length Slope Velocity Capacity Description
r.1 (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Li
n
Subcatchment 36: Flow to DP#2
Hydrograph
Ls
0.105; _ ❑Runoff
a.1
0.1 cfs
0.095: Type.11l 24-hr 100 Year Storm
0.09 Rainfall=6.50"
0.085
f7 0.08 Runoff Area=695 sf
0.075'',
u Runoff Volume=321 cf
0 ose`Runoff Depth>5.54"
�- 4 0.06 Tc=6.0 min
3 0.055
Lj 0 0.05- CN=95
LL
0.045.;
r 0.04-1
0.035..
U 0.03=:
0.025
0.02
n 0.015.'
u 0.01
0.005
(, 0 6 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
u
n
r�
u
r—i
u
M
cj
n
t EXISTING Butcher Boy Type HI 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
'1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U
Summary for Subcatchment 37: Flow to DP #3
Runoff = 4.9 cfs @ 12.09 hrs, Volume= 14,582 cf, Depth> 3.57"
v.
Runoff by SCS TR-20 method,UH=SCS, Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
u
Area(sf) CN Description
n 26,850 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
u 49,069 76 Weighted Average
49,069 100.00%Pervious Area
L, Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Subcatchment 37: Flow to DP #3
Hydrograph
u ❑Runoff
4.9 cfs
n 5 Type III 24-hr 100 Year Storm
Li Rainfall=6.50"
4 Runoff Area=49,069 sf
Runoff Volume=14,582 cf
Runoff Depth>3.57"
w 3.
Tc=6.0 min
n o CN=76
LL
U
2
n
U
1
n
I
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
ej
v
n
Li
u
n
u
s EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Lj Summary for Subcatchment 38: Flow to CB
Runoff = 0.7 cfs @ 12.09 hrs, Volume= 2,154 cf, Depth> 5.04"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
r? Type III 24-hr 100 Year Storm Rainfall=6.50"
U
Area(so CN Description
3,075 98 Paved parking,HSG C
2,054 79 50-75%Grass cover,Fair,HSG C
U 5,129 90 Weighted Average
2,054 40.05%Pervious Area
n 3,075 59.95%Impervious Area
Ls
Tc Length Slope Velocity Capacity Description
_(min) (feet) (ft/ft) (ft/sec) (cfs)
6,0 Direct Entry,Overland Flow
U
n
Subcatchment 38: Flow to CB
Hydrograph
u
0.75 ❑Runoff
0.7=
0.7 cfs
Type III 24-hr 100 Year Storm
`� 0.65 Rainfall=6.50"
0.6=.
-, 0.55 Runoff Area=5,129 sf
0.5 Runoff Volume=2,154 cf
0.45 Runoff Depth>5.04"
0.4 Tc=6.0 min
U c 0.35-x:
CN=90
LL .. .. ... .. _.... _
0.3
--)
0.25=
L..1 0.2
0.15,
0.1=
s--i 0.05
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
L-1
r'1
U
n
M
u
u
n
u
-.1
k--1 EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
`j Summary for Reach 41R: Flow to DP #1
n
Inflow Area= 21,638 sf, 25.60%Impervious, Inflow Depth> 4.25" for 100 Year Storm event
Lj Inflow = 1.9 cfs @ 12.10 hrs, Volume= 7,658 cf
Outflow = 1.9 cfs @ 12.10 hrs, Volume= 7,658 cf, Atten=0%, Lag=0.0 min
r-1
Lj Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Reach 41R: Flow to DP #1
U Hydrograph
___- _-_---------- n Inflow
n ❑Outflow
2- 1 1.9 cfs ........ Inflow Area=21,638 Sf
Li
rl
Li
LL
f
o < _
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
rl
n
LJ
U
n
t�--t
u
M
n
I EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Pond 21: CB 53
n
Inflow Area= 16,509 sf, 14.93%Impervious, Inflow Depth> 4.00" for 100 Year Storm event
Inflow = 1.2 cfs @ 12.12 hrs, Volume= 5,504 cf
Outflow = 1.2 cfs @ 12.12 hrs, Volume= 5,504 cf, Atten=0%, Lag=0.0 min
Primary = 1.2 cfs @ 12.12 hrs, Volume= 5,504 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 130.01'@ 12.12 hrs
u Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
M Inlet/Outlet Invert= 129.40'/ 128.11' S=0.0107'/' Cc=0.900 n=0.013
LJ
Primary OutFlow Max=1.2 cfs @ 12.12 hrs HW=130.00' (Free Discharge)
t-1=Culvert (Inlet Controls 1.2 cfs @ 2.08 fps)
Pond 21: CB 53
Hydrograph
r7
_......._................. Ci Inflow
❑Primary
'.2 cfs Inflow Area=16,509 sf
Li Peak Elev=130.01'
15.0"
Round Culvert
n=0.013
n 3
U, U. L=121.0'
n
S=0.0107 T
Li
n
011
6 7 8 9, 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
eu
h
Li
n
Li
n
n
U
n
u
n
LJ EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
'1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Pond 22: Detention Area
n
Inflow Area= 11,914 sf, 0.00%Impervious, Inflow Depth> 3.87" for 100 Year Storm event
r-` Inflow = 1.3 cfs @ 12.09 hrs, Volume= 3,844 cf
Outflow = 0.8 cfs @ 12.21 hrs, Volume= 3,615 cf, Atten=41%, Lag=7.3 min
n Primary = 0.8 cfs @ 12.21 hrs, Volume= 3,615 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
.- Peak Elev= 129.92'@ 12.21 hrs Surf.Area=2,579 sf Storage=926 cf
Li Plug-Flow detention time=49.5 min calculated for 3,615 cf(94%of inflow)
Center-of-Mass det.time=28.3 min( 808.3 -780.0)
�f
u
Volume Invert Avail.Storage Storage Description
#1 129.00' 10,090 cf Custom Stage Data(Irregular)Listed below(Recalc)
n
Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area
LJ (feet) (sq-ft) (feet) (cubic-feet) (cubic-feet) (sq-ft)
129.00 55 39.0 0 0 55
n 130.00 2,963 219.0 1,141 1,141 3,753
131.00 4,295 254.0 3,608 4,749 5,091
`J 132.00 6,461 303.0 5,341 10,090 7,281
ri
Device Routing Invert Outlet Devices
U #1 Primary 129.43' 24.0" Round Culvert L=22.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.43'/ 129.40' S=0.0014'/' Cc=0.900 n=0.013
n
Primary OutFlow Max=0.8 cfs @ 12.21 hrs HW=129.92' (Free Discharge)
L1=Culvert (Barrel Controls 0.8 cfs @ 1.91 fps)
1
LJ
t�
n
Li
c--i
LJ
n
u
rt
u
u
n
rj
1
Li EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
—) HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li Pond 22: Detention Area
Hydrograph
u
....._........._.............._.._.. ❑Inflow
1.3 cfs ❑Primary
Inflow Area=11,914 sf
Peak Elev=129.92'
1 ` Storage=926 cf
24.0..
N o.-8c—fs IRound Culvert
n
LL n=0.013
n
L=22.0'
S=0.0014 '/'
Li0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
U
n
n
u
r--t
n
LJ
n
u
'-7
U
M
u
1
u
U
n
u
r-i
L--i EXISTING Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Pond 39P: CB
n
Inflow Area= 5,129 sf, 59.95%Impervious, Inflow Depth> 5.04" for 100 Year Storm event
u Inflow = 0.7 cfs @ 12.09 hrs, Volume= 2,154 cf
Outflow = 0.7 cfs @ 12.09 hrs, Volume= 2,154 cf, Atten=0%, Lag=0.0 min
n Primary = 0.7 cfs @ 12.09 hrs, Volume= 2,154 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
r-1 Peak Elev= 130.10'@ 12.09 hrs
U Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
ri Inlet/Outlet Invert- 129.60'/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
LJ
Primary OutFlow Max=0.7 cfs @ 12.09 hrs HW=130.09' (Free Discharge)
-1 t-1=Culvert (Barrel Controls 0.7 cfs @ 2.53 fps)
Li Pond 39P: CB
n Hydrograph
- Inflow
Li 0.75: ❑Primary
n 0.7 07 ifs Inflow Area=5,129 sf
0 .6-
0.6-
Peak-Elev=130.10'
0.6-
n
r , 0.55 12.0
0.5
_ Round Culvert
0.45-
N
0.4= n=0.013
0 0.35-- 1
LL f
LJ 0.3 L=85.0'
0.25
S=0.0049 T
0.2
V 0.15
0.1
n
Li o
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
r1
u
n
n
u
u
u
ri
U
Lj
.-1
U
n
U
n
U
M Attachment A.2
U
-? Proposed Conditions Analysis
U
n
Ls
n
U
n
U
r�
U
�1
u
n
u
ri
Lj
r-?
Li
n
Li
n
Li
Stormwater Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
Ls
u
.l
u
Li
u
v
n
u
n
u
038P
u Flow to CB L 5B-P�
\................1
Ce Flow to Detention Basin
39 P POND-B B
41R
CB Detention Area
Flow to DP#1
35A P)
CB
A21
Flow to Detention Basin
Li CB 53 Detention Area
...........
n
�30P
Flow to CB 5336P 37P
.—t
`–� Flow to DP#2 Flow to DP#3
U
17
U
U
�1
vDrainage Diagram for PROPOSED Butcher Boy
Subcatl !Reach on lLink
�^J Prepared by Eaglebrook Engineering&Survey, Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
v
u
u
Li PROPOSED Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Summary for Subcatchment 3OP: Flow to CB 53
n
Runoff = 0.2 cfs @ 12.09 hrs, Volume= 638 cf, Depth> 1.76"
u
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
U
Area(so CN Description
n 3,675 98 Paved parking, HSG C
662 74 >75%Grass cover,Good,HSG C
U 4,337 94 Weighted Average
662 15.26%Pervious Area
n 3,675 84.74%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
U
n Subcatchment 3OP: Flow to CB 53
Hydrograph
v
0.23 ❑Runoff
0.22-; 0.2 cfs
0.21
0.2 Type III 24-hr 1 Year Storm
0.19
0.18. Rainfall=2.50"
n 017..
0.16Runoff Area=4,337 sf_
-
u 0.15 Runoff Volume=638 cf
0.14;
w
0.13" Runoff Depth>1.76"
0.12
L-ja 0.11 Tc=6.0 min
LL
0.09- CN=94.
0.06
0.07
0.06
0.05
n 0.04-
0.03
U 0.02
0.01'
0.
n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
^i
u
r-1
u
n
u
r�
u
7
J
PROPOSED Butcher Boy Type X 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
`1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
J Summary for Subcatchment 35A-P: Flow to Detention Basin A
Runoff = 0.6 cfs @ 12.09 hrs, Volume= 1,835 cf, Depth> 2.04"
Runoff by SCS TR-20 method,UH=SCS, Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
J
Area(so CN Description
1 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
J 10,791 97 Weighted Average
575 5.33%Pervious Area
10,216 94.67%Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
J
Subcatchment 35A-P: Flow to Detention Basin A
Hydrograph
❑Runoff
1 0.6 0.6 cfs
0.55 Type III 24-hr 1 Year Storm
0.5 Rainfall=2.50"
0.45. Runoff Area=10,791 sf
J 0.4 Runoff Volume=1,835 cf
0.35-' Runoff Depth>2.04"
0 03- Tc=6.0 min
LL
0.25
CN=97
0.2
0.15
0.1-
J 0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
J
-I
J
_0
J
r'1
u
,-1
u PROPOSED Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
^l HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Subcatchment 35B-P: Flow to Detention Basin B
n
Runoff = 0.6 cfs @ 12.09 hrs, Volume= 1,835 cf, Depth> 2.04"
L-1
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Type III 24-hr 1 Year Storm Rainfall=2.50"
Lj
Area(so CN Description
n 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
Li 10,791 97 Weighted Average
575 5.33%Pervious Area
10,216 94.67%Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
Subcatchment 35B-P: Flow to Detention Basin B
Hydrograph
Li
❑Runoff
0.6 0.6 cfs
0.55 Type III 24-hr 1 Year Storm
U
0.5- Rainfall=2.50"
0.45 Runoff Area=10,791 sf
0.4
Runoff Volume=1,835 Cf
-, 0.35 Runoff Depth>2.04"
0.3 Tc=6.0 min
LL 0.25= CN=97
0.2
U
0.15-
n 0.1..:
U 0.05,
0
5 6 7 8 9 10 1,1 12 13 14 15 16 17 18 19 20
Time (hours)
U
U
r7
U
U
U
-y
u
'-1
PROPOSED Butcher Boy Type X 24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Lj Summary for Subcatchment 36P: Flow to DP #2
Runoff = 0.0 cfs @ 12.09 hrs, Volume= 145 cf, Depth> 2.13"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
r� Type III 24-hr 1 Year Storm Rainfall=2.50"
Li
Area(so CN Description
—1 817 98 Paved parking,HSG C
817 100.00%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Subcatchment 36P: Flow to DP #2
Hydrograph
0.048'. ❑Runoff
0.046: 0.0 CfS
0.044; Type III 24-hr 1 Year Storm
0.042'1
0.04= Rainfall=2.50"
0:0 6- Runoff Area=817 sf
0.032 Runoff Volume=145 cf
0.03
H 0028 Runoff Depth>2.13"
16 0.026
3 0.024 Tc=6.0 m i n
,° 0.022' - CN=98
r� 0.02.:
0.018.
M1s
U 0.014.::
0.012;
^—� 0.01
0.008.:
U 0.006
0.004
0.002
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
U Time (hours)
M
u
�1
U
71
U
U
r'i
u
-1
v
u PROPOSED Butcher Boy Type III 24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Summary for Subcatchment 37P: Flow to DP #3
Runoff = 0.8 cfs @ 12.10 hrs, Volume= 2,321 cf, Depth> 0.67"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
Li
Area(so CN Description
1 19,200 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
`J 41,419 77 Weighted Average
41,419 100.00%Pervious Area
M
,J Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
• ti 6.0 Direct Entry,Overland Flow
`-' Subcatchment 37P: Flow to DP #3
Hydrograph
v ❑Runoff
0.8 0.8 cfs
—, 0.75 _ Type III 24-hr 1 Year Storm
0.7. Rainfall=2.50"
0.65-
0.6 Runoff Area=41,419 sf
0.55 - Runoff Volume=2,321 cf
Li H 0'5 Runoff Depth>0.67"
w
0.45
^� g 0.4 Tc=6.0 min
LL 0.35 CN=77
0.3
�1 0.25
0.2
0.15
,--�
0.1-
0.05
.1'0.05`
U 0 . .
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
r-1 Time (hours)
U
V
ri
U
U
r1
U
u
'-1
`—' PROPOSED Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 38P: Flow to CB
n
u
Runoff = 0.2 cfs @ 12.09 hrs, Volume= 661 cf, Depth> 1.95"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 1 Year Storm Rainfall=2.50"
u
Area(so CN Description
M 3,758 98 Paved parking,HSG C
315 74 >75%Grass cover,Good,HSG C
Li
4,073 96 Weighted Average
315 7.73%Pervious Area
n, 3,758 92.27%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
M (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
n Subcatchment 38P: Flow to CB
Hydrograph
u
0.23: ❑Runoff
n 0.22: 0.2 cfs
0.21 Type_III 24-hr_1 Year Storm
LJ 0.2
0.19 Rainfall=2.50"
r, 0.18
0.17: Runoff Area=4,073 sf
Li 01s
015 Runoff Volume=661 cf
42 0.13 Runoff Depth>1.95"
L-j0 0.11 Tc=6.0 min
LL o., CN=96
0.09..:
0.08
0.07-.
L-1
0.06
0.05.;1
71 0.04 1
0.03
U 0.02
0.01 w
r-1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
u
Li
�l
u
u
r7
u
'1
u
`i PROPOSED Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Reach 41R: Flow to DP #1
17
'v Inflow Area= 29,992 sf, 92.91%Impervious, Inflow Depth> 0.52" for 1 Year Storm event
Inflow = 0.4 cfs @ 12.09 hrs, Volume= 1,299 cf
n Outflow = 0.4 cfs @ 12.09 hrs, Volume= 1,299 cf, Atten=0%, Lag=0.0 min
U Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
M Reach 41R: Flow to DP #1
U Hydrograph
n fe ❑InFlow
0 46-. ❑OutFlow
Lj 044 0.4 ifs 0.42 Inflow Area=29,99.2 sf
E
0.4
'- 0.38-
0.36'
l__! 0.34:
0.32
0.3.
M 0.28
w 0.26
v
U 0.24
3
0.22,
0
LL 0.2.::
n 0.18
0.16'
Lj 0.14
0.12
r-.1 0.1:I
0.08
l i 0.06
0.04
0.02;
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
r-1
n
u
n
Li
Li
Li
'1
u
n
Ls
.-1
Li
7
`-' PROPOSED Butcher Boy Type III 24-hr I Year Storni Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Pond 21: CB 53
n
Li Inflow Area= 15,128 sf, 91.82%Impervious, Inflow Depth> 0.51" for 1 Year Storm event
Inflow = 0.2 cfs @ 12.09 hrs, Volume= 638 cf
M Outflow = 0.2 cfs @ 12.09 hrs, Volume= 638 cf, Atten=0%, Lag=0.0 min
Primary = 0.2 cfs @ 12.09 hrs, Volume= 638 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
r-� Peak Elev= 129.63'@ 12.09 hrs
`-' Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.40'/ 128.11' S=0.0107'/' Cc=0.900 n=0.013
Li
Primary OutFlow Max=0.2 cfs @ 12.09 hrs HW=129.63' (Free Discharge)
n L1=Culvert (Inlet Controls 0.2 cfs @ 1.29 fps)
`J Pond 21: CB 53
17 Hydrograph
t ► _.._.._..._..._. Inflow
0.23 D Primary
0.22 oz ifs
n 0z1 Inflow Area=15,128 sf
0 0.191. Peak Elev=129.63'
0.18-
7-1 15.0"
0.16;
0.15, Round Culvert.
_ 0.14.
42 0.13
0.12 n=0.013
3 011.
:
L=121...0
0.09: _
0.08. S=0.01 07 T
rl 0.07
0.06
U 0.05
0.04
0.03=
n
0.02-
0.0111"02 0.01W
U 0-
5 6 7 8< 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
rl
Ll
L-;
r1
LJ
M
,LJ
r-1
L-,
M
u
'-1
`-' PROPOSED Butcher Boy Type III24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
rt HydroCAD®9.10 s/n 06609 C 2010 HydroCAD Software Solutions LLC
U
Summary for Pond 39P: CB
Li Inflow Area= 14,864 sf, 94.01%Impervious, Inflow Depth> 0.53" for 1 Year Storm event
Inflow = 0.2 cfs @ 12.09 hrs, Volume= 661 cf
Outflow = 0.2 cfs @ 12.09 hrs, Volume= 661 cf, Atten=0%, Lag=0.0 min
Primary = 0.2 cfs @ 12.09 hrs, Volume= 661 cf
L!
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 129.87'@ 12.09 hrs
u Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 129.60'/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
Primary OutFlow Max=0.2 cfs @ 12.09 hrs HW=129.86' (Free Discharge)
t-t L1=Culvert (Barrel Controls 0.2 cfs @ 1.86 fps)
LJ Pond 39P: CB
n Hydrograph
m.� 0 Inflow
0.23 ❑Primary
0.22 0.2 ifs Inflow Area=.14,864 sf
0.21.
019 Peak Elev=129.87'
018;
017 12.-0..
0.16
0.15 Round Culvert
u 0.14 --
0 0.13
- 0.12 n=0.013
3 0 11
0.11
_ L=85.0'
0.09
0.08 1 x. S=0.0049 T
0.07
0.06
L! 0.05: '
0.04
0.03-
0.02.
.03 0.02
0.01
Li 0-'
..
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
Ll
Li
n
r,
Li
r1
u
'-1
`-1 PROPOSED Butcher Boy Type III 24-hr I Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Pond POND A: Detention Area
M
�t Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 2.04" for 1 Year Storm event
Inflow = 0.6 cfs @ 12.09 hrs, Volume= 1,835 cf
M Outflow = 0.0 cfs @ 5.00 hrs, Volume= 0 cf, Atten= 100%, Lag=0.0 min
Primary = 0.0 cfs @ 5.00 hrs, Volume= 0 cf
LJ
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 129.99'@ 20.00 hrs Surf.Area= 1,471 sf Storage= 1,834 cf
LJ Plug-Flow detention time=(not calculated: initial storage excedes outflow)
Center-of-Mass det.time=(not calculated: no outflow)
M
LJ Volume Invert Avail.Storage Storage Description
91 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage x 10
M
Device Routing Invert Outlet Devices
#1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 130.00'/ 129.40' S=0.0120'/' Cc=0.900 n=0.013
n
LJ Primary OutFlow Max=0.0 cfs @ 5.00 hrs HW=128.50' (Free Discharge)
L1=Culvert (Controls 0.0 cfs)
n
Pond POND A: Detention Area
Hydrograph
'-T
❑Inflow
v 0.6 cfS ❑Primary
os
Inflow Area=10,791 sf
0.55 Peak Elev=129.99'
L1 0.5
0.45 ..Storage=1,834 cf
0.4= 6.011
LJ 0.35 Round Culvert
LL 0.3 n=0.013
0.25 L=50.0'
0.2
0.15 S=0.0120 '1'
n 0.0 cfS
°_
l 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
n
u
n
u
Ls
U PROPOSED Butcher Boy Type III24-hr 1 Year Storm Rainfall=2.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
LJ
Summary for Pond POND-B: Detention Area
M
Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 2.04" for 1 Year Storm event
LJ Inflow = 0.6 cfs @ 12.09 hrs, Volume= 1,835 cf
Outflow = 0.0 cfs @ 5.00 hrs, Volume= 0 cf, Atten= 100%, Lag=0.0 min
n Primary = 0.0 cfs @ 5.00 hrs, Volume= 0 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 129.99'@ 20.00 hrs Surf.Area= 1,471 sf Storage= 1,834 cf
y Plug-Flow detention time=(not calculated: initial storage excedes outflow)
Center-of-Mass det.time=(not calculated: no outflow)
LJ Volume Invert Avail.Storage Storage Description
#1 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage x 10
n
Device Routing Invert Outlet Devices
`i #1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 130.00'/ 129.50' S=0.0100'/' Cc=0.900 n=0.013
LJ Primary OutFlow Max=0.0 cfs @ 5.00 hrs HW=128.50' (Free Discharge)
t-1=Culvert (Controls 0.0 cfs)
Pond POND-B: Detention Area
L
Hydrograph
11 Inflow
u0.6 s cf ❑Primary
0.6- Inflow Area=10,791 sf
0.55:,r
Peak Elev=129.99'
0.5
Storage=1,834 cf
0.45: i
0.4 6.011
U
0.35,: Round Culvert
LL 0.3
n=0.013
0.25 L=50.0'
0.2
0.15 S=0.0100 T
Lf 0.1
-� 0.0 cfs
J 5 6 7 8 9 10 11 1'2 13 14 15 16 17 18 19 20
Time (hours)
u
Ls
u
n
u
f`1
PROPOSED Butcher Boy Type X 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 30P: Flow to CB 53
n
u
Runoff = 0.4 cfs @ 12.09 hrs, Volume= 1,218 cf, Depth> 3.37"
M Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(sf) CN Description
n 3,675 98 Paved parking,HSG C
1rs
662 74 >75%Grass cover,Good,HSG C
4,337 94 Weighted Average
n 662 15.26%Pervious Area
3,675 84.74%Impervious Area
1...i
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
Li
6.0 Direct Entry,Overland Flow
M Subcatchment 30P: Flow to CB 53
U Hydrograph
0.42-
0.41
.42 0.a 0.4 cfs
0.38 Type III 24-hr 10 Year Storm
0.36
0.34 Rainfall=4.25"
°.32
0.3 Runoff Area=4�337 sf
:
Li 0.28, Runoff Volume=1,218 cf
0.26
-, 0.24 Runoff Depth>3.37"
0.22 Tc=6.0 m i n
0 0.2
LL 0.18; CN=94
�--� 0.16
0.14
u 0.12
0.1
n 0.08
0.06
Li 0.04
0.02-
r-1 05. . 6 7 8 .9. .: . . . , , ,. . . . . . . , . . . . . . . ,
10 1r1 12 13 14 15 16 17 18 19 20
Time (hours)
L-3
M
r-7
n
i..s
n
u
n
u
M
t' PROPOSED Butcher Boy Type X 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
r✓►
Summary for Subcatchment 35A-P: Flow to Detention Basin A
n
U Runoff = 1.0 cfs @ 12.09 hrs, Volume= 3,285 cf, Depth> 3.65"
ri Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(so CN Description
m 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
u
10,791 97 Weighted Average
,.� 575 5.33%Pervious Area
10,216 94.67%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
U
6.0 Direct Entry,Overland Flow
Subcatchment 35A-P: Flow to Detention Basin A
u
Hydrograph
❑Runoff
1.0 cfs
1 Type III 24-hr 10 Year Storm
Rainfall=4.25"
' Runoff Area=10,791 sf
Runoff Volume=3,285 cf
,-� H Runoff Depth>3.65"
L ; Tc=6.0 min
LL CN--';97
U
iJ
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
e_I
n
Li
h
U
M
u
u PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAM 9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 35B-P: Flow to Detention Basin B
n
Runoff = 1.0 cfs @ 12.09 hrs, Volume= 3,285 cf, Depth> 3.65"
U
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
Li
Area(so CN Description
r l 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
Li 10,791 97 Weighted Average
575 5.33%Pervious Area
10,216 94.67% Impervious Area
Li
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
Li
r, Subcatchment 35B-P: Flow to Detention Basin B
Hydrograph
u
❑Runoff
n 1.0 cfs
1, Type III 24-hr 10 Year Storm
Rainfall=4.25"
Runoff Area=10,791 sf
+� Runoff Volume=3,285 cf
Runoff Depth>3.65"
Li o Tc=6.0 min
LL CN=97
n
U
n
o.
n 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
U
rl
U
M
n
u
PROPOSED Butcher Boy Type HI 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Subcatchment 36P: Flow to DP 42
n
Li Runoff = 0.1 cfs @ 12.09 hrs, Volume= 254 cf, Depth> 3.73"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Type III 24-hr 10 Year Storm Rainfall=4.25"
Area(so CN Description
n 817 98 Paved parking,HSG C
u 817 100.00%Impervious Area
n Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
L-i 6.0 Direct Entry,Overland Flow
Subcatchment 36P: Flow to DP #2
u Hydrograph
0.085- ❑Runoff
0.08 0.1 cfs
0.075 Type III 24-hr 10 Year Storm
0.07 Rainfall-=4.25"
r'! 0.065' Runoff Area=817 sf
0.06- Runoff Volume=254 cf
0.055
n _ 0.05 Runoff Depth>3.73"
0.045 Tc=6.0 min
LiCN=98
0 0.04
LL
n 0.035:
0.03-
0.025
0.02
0.015-
0.01
.015-0.01 .
0.005
0.:
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
U Time (hours)
n
n
a.�
n
r�
u
n
u
u
'-1
Li PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 37P: Flow to DP #3
n
U Runoff = 2.2 cfs @ 12.09 hrs, Volume= 6,426 cf, Depth> 1.86"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
��, Type III 24-hr 10 Year Storm Rainfall=4.25"
U
Area(sf) CN Description
n 19,200 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
u 41,419 77 Weighted Average
n 41,419 100.00%Pervious Area
U Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
n 6.0 Direct Entry,Overland Flow
`-' Subcatchment 37P: Flow to DP #3
Hydrograph
U ❑Runoff
2.2 cfs
r Type III 24-hr 10 Year Storm
Li 2 Rainfall=4.25"
n
Runoff Area=41,419 sf
Runoff Volume=6,426 cf
`j Runoff Depth>1.86"
Tc=6.0 min
u U. 1_
CN=77
v
n
Li
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
r1 Time (hours)
U
n
U
n
U
n
Lj
n
u
u
`—' PROPOSED Butcher Boy Type X 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
rl HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Subcatchment 38P: Flow to CB
Li
Runoff = 0.4 cfs @ 12.09 hrs, Volume= 1,209 cf, Depth> 3.56"
rn Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 10 Year Storm Rainfall=4.25"
u
Area(so CN Description
n 3,758 98 Paved parking,HSG C
Li
315 74 >75%Grass cover,Good,HSG C
4,073 96 Weighted Average
r..) 315 7.73%Pervious Area
3,758 92.27%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
r) (min) (feet) (ft/ft) (ft/sec) (cfs)
u
6.0 Direct Entry,Overland Flow
Subcatchment 38P: Flow to CB
Hydrograph
❑Runoff
n 0.4. 0.4 cfs
0.38
0.36; Type III 24-hr 10 Year Storm
0.34 Ra i nfa l l=4.25"
0.32.
0.3 Runoff Area=4,073 sf
L, 0.28" Runoff Volume=1,209 cf
0.2s
0.24 Runoff Depth>3.56"
L; 0 0.2! Tc=6.0 min
LL 0.16 CN=96
0.16.
0.14-
0.12:
.14 0.12 S
0.1 _
0.08
0.06.'
u 0.041,
0.02
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
t_
M
u
n
L-1
n
--1
u
`-' PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u
Summary for Reach 41R: Flow to DP #1
n
Inflow Area= 29,992 sf, 92.91%Impervious, Inflow Depth> 2.03" for 10 Year Storm event
Li Inflow = 0.8 cfs @ 12.09 hrs, Volume= 5,072 cf
r-i Outflow = 0.8 cfs @ 12.09 hrs, Volume= 5,072 cf, Atten=0%, Lag=0.0 min
Li Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
M Reach 41R: Flow to DP #1
,J Hydrograph
€-Inflow
n Outflow
06 o.s If, w Ar =2 992 sf
075. Inflow ea 9,
0.7-
n
0.65
U 0.6,
0.55
'-i 0.5=
0.45-
0 0.4-
U. 0.35 r,
0.3
t J
0.25-
0.2.
0.15
Ll 0.1 . r
0.05
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
u Time (hours)
n
U
n
u
M
u
n
U
n
u
r--i
u
M
u
u
PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Pond 21: CB 53
n
Inflow Area= 15,128 sf, 91.82%Impervious, Inflow Depth> 2.02" for 10 Year Storm event
`i Inflow = 0.4 cfs @ 12.09 hrs, Volume= 2,541 cf
Outflow = 0.4 cfs @ 12.09 hrs, Volume= 2,541 cf, Atten=0%, Lag=0.0 min
r� Primary = 0.4 cfs @ 12.09 hrs, Volume= 2,541 cf
LJ
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 129.72'@ 12.09 hrs
Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
n
Inlet/Outlet Invert= 129.401/ 128.11' S=0.0107'/' Cc=0.900 n--0.013
Li
Primary OutFlow Max=0.4 cfs @ 12.09 hrs HW=129.72' (Free Discharge)
L1=Culvert (Inlet Controls 0.4 cfs @ 1.52 fps)
Pond 21: CB 53
Hydrograph
v FET nflow
0.42, r I❑Primary
0.4.: 0.4 cfs Inflow Area=15,128 sf
0.38
0.34 Peak Elev=129.72'
0.32: n
-�
0.3:
15.0
0.26:1 Round Culvert
Li 0.26- _ _
u 0.24
- 0.22-
n=.0.013
0.2 L=121 .0'
LJ LL016:
0.16
014 S=0.0107 T
0.12
0.1
V
0.08
0.06
' ] 0.04"
0.02
U 0.f, .
5 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
U
n
u
n
u
n
u
Li
rl
Li PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
1-7 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U
Summary for Pond 39P: CB
n
Inflow Area= 14,864 sf, 94.01%Impervious, Inflow Depth> 2.04" for 10 Year Storm event
Inflow = 0.4 cfs @ 12.09 hrs, Volume= 2,532 cf
Outflow = 0.4 cfs @ 12.09 hrs, Volume= 2,532 cf, Atten=0%, Lag=0.0 min
Primary = 0.4 cfs @ 12.09 hrs, Volume= 2,532 cf
U
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
M Peak Elev= 129.96'@ 12.09 hrs
LJ Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
n
Inlet/Outlet Invert= 129.601/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
U
Primary OutFlow Max=0.4 cfs @ 12.09 hrs HW=129.95' (Free Discharge)
Ll=Culvert (Barrel Controls 0.4 cfs @ 2.16 fps)
Pond 39P: CB
Hydrograph
u __-- ❑Inflow
0.4
❑Primary
-� 0.38 0.4 cfs Inflow Area=14,864 sf
0.36.
0.34-- Peak Elev=129.96'
0.32.
17 0.3- 12.0..
0.2&I`
0.26,; Round Culvert
w 0.24
0.22-: n=0.013
0.2
U LL 0.,8= L=85.0'
0.16.
0.14; P S=0.0049 T
._,
0.12
0.1-
0.08
0.06:
--� 0.04
0.02'
L.J p
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
'-1
u
"l
u
'-1
u
u
U
n
Li
n
PROPOSED Butcher Boy Type III 24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
s^i HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li
Summary for Pond POND A: Detention Area
M
Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 3.65" for 10 Year Storm event
`A Inflow = 1.0 cfs @ 12.09 hrs, Volume= 3,285 cf
Outflow = 0.1 cfs @ 12.62 hrs, Volume= 1,322 cf, Atten=87%, Lag=31.8 min
n Primary = 0.1 cfs @ 12.62 hrs, Volume= 1,322 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 130.25'@ 12.62 hrs Surf.Area= 1,374 sf Storage=2,205 cf
Li Plug-Flow detention time=259.2 min calculated for 1,322 cf(40%of inflow)
Center-of-Mass det.time=146.6 min(886.5 -740.0)
M
Volume Invert Avail.Storage Storage Description
U #1 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage x 10
n Device Routing Invert Outlet Devices
u #1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 130.00'/ 129.40' S=0.0120'/' Cc=0.900 n=0.013
n
LJ
Primary OutFlow Max=0.1 cfs @ 12.62 hrs HW=130.25' (Free Discharge)
L1=Culvert (Inlet Controls 0.1 cfs @ 1.35 fps)
n Pond POND A: Detention Area
Li
Hydrograph
M I7 Inflow
1.0 cfs ❑Primary
Li Inflow Area=10,791 Sf
Peak Elev=130.25'
LJ Storage=2,205 cf
n 6.0..
Li Round Culvert
0
U. n=0.013
L=50.0'
M S=0.0120 T
0.1 cfs
u 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
u
n
LJ
M
Li
n
eJ PROPOSED Butcher Boy Type III24-hr 10 Year Storm Rainfall=4.25"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
'-1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
LJ Summary for Pond POND-B: Detention Area
n
Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 3.65" for 10 Year Storm event
U Inflow = 1.0 cfs @ 12.09 hrs, Volume= 3,285 cf
Outflow = 0.1 cfs @ 12.62 hrs, Volume= 1,322 cf, Atten=87%, Lag=31.8 min
M Primary = 0.1 cfs @ 12.62 hrs, Volume= 1,322 cf
v
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Peak Elev= 130.25'@ 12.62 hrs Surf.Area= 1,374 sf Storage=2,205 cf
L� Plug-Flow detention time=259.2 min calculated for 1,322 cf(40%of inflow)
Center-of-Mass det.time=146.6 min(886.5 -740.0)
M
Volume Invert Avail.Storage Storage Description
#1 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage 10
M Device Routing Invert Outlet Devices
u #1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert=130.00'/ 129.50' S=0.0100'/' Cc=0.900 n=0.013
M
Primary OutFlow Max=0.1 cfs @ 12.62 hrs HW=130.25' (Free Discharge)
L1=Culvert (Inlet Controls 0.1 cfs @ 1.35 fps)
Pond POND-B: Detention Area
u Hydrograph
n ❑Inflow
1.0 CfS ❑Primary
Inflow Area=10,791 sf
Peak Elev=130.25'
Storage=2,205 cf
n 6.0"
Li Round Culvert
n0
U. n=0.013
,.. L=50.0'
M S=0.0100 '1'
0.1 cfs
-
n
1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
t__f
n
Li
^-1
U
rr
u
n
PROPOSED Butcher Boy Type 11124-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
``' Summary for Subcatchment 3OP: Flow to CB 53
n
Runoff = 0.6 cfs @ 12.09 hrs, Volume= 1,969 cf, Depth> 5.45"
Li
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
,j
Area(so CN Description
M 3,675 98 Paved parking,HSG C
662 74 >75%Grass cover,Good,HSG C
4,337 94 Weighted Average
662 15.26%Pervious Area
n 3,675 84.74%Impervious Area
Li
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
i--►
Subcatchment 30P: Flow to CB 53
n
Hydrograph
u
0.65 0.6 cfs ❑Runoff
0.6 Type III 24-hr 100 Year Storm
0.55 Rainfall=6.50"
r� 0.5 Runoff Area=4,337 sf
Li0.45 Runoff Volume=1,969 cf
0.4-. Runoff Depth>5.45"
0.35' Tc=6.0 min
L-1 a CN=94
LL 0.3..;
0.25
0.2
lJ
0.15-
n 0.1
0.05-
0-
5
.05-0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
U
n
U
n
u
17,
u
n
L-)
rt
u
n
u PROPOSED Butcher Boy Type X 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Li Summary for Subcatchment 35A-P: Flow to Detention Basin A
M
Runoff = 1.5 cfs @ 12.09 hrs, Volume= 5,138 cf, Depth> 5.71"
u
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
Area(so CN Description
n 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
i' 10,791 97 Weighted Average
575 5.33%Pervious Area
n 10,216 94.67%Impervious Area
u
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
1
Subcatchment 35A-P: Flow to Detention Basin A
Hydrograph
U
1.5 cfs ❑Runoff
Type III 24-hr 100 Year Storm
Rainfall=6.50"
Runoff Area=10,791 sf
Runoff Volume=5,138 cf
1 Runoff Depth>5.71"
Tc=6.0 min
.2 CN=97
LL
U
M
I
c_—i
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
l�
U
uJ
—7
L•
n
v
M
1
PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Summary for Subcatchment 35B-P: Flow to Detention Basin B
n
Runoff = 1.5 cfs @ 12.09 hrs, Volume= 5,138 cf, Depth> 5.71"
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
Area(sf) CN Description
r i 10,216 98 Paved parking,HSG C
575 74 >75%Grass cover,Good,HSG C
u 10,791 97 Weighted Average
575 5.33%Pervious Area
r7 10,216 94.67%Impervious Area
�i
Tc Length Slope Velocity Capacity Description
,-1 (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
1 Subcatchment 35B-P: Flow to Detention Basin B
Hydrograph
❑Runoff
n 1.5 cfs
Type III 24-hr 100 Year Storm
Rainfall=6.50"
n Runoff Area=10,791 sf
Runoff Volume=5,138 cf
- Runoff Depth>5.71
Tc=6.0 min
LL
CN=97
Li
0
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
L-s
M
ti..J
n
n
L-1
n
Lj
n
U
n
PROPOSED Butcher Boy Type X 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
eJ
Summary for Subcatchment 36P: Flow to DP #2
n
I Runoff = 0.1 cfs @ 12.09 hrs, Volume= 394 cf, Depth> 5.78"
u
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Type III 24-hr 100 Year Storm Rainfall=6.50"
u
Area(so CN Description
817 98 Paved parking,HSG C
817 100.00%Impervious Area
Tc Length Slope Velocity Capacity Description
n (min) (feet) (ft/ft) (ft/sec) (cfs)
v 6.0 Direct Entry,Overland Flow
n Subcatchment 36P: Flow to DP #2
i.._s Hydrograph
0.13
❑Runoff
n
0.125' 0.1 cfs
0.12
L; 0.115- -Type III 24-hr 100 Year Storm
0.11;
0.105 Rainfall 6.0"
n 0.095y Runoff Area=817 sf
0.0s
0.085 Runoff Volume=394 cf
--r H o ops Runoff Depth>5.78"
0.07 _ Tc=6.0 min
3 0.065
s 0.06 . .CN=98
LL 0.055:
0.05 W
0.045
l l 0.04
0.035'1
0.03.;'
0.025
i 0.02
U 0.015
0.01
0.005
,
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
u Time (hours)
n'
n
U
n
L-1
e_r
n
U
u PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
n HydroCAD®9.10 s/n 06609 C 2010 HydroCAD Software Solutions LLC
`i Summary for Subcatchment 37P: Flow to DP#3
n
Runoff = 4.3 cfs @ 12.09 hrs, Volume= 12,658 cf, Depth> 3.67"
�s
Runoff by SCS TR-20 method,UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Type III 24-hr 100 Year Storm Rainfall=6.50"
u
_ Area(so CN Description
n 19,200 74 >75%Grass cover,Good,HSG C
22,219 79 50-75%Grass cover,Fair,HSG C
` 41,419 77 Weighted Average
41,419 100.00%Pervious Area
n
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
`-' Subcatchment 37P: Flow to DP #3
M Hydrograph
U ❑Runoff
4.3 cfs
n Type III 24-hr 100 Year Storm
4 Rainfall=6.50"
Runoff Area=41,419 sf
Runoff Volume=12,658 cf
3.. Runoff Depth>3.67"
N
Tc=6.0 min
CN=77
U. 2
LI
n
5 fi. 7 . $. 9. 1.0. 1,1. .12. 1,3. 14. 15. 1,6. 17. 1;8. 1,9. 20
Time (hours)
V
rl
U
n
n
L-1
r�
r
t-1
M
Li
n
+-� PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCADR 9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
`1 Summary for Subcatchment 38P: Flow to CB
n
Runoff = 0.6 cfs @ 12.09 hrs, Volume= 1,912 cf, Depth> 5.63"
Runoff by SCS TR-20 method, UH=SCS,Time Span=5.00-20.00 hrs,dt=0.05 hrs
"? Type III 24-hr 100 Year Storm Rainfall=6.50"
Area(so CN Description
�--� 3,758 98 Paved parking,HSG C
315 74 >75%Grass cover,Good,HSG C
4,073 96 Weighted Average
315 7.73%Pervious Area
n 3,758 92.27%Impervious Area
u
Tc Length Slope Velocity Capacity Description
, (min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry,Overland Flow
u
Subcatchment 38P: Flow to CB
Hydrograph
u
❑Runoff
n 0.6- 0.6 cfs
0.55 Type III 24-hr 100 Year Storm
Rainfall=6.50"
0.5
r) Runoff Area=4,073 sf
0.45 Runoff_Volume=1,912_cf
Lj
0.4 Runoff Depth>5.63"
n
0.35- Tc=6.0 min
4, 0 0.3= CN-96
LL
0.25
0.2-
LL
0.15-
M 0.1-
u 0.05
0.:
(� 6 6 7 8 9 10 1,1 12 13 14 1,5 16 17 1E8 19 20
Time (hours)
ej
u
r`1
L-1
71
u
u
n
;1
PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
rl HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
u Summary for Reach 41R: Flow to DP #1
n
Inflow Area= 29,992 sf, 92.91%Impervious, Inflow Depth> 4.07" for 100 Year Storm event
'—' Inflow = 1.9 cfs @ 12.12 hrs, Volume= 10,177 cf
Outflow = 1.9 cfs @ 12.12 hrs, Volume= 10,177 cf, Atten=0%, Lag=0.0 min
n
Routing by Stor-Ind+Trans method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
n Reach 41R: Flow to DP#1
u Hydrograph
0Inflow
r1 ❑Outflow
2- Li.9 cfs Tj Inflow Area=29,992 sf
n
u
,.
LL
LJ
n 0 . . ; : . . . : : ..
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
Lt
M
Li
n
U
M
Li
'-1
Li
n
u
M
t_!
ry
U
n
u PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
"1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
U Summary for Pond 21: CB 53
n
Inflow Area= 15,128 sf, 91.82%Impervious, Inflow Depth> 4.06" for 100 Year Storm event
'–' Inflow = 1.0 cfs @ 12.12 hrs, Volume= 5,117 cf
Outflow = ].0 cfs @ 12.12 hrs, Volume= 5,117 cf, Atten=0%, Lag=0.0 min
Primary = 1.0 cfs @ 12.12 hrs, Volume= 5,117 cf
,LJ
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
ri Peak Elev= 129.93'@ 12.12 hrs
LJ Device Routing Invert Outlet Devices
#1 Primary 129.40' 15.0" Round Culvert L= 121.0' CPP,projecting,no headwall, Ke=0.900
ri Inlet/Outlet Invert= 129.40'/ 128.11' S=0.01077' Cc=0.900 n=0.013
1
Primary OutFlow Max=0.9 cfs @ 12.12 hrs HW=129.92' (Free Discharge)
n t-1=Culvert (Inlet Controls 0.9 cfs @ 1.93 fps)
Li Pond 21: CB 53
Hydrograph
Li 11 l-flow
1- 1.0 cfs ❑Primary
Inflow Area=15,128 sf
Peak Elev=129.93'
15.0"
G Round Culvert
N
n=0.013
LL L=121.0'
S=0.0107 T
LJ
0
6 6 7 8 9 10 11 12 13 14 1,5 1,6 17 18 19 20
Time (hours)
n
U
n
n
u
n
PROPOSED Butcher Boy Type X24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
Summary for Pond 39P: CB
n
Inflow Area= 14,864 sf, 94.01%Impervious, Inflow Depth> 4.08" for 100 Year Storm event
`-' Inflow = 0.9 cfs @ 12.12 hrs, Volume= 5,060 cf
Outflow = 0.9 cfs @ 12.12 hrs, Volume= 5,060 cf, Atten=0%, Lag=0.0 min
Primary = 0.9 cfs @ 12.12 hrs, Volume= 5,060 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
(..-) Peak Elev= 130.19'@ 12.12 hrs
u Device Routing Invert Outlet Devices
#1 Primary 129.60' 12.0" Round Culvert L=85.0' CPP,projecting,no headwall, Ke=0.900
n Inlet/Outlet Invert= 129.60'/ 129.18' S=0.0049'/' Cc=0.900 n=0.013
u
Primary OutFlow Max=0.9 cfs @ 12.12 hrs HW=130.18' (Free Discharge)
n LI=Culvert (Barrel Controls 0.9 cfs @ 2.72 fps)
�- Pond 39P: CB
Hydrograph
... ..... .. ... .. ....:. .. .. .. . _ . .
--� F13 Inflow
❑Primary
1" 0.9 cfs
Inflow Area=14,864 sf
Peak Elev=130.19'
12.0"
L Round Culvert
n ;
n=0.013
L=85.0'
S=0.0049 T
n
n ...
LJ o-
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
n
u
n
U
r"1
U
f--1
u
n
u
r1
U PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
" 1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
L
Summary for Pond POND A: Detention Area
n
Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 5.71" for 100 Year Storm event
L' Inflow = 1.5 cfs @ 12.09 hrs, Volume= 5,138 cf
Outflow = 0.5 cfs @ 12.35 hrs, Volume= 3,148 cf, Atten=64%, Lag= 15.7 min
r� Primary = 0.5 cfs @ 12.35 hrs, Volume= 3,148 cf
is
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 130.79'@ 12.35 hrs Surf.Area=840 sf Storage=2,823 cf
u Plug-Flow detention time=177.2 min calculated for 3,136 cf(61%of inflow)
Center-of-Mass det.time=99.1 min( 835.2-736.1 )
n
Volume Invert Avail.Storage Storage Description
`' #1 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage 10
r1 Device Routing Invert Outlet Devices
LJ #1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 130.00'/ 129.40' S=0.0120'/' Cc=0.900 n=0.013
rl
Primary OutFlow Max=0.5 cfs @ 12.35 hrs HW=130.79' (Free Discharge)
t—1=Culvert (Inlet Controls 0.5 cfs @ 2.78 fps)
Pond POND A: Detention Area
�a
Hydrograph
Cl Inflow
1.5 cfs ❑Primary
`J Inflow Area=10,791 sf
Peak Elev=130.79'
LJ Storage=2,823 cf
6.011
Round Culvert
3
n LL n=0.013
0.5 cfs L=50.0'
S=0.0120 T
M
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
n
L-1
n
U
v
n
u PROPOSED Butcher Boy Type III 24-hr 100 Year Storm Rainfall=6.50"
Prepared by Eaglebrook Engineering& Survey Printed 12/10/2012
"1 HydroCAD®9.10 s/n 06609 ©2010 HydroCAD Software Solutions LLC
LJ Summary for Pond POND-B: Detention Area
n
Inflow Area= 10,791 sf, 94.67%Impervious, Inflow Depth> 5.71" for 100 Year Storm event
`-' Inflow = 1.5 cfs @ 12.09 hrs, Volume= 5,138 cf
Outflow = 0.5 cfs @ 12.35 hrs, Volume= 3,148 cf, Atten=64%, Lag= 15.7 min
n Primary = 0.5 cfs @ 12.35 hrs, Volume= 3,148 cf
u
Routing by Stor-Ind method,Time Span=5.00-20.00 hrs,dt=0.05 hrs
Peak Elev= 130.79'@ 12.35 hrs Surf.Area=840 sf Storage=2,823 cf
L-1, Plug-Flow detention time=177.2 min calculated for 3,136 cf(61%of inflow)
Center-of-Mass det.time=99.1 min( 835.2-736.1 )
n
Volume Invert Avail.Storage Storage Description
LJ #1 128.50' 2,945 cf 30.0" D x 60.0'L Pipe Storage 10
Device Routing Invert Outlet Devices
u #1 Primary 130.00' 6.0" Round Culvert L=50.0' CPP,projecting,no headwall, Ke=0.900
Inlet/Outlet Invert= 130.00'/ 129.50' S=0.0100'/' Cc=0.900 n--0.013
r)
Primary OutFlow Max=0.5 cfs @ 12.35 hrs HW=130.79' (Free Discharge)
`—' L1=Culvert (Inlet Controls 0.5 cfs @ 2.78 fps)
n Pond POND-B: Detention Area
Li
Hydrograph
t 7 ❑Inflow
1.5 cfs ❑Primary
LJ Inflow Area=10,791 sf
n Peak Elev=130.79'
LJ
Storage=2,823 cf
-� 6.0"
U Round Culvert
n U. n=0.013
0.5 cfs L=50.0'
S=0.01007'
LJ
o..
U 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Time (hours)
-'i
L-1
ri
u
rl
u
n
r�
u
n
u
n
u
Attachment B
n
u
SCS Soils Report
n
C-3
n
u
n
u
n
n
Li
n
n
u
n
n
u
n
Lj
n
u
.. ................................
_.,,.
Stormwater Analysis Butcher Boy Markets
r"1 1077 Osgood Street, North Andover, MA.
u
n
u
C J I j C :1 C J C I C 3 C -_ 3 C j C_:) C 3 C _ 3 C 3 C J C .j C J C 3 C 3
Soil Map—Essex County,Massachusetts, Northern Part
tiZo
326300 326400 326500 326600 326700 326800 326900 327000 327100 327200 327300 327400 327500 327600
42*43'11 42'43'12"
U
4.
1%
W
4, ROO/
IL
—A
_41
x, s et
mork, -74,
Y
T
4�
t
..........
4
si-
#
7
A
"j
j//
4
z'
F
7-............ -7
7-PA
A
?
r"'-
X/A
7' 2
42'42 42" 42'42'43"
326300 326400 326500 326600 326700 326800 326900 327000 327100 327200 327300 327400 327500 327600
Map Scale:1:5,460 ifprinted onA size(8.5"x 11")sheet.
N —Meters
0 50 100 200 300 17
Feet
350 700 1,400 2,100
��USDA Natural Resources Web Soil Survey 12/10/2012
Conservation Service National Cooperative Soil Survey Page 1 of 3
C J C C J C J C J C __ 3 C_ 3 C _ 3 C .. J C_ _J C _ J C C J C J C J C C J C J C
Soil Map—Essex County,Massachusetts, Northern Part
MAP LEGEND MAP INFORMATION
Area of Interest(AOl) tZ Very Stony Spot Map Scale: 1:6;460 if printed on A size(8.5"X 11")sheet.
Area of Interest(AOI) w Wet Spot The soil surveys that comprise your AOI were mapped at 1:15,840.
Soils j Other
Soil Map Units Warning:Soil Map may not be valid at this scale.
Special Point Features Special Line FeaturesGully Enlargement of maps beyond the scale of mapping can cause
Blowout misunderstanding of the detail of mapping and accuracy of soil line
Short Steep Slope placement.The maps do not show the small areas of contrasting
Borrow Pit Other soils that could have been shown at a more detailed scale.
Clay Spot ..
Political Features Please rely on the bar scale on each map sheet for accurate map
♦ Closed Depression A Cities measurements.
Gravel Pit Water Features Source of Map: Natural Resources Conservation Service
Gravelly Spot Streams and Canals Web Soil Survey URL: http://websoilsurvey.nres.usda.gov
Coordinate System: UTM Zone 19N NAD83
y Landfill Transportation
This product is generated from the USDA-NRCS certified data as of
A Lava Flow +++ Rails the version date(s)listed below.
,Af, Marsh or swamp ~1 Interstate Highways Soil Survey Area: Essex County, Massachusetts, Northern Part
Mine or Quarry US Routes Survey Area Data: Version 8,Aug 11,2008
G� Miscellaneous Water Major Roads Date(s)aerial images were photographed: 7/10/2003
p Perennial Water ^4 r Local Roads The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
v Rock Outcrop imagery displayed on these maps.As a result,some minor shifting
+ Saline Spot of map unit boundaries may be evident.
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
0 Sodic Spot
Spoil Area
Stony Spot
USDA Natural Resources Web Soil Survey 12/10/2012
Conservation Service National Cooperative Soil Survey Page 2 of 3
n
u
n Soil Map-Essex County,Massachusetts,Northern Part
t_.t
r_1 Map Unit Legend
n j Essex County,Massachusetts,Northern Part(MA605)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
u I11 �Water 29.0 15.1%
n
,6A Scarboro mucky fine sandy loam,0 to 1 5.0 2.6%
percent slopes
u �-
38A I Pipestone loamy sand,0 to 3 percent slopes 8.1 4.2%'
256A Deerfield loamy fine sand,0 to 3 percent 3.4 1.8%
slopes
`J 305B Paxton fine sandy loam,3 to 8 percent slopes 36.8 19.2%
rj 305D Paxton fine sandy loam,15 to 25 percent 2.51 1.3%
slopes
-- -
u 306C Paxton fine sandy loam,8 to 15 percent 1.5 0.8%
slopes,very stony
306D Paxton fine sandy loam,15 to 25 percent 3,31 1.7%
slopes,very stony
v - -
310B Woodbridge fine sandy loam,3 to 8 percent 27.0 14.1%
n slopes -
310C Woodbridge fine sandy loam,8 to 15 percent 3.7 1.9%
Li slopes
311 B j Woodbridge fine sandy loam,0 to 8 percent 7.9 4.1%
n slopes,very stony
u 405C Charlton fine sandy loam,8 to 15 percent 3.2 1.7%
slopes
n 4106 Sutton fine sandy loam,3 to 8 percent slopes 4.6 2.4%1
602 'Urban land 52.3 27.4%
715B Ridgebury and Leicester fine sandy loams,3 3.1 1.6%
n to 8 percent slopes,extremely stony
L-3 LTotals for Area of Interest 191.2 100.0%
M
U
n
u
n
U
n
u
n
Li
n USDA Natural Resources Web Soil Survey 12/10/2012
Conservation Service National Cooperative Soil Survey Page 3 of 3
u
n
u
n
U
Li
n
u
n
n
Attachment C
Lin
Existing Watershed Plan
n
Lj
-,
U
U
U
Li
u
n
u
U
n
U
.,,- _.
Stormwater Analysis Butcher Boy Markets
M 1077 Osgood Street, North Andover, MA.
Lj
:I
u
!-I
u
N
u
Li
X11
p
,# ` a 3
u DPx
,,, -•i
l
L1
U
EXISTING WATERSHED MAP DATE:
r7 LYNNFIELD 1077 OSGOOD STREET DECEMBER 11,2012
ENGINEERING,INC. LOCATED IN
V 199 NEWBURY STREET SUITE 115 NORTH ANDOVER, MASSACHUSETTS SCALE:I"=80'
DANVERS,MASS.01923 PREPARED FOR TITLE:
TEL:(978)777-7250 ANGUS REALTY CORP.
Li NORTH ANDOVER MASSACHUSETTS X-WS
n
U
-1
Attachment D
Li
ri
Li Proposed Watershed Plan
r-I
L-i
1-7
Li
Li
ri
11-i
71
' ... ...........................
stormwa r Analysis Butcher Boy Markets
1077 Osgood Street, North Andover, MA.
r-1
u
Li
Li p� s
r'"'� mss, ,' '?- \i r-s, '• �,
Ll
1
n z �
Li
Li
Isc
P.
U UNDERGROUND
PROPOSED �AS`IN BON PARKI G SPAC
OUTLET ET 8 TIP UM TE,
1
U i ,
p
#y
CONTROL
OLE
Li
i
F +IYI 0
T \
nary
yr
q� i ti
LJ
r
13
tl. � "# .r�.'� ;��"�+;, .� ® •„sic PARKING SPACES
9'x 18' TIP
UNDERGROIJ `
ETEN710N
CO .
MA
Li
U
PROPOSED WATERSHED MAP DATE:
rl LYNNFIELD 1077 OSGOOD STREET DECEMBER 11,2012
ENGINEERING,INC. LOCATED IN
v 199 NEWBURY STREET SUITE 115 NORTH ANDOVER, MASSACHUSETTS SCALE: I"=80'
DANVERS,MASS.01923 PREPARED FOR TITLE:
TEL:(978)777-7250 ANGUS REALTY CORP.
NORTH ANDOVER MASSACHUSETTS P-ws
n
J
J
_J
.J
1
a
r�
J
.J
LA
LJ
:-i
i �
OI
TRAFFIC IMPACT AND ACCESS
STUDY
lki
+� O
s ��
0 �f
0
E
f
P
60
r
PROPOSED BRANCH BANK
NORTH ANDOVER, MA
OPREPARED FOR:
OLYNNFIELD ENGINEERING
LYNNFIELD,MASSACHUSETTS
0 NOVEMBER 27,2012
CPREPARED BY:
d
-QBAYSIDE
C ► 3 ENGINEERING
600 UNICORN PARK DRIVE
WOBURN,MA 01801
0
O
n
U
Lj TRAFFIC IMPACT AND ACCESS STUDY
PROPOSED BRANCH BANK
OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS
c
Prepared for:
r Lynnfield Engineering Co.
Li
r
6
r.
L
r
V November 27, 2012
r
u
E
EPrepared by:
L Bayside Engineering
600 Unicorn Park Drive
Woburn,MA 01801
C
I
U
L, TABLE OF CONTENTS
C
L�
U
n Section Title Page
Li 1 Introduction 1
Q2 Existing Condition 3
3 Future Conditions 12
4 Capacity Analysis 20
5 Recommendations and Conclusion 27
Appendix
U
U
i
i
r-)
L .
r �
TABLES
r�
r1
LJ
r1
L .
r 1
v
No. Title Page
�J
1 Existing Weekday Traffic-Volume Summary 6
rl
2 Existing Saturday Traffic-Volume Summary 6
3 Existing Butcher Boy Marketplace Exit Observed r�
Delays and Queues—Shared Left/through Movements 7
4 Existing Butcher Boy Marketplace Exit Observed r ,
Delays and Queues—Shared Right-Turn Movements 7
5 Motor Vehicle Crash Data Summary 10
6 Osgood Street Vehicle Speeds 11
7 Trip Generation Summary 15 `
8 Proposed Trip Distribution 16
r
9 Traffic-Volume Increases 19 ,
10 Level-of-Service Criteria for Unsignalized Intersections 21
11 Level-of-Service Criteria for Signalized Intersections 22
r�
12 Signalized Level-of-Service Analysis Summary 22
L J
13 Unsignalized Level-of-Service Analysis Summary 23
ri
u
r •
r •
C FIGURES
C
V'
n
u
Ell No. Title Page
1 Site Location Map 2
u 2 2012 Existing Peak-Hour Traffic Volumes 8
r 3 2017 No-Build Peak-Hour Traffic Volumes 14
U
4 2017 Build Peak-Hour Traffic Volumes 18
n
I{ 1
V
n
U
u
n
n
I
C
I�
U
SECTION 1: INTRODUCTION
U
n
Li
E
Bayside Engineering has prepared this study to assess the traffic impact and to evaluate
the access requirements of the proposed branch bank to be located at 1077 Osgood Street
in North Andover, Massachusetts.
PROJECT DESCRIPTION
LJThe development is to be located on the east side of Osgood Street (Route 125), north of
Great Pond Road (Route 133). Currently, the site consists of the Butcher Boy
Marketplace, an approximately 30,495 square foot (so shopping center. As currently
proposed, the project will consist of the addition of a free-standing, approximately 3,672
sf branch bank with three drive-through lanes (two teller lanes and one ATM lane). The
existing ATM on the Butcher Boy entrance would be removed. Parking for 21 vehicles
LJ will be provided.
Access to the project will be provided by way of the existing Butcher Boy Marketplace
U entrance and exit driveways to Osgood Street. Figure 1 shows the site location in relation
to the surrounding area.
STUDY METHODOLOGY
Ell This study has been prepared in three stages. The first stage involved an assessment of
existing conditions within the study area and included an inventory of roadway
geometrics, pedestrian and bicycle facilities and public transportation services. Existing
traffic counts were performed at the study area intersections.
In the second stage of the study, future traffic conditions were projected and analyzed.
Specific travel demand forecasts for the project were assessed along with future traffic
n demands due to expected traffic growth independent of the proposed project. In
L accordance with Massachusetts Department of Transportation (MassDOT) and Executive
Office of Environmental Affairs (EEA) guidelines, the year 2017 was selected as the
1
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Repons\T1AS 112712 F.docx
r 1
L J
G 1
basis for modeling future transportation impacts of the proposed development to reflect a
five-year planning horizon.
r �
The third stage of the study presents and evaluates measures to address traffic issues, if L
any, and necessary improvements to accommodate the development.
d
k `
i Ak
d J
r
low
�vt ,
i J
C)
LJ
R
R LJ
a y'
I��' 'k nY�• r
r1
. lr
l
Figure 1
Site Location Map
SUMMARY
r •
Review of the proposed project and access plan shows that in relation to roadway L�
capacity, traffic safety, and traffic impacts upon the surrounding roadway network, the
proposed project will have minimal impact on the surrounding roadways and r ,
intersections. The existing roadway system has sufficient capacity for the proposed
prof ect.
2
Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx r
r
u
0 SECTION 2: EXISTING TRAFFIC CONDITIONS
L�
Li
�1
n
V
r STUDY AREA
LJ Roadway geometry and traffic control information was collected for the following
n locations:
Li
• Osgood Street and Great Pond Road
n • Osgood Street and the Existing Butcher Boy Marketplace Entrance
�, • Osgood Street, Commerce Way and the Existing Butcher Boy
Marketplace Exit
n
L,
FIELD SURVEY
n
u A comprehensive field inventory of the proposed site was conducted in July 2012. The
inventory included collection of existing roadway geometrics, traffic volumes, and safety
F, data for the existing study area intersections and site access driveway locations. Traffic
volumes were measured by means of automatic traffic recorder (ATR) counts and
substantiated by manual turning movement counts (TMCs) conducted at the study area
intersections.
GEOMETRICS
LJ
n Primary study area roadways are described below.
LJ
Roadways
Osgood Street (Route 125)
Osgood Street (Route 125) is a four-lane, Principal Arterial under the jurisdiction of the
Li 3
'r Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.d=
1__!
t �
r•
Massachusetts Department of Transportation (MassDOT). Osgood Street traverses the
study area in a general north/south direction. Additional turn lanes are provided at major
intersections. Travel lanes are generally separated by a double yellow centerline. n
Marked shoulders are also provided. The posted speed limit on Osgood Street in the
vicinity of the site is 40 miles per hour(mph). Land use along Osgood Street in the study
area consists of primarily commercial uses. r
Intersections
r—
Osgood Street and Great Pond Road
Great Pond Road intersects Osgood Street from the east to form this four-legged,
signalized intersection. The driveway to Casa Mia forms the fourth leg of the
intersection across from Great Pond Road. The Osgood Street approaches each consist of
two lanes permitting left- or right-turn movements. The Great Pond Road approach r'
consists of a single lane which widens at Osgood Street to provide shared left-and
through movements separated from right-turn movements by a triangular shaped grassed
island. During the peak hours, the Great Pond Road approach was observed to be used as r
two lanes for left-turns to Osgood Street southbound'. The Casa Mia driveway approach
consists of a single lane permitting all movements. The intersection is controlled by a
two-phase traffic signal. Land use in the area consists of the Casa Blanca restaurant,
open space, the Butcher Boy Marketplace and Mad Maggie's Ice Cream stand.
Osgood Street and Existing Butcher Boy Marketplace Entrance r
tJ
The existing Butcher Boy Marketplace Entrance intersects Osgood Street from the east to
form this three-legged, unsignalized intersection. The Osgood Street northbound r�
approach consists of two lanes permitting right-turns. The Osgood Street southbound
approach consists of two lanes through lanes and an exclusive left-turn lane. The existing
Butcher Boy Marketplace Entrance is one-way into the Butcher Boy Marketplace. Land r
use in the area consists of the Butcher Boy Marketplace and wooded land. u
r,
Osgood Street, Commerce Way and the Existing Butcher Boy Marketplace Exit
The existing Butcher Boy Marketplace Exit intersects Osgood Street from the east and r
Commerce Way intersects from the west to form this four-legged, unsignalized
intersection. The Osgood Street approaches each consist of two lanes permitting left- or
right-turn movements. The existing Butcher Boy Marketplace Exit is one-way exiting to
Osgood Street and consists of an exclusive right-turn lane and an exclusive left-turn lane.
The Commerce Way approach consists of a single lane permitting all movements. Land `J
use in the area consists of the Butcher Boy Marketplace and Joe Fish Restaurant and r .
commercial uses. Both the Butcher Boy Marketplace exit driveway and Commerce Way
are under STOP control. `J
L<1
1 The capacity analyses for the intersection were performed assuming a single lane approach based on existing
geometry. r
4
Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\T1AS 112712 F.docx ,
t_�
I
U
TRAFFIC VOLUMES
rExisting Traffic Volumes
To establish base traffic conditions within the study area, manual turning movement and
LJ vehicle classification counts were obtained in June and July 2012. Peak-period turning
movement counts were conducted during the weekday morning peak period (7:00 to 9:00
r AM),weekday evening period (4:30 to 6:30 PM) and Saturday midday period (10:30 AM
L to 1:30 PM) at the following intersections:
h • Osgood Street and Great Pond Road
V Osgood Street and the Existing Butcher Boy Marketplace Entrance
• Osgood Street, Commerce Way and the Existing Butcher Boy
nMarketplace Exit
Daily traffic counts were conducted on Osgood Street, north of the Butcher Boy
r Marketplace exit for a two day period using automatic traffic recorders (ATR).
U
n Analysis of the peak-period traffic counts indicated that the weekday morning commuter
peak generally hour occurs between 7:30 and 8:30 AM and the weekday evening
�-' commuter peak hour occurs between 5:00 and 6:00 PM. The Saturday midday peak hour
occurs between 11:30 AM and 12:30 PM. The traffic count worksheets are provided in
the Appendix.
u
n Seasonal Adiustment
The traffic-volume data gathered as part of this study was collected during the month of
n July 2012. Data from the MassDOT was reviewed to determine the monthly variations of
U the traffic volumes. The traffic data showed June and July volumes to be higher than
average month conditions. Therefore, the June and July traffic volumes were used in
n order to provide for a conservative analysis scenario. The 2012 existing daily and peak-
hour traffic volumes for average-month conditions are summarized below in Table 1.
The Saturday volumes are shown in Table 2. The 2012 Existing peak hour traffic flow
Cnetworks are shown graphically on Figure 2.
Lj
c
5
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No AndoverUraffic\ReportsMAS 112712 F.docx
r ,
j
TABLE 1
EXISTING WEEKDAY TRAFFIC-VOLUME SUMMARYa r
Weekday Weekday Morning Peak Hour Weekday Evening Peak Hour t '
Traffic Traffic K Directional Traffic K Directional
r�
Location Volume Volume` Factord Distribution' Volume Factor Distribution
Osgood Street,north of
Butcher Boy Marketplace 17,200 1,247 7.3 68.3%SB 1,850 10.8 62.2%NB r,
'Two-way traffic volume
bDaily traffic expressed in vehicles per day.
`Expressed in vehicles per hour. r--1
°Percent of daily traffic volumes which occurs during the peak hour.
'Percent of peak-hour volume in the predominant direction of travel.
NB=northbound;SB=southbound;EB=eastbound;WB=westbound.
TABLE 2
EXISTING SATURDAY TRAFFIC-VOLUME SUMMARYa r
Saturday Saturday Midday Peak Hour
Traffic Traffic K Directional
Location Volumeb Volume` Factord Distribution' r`
t�
Osgood Street,north of
Butcher Boy Marketplace 11,800 1,120 9.5 55.9%NB
'Two-way traffic volume ,
bDaily traffic expressed in vehicles per day.
`Expressed in vehicles per hour.
°Percent of daily traffic volumes which occurs during the peak hour. P'
'Percent of peak-hour volume in the predominant direction of travel.
NB=northbound;SB=southbound;EB=eastbound;WB=westbound.
f�
Osgood Street was recorded to carry approximately 17,200 vehicles per day (vpd) during
average month conditions in front of the site. During the weekday morning peak hour,
r�
approximately 1,247 vehicles per hour (vph) were recorded, and during the weekday
evening peak hour, approximately 1,850 vph were recorded.
r,
Existing Intersection Operations
U
At the Existing Butcher Boy Marketplace Exit, vehicle queues and delays for vehicles r
exiting the Butcher Boy Marketplace driveway were recorded. As part of this study, the
delays for vehicles exiting the driveway were recorded and are summarized in Table 3 for
the shared left-turn/through movements and in Table 4 for the right-turn movements. The r ,
traffic delay worksheets are provided in the Appendix.
r�
L_
2 The existing delays were recorded to compare to the modeled delay as described in Section 4,Capacity Analysis. r 1
6
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
t /
r
'u
TABLE 3
EXISTING BUTCHER BOY MARKETPLACE EXIT OBSERVED DELAYS AND
QUEUES— SHARED LEFT/THROUGH MOVEMENTS
95"I
Average Percentile
Peak Hour Minimum Peak Maximum Peak Vehicle Maximum
Delay per Hour Delay per Hour Delay per Queue Queue
Vehicle Vehicle Vehicle Observed Observed
Time Period (sec) Observed(sec) Observed(sec) (Veh) (Veh)
Weekday Morning Peak Hour 13 1 38 2 3
V Weekday Evening Peak Hour 39 1 127 6 9
�? Saturday Midday Peak Hour 24 1 123 6 7
�j aBased on count data compiled on July 28 and 30,2012.
TABLE 4
EXISTING BUTCHER BOY MARKETPLACE EXIT OBSERVED DELAYS AND
QUEUES —RIGHT-TURN MOVEMENTS
n 95t"
Average Percentile
Peak Hour Minimum Peak Maximum Peak Vehicle Maximum
Delay per Hour Delay per Hour Delay per Queue Queue
Vehicle Vehicle Vehicle Observed Observed
Li Time Period (sec) Observed(sec) Observed(sec) (Veh) (Veh)
n Weekday Morning Peak Hour 5 2 17 1 1
U
Weekday Evening Peak Hour 15 1 85 3 5
Saturday Midday Peak Hour 7 1 30 1 2
'Based on count data compiled on July 28 and 30,2012.
�1 As shown in Tables 3 and 4, the average delay ranged from 5 to 39 seconds during the
IL, respective peak hours. This data is further used to calibrate the capacity analysis
methodology in Section 4.0, Capacity Analyses.
7
[—'� Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
Weekday Morning Peak Hour ( 7:30 - 8:30 A.M.) 9
K
CASABLANCA z IOEflSH
n
M `
I -881 x-16
i
—813 44 �—836
�67 OSGOOD STREET r
4 401--► (ROUTE 125) 33
447--► 100 368CA
-► -�
272
W OU
� A
A THES110PSA7' u
1- 90MER90Y
o .0 FSITE] 4MR10PLACE
SoO
W ?J
c Not To Scale
r �
Weekday Evening Peak Hour(4:30 - 5:30 P.M.) LJ
w
A
s �
s 3 r
CASABLANCA z IOEF/SR
a c'
m i_J
N
N
\ �1
J ION �4 f—848 Ln k--10
3 1 ~739 105 78 �► r 690 v
OSGOOD STREET
7 J 1053— (ROUTE 125) 28 S (� r
Z 1168--► 209 1025 l
306
ti p TWS110PSAT r
3 Bl/TCNERBOY
O�
FWE� /v1ARKETPLACE
o �tt G
2
a Not To Scale
Saturday Midday Peak Hour (11:30 - 12:30 A.M.)
Z
CASABLANCA z 10EF/SN
w n
w m
Z n r
w <
p Ioo �-0 �–608 �o k 13
r 1 l► ~708 63 �► ;81
OSGOOD STREET r
6� 568 (ROUTE 125) J (�
30
700 212 538-►
N 214 � (� w
ti LnJO
U
o THESHOPSAT
CL
Ry` SL7011ER90Y u
Sr ibfARKL7PLACE V
r -I
w o Not To Scale
r�
oBAYS I DE Proposed Branch Bank Figure-2
ENGINEERING North Andover, MA 2012 Existing
Peak Hour r,
600 Unicom Pais Drive A Wobum. MA 01801
Phone: 781.932.3201 A F= 781.9323413 Traffic Volumes
www.boyeideenginewiny.com ,
C
MOTOR VEHICLE CRASH DATA
rl Motor vehicle crash data for the study area intersections and roadways were obtained
L► from the MassDOT database for 2007 through 2009, the most recent three-year period for
which data is available. The motor vehicle crash data was reviewed to determine crash
trends in the study area. A summary of the data is provided in Table 5 and the crash data
is included in the Appendix.
n
Lj
E
r
U
n
n
u
n
r
L►
Ls
Ls
l�
" 9
QA12 PROJECCS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Mdovcr\Traffic\Reports\TIAS 112712 F.docx
. J
v
TABLE 5
MOTOR VEHICLE CRASH DATA SUMMARY
Location
f�
Osgood Street and Osgood Street,Commerce
Osgood Street and Existing Butcher Boy Way and Existing Butcher u
Scenario Great Pond Road Marketplace Entrance Boy Marketplace Exit
Year: r
2007 8 2 1
2008 4 2 1
2009 4 1 0
Total 16 5 2 r
Averageb 5.33 1.67 0.67 X J
Crash Rate` 0.43 0.22 0.17
Significant' No No No
Type:
r �
Angle 13 2 1
Rear-End 2 2 0 v
Head-On 1 0 0
Sideswipe 0 1 1
Run off Road/Hit Fixed Object 0 0 0
Unknown 0 0 0
Total 16 5 2 -�
Time of Day: r
Weekday(7:00 to 9:00 AM) 1 2 0
Weekday(4:00 to 6:00 PM) 5 1 0 t J
Remainder of Da v 10 2 2
Total 16 5 2
r�
Pavement Conditions:
Dry 12 3 2
Wet 3 2 0
Snow 1 0 0 f
0 0 0
Unknown 16 5 2 J
Total
r,
Severity:
Property Damage Only 13 4 1
Personal Injury 3 1 1
Fatal Accident 0 0 0
Unknown 0 0 0
Total 16 5 0
v
aSource: MassDOT Safety Management/Traffic Operations Unit records,2007 through 2009.
bAverage crashes over three-year period.
`Crash rate per million entering vehicles(mev).
'Signalized intersections are significant if rate>0.77 crashes per million vehicles,and unsignalized intersections are u
significant if rate>0.60 crashes per million vehicles.
ti
LJ
f~
L�
�7
10
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx r
\J
As shown in Table 5, the intersection of Osgood Street and Great Pond Road experienced
the greatest number of crashes over the three year period, sixteen with a crash rate lower
than the MassDOT District average.
Vehicle Speeds
Existing speed data for Osgood Street were also collected using the ATRs. The posted
speed limit on Osgood Street in the site vicinity is 40 mph. The speed data is
summarized in Table 6.
rl TABLE 6
L OSGOOD STREET VEHICLE SPEEDS
Average 85u'
Observed Percentile
Posted Speed Speed' Speed
n Direction Limit(mph) (mph) (mph)
f U� Osgood Street Northbound 40 41 46
Osgood Street Southbound 40 44 49
n 'Based on speed data compiled on July 12 through 14,2012.
As shown in Table 4, the average speed of vehicles travelling northbound or southbound
was found to be 41 and 44 mph, respectively. The 85th percentile speed was found to be
�-' 46 mph for northbound vehicles and 49 mph for southbound vehicles. The 85th percentile
n speed is the speed at which sight distances are typically evaluated.
F ;
lV
PLANNED ROADWAY IMPROVEMENTS
Officials for MassDOT and the Town of North Andover were contacted regarding
roadway improvements planned for the study area intersections. No improvement
projects were identified that would increase capacity at the study area intersections.
r
U
u
11
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\T1AS 112712 F.docx
t �
r �
SECTION 3:
2017 NO-BUILD AND BUILD TRAFFIC CONDITIONS
r�
to
r �
L J
r
To determine the impact of site-generated traffic volumes on the roadway network under
future conditions, baseline traffic volumes in the study area were projected to the year
2017. Traffic volumes on the roadway network at that time, in the absence of the
proposed project, would include existing traffic, new traffic due to general background
traffic growth, and traffic related to specific developments by others expected to be r
completed by 2017. Consideration of these factors resulted in the development of 2017
No-Build traffic volumes. Anticipated site-generated traffic volumes were then
superimposed upon these No-Build traffic flow networks to develop 2017 Build r'
conditions. t
r,
2017 NO-BUILD TRAFFIC VOLUMES
Traffic growth on area roadways is a function of the expected land development in the
immediate area as well as the surrounding region. Several methods can be used to
estimate this growth. A procedure frequently employed estimates an annual percentage
increase in traffic growth and applies that percentage to all traffic volumes under study. r
The drawback to such a procedure is that some turning volumes may actually grow at L 1
either a higher or a lower rate at particular intersections.
An alternative procedure identifies the location and type of planned development, �-
estimates the traffic to be generated, and assigns it to the area roadway network. This
r �
produces a more realistic estimate of growth for local traffic. However, the drawback of
this procedure is that the potential growth in population and development external to the `_J
study area would not be accounted for in the traffic projections. r i
To provide a conservative analysis framework,both procedures were used. `J
n
t✓
r �
12 t�
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx r
t i
E
Background Traffic Growth
C Traffic-volume data compiled by MassDOT from permanent count stations and historic
traffic counts in the area were reviewed in order to determine traffic growth trends.
Based on a review of this data, it was determined that traffic volumes within the study
O area have generally decreased over the past several years. The Merrimack Valley
Planning Commission was consulted and they indicated that for this area, a 0.5 percent
growth rate would be appropriate. Therefore, to provide a 0.5 percent per year
compounded annual background traffic growth rate was used to account for potential
future traffic growth external to the study area and presently unforeseen development.
Specific Development by Others
u
Traffic volumes generated by the specific local developments by others were included in
the 2017 No-Build condition. The Town of North Andover was contacted to identify
specific planned developments. Based on these discussions, there are two potential
projects that are currently planned or have been approved in the immediate area that
could impact future traffic volumes beyond the general background traffic growth rate.
These include a proposed 2,250 sf Dunkin Donuts at 1018 Osgood Street and a 25,000 sf
mixed use development at 1003 Osgood Street. Site generated traffic volumes were
(-? calculated and assigned according to Institute of Transportation Engineers (ITE)
Li recommended procedures or from the available traffic studies prepared for each
development.
L '
No-Build Condition Traffic Volumes
The 2017 No-Build weekday morning peak-hour traffic volumes were developed by
applying a compounded 0.5 percent annual growth rate to the 2012 Existing peak-hour
through movement traffic volumes and adding traffic from the identified background
projects. Figure 3 shows the projected 2017 No-Build peak hour traffic volumes for the
weekday morning and weekday evening peak-hour conditions.
rl
L_J
Ell
E13
Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
r •.
Weekday Morning Peak Hour ( 7:30 - 8:30 A.M.) o
l J
Casa BLANCA /OEF/SH
C_' �J
NOO 1 -949 rnm k-16
1 4-880 k., X04
i-68 `44 OSGOOD STREET f ,
4
452--f- (ROUTE 125) 33 (�
497—► 100 419—� 4'
295
ooLnr-
LA
A 7YES11OPSAT `-j
BL/TCHERSOY
opo SITE MARKETPLACE . ,
So
c Not To Scale
r�
Weekday Evening Peak Hour(4:30 - 5:30 P.M.)
w
o
CASABLANCA z JOEFISH
m n
rn
N
N '<
m r,
'1 N) �-4 4-891 LP x-10
a i ~107 780
78 4 x733 v
Y r '` OSGOOD STREET
7 ♦ 1109 (ROUTE 125) 28
L 1 209 1081—►
325 41 I �►
01
raoco IJ
N 0
N A THESHOPSAT r
a t^ySOMERBOY
a G .0 SIiE MARKE7PL4Cf i
0 'M C A
z J a Not To Scale
o �J
Saturday Midday Peak Hour (11:30 - 12:30 A.M.)
O r
p
3
� CASABG4NC4
LD
m JOEf/SH
Li n
w m
z D f
z {
LJ
Zm o o 589 4–660 '.38 X133
�► 71 63 OSGOOD STREET r
6 621–+ (ROUTE 125) 30
752–► 212 591–► 0) 00 �_ .
ti 233 w
U
O
o A 771ESHOPSAT
a
o Fs—
Not
ITE MARKETPLACE� To Scale
s G U
a
o f l
Proposed Branch Bank Figure 3
BAYS I D E
ENGINEERING North Andover, MA 2017 No-Build
Peak Hour
800 Unicom Pais Drive A Woburn. AIA 01801 Traffic Volumes
Phone: 781.932.3201 A F= 781.932.3413
www.boyeldeenginewing.com r .
f
LJ
I i FUTURE 2017 BUILD CONDITIONS
LJ
Proiect Description
As currently proposed, the project will consist of an approximately 3,672 sf branch bank
n with three drive-through lanes (two tellers and one ATM). Parking for 21 vehicles will
I be provided. Access to the project will be provided by way of the existing entrance and
exit to the Butcher Boy Marketplace.
Traffic Generation
n Trip-generation data published by the ITE Trip Generation manual3 was reviewed. Trip
U generation data for Land Use Code (LUC) 912 — Drive-In Bank was used to determine
the expected trip generation for the proposed project. The expected trip generation for
the proposed development is summarized in Table 7 and the trip generation worksheets
are included in the Appendix.
TABLE 7
TRIP-GENERATION SUMMARY
n
U Proposed
Bank
r1 Trips'
I �
u
Average Weekday Daily Traffic 544
UWeekday Morning Peak Hour:
Entering 25
n Exiting 20
,UI Total 45
n Weekday Evening Peak Hour:
L Entering 48
Exiting 47
Total 95
CSaturday Daily Traffic 316
Saturday Midday Peak Hour:
Entering 50
Exiting 47
n Total 97
u
'Based on ITE LUC 912, Drive-In Bank;3,672 sf.
U
n 3Trip Generation,Eighth Edition;Institute of Transportation Engineers;Washington,DC;2009.
LI 15
CQA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Tmffic\Reports\T[AS 112712 F.docx
i
' l J
r l
On a typical weekday, the proposed development is expected to generate 544 vehicle
trips (272 vehicles entering and 272 vehicles exiting). During the weekday morning peak r,
hour, 45 vehicle trips (25 vehicles entering and 20 vehicles exiting) are expected. During
the weekday evening peak hour, 95 vehicle trips (48 vehicles entering and 47 vehicles `J
exiting) are expected. On a Saturday, the proposed development is expected to generate r_
316 vehicle trips (158 vehicles entering and 158 vehicles exiting). During the Saturday
midday peak hour, 97 vehicle trips (50 vehicles entering and 47 vehicles exiting) are
expected.
It should be noted that no credit was taken for trips generated by the existing ATM on the
Butcher Boy entrance driveway or for dual purpose trips between the proposed branch r ,
bank and the existing Butcher Boy Marketplace stores.
Trip Distribution
The directional distribution of the vehicular traffic approaching and departing the site is a
function of population densities, the location of employment, existing travel patterns, r
similar uses, and the efficiency of the existing roadway system.
The trip distribution for the project was developed based on a review of existing trips '
generated by the existing Butcher Boy Market Place. Table 8 summarizes the expected
trip distribution.
F ,
U
TABLE 8
PROPOSED TRIP DISTRIBUTION "
U
Route Direction Percent of Trips
r �
Osgood Street North 29 ,
Osgood Street South 64 '
u
Great Pond Road East 7
TOTAL 100
LJ
r�
As shown in Table 8, approximately 29 percent of the site traffic is anticipated to arrive
and depart the site by way of Osgood Street to the north, 64 percent by way of Osgood r ,
Street to the south, and 7 percent by way of Great Pond Road to the east.
r
U
ri
16
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\T1AS 112712 F.docx
I 1
l I
Future Traffic Volumes - Build Condition
LJ
The site-generated traffic presented in Table 7 was distributed within the study area
according to the percentages summarized in Table 8. The site generated volumes were
superimposed onto the 2017 No-Build traffic volumes to represent the 2017 Build traffic-
volume conditions. The anticipated 2017 Build weekday morning and weekday evening
traffic volumes are graphically presented in Figure 4. These volumes were used as the
basis for all analysis as well as to identify potential mitigation measures to ameliorate the
n project's impacts.
n
u
A summary of peak-hour projected traffic-volume changes in the site vicinity are shown
n in Table 9. These volumes are based on the expected increases from the site traffic
generation.
u
Li
r?
C
n
Li
L
C
c
n
U 17
EQA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
Weekday Morning Peak Hour ( 7:30- 8:30 A.M.) o
CASABLANCA A�' lOERSH ` '
1651
69 OSGOOD STREET4 452-+ (ROUTE 125)513-► 118 i
295 (�
W J
A THFSHOPSAT 4-�
BUTCHERBOY
' G
FSrrEj MARKETPLACE
wn
c Not To Scale
r�
Weekday Evening Peak Hour(4:30 - 5:30 P.M.)
W l_3
S_ 04
Q CASABLANCA s IOEFTS11 r
n
m u
N
N j
JON �4 Co
—924 Ln� �10 r 1
92 � � --747
110
OSGOOD STREET
Y
s 7 1109-� (ROUTE 125) 28 (�
z 1253-i 243 i 1081-� � w No r
325
N O t0 U
r P J
N �
N THESHOPSATCr
,.
BUTCTT£RBOY
O SITE MARKETPLACE
z S Not To Scale
0
w L!
Saturday Midday Peak Hour (11:30 - 12:30 A.M.) o r
3
z CASABLANCA z IOEFTSH
W rnn
W
z
LO D l
w <
A
4-00 0 f 693 �o x-13 u
r i l►
1619
78 �► _�48
J OSGOOD STREET
6 j 621-� (ROUTE 125) 30
n 233- ► (� 247 591- ��N L�
aw
n J p
r OD f 1
U
o A 7HES110PSAT
a
ty^ BLTTCTT£RBOY L-J
o SITE MARKETPLACE
w o V Not To Scale
i Q t J
O
'Q'i BAYS I D E Proposed Branch Bank Figure 4 r�
ENGINEERING North Andover, MA 2017 Build
Peak Hour r
600 Unicorn Park Drive ♦ Wabum. MA 01801 Traffic Volumes
Phone 781.932.3201 A Fay 781.932.3413
www.bayokiwginewing.com
L i
I1
LJ
TABLE 9
'—' TRAFFIC-VOLUME INCREASESa
Volume Percent
Increase Increase
2017 2017 over over
Location/Peak Hour No-Build Build No-Build No-Build
Osgood Street,north of Site
n Weekday Morning 1,369 1,379 10 0.7
4 Weekday Evening 1,949 1,977 28 1.4
L� Saturday Midday 1,225 1,254 29 2.4
Osgood Street,south of Great Pond Road
Weekday Morning 2,081 2,110 29 1.4
Weekday Evening 2,583 2,648 65 2.5
Saturday Midday 1,762 1,824 62 3.5
Great Pond Road,east of Osgood Street
Weekday Morning 821 824 3 0.4
n Weekday Evening 772 778 6 0.8
LJ Saturday Midday 564 570 6 1.1
kr "All volumes are vehicles per hour,total of both directions.
U
As shown in Table 9, project-related increases are in the range of 0.7 to 1.4 percent
Li during the weekday morning peak hour and 1.4 to 2.5 percent during the weekday
evening peak hour. Saturday percent increases are slightly higher, but the overall traffic
�1 volumes are lower than the respective weekday morning and evening peak hours. This is
L, approximately equivalent to one additional vehicle per minute during the respective peak
hours.
C
L�
U 19
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\T1AS 112712 F.doex
l J
! 1
l J
SECTION 4: CAPACITY ANALYSIS
r,
�J
j •.
i,_l
r�
�r
To assess intersection operations, capacity analyses were conducted for Existing, No-
Build, and Build traffic-volume conditions. Capacity analyses provide an indication of ,
how well the study area intersections serve existing and projected traffic volumes.
Vehicle queue analyses provide a secondary measure of the operational characteristics of
an intersection or section of roadway under study in terms of lane use and demand.
LJ
METHODOLOGY
Levels of Service
Level of service (LOS) is a quantitative measure used to. describe the operation of an
intersection or roadway segment. The level of service definition is described by the
quality of traffic flow and is primarily defined in terms of traffic delays. The primary `
result of capacity analyses is the assignment of a level of service to traffic intersections . J
or roadway segments under various traffic-flow conditions. Six levels of service are
defined for traffic intersections and roadway segments. Levels of service range from `
LOS A to LOS F. LOS A represents very good operating conditions and LOS F
represents very poor operating conditions.
r�
Unsignalized Intersections
The level of service for an unsignalized intersection is determined by the methodology
and procedures described in the 2000 Highway Capacity Manuals The level of service
for unsignalized intersections is measured in terms of average delay for the critical
r �
movements (typically side street turning movements or mainline turning movements).
The delay for the critical movements is a function of the available capacity for the '
4The capacity analysis methodology is based on procedures presented in the Highway Capacity Manual,Transportation
Research Board;Washington,DC;2000.
5Highway Capacity Manual;Transportation Research Board;Washington,DC;2000. r i
20
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Trafric\Reports\TIAS 112712 F.docx
f 1
t
movement and the degree of saturation of the lane group containing the critical
movement. The delay calculation includes the affects of initial deceleration delay
approaching a STOP sign, stopped delay, queue move-up time, and final acceleration
delay from a stopped condition. The definitions for level of service at unsignalized
intersections are also provided in the 2000 Highway Capacity Manual. Table 10
summarizes the relationship between level of service and average control delay for the
critical movements at unsignalized intersections.
TABLE 10
LEVEL-OF-SERVICE CRITERIA FOR UNSIGNALIZED
INTERSECTIONS
Average Delay Resulting
(seconds-per vehicle) Level of Service
< 10.0 A
10.1 to 15.0 B
Q 15.1 to 25.0 C
25.1 to 35.0 D
35.1 to 50.0 E
>50.0 F
allighway Capacity Manual; Transportation Research Board;
Washington,DC;2000;page 17-2.
L
The analytical methodologies used for the analysis of unsignalized intersections use
I conservative analysis parameters, such as high critical gaps. The critical gap is defined as
!� the minimum time between successive main line vehicles for a side street vehicle to
execute the appropriate turning maneuver. Actual field observations indicate that drivers
on minor streets accept smaller gaps in traffic than those used in the analysis procedures
and therefore experience less delay than calculated by the HCM methodology. The
analysis results overstate the actual delays experienced in the field. It should be
Li noted that the unsignalized intersections along heavily trafficked roadways operate at
constrained levels and the resulting calculated results of the unsignalized intersection
n analyses should be considered highly conservative.
I �
rj
Signalized Intersections
r7' Levels of service for signalized intersections are calculated using the methodology and
u
procedures described in the 2000 Highway Capacity Manual. The methodology assesses
n the intersection based on type of signal operation, signal timing and phasing, progression,
�; vehicle mix, and intersection geometrics. Level-of-service designations are based on the
delay per vehicle. Table 11 summarizes the relationship between level of service and
n delay. The calculated delay values result in level-of-service designations which are
U applied to individual lane groups, to individual intersection approaches, and to the entire
n intersection.
n
Li 21
EQ:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
n
r,
TABLE 11
LEVEL-OF-SERVICE CRITERIA FOR SIGNALIZED L+
INTERSECTIONS
Delay per Vehicle Resulting
(Seconds) Level of Service
r}
<10.0 A 1
10.1 to 20.0 B `J
20.1 to 35.0 C
35.1 to 55.0 D
55.1 to 80.0 E �
>80.0 F
allighway Capacity Manual; Transportation Research Board; Washington, i
DC;2000;page 16-2.
r�
ANALYSIS RESULTS `y
Level-of-service analyses were conducted for 2012 Existing, 2017 No-Build and 2017
Build conditions for the intersections within the study area. The results of the signalized `J
capacity analyses are summarized in Table 12 and the unsignalized analyses are in Table r,
13. Detailed analysis sheets are presented in the Appendix.
TABLE 12
SIGNALIZED LEVEL-OF-SERVICE ANALYSIS SUMMARY
t-,
Signalized Intersection/ 2012 Existing 2017 No-Build 2017 Build
Peak Hour V/C' Delay LOS` V/C Delay LOS V/C Delay LOS `J
ri
Osgood Street and Great Pond Road
Weekday Morning 0.80 19.2 B 0.85 22.2 C 0.86 22.7 C
Weekday Evening 0.91 25.2 C 1.05 33.4 C 1.07 38.9 D
Saturday Midday 0.58 10.8 B 0.62 11.7 B 0.64 12.0 B t
'Volume-to-capacity ratio.
