Loading...
HomeMy WebLinkAboutMiscellaneous - 14 BALDWIN STREET 4/30/2018 (2) -14 BALDWIN STREET 210/009.0-0003-0000.0 �'" a li I ty'J - 31 lea <f rti r.. Location c9 3 -33 No. � '�" Date ! ,/;Z/ A, . - TOWN OF NORTH ANDOVER Certificate of Occupancy $ r Building/Frame Permit Fee $� I� F Foundation Permit Fee $ tet. Other Permit Fee $,— TOTAL ,TOTAL $ R Check# `N'1 -30 5 4 2 Building inspector .J NoRT#1 BUILDING PERMIT oF�t`Eo ,6'�ti TOWN OF NORTH ANDOVER o APPLICATION FOR PLAN EXAMINATION moo . e Permit No#• � Date Received 4jRoRA7ED^pP�`',�c "7 '_—Z6 �SSACHU /!/, Date Issued: l IMPORTANT:Applicant must complete all items on this page LOCATION — n - Fro n as L ' Print PROPERTY OWNER Print 446 Year Structure yesDno MAP PARCEL: ZONING DISTRICT: Historic District yes Machine Shop Village yes TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential ❑ New Building ❑ One family ❑Ad Pion ion ❑Two or more family ❑ Industrial Iteration No. of units: ❑ Commercial ❑ Repair, replacement- ❑Assessory Bldg ❑ Others: ❑ Demolition ❑ D Other x: ® 'Wated�©ist�ict .= n slp® n� Wds e _�Sw ,, . DESCRIPTION OF WORK TO BE PERFORMED: Identification- Please Type or Print Clearly ] OWNER: Name: Q0t4\ -)A ' N Phone Address: f em @ Contractor Name: V\ Email: dfb Address. tt L Construction License: D Exp. Date: Cnl��k Supervisor's Home Improvement License: \(DO Exp. Date: Z ARCH ITECT/ENGI N EER)U0 Sww G([ kteC6 Phone:' " (D��"�wv (40 Address: l Reg. No. FEE SCHEDULE:BOLDING PERMIT:$92.00 PER$9000.00 THE TOTA8D COST BASED ON$925.00 PER IN Total Project Cost: $ FEE: $ j�l Receipt No.: � �Z Check No.: p NOTE: Persons contracting with unregistered contractors do not have ce to the g my p:rAcal J I { Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL ±. Public Sewer ❑ Tanning/MassageBody Art ❑ Swimming Pools ❑ Weil ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank, etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING,SECTIONS FOR OFFICE USE ONLY i - INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING & DEVELOPMENT Reviewed On Signature_ COMMENTS CONSERVATION Reviewed on Signature COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals:Variance, Petition No: `Zoning Decision/receipt submitted yes a Planning Board Decision: Comments Conservation Decision: Comments Water& Sewer Connection/Signature&Date Driveway Permit DPW Town Engineer: Signature: Located 384 Osgood Street FIRE DEPAREFET—MMTS � s ,u �Ternp Dempster ontsite, c=,eye �{ 4Lo�catetl at 12,4 Main Street � + sY t. y 4, 7 ra U Fire " � ,�, t�rDepartm ont signatur ( date a ,.. I-4WAIT I Ali i ' li c10RTf-� Town of 2 _ Andover No. _ * t LAKS_ h ver, Mass .Q cocN�cH[w�c� 1' S U BOARD OF HEALTH Food/Kitchen PE NSeptic System THIS CERTIFIES THAT ... ... . ... . .. ..�........ ....... � ................ BUILDING INSPECTOR .... .. orat!.&... ......::...... Foundation has permission to erect .......................... buildi -gs .. .�. ... Rough to be occupied as .... . IrQ.......I. ► ... ... .......... �.t . ... ... '.. h!fir........................... Chimney provided that the person accepting this permitshall In every respect rm to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONST TIONRough Service ... ... ... .... ...... ......... Final BUIL SP CTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. Dimension Number of Stories: Total square feet of floor area, based on Exterior dimensions. Total land area, sq. ft.: ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector Yes No DANGER ZONE LITERATURE: Yes - No, MGL Chapter 166 Section 21A—F and G min.$100-$1000 fine NOTES and DATA— (For department use) i ❑ Notified for pickup Call Email Date Time Contact Name ------------ Doc.Building Permit Revised 2014 - - - -- - Building Department The following is a list of the required forms to be filled out for the appropriate permit to be obtained. Roofing, Siding, Interior Rehabilitation Permits Building Permit Application Workers Comp Affidavit Photo Copy Of H.I.C. And/Or C.S.L. Licenses Copy of Contract Floor Plan Or Proposed Interior Work Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit Addition Or Decks Building Permit Application Certified Surveyed Plot Plan Workers Comp Affidavit Photo Copy of H.I.C. And C.S.L. Licenses Copy Of Contract Floor/Cross Section/Elevation Plan Of Proposed Work With Sprinkler Plan And Hydraulic Calculations (If Applicable) Mass check Energy Compliance Report (If Applicable) Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg Permit New Construction (Single and Two Family) Building Permit Application Certified Proposed Plot Plan Photo of H.I.C. And C.S.L. Licenses 4. Workers Comp Affidavit j 4� Two Sets of Building Plans (One To Be Returned) to Include Sprinkler,Plan And Hydraulic Calculations (If Applicable) 4. Copy of Contract 2012 IECC Energy code Engineering Affidavits for Engineered products OTE: All dumpster permits require sign off from Fire Department prior to issuance of Bldg. Permit In all cases if a variance or special permit was required the Town Clerks office must stamp the decision from the Board of Appeals that the appeal period is over. The applicant must then get this recorded at the Registry of Deeds. one copy and proof of recording must be submitted with the building application Doc:Building Permit Revised 2014 J - - - -` I i '' J 4 r Date......,, � ........... OF NORT/y o?' " TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION 1y. ^ t 3�CHU5� This certifies that .... �........... a.... .. .....:............:................................................ has permission forgas installation . !! !�� 1........................................... inthe buildings of........ ......... .............................................................................................. atjA4..t.qJ.&.,jS..... ...............a.., No4Ander, Mass. Fees ... Lic. No. �c �....... A S Check# �/a 099jr MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY I North Andover MA DATE0510112015 PERMIT# 99-1 ADDRESS 12114116118 Baldwin St OWNER'S NAME GOWNER ADDRESS I Same I TEL FAX TYPE OR OCCUPANCY TYPE COMMERCIAL[—] EDUCATIONAL® RESIDENTIAL[] PRINT CLEARLY NEW: RENOVATION:Q REPLACEMENT:❑ PLANS SUBMITTED: YES[-1 NOQ i APPLIANCES 7 FLOORS- BSM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER ®® DRYER FIREPLACE FRYOLATOR FURNACE GENERATOR GRILLE INFRARED HEATER LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM/SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER OTHER Re lace 5 Gas Meters x and Associated Piping J INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL.Ch.142 YES [:]NO IF YOU CHECKED YES,PLEASE INDICATE THE TYPE OF COVERAGE BY CHECKING THE APPROPRIATE BOX BELOW . LIABILITY INSURANCE POLICY ❑ OTHER TYPE INDEMNITY ® BOND ❑ OWNER'S INSURANCE WAIVER:I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws,and that my signature on this permit application waives this"requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted or entered regarding this application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under the permit issued for this applicatLwill, n compliance ith all P rtinent prvi,,,_ sion of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER-GASATTER NAME Robert Josey LICENSE# SIGN RE MPO MGF® JP❑ JGF❑ LPGI❑ CORPORATION[:]# PARTNERSHIP❑# LLC[—I# COMPANY NAME:j RH White Construction Co ADDRESS 41 Central St CITY I Auburn STATE MA ZIPI 01501 TEL 508 832-3295 FAX 508-926-4347 CELL 508-476-2007 EMAIL ROUGH GAS INSPECTION NOTES THIS PAGE FOR INSPECTOR USE ONLY FINAL INSPECTION NOTES Yes No THIS APPLICATION SERVES AS THE PERMIT ❑ ❑ FEE: $ PERMIT# PLAN REVIEW NOTES r C0P cilvi D NORTH ANDOVER HOUSING AUTHORITY ONE 1�IORKESI�I NIFADOWS D _ NORTH ANDOVER, M.N. 01845 D _ CD Pro'ect 196017 J D WINDOW REPLACEMENT DPA. TOB # R05-02106 D - D R 'S HOUSING BALDWIN AND FRANCIS. STREET D l�TORI'H ANDO ICU 018 5 D ` _- F RF� N4115 5TF E E T Iso o -"R ___ .. .. .• Y 41i -f7i----'Ff'� FRO LIN . Irl COnY -• - I A Iti I� 1 I 1• 1 • 1 1 l ? -PLAY - )'. FLAY..AMA , t F� •i .. ARCA -..• - .. { -110 ;m Noce: C STREETV e HJK J F 27 BUIiO N 5 A 1 A L AR}.NJFl`HEC � `I fib' FROM BALDWIN 5 R L1 _ _L fRoFCRTY LIME -tel ... I - - - LIL 1117 OF )• -- -I _ e� BJI:U H 5 A`,'15-1,13-2 ARE NUIM E1 1 III FROM FR:.NC:S STP S GpNT 0.ACT ___ -1LJ__ 111 - Locaton man - D DesiA-Yn Partnershl Arcl ltects e. ...... 85 Brockton Ave.on Pentucket Lake•Haverhill,MA 01830.978*378*9400•Fam.978*373*6779 •FrMail:.desiginpaitnership@veiimn.net D a TABLE OF CONTENTS Number of Pages TITLE SHEET FOR PROJECT MANUAL........................................................................................................... 1 aTABLE OF CONTENTS........................................................................................................................................2 ADVERTISEMENT...........................................................................................................................................:.. 1 aBIDDING DOCUMENTS INSTRUCTIONS TO BIDDERS..............................................................................................................6 n FORM FOR GENERAL BID(3 COPIES INCLUDED W/BIDDER'S CHECKLIST NOT BOUND IN SPEC.).2 IUI FORM OF SOMWBA CERTIFIED ENTERPRISES PARTICIPATION SCHEDULE............................ 1 FORM OF SOMWBA LETTER OF INTENT........................................................................................... 1 a FORMS FORM OF OWNER/CONTRACTOR AGREEMENT............................................................................2 O FORM OF CORPORATE VOTE...............................................:...........................................................1 FORM OF CONTRACTOR'S EQUAL EMPLOYMENT CERTIFICATION ..........................................1 FORM OF PERFORMANCE BOND................................................................:.................................... 1 FORMOF PAYMENT BOND ................................................................................................................1 D CONTRACT DOCUMENTS aGENERAL CONDITIONS OF CONTRACT...........................................................................................29 SPECIFICATIONS aDIVISION 1 -GENERAL REQUIREMENTS Section 01010 - SUMMARY OF WORK.............................................:......... ........................................2 D Section 01020 - UNIT PRICES DELETED Section 01030 - ALTERNATES DELETED Section 01040 - EXISTING CONDITIONS ...........................................................................................1 Section 01045 - CUTTING AND PATCHING ................................................................................... 3 a Section 01050 - CONDUCT OF WORK................................................................................................2 Section 01100 - LABOR REGULATIONS.............................................................................................1 Section-01110 - EEO AND MBENVBE PROCESSING REQUIREMENTS W/FORMS......................5 a Section 01300 - SUBMITTALS.............................. *........ *..................:.. ............................................3 Section 01500 - TEMPORARY FACILITIES...".. 3 Section01510 - PROTECTION........................ ..... *. ........................................................................3 a Section 01520 - CLEANING UP............................................................................................................2 Section 01700 - PROJECT CLOSEOUT..............................................................................................4 Section 01710 - SURVEYS AND RECORD DRAWINGS DELETED aDIVISION 6 Section 06100 - ROUGH CARPENTRY.................................................................................6 Section 06400 - ARCHITECTURAL WOODWORK..................................................................3 aDIVISION 7 D Section 07200 - FLASHING AND SHEET METAL..................................................................3 Section 07900 - SEALANTS AND CAULKING..........................:............................................3 DHCD $100k-10Mil TABLE OF CONTENTS IL JI c.149 812004 aDIVISION 8 Section 08520 - VINYL WINDOWS....................................................................................5 PRO JE 1 MORM1i ION LOCUSMAP.........................................................................................................................1 a BUILDINGLOCATION PLAN....................................................................................................1 aWINDOW COUNT SHEET............:..........................................................................................1 BUILDING A-1 ELEVATIONS....................................................................................................................3 a PLANS.............................................................................................................................3 ELEVATIONPHOTOS......................................................................................... a BUILDING A-2 ELEVATIONS...............:....................................................................................................3. PLANS.........:...................................................................................................................3 a ELEVATION PHOTOS.........................................................................................................4 BUILDING A-3 ELEVATIONS....................................................................................................................3 PLANS..................................:..........................................................................................3 ELEVATIONPHOTOS.........................................................................................................4 BUILDING B-1 QELEVATIONS....................................................................................................................3 PLANS.............................................................................................................................3 ELEVATIONPHOTOS.........................................................................................................4 BUILDING B-2 ELEVATIONS....................................................................................................................3 PLANS..............................................................................................................................3 D ELEVATION PHOTOS.........................................................................................................4 BUILDING C ELEVATIONS.................................................................................................................. .3 .. .... PLANS.... ..3 ELEVATIONPHOTOS.....................................................:...................................................4 WALL SECTION SILLDETAIL.....................................................................................................................1 HEADDETAIL...................................................................................................................1 aWINDOW INFORMATION HARVEY SIGNATURE VINYL DOUBLE HUNG WINDOW..........................................................3 HARVEY VINYL HOPPER WINDOW(BASEMENT WINDOWS)...................................................2 VINYL WINDOW ACCESSORIES..........................................................................................2 VINYL WINDOW REPLACEMENT INSTALLATION INSTRUCTIONS......................................... 1 a a � a DHCD $100k-10Mil TABLE OF CONTENTS c.149 812004 a a PROJECT MANUAL a MODERNIZATION OF STATE AIDED PUBLIC HOUSING a STATE-AIDED PROJECT: NORTH ANDOVER HOUSING AUTHORITY VETERAN'S HOUSING 200-1 a NORTH ANDOVER, MASSACHUSETTS Ma:ssichu,sett,,5Department ,of a NORTH ANDOVER HOUSING AUTHORITY O ONE MORKESKI MEADOWS NORTH ANDOVER, MA. 01845 Phone: 978-682-3932 FAX: 978-794-1142 Joanne Comerford, Executive Director Architect Design Partnership Architects Inc. 85 Brockton Ave. on Pentucket Lake Haverhill, MA. 01830 Phone: 978-372-9400 Fax: 978-373-6779 E-mail: designpartnership@verizon.net Specifications Design Partnership Architects Inc. 85 Brockton Ave.on Pentucket Lake Haverhill, MA. 01830 Phone: 978-372-9400 Fax: 978-373-6779 E-mail: designpartnership@vedzon.net aDATE: May 3,2005 a DHCD $100k-10Mil Title r.14Q R/7C w 1 C1F 1 Q ADVERTISEMENT The North Andover Housing Authority, the Awarding Authority, invites sealed bids from General Contractors for the window replacement at 6 Veteran's Housing 200-1 development buildings for the North Andover Housing Authority in North Andover, Massachusetts, in accordance with the documents prepared by Design Partnership Architects Inc. The Project consists of: The removal of 328 existing windows and storm windows and the installation of 328 new vinyl windows,wrapping all window sills with .030 white aluminum, new painted window stops and the removal of all debris. The work is estimated to cost $ 176,226.00 General bidders must be certified by the Division of Capital Asset Management in the following category of a work. "General Building Construction" or"Doors and Windows" Bids are subject to M.G.L. c.149§44A-J &to minimum wage rates as required by M.G.L. c.149§§26 to 27H inclusive. aGeneral Bids will be received until 2:00 p.m., Tuesday, August 30th, 2005 and publicly opened, forthwith. SUBTRADES ( NONE ) aAll Bids should be sent to: North Andover Housing Authority,One Morkeski Meadows. No.Andover, MA.01845 and received no later than the date&time specified above. o General bids and sub-bids shall be accompanied by a ibid deposit that is not less than five(5%)of the greatest possible bid amount(considering all alternates), and made payable to the North Andover Housing Authority Bid Forms and Contract Documents will be available for pick-up at North Andover Housing Authority,One Morkeski Meadows.No.Andover, MA. 01845.After 10:00 a.m.,Tuesday,August 9th,2005. There is a plan deposit of$25.00 per set(maximum of 2 sets)payable to the Awarding Authority. Deposits must be a certified or cashier's check. This deposit will be refunded for up to two sets for general bidders O and for one set for sub-bidders upon return of the sets in good condition within thirty days of receipt of general bids. Otherwise the deposit shall be the property of the Awarding Authority. Additional sets may be purchased for$25.00 Bidders requesting Contract Documents to be mailed to them shall include a separate check for$15.00 per set, payable to the Awarding Authority, to cover mail handling costs. General bidders must agree to contract with minority and women-owned businesses as certified by the State Office of Minority and Women Business Assistance(SOMWBA). The amount of participation which shall be reserved for such enterprises shall not be less than seventeen(17%)percent of the final contract price, including accepted alternates, of which at least twelve(12%) percent shall be for minority business enterprises and five(5%) percent shall be reserved for women-owned business enterprises. The job site and/or existing buildings will be available for inspection at 10:00 a.m.Tuesday,August 16th,2005. North Andover Housing Authority,Joanne Comerford,Exec.Dir.978-682-3932 The Contract Documents may be seen, but not removed at: Projectdog McGraw Hill Construction 18 Graf Road, Unit 8 24 Hartwell Ave. a Newburyport, MA. 01950 Lexington, MA 02421 c149$100k-10 Mil Advertisement DHCD 8/2004 r ( 1 u INSTRUCTIONS TO BIDDERS ARTICLE 1 -BIDDER'S REPRESENTATION r '• 1.1 Each General Bidder or Sub-bidder(hereinafter called the"Bidder") by making a bid or sub-bid (hereinafter called"bid")represents that: 1. The Bidder has read and understands the Contract Documents and the bid is made in accordance r therewith. 2. The Bidder has visited the site and is familiar with the local conditions under which the Work has to be performed. 1.2 Failure to so examine the Contract Documents and site will not relieve any Bidder from any obligation under the bid as submitted. ARTICLE 2-GENERAL BIDDER'S CERTIFICATION 2.1 General bids shall be submitted with the following: 1. A Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance r� Form CQ7,showing that the Bidder has been approved to bid on projects the size and nature of this project;and 2. A Contractor Update Statement,Division of Capital Asset Management and Maintenance Form CQ3. 2.2 It is the Bidder's responsibility to obtain the necessary forms from Division of Capital Asset Management and Maintenance and make application in sufficient time for evaluation of the application and issuance of a Certificate of Eligibility prior to bid. 2.3 The Contractor Update Statement is not a public record as defined in M.G.L.cA§7 and will not be open to public inspection. ARTICLE 3-MBE AND WBE PARTICIPATION rt 3.1 Refer to the Advertisement for applicability of Article 3. `J 3.2 The minimum percentage that must be contracted with minority-owned and women-owned businesses is stated in the Advertisement. 3.3 The apparent low Bidder must submit the SOMWBA Certified Enterprise Participation Schedule and Letters of Intent from all of the firms listed on the Schedule within five(5)working days after receipt of bids. The Housing Authority and the Department may,at their discretion,grant an extension of time to ' submit these documents, if deemed to be appropriate and in the public interest to do so. Letters of Intent are not required for filed Subcontractors. However,filed Sub-bidders who are SOMWBA- ` ' Certified shall be listed on the Participation Schedule. Submit the completed Participation Schedule and Letters of Intent to:(with a copy to the Housing Authority) Department of Housing and Community Development DHCD-Legal Office/MBE Coordinator 100 Cambridge Street—3rd Floor ' Boston, MA 02114 ATTENTION: MBEN BE Participation for(project name). 3.4 The Bidder must submit prior to,and as a condition of Contract approval,signed subcontracts with all subcontractors or a purchase order or invoice from material suppliers or manufacturers listed on the Participation Schedule. 