HomeMy WebLinkAboutMiscellaneous - 125 FLAGSHIP DRIVE 4/30/2018 (10) i
� �
j ���
i �
��
\\
h
r'
----,
1
i
t
'�
t
/;,
,.
_, ..- i
I
I
SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION.ON DELIVERY
■ Complete itdrns 1,2,and 3.Also complete A. gnature
iterrf.4 if Restricted Delivery is desired. , 124gent
s Print your name and address on the reverse `- ❑Addressee
so that we can return the card to you. B. eived by(Printed Name) C. Date of Delivery I
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
D. Is delivery address different from item 1? ❑Yes
1. Article_`Addressed to: If YES,enter delivery address below: ❑No
f�iV(n -F
(/l lc- V L� 3: Service Type
43 C416jaMail ❑Express Mail
❑Registered ❑Return Receipt for Merchandise
❑ Ihsun:d Mail ❑C.O.D.
4. Restricted Delivery?(Extra Fee) ❑Yes
2. Article Number
(Transfer fromsevice lal ;7_0_0_2 ;0510 0 0 0 0; €0 8 9 4 0345-. .
i
y`PS Form 3811,February 2004 Domestic Retum Receipt 102595-02-M-1540
UNITED STATES POSTAL SEE rte, 1 -Fi>st- iaait
Egstagc-&F-ees-Raid
p u USPS,..•:. Fm..�
Permit.Na.G10"
• Sender: Please printyname, address, and ZIP+4 in this box,•
4w Ccs Svc
SENDER:*COMPLETE THIS SECTION M'I comPLETE THIS SE&hoN 6N 6E' LIVERY
■ Complete items 1,2,and 3.Also complete A. Signature
,I iterq,4 if Restricted Delivery is desired. V ❑Agent
X
■ Print your name and address on the reverse l ,� t5` ❑Addressee
so that we can return the card to you. s. by by[Printed Name) C;Date of Delivery
I ■ Attach this card to the back of the mailpiece,
or on the front if space permits.
D. is delivery address different from Rem 1? ❑Yes
1. Article Addressed to: If YES,enter delivery,address below: ❑No
DEP
Nero-Wetlands Division
1205B Lowell.Street
I Wilmington, MA. 01887 3. Service Type
6ertified Mail ❑Express Mail
��- ❑Registered ❑Return Receipt for Merchandise
❑Insured Mail ❑C.O.D.
4. Restricted Delivery?(Extra Fee) ❑Yes
li 2. Article Number
(rransferfrom service labeo t ::7002i,0510 0000 ,089,4 i0_338 1.i �
PS Form 3811,February 2004 Domestic Return Receipt L 102595-o2-M-1540
UNITED-STATES POSTAL SERVICE First-Class Mail
tPostage&Fees Paid
`USPS
.Permit No.G-10'
• Sender: Please print your name, address, and ZIP+4 in this box •
NW( AVOPQX- G&XV06vt (�*
`0 a�co S`4 VAC 1
�� %� OS45
Y .
fflffiH MIN
TOWN Or NORTH ANDOVER
�'. MASSACHUSETTS
f TM
O ..�•O �. 't'O
SA US
NOTICE OF DECISION
Date. . .May, .3,, •1988. . . . . . . . . . . . . . . .
Date of Ilearing . Apri1,28, •1988 , ,
{
Petition of • , � , Channel Building. • • • • • . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Industrial-1 District .on .the, southwest side of 125
Premises affected , , , ,
•Flagship Drive. . . • � • . . .. . . . ..
Referring to the above petition for a special permit from the requirements
of the , .
Section 8.3. 1,. • , . . • .Para2ofthe North AndoverZoningBylaw • • • • . • . , • . • • • .
so as to permit , •to•construct. a.
32:000, sq. ,ft..,, one• and. one•half •story facility:
. . . . . . .1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
After a public hearing given on the above date, the Planning Board voted
Conditionally
to . . . .`. . .the . .Site Plan Review
•approve• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Note: This decision replaces the original decision made by the Planning Board
on this site plan on August 21, 1987.
based upon the following conditions :
Signed
Paul Hedstrom,
. . . .
John Simons, Clerk
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Eric W. Nitzsche
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
George Perna
Michael Leary
'IsnvBoard . . . . . . .
�
lanni
'. � of HoarHq i
"° Town of
OFFICES OF: � °m 120 Main Street
APPEALS NORTH ANDOVER
North Andover,
BUILDING
;••a;:�o;:-..,5 Massachusetts 01845
CONSERVATION ,SS4CHus DIVISION OF (617)685-4775
HEALTH
PLANNING PLANNING & COMMUNITY DEVELOPMENT
KAREN H.P. NELSON, DIRECTOR
May 3, 1988
Mr. Daniel Long, Town Clerk
Town Office Building
North Andover, MA 01845
Re: Channel Building
Flagship Drive
Dear Mr. Long:
The North Andover Planning Board held a public hearing on Thursday
evening, April 28, 1988 at 8:15 p.m. in the Town Office Meeting Room upon
the application of Channel Building Company, Inc. P.O. Box 522/23 Main St. ,
Andover. The hearing was duly advertised in the Lawrence Eagle Tribune on
April 4 and April 11, 1988. The following members were present: Erich W.
Nitzsche, Chairman; John Simons, Clerk; Paul Hedstrom and Mike Leary.
The petitioner seeks a modification to a previous special permit under
Section 8.3. 1 Para. 2 of the North Andover Zoning Bylaw. The purpose of the
Site Plan Review is to review the proposal to contact a 32,000 square foot,
one and one half story facility on 5.79 acres in an Industrial-1 (I-1) Zoning
District on the south west side of 125 Flagship Drive.
The purpose of this modification is to address the following:
1. Allow for an enlarged Lot A to be utilized for the site. The old
lot contained 5.01 acres, the new lot contains 5.79 acres and was
filed in the Registry of Deeds Office under plan #11046, Form A plan
signed by the Board of 2/8/88.
2. Allow for other adjustments made to the site plan related to the
enlarged lot.
The Board stated that the only change to this plan was the enlarged lot
which actually exists as a Lot of record. The Board incorporated all of the
material contained in the original application with this submission.
John Simons closed the public hearing.
The North Andover Planning Board has voted to approve - subject to the
following conditions:
1. In accordance with the North Andover Fire Department's request of July 13,
1987 _ Note eleven conditions:
a. An automatic detection and ..suppression. sys_tem must be installed. . These
systems must be connected to the municipal fire alarm system through a
master fire alarm box. The developer must contact the Fire Chief for
the requirements for these systems prior to installation.
y t
Channel Building
Flagship Drive
b. Material Safety Data sheets must be submitted to the Fire Department
prior to occupancy.
c. Permits will be required for all flammable storage according to M.G.L.
Chap. 148 and all flammable storage shall be in accordance with N.F.P.A. 30.
d. Welding operations must be in accordance with N.F.P.A. 51B.
e. The Paint Shop, in particular the spray booth area must be in accordance
with N.F.P.A. 33.
f. The intended purpose for the gas ovens should be given to the Fire
Department and the intended fuel to be used so stated.
g. An additional fire hydrant is needed at the west corner of the building.
h. A 360° Fire Department access must be maintained especially after the
proposed expansion takes place.
i. The wire mesh between the stock room, carpenter ship and the drive bay
is unacceptable. A safer redesign of this area is needed.
j . Underground storage of fuel tanks will be in compliance with Fire
Department Regulations and no permit will be issued if the Conservation
Commission finds the lot unsuitable for such tanks.
k. No open burning is permitted except in compliance with the Fire
Department's Regulations during open burning season.
2. There will no on-site sanitary leaching system. The facility will be connected
to the North Andover Public Sewer System.
