HomeMy WebLinkAboutMiscellaneous - 112 COLONIAL AVENUE 4/30/2018 (3) l
L
i
i
i
FOR r7�soh DATE TIME �' P.M.
M ah O &D _.
PH'ONEO
OF RETURNED`
PHONE Q Fr < �- W9y- y9�d YOUR CAL
AREA CODE ! NUMB R EXTENSION
MESSAGE ✓Le�' , -`W To p cJ• PLEASE CALL
WILL CALL.
r his k4ase- . AGAIN
/ / �j CAME TO
.!/4cr- o. -z)ec4 SEEYOU
WANTS TO
SEE YOU
SIGNED QpS FORM 4002
s
PLAN OF LAND
/N
SC4LE.
I" = 40' SEPTEMBER 10, 1997
IM YES ENGINEERING, INC. ► 603 SALEM STREET
CML ENGINEERS & WAKEFIELD, MASS. 01880
LAND SURWYORS M. (617) 246-2800
AS-BUIL T L OT 18 COL ON/AL A VE.
OF MAS
S,q
COPErER J.
OGRE �yR+
OCIVIL
�j �N�o. 271� �'
-� LOT 9
L
LOT 17
so
0
25,369 S.F. LOT 18 ��, � m
25,839 S.F. 156.68
�p
90
/4p
/�• hry y FURED END x 15 .06
E=151.9_5 �3
A / �I5 x 041
155.9 , .06
/ Ix 15,64 IS2
/ x .79 Ij STO , 1X
38 2. 6 OS
/
X111 x 15 .8
x 155.96 x T5 ,57
µ x 2.16 x .95
/ 52.00 x 15155
/ x 156.
/ 151.9 111.55
/ x I
/ 155. .9
151 152.01 /
8"PVC ® STONE Af2 EA .66 / x 156.05 R/P_ I/
¢'=151.93x
1 156.os ,.63
x I
51.94 x (
/ 50.62
/ 15 156.1
158.31 1 .95 x 150.65 /
S82 39'08'E 21.3 31 x 6V. 1123
x ,s 30 p0
s. 4
x 158.12 152.76 / E �f
. EpG
B"PICC /
ZONE- PRD (R-2) V.R.
MINIMUM SETQACKS.• OPEN SPACE /V
FRONT = 20'
SIDE = 20' /
REAR = 20'
North Andover Conservation Dept.
27 Charles Street
North Andover,MA 01845
mill
To: Anthony Onello,Jr. Fax: 1-617-742-7774
From: Alison McKay,Interim Conservation Date: 4/20/04
Administrator
Re: Conservation information Pages: cover
CC:
❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle
If you would like to come into the office to look at the as-built plans we discussed,feel free.
I am leaving the plans with Donna Wedge, my secretary.
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Town of North Andover NORTH
Office of the Planning Department �� `._.°o
� A
Community Development and Services Division
VL
27 Charles Street
North Andover,Massachusetts 01845 9SSACHus�t
http:I Jwww.townofnorthandover.com
Town Planner: iwoods@townofnorthandover.com P (978)688-9535
J.Justin Woods F (978)688-9542
RECEIVED
October 10, 2003 OCT 1 0 2003
NORTH ANDOVER
Anthony P. Onello, Jr. CONSERVATION COMMISSION
112 Colonial Avenue
North Andover, MA 01845
RE: 112 Colonial Avenue
Woodland Estates
Dear Mr. Onello:
I have researched your inquiry regarding making grading and landscaping changes in the drainage easement
area and reviewed your letter with Jack Sullivan,the Director of Engineering. After reviewing the May 22,
2002 letter from Bob.Beshara, we concurred with the positions and steps he outlined.
After you obtain written approval from the developer, I would be happy to review the process for obtaining
Planning Board approval with you. Please note that the Planning Board will require that you have a
professional engineer prepare the grading and landscaping plan.
If you have any questions,please feel free to contact me.
FS' elyds
r
cc: Conservation Administrator
Engineering Director
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
L
Anthony P. Onello Jr.
Jennifer S. Onello
112 Colonial Avenue
North Andover MA 01845
August 26, 2003 AWN 2 2Qo3
Mr. J. Justin WoodsL `��h;� 4 ANDOVER
Director of Planning
"'iVNG QpaARTMEN7,
Town of North Andover
27 Charles Street
North Andover, Massachusetts 01845
Dear Mr. Woods:
Thank you for speaking with me on the telephone earlier this month regarding a project
that my wife, Jennifer, and I would like to have done in our backyard. During our conversation,
you suggested that we outline our proposed project in the form of a letter.
