HomeMy WebLinkAboutMiscellaneous - 1296 OSGOOD STREET 4/30/2018 (2) 31/ 43
LAMassachusetts Department of Environmental-Protection-
Industrial
nvironmental-P-r-otection -- -
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
Important` A. FacilityInformation
When filling out
forms on the
computer,use Mandolin Hair Salon 7231
only the tab key a. Facility Name b. Facility SIC Code c.DEP Assigned Facility ID
to move your 1296 Osgood Street 2nd Floor
cursor-do not d.Facility Site Address(Street No.,Street Name,Street Suffix e.g.St,Ave,etc.) e.Secondary Unit(e.g.Building-C,7th Floor)
use the return
key. North Andover MA 01845
f.City g.State h.Zip Code
r� 1296 Osgood Street 2nd
L Facility Mailing Address(If different from the facility site address above) j.Secondary Unit
North Andover MA 01845
k.City I.State m.Zip Code
978-697-5380 58-2678675
n.Phone Number o.Fax Number p. Federal Employer Identification Number(FEIN or EIN)
A-I. Certification Information
Wendy Forgetta Owner 978-697-5380
a.Contact Person First Name b.Contact Person Last Name c.Title d.Telephone Number
Wendy Forgetta Owner 978-697-5380
e.Owner First Name f.Owner Last Name g.Title h.Telephone Number
i.General business description
B. Industrial Wastewater and Holding Tank Information
Answer all questions, unless you are directed to skip a question. Do not answer questions that you
are directed to skip.
1. Major sources of industrial wastewater a. ❑ Process wastewater
(Check all that apply) b. ❑ Equipment cleaning wastewater
c. ❑ Spent concentrated solution
d. ❑ Floor spills or floor drainage
e. ® Other(s)(Please describe below)
Hair Treatment
Describe major sources
2. Major pollutants in the industrial wastewater a. ❑ BOD/COD
(Check all that apply) b. ❑ Oil &Grease
c. ❑ Low/High pH
d. ❑ Cyanide
e. ❑ Cadmium
f. ❑ Chromium
Ml g. ❑ Copper
R��' ' '' h. ❑ Lead
i. ❑ Nickel
MAY 2 3 on j• El Silver
k. El Zinc
I. ® Other(s) (Please describe below)
TOHEALTH Lc
--— Hair Color& Perm Products
Describe major pollutants
Edep01.doc 12/02 - Page 1 of 6
- --Massachusetts Department of Environmental Protection
Ll Industrial Wastewater Holding Tank
Compliance Certification Form DEP01 DEP Assigned FacilitylDor
P1 � ) Facility Name �
I
B. Industrial Wastewater and Holding Tank Information (Cont.)
3. Holding Tank ID (If any):
4. Holding Tank Installation Date:
(MM/DD/YYYY)
5. Tank Type (Check one box only): a. ❑ Above-ground
b. E In-ground
6. Tank Construction Material a. Steel
(Check appropriate box(es)or specify): b. E Concrete
c. E Fiberglass
d. ❑ Plastic
e. ❑ Other(s) (Please describe below)
Fiberglass Primary/Concrete
Containment
Describe construction material
7. Tank Capacity a. E Less than 3,000 gallons
(Check one box only): b. ❑ 3,000 gallons or more
B-I. Compliance Information
Section-1 General
101 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a septic system, leaching field, or complete a Return to Compliance Plan
cesspool?
E no
102 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a storm drain or to the ground without a complete a Return to Compliance Plan
surface water or groundwater discharge
permit? E no
103 Is the discharge of your industrial ❑ yes— I have checked with DEP and I am
wastewater to a municipal sewer system aware of the restrictions that may apply to
feasible? my facility
(if your answer is yes to this question, you
need to check with DEP for restrictions ® no
that may apply to your facility before
completing this certification)
Edep01-.doc-12/02— —- _- -- — Page 2 of 6
' . -- - -
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
Compliance Certification Form DEP01 LlDEPa ed FacilitylDor
p � ) FacilitytyName I
I
B-I. Compliance Information (Cont.)
104 Is your facility located in the Zone I or ❑ yes— I have checked with DEP and I am
Zone A of a drinking water supply area? aware of the restrictions that may apply to
(if your answer is yes to this question, you my facility
need to check with DEP for restrictions
that may apply to your facility before ® no
completing this certification)
105 Is this certification for an above-ground ❑ yes
holding tank?
® no -skip to question 301
Section-2 Above-Ground Holding Tank
201 Is this above-ground holding tank ❑ yes
constructed or lined with material
compatible with your industrial ❑ no -submit a Return to Compliance Plan
wastewater?