3. The North Andover Conservation Commission Order of Conditions will be strictly
adhered to in all aspects and the compliance of such shall be part of this
special permit.
4. Binder coat of pavement shall be placed on all means to be used by motor
vehicles prior to occupancy.
5. Any modification to these plans shall be reviewed by the North Andover Planning
Board.
6. The landscape plan (drawing L4-1) of submitted plans will be completed within
one year of initial construction.
The North Andover Planning Board -
2 -
Channel Building
Flagship Drive
In conditionally approving this site finds the .following:
1. The use is incompliance with Zoning Classifications
2. All utilities are available to site.
3. The neighborhood will not be adversely affected.
4. There will be no adverse affect to pedestrian or vehicular traffic.
5. Adequate green space will be provided in view of extended wetlands
included in proposed 5 acre site with use ratio to site.
The following plans shall be deemed approved by this decision:
- 3 -
a ,
�f MUM fflfl . -
9,�V N OF NORTIi ANI) OVEIZ
MON ',': ; .sl'':!`'IERM.ASSACItU SIi, TTS
AUG Z1 B
p ,ti
� , O
3 . p
ti 11
-TA RUSE
NOTICE OF DECISION
Date. . . , °August. 20°,. .1987. . . , . . .
Date of IIearing ,August. l7;° .1987
Petition of . . . . . . . , , , , ,
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Premises affected , . �nl�ust ��,-2 .P�stmt, orl,thesouh west side of 1,25
Flagship Drive. '
Referring to the above petition for a special permit from the requirements
of the , , Section .8;3 : 1 ,. _Para .2 :of the_North.Andover. Zoning. Bylaw, . : .
so as to permit , , , . , to .construct. a. 32: 000 .sq: ft, ,one .and. one half
. . •story facility.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Ner, a l, above e, the Plan
lic hearing given on the abdate, Board voted
Cotion�a�iy ,
A rove Site Plan Review
to .Ipf. . . . . . . ... . . . .the' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
based upon the following conditions :
Signed ,
cc: Director of Public Works Erich W. Nitzsche, Chairman
Public Works Department
Highway Surveyor John. Simons, Clerk
Tree Warden
NACC Paul Hedstrom
Building Inspector . . . . . . . . . . . . . . . . . . . . . . ' . ' ' ' ' ' ' ' '
Board of Health George Perna
Assessor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Police Chief
Fire Chief J41} . J3u ke.
lanni�g Board
Applicant, Engineer ,'�'File" �
NoarH i
OFFICES OF: ?' °m Town Of 120 Main Street
A.I'F'EAi_SNORTH ANDOVER North Andover.
13LJII-DING *;,''_::;� `.g. Massachusetts 01845
CONSERVA'T'ION s@"°" $�� DIVISION OF (617)685-4775
HEALTH
PLANNING PLANNING & COMMUNITY DEVELOPMENT
KAREN H.P. NELSON, DIRECTOR
August 20 , 1987
Mr. Daniel Long, Town Clerk Gy
Town Office Building
North Andover, MA 01845
Re: Channel Buildin '
Flagship Drive
Dear Mr. Long:
c�
The North Andover Planning Board held a public hearing on
Monday evening, July 20 , 1987 at 8 : 15 p.m. in the Town Office
Meeting Room upon the application of Channel Building Company, Inc.
P.O. Box 522/23 Main Street, Andover. The hearing was duly advertised
in the North Andover Citizen on July 2 and July 9, 1987 . The
following members were present: Erich W. Nitzsche, Chairman;
John Simons, Clerk; Paul Hedstrom; John Burke and George Perna.
The petitioner seeks a special permit under Section 8 . 3 . 1
Para. 2 of the North Andover Zoning Bylaw. The purpose of the
Site Plan Review is to review the proposal to construct a
32 , 000 square foot, one and one half story facility on 5 . 01 acres
in an Industrial-2 (I-2) Zoning District on the south west side
of 125 Flagship Drive.
The North Andover Planning Board has voted to approve - subject
to the following conditions:
1 . In accordance with the North Andover Fire Department' s request
of July 13, 1987 - Note eleven conditions:
1 . An automatic detection and suppression system must be
installed. These systems must be connected to the
municipal fire alarm system through a master fire alarm
box. The developer must contact the Fire Chief for the
requirements for these systems prior to installation.
2 . Material Safety Data sheets must be submitted to the
Fire Department prior to occupancy.
3 . Permits will be required for all flammable storage
according to M.G.L. Chap. 148 and all flammable
storage shall be in accordance with N.F.P.A. 30 .
4. Welding operations must be in accordance with N.F.P:A.
51B.
5 . The Paint Shop, in.particular the spray booth area must
be in accordance with N.F.P.A. 33 .
6 . The intended purpose for the gas ovens should be given
to the Fire Department and the intended fuel to be used
so stated.
Page : 2
Pull,.. ..^ .�
7 . An additional fire hydrant is needed tst corner
of the building. ��� t� U
8 . A 360° Fire Department access must be maintained especially
after the proposed expansion takes place.
9 . The wire mesh between the stock room, carpenter shop and
the drive bay is unacceptable. A safer redesign of this
area is needed.
10 . Underground storage of fuel tanks will be in compliance
with Fire Department Regulations and no permit will be
issued if the Conservation Commission finds the lot
unsuitable for such tanks.
11. No open burning is permitted except in compliance with
the Fire Department' s Regulations during open burning
season.
2. There will be no on-site sanitary leaching system. The
facility will be connected to the North Andover Public
Sewer System.
3. The North Andover Conservation Commission Order of Conditions
will be strictly adhered to in all aspects and the compliance
of such shall be part of this special permit.
4. Binder coat of pavement shall be placed on all means to be
used by motor vehicles prior to occupancy. .
�J Any modification to these plans shall be reviewed by the
�J North Andover Planning Board.
6. The landscape plan (drawing L4-1) of submitted plans will
be completed within one year of initial construction.
The North Andover Planning Board -
In conditionally approving this site finds the following:
1 . The use is incompliance with Zoning Classifications
2. All utilities are available to site.
3. The neighborhood will not be adversely affected.
4. There will be no adverse affect to pedestrian or
vehicular traffic.
5. Adequate green space will be provided in view of
extended wetlands included in proposed 5 acre site
with use ratio to site.
C!!riV ,:�
Page : 3 �l r�� �.., - ,r.
u�, li ` s� Eti�1 'dl
Sincerely,
PLANNING BOARD
EN/je Erich W. NitzOche, Chairman
cc: Director of Public Works
Public Works Department
Highway Surveyor
Tree Warden
NACC
Building Inspector
Board of Health
Assessor
Police Chief
Fire Chief
Applicant
Engineer
File
Interested Parties
Z
• �+;rt � �., .' � fi� , a ice,. �"° � ,�..
•
{.
3
7 4
f .•r; p . �4"' .a
aw
L
n •z
5 �t
E
VOly
,ti' 4,j `.,,q',! n;. "' k:YR,•,r•.}
-VL( Etl' : a zs' �. { s�•
a VVI,
iL
{ - 4 �a .s �� �,� ad �+x •erow�+^�uY'�� r .�a-'t� rw�L""„ °xi' � f,
,
r.
