HomeMy WebLinkAboutMiscellaneous - 125 PEACH TREE LANE 4/30/2018 (22) 70 Soutli Broadway 45 Route 12,
Lawrence,MAO 1843 Kingston,NH 0380
Tel:978-688-8307 ii I Tel:603-642-9W
Fax:978-688-1949 Fax:603-642-990(
providing ofivIl line of services and supplies
fully licensed and insured
ww"Janlilypoollsonfinexom
+s 'f- C4_ r_e 117 3Argc 2o t?
Name Date
Address
City I dip 0 if
Home Phone Wor-l<Phone
TOW Oa_ _
Cross Street/Directions 0 C,644-vitX
Estimated Start Date Estimated Completion Date
We propose to furnish and install oneGinl 'unite �_a4 12� T"�' swimming pool for the
sum of$ X 13 00
THIS PRICE INCLUDES:
Normal Excavation up to 8 hours on day of dig Manual vacuum cleaner kit Waterline Tile(6')
Backfill and Sub-Grade up to 3 hairs 3-Step stainless ladder Liner Choice
It Rope and goats lest Kit
Steel Reinforcing per Engineered Plans for gunite Initial balancing chemicals Surface skimmer(s)
SteelStructure per Engineered Plans for vinyl 8 to 12 Wk supply of maintenance chemicals Dual Main Drai%
Over-Flo Line for added protection (supply depends on pool size) Coping
Pressure testing of plumbing during construction
-Leaf net
Ten Year Plumbing Guarantee(see specifications) Wall brush ndrails
Transferable Lifetime Structural Warranty. Extension pole Filter tha 25ft fro pool{{{
(plumbed no more ha
-Pump motor— 1 )'25ftyfJ. ,.(,It
THIS PRICE DOES NOT INCLUDE: VJ*A—r-
-Any plumbing over 25f[from pool.Additional runs are not recommended but would bealacost of$ per foot per line.
Machine time in excess of that specified above.Additional machine time to be billed at$ ✓ including machine,operator,and laborer,due with second pool payment.
All hours of trucking will be charged at$ per hour per truck due with second pool payment.
Any dumping costs incurred for disposal of]edge,large rocks,garbage,stumps buried or otherwise,building materials,unsuitable or nonstructural soils,or any unforeseen material that must
be removed,
Removal of ledge or large rocks by way of a Start bit,chipper,or blasting.
Additional fill,if necessary,for proper backfill or reshaping of hole,supply or spreading of loam,reseeding of grass.
Patio,fence,retaining wall,or any accessory items other than noted on contract.
Electrical wiring,fuel connections,heater venting,fuel storage tanks or permits.
Repair or replacement of sprinkler systems or any buried Items such as well lines,drywells,leach fields,electrical lines,cables,etc.that are damaged during construction
Costs due to water or soil conditions(ex.clay,peat,live sand,excessive rock,etc.)requiring a stone pack of the hole.The stone pack will be at an extra charge of$ minimum to
$ maximum and at the discretion of the job supervisor.Additional machine time and/or materials necessary to rectify such a condition will be at a cost over and.above the stone
pack and will be quoted by the job supervisor.
Water to fill pool. Initiah
CUSTOMERS MUST SUPPLY:
Access for all trucks and equipment -Building and Electrical Permits or assume the costs necessary to obtain such permits.
Water and electric necessary for construction of pool Customer mustwater cure Gunito shell for 7 to 10 days if applicable.
Water to fill pool immediately upon interior finish
NOTES: \(I
OPTIONS: TOTALS:
Diving Board
Solar Cover Basic Pool Price $
Additional Pool Lighting
Options
Heater
Environpool Plus,8 hd,2.surface
SUBTOTAL
Additional Floor Heads
Polaris Vac-Sweep5%Sales Tax
Polaris retrofit only TOTAL $ _3D 1
Swimout/Bench
Interior Finish !�s
Less 10%Deposit
Spa Balance of Contract
Automated Control System $
Salt Chlorine Generator
Other
PAYMENTS:1/3 EXCAVATION 1/3 BACKFILL+EXTRAS 1/3 SYSTEM START-UP
The buyer hereby agrees to pay,in full,the total amount of this transaction upon start-up of the installed pool.Your salesman or job supervisor will meet with
you prior to excavation at which time all decisions including pool size,shape,elevation,liner print,and all options must be final.Changes after this date will be
subject to extra charges,where applicable,and will result in unavoidable delays.You,the Buyer,may cancel this transaction at any time prior to midnight of the
third business day after the date of this transaction.Credit card payments not accepted on contract amount.
on BUYER_R dlt'02 7
SELLE
, rc
CO-BUYER date