202 Is this above-ground holding tank ❑ yes
remotely filled or automatically filled?
❑ no-skip to question 203
202a Have you provided an appropriate ❑ yes
audio and light alarm system for
this above-ground holding tank? ❑ no-submit a Return to Compliance Plan
203 Have you provided appropriate spill ❑ yes
containment for this above-ground holding
tank? ❑ no-submit a Return to Compliance Plan
204 Have you provided "Non-Hazardous ❑ yes
Industrial Wastewater' labels for this
above-ground holding tank? ❑ no-submit a Return to Compliance Plan
205 Was this above-ground holding tank both ❑ yes
installed after November 15, 2002 and
fabricated on site? ❑ no - skip to question 401
I
— —Odep01.doc-1-2/02 ------ -- - Page 3 of 6-11111
LlMassachusetts Department of Environmental Protection -
Industrial Wastewater Holding Tank
Compliance Certification Form DEP01 DEP FacilityssignedFacilitylDor
Name i
B-I. Compliance Information (Cont.)
205a Was this above-ground holding ❑ yes —skip to question 401
tank constructed in accordance
with engineering plans that were ❑ no—submit a Return to Compliance Plan
stamped and signed by a and skip to question 401
Massachusetts Registered
Professional Engineer?
Section-3 In-Ground Holding Tank
301 Is this in-ground holding tank constructed ® yes
or lined with material compatible with your
industrial wastewater? ❑ no -submit a Return to Compliance Plan
302 Is the capacity of this in-ground holding ® yes
tank greater than 500% of the average
daily flow? ❑ no -submit a Return to Compliance Plan
303 Have you provided an appropriate audio ® yes
and light alarm system for this in-ground
holding tank? ❑ no-submit a Return to Compliance Plan
304 Have you provided "Non-Hazardous ® yes
Industrial Wastewater' labels or signs for
this in-ground holding tank? ❑ no-submit a Return to Compliance Plan
305 Was this in-ground holding tank installed ❑ yes
before November 15, 2002?
® no-skip to question 306
305a Was this in-ground holding tank ❑ yes -skip to question 401
constructed in accordance with
engineering plans that were ❑ no
stamped and signed by a
Massachusetts Registered
Professional Engineer?
---- - Odep01.doc 12/02 Page 4 of 6
• Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
305b Will you (or did you)obtain an ❑ yes - skip to question 401
- integrity assessment by
November 15, 2003, which will be ❑ no - submit a Return to Compliance Plan
prepared by a Massachusetts and skip to question 401
Registered Professional Engineer,
for this in-ground holding tank?
306 Was this in-ground holding tank ® yes
constructed in accordance with
engineering plans that were stamped and ❑ no- submit a Return to Compliance Plan
signed by a Massachusetts Registered
Professional Engineer?
307 Have you provided an appropriate ® yes
secondary containment for this in-ground
holding tank? ❑ no - submit a Return to Compliance Plan
Section-4 Record Keeping
401 Do you maintain all holding tank ® yes
construction and installation records
(including all applicable permits)at the ❑ no -submit a Return to Compliance Plan
facility?
402 Do you keep and maintain the appropriate ® yes
operating records, including wastewater
shipment, ultimate destination, and hauler ❑ no -submit a Return to Compliance Plan
information at the facility?
EdepOl.doc 12/02- - — - Page 5 of 6
- - Massachusetts Department-of-Environmental Protection
Ll Industrial Wastewater Holding Tank
Compliance Certification Form DEPO1 DEPAsNigned Facility ID or
p � � Facility Name
C. Certification Statement
(Note: Complete all required Return to Compliance Plan forms before signing this statement)
"I,Wendy Forgetta , attest under the pains and penalties of perjury:
(Name of responsible official)
(i) that I have personally examined and am familiar with the information contained in this submittal,
including any and all documents accompanying this certification statement;
(ii) that, based on my inquiry of those individuals responsible for obtaining the information, the
information contained in this submittal is to the best of my knowledge, true, accurate, and
complete;
(iii) that systems to maintain compliance are in place at the facility and will be maintained even if
processes or operating procedures are changed; and
(iv) that I am fully authorized to make this attestation on behalf of this facility.
am aware that there are significant penalties including, but not limited to, possible fines and
imprisonment for willfully submitting false, inaccurate, or incomplete information."