3.5 Filed Sub-bidders are not required to submit a Participation Schedule.They may,at their option, submit a Letter of Intent with their bid if they are a SOMWBA certified enterprise. If a filed subcontractor intends to sub-sub work to a SOMWBA certified enterprise, and the General Contractor wishes for that subcontract to be credited towards participation for this contract,a Participation Schedule and Letter of Intent is required. DHCD $100k-101VIi1 Instructions to Bidders c149 08/2004 1 of 6 r � ARTICLE 4-REQUESTS FOR INTERPRETATION 4.11 Bidders shall promptly notify the Architect of any ambiguity, inconsistency, or error which they may discover upon examination of the Contract Documents,the site,and local conditions. 4.2 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven(7)calendar days before the date for receipt of the bids. 4.3 Interpretation, correction,or change in the Contract Documents will be made by written Addendum which will become part of the Contract Documents. Neither the Housing Authority nor the Architect will be held accountable for any oral interpretations,corrections,or changes. 4.4 Addenda will be mailed by the Architect by U.S Postal Service,certificate of mailing,to every individual or firm on record as having taken a set of Contract Documents. 4.5 Copies of addenda will be made available for inspection at the locations listed in the Advertisement where Contract Documents are on file. ARTICLE 5-PREPARATION AND SUBMISSION OF BIDS 5.1 Forms and Bid Preparation Bids shall be submitted on the"Form for General Bid"or the"Form for Sub-Bid",as appropriate, furnished at no cost.by the Housing Authority.The forms enclosed in the Project Manual shall not be extracted or used. Additional forms are available at the location listed in the Advertisement. 5.1.1 All entries on the bid form shall be made by typewriter or in ink. 5.1.2 Sums shall be expressed in both words and figures in the space indicated on the bid form,. Where there is a discrepancy between the bid sum expressed in words and the bid sum expressed in figures,the words shall control. 5.1.3 If the requirement of Performance and Payment Bonds for filed sub-contractors is left blank by the General Bidder on the Form for General Bid,the Housing Authority shall interpret this as a "yes". No increase in contract price will be allowed for providing these bonds. 5.1.4 Costs for subcontractor's bond premiums shall be paid for by the General Contractor in accordance with M.G.L.c.149§44F. 5.2 Bid Deposits shall be: 5.2.1 at least five percent(5%)of the greatest possible bid amount,considering all alternates; 5.2.2 made payable to the housing authority; 5.2.3 conditioned upon faithful performance by the principal of the agreements contained in the bid, and 5.2.4 in the form of: .1 cash, .2 certified check,treasurer's or cashier's check issued by a responsible bank or trust company,or .3 a bid bond issued by a surety company licensed to do business in the Commonwealth of Massachusetts. 5.7.5 retained until the execution and delivery of the Owner/Contractor Agreement if they represent the bid deposit of one of the three(3)lowest responsible and eligible General Bidders or one of the(3)lowest Sub-bidders in a filed sub-bid trade,or a sub-bidder listed by one of the (3).lowest General Bidders. DHCD $100k-10Mil Instructions to Bidders cl49 08/2004 2 of 6 r_1 L J r J 5.3 Delivery of Bids FI 5.3.1 Sub-bids, including the bid deposit shall, be enclosed in a sealed envelope with the following plainly marked on the outside: LJ Filed Sub-Bid for: rl Name of Housing Authority and Project Number • Sub-bid Section Number L J # Trade • Sub-bidder's Name,Business Address,and Phone Number r 1 5.3.2 General Bids, including the bid deposit, Division of Capital Asset Management and LJ Maintenance Certificate of Eligibility(CQ7)and Update Statement(CQ3)shall be enclosed in a sealed envelop with the following plainly marked on the outside: r General Bid for: • Name of Housing Authority and Project Number `-' 0 Bidder's Name,Business Address,and Phone Number r; 5.3.4 Date and time for receipt of bids is set forth in the Advertisement. 5.3.5 Timely delivery of a bid to the location designated shall be the full responsibility of the Bidder. 5.4 Sub-Trade Solicitations r-1 5.4.1 If the General Bidders are instructed to cant'an amount for a given sub-trade listed under Item �' 2,General Bidder's shall list the sub-trade,and amount provided by the Housing Authority. r The line under bonds required on the General Bid Form should be left blank or marked N/A in order for subparagraph 5.4.2.2 to be applicable. `-' 5.4.2 Upon solicitation of a subcontractor to perform the work required by the sub-trade as mentioned in subparagraph 5.4.1,the selected General Contractor's contract amount will be adjusted as follows: .1 The difference between the subcontract amount and the amount carried in the bid. .2 The total cost of the subcontractor's bonds, if the selected General Contractor requires such bonds after the solicitation is completed and if the selected General Contractor complied with 5.4.1 above, and .3 The resultant cost difference for General Contractor's Bonds premiums. 5.4.3 Overhead and Profit for supervision of the sub-trade in question shall be included by all General Bidders in Item 1. LJ 5.4.4 Additional overhead and profit is not allowed on the incremental difference as stated in M.G.L. c.149§44F(4)(a)(2)nor on the costs for the additional bond premiums. u ARTICLE 6-ALTERNATES 6.1 Each General Bidder shall acknowledge Alternates in Section C on the Form for General Bid by entering the dollar amount of addition or subtraction necessitated by the Alternate. L 6.2 In the event an Alternate does not involve a change in the amount of the base bid,the Bidder shall so indicate by writing"No Change",or"N/C"or"0"in the space provided for that Alternate. 6.3 Sub-bidders shall enter on the Form for Sub-bid the amount of addition or subtraction necessitated by the Alternate which pertains to the work of that trade. If the Alternate does not involve a change in the bid amount so indicate by writing "No Change","N/C"or"0". If the alternate does not affect your category of work so indicate by writing"N/A". LJ 6.4 General Bidders shall enter on the Form for General Bid a single amount for each Alternate which shall consist of the Sub-bidders'amounts and the amount for work performed by the General Contractor. 6.5 The low Bidder will be determined on the basis of the sum of the base bid and the accepted L J alternates. ' DHCD $100k-10Mil Instructions to Bidders c149 08/2004 3 of 6 LJ � 1 LJ ARTICLE 7-WITHDRAWAL OF BIDS 7.1 Before Opening of Bids 7.1.1 Any bid may be withdrawn prior to the time designated for receipt of bids upon written request. Withdrawal of bids must be confirmed over the Bidder's signature by written notice post-marked or sent by facsimile on or before the date and time set for receipt of bids. 7.1.2 Withdrawn bids may be resubmitted up to the time designated for the receipt of bids. 7.2 After Opening of Bids Bidders may withdraw a bid,without penalty,any time up to the time of Award as defined in paragraph 8.1,and upon demonstrating,to the satisfaction of the Housing Authority,that a bona fide clerical error was made during the preparation of the bid. Failure to conclusively demonstrate a bona fide clerical error may result in forfeiture of the bid deposit. 7.3 In the event of a General Bid Withdrawal after Opening of Bids, the Housing Authority shall consider the bid from next lowest eligible and responsible bidder. 7.4 Sub-bid Withdrawal/Substitution 7.4.1 Selection - Should a filed sub-bidder listed on the Form for General Bid of the selected General Contractor (per Article 8 of these instructions) withdraw its bid, be unable to provide performance and payment bonds as required by the selected General Contractor, or otherwise refuse to sign a subcontract with the selected General Contractor, the housing authority and the selected General Contractor shall consider the other sub-bids to which the housing authority and the selected General Contractor make no objection and substitute a new sub- bidder for such trade. 7.4.2 Process: If the selected General Contractor: .1 required bonds (on the Form for General Bid)for the sub-bidder who withdrew then the selected General Contractor's contract amount shall be adjusted to account for: .1 the difference between the amount of the sub-bid listed on the Form for General Bid and the amount of the replacement sub-bid, and .2 the incremental difference in the cost of the General Contractor bonds premiums, but .3 there will be no compensation for additional subcontractor bond premiums .2 did not require bonds (on the Form for General Bid) for the sub-bidder who withdrew and now the selected General Contractor wants bonds from the replacement sub-bidder, then the selected General Contractor's contract amount shall be adjusted: .1 to account for the difference between the amount of the sub-bid listed on the Form for General Bid and the amount of the replacement sub-bid, .2 the amount for the new sub-bidder's performance and payment bonds,and .3 the incremental difference in the cost of the General Contractor bond premiums. 7.4.3 There shall be no adjustment to the selected General Contractor's contract amount except as set forth in 7.4.2.1 and 7.4.2..2. Additional overhead and profit is not allowed on the incremental difference in the sub-bids nor on the costs for the additional bond premiums. ARTICLE 8-CONTRACT AWARD 8.1 Award means both the determination and selection of the lowest, responsible and eligible bidder, by Housing Authority board vote. 8.2 The Housing Authority will award the contract to the lowest responsible and eligible bidder within thirty days,Saturdays, Sundays,and legal holidays excluded after the opening of bids in accordance with M.G.L. c.149§44A. DHCD $100k-10Mil Instructions to Bidders c149 08/2004 4 of 6 �-1 f1 8.3 The Contract will be awarded to the lowest responsible and eligible Bidder, except in the event of substitution as provided under M.G.L.c.149§§44E and 44F, in which cases the procedure as f required by said sections shall govern the award of the Contract. 8.4 The award of this Contract is subject to the approval of the Director of the Commonwealth of Massachusetts, Department of Housing and Community Development.(DHCD). Contracts without { DHCD approval shall not be considered valid. 8.5 The Housing Authority reserves the right to waive any informalities in or to reject any or all Bids if it be in the public interest to do so. r-1 8.6 The Housing Authority also reserves the right to reject any sub-bid if it determines that such sub- bid does not represent the bid of a person competent to perform the work as specified,or if less than three sub-bids are received for a sub-trade,or if bid prices are not reasonable for acceptance fwithout further competition. ' 8.7 As used herein,the term"lowest responsible and eligible bidder"shall mean the General Bidder `—' whose bid is the lowest of those Bidders demonstrably possessing the skill,ability,and integrity necessary for the faithful performance of the work,and who meets the requirements for Bidders set forth in M.G.L.c.149§44A-J and is not debarred from bidding under M.G.L. c.149§44C;and wrio u shall certify that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work. ARTICLE 9-FORMS REQUIRED FOR CONTRACT APPROVAL u 9.1 Upon Award,the General Bidder shall complete the following forms to ensure prompt contract -� validation. These forms will be provided to the selected General Bidder by DHCD. Submit(3) originals of each. u 9.2 Owner/Contractor Agreement and Form of Corporate Vote. r ? 9.3 Form of Contractor's Equal Employment Certification in accordance with Article 14 of the General Conditions. Form of Sub-Contractor's Equal Employment Certification in accordance with Article 14 of f, the General Conditions. 4, 9.4.1 Form of Performance Bond and Form of Payment Bond must be submitted by the General Contractor on DHCD's form, in accordance with Article 18 of the General Conditions.The dates on the r I bonds must coincide with the contract date, and a current Power-of-Attorney must be attached to each bond. `J 9.4.2 Performance and Payment Bonds must also be submitted for all filed subcontractors, if required by the General Bidder on its Form for General Bid, in the total amount of the subcontract payable to the General Contractor. 9.5.1 Insurance Certificates for the General Contractor and all filed subcontractors are required and must be submitted in accordance with Article 16 of the General Conditions. r� 9.5.2 General Contractors must indicate on special perils insurance or installation floater if stored materials are covered. r 1 9.6.1 Form of Subcontract for all filed subcontractors-executed and submitted on the statutory subcontract form. `' 9.6.2 Subcontracts with MBEMBE subcontractors-executed on a form agreeable between both parties. 9.6.3 Purchase Orders to,or Invoices from,MBEMBE suppliers. v 9.7 Statement of Management on Internal Accounting Controls and a Statement prepared by a CPA expressing an opinion to the state of Management Controls,as required by M.G.L.c.30 §39R. This applies to all General Contractors with contracts of$100,000 or more. DHCD $100k-1OMil Instructions to Bidders c149 08/2004 5 of 6 U ARTICLE 10-CONTRACT VALIDATION 10.1 The Owner-Contractor Agreement shall not be valid until signed by the Director of DHCD. 10.2 The Notice to Proceed for construction shall not be issued until the Owner/Contractor Agreement has been validated by the Director of DHCD 10.3 Incomplete or unacceptable submissions of forms required by paragraphs 9.2-9.7 will delay the validation of the Owner/Contractor Agreement by DHCD. END OF SECTION DHCD $100k-10MH Instructions to Bidders c149 08/2004 6 of 6 r-i r-1 FORM OF GENERAL BID r� TO THE AWARDING AUTHORITY r ; A. The undersigned proposes to furnish all labor and materials required for for the PROJECT u HOUSING AUTHORITY in Massachusetts r ) TOWN TOWN in accordance with Contract Documents prepared by Name of Engineer/Architect i For the contract price specified below,subject additions and deductions according to the terms of the specifications B. This bid includes addenda number(s) f ' C. The proposed contract price is: Dollars $ r Bid Amount in Words Bid Amount in Numbers u For Alternate No. Add$ Subtract$ r i No. $ $ J No. $ $ No. $ $ No. $ $ r1 Each Altemate shall be listed separately D. The subdivision of the proposed contract price is as follows: ITEM 1.The work of the general contractor, being all work other than that covered by ITEM 2. r ) TOTAL OF ITEM 1 ...................................................$ ITEM 2. Sub-bids as follows. r Sub-trade Name of Filed Sub-bidder Sub-bid Amount Bond Required Yes No r � Ll n r; r� TOTAL OF ITEM 2...........................................$ r i DHCD $100k-10Mil Form for General Bid u c.149 8/2004 1 OF 2 �J The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in Item I of this bid. The undersigned agrees that if selected as general contractor,they will promptly confer with the awarding authority on the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid,the total contract price being adjusted to conform thereto. E. The undersigned agrees that,if selected as general contractor,we will within five days, Saturdays,Sundays, and legal holidays excluded,after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond,each of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority and each in the sum of the contract price,the premiums for which are to be paid by the general contractor and are included in the contract price. The undersigned hereby certifies that they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work and that they will comply fully with all laws and regulations applicable to awards made subject to section forty-four A of Chapter 149. The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide,fair and made without collusion or fraud with any other person. As used in this subsection the word"person"shall mean natural person,joint venture, partnership,corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder. Name of General Bidder Signature fir BY: Signature&Title of person signing bid Date: Business Address (City and State) Note: If the bidder is a corporation, indicate state of incorporation under signature,and affix corporate seal; if a partnership,give full names and residential addresses of partners if different from business addresses. DHCD $100k-10MH Form for General Bid c.149 8/2004 2 OF 2 rr1 L_, r-1 L-, r I SOMWBA CERTIFIED ENTERPRISE (SCE) PARTICIPATION SCHEDULE Commonwealth of Massachusetts Department of Housing and Community Development r. • This form must be submitted by the apparent low general bidder within five working days of receipt of bids. L, • Filed sub-bidders who are SOMWBA certified MBEs or WKS or filed subcontractors who intend to sub- r_1 subcontract with a SOMWBA certified MBE or WBE may submit this form with their Filed sub-bid. - Letters of Intent from all SCEs listed must be submitted with this Participation Schedule. r ' State-Aided Project LHA DEVELOPMENT NUMBER LJ r The undersigned intends to subcontract with the following firms for the listed work and dollar amounts: L , Name of MBE Supplier or Value of Company Description of Work WBE Subcontractor Participation 1 r . 2 $ 3 $ 4 $ Lr 5 $ 6 $ r 7 $ LJ 8 $ r I Dollar Value of MBE Commitment: $ ' Dollar Value of WBE Commitment: $ u Total Dollar Value Commitment: $ rl r Name of General Contractor Date Authorized Signature r� LJ Address City,State&Zip Code LA ' 1 DHCD $100k-10MIl MBE WBE PARTICIPATION SCHEDULE ._J c.149 812004 1 of 1 rl u ri c � SOMWBA CERTIFIED ENTERPRISE LETTER OF INTENT f I Commonwealth of Massachusetts Department of Housing and Community Development �, • This form is provided for SOMWBA Certified Enterprises(SCEs)being utilized as MBEs and WSEs on this contract. r • This form must be completed by each SOMWBA Certified Enterprise and submitted by the bidder using the SCE. • General bidders or filed sub-bidders that are SCEs may omit this form. u TO:General Bidder FROM SOMWBA Certified Enterprise (SCE) Name Name: Street Street Address: Address: f CityTTown Citylrown Phone: Phone: U Fax: Fax: r :Email Email a.J RE: State-Aided Project: Name of Housing Authority and Project Number r ` 1. My company intends to perform work in connection with the above project as: ❑ an individual ❑a corporation ❑a partnership ❑ a joint venture with ❑ other(explain) r,. 2. My company is certified by SOMWBA as a ❑ MBE ❑ WBE in the following categories: Warning: Misrepresenting your firms SOMWBA r certification may result in u disqualification from this and other DHCD funded projects!! r� 3. My company has not changed its ownership,control,or management in any ways that affect certification since obtaining SOMWBA certification 4. My company understands that if your company is awarded the contract,your company intends to enter into an agreement to perform the work described below for the price indicated. My company also understands that your company will make substitutions only as allowed by Article 15 of the General Conditions for the above project r i 5. My company intends to Brief Description of work This Work includes: ❑ Labor&Materials ❑ Labor Only ❑ Materials only for a total amount of Dollars $ Date u Authorized Signature of SCE r� Name and Title Please advise DHCD immediately if either party attempts to renegotiate this agreement DHCD$100K-$10M LETTER OF INTENT c149 08/2004 1of 1 aJ r'1 171 OWNER-CONTRACTOR AGREEMENT Commonwealth of Massachusetts j Department of Housing and Community Development u This agreement made the day of 20 by and between Housing Authority hereinafter called the"Owner', and hereinafter called the"Contractor r i Name of Contractor L_J Witnesseth,that the Owner and the Contractor,for the consideration hereinunder named,agree as follows: r l Article 1.Scope of Work:The Contractor shall perform all Work required by the Contract Documents for referred to in the Contract Documents prepared by `J Description of Project r1 acting as and referred to as the"Architect" Architect/Engineer Article 2.Time of Completion: The Contractor shall commence work under this Contract on the date specified in the r i written Notice to Proceed"and shall bring the Work to Substantial Completion within calendar days of said date `J Days Damages for delays in the performance of the Work shall be in accordance with Article 9 of the General Conditions of r i the Contract. _J Article 3. Contract Sum: The Owner shall pay the Contractor, in current funds,for the performance of the Work, r Dollars$ Contract Amount in Words Contract Amount in Dollars The Contract Sum is divided as follows: Item 1: The Work of the Contractor,being all Work other than that covered by Item 2 $ Item 2: Subcontractors as follows r� Section-Trade Subcontractor Amount 1 $ 2 $ 3 $ U 4 $ 5 $ 6 $ r7 7 $ 8 $ 9 $ r_1 10 $ ,__, Total for Item 2 $ r' Article 4.The Contract Documents: The following, together with this Agreement, form the Contract and all are as fully a part of the contract as if attached to this Agreement or repeated herein: The Advertisement, Bidding r� Documents, Contract Forms, Conditions of the Contract, and Specifications as enumerated in the Table of Contents, the drawings as enumerated in the List of Contract Drawings, DHCD publication known as the `, Construction Handbook, and all Modifications issued after execution of the Contract. Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those r-i Conditions. DHCD$100K-$10M Owner Contractor Agreement c149 08/2004 1 of 2 f-1 u f-1 Article 5. Alternates: The following Alternates have been accepted and their costs are included in the Contract Sum stated in Article 3 of this Agreement: Alternate No(s): and n Article 6. REAP Certification: Pursuant to M.G.L. c.62(c), sec.49(a), the individual signing this Contract an u behalf of the Contractor, hereby certifies, under the penalties of perjury, that to the best of their knowledge and belief the Contractor has complied with all laws of the Commonwealth relating to taxes,reporting of employees and r 1 contractors, and withholding and remitting child support. L-, Article 7.Validation: This Contract will not be valid until signed by the Director of the Massachusetts Department of Housing and Community Development. VI In Witness Whereof,the Parties Hereto Have Caused This Instrument to be Executed Under Seal. r ' CONTRACTOR Z..AWARDING AUTHORITY U Name of Contractor Name of Housing Authority r, LJ Address Signature and Seal r1 By: Signature and Seal Title `_J Witness Attest: 1 If a Corporation,attach a notarized copy of the z If signed by someone other than a Housing Authority r ' Corporate Vote authorizing signatory to sign Contract. Board member attach a copy of Certified Board Vote authorizing the signatory to sign Contract. DEPARTMENT OF HOUSING&COMMUNITY DEVELOPMENT n In accordance with M.G.L. 121B, and Revisions thereto. Director r-� Date tJ n u n r 1_J r1 ' DHCD$100K-$10M Owner Contractor Agreement c149 08/2004 2 of 2 r J rt ' - 0ir - U n CERTIFICATE OF VOTE OF AUTHORIZATION r; 200 LJ rt hereby certify that a meeting of the Board of Directors of the: n NAME OF CoaPORAT'ON duly called and held at on the day of 200 r I At which a quorum was present and acting,it was voted that Name of Corporate Officer r-t of the be and hereby is authorized to execute and deliver for �J a and on behalf of the Corporation a Contract with Housing Authority,for r work to be done at State-Aided Housing Project No. In the City/Town of u And to act as principal to execute bonds in connection therewith, which Contract and Bonds were presented to and made part of the records of said meeting. n l further certify that Is duly qualified and acting Name of Corporate Officer ; of the Corporation and that said vote has not been Title } Repealed, rescinded or amended r: A true copy of the record, P ATTEST: :J r (CORPORATE SEAL) ' u On this day of 200_, before me,the undersigned Notary Public, personally appeared , duly designated by the board of directors and proved . J to me, through satisfactory evidence of identification,which was r, s/he is the person whose name is signed on the foregoing documents, and acknowledged to me that s/he signed it voluntarily for its stated purpose and that it was her/his free act and deed. �J t Notary Public My Commission Expires: - QHCD$700K-$10M CORPORATE VOTE r� c149 08/2004 1 of 1 � 7 aJ fl f , FORM OF CONTRACTOR'S EQUAL EMPLOYMENT CERTIFICATION Commonwealth of Massachusetts U Department of Housing and Community Development r� ` This form must be completed and submitted by the Contractor prior to the signing of the Owner-Contractor Agreement. This certifies that: n Contractor u r 1 Street Address f City/State/Zip Code u 1. Intends to use the following listed construction trades in the work under this contract: ri ri r-� 2. Will comply with the minority manpower ratio and specific affirmative action steps contained in Article 14 of the Conditions of this Contract;and --� 3. Will obtain similar certifications from each of its subcontractors and submit to the Owner prior to the award of any subcontract under this contract the subcontractor's certification. r SIGNATURE OF AUTHORIZED REPRESENTATIVE OF f CONTRACTOR u r , NAME AND TITLE v DATE r, DHCD$100K-$10M GC EEO CERTIFCATE c149 08/2004 1 of 1 r1 t T r i PERFORMANCE BOND f1 �� „ COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT r-J P•d KNOW ALL MEN BY THESE PRESENTS: r16. `J That we, as Principal, �4 1 t and as Surety,are held and firmly bound unto V U. U �:q the Housing Authority,as Obligee,in the sum of R4 r-1 �� dollars $ u to be paid to the Obligee,for which payments,well and truly to be made,we bind ourselves,our respective heirs,executors, administrators,successors and assigns,jointly and severally,firmly by these presents. �7 '619`9 WHEREAS,the said Principal has made a contract with the Obligee,bearing the date of 200 N q for the construction of in Massachusetts r U� Project Tile Uy u .fit NOW,the condition of this obligation is such that if the Principal and all Subcontractors under said contract shall well and f-1 truly keep and perform all the undertakings,covenants,agreement,terms and conditions of said contract on its part to be kept and performed during the original term of said contract and any extensions thereof that may be granted by the Obligee, u with or without notice to the Surety,and during the life and any guarantee required under the contract,and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly '( authorized modifications,alterations changes or additions to said contract that may hereafter be made,notice to the Surety • f 1 • of such modifications,alterations,changes or additions being hereby waived,then this obligation shall become null and void; otherwise,it shall remain in full force and virtue. D” r 1 IN THE EVENT,that the contract is abandoned by the Principal,or in the event that the Obligee,under the provisions of Article 19 of the General Conditions of said contract terminates the employment of the Principal or the authority of then Principal to continue the work, said Surety hereby further agrees that said Surety shall, if requested in writing by the Obligee,take such action as is necessary to complete said contract. f 1 6:9 <4 u IN WITNESS WHEREOF,the Principal and Surety have hereunto set their hands and seals this: Day of 200 ;7� PRINCIPAL SURETY ri By. By: LJ Seal Attomey-in Fact r 1 N Attest: Attest ` f 1 The rate for this bond is %for the first $ and %for the next $ b'- F., U tali The total premium for this bond is $ ' DHCD$100K-$10M Performance Bond f 1 � c149 08/2004 1 of 1 N2" :_ _ r1 fl LJ q/ PAYMENT BOND COMMONWEALTH OF MASSACHUSETTS l DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT KNOW ALL MEN BY THESE PRESENTS: f That we, as Principal, and as Surety,are held and firmly bound unto f the Housing Authority,as Obligee,in the sum of v dollars $ to be paid to the Obligee,for which payments,well and truly to be made,we bind ourselves,our respective heirs,executors, ' f administrators,successors and assigns,jointly and severally,firmly by these presents. WHEREAS,the said Principal has made a contract with the Obligee,bearing the date of 200 j rl �* / for the construction of in Massachusetts u Project Title y NOW the conditions of this obligation are such that if the Principal and all subcontractors under said contract shall pay for U all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications,alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to ' the Surety of such modifications,alterations,extensions of time,changes or additions being hereby waived,the foregoing to r include any other purposes or items set out in,and to be subject to, provisions of M.G.L.c.30§39A,and M.G.L.c.149§29, as amended,then this obligation shall become null and void;otherwise it shall remain in full force and virtue. u IN WITNESS WHEREOF,the Principal and Surety have hereunto set their hands and seals this: u Day of 200 t r� .� PRINCIPAL SURETY .J By: By. Seal Attorney-in Fact Attest: Attest lJ � The rate for this bond is %for the first $ and %for the next $ u The total premium for this bond is $ DHCD$100K-$10M Payment Bond ' 1 c149 08/2004 1 of 1 l-J rl r i L-i r) INDEX -A- Acceptance of Work.............................................................................9-5A Indemnification..................................................................................fkrficle 17 Access to Work......................................................33.4,4.9-5,4.21.1,7.2.1 Information Provided by Owner.......................................................2.2,4.2.1 Acts and Omissions ...............................4.2.1.4.2.2,4.3.4,4.7.9,10.8,17.1 ..............................4.2.1.4.2.2,4.3.4,4.7.9,10.8,17.1 Inspections.....................................................................................4.16.1,5.3.7 Addenda......... ......................................................I...... Instructions to Bidders.....................................................1.1.1,15.2.1,15,43 Administration of Contract.............................................................Article 5 Insurance...........................................................................................Article 16 Administrator.......................................2.3.2,3.1.2,3.1.3,3.3.1,3.3.3,8.1.5 8.7.1,8.7.2,19.4 Advertisement or Invitation to Bid........................................................1.1.1 Architect,Definition of.............................................•--..................5.1.5.1.1 MBE/VTBE .............................. ..............................PLiticle 15 Architect's Approval..........................MM............................... .7.6,4m 7.7,4.7.9 Methods,Means,Sequences......m................................m...............4.3 m I.8.6.2.2 5.3.5,8.1.2,8.1.3,8.1.4 -N- Architeces Decision ....................................4.3.7,4.8.1,4.11.1,5.3.10 8.3.1.3,8.6.3.1,8.7.1,8.7.2,9.3.3.2.2 Notice to Proceed................................................................9.1.2,9.5.1,14.4.3 9.6.4,9.7.1,9.7.2,10.4,10.5 Architect's Inspection....................................4.3.7,4.3.8,4.8.2,4.9.3,4.9.4 -0- 4.12.1,5.3.7,9.3.2.1,9.6.3 0- 4.12.1,5.3.7,9.3.2.1,9.6.3 Architects Interpretations......................................3.3.2,4.19.11 5.3.9,8.5.1 Occupancy.............. ............... .......................m...........4.16.1,5.3.7 Architects Authorization to Reject Work 4.8.1,4.11.1,4.12.1,5.3.4 Owner(Local Housing Authority,Authority)...................................Article 2 Architect's Site Visits... m.........................-mm...............................5.3.2,5.3.7 Aesthetic Effect.................................................................. ..........5.3.10 -P- Authority(Awarding Authority)..................................................See Owner Payments.........................................2.4.2,33.3,4.9.6,4.12,5.3.3,Article 10 -B- 14.6.2.2,15.5.1,15.5.2,17.1,19.2,19.3 Payments,Application for.......................5.3.3,10.2.1,10.3,10.4,10.5,10.6 Bonds.....................................................6.2.1.2,8.3.1.3(g),9.7.4,15.4.5,18 Payments,Certification of......................................................5.3.7,10.5,10.6 Payment,Final 33.1,53.1,53.7,93.3A,10.7,11.2.1,13.2,13A,16.1 -c- Permits.............. ...............m..........-....m.........................mm....................4.16 Product Data.. m.................................................. ..................4.7,4.15,5.3.5 Change Orders..........................................1.1.1,2.4.2,3-3.1.2,4.15.1,5.3.6 Project Representative..................................... 5.3.8,8.7.3,9.3.2.1 8.1.1,8.1.2,8.1.4,8.1.5,8.2.1-8.3.1,&S.1,8 m6,8.7.1 9.1.1,9.3.1,9.3.2.1,9.3m3.6,9.7m1,103.1A,181 -R- Claims for Additional Costs..........................7.1.1,8.7,10.7.2,17.1,19.3.2 Retainage....................................................................................10.3.1,10.6.2 rl Claims for Additional Time............................................................7.1.1.8.7 CleaningUp......-m..................................................mmmm......m-.....m..........4.17.1 -S- Completion(Substantial/Final) 3.3.1.6,4.11.1,5 3.7,9.2.2,9.6.1,9.7 Construction Advisor...................................•-------------•-----.-3.13,8.1 A,8.4.1 Safity..........M..........M..........................................................m..........................4.20 Construction Change Directive.....................1.1.1.3.3.1.2,5.3.6;8.1.1,9.7 Samples....................... .................4.7,4.8,4.15,53.5 Construction Handbook 1.1.1,1m1.7,3.1-3,5.3.8,5.4.1,8.7.4,10.3.1 Schedule of Values................. .............mm...............................mm.............10-2 ri Construction by Owner or by Separate Contractors.............1.1.4,Article 7 Schedule,Construction..............................m..................m 4.15.1,5.5,7.1.2,9.4 Construction Schedule......................................................4.15.1,7.1.2,9.4.1 Schedule.Pavinent...................m..........................................m....................m.9.4 J Contract Documents............mm............M...................M...............___M.......MM 1.1 Schedule,Participation................m......-151.1,15.4.1,15.4.2,15A.3,15.4A Contract,Owner Contractor Agreement 1.1.1,1.2.1,2.1.1,12.1r 33.1, 15.4.6,15.4.7,15.4.9,15.5.1 6-2.1,8.6,9.3.3.1,93-3.3,10.1.1,lOm8.2 Site.................. 1.2.1,2.2.2,4.4.1,4.4.2,4.8.2,4.9.1,4.9.2,4.9.3,4.9.4 Contract Sum.........................3.3.1.8.1.1,8.1.3,8.2.1,8.3.1,8A.1,8.6.2.2. 4.12,4.15,4.17.2,4.17.3,4.17A,4.18,4.203 r 1 9.3.3.3,9.5.7,10.1.17 14.6.2.1,15.1.12,15.3A 4m21.115.3.2.53.8.6.1.1.7.1.1,8.6.2,10.4.1,10.6.1.1,12.4.1,14.3.4,19.1.4 Contract Time...............................................33.1,8.1.1,8.1.3,8.2.1,8.4.1, SOMWBA ..........................m.......................Article 15 9.1.1,9.2,9.3.2.1,9.3.3.1 Specifications...................................1.1.1,1.1.6,1.3,4.3.3,4.7.5,4.15,5.3.5 Contractor...................M..........•...........................................................Article 4 8.6.3,9.4.1,10.2.2,10m7.1,11.2.1,12.4.1 Cutting And Patching.................................--............................................4.3 Stored Materials...................................................................4.9.4,4.9.6,10.4 Subcontractors............................................................................. Article 6 -D- Submittals........................................................................4.2.3,4.7,4.15,5.3.5 Substantial Completion....................................................................5.3.7,9.6 Damage to Work.....................................................................................9.6.7 Substitutions,Materials(or equals)...................................4.6.3,4.7.5,4.10.1 Delays/Extensions ofTime................................................4.6.3.3,4.8.2,93 Substitutions,MBE/WBE ........................................15.4.2,15.4.4,15.4.7 Department,DHCD.........................................................................Article 3 Superintendent......................................................................4.4,4.20.3,8.7.3 r-I (DEP)Department of Environmental Protection 4.17.4,4.20.2,4.20.3 Supervision&Construction Procedures...........................................43,8-3.1 (DLWD)Department ofLabor&Workforce Development4.20.2,12A,12.5 Surety.......................................6.2.1,9.7.4,15A.5,15.5.3,Article 18,19.1.5 Disputes.......................................................................................8.7.3,9.3.1 Surveys................. ..................................................................2.2.2 Drawings ............................................1.1.1,1.1.5,1.3,2.2.1,4.7,4.15 -T- -E- Taxes............................................................................................................4.14 Equal Employment Opportunity....................................................Article 14 Termination..............-...3.3.1,6,2.1,14.2.1,14.2.2,14.6.2.3,15.4.6.15.5.3 ExecutiveOrder.......................................................................................12.7 Testing&Inspection....................................................................................4.8 -F- -u- r-i Filed Subcontractors.....................................................6.1.3,8.3.1,10.6.2.1 Unit Prices............................................................... ...........................8.3.1 Find Completion. ..................................................5.3.7,9.5.4,9.7 Final Payment..................................3.3.1.7,53.1,9.3.3 A,10.6.1,10.6.1.2 -W- 103,11,2.1,13.2.1,13.2.2,13.4.1 Funding.......................................................................................................3.2 Warranties..........•-----..........................................4.10,5-3.7,9.6.8,Article I I WeatherProtection....................................................................................4.18 -G- Guarantees................................ ..........................................Article 11 rHazardous Materials.............................................................................4.17.4 DHCD!Ok-1 0 Mil GENERAL CONDITIONS c.149 8/2004 __J r r � GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION ARTICLE 1 GENERAL PROVISIONS 1 1.1 BASIC DEFINITIONS L 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents consist of the Owner-Contractor Agreement,Advertisement,Instructions to Bidders,Bidding r Documents,Contract Forms,Conditions of the Contract,Specifications,Drawings,DHCD publication known as the Construction I landbook.all addenda issued prior to execution of the Contract.and other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is(1)a written amendment to the Contract signed by both parties,(2)a Change Order,(3)a Construction Change Directive or(4)a written order for a r minor change in the Work issued by the Architect. `-' 1.1.2 THE CONTRACT f 1 The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements,either written or u oral. The Contract may be amended or modified only by a Modification. r 1 1.1.3 THE WORK The term"Work'means the construction and services required by the Contract Documents,whether completed or ' partially completed,and includes all other labor,materials,equipment,and services provided or to be provided by the fl Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. 1.1.4 THE PROJECT �J The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a r part and which may include construction by the Owner or by separate contractors. J 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents,wherever located and whenever issued,showing the 1 design,location and dimensions of the Work,generally including plans,elevations,sections,details,schedules,and diagrams. LJ 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, rl equipment,construction systems,standards,and workmanship for the Work,and performance of related services. `-' 1.1.7 THE CONSTRUCTION HANDBOOK The Construction I landbook is published by and available flee of charge.from the Department. It outlines the procedures that the Contractor,Owner,Architect,and Department shall follow during the construction ofthe Work. The most recent version,at the time L_, of bid opening,of the Construction I landbook is incorporated by reference into the Contract Documents. 1.2 EXECUTION,CORRELATION,AND INTENT r-1 1.2.1 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site,become familiar with L_, local conditions under which the Work is to be performed and correlated personal observations with requirements ofthe Contract Documents. f-1 1.2.2 The intent ofthe Contract Documents is to include all items necessary for the proper execution and completion ofthe Work u by the Contractor. The Contract Documents are complementary,and what is required by one shall be as binding as ifrequired by all. Performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable r-i from them as being necessary to produce the intended results. In case of inconsistent requirements in the Contract Documents,the requirement for the greater quantity or higher quality shall take precedence and shall be the Contract requirement. v 1.2.3. Unless otherwise stated in the Contract Documents,words which have well known technical or construction industry r 1 meanings are used in the Contract Documents in accordance with such recognized meanings. 1.2.4. Where reference is made to standards or trade association publications,it shall be considered to refer to the latest edition and revision thereof,if any,in effect on the date the Contract Documents were advertised for bid. r `J DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 1 of 29 rl v 1.3 USE OF DRAWINGS,SPECIFICATIONS,AND OTHER DOCUMENTS The Drawings,Specifications and other documents prepared by the Architect,and copies thereof furnished to the Contractor,are for use solely with respect to this Project. They are not to be used by the Contractor or any Subcontractor, Sub-subcontractor,or material or equipment supplier on other projects or for additions to this Project outside the scope of the Work without the specific written consent of the Owner,the Architect,and the Department. ARTICLE 2 OWNER 2.1 DEFINITION The term"Owner",sometimes also referred to as the"Awarding Authority"or"Authority",means the Housing Authority identified in the Owner-Contractor Agreement,organized and existing under the provisions of M.G.L.c.1 21B. 2.2 INFORMATION AND SERVICES TO BE PROVIDED BY THE OWNER 2.2.1 The Owner will famish to the Contractor,free of charge,a reasonable number of copies of the Contract Documents for the execution of the Work,including a set for record purposes. In addition,the Owner,through the Architect,will furnish to the Contractor a reproducible transparency and one black line print of detail and clarification drawings issued after the Contract has been awarded. The Contractor shall provide and distribute such number of prints of these transparencies as required for the Contractor's and Subcontractors'use. 2.2.2 The Owner shall furnish available surveys describing physical characteristics,legal limitations and utility locations for the site of the Project,and a legal description of the site. 2.3 OWNER'S RIGHT TO STOP THE WORK 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract Documents or persistently fails to carry out the Work in accordance with the Contract Documents,the Owner by written order signed personally or by its authorized agent,may order the Contractor to stop the Work,or any portion thereof, until the cause for such order has been eliminated. 