"Delay in seconds per vehicle.
`Level of service. r I
i__.
. t �
22
Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\TraHic\Reports\TIAS 112712 F.docx
! 7
i_J
E
f Osgood Street and Great Pond Road
u
Under 2012 Existing weekday morning conditions, this signalized intersection currently
operates at level of service (LOS) B during the weekday morning peak hour, at LOS C
during the weekday evening peak hour and at LOS B during the Saturday midday peak
hour. Under future 2017 No-Build conditions, this intersection is projected to operate at
LOS C during the weekday morning peak and weekday evening peak hours and at LOS B
during the Saturday midday peak hour. Under 2017 Build conditions, with the project,
R the intersection is projected to operate at LOS C during the weekday morning peak hour,
Lat LOS D during the weekday evening peak hour and at LOS B during the Saturday
midday peak hour.
Capacity analyses were also performed for the projected Build condition for each peak
hour based on the observations of existing flow at the intersection. During each peak
period observed, the Great Pond Road approach to Osgood Street was observed to be
used as two lanes for left-turns to Osgood Street southbound. It is noted that the Great
Pond Road approach is only striped for one lane of travel, but during peak periods, used
as two. The results of these analyses indicate that under future Build conditions, the
u intersection will operate at LOS C or better overall during each of the peak hours.
n
TABLE 13
UNSIGNALIZED LEVEL-OF-SERVICE ANALYSIS SUMMARY
Li 2012 Baseline 2017 No-Build 2017 Build
Critical Movement/
Peak Hour Demand' V/Cb Delay` LOS° Demand V/C Delay LOSDemand V/C Delay LOS
Osgood Street and the Existing Butcher
Boy Marketplace Entrance
Left-turn movements into the Butcher
Boy Marketplace:
Li Weekday Morning 44 0.04 8.3 A 44 0.04 8.5 A 51 0.05 8.5 A
Weekday Evening 78 0.14 11.8 B 78 0.15 12.1 B 92 0.18 12.6 B
Saturday Midday 63 0.07 9.1 A 63 0.07 9.2 A 78 0.09 9.4 A
0 Osgood Street and the Existing Butcher
Boy Marketplace Exit
Left-turn and through movements
Ef
from the Butcher Boy Marketplace:
Weekday Morning 74 0.42 35.5 E 74 0.48 43.8 E 88 0.59 52.8 F
Weekday Evening 194 2.26 >50 F 194 2.57 >50 F 227 3.01 >50 F
Saturday Midday 170 1.00 >50 F 170 1.06 >50 F 203 1.31 >50 F
Right-turn movements from the
Butcher Boy Marketplace:
Weekday Morning 21 0.03 9.5 A 21 0.03 9.6 A 27 0.04 9.7 A
Weekday Evening 106 0.14 10.0 B 106 0.14 10.3 B 120 0.16 10.4 B
Saturday Midday 78 0.13 10.7 B 78 0.12 10.3 B 92 0.14 10.5 B
U 'Demand of critical movements in vehicles per hour.
bVolume-to-capacity ratio.
E
`Delay in seconds per vehicle.
dLevel of service.
M
U 23
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
U
I.J
I ��
Osgood Street and the Existing Butcher Boy Marketplace Entrance
a-J
Under 2012 Existing weekday morning conditions, the critical movements (left-turn !
movements into the Butcher Boy Marketplace) at this unsignalized intersection currently
operate at LOS A during the weekday morning peak hour, at LOS B during the weekday `
evening peak hour and at LOS A during the Saturday midday peak hour. Under future
2017 No-Build conditions, these movements are projected to continue to operate at LOS
A during the weekday morning peak hour, at LOS B during the weekday evening peak
hour and at LOS A during the Saturday midday peak hour. Under 2017 Build conditions, r,
with the project, there is no change in the level of service. The critical movements are
modeled to continue to operate at LOS A during the weekday morning peak hour, at LOS
B during the weekday evening peak hour and at LOS A during the Saturday midday peak -,
hour.
Osgood Street, Commerce Way and the Existing Butcher Boy Marketplace Exit
Under 2017 Build conditions, the critical movements (shared left-turn and through
movements from the site driveway) are projected to operate at LOS E during the weekday r
morning peak hour and at LOS F during the weekday evening and Saturday midday peak
hours. As shown in Table 3, actual delays for existing left turns was found to be 13
seconds during the weekday morning peak hour (LOS B operations), 39 seconds during
the evening peak hour (LOS D operations) and 24 seconds during the Saturday midday
peak hour (LOS C operations). Compared to the level of service results in Table 13,
actual conditions are significantly better than the modeled results. Further, the signal to
the south on Osgood Street at Great Pond Road provides gaps in the northbound traffic
stream to facilitate movements out of the Butcher Boy exit.
Under future 2017 No-Build conditions, the critical movements are projected to continue U
to operate at LOS E during the weekday morning peak hour and at LOS F during the
weekday evening and Saturday midday peak hours. Under 2017 Build conditions, with ! i
the project, the critical movements are modeled to operate at LOS F during the weekday �-
morning peak hour and will continue to operate at LOS F during the weekday and
Saturday midday peak hours. Based on the actual measured delays during the peak
hours, actual future conditions will be better than the HCM model indicates.
lJ
!"1
lJ
1
U
LJ
!
24
QA12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
f
a. i
�l
�! ON SITE OPERATIONS SECONDARY BANK ACCESS
n An analysis was performed for the on-site intersection where the secondary bank
entrance/exit would forms the fourth leg of an on-site unsignalized intersection with the
Butcher Boy Marketplace entrance and the internal parking lots. For this analysis, it was
assumed, as a worst case scenario, that all of the bank traffic would enter and exit from
the Butcher Boy Marketplace parking fields. The analysis assumed 25 vehicles would
enter the bank during the morning peak hour, 47 during the evening peak hour and 47
during the Saturday midday peak hour from the internal parking fields.
L!
Under 2017 Build conditions, with the project, the critical movements are projected to
C operate at LOS A during the weekday morning peak hour, at LOS B during the weekday
evening peak hour and at LOS A during the Saturday midday peak hour. The analysis
indicates queues of one vehicle per each approach during the peak hours.
Based on the analysis performed no significant queuing of vehicles would occur along
the site access road from vehicles entering/exiting the bank from the Butcher Boy
Marketplace parking field. Actual traffic volumes are expected to be significantly less
than the modeled condition. It is recommended that the Butcher Boy Marketplace on-site
intersection include STOP signs, painted STOP bars and DO NOT ENTER signs
(preventing vehicles from exiting through the Butcher Boy Marketplace Entrance
driveway). Sidewalks and crosswalks are to be provided for pedestrians to access the
bank on foot from the Butcher Boy Marketplace. Implementation of the proposed traffic
measures will adequately control traffic flow and vehicle turning movements at the
intersection.
ri
L DRIVE-THROUGH QUEUING
To determine if the proposed drive-through window would impact traffic flow on the site
or on Osgood Street, a queuing operation analysis was performed for the proposed bank
r drive-through lanes. Specifically, based on the anticipated demand, and the expected
i service rate to provide services, the expected vehicle queue was determined.
Li
FA service rate was developed based on empirical data from the proposed bank. Based on
LJ the data, the time it takes for a transaction to occur at a teller operated window is between
two and four minutes. The time it takes a transaction to occur at the ATM is between 1.5
ri and two minutes.
LJ
Demand for the teller window was based on empirical data form the bank's Westgate,
Haverhill branch. During the weekday morning peak hour, an average of five teller
LJ transactions is expected and seven ATM transactions are expected. Applying an average
transaction rate of three minutes per transaction to the expected trips to be generated
through the teller drive-through window yields an expected average queue of one vehicle
U and a 95a' percentile queue of three vehicles or less. Applying a transaction rate of two
U 25
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Rcports\T1AS 112712 F.docx
r
l J
r ,
minutes per transaction to the expected trips to be generated through the ATM yields an
expected average queue of one vehicle and a 95th percentile queue of one vehicle.
r �
During the weekday evening peak hour, an average of ten teller transactions is expected
and nine ATM transactions are expected. Applying the average transaction rate of three `J
minutes per transaction yields an expected average queue of one vehicle and a 95th r}
percentile queue of four vehicles or less. Applying a transaction rate of two minutes per
transaction to the expected trips to be generated through the ATM yields an expected
average queue of one vehicle and a 95th percentile queue of two vehicles.
During the Saturday midday peak hour, an average of four teller transactions is expected
and thirteen ATM transactions are expected. Applying the average transaction rate of r
three minutes per transaction yields an expected average queue of one vehicle and a 95th
percentile queue of one vehicle. Applying a transaction rate of two minutes per
transaction to the expected trips to be generated through the ATM yields an expected r
average queue of one vehicle and a 95th percentile queue of three vehicles.
Based on the Site Plan, the maximum 95th percentile queue expected would be four r
vehicles during the weekday evening period at the teller window, which would extend
approximately 80 feet from the teller window. As shown on the site plan, storage for four
vehicles is provided in both teller window drive-through lanes. This queue would not '
extend out the driveway to Osgood Street.
Lj
Lj
r'
LJ
U
P
U
r�
r •.
�J
S �
U
r 1
26 U
Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx r
l J
SECTION 5: RECOMMENDATIONS AND CONCLUSION
Ell RECOMMENDATIONS
The final phase of the analysis process is to identify the mitigation measures necessary to
E. minimize the impact of the project on the transportation system. The proponent has made
a commitment to implement the mitigation measures listed below.
The capacity analyses performed indicate the critical movements at the Butcher Boy exit
(left-turns out) are projected to operate at LOS E or LOS F during the respective peak
hours. Actual delays for existing left turns was found to be 13 seconds during the
weekday morning peak hour (LOS B operations), 39 seconds during the evening peak
hour (LOS D operations) and 24 seconds during the Saturday midday peak hour (LOS C
C operations). Compared to the level of service results in Table 13, actual conditions are
significantly better than the modeled HCM capacity analysis results indicate. It is
recommended that the site driveway continue to be placed under STOP sign control.
It is recommended that tracking lines be shown to delineate the lanes for each teller
window, as well as the ATM. Further, it is recommended that the Butcher Boy on-site
intersection at the end of the Butcher Boy Plaza entrance (at the northwest corner of the
Butcher Boy Marketplace) include STOP signs and DO NOT ENTER signs (preventing
vehicles from exiting through the Butcher Boy Entrance driveway).
L�
CONCLUSION
The proposed branch bank is to be located on the east side of Osgood Street, north of
Great Pond Road. Currently, the site consists of the Butcher Boy Marketplace, a 30,495
square foot (sf) shopping center. The project will consist of the addition of a free-
standing, approximately 3,672 sf branch bank building with three drive-through lanes
kk� (two teller lanes and one ATM lane).
L�
On a typical weekday, the proposed branch bank is expected to generate 544 vehicle trips
(272 vehicles entering and 272 vehicles exiting). During the weekday morning peak
ri
Li 27
U Q:\12PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
r
LJ
hour, 45 vehicle trips (25 vehicles entering and 20 vehicles exiting) are expected. During r
the weekday evening peak hour, 95 vehicle trips (48 vehicles entering and 47 vehicles
exiting) are expected. On a Saturday, the proposed branch bank is expected to generate
316 vehicle trips (158 vehicles entering and 158 vehicles exiting). During the Saturday
midday peak hour, 97 vehicle trips (50 vehicles entering and 47 vehicles exiting) are
expected. n
Capacity analyses were performed for each of the study area intersections for 2012
Existing, 2017 No-Build (without the branch bank) and 2017 Build conditions (with the
branch bank). Based on the analyses performed, there is no significant change in level of
service from No-Build to Build conditions.
r-
It is recommended that tracking lines be shown to delineate the lanes for each teller
window, as well as the ATM. Further, it is recommended that the Butcher Boy on-site U
intersection at the end of the Butcher Boy Plaza entrance (at the northwest corner of the n
Butcher Boy Marketplace) include STOP signs and DO NOT ENTER signs (preventing
vehicles from exiting through the Butcher Boy Entrance driveway). F
r,
Review of the proposed branch bank and access plan shows that in relation to roadway
capacity, traffic safety, and traffic impacts upon the surrounding roadway network, the
proposed project will meet safety standards and have a minimal impact on existing traffic r,
conditions. With the proposed access, in conjunction with the mitigation measures ,r,
described above and maintaining sight distances from the driveway (clear sight lines
along frontage), safe and efficient access can be provided to the clienteles of the proposed
branch bank and to the motoring public in the area. Any vehicle queuing expected at the
teller windows or ATM will occur on the site.
r�
U
n
U
LJ
U
r�
LJ
r-
r,
28 ,
Q:\12 PROJECTS\2121491-LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\Reports\TIAS 112712 F.docx
r
i J
C
APPENDIX
CTraffic Count Data
Seasonal Adjustment Worksheets
Crash Worksheets
Traffic Growth Data
Trip Generation Worksheets
OCapacity Analysis Worksheets
a
0
a
C
n
V
E
El Traffic Count Data
L
C
V
r
V
Li
r
L,
C
C
C
C
C
Osgood Street rd
east of Butcher Boy Plaza PRECISION
City,State:North Andover,MA D A T A
Client:Bayside/K.Cram INDUSTMKU.0 122978 AA Volume(Weekly)
P.O.BM301 SeANMA 01503
OFFKa:50BA613M F-SM545.1234
Site Code:2121491
C E—Rd aequei ft011—
Start 09-Jul-12 Tue Wed Thu Fri Sat Sun Week Average
Time ES WB EB We E8 WB EB WB EB WB EB WB EB WB EB WB
12:00 AM 3633 38 31 66 47 47 37
01:00 13 15 12 17 29 1818 17
02:00 10 11 23 14 19 17 • 17 14
03:00 15 14 13 24 12 14 13 17
04:00 32 46 34 40 24 23 30 36
05:00 84 171 84 147 40 54 69 124
06:00 186 452 215 400 105 111 169 321
07:00 343 721: 359 631 200 236 301 529
08:00 ' 484 715 448 656 274 301 402 ;565
C' 09:00 e 445 444 476 506 359 376 a 427 442
10:00 393 445 439 456 488 435 443 445
11:00 467 485 :482 572 483 500: 477 519
12:00 PM ` 601 595` 577 S66 555 460 578 340.
01:00 ' 553 481 559 505 624 423 579 470
02:00 w 562 473 620 453 462 363 548 430
03:00 824 522 968 489 445 394 746 468
04:00 1035 588 1067• 545 358 348 820 494
05:00 1187 579 1044 505 359 366 863 483
06:00 736 411 713 426 346 315 598 384
07:00 413 320 407 284 263 277 361 294
08:00 308 265 311 235 207 216 275 239
09:00 211 173 203 165 179 156 198 165
10:00 151 96 131 110 131 121 138 109
11:00 1 100 561 102 691 101 661 101 64
Lane 0 0 0 0 0 0 9189 8111 9325 7840 6137 5637 0 0 8218 7196
Day 0 _ 0 0 17300 17165 11774 0 15414
AM Peak 08:00 07:00 11:00 08:00 10:00 11:00 11:00 08:00
1 �
Vol.-- 484 721 482 650 496 500 477 555
U PM Peak 17:00 12:00 16:00 12:00 13:00 12:00 17:00 12:00
Vol__ 1187 595 1067 566 624 460 863 540
n Comb.
Total 0 0 0 17300 17165 11774 0 15414
L
ADT ADT 15,413 AADT 15,413
C
CPage 1
C
L�
ra
r
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,I.IC
Client:Bayside/K.Cram P.O.Box301 Berlin,MA 01503 122978 AA Volume
Office:508.4813999 Fax:508.545AZ34 Site Code:2121491
Email:datarequesu@pdillc.com
�.l
Start EB WB Combined 12-Jul-12
Time A.M. P.M. A.M. P.M. A.M. P.M. Thu
12:00 13 144 10 151 23 295
12:15 7 146 15 151 22 297
12:30 8 146 3 154 11 300 a�
12:45 8 36 165 601 5 33 139 595 13 69 304 1196
01:00 5 135 7 134 12 269
01:15 2 146 3 113 5 259
01:30 2 140 2 124 4 264 L
01:45 4 13 132 553 3 15 110 481 7 28 242 1034
02:00 2 125 0 130 2 255
02:15 4 151 1 105 5 256 r
02:30 0 121 5 116 5 237
02:45 4 10 165 562 5 11 122 473 9 21 287 1035
03:00 5 154 4 117 9 271
03:15 1 162 2 142 3 304
03:30 6 235 4 131 10 366
03:45 3 15 273 824 4 14 132 522 7 29 405 1346
04:00 3 251 6 161 9 412
04:15 7 251 14 145 21 396
04:30 10 245 9 140 19 385 r-
04:45 12 32 288 1035 17 46 142 588 29 78 430 1623
05:00 13 298 25 188 38 486
05:15 20 338 48 151 68 489
05:30 18 286 44 127 62 413
05:45 33 84 265 1187 54 171 113 579 87 255 378 1766
06:00 27 250 88 108 115 358 L
06:15 33 195 107 97 140 292
06:30 59 159 120 103 179 262
06:45 67 186 132 736 137 452 103 411 204 638 235 1147 r
07:00 69 122 156 84 225 206
07:15 88 105 151 85 239 190
07:30 75 88 211 83 286 171
07:45 111 343 98 413 203 721 68 320 314 1064 166 733
08:00 95 84 199 75 294 159
08:15 100 81 188 75 288 156
08:30 125 67 183 65 308 132
08:45 164 484 76 308 145 715 50 265 309 1199 126 573
09:00 143 66 125 52 268 118 i
09:15 99 56 118 40 217 96
09:30 84 62 97 49 181 111
09:45 119 445 27 211 104 444 32 173 223 889 59 384
10:00 87 53 122 24 209 77 .�
10:15 94 39 94 33 188 72
10:30 100 31 108 17 208 48
10:45 112 393 28 151 121 445 22 96 233 838 50 247
11:00 107 29 103 17 210 46
11:15 111 19 120 15 231 34
11:30 115 27 133 18 248 45
11:45 134 467 25 100 129 485 6 56 263 952 31 156 LJ
Total 2508 6681 3552 4559 6060 11240
Percent 41.4% 59.4% 58.6% 40.6% r-�
Day Total 9189 8111 17300 u
Peak 08:15 04:45 07:30 04:30 07:45 04:45 r
Vol. 532 1210 801 621 1204 1818
P.H.F. 0.811 0.895 0.949 0.826 0.959 0.929
L J
Page 1 ,
l J
l
ra
Osgood Street PRECISION
L east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box 301 Berlin,MA 01503 122978 AA Volume
Office:508.481.3999 Fax508.545.1234 Site Code:2121491
Email:data req uestsfpdiliccom
Li
Start EB WB Combined 13-Jukl2
Time A.M. P.M. A.M. P.M. A.M. P.M. Fri
�1 12:00 12 137 9 168 21 305
IU 12:15 8 150 12 143 20 293
12:30 5 130 6 134 11 264
12:45 13 38 160 577 4 31 121 566 17 69 281 1143
01:00 1 138 5 127 6 265
01:15 1 136 3 117 4 253
U 01:30 6 143 6 129 12 272
01:45 4 12 142 559 3 17 132 505 7 29 274 1064
02:00 6 153 2 104 8 257
F102:15 8 157 4 127 12 284
LLLL.....LLL� 02:30 6 148 6 120 12 268
02:45 3 23 162 620 2 14 102 453 5 37 264 1073
03:00 4 201 2 117 6 318 \
n 03:15 1 220 6 107 7 327
i 03:30 4 263 8 136 12 399
03:45 4 13 284 968 8 24 129 489 12 37 413 1457
04:00 3 252 3 131 6 383
04:15 9 258 4 116 13 374
04:30 9 283 16 168 25 451
04:45 13 34 274 1067 17 40 130 545 30 74 404 1612
05:00 12 268 26 168 38 436
05:15 22 295 27 126 49 421
f"0 05:30 27 264 39 124 66 388
05:45 23 84 217 1044 55 147 87 505 78 231 304 1549
Li 06:00 40 222 60 117 100 339
06:15 38 197 97 102 135 299
n 06:30 47 167 105 112 152 279
06:45 90 215 127 713 138 400 95 426 228 615 222 1139
U 07:00 59 111 126 89 185 200
07:15 72 118 150 68 222 186
07:30 99 99 157 62 256 161
07:45 129 359 79 407 198 631 65 284 327 990 144 691
( 08:00 89 93 174 59 263 152
`i 08:15 96 65 169 64 265 129
08:30 105 82 164 69 269 151
n 08:45 158 448 71 311 143 650 43 235 301 1098 114 546
09:00 128 53 142 54 270 107
U 09:15 99 55 136 45 235 100
09:30 125 56 103 37 228 93
09:45 124 476 39 203 125 506 29 165 249 982 68 368
rl 10:00 105 43 118 26 223 69
10:15 112 30 111 26 223 56
U 10:30 105 29 109 32 214 61
10:45 117 439 29 131 118 456 26 110 235 895 55 241
n 11:00 101 30 129 8 230 38
11:15 132 23 122 21 254 44
(__1 11:30 113 24 144 22 257 46
11:45- 136 482 25 102 177 572 18 69 313 1054 43 171
Total 2623 6702 3488 4352 6111 11054
r Percent 42.9% 60.6% 57.1% 39.4%
U Day Total 9325 7840 17165
Peak 08:45 04:30 07:45 04:30 07:45 04:30
1__! Vol. 510 1120 705 592 1124 1712
P.H.F. 0.807 0.949 0.890 0.881 0.859 0.949
U
rt Page 2
V
r
L j
ra
r
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box301 Berlin,MA 01503 122978 AA Volume r
Office:508.481.3999 Fax508.545.1234 Site Code:2121491
Email:datarequests@pdilic.com
Start EB WB Combined 14-Jul-12
Time A.M. P.M. A.M. P.M. A.M. P.M. Sat r_1
12:00 26 155 17 137 43 292
12:15 17 153 16 116 33 269
12:30 15 123 9 94 24 217 `J
12:45 8 66 124 555 5 47 113 460 13 113 237 1015
01:00 15 138 5 103 20 241 r 1
01:15 5 159 8 99 13 258
01:30 5 165 2 104 7 269
01:45 4 29 162 624 3 18 117 423 7 47 279 1047
02:00 3 146 4 90 7 236
02:15 4 120 4 83 8 203 r i
02:30 7 94 2 100 9 194
02:45 5 19 102 462 7 17 90 363 12 36 192 825 `J
03:00 4 106 1 104 5 210
03:15 6 109 6 91 12 200 r l
03:30 2 126 3 107 5 233
03:45 0 12 104 445 4 14 92 394 4 26 196 839
04:00 4 91 2 98 6 189
04:15 2 86 5 84 7 170
04:30 9 80 3 80 12 160
04:45 9 24 101 358 13 23 86 348 22 47 187 706
05:00 4 112 4 95 -8 207
05:15 11 79 14 94 25 173
05:30 12 91 17 81 29 172 r'i
05:45 13 40 77 359 19 54 96 366 32 94 173 725
06:00 4 98 13 87 17 185
06:15 19 87 30 85 49 172
06:30 34 81 32 65 66 146
06:45 48 105 80 346 36 111 78 315 84 216 158 661 r
07:00 42 77 40 78 82 155
07:15 45 67 50 73 95 140
07:30 47 62 60 63 107 125
07:45 66 200 57 263 86 236 63 277 152 436 120 540
08:00 57 58 52 62 109 120
08:15 57 68 78 48 135 116
08:30 68 45 76 59 144 104
08:45 92 274 36 207 95 301 47 216 187 575 83 423 r
09:00 84 52 73 45 157 97
09:15 83 36 87 48 170 84
09:30 84 47 100 34 184 81 I
09:45 108 359 44 179 116 376 29 156 224 735 73 335
10:00 104 42 102 34 206 76
10:15 124 31 103 27 227 58
10:30 133 34 121 42 254 76
10:45 135 496 24 131 109 435 18 121 244 931 42 252
11:00 123 28 111 17 234 45 r
11:15 109 31 127 18 236 49
11:30 121 22 114 15 235 37
11:45 130 483 20 101 148 500 16 66 278 983 36 167 `l
Total 2107 4030 2132 3505 4239 7535
Percent 49.7% 53.5% 50.3% 46.5% F)
Day Total 6137 5637 11774 L
Peak 10:15 01:15 11:00 12:00 11:00 01:00
r �
Vol. 515 632 500 460 983 1047
P.H.F. 0.954 0.958 0.845 0.839 0.884 0.938
r
L J
Page 3 r
r �
l J
r r
L
n ra
L Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box301 Beriin,MA 01503 122978 A Class
Office:508.481.3999 Fax 508.545.1234 Site Code:2121491
EB EmaiL•datarequests@pdillccom
Start Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl
Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/12/12 0 32 3 1 0 0 0 0 0 0 0 0 0 36
01:00 0 11 2 0 0 0 0 0 0 0 0 0 0 13
02:00 0 6 3 0 1 0 0 0 0 0 0 0 0 10
03:00 0 8 5 0 0 1 0 0 0 1 0 0 0 15
04:00 1 18 12 0 1 0 0 0 0 0 0 0 0 32
05:00 0 60 19 1 2 2 0 0 0 0 0 0 0 84
n 06:00 3 128 42 0 6 3 0 3 1 0 0 0 0 186
07:00 6 272 44 4 11 2 0 1 2 1 0 0 0 343
U 08:00 7 376 72 4 15 1 0 7 2 0 0 0 0 484
09:00 3 348 62 10 8 4 0 3 6 0 1 0 0 445
10:00 9 300 58 4 12 4 0 0 5 0 0 1 0 393
n 11:00 6 373 55 3 10 10 0 5 4 1 0 0 0 467
12 PM 9 458 90 7 21 5 0 7 4 0 0 0 0 601
�--� 13:00 2 446 71 4 13 8 0 6 3 0 0 0 0 553
14:00 6 437 89 4 14 5 0 2 3 0 1 0 1 562
15:00 8 645 122 4 23 7 0 10 3 1 0 1 0 824
16:00 13 816 153 9 21 5 0 13 3 2 0 0 0 1035
17:00 14 1018 118 2 15 3 0 11 3 3 0 0 0 1187
18:00 7 632 82 3 3 2 0 7 0 0 0 0 0 736
19:00 8 354 41 1 4 1 1 3 0 0 0 0 0 413
F1
20:00 2 269 32 0 4 0 0 1 0 0 0 0 0 308
' 21:00 1 186 22 0 2 0 0 0 0 0 0 0 0 211
22:00 0 134 16 0 1 0 0 0 0 0 0 0 0 151
U 23:00 1 85 11 0 3 0 0 0 0 0 0 0 0 100
Percent 1.2% 80.7% 13.3% 0.7% 2.1% 0.7% 0.0% 0.9% 0.4% 0.1% 0.0% 0.0% 0.0%
r- AM Peak 10:00 08:00 08:00 09:00 08:00 11:00 08:00 09:00 03:00 09:00 10:00 08:00
i Vol. 9 376 72 10 15 10 7 6 1 1 1 484
PM Peak 17:00 17:00 16:00 16:00 15:00 13:00 19:00 16:00 12:00 17:00 14:00 15:00 14:00 17:00
Vol. 14 1018 153 9 23 8 1 13 4 3 1 1 1 1187
n
Li
U
n
LJ
n
U
Page 1
Li
r
Li
L.,
ri
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A L
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box 301 Berlin,MA 01503 122978 A Class
Office:508.4813999 Fax 508.545.1234 Site Code:2121491 ��
EB Email:datarequests@pdillc.com
Start Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 AM <6 Axl 6 Axle >6 Axl L
Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/13/12 0 34 4 0 0 0 0 0 0 0 0 0 0 38
01:00 0 7 5 0 0 0 0 0 0 0 0 0 0 12 r_l
02:00 0 16 5 0 2 0 0 0 0 0 0 0 0 23
03:00 0 8 3 0 1 0 0 0 1 0 0 0 0 13 L ,
04:00 2 19 11 0 1 1 0 0 0 0 0 0 0 34
05:00 1 54 20 1 5 1 0 1 1 0 0 0 0 84
06:00 1 163 41 3 3 1 0 0 2 1 0 0 0 215 r 1
07:00 11 284 46 2 13 2 0 0 1 0 0 0 0 359
08:00 2 347 72 6 11 5 1 2 2 0 0 0 0 448 L
09:00 6 351 84 5 17 7 0 2 3 1 0 0 0 476
10:00 4 343 59 8 15 3 0 2 5 0 0 0 0 439
11:00 4 372 69 6 16 7 1 1 3 3 0 0 0 482 r-1
12 PM 8 470 67 5 18 2 0 4 2 1 0 0 0 577
13:00 4 437 83 5 15 7 0 4 4 0 0 0 0 559 t
14:00 10 479 91 6 18 5 0 6 4 0 1 0 0 620
15:00 8 777 132 8 23 6 0 7 1 4 0 2 0 968
16:00 17 859 148 4 21 6 0 8 1 0 2 0 1 1067 r l
17:00 10 887 115 3 7 1 0 14 3 0 2 0 2 1044
18:00 13 607 78 1 10 1 0 3 0 0 0 0 0 713 L ,
19:00 6 348 45 2 5 0 0 1 0 0 0 0 0 407
20:00 4 259 43 1 2 1 0 1 0 0 0 0 0 311
21:00 3 177 21 0 1 0 0 1 0 0 0 0 0 203 r)
22:00 2 118 9 0 1 1 0 0 0 0 0 0 0 131
_ 23_.00 6 81 13 0-- 2 _0 __ 0 _ _0 0 0_ 0 0 0 102
Percent 1.3% _80.4% 13.6% 0.7% 2.2% 0.6% 0.0% 0.6% 0.4% 0.1% 0.1% 0.0% 0.0%
AM Peak 07:00 11:00 09:00 10:00 09:00 09:00 08:00 08:00 10:00 11:00 11:00
Vol. 11 372 84 8 17 7 1 2 5 3 482 �1
PM Peak 16:00 17:00 16:00 15:00 15:00 13:00 17:00 13:00 15:00 16:00 15:00 17:00 16:00
Vol. 17 887 148 8 23 7 14 4 4 2 2 2 1067 L�
rl
v
r 1
L
r �
V
l .i
U
l�
U
r-1
J
rl
lJ
Page 2
r �
L J
� 1
l J
n
?as
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.QBox30l Berlin,MA 01503 122978 A Class
Office:508.4813999 fax508.545.1234 Site Code:2121491
EB Email:datarequesrs@pdillc.com
U Start Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl
_Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/14/12 1 56 9 0 0 0 0 0 0 0 0 0 0 66
01:00 0 24 3 0 2 0 0 0 0 0 0 0 0 29
02:00 0 12 5 1 1 0 0 0 0 0 0 0 0 19
(J 03:00 0 9 2 0 1 0 0 0 0 0 0 0 0 12
04:00 1 16 6 0 1 0 0 0 0 0 0 0 0 24
05:00 1 26 7 1 4 1 0 0 0 0 0 0 0 40
06:00 3 80 18 0 2 2 0 0 0 0 0 0 0 105
07:00 5 144 36 2 11 0 0 1 1 0 0 0 0 200
U 08:00 2 215 43 1 8 4 0 0 1 0 0 0 0 274
09:00 4 290 53 3 5 1 0 2 1 0 0 0 0 359
10:00 4 395 77 0 13 3 0 2 2 0 0 0 0 496
rl 11:00 6 408 51 3 11 1 0 2 0 0 1 0 0 483
12 PM 5 475 67 0 7 1 0 0 0 0 0 0 0 555
13:00 11 536 66 0 7 0 0 3 1 0 0 0 0 624
14:00 3 383 63 1 5 2 0 5 0 0 0 0 0 462
15:00 5 375 52 3 9 0 0 1 0 0 0 0 0 445
16:00 11 305 38 1 3 0 0 0 0 0 0 0 0 358
17:00 7 306 39 1 6 0 0 0 0 0 0 0 0 359
Li 18:00 3 297 45 0 1 0 0 0 0 0 0 0 0 346
19:00 7 227 27 0 2 0 0 0 0 0 0 0 0 263
20:00 5 176 23 0 2 0 0 1 0 0 0 0 0 207
21:00 4 149 24 0 2 0 0 0 0 0 0 0 0 179
22:00 1 114 14 0 2 0 0 0 0 0 0 0 0 131
U 23:00 1 78 21 0 1 0 0 0 0 0 0 0 0 101
Percent 1.5% _83.0% _ 12.9% 0.3% 1.7% 0.2% _0.0% 0.3% 0.1% 0.0% 0.0% 0.0%-- 0.0%
AM Peak 11:00 11:00 10:00. 09:00 10:00 08:00 09:00 16:00 11:00 10:00
n Vol. 6 _ 408 77 3 13 4 2 2 1 496
PM Peak 13:00 13:00 12:00 15:00 15:00 14:00 14:00 13:00 13:00
U Vol. 11 536 67 3 9 2 5 1 624
Grand 318 20005 3277 144 503 135 3 153 78 19 8 4 4 24651
n Total
Percent 1.3% 81.2% 13.3% 0.6% 2.0% 0.5% 0.0% 0.6% 0.3% 0.1% 0.0% 0.0% 0.0%
L1
r7
Li
n
Li
n
L
n
L
n
I
Page 3
U
n
f
U
' 1
l_1
ra
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A tJ
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box301 Berlin,MA 01503 122978 A Class i
Office:50BA813999 Fax5O8.545.1234 Site Code:2121491
WB Email:datarequests@pdillccom
Start Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axi 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl
Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/12/12 0 22 9 2 0 0 0 0 0 0 0 0 0 33 r l
01:00 0 10 3 0 2 0 0 0 0 0 0 0 0 15
02:00 0 4 5 0 2 0 0 0 0 0 0 0 0 11
03:00 0 6 5 1 1 1 0 0 0 0 0 0 0 14 L_.
04:00 1 25 12 3 4 0 0 0 1 0 0 0 0 46
05:00 2 101 35 6 19 3 0 1 3 1 0 0 0 171
06:00 10 277 93 3 49 9 0 8 1 2 0 0 0 452 r 1
07:00 9 531 112 8 40 6 0 9 1 4 0 0 1 721
08:00 2 509 127 6 51 2 0 12 3 1 1 0 1 715
09:00 3 292 98 5 30 6 0 6 4 0 0 0 0 444
10:00 5 284 105 11 29 4 0 5 2 0 0 0 0 445
11:00 3 321 107 1 39 5 0 5 3 1 0 0 0 485 r t
12 PM 6 403 125 8 36 6 0 9 2 0 0 0 0 595
13:00 7 292 132 1 38 6 0 5 0 0 0 0 0 481 t✓
14:00 6 313 113 3 27 3 0 3 4 0 1 0 0 473
15:00 3 331 132 6 43 1 0 5 0 0 0 1 0 522 _
16:00 4 399 143 2 32 2 0 6 0 0 0 0 0 588 r 1
17:00 11 428 114 2 22 0 0 2 0 0 0 0 0 579
18:00 9 281 102 1 18 0 0 0 0 0 0 0 0 411 '
19:00 6 235 69 0 9 1 0 0 0 0 0 0 0 320
20:00 3 173 81 1 5 0 0 2 0 0 0 0 0 265
21:00 3 120 38 0 11 0 0 1 0 0 0 0 0 173 r 1
22:00 1 66 22 0 7 0 0 0 0 0 0 0 0 96
23:00 0 40 12 _ 0 _ 4 0 0 0 0 0 0 _ 0 0 _ 56 L J
Percent 1.2% 67.4% 22.1% 0.9% 6.4% 0.7% 0.0% 1.0% 0.3% 0.1% 0.0% 0.0% 0.0%
AM Peak 06:00 07:00 08:00 10:00 08:00 06:00 08:00 09:00 07:00 08:00 07:00 07:00
Vol. 10 531 127 11 51 9 ---- 12 4 4 1 1 721
PM Peak 17:00 17:00 16:00 12:00 15:00 12:00 12:00 14:00 14:00 15:00 12:00
Vol. 11 428 143 8 43 6 9 4 1 1 595 �J
r1
r �
ri
V
f1
l J
rl
v
r—�
LJ
r
U
l .
Page 4
r
r �
II
in
u
n
' ra
u Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIFS,LLC
n Client:Bayside/K.Cram RO.Box301 Berlin,MA 01503 122978 A Class
Office:508.4813999 Fax508.545.1234 Site Code:2121491
B Email:datarequests@pdillc.com
U WB
Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl
Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/13/12 0 19 10 1 1 0 0 0 0 0 0 0 0 31
01:00 0 15 2 0 0 0 0 0 0 0 0 0 0 17
02:00 0 7 4 0 3 0 0 0 0 0 0 0 0 14
U 03:00 0 16 5 0 1 2 0 0 0 0 0 0 0 24
04:00 2 24 5 3 6 0 0 0 0 0 0 0 0 40
05:00 2 86 25 7 18 5 0 2 2 0 0 0 0 147
n 06:00 7 259 69 8 37 9 0 4 3 3 1 0 0 400
07:00 5 448 107 3 44 4 0 11 6 3 0 0 0 631
U 08:00 3 437 146 6 35 6 0 11 4 1 1 0 0 650
09:00 7 309 126 12 35 5 0 9 3 0 0 0 0 506
10:00 3 306 89 6 36 4 2 6 4 0 0 0 0 456
n 11:00 3 362 139 11 44 6 0 3 4 0 0 0 0 572
f 12 PM 4 384 120 5 37 5 0 7 4 0 0 0 0 566
lJ 13:00 4 308 130 7 45 2 0 8 1 0 0 0 0 505
14:00 4 294 105 6 33 4 0 4 3 0 0 0 0 453
15:00 3 332 110 5 29 1 0 6 1 2 0 0 0 489
16:00 7 383 121 2 25 1 0 6 0 0 0 0 0 545
17:00 4 366 105 1 24 1 0 4 0 0 0 0 0 505
U 18:00 8 286 99 2 24 3 0 2 2 0 0 0 0 426
19:00 6 198 64 1 13 1 0 1 0 0 0 0 0 284
20:00 3 155 68 0 8 0 0 1 0 0 0 0 0 235
n 21:00 1 114 46 1 2 0 0 1 0 0 0 0 0 165
22:00 0 79 28 1 2 0 0 0 0 0 0 0 0 110
LJ _ 23:00 4_ 48 _ --16 0 1 0 0 0 0 0 0 0 0 69
Percent 1.0% 66.8% 22.2% 1.1% 6.4% 0.8% 0.0% 1.1% 0.5% 0.1% 0.0% 0.0% 0.0%
n AM Peak 06:00 07:00 08:00 09:00 07:00 06:00 10:00 07:00 07:00 06:00 06:00 08:00
Vol. 7 448 146 12 44 9 2 11 6 3 1 650
PM Peak 18:00 12:00 13:00 13:00 13:00 12:00 13:00 12:00 15:00 12:00
U Vol. 8 384 130 7 45 5 8 4 2 566
n
'u
n
lj
n
L
E
n
I
U
n
Page 5
' 1
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box 301 Berlin,MA 01503 122978 A Class r
Office:508A813999 Fa)c508.545.1234 Site Code:2121491
WB Email:datarequests@pdillc.com
Start Cars& 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axi 6 Axle >6 Axl L
_Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total
07/14/12 0 30 15 1 1 0 0 0 0 0 0 0 0 47 r-
01:00 0 12 2 0 4 0 0 0 0 0 0 0 0 18
02:00 1 11 3 0 2 0 0 0 0 0 0 0 0 17
03:00 0 7 4 1 1 1 0 0 0 0 0 0 0 14 L/
04:00 0 17 3 0 3 0 0 0 0 0 0 0 0 23
05:00 1 35 9 1 6 0 0 0 1 1 0 0 0 54 n
06:00 1 68 28 3 10 1 0 0 0 0 0 0 0 111
07:00 3 155 51 1 21 1 0 2 1 1 0 0 0 236
08:00 1 201 67 0 25 1 0 4 2 0 0 0 0 301
09:00 2 254 89 0 25 1 0 5 0 0 0 0 0 376
10:00 4 286 107 4 28 1 0 2 2 1 0 0 0 435 r 1
11:00 4 352 109 0 29 1 0 3 1 0 1 0 0 500
12 PM 2 333 97 0 20 1 0 6 0 1 0 0 0 460
13:00 5 304 91 1 15 0 0 6 1 0 0 0 0 423
14:00 5 253 81 2 15 0 0 6 0 0 1 0 0 363
15:00 8 274 94 1 16 0 0 1 0 0 0 0 0 394 r 1
16:00 0 257 72 1 16 0 0 2 0 0 0 0 0 348
17:00 9 264 73 1 18 0 0 1 0 0 0 0 0 366
18:00 3 226 71 1 12 0 0 2 0 0 0 0 0 315
19:00 5 197 67 0 7 0 0 1 0 0 0 0 0 277
20:00 6 148 55 0 7 0 0 0 0 0 0 0 0 216
21:00 1 110 39 0 5 0 0 1 0 0 .0 0 0 156 r 1
22:00 4 88 23 0 6 0 0 0 0 0 0 0 0 121
23:00 3 _ 39 20 0_ 3 0 0 1 0 0 0 _ 0 0 66 L J
Percent 1.2% 69.6% 22.5% 0.3% 5.2% 0.1% 0.0% 0.8% 0.1% 0.1% 0.0% 0.0% 0.0%
AM Peak 10:00 11:00 11:00 10:00 11:00 03:00 09:00 08:00 05:00 11:00 11:00 ,-1
_Vol. 4 352 109 _ 4 29 — 1 5 2 1 1 _ ___
0
PM Peak 17:00 12:00 12:00 14:00 12:00 12:00 12:00 13:00 12:00 14:00 12:00
Vol. 9 333 97 2 20 1 6 1 1 1 460
Grand242 14619 4803 176 1316 122 2 208 69 Total22 6 1 2 21588 r 1
Percent 1.1% 67.7% 22.2% 0.8% 6.1% 0.6% 0.0% 1.0% 0.3% 0.1% 0.0% 0.0% 0.0%
L✓
r j
L ,
f1
LJ
r •.
LI
r�
L_J
n
LJ
r �
LJ
1
LJ
Page 6
• r
1.1
l J
n
r
U
n
. rd
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIFS,LLC
Client:Bayside/K.Cram P.O.Box301 Berlin,MA 01503 122978 AA Speed
Office:508.4813999 Fax:508.545.1134 Site Code:2121491
EB Emal�.datarequests@pdilic.com
Lj Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave
Time 14 _19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
07/12/1
2 0 0 0 3 11 3 13 5 1 0 0 0 0 36 44 38
Li 01:00 0 0 0 0 3 4 1 4 1 0 0 0 0 13 47 40
02:00 0 0 0 0 2 4 1 1 2 0 0 0 0 10 38 41
03:00 0 0 0 0 3 3 5 3 1 0 0 0 0 15 45 41
04:00 0 0 1 0 3 6 12 5 3 2 0 0 0 32 49 42
05:00 0 0 0 1 1 20 33 23 6 0 0 0 0 84 47 43
U 06:00 0 0 0 2 11 40 86 37 9 1 0 0 0 186 46 42
07:00 1 0 0 6 15 72 154 77 16 2 0 0 0 343 46 42
08:00 0 0 1 9 39 107 195 109 20 2 1 0 1 484 46 41
n, 09:00 0 0 1 7 43 112 189 84 9 0 0 0 0 445 45 41
10:00 0 0 4 12 39 112 157 62 7 0 0 0 0 393 45 40
11:00 0 0 0 10 37 134 204 78 4 0 0 0 0 467 45 40
12 PM 0 0 0 7 52 145 241 130 25 1 0 0 0 601 46 41
13:00 0 0 0 13 45 147 233 93 21 1 0 0 0 553 45 41
14:00 0 1 0 15 60 146 227 99 12 2 0 0 0 562 45 40
ji 15:00 0 0 0 10 58 194 365 165 28 3 1 0 0 824 46 41
16:00 2 0 0 11 71 257 475 197 21 1 0 0 0 1035 45 41
17:00 1 0 1 17 107 274 504 238 39 4 1 1 0 1187 46 41
r1 18:00 0 0 1 8 56 140 296 182 48 5 0 0 0 736 47 42
19:00 0 0 0 7 47 107 150 88 12 2 0 0 0 413 46 41
20:00 0 0 1 8 38 90 110 46 13 2 0 0 0 308 45 40
21:00 0 0 0 13 41 72 59 20 5 1 0 0 0 211 43 38
22:00 0 0 0 7 18 53 46 21 6 0 0 0 0 151 45 39
23:00 0 0 0 1 16 21 37 19 4 0 1 1 0 100 46 41
___ % 0.0% 0.0% 0.1% 1.8% 8.9% 24.6% 41.3% 19.4% 3.4% 0.3% 0.0% 0.0% 0.0% _
AM 07:00 10:00 10:00 09:00 11:00 11:00 08:00 08:00 04:00 08:00 08:00 08:00
n Peak
Vol. 1 _ 4 12 43 134 204 _109 20 2 --1 1---.484
_ 484
UPM
Peaakk 16:00 14:00 17:00 17:00 17:00. 17:00 17:00 17:00 18:00 18:00 15:00 17:00 17:00
Vol. 2 1 1 17 107 274 504 238 48 5 1 1 1187
I-1. Total 4 1 10 167 816 2263 3793 1786 313 29 4 2 1 9189 1088
Pecent 15th Percentile: 34 MPH
Li 50th Percentile: 40 MPH
85th Percentile: 46 MPH
n 95th Percentile: 49 MPH
U Stats 10 MPH Pace Speed: 37-46 MPH
Number in Pace: 5864
rn Percent in Pace: 63.8%
Number of Vehicles>45 MPH: 1856
Li Percent of Vehicles>45 MPH: 20.2%
Mean Speed(Average): 41 MPH
v
I '
�1
f
U
r1 Page 1
' l
r .
ra
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A LJ
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box301 Berlin,MA 01503 122978 AA Speed r
Office:508.4813999 Fax:508.545.1234 Site Code:2121491
EB Email:data requests@pdillc.com
Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave �J
Time 14 19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
07/13/1 ( 1
2 0 0 0 3 8 11 7 7 2 0 0 0 0 38 45 39
01:00 0 0 0 0 2 1 5 4 0 0 0 0 0 12 46 42
02:00 0 0 0 1 5 4 4 6 3 0 0 0 0 23 48 41
03:00 0 0 0 0 0 3 6 4 0 0 0 0 0 13 46 42
04:00 0 0 1 0 0 7 11 12 2 1 0 0 0 34 47 43 r 7
05:00 0 0 0 1 4 7 37 24 10 1 0 0 0 84 49 44
06:00 0 0 0 3 13 49 86 48 14 2 0 0 0 215 47 42
07:00 0 0 0 5 22 89 151 78 13 1 0 0 0 359 46 41
08:00 0 0 0 1 37 89 197 111 13 0 0 0 0 448 46 42
09:00 1 0 0 11 43 119 200 75 26 0 0 0 1 476 45 41 r 1
10:00 2 0 1 11 53 101 189 65 15 0 1 0 1 439 45 40
11:00 1 0 1 6 49 139 199 72 15 0 0 0 0 482 45 40
12 PM 0 0 1 11 60 148 227 107 23 0 0 0 0 577 46 41
13:00 0 0 0 13 59 156 199 109 18 5 0 0 0 559 46 41 r_1
14:00 0 2 1 11 53 157 246 128 20 2 0 0 0 620 46 41
15:00 0 0 1 13 72 202 433 206 39 2 0 0 0 968 46 41 �..,
16:00 0 0 3 19 81 229 467 228 37 3 0 0 0 1067 46 41
17:00 0 2 0 18 70 239 433 244 32 5 0 0 1 1044 46 41
18:00 0 0 0 3 67 156 269 180 36 2 0 0 0 713 47 42 r }
19:00 0 0 1 4 38 94 173 80 16 1 0 0 0 407 46 41
20:00 0 0 1 7 64 92 99 42 4 2 0 0 0 311 44 39 v
21:00 0 0 0 14 32 74 65 16 1 0 1 0 0 203 43 38
22:00 0 0 0 5 28 39 42 15 2 0 0 0 0 131 43 39
23:00 0 0 0 7 20 26 36 7 6 0 0 0 0 102 44 39
% 0.0% 0.0% 0.1% 1.8% 9.4% 23.9% 40.5% 20.0% 3.7% 0.3% 0.0% 0.0% 0.0%
AM 10:00 04:00 09:00 10:00 11:00 09:00 08:00 09:00 06:00 10:00 09:00 11:00
Peak r
Vol. 2 1 11 53 139 200 111 26 2 1 1 482
PM 14:00 16:00 16:00 16:00 17:00 16:00 17:00 15:00 13:00 21:00 17:00 16:00 t
Peak
Vol. 2 3 19 81 239 467 244 39 5 1 1 1067
Total 4 4 11 167 880 2231 3781 1868 347 27 2 0 3 9325 1098
Pecent 15th Percentile: 34 MPH
50th Percentile: 40 MPH L ;
85th Percentile: 46 MPH
95th Percentile: 49 MPH
t 1
Stats 10 MPH Pace Speed: 37-46 MPH
Number in Pace: 5864
Percent in Pace: 62.9% r-.
Number of Vehicles>45 MPH: 1946
Percent of Vehicles>45 MPH: 20.9%
Mean Speed(Average): 41 MPH
f-1
("1
LJ
r1
L�
r �
Page 2 r
c .
n
Lj
n
r2i
Osgood Street PRECISION
U east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
rClient:Bayside/K.Cram P.03 301 Berrin,MA 01503 122978 AA Speed
Office:508.4813999 Fax50&545.1234 Site Code:2121491
EB Email:datarequesu@pdillc.com
Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave
Time 14 19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
07/14/1
2 0 0 1 2 11 18 21 13 0 0 0 0 0 66 45 39
U 01:00 0 0 0 1 0 8 12 7 1 0 0 0 0 29 45 42
02:00 0 0 0 0 1 5 10 2 1 0 0 0 0 19 43 41
03:00 0 0 0 0 2 4 2 2 1 1 0 0 0 12 38 42
r 04:00 0 0 0 2 1 4 6 7 4 0 0 0 0 24 50 43
05:00 0 0 0 2 2 10 11 8 6 1 0 0 0 40 49 42
U 06:00 0 0 0 0 5 13 51 29 6 0 1 0 0 105 47 43
07:00 0 0 0 2 14 48 76 51 6 2 1 0 0 200 46 42
08:00 0 0 0 4 27 75 104 54 10 0 0 0 0 274 46 41
n09:00 0 0 6 8 23 109 136 63 14 0 0 0 0 359 46 40
LJ 10:00 0 0 2 9 56 141 190 85 12 1 0 0 0 496 45 40
11:00 0 0 0 8 62 137 173 91 11 0 0 0 1 483 45 40
12 PM 0 0 0 7 49 142 245 95 16 1 0 0 0 555 45 41
n 13:00 0 0 2 9 40 151 254 140 24 4 0 0 0 624 46 41
14:00 0 0 0 8 41 117 168 104 23 1 0 0 0 462 46 41
U 15:00 0 0 0 6 43 107 161 109 13 5 1 0 0 445 46 41
16:00 0 0 0 4 40 87 144 65 17 0 1 0 0 358 46 41
17:00 0 0 1 9 49 75 133 75 15 2 0 0 0 359 46 41
n 18:00 0 0 0 3 45 71 138 67 21 1 0 0 0 346 46 41
' 19:00 0 0 0 1 32 69 98 49 13 0 1 0 0 263 46 41
U 20:00 0 0 1 11 26 73 64 28 4 0 0 0 0 207 44 39
21:00 0 0 1 8 22 65 62 17 3 1 0 0 0 179 43 39
22:00 0 0 1 7 30 36 37 14 5 1 0 0 0 131 44 38
n 23:00 0 0 0 1 13 39 31 13 2 2 0 0 0 101 44 40
l J % 0.0% 0.0% 0.2% 1.8% 10.3% 26.1% 37.9% 19.4% 3.7% 0.4% 0.1% 0.0% 0.0%
AM 09:00 10:00 11:00 10:00 10:00 11:00 09:00 07:00 06:00 11:00 10:00
n Peak
_ Vol. _ _ _ __ 6 9 62 141 190 91 14 2 _1 __ 1 496
LJ PM 13:00 20:00 12:00 13:00 13:00 13:00 13:00 15:00 15:00 13:00
Peak
Vol. 2 11 49 151 254 140 24 5 1 624
V-11 Total 0 0 15 112 634 1604 2327 1188 228 23 5 0 1 6137 1087
Pecent 15th Percentile: 34 MPH
50th Percentile: 40 MPH
85th Percentile: 46 MPH
95th Percentile: 49 MPH
lJ Stats 10 MPH Pace Speed: 37-46 MPH
Number in Pace: 3765
n Percent in Pace: 61.4%
Number of Vehicles>45 MPH: 1252
Li Percent of Vehicles>45 MPH: 20.4%
Mean Speed(Average): 41 MPH
C
I �
t�
n
U
r
I
U
n Page 3
r-�
ra
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.O.Box 301 Berlin,MA 01503 122978 AA Speed r-1
Office:508.4813999 Fax 508.545.1234 Site Code:2121491
WB Email:data requests@pdillccom
Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave t
Time 14 19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
07/12/1
r"1
2 0 0 0 1 2 4 12 8 4 1 1 0 0 33 49 44
01:00 0 0 0 0 2 3 5 4 1 0 0 0 0 15 46 42
02:00 0 0 0 0 2 0 4 4 1 0 0 0 0 11 47 43
03:00 0 0 0 0 1 3 5 5 0 0 0 0 0 14 46 42
04:00 0 0 0 2 3 9 13 9 7 3 0 0 0 46 50 43 r 1
05:00 0 0 0 4 11 22 41 59 29 3 2 0 0 171 50 44
06:00 0 0 1 3 11 41 119 200 60 16 1 0 0 452 50 45
07:00 0 0 0 3 27 72 220 295 84 20 0 0 0 721 49 45
08:00 1 0 1 3 33 92 249 230 94 9 2 1 0 715 49 44 r
09:00 0 0 1 2 20 64 173 126 49 7 2 0 0 444 48 44
10:00 0 2 1 4 11 68 154 159 39 7 0 0 0 445 48 44
11:00 0 0 0 5 25 56 179 176 41 3 0 0 0 485 48 44
12 PM 0 0 2 3 25 72 199 216 67 9 2 0 0 595 49 44
13:00 1 0 0 3 20 73 161 168 49 6 0 0 0 481 48 44 r }
14:00 0 0 0 2 21 54 166 161 53 14 2 0 0 473 49 44
15:00 0 0 0 3 22 51 160 191 76 19 0 0 0 522 50 45 t
16:00 0 0 3 8 21 66 223 208 48 9 2 0 0 588 48 44
17:00 1 0 0 5 18 86 192 205 64 8 0 0 0 579 49 44 r_I
18:00 0 0 1 1 12 40 119 159 68 11 0 0 0 411 50 45
19:00 0 0 1 1 17 35 119 116 26 3 1 1 0 320 48 44
20:00 0 0 0 0 11 39 103 75 29 8 0 0 0 265 49 44 t-
21:00 0 0 0 0 11 31 69 48 13 1 0 0 0 173 47 43
22:00 0 0 0 1 7 23 27 27 11 0 0 0 0 96 48 42 r-1
23:00 0 0 0 0 7 16 16 11 5 0 1 0 0 56 47 42
% 0.0% 0.0% 0.1% 0.7% 4.2% 12.6% 33.6% 35.3% 11.3% 1.9% 0.2% 0.0% 0.0%
PAM 08:00 10:00 06:00 11:00 08:00 08:00 08:00 07:00 08:00 07:00 05:00 08:00 07:00 r 1
Vol 1 2 1 _5 _33 92 249 295 — 94 20 2_ 1 - 721
PM
Peak 13:00 16:00 16:00 12:00 17:00 16:00 12:00 15:00 15:00 12:00 19:00 12:00
Vol. 1 3 8 25 86 223 216 76 19 2 1 595
Total 3 2 11 54 340 1020 2728 2860 918 157 16 2 0 8111 1162
Pecent 15th Percentile: 37 MPH
50th Percentile: 43 MPH L
85th Percentile: 49 MPH
95th Percentile: 52 MPH
r .1
Stats 10 MPH Pace Speed: 40-49 MPH �J
Number in Pace: 5149
Percent in Pace: 63.5%
Number of Vehicles>45 MPH: 3374
Percent of Vehicles>45 MPH: 41.6%
Mean Speed(Average): 44 MPH
f 1
v
u
r .
r �
Page 4 r'
u
r ;
LJ
I
U
?laws
n
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram P.0.8=301 Berlin,MA 01503 122978 AA Speed
Office:508.4813999 Fax5o8.545.1234 Site Code:2121491
WB Email:datarequesu@pdillccom
Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave
Time 14 19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
(- 07/13/1
2 0 0 0 1 4 4 14 5 2 1 0 0 0 31 46 42
LJ 01:00 0 0 0 0 0 5 8 2 1 0 1 0 0 17 44 43
02:00 0 0 0 0 1 5 7 1 0 0 0 0 0 14 43 40
03:00 0 0 0 0 3 2 12 7 0 0 0 0 0 24 46 42
04:00 0 0 1 0 3 4 12 14 4 2 0 0 0 40 49 44
05:00 0 0 0 2 10 9 27 53 34 10 2 0 0 147 52 46
Li 06:00 0 0 1 0 18 29 108 178 55 7 3 1 0 400 49 45
07:00 0 0 0 3 33 59 201 236 86 11 2 0 0 631 49 44
08:00 2 0 0 6 28 68 226 225 82 12 1 0 0 650 49 44
09:00 0 0 1 4 27 60 186 174 48 4 1 0 1 506 48 44
LJ 10:00 1 0 1 7 22 67 176 135 40 6 0 1 0 456 48 43
11:00 0 1 1 2 22 83 215 173 64 10 1 0 0 572 49 44
12 PM 0 2 0 1 25 69 199 190 71 8 1 0 0 566 49 44
n 13:00 0 0 0 3 15 64 193 174 47 7 2 0 0 505 48 44
14:00 0 0 1 5 16 67 144 159 52 9 0 0 0 453 49 44
Li 15:00 0 0 0 7 16 52 147 184 60 20 3 0 0 489 50 45
16:00 0 0 0 4 14 73 234 166 49 4 1 0 0 545 48 44
17:00 0 0 0 5 19 49 185 167 75 5 0 0 0 505 49 44
n, 18:00 0 0 1 2 18 41 139 151 59 14 1 0 0 426 50 45
+ 19:00 0 0 0 4 25 28 104 87 28 8 0 0 0 284 49 43
U 20:00 0 0 0 3 14 33 76 81 24 3 1 0 0 235 48 44
21:00 0 0 0 2 14 38 69 35 4 3 0 0 0 165 46 41
22:00 0 0 0 2 4 28 40 28 7 1 0 0 0 110 47 42
23:00 0 0 0 1 5 8 28 23 2 1 1 0 0 69 47 43
Li
%. 0.0% 0.0% 0.1% 0.8% 4.5% 12.1% 35.1% 33.8% 11.4% 1.9% 0.3% 0.0% 00%
AM 08:00 11:00 04:00 10:00 07:00 11:00 08:00 07:00 07:00 08:00 06:00 06:00 09:00 08:00
Peak
Vol. 2 1 1_ 7 33 83 _ 226 236 _ 86 12 _ 3 1 _ 1 650 _
U PM 12:00 14:00 15:00 12:00 16:00 16:00 12:00 17:00 15:00 15:00 12:00
Peak
Vol. 2 1 7 25 73 234 190 75 20 3 566
—To-tal 3 3 7 64 356 945 2750 2648 894 146 21 2 1 7840 1152
Pecent 15th Percentile: 37 MPH
v 50th Percentile: 43 MPH
85th Percentile: 49 MPH
95th Percentile: 52 MPH
V
Stats 10 MPH Pace Speed: 40-49 MPH
Number in Pace: 4969
r Percent in Pace: 63.4%
Number of Vehicles>45 MPH: 3184
Percent of Vehicles>45 MPH: 40.6%
Mean Speed(Average): 44 MPH
r
I
U
n
I
n
L
C Page 5
C
L
rar�
Osgood Street PRECISION
east of Butcher Boy Plaza D A T A `
City,State:North Andover,MA INDUSTRIES,LLC
Client:Bayside/K.Cram R0.8ox301 Berlin,MA 01503 122978 AA Speed r
Office:508.4813999 Fax 508.545.1234 Site Code:2121491
WB Emait datarequests@pdillccom
Start 1 15 20 25 30 35 40 45 50 55 60 65 70 Total 85th Ave
Time 14 19 24 29 34 39 44 49 54 59 64 69 9999 %ile Speed
07/14/1 r 1
2 0 0 0 0 3 11 21 9 1 1 1 0 0 47 45 42
01:00 0 0 0 1 1 5 7 3 0 0 0 0 1 18 44 40
02:00 0 0 0 0 1 4 4 5 2 1 0 0 0 17 48 44
03:00 0 0 0 0 2 4 5 2 1 0 0 0 0 14 44 41 r i
04:00 0 0 0 0 0 3 10 8 2 0 0 0 0 23 47 44
05:00 0 0 0 1 1 10 8 19 14 1 0 0 0 54 51 45
06:00 0 0 0 1 1 8 37 43 16 5 0 0 0 111 50 45
07:00 0 0 0 4 17 32 62 90 29 2 0 0 0 236 49 44
08:00 0 0 0 3 13 33 100 110 33 7 2 0 0 301 49 44 r 1
09:00 0 0 0 4 20 49 103 139 53 7 0 1 0 376 49 44
10:00 0 0 0 3 29 62 131 137 64 8 1 0 0 435 49 44
11:00 0 0 0 3 22 70 197 133 64 10 1 0 0 500 49 44
12 PM 0 0 1 2 30 61 161 136 60 8 1 0 0 460 49 44
13:00 1 0 0 4 17 49 134 162 45 9 1 1 0 423 49 44 r l
14:00 0 0 0 4 15 47 85 147 53 10 1 1 0 363 50 45
15:00 0 0 0 3 19 29 109 162 64 7 1 0 0 394 50 45 L
16:00 0 0 1 2 11 38 103 125 56 11 1 0 0 348 50 45
17:00 0 0 0 5 14 29 102 144 58 10 4 0 0 366 50 45
18:00 0 0 0 3 15 35 91 120 47 4 0 0 0 315 49 44
19:00 0 0 0 0 16 31 98 93 35 4 0 0 0 277 49 44
20:00 0 0 1 2 13 32 83 68 14 3 0 0 0 216 47 43
21:00 0 0 0 1 18 31 58 35 12 0 1 0 0 156 47 42
22:00 0 0 0 0 7 31 45 25 13 0 0 0 0 121 48 42 r-1
23:00 0 0 0 1 3 14 27 12 6 2 1 0 0 66 48 43
_ % 0.0% 0.0_% 0.1% 0.8% 5.1% 12.7% 31.6% 34.2% 13.2% 2.0% 0.3% 0.1% 0.0%AM
_ _
Peak 07:00 10:00 11:00 11:00 09:00 10:00 11:00 08:00 09:00 01:00 11:00
Vol. 4 _— 29 70 197 139 64 _ 10 _ 2 1 1 500
P M 13:00 12:00 17:00 12:00 12:00 12:00 13:00 15:00 16:00 17:00 13:00 12:00 `
Vol. 1 1 5 30 61 161 162 64 11 4 1 460 r�
Total 1 0 3 47 288 718 1781 1927 742 110 16 3 1 5637 1160
Pecent 15th Percentile: 37 MPH
50th Percentile: 43 MPH L a
85th Percentile: 49 MPH
95th Percentile: 53 MPH
Stats 10 MPH Pace Speed: 40-49 MPH `J
Number in Pace: 3439
Percent in Pace: 61.0% r-ti
Number of Vehicles>45 MPH: 2406
Percent of Vehicles>45 MPH: 42.7% ,J
Mean Speed(Average): 44 MPH
r�
r-1
u
r �
t�
Page 6 r
r �
�_1
i
U
1--I N/S: Osgood Street (Route 125) PRECISION File Name : 122978 A
E/W: Great Pond Rd (Rte 13,3))/Casa Blanca �puA T� Site Code : 2121491
City, State: North Andover, MA P.O.Box301 Betlin,MA 01503 StartDate : 6/28/201:
Office: 1234Client:Bayside Engineering/ K. Cram Emll:datarequests@pdilic.com Page No : 1
Lj Groups Printed-Cars- eaw Vehicles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time
Right Thm Left FU-Tum Ri ht Thru Left I U-Tum Right I Thru Left U-Tum Ri ht Thrn Left I U-Turn Int.Total
07:00 AM 0 182 10 0 8 0 51 0 52 72 1 0 0 0 0 0 376
07:15 AM 0 179 7 0 7 0 71 0 42 103 0 0 0 0 0 0 409
07:30 AM 0 241 8 0 14 0 80 0 49 98 0 0 0 0 0 0 490
07:45 AM 0 222 10 0 13 0 113 0 62 114 0 0 0 0 0 0 534
Total 0 824 35 0 42 0 315 0 205 387 1 0 0 0 0 0 1809
t...1
08:00AM 0 194 14 0 12 0 93 0 50 107 2 0 0 0 0 0 472
n 08:15 AM 0 185 15 0 15 0 90 0 66 125 1 0 0 0 0 0 497
08:30 AM 0 153 18 0 29 1 98 0 71 127 1 0 1 0 0 0 499
Li 08:45 AM 1 181 20 0 28 0 108 0 85 157 0 0 1 0 0 0 581
Total 1 713 67 0 84 1 389 0 272 516 4 0 2 0 0 0 2049
Grand Total 1 1537 102 0 126 1 704 0 477 903 5 0 2 0 0 0 3858
1 Apprch% 0.1 93.7 6.2 0 15.2 0.1 84.7 0 34.4 65.2 0.4 0 100 0 0 0
U Total% 0 39.8 2.6 0 3.3 0 18.2 0 12.4 23.4 0.1 0 0.1 0 0 0
Cars 0 1486 86 0 118 1 673 0 450 861 4 0 2 0 0 0 3681
Cars 0 96.7 84.3 0 93.7 100 95.6 0 94.3 95.3 80 0 100 0 0 0 95.4
Heavy Vehicles 1 51 16 0 8 0 31 0 27 42 1 0 0 0 0 0 177
U%Heavy Vehicles 100 3.3 15.7 0 6.3 0 4.4 0 5.7 4.7 20 0 0 0 0 0 4.6
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time R. h[ Thru Left U-Tum A .Tmal Right Thru Left U-T.. A .Taal Right Thru Left u-Tam A .Total Ri ht Thru Left U-Tum A .Tow Int.Total
eak Hour Analysis From 07:00 AM to 08:45 AM-Peak I of 1
Weak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 194 14 0 208 12 0 93 0 105 50 107 2 0 159 0 0 0 0 0 472
08:15 AM 0 185 15 0 200 15 0 90 0 105 66 125 1 0 192 0 0 0 0 0 497
r 08:30 AM 0 153 18 0 171 29 1 98 0 128 71 127 1 0 199 1 0 0 0 1 499
08:45 AM 1 181 20 0 202 28 0 108 0 136 85 157 0 0 242 1 0 0 0 1 581
LJ Total Volume 1 713 67 0 781 84 1 389 0 474 272 516 4 0 792 2 0 0 0 2 2049
%App.Total 0.1 91.3 8.6 0 1 17.7 0.2 82.1 0 34.3 65.2 0.5 0 100 0 0 0
PHF .250 .919 .838 .000 .939 .724 .250 .900 .000 .871 .800 .822 .500 .000 .818 .500 .000 .000 .000 .500 .882
Cars 0 689 57 0 746 79 1 373 0 453 258 490 3 0 751 2 0 0 0 2 1952
U %Cars 0 96.6 85.1 0 95.5 94.0 100 95.9 0 95.6 94.9 95.0 75.0 0 94.8 100 0 0 0 100 95.3
Heavy Vehicles 1 24 10 0 35 5 0 16 0 21 14 26 1 0 41 0 0 0 0 0 97
xxaavyvenkiaa 100 3.4 14.9 0 4.5 6.0 0 4.1 0 4.4 5.1 5.0 25.0 0 5.2 0 0 0 0 0 4.7
n
U
C
n
ILJ
n
Lil
n
Li
C
i
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 A
E/W: Great Pond Rd (Rte 133))/Casa Blanca DuusARi A Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201; `J
Office: .4813999 ?08545.1234Client:Bayside Engineering/ K. Cram Emil:datarequests@ dillc.com Page No 1
f }
Groups Printed-Cars L
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left —u-Tum Ri ht Thru Left I U-Tum Right I Thru I Left U-Tum Right I Thru LeftU-Tum Int.Total r"1
07:00AM 0 175 9 0 8 0 49 0 49 67 1 0 0 0 0 0 358
07:15 AM 0 175 5 0 7 0 66 0 39 99 0 0 0 0 0 0 391 L_,
07:30 AM 0 233 6 0 11 0 78 0 47 95 0 0 0 0 0 0 470
07:45 AM 0 214 9 0 13 0 107 0 57 110 0 0 0 0 0 0 510 1
Total 0 797 29 0 39 0 300 0 192 371 1 0 0 0 0 0 1729
08:00 AM 0 191 11 0 11 0 84 0 45 105 1 0 0 0 0 0 448 i
08:15 AM 0 178 12 0 14 0 88 0 64 118 1 0 0 0 0 0 475
08:30 AM 0 146 15 0 27 1 96 0 68 118 1 0 1 0 0 0 473 t`�
08:45 AM 0 174 19 0 27 0 105 0 81 149 0 0 1 0 0 0 556
Total 0 689 57 0 79 1 373 0 1 258 490 3 0 2 0 0 0 1952
Grand Total 0 1486 86 0 118 1 673 0 450 861 4 0 2 0 0 0 3681
Apprch% 0 94.5 5.5 0 14.9 0.1 85 0 34.2 65.5 0.3 0 100 0 0 0
Total% 0 40.4 2.3 0 3.2 0 18.3 0 12.2 23.4 0.1 0 0.1 0 0 0 L ,
r—)
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left IU-Tum I App.Tow Right I Thru I Left I U-Tum A2p.Toml Right I Thru I ft I U-Tum App.Tow Right Thru I LeftI U-T= Aw.Tow in Totat {
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 191 11 0 202 11 0 84 0 95 45 105 1 0 151 0 0 0 0 0 448 L
08:15 AM 0 178 12 0 190 14 0 88 0 102 64 118 1 0 183 0 0 0 0 0 475
08:30 AM 0 146 15 0 161 27 1 96 0 124 68 118 1 0 187 1 0 0 0 1 473 t l
08:45 AM 0 174 19 0 193 27 0 105 0 132 81 149 0 0 230 1 0 0 0 1 556
Total Volume 0 689 57 0 746 79 1 373 0 453 258 490 3 0 751 2 0 0 0 2 1952 %_J
%App.Total 0 92.4 7.6 0 17.4 0.2 82.3 0 34.4 65.2 0.4 0 100 0 0 0
PHF .000 .902 .750 .000 .923 .731 .250 .888 .000 .858 .796 .822 .750 .000 .816 .500 .000 .000 .000 .500 .878 r
L
f1
v
ll
�J
f 1
�J
f'1
C
tiJ
r �
r �
C •
I�
U
r-1 N/S: Osgood Street (Route 125) PRECISION File Name : 122978 A
G EM Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code : 2121491
City, P.O.BoIxD3015Bedin,MA 01503 Start Date : 6/28/201:
Ci State: North Andover MA
Client:Bayside Engineering/K. Cram OffEmail:.48 reque Fax50llc.co 234 Page No : 1
!-1 Email:datarequests@pdillc.com
Li Groups Printed-Heavy Vehicles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time
Right Thru Lefr U-TumRi htThm Left I U-Tum Right I Thru 1 Right Thru Left I U-Turn Int Total
U 07:00 AM 0 7 1 0 0 0 2 0 3 5 0 0 0 0 0 0 18
07:15 AM 0 4 2 0 0 0 5 0 3 4 0 0 0 0 0 0 18
07:30 AM 0 8 2 0 3 0 2 0 2 3 0 0 0 0 0 0 20
07:45 AM 0 8 1 0 0 0 6 0 5 4 0 0 0 0 0 0 24
Total 0 27 6 0 3 0 15 0 13 16 0 0 0 0 0 0 80
08:00 AM 0 3 3 0 1 0 9 0 5 2 1 0 0 0 0 0 24
f1 08:15 AM 0 7 3 0 1 0 2 0 2 7 0 0 0 0 0 0 22
08:30 AM 0 7 3 0 2 0 2 0 3 9 0 0 0 0 0 0 26
08:45 AM 1 7 1 0 1 0 3 0 4 8 0 0 0 0 0 0 25
Total 1 24 10 0 5 0 16 0 14 26 1 0 0 0 0 0 97
n Grand Total I 151 16 0 8 0 31 0 27 42 1 0 0 0 0 01
1.77
Apprch% 1.5 75 23.5 0 I 20.5 0 79.5 0 38.6 60 1.4 0 0 0 0 0
Total o 0.6 28.8 9 0 4.5 0 17.5 0 15.3 23.7 0.6 0 I 0 0 0 0
1
tJ
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From NorthFrom East From South From West
Start Time I Right Thru Left I Uaum I A .Tmai I Right Thru I Left U-T= App.Tmal I Right I Thru I Left I u-Tum App.ToMl I Right Thru I LeftI u-Tum App.Tmol Int.Total
leak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of I
LPeak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 3 3 0 6 1 0 9 0 10 5 2 1 0 8 0 0 0 0 0 24
08:15 AM 0 7 3 0 10 1 0 2 0 3 2 7 0 0 9 0 0 0 0 0 22
08:30 AM 0 7 3 0 10 2 0 2 0 4 3 9 0 0 12 0 0 0 0 0 26
08:45 AM 1 7 1 0 9 1 0 3 0 4 4 8 0 0 12 0 0 0 0 0 25
Total Volume 1 24 10 0 35 5 0 16 0 21 14 26 1 0 41 0 0 0 0 0 97
%App.Total 1 2.9 68.6 28.6 0 23.8 0 76.2 0 34.1 63.4 2.4 0 0 0 0 0
n PHF 250 .857 .833 .000 .875 -625 .000 .444 .000 .525 -700 .722 .250 .000 .854 1 .000 .000 .000 .000 .000 .933
Li
U
C
n
Lj
r
L
n
V
r 1
t ,
NIS: Osgood Street(Route 125) PRECISION File Name : 122978 A r
E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code :2121491
�'> P.O.BoxD301 BedinSMA 01503 Start Date : 6/28/201:
Ci State:North Andover MA
Office:508.4813999 Fax:508.545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No
Groups Printed-Peds and Bicycles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North I From East I From South From West
Start Time Right I Thru I Left Peds I Right Thru I Left I Peds Right II Left Peds 7kiiiht 7 Thru I Left I Peds Int.Total f
07:00 AM 0 1 00 0 0 0 0 0 0 0 0 0 0 0 0 1
07:15 AM 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 4 1
07:30 AM 0 6 0 0 0 0 3 0 1 2 0 0 0 0 0 0 12
07:45 AM 0 2 0 0 0 0 1 0 0 3 0 0 0 0 0 0 6 r'2
Total 0 9 0 0 1 0 0 6 0 3 5 0 0 0 0 0 0 23
08:00 AM 0 1 0 0 1 0 0 0 1 1 0 0 0 0 0 1 5
08:15 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 t
08:30 AM 0 1 0 0 0 0 1 0 0 1 0 0 0 0 0 0 3
08:45 AM 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1
Total 0 3 0 0 1 0 2 0 1 2 0 0 0 0 0 1 10
Grand Total 0 12 0 0 1 0 8 0 4 7 0 0 0 0 0 1 33 t
Apprch% 0 100 0 0 11.1 0 88.9 0 36.4 63.6 0 0 0 0 0 100
Total% 0 36.4 0 0 3 0 24.2 0 12.1 21.2 0 0 0 0 0 3 L'
r �
v
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left I eds I App.T.M1 I Right Thru I Lefl Peds I A .T i I Right Thru Left Peds App.Toml Ri ht I Thru Left I Peds App.ToW
Int.Total r
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15 AM
07:15 AM 0 0 0 00 0 0 2 0 2 2 0 0 0 2 0 0 0 0 0 4
07:30 AM 0 6 0 0 6 0 0 3 0 3 1 2 0 0 3 0 0 0 0 0 12 r
07:45 AM 0 2 0 0 2 0 0 1 0 1 0 3 0 0 3 0 0 0 0 0 6
08:00 AM 0 1 0 0 1 1 0 0 0 1 1 1 0 0 2 0 0 0 1 1 5
Total Volume 0 9 0 0 9 1 0 6 0 7 4 6 0 010 0 0 0 1 1 27
%App.Total 0 100 0 0 14.3 0 85.7 0 40 60 0 0 0 0 0 100
PHF .000 375 .000 .000 .375 .250 .000 .500 .000 .583 .500 .500 .000 .000 .833 1 .000 .000 .000 .250 .250 .563 r
f ^
s` 1
l_J
r �
L�
f 1
r �
L.1
r 1
L
r �
r
n
n N/S: Osgood Street (Route 125) PRECISION File Name : 122978 A
E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code : 2121491
301Ber
`yP.O.BoxD5iin5 A 01503
LLC
Ci , State: North Andover,MA Start Date : 6/28/201:
Office:508.4813999 Fax508545.1234
Client- Bayside Engineering/ K. Cram Email:datarequests@pdilk.com Page No : 1
U
n Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
l From North From East From South From West
UStart Time Fight Thru Left u-Tum .Taw Ri t Thru Left u-rum A .Toni Right Thru Left o-Tum A raw Right Thru Left u-Tum A .Taw Int Total
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 194 14 0 208 12 0 93 0 105 50 107 2 0 159 0 0 0 0 0 472
08:15 AM 0 185 15 0 200 15 0 90 0 105 66 125 1 0 192 0 0 0 0 0 497
4.J 08:30 AM 0 153 18 0 171 29 1 98 0 128 71 127 1 0 199 1 0 0 0 1 499
08:45 AM 1 181 20 0 202 28 0 108 0 136 85 157 0 0 242 1 0 0 0 1 581
Total Volume 1 713 67 0 781 84 1 389 0 474 272 516 4 0 792 2 0 0 0 2 2049
n a/o
App.Total 0.1 91.3 8.6 0 17.7 0.2 82.1 0 34.3 65.2 0.5 0 100 0 0 0
PHF 1 .250 .919 .838 .000 .939 .724 .250 .900 .000 .871 .800 .822 .500 .000 .818 .500 .000 .000 .000 .500 .882
Cars 1 0 689 57 0 746 79 1 373 0 453 258 490 3 0 751 2 0 0 0 2 1952
%Cars 0 96.6 85.1 0 95.5 94.0 100 95.9 0 95.6 94.9 95.0 75.0 0 94.8 100 0 0 0 100 95.3
n Heavy Vehicles 1 24 10 0 35 5 0 16 0 21 14 26 1 0 41 0 0 0 0 0 97
nu y Vawia 100 3.4 14.9 0 4.5 6.0 0 4.1 0 4.4 5.1 5.0 25.0 0 5.2 0 0 0 0 0 4.7
Osgood Street(Route 125)
Out In Total
569
;74611315 66
lJ 600 1381
0 689 57 0
1 24 10 0
tJ11 7131 671 0
Right Thru Left U-Tum
f � y
U
Peak Hour Data
«-_
LJ m .i
� co
North "' o
�--y s a
' M c N o F-� Peak Hour Begins at 08:00 A ~� o o
CN O N= N N
W Curs w W w .-.
to N ro ir� Heavy Vehicles �x u o
M
000E C oa
U H min
D 3000 °'
u
T r
Left Thru Ri ht U-Tum
3 490 258 0
y { 1 2131 14 0
0 4 5162721 0
8,51
n 81
1104 792 1896
U Out In Total
n
Li
C
r �
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 Al r
E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code : 2121491
City, s P.O.Bo1xD3015Berl nSMA 01503 Start Date : 6/28/201,
Ci State: North Andover MA
Office:508.4813999 Fa:c508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillccom Page No 1 r ,
Groups Printed-Cars- eavy Vehicles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa BlancaRestaurant
From North From East From South From West
Start Time I Right I Thru Left U•Tum Ri ht Thru Left I U-Turn Right I firm Left I U-Turn Ri ht I Thru Left I U-Tum IInt Total
04:00PM 3 164 27 0 20 0 72 0 70 257 0 0 0 0 0 0 613
04:15 PM 0 167 14 0 24 0 102 0 72 200 1 0 2 0 0 0 582 '
04:30 PM 0 174 15 .0 30 0 80 0 75 254 I 0 I 0 1 0 631
04:45 PM 2 183 33 0 20 0 63 0 91 296 4 0 0 0 1 0 693 r't
Total 5 688 89 0 94 0 317 0 308 1007 6 0 3 0 2 0 2519
05:00 PM 1 206 29 0 22 0 45 0 67 292 2 0 0 0 0 0 664
05:15 PM 1 176 28 0 20 0 41 0 73 326 0 0 6 0 0 0 671 r
05:30 PM 2 145 19 0 12 0 51 0 94 301 2 0 2 0 0 0 628
05:45 PM 1 151 14 0 14 0 64 0 64 306 6 0 0 1 0 0 621
Total 5 678 90 0 68 0 201 0 298 1225 10 0 8 1 0 0 2584
Grand Tota] 10 1366 179 0 162 0 518 0 606 2232 16 0 I1 1 2 0 5103 t l
Apprch% 0.6 87.8 11.5 0 23.8 0 76.2 0 21.2 78.2 0.6 0 78.6 7.1 14.3 0
Total% 0.2 26.8 3.5 0 3.2 0 10.2 0 11.9 43.7 0.3 0 0.2 0 0 0 t
Cars 10 1354 177 0 150 0 506 0 592 . 2187 16 0 11 1 2 0 5006
%Cars 100 99.1 98.9 0 92.6 0 97.7 0 97.7 98 100 0 100 100 100 0 98.1 r-�
Heavy Vehicles 0 12 2 0 12 0 12 0 14 45 0 0 0 0 0 0 97
%Heavy Vehicles 0 0.9 1.1 0 7.4 0 2.3 0 2.3 2 0 0 0 0 0 0 1.9
r �
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Right I Thru I Left I u-rum I App.T- Right I Thru I Left I u-Tum I App.T-i Ri ht I Thru I Left I U-T m App.T-j I Right Thru I Left I u-rum Ap,.Tad 1nt.Totat r 1
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak I of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 0 174 15 0 189 30 0 80 0 110 75 254 1 0 330 I 0 1 0 2 631
04:45 PM 2 183 33 0 218 20 0 63 0 83 91 296 4 0 391 0 0 1 0 1 693
05:00 PM 1 206 29 0 236 22 0 45 0 67 67 292 2 0 361 0 0 0 0 0 664 r'-
05:15 PM 1 176 28 0 205 20 0 41 0 61 73 326 0 0 399 6 0 0 0 6 671
Total Volume 4 739 105 0 848 92 0 229 0 321 306 1168 7 0 1481 7 0 2 0 9 2659
%A .Total 0.5 87.1 12.4 0 28.7 0 71.3 0203 78.9 0.5 0 1 77.8 0 22.2 0
PHF .500 .897 .795 .000 .898 .767 .000 .716 .000 .730 .841 .896 .438 .000 .928 .292 .000 .500 .000 .375 .959 r�
Cars 4 734 103 0 841 87 0 223 0 310 298 1153 7 0 1458 7 0 2 0 9 2618
%Cars 100 99.3 98.1 0 99.2 94.6 0 97.4 0 96.6 97.4 98.7 100 0 98.4 100 0 100 0 100 98.5
Heavy Vehicles
0 5 2 0 7 5 0 6 0 11 8 15 0 0 23 0 0 0 0 0 41
%H-y Vehidi« 0 0.7 1.9 0 0.8 5.4 0 2.6 0 3.4 2.6 1.3 0 0 1.6 0 0 0 0 0 1.5
rt
lJ
ri
�J
rl
u
r�
L J
r 1
r �
t J
r�
n
h NIS: Osgood Street (Route 125) PRECISION File Name : 122978 A)
E/W: Great Pond Rd (Rte 13,3))/Casa Blanca D A T A Site Code : 2121491
City, State: North Andover, R0.BoxD3015TRIBerInS
MA A 01503 StartDate : 6/28/201'e
Ofice:508.4813999 Fax:508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1
V Groups Printed-Cars
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time ht Thru Left U-Tum Right Thru Left U-Turn Right Thru Left U-Tum Ri ht Thru Left U-Turn Int.Total
U Right
04:00 PM 3 164 27 0 18 0 68 0 67 242 0 0 0 0 0 0 589
04:15 PM 0 163 14 0 23 0 100 0 70 190 1 0 2 0 0 0 563
04:30 PM 0 171 15 0 28 0 78 0 73 248 1 0 1 0 1 0 616
04:45 PM 2 182 33 0 19 0 62 0 88 292 4 0 0 0 1 0 683
! Total 5 680 89 0 88 0 308 0 298 972 6 0 3 0 2 0 2451
U
05:00PM 1 205 27 0 20 0 44 0 65 290 2 0 0 0 0 0 654
05:15 PM 1 176 28 0 20 0 39 0 72 323 0 0 6 0 0 0 665
05:30 PM 2 142 19 0 11 0 51 0 94 300 2 0 2 0 0 0 623
05:45 PM 1 151 14 0 11 0 64 0 63 302 6 0 0 1 0 0 613
Total 5 674 88 0 62 0 198 0 294 1215 10 0 8 1 0 0 2555
I Grand Total 10 1354 177 0 I 150 0 506 0 592 2187 160 11 I 2 0 5006
Apprch% 0.6 87.9 11.5 0 22.9 0 77.1 0 21.2 78.2 0.6 0 78.6 7.1 14.3 0
�_4 Total% 0.2 27 3.5 0 3 0 10.1 0 11.8 43.7 0.3 0 I 0.2 0 0 0
n
II
U
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Ri ht Thm Left U-Tum A22.Tod Right Thru Left U-Tum .Tmd Right Thru Left u•Turn App.Tmo Right Thru Left U-T. .TomI.-T.--i-I
?eak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of I
L-Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 2 182 33 0 21719 0 62 0 81 88 292 4 0 384 0 0 1 0 1 683
05:00 PM 1 205 27 0 233 20 0 44 0 64 65 290 2 0 357 0 0 0 0 0 654
n05:15 PM 1 176 28 0 205 20 0 39 0 59 72 323 0 0 395 6 0 0 0 6 665
05:30 PM 2 142 19 0 163 ll 0 51 0 62 94 300 2 0 396 2 0 0 0 2 623
Total Volume 6 705 107 0 818 70 0 196 0 266 319 1205 8 0 1532 8 0 1 0 9 2625
%App.Total 0.7 86.2 13.1 0 26.3 0 73.7 0 1 20.8 78.7 0.5 0 88.9 0 11.1 0
S PHF .750 .860 .811 .000 .878 .875 .000 .790 .000 .821 1 .848 .933 .500 .000 .967 1 .333 .000 .250 .000 .375 .961
U
I�
I ;
U
n
Li
E
n
f
U
n
rti
rd IL 1
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 A� r
EM Great Pond Rd (Rte 133))/Casa Blanca D� usATRi s,uc Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/2012 `J
Office:508.481.3999 Fax.508.545.1234
Client:Bayside Engineering/ K. Cram Email: Page No : 1
datarequests@pdillccom
Groups Printed-Heayx Vehicles L
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North I From East From South From West
Start Time Right Thru Left U-Tum I Right Thru Left U-Tum Right Thm Left I U-'IlanRi ht Thru Left U-Tum Int Total r 1
04:00 PM0 0 0 0 2 0 4 0 3 15 0 0 0 0 0 0 24
04:15 PM 0 4 0 0 1 0 2 0 2 10 0 0 0 0 0 0 19 `J
04:30 PM 0 3 0 0 2 0 2 0 2 6 0 0 0 0 0 0 15
04:45 PM 0 1 0 0 1 0 1 0 3 4 0 0 0 0 0 0 10
Total 0 8 0 0 1 6 0 9 0 10 35 0 0 0 0 0 0 68
05:00PM 0 1 2 0 2 0 1 0 2 2 0 0 0 0 0 0 10 'J
05:15 PM 0 0 0 0 0 0 2 0 1 3 0 0 0 0 0 0 6
05:30 PM 0 3 0 0 1 0 0 0 0 1 0 0 0 0 0 0 5 t '
05:45 PM 0 0 0 0 3 0 0 0 1 4 0 0 0 0 0 0 8
Total 0 4 2 0 6 0 3 0 4 10 0 0 0 0 0 0 29 `
Grand Total 0 12 2 0 12 0 12 0 14 45 0 0 0 0 0 0 97 f
Apprch% 0 85.7 14.3 0 50 0 50 0 23.7 76.3 0 0 0 0 0 0
Total% 0 12.4 2.1 0 12.4 0 12.4 0 14.4 46.4 0 0 0 0 0 0
c�
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Right I Thru I Left I U-T.. I App.T-1 Right I ThruLeft I U-T.. I Ap TOW Ri t I Thru I Left I U-Tum A .Toni Right I Thru I Left I U-T. App.T..1 Inc.Total f"
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 4 J
04:00 PM 0 0 0 0 0 2 0 4 0 6 3 15 0 0 18 00 0 0 0 24
04A5 PM 0 4 0 0 4 1 0 2 0 3 2 10 0 0 12 0 0 0 0 0 19
04:30 PM 0 3 0 0 3 2 0 2 0 4 2 6 0 0 8 0 0 0 0 0 15 r-l
04:45 PM 0 1 0 0 1 1 0 1 0 2 3 4 0 0 7 0 0 0 0 0 10
Total Volume 0 8 0 0 8 6 0 9 0 15 10 35 0 0 45 00 0 0 0 68
%A .Total 0 100 0 0 40 0 60 0 22.2 77.8 0 0 0 0 0 0
PHF .000 .500 .000 .000 .500 .750 .000 .563 .000 .625 .833 .583 .000 .000 .625 1 .000 .000 .000 .000 .000 .708 r
� t
r �
u
l 1
l J
l-1
r l
t-J
r�
r7
r •
r �.
n
n N/S: Osgood Street(Route 125) PRECISION File Name : 122978 Al
EM Great Pond Rd (Rte 133))/Casa Blanca DDu� ArRlETs,u Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201
Office:508.4813999 Fax508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
Li Groups Printed-Peds and Bicycles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
r From North From East From South From West
Start Time Fight Thru Left Peds Right
-;Fru Left Peds Ri ht Thru Left Peds Ri ht Thru Left Peds Int Total
04:00 PM 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0
U 04:15 PM 0 0 0 0 0 0 2 0 0 3 0 0 0 0 0 0 5
04:30 PM 0 2 1 0 0 0 1 0 1 3 0 0 0 0 0 0 8
f� 04:45 PM 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 4
Total 0 4 1 0 0 0 3 0 1 8 0 0 0 0 0 0 17
U
05:00 PM 0 3 0 0 1 0 0 0 2 1 0 0 0 0 0 0 7
r05:15 PM 0 1 1 0 1 0 0 0 2 2 0 0 0 0 0 0 7
l 05:30 PM 0 0 0 0 0 0 2 0 I 2 0 0 0 0 0 0 5
l.J 05:45 PM 0 2 0 1 ] 0 1 0 2 4 0 0 0 0 0 0 11
Total 0 6 1 1 3 0 3 0 7 9 0 0 0 0 0 0 30
n Grand Total 0 10 2 1 30 6 0 8 17 0 0 0 0 0 0 47
Apprch% ( 0 76.9 15.4 7.7 33.3 0 66.7 0 32 68 0 0 0 0 0 0 17 36.2 0 0 0 0 0
Total% 0 21.3 4.3 2.1 I 6.4 0 12.8 0
I 0
U
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left I Peds I AEp.Twm Right Thru I Left I Peds Ap2.Tow Right I Thru I Left I Peds I App.Tw Ri ht I Thru I Left I Peds App.Twi
tnt.Total
leak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of I
L-Peak Hour for Entire Intersection Begins at 05:00 PM
05:00 PM 0 3 0 0 3 10 0 0 1 2 1 0 0 3 0 0 0 0 0 7
05:15 PM 0 1 1 0 2 1 0 0 0 1 2 2 0 0 4 0 0 0 0 0 7
n 05:30 PM 0 0 0 0 0 0 0 2 0 2 1 2 0 0 3 0 0 0 0 0 5
05:45 PM 0 2 0 1 3 1 0 1 0 2 2 4 0 0 6 0 0 0 0 0 11
Total Volume 0 6 1 1 8 3 0 3 0 6 7 9 0 0 16 0 0 0 0 0 30
%App.Total 0 75 12.5 12.5 50 0 50 0 143.8 56.2 0 0 0 0 0 0
PHF .000 .500 .250 .250 .667 .750 .000 .375 .000 .750 .875 .563 .000 .000 .667 1 .000 .000 .000 .000 .000 .682
t
U
n
lJ
n
L
n
U
n
L
n
i
Li
n
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 Ai r
E/W: Great Pond Rd (Rte 133))/Casa Blanca D A T A Site Code : 2121491
City, State:North Andover,MA P.O.BoixD3015BerinS A 01503 Start Date : 6/28/201,
Office:508.4813999 Fax508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
Osgood Street(Route 125) ad(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant r
From North m East From South From West
Start Time Right Thru Left u-Tum .Tmd [RMuft I u-'rum I Mi,.T.W I Right I Tin I Left I U-T. I App.Tow I Right Thru I Left I u-'rum .Tom Int.Total
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak I of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 0 174 15 0 189 30 0 80 0 110 75 254 1 0 330 1 0 1 0 2 631 r 1
04:45 PM 2 183 33 0 218 20 0 63 0 83 91 296 4 0 391 0 0 1 0 1 693
05:00 PM 1 206 29 0 236 22 0 45 0 67 67 292 2 0 361 0 0 0 0 0 664
05:15 PM 1 176 28 0 205 20 0 41 0 61 73 326 0 0 399 6 0 0 0 6 671
Total volume 4 739 105 0 848 92 0 229 0 321 306 1168 7 0 1481 7 0 2 0 9 2659 r l
%App.Total 0.5 87.1 12.4 0 28.7 0 71.3 0 20.7 78.9 0.5 0 77.8 0 22.2 0
PHF .500 .897 .795 .000 .898 .767 .000 .716 .000 .730 .841 .896 .438 .000 .928 .292 .000 .500 .000 .375 .959
Cars 4 734 103 0 841 87 0 223 0 310 298 1153 7 0 1458 7 0 2 0 9 2618
%Cars 100 99.3 98.1 0 99.2 94.6 0 97.4 0 96.6 97.4 98.7 100 0 98.4 100 0 100 0 100 98.5
Hcsa y Vehicles 0 5 2 0 7 5 0 6 0 11 8 15 0 0 23 0 0 0 0 0 41 f 1
%Hwy Vehicles 0 0.7 1.9 0 0.8 5.4 0 2.6 0 3.4 2.6 1.3 0 0 1.6 0 0 0 0 0 1.5
a�
Osgood Street(Route 125)
Out In Total
1242841
I
83 727
1262 t
4 734 103 0 r
0 5 2 0
41 7391 1051 0
Right Thru Left U-Tum t
FJ 1
v
Peak Hour Data r
1�a NON N 0 t:)
G o m
T J I ^�[Jf-4 jO�
0 0 o North 1 0
S
it o 0 o F-� =Vehi
at 04:30 P ~-2 o 0 0 _� f l
0
v non.-
'C N N N O
no o ir� o
m0o0o E c im
0
> 3 0 o w
4� T r'
Left Thru Ri ht U-Tum
7 1153 298 0 f
0 15 8 0
71 11681 306 0
L_j
964 1458 2422 r
1 3 34
975 1481 456
Out In Total
r1
r �
r �
J
n
r--� N/S: Osgood Street (Route 125) PRECISION File Name : 122978 AA1
E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code : 2121491
U INDUSTRIES,LLC
City, State: North Andover,MA P.O.Box 301 Berlin,MA 01503 Start Date : 6/30/2012
Office:508.481.3999 Fax508545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No 1
Li Groups Printed-Cars- eavy Vehicles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Right I T -u I Left U-Tum Right I Thru Left I U-Tum Right I Thru I LeftTU-Turn Right I n ru I Int.Total
Li 10:30 AM 1 135 14 0 19 0 38 0 42 152 0 0 0 0 0 0 401
10:45 AM 0 139 17 0 19 0 41 0 33 182 1 0 0 0 0 0 432
{ Total 1 274 31 0 38 0 79 0 75 334 1 0 0 0 0 0 833
11:00 AM 1 159 11 0 16 0 38 0 44 163 1 0 0 0 1 0 434
11:15 AM 1 139 12 0 16 0 43 0 42 165 0 0 0 0 1 0 419
11:30 AM 0 142 25 0 18 1 35 0 52 184 1 0 0 0 0 0 458
11:45 AM 0 133 14 0 13 0 37 0 51 180 3 0 0 0 0 0 431
Total 2 573 62 0 63 1 153 0 189 692 5 0 0 0 2 0 1742
U
12:00 PM 0 117 13 0 19 0 45 0 56 168 2 0 3 0 0 0 423
12:15 PM 0 146 18 0 30 0 42 0 55 168 0 0 1 0 0 0 460
12:30 PM 0 140 13 0 17 0 35 0 48 181 1 0 4 0 0 0 439
12:45 PM 1 142 14 0 14 0 45 0 51 155 0 0 0 0 0 0 422
Total 1 545 58 0 80 0 167 0 210 672 3 0 8 0 0 0 1744
01:00 PM 1 121 14 0 19 0 47 0 37 164 1 0 0 0 0 0 404
01:15 PM 3 121 19 0 13 0 35 0 35 182 0 0 3 0 0 0 411
U Grand Total 8 1634 184 0 213 1 481 0 546 2044 10 0 11 0 2 0 5134
Apprch% 0.4 89.5 10.1 0 30.6 0.1 69.2 0 21 78.6 0.4 0 84.6 0 15.4 0
Total% 0.2 31.8 3.6 0 4.1 0 9.4 0 10.6 39.8 0.2 0 0.2 0 0 0
Cars 8 1613 177 0 200 1 472 0 541 2005 10 0 11 0 2 0 5040
Cars 100 98.7 96.2 0 93.9 100 98.1 0 99.1 98.1 100 0 100 0 100 0 98.2
Heavy Vehicles 0 21 7 0 13 0 9 0 5 39 0 0 0 0 0 0 94
%Heavy Vehicles 0 1.3 3.8 0 6.1 0 1.9 0 0.9 1.9 0 0 0 0 0 0 1.8
n,
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Ri ht Thru LefrI U-Tum I App.Tm i Right I Thru I Left I U-Tum I App.Tmai Right I Thru I Left I U-rum App.Tom Right Thru Left I u-Tm App.Tom 171nr.Total
eak Hour Analysis From 10:30 AM to 01:15 PM-Peak I of 1
Peak Hour for Entire Intersection Begins at 11:30 AM
11:30 AM 0 142 25 0 167 18 1 35 0 54 52 184 1 0 237 0 0 0 0 0 458
11:45 AM 0 133 14 0 147 13 0 37 0 50 51 180 3 0 234 0 0 0 0 0 431
L 12:00 PM 0 117 13 0 130 19 0 45 0 64 56 168 2 0 226 3 0 0 0 3 423
12:15 PM 1 0 146 18 0 164 30 0 42 0 72 55 168 0 0 223 1 0 0 0 1 460
Total Volume 0 538 70 0 608 80 1 159 0 240 214 700 6 0 920 4 0 0 0 4 1772
r/o A .Total 0 88.5 11.5 0 33.3 0.4 66.2 0 23.3 76.1 0.7 0 100 0 0 0
PHF .000 .921 .700 .000 .910 .667 .250 .883 .000 .833 .955 .951 .500 .000 .970 .333 .000 .000 .000 .333 .963
Cars 0 534 67 0 601 71 1 155 0 227 213 690 6 0 909 4 0 0 0 4 1741
%Cars 0 99.3 95.7 0 98.8 88.8 100 97.5 0 94.6 99.5 98.6 100 0 98.8 100 0 0 0 100 98.3
F3eavy Vehicles 0 4 3 0 7 9 0 4 0 13 1 10 0 0 11 0 0 0 0 0 31
%xnIy Vehicla 0 0.7 4.3 0 1.2 11.3 0 2.5 0 5.4 0.5 1.4 0 0 1.2 0 0 0 0 0 1.7
}n
1
n
I
U
I
Li
C
Li
' r �
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 AA r
E/W: Great Pond Rd (Rte 133))/Casa Blanca D A T A Site Code : 2121491
City, State: North Andover,MA P.O.BofxD3015Berlin,MA 01503 Start Date : 6/30/2012 Ll
Office:508.4813999 Fax 508545.1234
Client: Bayside Engineering/ K. Cram Email:data requests@pdillc.com Page No 1
Groups Printed-Cars L
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Right Thru Left U-Tum Right Thru Left U-Tum Right Thru LeftU-Tum Ri ht Thru Left U-Tum Int.Total
10:30 AM 1 134 14 0 18 0 38 0 42 146 0 0 0 0 0 0 393
10:45 AM 0 139 15 0 19 0 39 0 33 180 1 0 0 0 0 0 426
Total 1 273 29 0 1 37 0 77 0 75 326 1 0 0 0 0 0 819
r_7
11:00 AM 1 156 11 0 15 0 380 43 160 1 0 0 0 1 0 426
11:15 AM 1 137 11 0 16 0 41 0 41 163 0 0 0 0 1 0 411 �a
11:30 AM 0 139 23 0 17 1 32 0 51 181 1 0 0 0 0 0 445
11:45 AM 0 132 13 0 12 0 36 0 51 178 3 0 0 0 0 0 425 r.