t
Signature Date(MM/DD/YYYY)
Wendy Forgetta Owner
Printed Name Title
Source of Signatory Authority(Check appropriate box):
1. If a Corporation:
a. ❑ President
b. ❑ Secretary
c. ❑ Treasurer
d. ❑ Vice President(if authorized by corporate vote)
e. ❑ Representative of the above (if authorized by corporate vote
and if responsible for overall operation of the facility)
2. If a Partnership:
❑ General Partner
3. If a Sole Proprietorship:
E Proprietor
4. If an Institution:
❑ Principal Executive Officer
5. If a Municipality or a Public Agency:
a. ❑ Principal Executive Officer
b. ❑ Ranking Elected Official (Empowered to enter into contracts
on behalf of the municipality or public agency)
Edep01.doc-12/02 - -- Page 6 of 6 ■
MERRIMACK ENGINEERING SERVICES, INC.
PROFESSIONAL ENGINEERS • LAND SURVEYORS • PLANNERS
LVI 66 PARK STREET•ANDOVER,MASSACHUSETTS 01810•TEL(978)475-3555,373-5721 •FAX(978)475-1448•E-MAIL:merreng@aol.com
April 20, 2006
77-1
Ms. Susan Sawyer
Public Health Director A P R , 0 2006
400 Osgood Street
North Andover,MA 01845 1
Re: 1292 Osgood St
Dear Ms. Sawyer:
We have received your review letter dated April 19,2006 regarding the above referenced site.
With regard to item#1,we have revised the plan to reflect the location of T-3 &T-4. We
respectfully request the North Andover Board of Health approve the use of these test pit results as
they are more than 2 years old, and are consistent with recently conducted test pit#5.
With respect to item#2 of your letter, we ask that you approve the design as re-submitted,with
the condition that a non hazardous industrial waste holding tank permit is filed for and obtained
and that no request for a construction permit will be made by our client until this, and all other
necessary permits are obtained.
Lastly,with regards to item#3 of your letter, since the existing system is only a few years old,
and since construction of the existing system required substantial sand fill,we feel it is
unnecessary to remove existing suitable sand fill only to be replaced with similar sand fill.
Also since both the North Andover Board of Health and the design engineer conduct excavation
inspections during the normal course of a system installation, we could collectively agree upon
the extent of the sand removal during this inspection as the extent of spoiled soils is typically very
evident on systems this new.
We appreciate your consideration of this matter and look forward to discussing these issues, and
others related to this design at your earliest available meeting agenda.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
William Dufrense
Project Manager
tl
MERRIMACK ENGINEERING SERVICES, INC.
PROFESSIONAL ENGINEERS LAND SURVEYORS PLANNERS
66 PARK STREET•ANDOVER,MA 01810•(978)475-3555,373-5721 •FAX(978)475-1448 •E-MAIL info@merrimackengineering.com
May 23, 2006
Ms. Susan Sawyer: '
Public Health Director
1600 Osgood Street
Building 20, Suite 2-36 MAY 2 3 2006
North Andover, MA 01845
Re: 1296 Osgood Street/Beauty Salon
g Y
Dear Ms. Sawyer:
We are working with Wendy Forgetta regarding the above referenced project.
Pursuant to 310 CMR 18.00,permits are not required for installation of an industrial
waste holding tank. The current procedure requires the applicant to install a holding tank
consistent with the new regulations and then submit a Compliance Certification Form
(DEPO1) certifying compliance with DEP regulations.
Attached is a copy of this application which will be submitted to DEP upon completion
and installation of the holding tank.
We hope this information will be helpful in your evaluation of the pending septic
approvals.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
William Dufresne
Project Manager
ti
Massachusetts Department of Environmental Protection
Ll Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
Important: A. FacilityInformation
When filling out
forms on the
computer,use Mandolin Hair Salon 7231
only the tab key a.Facility Name b. Facility SIC Code c.DEP Assigned Facility ID
to move your 1296 Osgood Street 2nd Floor
cursor-do not d.Facility Site Address(Street No.,Street Name,Street Suffix e.g.St,Ave,etc.) e.Secondary Unit(e.g.Building-C,7th Floor)
use the return
key. North Andover MA 01845
f.City g.State h.Zip Code
r� 1296 Osgood Street 2nd
I. Facility Mailing Address(If different from the facility site address above) j.Secondary Unit
North Andover MA 01845
n k.City I.State m.Zip Code
978-697-5380 58-2678675
n.Phone Number o.Fax Number p.Federal Employer Identification Number(FEIN or EIN)
A-I. Certification Information
Wendy Forgetta Owner 978-697-5380
a.Contact Person First Name b.Contact Person Last Name c.Title d.Telephone Number
Wendy Forgetta Owner 978-697-5380
e.Owner First Name f.Owner Last Name g.Title h.Telephone Number
I.General business description
B. Industrial Wastewater and Holding Tank Information
Answer all questions, unless you are directed to skip a question. Do not answer questions that you
are directed to skip.