2.3.2 Stop work orders require the Administrator's prior approval. (See Subparagraph 3.1.2) 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK 2.4.1 If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven-day period after receipt of written notice from the Architect at the Owner's direction to commence and continue correction of such default or neglect with diligence and promptness,the Owner may,without prejudice to other remedies,hire one or more contractors to convect such deficiencies. 2.4.2 In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such deficiencies,including compensation for the Architect's additional services and expenses made necessary by such default,neglect,or failure. If payments then or thereafter due the Contractor are not sufficient to cover such amounts,the Contractor shall pay the difference to the Owner. ARTICLE 3 DEPARTMENT 3.1 DEFINITIONS 3.1.1 The term"Department"means the Massachusetts Department of Housing and Community Development, 100 Cambridge St Suite 300, Boston, MA 02114. 3.1.2 The term"Administrator"means the person appointed by the Department to administer the terms of the Contract for Financial Assistance between the Owner and the Department,who is also empowered to take certain actions under this Agreement. Contractor should address mail to the Administrator c%the Construction Management Unit. 3.1.3 The term"Construction Advisor"means the person designated by the Administrator to assist the Administrator. The duties..responsibilities and limitations of the Constriction Advisor's authority are described in the Construction I landbook. DHCD l0k-10 Mil GENERAL CONDITIONS c.149 8/2004 2 of 29 r r1 3.2 PROJECT FUNDING `—' The Work under this Contract is funded by the Commonwealth of Massachusetts through the Department pursuant to a contract for financial assistance between the Department and the Owner. f 3.3 DEPARTMENTS RESPONSIBILITIES 3.3.1 The Contractor is advised that various actions taken or decisions made by the Owner and/or the Architect under this Contract,require the prior approval and counter-signature of the Administrator. Those actions or decisions include, f but are not limited to,the following: __, .1 Approval,substitutions,and final selection of Sub-Bidders pursuant to M.G.L.c.149§44F .2 Change Orders and Construction Change Directives, whether or not they affect a change in the Contract (� Sum or in the Contract Time. .3 Written orders,notices,and approvals given by the Owner pursuant to the Contract Documents or pursuant to any Laws applicable to this Contract,including approval of the Contractor's payment requests. .4 Approval of"or equal"submissions and substitutions pursuant to Subparagraph 4.6.3. [ .5 Stop Work order. .6 Certificate of Substantial Completion. .7 Final payment. .8 Termination of Contract. 3.3.2 In any instance where the Contractor requires clarification as to whose approval is required,the Architect shall provide such clarification, 3.3.3 Work undertaken by the Contractor or a Subcontractor at the Owner's or other person's order without the Administrator's countersignature prior to the start of such work shall be considered unauthorized work and shall not be considered cause for extra payment. The Contractor or Subcontractor shall be responsible for performing,at their own expense,corrective measures required by the Architect due to any failure to obtain the prior approval of the r I Administrator pursuant to Subparagraph 3.3.1. 3.3.4 The Department and its authorized representatives and agents shall at all times have access to,and be permitted to observe and review all Work,materials,payrolls,records of personnel,conditions of employment,invoices of -� materials,and other relevant data and records maintained by the Contractor on the Project. ARTICLE 4 CONTRACTOR t � 4.1 DEFINITION The Contractor,sometimes referred to as the General Contractor,is the person or entity identified as such throughout the Contract Documents as if singular in number. The term Contractor means the Contractor or its authorized representative. 4.2 REVIEW OF CONTRACT DOCUMENTS&FIELD CONDITIONS BY CONTRACTOR 4.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner pursuant to Subparagraph 2.2.2 and shall at once report to the Architect errors,inconsistencies,or omissions discovered. The Contractor shall not be liable to the Owner or Architect for damage resulting from errors, [-1 inconsistencies,or omissions in the Contract Documents unless the Contractor recognized such error,inconsistency,or omission and knowingly failed to notify the Architect. If the Contractor performs any construction activity knowing it involves a recognized error,inconsistency or omission in the Contract Documents without such notice to the Architect,the Contractor shall assume responsibility for such perfomiance and shall bear the attributable costs for correction. n 4.2.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field J measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors,inconsistencies,or omissions discovered shall be reported to the Architect at once. [ I 4.23 The Contractor shall perform the Work in accordance with the Contract Documents and submittals approved pursuant to Paragraph 4.7. 4.3 SUPERVISION AND CONSTRUCTION PROCEDURES, [ COORDINATION,AND CUTTING AND PATCHING 4.3.1 The Contractor shall supervise and direct the Work,using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means,methods,techniques,sequences and [ procedures,and for coordinating all portions of the Work under the Contract. LJ DHCD$100k-10 Mil GENERAL CONDITIONS c.149 812004 3 of 29 f � 4.3.2 The Contractor shall be responsible for the proper fitting of all Work and the coordination of the operations of all trades,Subcontractors,or materialmen engaged upon the Work. 4.3.3 All necessary cutting,coring, drilling,grouting, and patching required to fit together the several parts of the Work shall be done by the Contractor, except as may be specifically noted otherwise under any particular filed sub-bid section of the Specifications. 4.3.4 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors,and their agents and employees,and other persons performing portions of the Work. 4.3.5 The Contractor shall be responsible for inspection of portions of Work already performed under this Contract to determine that such portions are in proper condition to receive subsequent Work. 4.3.6 The Contractor shall do engineering required for establishing grades,lines,levels,dimensions,layouts,and reference points for the trades;shall be responsible for maintaining bench marks and other survey marks;and shall replace any bench marks or survey marks which have been disturbed or destroyed. 4.3.7 Unless otherwise required by the Contract Documents,or directed in writing by the Architect,Work shall be done during regular working hours. However,if the Contractor desires to carry on the Work outside of regular working hours or on Saturdays,Sundays,or Massachusetts holidays it shall allow ample time to enable satisfactory arrangements to be made for inspecting Work in progress and shall bear the costs of such inspection. The Owner shall bill the Contractor directly for such costs. 4.3.8 Work done outside of regular working hours without the consent or knowledge of the Architect shall be subject to additional inspection and testing as directed by the Architect. The cost of this inspection and testing shall be paid by the Contractor whether the Work is found to be acceptable or not. 4.4 SUPERINTENDENT 4.4.1 The Contractor shall employ a Superintendent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The Superintendent shall represent the Contractor,and communications given to the Superintendent shall be as binding as if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case. The Superintendent shall attend each job meeting. 4.4.2 The Superintendent shall be a competent and responsible employee,satisfactory to the Owner,who is regularly employed by the Contractor and is designated by the Contractor as its representative to be in full time attendance at the Project site throughout the construction of the Work The Superintendent shall be responsible for coordinating all the Work of the Contractor and the Subcontractors. The Superintendent shall be licensed consistent with the Massachusetts Building Code. The Superintendent's resume shall be submitted to the Owner prior to commencement of construction and must demonstrate to the Owner's reasonable satisfaction that the Superintendent has performed similar duties on previous construction projects similar to the Project. 4.5 LABOR The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Work. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them,and whenever the Owner shall notify the Contractor,in writing,that any worker is,in its opinion, incompetent,unfaithful,disorderly,or otherwise unsatisfactory,such employee shall be discharged from the Work and shall not again be employed on the Project except with the consent of the Owner. 4.6 MATERIALS AND EQUIPMENT 4.6.1 Unless otherwise provided in the Contract Documents,the Contractor shall provide and pay for materials, equipment,tools,construction equipment and machinery,water,heat,utilities,transportation,and other facilities and services necessary for proper execution and completion of the Work,whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 4.6.2 Materials and Equipment to be installed as part of the Contract(both or either of which are hereinafter referred to as"Materials")shall be new,unused,of recent manufacture,assembled,and used in accordance with the best construction practices. 4.6.3 "OR EQUAL"SUBMISSIONSISUBSTITUTIONS 4.6.3.1 Except where a product has been specified as a proprietary material,the words"or equal"are understood to follow the name of any maker,vendor,or product specified to be used in the Contract Documents. To determine if the materials or articles proposed by the Contractor are equal to those specified,the Architect shall determine whether the materials or articles proposed are at least equal in quality,durability,appearance,strength and design to the material or articles named or described,and will perform at least equally the functions imposed by the design. See M.G.L.c.30§39M. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 4 of 29 !'1 LJ r 1 4.6.3.2 The Contractor shall be responsible for providing the Architect with any information and test results the ,-J Architect reasonably requires to determine if a material is equal to a material named or described in the Contract Documents. r1 4.6.3.3 Whenever the Contractor submits a material for approval as a substitute for a material named or described in the Contract Documents,such submission shall be made at least one hundred and twenty(120)days prior to the date the �J materials will be used on the Project. In no event shall the Contractor maintain a claim for delays based upon the Architect's review of such substituted materials if the Contractor has failed to comply with the one hundred and twenty (120)days submission requirement. `—' 4.7 SHOP DRAWINGS,PRODUCT DATA,AND SAMPLES 4.7.1 Shop Drawings are drawings,diagrams,sdiedules,and other data specially prepared for the Work by the Contractor or a 1 Subcontractor,Sub-subcontractor,manufacturer,supplier,or distributor to illustrate a portion of the'Work. 4.7.2 Product Data are illustrations,standard schedules,performance charts,instructions,brochures,diagrams and other information furnished by the Contractor or its Subcontractors and suppliers to illustrate materials or equipment for F1 some portion of the Work. 4.7.3 Samples are physical examples which illustrate materials,equipment,or workmanship and establish standards by which the Work will be judged. 4.7.4 Shop Drawings,Product Data,Samples,and similar submittals are not Contract Documents. The purpose of u their submission is to demonstrate for those portions of the Work for which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. r-1 Review by the Architect is subject to the limitations of Subparagraph 4.7.9. 4.7.5 The Contractor shall review,approve,and submit to the Architect Shop Drawings,Product Data,Samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the 1 Work or in the activities of the Owner or of separate contractors. Submittals made by the Contractor which are not required by the Contract Documents may be returned without action. The Contractor's attention is directed to the provisions of u Subparagraph 4.6.3 entitled"Or Equal"Submissions/Substitutions and Section 01300 of the Specifications. 4.7.6 The Contractor shall prepare and keep current,for the Architect's approval,a schedule of submittals which is n coordinated with the Contractor's construction schedule submitted pursuant to Paragraph 9.4,and allows the Architect J reasonable time to review submittals. 4.7.7 The Contractor shall perform no portion of the Work requiring submittal and review of Shop Drawings,Product r-1 Data,Samples or similar submittals until the respective submittal has been approved by the Architect. Such Work shall u be in accordance with approved submittals. 4.7.8 By approving and submitting Shop Drawings,Product Data,Samples and similar submittals,the Contractor r-1 represents that the Contractor has determined and verified materials,field measurements,and field construction criteria related thereto,or will do so,and has checked and coordinated the information contained within such submittals with the LJ requirements of the Work and of the Contract Documents. n 4.7.9 The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop Drawings,Product Data,Samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and the Department has given explicit written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop f 1 Drawings,Product Data,Samples,or similar submittals by the Architect's actions. 4.7.10 The Contractor shall direct specific attention,in writing or on resubmitted Shop Drawings,Product Data, Samples or similar submittals,to revisions other than those requested by the Architect on previous submittals. 4.7.11 Informational submittals upon which the Architect is not expected to take responsive action maybe so LJ identified in the Contract Documents. 4.7.12 When professional certification of performance criteria of materials,systems or equipment is required by the ! Contract Documents,the Architect shall be entitled to rely upon the accuracy and completeness of such calculations and certifications. r1 u rl DHCD$100k-10 Mil GENERAL CONDITIONS c.149 812004 5 of 29 f1 v 4.8 SAMPLES AND TESTS 4.8.1 Materials to be used in the Work may be tested or inspected after reasonable notice by the Architect and may be rejected if they fail the specified tests. Except as otherwise provided in the Contract,all testing of material specifically requested by the Architect will be paid for by the Owner,except that the cost of testing of materials that fail the testing criteria shall be bome by the Contractor. If the Contractor requests permission to use a material that was not specified in the Contract Documents and the Architect requires testing of such material before approving its use,the Contractor shall pay for such testing. 4.8.2 The source of material proposed by the Contractor shall be designated in time to permit all required testing and inspection before the material is needed for incorporation into the Work The Contractor shall have no claim for delays due to testing if it fails to designate the proposed source or to order the material in time to provide for adequate testing and inspection. Necessary arrangements shall be made to permit the Architect to make factory,shop,or other inspection of materials or equipment ordered for the Work,in process of manufacture or fabrication,or in storage elsewhere than the site of the Work 4.8.3 The Contractor shall furnish the Architect with samples of the materials it proposes to use in the execution of the work in sufficient time to afford the Architect the opportunity to adequately review and,if necessary,arrange for testing of such materials. 4.9 DELIVERY AND STORAGE OF MATERIALS 4.9.1 Materials and equipment shall be progressively delivered to the site so that there will be neither delay in the progress of the Work nor an undue accumulation of materials that are not to be used within a reasonable time. 4.9.2 Materials stored off-site shall be stored at the expense of the Contractor in a manner that preserves their quality and fitness for the Work. Material shall be placed on wooden platforms or other hard clean surfaces and not on the ground and shall be properly protected. 4.9.3 If the Contractor requests the Architect's inspection of materials stored off-site,the Contractor shall assume the Architect's reasonable costs for travel,room,and meals associated with such inspection. 4.9.4 Materials stored either at the site or at some other location agreed upon in writing shall be located so as to facilitate prompt inspection and may again be inspected prior to their use in the work- 4.9.5 ork4.9.5 The Contractor shall take charge of and be liable for any loss of or injury to the materials delivered at or in the vicinity of the place where the Work is being done and shall notify the Architect as soon as any such materials are so delivered and allow them to be examined by the Architect. 4.9.6 Payment for stored materials shall be made in accordance with Paragraph 10.4. 4.10 WARRANTY The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents,that the Work will be free from defects not inherent in the quality required or permitted,and that the Work will conform with the requirements of the Contract Documents. Work not conforming to these requirements,including substitutions not properly approved and authorized,may be considered defective. If required by the Architect,the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 4.11 REJECTION OF DEFECTIVE MATERIALS The Architect may reject materials if the Architect reasonably determines that such materials do not conform to the Contract Documents. No rejected materials,the defects of which have been subsequently corrected,shall be used in time Work except with the written permission of the Architect. No extra time shall be allowed for completion of the Work due to the rejection of non-conforming materials. 4.12 REJECTION OF DEFECTIVE WORK The Architect's inspection of the Work shall not relieve the Contractor of any of its responsibilities to fulfill the Contract obligations,and defective work shall be corrected. Unsuitable work may be rejected by the Architect,notwithstanding that such work and materials have been previously overlooked or misjudged by the Architect and accepted for payment. If the Work or any part thereof shall be found defective at any time before the final acceptance of the whole Work,the Contractor shall forthwith correct such defect in a manner satisfactory to the Architect;and if any material brought upon the site for use in the Work,or selected for the same,shall be rejected by the Architect as unsuitable or not in conformity with the Contract requirements,the Contractor shall forthwith remove such materials from the vicinity of the Work. 4.13 MATERIALS ATTACHED OR AFFIXED TO THE WORK Nothing in this Contract shall be construed as vesting in the Contractor any right of property in the materials used atter they have been attached or affixed to the Work or the soil;but all such materials shall,upon being so attached or affixed,become the property of the Owner. DHCD 10k-10 Mil GENERAL CONDITIONS c.149 8/2004 6 of 29 r � �1 C7 4.14 SALES TAX EXEMPTION AND OTHER TAXES 4.14.1 To the extent that materials and supplies are used or incorporated in the performance of this Contract,the Contractor is considered an exempt purchaser under the Massachusetts Sales Act,Chapter 14 of the Acts of 1966. f ! 4.14.2 The Contractor shall be responsible for paying all other taxes and tariffs of any sort,related to the work. `J 4.15 DOCUMENTS AND SAMPLES AT THE SITE The Contractor shall maintain at the site for the use and information of the Owner,one record copy of the Drawings, Specifications,Addenda,Change Orders,and other Contract Modifications,in good order and marked currently to record •-J changes and selections made during construction,and in addition approved Shop Drawings,Product Data,Samples, updated construction schedule,and similar required submittals. These shall be available to the Architect and shall be f delivered to the Architect for submittal to the Owner upon completion of the Work. 4.16 PERMITS,FEES,AND NOTICES 4.16.1 The Contractor shall secure and pay for any and all permits,licenses,and feesrequired for the proper execution of the Work. The Contractor shall coordinate all efforts required to obtain these permits 4.16.2 The Contractor shall comply with and give notices required by laws,ordinances,rules,regulations,and lawful orders of public authorities bearing on performance of the Work. f 4.16.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws,statutes,ordinances,building codes,and rules and regulations. However,if the Contractor observes that portions of the Contract Documents are at variance therewith,the Contractor shall promptly notify the Architect and .� Owner in writing,and necessary changes shall be accomplished by appropriate Modification. 