Notice of Decision
ti
Any appeal shall be filed o o
e I
Within (20) days after theW 66
o 70
Date of filing this Notice _ M
�cry
In the Office of the Town
Clerk C);0 U)rnn
rnxx
Date: December 7, 2000 '
Date of Hearing: November 14,200&
December 5, 2000
Petition of: Daniel and Joanne Forgetta, 1292 Osgood Street North Andover, MA
Premises affected: '\ 1292-Osgood Street
Referring to the above petition for a special permit from the requirements of the North
Andover Zoning Bylaw Sections 8.3, 10.3 and 10.31.
So as to allow: the construction of a 3,480 square foot florist shop with an approximate
576 square foot detached greenhouse.
After a public bearing given on the above date, the Planning Board voted to APPROVE the
Special Permit for Site Plan Review, based upon the following conditions:
Signed J01 --4r1Gr/1t
Alison Lescarbeau, Chairman
CC: Applicant John Simons, Vice Chairman
Engineer- Alberto Angles, Clerk
Abutters Richard Nardella
DPW Richard Rowen
Building Department William.Cunningham
Conservation Department
Health Department
ZBA
BOARD OF APPEALS 688-9541 BUILDINGS 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNI:NTG 688-9535
Site Plan Review - Special Permit
1292 Osgood Street—Forgetta Florist Shop
The Planning Board herein approves the Special Permit/Site Plan Review for the
construction of a 3,480 square foot florist shop with an approximate 576 square foot
detached greenhouse located.in the B-1 Zoning.District. This Special Permit was
requested by Daniel and Joanne Forgetta, 1292.Osgood Street, North Andover, MA
01845. This application was filed with the Planning Board on October 13, 2000. The
applicant submitted a complete application which was noticed and reviewed in
accordance with Sections 8.3, 10.3, and 10.31 of the Town of North Andover Zoning
Bylaw and MGL c 40A,..sec_.9
The Planning Board makes the following findings as required by the North Andover
Zoning Bylaws Section.8.3 and 10-3:
FINDINGS OF FACT:.
1. The specific site is an appropriate location for the. project as it is located in the
Business 1 Zone and.involves the construction of a permitted use within the B-1 zone.
The North Andover Zoning By-Law Section 4.126, Paragraph . 1 allows retail
establishment and Paragraph 9 allows residential use including one and two family
dwellings.
2. The use as developed will not adversely affect the neighborhood as a sufficient buffer
has been provided. Extensive landscaping has been provided around the perimeter
of the property-
3. There will be no nuisance or serious hazard to vehicles or pedestrians. The
applicant had demonstrated that the curb radii for the entrance/egress driveways is
adequate. The applicant has also indicated that there is over 275' of site distance in
either direction of the site..
4. The landscaping approved as a part of this plan meets the requirements of Section 8.4
as amended by the Planning-Board,ofthe.North Andover Zoning Bylaw;
5. The site drainage system is designed in accprdance with the Town Bylaw
requirements and has been reviewed and approved by the Outside Consulting
Engineer,VHB;
6. The applicant has met the requirements of the Town for Site Plan Review as stated in
Section 8.3 of the Zoning Bylaw except for the waiver granted in Condition#17_
7. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use..
Finally the Planning Board finds that this project generally complies with the Town of
North Andover Zoning Bylaw requirements as listed in Section 8.35 but requires
1
conditions in order to-be fully in compliance. The Planning Board hereby grants an
approval to the applicant provided the following conditions are met:
SPECIAL CONDITIONS:.
1. Prior to the endorsement of the plans by the..Planning Board, the applicant
must comply with the following conditions:
a) The final-plans must be reviewed and.approved by the DPW,..VHB and the
Town Planner and subsequently endorsed by the Planning Board.
Revised plans must-be submitted including a detailed signage plan in
conformance with the Town of North Andover Zoning Bylaw. The
final plaps must be submitted for review within ninety days of filing the
decision with.the Town Clerk..
b) A bond in the amount of seven thousand ($7,000) dollars must be
posted for the purpose of insuring that a final as-built plan showing the
location of all' on-site utilities,. structures, curb cuts, parking. spaces,
topography, and drainage facilities is submitted. The bond is also in place
to insure that the site is constructed in accordance with the approved plan.