1. Major sources of industrial wastewater a. ❑ Process wastewater
(Check all that apply) b. ❑ Equipment cleaning wastewater
c. ❑ Spent concentrated solution
d. ❑ Floor spills or floor drainage
e. ® Other(s) (Please describe below)
Hair Treatment
Describe major sources
2. Major pollutants in the industrial wastewater a. ❑ BOD/COD
(Check all that apply) b. ❑ Oil &Grease
c. ❑ Low/High pH
d. ❑ Cyanide
e. ❑ Cadmium
f. ❑ Chromium
g. ❑ Copper
h. ❑ Lead
i. ❑ Nickel
M 2. j. ❑ Silver
AY
k. ❑ Zinc
I. ® Other(s)(Please describe below)
Hair Color& Perm Products
Describe major pollutants
Ndep01.doc 12/02 Page 1 of 6
i
r Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B. Industrial Wastewater and Holding Tank Information (Cont.)
3. Holding Tank ID (If any):
4. Holding Tank Installation Date:
(MM/DD/YYYY)
5. Tank Type (Check one box only): a. ❑ Above-ground
b. ® In-ground
6. Tank Construction Material a. ❑ Steel
(Check appropriate box(es)or specify): b. ® Concrete
c. ® Fiberglass
d. ❑ Plastic
e. ❑ Other(s) (Please describe below)
Fiberglass Primary/Concrete
Containment
Describe construction material
7. Tank Capacity gallons
P Y a. ® .Less than 3�000
(Check one box only): b. ❑ 3,000 gallons or more
B-I. Compliance Information
Section-1 General
101 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a septic system, leaching field, or complete a Return to Compliance Plan
cesspool?
® no
102 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a storm drain or to the ground without a complete a Return to Compliance Plan
surface water or groundwater discharge
permit? ® no
103 Is the discharge of your industrial ❑ yes— I have checked with DEP and I am
wastewater to a municipal sewer system aware of the restrictions that may apply to
feasible? my facility
(if your answer is yes to this question, you
need to check with DEP for restrictions ® no
that may apply to your facility before
completing this certification)
■dep0l.doc 12/02 -- Page 2 of 6
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
104 Is your facility located in the Zone I or ❑ yes— I have checked with DEP and I am
Zone A of a drinking water supply area? aware of the restrictions that may apply to
(if your answer is yes to this question, you my facility
need to check with DEP for restrictions
that may apply to your facility before ® no
completing this certification)
105 Is this certification for an above-ground ❑ yes
holding tank?
® no -skip to question 301
Section-2 Above-Ground Holding Tank
201 Is this above-ground holding tank ❑ yes
constructed or lined with material
compatible with your industrial ❑ no -submit a Return to Compliance Plan
wastewater?
I
I
202 Is this above-ground holding tank ❑ yes
remotely filled or automatically filled?
❑ no-skip to question 203
202a Have you provided an appropriate ❑ yes
audio and light alarm system for
this above-ground holding tank? ❑ no-submit a Return to Compliance Plan
203 Have you provided appropriate spill ❑ yes
containment for this above-ground holding
tank? ❑ no-submit a Return to Compliance Plan
204 Have you provided "Non-Hazardous ❑ yes
Industrial Wastewater" labels for this
above-ground holding tank? ❑ no-submit a Return to Compliance Plan
205 Was this above-ground holding tank both ❑ yes
installed after November 15, 2002 and
fabricated on site? ❑ no-skip to question 401
■dep01.doc 12/02 Page 3 of 6 M
IL
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
205a Was this above-ground holding ❑ yes —skip to question 401
tank constructed in accordance
with engineering plans that were ❑ no—submit a Return to Compliance Plan
stamped and signed by a and skip to question 401
Massachusetts Registered
Professional Engineer?
Section-3 In-Ground Holding Tank
301 Is this in-ground holding tank constructed ® yes
or lined with material compatible with your
industrial wastewater? ❑ no-submit a Return to Compliance Plan
302 Is the capacity of this in-ground holding ® yes
tank greater than 500% of the average
daily flow? ❑ no -submit a Return to Compliance Plan
303 Have you provided an appropriate audio ® yes
and light alarm system for this in-ground
holding tank? ❑ no- submit a Return to Compliance Plan
304 Have you provided"Non-Hazardous ® yes
Industrial Wastewater" labels or signs for
this in-ground holding tank? ❑ no-submit a Return to Compliance Plan
305 Was this in-ground holding tank installed ❑ yes
before November 15, 2002?