,
e
a
„
2
F:
II
� �� �i���: � e;x Y� �; * >° -s "'ra rz::' � r � :tl �k�_.� �� 'i k"" •,. ;• �
f
+ v ,
f R
i
� £}
I A
a
E LOW=
yy (�rr!r t � z „++is�a�r 5°. � a �� �_' 1h ti �,,�,��� .o ' 'a,, •,{ y�-�
9 d. �r,R'?�,�pGe��"* �+S ♦, i 1 � J'i+„f ;A i t^'.m. '�4 �.Y J C �g.,�f. � �.� � E
n
;ixt r� :.J � 'i t j �a-... "y`R �'fi r,:AT,�c�. �'�± l�TT�����e� �g4�'A�'�':1�' �r .�'r, i• .i +*:♦ .n, :� .y=r t
x ,
I
I
I ,
s
"t
s
i
x
r
,
a r
8 � X14
1 S
r
-
,
1 E
' • ` I } .:Y Mme. � � i, ���
s, r
rr
' pyt
r
c
,
d S
„
NORTH ANDOVER CONSERVATION COMMISSION
SITE INSPECTION SHEET
DEP FiW#242- Date: IliV .- 2230
Cl-0 Does not have permit with the NACC Weather: P S(A
Site Address: 2 f
Inspector: �1/L
Agent/Representative/Owner:
Findings:
G �v►� v
QZ
v {
The
Neve -Morin
Group, Inc. RECEIVED
MAY 3 12006
May 19, 2006 NORTH ANDOVER
CONSERVATION COMMISSION
Ms. Pam Merrill
Conservation Commission
400 Osgood Street
North Andover, MA 01845
Re: Restoration Area– 125 Flagship Drive
Dear Pam:
As you know, our office has been assisting Mr. Stephen E. Foster, Dutton & Garfield, Inc., with
the work conducted to correct an ongoing drainage problem that existed on Flagship Drive. An
Enforcement Order was issued January 19, 2006 that allowed exploratory digging to occur to try
to find the problem. On February 16, 2006 the exploratory digging commenced and the cause of
the drainage problem was discovered. The problem was corrected and the area was backfilled
and stabilized.
A second Enforcement Order was issued on April 26, 2006 that would serve as a mechanism to
complete ,certain_restoration activities .within the. Buffer Zone associated ;to the adjacent
Bordering Vegetate Wetland.. , The; Enforcement..Order also required a wetland scientist to
monitor the restored area for one growing season to ensure survivability, health and vigor and
soil stabilization. Reports are required to be submitted to the Conservation Department for
review.
On Wednesday, May,18, 2006, the restoration area was planted in accordance with the approved
restoration plan submitted by our office.—Four Red-osier.Dogwood, Cornus sericea, and Four
Highbush`Blueberry(kaccinium corymbosum), were planted and the-area was seeded with New
England Conservation/Wildlife Mix, (see.attached,photographs showing the restoration area).
We shall continue to monitor the restoration area as required by the Enforcement Order.
ENGINEERS SURVEYORS ENVIRONMENTAL CONSULTANTS LAND USE PLANNERS
447 Old Boston Road (U.S. Route 1), Topsfield, MA 01983 978-887-8586 FAX 978-887-3480
Providing Professional Services Since 1978
www.nevemorin.com
y� 's
Ms. Pam Merrill Page 2
May 19, 2006
If you should have any question regarding this information please do not hesitate to contact our
office.
Sincerely,
THE NEVE-MORIN GROUP, INC.
Greg Hochmuth, RS
Senior Wetland Scientist
GH/km
Attachments
cc: Stephen E. Foster, V.P. —Dutton& Garfield, Inc.
F:\KATHYM\MSWORD\GENERAL\2293—NACC.doc
..,��x, .. '��-� , T " to `'�' t"-r"��`sf:�. .,�C•;��� � � J,.Y
�,"�ysl't r•+�,� '��, ,� �r � ,�, T,a�?•c i�i e�fiy y ��` `' Wap�Fyi�
_-'�,.� '�i,��,�'xr�' rr.. ��]tl r'Ps.- _ �-` {'s• - '�R ,fie',, s £ �� �.^-.Gtt�Y.
1.� 'ti * Y e•�+ �'�I'ii^�, ."r,✓„r } '� rF+ iR'i''..P ,�' "&_ 4 6n. s`�Y
41
If
g�
rA
x J`-q'7 .,�`+"* •�. Jar �i, ... ,�+ 1 i4 C � �9 �'
17;
1 \t it^.T„4�•
Q ,Irt! � f f t�'y� # �.;g f+t �, �t , ZS+ + �t• 1 ��.Tfd�'' "�:
.10 41
aw
AN
�1u • r � •, sY r �y � ,., ti�fr r . �r..
y t� 'i• y 7,��>3• a +� � �a s t .��' : � A• i 'f 4, d^* YJ
K•-
y� ) �1�t• s ctM1 f. 9 �'� i � a �t F. a 1 ' V!�x � � &kit
M1 k 2'r
i'.r� '�"1+ ++it'�',. � cu• ., ?� �.� +a�;A+e7�r. ��� sv l.�f��... n �.
7 � #L'70• ! � •?yf.1 �..� p'}�,�-. •i.�.T.� �,5�,.(�$' N •``i^;'jVi;(lr��
ff i
�'�',�Fk1
1s ,.� mak., ; o. ya •a 3! s '., A�r 4„S'ii),. y. T fryyd '.F n
y+f,
vaw
It70
•j F -s
1 •
'c �y .J'a K �� � �}: !� 7,�'L�� X° �� dd77:• t d�� L^A"" >F�,�xt 3:
t 'b � Ktlj
-M - '^v'tf� t 'r dFt � •M �.
hl
'r'.-
x>'
MADELl1 Ci,aJ�
C3 tx
ru
w -
°T0 ro '" a ,
M
ErIPostage $C OERM
0 Certified Fee Q
Q� Postmar O>
O Return Receipt Fee Here (9
O (Endorsement Required) ^OQ6
C3 Restricted Delivery Fee
(Endorsement Required) 1�
O
a Total Postage&Fees
L
0 .Sent
N
------To-- Oyh--f .
t 6 ------ --------------------
Street, /y/�
or PO Box n l/V`I--- ( Ul tf
O
-------------- 4 - -------------
Ow.NO
:�� ��
i
Certified Mail Provides:
• A mailing receipt
o A unique identifier for your mailpiece +'
n A signature upon delivery
C A record of delivery kept by the Postal Service for two years
Important Reminders:
• Certified Mail may ONLY be combined with First-Class Mail or Priority Mail.'
o Certified Mail is not available for any class of international mail.
o NO INSURANCE COVERAGE IS PROVIDED with Certified Mail. For:
valuables,please consider Insured or Registered Mail.
n For an additional fee,a Return Receipt may be requested to provide proof of!
delivery.To obtain Return Receipt service,please complete and attach a Return'
Receipt(PS Form 3811)to the article and add applicable postage to cover the
fee.Endorse mailpiece"Return Receipt Requested".To receive a fee waiver for;
a duplicate return receipt,a USPS postmark on your Certified Mail receipt is
required.
o For an additional fee, delivery may be restricted to the addressee or
addressee's authorized agent.Advise the clerk or mark the mailpiece with the
endorsement"Restricted Delivery".
o If a postmark on the Certified Mail receipt is desired,please present the arti-
cle at the post office for postmarking. If a postmark on the Certified Mail
receipt is not needed,detach and affix label with postage and mail.
IMPORTANT:Save this receipt and present it when making an inquiry.
PS Form 3800,January 2001 (Reverse) 102595-02-M-0452
r fi
Massachusetts Department of Environmental Protection
` DEP File Number:
-- Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
im portant: A. Violation Information FILE COPY
P This Enforcement Order is issued b
When filling out Y:
forms on the North Andover Conservation Commission April 26, 2006
computer, use Conservation Commission(Issuing Authority) Date
only the tab M
key to move To:
your cursor-
do not use the Stephen Foster, VP/Project Manager, Dutton &Garfield, Inc.
return key. Name of Violator
43 Gigante Drive, Hampstead, NH 03841
tab Address
1. Location of Violation:
Town of North Andover
Property Owner(if different)
Flagship Drive(Roadway)
Street Address
North Andover 01845
City/Town Zip Code
Map 107C Roadway
Assessors Map/Plat Number Parcel/Lot Number
2. Extent and Type of Activity(if more space is required, please attach a separate sheet):
The Amended Enforcement Order is being issued to Dutton &Garfield as a mechanism to complete
restoration activities within the Buffer Zone associated to the adjacent Bordering Vegetated Wetland
(BVW). A wetland scientist shall monitor the restored area for one(1)growing season to ensure
survivability, health and vigor, and soil stabilization. Reports shall be submitted to the Conservation
Department for review. Please refer to the attached letter prepared by the Conservation Department
dated April 25, 2006 for additional information and deadline dates.