The form ofsecurity must be acceptable-to the Planning Board
2. Prior to the start of construction:
a) During construction,the.site must be kept clean and..swept regularly.
b) A construction schedule shall be submitted to the Planning Staff for the
purpose of tracking the .construction .and informing the public of
Enticipated activities on the site.
3. Prior to FORM U verification (Building.Permit.Issuance):
a) The Planning Board must endorse the final site plan mylars and three (3)
copies of the signed.plans.must.be delivered.to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the
Planning.Department..
c) The applicant shall adhere to the following requirements of the North
Andover Fire Department and the North Andover Building Department:
1) All structures,must contain a commercial fire sprinkler system. The
plans and hydraulic calculations for.each commercial system shall be
submitted for review and approval by the North Andover Fire
Department. Plans and hydraulic calculations for each commercial
system must also be supplied to the Building Department.
2
a�
d) The applicant must havereceived an approved subsurface disposal
system from the North Andover Board of Health. Failure to receive
an approved subsurface disposal system will result in a building
permit not being issuerl_by the Planning Department.
e) The applicant must supply a copy of the approved Massachusetts Highway
Department permits necessary for access and construction of the site to the
Planning Department.
4. Prior to verification of the Certificate of Occupancy:
a) The applicant must submit .a letter from the architect and engineer of the
project stating that the building, signs, landscaping, lighting and site layout
substantially comply with the plans referenced at the end of this decision as
endorsed by the Planning Board_
b) The Planning Staff shall .approve..all artificial lighting used to illuminate
the site. All lighting shall have underground wiring and shall be so
arranged that all direct.rays from.such lighting.falls entirely.within the site
and shall be shielded or recessed so as not to shine upon abutting
properties or streets. The.Planning .Staff shafl...review. the site. Any
changes to the approved lighting plan as.may be..reasonably.required by
the Planning Staff shall be made at the owner's expense. All site lighting
shall provide security for the site and structures however it must not create
any glare or project anylight onto adjacent residential.properties.
c) .The commercial fire sprinkler systems must be installed in accordance
with referenced standard NFPA 13D and in accordance with 780 CMR,
Chapter 9 of the Massachusetts.State Building Code. Certification that the
systems have been installed properly in accordance with the above
referenced regulations must.be.provided from both the.North Andover Fire.
Department and the North Andover Building Department to the applicant.
The applicant must then provide this certification to the North Andover
Planning Department.
5. Prior to the final.release.of security:
a) The Planning Staff shall review the site. Any screening as may be
reasonably required by the Planning Staff will be added at the applicant's
expense. Specifically after the detention pond is completed, the Town
Planner will review the site and any screening as may be reasonably
required by the Town Planner will be added at the applicant's expense.
3
b) A final as-built plan showing final topography, the location of all on- site
utilities, structures, curb cuts, parking spaces and drainage facilities must
be submitted to and reviewed by the Planning Staff and the Division of
Public Works.
6. Any stockpiling of materials (dirt, wood, construction material, etc.) must be
shown on a plan and reviewed and approved by the Planning Staff Any approved
piles must remain covered at all times to minimize any dust problems that may
occur with adjacent properties. Any stock piles to remain for longer than one
week must be fenced off and covered.
7. In an effort to reduce noise levels, the applicant shall keep in optimum working
order, through regular maintenance, any and all equipment that shall emanate
sounds fxom.the structures or site.
8. The hours for construction shall be limited to between 7:00 a.m. and 7:00 p.m.
Monday through Fridayand.between 8:00 am..and 500 p.m. on Saturday.
9. Any plants, trees or shrubs that have been incorporated into the Landscape Plan
approved in this decision that die within one year from the date of planting shall
be replaced-by the owner.
10. The contractor shall contact Dig Safe at least 72 hours prior to commencing any
excavation.
11. Gas, Telephone, Cable and Electric utilities shall be installed underground as
specified-by the respective utility companies..
12. No open burning shall be done except as is permitted during burning season under
the Fire Department regulations.
13. No und@rground fuel storage shall be installed except as may be allowed by Town
Regulations.
14. The provisions of this conditional approval shall apply to and be binding upon the
applicant, its employees and all.successors and assigns in interest or control.