Total 2 564 58 0 60 1 147 0 1 186 682 5 0 1 0 0 2 0 1707
12:00 PM 0 117 13 0 19 0 45 0 56 165 2 0 3 0 0 0 420
12:15 PM 0 146 18 0 23 0 42 0 55 166 0 0 1 0 0 0 451
12:30 PM 0 135 13 0 17 0 35 0 48 176 1 0 4 0 0 0 429 t,
12:45 PM 1 139 14 0 14 0 45 0 50 153 0 0 0 0 0 0 416
Total 1 537 58 0 73 0 167 0 209 660 3 0 8 0 0 0 1716 L1
01:00 PM 1 118 13 0 19 0 46 0 37 158 1 0 0 0 0 0 393 r-)
01:15 PM 3 121 19 0 11 0 35 0 34 179 0 0 3 0 0 0 405
Grand Total 8 1613 177 0 200 1 472 0 541 2005 10 0 11 0 2 0 5040
Apprch% 0.4 89.7 9.8 0 29.7 0.1 70.1 0 21.2 78.4 0.4 0 84.6 0 15.4 0
Total% 1 0.2 32 3.5 0 4 0 9.4 0 10.7 39.8 0.2 0 0.2 0 0 0
t*
LJ
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant r t
From North From East From South From West
Start Time Ri ht I Thru I Left I U-Tum I A .Tmei Right Thru I Left I U-Tum APP.Total I Right I Thru I Leh I U-T= ?2,2.Toni Right I Thru I Lefr I U-Tum A,.T..)
Im.Totat
a i
Peak Hour Analysis From 10:30 AM to 0 1:15 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:30 AM
11:30 AM 0 139 23 0 162 1 11 1 32 050 51 181 1 0 233 0 0 0 0 0 445 r I
11:45 AM 0 132 13 0 145 12 0 36 0 48 51 178 3 0 232 0 0 0 0 0 425
12:00 PM 0 117 13 0 130 19 0 45 0 64 56 165 2 0 223 3 0 0 0 3 420 L-J
12:15 PM 0 146 18 0 164 23 0 42 0 65 55 166 0 0 221 1 0 0 0 1 451
Total volume 0 534 67 0 601 71 1 155 0 227 213 690 6 0 909 4 0 0 0 4 1741 11
%App.Total 0 88.9 11.1 0 31.3 0.4 68.3 0 23.4 75.9 0.7 0 100 0 0 0
PHF .000 .914 .728 .000 .916 .772 .250 .861 .000 .873 .951 .953 .500 .000 .975 .333 .000 .000 .000 .333 .965 s
r �
L�
r1
L l
r �
L J
r 1
l.J
r �
L J
r 1
l J
r
f� NIS: Osgood Street (Route 125) PRECISION File Name : 122978 AA1
U E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code : 2121491
City, State: North Andover,Mf'i pl7 Box30$B II oSMA 01503 Start Date : 6/30/2012
Office: A813Far.508.545 234Client: Bayside Engineering/ K. Cram Email:
mil:datarequesu@pdilic.com Page No 1
Grows Printed-HeM Vehicles
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time
Right Thru Left I U-Turn Right Thru Left I U-Turn Right I Thru I Left I U-Tum Right Thru Left I U-Tum Int Total
U 10:30 AM 0 1 0 0 1 0 0 0 0 6 0 0 0 0 0 0 8
10:45 AM 0 0 2 0 0 0 2 0 0 2 0 0 0 0 0 0 6
Total 0 1 2 0 1 0 2 0 0 8 0 0 0 0 0 0 14
11:00 AM 0 3 0 0 1 0 0 0 1 3 0 0 0 0 0 0 8
tJ 11:15 AM 0 2 1 0 0 0 2 0 1 2 0 0 0 0 0 0 8
11:30 AM 0 3 2 0 1 0 3 0 1 3 0 0 0 0 0 0 13
11:45 AM 0 1 1 0 1 0 1 0 0 2 0 0 0 0 0 0 6
Total 0 9 4 0 3 0 6 0 3 10 0 0 0 0 0 0 35
U
12:00 PM 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3
12:15 PM 0 0 0 0 7 0 0 0 0 2 0 0 0 0 0 0 9
12:30 PM 0 5 0 0 0 0 0 0 0 5 0 0 0 0 0 0 10
12:45 PM 0 3 0 0 0 0 0 0 1 2 0 0 0 0 0 0 6
Total 0 8 0 0 7 0 0 0 1 12 0 0 0 0 0 0 28
01:00 PM 0 3 1 0 0 0 1 0 0 6 0 0 0 0 0 0 11
01:15 PM 0 0 0 0 2 0 0 0 1 3 0 0 0 0 0 0 6
t j Grand Total 0 21 7 0 13 0 9 0 5 39 0 0 0 0 0 0 94
Apprch% 0 75 25 0 59.1 0 40.9 0 11.4 88.6 0 0 0 0 0 0
�I Total% 0 22.3 7.4 0 13.8 0 9.6 0 5.3 41.5 0 0 0 0 0 0
U
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left I u-Tum I App.Tw Right I Thru I Left I u-rum App.Tow Right I Thru I Leh I u-Tum App.Tm:i Right Thru I ft I u-Tum A .Tonal mt.Tota!
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak I of 1
Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 0 0 0 0 0 7 0 0 0 7 0 2 0 0 2 0 0 0 0 0 9
12:30 PM 0 5 0 0 5 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 10
12:45 PM 0 3 0 0 3 0 0 0 0 0 1 2 0 0 3 0 0 0 0 0 6
01:00 PM 0 3 1 0 4 0 0 1 0 1 0 6 0 0 6 0 0 0 0 0 11
f—Fotal Volume 0 11 1 0 12 7 0 1 0 8 1 15 0 0 16 0 0 0 0 0 36
o App.Total 0 91.7 8.3 0 87.5 0 12.5 0 6.2 93.8 0 0 0 0 0 0
U PHF .000 .550 .250 .000 .600 .250 .000 .250 .000 .286 1 .250 .625 .000 .000 .667 1 .000 .000 .000 .000 .000 1 .818
n
U
li
tJ
L
r �
1 J
N/S: Osgood Street(Route 125) PRECISION File Name : 122978 AA1
E/W: Great Pond Rd (Rte 133)/Casa Blanca D A T A Site Code :2121491
City, State: North Andover,MA P.O.Box0301 8e lln,,MA 01503 Start Date : 6/30/2012 �J
Office:508.4813999 Fax:508-545.1234
Client:Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No : 1 ,
Groups Printed-Peds and Bicycles �-
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time Right Thru Left Peds Ri t Thru Left Peds Right ThruLeft Peds Ri ht Thru Left Peds Int.Total
10:30 AM 0 2 0 0 0 0 0 0 3 6 0 0 0 0 0 0 11
10:45 AM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2 `J
Total 0 3 0 0 0 0 0 0 3 7 0 0 0 0 0 0 13
r 1
11:00 AM 0 1 0 0 0 0 0 0 3 2 0 0 0 0 0 0 6
11:15 AM 0 2 0 0 0 0 2 0 2 1 0 0 0 0 0 0 7
11:30 AM 0 0 0 0 1 0 0 0 6 2 0 0 0 0 0 0 9
11:45 AM 0 2 0 0 0 0 1 0 3 2 0 0 0 0 0 0 8 t
Total 0 5 0 0 1 0 3 0 14 7 0 0 0 0 0 0 30
12:00 PM 0 0 0 0 0 0 2 0 2 0 0 0 0 0 0 0 4
12:15 PM 0 1 0 0 0 0 1 0 6 1 0 0 0 0 0 0 9
12:30 PM 0 4 0 0 0 0 l 0 2 1 0 0 0 0 0 0 8 f
12:45 PM 0 2 0 0 1 0 2 0 3 1 0 0 0 0 0 0 9
Total 0 7 0 0 1 0 6 0 13 3 0 0 0 0 0 0 30 L-J
01:00 PM 0 2 0 0 0 2 0 0 1 2 0 0 0 0 0 0 7 r
01:15 PM 0 1 1 0 0 0 1 0 2 2 0 0 0 0 0 0 7
Grand Total 0 18 1 0 2 2 10 0 33 21 0 0 0 0 0 0 87
Apprch% 0 94.7 5.3 0 14.3 14.3 71.4 0 61.1 38.9 0 0 0 0 0 0
Total% 0 20.7 1.1 0 2.3 2.3 11.5 0 37.9 24.1 0 0 0 0 0 0 r
lJ
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant r 1
From North From East From South From West
Start Time Right I Thru I Left I Peds I App.Total Right I Thro I LefrI Peds App.rma Right Thru I LeftI Peds App.Total Right I Thru I LeftI Peds A .rmai Int.Total 4
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 oft
Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 0 1 0 0 1 0 0 1 0 1 6 1 0 0 7 0 0 0 00 9
12:30 PM 0 4 0 0 4 0 0 1 0 1 2 1 0 0 3 0 0 0 0 0 8
12:45 PM 0 2 0 0 2 1 0 2 0 3 3 1 0 0 4 0 0 0 0 0 9
01:00 PM 0 2 0 0 2 0 2 0 0 2 1 2 0 0 3 0 0 0 0 0 7
Total volume 09 0 0 9 1 2 4 0 7 12 5 0 0 17 0 0 0 0 0 33 f l
%App.Total 0 100 0 0 14.3 28.6 57.1 0 70.6 29.4 0 0 0 0 0 0
PHF 1 .000 .563 .000 .000 .563 .250 .250 .500 .000 .583 .500 .625 .000 .000 .607 1 .000 .000 .000 .000 .000 .917
r ,
tl
t�
r �
t
r-1
l.J
r 1
l .
1
r�
I ,
L4
r NIS: Osgood Street (Route 125) PRECISION File Name : 122978 AAf
iJ E/W: Great Pond Rd (Rte 13{3))/Casa Blanca DpusArl;l�,
MA A Site Code : 2121491
LLC
City, State: North Andover, P.O.Box301 Berlin,MA 01503 Start Date : 6/30/2012
Office:508.4813999 Fa)c508545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No 1
�U
Osgood Street(Route 125) Great Pond Road(Route 133) Osgood Street(Route 125) Casa Blanca Restaurant
From North From East From South From West
Start Time I Right I Thru I Left I u-rum .Taw Right I Thru I Left I u-T. I Ap.Tow Rjaht I Thru Left U-T. App.Tow Right I Thru I heft u-Tum App.Tow Int.Total
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:30 AM
n 11:30 AM 0 142 25 0 167 18 l 35 0 54 52 184 1 0 237 0 0 0 0 0 458
1 11:45 AM 0 133 14 0 147 13 0 37 0 50 51 180 3 0 234 0 0 0 0 0 431
1 12:00 PM 0 117 13 0 130 19 0 45 0 64 56 168 2 0 226 3 0 0 0 3 423
12:15 PM 0 146 18 0 164 30 0 42 0 72 55 168 0 0 223 1 0 0 0 1 460
Total Volume 0 538 70 0 608 80 1 159 0 240 214 700 6 0 920 4 0 0 0 4 1772
n %A .Total 0 88.5 11.5 0 33.3 0.4 66.2 0 23.3 76.1 0.7 0 100 0 0 0
PHF .000 .921 .700 .000 .910 1 .667 .250 .883 .000 .833 .955 .951 .500 .000 .970 .333 .000 .000 .000 .333 .963
Cars 0 534 67 0 601 71 1 155 0 227 213 690 6 0 909 4 0 0 0 4 1741
%Cars 0 99.3 95.7 0 98.8 88.8 100 97.5 0 94.6 99.5 98.6 100 0 98.8 100 0 0 0 100 98.3
Heavy Vehicles 0 4 3 0 7 9 0 4 0 13 1 10 0 0 11 0 0 0 0 0 31
%H—YVawda 0 0.7 4.3 0 1.2 11.3 0 2.5 0 5.4 0.5 1.4 0 0 1.2 0 0 0 0 0 1.7
Osgood Street(Route 125)
(`} Out In Total
f 761 601 1362
19 7 26
U78 08 38
�l 0 534 67 0
04 3 0
U 0 5381 70 0
Right Thru Left U-Tum
�..rl
Peak Hour Data
m
�7 �0»
M o 0 o North o m 0 0
� r�o� �� Peak Hour Begins at 11:30 A ~—'c —0—
3
'50
aoar
ca
o� Cars
to r o r it i Hea ^
Vehicles �» N c
m0� o0o E C c f
U H od
3 00 w
Left Thru Ri ht U-Tum
6 690 213 0
0 10 1 0
L 6 700 214 0
693 909 P16211
11 701 920
U Out In Total
F1
iL
lJ
C �
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 B ' 1
E: Butcher Boy Plaza Entrance �DuslEs, A Site Code : 2121491
City, State: North Andover,lv1A P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201
Office:508.4813999 Fax:508545.1234 PN : 1
Client:Bayside Engineering/ K. Cram Page Email:datarequests@pdillc.com f
Lj
Grouns Printed-Cars-Heavy Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South r
Start Time Thru Left I U-Tum ]Right Left I U-Tum Right I Thru I U-Tum Int.Total
07:00 AM 187 6 0 0 a 0 10 71 0 274 J
07:15 AM 191 5 0 0 0 0 19 94 0 309
07:30 AM 242 15 0 0 0 0 16 97 0 370
07:45 AM 235 9 0 0 0 0 18 108 0 370
Total 855 35 0 0 0 0 63 370 0 1323
08:00 AM 205 10 0 0 0 0 30 91 0 336
08:15 AM 199 10 0 0 0 0 36 105 0 350 f
08:30 AM 173 6 0 0 0 0 29 127 0 335
08:45 AM 198 7 0 0 0 0 31 152 0 388
Total 775 33 0 0 0 0 126 475 0 1409
Grand Total 1630 68 0 0 0 0 189 845 0 2732 r
Apprch% 96 4 0 0 0 0 18.3 81.7 0 L J
Total% 59.7 2.5 0 0 0 0 6.9 30.9 0
Cars 1566 66 0 0 0 0 180 808 0 2620
%Cars 96.1 97.1 0 0 0 0 95.2 95.6 0 95.9 r
Heavy Vehicles 64 2 0 0 0 0 9 37 0 112
%Heavy Vehicles 3.9 2.9 0 0 0 0 4.8 4.4 0 4.1
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time I Thm j Left I U-Tum A .Total Right Left U-Tum App.Total Right I Thm U-Tum App.Total Int Total r
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM IJ
07:30 AM 242 15 0 257 0 0 0 0 16 97 0 113 370
07:45 AM 235 9 0 244 0 0 0 0 18 108 0 126 370
08:00 AM 205 10 0 215 0 0 0 0 30 91 0 121 336 T
08:15 AM 199 10 0 209 0 0 0 0 36 105 0 141 350
Total Volume 881 44 0 925 0 0 0 0 100 401 0 501 1426
%App.Total 95.2 4.8 0 0 0 0 20 80 0
PHF .910 .733 .000 .900 .000 .000 .000 .000 .694 .928 .000 .888 .964 f
Cars 848 43 0 891 0 0 0 0 99 380 0 479 1370
%Cars 96.3 97.7 0 96.3 0 0 0 0 99.0 94.8 0 95.6 96.1 �.
Heavy Vehicles 33 1 0 34 0 0 0 0 1 21 0 22 56
%Heavy Vehicles 3.7 2.3 0 3.7 0 0 0 0 1.0 5.2 0 4.4 3.9
f"1
U
r-,
r1
to
1
1
Li
r NIS: Osgood Street (Route 125) PRECISION File Name : 122978 B
ij E:Butcher Boy Plaza Entrance D A T A Site Code : 2121491
LLC
City, State: North Andover, A P.O.BoxDTRI3015Beri�
Mro,A 0503 Start Date : 6/28/201:
Office: 834ClientBayside Engineering/K. Cram Emil:dataroquests@pdilc.com Page No 1
U
Groups Printed-Cars
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru I Left I U-Tum Ri ht Left I U-Turn Right I Thru I U-Tum Int.Total
U 07:00 AM 180 6 0 0 0 0 9 68 0 263
07:15 AM 184 4 0 0 0 0 18 90 0 296
07:30 AM 235 14 0 0 0 0 16 91 0 356
07:45 AM 225 9 0 0 0 0 18 104 0 356
Lj Total 824 33 0 0 0 0 61 353 0 1271
08:00 AM 199 10 0 0 0 0 30 87 0 326
r) 08:15 AM 189 10 0 0 0 0 35 98 0 332
08:30 AM 164 6 0 0 0 0 27 123 0 320
U 08:45 AM 190 7 0 0 0 0 27 147 0 371
Total 742 33 0 0 0 0 119 455 0 1349
Grand Total 1566 66 0 0 0 0 180 808 0 2620
Apprch% I 96 4 0 0 0 0 18.2 81.8 0
Total% 59.8 2.5 0 0 0 0 I 6.9 30.8 0
U
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
! Start Time Thru Lefr I U-Turn I App.Total Right Left U-Tum App.Total Right Thru I U- um Am.Total Int.Total
'eak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
--Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 235 14 0 249 0 0 0 0 16 91 0 107 356
07:45 AM 225 9 0 234 0 0 0 0 18 104 0 122 356
r 08:00 AM 199 10 0 209 0 0 0 0 30 87 0 117 326
08:15 AM 189 10 0 199 0 0 0 0 35 98 0 133 332
Total Volume 848 43 0 891 0 0 0 0 99 380 0 479 1370
%Ann.Total 1 95.2 4.8 0 0 0 0 1 20.7 79.3 0
PHF 1 .902 .768 .000 .895 .000 .000 .000 .000 1 .707 .913 .000 .900 .962
U
U
n
UI
r
U
U
n
i
Li
r ,
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 B r ,
E: Butcher Boy Plaza EntranceD A T A Site Code : 2121491
City, State: North Andover,MA PO.BoxD301STRIEBerinSAA 01503 Start Date : 6/28/201"
Office: .481.3q9 08545.1234Client: Bayside Engineering/K. Cram Emil:datarenesis@ dillc.com Page No 1
Groups Printed-Heavy Vehicles t
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left U-Tum Right Left I U-Turn Right Thru U-TumInt Total
07:00 AM 7 0 0 0 0 0 1 30 11
07:15 AM 7 1 0 0 0 0 1 4 0 13
07:30 AM 7 1 0 0 0 0 0 6 0 14
07:45 AM 10 0 0 0 0 0 0 4 0 14 r
Total 31 2 0 0 0 0 2 17 01 52
08:00 AM 6 0 0 0 0 0 0 4 0 10
08:15 AM 10 0 0 0 0 0 1 7 0 18 r�
08:30 AM 9 0 0 0 0 0 2 4 0 15
08:45 AM 8 0 0 0 0 0 4 5 0 17
Total 33 0 0 0 0 0 7 20 0 60
Grand Total 64 2 0 0 0 0 9 37 0 112 t
Apprch% 97 3 0 0 0 0 19.6 80.4 0
Total% 57.1 1.8 0 0 0 0 8 33 0 L
!`1
L1
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Leh I U-Turn App.Total Right I Left U-Tum App.Total Right Thru U- to App.Total Int Total ( `.
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 60 0 6 0 0 0 0 0 4 0 4 10
08:15 AM 10 0 0 10 0 0 0 0 1 7 0 8 18
08:30 AM 9 0 0 9 0 0 0 0 2 4 0 6 15 r
08:45 AM 8 0 0 8 0 0 0 0 4 5 0 9 17
Total Volume 33 0 0 33 0 0 0 0 7 20 0 27 60 `J
%App.Total 100 0 0 0 0 0 25.9 74.1 0
PHF .825 .000 .000 .825 1 .000 .000 .000 .000 .438 .714 .000 .750 .833 i
L .,
r �
L✓
f
�J
r�
LJ
�J
r,
r�
. l
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 B
IU E:Butcher Boy Plaza Entrance �puA T�A Site Code : 2121491
City,State: North Andover,MA P.O.Box 301 Berlin,MA 01503 Start Date : 6/28/201
Office:508.4813999 Fax508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
LJ Groups Printed-Peds and Bicycles
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
1 Start Time I iiruT Left Peds Right Left Peds Ri t Thru Peds Int Total
07:00 AM 1 0 0 0 0 0 0 0 0 1
U 07:15 AM 0 0 0 0 0 0 0 0 0 0
07:30 AM 6 0 0 0 0 0 0 2 0 8
07:45 AM 2 0 0 0 0 0 0 3 0 5
LI Total 9 0 0 0 0 0 0 5 0 14
08:00 AM 2 0 0 0 0 0 0 2 0 4
n 08:15 AM 1 0 0 0 0 0 0 0 0 1
08:30 AM 1 0 0 0 0 0 0 1 0 2
Ij 08:45 AM 0 0 0 0 0 0 0 0 0 0
Total 4 0 0 0 0 0 0 3 0 7
rl Grand Total 13 0 0 0 0 0 0 8 0 21
Li Apprch% 100 0 0 I 0 0 0 0 100 0
Total% 61.9 0 0 0 0 0 I 0 Al 0
fn,
I
W
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thtu Left Peds App.Total Right Left Peds App.Total Right Thru Peds App.TotW Int Total
} Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak I of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 6 0 0 6 00 0 0 0 2 0 2 8
07:45 AM 2 0 0 2 0 0 0 0 0 3 0 3 5
08:00 AM 2 0 0 2 0 0 0 0 0 2 0 2 4
08:15 AM 1 0 0 1 0 0 0 0 0 0 0 0 1
Total Volume 11 0 0 11 0 0 0 0 0 7 0 7 18
%App.Total 100 0 0 0 0 0 0 100 0
PHF .458 .000 .000 .458 .000 .000 .000 .000 .000 .583 .000 .583 1 .563
i
l.J
U
I
n
U
r �
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 B
E: Butcher Boy Plaza Entran�cre� DousA T,L A Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201:
Office:508.4813999 Fax:508545.1234 F
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No : 1
Osgood Street(Route 125) Butcher Boy Plaza Enhance Osgood Street(Route 125) 1
From North From East From South
Start Time I Thru Left I U-Tum A2p.Total Right Left I U-Tum App.Total I Right I Thru I U-Tum A .Total Int.Total t.
Peak Hour Analysis From 07:00 AM to 08.45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30AM 242 15 0 257 0 0 0 0 16 97 0 113 370 r 1
07:45 AM 235 9 0 244 0 0 0 0 18 108 0 126 370
08:00 AM 205 10 0 215 0 0 0 0 30 91 0 121 336 k
08:15 AM 199 10 0 209 0 0 0 0 36 105 0 141 350
Total Volume 881 44 0 925 0 0 0 0 100 401 0 501 1426 r Z
%App.Total 95.2 4.8 0 0 0 0 20 80 0
PHF .910 .733 .000 .900 .000 .000 .000 .000 .694 .928 .000 .888 .964 IL
Cars 848 43 0 891 0 0 0 0 99 380 0 479 1370
%Cars 96.3 97.7 0 96.3 0 0 0 0 99.0 94.8 0 95.6 96.1
Heavy Vehicles 33 1 0 34 0 0 0 0 1 21 0 22 56 t I
%Heavy Vehicles 3.7 2.3 0 3.7 0 0 0 0 1.0 5.2 0 4.4 3.9
L�
Osgood Street(Route 125)
Out In Total r 1
M401EH&
71
55
Thru Left U-Tum
1 L+
y �
Peak Hour Data
O�
North
- 000
Peak Hour Begins at 07:30 A °c r1
�m
Cars �000 0o rmi Lt
Hea Vehicles m
Am�
N—0
T r+
Thru Ri ht U-Tum
380 99 0 r 1
21 1 0
4011 1001 0
848 479 F-1 3277
8 551
81 5 33 0 1382 r 1
Out In Total
. 1
r1
E ?MS
r N/S: Osgood Street (Route 125) PRECISION File Name : 122978 Bi
L_J E: Butcher Boy Plaza EntranceDousARlT A Site Code : 2121491
City, State:North Andover,MA p.O.Box 301 Berlin,MA 01503 Start Date : 6/28/201.
Office:508.4813999 Fax:508545.1234
(1 Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1
Groups Printed-Cars-Heavy Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left U-Turn Right Left U-Tum Right Thru U-Tum Int Total
U 04:00 PM 202 17 1 0 0 0 40 238 0 .498
04:15 PM 188 14 1 0 0 0 52 180 0 435
04:30 PM 192 16 0 0 0 0 51 232 0 491
04:45 PM 213 22 1 0 0 0 54 263 0 553
U Total 795 69 3 0 0 0 197 913 0 1977
05:00 PM242 21 0 0 0 0 60 256 0 579
n 05:15 PM 201 18 0 0 0 0 44 303 0 566
� , 05:30 PM 171 14 0 0 0 0 39 265 0 489
1-t 05:45 PM 162 10 0 0 0 0 49 280 0 501
Total 776 63 0 0 0 0 192 1104 0 2135
Grand Total 1571 132 3 0 0 0 389 2017 0 4112
j Apprch% 92.1 7.7 0.2 0 0 0 16.2 83.8 0
Total% 38.2 3.2 0.1 0 0 0 9.5 49.1 0
Cars 1553 132 3 0 0 0 388 1958 0 4034
%Cars 98.9 100 100 0 0 0 99.7 97.1 0 98.1
Heavy Vehicles 18 0 0 0 0 0 1 59 0 78
U %Heavy Vehicles 1.1 0 0 0 0 0 0.3 2.9 0 1.9
r
L.-1
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left U-Tum App.Total Right Left U-Tum App.Total Right Thru U-Tum App.Total Int.Total
I "eak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
t--?eak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 192 16 0 208 0 0 0 0 51 232 0 283 491
04:45 PM 213 22 1 236 0 0 0 0 54 263 0 317 553
05:00 PM 242 21 0 263 0 0 0 0 60 256 0 316 579
05:15 PM 201 18 0 219 0 0 0 0 44 303 0 347 566
Total Volume 848 77 l 926 0 0 0 0 209 1054 0 1263 2189
%App.Total 91.6 8.3 0.1 0 0 0 16.5 83.5 0
PHF .876 .875 .250 .880 .000 .000 .000 .000 .871 .870 .000 .910 .945
Cars840 77 1 918 0 0 0 0 209 1033 0 1242 2160
L_1 °/U Cars 99.1 100 100 99.1 0 0 0 0 100 98.0 0 98.3 98.7
Heavy Vehicles 8 0 0 8 0 0 0 0 0 21 0 21 29
%Heavy Vehicles 0.9 0 0 0.9 0 0 0 0 0 2.0 0 1.7 1.3
Li
�7
1
U
`R
U
u
l d
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 B] r
E: Butcher Boy Plaza Entran�cre� D�us�l�,u Site Code :2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201:
/ Office:508.4813999 Fax508545.1234 Page No 1 r
Client: Bayside Engineering K. Cram Email:datarequests@pdillc.com
Grou s Printed-Cars tJ
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South (-
Start Time Thru Left U-Turn Right Left I U-Turn Ri t Thru U-Turn Int Total
04:00 PM 201 17 1 0 0 0 40 221 0 480 L J
04:15 PM 183 14 1 0 0 0 51 170 0 419
04:30 PM 189 16 0 0 0 0 51 224 0 480
04:45 PM 211 22 1 0 0 0 54 257 0 545 r
Total 784 69 3 0 0 0 196 872 0 1924
05:00 PM 239 21 0 0 0 0 60 252 0 572
05:15 PM 201 18 0 0 0 0 44 300 0 563 r
05:30 PM 168 14 0 0 0 0 39 262 0 483
05:45 PM 161 10 0 0 0 0 49 272 0 492
Total 769 63 0 0 0 0 192 1086 0 2110
Grand Total 1553 132 3 0 0 0 388 1958 0 4034 t
Apprch% 92 7.8 0.2 0 0 0 16.5 83.5 0
Total% 38.5 3.3 0.1 0 0 0 9.6 48.5 0 `f
wt
�f
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left I U-Tum App.Total Ri ht Left U-Tum App.Total Right I Thru U-Tum I Am.Total IInt Totat
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak I of I
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 211 22 1 234 0 0 0 0 54 257 0 311 545
05:00 PM 239 21 0 260 0 0 0 0 60 252 0 312 572
05:15 PM 201 18 0 219 0 0 0 0 44 300 0 344 563
05:30 PM 168 14 0 182 0 0 0 0 39 262 0 301 483
Total Volume 819 75 1 895 0 0 0 0 197 1071 0 1268 2163
%App.Total 91.5 8.4 0.1 0 0 0 15.5 84.5 0
PHF 1 .857 .852 .250 .861 .000 .000 .000 .000 1 .821 .893 .000 .922 .945 r
r�
r 1
l 1
f
t.I
f `
f 1
t 1
f 1
i_I
1-1
U
I''1 NIS: Osgood Street (Route 125) PRECISION File Name : 122978 Bl
E: Butcher Boy Plaza EntranceDpusAiRlESA T A Site Code : 2121491
City, State: North Andover,MA P.O.8ox301 Berlin,MA 01503 Start Date : 6/28/201:
Office:508.4813999 Fax:508.545.1234
(1 Client:Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1
U
Groups Printed-Heavy Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left U-Turn Right Left U-Turn Right I Thru U-Turn Int Total
Li 04:00 PM 1 0 0 0 0 0 0 17 0 18
04:15 PM 5 0 0 0 0 0 1 10 0 16
04:30 PM 3 0 0 0 0 0 0 8 0 11
P 04:45 PM 2 0 0 0 0 0 0 6 0 8
Il i Total 11 0 0 0 0 01 1 41 0 53
U
05:00 PM 3 0 0 0 0 0 0 4 0 7
r1 05:15 PM 0 0 0 0 0 0 0 3 0 3
05:30 PM 3 0 0 0 0 0 0 3 0 6
U 05:45 PM 1 0 0 0 0 0 0 8 0 9
Total 7 0 0 0 0 0 0 18 0 25
Grand Total 18 0 0 0 0 0 1 59 0 78
Apprch% I 100 0 0 0 0 0 I 1.7 98.3 0
Total% 23.1 0 0 0 0 0 1.3 75.6 0
U
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru I Left I U-Tum I Ann.Total I Right I Left U-Tum I App.Total Right Thru I U- urn App.Total Int Total
leak Hour Analysis From 04:00 PM to 05:45 PM-Peak I of I
Weak Hour for Entire Intersection Begins at 04:00 PM
04:00 PM 1 0 0 1 0 0 0 0 0 17 0 17 18
04:15 PM 5 0 0 5 0 0 0 0 1 10 0 11 16
04:30 PM 3 0 0 3 0 0 0 0 0 8 0 8 11
L[ 04:45 PM 2 0 0 2 0 0 0 0 0 6 0 6 8
Total Volume 11 0 0 11 0 0 0 0 1 41 0 42 53
%App.Total 100 0 0 0 0 0 2.4 97.6 0
PHF .550 .000 .000 .550 .000 .000 .000 .000 1 .250 .603 .000 .618 .736
n
u
n
lU
Lj
n
n
n
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 BJ r
E: Butcher Boy Plaza EntranceD A T A Site Code :2121491
City, State: North Andover, MA P.O.BoIxD301 BerlinSMA 01503 Start Date : 6/28/201: `J
Office:508.4813999 Fax:508545.1234
Client:Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1 r-i
Grou s Printed-Peds and Bicycles t-j
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time ThmT Left Peds Right Left Peds Right Thm Peds Int.Total r 7
04:00 PM 0 0 0 0 0 0 0 0 0 0
04:15 PM 0 0 0 0 0 0 0 3 0 3 t�
04:30 PM 3 0 0 0 0 0 0 3 0 6
04:45 PM 2 0 0 1 0 0 0 1 0 2 0 4
Total 5 0 0 1 0 0 0 1 0 8 0 13
05:00 PM 2 0 0 0 0 0 0 2 0 4 }
05:15 PM 2 0 0 0 0 1 0 2 0 5
05:30 PM 0 0 0 0 0 0 0 3 0 3 r t
05:45 PM 2 0 0 0 0 0 0 5 0 7
Total 6 0 0 0 0 1 0 12 0 19 ' J
Grand Total 11 00 0 0 1 0 20 0 32 f
Apprch% 100 0 0 0 0 100 0 100 0
Total% 34.4 0 0 0 0 3.1 0 62.5 0 L J
r 1
t r
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left I Peds Ann.Total Right Left Peds App.Total Right I Thru I Peds App.Total Int.Total f -
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 3 0 0 3 0 0 0 0 0 3 0 3 6
04:45 PM 2 0 0 2 0 0 0 0 0 2 0 2 4
05:00 PM 2 0 0 2 0 0 0 0 0 2 0 2 4 r 1
05:15 PM 2 0 0 2 0 0 1 1 0 2 0 2 5
Total Volume 9 0 0 9 0 0 1 1 0 9 0 9 19
%Any.Total 100 0 0 0 0 100 0 100 0
PHF .750 .000 .000 .750 .000 .000 .250 .250 1 .000 .750 .000 .750 .792 r
r-�
u
r ;
f ,
! N
1
4 1
•J
a J
U
r N/S: Osgood Street (Route 125) PRECISION File Name : 122978 BF
U E:Butcher Boy Plaza EntranceD A T A Site Code :2121491
S,LLC
City, State: North Andover,MA P.O.BolxD301 Be lin,MA 01503 Start Date : 6/28/201z'
Office:508.4813999 fa:c508345.1234
Client: Bayside Engineering/K. Cram Email:datarequesu@pdillc.com Page No : 1
I �
U
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
U Start Time Thru Left U-Tum App.Total Right Left U-Tum App.Total Fight Thru U-Turn Total Int.Total
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 192 16 0 208 0 0 0 0 51 232 0 283 491
04:45 PM 213 22 1 236 0 0 0 0 54 263 0 317 553
05:00 PM 242 21 0 263 0 0 0 0 60 256 0 316 579
05:15 PM 201 18 0 219 0 0 0 0 44 303 0 347 566
Total Volume 848 77 1 926 0 0 0 0 209 1054 0 1263 2189
%App.Total 91.6 8.3 0.1 0 0 0 16.5 83.5 0
PHF .876 .875 .250 .880 .000 .000 .000 .000 .871 .870 .000 .910 .945
Cars 840 77 1 918 0 0 0 0 209 1033 0 1242 2160
Cars 99.1 100 100 99.1 0 0 0 0 100 98.0 0 98.3 98.7
Heavy Vehicles 8 0 0 8 0 0 0 0 0 21 0 21 29
%Heavy Vehicles 0.9 0 0 0.9 0 0 0 0 0 2.0 0 1.7 1.3
Li
Osgood Street(Route 125)
Out In Total
1033 918 1 1951
l S 21 8 1 29
1054 9 1 1980
840 77 1
` 8 0 0
848 77 1
Thru Left U-Tum
r j L►
L
n Peak Hour Data
I 1 �o
North `�O� ° c I'D�0 0 0 a
Peak Hour Begins at 04:30 P 0
Cars X000 o O A
HeavyVehicles
m
0 0 0aP. .-
m
t J
Thru Ril ht U-Tum
n 1033 209 0
21 0 0
r; 1054 209 0
� 840 1242 2082 I 8 21 1 29
848 1263 1 2111
Out In Total
r'1
� I
l-J
U
r 1
t .
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 BB: r�
E: Butcher Boy Plaza Entrance D A T A Site Code : 2121491
5
City, State: North Andover,MA P0
o.8ox3B Mins A 01503 Start Date : 6/30/2012
Office:508.4813999 Fax:508.545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No : 1 f�
Groups Printed-Cars-Heavy Vehicles iJ
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left U-Turn Right Left U-Turn Right Thru U-Turn Int.Total r 1
10:30 AM 148 27 0 0 0 0 48 123 0 346
10:45 AM 155 16 0 0 0 0 53 145 0 369 L
Total 303 43 0 0 0 0 101 268 0 715
r1
11:00 AM 171 15 0 0 0 0 57 123 0 366
11:15 AM 156 20 0 0 0 0 54 129 0 359 �t
11:30 AM 167 12 0 0 0 0 48 154 0 381
11:45 AM 147 15 0 0 0 0 34 160 0 356
Total 641 62 0 0 0 0 193 566 0 1462 r 1
12:00 PM 128 17 0 0 1 0 46 140 0 332 J
12:15 PM 167 17 0 0 0 0 42 154 0 380
12:30 PM 152 17 0 0 0 0 55 143 0 367 t 1
12:45 PM 157 13 0 0 0 0 52 123 0 345
Total 604 64 0 0 1 0 195 560 0 1424 1--
01:00 PM 137 16 0 0 0 0 58 124 0 335 r 1
01:15 PM 143 18 0 0 0 0 52 142 0 355
Grand Total 1828 203 0 0 1 0 599 1660 0 4291
Apprch% 90 10 0 0 100 0 26.5 73.5 0
Total% 42.6 4.7 0 0 0 0 14 38.7 0
Cars 1796 202 0 0 l 0 595 1617 0 4211 1
%Cars 98.2 99.5 0 0 100 0 99.3 97.4 0 98.1
Heavy Vehicles 32 1 0 0 0 0 4 43 0 80 `
%Heavy Vehicles 1.8 0.5 0 0 0 0 0.7 2.6 0 1.9
r1
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125) t 1
From North From East From South
Start Time Thru Left I U-Tum App.Total Right I Left U-Turn App.Total Right Thru U-Turn A .Tota! Int.Total
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of 1 r r
Peak Hour for Entire Intersection Begins at 10:45 AM
10:45 AM 155 16 0 171 0 0 0 0 53 145 0 198 369 t
11:00 AM 171 15 0 186 0 0 0 0 57 123 0 180 366
11:15 AM 156 20 0 176 0 0 0 0 54 129 0 183 359 1
11:30 AM 167 12 0 179 0 0 0 0 48 154 0 202 381
Total Volume 649 63 0 712 0 0 0 0 212 551 0 763 1475
%APP.Total 1 91.2 8.8 0 0 0 0 27.8 72.2 0 r
PHF .949 .788 .000 .957 .000 .000 .000 .000 .930 .894 .000 .944 .968
Cars 637 63 0 700 0 0 0 0 211 542 0 753 1453
%Cars 98.2 100 0 98.3 0 0 0 0 99.5 98.4 0 98.7 98.5
Heavy Vehicles 12 0 0 12 0 0 0 0 1 9 0 10 22 h
%Heavy Vehicles 1.8 0 0 1.7 0 0 0 0 0.5 1.6 0 1.3 1.5
v
r \
�r
r.
ad
r •
1
a.J
n
Li rd
� N/S: Osgood Street (Route 125) PRECISION File Name : 122978 BBI
j E:Butcher Boy Plaza Entrance D A T A Site Code : 2121491
City, State: North Andover,MA P.O.Bolx30 BR11inSMA 01503 Start Date : 6/30/2012
+
Office: 99 234Client: Bayside Engineering//K. Cram Email:datareguests@pdilic.com
Page No : 1
Li Groups Printed-Cars
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
( I Start Time Tluu Left U-Turn Right Left U-Tum Ri t Thtu U-Tum Int.Total
1 1 10:30 AM 147 27 0 0 0 0 48 116 0 .338
10:45 AM 153 16 0 0 0 0 53 144 0 366
Total 300 43 0 0 0 0 101 260 0 704
11:00 AM 168 15 0 0 0 0 56 120 0 359
11:15 AM 152 20 0 0 0 0 54 127 0 353
11:30 AM 164 12 0 0 0 0 48 151 0 375
11:45 AM 145 15 0 0 0 0 33 158 0 351
Total 629 62 0 0 0 0 191 556 0 1438
t�-
12:00 PM 127 17 0 0 1 0 46 137 0 328
12:15 PM 165 17 0 0 0 0 42 146 0 370
12:30 PM 146 17 0 0 0 0 53 141 0 357
12:45 PM 152 13 0 0 0 0 52 120 0 337
Total 590 64 0 0 1 0 193 544 0 1392
01:00 PM 134 15 0 0 0 0 58 120 0 327
01:15 PM 143 18 0 0 0 0 52 137 0 350
Grand Total 1796 202 0 0 1 0 595 1617 0 4211
Apprch% 89.9 10.1 0 0 100 0 26.9 73.1 0
Total% 42.7 4.8 0 0 0 0 14.1 38.4 0
i Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
4 Start Time Thru Left I U-Tum App.Total Right Left U-Tum —A—.Total Right I Thru I U-Turn App.Total Int Total
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak I of]
weak Hour for Entire Intersection Begins at 10:45 AM
10:45AM 153 16 0 169 0 0 0 0 53 144 0 197 366
11:00 AM 168 15 0 183 0 0 0 0 56 120 0 176 359
11:15 AM 152 20 0 172 0 0 0 0 54 127 0 181 353
11:30 AM 164 12 0 176 0 0 0 0 48 151 0 199 375
r—I Total Volume 637 63 0 700 0 0 0 0 211 542 0 753 1453
? %ADZ).Total 91 9 0 0 0 0 28 72 0
PHF 948 .788 .000 .956 .000 .000 .000 .000 1 .942 .897 .000 .946 .969
r
w
n
Lj
Lj
n
L`
� 1
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 BB: r-1
E: Butcher Boy Plaza Entrance D A T A Site Code : 2121491
City, P.O.Box Berlin,MA 01503 Start Date : 6/30/2012 `l
Ci State: North Andover MA
y Engineering/
Office: roque Fax50llc.co 1234 Page No : 1 rti
Client: Bayside En eerie / K. Cram Emall:datarequests@pdilk.cam
Groups Printed-Heavy Vehicles '
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South r
Start Time Thru I Left I U-Turn Right Left I U-Tum Right I Thu T U-Turn Int Total
10:30 AM 1 0 0 0 0 0 0 7 0 8
10:45 AM 2 0 0 0 0 0 0 1 0 3 LJ
Total 3 0 0 0 0 0 0 8 0 11
r •
11:00 AM 3 0 0 0 0 0 1 3 0 7
11:15 AM 4 0 0 0 0 0 0 2 0 6 ■
11:30 AM 3 0 0 0 0 0 0 3 0 6
11:45 AM 2 0 0 0 0 0 1 2 0 5 i ti
Total 12 0 0 0 0 0 2 10 0 24
12:00 PM 1 0 0 0 0 0 0 3 0 4 J
12:15 PM 2 0 0 0 0 0 0 8 0 10
12:30 PM 6 0 0 0 0 0 2 2 0 10 1
12:45 PM 1 5 0 0 0 0 0 0 3 0 8
Total 14 0 0 0 0 0 2 16 0 32
01:00 PM 3 1 0 0 0 0 0 4 0 8 r }
01:15 PM 0 0 0 0 0 0 0 5 0 5
Grand Total 32 1 0 0 0 0 4 43 0 80 u
Apprch% 97 3 0 0 0 0 8.5 91.5 0
Total% 40 1.2 0 0 0 0 5 53.8 0
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru Left I U-Tum App.Total Right Left U-Turn A .Total Right Thru U-Tum Ann.Total I Int Total k-j
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 2 0 0 2 0 0 0 0 0 8 0 8 10 r�
12:30 PM 6 0 0 6 0 0 0 0 2 2 0 4 10
12:45 PM 5 0 0 5 0 0 0 0 0 3 0 3 8
01:00 PM 3 1 0 4 0 0 0 0 0 4 0 4 8
Total Volume 16 1 0 17 0 0 0 0 2 17 0 19 36 r
%AnD.Total 94.1 5.9 0 0 0 0 1 10.5 89.5 0
PHF .667 .250 .000 .708 .000 .000 .000 .000 1 .250 .531 .000 .594 .900 l
f—
L�
r�
v
F�
v
�1
ii
r �
n
l__;
n N/S: Osgood Street (Route 125) PRECISION File Name : 122978 BBF
U E:Butcher Boy Plaza Entrance� D A T A Site Code : 2121491
City, State: North Andover,MA P.O.BoxD3015TRIBefln,MA 01503 Start Date : 6/30/2012
Office:508.4813999 Fax:508345.1234
Client: Bayside Engineering/ K. Cram Emaa:datarequestscpdillc.com Page No : 1
U Grouvs Printed-Peds and Bicycles
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
Start Time Thru I Left Peds -----Ri,--h-t-1 Left I Peds RijZht nuu, Peds Int Total
10:30 AM 2 0 0 0 0 0 0 7 0 9
10:45 AM 1 0 0 0 0 0 1 1 0 3
Total 3 0 0 0 0 0 1 8 0 12
�y 11:00 AM 1 0 0 0 0 0 0 2 0 3
1, 11:15 AM 1 0 0 0 0 0 0 1 0 2
11:30 AM 0 0 0 0 0 0 0 3 0 3
1 1:45 AM 3 0 0 0 0 0 0 3 0 6
i Total 5 0 0 0 0 0 0 9 0 14
LJ
12:00 PM 0 0 0 0 0 0 0 0 0 0
12:15 PM 1 0 0 0 0 0 0 1 0 2
12:30 PM 3 0 0 0 0 0 0 1 0 4
12:45 PM 2 0 0 0 0 0 0 2 0 4
Total 6 0 0 0 0 0 0 4 0 10
t� 01:00 PM 2 0 0 0 0 0 0 2 0 4
i 01:15 PM 2 0 0 0 0 0 0 2 0 4
Grand Total 18 0 0" 0 0 0 1 25 0 44
Apprch% 100 0 0 0 0 0 3.8 96.2 0
Total% 40.9 0 0 0 0 0 2.3 56.8 0
Li
l Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125)
From North From East From South
y Start Time Thru Left I Peds App.Total Right Left Peds App.Total Right Thru Peds App.Total Int.Total
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of 1
rPeak Hour for Entire Intersection Begins at 10:30 AM
10:3 0
AM 2 0 0 2 0 0 0 0 0 7 0 7 9
y 10:45 AM 1 0 0 1 0 0 0 0 1 1 0 2 3
11:00 AM 1 0 0 1 0 0 0 0 0 2 0 2 3
11:15 AM 1 0 0 1 0 0 0 0 0 1 0 1 2
rl Total Volume 5 0 0 5 0 0 0 0 1 11 0 12 17
I I %App.Total 100 0 0 0 0 0 8.3 91.7 0
E 1 PHF .625 .000 .000 .625 .000 .000 .000 .000 .250 .393 .000 .429 .472
r'1
u
n
u
f t
N/S: Osgood Street(Route 125)
PRECISION File Name 122978 BB:
E:Butcher Boy Plaza Entrance D A T A Site Code :2121491
INDUSTRIES,
City, State: North Andover,MA P.o.Box301B iinSMA 01503 Start Date : 6/30/2012
Office:508.4813999 Fax:508.545.1234
Client:Bayside Engineering/K. Cram Email:datarequests@pdilic.com Page No : 1 r
l.�
Osgood Street(Route 125) Butcher Boy Plaza Entrance Osgood Street(Route 125) ( 1
From North From East From South
Start Time Thru I Left I U-TumI Apv.Total Right I Left I U-Tum I Any.Total I Right I Thru I U-Tum I Int.Total t 1
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of]
Peak Hour for Entire Intersection Begins at 10:45 AM
10:45 AM 155 16 0 171 0 0 0 0 53 145 0 198 369 r
11:00 AM 171 15 0 186 0 0 0 0 57 123 0 180 366
11:15 AM 156 20 0 176 0 0 0 0 54 129 0 183 359
11:30 AM 167 12 0 179 0 0 0 0 48 154 0 202 381
Total Volume 649 63 0 712 0 0 0 0 212 551 0 763 1475 r
%App.Total 91.2 8.8 0 0 0 0 27.8 72.2 0
PHF .949 .788 .000 .957 .000 .000 .000 .000 .930 .894 .000 .944 .968
Cars 637 63 0 700 0 0 0 0 211 542 0 753 1453
%Cars 98.2 100 0 98.3 0 0 0 0 99.5 98.4 0 98.7 98.5
Heavy Vehicles 12 0 0 12 0 0 0 0 1 9 0 10 22
%Heavy Vehicles 1.8 0 0 1.7 0 0 0 0 0.5 1.6 0 1.3 1.5
Osgood Street(Route 125)
Out In Total t l
5421 L 7001242
9 12 21 u
55 63
637 63 0 r
12 0 0
649 63 0 i
Thru Left U-Tum
1 L► f
V
Peak Hour Data
1
O
NoRh
�00003
=He ,h
s at 10:45 A f 1
o00 0o m L�
c
rr
c 4
300o Noiu
�
A—�
lU
r�
Thru Ri ht U-Tum
542 211 0
9 1 0
551 212 0
t �
637 753 -13-90 t
12 10 2
649 763 2
Out In Total L
r �
l J
• f
a ..
l J
7
Lj ?aws
NIS: Osgood Street(Route 125) PRECISION File Name : 122978 C
E/W:Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491
IESLLC
City,State: North Andover,MA vo.Box30 sBBedin IMA 01503 Start Date : 6/28/201:
Office: 234Client:Bayside Engineering/ K. Cram Emil:datarequests@pdillc.com Page No 1
Li Groups Printed-Cats- eavy Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right I Thru I Left I U-Tum Right Thru I Left I U-Tum Right I Thru I Left U-Tum Right I Thru Left U-Turn Int Total
U 07:00 AM 6 178 0 0 2 0 12 0 0 59 13 0 1 0 1 0 272
07:15 AM 5 177 0 0 2 0 18 0 0 88 5 0 4 0 1 0 300
07:30 AM 3 228 0 0 1 0 21 0 0 90 8 0 5 0 0 0 356
�- 07:45 AM 6 222 0 0 4 0 17 0 0 96 8 0 2 0 2 0 357
Total 20 805 0 0 9 0 68 0 0 333 34 0 12 0 4 0 1285
U
08:00AM 6 197 0 0 8 1 16 0 0 83 11 0 3 0 1 0 326
08:15 AM 1 186 0 0 8 0 19 0 0 99 6 0 6 0 3 0 328
08:30 AM 7 151 0 0 7 0 22 0 0 121 6 0 4 0 3 0 321
08:45 AM 4 172 0 0 4 1 24 0 0 142 9 0 9 0 2 0 367
Total 18 706 0 0 27 2 81 0 0 445 32 0 22 0 9 0 1342
r i Grand Total 38 1511 0 0 36 2 149 0 0 778 66 0 34 0 13 0 2627
L; Apprch Y. 2.5 97.5 0 0 19.3 1.1 79.7 0 0 92.2 7.8 0 72.3 0 27.7 0
t l Total% 1.4 57.5 0 0 1.4 0.1 5.7 0 0 29.6 2.5 0 1.3 0 0.5 0
Cars 35 1455 0 0 36 1 143 0 0 741 61 0 31 0 7 0 2510
%Cars 92.1 96.3 0 0 100 50 96 0 0 95.2 92.4 0 91.2 0 53.8 0 95.5
Heavy Vehicles 3 56 0 0 0 I 6 0 0 37 5 0 3 0 6 0 117
Heavy Vehicles 7.9 3.7 0 0 0 50 4 0 0 4.8 7.6 0 8.8 0 46.2 0 4.5
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Ri ht 1 Thm Lefr U-rum p .raei Right Thru Uft I U-r.. I p .anal Right Thru Leh I u-Tum App.T-1 Right I Thru !eL U-T= App.T-1 Int.T°tal
eak Hour Analysis From 07:00 AM to 08:45 AM-Peak I of I
Weak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 3 228 0 0 231 1 0 21 0 22 090 8 0 98 5 0 0 0 5 356
07:45 AM 6 222 0 0 228 1 4 0 17 0 21 0 96 8 0 104 2 0 2 0 4 357
08:00 AM 6 197 0 0 203 8 1 16 0 25 0 83 11 0 94 3 0 1 0 4 326
` 08:15 AM 1 186 0 0 187 8 0 19 0 27 0 99 6 0 105 6 0 3 0 9 328
l t Total Volume 16 833 0 0 849 21 1 73 0 95 0 368 33 0 401 16 0 6 0 22 1367
%App.Total 1.9 98.1 0 0 22.1 1.1 76.8 0 0 91.8 8.2 0 72.7 0 27.3 0
PHF 667 .913 .000 .000 .919 .656 .250 .869 .000 .880 .000 .929 .750 .000 .955 .667 .000 .500 .000 .611 .957
Cars 14 802 0 0 816 21 1 72 0 94 0 350 30 0 380 15 0 3 0 18 1308
V %Cars 87.5 96.3 0 0 96.1 100 100 98.6 0 98.9 0 95.1 90.9 0 94.8 93.8 0 50.0 0 81.8 95.7
Heavy Vehicles 2 31 0 0 33 0 0 1 0 1 0 18 3 0 21 1 0 3 0 4 59
%HnyV.W.In 12.5 3.7 0 0 3.9 0 0 1.4 0 1.1 0 4.9 9.1 0 5.2 6.3 0 50.0 0 18.2 4.3
w
Li
r7
I ;
Li
V
U
L�
r1
?Mows
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 C t
E/W: Butcher Boy Plaza Exit/Commerce Way DuuAAx1�,LA Site Code :2121491 �J
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201.
Office:508.4813999 Fax508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pollk.com Page No : 1 r 1
Gmu s Printed Cars L
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West )
Start Time
Right Thru Left U-Tum Right Thru I Left U-Tum Fight I Thru I Left U-T, Right Thru Left U-Tum Int Total
07:00 AM 5 171 0 0 2 0 12 0 0 56 13 0 1 0 0 0 260 t ,
07:15 AM 5 172 0 0 2 0 16 0 0 84 5 0 4 0 0 0 288
07:30 AM 3 220 0 0 1 0 21 0 0 84 8 0 5 0 0 0 342
07:45 AM 5 215 0 0 4 0 16 0 0 93 7 0 2 0 1 0 343 r 1
Total 18 778 0 0 9 0 65 0 0 317 33 0 12 0 1 0 1233
08:00AM 6 190 0 0 8 1 16 0 0 80 10 0 3 0 0 0 314
08:15 AM 0 177 0 0 8 0 19 0 0 93 5 0 5 0 2 0 309
08:30 AM 7 143 0 0 7 0 21 0 0 112 5 0 3 0 3 0 301
08:45 AM 4 167 0 0 4 0 22 0 0 139 8 0 8 0 1 0 353
Total 17 677 0 0 27 1 78 0 0 424 28 0 19 0 6 0 1277
Grand Total 35 1455 0 0 36 1 143 0 0 741 61 0 31 0 7 0 2510
Apprch% 2.3 97.7 0 0 20 0.6 79.4 0 0 92.4 7.6 0 81.6 0 18.4 0
Total% 1.4 58 0 0 1.4 0 5.7 0 0 29.5 2.4 0 1.2 0 0.3 0 t
L�
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right Thru Left U-Tum A .Tow Right Thru Left U-Tum A .Tow Right Thru Leh U-Tum .Tow Ri t Thru Left I U-T.. A .row Int.Ttl ,
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak I of I
Peak Hour for Entire Intersection Begins at 07:30 AM ,
07:30 AM 3 220 0 0 223 1 0 21 0 22 0 84 8 0 92 5 0 0 0 5 342
07:45 AM 5 215 0 0 220 4 0 16 0 20 0 93 7 0 100 2 0 1 0 3 343 r r
08:00 AM 6 190 0 0 196 8 1 16 0 25 0 80 10 0 90 3 0 0 0 3 314
08:15 AM 0 177 0 0 177 8 0 19 0 27 0 93 5 0 98 5 0 2 0 7 309 u
Total Volume 14 802 0 0 816 21 1 72 0 94 0 350 30 0 380 15 0 3 0 18 1308
App.Total 1.7 98.3 0 0 122.3 1.1 76.6 0 0 92.1 7.9 0 83.3 0 16.7 0
PHF .583 .911 .000 .000 .915 .656 .250 .857 .000 .870 .000 .941 .750 .000 .950 1 .750 .000 .375 .000 .643 .953 n
�a
1 �
u
r-
u
t �
v
s 7'
LJ
t 1
L.J
l J
ri
.J
n
Li
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 C
E/W:Butcher Boy Plaza Exit/Commerce Way DousATRlET A Site Code : 2121491
City, State: North.Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201:
Office:508.4813999 Fax:508545.1234
Client. Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
Groups Printed-H=Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Ri ht Thru Left U-Tran Right Thru Left U-Tum Right Thru Left U-Turn Right Thru I Left U-Tum Int Total
07:00 AM 1 7 0 0 0 0 0 0 0 3 0 0 0 0 1 0 12
07:15 AM 0 5 0 0 0 0 2 0 0 4 0 0 0 0 1 0 12
07:30 AM 0 8 0 0 0 0 0 0 0 6 0 0 0 0 0 0 14
07:45 AM 1 7 0 0 0 0 1 0 0 3 . 1 0 0 0 1 oil 4
Total 2 27 0 0 0 0 3 01 0 16 1 0 0 0 3 0 52
E�
08:00AM 0 7 0 0 0 0 0 0 0 3 1 0 0 0 1 0 12
h 08:15 AM 1 9 0 0 0 0 0 0 0 6 1 0 1 0 1 0 19
08:30 AM 0 8 0 0 0 0 1 0 0 9 1 0 1 0 0 0 20
�y 08:45 AM 0 5 0 0 0 1 2 0 0 3 1 0 1 0 I 0 14
Total 1 29 0 0 0 l 3 0 0 21 4 0 3 0 3 0 65
[� Grand Total 3 56 0 0 1 6 0 0 37 5 0 3 0 6 0 117
Apprch% 5.1 94.9 0 001 0 14.3 85.7 0 0 88.1 11.9
0 33.3 0 66.7 0 2.6 0 5.1
I� Total% 2.6 47.9 0 0 0 0.9 5.1 0 I 0 31.6 4.3 0
I 0
r
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time I Right I Thru I Left Iu-Tum I App.Tow Riaht Thru I Left I U-Tum App.T-1 Right Thru I Left I U-T. App.Taw Int.Total
I Oeak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM
07:45 AM 1 7 0 0 8 00 1 0 1 0 3 1 0 4 0 0 1 0 1 14
08:00 AM 0 7 0 0 7 0 0 0 0 0 0 3 1 0 4 0 0 1 0 1 12
08:15 AM 1 9 0 0 10 0 0 0 0 0 0 6 1 0 7 1 0 1 0 2 19
08:30 AM 0 8 0 0 8 0 0 1 0 1 0 9 1 0 10 1 0 0 0 1 20
Total Volume 2 31 0 0 33 0 0 2 0 2 0 21 4 0 25 2 0 3 0 5 65
%App.Total 6.1 93.9 0 0 0 0 100 0 0 84 16 0 40 0 60 0
rt PHF .500 .861 .000 .000 .825 .000 .000 .500 .000 .500 1 .000 .583 1.00 .000 .625 .500 .000 .750 .000 .625 .813
1_.t1
U
U
u
LI)
n
r1
LJ
U
U
U
r ,
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 C ri
E/W: Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491
TRIES,LLC
City, State: North Andover,MA P.O.BolxD3015BeTlin, MA 01503 Start Date : 6/28/201
Office:508.4813999 F=508545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdilic.com Page No : 1 rl
Groups Printed-Peds and Bicycles �J
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Ri t Thru Left Peds Ri ht Thru Left Peds Ri ht Thru Left Peds Ri ht Thru Left Peds Int.Total
07:00 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
07:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
07:30 AM 0 6 0 0 0 0 0 0 0 2 0 0 0 0 0 0 8
07:45 AM 0 2 0 0 0 0 0 0 0 3 0 0 0 0 0 0 5 r 1
Total 0 9 0 0 0 0 0 0 0 5 0 0 0 0 0 0 14
A
08:00 AM 0 1 0 0 0 0 0 0 0 2 0 0 0 0 0 0 3
08:15 AM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 r.�
08:30 AM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
08:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 3 0 0 0 0 0 0 0 3 0 0 0 0 0 0 6
Grand Total 0 12 0 0 0 0 0 0 0 8 0 0 0 0 0 0 20 r-1
Apprch% 0 100 0 0 0 0 0 0 0 100 0 0 0 0 0 0
Total% 0 60 0 0 0 0 0 0 0 40 0 0 0 0 0 0 t '
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Star4T. Right Thru Left Peds A .rural Right Tru Left Peds App.Tow Right Thru LeftPeds App.Tow Right Thru LeftPeds A .ra, 1nt.Totai r
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of I
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 0 6 0 0 6 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 8
07:45 AM 0 2 0 0 2 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 5 r1
08:00 AM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 3
08:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total Volume 0 10 0 0 10 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 17
%Ant).Total 0 100 0 0 0 0 0 0 0 100 0 0 0 0 0 0
PHF 1 .000 .417 .000 .000 A17 .000 .000 .000 .000 .000 .000 .583 .000 .000 .583 1 .000 .000 .000 .000 .000 .531 r
.J
Lr
r�
l J
r ?
L J
r-
r,
LJ
LJ
r ,
n
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 C
E/W: Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491
City,State: North Andover, A P.O.aoIxD301 Berliin
MMA 01503 StartDate : 6/28/201,'
Office:508.4813999 Fax 508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
i
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time I Right I Thru I Left I u-Tum I App.T.W I Right Thru I Left I U-T. App.Tow Right I Thru I Left U-T= App.Tom Right Thn) I Left I U-T= .Tm i Int.Total
Peak Hour Analysis From 07:00 AM to 08:45 AM-Peak 1 of I
Peak Hour for Entire Intersection Begins at 07:30 AM
n 07:30 AM 3 228 0 0 231 1 0 21 0 22 0 90 8 0 98 5 0 0 0 5 356
ff I' 07:45 AM 6 222 0 0 228 4 0 17 0 21 0 96 8 0 104 2 0 2 0 4 357
u 08:00 AM 6 197 0 0 203 8 1 16 0 25 0 83 11 0 94 3 0 1 0 4 326
08:15 AM 1 186 0 0 187 8 0 19 0 27 0 99 6 0 105 6 0 3 0 9 328
ry Total Volume 16 833 0 0 849 21 1 73 0 95 0 368 33 0 401 16 0 6 0 22 1367
`I 'I %App.Total 1.9 98.1 0 0 22.1 1.1 76.8 0 0 91.8 8.2 0 72.7 0 27.3 0
t t PHF .667 .913 .000 .000 .919 .656 .250 .869 .000 .880 .000 .929 .750 .000 .955 .667 .000 .500 .000 .611 .957
Cars 14 802 0 0 816 21 1 72 0 94 0 350 30 0 380 15 0 3 0 18 1308
%Cars 87.5 96.3 0 0 96.1 100 100 98.6 0 98.9 0 95.1 90.9 0 94.8 93.8 0 50.0 0 81.8 95.7
Heavy Vehicles 2 31 0 0 33 0 0 1 0 1 0 18 3 0 21 1 0 3 0 4 59
IUI %HaavyVehtcles 12.5 3.7 0 0 3.9 0 0 1.4 0 1.1 0 4.9 9.1 0 5.2 6.3 0 50.0 0 18.2 4.3
Osgood Street(Route 125)
OutI
Total
374119021 54
395
n 14 802 0 0
2 31 0 0
161 8331 01 0
Right Th Left U-Tum
�Jr
Peak Hour Data
m
O m
H G »
3 0 0 0 North � o w m
2 S
wa F- Peak Hour Begins at 07:30 A f-'c
Et2 L Cars r-rr a v
C w h c Hees Ve ices w N
U <r N
coop C orn
x
IT
= A-
� j O 00
4 ► T F►
Left Thru Ri ht U-Tum
n
301 350 0 0
f 1 3 18 0 0
n24
0 0889 3
33 1 54 1 1323
Li Out In Total
`r
U
r �
rd
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 C, '
E/W: Butcher Boy Plaza Exit/Commerce Way Rous lEs, A Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date :.6/28/201.
Y Engineering/
Office:508.4813999 rax:50lfc.co 234 Page No : 1 f '
Client: Bayside En eeriri / K. Cram Emall:datarequests@pdilk.com.
LJ
Groups Printed-Cars- eavy Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West n
Start Time Right I ThruI -E- ht Thru Left I U-Tum Right I Thru I Left U-Tum Right Thru I Left U-Tum Int Total
04:00 PM 4 180 0 0 17 0 30 0 0 228 7 0 8 0 4 0 478
04:15 PM 3 160 0 0 17 0 32 0 0 178 5 0 12 0 6 0 413
04:30 PM 5 143 0 0 23 1 53 0 0 224 8 0 13 0 8 0 478
04:45 PM 3 167 0 0 21 1 54 0 0 255 7 1 15 0 5 0 529 11
Total 15 650 0 0 78 2 169 0 0 885 27 1 48 0 23 0 1898
L_J
05:00 PM 3 194 0 0 28 0 52 0 0 252 5 0 11 0 6 0 551
05:15 PM 3 164 0 0 31 0 41 0 0 288 10 0 9 0 8 0 554 t7
05:30 PM 1 133 0 0 26 2 44 0 0 264 6 0 10 0 0 0 486
05:45 PM 2 129 0 0 22 0 37 0 0 272 9 0 5 0 1 0 477 t�
Total 9 620 0 0 107 2 174 0 0 1076 30 0 35 0 15 0 2068
Grand Total 24 1270 0 0 185 4 343 . 0 0 1961 57 1 83 0 38 0 3966
Apprch% 1.9 98.1 0 0 34.8 0.8 64.5 0 0 97.1 2.8 0 68.6 0 31.4 0 u
Total% 0.6 32 0 0 4.7 0.1 8.6 0 0 49.4 1.4 0 2.1 0 1 0
Cars 23 1253 0 0 185 4 342 0 0 1905 57 1 82 0 36 0 3888
%Cars 95.8 98.7 0 0 100 100 99.7 0 0 97.1 100 100 98.8 0 94.7 0 98
Heavy Vehicles 1 17 0 0 0 0 1 0 0 56 0 0 1 0 2 0 78
%Heavy Vehicles 4.2 1.3 0 0 0 0 0.3 0 0 2.9 0 0 1.2 0 5.3 0 2 L
f"1
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right Thru Left U-Tum A .Tmal Right Thru Left u-Tum A .T..] Right Thru Left u-Tum App.T-i Ri ht Thru Left u-rum A .Trani 1m.Total
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM L;
04:45 PM 3 167 0 0 170 21 1 54 0 76 0 255 7 1 263 15 0 5 0 20 529
05:00 PM 3 194 0 0 197 28 0 52 0 80 0 252 5 0 257 11 0 6 0 17 551
05:15 PM 3 164 0 0 167 31 0 41 0 72 0 288 10 0 298 9 0 8 0 17 554
05:30 PM 1 133 0 0 134 26 2 44 0 72 0 264 6 0 270 10 0 0 0 10 486
Total Volume 10 658 0 0 668 106 3 191 0 300 0 1059 28 1 1088 45 0 19 0 64 2120 lJ
%App.Total 1 1.5 98.5 0 0 1 35.3 1 63.7 0 0 97.3 2.6 0.1 70.3 0 29.7 0
PHF .833 .848 .000 .000 .848 .855 .375 .884 .000 .938 .000 .919 .700 .250 .913 .750 .000 .594 .000 .800 .957 (�
Cars 10 651 0 0 661 106 3 191 0 300 0 1044 '28 1 1073 44 0 19 0 63 2097
%Cars 100 98.9 0 0 99.0 100 100 100 0 100 0 98.6 100 100 98.6 97.8 0 100 0 98.4 98.9
Heavy Vehicles 0 7 0 0 7 0 0 0 0 0 0 15 0 0 15 1 0 0 0 1 23
�xa�yvemeie: 0 1.1 0 0 1.0 0 0 0 0 0 0 1.4 0 0 1.4 2.2 0 0 0 1.6 1.1 n
LJ
U
f�
f"1
U
f `
L J
LJ
l J
I'
C
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 Ci
E/W: Butcher Boy Plaza Exit/Commerce Way IN ,
City,
T A Site Code : 2121491
Li City, State: North Andover,MES
A P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201.
Oce:508.4813999 Fax508545.1234
Office: g
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1
Groups Prime d•Cars
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
C Start Time Fight I Thru I Left I U-Turn _Right_TghtT Thru I Left I U-Tum Right fi;u-T Left U-Turn Right Thru I Left U-Turn Int.Total
04:00 PM 4 178 0 0 17 0 30 0 0 212 7 0 8 0 3 0 459
04:15 PM 3 155 0 0 17 0 32 0 0 168 5 0 12 0 5 0 397
04:30 PM 4 141 0 0 23 1 52 0 0 216 8 0 13 0 8 0 466
C04:45 PM 3 165 0 0 21 1 54 0 0 250 7 1 15 0 5 0 522 Total 14 639 0 0 78 2 168 0 0 846 27 1 48 0 21 0 1844
05:00PM 3 192 0 0 28 0 52 0 0 248 5 0 10 0 6 0 544
05:15 PM 3 164 0 0 31 0 41 0 0 285 10 0 9 0 8 0 551
05:30 PM 1 130 0 0 26 2 44 0 0 261 6 0 10 0 0 0 480
v 05:45 PM 2 128 0 0 22 0 37 0 0 265 9 0 5 0 1 0 469
Total 9 614 0 0 107 2 174 0 0 1059 30 0 34 0 15 0 2044
Grand Total 23 1253 0 0 185 4 342 0 0 1905 57 1 82 0 36 0 3888
Apprch% 1.8 98.2 0 0 34.8 0.8 64.4 0 0 97 2.9 0.1 69.5 0 30.5 0
Li Total% 0.6 32.2 0 0 4.8 0.1 8.8 0 0 49 1.5 0 I 2.1 0 0.9 0
I
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right Thru Left u--rumApp.Tota Right Thru Left U-Tum App.Tam Right Thru Left U-Tum A .Twi Right Thru Left U-Tum APP.ToW InGTotal
eak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Weak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 3 165 0 0 168 21 1 54 0 76 0 250 7 1 258 15 0 5 0 20 522
05:00 PM 3 192 0 0 195 28 0 52 0 80 0 248 5 0 253 10 0 6 0 16 544
n 05:15 PM 3 164 0 0 167 31 0 41 0 72 0 285 10 0 295 9 0 8 0 17 551
05:30 PM 1 130 0 0 131 26 2 44 0 72 0 261 6 0 267 10 0 0 0 10 480
L—Total volume 10 651 0 0 661 106 3 191 0 300 0 1044 28 1 1073 44 0 19 0 63 2097
%App.Total 1.5 98.5 0 0 1 35.3 1 63.7 0 0 97.3 2.6 0.1 69.8 0 30.2 0
PHF .833 .848 .000 .000 .847 .855 .375 .884 .000 .938 1 .000 .916 .700 .250 .909 .733 .000 .594 .000 .788 1 .951
L
I�
Li
U
lU
i__l
r �
r 00
t �
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 C(
E/W: Butcher Boy Plaza Exit/Commerce Way DouA T c Site Code : 2121491
City, State: North Andover,MA P.O.BoxMl Berlin,MA 01503 Start Date : 6/28/201:
Office:508.4813999 Fax:508545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com Page No : 1 r
Groups Printed-HeM Vehicles
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right Thru Left U-Tum Ri ht Thru Left U-Turn Ri ht Thru Left U-Tum Right Thru Left U-Turn Int Total
04:00 PM 0 2 0 0 0 0 0 0 0 16 0 0 0 0 1 0 19 L ,
04:15 PM 0 5 0 0 0 0 0 0 0 10 0 0 0 0 1 0 16
04:30 PM 1 2 0 0 0 0 1 0 0 8 0 0 0 0 0 0 12
04:45 PM 0 2 0 0 0 0 0 0 0 5 0 0 0 0 0 0 7 r
Total 1 11 0 0 0 0 1 0 0 39 0 0 0 0 2 0 54
L�
05:00 PM0 2 0 0 0 0 0 0 0 4 0 0 1 0 0 0 7
05:15 PM 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3 r
05:30 PM 0 3 0 0 0 0 0 0 0 3 0 0 0 0 0 0 6
05:45 PM 0 1 0 0 0 0 0 0 0 7 0 0 0 0 0 0 8
Total 0 6 0 0 0 0 0 0 0 17 0 0 1 0 0 0 24
Grand Total 1 17 0 0 0 0 1 0 0 56 0 0 1 0 2 0 78 r,
Apprch% 5.6 94.4 0 0 0 0 100 0 0 100 0 0 33.3 0 66.7 0
Total% 1.3 21.8 0 0 0 0 1.3 0 0 71.8 0 0 1.3 0 2.6 0
rt
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West r,
Start Time I Right I Thru I Left I U-T= I App.Tmd Right Thru I ft I u-Tum .Tmal Right I Thru I LeftI U-Tum App.Taw Right I Thru I LeftI U-Tam App.row Int.Total
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM L
04:00 PM 0 2 0 0 2 0 0 0 0 0 0 16 0 0 16 0 0 1 0 1 19
04:15 PM 0 5 0 0 5 0 0 0 0 0 0 10 0 0 10 0 0 1 0 1 16 r
04:30 PM 1 2 0 0 3 0 0 1 0 1 0 8 0 0 8 0 0 0 0 0 12
04:45 PM 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 7 J
Total Volume 1 11 0 0 12 0 0 1 0 1 0 39 0 0 39 0 0 2 0 2 54
%App.Total 1 8.3 91.7 0 0 0 0 100 0 0 100 0 0 0 0 100 0
PHF .250 .550 .000 .000 .600 .000 .000 .250 .000 .250 .000 .609 .000 .000 .609 .000 .000 .500 .000 .500 1 .711 r i
L.:
ci
LJ
L J
L^J
f I
L.
rt
LJ
t
L J
f 1
■
r 1
■ J
i
rd
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 C(
E/W: Butcher Boy Plaza Exiitr/Commerce Way �puSTRIESA T A Site Code : 2121491
City, State: North Andover, MA RO.Box 301 Berlin,MA 01503 Start Date :6/28/201:
Office:508AB13999 Fax:508545.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No : 1
Groups Printed-Peds and Bicycles
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
C From North From East From South From West
Start Time Right I Thru Left Peds Ri ht iir Left Peds Right Thru Left Peds Right Thru I—Left I Peds Int.Total
04:00 PM 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
04:15 PM 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3
04:30 PM 0 2 0 0 0 0 0 0 0 3 0 0 1 0 0 0 6
04:45 PM 0 1 0 0 1 0 0 0 0 0 2 0 0 1 0 0 0 4
t__l�' Total 0 3 0 2 0 0 0 0 0 8 0 0 2 0 0 0 15
05:00 PM 0 3 0 0 0 0 0 0 0 2 0 0 0 0 0 0 5
05:15 PM 0 2 0 0 0 0 0 1 0 3 0 0 0 0 0 0 6
L 05:30 PM 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3
05:45 PM 0 2 0 0 0 0 0 0 0 5 0 0 0 0 0 I 8
Total 0 7 0 0 0 0 0 1 0 13 0 0 0 0 0 1 22
C Grand Total 0 10 0 2 0 0 0 1 0 21 0 0 2 0 0 l 37
Apprch% 0 83.3 0 16.7 0 0 0 100 0 100 0 0 66.7 0 0 33.3
Total% 0 27 0 5.4 0 0 0 2.7 I 0 56.8 0 0 5.4 0 0 2.7
I
I
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
E'eakHo.,TAnalysis
me Ri ht Thru Left Peds App.Total Right Thru Left Peds App.Toa Right Thru Left Peds A .Total Right Thru Left Peds A .ToW Int.Total
From 04:00 PM to 05:45 PM-Peak I of 1
for Entire Intersection Begins at 05:00 PM
05:00 PM 0 3 0 0 3 0 0 0 0 0 0 2 0 0 2 0 00 0 0 5
05:15 PM 0 2 0 0 2 0 0 0 1 1 0 3 0 0 3 0 0 0 0 0 6
05:30 PM 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 3
05:45 PM 0 2 0 0 2 0 0 0 0 0 0 5 0 0 5 0 0 0 1 1 8
Total Volume 0 7 0 0 7 0 0 0 1 1 0 13 0 0 13 0 0 0 1 1 22
"/o A .Total 0 100 0 0 0 0 0 100 0 100 0 0 0 0 0 100
�___tHF .000 .583 .000 .000 .583 .000 .000 .000 .250 .250 .000 .650 .000 .000 .650 .000 .000 .000 .250 .250 .688
I
V
U
L
Li
j
U
U
L
ra
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 C(
E/W: Butcher Boy Plaza Ext/Commerce Way �puA T L A Site Code : 2121491 t
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/28/201,'
y Engineering/
Office:50:datareque ts@pdillc.co 1234 Page No : 1 r�
Client: Bayside En eerie /K. Cram Email:datarequests�apdillc.com
Osgood Street(Route 125) Butcher Boy Plaza Exit Osgood Street(Route 125) Commerce Way f
From North From East From South From West
Start Time Right Thru Left u-Tum App.Taal Ri ht Thru Left u-TM App.Tow Right Thru Left u-Tlaa .Tow Ri ht Thru Left u-Tum A .Tow Int.Total
Peak Hour Analysis From 04:00 PM to 05:45 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 3 167 0 0 170 21 1 54 0 76 0 255 7 1 263 15 0 5 0 20 529
05:00 PM 3 194 0 0 197 28 0 52 0 80 0 252 5 0 257 11 0 6 0 17 551
05:15 PM 3 164 0 0 167 31 0 41 0 72 0 288 10 0 298 9 0 8 0 17 554 t
05:30 PM 1 133 0 0 134 26 2 44 0 72 0 264 6 0 270 10 0 0 0 10 486
Total Volume 10 658. 0 0 668 106 3 191 0 300 0 1059 28 1 1088 45 0 19 0 64 2120 r
%App.Total 1.5 98.5 0 0 35.3 1 63.7 0 0 97.3 2.6 0.1 70.3 0 29.7 0
PHF .833 .848 .000 .000 .848 .855 .375 .884 .000 .938 .000 .919 .700 .250 .913 .750 .000 .594 .000 .800 .957 L J
Cars 10 651 0 0 661 106 3 191 0 300 0 1044 28 1 1073 44 0 19 0 63 2097
%Cars 100 98.9 0 0 99.0 100 100 100 0 100 0 98.6 100 100 98.6 97.8 0 100 0 98.4 98.9
Heavy Vehicles 0 7 0 0 7 0 0 0 0 0 0 15 0 0 15 1 0 0 0 1 23 }
%Hees Vehicles 0 1.1 0 0 1.0 0 0 0 0 0 0 1.4 0 0 1.4 2.2 0 0 0 1.6 1.1
Osgood Street(Route 125)
Out In Total e l
1169 661 1830
15 7 22
1184 85 J
10 651 0 0 r1
0 7 0 0
10 6581 01 0 t
Right Thru Left U-Tum
Peak Hour Data
3 0 0 0 2 North LL ri
m
F—� Peak Hour Begins at 04:45 P f—c o w o r
Ev a Cars r,W � o 0 0 J
£ a Heavy Vehicles o ID
N
0 0 m
C
U�v v 000 = �0X
O F = o
°1
00 0 0
3 �
4� T r'
Left Thru Ri ht U-Tum
28 10441 01 1 r ti
0 151 ol 0
281 10591 01 11 IL J
894
10881 1982 r 1
Out In Total
0..4 qtraLt Mmita 19.9;1
r�
L.J
r �
L�
C
NIS: Osgood Street (Route 125) PRECISION File Name : 122978 CC
E/W: Butcher Boy Plaza Exit/Commerce/Commerce Way Duu� Ai>31Es,LLc Site Code : 2121491
City, State:North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/30/2012
Office:508.4813999 Fax508545.1234
CClient: Bayside Engineering/ K. Cram Email:datarequests@pdilic.com Page No 1
Grows Printed-Cars-Heavy Vehicles
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125)
Commerce Way
From North From East From South From West
Start Time Right I Thru I Left I U-Tum Right Thru I Left I U-Turn Ri ht Thro Left I U-Tum Ri ht Tiru I Left U-Turn Int.Total
10:30 AM 4 125 0 0 22 2 42 0 0 117 5 0 8 0 1 0 326
10:45 AM 4 116 0 0 18 1 44 0 0 135 8 2 8 0 6 0 342
Total 8 241 0 0 40 3 86 0 0 252 13 2 16 0 7 0 668
11:00 AM 2 124 0 0 20 2 42 0 0 110 10 0 20 0 2 0 332
11:15 AM 5 118 0 0 21 1 51 0 0 124 7 0 9 0 4 0 340
11:30 AM 1 117 0 0 23 0 50 0 0 149 5 0 6 0 5 0 356
11:45 AM 4 122 0 0 17 2 36 0 0 151 8 0 6 0 3 0 349
Total 12 481 0 0 81 5 179 0 0 534 30 0 41 0 14 0 1377
12:00PM 5 92 0 0 16 2 38 0 0 133 8 0 11 0 0 0 305
12:15 PM 3 143 0 0 22 3 39 0 0 144 9 0 4 0 2 0 369
12:30 PM 1 99 0 0 17 1 54 0 0 132 12 0 12 0 2 0 330
12:45 PM 3 121 0 0 18 0 42 0 0 111 10 0 8 0 2 1 316
Total 12 455 0 0 73 6 173 0 0 520 39 0 35 0 6 1 1320
01:00 PM 3 107 0 0 17 3 34 0 0 115 8 0 12 0 3 0 302
01:15 PM 4 96 0 0 21 1 55 0 0 133 7 0 7 0 0 0 324
Li Grand Total 39 1380 0 0 232 18 527 0 0 1554 97 2 111 0 30 1 3991
Apprch% 2.7 97.3 0 0 29.9 2.3 67.8 0 0 94 5.9 0.1 78.2 0 21.1 0.7
Total% 1 34.6 0 0 1 5.8 0.5 13.2 0 0 38.9 2.4 0.1 2.8 0 0.8 0
Cars 37 1353 0 0 227 18 526 0 0 1509 97 2 110 0 30 1 3910
Cars 94.9 98 0 0 97.8 100 99.8 0 0 97.1 100 100 99.1 0 100 100 98
Heavy Vehicles 2 27 0 0 5 0 1 0 0 45 0 0 1 0 0 0 81
%Heavy Vehicles 5.1 2 0 0 2.2 0 0.2 0 0 2.9 0 0 0.9 0 0 0 2
n
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right I Thru I Left I U-Tum I App.Toml Rioht Thru Left I U-Tum App.Tatd Right I Thru I LeftI u-Tum A .Tatal Right Thru I LeftI U-rum A .Tom int.Total
eak Hour Analysis From 10:30 AM to 01:15 PM-Peak 1 of I
Peak Hour for Entire Intersection Begins at 11:30 AM
n 11:30 AM 1 117 0 0 118 1 23 0 50 0 73 0 149 5 0 154 6 0 5 0 I1 356
11:45 AM 4 122 0 0 126 17 2 36 0 55 0 151 8 0 159 6 0 3 0 9 349
u 12:00 PM 5 92 0 0 97 16 2 38 0 56 0 133 8 0 141 11 0 0 0 11 305
12:15 PM 3 143 0 0 146 22 3 39 0 64 0 144 9 0 153 4 0 2 0 6 369
Total Volume 13 474 0 0 487 78 7 163 0 248 0 577 30 0 607 27 0 10 0 37 1379
n'/o Am.Total 2.7 97.3 0 0 31.5 2.8 65.7 0 0 95.1 4.9 0 73 0 27 0
PHF .650 .829 .000 .000 .834 .848 .583 .815 .000 .849 1 .000 .955 .833 .000 .954 .614 .000 .500 .000 .841r230
Lj Cars 13 468 0 0 481 76 7 163 0 246 0 558 30 0 588 27 0 10 0 37
%Cars 100 98.7 0 0 98.8 97.4 100 100 0 99.2 0 96.7 100 0 96.9 100' 0 100 0 100
� vy vehicles 0 6 0 0 6 2 0 0 0 2 0 19 0 0 19 0 0 0 0 0
fU A nmvy Vehictas 0 1.3 0 0 1.2 2.6 0 0 0 0.8 0 3.3 0 0 3.1 0 0 0 0 0
n.