4.16.4 If the Contractor performs Work knowing it to be contrary to laws,statutes,ordinances,building codes,and rules and regulations without such notice to the Architect and Owner,the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. f� 4.17 DEBRIS,CHEMICAL WASTE 4.17.1 The Contractor shall not permit the accumulation of debris,both exterior and interior,and the work area shall at all times be kept satisfactorily clean. f� 4.17.2 The Contractor shall remove debris from the site of the work and legally dispose of it at any private or public dump that the Contractor may choose. The Contractor shall make all arrangements and obtain any approvals necessary for said disposal from the owners or officials in charge of such dumps and shall bear all cost,including fees resulting f 1 from such disposal. Garbage shall be removed daily. v 4.17.3 No open fire shall be permitted on site. 4.17.4 Chemical Waste: Chemical waste shall be stored in corrosion resistant containers,removed from the Project site, f and disposed of not less frequently than monthly unless directed otherwise. Disposal of chemical waste shall be in accordance with requirements of the U.S.Environmental Protection Agency(EPA)and the Massachusetts Department of Environmental Protection(DEP).Fueling and lubricating of vehicles and equipment shall be conducted in a manner that f i affords the maximum protection against spills and evaporation Lubricants to be discarded or burned shall be disposed of in accordance with approved procedures meeting all applicable Federal,State and local regulations. In the event of an oil or hazardous materials spill large enough to violate Federal,State,or applicable local regulations,the Architect shall be notified immediately. The Contractor shall be responsible for immediately cleaning up any oil or hazardous waste spills resulting f from its operations. Any costs incurred in cleaning up any such spills shall be borne by the Contractor. 4.18 SITE AND WEATHER PROTECTION 4.18.1 The Contractor shall take precaution during the execution of work involving demolition not to disturb or f 1 damage any existing structures,landscaping,walks,roads,or other items scheduled to remain. The Contractor shall restore any damaged items to original condition and as directed by the Architect. The Contractor shall provide and `-i erect acceptable barricades,fences,signs,and other traffic devices to protect the work from traffic and the public as reasonably necessary and as required by the Massachusetts Building Code. f1 4.18.2 The Contractor shall install weather protection and provide adequate heat in the protected area from u November 1 to March 31 as required by M.G.L.c.149§44G. f1 4.19 ARCHAEOLOGICAL AND HISTORICAL RESOURCES All items having any apparent historical or archaeological interest which are discovered in the course of any construction u activities shall be carefully preserved and reported immediately to the Architect for determination of appropriate actions to be taken. r U DHCD$100k-10 Mil GENERAL CONDITIONS 049 812004 7 of 29 U 4.20 SAFETY REQUIREMENTS 4.20.1 The Contractor must comply with all Federal,State,and Local safety laws and regulations of the applicable to work performed under this Contract. 4.20.2 If the Contractor uses or stores toxic or hazardous substances it is subject to M.G.L.c.l I IF§2,the"Right to Know"law and regulations promulgated by the Department of Public Health, 105 CMR 670,the Department of Environmental Protection,310 CMR 33,and the Department of Labor and Workforce Development,441 CMR 21;and must post a Workplace Notice obtainable from the Department of Labor and Workforce Development. 4.20.3 The Contractor must comply with Dig-Safe Laws. Dig-Safe is the Utility Underground Plant Damage Prevention System,331 Montvale Ave.,Woburn,MA 01801,1.888.344.7233. The Contractor must notify Dib Safe of contemplated excavation,demolition,or explosive work in public or private ways,and in any utility company right of way or easement,by certified mail,with a copy to Department of Environmental Protection(DEP). This notice must be given at least 72 hours prior to the work,but not more than sixty days before the work is to be done. Such notice shall state the name of the street or the route number of the way and an accurate description of the location and nature of the proposed work. Dig-Safe is required to respond to the notice within 72 hours of receipt by designating the location of pipes,mains,wires or conduits at the site. The Contractor shall not commence work until Dig-Safe has responded. The work shall be performed in such manner and with reasonable precautions taken to avoid damage to utilities under the surface at the work location. The Contractor shall provide the Superintendent with current Dig-Safe regulations,and a copy of M.G.L.c.82§40. Any costs related to the services performed by Dig-Safe shall be borne by the Contractor. 4.20.4 This project is subject to compliance with Public Law 92-596"Occupational Safety and Health Act of 1970" (OSHA),with respect to all rules and regulations pertaining to construction,U.S.Code Title 29,sections 651 et seq. including Volume 36,numbers 75 and 105,of the Federal Register as amended,and as published by the U.S.Department of Labor. 4.20.5 If this Project requires the containment or removal of asbestos or material containing asbestos,lead or waste containing lead based paint,the Contractor shall ensure that the person or company performing the asbestos or lead related services is licensed pursuant to applicable State laws and regulations. 4.21 ACCESS TO WORK The Contractor shall provide the Owner and Architect access to the Work at all times and shall cooperate with the Owner whenever the Owner invites visitors to the site. ARTICLE 5 ADMINISTRATION OF THE CONTRACT 5.1 ARCHITECT The Architect is the person or entity licensed to practice architecture or engineering,who is responsible for performing the duties assigned to the Architect by the Contract Documents. 5.2 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION Except as otherwise provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall communicate through the Architect. Communications by and with the Architect's consultants shall be through the Architect. Communications by and with Subcontractors and material suppliers shall be through the Contractor.Communications by and with separate contractors shall be through the Owner. 5.3 ARCHITECTS ADMINISTRATION OF THE CONTRACT 5.3.1 The Architect will provide administration of the Contract as described in the Contract Documents,and will be the Owner's representative(1)during construction,(2)until final payment is due and(3)with the Owner's concurrence, from time to time during the guaranty period described in Article 11. The Architect will advise and consult with the Owner. 5.3.2 The Architect will regularly visit the site,conduct job meetings,and keep the Owner informed of the progress and quality of the Work,and will endeavor to guard the Owner against defects and deficiencies in the Work The Architect's minutes of meetings shall be the official minutes kept on the Project. 5.33 Based on the Architect's observations and evaluations of the Contractor's Applications for Payment,the Architect will review and certify the amounts due the Contractor and will submit to the Owner and the Department for their consideration Certificates for Payment in such amounts as the Architect determines appropriate. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 8 of 29 �J r-, 5.3.4 The Architect shall reject Work which does not conform to the Contract Documents. Whenever the Architect u considers it necessary or advisable to achieve the intent of the Contract Documents,the Architect will have authority to require additional inspection or testing of the Work in accordance with Paragraph 4.8. 5.3.5 The Architect will review and approve or take other appropriate action upon the Contractor's submittals such as u Shop Drawings,Product Data and Samples,but only for the limited purpose of checking such submittals for conformance with the information given and the design concept expressed in the Contract Documents. This review shall be in r accordance with the provisions of Subparagraph 4.6.3 and the procedures described in Section 01300 of the Specifications, and shall not relieve the Contractor from compliance with the requirements of the Contract Documents. 5.3.6 The Architect will prepare Change Orders and Construction Change Directives, and may authorize Minor Changes in the Work as provided in Paragraph 8.L 5.3.7 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of Final Completion,will receive and forward to the Owner for the Owner's review and records written warranties and related documents required by the Contract and assembled by the Contractor,and will issue a final Certificate for Payment upon the Contractor's compliance with the requirements of the Contract Documents. 5.3.8 if the Owner,Architect,and Department agree,the Owner may provide one or more project representatives to assist in carrying out the Architect's responsibilities at the site. The duties,responsibilities,and limitations of authority of f such prpject representatives shall be as described in the Construction I landbook and explained at the pre-construction u conference. 5.3.9 The Architect will interpret and decide matters concerning performance under and requirements of the Contract Documents on written request of either the Owner or Contractor. The Architect's written response to such requests will be made within the thirty day time limit prescribed in Paragraph 8.6.3. u 5.3.10 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent f 1 expressed in the Contract Documents. 5.4 PROCEDURES AND PRACTICES The Department's procedures,forms,and practices which must be employed on the Project are described in the r i Construction I landbook.and will be explained at the pre-construction conference_ 5.5 PRECONSTRUCTION CONFERENCE Prior to commencement of the Work,the Contractor shall meet in conference with representatives of the Owner, r 1 Department,and Architect to discuss and develop mutual understandings relative to administration of the quality assurance program,safety program,labor provisions,the schedule of work,and other Contract procedures. u ARTICLE 6 SUBCONTRACTORS � 1 6.1 DEFINITION u 6.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the work at the site. 6.1.2 The Contractor shall require each Subcontractor to be bound to the Contractor by the terms of the Contract u Documents,and to assume toward the Contractor all the obligations and responsibilities which the Contractor assumes toward the Owner and the Architect. :'I 6.1.3 Subcontracts between the Contractor and a filed sub-bidder shall be in the form required by M.G.L c.149§44F. 6.2 CONTINGENT ASSIGNMENT OF SUBCONTRACTS Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner provided that: .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Paragraph u 19.1 and only for those subcontract agreements which the Owner accepts by notifying the Subcontractor in writing,and .2 assignment is subject to the prior rights of the surety obligated under bond relating to the Contract. ' 1 DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 9 of 29 f ; u ARTICLE 7 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS 7.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces,and to award separate contracts in connection with other portions of the Project or other construction or operations on the site. If the Contractor claims that delay or additional cost is involved because of such action by the Owner,the Contractor shall make such claim as provided elsewhere in the Contract Documents. 7.1.2 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate contractor with the Work of the Contractor,who shall cooperate with them. The Contractor shall participate with other separate contractors and the Owner in reviewing and coordinating their construction schedules with one another when directed to do so. 7.2 MUTUAL RESPONSIBILITY " 7.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Contract Documents. - 7.2.2 If part of the Contractor's Work depends on proper execution or results upon construction or operations by the Owner or a separate contractor,the Contractor shall,prior to proceeding with that portion of the Work,promptly report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor to so report shall constitute an acknowledgment that the Owner's or separate contractors'completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. 7.2.3 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially completed construction or to property of the Owner or separate contractors ARTICLE 8 CHANGES IN THE WORK 8.1 CHANGES-DEFINITIONS 8.1.1 All changes in the work,including any increase,decrease,or other equitable adjustment in the Contract Sum or in the time for performing the Contract,shall be authorized in the form of one,or a combination of,the following written instruments: Change Order,Construction Change Directive,or a Minor Change in the Work. The term"equitable adj ustment"as used in this paragraph shall include all adjustments to the Contract Sum or time to which the Contractor is entitled pursuant to M.G.L.c.30§§39N and 390 and such equitable adjustment shall be made in accordance with the provisions of this Article. 8.1.2 A Minor Change is a written order binding on the Owner and Contractor issued by the Architect,with the concurrence of the Construction Advisor,not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. The Contractor shall carry out such written orders promptly. 8.1.3 A Change Order is a written instrument prepared by the Architect and signed by the Owner,Department, Contractor,and Architect,stating their agreement regarding a change in the work,including a change in the Contract Sum or Contract Time. 8.1.4 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner, Architect,and Department,directing a change in the Work and stating a proposed basis for adjustment,if any,in the Contract Sum,or Contract Time,or both. The Owner may,by Construction Change Directive,and without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions,deletions or other revisions,the Contract Sum and Contract Time being adjusted accordingly. DHCD 10k-10 Mil GENERAL CONDITIONS c.149 8/2004 10 of 29 C1 _J 8.1.5 A Change Order shall be based upon agreement among the Owner,Contractor,Architect,and Department;a .� Construction Change Directive requires agreement by the Owner,Architect,and the Department,and may or may not be agreed to by the Contractor;an order for a Minor Change in the Work may be issued by the Architect with the concurrence of the Construction Advisor. u 8.1.6 Change Orders and Construction Change Directives must be counter-signed by the Administrator in accordance with Subparagraph 3.3.1,to be effective. r ' 8.2 REQUEST FOR A CHANGE IN THE WORK A change order request shall be in writing and may originate with the Owner,the Department,the Architect,or the Contractor. If such a request would cause a change in the Contract Sum,the Contractor shall promptly submit to the Architect its cost and pricing data for such proposed change. Such data shall be accurate,current and complete at the time of submission and shall be computed in accordance with Subparagraph 8.3.1. 8.3 METHOD FOR DETERMINING AMOUNT OF CHANGE ( 1 8.3.1 Changes in the Contract Sum shall be calculated in accordance with one or a combination ofthe following methods,as determined by the Architect: v .1 Lump sum basis,provided the lump sum amount shall include the estimated cost of the change,broken down by Items a through i in the following Subparagraph.3. I .2 Unit price basis, to be adjusted in accordance with contract unit prices, or other agreed upon unit prices provided that the unit prices shall be inclusive of all costs related to such equitable adjustment. `J .3 Time and materials basis, on a not-to-exceed predetermined upset amount determined by the Architect, to be subsequently adjusted on the basis of the Contractor's actual costs based on the following items a though is a. Cost of labor at the rates found elsewhere in this document,including foremen; u b. Costs of materials,supplies and equipment,including cost ofiransportation,whether incorporated or consumed; c. Rental cost of machinery and equipment,exclusive ofhand tools,whether rented from the Contractor or others. I t d. A percent of the net increase or decrease of Item a to cover Worker's Compensation,F.I.C.A.,and unemployment contributions. e. The percentage for Worker's Compensation in Item d above shall not exceed the standard manual rate for the involved trade,as set by the Worker's Compensation Rating and Inspection Bureau of Massachusetts. This rate shall t t not include any surcharges such as experience modifications and all risk factor adjustment programs,etc. L For work performed by the Contractor's own forces,there shall be added an amount of 15%of items a-d for �J overhead,superintendence,and profit. g. For work performed by any Subcontractor,there shall be added an amount of 15%of the Subcontractor's costs rl for Items a-d for the Subcontractor's overhead,superintendence and profit. The Contractor shall be entitled to an additional 1011/o mark-up on the total amount of the Subcontractor's price as compensation for assuming full ` responsibility and supervision for the Subcontractor's work. h. Actual increases in the premium costs forperfammnce and payment bonds required of the Contractor and filed ( � Subcontractors,provided there will be an appropriate credit for reduced premiums for a credit change order. i. On any change in the Contract Sum that involves a credit,the amount of the credit will not include an overhead and profit factor,however,the credit will include an amount for item d.which shall not be less than 25%of item a. (_t 8.3.2 The method provided in Subparagraph 8.3.1,for compensating the Contractor and Subcontractors for changes in the Work,shall be considered to adequately compensate the Contractor and Subcontractors for any and all costs directly,indirectly,or consequentially related to,or caused by,such change in the work. r 8.4 WORK PERFORMED UNDER PROTEST The Contractor shall perform all work as directed by the Architect,and if the Architect determines that certain work for which the Contractor has requested a change order does not represent a change in the Contract,or if the Contractor and the Architect cannot agree to the amount of compensation for a change order,the Contractor shall perform said work a 1 under protest and must follow the notice requirements and maintain the records required by Subparagraph 8.7.3. u 8.5 STATUTORY CHANGE ORDER PROVISIONS The Contractor's attention is directed to the Massachusetts General Laws Chapter 30, 39L 39J,39N,390 and 39P,the provisions of which apply to this Contract. u r-1 �J ( 1 �J DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 11 of 29 ( 1 u 8.6 DIFFERING SITE CONDITIONS,M.G.L. c.30§39N 8.6.1 If,during the progress of the Work.the Contractor or the Owner discovers that the actual subsurface or latent physical conditions encountered at the site differ substantially or materially from those shown on the plans or indicated in the Contract Documents,either the Contractor or the Owner may request an appropriate time extension and an equitable adjustment in the Contract Sum applying to work affected by the differing site conditions. A request for such an adjustment shall be in writing and shall be delivered by the party making such claim to the other party as soon as possible after such conditions are discovered. 8.6.2 Upon receipt of such a claim from a Contractor,or upon its own initiative,the Owner shall make an investigation of such physical conditions,and,if they differ substantially or materially from those shown on the plans or indicated in the Contract Documents or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the plans and Contract Documents and are of such nature as to cause an increase or decrease in the cost ofperfommnce ofthe work or a change in the construction methods required for the performance of the work which results in an increase or decrease in the cost of the work,the Owner shall upon submission by the Contractor of a properly submitted Change Order request,make an equitable adjustment in the Contract Sum and the Contract shall be modified in writing accordingly. 8.6.3 TIMELY DECISION BY OWNER.M.G.L.c.30§39P Whenever this Contract requires the Owner or its Architect to make a decision during construction of the Project;on interpretation of the specifications,approval of equipment,material or any other approval,or progress of the work,that decision shall be made promptly and,in any event,no later than thirty days after receipt of a written submission for such decision by the Contractor-,but if such decision requires extended investigation and study,the Owner or the Architect shall,within thirty days after the receipt of the submission,give the Contractor written notice of the reasons why the decision cannot be made within the thirty day period and the date by which the decision will be made. 8.7 CLAIMS 8.7.1 If the Contractor has any claim or dispute of any nature arising under this Contract,including a claim based on the Owner's failure or refusal to approve a change order request of the Contractor,in full or in part,the Contractor shall submit such claim or dispute to the Architect,in the form of a change order request,for initial review and consideration, subject to further appeal to the Administrator. If the Contractor is not satisfied with the Architect's decision or,if the Architect fails to render a decision within thirty days after receiving written notice of such claim or dispute from the Contractor,the Contractor may file a written request for a decision with the Department pursuant to Subparagraph 8.7.2. 8.7.2 Appeal of an Architect's decision under Subparagraph 8.7.1 must be made directly to the Administrator by certified mail,copy to the Architect and Owner,within twenty-one(21)calendar days after the date on which the party making the appeal receives the Architect's written decision or within twenty-one(21)days after the thirty(30)day non- decision period noted in 8.7.1. Failure to appeal within this period will result in the Architect's decision becoming final and binding upon the Owner and the Contractor. 