15. Any action by a Town Board, Commission, or Department, which requires
changes in the plan or design of the building, as presented to the Planning Board,
may be subject-to modification by the-Planning Board.
16. Any revisions shall be submitted to the Town Planner for review. If these
revisions are deemed substantial, the applicant must submit revised plans to the
Planning Board for approval.
4
17. A waiver to Section 8.3.5.e.xix of the North Andover Zoning Bylaw requiring a
Traffic Impact Study is GRANTED due to the fact that the new florist shop is
proposed to be relocated from the existing facility it will replace. No increase in
traffic demand from the existing shop, or a change in the number of employees
from the existing shop is.expected.
18. This Special Permit approval shall be deemed to have lapsed after
(two years from the date permit granted) unless substantial
use or construction has commenced.. Substantial use or construction will be
determined by a majority vote of the Planning Board.
19. The following information shall be deemed part of the decision:
i
Plan Titled: Site Plan Florist Shop located in North Andover,MA
Prepared For: Daniel and Joanne Forgetta
1292 Osgood Street,North Andover,MA 01845
Prepared By: Merrimack Engineering Services
66 Park.Street.
Andover MA 018.10
Scale: J"=20'
Date: October 6, 2000 revised November 9,2000
Sheets: 1 through.5
Plan Titled: Proposed Landscape and Lighting Plan,Preliminary.Building
Floorplan&Elevations
Prepared For.: Forgetta.Flowers,.North Andover,MA.
Prepared By: Huntress Associates,Inc., Landscape Architecture and Land
Planning
17 Tewksbury Street,Andover,MA 01810
Scale: 1"=20'
Date: October 20, 2000
Sheets 1 through 2
Report Titled: Drainage Report
Dated: 10/6/00, revised 11/9/00
Prepared By: Merrimack Engineering Services
66 Park Street
Andover MA 01810
cc: Applicant
Engineer
File
5
r NORTH
Town of North Andover
William J. Scott
Division Director Office of the Planning Department }� °a'' ''�0
•�
Community Development and Services Division }
27 Charles Street °' `°`�`
�.q�O��no
North Andover Massachusetts Ss"CHUS�
Heidi Griffin Telephone(978)688-9535
Planning Director Fax(978)688-9542
Notice of Decision
ti
Any appeal shall be filed o z o
Within (20) days after the rn �o n
Date of filing this Notice �' =X W m
In the Office of the Town X r-y
Clerk §oM�o
Mss
Date: December 7,2000
Date of Hearing: November 14,200&
December 5,2000
Petition of: Daniel and Joanne Forgetta, 1292 Osgood Street North Andover, MA
Premises affected: 1292 Osgood Street
Referring to the above petition for a special permit from the requirements of the North
Andover Zoning.Bylaw Sections 8.3, 10.3 and 10.31.
So as to allow: the construction of a 3,480 square foot florist shop with an approXimate
576 square foot detached greenhouse.
After a public bearing given on the above date,the Planning Board voted to APPROVE the
Special Permit for Site Plan Review, based upon the following conditions:
Signed Ci1/G12y tel/1l �eir��� "=�
Alison Lescarbeau, Chairman
CC: Applicant. John Simons, Vice Chairman
Engineer. Alberto Angles, Clerk
Abutters Richard Nardella
DPW Richard Rowen
Building Department William.Cunningham
Conservation Department
Health Department
ZBA
BOARD O£APPEALS 688-9541 BIJILDINGS 688-9545 CONSERNIA 1ION 688-9530 HEALTH 688-9540 PLANWNTG 688-9535
i
• Site Plan Review - Special Permit
1292 Osgood Street.-Forgetta.Florist Shop
i
The Planning Board herein approves the Special Permit/Site Plan Review for the
construction of a 3,480 square foot florist shop with an approximate 576 square foot
detached greenhouse located.in the B-1 Zoning.District. This Special Permit was
requested by Daniel and Joanne Forgetta, 1292 Osgood Street, North Andover, MA
01845. This application was filed with the.Planning Board on October 13, 2000. The
applicant submitted a complete application which was noticed and reviewed in
accordance wit Sections 8.3, 10.3, and 10.31 of the Town of North Andover Zoning
Bylaw and MGL c 40A,see-9
The Planning Board makes the following findings as required by the North Andover
Zoning Bylaws Section 8.3 and 10.3:
I
I
FINDINGS OF FACT:.