U
F
LJ
n
L_1
n
rd L w
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 CC(
E/W: Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491 ,
INDUSTRIES,LLC -
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/30/2012
Office:508.4813999 Fax:5UB.545.1234
Client: Bayside Engineering/K. Cram Email:datarequests@pdillc.com page No : 1
l_J
Grourn Printed-Cars
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start TimeRi ht Thru I Left I U-Tum Right Thru I Left I U-Tum Ri ht Thru Left U-Tum Ri ht Thru Left U-Tum Int.Total
10:30 AM 3 124 0 0 22 2 42 0 0 110 5 0 8 0 1 0 31.7 J
10:45 AM 4 114 0 0 17 1 44 0 0 134 8 2 8 0 6 0 338
Total 7 238 0 0 39 3 86 0 0 244 13 2 16 0 7 0 655
r�
11:00AM 2 122 0 0 20 2 42 0 0 107 10 0 19 0 2 0 326
11:15 AM 5 115 0 0 21 1 50 0 0 122 7 0 9 0 4 0 334 '
11:30 AM 1 114 0 0 23 0 50 0 0 144 5 0 6 0 5 0 348
11:45 AM 4 120 0 0 16 2 36 0 0 148 8 0 6 0 3 0 343 r
Total 12 471 0 0 80 5 178 0 0 521 30 0 40 0 14 0 1351
u
12:00 PM 5 91 0 0 15 2 38 0 0 130 8 0 11 0 0 0 300
12:15 PM 3 143 0 0 22 3 39 0 0 136 9 0 4 0 2 0 361
12:30 PM 1 93 0 0 17 1 54 0 0 131 12 0 12 0 2 0 323
12:45 PM 2 117 0 0 16 0 42 0 0 109 10 0 8 0 2 1 307 J
Total 11 444 0 0 70 6 173 0 0 506 39 0 35 0 6 1 1291
01:00 PM 3 104 0 0 17 3 34 0 0 110 8 0 12 0 3 0 294 r
01:15 PM 4 96 0 0 21 1 55 0 0 128 7 0 7 0 0 0 319
Grand Total 37 1353 0 0 227 18 526 0 0 1509 97 2 110 0 30 1 3910 t—'
Apprch% 2.7 97.3 0 0 29.4 2.3 68.2 0 0 93.8 6 0.1 78 0 21.3 0.7
Total% 1 0.9 34.6 0 0 5.8 0.5 13.5 0 0 38.6 2.5 0.1 2.8 0 0.8 0
u
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
I Start Time I Right I Thru I Left I U-Tum I ADP.Tow I Right I Thru I Left I U-Tum I ADD Tow I Right I Thru I Left I U-rum I ADD T w Right I Thru I Left u Tu A r i t Tm i L J
Peak Hour Analysis From 10:30 AM to 0 1:15 PM-Peak I of I
Peak Hour for Entire Intersection Begins at 11:30 AM
11:30 AM 1 114 0 0 115 23 0 50 073 0 144 5 0 149 6 0 5 0 11 348 r
11:45 AM 4 120 0 0 124 16 2 36 0 54 0 148 8 0 156 6 0 3 0 9 343
12:00 PM 5 91 0 0 96 15 2 38 0 55 0 130 8 0 138 11 0 0 0 11 300 �J
12:15 PM 3 143 0 0 146 22 3 39 0 64 0 136 9 0 145 4 0 2 0 6 361
Total Volume 13 468 0 0 481 76 7 163 0 246 0 558 30 0 588 27 0 10 0 37 1352 r
%Am.Total 2.7 97.3 0 0 30.9 2.8 66.3 0 0 94.9 5.1 0 73 0 27 0
PHF .650 .818 .000 .000 .824 .826 .583 .815 .000 .842 .000 .943 .833 .000 .942 .614 .000 .500 .000 .841 .936
r�
LJ
r
LJ
r �
l J
r �
l J
r �
L,
r 1
l_J
r �
I
L,
rod
I
CN/S: Osgood Street (Route 125) PRECISION File Name : 122978 CG
E/W: Butcher Boy Plaza Exit/Commerce Way DouA Ts,L A Site Code : 2121491
City, State: North Andover,MA P.O.Box301 Berlin,MA 01503 Start Date : 6/30/2012
y Engineering/
Office:Emil: atareg99 Fax50llc.co 234 Page No : 1
C Client: Bayside En eerie /K. Cram Email:datarequests@pdillc.com
Groups Printed-Heavy Vehicles
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time
Right Thru Left U-Tum Ri ht Thru Left I U-Tum Right I Tim I Right Thru I Left U-Tum Int Total
10:30 AM 1 1 0 0 0 0 0 0 0 7 0 0 0 0 0 0 9
10:45 AM 0 2 0 0 1 0 0 0 0 1 0 0 0 0 0 0 4
Total 1 3 0 0 1 0 0 0 0 8 0 0 0 0 0 0 13
I ! 11:00 AM 0 2 0 0 0 0 0 0 0 3 0 0 1 0 0 0 6
�U1 11:15 AM 0 3 0 0 0 0 1 0 0 2 0 0 0 0 0 0 6
11:30 AM 0 3 0 0 0 0 0 0 0 5 0 0 0 0 0 0 8
C 11:45 AM 0 2 0 0 1 0 0 0 0 3 0 0 0 0 0 0 6
Total 0 10 0 0 1 0 1 0 0 13 0 0 l 0 0 0 26
12:00 PM 0 1 0 0 1 0 0 0 0 3 0 0 0 0 0 0 5
12:15 PM 0 0 0 0 0 0 0 0 0 8 0 0 0 0 0 0 8
12:30 PM 0 6 0 0 0 0 0 0 0 1 0 0 0 0 0 0 7
12:45 PM 1 4 0 0 2 0 0 0 0 2 0 0 0 0 0 0 9
Total 1 11 0 0 3 0 0 0 0 14 0 0 0 0 0 0 29
01:00 PM C 0 3 0 0 0 0 0 0 0 5 0 0 0 0 0 0 8 01:15 PM 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 5
Grand Total 2 27 0 0 5 0 1 0 0 45 0 0 1 0 0 0 81
Apprch% 6.9 93.1 0 0 83.3 0 16.7 0 0 100 0 0 100 0 0 0
Total% 2.5 33.3 0 0 6.2 0 1.2 0 0 55.6 0 0 1.2 0 0 0
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time Right I Thru I Left I U-T= I App.Total I Right Thru I Left I U-T= APP.Tatal Right I Thru I Left I U-Tum App.Tm] Right I Thru I Left I U-Tum Alp.Toral 1,7 Total
Peak Hour Analysis From 10:30 AM to 0 1:15 PM-Peak I of I
Peak Hour for Entire Intersection Begins at 12:15 PM
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 8 0 0 8 0 0 0 00 8
12:30 PM 0 6 0 0 6 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 7
12:45 PM 1 4 0 0 5 2 0 0 0 2 0 2 0 0 2 0 0 0 0 0 9
01:00 PM 0 3 0 0 3 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 8
l Volume 1 13 0 0 14 2 0 0 0 2 0 16 0 0 16 0 0 0 0 0 32
EVT.O.taipp.Total 7.1 92.9 0 0 100 0 0 0 1 0 100 0 0 1 0 0 0 0
PHF .250 .542 .000 .000 .583 .250 .000 .000 .000 .250 1 .000 .500 .000 .000 .500 .000 .000 .000 .000 .000 .889
U
C
C
lJ
I ;
L_1
C
a
l 1
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 CCC
E/W:Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491
City, State: North Andover, MA POBox30SB,ns a 01503 Start Date : 6/30/2012
Y g g
Office: reque ts@pdilic.co 234 Page No : 1
Client: Bayside En eerie / K. Cram Email:datarequests@pdillc.com
Groups Printed-Peds and Bicycles L�
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
From North From East From South From West
Start Time ]k ht Thru Left Peds Right Thru Left Peds Right I Thr- Left Peds Right Thru7 Left I Peds Int.Total "
10:30 AM 0 2 0 0 0 0 0 0 0 7 0 0 0 0 0 0 9
10:45 AM 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 3 '
Total 0 3 0 0 0 0 0 0 0 8 0 1 0 0 0 0 12
r�
11:00AM 0 1 0 2 0 0 0 0 0 2 0 0 0 0 0 0 5
11:1! 0 2 0 2 0 0 0 0 0 1 0 0 0 0 0 0 5 i J
11:30 AM 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3
11:45 AM 0 3 0 0 0 0 0 0 0 3 0 0 0 0 0 0 6
Total 0 6 0 4 0 0 0 0 0 9 0 0 0 0 0 0 19
12:00 PM 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0
12:15 PM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
12:30 PM 0 4 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5 `
12:45 PM 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 4
Total 0 7 0 0 0 0 0 0 0 4 0 0 0 0 0 0 11
01:00 PM 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 4
01:15PM 0 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 4
Grand Total 0 20 0 4 0 0 0 0 0 25 0 1 0 0 0 0 50 u
Apprch% 0 83.3 0 16.7 0 0 0 0 0 96.2 0 3.8 0 0 0 0
Total% 0 40 0 8 0 0 0 0 0 50 0 2 0 0 0 0
l_J
Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way 1
From North From East From South From West
Start Time Right I Thru I Left I Peds I App.T-1 Ri ht Thru I Le fr Peds App.Total Ri ht I Thru I LeftI Peds App,T.W Ri ht I Thru I LefrI Peds App.TW.1 Int.Total t—j
Peak Hour Analysis From 10:30 AM to 0 1:15 PM-Peak 1 of 1
Peak Hour for Entire Intersection Begins at 10:30 AM
10:30 AM 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 0 0 0 0 0 9 i
10:45AM 0 1 0 0 1 0 0 0 0 0 0 1 0 1 2 0 0 0 0 0 3
11.00 AM 0 1 0 2 3 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 5 '
11:15 AM 0 2 0 2 4 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 5
Total Volume 0 6 0 4 10 0 0 0 0 0 0 11 0 1 12 0 0 0 0 0 22
%A .Total 0 60 0 40 0 0 0 0 0 91.7 0 8.3 0 0 0 0
PHF .000 .750 .000 .500 .625 .000 .000 .000 .000 .000 .000 .393 .000 .250 .429 1 .000 .000 .000 .000 .000 1 .611
r�
l�
l�
V
. r �
IL
r �
l J
! 1
lJ
C ?44ms
N/S: Osgood Street (Route 125) PRECISION File Name : 122978 CC(
E/W: Butcher Boy Plaza Exit/Commerce Way D A T A Site Code : 2121491
,r INDUSTRIES,LLC
M
City, State: North Andover, A P.O.Box301 Berlin,MA 01503 Start Date : 6/30/2012
Office:508.4813999 Fax:508S45.1234
Client: Bayside Engineering/ K. Cram Email:datarequests@pdillc.com Page No 1
U
r� Osgood Street(Route 125) Bucther Boy Plaza Exit Osgood Street(Route 125) Commerce Way
( I From No From East From South From West
LJ Start Time I Ri ht I Thru I Left I U-T. I App.T w Right Thru I Left I U-T.. Am Tai Riot I Thru heft U-Tum App.Tmi Right Thru I Left I U-Tum I m,.Tnml Int Tntal
Peak Hour Analysis From 10:30 AM to 01:15 PM-Peak I of 1
Peak Hour for Entire Intersection Begins at 11:30 AM
n 11:30 AM 1 117 0 0 11823 0 50 0 73 0 149 5 0 154 6 0 5 0 11 356
11:45 AM 4 122 0 0 126 17 2 36 0 55 0 151 8 0 159 6 0 3 0 9 349
12:00 PM 5 92 0 0 97 16 2 38 0 56 0 133 8 0 141 11 0 0 0 11 305
12:15 PM 3 143 0 0 146 22 3 39 0 64 0 144 9 0 153 4 0 2 0 6 369
nTotal Volume 13 474 0 0 487 78 7 163 0 248 0 577 30 0 607 27 0 10 0 37 1379
%App.Total 2.7 97.3 0 0 31.5 2.8 65.7 0 0 95.1 4.9 0 73 0 27 0
lj PHF1 .650 .829 .000 .000 .834 1 .848 .583 .815 .000 .849 .000 .955 .833 .000 .954 .614 .000 .500 .000 .841 .934
Cars 13 468 0 0 481 76 7 163 0 246 0 558 30 0 588 27 0 10 0 37 1352
%Cars 100 98.7 0 0 98.8 97.4 100 100 0 99.2 0 96.7 100 0 96.9 100 0 100 0 100 98.0
nHeavy Vehicles 0 6 0 0 6 2 0 0 0 2 0 19 0 0 19 0 0 0 0 0 27
s Havr www. 0 1.3 0 0 1.2 2.6 0 0 0 0.8 0 3.3 0 0 3.1 0 0 0 0 0 2.0
Li
Osgood Street(Route 125)
Out In Total
r1 644 481 1125
U 21 6 27
665 5
13 468 0 0
0 6 0 0
U 131 7 1 01 0
Right T� Left U-Tum
4.J
u
n Peak Hour Data
J °>_
0002 North oo �
n
0 Peak Hour Begins at 11:30 A ~2 0_ o
U E a rCars r m T
0 0 0 0 it 1 Heavy Vehicles
U n n m
000� C -i
x
n
j O O
U
f
U
+, T r►
n Left Thru Ri ht U-Tum
30558 0 0
0 19 0 0
1-_d 1 301 5771 01 0
n Lj 664 609 1271
Out In Total
n
Li
n
L
Lj
1L ,1
C Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
Queue/Delay Study
City,State:North Andover,MA
Date:Thursday 6/28/2012
Tim 9:OOam
PDI File#122978
Client:Bayside Engineeringl K.Cram
Client 8: 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Delay Gueuo Exking Oelay Queue Exiting
Vehicle p Entered Guam Left Guam Vehicle a Entered Queue Loft Qusuo
In see. Longth Tum in me. Length Tum
1 7:03:10 AM 7:03:34 AM 0024 1 Left Tum 1 7:09:23 AM 7:0925 AM 00:02 1 Right Tum Total Count
2 7:04:15 AM 7:04:28 AM 00:13 1 Left Tum 2 7:11:36 AM 7:11:49 AM 00:13 1 Right Tum
3 7:0528 AM 7:05:33 AM 00:05 1 Left Tum 3 7:13:08 AM 7:13:17 AM 00:09 1 Left Tum Left Lane
4 7:05:49 AM 7:05:58 AM 00:09 1 Left Tum 4 7:17:51 AM 7:17:58 AM 00:07 1 Left Tum Exiting
n 5 7:07:45 AM 7:07:48 AM 00:03 1 Left Tum 5 727:01 AM 7:27:14 L AM- 00:13 1 Right Tum Totals 6 7:08:15 AM 7:08:18 AM 00:03 1 Lek Tum 6 728:54 AM 72Turn.8:59 AM 00:05 1 Right
7 7:09:43 AM 7:09:48 AM 00:05 1 Left Tum 7 7:4127 AM 7:41:44 AM' 00:17 I RightTum Total Vehicles 148
8 7:10:33 AM 7:11:07 AM 00:34 1 Left Tum 8. 7:46:33 AM: .7:46:39 AM' 00.06 '1 :Righl.Tum- Ave Stopped Time 00:14
9 7:12:14 AM 7:12:19 AM 00:05 1 Lek Tum .97:52:35 AM :7:52:38 AM: -00:03 1 Rigtit:Tum Max Stopped Time 00:56
10 7:12:38 AM 7:13:00 AM 00:22 1 Left Tum 10 :7:62:52 AM 7:52:54AM, OO."M 'A Right Tum Average Queue 1.24
t-ry 11 7:13:37 AM 7:13:39 AM 00:02 1 Left Tum 11.: 7:54-.41 ANI 75444 AM 00:031 "Right Tum Max Queue 4
L 12 7:15:04 AM 7:15:07 AM 00:03 1 Left Tum 12 7:i713 AM 7:57:27 AM 00:04 1 Right Tum Total Delay 0:33:25
13 7:1527 AM 7:15:31 AM 00:04 1 Left Tum 13. 8:03A6 AM- 8:03M AM 0010: 1 Right-Turn"
14 7:1829 AM 7:18:33 AM OD:04 1 Left Tum 14 8.04.37 AM 8:64:39 AM 00.02 1 -Right Tum
15 7:19:23 AM 7:19:27 AM 00:04 1 Left Tum 15. 8:08;10 AM "8:08:12 AM 00:02 1 .RightTum Right Lane
16 7:19:30 AM 7:19:32 AM 00:02 1 Left Tum 16.. 8:08:49 AM 8:08:45 AM DOM 1 Right Tum. Exiting
C 17 7:20:13 AM 720:17 AM 00:04 1 Left Tum 17 810 50 AM 81053 AM 0003 1 RightTum Totals
18 7:20:44 AM 7:20:48 AM 00:04 1 Left Tum 18 81125 AM 81128 AM 00:03 1 Right Tum:
19 7:22:33 AM 7:22:48 AM 00:15 1 Left Tum 19 81333 AM' 8:13:35 AM 0002 1 RightTum Total Vehicles 42
20 722:41 AM 722:55 AM 00:14 2 Left Tum 20. :8.14.15 AM 81418 AM 00:63 1 Right Tum Ave Stopped Time DO:05
21 723:51 AM 724:04 AM 00:13 1 Left Tum 21, 8:1603 AM_ 8;16:05 AM. 00;02 1 Right Tum Max Stopped Time 0025
22 7:25:28 AM 725:54 AM 00:26 1 Left Tum 22: 8-18:58 AM "8:19:00 AM 00:02. 1 Right Tum Average Guam 1.00
23 725:34 AM 7:26:15 AM 00:41 2 Left Tum .23, .8:19:03AM 8:19:05 AM D022. 1- RightTum Max Queue 1
24 726:43 AM 7:27:13 AM 00:30 1 Left Tum 24 819.-M AM 8;437 AM .0002 1 RightTum Total Delay 0:03:40
C 25 72729 AM 7:27:31 AM 00:02 1 Lek Tum 25 82123 AM 821:39 AM 001§ 1 Pi .
26 7:27:37 AM 7:27:39 AM 00:02 1 Left Tum 26, :822:29 AM 82235 AM DOM 1- RightTum
27 7:28:01 AM 7:28:17 AM 00.16 1 Left Tum 2T 825:01 AM .625.09 AM 00.08' 1 PighfTum-
28 728:12 AM 7:2820 AM 00:08 2 Lek Tum 28 827:50 AM 827:52 AM ,00:02- 1 Right Tum
29 7:29:45 AM 7:30:09 AM 0024 1 Left Tum 29 8:33:54 AM 8:33:57 AM 00:03 1 Right Tum
30- 7 30:59 AM: 7:31:02 AM- .00:03. '1 'Left Tum: 30 8:35:55 AM 8:36:01 AM 00:06 1 Right Tum Peak Hour Count
31 7:3 1:20 AM 7.31:45 AM 0025 1 Left Tum 31 8:36:32 AM 8:36:36 AM 00:04 1 Right Tum
32 7:31:36 AM 7:32:65 AM- .00:90 2 Left Tum 32 8:3825 AM 8:3827 AM DO:02 1 Right Tum Left Lane
U 33 7:31:58 AM. 7:32:12 AM: '00:14 2 Left Tum 33 8:39:34 AM 8:39:35 AM 00:01 1 RightTum Exiting
34 7:32:55 AM' 7:33:14 AM, 00:19 1 Left Tum 34 8:41:59 AM 8:42:10 AM 00:11 1 Right Tum Totals
35 7:34:13 AM .7:34:16 AM:. 0003 1: Left Tum. 35 8:42:40 AM 8:42:42 AM 00:02 1 Right Tum
36 7:34:33 AM 7:34:51 AM 00:18 -1 Left Tum' 36 8:46:18 AM 8:4622 AM 00:04 1 Left Tum Total Vehicles 75
37 7:36:01 AM 7 36:32 AM .00:31 '1 Left Tum- 37 8:48:39 AM 8:48:43 AM 00:04 1 Right Tum Ave Stopped Time 00:13
38 7:36:05 AM 7,31:41 AM 00:36 2 Left Tum: 38 8:48:47 AM 8:48:48 AM 00:01 1 Right Tum Max Stopped Tlms 00:38
39 7 37.12.AM 7:31:40 AM. 0028 1 Left Tum 39 8:60:54 AM 8:50:57 AM 00:03 1 Right Tum Average Queue 123
40 7:37:22 AM 7:37:55 AM 00:33 2 Left Tum 40 8:5527 AM 8:55:28 AM 00:01 1 Right Tum Max Queue 3
41 7:37:34 AM 7:3802 AM 0028 3 Left Tum 41 8:58:14 AM 8:58:39 AM 00:25 1 Thru Total Delay 0:16:41
42 7:38:54 AM 7:38:56 AM 00:02 1 Left Tum 42 8:59:49 AM 8:59:51 AM 00:02 ,1 Right Tum
43 7:40;07 AM 7:4021 AM 00:14 1 Left Tum
44. 7:41:03 AM 7:41:13 AM 00:10 1 Left Tum Right Lane
45- 7:42:02 AM 7:42:04 AM .00:02 1 Left Tum Exiting
46 7:42:22 AM, 7:42:26 AM 00:04 1 Left Tum Totals
47 7:42:42 AM 7:42:48 AM 00:06 1. Left Tum
48 7A3A6AM -7:43:17 AM 00:61 .1 Left Turn Total Vehicles 22
49 7:43:23 AM.. 7:43:30 AM '00:07 1 Left Tum- Ave Stopped Time 00:05
50. 7:44:28 AM. 7i45:06AM 00:38 '1 Left Tum Max Stopped Time 00:17
i 51 7:45:13 AM 7:45:18 AM 00:03 1 Left Tum- Average Queue 1.00
U 52 7:45:25 AM 7:45:36 AM- 00:11 1 Left Tum Max Queue 1
53 -7:47:52 AM 7:48;01 AM 00:09 1 Left Tum", Total Delay 0:01:42
54 7:48.10 AM- 7:48:13 AM. 00:03 1 Left Tum
55 7:48:26 AM- .7:48:46 AM' 0020 1 Left Tum
(� 56 7:49:29 AM 7:49:43 AM- "00:14 1 Left Tum
57 .7:50:t0AM .7:50:22 AM 00:12 1 Left Tum
i 58. 7:50:34 AM 7:50:46 AM 00:12 11 Left Turn: -
t..J 59 7:51:01 AM 7i5133AM 00:32 1 Left Tum
60 7:51:30 AM T51:37 AM :00:07 2 Left Tum
61 7:53:11 AM: 753:15 AIM: .00:04 .1 'Left.Tum.,
1"1 fit. 7:53:34 AM 7:53:42 AM' 00:08 1 Left Tum-
f i :63- -7.54:03 AM 7.5:WAM 00:09 .1 'LeftTum-
` 64: 7 5425 AM 7.54:56 AM 00:31. 1. :Left Tum
LJ :65 7.54.59 AM. 7.55:01 AM 00:02. .1 Left T6.m
66 7i 46AM 7:56:53 AM: 00:08 1 Left Turn -
67 .8:00:01 AM� 8:00 :04 AM: 0003 1- :LeftTum
68 8 00:10 AM "O.AAM 00:35. 1 :Left Turn
.69, 8:00:19 AM. 8:D0:54 AM .00:35., 2- LeftTum,
70 8:00:27 AM .8.00:57 AM 00:30. 3' Left Turn.
U 71 8:0.36.AM- :8:01:36'AM .0092 1- Left Turn
72- 8:02:18 AM 8:02:29 AM- 00:11 1 Left Tum
:73 804:10AM 8:04:13 AM- 00:03 1 Left Tum
74 -805:38 AM: '8:05:41 AM 00:03. 1 Left-Turn:
n .75 <8:05 52 AM' 8:06:02 AM 00:10 :1: Left Turn
76 8:06:17 AM 8:0635 AM 00:08 1: Left Turn
'77: 8.08:38 AM 806:55 AM. .00:17 1" .Left TumLi '
78' :807:18 AM. 8.0726AM 0002 '1' Thru:
798:08:00 AM -8:08-05 AM' -X06:05 1 -Left Turn
80' 8i0&04AM- 80823 AM: 00:19 2 Left Turn
81 809.5TAM 810:14 AM: -00 :17 1' .Heft Tum
82 813264M 81928AM 00:02. 1' Left Tum
83 .8:13:38-AM. 8:13:40 AM- 00:02 :1" 'Left Turn
U -84: 8:15:46 AM. 8:15:49 AM. 00:03. 1 Left Tum
85 8:15:53 AM: 8:15:59 AM 0006! 1 i6RTurt..
86 8:16:11 AM 8:1622 AM- 00:11 1 Left Turn.
87, 8;18;29 AM 8:16s46AM. 00:17- 1 Left Turn
n 88. 8:17:50AM 8:18:OOAM: DO10 1' Left Tum
66 .. ... .
89 8:1929 AM- 8:19:33 AM00:04. 1 Left Turn
U 90 8:19:44 AM 8:20:09AM.. :0025 1 Left Tum
91 X8:10:54 AM 8:20:12 AM 00118 2. 'LefCTuin
92 6:20:06 AM 820.16 AM 00:10- 3 Left Tum
.93 :820:35:AM 8:21:67AM. 00:32 1 Le.ftT.um.
n 94 8:21:01 AM 821:24 AM 0023 2. Left Tum
U
r •
Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
QueusiDelay Study
l J
City,State:North Andover,MA
Date:Thursday 6/28/2012
Time:7:00am-9:00am 1
PDI FIIelf 122978
Client:Bayside Engineering(K Cram
Client#: 2121491 t....�
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
n
Vehicle It Entered Queue Left Queue Delay quew Exiting Vehicle 0 Entered Queue Left Queue Deiey Queue ExtOng
In see. LengM Tum in see. Lengm Tum
95 821:17AM 8.21:49 AM -00:32 2 Left Tum L_1
96. 821:311 AM 8:21:57 AM 00:26 2 Right Sum.
97 822:19.AM 8:22:21 AM 00:02 1 Left Tum
'988:22i24AM- 822:34 AM 00:10 1 Left Turn
99. 8:22:56 AM 823:01.AM' 00:05: 1 Left Tum. ! i
-100 :825:53 AM 826,00 AM. -00:07. 1 Leh Tum
101' .8:27:21 AM 827:23 AM 00:6 1 Left Tum
102. 8:28:03.AM 8:2 8:07 00:04 1 Left Turn - LJ
103 828:19 AM 82821 AM' '00:02 1 Left Tum.
104 :829:62.AM 8:3D.,09 AM: 0077' 1 Left Turn
105 8:3024 AM 8:30:38 AM 60:14 1 Left Tum
106 8:3126 AM 8:31:30 AM 00:04 1 Left Tum
107 8:32:00 AM 8:32:03 AM 00:03 1 Left Tum
108 8:32:04 AM 8:32:09 AM 00:05 1 Left Tum L j
109 8:32:06 AM 8:32:13 AM 00:07 2 Left Tum
110 8:32:51 AM 8:33:12 AM 00:21 1 Left Tum
111 8:33:18 AM 8:33:21 AM 00:03 1 Left Tum 1
112 8:33:23 AM 8:3327 AM 00:04 1 Left Tum
113 8:33:52 AM 8:34:21 AM 0029 1 Left Turn
114 8:33:58 AM 8:3427 AM 0029 2 Left Tum
115 8:34:03 AM 8:34:30 AM 00:27 3 Left Tum
116 8:34:08 AM 8:34:35 AM 0027 4 Left Tum
117 8:34:66 AM 8:35:15 AM 0"9 1 Lek Tum
118 8:37:03 AM 8:37:06 AM 00:03 1 Left Tum 1
119 8:39:47 AM 8:40:07 AM 00:20 1 Lek Tum
120 8:40:16 AM 8:40:17 AM 00:01 1 Left Tum
121 8:40:53 AM 8:40:58 AM 00:05 1 Left Tum Lj
122 8:41:37 AM 8:41:44 AM 00:07 1 Left Tum
123 8:41:49 AM 8:42:19 AM 00:30 1 Left Tum
124 8:4420 AM 8:44:30 AM 00:10 1 Left Tum r
125 8:44:33 AM 8:44:36 AM 00:03 1 Left Tum
126 8:45:58 AM 8:46:01 AM 00:03 1 Left Tum
127 8:46:25 AM 8:46:27 AM 00:02 1 Left Tum l J
128 8:46:32 AM 8:46:53 AM 0021 1 Left Tum
129 8:47:02 AM 8:47:06 AM 00:04 1 Left Tum
130 8:47:45 AM 8:48:12 AM 00:27 1 Left Tum
131 8:49:46 AM 8:49:55 AM 00:09 1 Left Tum r
132 8:50:26 AM 8:50:27 AM 00:01 1 Left Tum
133 8:50:49 AM 8:50:56 AM 00:07 1 Left Tum
134 8:51:27 AM 8:51:30 AM 00:03 1 Left Tum L-�
135 6:51:34 AM 8:51:42 AM 00:06 1 Left Tum
136 8:52:02 AM 8:52:05 AM 00:03 1 Left Tum
137 8:52:13 AM 8:52:52 AM 00:39 1 Left Tum r
138 8:52:40 AM 8:52:59 AM 00:19 2 Left Tum
139 8:5421 AM 8:54:26 AM 00:05 1 Left Tum
140 8:54:35 AM 8:55:02 AM 00:27 1 Left Tum L–j
141 8:55:43 AM 8:55:59 AM 00:16 1 Left Tum
142 8:55:48 AM 8:56:07 AM 00:19 2 Left Tum
143 8:55:51 AM 8:56:12 AM 0021 3 Left Tum
144 8:57:45 AM 8:58:40 AM 00:55 1 Left Tum
145 8:57:49 AM 8:58:45 AM 00:56 2 Left Tum
146 8:5822 AM 8:58:50 AM 00:28 3 Left Tum L-
147 8:59:45 AM 8:59:54 AM 00:09 1 Left Tum
148 8:59:47 AM 8:59:57 AM 00:10 2 Left Tum
•-1
La
l.�
f 1
V
l�
s 1
t.
C 1
• f 1
2 Lr
r 1
v
Butcher Boy Plaza Exit Driveway(Right f Left Lanes)
Queue/Delay Study
City,State:North Andover,MA
Date:Thursday 6128/2012
n Time:4:00pm-6:00pm
1 PDI File#122978
Client Bayside Engineering/K.Cram '
li Client M 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Vehicle# Entered queue Left Queue Delay Queue Exiting . Vehicle# Entered Queue Left Queue Deley queue ExiOng
In aec. Length Tum In sac. Length Tum
1 4:00:14 PM 4:00:19 PM 00:05 1 Left Tum 1 4:00:28 PM 4:00:33 PM DO:05 1 Right Tum Total Count
2 4:0022 PM 4:00:36 PM 00:14 1 Left Tum 2 4:01:12 PM 4:0128 PM 00:16 1 Right Tum
3 4:00:41 PM 4:00:44 PM 00:03 1 Left Tum 3 4:02:21 PM 4:0226 PM 00:05 1 Right Tum Left Lane
4 4:00:55 PM 4:0126 PM 00:31 1 Left Tum 4 4:02:30 PM 4:02:56 PM 0026 1 Right Tum Exiling _
5 4:01:32 PM 4:01:36 PM 00:04 1 Left Tum 5 4:02:35 PM 4:03:02 PM 0027 2 Right Tum Totals
6 4:01:47 PM 4:01:54 PM 00:07 1 Left Tum 6 4:0322 PM 4:03:39 PM 00:17 1 Right Tum
7 4:03:18 PM 4:03:45 PM 0027 1 Left Tum 7 4:03:54 PM 4:03:56 PM 00:02 1 Right Tum Total Vehicles 341
8 4:03:34 PM 4:03:49 PM 00:15 2 Left Tum 8 4:04:48 PM 4:04:59 PM OD:11 1 Right Tum Ave Stopped Time 00:31
9 4:04:20 PM 4:04:33 PM 00:13 1 Left Tum 9 4:04:51 PM 4:05:03 PM 00:12 2 Right Tum Max Stopped Time 02:07
10 4:04:44 PM 4:04:55 PM 00:11 1 Left Tum 10 4:06:15 PM 4:0624 PM 00:09 1 Right Tum Average Queue 2.40
11 4:04:52 PM 4:05:07 PM 00:15 2 Left Tum 11 4:06:34 PM 4:08:41 PM 00:07 1 Right Tum Max Queue 9
12 4:05:16 PM 4:05:45 PM 0029 1 Left Tum 12 4:08:59 PM 4:09:04 PM 00:05 1 Right Tum Total Delay 2:56:14
13 4:05:23 PM 4:05:48 PM 00:25 2 Left Tum 13 4:10:14 PM 4:10:38 PM DO:24 1 Right Tum
14 4:0526 PM 4:05:55 PM 00:29 3 Left Tum 14 4:10:48 PM 4:10:54 PM 00:06 1 Right Tum
15 4:05:40 PM 4:06:04 PM 0024 4 Left Tum 15 4:11:04 PM 4:1128 PM 0024 1 Right Tum Right Lane
16 4:05:42 PM 4:06:17 PM 00:35 5 Left Tum 16 4:13:16 PM 4:1321 PM 00:05 1 Right Tum Exiling
^ 17 4:06:02 PM 4:06:43 PM 00:41 3 Left Tum 17 4:14:07 PM 4:14:13 PM 00:06 1 Right Tum Totals
`i'L71 18 4:06:11 PM 4:06:58 PM 00:47 3 Left Tum 18 4:15:09 PM 4:15:14 PM 00:05 1 Right Tum
19 4:0826 PM 4:08:39 PM 00:13 1 Left Tum 19 4:1529 PM 4:15:39 PM 00:10 1 Right Tum Total Vehicles 180
20 4:06:48 PM 4:08:53 PM 00:05 1 Left Tum 20 4:15:54 PM 4:16:03 PM 00:09 1 Right Tum Ave Stopped Time 00:14
21 4:08:50 PM 4:09:06 PM 00:16 2 Left Tum 21 4:16:39 PM 4:16:41 PM DO:02 1 Right Tum Max Stopped Time 0125
22 4:09:48 PM 4:10:07 PM 00:19 1 Left Tum 22 4:17:42 PM 4:17:46 PM 00:04 1 Right Tum Average Queue 1.32
9�-t 23 4:10:57 PM 4:1129 PM 00:32 1 Left Tum 23 4:17:48 PM 4:17:50 PM 00:02 1 Right Tum Max Queue 5
i 24 4:1126 PM 4:11:47 PM 0021 2 Left Tum 24 4:19:11 PM 4:19:33 PM 0022 1 Right Tum Total Delay 0:41:49
25 4:12:10 PM 4:12:23 PM 00:13 1 Left Tum 25 4:20:10 PM 420:14 PM 00:04 1 Right Tum
26 4:12:15 PM 4:12:59 PM 00:44 2 Left Tum 26 420:36 PM 420:51 PM 00:15 1 Right Tum
27 4:13:00 PM 4:13:10 PM 00:10 1 Left Tum 27 421:03 PM 421:06 PM 00:03 1 Right Tum
28 4:13:23 PM 4:13:31 PM 00:08 1 Left Tum 28 421:30 PM 4:21:42 PM 00:12 1 Right Tum Peak Hour Count
29 4:1326 PM 4:13:34 PM 00:08 2 Left Tum 29 422:13 PM 4:22:18 PM 00:05 1 Right Tum
30 4:14:49 PM 4:15:11 PM 00:22 1 Left Tum 30 4:23:04 PM 4:23:10 PM 00:06 1 Right Tum Left Lane
I 31 4:15:31 PM 4:15:41 PM 00:10 1 Left Tum 31 427:46 PM 428:09 PM 0023 1 Left Tum Exiling
1 32 4:15:47 PM 4:16:05 PM 00:18 1 Left Tum 32 428:18 PM 428:21 PM 00:03 1 Right Tum Totals
lJ 33 4:15:50 PM 4:16:09 PM 00:19 2 Left Tum 33 428:40 PM 4:28:46 PM 00:06 1 RightTum
34 4:16:53 PM 4:1723 PM 0030 1 Left Tum 34 429:28 PM 4:29:41 PM 00:13 1 Right Tum Total Vehicles 203
35 4:17:52 PM 4:18:19 PM 0027 1 Left Tum 35 4:31:14 PM :4:37 24 PM 00:10 1 Right Tum Ave Stopped Time 00:39
n 36 4:17:55 PM 4:18:30 PM 00:35 2 Left Tum 96 4:31:19 PM 4:31:32.PM: DO:13 2 Thru: Max Stopped Time 02:07
37 4:18:50 PM 4:18:53 PM 00:03 1 Left Tum 37 -4:31:21 PM- 4:32:12.PM OM51 3 RightTum Average Queue 2.77
38 4:1924 PM 4:19:28 PM 00:04 1 Left Tum 38 4:32:08 PM, 4:33:07 PM. 00.59 2 Right Tum Max Queue 9
L_1 39 4:20:19 PM 420:58 PM 00:39 1 Left Tum 39 4:32:43 PM 4:3323 PM 00:40 2 RightTum Total Delay 2:03:10
40 420:43 PM 4:21:00 PM 00:17 2 Left Tum 40 4:33:14 PM :4:33:46 PM 00:32 2 Right Tum
41 4:21:54 PM 422:10 PM 00:16 1 Left Tum 41 4:33:33 PM 4:38:46 PM 00:13 2 Right Tum
r��1 42 4:21:58 PM 4:22:24 PM 00:26 2 Left Tum 42 4:33:35 PM 4:33:51 PM 00:16 3 Right Tum Right Lane
l i 43 4:22:58 PM 4:23:11 PM 00:13 1 Left Turn 43 4:34:30 PM 4:34:32 PM 00:02 1 Right Tum Exiting
I 44 4:23:23 PM 42328 PM 00:05 1 Left Tum 44 4:35:28 PM 4:35:32 PM 00:04 1 -Right Tum Toteis
LJ 45 4:24:36 PM 4:24:40 PM 00:04 1 Left Tum 45 4:36:51 PM 4:36:56 PM 00:65 1 Right Tum
46 4:24:41 PM 4:24:52 PM 00:11 1 Left Tum 46 4:37:11 PM 4:37:39 PM 0028 1 Right Tum Total Vehicles _ 98
47 4:24:45 PM 425:20 PM 00:35 2 Left Tum 47 4:38:16 PM. 4:38:39 PM 0023 T RightTum Ave Stopped Time 00:15
48 4:25:00 PM 4:25:25 PM 00:25 2 Left Tum 48 4AOA3.PM 4:40;46 PM 00:03 1 Right Tum Max Stopped Time 0125
49 4:25:03 PM 425:39 PM 00:36 3 Left Tum 40 4:40:54 PM 4:40:59 PM. .00:05: 1, RightTum Average Queue 1.42
50 4:25:32 PM 4:26:04 PM 00:32 2 Left Tum 156 4:41:02 PM 4:41:04 PM 00:02 1 .Right Tum Max Queue 5
51 4:26:12 PM 42623 PM 00:11 1 Left Tum 51 4:41:D8 PM -4:41:10 PM. 00:02 1 Right`Turh Total Delay 0:24:39
LJ 52 4:26:30 PM 426:34 PM OD:04 1 Left Tum 52. 4:41:32 PM 4:41:34 PM 60:02. 1 Right Tum
53 4:26:58 PM 427:11 PM 00:13 1 Left Tum 53 4:41:38 PM' 4:42:30:PM 00:52 .1 RightTum
54 427:13 PM 4:27:21 PM 00:08 1 Left Tum '54 '4:42:43 PM 4[42:44 PM 00:01: 1 Right Tum,
55 427:41 PM 427:49 PM 00:08 1 Left Tum 55 4[44112 PM. 4144:39 PM 0027 .1 RightTum'
n 56 4:27:55 PM 428:10 PM 00:15 1 Left Tum .56 4.'":14 PM 4:44:49 PM 00:35 2 Right Turn
57 4:27:58 PM 428:13 PM 00:15 2 Left Tum 57 4:44:24 PM.. 4:44:52 PM 028. 3 ,Right Tum
U 58 4:28:01 PM 42823 PM 00:22 3 Left Tum 58 4:45:48 PM 4;45:52 PM- 00:04 1 Right Tum
59 429:15 PM 4:29:54 PM 00:39 1 Lek Tum 59- 4:47:15 PM 4:47:17.PM 00:02 4 Right:Turn
60 429:18 PM 429:58 PM 00:40 2 Lefl Tum 60 4:48:12 PM 4:48:14.PM. 00:02 '1 Right Tum.
61 4:29:52 PM 4:30:03 PM 00:11 3 Left Tum 61 4:4829 PM '4 48;32 PM .00:03 1" PighfTum.
n .62 4.30:14 PM- 4:3018 PK 00:04 .1 Left Tum 62 -4:4852 PM 4 48:57 PM Otr05. 1- RightSurn
63 4:3622 PM -4:30:48 PM- '00:26 1' Left?um. 63 4:49:08 PM `449,11.PM 00:03' 1 RightTum-.
64 4:31:06.PM 4:31:34 PM; `00:28 1 :Left Tum 64 4:4925 PM 4.49:31PM. '00:06? 1 .Right Turn
IJ ..
65, .'4:31i38�P,M :4:32:OSPM�.:0027 1' Left 65. '4i50:00PM. �:450.09:PM' .00:09� 1' Ttuu _,
66: 4x31:44 PM .4:32:14 PM. '00t30: 2 teftTum 65 4:5013 PM 4:5020 PM-� 00:07: �9; .Right:Tum
:6T 416PM 4132:17 PM` .00:01 1 left Tum 87. '4.51:33 PM 4:511:39.PM- 0006`: :1, 'LeNTum-
68 4332240 PM 4:3106 PM 0026 1 Left Tum 68 4:5136 PM 4:5146 PM "60.10 2 Right Tum
69 433 09.PM 4.3312 PMI. 00:03 1. Left Tum 69 4;52.07 PM 4:5224 PM: 0017 1 RightTum.
70 433:39 PM 4:33:58 PM 00:19 1 Left Turn. 70 4.5220 PM 4:5226 PM .00.06 2" Right Tum
71 4.33.56 PM 4.34:16 PM 0020 2. Left Tum 71 4.52 57 PM 4:5324 PM: 0027 T Flight Tum
72 4.34:19,PM 4:3424 PM 00;05- '1 left Tum 72 .4:54:00 PM. "4:6420 PM 0020 1' Right Tum
73, 4:35:02 PM. 4:35:08 PM .00:06 1 Left Turn 73 4:54.-N PM. .415414 PAA" 0.620 2: :Right Tum
74 4.35 05 PM 4:31:11 PM 06:06 2 Left Turn 74 454 40 PM 4:54 41 PM .0001 1- Right Tum
75 4:35:22 PM 4.3 524PM 0002 1 .Left Tum, 75 457 40 PM 4.5744 PM -0004 1 Right Tum
76 43534 PM 4:35:39 PM 00 05: 1 Left Tum 76 45845 PM A:58::58 PM 0013 1: Right Tum
77. 4:35W PM 435.53 PM 0016 2 Left Tum 77 4 5921 PM- 4:59:26W `0005 1: Right Tum:'
'.78: 4:35:43 PM .4:38:119PNI 0026 2 Left Tum'. 78- :5:00:53 PM 5:00:57:PM -00:04- 1- RghtTurn
79" 436:03PM :4:3626PM .00:25 2 Left Turn 79.� Si0058PM� 5:01.00°PM� 00:02 :1' RightTum
80 4;36:37 PM: 4 36:39 PM `00:02 1 LeftTum 80 5:01:13 PM: 5;01.16 PM::,00 " 1.: RightTum
81: 436:48,PM.. 4:36:57 PM. 00:09 .1 :LeN Tum" 81 5:01.,58 PM: .5.02 38 PM. 00:40:: 1: RightTum
82' 4:37:04 PM. 4:37:47 PM 00:13_ -1. LeftT.um 82 5621OPM S:02¢40:PM 00:30' 2 RightTum''
83 4037:07 PM! 4.37:45 PM 00:38 2 Left7um:: 83 5:02:93 PM :5:&A4 PM :00:31 3 Right Tum_
64. 437:.14PM 437:45 PM 60:31" 3 LeftTum -84: 5A226 PM 5:02-06PM. 0020. 4 f*ht Turn
... .. .. .. :L . ... .. . .... .125 f*ht
:65.. 4:37;35..PM, 4:32:48 PM: .00:13 3 :Left Tum: 85-. .5:02:32 PM. ;5:03:57:PM: :0125,. �5` :RightTum-.
86 4:37:52 PM 417:63 PM -00:01 1 Left Tum- 86 `5:62:56 PM. 5:04:05 PM 01:0 '2 Right Tum
. .. . . ..
87 4.37:58 PM. 438:01.PM 00:03 1 LeR Tum 87 503:12 PM .5:0427:PM 01:1.5 3 Rght.Tum
88 4:3.6-0.41 PM 438:97 PM 00:03 1 Left Turn 88 5:06:04 PM 5:0610 PM 00.06: 1 Right Tum
89 4.36A3PM 438.138 PM 00:25 1- LeftTym 89 '5:0723 PM :5'0726PM. 00:03 1 RightTum'
L_I 90 :4:38:42 PM. 4.38:60M :00:12 1 Left Tum' 90- :5:08:17PM .5:08:19 PAA 00`.02 1 RlghtTurn
.91 439:03 PM 439:10 PM 00071- Left7um- 91 5:0951.PM .5i09i57:PM, 0.0:06,, 1' RightTurn�
92 4 39:07 PM 4:39114 PM 00:07: 2 Left Tum 92 : 5:1022 PM: .5:1625'PM 00:03 1 Right Tum"
-93- 439:16 PM' 4:39:42 PM 0026 1 .Left Tum 93- 5i11l02PM 5:l1:O7PM- 00:05 1' Right Turn
. . . .
.�. 4:3929.!?M' 439:52 PM 0023 2 Left7um 94- 5:19:18 PM 5:9927lPM 00:11 'k RghtTfim. '
I
Li ,
EI
l
Butcher Boy Plaza Exit Driveway(Right 1 Left Lanes)
Queue/Delay Study
t i
City,State:North Andover,MA
Daft:Thursday 6/28/2012
Time:4:00pm-6:00pm 1
PDI Flle#122978
Client Bayside Engineering)K Cram
Client M. 2121491 l�
Butcher Boy Plate Exit Left Lane Butcher Boy Plaza Exit Right Lane
Delay Queue FxlBng Doisy Queue Exiting ! 1
Vehicle# Entered Queue Left Queue m we Length Tum Vehlele# Enbrsd Queue UR Queue in sec Length Tum
95 :4:39:31 PM. 4:319;56 PM 0025 - 3' LeflTum 95''' 511-20 PM 5:11:29PM. 00:09 2-" Right Tom k J
96. 4:39:50.PM" 4:40:09 PM 00:19- 3 LeftT+im 96. 5:11:53 PM .5:12:03 PM 00:70 .1. RghtTum'
g7 4:40:03 PM :4:40:17 PM 06:14 2 Left Tum 97 5:11:59 PM -5:12:40 PM -00:41 2 Right Tum
98 4., 40i20:PM 4:4023 PM. 0,0:03 1 Left Tum 98 5:12:39PM, 512:47: PM OD:O8,. .2. Right To
99 4:40:37 PM 4:40.48 PM. 00:11 1 Left-Tom 94 612:Q PM 5.12:49 PM':00:07 2 RghtTum' C 1
100 4.40:41 PM 4:40:58 PM 00:17. 2 Left Tum 106 511:55 P.M :5:13!06 PM _00:1.1 .1.- RightTum,
101 44114 PTA, 4:41:18 PM 00:04 -1 Lett Turn101 513:33.PM5:13:34PM: 00:01: 1t Turn,
.102 4:41:22.PM 4:4125PM :00:03 1 Left Tum :102 5.13:59PM 5.14:04:PM 00:05 1 Right Tum L-1
1D3 4:41:48 PM 4:42:28 PM 00:40 1 Left Turn 103 :5:14:19 PM 5:14:44 PM 0025 1 Right
104'.' 4 41:54 PM 414238 PM .00:44' 2 Left Tum 104: 5;14:31 PM 5:14:50 PM :00:19 2. Right?um
105 _4:42:18 PM- 4:42:48 PM. 0028 3 Leh Tum 105 5:14:56 PM 51.5.00 PM 00:04 1 Not Tum !-•
.106 4:4220 PM :4:4320 PM -01:00, 4. .LeflTum. 106: ,5:15:11 PM" 5:1524 PM ,09:13. 1 :Right Tum.
107. 4:42:49 PM: 4:4325 PM -00:36' 2 Left Tum 107 5:15:14 PM 5:1528 PM :00:14 2- Right Tom
166 4:42:53 PM 4:43:36PM.. 00:43. :3 Left Turn ,108 5:1527PM 5i15:42:PM. .0016' .2�1 Right Tum..
.109 4:42:57 PM 4:4144 PM, 00:47 4 Right Tom -109 5:15:37PM 5:15i450M' 00:08: 2` RigMTum
110 4:43:08.PM 4:43:49 PM 00:41' .5. .1611 Tom :110 '5:16:42 PM 516:59.PM 00:17-. 1.00.117. 1.
111 :4:43:32PM .4:43:56 PM 00:24 4 Left Tum '111. 5:17iD6.PM 5:1729-PM 00:23 1 Not Tom r
112 4:4346B PM 4.44:46 PM '00:50 1 Left Tom: .112 5:1821:PM 5:18:26:PM' 00:05: :1 Not Turn.
113 4:44:18 PM 4:44:54 PM 00:36 2 Left-Tum '113 5:18:37PM :5:18:38PM: 00:D1d: Rightrum--
114. 4:44:59 PM, -4:45:17 PM: ,00:181 Left Tom .114 3:18:46 PM b:18:48'PM' :00:02 '1 Riot Tum:
115. 4:4519PM 4:45:25 PM 00:06. 1 'Left.Tum 115 :5:19:14PM 5:19:18-PM 00:04- :1 RigMTum
116 4:45:60 PM 4:4554PM 00:04 1. .Left Tom .118. 5:19:17.PM 51929:PM: .00:12, 2;. .Right Toro.
117 4:46:17 PM' 4:46:47 PM 00:30 1 Left Tum: 117 8i19:43PM '5:19:45 PM. 00:62: 1. .Right Tum:
116 4:4622 PM 4:46:50 PM
00;28 2 Left Tum 118. 5:19:55 PM :5:19:56PM; 00:03. 1 .RigMTum - 1
119 4:46:25 PM 4:46:53 PM: 6028 3 Leh Tum 119: .520:39 PM 5:20:42 PM; 60:03 1 *Rigtit Tum'
120 '4:46;58 PM 4:47:02 PM. 00:04 '1 Left .120. 521:04 PM 521.38'PM, 00:34'. ;1' Right
121 '4:47:01 PM 4:47:06 PM 00:05 2 Left Tum -121 5:22:00 PM 5:22:05 PM' "00:05. 1 Not Turn l�
122 4:47:08L PM 4:47:10PM .00:02 1- Left Tum' .122 522:04 PM 522:09;PM 00:05 2. ,.Right?um
123: 4:4726 PM, 4:47:53 PM. 60:27. '1 'Leh.Tum. .123 522:15PM' 522:48PM X00:33.: 1. Right.Tum
124L 4;47:49 PM: '4:48.08 PM ;00:19 2 Left Tom: -124:: 522:24 PM: 522.51:PM. '0027,: .2" Right Turn:
125 4:48:02 PM 4:48:15 PM 00:13 2 Left Tum 125 52320 PM: 5:2325 PM 00:05: 1 ,Right Tom.
126 4:46:24 PM 4:49:13 PM 00:49 1 Left Tum. 126- .52417 PM. 624:41 PM 00:14' ..1 Right Turn
127 4:4827 PM '4:49:16 PM- :00:49. 2 Left Tum 127 5:24:40.PM 524:45 PM 00:05 2' R of turn L J
128, 4: 48:34�PM. 4:4927 PM 00:53 3 Left Tom 126 525:40PM 5:25:44;PM, .00:04 1 RightT6m.
129 4:48:44 PM: '4:49:33 PM. 00:49 4 Left Tum 129 526:04 PM 526:08 PM 00:04 1 Right Tum.
130 4:48:58 PM 4:49:35 PM 00:37 5 Left'Tom 936 52823 PM 528:46-PM- 0029 1 Right Tum _
131 4:49:00 PM 4:49:39 PM 00:39 6 Left Tum 131- 528:26 PM 5.28:67.PM 00:31 2 Right Tum ( 1
.132 4:49:02 PM 4:49:54 PM 00:52 7 Left Tom 132. 529:33 PM 5:29'.42-PM 00:09. 1 Right To
133 4:49:37 PM 4:50:18 PM 00:41 3 Left Tom 133 5:30:00 PM 5:30:02 PM 00:02 1 Right Tum
134 4:49:43 PM 4:5026 PM. 00:43 3 Left Tum 134 5:30:03 PM 5:30:39 PM 0036 1 Right Tum L.J
135 4:50:21 PM 4:51:22 PM 01:01 2 Left Tum 135 5:30:06 PM 5:30:44 PM 00:38 2 Right Tum
136 4:50:42 PM 4:5228 PM 01:46 2 :Left Tum 136 5:31:58 PM 5:3225 PM 00:27 1 Right Tum
137 4:51:53 PM 4:52:39 PM 00:46 2 Left Tum 137 5:32:39 PM 5:32:49 PM 00:10 1 Right Tum
138 4:52:10 PM 4:52:44 PM 00:34 .3 Left Tum 138 5:32:58 PM 5:33:00 PM 00:02 1 Right Tum
139 4:52:16 PM 4:53:34 PM .01:18 4 Left.Tum 139 5:33:27 PM 5:33:31 PM 00:04 1 Right Tum
140 4:52:31 PM 4:53:38 PM 01:07 4 Left Tum 140 5:34:09 PM 5:3425 PM 00:16 1 Right Tum L
141 4:52:50 PM 4:53:42 PM 00:52 3 Left Tum 141 5:35:01 PM 5:35:03 PM 00:02 1 Right Tum
147 .4:52:52 PM 4:53:48 PM .00:56 4 Left Tum 142 5:35:05 PM 5:35:08 PM 00:03 1 Right Tum
143 4:53:19.PM 4:54:25PM 01:06 .5 Left Tom 143 5:36:02 PM 5:36:03 PM D0:01 1 Left Tum
144 .4:5321 PM 4:64:33 PM. .01:12 .6. "Left Tam 144 5:36:23 PM 5:36:56 PM 00:35 1 Right Tum f
145 ,453:30:PM 454:37 PM. 01:07 7 Left Tum 145 5:37:44 PM 5:37:55 PM 00:11 1 Right Tum
146 4:53:32 PM 4:54:48 PM 01:16 8Left Tum 146 5:38:34 PM 5:39:06 PM 00:32 1 Right Tum L�
-147 453:44 PM 4:54:54 PM 01:10 6 Left:Turn 147 5:38:53 PM 5:39:09 PM 00:16 2 Right Tum
148 4:54:12 PM :4:55:28 PM 01:16 6 Left Tum 148 5:36:54 PM 5:39:11 PM 00:17 3 Right Tum
149 4:54:14 PM: 4:55:42 PM 01:28 7 Left Tam 149 5:39:37 PM 5:39:48 PM 00:11 1 Right Tum _
150 4:54:55 PM 4:55:49 PM 00:54 3 Left Tum 150 5:39:40 PM 5:39:58 PM 00:18 2 Right Tom f 1
151 4:54:58 PM 4:56:32 PM 01:34 4 LeflTum 151 5:39:42 PM 5:40:01 PM 00:19 3 Right Tum
162 4:5524 PM 4:56:38 PM 6:14 5 left Tum 152 5:40:11 PM 5:40:15 PM DD:04 1 Right Tom
153, :4:55:34:PM: 4:56:42 PM 01:08 5 Left Turn 153 5:42:09 PM 5:42:16 PM 00:07 1 Right Tum V
154 45537 PM 4:57:37 PM' 02:00 6 '.Left Tum' 154 5:42:21 PM 5:4216 PM 00:05 1 Right Tum
155 4:56:18 PM .4:57:53 PM :01:35- '5 Left Tum. 155 5:4228 PM 5:42:57 PM 0029 1 Right Tum
156 4W:63 PM 4:506 PM' :07:03. 3 LeR Turn 156 5:42:55 PM 5:43:12 PM 00:17 2 Right Tum
157 4;5727 PM 4:58:09 PM 00:42 4 Left Tum 157 5:43:36 PM 5:43:41 PM 00:05 1 Right Tum
.156- 4-'57.WP.M 4:58:14 PM :00:44 .5 Left Sum. 158 5:43:39 PM 5:43:43 PM 00:04 2 Right Tum
159 4M1.04 PM- 4:58:17 PM: 00:13: 4 LeftTurn159 5:44:13 PM 5:4425 PM 00:12 1 Right Tum L,
160 4:58:12.PM 4:58:48.PM. :00:36 :3 :Left Tum 160 5:46:09 PM 5:46:29 PM 0020 1 Right Tum
161 -4:58:31 PM 4:59:09PM :00:38 2 Leh Tum 161 5:46:31 PM 5:46:32 PM 00:01 1 Right Tom
162 4:58:33 PM- 4:$9:14 PM 00;41 ":3 Left Tum 162 5:46:43 PM 5:46:44 PM 00:01 1 Right Tum
163- 4:58:50 PM 4:59:18 PM 0028 3 Left Tum 163 5:47:43 PM 5:47:45 PM 00:02 1 Right Tum
,164 4:58:59 PM 4:5929 PM. :00:30 4 :Leh Tum 164 5:48:13 PM 5:48:46 PM 00:33 1 Right Tum
`165 4:59:021 PM 4:59:32 PM- 0629 5 Left Tum 165 5:4827 PM 5:48:50 PM 0023 2 Right Tum 1�
166' 4:59:45.PM. -5:00:00 P.M .00:15 .1 .Left Tum 166 5:48:40 PM 5:48:56 PM 00:16 3 Right Tum
167 5:00:01 PM 5:00:07 PM, DOM 1 Left Tum 167 5:49:16 PM 5:49:36 PM 00:20 1 Right Tum
168. 5!06:37.PM 5:00:46 PM `60:09' .1 :Left Tum, 168 5:4921 PM 5:49:39 PM 00:18 2 Right Tum
169 5:00:40 PM 5:00:50 PM 00:10. '2 'Left Tum 169 5:49:57 PM 5:50:00 PM 00:03 1 Right Tum (`1
170 :5:01:42 PM 5:01.46 PM. 60:04. 1 LeR.Tum 170 5:50:43 PM 5:50:59 PM 00:16 1 Right Tom
171.: 502:48 PM: 502:50 PM 00:02: 1' Leff To 171 5:51:19 PM 5:5124 PM 00:05 1 Right Tum
972- 5:03:07 PM .5.03:58 PM 00x49 .1 :Left Tum 172 5:53:17 PM 5:5323 PM 00:06 1 Right Tum L J
173 5:03116 PM -5:04:119 PM` 00:53 �2 Left Tum 173 5:53:55 PM 5:54:03 PM 00:06 1 Right Tum
.174 5:03:17:PM: .&D422 PMr' 01:05. 3 Left Tom: 174 5:54:58 PM 5:55:02 PM 00:04 1 Right Tum
.175_ .5:0328 PM :5:04:28 PM 01:00: 4 Leh Tum 175 5:55:08 PM 5:55:16 PM 00:08 1 Right Tum ( 1
176 .5:63:44PM 5:(f4 33 PM: :00:49 5 Left Tom 176 5:56:43 PM 5:57:12 PM 0029 1 Right Tum
j77' 5:04:17P M -5:0520 PM 01:03 4 Left Tum 177 5:56:56 PM 5:57:21 PM DO:25 2 Right Tom
178 5:0523PMS:0526.PM, :00:03 1 .Left_Tum 178 5:57:41 PM 5:5820 PM 00:39 1 Right Tum
178: 5:05:32 PM- :5:06:08 PM: 00:36: :1 Leh Tum. 179 5:5829 PM 5:58:30 PM 00:01 1 Right Tom
180- 5-0516 PM 5:06(12 PM 00:36 :2 Left Turn 180 5:59:08 PM 5:59:26 PM 00:18 1 Right Tom
181 5:05:39 PM 5:06.17PM '00:38 3 Leh Tom
162. 5:05;50 PM 5:0620 PM 00:30- 4 Left Tum, f
183 .5;0622 PM 5:0628 PM 00:04: 1 Left Tum
184 .5:06;31 PM- 5:07.06 PM .60:35 -1 Left Tum.
185 5:66:47 PM 5:07:17 PM. 60:30 2Leh Tum L J
186 507:20;PM 5.t7;21.PM. 00:01 1 Left.Tum
187 5:07:28 PM 5:08:32 PM :01:64 1 LeftTom
. . o
168 5:07i31.PM 5A6:36 PM 01:07 2 LeN Tum f-'
2 a j
aJ
C Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
Queue/Delay Study
City,State:North Andover,MA
Date:Thursday 6/2812012
C Time:4:00pm-6:00pm
PDI Filell 122978
Client Bayside Engineering/K Cram
Client 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Doley Queue Exitng VehiNe- Entered Queue Left Queue Delay. Queue Exiting
Vehkle 1 Entered Queue Left Queue Msec. Length Tum In see. Length Tum
189.. '.5;07:46 PM: 5:08:53 PM 011073 Left Tum
190 .5:07:53?M5:09:00 PM. 01:07 4 Leff Tum.
191 5:0829.PM. 5:09:05PM, 00:36 'S' Left Turn
192 5:08:36 PM S 0956 PM 9120 5 Left Tum
193 5:08:43 PM 51026 PM 01.43 5' Left Tum
194 :5:60:14 PM 51032 PM ;0:18, 1Left Tum::
195 5 0996 PM 51036 PM 0120 4: Left Tum.
:5:09:18PM . 5{ 10:4DPM' 01;22.. 6 :Left7um:
197j 510921 PM 3:1046 PM' 0125 6 Left tum
:198 -509:23 PM. 5:7125 PM. 02:02 2. Left Tum.
199' 5 0924 PM 511 31 PM- 02:07 6 Left Tum
` .206 6:0944 PM. 5.11 34 0.M. 01:50, :9 Left Turn
it J, 201; 510:38 PM .5:11 36 PM -00:59' 6 Left Tum
202 5,10:45 PM 5:12.04 P.M .01:19 6 .Left Turn.
203. 5:10:51 PM, 5:12:15 PMI 01:24: 6. Left Tum
.204 5;10:54 PM '5:1221 PM: 01:27 7 Left Tum
C 205 510:59 PM 5:12 25 PM: -01:26 8 Left Tum
206 511.43 PM 5:17190M. 00:46 5 Left Tum
207 511:45 PM 5:1233 PM 00:48 6, Left Tum
Oil 512'00 PM 5.12.50 PM 00:50 7 .Left Tum:
209 5(12:08 PM: :5[1394 PM- 101:06. 7 Leh Tum
210 5:]2:45 PM 5i7326'PM:. 'OD:41 3 1eft7urn
211 513:03 PM 513:30PM 0027 3 Left Tum
.212 .513:13 PM 513:36PM X00:23 4 Left7um
I 213 5.13:19 PM 5.13:4'1 PM 00:22 4 Left Tum
LJ 214 5:14:09 PM 5:14 :3¢ PM.,"0027 .1 LefttTurn
215 5:14:55 PM 5:14:58 PM 00:03. 1 Left Tum
216' 5:15:08 P.M 5:152.3 PM: 1 00: 15 1 left Turn
217' :5:15:26.PM 5:15:29 PM. OD:03: .1- Left Tum
(� .218 515:47 PM 515:50 PM: 00:03; 1 Latium
If 219 518:15 PM 51620 PM. 0D:05 1 Left Tum
220. 5;16 25 PM 5:1628 PM: 00:03. 1 Left Turn -
221 5:16:44.PM 5:17:34 PM- 00:50 1 Left Tum
222: 516:46 PM. .5:17:40 PM: .0054 '2 "Leff Tum
223' 5:17:33PM 5:18:30 PM. DO:57 3 Left Tum
n 224 5:1828 PM 5:18:42 PM, 06:14 2 LeftTum
225 5:18:37 PM 5:18:49 PM 00:12 2 Left Tum
226 5:18:57 PM 5:19:36 PM 00:39 1 Left Tum
L1 227 5i19:22.PM 5:19:40 PM 00:18 2 Left Tum
228 5:19:23 PM .5:19:46 PM 0023 .3 LeftTurn
229 5:19:39 PM 5:19:48 PM DO:09 3 Left Tum
:230 5:19:40 PM 5:1951 PM 00:11 3 Left Tum
231 5:20:18 PM 520:30 PM -00:12 1 Left Tum
232 5:2026 PM 520:34 PM 00:08 2 Left Tum
'� 233 520:38 PM 520:48 PM 00:10 1 Left Tum
234 5:20:46 PM 520:53 PM. 00:07. 2 Left Turn
235. 5:21:52 PM 5:21:57 PM 00:05 1 Left Tum
��-1 .236: 5:21:58 PM :5:22:10P.M. .00:12 1. Left Tum:
Y237 :522:20 PM 5:22:49 PM' -0029 1 Left Tum
` .238 522:32.PM. '522:55 PM" '0023• 2 Leh Tum.
239 5:23:00 PM- 523:02 PM 06:02 1 Left Tum
.240: :52323 PM- .523:33 PM .00:10 1 Left Tum
24 5:23:30 PM :5:23:42 PM 00:12 2 Left Tum.
242 3:23:31 PM .523:48PM 00:17, .3 Left Turn
n 243 523:53 PM 523:56 PM' 00:03: 1 Left Tum
:244 .524:15 PM '524:43 PM 0028 1 Left.Tum
f 245 5:24:17 PM 524:47 PM. 00:36 2: ':Left Tum
y :246 5 24:19.PM 524:50 PM 100:37 3 Left Turn
247' 5:24:22.PM- 5:24:54 PM_ !00:32 -4 Left Turn
'248 5:26;11 1M .526:42 PM- 0631 1' .Left Turn
249 5:26:1.2 PM 526:44 PM 00:32 2; Left Tum
:250 5.26:17.PM 526.SOPM 00:33 3 :Left Turn'
251- 526:19PM: 5:27,01 PM :00,42: 4' LeftTum.
'� 53:252' 526:41:PM 527,08 PM 0027 5 .Left Tum.
2 :527119 PM 531:44 PM 00:25 1 Left Tuni
254 327:37,PM 52748 PM 00:1.1. 2: 'Leh Tum
255: .5:27:52 PM. :52754 PM` 00:02 :1 -Left Tum
258 :56:27:59 PM 628'09 PM.. :00:10 .1 :Leff Tum.
257 5:28:01 PM: 5:28:46PM- 00:45 -2: 'Left Tum:
t 258 5.28:36 PIA .529:00 PM 0022; 2 ,.Left Tum.
1J 259- 5:26:41 PM529:04 PM 0023 3. Left Turn
.. PM .
260.: 528:43PM �529S9PM�_.01;16. 4 Left Tum,
261 528:54 PM: 5:30:45 PM 01:51 4 Left Tum:
262 52902.014 530:47 PM 01:45 4 Left Tum:
263 52941 PM 530:50 PM 01:09 4- Leh Tum:
264: 539.45 PNI 5.3137.PM 01;52 . ;5 Left Tum
Lf 265 5:30:09 PM 5:31:41 PM 01:32 5 Left Tum
266 5:30:10 PM 5:31:47 PM 01:37 6 Left Tum
267 5:3023 PM 5:31:52 PM 0129 7 Thru
�-1 268 5:3125 PM 5:32:02 PM 00:37 5 Left Tum
' 1 269 5:31:56 PM 5:32:21 PM 00:25 2 Left Tum
270 5:32:32 PM 5:32:44 PM 00:12 1 Left Tum
271 5:32:36 PM 5:32:46 PM 00:10 2 Left Tum
Lj 272 5:32:52 PM 5:32:55 PM 00:03 1 Left Tum
273 5:34:03 PM 5:3424 PM 0021 1 Leh Turn
^ 274 5:34:07 PM 5:34:39 PM 00:32 2 Left Tum
' 275 5:34:18 PM 5:34:45 PM 0027 3 Left Tum
276 5:34:22 PM 5:34:50 PM 0028 4 Leh Tum
277 5:35:10 PM 5:35:12 PM D0:02 1 Left Tum
l_j 278 5:35:48 PM 5:35:57 PM 00:09 1 Left Tum
279 5:37:17 PM 5:37:19 PM 0092 1 Left Tum
280 5:37:30 PM 5:37:59 PM 0029 1 Left Tum
n 281 5:38:31 PM 5:39:05 PM 00:34 1 Left Tum
282 5:36:49 PM 5:39:13 PM 00:24 2 Thru
l ! 3
1
I
U
r�
Butcher Boy Pura Exit Driveway(Right/Left Lanes)
Queue/Delay Study
City,State:North Andover,MA
Date:Thursday 6/2812012
Time:4:0Dpm-6:00pm
PDI Fllep 122978
Client:Bayside Engineering/K.Cram
ClientM 2121491
lJ
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Pxdt Right Lane
Delay queue ExRing Onlay queue Exltng rl
Vehicle p Entered queue Loft queue in see LongN Tum Vehicle p Entered queue Left queue in uc LengM Tum
283 5:38:56 PM 5:39:19 PM 0023 3 Left Tum L f
284 5:39:00 PM 5:40:03 PM 01:03 4 Left Tum
285 5:39:02 PM 5:40:09 PM 01:07 5 Left Tum
286 5:39:18 PM 5:40:14 PM 00:56 4 Left Tum
287 5:39:44 PM 5:4021 PM 00:37 4 Left Tum
288 5:39:46 PM 5:40:58 PM 01:12 5 Left Tum
289 5:4027 PM 5:41:02 PM 00:35 2 Left Tum
290 5:40:37 PM 5:41:09 PM 00:32 3 Left Tum
291 5:41:17 PM 5:4123 PM 00:06 1 Left Tum
292 5:41:27 PM 5:41:33 PM 00:06 1 Left Tum
293 5:41:35 PM 5:42:10 PM 00:35 1 Left Tum r.
294 5:41:47 PM 5:42:13 PM 0026 2 Left Tum
295 5:42:39 PM 5:43:14 PM 00:35 1 Left Tum
296 5:42:46 PM 5:4321 PM 00:35 2 Left Tum L
297 5:42:50 PM 5:43:25 PM 00:35 3 Left Tum
298 5:43:07 PM 5:43:30 PM 0023 4 Left Tum
299 5:43:15 PM 5:43:35 PM 00:20 4 Left Tum
300 5:43:20 PM 5:43:44 PM 00:24 5 Left Tum
301 5:43:46 PM 5:44:23 PM 00:37 1 Left Tum
302 5:44:28 PM 5:44:30 PM 00:02 1 Left Tum
303 5:44:33 PM 5:44:37 PM 00:04 1 Left Tum lJ
304 5:44:36 PM 5:44:41 PM 00:03 1 Left Tum
305 5:44:47 PM 5:44:52 PM 00:05 1 Left Tum
306 5:44:54 PM 5:45:13 PM 00:19 1 Left Tum ( 1
307 5:45:10 PM 5:4521 PM 00:11 2 Left Tum
308 5:45:18 PM 5:45:25 PM 00:07 2 Left Tum
309 5:45:43 PM 5:45:44 PM 00:01 1 Left Tum t_1
310 5:45:49 PM 5:45:50 PM 00:01 1 Left Tum
311 5:45:53 PM 5:46:34 PM 00:41 1 Left Tum
312 5:45:56 PM 5:46:30 PM 00:42 2 Left Tum -,
313 5:46:00 PM 5:46:45 PM 00:45 3 Left Tum
314 5:46:02 PM 5:46:49 PM DDA7 4 Left Tum
315 5:46:54 PM 5:46:57 PM 00:03 1 Left Tum L J
316 5:4729 PM 5:47:46 PM 00:17 1 Left Tum
317 5:46:10 PM 5:48:49 PM 00:39 1 Left Tum
318 5:4823 PM 5:48:58 PM 00:35 2 Left Tum
319 5:48:53 PM 5:49:01 PM 00:00 2 Left Tum r 1
320 5:49:06 PM 5:49:35 PM 0029 1 Left Tum
321 5:49:27 PM 5:49:36 PM 00:11 2 Left Tum
322 5:49:45 PM 5:50:04 PM 00:19 1 Left Tum a-/
323 5:49:48 PM 5:50:07 PM 00:19 2 Left Tum
324 5:51:02 PM 5:51:09 PM 00:07 1 Left Tum
325 5:51:21 PM 5:52:02 PM 00:41 1 Left Turn f 1
326 5:51:31 PM 5:52:06 PM 00:35 2 Left Tum
327 5:53:03 PM 5:53:20 PM 00:17 1 Left Tum
328 5:53:10 PM 5:53:26 PM 00:16 2 Left Tum t__1
329 5:53:17 PM 5:53:30 PM 00:13 3 Left Tum
330 5:53:36 PM 5:54:05 PM 00:29 1 Left Tum
331 5:53:39 PM 5:54:14 PM 00:35 2 Left Tum
332 5:53:43 PM 5:54:19 PM 00:36 3 Left Tum
333 5:53:45 PM 5:54:23 PM 00:38 4 Left Tum
334 5:54:31 PM 5:54:34 PM 00:03 1 Left Tum
335 5:55:27 PM 5:5529 PM 00:02 1 Left Tum L J
336 5:57:16 PM 5:57:23 PM 00:07 1 Left Tum
337 5:57:20 PM 5:57:26 PM 00:06 2 Left Turn
338 5:57:43 PM 5:58:31 PM 00:48 1 Left Tum
339 5:57:47 PM 5:58:33 PM 00:46 2 Left Tum
340 5:58:23 PM 5:58:38 PM 00:15 3 Left Tum
341 5:59:00 PM 5:59:29 PM 00:29 1 Left Tum l_/
C
L_1
r 1
L 1
(1
1.J
L• �
LJ
(_1
4 a /
r •
�j
Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
Queue/Delay Study
City,State:North Andover,MA
Date:Saturday 6/3012012
Tune le#12 m-7:30pm
Flle
PDI #122978
Client Bayside Engineering/K Cram
Client M. 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Vehicle# Emered Queue Left Queue Delay Queue Ex.t.. Vehicle# Entered Queue Left Queue Delay Queue Exiting
In aec. LengM Tum in sae. Length I Tum
Li 1 10:30:11 AM 10:30:35 AM 0024 1 Left Tum 1 10:30:18 AM 10:3020 AM 00:02 1 Right Tum Total Count
2 10:30:14 AM 10:30:42 AM 0028 2 Left Tum 2 10:32:16 AM 10:32:17 AM 00:01 1 Right Tum
3 10:31:46 AM 10:31:56 AM 00:10 1 Left Tum 3 10:33:01 AM 10:33:17 AM 00:16 1 Right Tum Left Lane
4 10:3222 AM 10:3223 AM 00:01 1 Left Tum 4 10:34:06 AM 10:34:09 AM 00:03 1 Right Tum Exiting
5 10:32:32 AM 10:32:35 AM 00:03 1 Left Tum 5 10:34:48 AM 10:34:52 AM 00:04 1 Right Tum Totals
6 10:32:34 AM 10:3325 AM 00:51 2 Left Tum 6 10:35:45 AM 10:35:47 AM 00:02 1 Right Tum
7 10:32:38 AM 10:33:30 AM 00:52 2 Left Tum 7 10:36:03 AM 10:36:14 AM 00:11 1 Thru Total Vehicles 533
8 10:32:49 AM 10:33:42 AM 00:63 3 Left Tum 8 10:3625 AM 10:36:35 AM 00:10 1 Right Tum Ave Stopped Time 00:19
9 10:33:02 AM 10:33:51 AM 00:49 4 Left Tum 9 10:36:55 AM 10:36:57 AM 00:02 1 Left Tum Max Stopped Time 02:03
10 10:33:22 AM 10:34:11 AM 00:49 5 Left Tum 10 10:37:07 AM 10:37:10 AM 00:03 1 Right Tum Average Queue 1.97
11 10:33:37 AM 10:34:16 AM 00:39 4 Left Tum 11 10:37:12 AM 10:37:14 AM 00:02 1 Right Tum Max Queue 7
I12 10:33:39 AM 10:34:22 AM 00:43 5 Left Tum 12 10:38:04 AM 10:38:06 AM 00:02 1 Right Tum Total Delay 2:47:02
13 10:33:39 AM 10:34:28 AM 00:49 6 Left Tum 13 10:39:33 AM 10:39:44 AM 00:11 1 Right Tum
V14 10:33:41 AM 10:34:34 AM 00:53 7 Left Tum 14 10:39:40 AM 10:39:45 AM 00:05 2 Right Tum
15 10:34:14 AM 10:34:59 AM 00:45 5 Leh Tum 15 10:4024 AM 10:40:57 AM 00:33 1 Right Tum Right Lane
16 10:34:19 AM 10:35:05 AM 00:46 5 Left Tum 16 10:41:49 AM 10:41:51 AM 00:02 1 Right Tum Exiting
C 17 10:34:45 AM 10:35:13 AM 0028 3 Left Tum 17 10:42:40 AM 10:42:45 AM 00:05 1 Right Tum Totals
18 1 D:35:14 AM 10:35:16 AM 00:02 1 Left Tum 18 10:42:50 AM 10:42:55 AM 00:05 1 Right Tum
19 10:35:27 AM 10:35:34 AM 00:07 1 Left Tum 19 10:43:38 AM 10:43:41 AM 00:03 1 Right Tum Total Vehicles 248
20 10:35:35 AM 10:36:08 AM 00:33 1 Left Tum 20 10:43:44 AM 10:43:46 AM 00:02 1 Right Tum Ave Stopped Time OOA7
21 10:35:52 AM 10:36:13 AM 0021 2 Left Tum 21 10:44:05 AM 10:44:19 AM 00:14 1 Thin Max Stopped Time 00:46
22 10:35:67 AM 10:36:18 AM 00:21 3 Left Tum 22 10:4422 AM 10:44:24 AM 00:02 1 Right Tum Average Queue 1.08
23 10:36:49 AM 10:36.16 AM 00:01 1 Left Tum 23 10:44:35 AM 10:44:37 AM 00:02 1 Right Tum Max Queue 3
24 10:37:05 AM 10:37:09 AM 00:04 1 Left Tum 24 10:44:45 AM 10:44:49 AM 00:04 1 Right Tum Total Delay 027:13
{ 25 10:37:35 AM 10:37:37 AM 00:02 1 Left Tum 25 10:45:40 AM 10:45:44 AM 00:04 1 Right Tum
26 10:38:08 AM 10:38:46 AM 00:38 1 Left Tum 26 10:45:59 AM 70:46:01 AM 00:02 1 Right Tum
27 10:38:31 AM 10:39:12 AM 00:41 2 Left Tum 27 10:46:15 AM 10:46:16 AM 00:01 1 Right Tum Peak Hour Count
28 10:38:34 AM 10:39:47 AM 01:13 3 Left Tum 28 10:48:30 AM 10:48:31 AM 00:01 1 Right Tum
29 10:38:36 AM 10:39:57 AM 0121 4 Left Tum 29 10:49:12 AM 10:4922 AM 00:10 1 Right Tum Left Lane
30 10:38:48 AM 10:40:02 AM 01:14 4 Left Tum 30 10:50:30 AM 10:50:31 AM 00:01 1 Right Tum Exiting
31 10:38:62 AM 10:4D:05 AM 01:13 5 Left Turn 31 10:51:37 AM 10:51:45 AM 00:08 1 Right Tum Totals
32 10:39:01 AM 10:40:08 AM 01:07 6 Left Tum 32 10:5222 AM 10:5223 AM 00:01 1 Right Tum Total Vehicles 172
33 10:40:00 AM 10:40:12 AM 00:12 4 Leh Tum 33 10:53:34 AM 10:5420 AM 00:46 1 Left Tum Ave Stopped Time 0024
34 10:41:41 AM 10:41:47 AM 00:06 1 Left Tum 34 10:53:39 AM 10:5422 AM 00:43 2 Right Tum Max Stopped Time 02:03
35 10:42:19 AM 10:4221 AM 00:02 1 Left Tum 35 10:54:08 AM 10:5427 AM 00:19 3 Right Tum Average Queue 2.33
36 10:42:25 AM 10:4228 AM 00:03 1 Left Tum 36 10:57:00 AM 10.57:06 AM 00:06 1 Right Tum Max Queue 7
37 10:42:31 AM 10:42:43 AM 00:12 1 Left Tum 37 10:57:40 AM 10:57:42 AM 00:02 1 Right Tum Total Delay 1:09:58
L 38 10:42:47 AM 10:43:01 AM 00:14 1 Left Tum 38 10:59:00 AM 10:59:05 AM 00:05 1 Right Tum
39 10:42:58 AM 10:43:03 AM 00:05 2 Left Tum 39 10:59:07 AM 10:59:14 AM 00:07 1 Right Tum
40 10:43:57 AM 10:44:07 AM DO:10 1 Left Tum 40 10:59:10 AM 10:5923 AM 00:13 2 Right Tum Right Lane
41 10:44:30 AM 10:44:53 AM 0023 1 Left Tum 41 10:59:38 AM 10:59:42 AM 00:04 1 Right Tum Exiting
42 10:46:08 AM 10:46:10 AM 00:02 1 Left Tum 42 10:59:40 AM 10:59:44 AM 00:04 2 Left Tum Totals
F'
43 10:47:41 AM 10:47:53 AM 00:12 1 Left Tum 43 10:59:46 AM 10:59:49 AM 00:03 1 Lett Tum
44 70:47:51 AM 70:47:58 AM 00:07 2 Left Tum 44 11:00:18 AM 11:0026 AM 00:08 1 Right Tum Total Vehicles 85
i 45 10:47:56 AM 10:48:04 AM 00:08 2 Left Tum 45 11:00:35 AM 11:00:39 AM 00:04 1 Right Tum Ave Stopped Time 00:07
�! 46 10:48:00 AM 10:48:08 AM 00:08 2 Left Tum 46 11:01:26 AM 11:01:28 AM 00:02 1 Right Tum Max Stopped Time 00:30
47 10:48:46 AM 10:49:18 AM 00:32 1 Left Turn 47 11:02:18 AM 11:02:19 AM 00:01 1 Right Tum Average Queue 1.06
48 10:49:17 AM 10:49:31 AM 00:14 2 Left Tum 48 11:02:35 AM 11:02:37 AM 00:02 1 Right Tum Max Queue 2
49 10:49:24 AM 10:49:35 AM 00:11 2 Let[Tum 49 11:02:48 AM 11:02:49 AM 00:01 1 Right Tum Total Delay 0:09:54
50 10:49:43 AM 10:49:45 AM 00:02 1' Left Tum 50 11:04:31 AM 11:04:42 AM 00:11 1 Right Tum
51 10:49:58 AM 10:50:09 AM 00:11 1 Left Tum 51 11:04:39 AM 11:04:49 AM 00:10 2 Right Tum
LJ 52 10:50:04 AM 10:50:15 AM 00:11 2 Left Tum 52 11:06:09 AM 11:06:10 AM 00:01 1 Right Tum
53 10:5026 AM 10:50:27 AM 00:01 1 Left Tum 53 11:06:12 AM 11:06:14 AM 00:02 1 Right Tum
54 10:5028 AM 10:5029 AM 00:01 1 Left Tum 54 11:06:43 AM 11:06:44 AM 00:01 1 Right Tum
55 70:50:45 AM 10:50:49 AM OD:D4 1 Left Tum 55 11:06:55 AM 11:06:57 AM 00:02 1 Right Tum
56 10:50:53 AM 10:50:59 AM 00:06 1 Left Tum 56 11:06:59 AM 11:07:00 AM 00:01 1 Right Tum
57 10:50:56 AM 10:51:12 AM 00:16 2 Left Tum 57 11:07:02 AM 11:07:03 AM 00:01 1 Right Tum
u 56 10:51:15 AM 10:51:16 AM 00:01 1 Left Tum 58 11:08:14 AM 11:0829 AM 00:15 1 Right Tum
59 10:51:18 AM 10:51:27 AM 00:09 1 Lek Tum 59 71:10:49 AM 11:10:53 AM 00:04 1 Right Tum
60 10:5124 AM 10:51:35 AM 00:11 2 Left Tum 60 11:12:33 AM 11:12:36 AM 00:03 1 Right Tum
61 10:51:50 AM 10:51:56 AM 00:06 1 Left Tum 61 11:12:38 AM 11:12:40 AM 00:02 1 Right Tum
�1 62 10:52:41 AM 10:52:47 AM 00:06 1 Leh Tum 62 11:13:04 AM 11:13:06 AM 00:02 1 Right Tum
r 63 10:52:42 AM 10:53:03 AM 00:21 2 Left Tum 63 11:13:32 AM 11:13:34 AM 00:02 1 Right Tum
�L 64 10:52:43 AM 10:53:13 AM 00:30 3 Left Tum 64 11:14:33 AM 11:14:40 AM 00:07 1 Right Tum
U 65 10:53:16 AM 10:5322 AM 00:06 1 Left Tum 65 11:14:48 AM 11:15:01 AM 00:13 1 Left Tum
66 10:53:29 AM 10:53:32 AM 00:03 1 Left Tum 66 11:14:57 AM 11:15:10 AM 00:13 2 Right Tum
67 10:54:03 AM 10:54:18 AM 00:15 1 Left Tum 67 11:15:49 AM 11:16:18 AM 0029 1 Right Tum
68 10:54:13 AM 10:5424 AM 00:11 2 Left Tum 68 11:16:10 AM 11:1623 AM 00:13 2 Right Tum
69 10:55:02 AM 10:5520 AM 00:18 1 Left Tum 69 11:16:35 AM 11:16:36 AM 00:01 1 Right Tum
70 10:55:06 AM 10:55:24 AM 00:18 2 Left Tum 70 11:18:39 AM 11:18:41 AM 00:02 1 Right Tum
Lj 71 10:5521 AM 10:55:30 AM 00:09 2 Left Tum 71 11:18:43 AM 11:18:47 AM 00:04 1 Right Tum
72 10:56:00 AM 10:56:05 AM 00:05 1 Left Tum 72 11:19:36 AM 11:19:38 AM 00:02 1 Right Tum
73 10:56:09 AM 10:5622 AM 00:13 1 Left Tum 73 1121:38 AM 1121:40 AM 00:02 1 Right Tum
74 10:56:13 AM 10:5625 AM 00:12 2 Left Tum 74 1121:43 AM 1121:50 AM 00:07 1 Right Tum
75 10:56:17 AM 10:5629 AM 00:12 3 Leff Tum 75 112223 AM 112227 AM 00:04 1 Right Tum
76 10:5620 AM 10:56:35 AM 00:15 4 Left Tum 76 112326 AM 1123:33 AM 00:07 1 Right Tum
77 10:57:54 AM 10:58:04 AM 00:10 1 Left Tum 77 1124:40 AM 1124:45 AM 00:05 1 Right Tum
78 10:58:32 AM 10:58:40 AM 00:08 1 Left Tum 78 1125:10 AM 112526 AM 00:16 1 Left Tum
79 10:58:43 AM 10:59:76 AM 00:33 1 Left Tum 79 1125:54 AM 1125:57 AM 00:03 1 Right Tum
80 10:5921 AM 10:59:32 AM 00:11 1 Left Tum 80 1126:00 AM 1126:01 AM 00:01 1 Right Tum
81 10:59:48 AM 10:59:50 AM 00:02 1 Left Tum 81 1126:41 AM 1126:47 AM 00:06 1 Right Tum
82 11:00:15 AM 11:00:28 AM 00:13 1 Left Tum 82 1126:59 AM 1127:01 AM 00:02 1 Right Tum
83 11:00:31 AM 11:00:41 AM 00:10 1 Left Tum 83 1127:52 AM 1127:53 AM 00:01 1 Right Tum
U 84 11:00:33 AM 11:00:44 AM 00:11 2 Left Tum 84 1128:12 AM 1128:14 AM 00:02 1 Thru
85 11:00:37 AM 11:00:50 AM 00:13 3 Left Tum 85 1128:15 AM 1128:16 AM 00:01 1 RightTum
86 11:0DA6 AM 11:01:00 AM 00:14 2 Left Tum 86 1128:24 AM 112825 AM 00:01 1 Right Tum
87 11:0120 AM 11:0124 AM 00:04 7 Left Tum 87 112828 AM 1128:30 AM 00:02 1 Right Tum
88 11:01:64 AM 11:01:65 AM 00:01 1 Left Tum 88 11:30.10 AM "11:30:11 AM 00:01 1 Right Tums
89 11:02:05 AM 11:02:06 AM 00:01 1 Left Tum 89 11:3.126 AM11:3128 AM .00:02: 1 ..Right Tum i
LJ 90 11:0223 AM 11:02:38 AM 00:15 1 Left Tum 9D 11:32:07 AM 71:32:11 AM 00:04, 1 Right Turn
91 11:0323 AM 11:03:36 AM 00:13 1 Left Tum 91 11:32:14.AM 11:3229 AM :00:15- 1. -RightTum,
92 11:04:41 AM 11:04:51 AM 00:10 1 Left Tum 92. '11:32:39AM. 11:32.43 AM -00:04 -1 Right.Tum.
93 11:04:48 AM 11:04:58 AM 00:10 2 Left Tum 93 1.1:33 27AM 11-33:30 AM 00:03. 1 RightTum
. 94 11:05:07 AM 11:0522 AM 00:15 1 Leff Tum 94 11:3357 AM 11:34:01 AM '00:04 1 Right Turn
L7 _ 1
/ l
Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
Queue/Delay Study
t�
City,State:North Andover,MA
Date:Saturday 6/30/2012
Time:10:30am•1:30pm
PDI F&P 122978
Client Bayside Engineering)K Cram
Client 8: 2121491 L J
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Vehicle 1t Entered Queue Left Queue Delay Queue Exiting Vehicle t< Entered Queue Left Queue Delay Queue ExlOng
ri
In S.C. Length Tum in sec. Length Tum
95 11:05:46 AM 11:06:39 AM 00:53 1 Left Tum 95 11:33:59 AM :11:34:03 AM 00:04 -2 ',Rght Tum L
96 11:05:50 AM 11:06:45AM 00:55 2 Left Tum 98- .11:34:53 AM 71:34:55 AM 00:02: 1 "Right Tum_
97 11:05:62 AM 11:06:50 AM 00:58 3 Left Tum 97 11:35:D7AM 11:35:09 AM: 00:02. :1 Right Turn
98 11:05:55 AM 11:07:04 AM 01:09 4 Leh Tum 98: l l.- '617 AM AM 11:35:19 ,00:02 .1 RightTurn
99 11:0621 AM 11:07:12 AM 00:51 5 Left Tum 99. '113523 AM 11:35:29AM: 00:06: .4, RghtTum. �.
100 11:0622 AM 11:07:42 AM 0120 6 Left Tum :10011:36:08AM- 1136;10AM :00:02. 1. .Rght7um;
101 11:0622 AM 11:07:46 AM 0124 7 Left Tum 101 1136:19 AM11 36:21 AM 00:02- 1. Right Turn L J
102 11:06:48 AM 11:07:50 AM 01:02 6 Left Tum .102: 11,3623 AM. 11.3625:AM 00:02-. 1 Right Tum
103 11:07:07 AM 11:07:58 AM DO:51 5 Left Tum 103 -11136:31 AM 11:36:33 AM 00:02: 1. Right Tum
1D4 11:07:09 AM 11:08:00 AM 00:51 6 Left Tum 104 11:39r01AM 11:39:03 AM X00:02: 7:- Right Tu ,
105 11:07:41 AM 11:08:04 AM 0023 6 Left Tum 105 11:39:06 AM` 11:39:30 AM -0024- 1 Right Turn !�
106 11:08:16 AM 11:08:26 AM 00:10 1 Left Tum 166; 11;39:34 AM :11:39;44,AM' 00:10.: 1. Right Turn
107 11:08:43 AM 11:08:49 AM 00:06 1 Left Tum 107� 11:39:46 AM- '11:39:49 AM- 00:03 1 Right Tum-
108 11:08:47 AM 11:08:53 AM 00:06 2 Left Tum 108" 11:41:31.AM. -71:41:39AM: .00:06 1. .RghtTurn L�
109 11:09:03 AM 11:09:10 AM D0:07 1 Right Tum 109 11:42:38 AM l l:42:39 AM. 00:01: 1 Right Tum-
110 11:09:31 AM 11:09:36 AM 00:05 1 Left Tum -110- -11:42f52 AM .11:42;58 AM : 00:06. :1 Right Turn.