® no-skip to question 306
305a Was this in-ground holding tank ❑ yes-skip to question 401
constructed in accordance with
engineering plans that were ❑ no
stamped and signed by a
Massachusetts Registered
Professional Engineer?
■depol.doc 12/02 Page-4 of 6 S
Massachusetts Department of Environmental Protection
Ll Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
305b Will you (or did you)obtain an ❑ yes - skip to question 401
integrity assessment by
November 15, 2003, which will be ❑ no-submit a Return to Compliance Plan
prepared by a Massachusetts and skip to question 401
Registered Professional Engineer,
for this in-ground holding tank?
306 Was this in-ground holding tank ® yes
constructed in accordance with
engineering plans that were stamped and ❑ no -submit a Return to Compliance Plan
signed by a Massachusetts Registered
Professional Engineer?
307 Have you provided an appropriate ® yes
secondary containment for this in-ground
holding tank? ❑ no - submit a Return to Compliance Plan
Section-4 Record Keeping
401 Do you maintain all holding tank ® yes
construction and installation records
(including all applicable permits)at the ❑ no -submit a Return to Compliance Plan
facility?
402 Do you keep and maintain the appropriate ® yes
operating records, including wastewater
shipment, ultimate destination, and hauler ❑ no-submit a Return to Compliance Plan
information at the facility?
MdepOl.doc 12/02 Page 5 of 6
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
ILI Compliance Certification Form (DEPO1 ) Facility Name
C. Certification Statement
(Note: Complete all required Return to Compliance Plan forms before signing this statement)
"I, Wendy Forgetta , attest under the pains and penalties of perjury:
(Name of responsible official)
(i) that I have personally examined and am familiar with the information contained in this submittal,
including any and all documents accompanying this certification statement;
(ii) that, based on my inquiry of those individuals responsible for obtaining the information, the
information contained in this submittal is to the best of my knowledge, true, accurate, and
complete;
(iii) that systems to maintain compliance are in place at the facility and will be maintained even if
processes or operating procedures are changed; and
(iv) that I am fully authorized to make this attestation on behalf of this facility.
I am aware that there are significant penalties including, but not limited to, possible fines and
imprisonment for willfully submitting false, inaccurate, or incomplete information."
Signature Date(MM/DD/YYYY)
Wendy Forgetta Owner
Printed Name Title
Source of Signatory Authority(Check appropriate box):
1. If a Corporation:
a. ❑ President
b. ❑ Secretary
c. ❑ Treasurer
d. ❑ Vice President(if authorized by corporate vote)
e. ❑ Representative of the above(if authorized by corporate vote
and if responsible for overall operation of the facility)
2. If a Partnership:- --
❑ General Partner
3. If a Sole Proprietorship:
E Proprietor
4. If an Institution:
❑ Principal Executive Officer
5. If a Municipality or a Public Agency:
a. ❑ Principal Executive Officer
b. ❑ Ranking Elected Official (Empowered to enter into contracts
on behalf of the municipality or public agency)
MdepOl.doc 12/02 Page 6 of 6
e
MERRIMACK ENGINEERING SERVICES, INC,
PROFESSIONAL ENGINEERS • LAND SURVEYORS • PLANNERS
66 PARK STREET•ANDOVER,MASSACHUSETTS 01810•TEL(978)475-3555,373-5721 •FAX(978)475-1448•E-MAIL:merreng@aol.com
April 20, 2006
1
Ms. Susan Sawyer !
Public Health Director APR 2 2006
400 Osgood Street
North Andover,MA 01845 I x)wE R
Re: 1292 Osgood St
Dear Ms. Sawyer:
We have received your review letter dated April 19, 2006 regarding the above referenced site.
With regard to item#1, we have revised the plan to reflect the location of T-3 &T-4. We
respectfully request the North Andover Board of Health approve the use of these test pit results as
they are more than 2 years old, and are consistent with recently conducted test pit#5.
With respect to item#2 of your letter,we ask that you approve the design as re-submitted, with
the condition that a non hazardous industrial waste holding tank permit is filed for and obtained
and that no request for a construction permit will be made by our client until this, and all other
necessary permits are obtained.
Lastly,with regards to item#3 of your letter, since the existing system is only a few years old,
and since construction of the existing system required substantial sand fill, we feel it is
unnecessary to remove existing suitable sand fill only to be replaced with similar sand fill.