B. Findings
The Issuing Authority has determined that the activity described above is in a resource area and/or buffer
zone and is in violation of the Wetlands Protection Act(M.G.L. c. 131, §40)and its Regulations(310
CMR 10.00), because:
® the activity has been/is being conducted in an area subject to protection under c. 131, §40 or the
buffer zone without approval from the issuing authority(i.e., a valid Order of Conditions or Negative
wpaform9a.doc•rev.7/14/04
Page 1 of 4
( i
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
❑ the activity has been/is being conducted in an area subject to protection under c. 131, §40 or the
buffer zone in violation of an issuing authority approval (i.e., valid Order of Conditions or Negative
Determination of Applicability) issued to:
Name Dated
File Number Condition number(s)
❑ The Order of Conditions expired on (date): Date
❑ The activity violates provisions of the Certificate of Compliance.
❑ The activity is outside the areas subject to protection under MGL c.131 s.40 and the buffer zone,
but has altered an area subject to MGL c.131 s.40.
❑ Other(specify):
C. Order
The issuing authority hereby orders the following (check all that apply):
❑ The property owner, his agents, permittees, and all others shall immediately cease and desist
from any activity affecting the Buffer Zone and/or resource areas.
® Resource area alterations resulting from said activity shall be corrected and the resource areas
returned to their original condition.
❑ A restoration plan shall be filed with the issuing authority on or before Date
for the following:
The restoration shall be completed in accordance with the conditions and timetable established by the
issuing authority.
wpaform9a.doc•rev.7114/04
Page 2 of 4
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. Order (cont.)
❑ Complete the attached Notice of Intent(NOI). The NOI shall be filed with the Issuing Authority on
or before:
Date
for the following:
No further work shall be performed until a public hearing has been held and an Order of Conditions
has been issued to regulate said work.
❑ The property owner shall take the following action (e.g., erosion/sedimentation controls)to
prevent further violations of the Act:
Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts
General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a)
shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not
more than two years, or both, such fine and imprisonment; or(b) shall be subject to a civil penalty not
to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing
violation shall constitute a separate offense.
D. Appeals/Signatures
An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of
Environmental Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be directed to:
Pamela Merrill, Conservation Associate or Alison McKay, Conservation Administrator
Name
978.688.9530
Phone Number
Monday- Friday 8:30am to 4:30pm
Hours/Days Available
Issued by:
North Andover Conservation Commission
Conservation Commission
wpaform9a.doc•rev.7/14/04
Page 3 of 4
s s
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Conservation Commission signatures required on following page.
-�-L1 I�
D. Appeals/Signatures (cont.)
In a situation regarding immediate action, an Enforcement Order may be signed by a sin er or
agent of the Commission and ratified by majority of the members at the next sched meeting of the
Commission.
Sig tures:
fA 1,
i
Signature of delivery person or certified mail number
wpaform9a.doc•rev.7114104 Page 4 of 4
i
NORTH Town of North Andover
Of,, tc ;"qh0
o? °� Office of the Conservation Department
Community Development and Services Division
�9SSgCHUS 1� 400 Osgood Street
North Andover,Massachusetts 01845
Pamela A. Merrill Telephone 978.688.9530
Conservation Associate Fax 978.688.9542
April 25, 2006
Mr. Stephen E. Foster
Dutton & Garfield, Inc.
43 Gigante Drive
Hampstead,NH 03841
VIA CERTIFIED MAIL #70020510000008939820
RE: AMENDED ENFORCEMENT ORDER, 125 Flagship Drive,North Andover,
MA
Dear Mr. Foster,
As you know, the North Andover Conservation Commission (NACC) issued an
Enforcement Order as a mechanism to perform exploratory digging,in order to identify an
ongoing drainage problem. During the initial phase of excavation,it was discovered that there
was a crushed reinforced concrete pipe and a filled fieldstone headwall was the source of the
problem. It is my understanding that a small section of 12"ADS pipe, a rubber coupling and a
plastic flared end section were installed to immediately repair the drainage problem. Additionally,
the fieldstone headwall was rebuilding using the existing stone material. Upon the completion of
work, the disturbed area was graded to preexisting conditions and mulched with hay for
temporary stabilization until permanent stabilization efforts could be reached.
The North Andover Conservation Department is in receipt of a restoration planting plan,
entitled, "Restoration Detail: 125 Flagship Drive" prepared by The Neve-Morin Group, Inc.,
which details proposed restoration activities within the Buffer Zone to the adjacent Bordering
- Vegetated Wetland (BVW) This plan has been reviewed-and-is hereby approved with the-
following conditions:
:• At least 48 hours prior to the commencement of the restoration work, the Conservation
Department shall be contacted to ensure temporary erosion controls are functioning as
intended.
:• A wetland scientist shall inspect the plantings and seed mixes upon completion, and
subsequently submit an inventory report to the Conservation Department. Additionally, the
Buffer Zone restoration shall be monitored for one (1) full growing season, and seasonal
reports (fall and spring), and shall document the survivability, health,vigor, and soil
stabilization of the restored areas. These reports shall be submitted to the
130ARD Of APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 11EAL;L'H 698-9540 PLANNING 688-9535
Conservation Department. If at the end of the first growing season, or at an time within
p g g Y
the 1-yr growing season period, it has been determined that a 75% success rate has not been
achieved, the NACC shall require additional mitigation measures, such as additional
plantings.
The restoration activities shall completed by no later than June 15, 2006.
Should you have questions or comments regarding the contents of this amended Enforcement
Order,please do not hesitate to contact the undersigned at your earliest convenience.
Respectfully,
—4amela A. Mer
Conservation Associate
Cc: Alison McKay, Conservation Administrator
Curt Bellavance,AICP, Community Development Director
Greg Hochmuth, RS,The Neve-Morin Group, Inc.
NACC He
i
i
i
i
I
i
I
I
i
Restoration Detail - Flagship Drive
(No t To Scale)
New England Con ser va tion/Wildlife Mix
Big Bluestem (Andropogon gerardi) Replication Sp e cl es List
Little Blues tem (Schizachyrium scoparius)
A. 24" — 36" Red—osier Dogwood (Cornus sericea)
Switchgross (Panicum virgatum) B. 24" — 36" Highbush Blueberry (Vaccinum corymbosum)
Deertongue (Panicum clondestinum)
Fox Sedge (Carex vulpinoidea) Proposed
Restoration
Area Exis ting Existing
Canada Wild—rye (Elymus conadensis) Fieldstone Concrete
Headwall Headwa/l
Smortweed (Polygonum pennsylvanicum) Existing
Portidge Pea (Chamaecrista fasciculate) ADS/RCP
Annual Sunflower (Helian thus annuus) Exis ting
12" RCP
Showy Tick—trefoil (Desmodium canodense)
B A.
Nodding Burmarigold (Bidens cernuo) e
Approx. 800 Sq ft A
Green—headed Coneflower (Rudbeckia laciniata) e.