8.7.3 Pending resolution of the claim or dispute,the Contractor must proceed with the disputed Work,as directed by the Architect. The Contractor must give written notice to the Department and the Architect stating that it is proceeding with the disputed work under protest. Accurate records of the nature and extent of the disputed Work and of the time spent and equipment used on the disputed Work shall be maintained by the superintendent and verified daily by the Project Representative,or the Owner's designee. Failure of the Contractor to maintain such records shall cause the Contractor to forfeit its claim to additional compensation for such disputed work. 8.7.4 Meetings or administrative conferences held by the Department to review the basis of the claim or dispute are conducted in accordance with the procedure described in the Construction Iltuidbook. Such conferences are not subject to the State Administrative Procedures Act. 8.7-1; At the conclusion of these proceedings,the Department shall issue a decision which shall be final under the Contract. The matter may then be appealed to a court of competent jurisdiction. 8.7.6 Requests for administrative conferences by subcontractors must be made by the Contractor,subcontractors cannot make such requests directly. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 812004 12 of 29 r� ARTICLE 9 r ; TIME,SCHEDULES,AND COMPLETION u 9.1 DEFINITIONS [, 9.1.1 Unless otherwise provided,Contract Time is the period of time,as extended by approved Change Order, allotted in the Contract Documents for Substantial Completion of the Work. u 9.1.2 The date of commencement of the Work is the date established in the Notice to Proceed from the Owner. The r I commencement date shall not be postponed by the failure to act by the Contractor or by persons or entities for whom the Contractor is responsible. 9.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Subparagraph 9.6.7. 9.1.4 The tern"day"as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. �, 9.2. PROGRESS AND COMPLETION 9.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Contract the [ 1 Contractor confirms that the Contract Time is a reasonable period for performing the Work. 9.2.2 The Contractor shall proceed expeditiously with adequate fomes and shall achieve Completion within the Contract Time. 9.3 DELAYS AND EXTENSIONS OF TIME r 1 9.3.1 The Contractor shall be entitled to an extension of time for completion of the Work because of; `J .1 acts of God; .2 labor disputes; r 1 .3 abnormal weather conditions;or .4 acts of neglect of the Owner,Architect,or Department as described in Subparagraph 8.6.3. �J 9.3.1.5 Except in unusual circumstances,delays caused by suppliers,Subcontractors and sub-subcontractors shall be considered to be within the control of the Contractor. r_1 9.3.1.6 Should the Contractor require additional time to complete the Work,the Contractor shall document the reasons therefor and request an extension of time at the time the alleged delay occurs,as provided in this Article and Article 8. 9.3.1.7 Failure to notify the Architect of any delay as provided in this Article shall preclude the Contractor from IF 1 subsequently claiming any damages due to said delay. u 9.3.1.8 Requests for extensions of time shall be submitted as a change order request to the Architect under Article 8 for the Owner's consideration. 9.3.2 CONTRACTOR'S LIABILITY FOR DELAYS The Contractor shall be liable for,and shall pay,to the Owner,all of the Owner's Project related costs incurred after the time stipulated for Substantial Completion,as extended by Change Order. Such costs shall include: fees paid to r 1 the Architect as extra services for inspection services and administration of the Contract,at the rate stipulated in the Contract for Architectural Services between the Owner and the Architect; the costs of the Project Representative at �J the current salary rate;lost rental income based on the average rent collected by the Owner,and/or increased rental subsidies and any other direct expenses. The Owner may retain from moneys otherwise due the Contractor whatever r sums accrue to the Owner pursuant to this provision. The Contractor shall not be liable for costs for delay in performance for any period for which an extension of the Contract Time has been granted pursuant to the provisions of Subparagraph 9.3. r1 9.3.3 OWNER DELAYS 9.33.1 The Owner may delay the commencement ofthe Work,or any part thereof,due to unforeseen circumstances or conditions which have a bearing on the Work required under this Contract or for any other reason if it is deemed to be in the best interest of the Owner to do so. Except as expressly provided in the following Subparagraphs 9.3.3.2,9.3.3.3,and 9.3.3.4, the Contractor shall have no claim for additional compensation on account of such delay,but shall be entitled to an extension of u Contract Time as determined reasonable by the Architect. 9.3.3.2 The Contractor and the Owner agree that the following Subparagraphs provide the Contractor with the right to request additional compensation for Owner caused delays only in the following two circumstances: .1 When the Owner provides the Contractor with a written order to suspend or delay the Work,or a portion thereof,for a period of fifteen days or more. r1 DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 13 of 29 r1 u .2 When the Owner or its Architect fails to make a decision within the thirty day period described in Subparagraph 8.6.3 and such failure delays the Work,or a portion thereof,for fifteen days or more. 9.33.3 The Owner may,for its convenience,order the Contractor in writing to suspend,delay,or interrupt all or any part of the Work for such period of time as it may determine appropriate,provided however,that if there is a suspension,delay, or interruption for fifteen days or more,or there is a failure of the Owner to act within the time specified in this Contract,the Owner shall make an adjustment in the Contract Sum for any increase in the cost of performance of this Contract,but shall not include any profit to the Contractor on account of such increase;and provided further,that the Owner shall not make any adjustment in the Contract Sum under this provision for any suspension,delay,interruption,or failure to act to the extent that such is due to any cause for which this Contract provides for an equitable adjustment of the Contract Sum under any other Contract provisions.M.G.L.e.30§390(a). 9.3.3.4 The Contractor must submit the amount of a claim under Subparagraph 9.3.3.3 to the Owner in writing as soon as practicable after the end of the suspension,delay,interruption,or failure to act and,in any event,not later than the date of final payment under this Contract and except for costs due to a suspension order,the Owner shall not approve any costs in the claim incurred more than twenty days before the Contractor notified the Owner in writing of the act or failure to act involved in the claim. M.G.L.c.30§390(b). 9.3.3.5 The Owner and the Contractor agree that the preceding Subparagraph 9.3.3.4 places a burden on the Contractor to infonn the Owner,whenever the Contractor considers that an action or inaction of the Owner or its Architect could result or has resulted in a delay in the Project,thereby providing the Owner with the opportunity to take action to avoid or lessen the time extensions or damages that might be associated with such action or inaction. 9.33.6 The Contractor must file any claim for additional compensation made pursuant to Subparagraph 9.3.3.4 as a Change Order request. The amount of any such claim shall be calculated only in accordance with the provisions of Subparagraph 8.3.1.3 items a through i,and shall be subject to the provisions of Subparagraph 8.3.2. 9.4 CONSTRUCTION AND PAYMENT SCHEDULES 9.4.1 Prior to commencement of the Work the Contractor shall submit to the Architect a construction schedule in bar graph form,satisfactory to the Architect,showing in detail the proposed progress for the construction of the various parts of the Work,the proposed times for receiving materials required,and the interrelationship between the various construction operations and the percentage of completion and the dollar value of the completed work on the first day of each month for each section of the specifications and the entire Work.Submission of said schedule shall be a condition precedent to approval of the Contractor's first application for payment. 9.4.2 At the end of each month,or more often if required,the Contractor shall furnish the Architect an updated schedule showing actual progress of the various parts of the Work in comparison with the originally proposed progress and payment schedules. If the Architect raises any objections to progress or payment schedules submitted by the Contractor,the Contractor shall immediately address and resolve such objections to the reasonable satisfaction of the Architect. 9.43 If the Contractor submits a construction schedule that anticipates Substantial Completion before the date established in the Owners Notice to Proceed,the Contractor shall have no claim for additional compensation on account of any delays that prevent Substantial Completion before the date set in said Owners Notice to Proceed. 9.5 USE AND OCCUPANCY 95.1 Prior to the date of Substantial Completion of the entire Project stipulated in the Notice to Proceed,the Owner shall have the right,from time to time,to occupy and use any portion of the Project as the Work in connection therewith is substantially completed,provided such use and occupancy does not unduly interfere with the Contractor's operations. 9.5.2 The Architect will,prior to any such use and occupancy,give written notice to the Contractor,indicating the areas intended to be occupied and used,and the intended commencement date of such use and occupancy. Occupancy and use shall not commence prior to a time mutually agreed to by the Owner and the Contractor. 9.5.3 Upon receipt of such notice of intent,the Contractor shall promptly secure and submit to the Architect endorsement from the insurance carrier permitting use and occupancy of the Work,or any designated portion thereof,by the Owner prior to Substantial Completion of the entire Project. The Contractor shall be permitted to cancel its special perils insurance for that portion of the Project used and/or occupied by the Owner. 9.5.4 Partial or entire use and occupancy by the Owner shall not constitute an acceptance of Work not completed in accordance with the Contract Documents nor relieve the Contractor from the obligation of performing any Work required . by the Contract but not completed at the time of use and occupancy. Before such use and occupancy,the Architect will give the Contractor a list of items to be completed prior to Final Completion occurring in the areas to be occupied. 95.5 The Contractor shall be relieved of all maintenance costs of the portion of the Project occupied under the provisions of this Article. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 14 of 29 f ' J r' 9.5.6 The Contractor shall not be responsible for wear and tear or damage resulting solely from such use and occupancy. �J 95.7 The Contract Sum will be adjusted by mutually acceptable arrangements between the Owner and the Contractor with f , respect-to heat,electricity,and water furnished by the Contractor to the portion of-the Work so occupied. 9.5.8 When any portion of the building is in condition to receive fittings,appliances,fumiture,or other property to be `—' furnished and installed by the Owner under separate contracts,the Contractor shall allow the Owner to bring such items into the building and shall provide all reasonable facilities and protection therefor. f-l 9.6 SUBSTANTIAL COMPLETION LJ 9.6.1 Substantial Completion is the stage in the progress of the Work when,in the opinion of the Architect,the Work is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its f� intended use. '-J 9.6.2 When the Contractor considers that the Work,or a portion thereof which the Owner agrees to accept separately,is substantially complete,the Contractor shall prepare and submit to the Architect a comprehensive list of items to be Meted or f l corrected The Contractor shallproceed promptly to complete and conect items on the list. Failure to include an item on such list does not alta the responsibility ofihe Contractor to complete all Work in accordance with the Contract Documents. 9.6.3 Upon receipt of the Contractor's list of items to be completed or corrected,the Architect will promptly make a f thorough inspection and prepare a "punch list", setting forth in accurate detail any items on the Contractor's list and additional items that are not acceptable or are incomplete. �J 9.6.4 If,after receipt of the Contractor's list,the Architect determines that the Work is not substantially complete,the t t Architect shall inform the Contractor of those items that must be completed before the Architect will prepare a punch list. Upon completion of those items,the Contractor shall again request the Architect to prepare the punch list. �J 9.63 When the punch list has been prepared,the Contractor will anange ameeting with the Architect and Subcontractors to identify and explain all punch list items and address questions on the work which must be done before final acceptance. 9.6.6 The Architect may revise the punch list,from time to time,to ensure that all items ofthe Work are properly completed 9.6.7 The Architect will prepare a Certificate of Substantial Completion which shall establish the date of Substantial f Completion,shall establish responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance,and shall fix the time writhin which the Contractor shall finish all items on the list u accompanying the Certificate within the provisions of Subparagraph 9.7.2. f t 9.6.8 Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The J Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate and shall be subject to the approval of the Department. 1 9.7 FINAL COMPLETION 9.7.1 After the Architect has certified that the Work is substantially complete,the Contractor shall immediately proceed to complete all the remaining items of Work as determined by the Architect,including items authorized by Change Orders,Construction Change Directives,or items disputed by the Contractor. 9.7.2 The Contractor shall complete all the remaining items of Work described in Subparagraph 9.7.1,as soon as possible,and in any event within one hundred and twenty days after Substantial Completion,unless the Architect F) determines that a shorter time period for completion is appropriate,in which event the Contractor must complete the Contract work within such period. The Architect may extend such one hundred and twenty day period if the Architect determines that such extension is justified. 9.73 If the Contractor fails to complete the remaining items of Work within the time period provided in Subparagraph 9.7.1,the Owner may arrange for other contractors to complete such items and the direct and indirect costs of such completion shall be charged against the balance due the Contractor or,if no such balance remains,the Contractor shall pay the Owner the costs of such completion. 9.7.4 As an alternative to the procedure described in Subparagraph 9.7.3,the Owner may invoke the performance bond of the Contractor and demand that the surety shall complete the remaining items of work in a timely manner. Lf 9.75 The Architect will conduct up to three(3)inspections of completed punchlist items. The Contractor shall be r responsible for the costs of additional inspections required to verify successful completion of the punchlist. DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 15 of 29 r; ARTICLE 10 PAYMENTS 10.1 CONTRACT SUM The Contract Sum is stated in the Owner-Contractor Agreement and,including authorized adjustments,is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. 10.2 SCHEDULE OF VALUES 10.2.1 Before the first Application for Payment,the Contractor shall submit to the Architect a schedule of values allocated to various portions of the Work,prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule,unless objected to by the Architect,shall be used as a basis for reviewing the Contractor's Applications for Payment. 10.2.2 The schedule of values shall contain a separate item for each Section of the Specifications broken down in such form as the Architect may require. Each item in the schedule of values shall include its proper share of overhead and profit. 10.3 APPLICATIONS FOR PAYMENT Once each month,on a date established at the beginning of the Work,the Contractor shall deliver to the Architect by hand or by registered or certified mail with return receipt,an itemized Application for Payment,supported by such data substantiating the Contractor's right to payment as the Architect may require,and reflecting retainage as provided in Subparagraph 10.6.1. Such Application for Payment shall be submitted on a form available from the Department,(a copy can be found in the Construction Handbook). The form shall show separately: .1 The value of labor and materials incorporated in the Work. .2 The value,kind,and quantity of each item of material or equipment not incorporated in the Work but delivered and suitably stored at the site,during the current pay period. .3 The value,kind,and quantity of each item of material or equipment not incorporated in the Work but suitably stored at some other location agreed upon in writing,during the current pay period. .4 All Change Orders approved up to the date of the Application for Payment. .5 The amounts approved for payment for each item on previous applications. 10.4 PAYMENT FOR STORED MATERIALS 10.4.1 The Contractor shall include in such Application for Payment only such materials as are incorporated in the Work. Except however,the Contractor may include the value of materials or equipment delivered at the site of the Work (or at some location agreed to in writing)upon delivery to the Owner of: .1 an acceptable Transfer of Title(see the Construction Handbook);and .2 receipted invoices or other acceptable proof of prior payment by the Contractor for such materials;and .3 a stored materials insurance binder(see subparagraph 16.5.2)that covers the materials for which payment is requested,that names the Owner and the Department as an insured party should the stored materials be subjected to any casualty,loss,or theft prior to their inclusion in the Work. 10.4.2 This material(s)or equipment must,in the judgment of the Architect: .1 meet the requirements of the Contract,including prior shop drawing,product data,and sample approval;and .2 be ready for use;and 3 be properly stored by the Contractor and adequately protected until incorporated into the Work. 10.4.3 Failure to comply with subparagraphs 10.4.1 and 10.4.2 may result in Certificates being changed in accordance with M.G.L.c.30§39K 10.5. CERTIFICATES FOR PAYMENT 10.5.1 The Architect shall mask the date of receipt on the Contractor's Application for Payment The Architect will,within seven days after receipt of the Contractor's Application for Payment either, .1 issue to the Owner a Certificate for Payment,with a copy to the Contractor,for such amount as the Architect determines is properly due,or .2 return the application to the Contractor if it is not in proper fomt or contains computations not arithmetically cow or .3 make changes to the application as provided in subparagraph 10.5.2. 10.5.2 The Architect shall notify the Contractor and Owner in writing of the Architect's reasons for withholding certification in whole or in part as provided in subparagraphs 10.6.1.2 and 10.6.1.3. DHCD I0k-10 Mil GENERAL CONDITIONS c.149 8/2004 16 of 29 r _j r1 10.5.3 The Owner may make changes in any Application for Payment submitted by the Contractor in accordance with ._j M.G.L.c.30§39K,and the payment due on said Application for Payment shall be computed in accordance with the changes so made. The provisions of said Section 39K shall govern payments pursuant to Applications for Payment on which the Owner has made changes. 10.5.4 No certificate for payment nor any progress payment shall constitute acceptance of Work not in accordance with the Contract Documents. 10.6 STATUTORY PAYMENT PROVISIONS 10.6.1 After the Architect has issued a Certificate for Payment the Owner shall make payment to the Contractor in accordance with M.G.L.c.30§39K which provides as follows: f, .1 Within 30 days after receipt from the Contractor,at the place designated by the Owner if such a place is so designated,of a periodic estimate requesting payment of the amount due for the preceding month,the Owner will make a periodic .� payment to the Contractor for the Work performed during the preceding month and for the materials not incorporated in the Work but delivered and suitably stored at the site(or at some location agreed upon in writing)to which the Contractor has title or to which a Subcontractor has title and has authorized the Contractor to transfer title to the Owner,less(1)a retention based on its estimate of the fair value of its claims against the Contractor and less(2)a retention for direct payments to Subcontractors based on demands for same in accordance with the provisions of Section 39F,and less(3)a retention not exceeding five percent(5%)of the approved amount of the periodic payment. .2 After the receipt of a periodic estimate requesting final payment and within 65 days after(a)the Contractor fully completes the Work or substantially completes the work so that the value of the Work remaining to be done is,in the estimate of the Owner,less than one percent(1%)of the original Contract Sum,or(b)the Contractor substantially completes the Work and the Owner takes possession for occupancy,whichever occurs first,the Owner shall pay the Contractor the entire f balance due on the Contract less,(1)a retention based on its estimate of the fair value of its claims a,airrst the Contractor and of the cost of completing the incomplete and unsatisfactory items of Work less(2)a retention for direct payments to Subcontractors based on demands for same in accordance with the provisions of Section 39F,or based on the record of payments by the Contractor to the Subcontractors under this Contract if such record of payment indicates that the Contractor has not paid Subcontractors as provided in Section 39F. 4, 3 If the Owner fails to make payment as herein provided,there shall be added to each such payment daily interest at the rate of three percentage points above the rediscount rate then charged by the Federal Reserve Bank of Boston f 1 commencing on the first day after said payment is due and continuing until the payment is delivered or mailed to the Contractor;provided,that no interest shall be due,in any event,on the amount due on a periodic estimate for final _' payment until forty-five days after receipt of such a periodic estimate from the Contractor,at the place designated by the Owner if such a place is so designated. The Contractor agrees to pay to each Subcontractor a portion of any such interest t 1 paid in accordance with the amount due each Subcontractor. 