1. The specific site is an appropriate location for the. project as it is located in the
Business 1 Zone and.involves.the construction of a permitted use within the B-1 zone.
The North /Andover Zoning By-Law Section 4.126, Paragraph 1 allows retail
establishmer t and Paragraph 9 allows residential use including one and two family
dwellings.
2. The use as developed will not adversely affect the neighborhood as a sufficient buffer
has been prgvided. Extensive landscaping has been provided around the perimeter
of the property_
3. There will be no nuisance or serious hazard to vehicles or pedestrians. The
applicant had demonstrated that the curb radii for the entrance/egress driveways is
adequate. The applicant has also indicated that there is over 275' of site distance in
either direction of the site..
4. The landscaping approved as a part of this plan meets the requirements of Section 8.4
as amended by the Planning-Board,.ofthe North Andover Zoning Bylaw;
5. The site drainage system is designed in accprdance with the Town Bylaw
requirements and has been reviewed and approved by the Outside Consulting
Engineer,VIM;
6. The applicant has met the requirements of the Town for Site Plan Review as stated in
Section 8.3 of the_Zoning Bylaw except for the waiver granted in Condition#1 Z
7. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
Finally the Planning Board finds that this project generally complies with the Town of
North Andover Zoning Bylaw requirements as listed in Section 8.35 but requires
1 I
conditions in order to- be fully in compliance. The Planning Board hereby grants an
approval to the applicant provided the following conditions are met:
i
SPECIAL CONDITIONS:
1. Prior to the endorsement of the plans by.the_Planning Board, the applicant
must comply with the following conditions:
a) The final plans must be reviewed and.approved.by the DPW,.VIM and the
Town Planner and subsequently endorsed by the Planning Board.
Revised plans must be submitted including a detailed signage plan in
conformance with the Town of North Andover Zoning Bylaw. The
final plaps must be submitted for review within ninety days of filing the
decision withthe Town.Clerk..
b) A bond in the amount of seven thousand ($7,000) dollars must be
posted for the purpose of insuring that a final as-built plan showing the
location of allon-site utilities, structures, curb cuts, parking.spaces,
topography, and drainage facilities is submitted. The bond is also in place
to insure that the site is constructed in accordance with the approved plan.
The form of security must be acceptable to the Planning Board.
2. Prior to the start of construction:
i
a) During construction,the site must be kept clean and.swept regularly.
b) A construction schedule shall be submitted to the Planning Staff for the
purpose of tracking the .construction and- informing the .public of
anticipated activities on the site.
3. Prior to FORM U verification (Building.Permit.Issuance):
a) The Planning Board must endorse the final site plan mylars and three (3)
copies of the signed plans.must_be delivered.to the Planning Department.
b) One certified copy of the recorded decision must be submitted to the
Planning.Department.
C) The applicant shall adhere to the following requirements of the North
Andover Fire Department and the North Andover Building Department:
1) All structure&must contain a commercial fire sprinkler system. The
plans and hydraulic calculations for.each commercial system shall be
submitted for review and approval by the North Andover Fire
Department. Plans and hydraulic calculations for each commercial
system must also be supplied to the Building Department.
2
d) The applicant must have. received an approved subsurface disposal
system from the North Andover Board of Health. Failure to receive
an approved subsurface disposal system will result in a building
permit not being issued.by.the Planning Department.
e) The applicant must supply a copy of the approved Massachusetts Highway
Department permits necessary for access and construction of the site to the
Planning Department.
4. Prior to verification of the Certificate of Occupancy:
a) The applicant must submit .a letter from the architect and engineer of the
project stating that the building, signs, landscaping, lighting and site layout
substantially comply with the plans referenced at the end of this decision as
endorsed by the Planning Board..