111 11:09:40 AM 11:09:43 AM 00:03 1 Left Tum 111. '11:44:00 AM 71.44:05 AM, .00:05. 1 Right:Tum:, r.
112 11:09:54 AM 11:09:56 AM 00:02 1 Left Tum :1.12. 11:44:24 AM 11:44t35AM 00:11 :1 :.Right Tum'
113 11:10:13 AM 11:10:32 AM 00:19 1 Left Tum 113 11:44:47 AM :11:44:52 AM. 00:05 1. Right Tum-
114 11:10:45 AM 11:10:51 AM 00:06 1 Left Tum AU-.11:45:44 AM. -11 46.00 AM 00:16 1 Right-Turn V
115 11:10:53 AM 11:10:59 AM 00:06 1 Left Tum .115: 11:46:48 AM" 11:47:08 AM .00:20: 1 Right.Tum:
116 11:10:57 AM 11:11:02 AM 00:05 2 Left Tum 116 11:4715 AMS 11:47:17 AM- 00:02. 1 . Right Tuin:
117 11:11:01 AM 11:11:36 AM 00:35 2 Leh Tum 117 11:4721 AM -11A724 AM 00:03 1. Right Tum.
118 11:11:40 AM 11:11:49AM 00:09 1 Left Tum '118 11:48:54 AM :7.1:4924"AM OD:30 1 -Rghf7um '"1
119 11:11:45 AM 11:11:53 AM 00:08 2 Left Tum 119 17:49:33 AM. 11:49:35 AM: 00:021 RightTum
120 11:11:58 AM 11:12:19 AM 00:21 1 Left Tum 120. 11:49:56 AM. 11,:5021.AM -00 17 ,RgMTum.
121 11:12:09 AM 11:12:23 AM 00:14 2 Left Tum 121 -11:50:45 AM: 11:50:46 AM 00:01:25. 1 Right Turn L-j
122 11:13:31 AM 11:13:33AM DO:02 1 Left Tum 122" 11:51:13 AM 11:5122AM 00:09- -1 Right:Tum
123 11:13AO AM 11:13:43 AM 00:03 1 Left Tum 123. 11:52:53 AM -11:52:57AM 00:04- 1 .RghtTurn
124 11:14:01 AM 11:14:06 AM 00:05 1 Left Tum 124 11:53:05 AM. '11:53:08 AM:"00;03 1 :RightTurn`
125 11:14:53 AM 11:15:00AM DOW 1 Left Tum 125 �11026AM: 11:5335AM :00.10 1got TOM.
126 11:15:39 AM 11:1621 AM 00:42 1 Left Tum 126 11.53:45 AM. 11:5346 AM 0001 1' ,Right Tum-
127 11:16:23AM 11:16:29AM 00:06 1 Left Tum 127- 11:65:52.AM., 11:56:011 AM .0009 .4 :Right Tum
128 11:16:59 AM 11:17:02 AM 00:03 1 Left Tum :126: 11456:47 AM: 71:56:59 AM .60:12 - :1 .Right Tum
129 11:17:16AM 11:1722 AM 00:06 1 Left Tum '129 11:57:48AM 11:58:04AM '06:13 1 Thru .--
130 11:17:18 AM 11:17:38 AM 0020 2 Left Tum 130 11.:57:56 AM 11;58:10 AM- 00:14 2 -Right Tum
131 11:17:27 AM 11:17:40 AM 00:13 2 Left Tum .131 11:59:47 AM 11:59:57 AM: 00:10. 1 Right Tum r
132 11:17:32 AM 11:17:45 AM 00:13 3 Left Tum 132: 12:00:51 PM'. 12:00453-PM 00:02 1 Left Tum
133 11:17:51 AM 11:17:54 AM 00:03 1 Left Tum 133 12:01:06 PM 72:01:13 PM: 00:07 1 Right Tum
134 11:18:01 AM 11:18:11 AM 00:10 1 Left Tum 134 12:04:51 PM 12:04i55:PM- 00:04- .1' ,Right Turn L
135 11:18:12 AM 11:18:14 AM 00:02 1 Left Tum 135 12:0526 PM 12:0528 PM. -00:02' 1 Right Tum
136 11:18:17 AM 11:18:23 AM 00:06 1 Left Tum 136 .12:05:45 PM .12:06:08 PM 0023 1 Right Tum
137 11:18:20 AM 11:18:38 AM 00:18 2 Left Tum 137 12:0622 PM. 12:0623 PM 0001 1 Right Tum r-1
138 11:18:26 AM 11:19:01 AM 00:35 2 Left Tum 138 12:06:41 PM 12:06'.44,1*101 00:03 1 .Right Tum
139 11:18:29AM 11:19:14AM 00:45 3 Left Tum .139 112A7:11 PM 12:07:17 PM 6001. 1 Right Turn
140 11:16:45 AM 11:19:18 AM 00:33 3 Left Tum 140 12:0725 PM 12:07:28 PM 00:03 1 Right Tum t✓j
141 11:19:05 AM 11:19:23 AM 00:18 3 Left Tum -141 12:68:22 PM 12:08:25 PM 00:03 1 Right Tum
. ..
142 11:19:28 AM 11:19:31 AM 00:03 1 Left Tum 142- 12:09:48 PM 12:09:52 PM 00:04- 1 Right Tum.
143 11:19:50 AM 11:19:52 AM 00: 14
02 1 Leh Tum 3 12:10:04 PM 12:10:26 PM i D.22 1 Thor
144 1120:57 AM 11:20:57 AM 00:00 1 Leh Tum 144: 12:11LA5 PM 12:1120 PM -00:05 1. :Right Tum
145 11:21:05 AM 11:2120 AM 00:15 1 Left Tum 145 12:1127 PM 12:11:29 PM '00:02- 1. Right Tum
146 11:21:22 AM 1121:30 AM 00:08 1 Left Tum 146 12:12:35 PM :12:12:38 PM 60:63 c1. Right Turn j
147 1121:31 AM 1121:34 AM 00:03 1 Left Tum 147 12:13:35 PM -12:13:53 PM 00:18- 1 Right Tum
148 1121:36 AM 11:21:44 AM 00:08 1 Left Tum 148 12:13;58 PM 12:14:02 PM 00:04. 1 RghtTum
149 11:21:49 AM 11:22:02 AM 00:13 1 Left Tum 149 12.14:15 PM 12:14:18 PM 00:03" 1- Right Tum
150 11:23:17 AM 1123:38 AM 0021 1 Left Tum 150 12:1725 PM '12:1:34 PM .00:09. 1. Rght Tum r
151 11:23:21 AM 11:23:43 AM 0022 2 Left Tum 151. 12x17:41 PM. 12:17:42 PM 00:01 1 :Right Tum
152 1123:23 AM 1123:45 AM 0022 3 Left Tum 152 12:19:02 PM: 12:19:09.PM 00:07.- 1 'Right Turn
153 1123:42 AM 11:23:51 AM 00:09 3 Left Tum 153: 12:19:24 PM 12:1925 PM 00:01 '.1 Right Tum L'
154 11:23:49 AM 1123:55 AM 00:06 2 Left Tum 154- -1220:02 PM- 12;20;05 PM '00:03 1: :Right Tum
155 11:24:OOAM 1124:03 AM 00:03 1 Leh Tum 153 12:2021i PM 122026 PM 00:01- 1. Right Tum
156 1124:10 AM 11:24:12 AM 00:02 1 Left Tum 156 1220 46 PM 1220:46:P101 00:06. 1 Right Tum
157 1124:17 AM 1124:32 AM 00:15 1 Left Tum 157 11210 PM' 1221:11 PM- 00:02 1. -Right Tum
158 11:24:35 AM 11:24:41 AM 00:06 1 Leh Tum 158 122212 PM' -122213 PM 100:01:01 .1 Right Turn"
159 1124:44 AM 1124:49 AM 00:05 1 Left Tum 759 1222:34 PM' 1222:36 PM.: 00:02, I Right Tum'
160 1125:16 AM 1125:37 AM 0021 1 Left Tum 160 122255 PM 12:?3:75:PM :0020 1 :Right-rum.
161 11:25AO AM 11:25:43 AM 00:03 1 Left Tum 161: :72:23:05 PM 1223:18 PM: :00:13` 2; Right Tum.
162 11:26:15 AM 1126:34 AM 00:19 1 Left Tum 162 12.2&.660.M 1215:09 PM: -00:09.. 1 iLghtTum. �
163 11:26:55 AM 11:26:56 AM 00:01 1 Left Tum 163 1225:02 PM: '1225:17 PM. 00:15. 2 .Right Tum
164 11:27:22 AM 1127:30 AM 00:08 1 Left Turn Tu :764 122529 PM t215:31,PM; ,00:02,: a' Right7um:
165 1127:33 AM 1127:35 AM 00:02 1 Left Tum 165' 122623 PM 1226:30 PM 00:07 :1 Right Tum L�
166 1127:48 AM 1127:49 AM 00:01 1 Left Tum 166 1226:44.PM .1226:56 PM- Di .1 Right Tum..
167 11:28:19 AM 11:2821 AM 00:02 1 Left Tum 167 1227:37 PM 1227:39 PM- .00:02- 4Right Tum
168 11:28:37 AM 11:28:53 AM 00:16 1 Left Tum 1156: 1227:56 PM, :1228:02PM .00;06 -1. Right"funi. _
169 11:28:42 AM 11:28:55 AM 00:13 2 Left Tum 169- 1228:26 PM .122827 PM: 60:01: 1 Right Turn-
170 11:28:56 AM 1129:00 AM 00:04 1 Leff Tum 170' 1228:30 PM :122834 PM.. '00:04: '1 Right?um..
171 1129:14 AM 11:29:39 AM 0025 1 Left Tum 171 1228:57 PM 12:29:21 PM" 0024 1: LeflTarn
.. .. ..
172 11:29:17 AM 1129:42 AM 0025 2 Left Tum 172: .122:13 9PM .122933 PM�:,0020., 2: Right Tum_ L �
173 11:2929 AM 1129:54 AM 0025 3 Left Tum 173 12:30:10 PM 12:30:13 PM 00:03 1 Right Tum
174 11:29:48 AM 1129:59 AM 00:11 2 Left Tum 174 12:3123 PM 12.31:38 PM 00:15 1 Right Tum
.175 11:30:18 AM11:30:36 AM ;00:18 1 Left Tum- 175 12:33:02 PM 12:33:07 PM 00:05 1 Right Tum r �
.. .. ..
176 11:30:SO.AM. :;71:30.¢1 AM- '00:0] 1 'Lefl Sum, 176 12:34:18 PM 12:3421 PM 00:03 1 Right Tum
177: 41:30:55 AM. 41:3057 AM: 00:02: 1- Lett Tum 177 12 :3524 PM 12:3527 PM 00:03 1 Right Tum
176 X7.1:31;10 AM- :11:31:12 AM 00r02 1 Left Tum 178 12:35:52 PM 12:35:54 PM 00:02 1 Right Tum
179' 11:32:02 AM .1ti32:30AM. 00:28 1 Lem Tum. 179 12:35:58 PM 12:36:02 PM 00:04 1 Right Tum
180 11:3210.AM: 11:32:34 AM '0024. 2. Left Tum 180 12:37:08 PM 12:37:11 PM 00:03 1 Right Tum
181 11:32:16AM. 113238 AM 00:22. 3 Left Tum 181 12:38:03 PM 12:38:08 PM 00:05 1 Right Tum
182 77:32:18 AM 11:3242 45 AM 0024 4 Left Tum 182 12:36:15 PM 12:38:15 PM OO:DO 1 Right Tum
l 1
183 1:1:33:13 AM.' 11[33: AM :00:32 1 Left Turn 183 12:38:49 PM 12:38:52 PM 00:03 1 Right Tum
184 113321 AM 11.33:52AM .00:31 2 Left Tum 184 12:41:46 PM 12:41:56 PM 0010 1 Right Tum
165 11:36:34'AM: 11.34:04 AM 00:30 3 Left Tum 185 12:42:14 PM 12:42:15 PM 00:01 1 Right Tum
786' 1T.33i36.AN1 11:34:08 AM. .00:32 4 Leff Tum 186 12:43:33 PM 12:43:35 PM 00:02 1 Right Tum
1.87' 41:33:37:AM- 11:34.12 AM 00:35 5 Left Tum: 187 12: m
44:07 PM 12:44:12 PM 00:05 1 Right Tu
188 11 m:54 AM 11:34:1 16 AM 0022 4 Left Tum 188 12:44:46 PM 12:44:53 PM 00:07 1 Right Tum
2 e
Lf
I Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
L ; Queue/Delay Study
u City,State:North Andover,MA
Date:Saturday 613 012 01 2
Tims:10:30am-1:30pm
PDI File#122978
Client:Bayside Engineering/K Cram
Client#: 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
r f Delay Queue Exiting Deley. Queue Exiting
Vehiele#
Entered Queue Left Quoue 1n see. Length Tum Vehicle 9 Entered Qmus Left Queue In sec OumueLongth Tum
U 189 11:34:07 AM 11:34:22 AM 00:15 4 Left Tum 169 12:45:00 PM 12:45:02 PM DD:02 1 Right Tum
190 11:M4 40,AM: 11:34:51-AM D0:71 1- Left tum 190 12:45:17 PM 12:45:19 PM DO:02 1 Right Tum
191 11:35:00 AM, 11:35;03 AM 00:03- 1 Left Tum 191 12:45:50 PM 12:45:53 PM 00:03 1 Right Tum
192 11:3527 AM .1Y 35:53 AM' 0026. 1 :Left Tum 192 12:48:37 PM 12:46:42 PM 00:05 1 Right Tum
C -193 11.35:55 AM 11:35 57 AM 00:012 :.1 Left Tum 193 12:48:46 PM 12:48:53 PM 00:07 1 Right Tum
104 113628AM 113643AM- 0015. 1Left Turn 194 12:48:52 PM 12:49:01 PM 00:09 2 Right Tum
195 1136:34 AM 11:3653 AM:. 00.19 2 LeR Turn 195 12:49:48 PM 12:50:19 PM 00:31 1 Right Tum
186 1736:41 AM. ..11:36:56 AM. 00:15 1 Left Tum 196 12:50:07 PM 12:5022 PM 00:15 2 Right Tum
197 1137:07 AM: 11.'.37:12 AM DO:05 1 LeR Tum 197 12:50:45 PM 12:50:47 PM 00:02 1 Right Tum
-37:27;AM .11:3728 AM:. 00:01 .1 :Left Tum 198 12:50:52 PM 12:50:56 PM 00:04 1 Right Tum
199 11 3729 AM 11:37:32 AM 00:03 1 Left Turn 199 12:51:46 PM 12:51:59 PM 00:13 1 Right Tum
200 1137:34 AM 11:3812 AM 00:38: 1 LeRTum 200 12:52:37 PM 12:52:58 PM 0021 1 Right Tum
201 11:38:15 AM 11:3819 AM' 00.04 1 Lek Tum 201 12:54:13 PM 12:54:19 PM 00:06 1 Right Tum
:202 11.38:51.AM 11:38:52 AM. .00:01. 1 Leff Tum 202 12:56:08 PM 12:66:11 PM 00:03 1 Right Tum
203: 11:38:55 AM 11:38:58 AM: 00:03- 1 'Lafaum: 203 12:56:32 PM 12:56:34 PM 00:02 1 Right Tum
204 11;39:13-AM: 11:3925AM :00:12 1' .Left Tum 204 12:57:18 PM 12:57:31 PM 00:13 1 Right Tum
205 11 40:20 AM11:40 40 AM 0020 1 Left Tum 205 12:57:52 PM 12:57:55 PM 00:03 1 Right Tum
206 11 4042 AM 11446 0 AM 00:04 1 Left Tum- 206 12:58:02 PM 12:58:08 PM 00:06 1 Right Tum
i 207 11 41:10 AM 11:4120 AM 00:10 1 Lek Tum 207 12:58:53 PM 12:58:54 PM 00:01 1 Right Tum
208 11:41:40 AM 114218 AM- 00:38 1 Left Tum 208 1:00:16 PM 1:00:18 PM 00:02 1 Right Tum
209' 11:41:49 AM 14;42:40 AM.. 00:51 2 Left Tum 209 1:01:06 PM 1:01:08 PM 00:02 1 Right Tum
210: 11.4207AM :11:42:44AM :00:37. :3 'LettTum 210 1:02:32 PM 1:02:46 PM 00:14 1 Right Tum.
211: 11142:11 AM :11`42:48 AM: 00:37 4 Left Tum 211 1:04:13 PM 1:04:36 PM 0023 1 Right Tum
n .212 11 42:1P AM 11:42 56 AM- 00:44 .5 Lek Tum: 212 1:05:35 PM 1:05:36 PM 00:01 1 Right Tum
1 213 11 42.14 AM 11.43:0.5 m
AM 00:51 6. Left Turn 213 1:06:35 PM 1:06:37 PM 00:02 1 Right Tu
214 114223 AM 11:4,316 AM 00:53 1.6 Left Tum 214 1:06:54 PM 1:07:03 PM 00:09 1 Thru
215 11:4225 AM 11.4323 AM 00:58 7 Left Tum 215 1:07:07 PM 1:07:13 PM 00:06 1 Thru
.216. 11:42:44'AM' 11:4329 AM 00:45. 6. :Left Tum 216 1:07:40 PM 1:08:05 PM 0025 1 Right Tum
217- 11:43:01 AM 11t43:31AM. :00:30 5 Left Tum 217 1:08:26 PM 1:08:40 PM 00:14 1 Thor
/--t '278:: 11:43:03.AM: 11:43:34 AM 00:31: 6- Left Tum 218 1:09:08 PM 1:09:10 PM 00:02 1 Right Tum
t I 219 11:43:09 AM: 11:43:37 AM -00:28 6 Left Tum 219 1:09:31 PM 1:09:37 PM 00:06 1 Right Tum
1 220 11:43:14 AM 11:43:42 AM: :00:28. .7 Left Tum 220 1:09:46 PM 1:09:47 PM 00:01 1 Right Tum
U 221 11:43:24 AM 11:43:48 AM 00:24 6 Left Tum 221 1:10:47 PM 1:10:56 PM 00:09 1 Right Tum
.222. 11:4326 AM' 11:43:50 AM 0024 7. Left,Tum 222 1:11:11 PM 1:11:15 PM 00:04 1 Right Tum
223: 11:43:38 AM 11:43:56 AM:.00:18- 4 Left Turn 223 1:11:38 PM 1:11:41 PM 00:03 1 Right Tum
.224 11:43:43 AM .1.1:44:03 AM- 0020_ 4 Lett Tum 224 1:11:51 PM 1:12:06 PM 00:15 1 Right Tum
n 225 11:43:47 AM 11`44:37 AM, 00:50 5 Left Tum 225 1:13:12 PM 1:13:29 PM 00:17 1 Right Tum
226 11:44:26 AM 11:44:39 AM :00:13. 2 Left.Tuni 226 1:13:37 PM 1:13:40 PM 00:03 1 Right Tum
U 227 11;44:28 AM 11:44:51 AM :0023 3 Left Tum 227 1:14:17 PM 1:1420 PM 00:03 1 Right Tum
.228- 11:44:30 AM 11:44:55 AM 00:25 4 Left Tum 228 1:15:32 PM 1:15:36 PM 00:04 1 Right Tum
'229 11:44:32 AM 11:45:07 AM 00:35 5. Left Tum 229 1:15:40 PM 1:15:42 PM 00:02 1 Right Tum
230 11:45:02 AM 11 A!05 AM 00:13 2 Left Tum 230 1:16:24 PM 1:1626 PM 00:02 1 Right Tum
n 231 11:45:14 AM 11:4527 AM 00:13 2 Left Tum 231 1:16:31 PM 1:16:35 PM 00:04 1 Right Tum
232 11;45:59 AM 11:4607 AM 00:08 1 Left Tum 232 1:17:11 PM 1:1729 PM 00:18 1 Right Tum
` 233 11:46:05 AM 11:46:10 AM 00:05 2 Left Tum 233 1:17:20 PM 1:17:32 PM 00:12 2 Right Tum
tJ 234 1.1:46:08 AM 11:46:14 AM 00:06 2 Left Tum 234 1:18:49 PM 1:18:51 PM 00:02 1 Right Tum
235 11:46:16 AM 11:4621 AM 00:05 1 Left Tum 235 121:32 PM 121:36 PM 00:04 1 Right Tum
236 11:46:20 AM '11:4623 AM .00:03 2 Left Tum 236 121:58 PM 1:22:01 PM 00:03 1 Right Tum
237 11:4722 AM 11:4725 AM 00:03 1' Lek Turn 237 121:59 PM 122:03 PM 00:04 2 Right Tum
236 11:47:33 AM. .11:47:38 AM. 00:06 1 LeRTum: 238 12228 PM 122:31 PM 00:03 1 Right Tum
239 7147:52 AM 11:4820'AM 00:28 1 Left Tum 239 1:23:40 PM 123:41 PM 00:01 1 Right Tum
U 240 11:47:55 AM 11.:4822 AM 00:27 2 Left Tum, 240 12429 PM 124:30 PM 00:01 1 Right Tum
241 11:48:42 AM: 11:48:46 AM DO:04 1 Left Tum 241 125:38 PM 125:39 PM 0001 1 Right Tum
242 1.1:48:57,AM 11:4923 AM :0026- :1 Left Tum 242 12622 PM 12623 PM 00:01 1 Right Tum
243, 11:411:01 AM 1,I 4926 AM 00:15: 2 Left Tum 243 126:42 PM 126:43 PM OD:01 1 Right Tum
244- 11 49 D4 AM 11 49 31 AM 00:27 :3 Left Tum 244 12825 PM 12827 PM 00:02 1 Right Tum
245 11:50:14 AM 11 5019 AM 00:651 Left Tum 245 1:28:29 PM 128:32 PM 00:03 1 Right Tum
246 11 5D 19 AM 11:50:23A M 00'04 1 Left Tum 246 129:19 PM 129:36 PM 00:17 1 Right Tum
247- 11:50:28 AM 11:50:37 AM' :60:09 .1 LeftTum 247 12925 PM 129:40 PM 00:15 2 Right Tum
248 11i50:52.AM .11:50:58 AM 00:06 11 Left Turn 248 129:32 PM 129:46 PM 00:14 3 Right Tum
249 11:51:00AM� 14:51:31 AM 00:31' '.1. :Left Tui.-
1151:17AM 11.51:37AM 00.20: 2- Left Turn
1{ 25111 5314 AN 11 X5322 AM 0108: 1 Left Tuirn
V
252' 11:5337AM. .11:6.3:41 AM .00.10 1: 'Left Tum.. . . ...
:253. 11:53:39 AM fi54f38 AM' OOi57: 2 Left Tun:
:254 11:64:20 AM- 111:54A1AM: ':00:21. 2. 'LeRTurn
'
255 11:6038 AM 11:54:51 AM 00:13 2 Left Turn
256 1154:48 AM 11 55:32 AM 60.44; 2 Left Tum
.25T 115457AM 1155:48 AM 00•51 '2: :Left Tum
.256- .115501AM 1156:08AM 0107 3, Left Tum
U 259 '11:55:03AM 11-.56:31 AM 0128: 4 Left Tum
366. '11:55:O6AM .11:57:09 AM 02:03 5 .Left Turn
261: 11:55:43 AM -11:57:17 AM 01:34 5 Left Tum
262. 11:55:46 AM 11.5724 AM 01:39 6' Left Tum
n 263.: 1156:45 AM. 11:58:04 AM 01119 4 -Lek:Tum.
( 264. 1157A4 AM 1158:33AM: 60:48: 2- Lef:Tutn:
265 11:68:31 AM 11 59:17 AM: ODA6: 2 Left Tum.:
19:
266. 11:59:06 AM 59:32AM: 00:26` .2 .Left Turn:
267: 11 t5927AM 12:00:15 PM. 00:48 2 Left Tum-
. ..� . ..... .:
266 12:00:77 PM 120024PM` :00:13. 2 Left Tu
269 12:0021:PM 12:00:34 PM 00:13 -2: Left:Tum
270 12:00:30`PM. 1202:30 PM .02:00.. 2: :Left Tum
279: 120228.PM 12:0239 PM 00:31: 2 -Left Tum
U 277 .12:02.38 PM .12.03:16 PM. DOW. 2 Left Tum
273. 12:02W,PM 12:0324 PM OUT 3 Left Tum.
274: 12.03:03 PM 120329 PM -0026' 3 .LeR Tum.
^ 275 120321014 12:D4.21 PM 01:00 3- LeRTum
276 12:00:16. 0M 120428 PM- 00:12 2 :Left Tum
277 120424 PM 12:04:54 PM.' 00:30' 2 Lek Tum
iu .278 ,12;04:47.PM .121)5:07PM' 0020' 2. Left:Tum
279 72:04:50 PM 12:05:14 PM, 0024 3 Left Turn
280 .1205:04,PM .12:0523 P.M 00;19 3 :Leff Turd
281 12105:20.PM 12 06:08 PM 00[46 2 Left.Tum:
.. m .... .. . .
282. 1205,38:PM "12116.40 PM 07:02 2 LeRTum '
U 3
Butcher Boy Plaza Exit Driveway(Right I Left Lanes)
Ousua0alay Study
t r
City,State:North Andover,MA
Date:Saturday 6/3012012
TIme:10:30am-1:30pm
PDI F090122978
Client:Bayside Engineering/K Cram
Client 2121491
U
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Vehicle a Entered Qwua Left Queue Delay Cwua Exiting Vahicb a Entered Cwue Left tiww Daley Cueue Exiting ( 1
In sec. Lan th Tum in sec. Length Tum
283- 12:06:38 PM. 12:07:05 PM' W.'27 2 Left Tum
284 12MA6PM 12 :07:34 PM 00:48 .2 .LeftIum t. J
285 '12:0727 PM: 12i08:09PM. 00:42 2 Left Tum
.286- 12:08:02 PM- 12:08:34 PM. 00:32 2 Left Tum
287 .12:08:10 PM.12 12:08:40 PM 00:30 2 Left Tum
288 :08:14 PM: 42:08:44 PM' '00:30 3 Lek Tum:
289 12108:15 PM 12:08:48 PM 00:33 4 Left Tum
290` i2:08:17 16M.; :12:68:52 PM :00:35- 5 Left Tum: lJ
291 12:08:29 PM. 12:09:15 PM 00:46 6 Left T m
'292' 12:08:30 PM: 12:0924 PM 00:54 7 Left 7urr
293 12:08:54 PM 42:09:31 PM: 00:37 3 Left Turn.
294 12:11:09 PM 12:11:18 PM :60:09 1 Left Tum /
295.' 12:11:31 PM 12:11.38 PM 00:07 1 Left.Tum
.296 12:11:34 PM12:11:41 PM .00:07 2 Left Tum
12:11:36 PM 12.114.48 PM 00:12 9 Left Turn k-
297 l
298 12:12:10 PM, 12:12:15 PM 00 :05 - .1 Left Tum'
299 12:12:12.PM 12:1220 PM :00:08 2 Left Tum'
300. 12i12210M` '12i1224PM. 00:03 1. Left Turn '1
301' 12:12:49 PM- .12:12:57 PM00:08 1 Left Tum
302. 12:14:04 PM :12:14M.M. 00:04. 1 Left Turn
303 12:14:10 PM -12:14:12 PM' 00:02 1 Left Tum.
304 12:14:34 PM' 12141.371`101 00:03 4 Left Tum
305 12:14:58 PM 12:15:02PM :00:04 :1 Thiu.
306 12:15:04 PM, 12115,05 PM. :00:01 1 m
Left Tu .
307 12:15:08 PM: 12:15:11,PM DO:03 1 Left Tum r
.308 12:15:20 PM 12:1528 PM .00:08 :1 'Left Tum.
309 12:1624 PM: 12:16:27 PMI 00:03 1 Thru.
L-
'310 12:16:26 PM 12116:30 PM.'. 00:04 2 Left Tum ;
311 42:16:32 PW 12:16:41 PM 00:09 .1 Lett Tum
.312 12:16:35 PM 12:16:53 PM 00:18„ 2 Left.Tum.
313'.. 12:17:07 PM 12:17:09PM 00:02 1- 'Left Tum• P ti
314 12:1728 PM: '12:17,,43 PM 00:15.. 1 Left Turn
315 1217:51 PM 12:18:09PM: 00:18 1. Left
315 12:18:18 PM 121010 PM 00:52 1 'Left.Tum: t--r
317: 12:18:44 PM' 12:14.16 PM 00:32 2 Left Tum
318 12:18:49.PM: .12:1923 PM -.00:34 3 Left Tum
319 12-18:59 PM 12:19126 PM 00:27 4 Left Tum 1
920. 12.19:36 PM 12 :19:45 PM 00:09 1 Left Tum
321 12:19:53 PM 12:20:18 PM 00:25 1 Left Tum
322 12:20:14 PM 122021 PM' 00:07 2 Left Tum l.,
323:. 1220:15 PM 1220:28 PM 0013 3 Thru
324 12:20:38 PM 12:20:42 PM 00:04 1 Left Tum
325 1222:03 PM 1222:05 PM 00:02 1 Left Tum
326 12:22:53 PM 12:23:12 PM 00:19 1 Left Tum f
327 1223:00 PM 1223:16 PM 00:16 2 Left Tum
328 12:23:22 PM 122328 PM OD:06 1 Left Tum
329 4223:26 PM 1223:32 PM 00:06 2 Left Tum V
330 12:2327 PM 1223:49 PM 00:22 .3 Left Tum
331 1223:29 PM, 12:23:52 PM- :00:23 3 Left Tum
332, 1224:01 PM 1224:11:PM. :00:10. 1 Left Turn
333 -1224:45 PM -1225118 PM 00:33 1 Left Tum
334 12:25:57 PM .1226:05 PM. :00:08 1 Left Tum
335 1226:01 PM 122628*PM00:27. 2 Left Tum
336. 12:2608 PM 1226:32 PM 0024 2 Left Turn
337 -1226:12 Pk] 12:26:38 PM 0026 3 LeftTuM
938 12:26:24 PM: 1227:14 PM '00:50 4 Left Tum
339 1226:48 PM 1227:18 PM' 00:30 2 Left Tum f
340 12:26:49PM 12:2723 PM 00:34 3 Left Tum
341 12:26:50 PM: 1227:33 PM :00:43 4 Left Tum V
-342: .9227:45 PM- 1228:03 PM 00:16 1 Left Tum
343 '12:28:48.PM' 12:28:51 PM 00:03 1' Left To
344; 1229:23 PM ,122929 PM .60:06 1 Left Tum
345 1229:36 Pk: 1229:39 PM 00:03 1 Left Turn r 1
946 1229:42.PM 122946PM :00:08:. -1 .LeftTum
34 ?
7 12:30:09 PM 12:30:28 PM 06:19 1 Left Tum
348 12:30:30 PM 12:30:32 PM 00:02 1 Left Tum t J
349 12:30:48 PM 12:30:50 PM 00:02 1 Left Tum
350 12:31:17 PM 12:31:40 PM 00:23 1 Left Tum
351 12:32:04 PM 12:32:07 PM 00:03 1 Left Tum f 1
352 12:32:10 PM 12:32:17 PM 00:07 1 Left Tum
353 12:32:16 PM 12:32:35 PM 00:19 2 Left Tum
354 12:3221 PM 12:32:39 PM 00:18 2 Left Tum l
355 12:32:39 PM 12:32:45 PM 00:06 1 Left Tum
356 12:32:52 PM 12:32:54 PM 00:02 1 Left Tum
357 12:33:11 PM 12:33:16 PM 00:05 1 Left Tum
358 12:33:14 PM 12:33:17 PM 00:03 2 Thru (�
359 12:33:19 PM 12:3326 PM DOW 1 Left Tum
360 12:3321 PM 12:3328 PM 00:07 2 Left Tum
L.i
361 12:33:33 PM 12:33:36 PM 00:03 1 Lek Tum
362 12:33:36 PM 12:33:39 PM 00:03 1 Left Tum
363 12:33:41 PM 12:33:46 PM 00:05 1 Lek Tum
364 12:33:43 PM 12:33:51 PM 00:08 2 Lek Tum
365 12:33:49 PM 12:34:09 PM DO20 2 Left Tum
366 12:33:51 PM 12:34:17 PM 00:26 2 Lek Tum
367 12:33:52 PM 12:3424 PM 00:32 3 Left Tum L f
368 12:33:54 PM 12:3427 PM 00:33 4 Left Tum
369 12:33:57 PM 12:34:31 PM 00:34 5 Left Tum
370 12:34:05 PM 12:34:34 PM 0029 6 Thru
f 1
371 12:35:14 PM 12:35:20 PM 00:06 1 Left Tum
372 12:36:08 PM 12:36:10 PM 00:02 1 Left Tum
373 12:36:12 PM 12:3622 PM 00:10 1 Lek Tum L,
374 12:36:47 PM 12:37:02 PM 00:15 1 Left Tum
375 12:3723 PM 12:3726 PM 00:03 1 Left Tum
376 12:3729 PM 12:37:31 PM 00:02 1 Left Tum
• f
4
f'1
t �
Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
' DueuelDelay Study
City,State:North Andover,MA
Date:Saturday 6/3012012
C Tim10:30am•1:30pm
F
PDI ileg 122978
Client,Bayside Engineering/K Cram
Client 0: 2121491
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
C Vehicle t1 Entered Queue Left Queue Delay Queue Exiting Vetkie R Entered Queue Laft Queue Delay Queue ExiBng
in sec. Length Tum in sec. Length Tum
377 12:37:53 PM 12:36:04 PM 00:11 1 Left Tum
378 12:37:58 PM 12:38:11 PM 00:13 2 Left Tum
379 12:38:39 PM 12:38:45 PM 00:06 1 Left Tum
zz--••�� 380 12:38:43 PM 12:39:17 PM 00:34 2 Left Tum
t I 381 12:36:56 PM 12:39:22 PM 0026 2 Left Tum
382 12:39:02 PM 12:3928 PM 0026 3 Left Tum
U 383 12:40:50 PM 12:40:58 PM 00:08 1 Left Tum
384 12:41:21 PM 12:4126 PM 00:05 1 Left Tum
385 12:4126 PM 12:41:35 PM DO:09 1 Left Tum
386 12:41:33 PM 12:41:47 PM 00:14 2 Left Tum
387 12:41:38 PM 12:41:39 PM 00:01 2 Left Tum
388 12:41:42 PM 12:42:03 PM 00:21 3 Left Tum
389 12:41:45 PM 12:42:18 PM 00:33 4 Leff Tum
390 12:42:12 PM 12:42:35 PM 0023 2 Left Tum
391 12:42:38 PM 12:42:40 PM 00:02 1 Left Tum
392 12:42:43 PM 12:42:56 PM 60:13 1 Left Tum
393 12:42:58 PM 12:43:02 PM 00:04 1 Left Tum
394 12:43:04 PM 12:4324 PM 0020 1 Left Tum
395 12:43:16 PM 12:4327 PM 00:11 2 Left Tum
Li 396 12:43:17 PM 12:43:36 PM 00:19 3 Left Tum
397 12:43:18 PM 12:43:39 PM 0021 4 Left Tum
398 12:43:42 PM 12:43:45 PM 00:03 1 Left Tum
399 12:44:14 PM 12:44:16 PM 00:02 1 Left Tum
400 12:44:33 PM 12:44:35 PM 00:02 1 Left Tum
401 12:44:37 PM 12:44:40 PM 00:03 1 Left Tum
L402 12:44:42 PM 12:44:53 PM 00:11 1 Left Tum
403 12:46:18 PM 12:4624 PM 00:06 1 Left Tum
404 12:46:26 PM 12:46:31 PM 00:05 1 Left Tum
405 12:46:34 PM 12:46:38 PM DO:04 1 Left Tum
f"1 406 12:46:37 PM 12:46:41 PM 00:04 2 Left Tum
407 12:46:42 PM 12:46:44 PM 00:02 1 Left Tum
408 12:46:45 PM 12:46:48 PM 00:03 1 Left Tum
�--� 409 12:46:47 PM 12:46:53 PM 00:06 2 Left Tum
410 12:46:51 PM 12:4720 PM 0029 2 Left Tum
411 12:47:45 PM 12:47:46 PM 00:01 1 Left Tum
412 12:47:49 PM 12:47:50 PM 00:01 1 Left Tum
413 12:48:09 PM 12:48:12 PM 00:03 1 Left Tum
414 12:48:18 PM 12:4825 PM 00:07 1 Left Tum
U 415 12:48:40 PM 12:49:07 PM 0027 1 Left Tum
416 12:49:21 PM 12:49:26 PM 00:05 1 Left Tum
417 12:49:22 PM 12:49:32 PM 00:10 2 Left Tum
418 12:4924 PM 12:49:38 PM 00:14 3 Left Tum
n 419 12:49:37 PM 12:49:42 PM 00:05 2 Left Tum
420 12:49:45 PM 12:50:16 PM 00:31 1 Left Tum
- 421 12:51:02 PM 12:5126 PM 0024 1 Left Tum
lJ 422 12:51:05 PM 12:5126 PM 00:21 2 Left Tum
423 12:51:41 PM 12:52:01 PM 0020 1 Left Tum
424 12:51:43 PM 12:52:18 PM 00:35 2 Left Tum
r 7 425 12:52:07 PM 12:52:30 PM 0023 2 Left Tum
426 12:52:09 PM 12:52:32 PM 00:23 3 Left Tum
427 12:52:47 PM 12:53:13 PM 0026 1 Left Tum
v 428 12:53:02 PM 12:53:16 PM 00:14 2 Left Tum
429 12:53:04 PM 12:53:20 PM 00:16 3 Left Tum
430 12:53:10 PM 12:5325 PM 00:15 4 Left Tum
n 431 12:6329 PM 12:53:34 PM 00:05 1 Left Tum
432 12:56:16 PM 12:56:27 PM ODI 1 1 Leff Tum
433 12:56:58 PM 12:57:02 PM 00:04 1 Left Tum
`f 434 12:57:00 PM 12:57:07 PM 00:07 2 Left Tum
435 12:57:09 PM 12:57:10 PM 00:01 1 Left Tum
436 12:57:27 PM 12:57:32 PM 00:05 1 Left Tum
437 12:57:44 PM 12:57:47 PM 00:03 1 Left Tum
438 12:57:45 PM 12:58:06 PM 00:21 2 Left Tum
439 12:57:50 PM 12:58:11 PM 0021 2 Left Tum
1 440 12:58:14 PM 12:58:19 PM 00:05 1 Left Tum
U
441 12:58:17 PM 12:58:41 PM 0024 2 Left Tum
442 12:58:33 PM 12:58:45 PM 00:12 2 Left Tum
443 12:58:35 PM 12:58:50 PM 00:15 3 Left Tum
444 12:58:57 PM 12:58:59 PM 00:02 1 Left Tum
Ir ' 445 12:59:17 PM 12:5920 PM 00:03 1 Left Tum
446 1:00:13 PM 1:00:14 PM 00:01 1 Left Tum
l_) 447 1:00:32 PM 1:00:34 PM 00:02 1 Left Tum
448 1:00:53 PM 1:01:00 PM 00:07 1 Left Tum
449 1:01:02 PM 1:01:04 PM 00:02 1 Left Tum
{-7 450 1:0220 PM 1:02:48 PM 0028 1 Left Tum
' 1 451 1:03:55 PM 1:04:05 PM 00:10 1 Left Tum
U. 452 1:04:02 PM 1:04:07 PM 00:05 2 Left Tum
453 1:04:09 PM 1:04:11 PM D0:02 1 Left Tum
454 1:05:11 PM 1:05:14 PM 00:03 1 Left Tum
455 1:05:52 PM 1:05:55 PM 00:03 1 Left Tum
�-�1 456 1:06:13 PM 1:06:28 PM DO:15 1 Left Tum
r l 457 1:06:40 PM 1:06:56 PM 00:16 1 Left Tum
458 1:06:59 PM 1:07:04 PM 00:05 1 Left Tum
u 459 1:07:27 PM 1:07:31 PM 00:04 1 Left Tum
460 1:07:34 PM 1:07:49 PM 00:15 1 Leh Tum
461 1:07:47 PM 1:07:59 PM 00:12 2 Left Tum
462 "8:09 PM 1:06:12 PM 00:03 1 Left Tum
r"' 463 1:08:13 PM 1:08:16 PM 00:03 1 Left Tum
464 1:08:17 PM 1:08:21 PM 00:04 1 Lett Tum
465 1:08:51 PM 1:08:52 PM 00:01 1 Left Tum
L...! 466 1:09:17 PM 1:0925 PM 00:08 1 Left Tum
467 1:0927 PM 1:09:41 PM 00:14 1 Left Tum
468 1:09:57 PM 1:10:01 PM 00:04 1 Left Tum
469 1:10:03 PM 1:10:06 PM 00:03 1 Left Tum
I ' 470 1:1029 PM 1:10:42 PM 00:13 1 Left Tum
') 5
Butcher Boy Plaza Exit Driveway(Right/Left Lanes)
Queue/Delay Study
l �
City,State:North Andover,MA
Date:Saturday 613012012
TIms:10:30am•1:30pm e
PDI F le#122978
Client:Bayside Engineering)K Cram
Client#: 2121491 t_J
Butcher Boy Plaza Exit Left Lane Butcher Boy Plaza Exit Right Lane
Delay Queue Exiting Dolay Queue Ezitlng r l
Vehicle# Entered Queue Leh Queue in aec. Le h Tum Vehicle# Entered Queue Left Queue
n9t in aec. LengM Tum
471 1:10:45 PM 1:10:56 PM 00:11 1 Left Tum
472 1:10:59 PM 1:11:09 PM 00:10 1 Left Tum L_!
473 1:11:32 PM 1:11:45 PM 00:13 1 Left Tum
474 1:11:34 PM 1:11:47 PM 00:13 2 Left Tum
475 1:12:09 PM 1:12:13 PM 00:04 1 Left Tum ( l
476 1:12:23 PM 1:12:26 PM 00:05 1 Left Tum
477 1:12:58 PM 1:13:31 PM 00:33 1 Left Tum
478 1:14:23 PM 1:1425 PM 00:02 1 Left Tum U
479 1:14:49 PM 1:14:55 PM 00:06 1 Left Tum
480 1:15:22 PM 1:15:36 PM 00:14 1 Thru
481 1:16:18 PM 1:1625 PM 00:07 1 Left Tum (-,
482 1:16:46 PM 1:16:48 PM 00:02 1 Left Tum
483 1:16:54 PM 1:16:57 PM 00:03 1 Left Tum
484 1:16:58 PM 1:17:02 PM 00:04 1 Left Tum
485 1:17:05 PM 1:17:33 PM 0028 1 Left Tum
486 1:17:18 PM 1:17:35 PM 00:17 2 Left Tum
487 1:18:17 PM 1:18:21 PM 00:04 1 Left Tum
488 1:1823 PM 1:18:30 PM 00:07 1 Left Tum
489 1:19:00 PM 1:19:06 PM 00:06 1 Left Tum
490 1:19:03 PM 1:19:13 PM 00:10 2 Left Tum
491 1:19:21 PM 1:19:34 PM 00:13 1 Left Tum V
492 1:19:31 PM 1:19:43 PM 00:12 2 Left Tum
493 1:19:58 PM 1:19:58 PM 00:00 1 Left Tum
494 1:20:50 PM 1:20:57 PM 00:07 1 Left Tum
495 1:20:52 PM 121:39 PM 00:47 2 Left Tum
496 120:56 PM 1:21:41 PM 00:45 3 Left Tum
497 121:11 PM 121 AS PM 00:34 3 Leff Tum t_j
498 1:21:35 PM 121:49 PM 00:14 4 Left Tum
499 121:37 PM 122:05 PM 00:28 5 Left Tum
500 121:38 PM 122:09 PM 00:31 6 Left Tum
501 122:33 PM 1:22:35 PM OD:02 1 Left Tum
502 1:22:42 PM 122:52 PM 00:10 1 Left Tum
503 122:46 PM 123:45 PM 00:59 2 Left Tum `7
504 122:56 PM 123:48 PM 00:50 2 Left Tum
505 123:00 PM 1:24:03 PM 01:03 3 Left Tum
5D6 1:23:09 PM 1:24:06 PM 00:57 4 Left Tum
507 123:44 PM 124:09 PM 0025 5 Left Tum f 1
508 1:23:51 PM 1:24:15 PM 00:24 4 Left Tum
509 1:23:53 PM 1:24:18 PM 00:25 5 Left Tum
510 1:24:26 PM 124:41 PM 00:15 1 Left Tum k
511 1:24:34 PM 1:24:59 PM 00:25 2 Left Tum
512 1:24:35 PM 1:25:03 PM 00:28 3 Left Tum
513 1:24:36 PM 1:25:15 PM 00:39 4 Left Tum
514 124:57 PM 12521 PM 00:24 4 Left Tum
515 125:29 PM 125:32 PM 00:03 1 Left Tum
516 1:25:34 PM 1:25:43 PM 00:09 1 Left Tum L
517 1:25:44 PM 1:25:55 PM 00:11 1 Left Tum
518 1:25:49 PM 1:26:19 PM 00:30 2 Left Tum
519 1:25:51 PM 1:26:27 PM 00:36 3 Left Tum
520 125:52 PM 1:26:30 PM 00:38 4 Left Tum
521 1:26:31 PM 1:26:35 PM 00:04 1 Left Tum
522 127:05 PM 127:16 PM 00:11 1 Left Tum
523 1:27:33 PM 1:27:38 PM 00:05 1 Left Tum `-J
524 1:27:59 PM 128:05 PM 00:06 1 Left Tum
525 128:18 PM 1:2823 PM 00:05 1 Left Tum
526 128:35 PM 128:39 PM 00:04 1 Left Tum r
527 1:28:37 PM 128:42 PM DO:05 2 Left Tum
528 1:28:49 PM 1:29:04 PM 00:15 1 Left Tum
529 1:28:51 PM 1:29:07 PM 00:16 2 Left Tum L�
530 1:28:54 PM 1:29:20 PM 0026 3 Left Tum
531 1:28:56 PM 129:34 PM 00:38 4 Left Tum
532 129:11 PM 1:29:42 PM 00:31 3 Left Tum
533 129:29 PM 1:29:44 PM 00:15 3 Left Tum
U
r�
r�
l_J
f 1
4 1
f
6
r �
C
r Seasonal Ad'ustment Worksheets
LJ
l�
G
c
c
r
Lin
V
L�
MASSACHUSETTS NIGNWAY DEPARTMENT-STATEWIDE TRAFFIC DATA COLLECTION
---"2D1D.YVEE(�pAY SEA6iONAl FACTORS• --- 1
I'
FACTOR GROUP Nale:Thema m weekday fm ft,The mumps d the lack"ror um ysrwvp not epwl t,n waekmM dNa are not conn rad ..• s
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Use group 2 for R5, R6, & RO
GROUP 1 -WEST INTERSTATE 0.97 0,93 0,89 0.88 0.89 0.87 0.91 0.89 0.89 0,90 0.93 0.95
GROUP 2-RURAL MAJOR COLLECTOR(R-5) 1.11 1.10 1.07 1,00 0,91 0.89 0.87 0.86 0.90 0.92 1.02 1.
- 06
GROUP 3A-RECREATIONAL*'(1-4)See below 1.26 1,25 1.19 1.08 0.95 0.88 0.77 0.76 0.93 1,00 1.08 1.1
5
GROUP 38-RECREATIONAL'*'(5)See below 1.25 1,23 1.16 1.10 0.96 0.90 0.75 0.73 0.93 0.99 1.13 1.16
GROUP 4-1-495 INTERSTATE 1.02 0.99 0.98 0.95 0.92 0.88 0.86 0.84 0.93 0.95 0.99 1.03
GROUP 5-EAST INTERSTATE 1.04 1,00 0.97 0.93 0.92 0.91 0.92 0.89
GROUP 6: Use group 6 for U2, U3, U5, U6, U0, R2, &R3 0.92 0.93 0.97 1.01
URBAN ARTERIALS,COLLECTORS&RURAL ARTERIALS R-2, R-3) 1.01 1.00 0.96 0.93 0.91 0.90 0.91 0,90 0.92 0.93 0.97 0.99
GROUP 7-1-84 PROXIMITY(STA. 17,3921) 1.21 1.20 1.11 1.06 1.00 1.01 0.95 0.90 1.06 1.06
1.06 1,14
GROUP 8-1-295 PROXIMITY(STA. 6590) 1.00 0,99 0.95 0.92 0.88 0.87 0.92 0.88 0.91 0.91 0.92 0.94
GROUP 9-1-195 PROXIMITY(STA. 7) 1.10 1,05 1.03 0.96 0,90 0,86 0.85 0,79 0.88 0.93 0.99 1.04
RECRE RONAL:(ALL YEARS)
-..__.....__.
RtltA AXLE COIIRECTNIN FACTOR6
'"GROUP 3A:
1.CAPE CDD(ALL TOWNS) ROAD INVENTORY AXLE CORRECTION
2.PLYMOUTH(SOUTHOFRTE-3A)
FUNCTIONAL CLASSIFICATION0-999.............10� 1,000.
RURAL " "' '�'1 OOTION FACTOR
7014,7079,7080,7090,7091,7092,7093.7094,7095,7096,7097,7108,7178 - 1
0.93
3.MARTHA'S VINEYARD
4.NANTUCKET 2 0.97
3' _ =0:98°
-GROUP 38: 0,5,6 0.98
URBAN
&PERMANENTS 2 8 189
1
1088,1067,1083,1084,1085,1088,1087,1088,1089,1090,1091,1092, 0.96
1093,1094,1095,1096,1097,1098,1099,1100,1101,1102,1103,1104, 2,3 0.975 oa98 --
1105.1106.1107,1108,1113,1114,1116.2198,2197,2198 APPIY 144 factor to st9ions:
0,6 0.98 3280,3921,3M
SECTION/-CONTINUOUS COUNTING STATION MONTHLY AVERAGE DAILY TRAFFIC
STATION 18-GEORGETOWN-RTE-1-95-NORTH OF RTE.133
YR JAN FEB MAR APR MAY
05 57JAN 61,640 62,154 66,076 JUN JUL AUG SEP
4% -1% 2% -10/u 69,3703 80,051 82,926 83,378 71,578 OCT NOV DEC YEAR
06 60,000 -3/o -8/0 0 0 68,235 65,280 62,250
0 61,145 63,651 65,342 67,549 73,606 -6% -2% 1% 3% 0% ° 69,236
07
-1/o -1/o -3% -3% o 0 77,874 81,624 72,579 1/O -1%
07 4/0 70,144 65,604
59,608 60,364 61,801 63,520 2/0 4% 3% 1% 0% 0 62,-8 68,5%
-4% -3% -3% p% 70 1 2 75 263 81,298 84,431 73,267 -2/o -8/0 0%
08 57,267 -5% -5% 70,309 64,535 58,030 68,545
58,298 60,036 63,255 66,709 70,176
° ° 77,042 79,130 67,039 67,879 61,016
09 52,861 2/o -3% 1% 1% 0% _3% 56,843 65,391
59,333 58,135 63,706 67,410 70,526 74,731 _2%
63,815
STATION 502-NORTH ANDOVER-RTEA 14-NORTH OF THE ANDOVER BY-PASS
YR JAN FEB MAR APR
06 38JAN 38FEB MAY JUN JUL AUG SEP OCT
40,430 39,649 39,116 41,101 37,278 41,551 NOV DEC YEAR
-4% -4% -2% ° 1% 3/0 0% 42,0% 41 0% 39,684 38,07°7
07 37,668 36,760 5/0 0 39,738
38,763 38,810 41,163 41,337 38,481 41,551 _2/0
-1% 2% -2% 2% -6% -3%
42,384 41 2% 38,852 35.9 06
08 37,247 37,312 -5% o 39,410
38,138 39,502 39,130 38,882 37,160 37,01340,258
-6% -1% 0% -3% ° 0% 1% -1% 38'p49 37,331 36.1 00
09 34,917 37,098 38,237 -3/0 038,078
38,216 37,958 38,986 37,402 36,661 0/O 2/O -1%
38,802 39,841 37,200 36,802 37,677
STATION 5022-ANDOVER-RTE-1-93-NORTH OF RTE.125
YR JAN FEB MAR APR MAY JUN
05 124,000 126,185 126MA 131,454 136,994 JUL AUG SEP OCT NOV DEC
o ° 144,309 149,303 147,936 140,393 134,533 127,383 124,378 YEAR
06 131,360 125,662 5/o 0 0/0 134,462
0 62 138,687° 137,626 135,905 136,190° 140,243° 144,7110 0 4% 6% 6% 1%
19 9% 2% 0% o 0 139,807 140,025 134,818 132,016 136,421
07 132,589 137,375 141,923 138,061 139,12% 145,325 1% 2% 0% 2% 1P -6% 2%
-1% -75 _23 141,686 147,710 140,272 143,411 136,392 123,438
08 131,683 130,041 137,000 138,81% 137,-1% 141,721 0 138,947
-2/o -1/o -4% -1% -8% -5% -14% -4%
-83 41 _00 52 139,813 141,255 138,658 131,381 129,380 105,779
09 126,540 133,351 133,285 138,979 0% 0% 2% 1% 9% 4/0 133,5%
137,621 141,721 2% ° 25% 3/0
141,929 143,127 141,948 142,958 134,338 131,723 137,293
STATION 5073-ANDOVER-RTE.I-93-NORTH OF RTE.133
YR JAN FEB MAR APR MAY JUN
05 126,600 123,600 125,241 145,402 128,982 132,433 JUL AUG SEP OCT NOV DEC YEAR
2% 5% 5% -12% 129,533 132,198 129,552 126,065 127,725 128,000 129,611
° ° 0/o
06 129,000 129,704 ° -4/o ° 5% 13% 16% 1% -2% °
131,573 128,387 128,172 126,563 129,967 139,167 2/o
-18 -4% -1% 0% 1% 9% ° 1% 146,937 146:7% 128,0/0 126,049 132,553
07 124,218 124,837 129,787 128,993 128,988 138,525 4/o -9% o -8/o
-2% 135,210 141,234 133,180 135,736 128,937 115,548 -2/0
0% 0% 2% 2% ° -1% 130,433
08 122,018 124,262 130,000 132,135 131,504 _3/0 -4% '1% 0% -3% 4%
0 0 134,804 133,368 134,887 131,755 136,329 125,452 119,721 -1%
-2/o ° 3% 129,686
0 2/o ° o
09 127,000 127,302 126,855 132,624 0% 2P o 2% 3% -2% 1"/o q%
131,404 137,403 136,835 137,095 135,110 134,259 126,876 124,582 131,445
ITALICS=ESTIMATED DATA
Page 1 of 2 MADT
r r r r r r r r r ` r
C-.7 C C-7 C^7 C_---3 C-7 C--7 C--3 C - 3 C_:3 C-7 CD 1:-3 C7 C-73 C--3 C`�
SECTION I-CONTINUOUS COUNTING STATION MONTHLYAVERA GE DAILY TRAFFIC
STATION 5127-ANDOVER-RTE.125-SOUTH OF RTE.28
YR JAN FEB MAR APR MAY
05 14,098 13,567 14MA 15,513 JUN JUL AUG SEP OCT
3% 6% 18 -3/° 15,508 16,23�0 14,400 15,216 15,523 NOV DEC YEAR
° 3% _2% 15,400 15,071 15,028 15,047
06 14,564 14,358 15,099 14,994 16,032 -3/O
15,800 14,113 14,688 15,104 15,000 14,836 12,599
09 11,428 12,502 14,278 14,509 13,736 14,681 14,766
14,800 13,939 14,846 14,700 14,486 14,580
14,040
1,965,392
1,868,698
5.174 % above Average
Growth: Negative to 0.51: per year based on count station data
Discussions with MVAC indicate 0.5% is appropriate
ITALICS ESTIMATED DATA
Page 2 of 2 MADT
a�
a�
s,
O
C�
U
C-D C---3 CL-3 C:-> C-3 C- 3 C-_3 C-3 C- D C--3 C -3 C-3
C7_3 C_3 C 7_3 C-7 C-773 C-71 C--D C__3 C---D C___3 C___D C_:) C___D C-77 C-7D C_,7:) C_�)
MassHighway Crash Report for NORTH ANDOVER In the year 2007
ikft CI.hg.**.'V119d... q+M.'.p.lr M.ulydt:at6lm-
'l)clmPl6bQd11 tl.M Fdd
Tr [)%.d_ Meel Hirmbl EvMui' dddiCMB91Nem � R°•M9 - -
Aec1.e2Rtlt NM*Ccr4ftn NR=d"kt...1s1 uuuda, 7•..aw X4boiAr•y YCma.b
21M124 NORTH M-ty( adenap. V1:TrwellMB ahelghl ahead/ VI.—
NORM elU mdavMMe V1:Lphi huclgvm,mlM-ven.
ANDOVER o&Mer200] 7:d3 PM r•d 2 0 0 A In M1amcI VT:Cdnelon MU pend,Pickup,•purl Nlpry)w1U p .0 0460pD STREETI
V2:T IM V1:SMhbound/V2:Wmlbound mdmvehld•Inlnmc BMed OSGOOD STREET I GREAT
M bur llmlV2:Pneerlg.�p y CI•.
POND ROAD Yd130p.]e60dB67] Bd043B�50pTddD30
2212918 NORTH ANDOVER T1-Mar- V1:ght h lapl V2:Tnvemn V1:Cdnalan vdlh mdd vahlNe
200] 7mB AM NonfiMiln 2 1 0 prgN eln IaheaO g In lnmc l V2:COnIelM elh VI:Paaaen9er rorl V2:Slrgle- —
V1:WmIboMd/VTNMhbmmd moor vahMeMlmme unOtruA 3.a-mwa.dea q
O A CherICM. 1077 OSGOOD STREET-EXi
�NfAen^ami V1:CNnabn vnU mdm vhM• 2J14dD.3023T35J] BdpOTa.B10110]21
31941W NORTH ANDOVER 11-M -2001636 PM 2 0 0 N yT;Tr hl elraa0l Mhalfi l V2:Cdna1W xh VI:POaam Wmf
nO nD Vt:Sadhboundl V2:NMhbound mda vdrki.in hnme V2:Pnam mnr D GREAT POND ROAD/OSGOOO
Vt:LIpM InlCklvaO,mint-ven, D I D � STREET Yd1400.]05pdB57] Bd099B.60020dBJ0
PMP"damage Pnnd.pickup.alml umily)a,h _
Mblmrm onh barme•/v2.i19h1
2zI1JB1 NORTH ANDOVER 10Juo-2007 3:49 PM In V1:Chen9lnlamel V2:Tu , V1:Co0hiM.Oh.0. W.t Mwn.minl-ven,pend,
2 0 0 pngl• hA in treme/VT:CdIIaIM U pleMq,
VsP ulnlry)w mrytour
1:NaMbouMIV2:9ou1hbMrM motor vehida lnb.mc drag GREAT POND ROADI
Vt:Cdhbn vAlh mold vM a V1:Paaempermr! D•yl M CH. OSGOOD STREET 2J1800.784N85]i
m lnmclvz:cdn•ron»tm vzsa.aenv.rc.rrv�tyM ems9e.wor�Bao_
V1:Tmmnp elrapM ahead/ m whldeInhome/V3: Imddwn.min4vm,pmd, -- _
2211360 NORTH ANDOVER 12Jmf2007 735 AM Non-tddm 3 1 V2:Sl-ng.Iepped In tramsl V1:Southbwnd/V1:SMhbmmd Comabn eiU moor vehid.M
0 R•.-end VJSIOMn or•top In lmmc /VJ:SMhbound Ppllp,aPM-11,).1h Mhlour GREAT POND ROAD RM 126
Inmc Dir D M CHMCle1r SIOSGOpD STREET
Pnp•dydyp�� _—...-- — _TJ_t30o.7a5Nes77 PdaseB.Wo2daB3o
aMy(nen. Vt:Tu 9IanIV2:Travamrg V1:Comalm e11h mdar vhlde
2201BS2 NORTH ANDOVER 27-A 200]0O1 PM I 2 0 0 In lnllbl V2:Comsionwlh VI:Pmee 9g 1 GREAT POND ROAD/ ---
- 19Mah•ad V1:Nodhboundl V2:SmnhbomM mda vahkl.In trdec V2Prna OSGOOp 9TREETIGREAT
rs M _ CMr POND ROAD
V1:Com•bn vAlh motarveMds 2J1500_]BSB18s/7 BOOSBa.sO0T10830
2I40d81 NORTH ANDOVER 265 Ta07 BV__M NOUtdH v1:TrmbV atrdghl.heldl In lnmcl V2:Cdlhlon elU vl:pmap _l --
2 T 0 H_ V2:Tum loll VI:NoMpouM I V2:SPumb*EW and«vMd•Inhellk V2daae P. D'*'B��
-- roadwry Clw GREAT POND ROAD I OSQOOD
-----__ STREET 2J1600.]SSB18S77 800608.000210920
2Td0372 NORTH
AN
2&9 2007 3:28 PM Nm-fehl In 2 p V1:SIaNipwaloppedmn S./ n"Mchbn w0lrmdath ----- — —__
0 0.ear-•rq In Oamc/V2:Cdllalan rAlh VI:p.,_1
Par/
V2:Trakel2 .mApMehead V1:NaMb.WIWNMhbcund Indo vehld.minme V2:Pna.n ere. p
V1:Pabarp.r m/V2:LbM ry '➢M Q t.]]OSGOOD STREET-ENT 2J10502309tJee) W
trutlgvan,mlMven.paml. OT21.D3d312Me
38618p NORTH ANppVE0. 20-0d-TOOT VI:NM•Md 2 1 0 A-. V2,TmWVlpehal9M aheatll �_1:NdMrepMMIV2:Nd �uW-•ped u.,Y)e0h e^h —__
dyp�a V2:Tum Ie3 V1:NOMbouMIV2:Enlbpmd Rh 1201 GREAT POND
D M CIaMROAD Rb 13J E
2J7S8)8 NORTH ANDOVER 26D•P200]330 PM Mry) V1:SIPMng or dapped MhelAcl __ 2J1N2.i18119119 _D0pS1B.0002i00BP
2 0 Re.and V1:Ndreporledl V2:Nd VV1 drep.ddIV2:p•e•en9. Dat-IlpMed OSOOOD BTREETIORFAT ----_-----
0 V2:Tnydn a hl eh••d V1:Ndn a Jv2:Nd Med M -- __
Prapedy damage Sn°w roMw.y CI ryrlov POND ROAD
291500.]B90.0377 D103aB.3002119J0
2271130 NORTH AND 2o-peP20p] 1:67 PM m (mn. V1:SbMn9�elopp•d Mlnmcl v1:CdnalM etU older vehbN — _ _
2 0 0 RmwM MhamcIV2:Calnaion vdih Vt:Pa••en9.e.IV2SMpis
V2:SbMn Mhamc V1:9aulhbwmdl V2:Sadhpourp motor vehiPh In home udl huQ 2mde.bOn) Wet D 1 CN.
I—OSGOOD STREET-ENT TJ1050.2JOB827BI 810021.BJ123]BB3
NORTH ANDOVERTOO7-2000
Page 1
C� C C7 C_-D C-73 C-D C_ C__3 C _3 C__3 C-D C:0 C=7 C-7-3 C 3 C__D C73 C^"a
iriassDor MassDOT Crash Re ort for NORTH ANDOVER for the ear 2008
Mnlor cwn cinitih/IanIB' Car Ce�hl�ee{ - a Nan1rJA Faf'
a°•xb. Idaf. F ' FbanraODfynr A[Sm PltnbCwfA TtM Dllecllonf - VahklO Cpnlplafom -
MadH9rmNlEvenh 2Aryrl ! nr OtlrrdllAar AIRmpAq 2t2rraaJtn D!>dwAOB MaariaRm�rT.
PmPxn demeDe
FBwaarldp 7CCead2mr Geadlnr
2290251 NORTHANDOVER 2'fetr2WB ]US PM Nblrlxm V1:Trnemrp fOalpM ana9dl Vt:Ccllialw Wln mdx vahMe
1 2 0 0 Angle V2:Tuml Ie9 In tmmel V2:Co61fion Wlh V1:Nd repaded lV2:Nd pa ,
PrW°M damps V1:9--.112.a011l urld mdxvehId': lame myoded GSGODD STREET/GREAT
We rM6DMed Chfr POND ROAD
2415117 NORTH ANDOVER 22-A 2Doe 10.'MAM In°ne 2 o 0 prryb V1:TmvNlMp fhalpM aneadl VI;Nd lOOO$l V2:NO
V1:Pnf 2315W.7650 BeO%9.5002
V2:TumnrplM V1dJOMhxmdIV2:EnIEourM mpWW m9RwrIV2Not Rio 123 I GREAT POND
—repOhindl Dry Dy" Cka ROAD
24MV1:lIgM 231500.)658 Bao5e9.W02
d NORTH ANDOVER 30 -200e tdIO AM NdR z 0 Vt;Tumhg hAl V2:trwf9Mp V1:Nd 1rupFlvan,minpvan,
Airylo foal Al Mead VI:Evlhwntl/V2:Nonnhwnd r°P°'INIV2:Nd Omd.pickup.epmt u0071 w'IOt
temLlld any bwXmlV2:NdDhy O Clear
Rla 133/OSOOOD STREET
IJ74080 NORTH ANDOVER 063uF2We tO:JT AM NdR V1:CdOsbn vrtm mdx vehicle
2 0 0 Lmf. Ni:9 IVIONx Inhamc/VLh_,r -vAth Vt:Poefenper wrl
Pr "dxneDa VIN.repOnMlV2:Nd mpedM mdorvMlGe Mtmmc V_E!s ner wrD 1 Clnr
p
mlr lnn° V1:Camalon wlm mora vehlda Vt:Light hVCM 10]T09G000STREET-ENT 2315aD.6B2J
x376131 NORTHANDOVER J1Jd-2008 6:•J PM 2 0 0 q a V1:Tumlrp h91 V2:TrovM6np In t:CO"ift V2:Cdll.`,im wllh Ivm..mini-wn, 0.0920.8101
_— atmipht ahaed V1:Nalnboundl V2:9wmh0uM 2L—v hidalntrame mnBlaB fireapi°PW V2:Pnaen)art wr Wel O IgM Cl-pmpfM demepe GREAT POND ROAD I OSGOOD
_ STREET 231WO.T656
tmN(nOM Ih C V2:wdmdxvenhda DdOSBe.5002
2107683 NORTH ANDOVER Ol•D¢P2WB 9:Ai AM � 2 D o diniellon��eems '1:Tumlrig lMIV2:Trnf0lnp NhaXlel V2:Cdllfbn MlA V1:Pmfnpxcx/
trBl IMead V1SwmhouM IV2SMhhwnd mdxveMde Mtmmc vz:PofeM9errn p
1:Upryt hucFlvvn,minFvon, DaYINIA Che IIHT OSGOOD STREET-ENT 2315.8.8023 9eW29.eta1
Pen•1.pkkuP.+pwt Nmryl vAb
V1:Cd0alan°eh other x76 her eref l V2d/DM
2410576 NORTHANDOVER 1tl —S 12:46PM NOR 2 Vt:TrneRrg atrxpnt ene°dl VI:C.ohlectl OC011hbn InOmn.mlM-van,Mo.
0 0 dIOSO, V2:Trawmrq Mfnaad V1:NaMeouMIV2:NOMpwnd Wm mdavehklV':CA tlr•i °p°Nwv9TIVe"
U CI°xICNx 1077 OSG00p STREET-FJ(T
z319aveozJ IMM s.elat
nYassDOT MassDOT Crash Re ortfor NORTH ANDOVER for the ear 2009
TV—
Mor4aF, tlwr Wlw.- bfY Ctnttlba - - of NehMd
Fd41 4—
atxdC90bt AlfrftPrbbGafh VahidaTrnal OtlacXaln Mntl9xmMl t111 VahlcN CmSpuaeee � '_' pmyl.
AnOt�Al CvtdOetAt df[/1wtId11Nww1
P.P"dxnepa R°�d+11�Me6o1 Mlxsecear XCOeldbaf CdarAIW
wN some V1:TummD b6I V2:TwvN Vt:Cd6alOn wllh mdx vMMf
2389290 NORTH ANDOVER 0676ry2We 225 PM In urM 2 0 0 A h alnlpM Mwd Inlmmcl V2:Co1161an W,, V1:Poaveripx wrl OSGOOD STREET
V1;NxwbwrMl V2:9adhM1wmd mdOr-WO.M tmmc V3Anf Wa I OSGOOD STREET RN 1259
Pmpxydampe R_
2IGREAT POND ROAD
V1:COl6alon°11M1 motervMlde ZJ16W.763e BAOSB8.6002
601222 NORTH ANDOVER OtrF 2008 2:40 PM M V1:Trnallhp etmlphl ahead) In lwm°l V2:C_,O,xi,h VI:PnaoWfr wrl OSGOOD STREET RM1 125N
nd/V2:Satdn d
2 0 0 A V2:Txn 246 V1:NwNlnumdorvMMhbtreme IOREAT POND ROAD Rto
dn"1°D° V29nfm xmDq DMNM Clfx 133E
25D]aX! NORTH ANDOVER OF-Ag-209 JUO PM 0 A^da Vt:Tuminp IV2:TnNNArq Vi:NO 2315W.TBSO W-M.9W2
2 0 0 V1:SaulMoundlVlNdn .dr°p_IMropplMIV2:NO V1:NdrepptM/yz:Pnwrgx OSGOOD STREET qN 1239
D Chx On
IMEAT POND ROAD
Plwmy dmnpa 2Jt5W.M. DeO569.5002
(nWe Vt:TmvMlnp amdpM ahf W I Vt:CMhlm wIM mdx veAMa
25JO9W NORTH ANpOVER 063 2009 JUS PM 1 2 0 0 An h Mhemol V2:Com•Mn v.11M1 Vt:Pasaerger cer/
V2:TurMrp hilt VI:NatrySwlal V2:Ndreported mdarvMich In trams V2PenanpxwrO9GOODSTREETRh125N
Clow IOREAT POND ROAD
V1:OMNIOn vAlh mdxvehlGa 231600.7850 BfOSee.BW2
2592652 NORTH ANDOVER SO-Nw•29W tU6 PM NdR 2 0 0 A 0 VhalThi aheodBl Vl:Treva0in0 Mtremcl Vz:C011bbn vMh Vt:PnaenOxarl
V1:SauthM1pundl V2:NxthbOund maMvMldeln o-amc V2:pnaan xca Wel II M pahVCl
1077 036000 9TREEi-ENT 23f 610.9033 9fOB2a.8111
NORTH ANpOVER2007.20W
Pa.2
NE111111W&Y
CRASH RATE WORKSHEET
CITY/TOWN : N.Andover, MA COUNT DATE : June/July 2012 MHD USE ONLY
DISTRICT : 5 UNSIGNALIZED: Q SIGNALIZED : Source#�
r ..........................................................................................................INTERSECT............................ON ION .. ....A 'DATA... :...............................................................
I-J MAJOR STREET : Osgood Street ST#
MINOR STREET(S): Great Pond Road ST#
ST# D
ST#
ST#
C
INTERSECTION North INTERSECTION
U
DIAGRAM REF#
(Label Approaches)
L'
U
Peak Hour Volumes
APPROACH : 1 2 3 4 5 Total
Entering
b DIRECTION : EB WB NB SB Vehicles
VOLUMES (PM) : 9 321 1,481 848 2,659
�, p
K FACTOR: 0.078 APPROACH ADT : 34,09 ADT_TOTAL VOLP'K"FACT.
n TOTAL#OF #OF AVERAGE#OF
L-i ACCIDENTS : 16 YEARS : 3 ACCIDENTS(A) : 5.33
.........................................................................................................................................................................................................................................
CRASH RATE CALCULATION : 0.43 RATE _ (A•1,000,000)
(ADT 365)
+t-t Comments :
I
U
f)V .
&qSSI
Y r .
CRASH RATE WORKSHEET
CITY/TOWN : N.Andover, MA COUNT DATE : June/July 2012 MHD usE oNLY
DISTRICT: 5 UNSIGNALIZED : L^.J SIGNALIZED : Source#�
- INTERSECTION DATA
.......................................................................................................................................................................................................................................
MAJOR STREET: Osgood Street ST#
MINOR STREETS) : Butcher Boy Entrance ST# r
ST# U
ST#
ST#
INTERSECTION North INTERSECTION IL
DIAGRAM REF#
(Label Approaches) '
'7
r-1
Peak Hour Volumes
APPROACH : 1 2 3 4 5 Total
Entering r
DIRECTION : EB WB NB SB Vehicles
-T
VOLUMES (PM) : 0 0 1,362 926 2,288
r �
"K" FACTOR : 0.078 APPROACH ADT: 29,333 ADT=TOTAL VOLP'K"FACT.
TOTAL#OF #OF AVERAGE#OF
ACCIDENTS : YEARS : 3 ACCIDENTS(A) : 2.33
.......................................................................................................................................................................................................................................
CRASH RATE CALCULATION : 0"22 RATE _ (A*1,000,000)
(ADT 365)
Comments : r
l J
r1
� 1
MsssHr lbws
� y
CRASH RATE WORKSHEET
n
CITY/TOWN : N. Andover, MA COUNT DATE : June/July2012 MHDUSE ONLY
DISTRICT : 5 UNSIGNALIZED : SIGNALIZED : Source#�
INTERSECTION DATA --
.......................................................................................................................................................................................................................................
MAJOR STREET : Osgood Street ST#
MINOR STREET(S) : Butcher Boy Exit/Commerce Way ST#
u
ST#
ST#
U
ST#
n
M '
u
INTERSECTION NOrth INTERSECTION
DIAGRAM REF#
(Label Approaches)
L)
U
r
I Peak Hour Volumes
U
APPROACH : 1 2 3 4 5 Total
r Entering
Li DIRECTION : EB WB NB SB Vehicles
M
VOLUMES (PM) : 64 300 1,053 700 2,117
"K" FACTOR : 0.078 APPROACH ADT: 27,141 ADT=TOTAL VOU"K"FACT.
TOTAL#OF #OF AVERAGE#OF
Li ACCIDENTS : 5 YEARS : 3 ACCIDENTS(A) : 1.67
.......................................................................................................................................................................................................................................
CRASH RATE CALCULATION : 0.17 RATE _ (A"1,000,000)
u (ADT 365)
('T Comments
n
La
•w+
A
.a
3
0
s.
C7
e�
H
C- 31 U-3 L- 1 C---) C✓_-3 C=3 L—"3 C--3 C3 C
C-3 C _-:�k C -3 c -3 --3 C` Z--D C 7 C-- 7 c- ? c-7 lc-'l 1_--3 C-73 C 77 C-7 C---) C-73 C----:)
SECTION l-CONTINUOUS COUNTING STATION MONTHLYAVERAGE DAILY TRAFFIC
STATION 18-GEORGETOWN-RTE.I-95-NORTH OF RTEA 33
YR JAN FEB MAR APR MAY JUN
05 57JAN 61,640 62,154 66,076 69MA JUL AUG SEP OCT NOV DEC
4% -1% 2% 1% 80,051 82,9266/0 83_2/0 71,57°8 68,235 65,280 62,250 YEAR
06 60,000 61,145 63,651 65,342 67,-3% 73,606° 77,874° 0 1% 3% 0% 1% 69+1%
° 0 4/0 81,624 72,1 9 70,144 65,604 ° �1/O
07 59,6% -1/o -3% -3% 4% 2% 0 3% 0% 62,-8 68,5%
60,364 61,801 63,520
0 70,112 75,263 -2/o 030 o
-4/0 -3% -3% 0% -5°/u ° 81,298 84,431 73,267 70,309 64,535 0%
08 57,267 58,298 '7/0 -5% 58,030 68,545
60,036 63,255 66,709
-8% 2% _3% 1% 0 70,0% 77,042 79,130 67,039 67,879 61,016 56,8430 65,391
09 52,861 59,333 58,135 63,706 67,410 70,526 74,731
-2%
63,815
STATION 502-NORTH ANDOVER-RTE.114-NORTH OF THE ANDOVER BY-PASS
YR JAN FEB MAR APR MAY JUN JUL
06 38,10 38_430 40,430 39,249 39,116 41,101 AUG SEP OCT NOV DEC YEAR
° 0 37,278 41,551 42,384 41,218 39,684 38,077
° 39,738
07 37,668 36,760 38,763 ° 1/0 3% 0% 0% 0% -2%
38,810 41,163 41,337 38,481 41,551 42,384 -6% -1
-1% 2% ° ° -6% 41,231 38,852 35,916 39,410
08 37,247 37,312 38,138 39,502 39, 30 38,882 37,160 3710130
-6% -1% 0% -3% -3% o 38,849 40,258 37,331 36,110 38,078
09 34,917 37,098 38,237 38,216 0/0 1% -1% 0% -1% 0% 2% -1
37,958 38,986 37,402 36,661 38,802 39,841 37,200 36,802 37,677
STATION 5022-ANDOVER-RTE.I-93-NORTH OF RTE.125
YR JAN FEB MAR APR MAY JUN JUL AUG
05 124,000 126,185 126,680 131,454 136,994 144,309 SEP OCT NOV DEC YEAR
6% 0% 9% -6% 149,36/0 147,936 140,309 3 134,5334/0 127,368 3 124,3% 134,4%
06 131,360 125,662 138,687 137,6260 135,9050 136,190 ° -2% ° °
140,243 144,711 6/O 1/o
1% 9% 2% 0% ° 0 139,807 140,025 134,818 132,016 136,421
07 132,589 137,375 141,923 138,061 139,1770 145,3250 1% 2% 0% 2% 1% _g% 2%
. -1% 'S% -3% 1% -1% -2% 141,686 147,710 140,272 143,411 136,392 123,438 138,947
08 131,683 130,041 137,000 138,852 137,621 -1% -4% -1% -8% -5% -14%
-3/0 0/0 0/0 141,720 139,813 141,255 138,658 131,381 129,380 105,779 -4%
-4% 3% ° o 0 0% 2% o 0 133,599
09 126,540 133,351 133,285 138,979 137,621 141,721 141,929 143,1270 141,94/8 142,958 134,33/8 131,72/3 3%
137,293
STATION 5073-ANDOVER-RTE.I-93-NORTH OF RTE.133
YR JAN FEB MAR APR MAY JUN JUL AUG
05 126,600 123,600 125,241 145,402 128,982 132,433 SEP OCT NOV DEC YEAR
2% 5% 5% -12% 129,533 132,198 129,552 126,065 127,725 128,000 129,611
-1% -4% 0% 5% 13% 16% 1% -2%
06 129,000 129,704 131,573 128,387 128,172 126,563 129,967 139,167 2%
-4% -4% -1% 0% 1% 9% 4/0 1% 146,937 146,351 128,761 126,049 132,553
07 124,218 124,837 129,787 128,993 128,988 138,525 0 ° -9% -7%
135,210 141,234 133,180 135,736 128,937 115,548 2%
-2% 0% 0% 2% 2% ° 130,433
-3/o -1% -4% -1% 0% -3% 4%
08 122,018 124,262 130,000 132,135 131,504 134,804 133,368 134,887 -1
4% 2% -2% 0% 0% 131,755 136,329 125,452 119,721 129,686
2% 3% 2% 3% -2%
09 127,000 127,302 126,855 132,624 131,404 137,403 136,835 137,095 1% 4% 1%
135,110 134,259 126,876 124,582 131,445
ITALICS=ESTIMATED DATA
Page 1 of 2 MADT
i
SECTION I-CONTINUOUS COUNTING STATION MONTHLYAVERAGE DAILY TRAFFIC
STATION 5127-ANDOVER-RTE.125-SOUTH OF RTE.28
' YR JAN FEB MAR APR MAY
05 14,098 13,567 14MA 15,513 JUN JUL AUG SEP OCT
3% 6% 48 0 15,508 16,23/0 14,400 15,216 15,523 NOV DEC YEAR
06 14,564 "3/0 3% o -2% 15,400 15,071 15,028 15,047
14,358 15,099 14,994 16,032 15,800 -3/o -3%
14,113 14,688 15,104 15,000 14,836 12,599 -2%
09 11,428 12,502 14,278 14,509 13,736 14,681 14,800 13,939 14,766
14,846 14,700 14,486 14,580 14,040
1,965,392
1,868,698
5.174 % above Average
Growth: Negative to 0.5% per year based on count station data
Discussions with MVPs indicate 0.5% is appropriate
ITALICS=ESTIMATED DATA
Page 2 of 2 MADT
a�
a�
.O
O
A
O
Ri
D
it
C_� C--3 C-3 U C--3 CL3 C.�^3 CLL� C--3 C--� C C- 3 C_3 IL-3 C-3 C_ _3 C--3 "C - C= 3
U, I
Proposed Drive-In Bank, North Andover, MA
i '
Land Use Code(LUC)912-Drive-in Bank
f� Source: Institute of Transportation Engineers (ITE)-8th Edition
Average Vehicle Trips Ends vs: 1,000 Sq. Feet Gross Floor Area
Independent Variable(X): 3.672 ksf
AVERAGE WEEKDAY DAILY
T= 148.15 *(X) No Formula,7 Studies
T= 148.15 * 3.672
T= 544.01
T= 544 vehicle trips
with 50%( 272 vpd) entering and 50%( 272 vpd) exiting.
WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC
T= 12.35 * (X) No Formula,26 Studies
T= 12.35 * 3.672
T= 45.35
T= 45 vehicle trips
with 56%( 25 vph)entering and 44%( 20 vph)exiting.
i
WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC
T= 25.82 * (X) No Formula, 71 Studies
Ls T= 25.82 * 3.672
T= 94.81
(-'
T= 95 vehicle trips
with 50% ( 48 vph)entering and 50%( 47 vph) exiting.
SATURDAY DAILY
Li T= 86.32 * (X) No Formula, 5 Studies
rl T= 86.32 * 3.672
U T= 316.97
T= 316 vehicle trips
with 50% ( 158 vpd)entering and 50%( 158 vpd)exiting.
SATURDAY MIDDAY PEAK HOUR OF GENERATOR(No Data)
t-t T= 26.53 * (X) No Formula, 39 Studies
T= 26.53 * 3.672
T= 97.42
n T= 97 vehicle trips
L i with 52%( 50 vph) entering and 48%( 47 vph)exiting.
n
iI
u
912-SF
f 1
.J
Proposed Drive-In Bank,North Andover, MA r
Land Use Code(LUC) 912-Drive-in Bank `J
Source: Institute of Transportation Engineers (ITE)-8th Edition r
Average Vehicle Trips Ends vs: Drive-through lanes
Independent Variable(X): 3.00 Lanes
AVERAGE WEEKDAY DAILY
T= 139.25 *(X) No Formula, 7 Studies r '
T= 139.25 * 3.00
T= 417.75
T= 418 vehicle trips
with 50%( 209 vpd)entering and 50%( 209 vpd)exiting.
WEEKDAY MORNING PEAK HOUR OF ADJACENT STREET TRAFFIC f
T= 9.44 *(X) No Formula,26 Studies
T= 9.44 * 3.00
T= 28.32
T= 28 vehicle trips
with 58%( 16 vph) entering and 42%( 12 vph) exiting.
WEEKDAY EVENING PEAK HOUR OF ADJACENT STREET TRAFFIC �
T= 27.41 *(X) No Formula, 71 Studies r
T= 27.41 * 3.00
T= 82.23
T= 82 vehicle trips '
with 49% ( 40 vph) entering and 51% ( 42 vph) exiting. ,
SATURDAY DAILY '
No Data
f ,
U
Y
SATURDAYMIDDAY PEAK HOUR OF GENERATOR(No Data) `1
T= 29.88 *(X) No Formula,39 Studies
T= 29.88 * 3.00
T= 89.64
T= 90 vehicle trips ,
with 49%( 44 vph) entering and 51%( 46 vph)exiting.
912-Lanes `�
Capacity Analysis Worksheets
L
U
r?
Li
LJ
u
U
Li r 3: Casa Blanca Driveway& Osgood Street 2012 Existing AM Peak Hour
Lanes and Geometrics
l"IF TI—T 1,;R
uia
Lane Configurations
Ideal:Flow(vphpl) 1906 1900 1900 1900 1900. 1900 1900 1900 1900 1.900 -.19001.900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade%) 0*/o, -.0%, 0% DIo
Storage Length (ft). 0 0 0 0 0 0 0 0
Stoqge.Lanes: 0 0 0 0 '0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane 1.00 1..00
100: 1100 0.95 -0.96 1.00: 0.950 0.95
r
Ped,Bike'Fact-or:
Frt U65 0.983
.Fit Protected 0.958 0.996
Satd1.Flow-(Orbt)' 0: 1644 .0. .01945 0 0 3432 0.
.331,2 .0
Fit Permitted 0.756 0.946 0.1 858 -
Satd.Flow,(perm) �O 1644 0 1523. -_0 6. 3W 0 0 28581
Right Turn on Red Yes Yes Yes Yes
Sqtd.Flow(RiT0,13) 1U3 14
Link Speed(mph)' _39 3 1 0 40 40
Link Distance(ft) -182 1.083 S481
22-7
Travel Time(s) 4.1 24.6 14.5 .3.9
j7
S 14
6re
WREN
Area Type: Other
Li
E,
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CX2012ax.syn
Synchro 7- Report Page 1
Li
3: Casa Blanca Driveway& Osgood Street 2012 Existing AM Peak Hour
t ,
Volume
:UI 1 rINBT �'1NBR% .NBL NBT`�s.NBR`i a. SBL' ' SBT 'SBR
Volume(vph) 0 0 2 376 0 54 4 447 0 67 813 1 r N
Popf1w Peds (#/ r)
�J
Confl.Bikes(#/hr)
Peak Hour Factor 0.92 0.92 0 50 0 87, 0.87 0:87 0 82: 0'82 0.82 094. 0.94 0:94 ,
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100%° 100% 100% 100% 100%
Heavy Vehicles(%o).: .2.% 2%. 0%c :4%° 0% 6% 25%c 5%° 5%.. 15% 4%, 100%c
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (Whi)
Mid-Block Traffic(%) 0% 0% 0% 0%
t ,
Atli
Row(vph) 0 0 4 432 0 62 5 545 D 71 865, 1.
Shared Lane Traffic(%) r ,
Lane Group 0.6.W(vph) 0 4. 0 0 49:4. 0 0 550 0 0 937` 0
Inte^rrs„►e*e-x•t^,fot*nr.B--mama,ry4, 1 Y
-TIT
um ; Y r f:lAi 4.w.S7�i-.�..{ wr 3t Y. r C.-C�✓O• rI�lnllLy".!ykt7�y;Y*r1fF,..,;.,, 0 . S 7,17
� wPr
z } +
n
r
l.�
t 1
l.
tom,`
1
t
U
t 1
lJ
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CA12012ax.syn
Synchro 7- Report Page 2
t ,
L ,
c ,
U
3: Casa Blanca Driveway& Osgood Street 2012 Existing AM Peak Hour
Queues
-�► '-Lj
t l
� _,....,•,t^tv^ r-r s: 4 '^..^ -.-, •. '"w` t �s _. t^ y ir*^in,,. ,.h�,..' :4S. +` .i -z"7 :^t"c'Tc F7 �'!. i
sae Group�.�.":� �;.,. .�:EBT;.._::WBT� :<,.NBT.;�';:.SB.T.. •: ...� �:.�- �..w:���x�,r;���.,.. _ ::• .:.:.�.z;,,;.,j.:k.:xx�' ...i�..:.:k''u.a,,,,_,._
Lane Group Flow(vph) 4 494 550 937
v/c Ratio 0.01.. 0:86 0.39 0:77
Control Delay 0.0 36.6 13.1 19.9
Queue Delay 0.0 "Off A 0 0.0
Total Delay 0.0 36.6 131 19.9
Queue Length,50th:(ft), 0' 167 75 157
Queue Length 95th(ft) 0 #365 96 222
lntemalLnkDist(ft)' 102:. 1003: `768. 147
Tum Bay Length(ft)
130'e—cap ityftph) 733 629 1859 16.33
Starvation Cap Reductn 0 0 0 0
Spillback Cap fieductrn' 0' fl 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0,01 0.:79 0:30 0,57
�r�n.'iC"`t 't 'M^n FWry-
-ft:
CL r r-i .f'•' ^•i »7�c `T. ++t c».c"'^7 C,'^ Y-^ r m.e n-•Ma•m'C+^ 'T+'t,n.
Intersect W,A'mma
ry cera s::t u 2 .. `�d'71,•v' M S {r.,i'R st.., i....� G c ...;:;ps h4 f.. '..'Lcs.,, .J2:hf..t,.0.4. U. 1,�: .t,.+.}:C>~Tr F`�f•{,n
# 95t1 {ierce�tile aolume exceeds capacity,queue may be;longer.
Queue shown is maximum after two cycles.
1
u
Lr
U
L3
u
Q:1Projects112 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CA12012ax.syn
Synchro 7- Report Page 3
L!
U
3: Casa Blanca Driveway& Osgood Street 2012 Existing AM Peak Hour L
HCM Signalized Intersection Capacity Analysis
1MBL" VVBI r11UBR`'m':NBLr '�NBT �:.:`fVBR 'SBL=.rSBTv -. :SBR
Lane Configurations
Volume(vph) 0 0 2 376 0 54 4 447 0" 67 813 1
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width, 12: 12 12 16 ,1.6 16 12 12 12 11 11 11 ,
Total Lost time(s) 6.0 6.0 6.0 6.0
- - LJ
Lane Oil.Factor 100 1.00 0.95 0.95.
_ __
Frt 0.86 0.98 1.00 1.00 F
Fit Protected 1.00 096 1.00 1.00
Satd.Flow(prot) 1644 1945 3431 3312 v1
Flt:Permitted 1.00 0:75 0.95. 0.86:
Said Flow(perm) 1644 1523 3247 2854 r
Peak-hour.factor,PHF 0.92, 0.92 0.50 0.87 0.87 .0687 0.82 0:82 0.82 0.94 0.94 .0:94
Adj.Flow(vph) 0 0 4 432 0 62 5 545 0 71 865 1
RTOR Reduction(vph) 0 2 0:: 0 7 0 0 0; 0 0 0, 0 -�
Lane Group Flow(vph) 0 2 0 0 487 0 0 550 0 0 937 0
° 0%° 6% . '25
Heavy Vehicles(°Ia) 2% 2% 0% 4% 5°!0; 5°7 15%0 .4°I°'. 100% v
Tum Type Perm Perm Perm Perm
Protected Phases; 4
Permitted Phases 4 8 2 6
Actuated Green,G(s) 23A 23.4 26:9 .26:9:
Effective Green,g(s) 23.4 23.4 26.9 26.9 ,
Actuated gt Ratio 0.38 A.38 0.43 0.43
Clearance Time(s) 6.0 6.0 6.0 6.0
Vehicle Extension(s) 3 0 3.0 3:0 3.0
Lane Grp Cap(vph) 617 572 1402 1232
v/s Ratio Prot 0.00
v/s Ratio Perm c0.32 0.17 c0.33
u/c Ratiol. 0.00 0.85 0.39 0.76 ,
Uniform Delay,d1 12.2 17.9 12.1 15.0
L.J
Progression Factor 1.00 1.00 1.00, 1:00
Incremental Delay,d2 0.0 11.7 0.2 2.8
Delay(s) 12.2 29.5 12;3 17.8
Level of Service B C B B }
Approach Delay(s) 122 29:5 12:3 17a3°
Approach LOS B C B B r
�tBraeG�iorq Sumrra��§ '�'•`S �est i � __r ����..,��"'�F3 :'�.��-�'�,�. `'1f"r"��"t..>., �'�"�'` - ��,.r�. _��� '^�F z �a, .?5 �
HCM Average Control Delay 19.2 HCM Level of Service B
HO Volume to Capacity ratio 0.80
Actuated Cycle Length(s) 62.3 Sum of lost time(s) 12.0
Intersection Utilization 82.70A ICU Level of Service E
Analysis Period(min) 15
c t4ca[Lane Group
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012ax.syn
Synchro 7- Report Page 4 r
J
R .
l
i-`
Li 3: Casa Blanca Driveway& Osgood Street 2012 Existing AM Peak Hour
Timing Report, Sorted By Phase
r 7
Sra•� tT rP r Y7w•^ t r T^ >F {r r... �? �n .:a-•:s ., if,� ^S roti est ..cCr
, ; I�
Movement NBTL EBTL SBTL WBTL
Leatl7La9
Lead-Lag Optimize
I Recall Mode. Min. MinMin Min
U Maximum Split(s) 41 31 41 31
Maximum Split;(%A) 569%. 43.1% 56:9% 43:1%.