10.6.2 DIRECT PAYMENT TO SUBCONTRACTORS 10.6.2.1 The Contractor shall make payments to filed Subcontractors in accordance with M.G.L c.30§39F which I I provides as follows: .1 Forthwith after the Contractor receives payment on account of a periodic estimate,the Contractor shall pay to each Subcontractor the amount paid for the labor performed and the materials famished by the Subcontractor,less any amount specified in any court proceedings barring such payment and also less any amount claimed due from the Subcontractor by the Contractor. .2 Not later than the 651h day after each Subcontractor substantially completes the Work in accordance with the plans and specifications,the entire balance due under the subcontract less amounts retained by the Owner as the estimated cost of f 1 completing the incomplete and unsatisfactory items of Wank,shall be due the Subcontractor and the Owner shall pay that amount to the Contractor. The Contractor shall forthwith pay to the Subcontractor the full amount received from the u Owner less any amount specified in any court proceedings baring such payment and also less any amount claimed due from the Subcontractor by the Contractor. f 1 3 Each payment made by the Owner to the Contractor pursuant to Subparagraphs.1 and.2 of this paragraph for the labor performed and the materials furnished by a Subcontractor shall be made to the Contractor for the account of that LJ Subcontractor and the Owner shall take reasonable steps to compel the Contractor to make each such payment to each such Subcontractor. If the Owner has received a demand for direct payment from a Subcontractor for any amount t 1 which has already been included in a payment to the Contractor or which is to be included in a payment to the Contractor for payment to the Subcontractor as provided in Subparagraphs.1 and 2,the Owner shall act upon the demand as provided in this section. 4 If,within 70 days after the Subcontractor has substantially completed the Subcontract Work,the Subcontractor has not r l received from the Contractor the balance due under the Subcontract including any amount due for extra labor and materials fimushed to the Contractor,less any amount retained by the Owner as the estimated cost of completing the incomplete and unsatisfactory items of Work,the Subcontractor may demand direct payment of that balance from the f-I Owner. The demand shall be by a swom statement delivered to or sent by certified mail to the Owner,and a copy shall DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 17 of 29 fl LJ be valid even if delivered or mailed prior to the seventieth day after the Subcontractor has substantially completed the Subcontract Work Within ten days after the Subcontractor has delivered or so mailed a copy to the Contractor,the Contractor may reply to the demand. The reply shall be by a swom statement delivered to or sent by certified mail to the Owner,and a copy shall be delivered to or sent by certified mail to the Subcontractor at the same time. The reply shall contain a detailed breakdown of the balance due under the Subcontract including any amount due for extra labor and materials furnished to the Contractor and of the amount due for each claim made by the Contractor and of the amount due for each claim made by the Contractor against the Subcontractor. .5 Within 15 days after receipt of the demand by the Owner but in no event prior to the 70th day after substantial completion of the Subcontract Work,the Owner shall make direct payment to the Subcontractor of the balance due under the Subcontract including any amount due for extra labor and materials famished to the Contractor,less any amount(i)retained by the Owner as the estimated cost of completing the incomplete or unsatisfactory items of Work, (ii)specified in any court proceedings barring such payment,or(iii)disputed by the Contractor in the swom reply; provided,that the Owner shall not deduct from a direct payment any amount as provided in part(iii)if the reply is not swom to,or for which the sworn reply does not contain the detailed breakdown required by Subparagraph.4. The Owner shall make further direct payments to the Subcontractor forthwith after the removal of the basis for deductions from direct payments made as provided in part(i)and(ii)of this Subparagraph. .b The Owner shall forthwith deposit the amount deducted from a direct payment as provided in part(iii)of Subparagraph.5 in an interest-bearing joint account in the names of the Contractor and the Subcontractor in a bank in Massachusetts selected by the Owner or agreed upon by the Contractor and the Subcontractor and shall notify the Contractor and the Subcontractor of the date of the deposit and the bank receiving the deposit. The bank shall pay the amount in the account,including accrued interest,as provided in an agreement between the Contractor and the Subcontractor or as determined by decree of a court of competent j urisdiction. .7 All direct payments and all deductions from demands for direct payments deposited in an interest-bearing account or accounts in a bank pursuant to Subparagraph.6 shall be made out of amounts payable to the General Contractor at the time of receipt of a demand for direct payment from a Subcontractor or out of amounts which later become payable to the Contractor and in order of receipt of such demands from Subcontractors. All direct payments shall discharge the obligation of the Owner to the Contractor to the extent of such payment. .8 The Owner shall deduct from payments to the Contractor amounts which,together with the deposits in interest-bearmg accounts pursuant to Subparagraph.6,are sufficient to satisfy all unpaid balances of demands for direct payment received from Subcontractors. All such amounts shall be earmarked for such direct payments,and the Subcontractors shall have a right to such deductions prior to any claims against such amounts by creditors ofthe Contractor. .9 If the Subcontractor does not receive payment as provided in Subparagraph.1 or if the Contractor does not submit a periodic estimate for the value of the labor and materials performed or famished by the Subcontractor and the Subcontractor does not receive payment for same when due less the deductions provided for in Subparagraph.1,the Subcontractor may demand direct payment by following the procedure in Subparagraph.4 and the Contractor may file a sworn reply as provided in that same Subparagraph. A demand made after the first day of the month following that for which the Subcontractor performed or furnished the labor and materials for which the Subcontractor seeks payment shall be valid even if delivered or mailed prior to the time payment was due on a periodic estimate from the Contractor. Thereafter the Owner shall proceed as provided in Subparagraphs.5,.6,.7,and.8. 10.7 FINAL PAYMENT 10.7.1 Upon completion of the Work,the Contractor shall be entitled to payment of the Contract balance,in accordance with Subparagraph 10.6.1.2 and per the process described in Division 1 of the Specifications. 10.7.2 The acceptance by the Contractor of the last payment due under this Contractor the execution of the Final Certificate of Completion,shall operate as a release to the Owner,Department,and the Architect from all claims and liability related to this Contract. 10.8 PAYMENT LIABILITIES OF CONTRACTOR 10.8.1 The Contractor shall be responsible to the Owner for all expenses,losses,and damages incurred in consequence of any defect,omission,or mistake of the Contractor or any of its employees,Subcontractors,or suppliers. 10.8.2 The Owner may retain any moneys which would otherwise be payable under this Contract and apply the same, or so much as may be necessary therefor,to the payment of any expenses,losses,or damages incurred by the Owner as a direct result of the Contractor's failure to perform its obligations hereunder. DHCD lOk-10 Mil GENERAL CONDITIONS c.149 8/2004 18 of 29 r u r ' ARTICLE 11 r-I GUARANTEES AND WARRANTIES 11.1 GENERAL GUARANTY r I If at any time during the period of one(1)year from the date of Substantial Completion as defined in Paragraph 9.6,any part of the Work shall,in the reasonable determination of the Architect or Owner,require replacing or repairing due to u the fact that it is broken,defective,or otherwise does not conform to the Contract Documents,the Owner will notify the Contractor to make the required repairs or replacement. 11.2 If the Contractor shall neglect to commence such repairs or replacement to the satisfaction of the Owner within u ten(10)days from the date of giving or mailing such notice,then the Owner may employ other persons to make the same. r-1 11.3 The Contractor agrees,upon demand,to pay to the Owner all amounts which the Owner expends for such repairs or replacements. 11.4 During this one year guarantee period any corrective work shall be performed in accordance with the applicable C terms of this Contract. For items of work completed after use and occupancy has been taken,the one year guarantee shall commence at the time the Owner accepts such items. 11.5 This one year guarantee shall not limit any express guaranty or warranty provided elsewhere in the Contract. r 11.2 SPECIAL GUARANTEES AND WARRANTIES 11.2.1 Guarantees and warranties required in the various sections of the Specifications must be delivered to the Architect before final payment to the Contractor may be made,or in the case of guarantees and warranties which f originate with a Subcontractor's section of the Work,before final payment for the amount of that subtrade or for the phase of Work to which the guarantee or warranty relates. 11.2.2 The failure to deliver a required guarantee or warranty shall constitute a failure to fully complete the Work in n accordance with the Contract Documents. 11.2.3 The Contractor's obligation to correct Work as set forth in Paragraph 4.12 is in addition to,and not in substitution of,such guarantees or warranties as may be required in the various Sections of the Specifications. rl ARTICLE 12 MISCELLANEOUS LEGAL REQUIREMENTS n `i 12.1 GENERAL The Contractor shall stay fully informed of all existing and future state and national laws and municipal ordinances and r 1 regulations in any manner affecting those engaged or employed in the work,or the materials used or employed in the work,or �J in any way affecting the conduct of the Work,and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the Contract Work All provisions of law that apply to this Contract are hereby made a part ofthis Contract. n If any discrepancy or inconsistency is discovered in the Contract Documents in relation to any such law,ordinance,regulation, order or decree,the Contractor shall forthwith report the same to the Owner in writing. 12.1.1 The Contractor shall cause all of its agents and employees to observe and comply with all such existing and future laws,ordinances,regulations,orders and decrees. fll 12.2 CORPORATE DISCLOSURES u The Contractor,if a foreign corporation,shall comply with M.G.L.c.181 §3 and§5,and M.G.L.c.30§39L. n 12.3 VETERANS PREFERENCE L, In the employment of mechanics and apprentices,teamsters,chauffeurs,and laborers in the construction of public works in the Commonwealth,preference shall first be given to citizens of the Commonwealth who have been residents of the VI Cormnonwealth for at least six months at the commencement oftheir employment and who are veterans as defined M.G.L.c.4 §7(34),and who are qualified to perform the work to which the employment relates;and secondly,to citizens of the L+ Commonwealthgenerally who have been residents of the Commonwealth for at least six months at the commencement of their employment,and if they cannot be obtained in sufficient numbers,then to citizens of the United States. [ 1 u DHCD$100k-10 Mil GENERAL CONDITIONS G.149 812004 19 of 29 r1 LJ 12.4 PREVAILING WAGE RATES The Director of the Department of Labor and Workforce Development has established the Schedule found in Division One of the Specifications,listing the prevailing minimum wage rates that must be paid to all workers employed on the Contract.Such Schedule shall continue to be the minimum rate of wages payable to workers on this Contract throughout the term of the Contract. The Contractor shall not have any claim for extra compensation from the Owner if the actual wages paid to employees on the Contract exceeds the rates listed on the Schedule. The Contractor shall cause a copy of said Schedule to be kept in a conspicuous place at the Project site during the terra of the Contract. (See M.G.L c.149§26-27H.) If reserve police officers are employed by the Contractor,they shall be paid the prevailing wage of regular police officers.(See M.G.L c.149§34B). 12.5 VEHICLE AND EQUIPMENT OPERATORS If the Director of the Department of Labor and WoAdorce Development has established a Schedule of wage rates to be paid to the operators of trucks,vehicles or equipment for this Project,the Contractor shall be obligated to pay such operators at least the minimum wage rate contained on such Schedule.(See M.G.L.c.149§26-27H). 12.6 EIGHT HOUR DAY AND LODGING 12.6.1 No laborer,workman,mechanic,foreman or inspector working in the employment of the Contractor,Subcontractor or other person doing or contracting to do the whole or part of the Work,shall be required or permitted to work any more than eight hours in any one day,or more than 48 hours in any one week,or more than six days in any one week,except in cases of emergency. 12.6.2 Every employee on the Work shall lodge,board,and trade where and with whom helshe elects,and the Contractor and any Subcontractor shall not directly or indirectly require,as a condition of employment,that an employee lodge,board,or trade at a particular place or with a particular person. 12.7 EXECUTIVE ORDERS The Contractor shall comply with the provisions ofKG.L.c.151B;Executive OrderNo.227,Govemor's Code ofFair Practices, Executive Order No.237 pertaining to minority and women business development;Executive Order No.246 pertaining to the handicapped and all regulations promulgated pursuant thereto. The aforementioned law,Executive Orders,and regulations are incorporated herein by reference and made a part of this Contract. ARTICLE 13 CONTRACTOR'S ACCOUNTING REQUIREMENTS 13.1 DEFINITIONS 13.1.1 "Contractor"means any person,corporation,partnership,joint venture,sole proprietorship,or other entity awarded this Contract. 13.1.2 "Contract"means any contract awarded or executed pursuant to M.G.L.c.30§39M or M.G.L.c.149§44A-J, which is for an amount greater than one hundred thousand dollars ($100,000). 13.1.3 "Records"means books of original entry,accounts,checks,bank statements and all other banking documents, correspondence,memoranda,invoices,computer printouts,tapes,discs,papers and other documents or transcribed information of any type,whether expressed in ordinary or machine language. 13.1.4 "Independent Certified Public Accountant"means a person duly registered in good standing and entitled to practice as a certified public accountant under the laws of the place of his/her residence or principal office and who is in fact independent 13.1.5 "Audit,"when used in regard to financial statements,means an examination of records by an independent certified public accountant in accordance with generally accepted accounting principles and auditing standards for the purpose of expressing a certified opinion thereon,or,in the alternative,a qualified opinion or a declination to express an opinion for stated reasons. 13.1.6 "Accountant's Report,"when used in regard to financial statements,means a document in which an independent certified public accountant indicates the scope of the audit which he/she has made and sets forth his/her opinion regarding the financial statements taken as a whole with a listing of noted exceptions and qualifications,or an assertion to the effect that an overall opinion cannot be expressed. When an overall opinion cannot be expressed the reason therefor shall be stated. An accountant's report shall include a signed statement by the responsible corporate officer attesting that management has fully disclosed all material facts to the independent certified public accountant,and that the audited financial statement is a true and complete statement of the financial condition of the Contractor. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 20 of 29 r1 u f 1 13.1.7 "Management" when used herein, means the chief executive officers, partners, principals or other person or .� persons primarily responsible for the financial and operational policies and practices of the Contractor. 13.1.8 Accounting terms,unless otherwise defined herein shall mean,in accordance with generally accepted accounting principles and auditing standards. 13.2 RECORD KEEPING 13.2.1 The Contractor shall make,and keep for at least six years after final payment,books,records,and accounts which in reasonable detail accurately and fairly reflect the transactions and dispositions of the Contractor. 13.2.2 Until the expiration of six years after final payment,the Inspector General,the Owner,and the Department shall have the right to examine any books,documents,papers or records of the Contractor and Subcontractors that directly r-I pertain to,and involve transactions relating to the Contractor and Subcontractors. v 13.2.3 The Contractor shall describe any change in the method of maintaining records or recording transactions which materially affects any statements filed with the Owner including the date of the change and reasons therefor,and shall �- accompany said description with a letter from the Contractor's independent certified public accountant approving or otherwise commenting on the changes. `J 13.2.4 Prior to the execution of the Contract,the Contractor shall file a statement of management on internal r accounting controls as set forth in Paragraph 13.3 below. 13.2.5 Prior to the execution of the Contract,the Contractor shall Bean audited financial statement for the most recent completed fiscal year as set forth in Paragraph 13.4 below and will continue to file such statement annually during the term of the Contract. r1 13.3 STATEMENT OF MANAGEMENT CONTROLS u 13.3.1 Prior to execution of the Contract,the Contractor shall file with the Owner a statement of management as to f 1 whether the system of internal accounting controls of the Contractor and its subsidiaries reasonably assures that: .1 transactions are executed in accordance with management's general and specific authorization; .2 transactions are recorded as necessary to: a. to permit preparation of financial statements in conformity with generally accepted accounting principles,and f-1 b, to maintain accountability for assets; .3 access to assets is permitted only in accordance with management's general or specific authorization;and Li .4 the recorded accountability for assets is compared with the existing assets at reasonable intervals and appropriate action was taken with respect to any difference. f 1 13.3.2 Prior to execution of the Contract,the Contractor shall also file with the Owner a statement prepared and signed by an independent certified public accountant,stating that the accountant has examined the statement of management on internal accounting controls,and expressing an opinion as to: r .1 whether the representations of management in response to subparagraph 13.3.1 above are consistent with the results of management's evaluation of the system of internal accounting controls;and .2 whether such representations of management are reasonable with respect to transactions and assets in amounts which would be material when measured in relation to the applicant's financial statement. f 13.4 ANNUAL FINANCIAL STATEMENT Li Every Contractor awarded a contract shall annually file with the Owner during the term of the Contract a financial statement prepared by an independent certified public accountant on the basis of an audit by such accountant The final statement filed f 1 shall include the date of final payment All statements shall be accompanied by an accountant's report. u t"1 u r..i r � u fl u DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 21 of 29 r� u � ARTICLE 14 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS 14.1 DEFINITIONS For purposes of this Article 14,the following additional definitions shall apply: 14.1.1 "Minority"means Asian-Americans,Blacks,Western Hemisphere Hispanic Americans,North American Indians,Eskimos and Aleuts,and Cape Verdeans. 14.1.2 "Commission"or"MCAD"means the Massachusetts Commission Against Discrimination. 14.1.3 "E.E.O.Officer"or Equal Employment Opportunity Officer means those persons designated by the Contractor, the Owner,or any other agency or party having jurisdiction under this contract,that serve in a capacity to implement this Article. 14.2 CONDITIONS 14.2.1 The provisions of this Article 14 shall apply to the Contractor and all Subcontractors. 14.2.2 The Contractor shall not discriminate against any employee or applicant for employment because of race,color, religious creed,national origin,age,handicap,or sex. The aforesaid provision shall include,but not be limited to,the following: employment upgrading,demotion or transfer;recruitment advertising;recruitment layoff;termination;rates of pay or other forms of compensation;conditions or privileges of employment;and selection for apprenticeship. 