/ \
Common Sneezeweed (Helenium autumnale) B. A.CB Edge f povernent
—~— o
Common Milkweed (Asclepias syriaca) II
Note: Area Shall Be Seeded With New Flagship D g,
England Conservation/Wildlife Mix II E 'stiRCP
Application Rate: 1743 Sq ft//b 2
CB
�CB
2295 — Restoration
r+r
` Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 9 Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Violation Information FILE CO
Important:
When filling out This Enforcement Order is issued by:
forms on the North Andover Conservation Janua 19, 2006
computer, use
only the tab Conservation Commission(Issuing Authority) Date
key to move To:
your cursor-
do not use the Stephen Foster, VP/ Project Mana eg r, Dutton & Garfield, Inc.
return key. Name of Violator
43 Gigante Drive, Hampstead, NH 03841
tab Address
1. Location of Violation:
e� Town of North Andover(Roadway)
Property Owner(if different)
Flagship Drive (Roadway)
Street Address
North Andover 01845
Cityrrown Zip Code
Map 107C Roadway
Assessors Map/Plat Number Parcel/Lot Number
2. Extent and Type of Activity(if more space is required, please attach a separate sheet):
This Enforcement Order is being issued to perform exploratory digging only in order to identify the
cause of the ongoing drainage problem. All work shall conform to the conditions outlined in attached
letter prepared by the North Andover Conservation Department, dated January 19, 2006. All work
and stabilization activities shall be completed within a 24 hour timeframe. This Enforcement Order will
expire within 30 days from the date of issuance. Please refer to the aforementioned letter for
additional information.
B. Findings
The Issuing Authority has determined that the activity described above is in a resource area and/or buffer
zone and is in violation of the Wetlands Protection Act(M.G.L. c. 131, §40) and its Regulations(310
CMR 10.00), because:
❑ the activity has been/is being conducted in an area subject to protection under c. 131, §40 or the
buffer zone without approval from the issuing.authority (i.e., a valid Order of Conditions or Negative
wpaform9a.doc•rev.7/14/04 Page 1 of 4
LIMassachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
❑ the activity has been/is being conducted in an area subject to protection under c. 131, §40 or the
buffer zone in violation of an issuing authority approval (i.e., valid Order of Conditions or Negative
Determination of Applicability) issued to:
Name Dated
File Number Condition number(s)
❑ The Order of Conditions expired on (date): Date
❑ The activity violates provisions of the Certificate of Compliance.
❑ The activity is outside the areas subject to protection under MGL c.131 s.40 and the buffer zone,
but has altered an area subject to MGL c.131 s.40.
® Other(specify):
Please refer to the accompanying letter prepared by the North Andover Conservation Department
for additional information.
C. Order-
The issuing authority hereby orders the following (check all that apply):
❑ The property owner, his agents, permittees, and all others shall immediately cease and desist
from any activity affecting the Buffer Zone and/or resource areas.
® Resource area alterations resulting from said activity shall be corrected and the resource areas
returned to their original condition.
❑ A restoration plan shall be filed with the issuing authority on or before Date
for the following:
The restoration shall be completed in accordance with the conditions and timetable established by the
issuing authority.
wpaform9a.doc•rev.7/14/04 Page 2 of 4
r
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 9 — Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. Order (cont.)
® Complete the attached Notice of Intent(NOI). The NO[ shall be filed with the Issuing Authority on
or before:
Date
for the following:
Upon identifying the drainage problem, the appropriate application shall be filed with the North
Andover Conservation Commission for any repair work needed.
No further work shall be performed until a public hearing has been held and an Order of Conditions
has been issued to regulate said work.
® The property owner shall take the following action (e.g., erosion/sedimentation controls) to
prevent further violations of the Act:
Prior to the commencement of any work, erosion controls shall be installed at the perimeter of work. A
wetland scientist or professional engineer shall be designated to oversee the exploritory digging and
stabilization activities. Prior to the commencement of any work, a contingency plan relative to
dewatering activities shall be submitted to this department review and approval.
Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts
General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a)
shall be punished by a fine of not more than twenty-five thousand dollars or by imprisonment for not
more than two years, or both, such fine and imprisonment; or(b) shall be subject to a civil penalty not
to exceed twenty-five thousand dollars for each violation". Each day or portion thereof of continuing
violation shall constitute a separate offense.
D. Appeals/Signatures
An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of
Environmental Protection, but may be filed in Superior Court.
Questions regarding this Enforcement Order should be directed to:
Alison McKay, onservation Administrator; Pamela Merrill, Conservation Associate _
Name
978.68_8.9530
Phone Number---- — -- --- ----- --
Monday- Friday, 8:30am -
Hours/Days Available
Issued by:
North Andover Conservation Commission
Conservation Commission
wpaform9a.doc•rev.7/14/04 Page 3 of 4
Massachusetts Department of Environmental Protection
� DEP File Number:
- Bureau of Resource Protection - Wetlands
WPA Form 9 - Enforcement Order
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Conservation Commission signatures required on following page.
D. Appeals/Signatures (cont.)
In a situation regarding immediate action, an Enforcement Order may be signed by a single member or
agent of the Commission and ratified by majority of the members at the next scheduled meeting of the
Commission.
SigDatures-
i y
Signature of delivery person or certified mail number
wpaform9a.doc•rev.7/14104 Page 4 of 4{
Town of North Andover TtORTH
p jt�ao °'9.y
Office of the Conservation Department
Community Development and Services Division # c
400 Osgood Street SSacwusE
North Andover,Massachusetts 01845
Alison McKay Telephone (978) 688-9530
Conservation Administrator Fax (978)6889542
January 19,2006
Mr.Stephen E. Foster
Dutton&Garfield,Inc.
43 Giagante Drive
Hampstead,NH 03841
VIA CERTIFIED MAIL#70020510000008940345
RE: ENFORCEMENT ORDER-Flagship Drive,North Andover,MA
Dear Mr. Foster,
The North Andover Conservation Department is in receipt of your written request dated
January 11,2006 to conduct exploratory digging within portions of Flagship Drive.The intent
of this project is to identify the potential cause of the inadequate drainage between the two(2)
existing catch basins and the headwall,as shown on the sketch that accompanied the request
letter. In August 2005,the North Andover Department of Public Works (DPW)used high-
pressure water jetting to flush the basins of accumulated deposits(silts and sediments).This
process was used in order to return the drain to a free flowing condition. Unfortunately,this
method did not resolve the drainage problem.Based on my conversations with you and Greg
Hochmuth,The Neve-Morin Group,Inc.,the poor drainage could be a result from a collapsed/
clogged pipe or culvert.
The attached Enforcement Order is being issued to you as a mechanism to perform exploratory
digging only within the Buffer Zone to-a BorderingVegetated-Wetland (BVW)in an effort to-
identify the ongoing drainage problem on Flagship Drive. No other work is allowed under
this Enforcement Order.The North Andover Conservation Commission(NACC)is hereby
imposing the following action items that are mandatory under this Enforcement Order:
❑ Prior to the commencement of any work,temporary erosion controls measures
(double-staked hay bales and entrenched silt fence) shall be installed along the
perimeter of work. Please contact this Department once the erosion controls are
installed,so an inspection can be scheduled.Erosion controls must be maintained
and remain in place until all disturbed areas have been adequately stabilized.
❑ A Professional Wetland Scientist or Professional Engineer shall be onsite
throughout the project to ensure that work conforms to the Enforcement Order,the
North Andover Wetlands Protection Bylaw and Regulations,and the MA Wetlands
Protection Regulations.A letter shall be prepared identifying who the designated
BOARD OP APPFuALS 658-954 1 BUILDING 688-9545 C)NSF'RVA HON 6813-9530 I IEALa-H 688-9540 PLANNING OXS-95 35
Y
monitor is,as well as their contact information for approval by the Conservation
Department.
❑ Due to project location and the lack of grassed upland areas,a contingency plan
relative to dewatering shall be submitted to this department for approval.The plan
shall provide for the pumped water to be contained in a settling basin,to reduce
turbidity prior to discharge into the adjacent Bordering Vegetated Wetland (BVW).