Minimum Split(s) 35 10 35 10
Yellow Time(s) 4 4 4 4
All Red Time(s) 2 2 2 2
Minimum Initial(s) 4 4: 4 4
Vehicle Extension(s) 3 3 3 3
Minimum Gap(s1 3 3 ,3 3..
Time Before Reduce(s) 0 0 0 0
Time.To'Reduce(s)` 0 0 b 0
Walk Time(s)
1=lasfi;Dont Walk:(s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time(s) 0 41 0 41
End Time(s) 41 0 41'' 4
r1 Yieldi0orce Off(s) 35 66 35 66
U Yield[i=orce.Off 170, (s): 35 66 35 .66
Local Start Time(s) 0 41 0 41
Local Yield(s) 35 66 35 66
n Local Yield 170(s) 35 66 35 66
entersection Summary
Cycle Length 72
Control Type Semi Act-Oncodrd
Li Natural Cycle 65
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
*
L+ 'I o2 q "► 04 fl
.OiS ��:S:li'�K�fa$ily�'�'��..�n..�e q�tS�'^'�Iw+.wt��;i��'s:.'rr-r,:.����Ykt' r+W�•"�s'.'r�� �.'����e�t.�<<.i��.`i'i�'�a:`-�:�`�ti�,�E':`.�tN'ii."n a.� cr`
n
F�A�ffpp���o6 08
r!N'batiTrr:: >ro4ra'rr 'P'R �",tY"fr.,�t �+r >, �Srtp. res r ., r�"S w s --•yr.
.:aSL.k. ...eC..� .t iv�" 'rA (n.'..S.-0'ii�'�+,t.�.3�ti ;4. .•iS.rt.kl CT'•F.�[,�' �n,Jkt.� n.v,w ....,y.r4,%
U
L--J
M
L1
1
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CAT012ax.syn
n Synchro 7- Report Page 5
Li
6: BB Entrance & Osgood Street 2012 Existing AM Peak Hour
Lanes and Geometncs
Lane Group s WBL -WBR NBT ?NBR SBL, :SBT
Lane Configurations I t4
idea(Flow(vphpl). 1900 1900 1900 1900 1900 1900
Lane Width(ft) 12 12 12 12 12 12
Grade'(°1a) 0'/0 0% 0'% r
Storage Length(ft) 0 0 0 300
Storage Lanes 0 Q 0 1
Taper Length(ft) 25 25 25 25
Lane U.til:Factor ,1.00. 1.0.0
0.95 0.95 1:00 0:95.
Ped Bike Factor
Frt 0.970
Flt Protected 0.950 r
-1 Flow(Prot)' 0 0: 3360 0 1770. 3471
Flt Permitted 0.950 LJ
Satd Flow(perm: 6 6 3360 0 1770' 3471
Link Speed(mph) 30 30 30
Link Distance(ft) 300 227 383 .,
Travel Time(s) 6.8 5.2 8.7
.n^w•^-nra•.t rn n^nnr"
fte^se77-7-1 ..- R
Area Type: Other
r-
� J
r
l-�
1.1
l�
r-
EJ
n
J
r �
l J
r-I
Q:1Projects112 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012ax.syn
Synchro 7- Report Page 6 r
l J
1
LJ
u 6: BB Entrance & Osgood Street 2012 Existing AM Peak Hour
Volume
•..7*°-._..n, t,r• r :-:— .r^s`, ., ".. ^+. Y'; �^:j.. +.."C" ^+. ,,tit )I 1 P -r i h*r ' ti+ c1— + F
SBT
Volume(vph) 0 0 401 100 44 881
j Confl:Peds.{#/hr).
Confl.Bikes(#/hr)
Peak Hour Factor 0.92_ 0.92 0.89 0089 090 0.19U
Growth Factor 100% 100%° 100% 100% 100%° 100%
Heavy.Vehicles{%D). 0°/a 0% 5% 1% 2% 4%
Bus Blockages(#/hr) 0 0 0 0 0 0
Parking.(##ir)
Mid Block Traffic(%) 0% 0% 0%
Adi flow(vph) 0 0 451 112 49 979
I`l Shared Lane Traffic(%)
Lane Group Fiow.(vph) ;0 0 .568 0 49 979
+�:<•.'^':'�a-^`.;�ner+ r. 3- '�i`cT "'""T.'�'" ,'F "y' ' .�V "7 F "{ x ary .r-sr�
n
L,
rl
Li5
V
1
L
Ej
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2012ax.syn
Synchro 7- Report Page 7
LA
r •
6: BB Entrance & Osgood Street 2012 Existing AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
emen# C Wgk,
W8
"T
Lane Configurations
volume'.. 0 .461' 1.60.
, (veh/.h) 44. Of
Sign Control Stop Free Free
Grade 0%,
Peak Hour Factor0.92 0.92 0.89 0.89 0.90 0.90
Hourlyflow rate(vph
: .- I .. . .7 1 - . .-
) .0 0 451 11.2 49 979
Pedestrians
Lane Width'(ft) r 7
Walking Speed(ft/s) 4
Pqr6e,pt Blockage
Right turn flare(veh)
Median type'., None None
Median storage veh)
Upstream..*'signal.(ft) 221T
pX,platoon unblocked 0.91 0.91 0.91
rx0f)-i
cting volume 1.004 281 60
vC1,stage I conf vol
ri
vCu, unblocked vol 903 9 318
to
sk -1-4
6.8' 6.9, 4.111
tC,2 stage(s)
-8.6 .3 3 2.2
pO queue free% 100 100 96 k J
cM capacity(ve,h/h) 244 079 1126 26
bir'e"66n,Lane 4 N8 1, N8 2 SB.1. "SB 2 SB 3
.volume Total .300 263 49 489 489
Volume Left 0 0 49 0 0
Volume Right 6 -112 0 oi 0
cSH 1700 1700 1126 1700 1700 LA
Volume.to Capacity 0.18 0.15 0:04�04 %0*.2.9 0.29.
Queue..Length 95th(ft) 0 03 0 0
Control Delay(s) 0.0 .8.3 0.-0 :01 1 0.
Lane Los A
Approach Delay.(s) 0.0 QA
Approach LOS
InterS8CtlonSumma77
Average Delay 0.3
Inter.s.e.0*6n Cap.q*:,U.i.1Iization 27.16% ICU Level o I f:S.ervice A
Analysis Period(min) 15
r
%-4
t
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2012ax.syn
Synchro 7- Report Page 8
8: Commerce Way& Osgood Street 2012 Existing AM Peak Hour
Lanes and Geometrics
p...�..>r_.. ,}; �`.:. EBL F1:.,,EBT....1;�fBR,•;�t:,WBC.'�• 11VBT.;� ;.WBR .+;.NBL ••::�NBT.i;>.'NBRv�.:,$BL��:,.;SQTi..u,SBR
Lane Configurations �, �► �►�,
Ideal-_Flow(yphpl) 1900 1900 1900 1900. 1900, 1900 1900 1900 1900... 19007 1900 1;900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grade(A/o) 4'/0 0% 0% 0'la
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes. 0 0 -
0- 1 t) 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util Factor 1.00 100: .,
10.0.. 1:00 1,00 1::00' O.g5 0,9b, 1.00 1.0.0: 095: 0,95
Ped Bike Factor
Frt 0..903 0:850 0:997
Flt Protected 0.986 0.953 0.996
Satd Flow(prof)` 0 1481 .0: 0" 1I.7913 1615 0 3414 _0. 1.0 3455 0
Flt Permitted 0.986 0.953 0.996
Satd Flow(perm)` 0 1481 0 0 1793
:1615_ 0. 3414 0: 0_ 3455. 0
Link Speed(mph) 30 30 40 40
Link Distance(ft) 360. 315 383 811'
Travel Time(s) 8.2 7.2 6.5 13.8
s m•`.c'41 1"'�.'�' C^f ..4, ,G «•.rt.• ^� ra �a.r .+^s ,.,gyp y-
ntersecbor' Suntroak� I , ;r kt ti�. Yr 4 SEs ^ �l d a r *N` �KP :s +n^:. •k -s , j ✓.. tip..<r. �n +:IJ.,'t, Sw� 7G tk<,..riM1
Area Type: Other
U
u
u
0:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traf iic\CA12012ax.syn
r� Synchro 7- Report Page 9
Li
LJ
r
8: Commerce Way & Osgood Street 2012 Existing AM Peak Hour L,
Volume
r�
bane Group: :?y. EBL EBT EBR,:, WBL 'WBR; T-,
7:SBR
Volume(vph) 6 0 16 73 1 21 33 368 0 0 836 16 `1
.,00 Peds.(#, r); u
Confl.Bikes(#/hr)
Peak,Hour Factor 0.61 0.61: 0.61 0.88 0.88 0.88 0 95. 0.95. 0.95 0;92 0.9-2. 0.92 r-
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100%° 100% 100%° 100%° 100%°
HeavyVehicles,('Io) 18% 18% 1'8%a: 1'/a 1%, 0%D 9%° 5% 00/c 0% 4% 13%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Barking (#m) r
Mid-Block Traffic(%) 0% 0% 0% 0% +�
Adl Flow(vpfi) 10 0 8 83' 1 24 35. 38.7 0 0 909 17
Shared Lane Traffic(%)
84'.
Lane Group Flow(vpfi') 0 36 0 0. ;24 0 422 0 0.1 926 0
v--..ti^;r^n—.�,.^.,^-*.o+�
fnteFecBon=Summary:
f 7
l_J
r�
v
r,
l�
L.
I�
LA
r�
U
r�
L�
U
f 1
LJ
r'7
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012ax.syn `J
Synchro 7- Report Page 10
I LJ
f ,
r_1
Li 8: Commerce Way& Osgood Street 2012 Existing AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
Lane Configurations
Volume. .(veh/h). 6: 0 16 73 1 21 33 868 0 0 836. 16
Sign Control Stop Stop Free Free
Grade 06% 0% 0°la 0%
Peak Hour Factor 0.61 0.61 0.61 0.88 0.88 0.88 0.95 0.95 0.95 0.92 0.92 0.92
Hog] 1 0 83 1 24 35: 387 0 0 909 17
Hourly flow w0ph), 0
Pedestrians
Lane.Widih(ftp
Li Walking Speed(ft1s)
Percent Blockage:
lock6ae:
Right turn flare(veh)
Median n:tYpe Non I e: :None.
Median storage veh)
Upstream signal hai�ft): 610
Upstream si ., -
pX,platoon unblocked
Li V conflicting Yo1pne
1205 11374463 _90t 130 -194 926, 387
vC1,_stage I conf vol
vb2stage conf vol
Li vCu,unblocked vol 1205 1374 463 937 1383 194 926 387
tci s.ingle-M '7.9 6.9 7.3 7.5, 6.5 6.9 4.3: 4.1
r tC,..2stage(s)
, .
tF 3.7 42 3.5 3.5 4.0 .3.3 23 2.2
pO queue free% 91 100 95 59 99 97 95 100
CM capacity(veh/h) 1.114 11.9 504 2011. 1137 821 692 1162
Direction,Lane -tb 1. WB i M2 NB 1- N132 S81 -''SB 2-'"
Volume Total 36 84 24 164 258 606° :320
Volume Left 10 83 0 35 0 0 0
Volume Right .26 :6 24 0 0 0 1T
CSH 260 200 821 692 1700 1700 1700
,Volume to CaDacftv 0.14 0.42, 0:03 0.05 0.15 0.36 0.19
Queue Length 95th(ft) 12 48 2 4 0 0 0
LJ Control Delay(0) 2.1.0 S5,61 9.5 21 0:0. 0.0 0.0
Lane LOS C E A A
pro*...Delay(s) 21.0 29.7 foo
Approach LOS C D
Li
Fte 10*1hN ffi17r7 3 771 FlZINM
Average Delay 3.0
Intor n Capacity UtiUzation 53.0% 'ICU Level.of.Service A.
Analysis Period(min) 15
E
E
E
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012ax.syn
Synchro 7- Report Page 11
rl
3: Casa Blanca Driveway& Osgood Street 2017 No-Build AM Peak Hour
Lanes and Geornetrics
W
B
Lane Configurations
Ideal Flow NOW) .
19.00. 1900 1900 1900: 1900. 1900 19. 00 1.90.0 1.90b 1960 1900 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade %)
0% 0% 00/0 .06%,
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanit0: 0 0 b o 0 a 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Uth.176-clor 1.00 1A 1.0.0 1...0.0 100 1...0.0 .0.95 0.19.5- 1.00. {1.95 0.95 0-9.5
Ped Bike Factor
FrE 0.865 0.984
Flt Protected 0.958 0.996 f 7
Sa.t,.d,.Flow(Orot) 0 1644 0 0 1947 0 _03433 0 0 3314. 0
At Permitted 0.749 0.946 0.852
Satd Flow
V 11644 0 0 1522. .0 :0 3247 0 0 2835. 0
Right Turn on Red Yes Yes Yes Yes
SAf,d,...Flo,w.(ATOR); .84 1.0
Link Speed(mph) 30 30 40 40
Link DistanceI (ft1083' ..8 1 48 227-
Travel Time(s) 4.1 24.6 14.5 3.9
Area Type: Other
L_J
r-I
r
CA
r�
L_j
r,
L_j
rl
Q:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017anb.syn
Synchro 7- Report Page I
t j
I F-1
Li 3: Casa Blanca Driveway& Osgood Street 2017 No-Build AM Peak Hour
Volume
Volume(vph) 0 0 2 403 0 55 4 497 0 68 880 1
conkFeds.(#1hr).
Cbnfl.Bikes(#/hr)
PeAk&&Factot 0.92 .0.92 0.87 0.87 0:87 0.82 i0;82 0.82- 4
09 0,94, 0.94
. .
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Vehicles 2% 2%. OF/6, 4%
.0%, B% 2F/o 5% 5% 16%:- 4% 1.000%
Bus Blockage's(#/hr) 1 0 0 1 0 0 .0 0 ...0 0 0 0 ..0 0
Parking.-(#Iht)
Li Mid-Block Traffic 0% 0% 0% 0%
AdJ -Flow,(vpq 0 .0 4 463_ 0, 63 5 606, 0 721. 936 i
r Shared Lane Traffic(*/o)
Lj LawGroupfl'
ow(v h) _0 .4 0 0. 526 '0: 0 -611 0 .10%: 01
Tr ,f
nt6rsecW.'Sd j.4, �q..
Li
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CX2017anb.syn
Synchro 7- Report Page 2
3: Casa Blanca Driveway& Osgood Street 2017 No-Build AM Peak Hour
Queues
t
Lane Group Flow(vph) 4 526 611 1009
V/6 Ratio: 01;01, 0.911, 0.43 0.81
Control Delay 0.0 43.8 13.6 21.8
Queue Delay .0.0 0.0 6.6 00.
,... 1. -.1.qY
Total Delay 0.0 43.8 13.6 21.8
Queue I Length 50th.(ft) 01. 198: 85 177
Queue Length 95th(ft) 0 #400 108 249 r
internal Link:Dist(ft) 102 100 768 147
Turn Bay Length(ft) L.J
Base (Vph) 674 582 1720 15.02
Starvation Cap Reductn 0 0 0 0
S,pillback.C.ap Reductn 0 .0 0 .0:
Storage Cap Reductn o 0 0 0
Reduced v/c Ratio 0:01 0,90 0.360.67
.q th
# .;:5 percentile volume exceeds capacity,queue may be longer..
Queue shown is maximum after two cycles.
r
a ,
r I
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017anb.syn
Synchro 7- Report Page 3 r,
3: Casa Blanca Driveway& Osgood Street 2017 No-Build AM Peak Hour
HCM Signalized Intersection Capacity Analysis
Movement ;,.:.'.,, n5 EBL. EBT EBR WBL.>�: NBL `.
Lane Configurations �, �, ��► �,
Volume(dph), 0 0 2_ 403 0 55 4 497 0 68 880 1
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12; 12 12 1s; 16_ 16 12: 12 12 11; 11 11.
Total Lost time(s) 6.0 6.0 6.0 6.0
Lane Util Factor 1:00 1.00. 0:95 0:95
Fit 0.86 0.98 1.00 1.00
CFlt Protected 1:00 0.96 1.00. 1
Satd.Flow(prot) 1644 1947 3431 3315
PI Permitted 1.00 0.7.5 0..95: 0.85
Satd.Flow(permL 1644 1522 3249 2835
?HF 0.92 0:92` 0.50 0:87
Li Peak-hour facto{, 0:87 0:87 0A 27 0.82 0:82 0:94 0,.94 0.94
Adj. Flow(vph) 0 0 4 463 0 63 b 606 0 72 936 1
RTOR Reduction syph) 0 .2 .0 0 6: 0 0 ;0 0 0` 0' 0
Lane Group Flow(vph) 0 2 0 0 520 0 0 611 0 0 1009 0
Heavyyehicles;(P%j .2%%,, 2% 0% 4% 0%0.: 6% 25%_ :5% -5%-. 15%0 4'/0 100%
Tum Type Perm Perm Perm Perm
C Protected Phases, 4 -8 2
Permuted Phases 4 8 2 6
Actuated Green,_G(s) 25:1` 25:1 29.3 291
Effective Green,g(s) 25.1 25.1 29.3 29.3
Actuated g/C Ratio 0.38 0`38 0.44 0.44
Clearance Time(s) 6.0 6.0 6.0 6.0
�1 Vehicle Extension(s) 3.0 3:0 3.10 3.0
` Lane Grp Cap(vph) 621 575 1434 1251
U v/s;Ratio Prot 0:00
v/s Ratio Perm c0.34 0.19 c0.36
M v/c Ratio 0.00; 0:90 6.43 0.81
LJ Uniform Delay,di 12.9 19.5 12.8 16.1
Progression Factor 1.00 1.00 1:00 1:00
n Incremental Delay,.d2 0.0 17.6 0.2 3.9
U Delay(s.) 129 37.1 13;0 20.0.
Level of Service B D B B
A,',pproach`Delay(s) 12:9. 37:1 13.0 20.0
Approach LOS B D B B
t--S4�T^t�hYa7""ia. Ct'+R".�+�ra.'1x+ ��`^^.�rl r^ .
;Y
�nterseciroumnia►y,�� .:� ,...,t, , �� may ,�: ,s� v ��'��; �: � t'��r? rr �;�� ,�-
-Kr w r .pC.,ic .> o,.rr.:S.r.. r(;..n r ''� .�:4«n.�;�,i+,.rd:,t':txi..dyt•ty.'(.,.:...,�.
HCM Average Control Delay 22.2 HCM Level of Service C
HCM Volume toCapacity ratio 0.85
Actuated Cycle Length(s) 66.4 Sum of lost time(s) 12.0
In Capacity Utilization 87.5b% 160 Level of Service- E
M Analysis Period(min) 15
L, c.: ;.:critical Lane-Group
u
n
Li
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017anb.syn
Synchro 7- Report Page 4
3: Casa Blanca Driveway& Osgood Street 2017 No-Build AM Peak Hour
Timing Report, Sorted By Phase
irt
Movement NBTL EBTL SBTL WBTL
Lead/Lag
49
Lead-Lag Optimize
;
Reca I Mode Min_ Mih: Min Min
Maximum Split(s) 41 31 41 31
Maim urn tP0(016) 56.9% .43.16/o 56.9% 431'%
Minimum Split(s) 35 10 35 10
Yellow Time(00 4 ..4 4. 4
All-Red Time(s) 2 2 2 2
Min imurn Initial(6) 4: 41 4 4
Vehicle Extension(s) 3 3 3 3
Minimum 1
. aG,p W 3. -3 3, 3
Time Before Reduce(s) 0 0 0 0
Time To R6duc&,(,s) 0 0 .0
Walk Time(s)
Flash b6nt Wilk
Dual Entry Yes Yes Yes Yes
,Inhibit Max Yes Yes Yes Yes
Start Time(s) 0 41 0 41
End Time(0) 41 0, 41 -0
Yield/Force Off(s) 35 66 35 66
Yle.!Oorce.Off 116(s) 36 W., :36 66
Local Stmt Time(s) 0 41 0 41
Local Yield.(s) 35 66 35, 6.6
Local Yield 170(s) 35 66 35 66
intersection Summary
Cycle Length 72
controfType Semi Act-Uhpoord
Natural Cycle 65
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
A,tyyt 02 o4
06 ~ 08
r i
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017anb.syn L j
Synchro 7- Report Page 5
6: BB Entrance & Osgood Street 2017 No-Build AM Peak Hour
Lanes and Geometrics
n
1^.Y,.-•.'fes h wy C, .,.. .. tF F C i 4 C
BT� :#'NBR
Lane Configurations �►� ��
Ideal Flow(vphpl), 1900 1900 1900 1800; 1900 1900
Lane Width(ft) 12 12 12 12 12 12
Gude.(°Io) 0°%:
U Storage Length(ft) 0 0 0 300
Storage Lanes 0 0 0 1
Taper Length(ft) 25 25 25 25
Lane Ute Factor1;0.0 100 0.95 0:95 1:00 0:95
�-' Ped Bike Factor
n Fit 0.973
Flt Protected 0.950
U Said :Flow(prot).. 0 0 3.36.8 0 1720 3471
Flt Permitted 0.950
n Satd:,Flow(perm) 0 0 3368 0 1770 3471
Link Speed(mph) 30 30 30
Link Disiance;(ft) 360 227 383
Travel Time(s) 6.8 5.2 8.7
"�7�^'0=or.-•"!I�+.T?fM4^„tt k F {"C'e" .� YT 'w.n.-t..-w '�'"ir , "cr. -ry I" S aC'^ q .7V-t ',n �
-ter?' ti irr�."'r�, � u i7 y ti r,xxJ+"' '�"'4.. r '.'r. e'"' r.'b.°�'T •nv
I n ersection�Summar�. �. ..�,,,-,� :�a:, .,,��x �����;: � ,;����t> >. ,,�� �,,;,� �`�.�. •.� �^�F
Area Type: Other
I
U
r
U
P
U
n
L�
n
u
n
Li
n
U
n
U
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CA12017anb.syn
n Synchro 7- Report Page 6
Li
f ,
6: BB Entrance & Osgood Street 2017 No-Build AM Peak Hour L j
Volume
lane Group ' WBL 'ex
W-B,A 6T NBR SBL
Volume(vph) 0 0 452 100 44 949
Confl,;.P#ds.:(# �r
6nfl*.Bikes(#/hr)
PeaMurfadtor 0.92 0.92 0.89 0.89 - 0.90 0.90
Growth Factor 10 1 0% 100% 10.0% 100,% 100%. 1 100%. .
Heavy V h les 0% 0% 5%0, 1% 2%.; 4% L_J
0 1 1 c ' MO...
Bus Blockages(#/hr) 0 0 0 0 0 0
Parking Wbr)
Mid-Block Traffic(%) 0% 0% 0%
4now(vph). -C 0 9 5.08 1112 49 1.054
Shared Lane Traffic(%)
Lane-GroupFlow(vph).. 0 :0 620 0 49 1054
rumc^imvraMi�T�7,77
.7 7;
fRi Aiic_gbi
LJ
ri
LJ
LJ
ri
LJ
V-1
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017anb.syn L,
Synchro 7- Report Page 7
r
Li 6: BB Entrance & Osgood Street 2017 No-Build AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
WBR .;NBT5C"' NBW
-ML. 'N
Lane Configurations
Voibm' 00A. ) 0 0 452 160 44., 949.
Sign Control Stop Free Free
Grade " 03/0 0%
Peak Hour Factor 0.92 0.92 0.89 0.89 0.90 0.90
Hourly flow rate.(vph) 0 0 508 112 4 1054
r Pedestrians
Lane Width(ft)
Walking Speed(ft/s)
Percent Blockage.-,
Right turn flare(veh)
Median I-type None
one :None
Median storage veh)
Upstream s'igna1_,(ft_
227`
px,platoon unblocked 0.891, 0.89 0.89
conflicting.volume: 1189 310 620
vC1,stage I conf vol
vq2,.stage1pd.rf-vol
vCu,unblocked vol. 974 0 337
VC
i.:pngle_(s) 6.8 6.9 4.1
t,C,.2 stage(s)
22
pO queuefree% 100 100 96
cKcapacity. .(ve,h 5.
. .1h) 216 971. 108-
Lj Diredon,Lane# -NB I -NB 2 SB I- SB 2 SB 3
Volume.Total 339 2.82 49 527 .5*27
Volume Left 0 0 49 0 0
Volume Right 112 .0 0 .0
Lj c,SH 1.700 1700 10 1 89 1.700 1700
Volumeto Capacity 0.20 0.17 0.04 0.31 031
Queue Length 95th(ft) 0 0 4 0 0
Control Delay(s) 0.0 0.0 8.5% 0.0 TO
Lane LOS A
r-I ApptoadfiDel -.0.4
,Delay 9.0
.L_j Approach LOS
*T, 30,1�7S1_5tT1"1�7N5TV1, Z
Average Delay 0.2
i ion: A
lntersecbbn)p*b ty:Utilizati 29.6% lCulevel of-Service
Analysis Period(min) 15
Lj
i rl
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverATraffic\CA\2017anb.syn
F-i Synchro 7- Report Page 8
1
Li
P
Lj
r
8: Commerce Way& Osgood Street 2017 No-Build AM Peak Hour
Lanes and Geometrics
4% t /0
Lane 7 L S
Lane Configurations
Ideal Flow(vphpQ 1900 1900 1900- 1900.1 -1900 1900, 1900 1900. 1900 1900 1900 1,900 LJ
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grad6P/o
0% 66/0 0 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lan,e.s 0 0 0 1 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util.Factor 1.00 1,00: 1,00 1.00 1.00 1.00 0.95 0,95., 1.010 1.00 0.95 0.95
Ped Bike Factor
Fit: 0.903- 0.850: 0:997
Flt Protected 0.986 0.953 0.996
Said Flow(prot). 0 1481 _0 0 1793 1615 0 3415 01 0. 3456 0
Flt Permitted 0.986 0.953 0.996
Satd.Flow.,&M10, b mi 6 0 1793: 1615.. 0 3415 .0 0 3456 0
Link Speed(mph) 30 30 40 . 40
Link-D"Distance(ft) 360 315
1.5 38 1 3 81.1
qnce ')
Travel Time(s) 8.2 7.2 6.5 13.8
717%
'77K'
Area Type: Other LJ
L
LJ
F-1
r
LJ
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017anb.syn
Synchro 7- Report Page 9 r
f
r
L, 8: Commerce Way& Osgood Street 2017 No-Build AM Peak Hour
Volume
lane Group;.:,;
B
rr �_.
EBL EBT:> EBR.,"''.WBL... :VVBT•r WBR:`< NL;.:;:NBT�r,•NBR` 1,11 �k SBTX �r _�8R
Volume(vph) 6 0 16 73 1 21 33 419 0 0 904 16
LjConfl Peds:(#r)
Confl.Bikes(#/hr)
PeakHour Factor 0 61 0.6.I 0.61 0.88 0 88 0.:88: 0 95- 0.95 0 95 0.92 0.92 0.92
Growth Factor 100% 100% 100% 100% 100% 100%0 100% 100% 100% 100% 100% 100
Hea�ry.Vehicles(%) 18% 18% 18°La 1% 110 0% 9%0 5%0 0% 0% 4%0 13%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
C Parking (#/ht)
Mid-Block Traffic(%) 0% 0% 0% 0%
Atli Flow(veli) 10 0 26 83 1 24: 35 441 0 0 983 17
u Shared Lane Traffic(%)
I _ -
Lane Group Flow{vph) .0.. 36 0 0 84 24 0= 476 0 0' 1000 0
I '^i-^aR:^r:C-SCa'.•"'4sc5-'z...+'- "c•---3'.•.-�-,..•_�r .�. ti 4� :f't'ro _n 'Y �4� !� 7C'T s 5
rite[secaon:Summaiye .. a ryt KyM1 ._ [a t .. .�..r! . c rrF 1 Y4 1'�JN r� A i�> r1F a�i-r 2hY i ° 4� n� ,n•\f�"r
L
n
n
u
n
u
n
'u
n
Li
n
Li
u
n
u
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017anb.syn
Synchro 7- Report Page 10
Li
III
r 1
8: Commerce Way & Osgood Street 2017 No-Build AM Peak Hour , ,
HCM Unsignalized Intersection Capacity Analysis
Movement,}�;. . EBL EBT .; .EBR WBL :.:'.WBT::,-.WBR .:. ABL,�,NBT_.
Lane Configurationsr }
Volume(veh/h) 6 `0 16 73 1 21 33- 41.9 0 0 904' 16
Sign Control Stop Stop Free Free
Grade 0% 6% Q°Io
Peak Hour Factor 0.61 0.61 0.61 0.88 0.88 0.88 0.95 0.95 0.95 0.92 0.92 0.92
_..
Hourly flow rate_ (vph) 10 0 26 83 1 24 36 44.1. 0: Q 983 17
Pedestrians
ri
Lane Widtfa,(ft)
Walking Speed(ft/s) L_
Percerit,B!! age,
Right tum flare(veh)
Median type ,None None
Median storage veh)
upstrearn signal{ft) 610
ri
pX,platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99
vC,conflic#Ing volume 1306 1502 500 1.028 15111 221 100.0 . 441.
vC1,stage 1 conf vol
vC2,s#age2 conf 1.1:vol r'
vCu,unblocked vol 1293 1491 500 1014 1500 200 1000 422
tC,single(s). 7.9 6:9 7:3' - 7.51 6.5. 6.9 4.3 4.1.
tC,2 stage(s) r
#F(s) 3.7 4.'2 3.5 3.5 .4.0 3.3. 2.3 2.2
p0 queue free% 90 100 94 53 99 97 95 100 �J
cM capacity(veh/h) 96 99 476 175 115 808 647 1139
r �
birection,Lane# EB 1 WB 1 WB 2'-' .NB 1 NO 2 SB 1 SB 2'
Volume Total 36 84 24 182 294 655 345
Volume Left 10 83 0 35 0 0 0
Volume'Right 26 .0. .24 0 0 0 17 r
cSH 229 174 808 647 1700 1700 1700
Volume,to Capacity: 0.16 0A8 0.03, 0.05 0.17 :0.39 0.20.
Queue Length 95th(ft) 14 58 2 4 0 0 0 r
Control Delay(s) 23.6 43.8: 9.6 2:6 Q:0 0.0. 0.0
Lane LOS C E A A
Approach Delay(s) 23.6 36.3 1.0 010
Approach LOS C E
^�•.:+rntte ^.».r+.-;r'rtra+s-r�+'ct: 'T^;"P C ^'rr.,.,.m rye; :F?'' '."'"i 5 r^.•.r^x +r- x
latersecfion SumnaaN���.,: � ,* r ��,, ��.; �.t;�:v,��, �fir,.�' y.. ,r.>..r�.5 ��.�:...•, :��a���.�: 5
Average Delay
-
Intersection Capacity Utilization 54.2% ICU Level of-Service A
Analysis Period(min) 15
r-i
LJ
r •
u
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017anb.syn J
Synchro 7- Report Page 11 r
Li 3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour
Lanes and Geometrics
M
WW
—AM BT. q4, R
B
Lane Configurations 4#
ideal Flow(v-phpl)- 1900 1900 1500 1900 1900 1900 1900 1900 1900 1900 i9do.
1900
Lane*Width(ft) 12 12 12 16 16 16 12 12 12 11 1 1 1 1 11
GrAda(%) 0% 0% 06/.:
Storage Length(ft) .0 0 0 0 0 .0 0 0
00rage tanes 0 0 0 U 0 a 0
Taper Length(ft) 25 25 25 25 25 25 25 25
L4ne,:Util.factor. 1.00. 1:00 1.66 1.00 1.00 1.00 *0.9,5 0.95 1:00 - -
.00 0,95' 0.95 .0,95
Ped Bike Factor
Frt 0.865.
Fit Protected 0.958 0.996
Satd.:FI 0 1644 0:
-ow'(Prot), 0 1945 -0 0 -3483 0 -0 3314 0
Fit Permitted 0.7500.946 0.849
Satd Flow(perm) 6 f.6.44 :6. 6: 1523 0 0. 324 6- 0: "2825.
Right Turn on Red Yes Yes Yes Yes
Said... .6
Link Speed(Mph) 3030 40 40
Link istahce(m 1 1 82 .1 083 .848 227
Travel
Tim
Travel 4.1 24.6 14.5 3.9
Area Type: Other
I
L
Li
F-1
r7
LJ
Q:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab.syn
Synchro 7- Report Page 1
U
r
L
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour
Volume
4\ t /0-
Lane Group EBL nEBT .EBR;,'°
WBL',
Volume(vph) 0 0 2 403 0 57 4 513 0 69 893 1
Confl.Bikes(#/hr)
Peak:Hour Factor 0.92 0.92. 0.50 0.87 0.87 0..87 0,82: 0.82 082: :0.94 0.94- :0.9.4
Growth
� Factor 100% 100% 100% 100% 100% 100% 100% 100% 10 0% 100% 100%% 1 00%
..1. . . i .-., -, ' L-j
Heavy 20/. 2% 0 4% 0% .6% 25% 5% 50/6 150/q 4% 100%
_. avy..V Vehicles %) --
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr)
Mid-Block Traffic(%) 0% 0% 0% 0%
Adl Flow VP.b) 0463 6 66- 5 626 0 731 950 -1
�
Shared Lane Traffic(%)
Lah.e.-Group,Flow(v.ph) .0: 4 -0` -O 5.2.9 0 -0. 631 0 0 1024: 10
�F-T
F
lJ
r
0:\Projects\12 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017ab.syn
Synchro 7- Report Page 2
r
L1 3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour
Queues
F)
t 1
"i7'•r.'...,.K -w i'yr.y r. r r*, t;.._ r... .. .,•+v ��. xV"I",
,. v.�t,fi r� to c. R• i JC"r*"1 �.
WBT ;. NBT,; ?SBTX;�xr .�_ :r..:
rLane Group Flow(vph) 4 529 631 1024
Li v/c Ratio 0.01 0.92 0,.44 0:82
Control Delay 0.0 45.4 13.6 22.1
C Queue Delay O.o: 0 0 OA
Total Delay 0.0 45.4 13.6 22.1
Queue Length 50th(ft): 0 208- 88. 182'
Queue Length 95th(ft) 0 #402 112 256
C InternalLink Dist(ft). 102 1,603 768 14.7
Tum Bay Length(ft)
Base Capacity,(0) 668 578 . 1706 4484
Starvation Cap Reductn 0 0 0 0
$Olback,Cap#ieductn0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio K 001 d, 0.0 0-01
d,.y ry.. 'i"1 ,t �'mtr r•.n t'4^t -y4 �"f^^c r.^;t-n- � ���y7^m.
nterSe6a6 cSummary, y '? . r� ., � � :�?,.= t �-S. ^.5-11"17747,, y._t• '7 �?rk , !7 k.�L .. , ,t,tt}i,y.
# 95...percentile volume exceeds capacity,queue may belonger:
C' Queue shown is maximum after two cycles.
n
n
i
U
r
u
n
Q:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab.syn
Synchro 7- Report Page 3
U
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour
HCM Signalized Intersection Capacity Analysis
4\ t
";'WBR' NB 1.,,SBR
-U-,77 6T- SS
Ii EBR 1,WB
Lane Configurations
Volume: .513 '0 69 893 .1
(vph)` 0 0. 2 403. 0 57 4
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 19.00
Lane Width 12:. 1 12 16 1.6 16 12 121 12 11 11 11
Total Lost time(s) 6.0 6.0 6.0 6.0
Lane Util;.Fador 1,00 1.00 0.95 0.95
Frt 0.86 0.98 1.00 1.00
PhRotected .1.00 0.96 1.00 1.00
8 atd.Flow(prot) 164.4 1946. 3432 331.5
FItPearfiff6d 0.75 0.95 0.85
.Said.Flow(perm) 164 1523 3249. . 282 1 3
Peak,-hour factor,'PHF 02 0.92 .0.50 0.87 0.87 0.87 6.62 0:820.82 '0.94 0.94., -0.94
Adj.Flow(vph) 0 0 4 463 0 66 5 626 0 73 950 1
.0 0': 7 .0: 0 O� '0
RTOR Reduction 0 2 0 0 0'
Lane Group Flow(vph) 0 2 0 0 522 0 0 631 0 0 1024 0
Heavy Vehicles(%) 2% 2% 0,016 4% 6% 25%,-. 5%. 5% 150/6 .4%.. 100%
Turn Type Perm Perm Perm Perm
Protected Phases 4 8 2 %6
Permitted Phases 48 2 6
Actuated Green,G(s) 2 1 5..2 25.2 .26.8, 29.8
Effective Green,g(s) 25.2 25.2 29.8 29.8
Actuated,g/C Ratio 0.38 .0.38, 0;44 .0.44
Clearance Time(s) 6.0 6.0 6.0 6.0
Vehicle Extension-(s) 3.0 3.0 3.6 3.0 r I
Lane Grp Cap(vph) 618 573 1445 1256
A Rati o.Prot 0.00
v/s Ratio Perm c0.34 0.19 c0.36
v/c.Ratio 6.00 0.01 0.44 0.82
Uniform Delay,dl 13.1 19..8 12.8 16.2
Progression
Fact0r 1.00 .1.00 1.00 1.00
Incremental Delay,d2 0.0 18.8 0.2 4.2
Delay 1.3.0 20.4
-(q 13.1 38.6
Level of Service B D B C
Approach'DelayAQ/
13A 38.6 110 20:4
r i
Approach LOS B D B C
r6ters-
HCM Average Control Delay 22.7 HCIVI Level of Service C
HCM:Vb!urn y7 e to
ratio 0,86
Actuated Cycle Length(s) 67.0 Sum of lost time 12.0
Intersection Capacity Utilization, 88.56/o i.IC,U Level of Service E
Analysis Period(min) 15
c Critical Lane Group L
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab.syn
Synchro 7- Report Page 4
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour
Timing Report, Sorted By Phase
r Movement NBTL EBTL SBTL WBTL
U Load/Lag
Lead-Lag Optimize
Recall:Mode Min Mid Min Min
itinu' m Split(s) 41 31 41 31
Maximum Split(%) se.A. 411/0, 56.9% 43:]%
Minimum Split(s) 35 10 35 10
Yellow Time(s ): 4 4 .4 4
All-Red Time(s) 2 2 2 2
Minimum Iftiti6i(o). .4. 4 4 4
Vehicle Extension(s) 3 3 3 3
U Minimum G S, 3 3
@p
Time Before Reduce(s) 0 0 0 0
Time To:.Reduce':*(s): 0 .0 0. 0:
Walk_Time(s)
Flash.' o ta-
W lk(t
Dual Entry Yes Yes Yes Yes
in-hibit:Max Yes Y68 Yes Yes
Start Time(s) 0 41 0 41
End Time-(s): 41., 0 41, .0
Yield/Force Off(s) 35 66 .35 .66.
Yield ide:Off.170
To :35 66 35 66
Local Start Time(s) 0 41 0 41
Local Yield,(s) 35 66 35 66
Local Yield 170(s) 35 66 35 66
1. -
Intersecto'n Summary
Cycle Length 72
Control T
ype Semi Act=uncoo�d
Li Natural Cycle 65
S lits and Phases: 3:Casa Blanca Drivewa &Os ood Street
Lir
r
Li
Li
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017ab.syn
F1 Synchro 7- Report Page 5
Lj
n
U
r �
6: BB Entrance & Osgood Street 2017 Build AM Peak Hour
Lanes and Geometrics
Lane`-Group; WBL� HVBR NBT
r�
Lane Configurations
Ideal Flow(vpf pl) 1900 1-900 1900. 1900 1900 1900
Lane Width(ft) 12 12 12 12 12 12
Grade(-%) 00% 0%0. 0'/0
Storage Length(ft) 0 0 0 300
Storage Lanes 0 0 0 1.
Taper Length(ft) 25 25 25 25 ,
Lane Vil.Factor 1.00 1:00: 0.951 0:95 1.00. 0.95
Ped Bike Factor '
Frt 0.969`
Flt Protected 0.950 r
$atd:Flow(prot):. 0 0 3358 D. 1770 3471
Flt Permitted 0.950
Satd.Flow(perm) 0` 0 3358 0 1770 347-1
Link Speed(mph) 30 30 30
Link Distance(ftY 300 .227 383
Travel Time(s) 6.8 5.2 8.7
r�
'^5T
lntersec`8on Summary }� ti.
Area Type: Other
r �
F)
L_J
r ,
u
r�
LJ
r
u
r �
LJ
l�
l
LJ
0:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover7raffic1CA12017ab.syn
Synchro 7- Report Page 6 r
r �
6: BB Entrance & Osgood Street 2017 Build AM Peak Hour
Volume
r'• `� r. t ,;i•. 4rr ,,:1
ne. roup,.. .... , .4 ,':VilBL1<, IIVBR � NBT. ;. NBR. '.SBL� :.SBTX;
Volume(vph) 0 0 452 118 51 963
Cpnfl.Ms:(#/hr)
Confl.Bikes(#/hr)
Peak Hour Factor092 0 92 0.89 0.89 090 0.90
Ell Growth Factor 100% 100% 100% 100% 100% 100%°
Heavy NehlCles(%). 0% �0 5%. 1%. 2% 4%
_._
Bus Blockages(#/hr) 0 0 0 0 0 0
C Parking (#7hcj
Mid-Block Traffic(%) 0% 0% 0%
Add Flow(vph). 00 508' 133 57 1070
n Shared Lane Traffic(%)
Lane Group Flow(vph) 0. 0 64.1: D 57 1070_
+e'* r•r+^••;rs•:.* :v:cr,.n;�trf: —,-.� J .-- ,..... ^� -r-- .,.•c+ , --^z-s—a 7 .n v
�7.-� 1i r1p' ' ,2 �} S ,y !i! ;✓.i t-S,t-� J:T' a:rS ' )n G1.t 'F'+rl1 T$',.Ti".
n#ers°cGon. urnma//// }ry Y
�...C,.
Iy�
W
r
r
U
n
Lj
P.
V
E
n
n
u
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017ab.syn
M Synchro 7- Report Page 7
F
Li
6: BB Entrance & Osgood Street 2017 Build AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
.7
, i-, -
Movement NBR'
;,-
Lane Configurations
Volurne(veh/h) 0 .0 452 118 51 963
Sign Control Stop Free Free
Grade 00%,' 0% 00/0
Peak Hour Factor 0.92 0.92 0.89 0.89 0.90 0.90
y:fi.oW rate(vph)
0: :0. 508,: 133 57 1070.
Pedestrians
*e Width eft),
Walking Speed(ft/s)
Percent Blockage
Right tum flare(v-eh)
Med.ian..tvD.eNone None-
Median storage veh)
Upstream signal(ft) .227
PX,platoon unblocked 0.89 0.89 0.89
vp,cotiflictinig volume'1.lume, 1222. .320 640
vC.1.,stage 1 conf vol ri
vCu,unblocked vol 1001 0 347
tc. singld,.(S), 6..8 6.9
t C:2, stage(s)
tF.w 8.5- 3..3
pO queue free% 100 100 95
I CM ca0acity('Veh/h) 205 970 1075
bire'ct-10-'n'-,1ane NB 1 NB *88 1" 8132 8132C
Volume Total 339 302 57 535 635
Volume Left 0 0 57 0 0
Volume:Right.- 0 133 0 0 0
cSH 1700 1700 1075 1700 1700
Volume to,Capacity 020 0.18 0.05, 0.31 0.31
Queue Length 95th(ft) 0 0 4 0 0
Control belay:(s) 01.0. 0..0. 8.5 0.0- 0.0
Lane LOS A
Approach Delay,*(s) 0...0; 0.4 r
Approach LOS
L i
nu .
Average Delay 0.3
intersection.On C.apacity Utilization -30-0P/0 ICU.Level of Service. A
Analysis Period(min) 15
LJ
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab.syn
Synchro 7- Report Page 8
8: Commerce Way& Osgood Street 2017 Build AM Peak Hour
Lanes and Geometrics
_ 1
Laiie:Group�."ti EBL;, 'EBT' ;;EBR'.' `;WBL IfVBT INBR .. NBL :'NBTk :NBR''t ,SBL x�SBl�,ktSBR
Lane Configurations 4 r
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 9900 1900 1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grade % 0%. 0 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
St©rage Lanes 0 0 0 1 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
ELane Jtil Factor 1.00 1.00.
1:00 L00 1;00 140; 0.1 0,95' 1.01 1;00- 0:95 :0:95
Ped Bike Factor
Frt 0:903 0.850 0:997
Flt iProtected 0.986 0.953 0.996
U _ _
Satd :Flow(phot) 0 1481 0 0 1793 1,615 0 3415: 0 -0 3456 -0
Flt Permitted 0.986 0.953 0.996
Satd Flow(perm)' 0 1481 0 0 1793 1615; .0 3415 0 0 3456. 0
Link Speed(mph) 30 30 40 40
Link Dista nce;(ft) .360 315 383, 811'
Travel Time(s) 8.2 7.2 6.5' 13 8
R`T`:+9!'`-. .'7,,.;.+A 'f"n.. ...•rv'T-.^"i^>^,+•..yY -r sr+-r .�.-�..'c .m.J,'�'r• �Z L,v.".^^t r
raters�s'iGecaontymrnary
Area Type: Other
1�1
r
Li
n
r
L
n
r
Lj
r,
Ls
Lj
Q:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017ab.syn
rl Synchro 7- Report Page 9
u-
I
iJ
8: Commerce Way& Osgood Street 2017 Build AM Peak Hour
Volume
SBR
L—an .7,IB.rl*., 6t
Volume(vph) 6 0 16 87 1 27 33 419 0 0 911 16
C-601.Fids..JA/hr)`
Confl.Bikes(#/hr)
P.eak,Hour.Factor 0.61 0.61 0.61, 0.88 U& 0.88. :0.95 0:95 .0.95 %0.92: 0.92 0.92
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy Vehicles
8%: 1%0 0%. 9%, 5% 0% 0% 4% 13%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Mid-Block Traffic(1/o) 0%W(0) 0% 0% 0%
Add No 10 0 26** .99 1 3 1 1 .35 44.1 0 0 99.0 17
- ...
Shared Lane Traffic(%)
Lane Group flow{voh):, 0 36 6 _0 100 81. 0 476 0 1007 0
IN"
rs
L_J
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CA12017ab.syn
Synchro 7- Report Page 10 r
8: Commerce Way& Osgood Street 2017 Build AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
'A
M&g
9t,
Lane Configurations
Volume,(yeh/h) 6 0 116 81 1 27. 33 .419 0 0 .91.1 .1.6
Sign Control Stop stop Free Free
Grade 0% 60/0
Ls 'Peak�our Factor 0.61 0.61 0.61 0.88 0.88 0.88 0.95 0.95 0.95 0.92 0.92 0.92
46uriyflow rate(-vph) 10 0 .26 99 1 31 35: 441 0 O: -990 1:7
Pedestrians
Lane,Wdth
Walking Speed(ft/s)
P.ercent 15166kage
Right turn flare-(ve'h)
Median type, None .None_
Median storage veh)
Upstream signal
610
pX,platoon unblocked
yp, conflicting Volume 1320 1509. 504 1032 1518 221. 1008 -441'
vC1,stage 1 conf vol
stage,2 coni vol
vCu,unblocked vol 1320 1509 504 1032 1518 221 1008 441
tC,single.(p) 7.19 61'.9. 7.31 71-.5, 6.5 6.9. 4.3 4.1
r tc,2 stage(s)
Li T(s) 3.7 4.2 15 3.b, U 3 2.3 22
pO queue free 89 100 94, 42 99 96, 95 1010
cM capacity(voh/h) 91 1 97 473 171 113 790 643 F 1130
Il Dfiido-ne,16ne.-i -E8 f -WB'1 WB 2 fftl� NB.2- .89 f.* §9.2'
Vol.ume To.tal 36 ' 100 ' 31 182 29.4660 347
Volume Left 10 990 35 0 0 0
Volume Right- .2.6:, .0. 81 .0 0
CSH 221 170 790 643 1700 1700 1700
� �
Volume toCapacity; 016 0.59 0.04 0.050.17 0.39 0.20
Queue Length 95th(ft) 14 79 3 4 0 0 0
Control .24.4 52.8 9.7 206 0.0 0.0 �0.0:
7.Do!
4y kq/ , .I
Lane LOS C F A A
r
Appr6ac
I)Deloy:(4) 24.4 .42.7 to- 0.0
Li Approach LOS C E
Average Delay 4.2
Intersection Capacity Utilisation. 55.0% ICU LeV61[of.SeTvice A
Analysis Period(min) 15
Lj
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017ab.syn
r Synchro 7- Report Page 11
r
Lj
r
11: BB Entrance & 2017 Build AM Peak Hour
Lanes and Geometrics '
a''ne'Group7777-77'777. ;Y:EBL' -EBT EBR ; L ,':WBT WBR f` NBL: BT `'NBR ..SBIh: SBT ;;SB
N
Lane Configurations
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width(ft) 12 12 12 12 12 12 12 12 12 12 12 12 `
Grade 0% 0% 0% 0%,_
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util.Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '
Ped Bike Factor
Frt 0.865
Fit Protected 0.955 0.992 {
Satd.Flow(prot) 0 1779 0 0 1611 0 0 1863 0 0 1848 0
Flt Permitted 0.955 0.992
Satd.Flow(perm) 0 1779 0 0 1611 0 0 1863 0 0 1848 0
Link Speed(mph) 30 30 30 30 "
Link Distance(ft) 223 77 66 133
Travel Time(s) 5.1 1.8 1.5 3.0
r H.: y i; x,<a , at w t ry, f
nterse ion'•Summary, •,� a�,,,'�� ,,, ,�4. �, ,,,.�:, �u. •.F. .,.. µ....;,
Area Type: Other
r�
ri
i1
r �
v
rl
f
t T
U
f �
l�
r �
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017ab On-Site.syn
Synchro 7- Report Page 1
r'+
r-
11: BB Entrance & 2017 Build AM Peak Hour
Volume
r rie.Group ._ SEBL :EBT_ "EBR�_._WB _.. WBT .,NBBR . ,SSBRLB 7R
Volume(vph) 137 7 0 0 0 5 0 20 0 5 25 0
Confl.Peds.(#/hr)
Confl.Bikes(#/hr)
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy Vehicles(%) 2% 2% 2% 2% 2% 2% 2% 2% 261, 2% 20% 2%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr)
(� Mid-Block Traffic(%) 0% 0% 0% 0%
Adj.Flow(vph) 149 8 0 0 0 5 0 22 0 5 27 0
n Shared Lane Traffic(%)
`Lj Lane Group Flow(vph) 0 157 0 0 5 0 0 22 0 0 32 0
nterseetlon Gummary.
r,
l
Lj
P
Li
n
Lj
n
LJ
n
1 '
Li
n
n
L
n
Li OAProjects112 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab On-Site.syn
n Synchro 7- Report Page 2
Lj
F
Lj
11: BB Entrance & 2017 Build AM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
IL
EBL7 TBT .7'EBR ME, WBT-,, WK'K- '7N BL NBT NBR 8131 SBA
Lane Configurations 4
Sign Control Stop Stop Stop Stop
Volume(vph) 137 7 0 0 0 5 0 20 0 5 25 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate(vph) 149 8 0 0 0 5 0 22 0 5 27 0
77-71131,`7 WB Vf-1 °SBI:17'7.�'. pry, :77 777:7,4k t7.7,77,
Volume Total(vph) 157 5 22 33
Volume Left(vph) 149 0 0 5
Volume Right(vph) 0 5 0 0
Hadj(s) 0.22 -0.57 0.03 0.07
r I
Departure Headway(s) 4.3 3.6 4.3 4.4
Degree Utilization,x 0.18 0.01 0.03 0.04
Capacity(veh/h) 832 967 790 792
Control Delay(s) 8.2 6.6 7.5 7.5
Approach Delay(s) 8.2 6.6 7.5 7.5
Approach LOS A A A A
ntersebtiori.St�mma�r=,
Delay 8.0
HCM Level of Service A
Intersection Capacity Utilization 26.9% ICU Level of Service A
Analysis Period(min) 15
L
C)
L J
fl
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017ab On-Site.syn
Synchro 7- Report Page 3
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour Observed Flow
Lanes and Geometrics
Lane'Group" 4 ''EBL ' EBT r -EBR WBL WB? `W8R i,NBA �7 BT?,
Lane Configurations
Ideal:Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900• 1900 1900 1900. 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade!— 0% 0%_ 0 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0' 0 1 '0 0 0 0 0
n Taper Length(ft) 25 25 25 25 25 25 25 25
V Lane Util Factor 1.002 1:00 1.00 0.93 0.95 1.00 0.95 0.9.5, 1_:00 0.95 0.95 0.95
Ped Bike Factor
Frt 0.865 0,962
At Protected 0.950 0.964 0.996
Satd Flow(pr4t) 0 1-644 0 1869 1815 0. 0- 34;33 0 0 3314 0
Flt Permitted 0.755 0.779 0.946 0.855
Satd Flow-(perm) 0 1644 0 1485 1467 0 0 3248 0 0 2845.; 0
Right Tum on Red Yes Yes Yes Yes
Satd.Flow(RSOR) 8}: 26
Link Speed(mph) 30 30 40 40
Lmk Distance(ft) 182 1083 848 227
Travel Time(s) 4.1 24.6 14.5 3.9
. rrra-{.-,;+»...e.:�^-:^;'+S:f -n-ry-.•-'-na-+, .T ;. r -m.-,... �."�.i'�".�'„?r" ^''.'rF..� - - -lr'7 •w.r-+�.
In teri66bon`Sum&iy
U Area Type: Other
n
Li
n
{4 3
U
r
U
F
U
n
Ls
r
Li
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017ab-obs.syn
Synchro 7- Report Page 1
j
n
U
/ 1
3: Casa Blanca Driveway & Osgood Street 2017 Build AM Peak Hour Observed Flow t
Volume
LanerGroup , EBL . EBT EBR "WBL WBT: ._'WBR ;,•NBL�a`..NBT.. NBR;;; ;.SBL, ' ABT°'rr SBR
Volume(vph) 0 0 2 403 0 57 4 513 0 69 893 1
Confl Reds {#m6 `
Confl.Bikes(#/hr)
Peek Hour Factor; 0.92 0.92 0.50 0 87 U7 0.87 0.82 0.82 0:82 0.94 0:94 0.94 =
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
He Vehicles(%); 20/. 210 0% 4%: 0% 6% 25'/0 5% 5% 15% 41/6 1000/.
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 /
Mid-Block Traffic(%) 0% 0% 0% 0% `
Adj.Flow(vph) 0: 0; 4 463 0 66 5 626 0 73 9% 1
Shared Lane Traffic(%) 42% }
Lane Group Flog(yph). 0 4 0` 269 :260 0 0 631 0 0 1024 0 .,
`"'a�TP-z. ,�• -r„�N+za —^C r•�..r .r^: (�^. _ .—r s— �-.ri :�xv 1',^fCS9hi�y:1 ����'°`+-'�`�Y^.
Iniersecontiummary ,, k r•.,.4�W.�fu„ rr.91
r;
lJ
f 1
l_i
1
� i
r
r�
r �
�J
LJ
U
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017ab-obs.syn
Synchro 7- Report Page 2
L.J
tvl
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour Observed Flow
Queues
CAiSCt.
Lane Group Flow(vph) 4 269 260 631 1024
vlc sati.6. 0.01 OM 0.t6. 0:41 6.75
Control Delay 0.0 25.1 21.9 10.8 .16.6
Queue Delay 6.0- 0-.b 0,0. 0-0
0 0.0.
Total Delay 0.0 25.12 1.9 10.8 16.6
Queue Length.-501:h(4) 01 81- 68 6.5 1. .133
Queue Length 95th(ft) 0 164 147 112 255
Internal Link Dist
Turn Bay Length(ft)
Base Capacity(0) 827 708. 713- 2169 1900
Starvation Cap Reductn 0 0 0 0 0
80iIiback CAD R-,-bd--Uctn 0 P 0- 0-
Storage Cap Reductn 0 0 0 0 0
R6&d`6d-.-v/c R—afio. 0.00 0.38 036: :0.29 0.54.
�5
Li
U
r
Li
r
Li
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Ancloveffraffic\CM2017ab-obs.syn
Synchro 7- Report Page 3
Lj
r
Lj
� 1
3: Casa Blanca Driveway& Osgood Street 2017 Build AM Peak Hour Observed Flow J
HCM Signalized Intersection Capacity Analysis
Movement ` ; "EBL '' EBT , EBR ,YVBL WBT?' BR
Lane Configurations
rations
Volume(vph) 0 D. 2 403 0 5.7. 4 513 0 69
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12, 121 16 16. 1;6 12 12 12 11 11 11
Total Lost time(s) 6.0 6.0 6.0 6.0 6.0
Lane WI.Factor 1.00 0.95 0.95 0.95 0:95
Frt 0.86 1.00 0.96 1.00 1.00 r
Flt Protected 1.00 0 95 .0.9.0 1:00 100
Satd Flow(prot) 1644 1869 1815 3432 3315 `
Flt Permitted 1.00 :0:76 0.78: 0:95 0.8.5 r
Satd Flow(perm) 1644 1485 1466 3249 2844
Peak-hour facto;PNF 0.92 0:92 0:50 0 87 0.87 0 87 0:82 0.82 0.82 0:94 0.94 0:94 �-
Ad) Flow(vph) 0 04 463 0 66 5 626 0 73 950 1 r-1
RTOR Reduction(vph 0 3 0 0 18
.0 0 0 0. 0 Q. 0
Lane Group Flow(vph) 0 1 0 269 242 0 0 631 0 0 1024 0
Heavy Vehicles(%) 2% 2% ov 4% 0'%: 6% 25% _-5% 5% 15% 4%0 100%
Tum Type Perm Perm Perm Perm r
Protected Phases 4 8 2 6
Permitted Phases 4 8 2 6
Actuated Creph, G(s) 16.3 16.3 16.3 26.8 26:8
Effective Green,g(s) 16.3 16.3 16.3 26.8 26.8
Actuatedg/C Ratio 0.30 0.30 0.30 0.49 0.49"
Clearance Time(s) 6.0 6.0 6.0 6.0 6.0
Vehicle Extension(s) 3.0 3.0 3.0 3.0 3.0.
Lane Grp Cap(vph) 486 439 434 1580 1383
lJ
v/s'Ratio Prot 0.00
v/s Ratio Perm c_0.18 0.160.19 c0.36 r
v/c Ratio 0.00 0.61 0656 0..40 0 :74.
Uniform Delay,d1 13.7 16.7 16.4 9.0 11.4
Peogression Factor 1,00 1.00 1.00 1.00 1.00
Incremental Delay,d2 0.0 2.5 1.6 0.2 2.2 r
Delay W 13.7 19:2 17.9 9.2 13.5
Level of Service B B B A B 1
Approach Delay(s) 13.7 18.6 '9.2 13:5 r ,
Approach LOS B B A B
r reoonr � .r: s.?°� - rtrr�^-T^.^^ Vie!" .-�•..'"'�i i'•tf`.`Lt"fi.r. -'+r'^^'"'s'!'.,q'""' 'T'.S ; r.'�.�,�,Rq-r c•�.�'trf i g` t {,G � '-yv�+ N+;S'F'f' l�
S immaryr �t H: :� r} }y t ti', tMr T. rC si •S n'. .�, ✓:H . r,1 r.1 �:✓ ,✓ x a a !x' 13tH l .,.fe .4Pfy w '
HCM Average Control Delay 13.5 HCM Level of Service B r
HGM Volume to Capacity ratio 0.69.
Actuated Cycle Length(s) 55.1 Sum of lost time(s) 12.0 `J
latersection Capacity-Utilization 75:6% ICU.Level of Service D.
r�
Analysis Period(min) 15
c Critical Lane Group
r �
U
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017ab-obs.syn
Synchro 7- Report Page 4
3: Casa Blanca Driveway & Osgood Street 2017 Build AM Peak Hour Observed Flow
Timing Report, Sorted By Phase
t
�; „�
'f 4”
U Movement NBTL EBTL SBTL WBTL
Ldad/Laa
Lead-Lag Optimize
pecall Mode' Min Min: Min- Min
Maximum Split(s) 41 31 41 31
Maximur.h 8p,!'jt(%) 56.9,% 43,1 1.% .56.9% 431.1%
Minimum Split(s) 35 10 35 10
L.j Yellow Time(s)' 4- 4 4 4
A _R T 2 2 2 2
ll ed Time(s)
ri Minimum Irntial(s) 4 4 A 4
Vehicle Extension(s) 3 3 3 3
WMU_m`dap(i 'j -3 3* 3
Time Before Reduce(s) 0 0 0 0
Walk Il_f ime(s)
c=lashI_. bon't.. lk(s)-
n Dual Entry, Yes Yes I Yes Yes
LJ
Inhibit Max Yes Yes- Yes:: Yes
Start Time(s) 0 41 0 41
End-rime 41 0 -41 10
r Yield/Force Off(s) 35 66 35 66
Yi6fd/Forc'e Off 17.0(p) 35 66, 35 66.
LocalStart Time(s) 0 41 0 41
Local I Yield(s) 35 66 35 66
Local Yield 170(s) 35 66 35 66
1df6'r's"e_R6h Summary
Cycle Length 72
.4 1 Type Semi Act-Uncoord.
:
Natural Cycle 55
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2 o4
At�.W$
.6 08
01
Lj
r
Lj
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017ab-obs.syn
Synchro 7- Report Page 5
L_j
r
Lj
� 1
3: Casa Blanca Driveway& Osgood Street 2012 Existing PM Peak Hour ,
Lanes and Geometrics
IL
Lanetaroup}i, : EBL'`' ' EBT,=>EBR ` WBL WBT WBFi:. `NBL�''YVNBT 'NBFi' SBL;° J
8BT <8BR
...t' •r�.... 1. _;.
r�
Lane Configurations ' a
ldeaiflow(vphpl) 1900 1900 1900' 1900: 190.0 19.00 1900 1900. 1900. 1900. 190Q 11.900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade{°10) 0% no 0%0 0% r
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 00 0' 0 0 0 0
Taper Length ft 0
25" O 25 .25 25 25
25 25 25
Lane l)tl.Factor. t:00 1.00 1.00 11.00 1.000.95 0.95 1':00_:00 0.95 0.95.: -.0:95
Ped Bike Factor
Frt
:0.894 .0:961 0:999
Flt Protected 0.989 0.966 0.994 r '
Satd Flow(prot) 0 1680. 0 0 1930 0' 0 3574 0 0 3427 0
Flt Permitted 0.908 0.774 0.948 0.563
8atd Flow(perm) 6 1542 0 01546, 0 D 3389`
Right Turn on Red Yes Yes Yes Yes
Satd.Flow(RTOR'), 18
Link Speed(mph) 30 30 40 40
Link Distance(ft)' 182 108.3 848 227 r '
Travel Time(s) 4.1 24.6 14.5 3.9
x^- ,r•n^- - *j'r r
�nterse'-coon Summary' '
Area Type: Other
4>
1
l.J
r 1
lJ
r ;
L�
� 7
4�
ri
L i
LJ
r
L J
Q:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12012px.syn
Synchro 7- Report Page 1 r
3: Casa Blanca Driveway& Osgood Street 2012 Existing PM Peak Hour
Volume
�. �. .�
C
r-T
av 6A
U, Volume(vph) 2 0 7 229 0 92 7 1168 0 105 739 4
Confl.Bikes(#/hr)
Peak Hour Factor 0.35 .0.38 ;038, 0.73 013� 0.73 0.93 -0193 0198 O.W 0.90 :0.900
Growth Factor 100_% 1-66% 106%, 1000/0 100% 100% 100% 100% 100% 100% 100% 100%
Heavy Vehicles I (-5%) .1.QW, �0,% 0.%. ..3-% 5 0/6 0%. 1.%1- .3% 2% 1% 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking,
Mid-Block Traffic(%) 0% 0% 0% 0%
h) _5 0 18 314 0- 126 8 1256-1 -0 117 821.
Shared Lane Traffic(%) - -
Lane broup.Flow_�vph)i 23- D 0 440: 0 0; 1264 0 .0 .942 0
ROROWR&gii
Ell
r
U
r
LJ
r
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012px.syn
Synchro 7- Report Page 2
L_j
r
LJ
3: Casa Blanca Driveway& Osgood Street 2012 Existing PM Peak Hour
Queues
�aneGrdupFt
-v
EBT
...... W8-f N 6T
LaneGroup Flow(vph) 23 440 1264 942
V/c-R.dti 6: .0.05. :0.86 0:73 0
Control Delay 9.0 38.9 17.2 39.0
Q.Ueue Delay 1 bso U, 0.0 0.0
Total. D.elay 9.0 38.9-. 17-2- kb
ON l ue tencift-50th 1 161 227 206
Queue Length 95th(ft) 3 195 308 #350
internal Link Dist 102 1003 766 W
Turn Bay Length(ft)
Base'Capacity
(vph), 572 582 1725, 988.
Starvation Cap Reductn 0 0 0. 0
Spillback:4 Re. ductn- 0 0* Q� 0
Storage Cap Reductn -0 0 0 0
Reduced v/6 Ratio 0.0 4, 0.76 0A :0.95.
7j
UE
#.. .9§!h rcentile:volume exceeds capacity, be eI�o-nger,
Queue shown is maximum after two cycles.
r
LJ
LJ
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA12012px.syn
Synchro 7- Report Page 3
I
► 3: Casa Blanca Driveway & Osgood Street 2012 Existing PM Peak Hour
HCM Signalized Intersection Capacity Analysis
Movement,h' !_ "EBL :EBT. ``EBR' ``.WBL` ''11VBT� WBR _;NBL sr NBT _ : IBR;: SBL '.`
Lane Configurations 4* a�
7 229 0. :9� 105 .739 .4
Volume(vph) -. 2 0 � 1168 0
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Ell
Lane Width 12 12 12 16- 16 :16 12. 12 12 11 11 1'1 Total Lost time(s) 6.0 6.0 6.0 6.0
Lane U.ti[Factor 1.00 ,1.00, 0:95 0.95
Frt 0.89 0.96 1.00 1.00
El
At Protected 0.99 0.97 1.00 0.99:
Satd. Flow(prot) 1681 1930 3573 3428
FIt Permitted 0.91° 0 77 095 0.56
Satd Flow(perm) 1544 1547 3389 1942
Peak=' factor;PHI: 0.38 0.38 0.38, '0.73 0 73 0 73 0:93_ 0:93 0.93 0.90 0.90 0:_90
-- -._. _ _
Adj. Flow(vph) 5 0 18 314 0 126 8 1256 0 117 821 4
Reduction(yph)` 0 12' .0 0` 21 .0. 0 0' 0 0 0 0
�j Lane Group Flow(vph) 0 11 0 0 419 0 0 1264 0 0 942 0
Heavy:4icles('/o); U'/o 06% -M... . 3% 0%0 . . 5 .--0%:- 11%. _3% . 2% 1% 0%
Turn TypePerm Perm Perm Perm
Protected Phases 4 8 2 6
Permitted Phases 4 8 2 6
Actuated;Gre6 "G(s)` 21.9 21.9` 35.1 35.1
Effective Green,g(s) 21.9 21.9 35.1 35.1
Actuated,g/C%Ratio. 032 0.32 0.51 0:51
Clearance Time(s) 6.0 6.0 6.0 6.0
Vehicle Extension(s) 3.0 3.0 3:0 3.0
Lane Grp Cap(vph) 490 491 1724 988
v/s Ratio Prot
n v/s Ratio Perm 0.01 c0.27 0.37 c0.48
v/c Ratio 0.02 0.85 0.73 0.:95,
Uniform Delay,dl 16.2 22.0 13.3 16.2
Progression Factor 1:00 1:00 1_:00 1; 0
C Incremental Delay,d2 0.0 13.4 1.6 18.2
Delay(s) 16;2 35:5 14:9 34..4
Level of Service B D B C
Approach Delay(s) 18:2 05.5 14.9 .34.4
Approach LOS B D B C
T -r.n� n a T�- "n Zn r.r t.,*�.'�+'. [ .r .rqg-w� •cr "t'r3�t zF7 a� 4Fty' N"YjJ r;
Iratersection:Sunmaru,,. �� `� i-a�'�3. :l'ra1.°a,`.r. r���c r:.f4.✓,': ��o�.c1'a:�, '��?". �. : tt �w_s�`• F4
n HCM Average Control Delay 25.2 HCM Level of Service C
U NCM Volume to Capacity ratio Q91
Actuated Cycle Length(s) 69.0 Sum of lost time(s) 12.0
Intersection Capacity Utilization 96.1% ICU Level of Service F
Analysis Period(min) 15
L, c CriticaLLane,Group
C►
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CQ012px.syn
CSynchro 7- Report Page 4
C
3: Casa Blanca Driveway& Osgood Street 2012 Existing PM Peak Hour
Timing Report, Sorted By Phase
' -
04Number:, C, : .' � 2 4 6 ; - -
Movement NBTL EBTL SBTL WBTL
Load/Lag
Lead-Lag Optimize
Recall Mod 6 Min Min. Mi.n `Min:°
Maximum Split(s) .41. 31 41 31
Maximum Split,(0/6) 56:9'/0.96/. 48J% 56.9% 411%
Minimum Split(s) 35 10 35 10
Yellow Tme(s) 4 4, .4
All-Red Time(s) 2 2 2 2
.Minimum Initial -4 4 4 4
Vehicle Extension(s) 3 3
.Minimum 6ap(s) .3 3 3 .:3
Time Before Reduce(s) 0 0 0 0
Time-T6,.Rdduce(s) 0* 0 6 0
Walk Time(s)
Flash Dont-Walk(s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes. Yes
Stan Time(s) 0 41 0 411
End-Time(s) 41 0. 41. &
Yield/Force Off(s) 35 66 35 66
Yield/Force Off,110(s) 85 .66 .35 6.6
Local Stan Time(s) 0 4.1. 0 41
Local Yield(s) 35 66 35 66
Local Yield 170(s) 35 66 35 66
L
Intersection Summary
Cycle Length 72
Contr6l,Type. Semi A6t-Uhcoord
Natural Cycle 75
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2 101o4 X 'tr
TITFT. tt
06 08 LJ
141-i'Mf
Y-
r1
Lj
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveffraffiXX2012ptsyn Page 5
Synchro 7- Report
6: BB Entrance & Osgood Street 2012 Existing PM Peak Hour
Lanes and Geometrics
Lane Configurations
Ideal,F16W(Vp4p!): .190.01 1900 1900 1900 1900: 1900-
Lane Width(ft) 12 12 12 12 12 12
.0% 0% 0%
Storage Length(ft) 0 0 0 300
:
Storage Lanes- 0 0 .0, 1
,
TaperLength(ft) 25 25 25 25
Lane W.Fact-or' too: 1.0.01 .0.95 0.95 1.00 0.95
Ped Bike Factor
Frt Am%
'Fit-Protected 0.950
Satd Flow t), 0 0 3462 0 1805: 3574
At Permitted 0.950
Said.Flow I(perm) .D 0 1805 354
0 3462
Ell Link,Speed- . (mph) 30 30.. 30
Link Distance(ft) 300 227 :383
rTravel Time(s) 6.8 5.2 8.7
U 11-1117f 7(17,7� :171- Rli. Z,
Area Type: Other
n
L
Lj
r
ri
6
f7
Li
M
.L
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2012px.syn
Synchro,7- Report Page 6
r
U
r �
6: BB Entrance & Osgood Street 2012 Existing PM Peak Hour
Volume
t �' �►
Volume(vph) 0 0 1053 209 78 848
Confl.Bikes(#/hr)
Peak.Hourfactor 0..92 0.92 0,91 0.91 0.88 0.88. !
Growth Factor 100% 100% 100% 100% 100% 100%
Heavy Vehacles(%): 0% 0%a. 2% 0% 0% 1%
Bus Blockages(#/hr) 0 0 0 0 0 0 r ,
.parking..(#7fir)
Mid-Block Traffic(%) 0% 0% 0%
AdJ Flow(vph) 0 0 1157 230 8R 964
Shared Lane Traffic(%)
Lane Group Flow{vph) 0 0 1387 0 89 964
^+'7s.'^,r•"8�.'a'..'••vt'r,Tt:'T•`i'gr` 7",v , 'v a4' .��rvf��•x. a- rcr•...c„t jtz' ''^ r - dr e -T'
..."`
,r.( ,�^t-.a Z_ +' ,j'f' ..•`..,"`Y.n. .°�;3� ' x� Y�..1.
intersecbon:Summary r. w: � � r.•=•�
r �
r �
u
r
r�
!z
! l
•1
a.
r �
ri
LJ
0:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012px.syn
Synchro 7- Report Page 7 r ,
r ,
6: 1313 Entrance & Osgood Street 2012 Existing PM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
,W.Ki- WBul,• "..
Movement.
Lane Configurations
Volume
�0
ol (y6h/h) 0 1051 209. 78 848
Sign Control Stop Free Free
Grade 0%. 0%. 00/0
Pe.ak Hour Factor 0.92 0.92 0.91 0.91 0.88 0.88
HourlV-,fl--*bw rite('.ph): P 0 1157 230 89. -964
Pedestrians
LaneWidth(k
Lj
Walking Speed(fYs)
Percent Blockage
Right turn flare(veh)
Median type None None,
Median storage veh)
227
U pX,platoon unblocked 0.72 0.72 0.72
VC,conflicting volume 1931 693. 1387
Vcl,stage: f conf Vol
stage,2:cont vol
vCu,unblocked Vol 1519 0 765
single=(s) 6.8 6.9 .4.1
tC,2 stage(s)
IF(t) 8..5 3.3 22
pO queue free% 100 100 86
CM capacity
ty(veh/h) 69 787 61.9
r
Lj, NB f N6'2 8b I Si]12'Sb3.'
voiume:Total: 771 615 .89 482. :482,
Volume Left 0 0 89 0 0
Volume- Right 0 230, 0 0 0
cSH 1700 1700 619 1700 1700
Volume bCapacity 0.36 0.14 042S
Queue Length 95th(ft) 0 0 12 0 0
. -1.
Li Deiay 6s) 0.0 :11.81 0.-0 -0.0.
Lane LOS B
Appf949h Delays) 0..0 :1.0
Approach LOS
1�7 70;
Average Delay 0.4
.46.1 8 1% ICULd.Y.e.folf Service
Intersection%..0 CapacityUtilization
p.1. , . ;apaci
Analysis Period(min) 15
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2012px.syn
Synchro 7- Report Page 8
Lj
„
8: Commerce Way& Osgood Street 2012 Existing PM Peak Hour
Lanes and Geometrics
Lane.Group EBL EI3T EBR.;. "1NBL;.':'WBTr , WBR 9BTI L'SBR
Lane Configurations 41 '
_
Ideal Flow(vphpl) 1900 1900 1900_ 1900 1900 :1900 1900.. _ 1900 1900 1900 1900 1900 `
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grade{;o) 0 jo. r ,
° 0% 0% 0°l0
Storage Length(ft) 0 0 0 0 0 0 0 0 ,
Storage Lanes 0 0 0 1. 0 .0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25 r
Lane Uii Factor 1.00 1.00 1.00. 1:.00 1 A0 1...06 0.93 0.95 1:00 1,00 0.95 0,95
Ped Bike Factor `J
Frt, 0.906 0:850 0.998
Flt Protected 0.985 0.953 0.999
Satd Flow(prot) 0 1.72.8 0 0 18:11 1615 0 3572 0. 0 3568 0 L�
Flt Permitted 0.985 0.953 0.999
Satd.Flow(perm)_ 0 1728 0 0 181,1 1615 0 3.572 01 0 3568 0 r
Link Speed(mph) 30 30 40 40
Link Distance(ft) 360. 3 5 383 81 `J
Travel Time(s) 8.2 7.2 6.5 13.8
.- cr ^n,.er,.-.-.. ..i.t,. ,-.;.--....• f ...-.-..r^,^t^ '�.'T 7;:w+.'sM 3 '�"'r.m.
fnatersec.rcfiin;Sutrimanj
Area Type: Other
r�
LJ
1
l
r-�
�r
r �
r-�
v
r�
r '
r�
41
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffi6CA12012px.syn
Synchro 7- Report -Page 9
v
8: Commerce Way& Osgood Street 2012 Existing PM Peak Hour
Volume
Lane Group, ',:ESC ,..EBT_ s.�EBR WB C fi^.WBT WBR' .='.;.NBL;; ,:NBT.`.: NBR' .SBL'.:�. BY ;.SBR
Volume(vph) 19 0 45 191 3 106 28 1025 0 0 690 10
Confl.Peds.(#/hr)
Confl.Bikes(#/hr)
4 Peak:Hour':Factor --0 0.80 0 80 0 94 0.94 0.94 0 91 M 0 9.1, 0:85 0 85 0.85
Grow % th Factor 100% 100% 100% 100% 100% 100% 100% 100%° 100% 100% 100% 10.0%
Heavy Vehicles(°(°) 0°l 0'Io 2%. 0% 0% 0,/Q 0'/0 1% 0'/0 0% 1% 00/0
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 . 0
Parking (# 6
Mid-Block Traffic(%) 00/0 0% 0% 0%
Ad) Flow(vph) 24 0 56 2.03
3` 11.3, 31 11,26, 0 0 812 12
�! Shared Lane Traffic(%)
Lj Lane Group flow(vph) -0 .80. 0 0 206 113 0 1.157 0 0 824 0
6'riterse
""—
v
n
u
n
n
Li
u
n
u
n
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012px.syn
r Synchro 7- Report Page 10
rJ
E
rt
8: Commerce Way & Osgood Street 2012 Existing PM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
_.. � .�•
-�NBL,n;:NBT ;-���NBR°... :.SBL-x�_SST .."-•SBR
r �
Lane Configurations
Volume(veh/h) 19 0: 45 191 3 06 28 1025 0' 0 690 10 '
Sign Control Stop Stop Free Free r l
Grade 0% 0% 0°l 0%
Peak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 0.91 0.91 0.85 0..85 0.85
Hourly flow rate.{vph) 24 0 56 203 3
113: 31 1126 0 0. 812. 12
Pedestrians r
Larne Width:(ft)
Walking Speed(ft/s)
Percent Blockage r i
Right tum flare(veh)
Median type None None
Median storage veh)
Upstream signal(#t) 610' '7
X,platoon unblocked 0.76 0.76 0.76 0.76 0.76 0.76
vC;conflicting volume 1557 2006 412% 1650 2611 563 824 1116
vC1,stage 1 conf vol r,
vC2,stage 2 conf vol
vCu,unblocked vol 1100 1691 412 1223 1699 0 824 53 u
tC,single(s) 7.5 6.5. 6.9. 7.5. 6.5 `6.9. 41 4.1
r�
tC,2 stage(s)
IF(s) 3.5 4.0 3.3 3:5 4 0 3.3 2:2 2.2 L_i
p0 queue free
77 100 90 0 95 86 96 100
cM capacity.(veM) 104 69 589 92 68 829 815 793 r
Direction,Lane# EB1 WB 1 W132- N91 ' NB 2 SB 1. . .98 2 ,
Volume Total 80 206 113 406 75;1 541 28.2
Volume Left 24 203 031 0 0 0 r
Volume Right 56 0 113 0, 0 0 12
cSH 247 91 829 815 1700 17,00. 1.700 `
Volume to Capacity0.32 2.26 6.14 0.0.4 0.44 0.32 0,17
r-�
Queue Length 95th(ft) 34 464 12 3 0 0 _ 0
Control Delay.( 26.4 674.7 10:0 1;2 0.0 0.0 0.0
Lane LOS D F B A
Approach Delay js) 26.4` 439:9, 0.4 OA r
Approach LOS D F k J
-rr_; -raax;Y.r.. "..';p }Z.r nor,.}.- 3."+gT'•G:•,yj`t v - 'w!1,IC"}x"�%!�^sr'�.�;'�'r* /"'- -..���N'-°�'ti'':�•`�'t'''`*.C""
rntersecfionr$ummar��r �'} �• „�, h: � AxF, �. . �� r.ax ,.,
Average Delay 60.1 r-
fersection Capacity Utilisation 72;6% ICU Level of SerVice C J
Analysis Period(min) 15
r_!
u
r�
u
r�
U
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2012px.syn
Synchro 7- Report Page 11 r
L J
• f t
L1
3: Casa Blanca Driveway & Osgood Street 2017 No-Build PM Peak Hour
Lanes and Geometrics
;,.EBT;. NBR
Lane Configurations4#
Ideal.,1716w .1900, 1.900 1900 1900 1900 1900" .1900. 1900. 1900 .1900 1900. 19001 ,
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 1-1 11
Grade %) -06/. 0?/. .0% 0%
Storage Length(ft) 0 0 0 0 0 0 500 0
.Storage Lanes 0 0_ 0 0 0 0 1� 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane litil.Facto 1:00 1.00. 1.00. 1'.001;00 1.00 0.95.- 0.95! t;00 1.00 1.00 1.00
Ped Bike Factor
F4 0.8941 0;963 0.999
Flt Protected 0.989 0.965 0.950
$a.t.4.9 low-(Pro;) .0 168.0 O� 0. 1932 0, 0 .3574 0 171 11 1811 01
At Permitted 0.907 0.772 0.883 0.114
Satd. w P6 F o (Perin); 1541 .0. Q ` 1546 0: 0, 3156 0 206 1817 0
I , )
Right Tum on Red... Yes Yes Yes Yes
Satd.Flow(RTOR) 18: .28
Link Speed(mph) 30 30 40 40
Link:Dbitance M 182 1083 848 227
Travel Time(s) 4.1 24.6 14.5 3.9
Area Type: Other
Ell
E,
P,
Li
E
i
Q:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraIfic\CA\2017pnb.syn
Synchro 7- Report Page 1
rt
3: Casa Blanca Driveway& Osgood Street 2017 No-Build PM Peak Hour
Volume
Larie.GrouI'
I . , N8T. Aga :';98k
Volume(vph) 2 0 7 246 0 94 7 1222 0 107 780 4
Confl,..Ped§.(4/hr)
Confl.Bikes(#/hr)
Pea,k Hour F I actor 0.38 :0:38 - 0.38 -0 J3: 0.73 0.73 0.93, 0.93 0.93. 0.90 0.90 0.90
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
140*V'6 W616 s ON 0% , -0%, 0% 3% 0% 5% 0% 1a_/a. 3%: 2%: 1% 0%
Bus Blockages(#/hr) 0 0 0. 0 0 0 0 0 0 0 0 0
P rking, (Whr)
Mid-Block Traffic(1/o) 0% 0% 0%
Adj.'Pbwftph) 5. 1-8 33.7 .0. :1.29 8. 1.814 0 .11.9 867 4
Shared Lane Traffic(0/6).
Lane,Group-Flow I :(yph) 0 Z.. 0' 0, 466 0 0 1322 .1.19 .871 :0
Rtiwi
rl
0:\Projects112 PROJECTS2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pnb.syn
Synchro 7- Report Page 2
3: Casa Blanca Driveway& Osgood Street 2017 No-Build PM Peak Hour
Queues
'EBT
Lane Group Flow(vph) 23 466 1322 119 871
V/d Ratio .0.04 0i891 0:834 1-J.6 0.96
Control Delay 9.0 42.6 21.8 162.9 40.8
Queue Delay 0.0, 0.0 0-0: 0.0 0;0
Total Delay 9.0 42.6 21 8 162.9 40.8
q*P Length 5
11.771 257 -65 361
Queue Length 95th(ft) 3 1 212 #371 #1_21' #6'16"
Int emal Link Dist(ft-). `102 .1003 768 147
Li
Turn Bay Length(ft) 500
Bas.e Capacity(Vph) 564572 1584 10.3 912
Starvafion Cap Reductri 0 0 01 0. .0
:
pillbackC :Reducth.. 0 0 0 .0 0,
...........
Storage Cap Reductri 0 0 0 0 0
Fteduc-ed"-.V/c Ratio 0.04 0.91 0.83 1.16 O'96
volume exceeds capacity,quietie is theoretically infinite.
Queue shown is maximum after two cycles.
4 .95thipercentile Volume exceeds capacity,-queue may b.p.longer.
Queue shown is maximum after two cycles.
Lj
Li
Li
QAPrcjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pnb.syn
r_1 Synchro 7- Report Page 3
Li
3: Casa Blanca Driveway& Osgood Street 2017 No-Build PM Peak Hour
,HCM Signalized Intersection Capacity Analysis
Now, -
NBL, T
Movement,
Lane Configurations
V61ume..(vp -122.
2 0 7 .246 0 94 7 .2 0- 107 780 4
.Ideal.Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane.1 Wid.t.h 12 12 12, 16 16 16 12. 12 121 - 11 11- 11
Total Lost time(s) 6.0 6.0 6.0 .6.0 6.0
Lane' iii.Factor 1.00 1.00 0.95: 1 i0o 100
Fa 0.89 0.96 1.00 1.00 1.00
FR.Protected7 0.99 0.97' 1.00 0.195. 1,.00-.
Said.Flow(prot) 1681 1932 3573 1711 1817
FR Permitted 0!91_ 0.77' 0;68 011 IM
S.a.td.Flow(perm) 1541 1544 3156 205 1817
Peak.h
; 6urlactor,PHF 01
.38 0.38 �0.38: .0.73. 0.73: 0.73 0.93, '0.93 0.93 0.900-90; 0M
A.d I j.-Flow I.1 ' ; .(vph) 5 0 18 337 0 129 8 1314 0 119 867 4
u6t
AT kked on(0) 0 12 0 0 19 0 .0. 0 0 0 0
Lane."Group. -. Flow(vph) 0 1 1 1 0 0 447 0 0 1322 0 119 871 0
Heavy Vehicles 0% 0% 0% 3% -. ., 0%. 5% 0% 1%. 2% , -1% ...0%
Turn Type Perm Perm Perm Perm
4 8 2 0
.P.ermitted Phases 4 8 2 6
Actuated Green,G(s) 22.8 22.8, 35.1, 351 341
.Effective. I Green,.en,g..(s) 22.8 22.8 35.1 35.1 35.1
Actuated..glC Ratio,atio. 0.33 0.33 0.50. 0.5-01 0.50
Clearance Time.(s)1 6.0 6.0 6.0 6.0 6.0 V
VeNcle Extension`(s) 3.0 3.0 3.6 10 3.0:
Lane Grp Cap(vph) 503 504 1585 103 91.2
v/s Ratio'Prot 0.48 L J
v/s Ratio Perm 0.01 c0.29 9.42 c0.58
V/d Ratio 0.02 0.89 0.83 1-116 0,96
Uniform Delay,dI 16.0 22.3 14.9 17.4 16.6
.
Pro.grepsionfactor 1.00 1.00 1.00, 1.00 1 00
I Incremental. . t.Delay,d2 0.0 17.0 3.9 136.5 19.6
Delay(s) 16.0, 39.3. 1:819 163.9 36.2
Level of Service B D B F D
Approach belay16 0_ 181
VI
Approach LOS B D B D
77
7; "�W,--.7,47110YE
HCM Average Control Delay 33.4 HCM Level of Service C
HCM Volume to Capacity,ratio
Actuated Cycle Length(s) 69.9 Sum_
of lost time(s) 12.0
i6t I qsection.I Capacity'Utilization' 11-00/0 ICU.Level,of:8ervice 1H
Analysis Period(min) 15
c Criticaliane broub
Vi
Q:1Projects112 PROJECT&2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover7ral'116CA12017prib.syn
Synchro 7- Report Page 4
L
P
3: Casa Blanca Driveway& Osgood Street 2017 No-Build PM Peak Hour
Timing Report, Sorted By Phase
�jr l
;e'7t5
as umj:
Movement NBTL EBTL SBTL WBTL
LeA. d/Lag
Lead-Lag Optimize
Recall Mode Min Min: Min Min
Maximum Split(s) 41 31 41 31
Maiimuntt /0) 5.0% 43.1% 56.9% 43.1%
Minimum Split(s) 35 10 35 10
YellowI Time(0) 4 .4: 4 -4.
All-Red Time(s) 2 2 2 2
Mirlimuninitial 4 4- 4. 4
Vehicle Extension(s) 3 3 -3 3
Minimum Gap(s) 3 3 3 3
Time Before Reduce(s) 0 0 0 0
Time to Reduce(s): .6 6 6 4
Walk Time s)
Fias.h:D Dont Walk
Dual Entry Yes Yes Yes Yes
inhilb--ft Max Yes Yes: Yes. Yes-
Start Time(s) 0 41 0 41
41 0 4-1:
Time(s) 0.
Yield/Force Off(s) 35 66 35 66
Yield/Force%Off 170.(s) 315 66 35,: :66
Local Start Time(s) 0 41 0 41
Local,Yield- (s) 35 66 35 -66
Local Yield 170(s) 35 66 35 66
Intersection.Summary
Cycle Length 72,
Lj ControlType Semi Act-Uncoord
..
Natural Cycle 80
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
F�yt o2o4
'NIX
Lj06 08
F
Ell
r
Li
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CAT01 7pnb.syn
Synchro 7- Report Page 5
Lj
E
r �
6: BB Entrance & Osgood Street 2017 No-Build PM Peak Hour L
Lanes and Geometrics
,. rr WBLTr`- WBR ' NBT;.,._•.NBR. r"SBL SBT
�.an'e Group,;
Lane Configurations
ideal Flow(vphpl) 1900 1900 1900 1300 1900 1900
Lane Width(ft) 12 12 12 12 12 12
Grade(%o) 0% 0%0 0% r ti
Storage Length(ft) 0 0 0 30.0 !
Storage Lanes 0 0 0 .1
Taper Length(ft) 25 25 25 25
Lane W1.Factor 1:00 1;00 0:95; 0.95 1.00 .0:95,
L
Ped Bike Factor
Frt 0:976. r�
At Protected 0.950
Satd Flow(prof) 0 0 3465 0 1805 3574
Flt Permitted 0.950
Said.Flow(perm) 0 .0 34.65 0 1.805 3574 r1
Link Speed(mph) 30 30 30
Link Distance(ft) . 300 227 383
Travel Time(s) 6.8 5.2 8.7 r
Intersection=Summary=� �.� '�. .�,...m1�,� •� . -r- ,r, ,�.:.n9��� L_
Area Type: Other
v
r
n
LJ
r
LJ
r1
U
r,
LJ
r-
LJ
r
Q:1Prcjects112-PROJECTSl2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pnb.syn
Synchro 7- Report Page 6
u
.J
' 6: BB Entrance & Osgood Street 2017 No-Build PM Peak Hour
Volume
La
r.'nei'... .'Gr.
Volume(vph) 0 0 1109 209 78 891
Confl Peds .(#/.hr)
Confl.Bikes(#/hr)
C Peak Hour.Factor 0.92 0 92 0.91 0:91 0.88 0.88
Growth Factor 100.% 100% 100% 100% 100% 100%
Heavy Vehicles('/) 0% -0% 2% 0'!a
Bus Blockages(#/hr) 0 0 0 0 0 0
Parking (4, 'r).
Mid-Block Traffic(%) 0% 0% 0%
Add Flow,(vph) 0 0 1219 230 89 1013'
Shared Lane Traffic(%)
Lane Group Flow(vph) 0 0 1449 0 89 101:2
iw'�7ar.*."y�V^Cc"'"�"'fA, .t*. s r n' - � 5�.- ���{,�+,,.�?•..- �, r Rll^r1 G"^..^<JP*•xy^+�<��sr-sr.�i.nc'T'rcJ`.Cttry Lrl�?`Vr+ r
ntei'SECtIon;Summaryr EA�y��'�J..f A z.A>�..�'.'� ..��;;'a�."� .-h•<.e;.��� t.44.t:[''',lY..��:�:SAK�'1Si�ti.w.+i?TT9'.�7.3_ i A .a .k.�.a{:�� :��i
c
n
U
F7
L
n QAProjects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pnb.syn
Synchro 7- Report Page 7
Li
L�
6: BB Entrance & Osgood Street 2017 No-Build PM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
77
Lane Configurations
Yolum' e..(v6h/h) "0 0. 11.09 209, 7,8., .891,
Sign Control Stop Free Free r i
Grader 6%
Peak Hour Factor 0.92 0.92 0.91 0.91 0.88 0.88
069r;Iy flow rate.(vp .0 O 121.9. 2.30 .89 11.0.12
Pedestrians
Lane Width(ft)
Walking Speed(ft/s)
PercentBlocka'
:
Blockage
Right turn flare(veh)
Median
echan type None -None
Median storage veh)
Upstr,eaM:sjghaI(ft) 227
pX,platoon unblocked 0.70 0.70 0.70
vC pnfiicting volume 2017 724: 4448
vC1,stage I conf Vol
RC2,stage cordf Vol
vCu,unblocked vol 1589 0 773
ic,single.)(sy. '6.8 6.9. 4.1
t6 2 1 stage(s)
W'W 3.15; 3.3 2.2
PO queue free% 100 100 85
cm papacity'(veh/b) 60 760 593
NB 1 NB 9B 1 99 2 '-89'.3-
Volume Total' 06 506 506
Volume Left 0 0 89 0 0
Volume. bRight. 01 230 p 0
CSH 1700 1700 593 1700 1700
Volume to Capacity 0.48 0.37 0.15: 030 0.30
Queue Length 95th(ft) 0 0 113 0 .0
controi:60y1s)16 Q:0
.0 0;0 12.1 0.0 0.0
Lane LOS B
Approach:Dblay..(s) 00.0
Approach LOS
K'71_1"�_
Average Delay 0.4
Intersection. Utilkati6h 46,80% loutevel of Service ct y: A
Analysis Period(min) 15
LJ
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pnb.syn
Synchro 7- Report Page 8
C
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour
r, Lanes and Geometrics
Lane Group . ::EBL, " EBT` is EBB tr'.WBL : :WB1•' ,UVBR;:;,` 9E ::'', NBT.,F N'8R>r{ 89' r'SBT ;'SBR
Lane Configurations 4
ideal Flow(vphpj), 1900 1900 1900 1900 1900 1900. 1.900 1900- 1900 1900. 1900 1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
bra de('lo) 0%0. 0%a N.