As we discussed, the southeast corner of our property at 112 Colonial includes a storm
drainage easement (See Fig. 1). The easement is in the form of an oval depression about 15 feet
wide, 50 feet long and 5 feet deep,with banked, earthen walls.
The top of the depression is at the level of the driveway, and forms a grass side yard along
the driveway. The side yard runs toward the rear of the property along a level walkway that is
currently left in a natural state.
The backyard is at a level about 4 feet above the walkway. (See Fig. 2, taken along
section A-A of Fig. 1). A rip-rap bank is between the upper yard level and the lower walkway.
We find that the rip-rap bank is unsightly, and is also a safety hazard. We have two young
children, and their natural curiosity, and that of their friends, always seems to draw them toward
the rip-rap bank. Balls and toys from the yard are constantly tumbling down the bank, and the
bank is dangerous to walk up and down.
We would like to replace the rip-rap bank with a stone wall, as shown in FIGs. 3A and
3B. We plan to decide with the help of a landscaper whether the stone wall will take the form of
a single wall (Fig. 3A) , or a tiered wall (Fig. 3B). We are also considering placing a safety
barrier in the form of a fence or shrubbery along the top of the stone wall.
The stone wall will provide a more finished look to the backyard, and will offer a much
safer solution than the current rip-rap bank.
Mr. J. Justin Woods
August 26, 2003
Page Two
Our proposed project will not impact the drainage easement in any way. Any work that is
to be done will be above the top level of the drainage easement, on the side of the natural
walkway opposite the easement.
Last year, we consulted with the then town engineer, Robert E. Beshara, P.E., regarding
the project. Mr. Beshara was kind enough to visit our property and provide us with a letter
outlining his opinion on the project. A copy of Mr. Beshara's letter, dated May 22, 2002, is
enclosed for your review.
We would appreciate your kind advice as to the next steps we should take in the approval
process.
Sincerely,
Anth ny P. Onello Jr.
enclosure
CAOne1lo\Home\Backyard Project400ds_lettermpd
S
Nom.
R�51
A0
r r";1
k\ �� 4\.•`,is
//Z
F
FiG .Z
CSEC'f,�� 'A of FICA
Wfl�k-wA j
DRAwA4.6 S IU
EA5LIU�iJ
FICC;lk
SIG-33 u`
W At.(
►,�A�C.K-�r�i
=Ye
�Orj
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
4
384 OSGOOD STREET
NORTH ANDOVER,MASSACHUSETTS 01845-2909
J. WILLIAM HMURCIAK,DIRECTOR, P.E.
f NORTH
°6�t`eD�al°~O
hone Tele 978 685-0950
FRobert E. Beshara, P.E. P ( )
Director of Engineering * Fax(978) 688-9573
�1 �A.ITED lfPt�7
4SSNCHU50t
May 22, 2002
Anthony&Jennifer Onello
112 Colonial Avenue
North Andover,MA 01845
Dear Anthony&Jennifer,
This letter is to follow—up our meeting on Monday May 20,2002 at your property.As I understand the proposed work,you
would like to make grading and landscape changes to your lot that may include the construction of a wall. Some of this work
will be performed on an area on your property that the Town has drainage easement rights.Based on my review of the
approved subdivision plans and your description of the proposed work,I offer the following comments:
1. The subdivision has not been accepted by the Town;therefore the developer has rights to the easement area.You
would probably need to obtain approval of your proposed changes from the developer.
2. Approval would then be required from the Planning Board,which oversees the subdivision until completion and
acceptance by the Town.
3. Approval is also likely from the Conservation Commission as the work you proposed is probably within the buffet
zone of a wetlands.
4. Finally,you would require approval for the work from the Division of Public Works.
My position on your proposed work follows:
1. I do not believe that the landscaping and possible construction of the wall as you have described to me,will
interfere with the Town's ability to provide maintenance within the drainage easement.
2. I do not believe that the proposed work as you have described to me will interfere or compromise the operation of
existing drainage facilities within the easement.
3. The Town has no plans and isnot likely to have plans to change the use or operation of the drainage facility that
might interfere with the work you propose to perform,however,with the construction of permanent facilities within
the easement(the wall)you always run the risk that the Town will need to perform work on the easement and
would require you to remove or modify the permanent facility at your own expense.
Very truly yours,
Robert E. Beshara,P.E.
Director of Engineering
cc: J William Hmurciak,P.E.,Director DPW
Tim Willett, Superintendent Water&Sewer
Jacki Byerley,Planning Department