Also since both the North Andover Board of Health and the design engineer conduct excavation
inspections during the normal course of a system installation,we could collectively agree upon
the extent of the sand removal during this inspection as the extent of spoiled soils is typically very
evident on systems this new.
We appreciate your consideration of this matter and look forward to discussing these issues, and
others related to this design at your earliest available meeting agenda.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
William Dufrense
Project Manager
ti
1
MERRIMACK ENGINEERING SERVICES, INC.
PROFESSIONAL ENGINEERS LAND SURVEYORS PLANNERS
66 PARK STREET•ANDOVER,MA 01810•(978)475-3555,373-5721 •FAX(978)475-1448• E-MAIL info@merrimackengineering.com
May 23, 2006
Ms. Susan Sawyer::
Public Health Director
1600 Osgood Street
Building 20, Suite 2-36 MAY 2 2006
North Andover, MA 01845
Re: 1296 Osgood Street/Beauty Salon
Dear Ms. Sawyer:
We are working with Wendy Forgetta regarding the above referenced project.
Pursuant to 310 CMR 18.00,permits are not required for installation of an industrial
waste holding tank. The current procedure requires the applicant to install a holding tank
consistent with the new regulations and then submit a Compliance Certification Form
(DEP01) certifying compliance with DEP regulations.
Attached is a copy of this application which will be submitted to DEP upon completion
and installation of the holding tank.
We hope this information will be helpful in your evaluation of the pending septic
approvals.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
LIU
William Dufresne
Project Manager
ti
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
Important:
When filling out A. Facility Information
forms on the
computer,use Mandolin Hair Salon 7231
only the tab key a. Facility Name b. Facility SIC Code c.DEP Assigned Facility ID
to move your 1296 Osgood Street 2nd Floor
cursor-do not d.Facility Site Address(Street No.,Street Name,Street Suffix e.g.St,Ave,etc.) e.Secondary Unit(e.g.Building-C,7th Floor)
use the return
key. North Andover MA 01845
f.City g.State h.Zip Code
r� 1296 Osgood Street 2nd
I.Facility Mailing Address(If different from the facility site address above) j.Secondary Unit
North Andover MA
�n k.City I.State m.m.Zip Zip Code
978-697-5380 58-2678675
n.Phone Number o.Fax Number p.Federal Employer Identification Number(FEIN or EIN)
A-I. Certification Information
Wendy Forgetta Owner 978-697-5380
a.Contact Person First Name b.Contact Person Last Name c.Title d.Telephone Number
Wendy Forgetta Owner 978-697-5380
e.Owner First Name f.Owner Last Name g.Title h.Telephone Number
I.General business description
Wastewater and Holding B. Industrial a g Tank Information
Answer all questions, unless you are directed to skip a question. Do not answer questions that you
are directed to skip.
1. Major sources of industrial wastewater a. ❑ Process wastewater
(Check all that apply) b. ❑ Equipment cleaning wastewater
c. ❑ Spent concentrated solution
d. ❑ Floor spills or floor drainage
e. ® Other(s) (Please describe below)
Hair Treatment
Describe major sources
2. Major pollutants in the industrial wastewater a. ❑ BOD/COD
(Check all that apply) b. ❑ Oil &Grease
c. ❑ Low/High pH
d. ❑ Cyanide
e. ❑ Cadmium
f. ❑ Chromium
g. ❑ Copper
h. ❑ Lead
i. ❑ Nickel
MAY 2 j. ❑ Silver
k. ❑ Zinc
I. ® Other(s) (Please describe below)
lVu�`d�
Hair Color& Perm Products
Describe major pollutants
Edep01.doc 12/02 Page 1 of 6
i
i
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B. Industrial Wastewater and Holding Tank Information (Cont.)
3. Holding Tank ID (If any):
4. Holding Tank Installation Date:
(MM/DD/YYYY)
5. Tank Type(Check one box only): a. ❑ Above-ground
b. ® In-ground
6. Tank Construction Material a. ❑ Steel
(Check appropriate box(es)or specify): b. ® Concrete
c. ® Fiberglass
d. ❑ Plastic
e. ❑ Other(s)(Please describe below)
Fiberglass Primary/Concrete
Containment
Describe construction material
7. Tank Capacity a. ® Less than 3,000 gallons
(Check one box only): b. ❑ 3,000 gallons or more
B-I. Compliance Information
Section-1 General
101 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a septic system, leaching field, or complete a Return to Compliance Plan
cesspool?