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 '0 '0 1 0, 0 0' 0
Taper Length(ft) 25 25 25 25 25 25 25 _ 25
Lane Ut l Factor. 1..00 1.00. 1:_0.0 1.00 .1.00 1.00 0.95 0:951.00 1.00 0:95 .0.95
Ped Bike Factor
Frt 0.906 0:850. 0:998
Fit Protected 0.985 0 953 0.999
Satd Flow(prof) 0 1.728 0 0. 1811 1615 0 3572 0- 0. 8. 568 .0
Flt Permitted 0.985 0.953 0.999
Satd Flow(perm) 0 1728 0 0 1811 161.5 •0. 3572. 0 0' 3.568 0
Link Speed(mph) 30 30 40 40
Link Distance(ft) 360 31°5 383 81.1
n Travel Time(s) 8.2 7.2 6.5 13.8
r,.....rre*.•..�. i "' �-.. r..t-+-n.tea r ...._.� I.v: rn�ti rrrry fm. i^"�.rr,.v ..�..f••r^+.{^� ....+.-! -�,. ,
Ls Intersection:Summary'_f :`Y °,r. ; ' '.. at:•;: ..�?M1,`. " t .u� �4 rpt : , .r;, t , �.�: .^: , �'r � .
Area Type: Other
Mi `
v
L,
n
FJ
�1
U
F7
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pnb.syn
Synchro 7- Report Page 9
u
n
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour
Volume
4\ t /0 l
Lane Group� .EBL .EBT'• .EBR,•. :WBL �V�IBT a`' .WBR.:f��NBL�<f r NBT.'� �NBRk .�SBL ��Sf3T�.:, SBA .�
Volume(vph) 19 0 45 191 3 106 28 1081 0 0 733 10
COnfl Peds:.(#Ihr)
Confl.Bikes(#/hr)
Peak Hour Factor' .0.80- 0.80 0,80 0.94 0.94 0.94 0.91 0.:91 0.91 0:85 0.85; 0:85
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100%° 100% 100% 100%
Heavy Vehicles(%) 0'/0 0%° 2'/0 0°Io 0% 0% 0% 1% 6% 0% 1%° 0%°
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 f,
Parking (#fr)
Mid-Block Traffic(%) 0% 0% 0% 0%
Adj Flow_(vph) 24 0 56 203. 3 113 31; 1188 0 0 862. 12 *�
Shared Lane Traffic(%)
Lane Group Mow(vph) 0 80 Q 0. 206 113 0 121.9 0 0 874 0
T..n '�. M1 al.'7^+^+raT"'X'3'.."R "...f •rxY 5 f ^P 1f', T...yyy.
FT-r-{�a.�. ••—r.;,..nn, -.;+.r � n r i y,�I�'^.J'� �"'i• w�.s. � �.e u Y s.:i.%�� r� 'v .'�Y:°+! � ��r :d.
1•nt�i.Q.CWn,Smmary :.S .3 t��k� �. S �r 1.« .� ,#` ,1�•' ...fF�•,.h..t :� t?.,. .r. ,.z Y:.«'.Q.f.±ri..,a;..,;...
rl
n
i ,
A
V
n
rl
fl
r1
C1
e__,
L_,
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017pnb.syn
Synchro 7- Report Page 10
r
Li
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour
r_1 HCM Unsignalized Intersection Capacity Analysis
N 4N
4
t
n, E.
Lane Configurations 4#
Li
Volume. :19 -28
(v0h,/h) U 45 .1.91 3 .106 1081 0 0 733 10
Sign Control Stop Stop Free Free
Grade. 0% 0% _0% 0%a-
Peak
%ePeak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 0.91 0.91 0.85 0.85 0.85
Houjly*w'rafe 24 .0 56. 20 3 113 31 1188 '�:O.�
, , (vph)� 0 862 :12
Pedestrians
LaneWidth. (,(ft)
Li
Walking Speed(ft/s)
Per ntblockage
Right turn flare(veh)
L_j Median type None e None
Median storage veh)
Upstrearn sign al 6.10
A platoon unblocked 0.73 0.73 0.73 0.73 0.73 0.73
vC.I..conflicting volume 16.38 2.1.18 43.7* .1737 2124 594 874 -11.88
vC1,stage I conf volta-
vt�_.s-oe:2.conf.-vol
1.. o. - ,
vCu,unblocked vol 1138 1794 437 1273 1802 0 874 522
ic..single 4) 7.5 6.5* 6.9 7.5 6.5: .6.9 4.1 4.1
tC,2 stage(s)
tF.( 15 4.0 3.3 9.6. 4;0 3.3 2.2 22.
pO queue free% 74 100 90 0 94 86 96 100
r_1 cM capacity(veh/h) 93 57 567 81 57 7918 781 771
direction;Lane# tB,1 Wb'1 Wb 2 NB-i Wb 2 8B f SB 2
Volume Total 80 206 113 427 792 .5. 75, 299
7 Volume Left 24 203 0 31 0 0 0
.Li Volume*Right 56 0 113 01 0 D. 12
cSH 225 80 798 781 1700 1700 1700
Vol Imeto.0, Ap4city
0.36 2.57 0.14 0 04� 047 '0.34 0.18
.
Queue Length 95th(ft) 38 492 12 3 0 0 0
Q0*!Delay(s) .0
' .:29.6 824:0. .1.0.3 1.2 ..0.0 0. 0.0.
Lane LOS D F B A
*040-061ay:(p). 29.6 636;5 0.4 :0.1 0.
Approach LOS D F
Average Delay 69.9
tseCtjo
L_j Intersection-Cap ilization 7.4.1:0/o.. D:
.n - I.CU:Lev6[,ofI.S0ice
Analysis Period(min) 15
LJ
7
t-i
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pnb.syn
Synchro 7- Report Page 11
Li
r �
3: Casa Blanca Driveway& Osgood Street 2017 Build PM Peak Hour
Lanes and Geornetrics r ,
�..... . _�. ,_WB
T j'1NBR BL NBTSBL
, NBR:.r:. .r' S�BT ' {.°SBR
N •-,
Lane Configurationsa ' _
Ideal Flow(yphpl) 1900 1900 1900, 1900 1906 1-900 100.0: 1900 1900 1900 1900 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11 r
Grade.('/o) 0 0%. 0% 0%
Storage Length(ft) 0 0 00 0 0 500 0 L
Storage,Lanes 0 0 0 0.. Oi 0 i D
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane lltil.Factor 1.00 1100 1..00 1:00 1.00 1.0.0 0:95 0.95; 100 1:00 UO. 1.00 L J
Ped Bike Factor
Frt 0.894 0.062 0.999 r
Flt Protected 0.989 0.965 0.950
Said Flow(prof) 0 1680 0 0 1930 0 0 3574 0 1713 1817` 0 L f
Flt Permitted 0.907 0.773 0.846 0.114
Said Flow(perm) 0 1541 0 0 1546 D: .0 3024' 0 205 181.7 0 r i
Right Turn on Red Yes Yes Yes Yes L
Satd.Flow(RTOR). 18 25.
Link Speed(mph) 30 30 40 40
Link Distance(ft} 182 1083 848 227
Travel Time(s) 4.1 24.6 14.5 3.977
`J
on Summary"
r.- r ) ^^^r, v
�ntersecfi - r ;, Y7T
r
Area Type: Other
L J
r �
L.
rl
L J
r 1
La
r
LJ
ri
U
r'l
LJ
r
LJ
r
L J
Q:1Project02 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pb.syn
Synchro 7- Report Page 1 r l
r
3: Casa Blanca Driveway & Osgood,Street 2017 Build PM Peak Hour
M Volume -
NBT ? NBR:
Li Volume(vph) 2 0 7 246 0 97 7 1253 0 110 810 4
Confl.;Peds.;(#!hi)
n Confl.Bikes(#%hr)
Peak Hour Factor - :0.38; 0 38 :0.38 0.73 0.73 0 73 0:93 0.93_ 0.93 0'90 0.90 0:90
L-i Growth_Factor 100 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy:Vehicles(°ro).
0% 0%. 0% 3% 0%c 3% 0% 1'/c 3✓. 2%0. 1% 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
L_,' Parking. Oft)
Mid-Block Traffic(1 0% 0% 0% 0%
n Adl Flow NO) 5 0 18, 337 0, 133 8 1347 0 122: 900 4
U Shared Lane Traffic(%)
Lane Group Flow(vph): 0: 23 0 0 470 0 _0 135.5 :0 1.22 904 0
`"" TC'e'.,Y�xRP
j f :3 `/, ;.. - .�';,i1 Y v Y. '�,+v 4 HY•F 1 < < Y{ k s° <_�. �°t �",
kWit. ,.�. .
n
Li
Lj
r
Li
LJ
n
Li
n
u
n
L..j
M QAPrcjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING ButCher Boy No AndovehTraffic1CA12017pb.syn
Synchro 7- Report Page 2
u �
M
Li
I 1
3: Casa Blanca Driveway & Osgood Street 2017 Build PM Peak Hour .
Queues
- rti
Lane Group�. .�. `SBS'..•, �>� ,., �a, ,:.,
Lane Group Flow(vph) 23 470 1355 122 904
v/c Ratio 0.04 0.90 0:90 1A8 0.99
Control Delay 9.0 43.5 26.4 174.4 49.6
Queue Delay 0.0 0.0 0:0 0.0; 0.0-
Total Delay 9.0 43.5 26.4 174.4 49.6
Queue Length:50th(ft) 1 181 278 68 -406.
Queue Length 95th(ft) 3 215 #432 #125 #650 r
Intem.al Link Dist{ft) 102 1003' 768 147
Tum Bay Length(ft) 500 ` '
Base Capacity(ph) 562 568 1512 1:03 90:.9
Starvation Cap Reductn 0 0 0 0 0 r
.pillback Cap Reductn 0 0 0 0 0 �_
Storage Cap Reductn 0 0 0 0 0
Reduced We Ratio. 0:04 0.83 0.90 1.18 U.99 r i
�� .r s,m3'a�
Intersection Summary' ',• fir'J,. s �., v 4.,,_ f ,s �.�:i: . tir
Volume exceeds capacity,queue is lheoreticaGy infinite.
Queue shown is maximum after two cycles. r
# 95th percentile volume exceedscapacity,queue may be longer.
Queue shown is maximum after two cycles.
r�
LJ
UI
LJ
ri
LJ
r
LJ
n
LJ
r-I
L—j
n
LJ
r
L�
U
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA12017pb.syn
Synchro 7- Report Page 3 r
r,
r
3: Casa Blanca Driveway & Osgood Street 2017 Build PM Peak Hour
HCM Signalized Intersection Capacity Analysis
U 4\
NBT,'-1.,-_.;,,NB, "S 'F�.68f.;�S�'SBR
EBT.
Movement EBL k 8c
Lane Configurations
(vph) 7 246- 0 97 7 1253 0 110 .810 4
11.1 ,
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane width , 12. 12 12 16 16 16 19 12 12 11 11 11.
Total Lost time(s) 6.0 6.0 6.0 6.0 6.0
Lane e MI.Fictof 1.00 1.00 0.95 140; 1001.`
Frt 0.89 0.96 1.00 1.00 1.00
Li Flt Protected 'um ON 1.'00 .0.*95: 1.00
Satd.Flow(Prot) 1681 1931 357.3 1711 18,17
n Flt�eirmifte.d 0:91,91 0..77 H5 0.11 I.M
I Sat8.Flow(perm) 1541 1546 3023 205 1817
U
Peak-hour factor,PHF 0.38 0.38 0.38 0.73 :013 0.93 0.93 :0.93- .0.190 -0.00 0.96
Adj.Flow(vph) 5 0 18 337 0 133 8 1347 0 122 900 4
RTORA6ductioh.(vph): 0 12 .0� 0 17 0 0 0. 0- 'V :0 0
Li Lane Group..I Flow.. . (vph) 0 1.1 0 0 453 0 0 1355 0 122 904 0
Heavy-Vehioln:(°) 0% 60/6 . 0% .. j%: 0°I �0%% 1% .2%. .. 1%0_ :0,4
Turn Type Perm Perm Perm Perm
Protected Phases 4. 8:. 2. 6
Permitted Phases 4 8 2 6
r_1 4t0a.tedGreen,G°(s)I 1 23.0 2&01 351 8,5A 351A
Effective Green,g(s) 23.0 23.0 .35.1 35.11 35.1
Act I uated
-a/C,Ratio, 0.33, 033 - 0.50 0.50 0.50
Clearance Time(s) 6.0 6.0 6.0 6.0 61.0
Vehicle Extension(s) 3.0 3.0 3.0 8.0 3.0
Lane Grp Cap(vph) 506 507 1514 103 910
v/s Ratio,Prot 0.50
M v/s Ratio Perm 0.01 c0.29 0.45 c0.59
y/c Ratio :0;62 .6.69. 0.89 1.18 0.99
Uniform Delay,dl 15.9 22.4 15.8 17.5 17.4
Progressi-on FaCtOT 1.00 1...00 1.0.0 1.00 1.0.10
Incremental Delay,d2 0.0 17.9 7.2 146.6 28.1
Delay 16.0 40.8 23.1 164.1 457.4
.. _
Level of Service B D C F D
M roach be'lay..(s)- 1B.D. 40.3 25.1 59:5
L, Approach LOS B D C E
3P 5
tion, urn
M
HCM Average Control Delay 38.9 HCM Level of Service D
% .. .Volume
1—— 6 ti
HCM Vold'M6 to-- -apadity:rq o 147
Actuated Cycle Length(s) 70.1 Sum of lost time(s) 12.0
Intersection Cap ' -Utillizatioln 118.0% IcUtevol of Service H.
_acq . k
Analysis Period(min) 15
6 Critical Lane Group
Li
Q:\ProjectsM PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndovMTraffic1CA12017pb.syn
F-1 Synchro 7- Report Page 4
Li
3: Casa Blanca Driveway& Osgood Street 2017 Build PM Peak Hour
Timing Report, Sorted By Phase
'7�
, 6
Phase 2
`
Movement NBTL EBTL SBTL WBTL
Lead/Lag
Lead-Lag Optimize r I
Recall Mode :Min' -Min Uin :Min.
Maximum Split(s) 41 31 41 31
Maxi.Mum Split(%) 56.9%, 43:1.o- 56.9% 411%.Z
Minimum Split(s) 35 10 35 10
.yeil6wlime 4 4 4 4
All-Red Time(s) 2 2 2 2 1, J
Mi himum 1nit ia 1 4 4 4 4
Vehicle i cl e Exte ns ion(s) 3 3 3 -3
.. I I- - - '.
Minimum:*(t). 3 3 3 3
Time Before Reduce(s) 0 0 0 0
Time To Red ucq{s) 0. 0 .0 :0, r ti
Walk Time(s)
LJ
Fl.ash,,Dbh.t Walk(s)
Dual Entry Yes Yes Yes Yes
r i
Inhibit Max Yes Yes Yes Yes
Start Time(s) 0 41 0 41 Lj
End Tjme(s) 41, .0 41 0
Yield/Force Off(s) 35 66 35 66
Yield/Force Off
If 70(s) 35 66. 35.: 66.
Local Start Time(s) 0 41 0 41
Local Yield
d(s 11) 35 66 35 66
Local Yield 170(s) 35 66 35 66
intersection Summary
Cycle Length 72
Control Type.. Semi Acto-Uncoord
Natural Cycle 90
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2 o4
m
06 08
r
Q:1Projects112 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pb.syn
Synchro 7- Report Page 5
r
6: BB Entrance & Osgood Street 2017 Build PM Peak Hour
Lanes and Geometrics
Lane Configurations:
I a I hol) 1900 1960'. 71900 A00 1066 1900,
da !,,F'oW(v.p'
Lane Width(ft) 12 12 12 12 12 12
Grade�-/O .0% 0% 0016
Li
Storage Length(ft) 0 0 0 300.
Stora-e1anes .0 0 0 1
n Taper Length(11) 25 25 25 25
Lane MI Factor 1.00 1.00 0.95 0.195 1-.00: 0.95
Ped Bike Factor
Frt 6.973
Lj Flt Protected 0.950
Satd.Flow,(pro .0 0 3456 0 1805 3574
Flt Permitted 0.950
40.Flow(Pe* 0�
' 0 3456 0; 1805 :3574
;
Li Link Speed(mph) 30 30 .30
L.ink Distance(ft) 300 227 383
Travel Time(s) 6.8 5.2 8.7
-77 • '1"..
Area Type: Other
7
L-j
Li
Lj
.L-i
Li
Li
r Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pb.syn
Lj Synchro 7- Report Page 6
r
Li
r ,
6: BB Entrance & Osgood ood Street 2017 Build PM Peak Hour
Volume
' .-.• .. ,P.__ ...,. :cam � t,l 1 J" t r:.f- a' Y'. i � t
Lane Group , , ,, WBL . WEI
Volume(v_p h) 0 0 1109 243 92 924
CW.Peds.(#fit).
Confl.Bikes(#/hr)
Peak.Hour Factor 0:92 0.92 0.91.. 0.91 0:88 0.88'
Growth Factor 100% 100% 100% 100% 100% 100%
Heavy Vehicles �Q% 0% 2% 0% 0% 1%
Bus Blockages(#/.hr) 0 0 0 0 0 0
Parking.;(#/hr)
Mid-Block Traffic(%) 0% 0% 0% `J
Adj.Flow(vph), 0 0 1219; 267 105 1.050 r,
Shared Lane Traffic(°/G)
Lane Group Flow(vph) 0 0 1486 Q 105. 1050,
.. ..T.. ,.,t x.. s l� r.g... r } .H,. - r-iv -i•er�,Fr .v ,T•a'7+'sr'�WYV'x'
Intersec�on°'Summary t,. �.t -...;�f�. T�„;...1 ,,,�'. . �- ,:� . .�•;�..r,� . �. a;;r'-.�.. -, �<.},.���.�.?
r,
L,
r,
LJ
r"
L j
r �
LJ
fl
L�
r 1
LJ
1
LJ
r-I
L�
f l
u
u
r 1
u
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pb.syn
Synchro 7- Report Page 7 r
v
r,
11
E6: BB Entrance & Osgood Street 2017 Build PM Peak Hour
F1 HCM Unsignalized Intersection Capacity Analysis
Li
'S
WBR `NM":4,�
-WBL:
Movement.,
Lane Configurations I tt
Volume--( hlh,) 0 0 11.0$ 243, .92. 924
Sign Control Stop Free Free
Grade M .0016- 0%
Peak Hour Factor 0.92 0.92 0.91 0.91 0.88 0.88
Hourly flow rate..(vph,) 0 0 1219 267 105 1050
Pedestrians
('.*Width(ft)
Walking Speed(ft/s)
Percent 8 lockage
Right turn flare(veh)
We
Med None None
Median storage veh)
Upstream s:ig'na.J,(ft) 227
pX,platoon unblocked 0.68 0.68 0.68
Vconflicting.
C . volume 2086 743 148.6
r-1 vC1,stage 1 cont vol
vC.2 stage 2 coni vol
vCu,unblocked vol 1662 0 783
tC.;single(4 .6;8 6,9 4.1
tc,2 stage(s)
Li T(s) 3.5 3.3 2.2:
pO queue free% 100 100 8.2
CM Capacity(Veh/h) 50 745 577
b1r-e-ctioh',--La'n'-e# N8 Ir N'B' 2 8B 1 SB 2 S133
Volume To I tal 8.12 6Z3. .1.05, 525: 525
Volume Left 0 0 105 0 0
L-j Volume Right 0 267 Q.,
cSH 1700 1700 577 1700 1700
Volume to capacity 0.48 0.40. 0.18. 0.31 0.31
Queue Length 95th(ft) -16.
Control_. .Q6lay:(s) 0.0 O.D. 12.6. 0 0.0.
Lane LOS B
:
proachb6la.y4s) 0.0 11
. i, ..
Approach LOS
7-71.17-1 71741f, 5
Average Delay 0.5
Intersection .p'Ca ac'y"UtNiAtion., 5620). -ICU ev-el of Se vice A
Analysis Period(min) 15
I r-1
Li
r
Lj
Q:\Projects\l 2 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Tr.affic\CX2017pb.syn Page 8
Synchro 7- Report
�l
8: Commerce Way & Osgood Street 2017 Build PM Peak Hour
Lanes and Geometrics
Lame Group EBI. :��EBT _EBR ' 'WBL ' WBT WBR. ,NBT: � NBR.;?': SBL'a SBT''. :SBR
Lane Configurations c
Ideal Flow(vphpl) 1900 1900 1900 1900 1900. 1900 1900 1900 1900 1.900 1900_ 1:900 `J
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grade(°) 0% 06/. -0% 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes -0` 0: 0 1 0- - 0 0' 0
Taper9�Len ft25 25 25 25 25 25 25 25 ,
Lane w).Factor 1.60 1.00 1.00 too. 1.00 1.00 0:95: 0:95 1.00; 1.0.0 0:95 0.95
Ped Bike Factor
Frt 0.906 0.850 0:998
Flt Protected 0.985 0.953 0.999 ,
Satd.Flow(prot) 0 1728 0 0 1811 1615 0 3572 0 0 3568 0
At Permitted 0.985 0.953 0.999
Satd,Flow(Plow- 0 1728 0. '0 1811 1615 0 3572 0 0 3564 0
Link Speed(mph) 30 30 40 40
Unk Distance(ft) 360 .315. 383 811
Travel Time(s) 8.2 7.2 6.5 13.8
� L p {e. n• v..3n3.. a7
U
Area Type: Other
r-1
r ,
r,
LJ
r ,
L J
r-i
lJ
r �
v
u
f �
LJ
r�
u
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017pb.syn
Synchro 7- Report Page 9 r
LJ
r-•
8: Commerce Way& Osgood Street 2017 Build PM Peak Hour
Volume
-WBTr.; BL'
SST Y;SBA
Volume(vph) 19 0 45 224 3 120 28 1081 0 0 747 10
Confl.Bikes(#/hr)
P,6ak:.H6ur Pictor b-8o: 0.80 030 1 0.94. U4 0:94- 0.91 U1 1 0.91% 0.85. U5 :.0.85
Growth Factor' 100.% 10.0% 10.0% 1.00% 100%
% 1 1 00-% 100% 100% 100% 100% 100.% 100%
Heavy Vehic-les N .0% 0% 2% 0% -:0% 0% 0% 1%:. .06/6 0%; 1*% 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (or)
_
Mid-Block Traffic(1/6) 0% 0% 0% 0%
�, qj.Flow.(yph)� 24 0 56 238 3, 1:28: .3'l 1188 0 0 :879 12
Shared LaneTraffic(%) - —
Li
LaneGroup".Fiow�v 0 80 0, �O 241 128 .01 1219 0 .0 891,. 0
1. ne. .. p: �_, p
C �'nlersectio��Surrtmary RTF.t�'c�'k rtiftr��'*/ p*r �"`M� �� s�'z�+.y�.a 0.� yk1l�'ff tr)�. +` n� Ct r ii•� 1 7 tut � � �. 'F 'ir� y�Sr
Li
Lj
U
r_1
U
Li
rl Q:\Projects\12 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017pb.syn
Synchro 7- Report Page 10
Lj
r-I
Lj
r)
8: Commerce Way& Osgood Street 2017 Build PM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
-► `� it .- 4. 4%
Movement... . EBL. EBT` '.EBR,���,:WBL..;:.'WBT,'. WBR.. NBL :°':NBT :.YNBR k `SBL. ;.rSBT:, ;.SBR
Lane Configurations' ` r�
Volume(veh/h), 19 0 45 224' 3 120 28 1081; .0 0 747 10
Sign Control Stop Stop Free Free
Grade 0%: 0% 0 0% r
Peak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 0.91 0.91 0.85 0.85 0.85
Hourly flow rate(vph) 24 0 55 238 3 128 31 11'88 0. 0 879 12
Pedestrians r
Lane Width(ft).
Walking Speed(ft/s) `
Percent Blockage
Right tum flare(veh) r
Median type None None L;
Median storage veh)
A Upstream signal,(ft) 61 r�
X,platoon unblocked 0.72 0.72 0.72 0.72 0.72 0.72
vC,conflicting volume 1669 2134 445: 1745 2140 594: 891 1186 u
vC1,stage 1 conf vol
vC2,stage 2 conf' vol r
vCu,unblocked vol 1163 1805 441.5 1268 1813 0 891 498 L�
tC,single(s) 7.5 6.5 6:9 7.5 6:5 6.91 4.1
tC,2 stage(s)
tF(s) 3.5 4.0 3.3 3.5 4 0 3.3 2.2 2.2
p0 queue free% 72 100 90 0 94 84 96 100 `
cm capacity(veh/h) 86 56 560 81 55 790 770 779
_ n
Direction,Lane# _ EB 1 WB 1 WB 2 NB 1 NB 2 . 8131 SB 2
Volume Total 80 241 128 427 792 586 305 `
Volume Left 24 238 0 31 0 0 0
rl
Volume Right 56 .0 1.28 0 01 0 12
cSH 212 80 790 770 1700 1700 1700
Volume to'Capacity 0.38 3.01 0.16 0.04 0.47 0:34: 0:18
Queue Length 95th(ft) 41 Err 14 3 0 0 0 r
Control Delay(s) 31.9 Err 10.4 1.2 0.0 0.0 -0-0
Lane LOS D F B A
Approach`Delay(s) 3109 654.4.7 0.4 0:0 r,
Approach LOS D F
7•^a-r'e., +cc+--a:r�;c+:+rcc-•- -r.,.. ,t. ..r„,.,r-- r'•fin-^?..... ..�y+ o ti •rrRra lx^^ _.�--+,•r} ra �,n-,^ ..,;#'" .vrk �. l�
jntescfion Summary ^37"
Average
aP. ry r
.
ntersection IG aci_ Utilization 549/0 ICU Level Service- D
Analysis Period(min) 15
n
Q:1Projectsll2 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CA12017pb.syn
Synchro 7- Report Page 11 r ,
r1
n
11: BB Entrance & 2017 Build PM Peak Hour
Lanes and Geometrics
Lj
e'GrouPtk z: EBI: _:_;EBT EBR;,.:'WS
Lane Configurations
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width(ft) 12 12 12 12 12 12 12 12 12 12 12 12
r1, Grade(%),. ..- . 000 00/0 0% 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0.
n Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util.Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike_ Factor
Frt. 0.932
r-1 Flt Protected 0.955 0.976 0.996
Satd.Flow(prot) 0 1779 0 0 1694 0 0 1863 0 0 1855 0
Flt Permitted 0.955 0.976 0.996
Said.Flow(perm) 0 1779 01 0 1694 0 0 1863 0 0 1855 0
Link Speed(mph) 30 30 30 30
L, Link Distance(ft) 223 77 69 123
Travel Time(s) 5.1 1.8 1.6 2.8
Area Type: Other A ,
L,
n
Lj
M
u
LJ
Lj
U
n
U
Lj
Li Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pb On-Site.syn
Synchro 7- Report Page 1
Li
11: BB Entrance & 2017 Build PM Peak Hour
Volume
W 77r 777,
BT-' "WB
R..-��`MNBC �f.NBT NBR, BA
Volume(vph) 273 14 0 5 0 5 0 47 0 5 48 0
(bnfl.Peds,(#/hr)
Confl.Bikes(#/hr)
Peak Hour Factor 0.92 0.92 0.92 0.62 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
.Heavy Vehicles(%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%- 2%
Bus Blockages, (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#Ihr)
Mid-Block Traffic(0/6) 0% 0% 0% 0%
Adj.Flow(vph) 297 15 0 5 0 5 0 51 0 5 52 0
Shared Lane Traffic(%)
Lane Group Flow(vph) 0 312 0 0 10 0 0 51 0 0 57 0
ritersection Summary
!.
"',W57
ri
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pb On-Sit e.syn
Synchro 7- Report Page 2
Li L 11: BB Entrance & 2017 Build PM Peak Hour
HCM Unsignalized Intersection Capacity Analysis
FI _-* __p� -V '- 4_ 4\ t /10- �► l
ovement rr: V:- _` : EBL==: _E T..` EBRD: �1/VBL:_:JNBT ,_ UIIBR BL.�.,'BT A;,_ :SBL �SBTf SBR
Lane Configurations 4 4+ '� M +T
Sign Control Stop Stop Stop Stop
Volume(vph) 273 14 0 5 0 5 0 47 0 5 48 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.9.2 0.92 0.92 0.92 0.92 0.92, 0.92 0_.92
Hourly flow rate(vph) 297 15 0 5 0 5 0 51 0 5 52 0
erection; e`.# z EB.t�. _WB;11::..
Volume Total(vph) 312 11 51 58
Volume Left(vph) 297 5 0 5
Volume Right_(vph) 0 5 0 0
Hadj(s) 0.22 -0.17 0.03 0.05
Departure Headway(s) 4.4 4.3 4.8 4.8
Degree Utilization,x 0.38 0.01 0.07 0.08
Capacity(veh/h) 800 780 701 695
n Control Delay(s) 10.1 7.4 8.1 8.2
Approach Delay(s) 10.1 7.4 8.1 8.2
Approach LOS " B A A A
me section.Summa `
L; Delay 9.6
HCM Level of Service A
n Intersection Capacity Utilization 35.9% ICU Level of Service A
L Analysis Period(min) 15
n
u
u
I
U
r
U
u
h
I
U
f
Li 0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pb On-Site.syn
Synchro 7- Report Page 3-.
n
L
3: Casa Blanca Driveway& Osgood Street 2017 Build PM Peak Hour Observed Flow
Lanes and Geornetrics
WAA PITfRA
EBL.,X; EBT 7ff6f.
Lane Configurafions
Ideal Flow..,(vphp0 I..M- 1900 1900 1900. 1006 '1 960 1900 1900 IW11.9.
O, 1900 1900. 00
Lane Width(ft) 12 12 12 9 9 9 12 12 12 11 11 11
Grade M 0%, 0% 010/6 0%:: r i
Storage Length 0 0 0 0 0 0 500 0
Storage Lanes 0 0. 1 0 0 0 1 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane-Util.Factor 1.00. 1.00: 1-00: 0..95 0.95. 1.00 0.95 .0.9$ 1.66. 1.00: 1..0.0 1..001
Ped Bike Factor
Frt 0.894 0.912 6.999
Fit Protected 0.989 0.950 0.980 0.950
Saw ow, t 0 0 -0 1.711.. 1817 0
FI (Pro 1680 0 1498 1394 0.� 3574,
Fit Permitted 0.928 0.742 0.855 0.919 0.122
LJ
Satd.Pow 0 157.6; 0% fit �1�16 0 0. 3285, 0 22:0. 181,1 7 �0
....(per.m) U-1
Right Turn on Red Yes Yes Yes Yes
Satd.Flow(RTOR) .18. 25
Link Speed(mph) 30 30 40 40
Link bistance(fW 1.083 1 .848. 11 227
Travel Time(s) 4.1 24.6 14.5 3.9
kiriki
U 7
Area Type: Other
LJ
LJ
LJ
LJ
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pb-obs.syn
Synchro 7- Report Page 1
3: Casa Blanca Driveway& Osgood Street 2017 Build PM Peak Hour Observed Flow
Volume
n Lane:GroMup. EBL. y':EBTEBR; wBL ` WBT,t 'wBR rNBL�, .a NBT:w.;r,,NBR�`' cSBL j :'.S$TnrSBR
Volume(vph) 2 0 7 246 0 97 7 1253 0 110 810 4
U Confl.
Confl.Bikes(#/hr)
Peak'lour Factor `0.38 0.38
_
0.38. 0.73 0.73; 0.73 0 93, 0.9 3: :0.9.3 0.90. 0.90 0:90
Growth Factor 100% 100% 100% 100% 100%- 100% 100% 100% 100% 100% 100% 100%
Heavy Wh cles,(%. 0 0% 0/0 3./0; 010 5% Q/% 1% 31% 2% 11% 0%
r Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Mid-Block Traffic(%/%) 0°/% 0% 0% 0%
5,
(%) , 337 0: 133. 8 1347 0 122 900
/% 4 Atl Flow lt: , 0 18 _
Shared Lane Traffic 28%
u Lane Group Flow(vph). 0` 23 0 243 227 0 0 1355 0 122 904 .0
'T^!T•f'':.
on,T+�'-+4:f.+v,•.'vxutCt' r fr r7 °Lk ice:py� � rr 'T., it 'LY.:�'F^",,Ir -�+�rt+ T}�. +'T°"'e;. nr •at;t st >i�
L!
n
L,
n
U
F-1
Li
n
r
U
n
U
n
U
n
Li
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pb-obs.syn
Synchro 7- Report Page 2
U
:-1
3: Casa Blanca Driveway & Osgood Street 2017 Build PM Peak Hour Observed Flow
Queues
B •. r-•4 r -t r^-` r �.'
Lane Grou"'-;" EBT . .WBL �IVT: NBT<:
ro. ,�'
Lane Group Flow(vph) 23 243 227 1355 122 904
v/c Ratio 0.05 0.75: 0:64 0.77 1.03 0..93
Control Delay 9.2 36.1 26.7 17.2 118.8 33.9
Queue Delay` 0.0 0.0. 0.0 fl 0 0.0 0
Total Delay 9.236.1 26.7 17.2 118.8 33.9
Queue Length 50th(ft) 1 9t 73 214 5.6 31.7
Queue Length 95th(ft) 3 126 104 #359 #118 #650
Internal Link Dist'(tt) 102 1003 :768. 147
Turn Bay Length(ft) 500 -
:
Base Gapaaty(yph) 616
449 483 1766 118 977
Starvation Cap Reductn 0 0 0 0 0 0 r
Spill.
back Cap Reductn, 0- 0 0; O. 0, 0 u
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio, 0;04 `0.54; 0.47 0.77 1.03 0:93. r i
• .rrr::x^...z'�"Tmsr.`lr T_ri#ersectlon'v Sammary1 -77
••»p,r•- fj� , - V +zh:iJ
Volume exceeds ca ac
, p ity,queue)s theoretically infinite:
Queue shown is maximum after two cycles. r,
# 95th percentile voluine;exceeds capacity;queue may be longer.
Queue shown is maximum after two cycles.
n
r1
v
t�
U
si
U
n
r�
U
L�
f l
U
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pb-obs.syn
Synchro 7- Report Page 3
r �
u
V3: Casa Blanca Driveway & Osgood Street 2017 Build PM Peak Hour Observed Flow
HCM Signalized Intersection Capacity Analysis
Lj
` �► '- t 1
Movement,. EBL > EBT :. IBR 'T.WBLVUBT `.WBR:, fVB6T , 1BR� `:SBL^
Lane Configurations , 1 4*
Volume(vph) 2 0. 7 246. 0 97 7 1253' 0 110 81U 4
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width .12. 12 12. 9' 9 9 12` 12 12 11 11 11
Total Lost time(s) 6.0 6.0 6.0 6.0 6.0 6.0
Lane Util.Factor 1.00 0:95' 0:95 0.95 1:00 1:00
Frt 0.89 1.00 0.91 1.00 1.00 1.01.0
PI Protected 0.99 0.95. 0 98_ 0.95 100
Satd Flow(prot) 1681 1498 1394 3573 1711 1817
F4 Permitted 0:93 0.74 0:86- 0 92 0:12 1.00
r Said.Flow(perm) 1577 1171 1216 3287 220 1817
leak-hourfactor,PHF 0.38 0.38; 0.38 :0.73 0.73 0.73 0:93 0:93 0.93. 0.90 090 0.90
Adj.Flow(vph) 5 0 18 337 0 133 8 1347 0 122 900 4
RTOR Reduction{vpf); 0 13 0 0 18 0 0 0 0 0 0
Lane Group Flow(vph) 0 10 0 243 209 0 0 1355 0 122 904 0
:
Heavy Vehicles(%) 0°!° .. . 0', 0'/ 3% % 50/. . 0% 1 J° 3'% 2% M ,. 0%
Tum Type Perm Perm Perm Perm
Protected Phases 4 8 2 ;6
Permitted Phases 4 8 2 6
Actuated'Green,G(s) 18.2 18.2 18.2 35.3 35:3 35.3
Effective Green,g(s) 18.2 18.2 18.2 35.3 35.3 35.3
Actuated g/C Ratio 0.28 0.28 0.28 0.54 0.54 0.54
Clearance Time(s) 6.0 6.0 6.0 6.0 6.0 6.0
Vehicle Extension(s). 3.0 3.0 . 3.0 3.0 3.0 3.0
Lane Grp Cap(vph) 438 325 338 1771 119 979
vis Ratio Prot, 6.50
v/s Ratio Perm 0.01 c0.21 0.17 0.41 c0.55
v!c Ratio 40.021 -0.75 0.62 0:77 1;03 .0,92-
Un i fo r rn
0.92-Uniform Delay,d1 17.2 21 6 2 0.6 11.8 15.1 13.9
Progr. ression Factor 1.00 1.00 1 00 00,100 1. 1:00
Incremental Delay,d2 0.0 9.1 3.3 2.0 89.4 13.8
Delay Vis) 17.2 30.6 24 Q 13.9 104.5 27.7
Level of Service B C C B F C
Approach Delay(s)' 17.2 274, 13:9 36.8
Approach LOS B C B D
c q tea.•^np^ �ao ���rrn r r P 9^ n.• t d ' } s 6 t.a"�"n m
x�s.{�`�.r�t5� i�'"
r'[Ct !r`� ,,d3'%. itx.
n HCM Average Control Delay 24.3 HCM Level of Service C
I HCM Volume to Capacity ratio 0.93
Actuated Cycle Length(s) 65.5 Sum of lost time(s) 12.0
Intersection Capacity Utilization: 109.2% ICU Level of Service H.
f� Analysis Period(min) 15
l� c; UUcal Lane Group
V
a--,
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CA12017pb-obs.syn
M Synchro 7- Report Page 4
L
r
L
3: Casa Blanca Driveway& Osgood Street 2017 Build PM Peak Hour Observed Flow
Timing Report, Sorted By Phase
Movement NBTL EBTL SBTL WBTL
LeAd/Lag
Lead-Lag Optimize
qqqall Mode Min- min UP: Min r i
Maximum Split(s) 41 31 41 31
Maximum Split(%). 56.9.% .43;1%
3.1% .56..9.% 43.1.%
1 r-
Minimum Split(s) 35 10 35 10
ye�q Tjm 4.. - 4 4
Time
qfs) 4
All-Red Time(s) 2 2 2 2
M. i 4' 4 4
inimu'r.Initial:(s) .
Vehicle. Extension(s) 3 3 3 3
Minimum Gap,( .3 3 3,
Time Before Reduce(s) 0 0 0 0
.Time'T6n .0
, . eddqe#). 0 a O� r
Walk Time(s)
Flash Dont Walk;1 s)
Dual Entry Yes Yes Yes Yes
inhibit Max. Yes Yes Yes. Yes:
Stan Time(s) 0 41 0 41
End.Tirpe.(s) 41 6. 41.
Yield/Force Off(s) 35 66 35 66
Yie IdIfficilrpe Off-170(s)' 3.5 66 35. 66`�
Local Start Time(s) 0 41 0 41
Local Yield(s) 35 66 15 66.
Local Yield 170(s) 35 66 35 66
Intersection Summary
Cycle Length 72
Control... Type Semi Act-Uncoord
Natural Cycle 80
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
to2 "'per o4
ng
o6 ~ 08
141
Q:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pb-obs.syn
Synchro 7- Report Page 5
r
�'
8: Commerce Way& Osgood Street 2012 Existing PM Peak Hour Mod. Gap
Lanes and Geometrics
4\
iwgll7'18U�13 ff RT 9A
Lane Configurations
ideal,Flow(v 1900.
1900. 1900 1900 400 1900: 190.0: 190Q 1900 1900; 1900, 1.900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grad6 0% 0% 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
es a
e
Stora Ln0 Q: .0- 1. O� 0 .0 �0
I i �
Storage.Lanes:-.:-� . — r --
Taper Length(ft) 25 25 -.25 2-5. . 25 2.5 25 25
Lane Utif.factor 100. : tdo 1'.00. 1.00. 1;00: 1:00. 0.95 0.95 1....00 1.06 dm: 6.98
L
Ped Bike!Factor
Frt 0:9061 -0.850 0.998.
Flt Protected 0.953 0.999
I tj Satd.Flow(prot) 0 1728` 0 1811 1615 0 3572_ 0 0 3568;
Flt Permitted 0.985 0.953 0.999
8atdFlow -6
0: 1:728 .0� :1811 0 357 Z 0 ,0. 35681 0
.'
Link Speed(mph) 30 30 40 40
Q.n.kDlstahcb,{ft) .360 315; 383 8,1,1
Travel Time(s) 8.2 7.2 6.5 13.8
Area Type: Other
Lj
r
Lj
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012px-mod gap.syn
f7 Synchro 7- Report Page 1
Li
8: Commerce Way& Osgood Street 2012 Existing PM Peak Hour Mod. Gap
Volume
EfCv 'WTV7W," 9U���
v
(AbiTrida 77, yVt FT 7
Volume(vph) 19 0 45 191 3 106 28 1025 0 0 690 10
Confl.Bikes(#/hr)
060 Hour Faqt,or, .0.800.80 0.80' 0.94 0.94 0.94 ;:0.91 0.91 0.91 0.85 0.8 0.85
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 1000/0
Heavy Vehicles.(%°) 0% 0% 2%, 0% 0% 0% Q%- 1% NL-i
00/0 14/10 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 VI
Parking (00
Mid-Block Traffic(%) 0% 0% 0% 0% L_j
Add Flow(veli) 24 .0" 56. 203 3 113 31 1126 0 0. 812 12
Shared Lane Traffic r I
Lane:G F1 O� 80 0 _0� 1,13 0 1157 0 .0 824 0
#9up.Flow VP -
'21 17M;*U-Nl.�
r
rl
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012px-mod gap.syn
Synchro 7- Report Page 2 r—
C8: Commerce Way& Osgood Street 2012 Existing PM Peak Hour Mod. Gap
HCM Unsignalized Intersection Capacity Analysis
hilovemenf" t ,, /A-
EBL BT ' NBR- „ fiBL �SBT °PSBR
Lane Configurations ��► �'�
Volume_(vehh) 19 0 .45 191 3 1.06 28 1025 0 0 690 10
Sign Control Stop Stop Free Free
Grade `00/. 000 ©% 01%
Peak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 091 0.91 0.85 0.85 0.85
Hourly flow rate 19h) 24: 0 56 203 3 113 31 1126 ;0 0 812 12
n Pedestrians
Li Lane Width(ft)
Walking Speed(fVs)
Percent Blockage
P Right tum flare(veh)
u IVledian type None None_
Median storage veh)
Upstream signal.(ft): 610'
FX,platoon unblocked 0.76 0.76 0.76 0.76 0.76 0.76
vC,conffcting volume; 1557 2006 412 1650_ 2011. 563 _824 1126
vC1,stage 1 conf vol
vC2,stage 2:conf vol
vCu,unblocked vol 1100 1691 412 1223 1699 0 824 533
tC,smgle'(s) 7.5 '6.5 6:9' 7:5 6.5 6.9. 4.1; 41°
[� tC,2 stage(s)
L tF(sj 3.5 4.0 303 *0.7 *03. 33. 2 2 2.2
PO queue free% 78 100 90 33 98 86 96 100
CM capacity(v&h) 107 69 589 302 206 829` 815 793.
Direction,.Lane4". EB 1 WB 1 WB 2 "NB 1 7. NS
Volume Total 80 206 113 406 751 54.1 282
Volume Left 24 203 0 31 0 0 0
Volume Right a6: 0 113 0: 0 0. 12
c S H 251 300 829 815 1700 1700 1700
Volume to Capacity 0.32 0.69 0._14 0.04; 044 :0.32 017
Queue Length 95th(ft) 33 118 12 3 0 0 0
Control Delay(s)` .25.9 :39.9 109 1:2- '0A 0.0, 0A
Lane LOS D E B A
r Approach-D61ay(s) 25.9 29;3 0:4 H
L� Approach LOS D D
eters coon SUminary :i<:s .r; 4'" ,y ,, .; :t ,"1�'•:=u��� '+�`" .ter r r i.1i?3K'11;�.'TM'7'f.'Ls PIN
v Average Delay 5.0
n
Intersection Capacity Utilizatiori 72.6% ICU Level of Service C
Analysis Period(min) 15
n
* User Entered Value
r
U
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012px-mod gap.syn
Synchro 7- Report Page 3
r
Lj
f 1
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour Modified Gap L
Lanes and Geometrics Lane Configurations
1900 1900 1,900 .900
Itleal Flow v tiMY 19K 1900 1900 1.900 1 ga 1900 1900: 1 1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grad :0% 0% 0% 0% r
Storage Length(ft) 0 0 0 0 .0 0 0. 0
Storage,�je.Lanes 0 0- 0 1 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane LIN.Factor 1.00 -1 1.00 .1-..00 1.00 1.00 0.95 0.95 1.00 1.00 0,95 0.95
Ped Bike Factor
Frt 0.906 0.998
At Protected 0.985 0.953 0.999
Satd.Flow(Orpt) 0. 1.7280. 01 1811 1615 0 3572 0 0 3568 0
Fit, Permitted 0.985 0.953&. - � 0.999
S*d.,Flow(perm) 0- -17,28 0 0 1811 1615 0 -3572 :0 0 $568 0 r i
Link Speed(mph) 30 30 40 40
!hk.U 3,83 811
, .Distance(ft) :360 315
Travel Time(s) 8.2 7.2 6.5 13.8
r i
7-7,
Area Type: Other
LJ
ri
lJ
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017pnb-mod gap.syn
Synchro 7- Report Page 1
F
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour Modified Gap
Volume
/0-
L 6f.,"7f9F-f ffTfX'.'4V:7'$-6R
C Confl.Peds: #[tir
Volume(vph) 19 0 45 191 3 106 28 1081 0 0 733 10
Confl.Bikes(#/hr)
Pea Hour factbr: 0.80 0..80 0.80 0.94 .OV94 0-.-9-4 0. :.1 0.91 0.91 0.85 0;8 5 0.85
browth,F:act'o,�r' 100% 100% 100% 100% 1.00% 10.0%% 100% 100% 100% 100%1 . 100% 10 1.0%
Heavy W�tqles .0%. .0-% .2% -0%° 0.%
% 0% D% 1%. 0%. ''.0% 16/o :00/0
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/4r)
Mid-Block Traffic(%) 0% 0% 0% 0%
Aqj..Flow(veli) 24 0 56. 203 3> 1:13 -31 1188, 0 O 862 12
Shared Lane Traffic(%)
Lan.e Group Flow.(vpta). .0 .80 0 0 .206. 1.13 0 .1.219 0: 0 874, 0
liFte—rsefcCoK,'g-d—mWat'yr;2,7FIMZ-ti 31 t
LJ
f,
Li
Q:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017pnb-mod gap.syn
r-1 Synchro 7- Report Page 2
f �
8: Commerce Way& Osgood Street 2017 No-Build PM Peak Hour Modified Gap ,
HCM Unsignalized Intersection Capacity Analysis
Moveme r:
EBL . ''ET, �97 WB`�`"',-: T-` R'� r NBNT
Lane Configurations ::,,�rNBR.: ':.SBL':w"3 :SI T:r,'��•S-.B._R.
r ,
��► ��,
Volume(uehm)': 19 0 45 1913 106 28 1081 0 0 733 10
Sign Control Stop Stop Free Free
Grade 00/. 06/0
Peak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 0.91 0.91 0.85 0.85 0.85 ��
.- . ... . _
Hourly flow.rate(vph) 24- :0 56. 203 3_ 1.13 31 1188 0 0- 862 12
Pedestrians
Lane Width(it)
Walking Speed(ft/s)
Percent Blockage
Right tum flare(veh) '
Median We None None
Median storage veh)
Upstream ignal(ft) 610 f
pX,platoon unblocked 0.73 0.73 0.73 0.73 0.73 0.73
VC,conflicting volume '
1638. 21 $ 437 1737 2124 594, 874 - .11,88'
vC1,stage 1 conf vol
vC2,stage 2 cqn#vol
vCu,unblocked vol 1138 1794 437 1273 1802 0 874 522 ,
tc,single(s): 7.5 6.5 .6.9 7.5 6.5 6;9 41 4A
tC,2 stage(s) r,
IF(s)' 3.5 4.0 3.3 *0:7 *0.7 3:3 2.2 2.2
p0 queue free% 75 100 90 22 98 86 96 100
cM capacity(veh/h) 95 57 567 262 166 .798 781 771
6irection;°Lane# EB 1 WB 1 -WB 2 NB 1 NB 2 SB 1 SB 2
Volume.Total 80 206 11. 427 792 575 299
Volume Left 24 203 0 31 0 0 0
Volume,Right 56. 0 113. 0 0. 0 12 ,
cSH 230 259 798 781 1700 1700 1700 1
Volume'to Capacity 0.35 080 0.14 0:04 . AT 0;34 0. 18 -
Queue Length 95th(ft) 37 152 12 3 0 0 0
Control Delay.(s) 28.8 57.1. 10.3 1:2 0.0 0.0 0.0
Lane LOS DF B A V
Approach Belay(s) 28.8 40:6 0.4 0 0 r
Approach LOS D E
fi r'^q':sa�7:s^n-.r ^;'p yr'ry��,-r v-rre+-+• �+-�-�- w `P�"'p'f•"S�X""`�'" r'i zf$t ,""* 'ty""'�"'•y�.'c*'�+uo^rr'^*y r•.y. U
ntieuinmary� + 2L':��• i.
Average Delay 6.3
Intersection Capacity Utilization 74,1% ICU Level of Service- D
Analysis Period(min) 15 `J
User Entered Value
r
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017pnb-mod gap.syn
Synchro 7- Report Page 3 r
r.i
8: Commerce Way& Osgood Street 2017 Build PM Peak Hour Modified Gap
Lanes and Geometdcs
"EBL r r=EBT r' 'EBF r;:?WBL WBT f µWBR NBL ;NBT> T;NBlT 1,g 'SQL � SBTr SBR
Lane Configurations
ideal Flow(yphpl) `1.9.00 1900 19001 1900 1900 1060 1900, 1900 1900 1900 1,900 1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
Grade(%). 0% 0% 0% 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
*rage Lanes 0 0 0 1 0 0 .0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
LaneIU-til.Factor. 1:00' 1..00' 1.00' 1;06 1..00 1:00 0.95 0:95 100 1.00 0.95 0:95
Ped Bike Factor
Fit . 0.906 0.850 0:998_
Flt Protected 0.985 0.953 0.999
Satd.Flow_(Prot) 0 1728 0: 0 1811 16.1.5.: 0 3572 -0 0' 35W 0
Flt Permitted 0.985 0.953 0.999
Satd Flow(perm) 0 1:728 .0 01 181.1 1615 0 3572 0. 0 3568 0
E Link Speed(mph) 30 30 40 40
Link Pjstance(f#) 360 315 383 811
f� Travel Time(s) 8.2 7.2 6.5 13.8
{ ,{
nese1ctwnSuaamaryG 1!.. 1.t.1^• :t y4F v'.• fi ids' -N A -/ Y"4 - s r1'r'S7�"T'« i ( 1gl i�
�, }d.. `.✓1...,.,.r i-s°u.�tr.t d.�:Fr� t �f.,.. .SLS..r( .:Y`:rFt,t X71;,')1,:l r•Nrri•}. '�C:. ..mi 5.
Area Type: Other
L�
L
n
L
C
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017pb-mod gap.syn
Synchro 7- Report Page 1
C
8: Commerce Way& Osgood Street 2017 Build PM Peak Hour Modified Gap
Volume
Lane,Group",''' 'EBL EBT3 .-:EBR;:.'1NBL...,: WBT �'�WBRru,t
Volume(vph) 19 0 45 224 3 120 28 1081 0 0 747 10
ConflFeds.,(#nir): \
Confl.Bikes(#/hr)
Peak Hour Factor 0.8 0
0;80' ;080, _:
:4:94 0.94 0:94 0.9.1 0 9.1 0.91: 0.8� 0.85 Q:85
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%° 100%
Heaq.Vehtcles{°/a) 0%0 0%° 2% 0% 0% 0% 0% 1'/° 0°70 4°l0 1'/° 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr)
Mid-Block Traffic(%) 0% 0% 0% 0%
}df Flow(vph) 24 0 56 238 8 128 31 .1188 0 0. 879 12
Shared Lane Traffic(%)
Lan `
e Group Flow:(vph) 0 80 0: 0 241 12.8. 0 1219. 0 , 891 0 �.
fnter :r!-"6'L+l -""'t.'ge�."tm7r t'^js. �e-.-•'•�'r s�.a-rnr .,-rrr.+�;,^r^^� ?^x-r-+^,�^^i^�......._� rrMn�
sectton:Summaryr,.z r ce?r, e '",r '. :\t �:.r-'��c"u `��1;+�!z�r 3 ;a �,�>.a..c� �!t
LJ
r
�J
�1
l 1
r �
lJ
\J
F1
v
n
v
u
L
r �
l_1
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA12017pb-mod gap.syn
Synchro 7- Report Page 2 r
8: Commerce Way& Osgood Street 2017 Build PM Peak Hour Modified Gap
HCM Unsignalized Intersection Capacity Analysis
Move'm'ents `r
""M
ri. R ;81�" o:SBR
"EBL BEL ;EBT.'-,'Egk
Lane Configurations
Volume-(veh/h); 19 0 45 224 --,3 120 28 1081 0 .0` 7.47 1.0
Sign Control Stop Stop Free Free
Grade .0%, 0% 00/c
Peak Hour Factor 0.80 0.80 0.80 0.94 0.94 0.94 0.91 0.91 0.91 0.85 0.8 5 0.85
Hourly flow (vph)_ 24. 0 56 238, 3 -: 128 31 1188 0 0 879 12
Pedestrians
Lane Width
Walking Speed(ft/s)
Percent.Blockage
Right turn flare(veh)
Median type* NoneNone
Median storage veh)
Upsjre4m sJlgn#*(ft)', 610
pX,platoon unblocked 0.72 0.72 0.72 0.72 0.72 0.72
I I C-99flictin volume, 1669 2134 445 1745. 2140 594 891, 1188
vC1,stage 1 conf vol
vC21_,stage 2 conf vol
vCu,unblocked vol 1163 1805 445 1268 1813 0 891 498
tC,single(s) 7.8 6,5 6.9. 7.5 65 6,9: 4.1' 4.1
n tC,2 stage(s)
tF,(s) 3..5 A0 3.3 *01 2.2.
Lj 6, 3.3 2.2
pO queue free% 73 100 90 9 98 84 1,00
cIVI'd apacity(veh/h) 88
8 56 56.0 261 161'. '790 .770 779
Lane.#
V.6lum-e Total. 80 2.41 1.2.8- 427 79 1 2. 580, 30.5
Volume Left 24 238 0 31 0 0 0
yolume.Nght '516. 01- 128. 0.. 0., 0. 1.2
cSH 217 259 790 770 1700 1700 1700
,volume,to:CaDacitv -0.37 :0.93 0:16, 0.041 0:47 0.34 .0.1:8
Queue. I -L;e-ng1th,-95t-h' (ft) 40 21-2 14 3 0 0 1-0
Control Delay 31..0- , 61.3 10.4 1.2: -0.-0 0.0-. D--:0
Lane LOS D F B A
Approach Delay(s) -31.0- S6.8, 0;4.
Approach LOS D F
fnTb"
Average Delay 9.4
16tersection..Capacit Utilization 75.9 'ICU,Level of Service D,
Analysis Period(min) 15
M
User Entered Value
Li
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CX2017pb-mod gap.syn
Synchro 7- Report Page 3
0
3: Casa Blanca Driveway & Osgood Street 2012 Existing Sat Peak Hour
Lanes and Geometrics
Lane Configurations
l066111716W(vphlbl) :1900. 1900.. 1.900, 1900 1.9.00., .190.0. 19M 1900 1.00. 1900 100 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
CiGrade .0 0%
.- -
Storage Length(ft) .0 0 0 0 0 0 .0 0.
Storage -Lanes- 0 0i �0 0 `0 .0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane.-Utif.Factor tdd.� 1.00 1.0,0 1. 1.00 1:00 -0-9 1 5 0.95 1. 00. pip.4- �.Q.90-: .0.,95
Ped Bike Factor
Frt. 0.865 0.955
FIt Protected 0.968 0.994
Li Satcl.Flow_(Orot) 1644 0 0- 1'884 0 D 3575 0 0 3423 0
Flt Permitted 0.793 0.948 0.785
SAttl7low(perm 0 1-644, -0 0 1544 0 :0 3389 .q :0 .2703 0
Right Turn on Red Yes Yes Yes Yes
U Sa,td.Flow'(*A TO R- ) 223 38
Link Speed(mph) 30 30 40 40
Link Distance 182 1083 4 8 .2.2 7
Travel Time(s) 4.1 24.6 14.5 3.9
77
Area Type: Other
Li
Lj
P
U
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012sx.syn
Synchro 7- Report Page I
Li
n
3: Casa Blanca Driveway& Osgood Street 2012 Existing Sat Peak Hour
Volume
WB
EgF."'..EBT R NBL
Volume(vph) 0 0 4 159 1 80 6 700 0 70 538 0
r
_�orifi Peds.,(Whr)
Confl.Bikes(#/hr)
04 Hour Factor 0.33 :0.33 "0.39� 0.83 0A 0.83 1 0,95 0.95 0.91 0.91. �0.91
Growth Factor 1,00% 100% 100%. . 1 100% 100 1% 1,00% 100%°. 1 00% 100% 100%°. 100% 100%
Heavy Ve .1es N/6) 0% 0%1 0%. 3%, 0% 11%:: 0% 1% 1-/6: 4% 1.% 0%
Heavy Vehicles
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr..)
Mid-Block Traffic 0% 0% 0% 0%
Adj.I -W _ph Flo (v .0 Q 12 192 1 96 6 7.37 O` .77 591, 0
Shared Lane Traffic
:.G
Lan ph
Group Flow(V 0. 12- %0:* :0 289 0. 743 0.. 9. 6618 0
77. 7
'7
'N
HT, -7
Fht rrte_'&"Z-S
Ll
L_j
ll
IJ
QAProjects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2012sx.syn
Synchro 7- Report Page 2
3: Casa Blanca Driveway& Osgood Street 2012 Existing Sat Peak Hour
Queues
EBT,
rf-o
MT
Lane Group Flow(vph) 12 289 743 668
v/c Ratio 0W02 0.59 0.55, 0.62.
Control Delay 0.0 17.4 11.8 13.3
Queue-Delay0.0- 0.0. off �0;0
- . ��. .
Total Delay 0.0. 17.4. 11.8 13.3
Queue Lepgth,5'O.t.h:.(,) D 46 63 5.9
Queue Length 95th(ft) 0 120 136 133
(fit a,ltink Dist(ft) 1.02 1.0,03 768 147.
Li Turn Bay Length(ft)
gasecapa'd.ity(vph) 1104 971 .2812. 9.P42.
Starvation Cap Reductn 0 0 0
P0111backCap..ROOM 0 a 0 0.
Storage Cap Reductn 0 0 0 0
Reduced vlt,Ratio 0.01 0,30. 0.26 0.30
7 7
1`7
U
F),
Lj
QAProjects11 2 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012sx.syn
nn Synchro 7- Report Page 3
.L�j
F,
3: Casa Blanca Driveway & Osgood Street 2012 Existing Sat Peak Hour
IHCM Signalized Intersection Capacity Analysis
NI3
VM
6T
BT.' "W
EBI: EBT , NBT' SBR
Lane Configurations
Volume.
0 4. 159 1. 80 6 700 '0 70,I (Vph)� 0 .538 - 0
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane"idth 12 12 12. 16 16. 16 12 12 12 11 11- 11 r
Total Lost time(s) 6.0 6..0 6..0 6.0
Lane W1.Factor 1.00. 1.00 .6.95 05
Frt 0.86 .0.96 .1-00 1.00
FIf Protected -100 ..0.99
Satd..Flow(prot) 1644 1884 3.57.3 34.2.4
Flt.Permitted 0.95 .0.78
Satd.'Flow(perm) 1644 1544 3389 2702
Peak-hour factor,,PH F 0.38 0.83 0..33-'* 0.83 Ob! 0.83, 0.95 0 95 0.95 O.M 0.91. 0.91
Adj.Flow(vph), 0 0 12 192 1 96 6 737 0 77 591 0
RTOR Reduction(vph) 0' a 0 -0. 26 0 0 0 0. 0 . 0
Lane Group2 Flow- (vph) 0 4 0 0 263 0 0 743 0 0 668 1 0 1
LA
Heavy,Vehicles 0%- 0% 0% 3% 0% 711 69% :1 0/." .1% 4% 1.0/o .0%
Turn Type Perm Perm Perm Perm,
Protected`Phases 4 .8- 2
Permitted Phases 4 8 2 6
-1Z9 1.7.2 1.7.2
Actuated Gree
Effective Green,g(s) 12.9 12.9 17.2 17.2 r i
Actuated 0/rql-Ratio- 0.31 0 1.31 -0.41 .0.41
Clearance Time(s) 6.0 6.0 6.0 6.0
VehicleExtension(s) n n 3.0 n
Lane Grp Cap(vph) 504 473 1385 1104
v/s Ratio Prot 0;00
v/s Ratio Perm c0.17 0.22 c0.25
v/6 Ratio 0.01 0.5.6: 0.54 0.61
Uniform Delay,dl 10.1 12.2 9.4 9.8
Progression sion Factor 1.00 1,00 1'.00 1-.00
Incremental Delay,d2 0.0 1.4 0.4 0.9
66,gy. W 1 10.2 13.6 9.8 10:7
. .1 -
Level of Service B B A B
Approach belay(s), 102 .9.8.
Approach LOS B B A B
'Ink
-W-su w,
7, -,i,7
HCM Average Control Delay. 10.8 HCM Level of Service B
V lur
8CM. .Volume to Capacity 1PAP ity..
: ratio 0.58.
Actuated Cycle Length(s) 42.1 Sum of lost time(s) 12.0
.I..riters6et I ion Capacity U I tilization 71.80% ]CU Level of.Service.. 0
:I. - ap
Analysis Period(min) 15
c Criti,cal'Lane Group
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012sx.syn
Synchro 7- Report Page 4 r-i
3: Casa Blanca Driveway& Osgood Street 2012 Existing Sat Peak Hour
Timing Report, Sorted By Phase
Phase Number.,
Movement NBTL EBTL SBTL WBTL
Load/Lag
Lead-Lag Optimize
Recall Mode: Min Min :Min: Min
Maximum Split(s) 41 31 41 31
M.aximu.m,Sp1K(�6) 56.9% 43.-10/, 56.9% 43.10/p-
Minimum Split(s) 35 10 35 10
How Time fs) 4 4 4 4
All-Red Time(s) 2 2 2 2
Minim' iti m In al, 4 4 �4 4
Vehicle Extension(s) 3 3 3 3
Minimum G Ap(s) 3 & 3 -3
- -
Time Before Reduce(s) 0 0 0 0
Tme To Ae'duce(s)-. 0 0 0.. :0
walk Time(s,)
Fimfiton.t Walk:
Dual Entry Yes Yes Yes Yes
lnh,ib.ftMax .:,Yes :Yes Yes Yes
Stan Time(s) 0 41 0 41
Ehd.Tjm6(s1 41: 0 41 0
Yield/Force Off(s) 35 66 35 66
Y,i,e.1d./Force..Off 170(s) 35 66 315 66
Local Stan Time(s) 0 41 0 41
Local Yield(s), 35 66 .35 66
Local Yield 170(s) 35 66 35 66
inteirseciiMSummary-
Cycle Length 72
Ell Control Typa Sern.i.-Act-Uncodd
Natural Cycle 55
C" Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2 A
06 08
414;W,T,11245,74531
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012sx.syn
r) Synchro 7- Report Page 5
r�
6: BB Entrance & Osgood Street 2012 Existing Sat Peak Hour
Lanes and Geometrics
WBL -WBR:
Lane Configurations
Ideal Flow(vp,hpl) 1900 1900 1900 1900, 1,900 19.00
Lane Width(ft) 12 12 12 12 12 12
Grade(%o) 0% 0'10 -:0%
Storage Length(ft) 0 0 0 300
Storage Lanes 0 0 0 1
Taper Length(ft) 25 2525 25
Lane Uti1 Factor 1:00. 1;00 0.95 0 .95 1.00 0.95
Ped Bike Factor
Frt 0.958,
Flt Protected 0.950 r'
Satd flow(prot) 0. 0 3403 0 1805 3539 ._:
Flt Permitted 0.950
Satd:;Flow(perm) 0 0 3403 0 1805 3539
Link Speed(mph) 30 30 30
Ll
Link Distance(tt) 300 227 383
Travel Time(s) 6.8 5.2 8.7
f�
s72-7
; r ?r _ rr�neecorSmmary2r.
u
Area Type: Other
r
1.1
r�
lJ
�1
lJ
r�
u
�1
v
w
QAProjects\12 PROJECTST121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2012sx.syn
Synchro 7- Report Page 6 n
n
l J
n
L 6: BB Entrance & Osgood Street 2012 Existing Sat Peak Hour
Volume
i
. ., .Nrou _ _ ,... "'i!i ^• t '-P•r •7+ .y. FY " ! 7 r. ..a1r7- ��,p. -1 Yet"57
L•ane•Gp4.
Volume(vph) 0 0 568 212 63 608
Confl.Bikes(#/hr)
�} Peak Hour Faotof 0 92 0.02 0.94 0.94 1.95 0.95
U Growth Factor 100% 100% 100% 100% 100% 100%
Heavy Vehicles M. .0% 0% 2% 1% 0% 2%
Bus Blockages(#/hr) 0 0 0 0 0 0
Parking.(#/hr);
Mid Block Traffic(%) 0% 0% 0%
Adl Flow(vph) 0 0 604 226 66 :640
Shared Lane Traffic
Lane:Group Flow(vpf) 0 D 830 0. 66 640
f ..,na+:..:^.r--^.rr-.v^i�-s+.z- _-^�''Fy - f �r.4,'Y�'] a "^"T "'F?V""'I r "',s�^i'TK1A4'7..r 'SOTr'`...•�(sr,I-m � „rrFy Mn`.f7"'..a�'i'4y 'ri rY�';
rifefsection.S�mmar�l�?"'�:,r . ,� �t�ia;i'.»i�a i 'v,.••y3tk.£�''�S,a t�+��'J.:?�.a�i�..., .t51'«-�w{fe s':a' ,-f7.; � :s:�+Y. ,.rt ,'"� -YK:"�`Ii%.�rY�.'�,r s� ;�:s�r .�r.`:;�4 s".
1
f`l
L
r
I
Ell
�I
r
L
r
Lj
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012sx.syn
{ Synchro 7- Report Page 7
C
6: 1313 Entrance & Osgood Street 2012 Existing Sat Peak Hour
,HCM Unsignalized Intersection Capacity Analysis
1 f1
109L -MC' NBRs
Movement
Lane Configurations
0 568 212 -a 608
Volume(veh/h) 0
Sign Control Stop Free Free
Grade 0% 00/0
Peak Hour Factor 0.92 0.92 0.94 0.94 0.95 0.95
Hourly
00 fjoW , ,r : - 6'
:rate-,( 604 226 6 64.
vph .0 ---
Pedestrians
Lane'Width(ft)
Walking Speed(ft/s)
Percent Blockage
Right I turn flare(veh)
e
Median ty.p. None. None
Median storage veh)
opstream.signal.(#) 227
pX,platoon unblocked 0.85 0.85 0.85 L
VC,conflicting,volume, 117.0, 41.5 830
VC1,stage 1 conf vol
vC2'stag e confvol
.- V.
vCu,unblocked vol 848 0 448
tc,single W. 6.81 .6-9. 4.1
tc,2 stage(s)
3.5 33 2.2'
pO queue free% 100 1.00 .93
cm'capacity(veh/h) 241 928 955
Direction,Lani# NB 1 NB 2 SBf '962 86*3
Volume Total 403 427 66.: 320 320
Volume Left 0 0 66 0 0
Volume Right :0 .226 .0. 0
cSH 1700 1700 955 1700 1700
Volume to.Ca pacity 0.24
4 0.25 0.07 0.19 0.19
1 Ym .,.
Queue Length 95th(ft) 0 0 6 0 0
Conirab.pay
1 (i) 0.0 b.0 9;16.0 0.0. k-J
Lane LOS A
Approach:Deldy(s) U 0.8
Approach LOS
;• Rt?dw
nTwti -
Average Delay 0.4
Intersection Capacity Uti0imilon 32iN6 ICU16el of-.Service. A:
Analysis Period(min) 15
Q:\Projects\l 2 PROJECTS12121491 -LYNNF1 ELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012sx.syn
Synchro 7- Report Page 8
8: Commerce Way 9 9& Osgood Street 2012 Existing Sat Peak Hour
Lanes and Geometrics
Lane:Group; EBL. '�,,"'E-B-T'r'!;IBR"'---W-
Lane
'--WLane Configurationsa
Ideal Flow(vphpl) 1900 1900 1:900 1900 1900 1900 1900 1900 1900: 1900. 1900.1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
r} Grade(°la) 0% 0% 00%-
Storage Length(ft) 0 0 0 0 0 0 0 0
Stora%e arses 0 0 0 1 0 0 0 (�
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util Factor 1.00. 1.00 100,: 1.00 1.00. 1.00 0.95 0:95 1:00 1:.00 0.95 . 0.95
Ped Bike Factor
Ftt 0.902 0.850 -0:996
C Flt Protected 0.987 0.954 0.997
Satd.Flow{prof) 0 1723 0' 0 181.3' 1596 0 3544 0 U 3554 0
.
Flt Permitted 0.987 0.954 0.997
. _.
Satd`Flow(perm): 0 1.723 0 0 1813 1596 0 3544 0 0 3554 0
V lank Speed(mph) 30 30 40 40
Link Distance{ft). 360 315 383 811;
Travel Time(s) 8.2 7.2 6.5 13.8
^ r' n n;x':T+ y^r •rr+i.a, K 'mss"+?{'[ y13�� rp^ ""K-F -;fw-+ .r-rr�;r-�f�•� .r� ,g} f'�",C' L°�f .r'�.Z ,r���y= ^j"r^yr,..
ntefS@CtioD`Sdmmary,.. ;� .. w .�a,
Area Type: Other
n
M
I
La
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012sx.syn
In Synchro 7- Report Page 9
L.s
C
8: Commerce Way 9& Osgood Street 2012 Existing Sat Peak Hour
-
Volume
_.... ' _ , ...-._ T,,- ......_ .. ., ..1 7 78� 30 r 538 0 0 481 Y i3
m SBR
Lake Gro� - EBL EBT EBR: WBL °1NBT ::WBR.�t�,NBL., .:•NBT-_. NBR: SBL
Volume(vph) 10 0 27 63 r
Coni:Ped8.`.0[)
Confl.Bikes(#/hr)
Peak Hour Factor 0.84 0:84 0.84 U 85' 0 85 0.85 0.95 0.95 0.95 0.831. 0.83 0.83
Growth Factor o 100°Io 100% 1�% 100% 1 OD%_ 1 0°l0 1 00%, 1000% 100 A% 100000 100�0 100%
U
Heavy Vehicles(/o) �°
Bus Blockages(#/hr) 0 0 0 0 0 3 0 3 0 0 1 0
Parking(#/hr)
Mid-Block Traffic(%) 0% 0% 0% 0%
Add Ftow(vph). 12 0 32, 192 8 92 32 566 0' 0 580 16
Shared Lane Traffic(%) r
Lane'G oup Flow(vp0 h) 0 44 0 0. .290 92. 0 598 0 596 0
.:
intersection mammary �'` �: .�.. n � �,� s ,:. .,, ,, u, �� fk�,��, ; , ��, ? ''•
r 1
L J
r7
U
IL
r-�
LJ
L.i
f )
u
r-�
'l
L J
r
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12012sx.syn
Synchro 7- Report Page 10 r
CI
v
r
8: Commerce Way& Osgood Street 2012 Existing Sat Peak Hour
HCM Unsignalized Intersection Capacity Analysis
BTz R
'WBR �k.�""N
R_
Wvgm-
Lane Configurations 4*
Volurn.e.Jveb/h' ). 110 0 27 1.63 78 30.. 538 .0 �O 48'1 18
Sign Control Stop Stop Free Free
0%: 06/0,
Peak
Grade_
Hour Factor 0.84 0 84 0.84 0.85 0.8-5 0.85 0.95 0 1 95 1. 0.9.5 0.83 0.83 0.8 1 3
064 flow-rate_(0* ) .0 32 192 :8 92 32 566 0 0 580 1.6
Pedestrians
Land Width(ft)
Walking Speed(ft/s)
Percenf BldckAge
Right turn flare(veh)
Mianj.type None, N6ne.
Median storage veh)
U0s frearn signal:(ft) 610
pX,platoon.unblocked
vp. conflicting volume'. 10301217 298: 951 1225 :283.. 5.95 :566
VC1,siage'l cont vol
... ...
4-4tage 2 con f vol
vCu,'unb_1ock'ed vol 1030 1217 298 951 1225 283 595 566
16.1.9 7.5: 6.5 6.9 4.1
singe(s) 7.5: .5 4.1
tC,2 stage(s)
3.6. 4.0. 31 3.5 4.0 3.3 22. 22
pO queue free% 92 100 95 5 95 87 97 100
cKcapacity'(veh/h) 156 177 699 202 175 720 991 1016
1ane# EB.1 WB 1 W132 NB I A-2 SB1 'SB 2,
Volume Total 44 200 K 220 378 386 266
Volume Left 12 192 0 32 0 0 0
Volume'Right 32 :0. 92 0 D .0 1.6
CSH 361 201 720 991 1700 1700 1700
Volume to Capacitv 0.12 1.06 0'.13 0.03 022 0.23 0.1,21
Queue Length 95th(ft) 10 215 11 2 0 0 0
Contr6l,IJ614y(g) 16A 111.5 103 1.5 0.0: 0.0 0.0
Lane LOS C F B A
Approach.Delay.6 .16.4 79.8 0,6 D.
Approach LOS C F
FY
Average Delay 15..9.
lJ
intersection.Capacity Utilisation ICU.Level bf.Service:,
Analysis Period(min) 15
r
LJ
0:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12012sx.syn
Synchro 7- Report Page 11
E
3: Casa Blanca Driveway& Osgood Street 2017 No-Build Sat Peak Hour ,
Lanes and Geometrics
r,
;'WBT'm' WBR: ' .NBL:;•. .NBT,"NBR. " SBL' r,`SBT ?` $BR
.�
Lane Configurations 4# a�
Ideal Flow N.PhPl) 1900 1900 1900 19Q0: 1900 1900 1900 19.00 19.00 1900 1900 1900 �
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade.{0/6) 0% 0°Io 0% 0% r '
Storage Length(ft) 0 0 0 0 0 0 0 0
$*ge Lanes 0 0 0 0 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25 r
Lane 1:ftil;Factor 1.00- . 1:00 I.Q.0 1
1.000 0.95. 9.5 100. 0.95 0.95 0.95
Ped Bike Factor -�
Frt0.86.5_ 0:958
Flt Protected 0.967 0.995 r
Satd Flow(prof) 0 - 1644' 0 0 189:1 0 0 3575 0' 0 3427 0 ,
Flt Permitted 0.788 0.948 0.783
Satd Flow(perm):: 0' 1644 0 0: 1541 ` 0:' 6 3389' 0. 26970
Right Tum on Red Yes Yes Yes Yes
Satd..Flow(RTOR) 191 35 L J
Link Speed(mph) 30 30 40 40
Link Distance(ft) 182 1083 848 227
Travel Time(s) 4.1 24.6 14.5 3.9
-fttl
Area Type: Other r�
r �
.r
U
lJ
r�
V
LJ
. J
r-
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017snb.syn
Synchro 7- Report Page 1 r,
r �
3: Casa Blanca Driveway& Osgood Street 2017 No-Build Sat Peak Hour
(� Volume * I
n lane GroupT. ;: �' EBL: Y,EBT, `.EBR uVBI _UVBT. WBR::.,NBL,,:•.. NBTn:.,, NBR�,-..SBL=, �..SBT;��w�,,:SBR
U Volume(vph) 0 0 4 178 1 81 6 752 0 71 589 0
UU Confl:Peds:(#/hr).
Confl Bikes(#/hr)
U
0:83
Growth Fa 0
tor .33 0.33 0 33
Houctor 0.83: 0.83 0.95 0.95 0 95:. 091 0.91 0.9.1
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy V.hicles,(° ) 0'/0 0° 0% 3%` 0% 11% 0% 1%0 1%0 410 1'/A 0'/0
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
Parking (#/hr).:
Mid-Block Traffic(%) 0% 0% 0% 0%
Adf Flow(Vph) 0 0 12 2,114 1 98 6 792. 0 78 647 0
Shared Lane Traffic(%)
Lane Group Flow(vph) 0 12 0 0 313 ;0 0 798 0 0 Z25 t)
r^-nsr.--�'7'��,,�•.'_W tam� ti e� ,:C.1�i J.n :�:r'Zrf '{. w�'�u�}'`.� i'P1'�.�''gn' ��r S.�f �Y �u..�"',!Ty�,� k'` �'1T e�l���r.�sj�.t�rti.X itZl �Y��`.�
i�
n
i
Li
L
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017snb.syn
Synchro 7- Report Page 2
Li
3: Casa Blanca Driveway& Osgood Street 2017 No-Build Sat Peak Hour
Queues
Lane Group Flow(vph) 12 313 798 725
/c'Ratio- 0.02 0:63 0.57 0.65 u
Control Delay 0.0 19.4 12.6 14.4
Queue Delay 0.0 00 00 O.0 r
'total Delay 0.0 19.4 12.6 14.4
Queue Length..50th(ft) 0 .59 75 7 '
Queue Length 95th(ft) 0 143 166 164 f
tntemal:Link Dist(ft) 102 1003 768 147
Turn Bay Length(ft)
Base Cap.acity,f vph 1024 898 2629 2092
Starvation Cap Reductn 0 0 0 0 '
SpliOnk'CapReductn 0 0 Q 0
Storage Cap Reductn 0 0 0 0
1.
91 ced-v/c Ratio 0,01 0.$5 0730 0:35 r
tl'^hr:1."�k!'"-.�' iftc.++.r -�+ r...�.._..... .*. •�• ra - .�-�r�rr 7T.^,..'� ;�c,t"`Y s.. "S'r'�"mt r ,� z�gl"1.°',a. fln"X'�f r m{ K�•},��..
Intersection Summary tfi SC 7} 1 l:" i { y.y yY nrr �c{ x Y 1 I.J
s t'w' 'r° '. ,;. ..'4 t ri.; C. .rd Cv ,na.. :�. ,._c..�.. ""Y Y...kx1.a..1':«i.ti. ?.".n....,. :t.A: .,t.
�J
L
� 1
L.
t.J
ri
U
r^1
!�1
LJ
U
-1
U
f�
U
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andoveffraffic1CX2017snb.syn
Synchro 7- Report Page 3
U
1
LJ
3: Casa Blanca Driveway& Osgood Street 2017 No-Build Sat Peak Hour
HCM Signalized Intersection Capacity Analysis
-.77
Movement 's* T, "ABT Z", T
Lane Configurations
Volume.(vPK) .6 b .4 _178 1 Al .6 ltZ a 711 689- 0
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width 12 12 1.2 i�! 16 16, 12, 12: _121 11* ii- 11Total Lositirne(s 0.
Lf -) 6. . 6.0- 6.0 6.,0 1
Lane bfiifictor 'Ijob 1.00 0 95 0.95
Frt 0.86 0.96 1.00 1.00
Fit Proiktod' 1.00; 0.97 OM
Satd.Flow(prot) 1644 1890 3573 3426
Flt Parrhi-fled 100 0.79 0.95. 0.78
Satd.Flow(perm) I,644 1541 3390 2695
Peakbur factor.:PHF 0.33 0.33 OM 0:83 0b. 033 0.95. :-0.95 0.95. 9i'01 0i9f 0.91
Adj.Flow(vph) 0 0 12 214 1 98 6 792 0 78 647 0
ATOR.A-e- '0� 8 0. 9 N 0 .0- - 0 :0 .0 0
..1. 1 ., 0.911L.- 400 -
Lane Group Flow(vph) 0 4 0 0 289 0 0 798 0 0 725
Heavy Vehicles� .00% ho: 6%. 3% .00/0 1% 1% _4% _,j% 01/o
Turn Type Perm Perm Perm Perm
Protected Ptiases 4 8 2 6
Permitted Phases 4 8 2 6
Actuated-Green.G:(s), 14.5 14.5 19:5 19:5
Effective Green,g(s) 14.5 14.5 19.5 19.5
Actuated.WC Ratio 632 0.32 0.42 0.4Z
Clearance Time(s) 6.0 6.0 6.0 6.0
Vehicle Extension(s) 3.0 3.0, .3.0 u
Lane Grp Cap(vph) 518 486 1437 1142
v/s Ratio Prot 0.00
v/s Ratio Perm C0.19 0.24 c0.27
W&P-4tio 0.01 -0;59 A.56 0,.63
Uniform- :Delay,d.1 10.8 13..3 10.0 1 0.4.
Progression Factor 1.00 100 1-.00:
Incremental Delay,d2 0.0 2.0 0.5 1.2
Lr Delay-(s) 10.8 15Z 10.5: 11,6
Level of Service B B B B
Dl 1 0.8 15 10
.2 .5 11:6
App0a6h. e0-Ay(s):
Approach LOS B B B B
1n_t'e'W06n'T,�Sm-aWt-;' 'Lw tatLzr" T�
HCM Average Control Delay 11.7 HCM Level of Service B
HCM Volume to ratio AM
....1; : P pAcity
Actuated Cycle Length(s) 46.0 Sum of lost time(s) 12.0
Intersection Capacity Utilization 75.8% iCU Level of Service.
Analysis Period(min) 15
6 CO af.La.ne-Gio6p.
Lj
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017snb.syn
Synchro 7- Report Page 4
Li
E
r�
3: Casa Blanca Driveway& Osgood Street 2017 No-Build Sat Peak Hour
Timing Report, Sorted By Phase
r,
t
8aa Nmbr2 u .•rte -+ r. r- r vr^'s^x- + ti n
.t ,,. .1• . fr:
Movement NBTL EBTL SBTL WBTL
Lead�Lag ��
Lead-Lag Optimize
Recall Mode Min Min Min Min r
Maximum Split(s) 41 31 41 31
Maximum Split(%)' 56.9% 43:1% 56:9% 431%
... . .
Minimum Split(s) 35 10 35 10 r
YelloW:.Tl (s) . .4 .4 4 4
All-Red Time(s) 2 2 2 2
Minimum ln�tial(s) 4 4 4: 4.
Vehicle Extension(s) 3 3 3 3 r
Mm�mum Gap(s) 3. 3 3 3
Time Before Reduce(s) 0 0 0 0
Time To Reduce(s) 0 .0 0 0
Walk Time(s)
Flash Dont Walk(s),.
Dual Entry Yes Yes Yes Yes
inhibit Max Yes Yes Yes Yes
Start Time(s) 0 41 0 4-1 LJ
EndTime'(s) 41 0 41 0.
Yield/Force Off(s) 35 66 35 66
Yield/Force Off 170(s) 35 66 35 66
Local Start Time(s) 0 41 0 41 ` J
Local Yield(s) 35 66 35 66,
Local Yield 170(s) 35 66 35 66 i
intersection`Summary
Cycle Length 72 r,
Control Type Semi Act-Uncoord
Natural Cycle 55
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street '?
t 02
y .,r'7 ,.. J �{ �. - 1 {, r:. +y',i�1, T yrsyK' R f } }';.•i °"+f";...
Nyyt�C v.Y,.1 w, t J t�lti.4w� 'r,�+•y...�+y.rt..r�+:..y, .t.'.t, ].P7f'.n+ .7A�9f6�i. r � ,#`1' .:..+71J-�k'e, �.�i
r 1
y� 06 08 t�
±Y 'ST7F ��.+4�x'�fi��^t�-�`�iP�'YS� tA•.^1.;�;' ��"� r'+S.aO. '.�"c+��':.T::..G: '+ tA...,Y,:• :]M[.Y"' M ..a. �Y' +1`�'
r�
1.1
r-1
L.
'l J
U
0:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveffrafficUT017snb.syn
Synchro 7- Report Page 5 r
La
r �
u
6: BB Entrance & Osgood Street 2017 No-Build Sat Peak Hour
Lanes and Geornetrics
Lane Configurations
Id6aIFimV:(vph0,l), 1900 1900 190,0 1900 1900 190
Lane Width(ft) .12� 12 .12 12 12 12
UI ONO 0%
Grade: 0% 0%
Storage Length(ft) 0 0 0 300
Storage Lanes 0 .9.
Taper Length(ft) 25 25 25 25
Lane Vo. Factor 1 m.oq 1:00. 0.95 .0.05 -1.60. 6.95.
Ped Bike Factor
0.962
Fit Protected 0.950
Satd.Flow(oro W 3'5W
�0 0 341.3- ..0
FitPermitted 0-950
S..6..td.1Flow,(Oer.m). 0, 0 341'3 f3 H 1 05, 3539'
Link Speed(mph) 30 30 30
Q. k-Distance.(ft): 20227 .383`
Travel Time(s) 6.8 5.2 8.7
��,7i,,i,7TK -A TIM' '
Area Type: (Mer
QAPrpjects;11 2 PROJEC7S2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017snb.syn
Synchro 7- Report Page 6
6: BB Entrance & Osgood Street 2017 No-Build Sat Peak Hour
Volume
Lane Group, . B _W W6A_
j,NBT NB
LA, J_ - —
Volume(vph) 0 0 .621 212 63 660
Ped_&'(#/_fir)
Confl.Bikes(#/hr)
. .-
Peak,Hour Faqtqr OM: 0.92 0 94 94 _A95 0.95- 0
Growth Factor 100% 100% 100% 100% 100% 100%
Heavy Vehicles(°) 0% OO/o 0
2%
Bus Blockages(#/hr) 0 0 0 0 0 0
Pa.rld.hg (#,Mr)
Mid-Block Traffic(1/o) 0% 0% 0%
Add.'Flow(vph) 0
66.1: 226 66 6.95
Shared Lane Traffic(%)
.Lane Group FI6W:(vph), 0 0 88.7 0 66 695
rl
Lj
r �
44
lJ
r7
iJ
lJ
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017snb.syn
Syrichro 7- Report Page 7
r I
G� 6: BB Entrance & Osgood Street 2017 No-Build Sat Peak Hour
HCM Unsignalized Intersection Capacity Analysis
Movement'° f. y 1hIBL. `'`WBR r NBT i's N81 �}. SBS: •.zBBT. �' ' ..� xx yr,, a.at �..,ti
Lane Configurations
Volumd(veh/h); 0 0 621 212' 63 660
Sign Control Stop Free Free
Grade 0°k 0'(0 0%
Peak Hour Factor 0.92 0.92 0 94 0.94 0.95 .0-95
Hourly flow rate(vph) 0 0 661, 22666 695
Pedestrians
Lane Width jft)
Walking Speed(ft/s)
Percent Blockage
C Right tum flare(veh)
Median type, None Nine
Median storage veh)
Up,ij r n signal 1.t) -227
CI pX,platoon unblocked 0.84 0.84 0.84
vC,conflicting volume 1253,
4.43 886'
h vC1,stage 1 conf vol
vG2,stage..2.conf vol_
vCu,unblocked vol 914 0 475
tC single{s) 6.8 6.9 4.1
tC,2 stage(s)
tF(s) 3.5 3.3` :2.2
p0 queue free% 100 100 93
cm capacity(veh/h) 215 913 919
C lairection,Lane# NB
1 N132 SB-9SB2
Volume'total 440 446
66 347 347
Volume Left 0 0 66 0 0
Volume;Right .0 226 0` 0 0
cSH 1700 1700 919 1700 1700
Volume#o Capacity 0.26, 0.26 0.07 0420 :-0.20:
Queue� Length 95th(ft) 0 0 6 0 0 Control Delay(s) 6.0 0.0 9.2 0.0 OA.
Lane LOS A
Approach pelay_(s) 0.0 0.8
Approach LOS
�,r.,;-�^sy o +ate t, r �. rs+• ,y`^'� '-r-u.��h'��••+n � �rer T+��,,7� -�y��A4S31� .Sir �,.,.Lry ''X .z.+.y`�ay',..�U"�-.v tii.`�• -r ^ctc,�r��,;.,:
interseetionj�Fmma s�yc.�r n
Average Delay 0.4
intersection CapacityUtilization> 34.1% ICU;Level of ServicIe A
Analysis Period(min) 15
4v
LJ
n
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA12017snb.syn
Synchro 7- Report Page 8
C
8: Commerce Way& Osgood Street 2017 No-Build Sat Peak Hour
. .�
Lanes and Geometrics
--� T �►
..EBT,. EBRaF WBl WBT; '.WBR�_;.�, NBL:%NBTa `NBR:,.,:::�SBL: .;�.$BT�:• :,: BR r,
Lane Configurations '"
ideal Flow(vplpl) 1.900 1900 1900 1900 1999 1900 1900 1900 1900. `1900 1900 1900
Lane Width(ft) 13 13 13 13 12 12 12 12 12 12 12 12
0%a 0% 0%, 00/6
Storage Length(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0; 1 0 0 9 0
Taper Length(ft) 25 25 25 25 25 25 25 25 r,
Lane U.til Factor1:00 1.00 1.00 1:00 1.00 1.00 0:95 0.95 1.00 1.00 0:95 0.95
Ped Bike Factor
Frt 6.902 0.850 0.996
Flt Protected 0.987 0.954 0.998
Satd Flow(prof)' 0 1723 0 0 1813 1596; 0 3547 '0 0` 3554 0
Fit Permitted 0.987 0.954 0.998
Satd Flow(perm) 0 1723 .0 6. 180 1596 0 3547 6 0 3854 0
Link Speed(mph) 30 30 40 40
Link Distance(ft) 360 315 383: 811
Travel Time(s) 8.2 7.2 6.5 13.8 r r,
•. .«--7.. -•t'^ ^�^."-r,*^M..,�� a i•—:'ro r` -^.,... ..i.Ft+.r,.y'k.'.!n , «y�sf pY�_ •�F4�..,.:•a c�>":>::•—+`r F�u
X,7
�� C4 V
Rtrrs7egrn um•mry ,r'„1'
Area Type: Other
L ,
r�
r�
u
fti
u
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndovMTraffic1CA12017snb.syn
Synchro 7- Report Page 9 f,
8: Commerce Way& Osgood Street 2017 No-Build Sat Peak Hour
Volume
Lj
SIB ,Cs
EBL. BT--;' R`
N
Volume(vph) 10 0 27 163 7 78 30 591 .0 0 533 13
Conh;Peds.
(#/hr)
Confl.Bikes(#/hr)
Peak C .Hour Factor 0;84 1 .0.84 0.84, 0115 U5. 0.85 0.95 :0.95 :.0.95 * 0.83-, U& 0.83
Gr c,v v1h Factor, 100% 100% 100% 100% 100% 100% 100% 100%° 100% 100% 100% 10 0%
'2% 0% OP/6, O.'/'o .0% 1%- 1% 0%
HeavyV0Nqles:(%)! .0?/o 0%
Bus Blockages(.#/hr),. 0 0 0 0 0 3 0 3 0 0 1 0
Parking (#ft)�
Mid-Block Traffic(/o) 0% 0% 0% 0%
WFlow(yph). 12 0 32 192- 8. 92 32 622 0 0 642 16
Shared Lane Traffic(%)
Ls Lane--
Group- 0: 44 0 U. 200. :92 D '654 0 .0 -650;1 0
-Flow ph)
rh Fe 1!9 9 4 t E ffi
F1_1,n_1.VT7L777 fl.,Z
Li
E.