This plan shall be submitted prior to the commencement of any work.
❑ Approved de-watering activities shall be supervised and witnessed/monitored by
the designated Wetland Scientist or Engineer to ensure that sediment laden water is
appropriately settled prior to discharge toward the adjacent wetland resource area.
No discharge of water is allowed directly into an area subject to jurisdiction of the MA
Wetlands Protection Act and the North Andover Wetland Bylaw.
❑ Immediately upon completion of work,all areas shall be returned to its pre-existing
conditions and permanently stabilized to prevent any erosion runoff towards the
wetland resource area.
❑ Immediately upon completion of the above-mentioned activities,the Conservation
Department shall be contacted for a final site inspection.
❑ Immediately upon completion of work,the appropriate application shall be filed with
the NACC for any repair work needed.
It's my understanding that the exploratory digging shall take approximately one (1) day.
Therefore,all work,including stabilization activities shall be conducted within 24 hrs
timeframe,unless otherwise authorized by this department.Additionally,this Enforcement
Order will expire thirty(30) days from the date of issuance.Should you have any questions/
comments regarding the contents of this letter and/ or attached Enforcement Order,please do
not hesitate to contact the undersigned at your earliest convenience.Thanking you in advance
for your anticipated cooperation with this matter.
Sincerely,
NORTH ANDOVER CONSERVATION DEPARTMENT
Z"'
Alison McKay �,
Conservation Admini6 rator
Enc.
Cc: Curt Bellavance,AICP,Director of Community Development Division
Tim Willett,Superintendent of Water and Sewer
Bill Hmurciak,Director of Public Works
Greg Hochmuth,The Neve-Morin Group,Inc.
Department of Environmental Protection,Wetlands Division,NERO
File
^ Q. r� 7e-
CLkl
J`l 1 GC�� i art ANA
,,,,�„�,
e,.
4-o b e- r►��
�
G
,,,
m ��,r V. ori
1
The
Neve -Morin RECEIVED
Group, Inc.
FEB 2 2 2006 P`''J �
NORTH ANDOVER
February 21, 2006 CONSERVATION COMMISSION
Ms. Pam Merrill
Conservation Commission
400 Osgood Street
North Andover, MA 01845
Re: Summary of Exploration
Enforcement Order—Flagship Drive
Dear Pam:
As you are aware, our office has been working with Mr. Steve Foster of Dutton & Garfield, Inc.
to try to discover the cause of a drainage problem at Flagship Drive. In August of 2005 the
North Andover Department of Public Works used high pressure water jetting to try to flush out
the existing drainage system that was not flowing during storm events. During the water jetting
procedure the water began to bubble out of the ground approximately 5 feet from the existing
headwall where it was designed to flow to. It was evident that the system was not functioning as
designed.
We received an Enforcement Order dated January 19, 2006 that allowed exploratory digging in
order to identify the cause of the ongoing drainage problem. The Order required erosion controls
be installed, a wetland scientist or professional engineer oversee the work, a dewatering detail be
submitted for review and approval, a pre-construction meeting and that the site be stabilized
upon completion.
i
On Thursday, February 16, 2006, the erosion controls were installed and the pre-construction
meeting took place. Prior to the pre-construction meeting we submitted the required dewatering
detail as well as a list of emergency contact information for the wetland scientist and contractor
performing the work. Following the pre-construction meeting we began digging in the area of °
the suspected blockage. It did not take long to uncover the crushed reinforced concrete pipe
(RCP) and filled fieldstone headwall. We were able to obtain a small section of 12 inch ADS
pipe, a rubber coupling and a plastic flared end section to repair to problem. Once the small
section of pipe was added to the RCP we strapped on the flared end section and re-built the
fieldstone headwall using the same stones. Erosion controls were placed in the wetland resource
area to protect the resource area from the sediment that has been lodged in the pipe since it
became damaged.
ENGINEERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LAND USE PLANNERS
447 Old Boston Road (U.S. Route 1), Topsfield, MA 01983 978-887-8586 FAX 978-887-3480
Providing Professional Services Since 1978
www.nevemorin.com
Ms. Pam Merrill Page 2
February 21, 2006
The following day we received a rain event and the drainage system worked as designed. Some
sediment came out of the culvert but was held up in the haybale check dam that was installed.
We will continue to monitor the area during storm events until the area is stable.
You will find attached a set of photographs that show the work that was done and a restoration
plan for the area that was excavated.
If you should have any question regarding this information please do not hesitate to contact our
office.
Sincerely,
THE NEVE-MORIN GROUP, INC.
/'
'1_4
---el�
Greg Hochmuth, RS
Professional Wetland Scientist
GH/km
cc: Mr. Stephen E. Foster
F:\KATHYM\MSWORD\GENERAL\2293—NACC.doc
�l
i f,fr �(.�f Y ����'ti�L,� L +I ' ,�- ��}V'���`� fyl •'� -
Y �1�• \(✓yam r �"��7".i+ Ff` � t:�; \ •c� .�
i t; 'y,�ds'`�u' d �t�A ,i _ x �y �I .+, b (`r� Y�� '�'♦� +i,,( "nit J � r ;l
2 {zC(.-. 1 � lf�•, .. � I"yf�//,,, _.�,,'7e> y`� 1 r ..,y`. t,<d Ii 'I ` •�.
�l(1 7
�,d ! Ilk \ - t `t✓� 'r
u A7
o
-4';/Y�
r
f',Pf\�p
i
February 14,2006
Pamela Merrill
400 Osgood Street
North Andover,MA 01845
Re: Enforcement Order—Flagship Drive,North Andover, MA
Dear Pam:
As required by the Enforcement Order,please find the contact information of the designated
Environmental Monitor and the Contractor who will be performing the work.
Environmental Monitor:
Greg Hochmuth
THE NEVE-MORIN GROUP, INC.
447 Boston Street
Topsfield, MA 01983
Office:978-887-8586
Cell: 978-590-6416
Contractor:
Steve Foster
DUTTON AND GARFIELD,INC.
43 Gigante Drive
Hampstead,NH 03841
Office:603-329-5300
Cell: 603-401-7607
If you,should have any questions regarding this information please do not hesitate to contact our
office.
FROM NEVE-MORIN GROUP (TUE)JAN 17 2006 15:38/ST. 15:37/No. 6802445139 P 2
bow* Ne i
VL
a
AOA^ of 6
. sus DqE'�. �►.��nl
to
4 of
� � f
I
Ru Reel!y rrus.
��r pvr►4r (J./ ZM Rupp. Tr
PIan
-F`lagsbxp Drive
Scalal"--40*"=40'
i
k4kr
°
! °
s
3
J
J
North Andover Conservation Department
• 400 Osgood Street
t North Andover,Ma 01845
Tel: 978.688.9530
Fax: 978.688.9542
`. facs�e t�a��smittal� s
To: � Fax:
From: Pamela Merrill Date:
Re: �2 Cr4A Q Pages: tVIC V��S C
CC:
❑ Urgent ❑ For Review ❑ Please ❑ Please ❑ Pleas
Comment Reply Recycl
tA40M �tu 6��Ackt
5 CA
cc
f
F
. . . . . . . . . . . . . . . . . . . . . . . . . .
HP Fax K 1220xi Log for
NORTH ANDOVER
9786889542
Y
Jan 19 2006 11:35am
Last Transaction
Dig Time 1�= Identification Duration PA= Result
Jan 19 11:3 lam Fax Sent 816033295368 2:43 7 OK
leen WHO, Inc.