® no
102 Do you discharge industrial wastewater to ❑ yes—you must cease discharging and
a storm drain or to the ground without a complete a Return to Compliance Plan
surface water or groundwater discharge
permit? ® no
103 Is the discharge of your industrial ❑ yes— I have checked with DEP and I am
wastewater to a municipal sewer system aware of the restrictions that may apply to
feasible? my facility
(if your answer is yes to this question, you
need to check with DEP for restrictions ® no
that may apply to your facility before
completing this certification)
Edep01.doc 12/02 Page 2 of 6 E
Massachusetts Department of Environmental Protection
Ll Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
104 Is your facility located in the Zone I or ❑ yes— I have checked with DEP and I am
Zone A of a drinking water supply area? aware of the restrictions that may apply to
(if your answer is yes to this question, you my facility
need to check with DEP for restrictions
that may apply to your facility before ® no
completing this certification)
105 Is this certification for an above-ground ❑ yes
holding tank?
® no -skip to question 301
Section-2 Above-Ground Holding Tank
201 Is this above-ground holding tank ❑ yes
constructed or lined with material
compatible with your industrial ❑ no -submit a Return to Compliance Plan
wastewater?
202 Is this above-ground holding tank ❑ yes
remotely filled or automatically filled?
❑ no-skip to question 203
202a Have you provided an appropriate ❑ yes
audio and light alarm system for
this above-ground holding tank? ❑ no-submit a Return to Compliance Plan
203 Have you provided appropriate spill ❑ yes
containment for this above-ground holding
tank? ❑ no-submit a Return to Compliance Plan
204 Have you provided"Non-Hazardous ❑ yes
Industrial Wastewater' labels for this
above-ground holding tank? ❑ no-submit a Return to Compliance Plan
205 Was this above-ground holding tank both ❑ yes
installed after November 15, 2002 and
fabricated on site? ❑ no-skip to question 401
Odep01.doc 12/02 Page 3 of 6
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
Compliance Certification Form (DEP01 ) DEP Assigned Facility lDor
Facility Name
B-I. Compliance Information (Cont.)
205a Was this above-ground holding ❑ yes —skip to question 401
tank constructed in accordance
with engineering plans that were ❑ no—submit a Return to Compliance Plan
stamped and signed by a and skip to question 401
Massachusetts Registered
Professional Engineer?
Section-3 In-Ground Holding Tank
301 Is this in-ground holding tank constructed ® yes
or lined with material compatible with your
industrial wastewater? ❑ no-submit a Return to Compliance Plan
302 Is the capacity of this in-ground holding ® yes
tank greater than 500% of the average
daily flow? ❑ no-submit a Return to Compliance Plan
303 Have you provided an appropriate audio ® yes
and light alarm system for this in-ground
holding tank? ❑ no-submit a Return to Compliance Plan
304 Have you provided"Non-Hazardous ® yes
Industrial Wastewater"labels or signs for
this in-ground holding tank? ❑ no-submit a Return to Compliance Plan
305 Was this in-ground holding tank installed ❑ yes
before November 15, 2002?
® no-skip to question 306
305a Was this in-ground holding tank ❑ yes -skip to question 401
constructed in accordance with
engineering plans that were ❑ no
stamped and signed by a
Massachusetts Registered
Professional Engineer?
®depOl.doc 12/02 P606_4 of 6 ■
Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Compliance Certification Form (DEP01 ) Facility Name
B-I. Compliance Information (Cont.)
305b Will you (or did you)obtain an ❑ yes - skip to question 401
integrity assessment by
November 15, 2003, which will be ❑ no -submit a Return to Compliance Plan
prepared by a Massachusetts and skip to question 401
Registered Professional Engineer,
for this in-ground holding tank?
306 Was this in-ground holding tank ® yes
constructed in accordance with
engineering plans that were stamped and ❑ no- submit a Return to Compliance Plan
signed by a Massachusetts Registered
Professional Engineer?
307 Have you provided an appropriate ® yes
secondary containment for this in-ground
holding tank? ❑ no - submit a Return to Compliance Plan
Section-4 Record Keeping
401 Do you maintain all holding tank ® yes
construction and installation records
(including all applicable permits)at the ❑ no -submit a Return to Compliance Plan
facility?
402 Do you keep and maintain the appropriate ® yes
operating records, including wastewater
shipment, ultimate destination, and hauler ❑ no-submit a Return to Compliance Plan
information at the facility?