E
r
L
ri
ri
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017snb.syn
Synchro 7- Report Page 10
Lj
71
Lj
r,
8: Commerce Way& Osgood Street 2017 No-Build Sat Peak Hour ;
HCM Unsignalized Intersection Capacity Analysis
IoVement �, . EBL: .EBT ' ' EBR; WBL. r;WBTWBR. "NBL _ •NBT , .NBR x SBL::
. '
Lane Configurations 4
Volume(yeh/h) 10 0 27 1.63 7 78 30 591 0 0 533 13
Sign Control Stop Stop Free Free
Grade 0% 0% 4%;
Peak Hour Factor 0.84 0.84 0.84 0.85 0.85 0.85 0.95 0.95 0.95 0.83 0.83 0.83
Hourly#low rate:(vph) 12. 0 32. 192: '8. 92. 32 622 0 0 642 16
Pedestrians
Lane.Width tft)
Walking Speed(ft/s)
Percent,Blockage
Right turn flare(veh) r
Median type; None None
Median storage veh)
Upstream signal-.(, 6}fl
A platoon unblocked 0.96 0.960.96 0.96 0.96 0.96
uC,conflicting V61ume 1420 1335 329. 1038- 1343, 311 658 622
vC1,stage 1 conf vol
vd2,stage 2 conf vol r
vCu,unblocked vol 1049 1273 329 965 1281 210 658 533
tC,single(s). 7;5 6.6 6:9 T: . 6.5: 6.9 4.1 41
tC,2 stage(s) rti
.tF.(s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2;2
p0 queue free% 92 100 95 0 95 88 97 100
cM capacity(veh/h) 146 157 667 190 136 773 939 1007
r�
Direction,Lane# EB 1 WB 1 WB 2 NB 1 NB 2 'SB 1 SB':2
Volume Total .44 200 92 239 415. 428 230
Volume Left 12 192 0 32 0 0 0
_ n
Volume.Right 32 0, 92 0 0 0 16
cSH 340 188 773 939 1700 1700 1700
Volume;to Capacity 0._1,3 :1.06 0.12. 0.03 024 6.25 0.14
Queue Length 95th(ft) 11 236 10 3 0 0 0
Control Delay(s� 17.2 135.0 10.3 1.5. 0:0 0.0 00
Lane LOS C F B A
Approach Delays) 17:2 95.7 0.5, U;0
Approach LOS C F
• ,,•A..,s--T'iV•'.a0„a+3rr,�'s's sx_. '.�' c«F,.2.,a..� *.,t...,- �n -^cs�.•�..or w o'r*�^ �.'�.i r»- w <�'i"'>� st �ti
Vnferse htm�Summaryr, a� .
• �: � .�r ��. ., A..r.- aji.Y. aC...".Y .�.�.v,.. . n,C .,.�,Y?J.S4:J:��
Average Delay 17.6 r
IntersectionCapacity Utilization 58:4° ICU Level of.Service B
Analysis Period(min) 15
� r
L_1
r_1
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017snb.syn J
`
Synchro 7- Report Page 11
C1
lJ
�+ 3: Casa Blanca Driveway & Osgood Street 2017 Build Sat Peak Hour
Lanes and Geometrics
bane Group, k EBL' EBT .EBR
' ' VNBL:{`'.wBT WBR : NBL� i;.N6T'- :NBR � r_SBf 98T_ mB
Lane Configurations 41,
ideal Flow(vpl pl), 1900 1900 1900 1900 1900; 1900 1900 1900 1900. 1900: 1900 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Grade:(1o) 0% 0% . 0% 0%
Storage Length(ft) 0 0 0 0 0 0 0 0
0
Storage Lanes 0 0 0 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
i Lane 11til Factor 1:00 1..00 1.00 1:00' 1:00 4.00 0.95 0.95 1:00 0.95 0.95 0:95
Ped Bike Factor
Frt 0.865 0.957
C Flt Protected 0.9 6 7 0 995
Satd Flow(prof) 0 1644 0 0 '1888 0 0` 3575. 0 `0 3427 0
Flt Permitted 0.790 0.949 0.770
(� Satd Flow(perm) 0- 1644 0 0. 1542 0 0 3392 -0. 0 26.52, •0
uRight Turn on Red Yes Yes Yes Yes
Satd.Flow(RTOR); 174 36.
Link Speed(mph) 30 30 40 40
Link Distance(ft)' 182 1083 848 227
Travel Time(s) 4.1 2 4.6 14.5 3.9
m-,-,m.:✓r,.r-•p�;rt>. I-: •-'„i^F' '^ T-Fi�S � �n K' ''J'4 T;�('�—....r'7' i"ler'rv�:; u+^�"' 4, ('°�"` 'a q^
Rersecfion:Summary a,1� ra zG �,,- �,;T�,•, �,:r r
n :
f Area Type: Other
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017sb.syn
Synchro 7- Report Page 1
i
Ej
r-
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour
Volume
NBRBU
Volume(vph) 0 0 4 178 1 84 6 784 0 74 619 0
COO.Peds.(#ft)
Confl.Bikes(#/hr)
Peak Hour Factor 0.33 033 0.33 0.83 0183 0;83 :0.95 �0.95. .0-95 0.91 0.91: 0,91
Growth' ilac'tor;. 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy hicles /o- 0% 0% 0% 3% 0% jj% 0% 1% i%' 4% .1% 0%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 r7
Parking (#/hr).
Mid-Block Traffic(0/6) 0% 0% 0% 0%
Aqj:FIow(vpl)) 0 0 12 214 .6 .0, 81: 680;.' 0
Shared Lane Traffic(%)
Lane Group Flow NO), 0 12 0 :0 316 0 :0. 831 0 0 761 0
iWMRIZ MR TW 7-1"
7,
Wt
r i
La
QAPrqjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA12017sb.syn
Synchro 7- Report Page 2
ri
L_j
n
'L, 3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour
Queues _
M
-► t l
.ya .r:. � .r �., 'n..^•'.t M.'^.. Yf nrc'1 +, r.� r ^•-r j. i Ly. 'Gµs^r' l r3 qrr 5 � 7
n Lane`GroupA�-• -� ;EBTr• VIBT. :NBT�>� �SBT� , ,.��,,�. .�.�:�, ,,:.. � ,n.•;f�,.+. k {rs:�,!.ra � ,r
Lane Group Flow(vph) 12 316 831 761
Li vlc Ratio, 0.02: 0.64 0.57 0.67
Control Delay 0.0 20.5 12.5 14.8
Quewpelay
0.Q -0.0 0.0 0.0 '
,J Total Delay 0 T.
20.5 12.5 14.8
Queue Length 50th(ft)' 0 63 81 I
Queue Length 95th(ft) 0 152 173 175
if Internal Link Dist(ft) 102 1003 768 '147
L' Tum Bay Length(ft)
Base Capacity(vph) 991- 873 2560 2002
�! Starvation Cap Reductn 0 0 0 -0
Li $.01 lback Cap Reductn` 0: 0 0 0'
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio: 0.01 0:36 -0,321 0:38 7
"'4'::..rti.x'•^..t-J.--•cr.<rm'u +-•n-^.r Y� 7 "t^• y rm r xr.-s:.r •r•epprC•T'r+"' r• i� t":� " : ''/� n'4 r :r F�� �'r � I �� tt
f-I
u
C
h
L
c
c
c
c
c
c
c _
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CA12017sb.syn
Synchro 7- Report Page 3
C
C
r-1
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour
HCM Signalized Intersection Capacity Analysis
4-
BT
WV �'1771'��'C. . 'NB
Lane Configurations
Volume`(vph). 0. 0 4 1-78 i 84 6 184 0 .74 619 .6
Ideal.Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900, 1900
12 12 12 16*. 16 12 12. 12 11� 11 11
Total I Lost time(s) 6.0 6.0 6.0 6.0
Lane U.til I.,Factor 1.00 1 . .0.95 0:95. Li
Frt 0.86 0.96
1.00 1.00
Flt Protected .00 0.97 11 00 0:99
Satd.Flow(prot) 1644 1888 3573 3426
Fit Permitted 1.00 091 095 077
Satd.Flow(perm) 1644 1542 3391 2653 -
Peak-hoii factor,PHF 0.33 033. -'033: 0483 .0.88 0.83 0.95 0.95 .0.95 0-.91 0.91 0.91
Adj.Flow(vph) 0 .0 12 214 1 101 6 825 0 81 680 0
kTQR Reduction(vph), 0, '0-: 0 0 0 0.' 61
1 L.ane Group Flow(vph) 0 4 0 0 291 0 0 83.1 .0 0 761 .0.
Hea*Whicles:(%Y�, . 0%. 0'/-;: 00% 3 1% 0% 11% 0%
Turn Type Perm Perm Perm Perm
Proteded0bases 4
Permitted Phases 4 8 2 6
Actuated Green 14.8 14.8. 20.8 20.,.8
..' I-- ...Green;- \01 -
Effective Green,g(s) 14.8 14.8 20.8 20.8 r I
Aqtuated.Vp Ratio 0.31 '0.31 0.44 044
Clearance Time 6.0 6.0 6.0 6.0
Vehicle Extension 3.0 .3.0 3.0 3.0
Lane Grp Cap(vph) 511 479 1482 1159
V/Sflatjo Prot 0.00 Lj
v/s Ratio Perm C0.19 0.25 c0.29
vk.'Ratio 0.01 0.5. 6 Q.66:
Uniform Delay,dl 11.3 13.9 10.0 10.6
L-A
Ord ression Factor 1.00 1.90 1.00 1;00
Incremental Delay,d2 0.0 2.2 .0.5 1.4 V-1
Del 16.1. 1.0.5 11.9
Level of Service B B B B
Approach belay'W
Approach LOS B B B B
11"'r-
jnle'f's�W 'U�Mmffl"J-M 7�7-70,
HCM Average Control Delay 12.0 HCM Level of Service B
1-101M V urn e to Capacity ratio� :0.64
Actuated Cycle Length s) 47.6 Sum of lost time(s) 12.0
Intersection Cap t ilizatio n 7-1.8% ICU Level of..Service. D
:U
Analysis Period(min) 15
c Critical Lane Group
Q:Trojects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverNTrafficNCA\2017sb.syn
Synchro 7- Report Page 4
r1
k ,
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour
Timing Report, Sorted By Phase
Nunn ek:�:
ph
Movement NBTL EBTL SBTL WBTL
Wadlag
.. 9:
Lead-Lag Optimize
Recall Mode Min Min Min Min
Maximum Split(s) 41 31 41 31
Maximum56.9% 43:1'1060% 43.11-0/6
' split:M
Minimum Split(s) 35 10 35 10
4 4
All-Red Time(s) 2 2 2 2
Minimum 4 :4
: 1n) 4., .4' -
Vehicle Extension(s) 3 3 3 3
Minimum Gap-(s) 3 81 3:
Time Before Reduce(s) 0 0 0 0.
Time To'Reduce`W 6, -0,
Walk Time(s)
Flash I ..Dont., Walk(s.
Dual Entry Yes Yes Yes Yes
Inhibft Max Yes Yes Y68: Yes
Start Time(s) 0 41 0 41
End-Time(0) 41 0 41. 0-
Yield/Force Off(s) 35 66 35 66
Yield/Force Off 170(s) 35 66 35 66
Local Start Time(s) . 0 4.1 ...0 .41,
r_1 LOC41 Yield,(s) 3b 66 35 66
U 1 Local Yield 170(s) 35 66 35 66
intersection
r–I Cycle Length 72
Control Type Sem)A6t_Unco6rd
Natural Cycle 55
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2
f4..,"k— 't;�p
06 08
Li
LJ
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Trafl`ic\CA\2017sb.syn Page 5
Synchro 7- Report
Li
E
r -,
6: BB Entrance & Osgood Street 2017 Build Sat Peak Hour U
Lanes and Geomettics
n
LaiieGroup. '� ~ 1NBL< VVBA J:NBT ' 7 '�' `'`
r�
Lane Configurations
Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900
Lane Width(ft) 12 12 12 12 12 12
Grade(%) 0% 0'Zo
Storage Length(ft) 0 0 0 300
U
Storage Lanes 0 0: 0 1
Taper Length(ft) 25 25 25 25
Lane UA Factor '1.00 1.00 0.95 0.95 1.00 0.95.
Ped . ..
Bike Factor
Frt 0:957
Flt Protected 0.950 r
460.1.Flow(plot)'. 0 0 .3.397 .0 1805 3539 L,
Flt Permitted 0.950
Satd Flow(perm) 0, 0 33.97 0 18M 3$39
Lank Speed(mph) 30 30 30
Link Distance(ft) 300. 22 303 L'
Travel Time(s) 6.8 5.2 8.7
ei�rr-«.rr^u:rr��y ` TM"„ 7W;5W
;ym ' + :"" +w. • .. -- 77 :,,,{1 v••i-� .�:rw r,
Area Type: Other
r,
U
U
n
r�
n
r�
u
r�
u
r
U
r�
U
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017sb.syn
Synchro 7- Report Page 6 n
n
6: BB Entrance & Osgood Street 2017 Build Sat Peak Hour
Volume
Lane Group wa, wm
Volume(vph) 0 0 621 247 78 693
Con—,
Confl.Bikes(#/hr)
Pea'k:.H 6u,r Pacto-r- -0.92 0492 0.94 0194 -:0.95 U5
:Growth. Factor d I. 100% 1,00% 100%0 0.% 100.% 100%- 7 100%
Heavy Vehicles(0 0% Ot/lo 2% 1% 6% 2%
Bus Blockages(#/hr) 0 0 0 0 0 0
P rkin
g I(#/hr)
Mid-Block Traffic(%) 0% 0% 0%
Add flqw.Vph). 0 O 661: .263 82 729
Shared Lane Traffic(%)
Lane Group F-jo"w(.yph' 0, 0 924 0'
82: -729'
fnfi"a
r
Iln
LJ
LJ
0:\Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017sb.syn
Synchro 7- Report Page 7
r_1
I
L-i
r�
6: BB Entrance & Osgood Street 2017 Build Sat Peak Hour
HCM Unsignalized Intersection Capacity Analysis
t
6F,
Lane Configurations
VoIlume eh/h), 0 0 621 241 78 6193.
Sign Control Stop Free Free
Grade 0%%
Peak Hour Factor 0.92 0.92 0.94 0.94 0.95 0.95
Uj
Hourly flow.rate(vph):. 0 661: 263 82 729
Pedestrians
Lane Width.
Walking Speed(ft/s)
Porceni.Blockage
Right turn flare(veh)
Median type None None.,
Median storage veh)
*i:qw signal 997
pX,platoon unblocked 0.83 0.83 0.83
conflicting volume urne 132 1 462 923
—
vC1,stage I conf vol
vb2.stage,2 conf Vol
vCu,unblocked vol 979 0 500
tc,sipgie 6,8 6.9 4.1
IC,2 stage(s)
IF(s) .31.5 3.3 2.2
pO queue free% 100 100 91
6M ca.P adit
y.(veh/h) 189 906 892
direction,Lane i NO j -N8 2 8B 1 8B 2 _'99'3
.Volume Total 441.0 483 .82. 365 365
Volume Left 0 0 82, 9 0
Volume.Right 0 263 0 0 0:
c SH 1700 1700 892 1700 1700 LA
volume to Capacity 0.26 6.2-8, 0.69.1 ORT 0.21
dueueLength 95th(ft) 0 0 8 0 0
6�i�6 I Delay.W U 0.6 9.4. Off 0.0
Lane LOS A
Approach Dolak(s) 0.0. I.Q
Approach LOS
L_j
FaFeRe�FeRS-Fiffi �,F R ZZ7 7*TT_ �T .7-'77,71, 11_,'
N;
Al
Average Delay 0.4 r I
Intersection n.tettictio'n.Capacity;Utilization. .36.1.% ICU Leve I.:6 f Service A
Analysis Period(min) 15
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA12017sb.syn
Synchro 7- Report Page 8
L
8: Commerce Way& Osgood Street 2017 Build Sat Peak Hour
Lanes and Geometrics
F1
Li
NBL SBR
i'�U �-'Nff "NBR'' -'96
j "e5 --- L-
-.16k."T, VB -WffA
Lane Configurations
0
Ideal Flow(vphpI) 1900 1900. 1:900 1900 1900 1900, 19.00 1900 1900 1900: 1900 190
Lan,e'kdth(ft) 13 13 13 - 1.3 1.2 12 12 12 .12 12 1.11 2 1.2.
00/.- .0% 0% 0'/07
Lj Storage Length(ft) 0 0 0 0 0 0 0 0
Storage.Lanes 0 0 0 -1 0 0 0 0
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Utit factor 1.-00 1,00 1.00, 1.00: U0 1.66 6.05 0.95: 1.00 1;00 0.95 0.95
Ped Bike Factor
M 0.002 0.86d 0.096:
Flt Protected 0.987 0.954 0.998
Li Satd.- 0 1723 0. .0
0 1810 1596..1-596.. `0 .3541- 0 O 3664
At Permitted 0.987 0.954 0.998
Satd-Flow(perm) :0 172.3. Q. 0 1813 1596 0 3547 6: 0 3554 0
Link Speed(mph) 30 30 40 40
Li
Linkbis'tanw M .360 Z15 -383 811'
F1 Travel Time(s), 8.2 7:,2 6.5 13..8
L-j 11 -7111
Area Type: Other
F,
L
F,
Li
r-1
I
Li
i r-1
L
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017sb.syn
Synchro 7- Report Page 9
Li
E
r�
8: Commerce Way& Osgood Street 2017 Build Sat Peak Hour
Volume
Lane:Group EBL.. EBT`' ,EBR' WBL'`"TWBT •,WBW ,NBL., TNBTJ�'NBR"'T SBL,,.',SBT„.:.SBR
Volume(vph) ' 10 0 27 196 7 92 30 591 0 0 548 13
060.0., eds.(#/hr) L
Conl.Bikes(#/hr)
PewHourFactor 0.84 0.84- 0:84 0:85 0.85 '0.85 0.95 095 0:95: 0.83. 0.83 0.83 e
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%°
M_eavy Vehicles °Ia 0 0 2% 0016 0% -0% 0%0 1°10: 0% 0 L'
Bus Blockages(#/hr) 0 0 0 0 0 3 0 3 0 0 1 0
Parking (#,)fir),
Mid-Block Traffic(%) 0% 0% 0% 0% L
0-flow(vph) 1:2 0 32: 231 8 108 32 622 0 0 660 16
Shared Lane Traffic(%)
Lane Group Flow(vpfi) 0 44 0 0 - .1 0
108 _ 654 0' 0 676 0
5 17
ry t h t..• tRw,i;"7 M _ .v , y c � xv ! y;r' '
Intersection:Summary> S {d
n
L.�
� 7
CJ
n
L.
�7
U
F7
LJ
LJ
rl
L�
r
U
ri
ri
LJ
r7
L�
Q:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic1CA12017sb.syn
Synchro 7- Report Page 10 r-7
LJ
r1
LJ
Li 8: Commerce Way & Osgood Street 2017 Build Sat Peak Hour
HCM Unsignalized Intersection Capacity Analysis
4- t
.70
69.
,.ftc
UMn-iin- �,k-Ek, Mf
Lane Configurations 4+
V6
lumo. 10. 6. V- .1-9.6 7 92. 30 59.1 0 0 548 13
Sign,C-ontrol Stop Stop Free Free
Grade 06/. do/.- 0% 0%
Peak Hour Factor 0.84 0.84 0.84 0..85 0 1.85 0.85 0.95 0-.95.11 0.95 0.83 0.8,3. 0.83
H -- h) 'i� b .- . - . 1:1... 1 . - .... .......
9 ffdw:rate:-�vp 0: 660 16
Y. 231 8 108 -32 622
Pedestrians
Lane:Width(ft)
Walking Speed(fYs)
.Percent Blockage
Right turn flare(yeh)
Mediarlaype None None
Median storage veh)
Upstream signal-(ft) 6.16
A platoon unblocked 0.97 0.97 0.97 0.97 0.97 0.97
v-C.,conflicting volume. 115.51 1353 338.. 1048 1*361 311 .676 622
vqj,stage 1 conf vol
yQ2j,stage 2-conf vol
-,
Li vCu,unblocked vol 1097 1302 338 986 1310 227 676 547
to,single(s) 7.5 6.5 -6.9. 7.5 '6.5 '6.9, 4.1 4.1
r tC,2 stage(s)
Li tF�s) 3.5 4.0, 3.3 3.5 -4.0' 3.3, 2.2,
pO queue free% 91 100 95 0 95 86 97 100
r-1 cM capacity(veh./h) 132 152 658
8 184 150 759 .925 1001
L-j Direction,Lane# -,EB I WB' 1 W-,B,2-".*,- N--B 1, N-8-2 S"-B,1" SB-,-2, .
Volume-Total 44 289. 108 M 4.15 440 236:
Volume Left 12 231 0 32 0 0 0
Volume Right 32 0 108 .0 0 0 16
- -
CSH 317 183 759 925 1700 1700 1700
Volume to Capacity 0.14 1.31 0.14 0.03. -D.24 0.26 014:
Queue Length 95th(fl) 12 340 12 3 0 0 0
LControl-Delak.. 18.2 224.9' 10.5 5 .1.5 .0.0 0.v0 0.0
Lane LOS C F B A
A. p 182 166 0.,5 '04,
,.p roach D614Y(s)
Approach LOS C F
7T
...........
Average Delay 32.1
Intersection. -Capacity* Utilisation .60,7% IC.U Leve-I of-Servibe B
V
Analysis Period(min) 15
L-j
I r-1
U
Li
0:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017sb.syn
Synchro 7- Report Page 11
E
f-�
11: BB Entrance & 2017 Build Sat Peak Hour
Lanes and Geometrics
L J
4-66 OFFU707n., 7. 58W,-7 :,,ML�"!. WE 77,WopC, N
Syr BT
Lane Configurations 4*
Ideal Flow(vph' 19.00 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
1.. pl) - J
Lane Width(ft) 12 12 12 12 12. 12 12 12 12 12 12 12 L
Grade 0.% 0%% 061. 0%
.Storage Length _(ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0 LJ
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane Util.Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
L ,
Frt 0.932
At Protected 0.955 0.976 0.996
.Satd.Flow(prot) 0 1779 0 0 1694 0 0 1863 0 0 1855 0
Flt Permitted 0.955 0.976 0,996
,Satd.Plow(perm) 6 1779 0 0 1694 0 0 1863 0 0 1855 0
Link Speed(mph) 30 30 30 30
Link Distance(ft) 216 84 68 127
Travel Time(s) 4.9 1.9 1.5 2.9
Ifititimon"'.8"U'MR97, 7 111, "7., — !-41,
Area Type: Other
r i
r-I
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017sb On-Site.syn
Synchro 7- Report Page 1
11: BB Entrance & 2017 Build Sat Peak Hour
Volume
•ane:Grou• ' t 'EI3 EBT,.'. 'EB F.;__wBL ., T'7 :._NBL:, `NBT:. . NBA.`_ SB, w xS W772W
C Volume(vph) 261 14 0 5 0 5 0 47 0 5 50 0
Confl.Peds.(#/hr) .
Confl.Bikes(#/hr)
Peak Hour Factor . > 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 , 0.92 0.92 0.92 0.92
Growth Factor 100% 100% 100% 106% 100% 100% 100% 100% 100% 100% 100% 100%
Heavy Vehicles(%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 20/. _ 2% 2%
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0
C Parking (#/hr)
Mid-Block Traffic(%) 0% 0% 0% 0%
Adj.Flow(vph) 284 15 0 5 0 5 0 51 0 5 54 0
Shared Lane Traffic(%)
Lane Group Flow(vph) 0 299 0. 0 10 0 0 51 0 0 59 0
frseS rima77z7-17,771
Ell
C
C
F,
C
U
v
n
n
QAProjects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017sb On-Site.syn
hn Synchro 7- Report Page 2
h
r �
11: BB Entrance & 2017 Build Sat Peak Hour
HCM Unsignalized Intersection Capacity Analysis `
. a_ SU
EBL EBR' W _WBT;' WB ,
Lane Configurations 4* a
Sign Control Stop Stop Stop Stop
Volume(vph) 261 14 0 5 0 5 0 47 0 5 50 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 r
Hourly flow rate(vph) 284 15 0 5 0 5 0 51 0 5 54 0
Volume Total(vph) 299 11 51 60
Volume Left(vph) 284 5 0 5
VolumeRight(vph) 0 5 0 0 �-
Hadj(s) 0.22 -0.17 0.03 0.05
Departure Headway(s) 4.4 4.3 4.7 4.7 r
Degree Utilization,x 0.37 0.01 0.07 0.08
Capacity(veh/h) 799 782 706 701
Control Delay(s) 9.9 7.4 8.1 8.2 �-
Approach Delay(s) 9.9 7.4 8.1 8.2
Approach LOS A A A A L
�v T� ayµ;, <
Delay 9.4
HCM Level of Service A
Intersection Capacity Utilization 35.3% ICU Level of Service A
Analysis Period(min) 15
u
F 1
IJ
n
n
r�
U
f`1
t�
1
V
Q:\Projects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic\CA\2017sb On-Site.syn
Synchro 7- Report Page 3
n
ri
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour Observed Flow
Lanes and Geornetrics
4% /0-
F.�
...:SBT r,�WR
i8f. 'AbA,
Lane Configurations 4T+
Ideal 510--wk,NpholY 1900 1.600 1-900. 1900, 1900.: 1900 :1900 15001.900 16,64 1906 1900
Lane Width(ft) 12 12 12 16 16 16 12 12 12 11 11 11
Orad00/0 0% 0%,
Storage Length(ft) 0 0 0 0 0 0. 0
Storage0 0 0
- , nes,
Taper Length(ft) 25 25 25 25 25 25 25 25
Lane ail.Fact6i 1.00 11.06. 11.6d; .6.95 -0.95 1..*00 0 0.9� 1;00 0.95, :095 .0.95
Ped Bike Factor
Frt 0..865 0600
Fit Protected 0.950 0.984 0.995
Satd :Flow(pr 0 1644 0 1887 1672. 0 0. ;3575 :00 3427
Fit Permitted0.750 0.887 0.948 0.779
Said.Flow{perm) 0 164.4 0 1490: 1507 ot 0 -3389. : 0 2683 0
Lj Right Turn on Red Yes Yes Yes Yes
8at01-Flow(FIT R) 1.74 "101
Link Speed(mph) 30 30 40 40
Link Distance{ft) 182.. 10.83 848 227
Travel Time(s) 4.1 24.6 14.5 3.9
7
c !n ersection Summary _, : , .., ,m y 4• r.nta :7..,rin,, �. ,,,., ..r
Area Type: Other
c .
QAProjects\12 PROJECTS\2121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoveATraffic\CA\2017sb-obs.syn
Synchro 7- Report Page 1
r1
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour Observed Flow
Volume
r ,
Lane'GroupT _ #t.EBL. 'EBT `' -EBR .�,::WBL'. 1NBT�. wBR,>a' NBL .NBT NB,." ,SBL; .SBT
Volume(vph) 0~ 0 4 178 1 84 6 784 0 74 619 0
Confl `Peds (#mr)' .• L_
Confl.Bikes(#/hr)
Peak Hour Factor 0:33 0:33 0.33 0.83- 0.83; 20.83 0:95 0:95 0.95 0.9.1 0.91 0:91 '
Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%° 100% L;
Heavy Vehicles(%) 0% 0%. 0%. 3% 0'/6 11% 0% 1'/0 :16/6 4% 1% 000
Bus Blockages(#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 r,
Parking (#/hr)_
Mid-Block Traffic(%) 0% 0% 0% 0%
Ad) Flow(vph) 0 .0 12. 214 1 1.01 6 825 0` :8.1 680 0
Shared Lane Traffic(%) 23% '
-
Lane Group Fiow-(vph) 0 12. 0 165 1151 0 0 831 0; 0 761 0
ilntersecbon'Summaryf� a,., Ytic:h`� ^:•,[ '•'Y:+ �`vi'� J ,,t'.}'-Ctir 4r {' N lv 1 h'�P's"4 Yf Y t:�Y fGy S.'1r v �.vt,�h..r��.• ���`
�, es r, in -. v. a.. .(ir k,.:.::.y .....;.i ...K`°.6e•..y.^tr,.» n cf.�.. i..
f�
L1
�7
L/
r�
U
r�
u
n
L!
r1
U
n
L1
r�
iJ
r�
U
cl
u
r�
U
0:1Projects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTraffic1CA12017sb-obs.syn
Synchro 7- Report Page 2 r ,
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour Observed Flow
Queues
EBT;;�,-, WBL,'.
Lane Group Flow(vph) 12 165 151 831 761
u�c Ratio 0.02 .0.4 :0.33 0.56 0.64
Control Delay 0.0 18.4 10.4 12.2
Queue
ueu.e Delay ..0.10 0.0 .0.6 0.0 0.0*
Total Delay 0.0 18.4 8.6 10.4 12.2
Oueue.,L6hgth:5 (ft) 0* 32-: .9 615 -63'
Queue Length 95th(ft) 0 87 44 137 139
Internal Link Dist(ft) 102 1,003 76.8 147
Turn Bay Length(ft)
66sa Capacity.. . (v h) 1100: 939 �987 285T 2262
- V, --
Starvation Cap Reductn 0 .0 0 0 0
Spillback Cap Reductn .01 0 :0 0
Storage Cap Reductn 0 0 0 0 0
AMUIC'ed y/c:11-atio. 0.01 0.18 0-15 0 29 0.34
"7�U-F,
QAProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017sb-obs.syn
Synchro 7- Report Page 3
r�
Vehicle Queuing Analysis
r,
Project: Proposed Branch Bank Date: 8/20/2012 �J
Location: Osgood Street, North Andover, MA r,
Inputs-AM Peak Hour Teller Window
lJ
Time Unit= Hour
Arrival Rate= 5 vph = Lambda =average number of arrivals per unit of time r i
Service Rate= 20 vph= Mu=average service rate, number of services per unit of time. �J
r
Intermediate Calculations L-,
Average Time between arrivals= 0.2 Hour or 12 minutes r'
Average Service Time= 0.05 Hour or 3 minutes LJ
r,
Performance Measures
u
Average utilization= ._. .____. ._.. - _ _-- _..25 % _ n
Probability of No QU66"P(0)' 75 % ! L-,
Mean number of vehicles in queue= 0.33333 vehicles
Average number of vehicles waiting in queue= 0.08333 vehicles r'
Average time in the system = 0.06667 Hour or 4.0 minutes
Average time in the queue= 0.017 Hour or 1.0 minutes
r1
Probability of a specific number of vehicles in the Queue
Cum Prob. r'
P(0)= 0.75 0 0.75
P(1)= 0.1875 1 0.94
P(2) = 0.0469 2 0.98 n
P(3)= 0.0117 3 1.00
P(4) = 0.0029 4 1.00
r-i
P(5)= 0.0007 5 1.00
P(6) = 0.0002 6 1.00 `J
P(7)= 5E-05 7 1.00 r-�
P(8)= 1E-05 95th percentile 8 1.00
U
P(9)= 3E-06 9 1.00
P(10) = 7E-07 10 1.00 r
P(11) = 2E-07 11 1.00 `J
P(12) = 4E-08 12 1.00
176 r
r �
r �
C
Vehicle Queuing Analysis
Project: Proposed Branch Bank Date: 8/20/2012
Location: Osgood Street, North Andover, MA
c
CInputs-AM Peak Hour ATM
Time Unit= Hour
C Arrival Rate= 7 vph= Lambda =average number of arrivals per unit of time
Service Rate= 30 vph = Mu=average service rate, number of services per unit of time.
n
V Intermediate Calculations
Average Time between arrivals= 0.14 Hour or 8.57143 minutes
Average Service Time= 0.03 Hour or 2 minutes
Lr Performance Measures
Average utilization= 23.3333
Probability of No Queue-P(0)= 76.6667
Mean number of vehicles in queue= 0.30435 vehicles
I Average number of vehicles waiting in queue= 0.07101 vehicles
LJ Average time in the system= 0.04348 Hour or 2.6 minutes
Average time in the queue= 0.010 Hour or 0.6 minutes
E
Probability of a specific number of vehicles in the queue
Cum Prob.
P(0)= 0.7667 0 0.77
P(1) = 0.1789 1 0.95
P(2)= 0.0417 2 0.99
P(3)= 0.0097 3 1.00
P(4)= 0.0023 4 1.00
P(5)= 0.0005 5 1.00
P(6)= 0.0001 6 1.00
P(7)= 3E-05 7 1.00
P(8)= 7E-06 95th percentile 8 1.00
P(9) = 2E-06 9 1.00
P(10)= 4E-07 10 1.00
P(11)= 9E-08 11 1.00
P(12) = 2E-08 12 1.00
r 176
n
r
ai
Vehicle Queuing Analysis
r ,
Project: Proposed Branch Bank Date: 8/20/2012
Location: Osgood Street, North Andover, MA
L.
Inputs-PM Peak Hour Teller Window
lJ
Time Unit= Hour
Arrival Rate= 10 vph= Lambda =average number of arrivals per unit of time r ,
Service Rate= 20 vph= Mu =average service rate, number of services per unit of time.
r�
Intermediate Calculations
Average Time between arrivals= 0.1 Hour or 6 minutes r
Average Service Time= 0.05 Hour or 3 minutes
t J
Performance Measures L
Average utilization= 50 % r�
Probability of No Queue P(0)= 50
Mean number of vehicles in queue= 1 vehicles
Average number of vehicles waiting in queue= 0.5 vehicles
Average time in the system= 0.1 Hour or 6.0 minutes
Average time in the queue= 0.050 Hour or 3.0 minutes
r—,
L
Probability of a specific number of vehicles in the pueue
Cum Prob. r
P(0)= 0.5 0 0.50 u
P(1)= 0.25 1 0.75
P(2)= 0.125 2 0.88
P(3)= 0.0625 3 0.94
P(4)= 0.0313 4 0.97
P(5)= 0.0156 5 0.98
P(6)= 0.0078 6 0.99
P(7)= 0.0039 7 1.00
P(8)= 0.002 95th percentile 8 1.00
P(9)= 0.001 9 1.00
P(10)= 0.0005 10 1.00 r i
P(11) = 0.0002 11 1.00
U
P(12)= 0.0001 12 1.00
176 r�
U
[ 1
lJ
r l
it
Vehicle Queuing Analysis
Project: Proposed Branch Bank Date: 8/20/2012
CLocation: Osgood Street, North Andover, MA
Ell Inputs-PM Peak Hour ATM
Time Unit= Hour
(� Arrival Rate= 9 vph= Lambda=average number of arrivals per unit of time
L Service Rate= 30 vph= Mu=average service rate, number of services per unit of time.
n
LIntermediate Calculations
Average Time between arrivals= 0.11 Hour or 6.66667 minutes
Average Service Time= 0.03 Hour or 2 minutes
�r Performance Measures
Average utilization= 30 %
u Probability of No Queue P(0)_ 70 %
Mean number of vehicles in queue= 0.42857 vehicles
n Average number of vehicles waiting in queue= 0.12857 vehicles
LAverage time in the system = 0.04762 Hour or 2.9 minutes
Average time in the queue= 0.014 Hour or 0.9 minutes
n
L
Probability of a specific number of vehicles in the queue
F Cum Prob.
P(0)= 0.7 0 0.70
P(1)= 0.21 1 0.91
P(2)= 0.063 2 0.97
P(3)= 0.0189 3 0.99
P(4)= 0.0057 4 1.00
P(5)= 0.0017 5 1.00
P(6) = 0.0005 6 1.00
n P(7)= 0.0002 7 1.00
P(8) = 5E-05 95th percentile 8 1.00
P(9)= 1E-05 9 1.00
P(10) = 4E-06 10 1.00
u P(11)= 1E-06 11 1.00
P(12)= 4E-07 12 1.00
176
u
n
i
e.�
Vehicle Queuing Analysis
Project: Proposed Branch Bank Date: 8/20/2012 lJ
Location: Osgood Street, North Andover, MA r,
Inputs-Sat Peak Hour Teller Window ,
Time Unit= Hour
Arrival Rate= 4 vph= Lambda =average number of arrivals per unit of time
Service Rate= 20 vph= Mu=average service rate, number of services per unit of time.
r-,
Intermediate Calculations
Average Time between arrivals= 0.25 Hour or 15 minutes r
Average Service Time= 0.05 Hour or 3 minutes
Performance Measures
Average utilization = 20 % r
Probability of No Queue P(0)= 80 % i
lJ
Mean number of vehicles in queue= 0.25 vehicles
Average number of vehicles waiting in queue= 0.05 vehicles
Average time in the system= 0.0625 Hour or 3.8 minutes
Average time in the queue= 0.013 Hour or 0.8 minutes
r�
Probability of a specific number of vehicles in the Queue
Cum Prob. r
P(0)= 0.8 0 0.80
P(1) = 0.16 1 0.96
P(2) = 0.032 2 0.99
P(3)= 0.0064 3 1.00
P(4)= 0.0013 4 1.00
P(5)= 0.0003 5 1.00
P(6)= 5E-05 6 1.00
P(7)= 1E-05 7 1.00 r 1
P(8)= 2E-06 95th percentile 8 1.00
P(9)= 4E-07 9 1.00
P(10) = 8E-08 10 1.00 r
P(11) = 2E-08 11 1.00
v
P(12) = 3E-09 12 1.00
176 r
ri
r ►
C
Vehicle Queuing Analysis
C
Project: Proposed Branch Bank Date: 8/20/2012
Location: Osgood Street, North Andover, MA
C
EI Inputs-Sat Peak Hour ATM
Time Unit= Hour
Arrival Rate= 13 vph= Lambda=average number of arrivals per unit of time
Service Rate= 30 vph= Mu=average service rate, number of services per unit of time.
CIntermediate Calculations
F, Average Time between arrivals= 0.08 Hour or 4.61538 minutes
LJ Average Service Time= 0.03 Hour or 2 minutes
EI Performance Measures
Average utilization= 43.3333
L, Probability of No Queue P(0)= 56.6667
Mean number of vehicles in queue= 0.76471 vehicles
Average number of vehicles waiting in queue= 0.33137 vehicles
Average time in the system= 0.05882 Hour or 3.5 minutes
nn Average time in the queue= 0.025 Hour or 1.5 minutes
l
U
Probability of a specific number of vehicles in the queue
n, Cum Prob.
P(0)= 0.5667 0 0.57
P(1)= 0.2456 1 0.81
P(2)= 0.1064 2 0.92
P(3)= 0.0461 3 0.96
P(4)= 0.02 4 0.98
CP(5)= 0.0087 5 0.99
P(6)= 0.0038 6 1.00
P(7)= 0.0016 7 1.00
P(8)= 0.0007 95th percentile 8 1.00
P(9)= 0.0003 9 1.00
P(10) = 0.0001 10 1.00
P(11) = 6E-05 11 1.00
P(12) = 2E-05 12 1.00
r? 176
Li
C
EI
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour Observed Flow
HCM Signalized Intersection Capacity Analysis
�,..,._ , r _. 7: - Yr,__ ,--.,,, - YlfBfi L' �`N T L`' SBTti�`':$BR
Movement{.; :�,. . EBL EBT. . EBR�f= L .r:.WBT
Lane Configurations ' �1
Volume(vph) 0; 0. 4 178 1 84 6 7.84 0 74 619 0
IdealFlow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Wdth 12' 12 -12-116. 16 16 1.2 i2 12 11 11 11
Total Lost time(s) 6.0 6.0 6.0 6.0 6.0
Lane Util.Factor 1.00 0.95 0.95 0;95 0:95
Frt 0.86 1.00 0.90 1.00 1.00
Flt'Protected 1.00 QM0:98 1.00 0:99
Said.Flow(prot) 1644 1887 1672 3573 3426
A Perrn tted 1.00' U 75 0,89 0.95 V&
Satd Flow(perm) 1644 1489 1507 3390 2684 r
Peak-hourfactor,PHF 0:33. 633 0.33 0:83 0:83 0,83: 0.-95: 0.95 0:95 0:91: 0..91 0;9i
AddI..Flow(vph) 0 0 12 214 1 101 6 825 0 81 680 0
0 0
RTOR Reduction(vph) 0. 9 0 0 75 0 0 0' 0 0 r ,
Lane Group Flow(vph) 0 3 0 165 76 0 0 831 0 0 761 0
Heavy Vehicles('/o) 0% `0% 0% 3% 0% 11% 0!0 1% 1% 4% - 1%, 0% L '
Tum Type Perm Perm Perm Perm
Protected phases 4 $ .2 6 r
Permitted Phases4 8 2 6
Actuated Green,G!(sj 10:8 10:8 10.8 18.5 18.5.
Effective Green,g(s) 10.8 10.8 10.8 18.5 18.5 r
Actuated g/C.Ratio 0.26 0.26 0.2.6 0.45 0:45
Clearance Time(s) 6.0 6.0 6.0 6.0 6.0 ��
Vehicle Extension(s) 30 3.0 3.0 3.0 3.0.
r
Lane Grp Cap(vph) 430 389 394 1519 1202
v/s Ratio Prot 0.0.0
v/s Ratio Perm c0.11 0.05 0.25 c0.28
v/c Ratio 0:01 0.42 0.19 0:55 0.63: r
Uniform Delay,d1 11.3 12.7 11.9 8.3 8.8
Progression Factor 1:00 1:00 1.00 .1 wo0 1.00
Incremental Delay,d2 0.0 0.7 0.2 0.4 1.1 r-)
Delay(5j
11.3 13.4 12.1 8..7 9.9
Level of Service B B B A A L-i
Approach Defay(s) 10 12.8 8.7 9 9
Approach LOS B B y A A r t
sP±ar+� wSSX"c?T^e•* .. .,.....a.,. d. �7 ti nfl^n��.^Y��4.'r�;r,h ti y� '�s'G'9 "T�AVKr•�� M' 1 i T x ��� t�T• tJ
�ritersection Summary }� hots. k nh �aUJS`
HCM Average Control Delay9.9 HCM Level of Service A
- n
HCM Volume to Capacity ratio 0:56
Actuated Cycle Length(s) 41.3 Sum of lost time(s) 12.0 u
Intersection Capacity Utilization 70.3'0` IC_U;Level of Service C
Analysis Period(min) 15 r
c Critical Lane Group LJ
r ,
r-�
L�
0:IProjects112 PROJECTS12121491 -LYNNFIELD ENGINEERING Butcher Boy No AndoverlTrafficlCA12017sb-obs.syn
Synchro 7- Report Page 4 r
3: Casa Blanca Driveway& Osgood Street 2017 Build Sat Peak Hour Observed Flow
Timing Report, Sorted By Phase
Movement NBTL EBTL SBTL WBTL
Lead-Lag Optimize
Recall Mode Min: An Min Min
Lj Maximum Split(s) 41 31 41 31
MaxlrriUm 9. 4, '5-
Split(% -6�. % 3.1016. .6.9% 431%
Minimum Split(s) 35 10 35 10
Yellow Timb(6 4 4 4. .4
E I - - I � 1.
All-Red Time(s) 2 2 2 2
Minimum Initial(s) 4 4 .4 4*
r VehicleExtension(s) 3 .3 3 3
U Minimum Gap(s) 3: 3. 3 .3
Time Before Reduce(s) 0 0 0 0
Time To Reduce-(i) �6�. .0. 0 0
Walk Time(s)
Flash:Dont..Walk{s)_
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes .Yes: Yes Yes
Start Time(s) 0 41 0 41
End"T_ m 0: 41 T
.Time 41
Yield/Force Off(s) 35 66 35 66.
Yield/For6e:Off 170(6)- 35 66 35 66
Local Start Time(s) 0 41 0 41
Local,Yield
Yield(t) 35 66 35 66
Local Yield 170(s) 35 66 35 66
Intersection Summary
Cycle Length 72
Control. Type Semi Aci.-Qnqoord,
Natural Cycle 50
Splits and Phases: 3:Casa Blanca Driveway&Osgood Street
t o2 1-01o4
Viou
o6
0:1Projects112 PROJECTS121214911 -LYNNFIELD ENGINEERING Butcher Boy No Andover\Traffic1CA12017sb-obs.syn
Synchro 7- Report Page 5
E
RECEIPT
Printed:02-13-2013 @ 9:13:12
Essex North Registry
M. Paul Iannuccillo
Register
Trans#: 4019 Oper:KEVINZ
CAFFREY & SMITH
Book: PL Page: 16866
Ctl#: 41 Rec:2-13-2013 0 9:13:08a
DOC DESCRIPTION TRANS AMT
--- ----------- ---------
PLAN
Surcharge CPA $20.00 20.00
5.00 TECH FEE 5.00
Plan recording 50.00
Total fees: 75.00
Book: 13344 Page: 59 Inst#: 4246
Ctl#: 42 Rec:2-13-2013 @ 9:13:08a
NAND 1077 OSGOOD ST
DOC DESCRIPTION TRANS AMT
--- ----------- ---------
,NOTICE
Surcharge CPA $20.00 20.00
50.00 recording fee 50.00
5.00 TECH FEE 5.00
z Document Copy -Man 9.00
Total fees: 84.00
*** Total charges: 159.00
CHECK PM 22537 159.00
=ssax North Resists
_k 1334-4 p959 J-424-6
'2-13-2013 a 09 = 13a
Space above this line is for Registry use only
NORTHERN ESSEX DISTRICT REGISTRY OF DEEDS
M. Paullannuccillo: A division of the Secretary of the Commonwealth
Register of Deeds
DOCUMENT COVER SHEET
For use with documents that do not meet Document formatting standards
This is the first page of the document-Do not remove
PRINT OR TYPE
DOCUMENT TYPE: _C115iOn
NUMBER OF PAGES (including cover sheet) 3
TOWN: At
PROPERTY ADDRESS: /) 05,.J Zr
INDEXING SHALL BE ABSTRACTED FROM THE DOCUMENT
SUBMITTED
Town of North Andover
rLe 7!,
ZONING BOARD OF APPEALS?'
Albert P.Mami II],E sq.Chairman %toRT#j
Ellen P.McIntyre,Vice-Chairman ""Ito 2013. JAN 22 P14 1: 05
Richard J.Byers,F'sq.Clerk 3
e- -
D.Paul Koch Jr.,Esq.
!j
Allan Cuscia
NORTH
Assodale Memlw-s
MASS ACII
Michael 11.Liporto
Deney Morganthal SSACHU
SF
Douglas Ludgin This is to oerVy that twenty(20)days
Town clerk'firncstamp have elapsed from date of decision,filed
without filing of an peal.
Dat
Any appeal shall be filed within(20) Notice of Decision joyceilB�rashaw
Town Clerk
days after the date of filing of this Year 2013
notice in the office of the Town Clerk, 845
er Mass.Gen.L.ch.40A, §17 Property at: 1077 Osgood Street North Andover,MA 0
NAME: William Yameen,Angus Realty Corp HEARING(S): 14 Aug 2012,9 Oct 2012, 13 Nov2012,
8 Dec 2012 and Jan 8,2013
ADDRESS: 1077 Osgood Street(Map 35 Parcel 27), PETITION: 2012-007
North Andover,MA 01845
The North Andover Board of Appeals held a public hearing at the Town Hall, at 120 Main Street, North
Andover, MA on Tuesday, January 8, 2013 at 7:30 PM on the application of William Yameen (Angus
Realty Corp) for property located at 1077 Osgood Street (Map 35 Parcel 27),North Andover,MA
01845. Petitioner is requesting a Variance from Section 4.136, (Watershed Protection Division) and
4.136 c ii (3). Applicant proposes the Construction of a bank (a new permanent structure) and is
requesting a Variance from the Zoning Board of Appeals in the GB Zoning District.
Legal notices were sent to all the certified abutters provided by the Town of North Andover,Assessors
Office, and were published in the Eagle-Tribune, a newspaper of general circulation in the Town of North
Andover, on July 31,2012 and August 7, 2012.
The following regular voting members were present: Albert P.Manzi 111, Ellen P.McIntyre, Richard J.
Byers, D. Paul Koch Jr. and Allan Cuscia.
Associate members present were Michael Liporto, Deney Morganthal and Douglas Ludgin.
Upon a motion by Richard Byers to GRANT the Variance to allow Under Section 4.136, and 4.136 c ii
(3) of the Watershed Protection Division to construct a new permanent structure of a batik within the
"Non-Disturbance Zone" this is allowed by Special Permit by the Planning Board only after a Variance
has been granted by the Zoning Board of Appeals.
Allan Cuscia second the motion to Grant the Variance
All those in favor: Albert P. Manzi HI,Ellen P. McIntyre,Richard J. Byers and Allan Cuscia
Not in Favor: D. Paul Koch Jr
4-1
The Board finds that owing to circumstances relating to soil conditions, shape, or topography of the land
or structures and especially affecting such land or structures but not affecting generally the zoning district
in general, a literal enforcement of the provisions of the Bylaw will involve substantial hardship,financial
or otherwise, to the petitioner or applicant. The Board finds that desirable relief may be granted without
substantial detriment to the public good and without nullifying or substantially derogating from the intent
of the purpose of this bylaw
The Board also finds that this use, as developed by the building& site plans, is,an appTopriate location for
such a use and will not adversely affect the neighborhood.
There will be no nuisance or serious hazard to vehicles or pedestrians, since there. are parking provisions
required. Adequate and appropriate facilities will be provided to the propose"(1 ctu're. The Board
XT Pace 1 of 2
finds that the new proposed bank will not be substantially more detrimental to the area and that this use is
in harmony with the general purpose and intent of this Bylaw.
Site: 1077 Osgood Street(Map 35 Parcel 27), North Andover,MA 01845
Under Section 4.136 and 4.136 c.ii(3)of the Zoning Bylaw,The Construction of a new
Permanent Structure within the`Non-Disturbance Zone"is allowed by Special Permit by
the Planning Board only after a Variance has been granted by the Zoning Board of
Appeals.GB District.
Plan(s)Title: 1)"Plot Plan of Land"containing one(1)sheet. Prepared by Lynnfield Engineering,
INC., 199 Newbury Street Suite 11,Danvers Ma.01923,dated July 18,2012.
2)"Proposed Schematic Layout Plan",containing one(1)sheet,Prepared by Lynnfield
Engineering,INC.; 199 Newbury Street Suite 11,Danvers MA,01923,dated July 18,
2012.
3)`Exterior Elevations of the Pentucket Bank(in color)"containing two(2)sheet,
showing all four(4)sides of bank.Prepared by Lloyd Architects,2 High Cliff,and
Plymouth MA.02360,dated June f7,2012.
4)Preliminary Floor Plan,showing interior.
5)Traffic impact and Access Study Prepared by Bayside Engineering Woburn MA,
Dated November 27,2012
6)Preliminary Stormwater Analysis and Calculations Butcher Boy Markets Dated
December 11,2012
Voting in favor: Albert P.Manzi 111,Ellen P.McIntyre,Richard J.Byers,Allan Cuscia,
Voting in the Negative: D.Paul Koch Jr.
Voting results 4-1
The Board finds that the applicant has satisfied the provisions Under Section 4.136 and 4.136 c. ii(3)of the Zoning
Bylaw,for the Construction of a new Permanent Structure of a bank within the"Non-Disturbance Zone"in a GB
Zoning District.
Notes:
1. This decision shall not be in effect until a copy of this decision is recorded at the Essex County Registry of
Deeds,Northern District at the applicant's expense.
2. The granting of the Variance as requested by the applicant does not necessarily ensure the granting of a
building permit as the applicant must abide by all applicable local,state,and federal building codes and
regulations,prior to the issuance of a building permit as required by the Inspector of Buildings.
3. If the rights authorized by the Variance are not exercised within two(2)years of the date of the grant,it shall
lapse,and may be re-established only after notice,and a new hearing.
Nor Andover Zonin Board of Appeals
A ert P. Manzi III, Esq., Chairman
Ellen P. McIntyre, Vice-Chairman
Richard J. Byers, Esq., Clerk
D. Paul Koch Jr., Esq.,
Allan Cuscia
Decision 2012-007
Page 2 of 2
Town of North Andover u`I V
ZONING BOARD OF APPEALS""".:
Albert P.Manzi 11I,Esq.Chailwan NORTH99
Ellen P.McIntyre,Vice-Chaioman o Leo , ti Z J." "� 22 PH I
tt e,9 O
Richard J.Byers,Esq.Clerk
D.Paul Koch Jr.,Esq.
Allan Cuscia cr� NORRr. .
'
Assazate 11eznherr u, v�
Michael P. iporto � i
Deney Morganthal gCHU '>
„
Douglas Iudgin
Town Clerk-Time Stamp
Any appeal shall be filed within(20) Notice of Decision
days after the date of filing of this Year 2013
notice in the office of the Town Clerk,
per Mass.Gen.L.ch.40A, §17 Pro erty at: 1077 Osgood Street North Andover,MA 01845
NAME: William Yameen,Angus Realty Corp BEARING(S): 14 Aug 2012,9 Oct 2012, 13::°Nov20:12, .
8 Dec 2012 and Jan 8,2013
ADDRESS: 1077 Osgood Street(Map 35 Parcel 27), PETITION: 2012-007.
North Andover,MA 01845
The North Andover Board of Appeals held a public hearing at the Town Hall;.at*120 Main Street,North
Andover, MA on Tuesday, January 8, 2013 at 7:30 PM on the application of William Yameen (Angus
Realty Corp) for property located at 1077 Osgood Street(Map 35 Parcel 27),North Andover,MA
01845. Petitioner is requesting a Variance from Section 4.136, (Watershed Protection:Division) and .
4.136 c ii (3). Applicant proposes the Construction of a bank (a new permanent structure) and is
requesting a Variance from the Zoning Board of Appeals in the GB Zoning District.
Legal notices were sent to all the certified abutters provided by the Town of North Andover,Assessors
Office, and were published in the Eagle-Tribune,a newspaper of general circulation in the Town of North
Andover,on July 31,2012 and August 7;2012.
The following regular voting members were present: Albert P.Manzi III,Ellen P.McIntyre,Richard J.
Byers,D.Paul Koch Jr.and Allan Cuscia.
Associate members present were Michael Liporto,Deney Morganthal and Douglas Ludgin.
Upon a motion by Richard Byers to GRANT the Variance to allow Under Section 4.136, and 4.136 c ii
(3) of the Watershed Protection Division to construct a new permanent structure of a bank within the
"Non-Disturbance Zone" this is allowed by Special Permit by the Planning Board only after a Variance
has been granted by the Zoning Board of Appeals.
Allan Cuscia second the motion to Grant the Variance
All those in favor:Albert P.Manzi III,Ellen P.McIntyre,Richard J.Byers and Allan Cuscia
Not in Favor:D.Paul Koch Jr
4-1
The Board finds that owing to circumstances relating to soil conditions, shape, or topography of the land
or structures and especially affecting such land or structures but not affecting generally the zoning district
in general,a literal enforcement of the provisions of the Bylaw will involve substantial hardship,financial
or otherwise,to the petitioner or applicant. The Board finds that desirable relief may be granted without
substantial detriment to the public good and without nullifying or substantially derogating from the intent
of the purpose of this bylaw
The Board also finds that this use, as developed by the building&site plans,is an appropriate location for
such a use and will not adversely affect the neighborhood.
There will be no nuisance or serious hazard to vehicles or pedestrians, since there are parking provisions
required. Adequate and appropriate facilities will be provided to the proposed new structure. The Board
Page 1 of 2
1
1
finds that the new proposed bank will not be substantially more detrimental to the area and that this use is
in harmony with the general purpose and intent of this Bylaw.
Site: 1077 Osgood Street(Map 35 Parcel 27), North Andover,MA 01845
Under Section 4.136 and 4.136 c.ii(3)of the Zoning Bylaw,The Construction of a new
Permanent Structure within the"Non-Disturbance Zone"is allowed by Special Permit by
the Planning Board only after a Variance has been granted by the Zoning Board of
Appeals.GB District.
Plan(s)Title: 1)"Plot Plan of Land"containing one(1)sheet. Prepared by Lynnfield Engineering,
INC., 199 Newbury Street Suite 11,Danvers Ma.01923,dated July 18,2012.
2)"Proposed Schematic Layout Plan",containing one(1)sheet,Prepared by Lynnfield
Engineering,INC.,199 Newbury Street Suite 11,Danvers MA,01923,dated July 18,
2012.
3)`Exterior Elevations of the Pentucket Bank(in color)"containing two(2)sheet,
showing all four(4)sides of bank.Prepared by Lloyd Architects,2 High Cliff,and
Plymouth MA.02360,dated June 17,2012.
4)Preliminary Floor Plan,showing interior.
5)Trafc impact and Access Study Prepared by Bayside Engineering Woburn MA,
Dated November 27,2012
6)Preliminary Stormwater Analysis and Calculations Butcher Boy Markets Dated
December 11,2012
Voting in favor: Albert P.Manzi III,Ellen P.McIntyre,Richard J.Byers,Allan Cuscia,
Voting in the Negative: D.Paul Koch Jr.
Voting results 4-1
The Board finds that the applicant has satisfied the provisions Under Section 4.136 and 4.136 c.ii(3)of the Zoning
Bylaw,for the Construction of a new Permanent Structure of a bank within the"Non-Disturbance Zone"in a GB
Zoning District.
Notes:
1. This decision shall not be in effect until a copy of this decision is recorded at the Essex County Registry of
Deeds,Northern District at the applicant's expense.
2. The granting of the Variance as requested by the applicant does not necessarily ensure the granting of a
building permit as the applicant must abide by all applicable local,state,and federal building codes and
regulations,prior to the issuance of a building permit as required by the Inspector of Buildings.
3. If the rights authorized by the Variance are not exercised within two(2)years of the date of the grant,it shall
lapse,and may be re-established only after notice,and a new hearing.
No , Andover Zonin Board of Appeals
A �ert P.Manzi III,Esq., Chairman
Ellen P.McIntyre, Vice-Chairman
Richard J.Byers,Esq.,Clerk
D.Paul Koch Jr.,Esq.,
Allan Cuscia
Decision 2012-007
Page 2 of 2
LYNCH, DESIMONE&NYLEN,LLP
ATTORNEYS AT LAN
10 POST OFFICE SQUARE,SUITE 970N
BOSTON,MASSACHUSETTS 02109
Telephone: (6I7)348-4500
Facsimile: (617)348-4545
Email: RNylen@LDNLLP.COM
JoHN M.LYNCH.P.C. oFCOU,vsEL
ERNEST P.DESIMONE
RICHARD A.NYLEN.JR. --
STEPHEN W.DLCOUP,cFY November 8,2012 JAMES W.MURPHY
SHANNON MICHAUD WAYm H.SCOTT
Vin Facsimile& Ifs Class Mail
Albert P.Manzi, III,Esq., Chair
Zoning Board of Appeals
1600 Osgood Street
Building 20, Suite 2-36 BOARD OF APPEALS
North Andover,MA 01845
Re: Angus Realty Corporation; 1077 Osgood Street,North Andover,MA 01845;
Withdrawal of Opposition to Variance Request
Dear Chairman Manzi and Members of the Zoning Board of Appeals:
This office represents Mr.Frank Ragonese of 1939 Great Pond Road,North Andover,
Massachusetts 01845 who hereby withdraws his opposition to the above application filed by Angus
Realty Corporation(the"Applicant")seeking a Variance from the Watershed Protection District
and 4.136.c.ii(3) of the Zoning Bylaw of North Andover.
The Applicant has made a plan revision to address my client's concern and he hereby
retracts his letter dated August 14,2012.
Please contact me if you have any questions.
Thank you.
0. rely,
'chard A.Nylen,Jr.
RAN/kad
cc: Mr.Frank Ragonese
Paula M.Devereaux,Esq.
H:1RagoncselLetter to North Andover ZBA 11-06-12.docx
Ka Aug. 14. 2012 1 : 34PM Lynch, DeSimone & Nylen LLP No. 1680 P. 1
.� pGC� C� fldC�
RI CHARD A.N'YLEN,JR, t 1 0 14
,j N '
LYNCH,DESIMONE &NYLEN,LLP
^ PnAPn OF APPPAI 4
10 Post Office Square,Suite 970N
Boston,JvU 02109
Telephone: 617-348-4500 Facsimile: 617-348-4545
FACS1MIL)�TRANSMITTAL
DATE: August 14,2012
TO: North Andover ZRA FAX NO. (978) 688-9542
Attn: Ms. Angela Ciofolo
FROM: Richard A. Nylen,Jr.,Esq,
RE: Opposition to Variance Request;Angus Realty Corporation: 1077 Osgood
Street,North Andover,MA 01845
NUMBER OF PAGES (including cover sheet)
The document accompanying this telecopy transmission contains information from Lynch,DeSimone and Nylen,
LLP,which is confidential and legally privileged. The information is intended only for the use of the individual
or entity named on this tronsmission sheet. If you are not the intended recipient,you are hereby notified that
any disclosure,copying,distribution,or the taking of any action in reliance on the contents of this telecopied
information is strictly prohibited and that the document should be returned to this firm immediately. in this
regard,if you have received this telecopy in error,please notify us by telephone immediately so that we can
arrange for the return of the original document to us at no cost to you.
Aug. 14, 2012 1 :34PM lynch, DeSimone & Men LLP No. 1680 P. 2
LYNCH,DBSIMONE&NVL1✓N,LLp
A,,Tromm AT LAw
10 POST OFFICE SQUARE,SIME 970N
DOSTON,MASSACHUSETTS 02109
Telephone: (617)348-4500
)Acsimile: (617)348-4545
JOHN M.LYNCH,P.C. Email: .RNyten@Lt)NLLP.COM
)rRNOT P.DESIMONE OF CO UNSEL
)21cHARD A.NYLEN.JR. _
STEPHEN W.DECOIIRCEY August 14, 2012 JAMM W.MURPHY
SHANNONUMADD 147AYm 14.ScorT
Via Facsimile& 15'. class mail
Albert P. Manzi,Ill,Esq., Chair
Zoning Board of Appeals
1600 Osgood Street
13uilding 20, Suite 2-36
North Andover,MA 01845
Re: Angus Realty Corporation; 1077 Osgood Street,North Andover,MA 01845;
Opposition to Variance Request
Dear Chairman Manzi and Members of the Zoning.Board of Appeals:
This office represents Mr. Prank Ragonese of 1939 Great Pond Road,North Andover,
Massachusetts 01845 who is offering his opposition to the above application filed by Angus Realty
Corporation(the"Applicant')seeking a Vatiance from the'Watershed Protection District and
4.136.c.ii(3)of the zoning Bylaw of North Andover, My apologies as I am unable to appear before
the Board on August 14, 2012 due to a previously scheduled hearing in,Norton,Massachusetts.
Mr.Ragonese opposes the Variance because the Applicant has not met the three prong test'
established by the Bylaw under 10.4 or Massachusetts General Laws, Chapter 40A, §10.
Specifically,the Variance process is to be used for situations where the unique landform,
topography or soils has created a hardship, financial or otherwise, A Variance should not be
granted under 10.4 or Chapter 40A, §10 when it is based upon the Owner's desire to expand its
substantial buildialgs and uses into the only vacant area remaining on the Property.
The Variance should not be granted for the following reasons:
A. The Watershed.Bylaw]Prohibits the Disturbance.
The Project involves the construction of a new bank at the shopping plaza within the 250
foot non-disturbance zone of the North Andover Watershed District, The project involves new
impervious area and the elimination of an approved detention basin on the'west of the Property.
The Bylaw was enacted almost twenty(20)years ago and prior to the Applicant's assembly
of the parcels used to create the shopping center. Section 4.136 of the Bylaw was carefully drafted
to protect the areas surrounding the North Andover water supply with an overlay District that
Aug. 14. 2012 1 :35PM Lynch, DeSimone & Wen LLP No. 1680 P. 3
August 14,2012
2 1 P a g e
established four zones of protection including the general 400 foot zone,the non-discharge zone,
the non-disturbance zone and the conservation zone. These zones and their use restrictions of
setbacks are the foundation of the Watershed Protection District, The Bylaw allows certain uses
within the general and conservation zones by Special Permit but prohibits most uses in the non-
disturbance zone.
B. The Owner does not meet the three prong test for a Variance under the Bylaw
and state law.
The Applicant submitted a memorandum in support of its Variance application dated
July 18,2012 which fails to demonstrate that the proposal meets the three prong test necessary to be
granted a'Variance. The Applicant has failed to meet its burden of proof and the Board cannot
make the necessary findings.
1. The Applicant has not demonstrated that the circumstances are unique relating
to soil conditions,shape or topography of such land or structures and especially
affecting such land or structures but not affecting generally the zoning district
in which it is located.
The Applicant concedes that the soil conditions are not at issue. The Applicant concedes
that the reason the Variance is required is due to the location of a portion of its expansive property
within the restricted non-disturbance area. The plans demonstrate that there is nothing unique about
this large multi-acred property than already contains multiple stores and parking. The shape is not
confining or irregular for its allowed uses. The plans demonstrate that there is nothing unique about
the topography of this flat parcel. In fact,the Applicant seeks to fill in a detention basin that
provides open space and stormwater infiltration,two purposes of the Bylaw.
2. The Applicant bas hot demonstrated that the literal enforeemexrt of the
Watershed Protection Bylaws will result in a substantial hardship to it,
financially or otherwise.
The Courts have issued many decisions to guide municipalities as to what constitutes a
hardship. There is no demonstrated hardship. First,the Applicant has not stated what the hardship
is. Second,the Applicant cannot claim a financial hardship to its shopping plaza for the past twelve
(12) years based upon its inability to place a bank in the Watershed District. Third,the courts are
clear that the financial hardship must be the result of the unique condition of the land and not the
owner's personal or financial status. Huntington v. ZBA of Hadley, 12 Mass. App. Ct. 710,715
(1981). Here there is no demonstration that the shopping plaza has suffered a substantial hardship
without a bank on the premises rfor the past twelve (12)years. Finally,the courts do not consider
the enforcement a government regulation such as a bylaw or local restriction that may result in a
lesser profit or less than maximum used to be a hardship. Kirkwood v.ZBA of 12ockpgl t, 17 Mass,
App. Ct.431 (1984);Bicknell v.Boston Board of Appeals,330 Mass. 676, 681 (1953).
Aug. 14, 2012 1 : 35PM lynch, DeSimone & Nylen LLP No- 1680 P. 4
• ; r
August 14,2012
3 1 P a g e
3. The Variance will cause harm to the public good and derogate from the purpose
of the Bylaw.
The third test requires the Applicant to demonstrate that the Project will not substantially
halm the public good or substantial derogation from the Bylaw.
In addition to proposing a use not allowed under the Bylaw the application is deficient as
pointed out by the Planning Department and the Building Inspector. The application does not
include stormwater calculations with more than 20,000 square feet of new impervious surface being
presented. Impervious areas are the types of uses which the non-disturbance zone is designed to
protect against. Second,there is no demonstration that the project complies with the Wetlands
Protection Bylaw or the Wetlands Act. Third,the design ignores the fact that the substantial
number of trucks are sent to the same vicinity as the bank. Trucks idle and create queues due to the
existing traffic circulation patterns that sometimes spill out onto Osgood Street creating a public
safety issue. The bank will take up an area where trucks line up and will add traffic.
C. The Applicant and the Board cannot rely upon the findings in prior permits.
The Applicant has suggested that the prior approval of a parking area on the property
supports the issuance of this Variance. This is not a compelling or correct argument. The Applicant
must meet the three prong requirements of the Variance and cannot rely upon the prior actions or
prior proceedings. Callahan &Sons v.Board of Appeals of Lenon,30 Mass.App. Ct. 36,40
(1991);Lopes rv. Board of Appeals of Fairhaven,27 Mass. App. Ct. 754(1989).
SYJMMARX
The intention of the Bylaw and the state statute is to grant Variances only under last resort
conditions where the unique character,shape or topography presents a hardship. There is no ri ht
under M.G.L., c. 40A, §10 or the Bylaw to a Variance.
The Courts have stated expressly that Variances are to be issued sparingly in contrast to the
more flexible Special Permits. Mendesy, Board of Appeals of Barnstable,28 Mass. App. Ct. 527,
531 (1939):
"The power of variation is to be sparingly exercised and only in
rare instances and under exceptional circumstances peculiar in
their nature, and with due regard to the main purpose of a zoning
ordinance to preserve the property rights of others . . ." RW Pro
Inc.v. Board of Appeal of Boston, 319 Mass, 180, 184-185 (1946).
Aug. 14. 2012 1 :36PM Lynch, DeSimone & Men LLP No. 1680 P. 5
August 14,2012
4 �Page
The Courts have also stated that all three elements and findings must be made. Failure to
meet any one of the three shall result in the denial of the Variance, Kirkwood v.Board of Appeals
ofRockpo—, 17 Mass.App. Ct. 423, 427(1984),
In this instance, as noted above,the Applicant has not presented sufficient evidence that it
meets any of the three tests. The Applicant seeks to maximize the use of a lot and has not been
harmed. This is not a hardship.
Please deny the Variance.
Please contact me if you have any questions.
Thank you.
Sincerely,
Eard A.Nylen, X,
RAN/kad
HARagoneselLelWr to North Andover ZDA 06.14.12.doex
C �
gORTH
Ot""So 1,14
,t�0
Town of North Andover
° r* Office of the Planning Department
'�"°••_�° Community Development and Services Division
�sS�cNustt
Osgood Landing
1600 Osgood Street
Building#20,Suite 2-36
P(978)688-9535 North Andover,Massachusetts 01845
F(978)688-9542
To: Thomas Yameen
Angus Realty
From: Judy Tymon, Town Planner
Date: July 16, 2012
Subject: Pentucket Bank Proposal for Butcher Boy Plaza
Dear Mr. Yameen,
On behalf of the entire staff of the Community Development Department, I want to thank you for
attending our Technical Review Committee meeting (TRC) on June 13. We hope the meeting
was helpful to you and that your questions were answered.
At the meeting, I mentioned several items that the Planning Board would like to have addressed
if you apply for a Watershed and Site Plan Review Special Permits. A summary of those items
are as follows:
• Stormwater Management Standards: Any construction within the Watershed is required
to comply with best management practices for stormwater control, in order to prevent
degradation of the quality or quantity of water entering Lake Cochichewick. This is
especially important when new construction is proposed and when that construction is
within the Non-Discharge Zone, as is the case with your proposal. Over 20,000 sq. ft. of
new impervious surface is being proposed to be built on that portion of the parcel that is
closest to the Lake. Through the implementation of this Bylaw, the Planning Board is
charged with protecting the town's drinking water supply and they will perform this
function, as they have with other projects, with the utmost due diligence.
• North Andover Wetlands Bylaw: When your company applied for and received a
Watershed Special Permit from the Planning Board and an Order of Condition from the
Conservation Commission in July 2007, the project was required to comply with town's
Wetlands Protection Bylaw and the State Wetland's Protection Act. The project was
subject to Stormwater Management Policy and the stormwater provisions of that Bylaw.
At the time, the project did not meet all of the Policy requirements but it was not required
that all criteria be met. In 2008, MA DEP adopted that policy as a Standard, so that any
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
commercial project must now meet the state Stormwater Management Standards as well
as the local Bylaw standards.
• Traffic entering and exiting the site, as well as traffic circulation within the site will be
reviewed by the Planning Board under the Site Plan Review requirements of the town's
Bylaw. A drive-through facility will generate additional traffic and will require a traffic
study that will address traffic flow and traffic queuing for the teller windows and the
ATM. As you are aware,the site currently generates large volumes of traffic on Osgood
St. and existing parking spaces are well utilized. The traffic study should address all of
these issues and should demonstrate that the new use will not create additional traffic
problems.
If you have any questions, please let me know and I would be happy to review them with you.
Judy Tymon
Town Planner, Town of North Andover
cc: Andrew Maylor, Town Manager
Curt Bellavance, Community Development Director
Jennifer Hughes, Conservation Administrator
Gerald Brown, Inspector of Buildings
Town of North Andover Zoning Board of Appeals
Town of North Andover Planning Board
Town of North Andover •rov
ZONING BOARD OF APPEALS TO VY'
C�rF. ' ��`'�
&q. d NO
2012 NOV 20 A 9: 04
C9�zn�. '��c�r✓,�e, Vivi l..fealrman ; pT
11
Q` byb O
Nom TOWN OF
g �aue�oc�i�r �Jasf. 1�
NORTH AHOO FP
MASSACHUSETTS
O*o cu..s�niw.tw �'
Too
�tI zf S.p�ku �43SAC14US
Clttut�JllusyarW,aC
Date 19 November,2012
Town of North Andover
Zoning Board of Appeals
1600 Osgood Street
North Andover MA 01845
Please be advised that I have agreed to waive the time constraints for the North
Andover Zoning Board of Appeals to make a decision regarding the granting of a
Special Permit
Comprehensive Permit(40B)
Finding
For property located at:
STREET: 1077 Os og od Street
MAP:35 PARCEL: 27
TOWN: 110RIX MR07e11,MR 01855
TO MEETING DATE(S): January 8,2013
NAME OF PETITIONER: William Yameen(Angus Real Co
t
SIGNED:
Petitioner(or petitioner's represe a 'A)
f
1600 Osgood Street,Building 20-Suite 2-36,North Andover;Massachusetts 01845
Phone-978-688-9541 Fax-978-688-9542 Web-www.townofnorthandover.com
Town of North Andover Town Clerk-Time sty
ZONING BOARD OF APPEALS R E C E I V E D
affwd J.Alanzi 393,ferry. 6 aiwu T 0 V S!_Pa, E R K'S 0 F F i C
NOR7y '9
16.6�'�
1.X�,bij. � o z - - °�, 2012 NOV 14 AM 10: 49
D..l aut Xo,&,U. �
h �* TOF' i Or
00� ..�. NORTH ANDOVER
ffiae late Afemkop�►ArEo�P¢� MA S S A C H U S E T T S
SSACHUS�
.11&had J.,Cipmta
Date 13 November,2012
Town of North Andover
Zoning Board of Appeals
1600 Osgood Street
North Andover MA 01845
Please be advised that I have agreed to waive the time constraints for the North
Andover Zoning Board of Appeals to make a decision regarding the granting of a
Variance
Special Permit
Comprehensive Permit (40B)
Finding
For property located at:
STREET: 1077 Osgood Street
MAP: 35 PARCEL: 27
TOWN: North Andover, MA 01845
TO MEETING DATE(S) December 11, 2012
NAME OF PETITIONER: William Yameen An us Realtv RealTrust
SIGNED: ,
Petitioner(or petitioner's repr tative)
1600 Osgood Street,Building 20-Suite 2035,North Andover,Massachusetts 01845
Phone-978-688-9541 Fax-978-688-9542 Web-xvww.townofnorthandover.com
�® 10/04/2012 09:14 9787778650 LYNNFIELD ENG PAGE 01/01
RECEIVED
7p,� p,, TO's°;;a CLERK'S OFFICE
�I'o-vvn of North rth YY.11l mover Cc�n l20
ZONING BOARD OF A�rr- ALS 2012 OCT —4 Aid IOC I 0
aeovIty.Ji`iC[I 4,7.�`��&q. M'fjfl ao, NpfiTN iOhrI4 Or
1,.Ifltaw-yre, 2Jfre-L'/fn�anuxn o46tf-rh o - �(/�ORTH nANDOlti i__R
il1aN+md Y...�pm,&q �-# 0 e Y Om f•111SSACHUS
nlroo
�S�9cP1U�E�
7jaic 40C �
Town of North Andover
Zoning Board of Appeals
1.600 Osgood St>;cct
N01111 Andover MA 01.815
Pkcase be advised that I havea.grecd to v�ttiivc the tim.c co�5tra.ilits for the North
Andover Zoning Board of Appeals to maj<e a dccisiola regarding the granting of a
t •
V�>r6ance
Special Permit
(1on,.p),.chcilsivc Permit(4013)
T'indin g
.for property located at:
STIZZ-ET: :1-6--7-70
s>?n.a�cll S4�meg
MAi': 35 PARCEL: 27
:GOWN: North Andover, MA 01845
TO MEETINCI DATE(S): N.ovembeir 1.3,20112.
NAME OF 1"ETITI LR: Wi ligi,,nn Yg-rncem (Aragm CCP
SIGNED: /�'.-- -
�� l�etiti.oI or(or pc.it'i.oller oprese]1tctti.ve)
Richa.rd Barthelmes, P.E.
Lynnfield Engineering, Inc. 1
1600 Osgood Stroat.G3uifding 2Q-Suite 2-3G.North nndovcr,
01845
Phone-978-68S-9541 Fnx-978.0319542 Wab-tvcvvv.rnwnoGlOrlhon(tgvcr.cem
t7y/lk7/'Lt71L I•L:b:i WU///tMbbb LYN14-1ELU ENG F'AD'E: b1/Ul
©m RECEIVED
TOW4 CLERK'S OFFICE
Town of'North Andover 1"At-11CEc(kYimf.,&OMn
ZON.INC BOARD OP APPEAU92012 SEP 10 PM 2: 22
(ZPlirrct rJ'..�flarrr�aJ''.79,ferry.Q/ftrirnr7tu
well 0..Ile tape, Qljt�-�n/N4lrrrr. dello orro;Zq F OVIII o
,r/2fcftn cl',c.f rrco,£aq.C'l�r/1 �� `. •�:.. '•`` ��, NORTH AUDOVER
.v ✓arrl'7fnc�,71, �.�7 � ���� � MASSACHUSETTS
Qooact/�le.�tetH�crca CI
.4fictlact Pi.Ripanfa ariu
fterc Sped �$ss►et+us�c
date l.0�cntertniacr X12
Totivta of North Audover
%onlay,Board of Appeals
1600 Osgood Street
North Anclover MA 01845
please-be advised that I have agrecd to Whe the timo c01)9tr1qiJ1ts for the North
Afidover 7.0111119 Bostcl of Appeals to matte a decision regarding the graliting of a
Spcclal Permit
Comprehensive Permit(011)
1•�itulit{.g
For proporty located at'.
STREFaT;.1077 Osgood Street
MAP;LS PARCEL: L
TOWN: North Andover, MA-,01846
TO MmII ING DATER: •O:ctober 9.2012
NAME OTr Pl T1Tl .NHIZ: William c 1i.: -I us Cali Cori
SIGN13ll: • 12�
Petitloat r(or petitimer's repybsenta 1, c
Richard Barthel.mear P.B.
LXn.nfield Engineering, Inc.
Y tGot1 t�4good Sircct,Huildin� tpilc2-:tG,.Nnrlhhndnt�er,1u1n9snchuseEls 0lRdS
Phone•978.6+88-9541 Ym)978•(;88-9542 %Vcb-i«�«.lmvatu{iiorthnadn��cr.crnu
' ntegrettng d�Yign, expertise and ttic'hnology j
September 10, 2012
Zoning Board of Appeals
Town of North Andover
1600 Osgood Street
Building 20, Suite 2-36
North Andover, MA 01845
Attention: Ms. Angela Ciofolo
Department Assistant
Subject: Butcher Boy Marketplace
1077 Osgood Street
North Andover MA
LEI Job No. 480-40
Dear Ms. Ciofolo:
On behalf of Angus Realty, LLC, Lynnfield Engineering, Inc. is hereby requesting that our
hearing be postponed until the October 9, 2012 meeting date. Angus Realty is currently
reviewing the specifics of the proposed project with abutters to the site and desires to
complete this review prior to the public hearing.
If you have any questions or desire any additional information regarding this matter, please
do not hesitate to contact me at 978.777.7250 Ext. 12.
Very truly yours,
Lynnfield Engineering, Inc.
Richard Digitally signed by Richard Barthelmes
DN:cndtkhard Barthelmes,%ou,
email=rbarthelmesvlynnfieldeng.com,c=us
Bart e l m es Date:2012.09.101407.39-04'00'
Richard Barthelmes, P.E.
fax
c: Mr. Alan Yameen, Butcher Boy Marketplace
via fax
199 Newbury Street,Suite 115•Danvers,MA 01923.978.777.7250 o fax 978.777.8650•www.lynnfieldeng.com
K:\480-40\Corr\Ciofo10 A_091012_let postponernent.docx
I
Town of North Andover Town Clerk Time Stamp
ZONING BOARD OF APPEALS
ame%t 9..Ma&zi 933,&q. 6favmi= VIORTFt
I�M�.GI�L�✓ ��f/MgL.� V�L�1/�������/Lf-H(. �
28
JLl(:IC(ad LEO
1.5yvo ta_•r a p r. t7 ;t i
,Uj(�. �.1.�11/L � L
.Il.
Yd 9LVd Jll.
/��
q
tb,jaclak ✓ temk J 5
Aikhad 9.,Ci pada �9SSpCH1/
g chi 4peck
Date: 14 August 2012
Town of North Andover
Zoning Board of Appeals
1600 Osgood Street
North Andover MA 01845
Please be advised that I have agreed to waive the time constraints for the North
Andover Zoning Board of Appeals to make a decision regarding the granting of a
Variance
Special Permit
Comprehensive Permit(40B)
Finding
For property located at:
STREET: 1007 Osgood Street
MAP: 35 PARCEL(S): 27
TOWN: North Andover, MA 01845
TO MEETING DATE( :-September 11,2012
NAME OF PETITI E ameen (Angus Realty Corp
SIGNED:
i ioner(or petitioner's repres tative)
1600 Osgood Street,Building 20-Suite 2035,North Andover,Massachusetts 01845
Phone-978-688-9541 Fax-978-688-9542 Web-w"%,%v.toxvnofnorthandover.com
Town of North Andover
ZONING BOARD OF APPEALS
NORTH
Albert P.Manzi III,Esq.Chairman 1,%D s°— Associate Members
3? ° '-
Ellen P.McIntyre,Vice-Chairman ° �, Michael P.Li porto
Richard J.Byers,Esq.Clerk '' p Tyler Speck
D.Paul Koch Jr.,Esq i Zoning Enforcement Officer
Gerald Brown
�9SSACHUS y
Legal Notice
North Andover Board-of Appeals
Notice is hereby given that the Board of Appeals will hold a public hearing at North
Andover Town Hall at 120 Main Street, North Andover, MA on Tuesday, August
14th 2012, at 7:30PM to all parties interested in the petition of William Yameen
(Angus Realty Corp) for property located at 1077 Osgood Street (Map 35, Parcel
27), North Andover, MA 01845.
The applicant plans to construct a bank, a new permanent structure in the GB Zoning
District.
A Variance is requested under Section 4.136, (Watershed Protection Division) and
4.136 c.ii(3), of the Zoning Bylaws.
Application and supporting materials are available for review at the office of the
Zoning Department located at 1600 Osgood Street, North Andover, MA, Monday,
Wednesday and Thursday from the hours of 8:00-400, Tuesday from the hours of
800-5:30 and Friday from 8:00 to 11:30.
By order of the Board of Appeals
Albert P. Manzi III, Esq., Chairman
Published in the Eagle Tribune on:
July 31, 2012
August 7, 2012
Town of North Andover
ZONING BOARD OF APPEALS
NORTN
Albert P.Manzi III,Esq.Chairman of�t«o ,�1y Associate Members
Ellen P.McIntyre,Vice-Chairman c� $� ° °� Michael P.Liporto
Richard J.Byers,Esq.Clerk '- 70 Tyler Speck
D.Paul Koch Jr.,Esq Zoning Enforcement Officer
Gerald Brown
SSACHUS�S
Legal Notice
North Andover Board of Appeals
Notice is hereby given that the Board of Appeals will hold a public hearing at North
Andover Town Hall at 120 Main Street, North Andover, MA on Tuesday, August
14th 2012, at 7:30PM to all parties interested in the petition of William Yameen
(Angus Realty Corp) for property located at 1077 Osgood Street (Map 35, Parcel
27), North Andover, MA 01845.
The applicant plans to construct a bank, a new permanent structure in the GB Zoning
District.
A Variance is requested under Section 4.136, (Watershed Protection Division) and
4.136 c.ii(3), of the Zoning Bylaws.
Application and supporting materials are available for review at the office of the
Zoning Department located at 1600 Osgood Street, North Andover, MA, Monday,
Wednesday and Thursday from the hours of 8:00-400, Tuesday from the hours of
800-5:30 and Friday from 8:00 to 11:30.
NORTH ANDOVER
BOARD OF APPEALS
Notice is hereby given that the
Board of Appeals will hold a public
hearing at North Andover Town Hall
at 120 Main Street, North Andover,
By order of the Board of Appeals NIA on Tuesday,August 14th 2012,
at 7:30PM to all parties interested
Albert P. Manzi lII, Esq., Chairman in the petition of William Yameen
(Angus Realty Corp)for property to-
cated at 1077 Osgood Street(Map
35, Parcel 27), North Andover, MA
01845.
The applicant plans to construct a
bank,a new permanent structure in
the GB Zoning District.
Published in the Ea le Tribune on: A Variance is requested under
� Section 4.136, (Watershed Protec-
July 31, 2012 tion Division)and 4.136 c.ii(3),of the
August 7, 2012 Z App Bylaws. p
A lication and supporting ma-
terials are available for review at the
office of the Zoning Department lo-
cated at 1600 Osgood Street,North
Andover, MA, Monday, Wednesday
and Thursday from the hours of
8:00-400, Tuesday from the hours
of 800-5:30 and Friday from 8:00 to
11:30.
By order of the Board of Appeals
Albert P.Manzi III,Esq.Chairman
ET-7/31,8/7/12
North Andover MIMAP July 17,2012
O16 Farm-ROad
125
dd
mfr
133
B2.
Water Er..o ecti n R
Rail Line Wetlands Zoning
Interstates Exempt Lands Busine s 1(R-1)
p ❑Busine s 2(R-2) Horizontal Datum:MA Stateplane Coordinate System,Datum NAD83,
Interstate O Busine s 3(R-3) Meters Data Sources:The data for this map was produced by Merrimack
—Major Roads ®Busine s 4(R4) AORT1l Valley Planning Commission(MVPC)using data provided by the Town of
Roads O Gener Business(G-B) Of tae X11, North Andover.Additional data provided by the Executive Office of
n Planne Commercial Dev •S r•.1 0 Environmental Affairs/MassGIS.The information depicted on this map is
L:,Easements Corrido Development Dist • O for planning purposes on It may not be adequate for legal bounds
0 MVPC Bounds - L in g regulatory
to y q g boundary
Boundary D Corrido Development Disc O - ''"� t° definition or regulatory interpretation.THE TOWN OF NORTH ANDOVER
0 Municipal Boundary ®Co do Development Dist $- 9 MAKES NO WARRANTIES,EXPRESSED OR IMPLIED,CONCERNING
Zoning Overlay Industri I 1(I-1) Y THE ACCURACY,COMPLETENESS,RELIABILITY,OR SUITABILITY
8 Adult Entertainment CI Industri 12(I-2) *% OF THESE DATA.THE TOWN OF NORTH ANDOVER DOES NOT
0 Downtown Oveday District Industri 13(I-3) ry o �� i ASSUME ANY LIABILITY ASSOCIATED WITH THE USE OR MISUSE OF
0 Historic District G IndustriI S(I-S) "' THIS INFORMATION
®Water Protection Reside ce 1(R-1) �,� °•ono^��'h
Reside ce 2(R-2) SSACHUSE
0 Parcels �'P—ide ce 3(R-3)
Hydrographic Features de ce 4(R-0)
1"=350 ft de ce s(R-s)
Streams fde ce6(RI)
,,,age esidential(VR)
A
"A COMMONWEALTH OF MASSACHUSETTS NUMBER
tArr . BHP-2017-0217
f North Andover
• BOARD OF HEALTH FEE
' $60.00
Pentucket Bank DATE ISSUED
NAME March 01,2017
1077 OSGOOD STREET
-----------------------------------------------------------------------------------------
-
------------------------------------------------------------------------------
ADDRESS
IS HEREBY GRANTED A Dumpster Permit
Dumpster PERMIT
This permit is granted in conformity with the Statutes and ordinances relating thereto,and
expires..............February 28,2018--------------unless sooner suspended or revoked.
RESTRICTIONS:Northside Carting 1 pickup per week
978.686.8604 ------------- -- -- --- ------------ --- - - ---------
BOARD OF
,- HEALTH
NOTES: Contact: Thomas Smithers 978.556.5435 ___________,__ ,_ ; �___________________
.y
1--- X—ow t
------------------------------------------------------------
HOURS ACTIVE:Angus Realty Corporation --------_________________________________________________
1077 Osgood Street BOARD OF HEALTH CHAIRMAN
A•
TOWN OF NORTH ANDOVER .5��714
Community& Economic Development
HEALTH DEPARTMENT
120 Main St.
NORTH ANDOVER,MASSACHUSETTS 01845
Phone:978.688.9540 Fax: 978.688.9542 E-mail:healthdept@northandoverma.gov
APPLICATION FOR DUMPSTER PERMIT
P URSUANT TO SECTION 31A AND 31 B OF CHAPTER IN
OF THE GENERAL LA WN AND R ULES AND REG ULA TIONS OF THE
NORTHANDOVER BOARD OF HEALTH
DATE:
Application is hereby made for a permit to maintain a dumpster(s)on property located at
'lp YNtItS1Ft�w,,s�ANt 6VER`,
10(0
in accordance with the rules and regulations of the Board of Health. "'t t''� ` �' i
70WN OF N0i R rll A1400'j8_R
Applicant: VeYn kxlCer 1E a L Property Owner: AY)QUa RMI V44 1�7H r� M�
Name of Contact: EAgyi ) 1:(D, true_ Owners Address: IOiq OSGork `4_
Address: JOLPS QS6ccrJ S'!- K0.AntU 4M i 1a• 610-�J
b(a- /krec w,MA. 01R( Owners Phone#: 331-1or5 6- IS\k
Telephone#: q-j(k_ C 4-610 o Email address: f3f_�it AO L•o c, r\,
x-14-�s�de CcA -k
Dumpster Company:
Telephone#: qu-(Omp- �Uoy -
Pick-Up
PickUp Schedule: i ipfc L J-,24eL T;-Idmis
On the back of this form, please sketch an outline of property,
showing the proposed location of the dumpster(s). Give,
distance from dumpster to other buildings and lot lines or
;boundaries.
Annual Dumpster Permit Fee: $60.00 per establishment
Payable to: Town of North Andover. LATE FEE AFTER FEBRUARY 28 BE DOUBLED-$120.00
*Please note that all contact information and the associated fee is required upon application submittal.
Page I of I
IIII iilfllllliifll i � I BW 126.D
I I 135.D
l2
134.D
- I
TW 135.2
�BW 126.5
—�+ 135.9)
03
w � �
M .
it
134.9
HP 156.1
HP
- I
I
13 .
'1,35.7
�e
L133x9 F
._ .' 132.5
V32.5. — -- —
'
co
/ 6
o
CRASS SWALE TO
OLLECT SURFACE
5
` RUNOFF
.. r.........�..
K:K5242°KadWrwtrpflpflpnWlJll�W65
X", I
/h
c�
3m
v
-A
-J—
'0 �t. . .....
s pis It b 21
1r'r11-5
z
ffi
7
c�
p
s.
'z 6
T
16
R 1j3jajt-:jgjRjej+jaj+j1 w:mral
FF FF�FTYFF6F5FFFFFFF�
Aa Gal4 9 ki zi tf 19
NG PENTUCKET BANK
AT BUTCHER BOY MARKETPLACE LYNNFIELD ENG/NEER/NG, INC.
SITE GRADING, 1077 OSGOOD STREET CONSULTING ENVIRONMENTAL ENGINEERS
DRAINAGE AND 3"" NORM ANDOVER,MASSACHUSETTS 01845
UT1UTY PLAN 'AIMS NC PREPARED FOR 2 ELECTRONICS AVE, SUITE 41
PZWTUCKET BANK DANVERS, MASSACHUSETTS 01923
a. I MD?RMAC S7REFT (978) 777-7250 FAX(978) 777-8650
31304 HAMMM"MASSACWSE"S 01830
' Commonwealth of Massachusetts
-_ BOARD OF HEALTH
North Andover
120 Main Street
NORTH ANDOVER,MA 01845
DATE PRINTED 12/19/2016
ESTABLISHMENT NAME: Pentucket Bank
Pentucket Bank 1077 Osgood St.
File Number: BHF-2015-000011
NORH ANDOVER MA 01845
LOCATED AT:
1077 OSGOOD STREET
,Commonwealth of Massachusetts
OWNER: Angus Realty Corporation PHONE:(978)688-1511
PERMIT TYPE FEE
Dumpster Permit $60.00
Hours Active: Angus Realty Corporation
1077 Osgood Street
North Andover,MA 01845
978.688.1511
Total Fees: $60.00
f� 1 ry
611.
IC) 1Sv