CONTRACTORS
January 11, 2006 RECEIVED
JAN 1,:2 2006
Town of North Andover
Conservation Department NORTH ANDOVER
400 Osgood Street CONSERVATION COMMISSION
North Andover, MA 01845
Attn: Pam Merrill
Re: Drainage Exploration Methodology, Flagship Drive
Dear Pam:
Dutton & Garfield, inc. is proposing exploration of the existing drainage system at the location depicted on
the attached sketch plan. Exploration is required in order to investigate the cause of the poor drainage at
the(former) cul-de-sac/Chemineer driveway intersection. It appears that the existing drainage system
may be clogged with silt based on discussions with NADPW personnel and field observations. In order to
better understand what the problem may be, a more detailed exploration is necessary.
Drainage Exploration Methodology:
• Install erosion controls to protect resource areas during exploration.
• Excavate, using a rubber tired backhoe, upslope of the existing headwall to see if the culvert is
clogged.
• Dewatering.as.needed to hay.bale.enclosure.
• Stabilize all disturbed areas per NACC agent.
Following the,exploration a detailed report shall be prepared and sent to the conservation commission
detailing the cause of the drainage problem. It is our hope that the problem will be minor enough that it
could be handled under an Enforcement Order.
Our goal is to find out what is causing the current drainage problem. We know that the problem lies
somewhere between the catch basins and the headwall. An Enforcement Order would provide us with a
mechanism that would allow the exploration to commence.
If you should have any question regarding this information please do not hesitate to contact our office.
Sincerely,
Stephen E., Foster,
Vice President/Project Manager
Cc: Greg Hochmuth, Neve-Morin,Group:
Lisa Littlefield, Bayfield Development Co.
Steven R. Webster, D&G
BUTLER
43 Gigante Drive• Hampstead,NH 03841 BUILDER North Andover, Massachusetts 01845
Tel:(603) 329-5300 Fax:(603) 329-5368 www.duttongarfield.com Tel:(978) 681-8600 Fax:(978)681-7570
FROM NEVE—MORIN GROUP (WED)JAN 11 2006 8;16/ST. 8;15/No. 6802445125 P 3
• Al
FOR Associates Limite
(CIO Channe; Buildin6
coo --�
Go
/ N �
Ca+cret� � d� i
ltModlwd op
*� Drainage
+' E'asern en t
5
Rupp Real.
(WkE.dlEC
PIan
Flagship Dr i
Sca/e:1"--4p'
;A1/11/2006 13:57 6033295368 DUTTON & GARFIELD PAGE 01/03
Dutton a Garrield, Inc.
CONTRACTORS E�1l�®
JAN 1 1 2006
NORTH ANDOVER
CONSERVATION COMMISSION
FACSIMILE TRANSMITTAL SHEET
TO: FROM:
Pam Merrill Steve Foster
COMPANY; DATE:
Town of North Andover January 11,2006
FAX NUMBER: TOTAL NO.OF PAGES INCLUDING COVER:
978-688-9542 4
PHONE NUMBER: PROJECT:
97888-9530 NRPB—Flagship Drive
RE; CC:
Drainage Maintenance Neve-Morin, Bayfield Development
O URGENT ®FOR REVIEW ❑PLEASE COMMENT ❑PLEASE REPLY ❑FOR YOUR USE
NOTES/COMMENTS:
Original to follow via U.S. Mail
The information contained in this facsimile is intended only for the personal and confidential use of the
designated recipient named above.If you have received this communication in error,please notify us
immediately by telephone,
B[/YLER
43 Gigante Drive,Hompstead,:NH D3841 www.duttongaftid.com Tel:603.329-SM Fax:603-329.536$
x.01/11/2006 13:57 6033295368 DUTTON & GARFIELD PAGE 02/03
Batton a Barfield, Inc.
CONTRACTORS
January 11,2006
Town of North Andover
Conservation Department
400 Osgood Street
North Andover,MA 01845
Attn: Pam Merrill
Re: Drainage Exploration Methadology,Flagship Drive
Dear Pam:
Dutton&Garfield, inc, is proposing exploration of the existing drainage system at the location depicted on
the attached sketch plan. Exploration is required in order to investigate the cause of the poor drainage at
the(former)cul-de-sac/Chemineer driveway intersection, It appears that the existing drainage system
may be clogged with silt based on discussions with NADPW personnel and field observations. In order to
better understand what the problem may be,a more detailed exploration is necessary.
Drainage Exploration Methodology:
• Install erosion controls to protect resource areas during exploration.
• Excavate,using a rubber tired backhoe, upslope of the existing headwall to see if the culvert is
clogged.
• Dewatering as needed to hay bale enclosure.
• Stabilize all disturbed areas per NACC agent.
Following the exploration a detailed report shall be prepared and sent to the conservation commission
detailing the cause of the drainage problem. It is our hope that the problem will be minor enough that it
could be handled under an Enforcement Order.
Our goal is to find out what is causing the current drainage problem. We know that the problem lies
somewhere between the catch basins and the headwall. An Enforcement Order would provide us with a
mechanism that would allow the exploration to commence.
If you should have any question regarding this information please do not hesitate to contact our office.
Sincerely,
Stephen E. Foster,
Vice President/Project Manager
Cc: Greg Hochmuth, Neve-Morin Group
Lisa Littlefield, Bayfield Development Co.
Steven R.Webster, D&G
BUTLER
43 Gigante Drive•Hampstead.NH 03841 BUILDER North Andover,Massachusetts 01845
Tel:(603)329-5300 Fax:(603)329-5368 www.duttongarficid.com Tel:(978)681.8600 F":(978)681-7570
:-&01/11/2006 13:57 6033295368 DUTTON & GARFIELD PAGE 03/03
FROM NEVE—MORIN GROUP (WED)JAN.19 2008 8:16/ST. 8:15/No. 8802445125 P ,3
A.
WOR Associates Uinite
(C/O Chance; Buildlaj
sas
Iwo
46
O
�s
Iwadwal .± wS
Drainage
a esleme4at
RunReal.
(JJ xv h
Lv
A;
P n
Flagship Drj
FROM NEVE—MORIN GROUP (TUE)JAN 17 2006 15:08/ST. 15:01/No. 6802445138 P 2
Ir-
s�
1,.,"'_,
•
• i
Carwt� • �
�aea�a �• `a ✓
Drainage
~` Basemen:
Aw
# vJ�"f4aNb �P
Rupp Realty Trus,
ftoe- rvr4t (off RM Ruppl, Tr
F a n
F1agshlp Drive
Scale:1"--40'
CA �Jrw
ps
16.
t i i 0 � v. �.. ♦ • / j r
y- Ile-
�hC
l �
' � I
FROM NEVE-MORIN GROUP (TUE)JAN 0 2006 15:08/ST, 15:01/No, 6802445138 P 1
i
"7 Boston Beet.TopsW,MA 01983Th - s •
• ! • •
ftx
To Pem mWw Pry Greg Hodhnuth
Frog 978.688.9542 Pie 3
ehmese 978.887.8,88 n 1/17/06
Rm Flagship DrNo Drainap Pmblom CQ
O U Som X Fm RwAm D Phe Commod O Pk1 ftWw ❑Pkado
Lot mo Know N you roqulro any addMmal IMbrmndm. Thanks Gvqlt,.
FROM NEVE—MORIN GROUP (MON)JAN 9 2006 13:47/8T. 13:43/No. 6802€445121 P 1
bl W
Neve -Morin
Group. 'Inc.
Fax Cover Sheet
To: Page a of ':
fag
Fax #: cP7a -tS81- G54_
From:
.Date:
��`' ►gyp
Re:
C�
M.esSage:
4- �
Noe: If you did not receive the correct.number of pages,please call.