Mdep01.doc 12/02 Page 5 of 6
• Massachusetts Department of Environmental Protection
Industrial Wastewater Holding Tank
DEP Assigned Facility ID or
Ll Compliance Certification Form (DEP01 ) Facility Name
C. Certification Statement
(Note: Complete all required Return to Compliance Plan forms before signing this statement)
"I,Wendy Forgetta , attest under the pains and penalties of perjury:
(Name of responsible official)
(i) that I have personally examined and am familiar with the information contained in this submittal,
including any and all documents accompanying this certification statement;
(ii) that, based on my inquiry of those individuals responsible for obtaining the information,the
information contained in this submittal is to the best of my knowledge, true, accurate, and
complete;
(iii) that systems to maintain compliance are in place at the facility and will be maintained even if
processes or operating procedures are changed; and
(iv) that I am fully authorized to make this attestation on behalf of this facility.
I am aware that there are significant penalties including, but not limited to, possible fines and
imprisonment for willfully submitting false, inaccurate, or incomplete information."
Signature Date(MM/DD/YYYY)
Wendy Forgetta Owner
Printed Name Title
Source of Signatory Authority(Check appropriate box):
1. If a Corporation:
a. ❑ President
b. ❑ Secretary
c. ❑ Treasurer
d. ❑ Vice President(if authorized by corporate vote)
e. ❑ Representative of the above(if authorized by corporate vote
and if responsible for overall operation of the facility)
2. If a Partnership: -
❑ General Partner
3. If a Sole Proprietorship:
® Proprietor
4. If an Institution:
❑ Principal Executive Officer
5. If a Municipality or a Public Agency:
a. ❑ Principal Executive Officer
b. ❑ Ranking Elected Official (Empowered to enter into contracts
on behalf of the municipality or public agency)
Edepol.doc 12/02 Page 6 of 6 E
MERRIMACK ENGINEERING SERVICES, INC.
' PROFESSIONAL ENGINEERS LAND SURVEYORS PLANNERS
66 PARK STREET•ANDOVER,MA 01810•(978)475-3555,373-5721 •FAX(978)475-1448• E-MAIL info@merrimackengineering,com
May 23, 2006
Ms. Susan Sawyer: REC `aa?���;
Public Health Director
1600 Osgood Street
Building 20, Suite 2-36 MAY 2 3 2006
North Andover, MA 01845 TOWN;-,. , ; ; ;-,;a;,;iu0VER
HEALTH _'�FAR.TMENT
Re: 1296 Osgood Street/Beauty Salon
Dear Ms. Sawyer:
We are working with Wendy Forgetta regarding the above referenced project.
Pursuant to 310 CMR 18.00, permits are not required for installation of an industrial
waste holding tank. The current procedure requires the applicant to install a holding tank
consistent with the new regulations and then submit a Compliance Certification Form
(DEPO1) certifying compliance with DEP regulations.
Attached is a copy of this application which will be submitted to DEP upon completion
and installation of the holding tank.
We hope this information will be helpful in your evaluation of the pending septic
approvals.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
W- ^- �---
-
William Dufresne
Project Manager
ti
LQMERRIMACK ENGINEERING SERVICES, INC,
PROFESSIONAL ENGINEERS • LAND SURVEYORS • PLANNERS
66 PARK STREET•ANDOVER,MASSACHUSETTS 01810•TEL(978)475-3555,373-5721 •FAX(978)475-1448•E-MAIL:merreng@aol.com
April 20, 2006
Ms. Susan Sawyer
Public Health Director APR 2 0 2006
400 Osgood Street
North Andover,MA 01845 �� MENT
ANDOVER
Re: 1292 Osgood St
Dear Ms. Sawyer:
We have received your review letter dated April 19,2006 regarding the above referenced site.
With regard to item#1, we have revised the plan to reflect the location of T-3 &T-4. We
respectfully request the North Andover Board of Health approve the use of these test pit results as
they are more than 2 years old, and are consistent with recently conducted test pit#5.
With respect to item#2 of your letter,we ask that you approve the design as re-submitted, with
the condition that a non hazardous industrial waste holding tank permit is filed for and obtained
and that no request for a construction permit will be made by our client until this, and all other
necessary permits are obtained.
Lastly, with regards to item#3 of your letter, since the existing system is only a few years old,
and since construction of the existing system required substantial sand fill,we feel it is
unnecessary to remove existing suitable sand fill only to be replaced with similar sand fill.
Also since both the North Andover Board of Health and the design engineer conduct excavation
inspections during the normal course of a system installation,we could collectively agree upon
the extent of the sand removal during this inspection as the extent of spoiled soils is typically very
evident on systems this new.
We appreciate your consideration of this matter and look forward to discussing these issues, and
others related to this design at your earliest available meeting agenda.
Very truly yours,
MERRIMACK ENGINEERING SERVICES
William Dufrense
Project Manager
ti