I
b) The Planning Staff shall approve..all artificial lighting used to illuminate
the site. All lighting shall have underground wiring and shall be so
arranged that all direct.rays from such lighting.falls entirely within the site
and shall be shielded or recessed so as not to shine upon abutting
properties or streets. The.Planning Staff shall..review the site. Any
changes to the approved lighting.plan.as may be. reasonably required by
the Planning Staff shall be made at the owner's expense. All site lighting
shall provide security for the site and structures however it must not create
any glare or project any light-onto adjacent residential.properties.
c) .The commercial fire sprinkler systems must be installed in accordance
with referenced standard NFPA 13D and in accordance with 780 CMR,
Chapter 9 of the Massachusetts State.Building Code. Certification that the
systems have been installed properly in accordance with the above
referenced regulations must be.provided from both the.North Andover Fire
Department and the North Andover Building Department to the applicant.
The applicant must then provide this certification to the North Andover
Planning Department.
5. Prior to the final.release.of security:
a) The Planning Staff shall review the site. Any screening as may be
reasonably required by the Planning Staff will be added at the applicant's
expense. Specifically after the detention pond is completed, the Town
Planner will review the site and any screening as may be reasonably
required by the Town Planner will be added at the applicant's expense.
3
b) A final as-built plan showing final topography, the location of all on- site
utilities, structures, curb cuts, parking spaces and drainage facilities must
be submitted to and reviewed by the Planning Staff and the Division of
Public Works.
6. Any stockpiling of materials (dirt, wood, construction material, etc.) must be
shown on a plan and reviewed and approved by the Planning Staff Any approved
piles must remain covered at all times to minimize any dust problems that may
occur with adjacent properties. Any stock piles to remain for longer than one
week must be fenced off and covered. .
7. In an effort to reduce noise levels, the applicant shall keep in optimum working
order, through regular maintenance, any and all equipment that shall emanate
sounds from.the structures or site.
8. The hours for construction shall be limited to between 7:00 a.m. and 7:00 p.m.
Monday through Friday.and.between 8.00.a.m..and 5.00 p.m. on Saturday.
9. Any plants, trees or shrubs that have been incorporated into the Landscape Plan
approved in this decision that die within one year from the date of planting shall
be replaced-by the owner.
10. The contractor shall contact Dig Safe at least 72 hours prior to commencing any
excavation.
11. Gas, Tglephone, Cable and Electric utilities shall be installed underground as
specified,by the respective utility companies..
12. No open burning shall be done except as is permitted during burning season under
the Fire Department regulations.
13. No underground fuel storage shall be installed except as may be allowed by Town
Regulations_
14. The provisions of this conditional approval shall apply to and be binding upon the
applicant, its employees.and all.successors and assigns in interest or control.
15. Any action by a Town Board, Commission, or Department, which requires
changes in the plan or design of the building, as presented to the Planning Board,
may be subject to modification by the Planning Board.
16. Any revisions shall be submitted to the Town Planner for review. If these
revisions are deemed substantial, the applicant must submit revised plans to the
Planning Board for approval.
i
4
17. A waiver to Section 8.3.5.e.xix of the North Andover Zoning Bylaw requiring a
Traffic Impact Study is GRANTED due to the fact that the new florist shop is
proposed to be relocated from the existing facility it will replace. No increase in
traffic demand from the existing shop, or a change in the number of employees
from the existing shop is.expected.
18. This Special Permit approval shall be deemed to have lapsed after
(two years from the date permit granted) unless substantial
use .or construction has commenced. Substantial use or construction will be
determined by a majority vote of the Planning Board.
19. The following information shall be deemed.part of the decision:
Plan Titled: Site Plan Florist Shop located in North Andover,MA
Prepared For: Daniel and Joanne Forgetta
1292 Osgood Street,North Andover,MA 01845
Prepared By: Merrimack Engineering Services
66 Park.Street.
Andover MA 018.10
Scale: �"=20'
Date: October 6, 2000 revised November 9,2000
Sheets: 1 through 5
Plan Titled: Proposed Landscape and Lighting Plan,Preliminary.Building
Floorplan&Elevations
Prepared For: Forgetta.Flowers,North Andover,MA
Prepared By: Huntress Associates,Inc.,Landscape Architecture and Land
Planning
17 Tewksbury Street,Andover,MA 01810
Scale: 1"=20'
Date: October 20, 2000
Sheets 1 through 2
Report Titled: Drainage Report
Dated: 10/6/00, revised 11/9/00
Prepared By: Merrimack Engineering Services
66 Park Street
Andover MA 01810
cc: Applicant
Engineer
File
5