°:�sC'c�crs6�c
ENGINEERS , SURVEYORS • ENVIRONMENTAL CONSULTANTS LAND USE PLANNERS
447 Old Boston Road (U.S. Route 1),Topsfielcl, MA 01983 978.887-8S86 FAX 978.887-3480
Providinc/Professional Sorvicos Sinco 1978
FROM NEVE-MORIN GROUP (MON)JAN 9 2006 13:47/ST. 13:43/No. 6802445121 P 2
n�
Project Memo
North Andover Business Park
Willow Street
North Andover,MA
To: nt—Town of North Andover,MA
From: Stephen E. Foster G41 t
Date: 1
Re: drainage maintenance Flagship Drive
Dutton&Garfield, Inc. is proposing drainage maintenance work at the location depicted
on the attached sk drawing. maintenance work is required in order to alleviate poor
drainage at the(former)"cul-d*-s /Cheminesr driveway Intersection.
It appears that the drainage outfall shown on the attached sk drawing is cogged with slit
based on discussions with NADPW psmonnel and field observations.
This location is the same as referenced during field discussions with Wm. Hmurclak of
NAPW and Steve Webser of Dutton&Garfield, Inc, on 9/26/05.
Proposed activities are anticipated as follows;
o Brush removal to allow for installation of silt fence as well as excavation
o Install silt fence per NACC
o Exploratory excavation at formerly known location of outfall(sama location as
previous water jetting activity)
o Uncover drainage outfall and provide necessary excavation as needed(per
NADPW)for proper storm drainage flow
o Dewatering as needed to hay bale enclosure
o Off site removalldisposal of excavation materials,brush.etc.
o Reshape outfall swale(per NADPW)&rip-rap as required hp
o `Stabilized disturbed areas(mulch, seed,ate.)per NACC
Kindly review and advise at your earliest convenience
Thank you
Stephen E. Foster,V.P.—Project Manager
fWCAPrq$*1Form VAem1031n
CC'31 v
FROM NEVE-MORIN GROUP (MON)JAN 9 2006 13:48/ST, 13:43/No, 6802445121 P 3
10
Al
WOR Associates Limits
(C/O Channe; 9uildinA
ses
GOO
ac
—7 T14
h
_ f
Cara0�1�1 4 I
O Sw
Drainage
r
A eo. ,,, Easement
Rupp Rea!
.�
1
We4Canwl,
QOKK. tr.- SCD 'it 41 -' %(00tdkx
Platz
'Flagship Dn
Sco%1"=40'
a t 7 Cod 7
Dutton a WHO, Inc®
CONTRACTORS
Stephen E. Foster
Vice President
43 Gigante Drive•Hampstead,NH 03841
Tel.:(603)329-5300 Fax:(603)329-5368
E-Mail:sfoster@duttongarfield.com BUTLER
www.duttongarfield.com BUILDER
_ Zi/10/2005 15:41 6033295368 DUTTON & GARFIELD PAGE 01
FANDutton. al GarfieldB Inc®
CONTRACTORS
FACSIMILE TRANSMITTAL SHEET
TO: FROM:
Allison McKay Steve Foster
COMPANY: DATE:
Town of North Andover November 10,2005
FAX NUMBER: TOTAL NO.OF PAGES INCLUDING COVER;
978-688-9542 4
PHONE NUMBER: PROJECT:
978-688-9530 Willow Street Road Work
RE: CC;
Drainage Maintenance
❑URGENT ®FOR REVIEW O PLEASE COMMENT ❑PLEASE REPLY ❑FOR YOUR USE
NOTES/COMMENTS:
RECEIVED
NOV 1-0 2005 6)
NORTH ANDOVER
CONSERVATION COMMISSION
The information contained in this facsimile is intended only for the personal and confidential use of the
designated recipient named above.If you have received this communication in error,please notify us
immediately by telephone.
EFUTLER
e
43 Gigonte DrIve.Hampsteod,`NH 03841 www.durongaffleld.com Tel:603-329-5300 Fax:603,329-5368
,11/10/2005 15:41 6033295368 DUTTON & GARFIELD PAGE 02
Project Memo
North Andover Business Park
Willow Street
North Andover, MA
To: Conservation Agent—Town of North Andover, MA
From: Stephen E. Foster
Date: 10/31/05
Re: drainage maintenance Flagship Drive
Dutton &Garfield, inc. is proposing drainage maintenance work at the location depicted
on the attached sk drawing. maintenance work is required in order to alleviate poor
drainage at the(former)"cul-de-sac"/Chemineer driveway intersection.
It appears that the drainage outfall shown on the attached sk drawing is clogged with silt
based on discussions with NADPW personnel and field observations.
This location is the same as referenced during field discussions with Wm. Hmurciak of
NAPW and Steve Webser of Dutton&Garfield, Inc. on 9/26/05.
Proposed activities are anticipated as follows;
o Brush removal to allow for installation of silt fence as well as excavation
o Install silt fence per NACC
o Exploratory excavation at formerly known location of outfall (same location as
previous water jetting activity)
o Uncover drainage outfall and provide necessary excavation as needed (per
NADPW)for proper storm drainage flow
o Dewatering as needed to hay bale enclosure
o Off site removal/disposal of excavation materials, brush,etc.
o Re-shape outfall swale (per NADPW)& rip-rap as required
o Stabilized disturbed areas mulch, seed etc. per( p NACC
Kindly review and advise at your earliest convenience
Than/Foster
Steph .P. —Project Manager
fite:QkProjectMFormsWlem 1031 a
ce:srw
mrnabp
WOR Associates Limited Partnership
C/O Channe; Building Company)
coN
m
CD
lJl
v6sv C G r
ZS °'
CD
w
C&
Ics w
N
OctDw (31
f 1, -f— TT�iIy - LD
w
OD
10
M
1
Ca►vsrs �' 41F4410*
Jq
`%14 s o
�`= Drainage z
Q'
Eesern en t �
Crecy cf� PIPC v
� _ M
M
r
p Rupp Realty Trust
''tier (. f & EV Rupp, Trustees)
D
m
w
McKay, Alison
From: Steve Foster[sfoster@duttongartield.com]
Sent: Thursday, November 10, 2005 2:30 PM
To: McKay,Alison
Subject: drainage mtce work flagship drive
MEM01031a.doc
Stephen E. Foster
Dutton & Garfield, Inc.
43 Gigante Drive
Hampstead, NH 03841
Tel: 603-329-5300
Fax: 603-329-5368
allison:
please see attached memo forwarded to your office on 10/31l05P>
I will send referenced sk drawing via fax
please call when received so that we can discuss
1 II
Project Memo
North Andover Business Park
Willow Street
North Andover, MA
To: Conservation Agent—Town of North Andover, MA
From: Stephen E. Foster
Date: 10/31/05
Re: Drainage Maintenance Flagship Drive
t
Dutton & Garfield, inc. is proposing drainage maintenance work at the location depicted on the
attached sk drawing. Maintenance work is required in order to alleviate poor drainage at the
(former) "cul-de-sac"/Chemineer driveway intersection.
It appears that the drainage outfall shown on the attached sk drawing is clogged with silt based
on discussions with NADPW personnel and field observations.
This location is the same as referenced during field discussions with Wm. Hmurciak of NAPW
and Steve Webster of Dutton &Garfield, Inc. on 9/26/05.
Proposed activities are anticipated as follows;
f
o Brush removal to allow for installation of silt fence as well as excavation
o Install silt fence per NACC
o Exploratory excavation at formerly known location of outfall (same location as previous
water jetting activity)
o Uncover drainage outfall and provide necessary excavation as needed(per NADPW)for
proper storm drainage flow
o Dewatering as needed to hay bale enclosure
o Off site removal/disposal of excavation materials, brush,etc.
o Re-shape outfall swale (per NADPW) & rip-rap as required
o Stabilized disturbed areas (mulch, seed, etc.) per NACC
Kindly review and advise at your earliest convenience
Thank you
Stephen E. Foster, V.P. —Project Manager