14.2.3 The Contractor shall post notices provided by the Commission,in conspicuous places,setting forth the provisions of the Fair Employment Practices Law of the Commonwealth. 14.2.4 The Contractor shall undertake in good faith affirmative action measures designed to eliminate any discriminatory barriers in the terms and conditions of employment on the grounds of race,color,religious creed,national origin,age,handicap,or sex,and to eliminate and remedy any effects of such discrimination in the past. Such affirmative action shall entail positive and aggressive measures to ensure equal opportunity in the areas of hiring, upgrading,demotion or transfer,recruitment,layoff or termination,rate of compensation,and in-service or apprenticeship training programs. This affirmative action shall include all action required to guarantee equal employment opportunity for all persons,regardless of race,color,religious creed,national origin,age or sex. 14.25 The Contractor shall not discriminate on grounds ofrace,color,religious creed,national origin,age,or sex in employment practices,in the selection or retention of Subcontractors,or in the procurernent of materials and rentals of equipment 14.2.6 The Commission and a designee of the Owner shall have access to the construction site and all applicable records of the Contractor and Subcontractors. 14.2.7 The Contractors EEO Certificate must be signed by the low general and all filed sub-bidders as a condition of Contract validation by the Department. 14.3 MINORITY GOAL 14.3.1 Theprovisions ofparagraphs 143-14.9 shall only apply to contracts with an adverdsedesmmated valueof$100,000 ormore. 14.3.2 The Contractor shall maintain a percent ratio of minority employee man-hours in each job category not less than the percentages found in Section 01100 of the Specifications. Such job categories shall include but not be limited to those "Classes of Work"enumerated in M.G.L.c.149§44F and for trades covered by Item 1 of the Contractor's bid.. 14.4 REFERRALS 14.4.1 In the hiring of minority journeymen,apprentices,trainees and advanced trainees,the Contractor shall rely on referrals from a multi-employer affirmative action program approved by the Department or the Commission;and traditional referral methods utilized by the construction industry,where such referrals are needed to meet minority hiring requirements. The Contractor shall keep accurate records of such requests for referrals. 14.4.3 Records of employment referral orders,prepared by the Contractor,shall be made available to the Owner and to the Department upon request. 14.5 WORK FORCE TABLES 14.5.1 The Contractor shall provide the weekly and quarterly information to the Owner on copies of forms that can be found in the Section 01110 of these Specifications. DHCD 10k-10 Mil GENERAL CONDITIONS c.149 812004 22 of 29 r � r 14.6 COMPLIANCE-REPORTS AND INFORMATION The Contractor shall provide all information and reports required by the Owner or the Department and will permit access to its facilities and to any books,records,accounts and other sources of information which may be determined by the Owner r ] or the Department to affect the employment of personnel. Where information required is in the exclusive possession of another who fails or refuses to furnish this information,the Contractor shall so certify to the Owner or the Department as appropriate and shall set forth what efforts have been made to obtain the information. 14.7 COMPLIANCE-INVESTIGATIONS 14.7.1 Whenever the Owner's EEO Officer,the MCAD,or the Department believes the Contractor may not be operating in compliance with the terms of these requirements,the Department shall conduct an investigation,and may confer with the parties,to verify such allegations. The Department shall not initiate an investigation without prior notice r ] to the Contractor. v 14.7.2 If the Department finds the Contractor in non-compliance,it shall make a preliminary report,and notify the Contractor in writing of the steps necessary to bring such Contractor into compliance. A copy of this report shall be sent f ] to the Department's Affirmative Action Officer. 14.8 COMPLIANCE-DEPARTMENT-AFFIRMATIVE ACTION INVESTIGATION 14.8.1 If the Contractor fails or refuses to fully perform the steps necessary to achieve compliance,the Department shall make a [ ' report of non-compliance to the Department's Affirmative Action Officer,who will then conduct an investigation. I 14.8.2 Should the Department's Affirmative Action Officer find the Contractor in non-compliance a final report recommending the imposition of one or more of the sanctions listed below shall be issued. r 1 14.8.3 Within fifteen(15)days of said report the Department shall,after due notice and giving the Contractor an opportunity to respond,move to impose one or more of the following sanctions to attain compliance. 14.8.4 If the Department's Affirmative Action Office believes the Contractor has taken or is taking every possible n measure to achieve compliance,a report shall show the Contractor is in compliance. Li 14.9 SANCTIONS 14.9.1 For each week that the Contractor fails or refuses to comply,the Department may recover from the Contractor,1/100 of n 1%of the original Contract Sum or$1000 whichever sum is greater,in the nature of liquidated damages. u 14.9.2 If a Subcontractor is in non-compliance,the Department may recover from the Contractor, 1/10 of 1%of the Subcontract Sum,or$400 whichever sum is greater,in the nature of liquidated damages,to be assessed by the Contractor r � as a back charge against the Subcontractor for each week that Subcontractor fails or refuses to comply. 14.9.3 The Owner may suspend part or all of any payment due under the contract until such time as the Contractor or any Subcontractor is able to demonstrate compliance with the terms of the Contract; f� 14.9.4 The Owner may terminate,or cancel part or all of the Contract,in accordance with the provisions of Article 19, unless the Contractor or any Subcontractor is able to demonstrate,within a specified time,compliance with the terms of L' the Contract. r ] 14.95 The Contractor may request the Department and Ownerto suspend the sanctions conditionally. Whereupon the Department shall investigate corrective measures taken by the Contractor and shall either lift or re-impose the sanctions. u 14.10 SEVERABILITY r l The provisions of this article are severable,and if any of these provisions shall be held unconstitutional by any court of competent jurisdiction,the decision of such court shall not affect or impair any of the remaining nting provisions of the Contract l� n u r] n rl v DHCD$100k-10 Mil GENERAL CONDITIONS c.149 812004 23 of 29 f1 ARTICLE 15 MINORITY OR WOMAN OWNED BUSINESS ENTERPRISES' AFFIRMATIVE MARKET PROGRAM 15.1 DEFINITIONS: For purposes of this Article 15,the following definitions shall apply: 15.1.1 "Minority"means a person who is a citizen or permanent resident of the United States and who is either: Black,Western Hemisphere Hispanic,Native American Indians,Eskimo and Aleut,Asian,or Cape Verdeans as defined by Executive Order 390 the Affirmative Market Program. 15.1.2 "SOMWBA"means the State Office of Minority and Women Business Assistance, 15.1.3 "Minority Business Enterprise"(MBE)means a business organization which is owned and controlled fifty-one percent(51%)or more by one or more minority group members and certified as such by SOMWBA. 15.1.4 "Women Business Enterprise"(WBE)means a business organization which is owned and controlled fifty-one percent(51%)or more by one or more women and certified as such by SOMWBA. 15.1.5 "SOMWBA Certified Enterprise"(SCE)means a MBE or WBE as defined in 15.1.3 and 15.1.4. 15.1.6 "MBE/WBE Manufacturer"means a person or fine certified by SOMWBA and engaged in the process of making,fabricating,constructing,forming or assembling a product(s)from raw,unfinished,semi-finished,or finished materials through a direct contract with a contractor,subcontractor,or supplier. 15.1.7 "MBE/WBE Subcontractor"means a person or firm certified as such by SOMWBA and contractually engaged by the contractor to perform a portion(a)of the contracted Work,including labor,materials and supplies,or(b)labor, materials and supplies,or any combination thereof. 15.1.8 "MBE/WBE Supplier"means a person or firm certified as such by SOMWBA and engaged in selling of materials and supplies to contractors,subcontractors,and/or manufacturers for the purpose of constructing,repairing, remodeling,adding to or subtracting from,or improving any building,structure or property through a direct contract with a contractor or subcontractor. Said MBE/WBE must sustain substantial financial risk in the process of performing/supplying the work for this contract. The Department may request information to determine where the MBE/WBE obtains supplies and materials. 15.1.9 "Amount of Participation"means the percentage stated on the advertisement of the final contract amount which is to be contracted to SCEs for work to be performed on this contract in accordance with this Article 15. . 15.2 JOINT VENTURES 15.2.1 A Joint Venture shall mean a business arrangement between SOMWBA-certified M/WBEs and a non- SOMWBA certified General Contractor,in which the MBE or WBE has at least a twenty-five percent(25%)interest in the Contract,and in which the other has at least the required minimum percentage of participation in the Contract. It is expected that the M/WBE having the minimum 25%interest will participate in the management and decision making aspects of the project proportionate to its percentage of ownership and interest in the Contract. 15.2.2 An M/WBE Joint Venture shall mean a business arrangement wherein a SOMWBA certified MBE or WBE serves as a General Contractor and engages the services of another SOMWBA certified MBE or WBE(whichever is required)in an amount not less than twenty-five percent(25%)of the Contract amount,and in which the management and decision making aspects of the project are shared to the degree of participation and ownership in the Contract. 15.3 CONDITIONS The provisions of this Article 15 shall apply to all contracts with an advertised estimate of$50,000 or greater. 153.1 Once the Contractor agues to comply with these provisions,and within 5 working days after receipt of bids,unless an extension of time or waiver for compliance is granted in accordance with Article 3 of the Instructions to Bidders,the apparent low bidder must submit a completed Participation Schedule and Letters of Intent covering each SCE used to satisfy the requirements of this Article 15. These letters shall include the contract items the SCE is proposing to perform and the prices that the SCE proposes to charge for the work 15.3.2 SCEs listed on the Participation Schedule may be any combination of MBE/WBE Subcontractors,MBE/WBE Manufactures,or MBE/WBE Suppliers as defined in Paragraph 15.1. 15.3.3 Letters of Intent are not required from filed sub-bidders who are SCEs. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 24 of 29 153.4 The amount of participation of SCEs listed in The Participation Schedule must total at least the percentage set L_J forth in the Advertisement. The amounts indicated in the Letter of Intent shall not be less than the amount shown on the Participation Schedule. The SCEs for whom Letters of Intent are submitted must be identical to the ones listed on the f i Participation Schedule. No substitutions shall be made without the written approval of the Department. 15.3.5 Prior to the Validation of the Contract,the Contractor shall furnish the Owner and the Department with executed copies of all subcontracts with all of the SCEs listed on the Participation Schedule. f 15.3.6 Subcontractors are encouraged,but not required to subcontract portions of their work to SCEs. Participation forms,available with the bidding documents shall be used to list those SCEs with whom they wish to sub-subcontract Li and the dollar amount of those proposed sub-subcontracts. n 15.3.7 The Contractor may include SCEs utilized by non-certified subcontractors to satisfy the requirements of this article. LJ 15.3.8 SCEs listed on the Participation Schedule must be SOMWBA certified MBEs and WBEs at the time of the opening of bids. n 153.9 MBE/WBE Certification from any other agency/municipality shall not be considered applicable for this Contract u 15.3.9.1 The Department reserves the right to allow a SCE to perform work other than those categories listed on the f SCE's SOMWBA certification. 15.3.10 If a filed sub-bidder listed as a SCE is rejected for failure to obtain a performance and payment bond from a u surety qualified to do business in the Commonwealth when requested by the general bidder to do so at the time of bid, said failure shall not entitle the general bidder to avoid the requirements of this Article 15. f� 15.3.11 The Contractor shall not change the SCEs listed in the Participation Schedule or make any other such SCE L substitutions after the Contract has been executed or during construction without the written approval of the Owner and the Department. n 15.3.12 The Contractor shall not terminate any subcontract for,nor perform with its own organization,work designated u to an SCE on the Participation Schedule without the written approval of the Owner and the Department. Such approval shall be withheld until the Contractor demonstrates that the Amount of Participation is still met for any substituted SCE, n provided however,that compliance with this paragraph shall not supercede the terms of M.G.L.c.149§44F. Notice of all M/WBE status changes(before Final Completion)must be sent to the Department of Housing and Community Development-Legal Office/MBE/WBE,One Congress Street, 10th Floor, Boston,Massachusetts 02114. n 15.4 COMPLIANCE 15.4.1 The Contractor must provide information as is necessary,in the judgment of the Owner or the Department,to `J ascertain compliance with the terms of this Article 15. f-� 15.4.2 The Contractor shall provide,an executed Contractor's Affidavit of Payment to Minority Business Enterprises as found in Section 01110 of these Specifications. 15.4.3 If the Contractor desires to comply with this Article 15,but for reasons beyond its control cannot do so in t accordance with the Participation Schedule,the Contractor must submit to the Owner and the Department the reason for its inability to comply and proposed revisions to the Participation Schedule stating how conditions of this Article 15 are to be met. 15.5 SANCTIONS n 15.5.1 If at anytime during the life of this Contract,the Contractor is found to be out of compliance with Article 15, u sanctions may be imposed within fifteen(15)working days after notification to the Contractor of said violation. If within those fifteen(15)days the Contractor remedies the non-compliance to the satisfaction of the Department,or provides n compelling documentation as outlined in Article 15.6.2,said sanctions may be postponed or waived. If the Contractor requires more than fifteen(15)days to remedy non-compliance,it shall make a written request to the Department for a u time extension. This request shall be made within the original fifteen(15)day period. f-1 15.5.2 If the Contractor fails to comply with the terms of these conditions,the Owner may impose the following sanctions: .1 require the Contractor to provide equivalent substitute participation with SCEs acceptable to the Owner and u Department and at no additional cost to the Owner.,or .2 suspend any payment for the Work that should have been but was not performed by an SCE pursuant to the Participation Schedule. LJ n DHCD$100k-10 Mit GENERAL CONDITIONS 049 812004 25 of 29 f 1 L 15.5,3 To the extent that the Contractor has not complied with the terms of these conditions,the Owner may withhold from any Certificate for Payment moneys equivalent to the product of the percentage of completion times the SCE dollar amount,minus the amount already paid to SCEs for Work performed under the contract,minus any amounts withheld for previous non-compliance. 15.6 RECOURSE 15.6.1 The Owner and the Department have the option not to impose sanctions if the Contractor demonstrates,to the satisfaction of the Department,that the Contractor has taken every possible measure to comply with Article 15. This may constitute a reason for waiving this Article in whole or in part. 15.6.2 To demonstrate every possible measure,the Contractor shall furnish: .1 the name of each firm solicited for quotations on each Subcontract,the price quoted by each,and whether or not the firm solicited was a minority or woman-owned business; .2 the reason for not subcontracting with a minority or woman-owned business enterprise when applicable; .3 evidence showing efforts by the Contractor to supplement its own and SOMWBA lists of minority and woman- owned business sources by contacting the Small Business Administration,trade organizations,the General Services Administration(U.S.Government),minority contractors'organizations,community organizations and other likely sources of names of additional minority or woman-owned business firms capable of performing the Work;and .4 evidence showing other efforts to comply with this Article 15. 15.7 WAIVERS The Department reserves the right,in its sole discretion,to waive all,or a portion of the requirements of this Article 1$. 15.8 SEVERABILITY The provisions of this article are severable,and if any of these provisions shall be held unconstitutional by any court of competent jurisdiction,the decision of such court shall not affect or impair any of the remaining provisions of the Contract. ARTICLE 16 INSURANCE 16.1 INSURANCE REQUIREMENTS 16.1.1 The Contractor shall take out and maintain insurance coverage as listed in subparagraphs 16.2- 16.$with respect to the operations as well as the completed operations of this Contract. This insurance shall be provided at the Contractor's expense and shall be in full force and effect for the full term of the Contract. 16.1.2 All policies shall be issued by companies authorized to write that type of insurance under the laws of this Commonwealth of Massachusetts. 16.2 CONTRACTOR'S COMMERCIAL GENERAL LIABILITY 16.2.1 Provide the following minimum coverage with respect to the operations performed by any employee, Subcontractor,or supplier: Bodily Injury& $1,000,000. each occurrence Property Damage $1,000,000. general aggregate Products&Completed Operations $1,000,000. aggregate Personal&Advertising Injury $1,000,000. each occurrence 16.2.2 This policy shall include coverage relating to explosion,collapse,and underground property damage. 16.2.3 This policy shall include contractual liability coverage. 16.2.4 The Contractor shall provide a separate Owner's and Contractor's Protective Liability policy in the name of the Owner at the same limits listed above. 16.2.5 The completed operations coverage shall be maintained for a period of two(2)years after Substantial Completion as defined in subparagraph 9.6.1. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 26 of 29 r• u 16.3 VEHICLE LIABILITY Provide the following minimum coverage with respect to the operations of any employee,including coverage for owned, non-owned,and hired vehicles: Bodily Injury and $ 1,000,000. each person Property Damage $ 1,000,000. each accident �J Combined Single Limit of$1,000,000 r, 16.4 WORKER'S COMPENSATION Provide the following coverage in accordance with M.G.L.c.149§34A and c.152 as amended: Worker's Compensation Coverage A Provide Statutory Minimum Employer's Liability $500,000.each accident u Coverage B $500,000.disease per employee $500,000.disease policy 16.5 PROPERTY COVERAGE 165.1 Provide Special Perils coverage against loss or damage by fire and against loss or damage covered by the special perils insurance endorsement on all work included in this contract in an amount equal to at least 80%of Contract f1 Amount. 16.5.2 When work will be completed on existing buildings owned by the Owner,the Contractor shall provide an installation floater,in the full amount of the Contract,for the requirements set forth in Subparagraph 16.5. r 1 165.3 This policy and/or installation floater shall indicate if Stored Materials coverage is provided as required by Paragraph 10.4. u 16.6.1 The policy or policies shall specifically state that they are for the benefit of and payable to the Owner,the Department,the Contractor,and all persons furnishing labor or labor and materials for the Contract Work,as their interests may appear 16.6.2 The Special Perils coverage shall include any costs for work performed by the Architect or any consultant as the result of a loss experienced during the life of this contract. !1 16.7 OWNER AS ADDITIONAL INSURED The Owner and Department shall be named as additional insureds on the Contractor's Commercial Liability Policies. n 16.8 CERTIFICATES OF INSURANCE,POLICIES 16.8.1 Certificates of insurance,acceptable to the Owner,shall be submitted to the Owner simultaneously with the execution of the Contract. Certificates shall indicate that the contractual liability coverage,and Owner's and Contractor's Protective Liability coverage is in force,as well as the deletions of the XCU exclusions. C1 16.8.2 The Contractor shall file the original and one certified copy of all policies with the Owner and one with the Department within sixty days after Contract award. If the Owner is damaged by the Contractor's failure to maintain such insurance and to so notify the Owner,then the Contractor shall be responsible for all reasonable costs attributable thereto. r�] 16.9 CANCELLATION ' Cancellation of any insurance required by this contract,whether by the insurer or the insured,shall not be valid unless written notice thereof is given by the party proposing cancellation to the other party and Owner at least thirty days prior to the effective date thereof,which shall be expressed in said notice u u f'1 u Li �' DHCD$100k-10 Mil GENERAL CONDITIONS c.149 812004 27 of 29 LJ ARTICLE 17 INDEMNIFICATION The Contractor shall take all responsibility for the Work and take all precautions for preventing injuries to persons and property in or about the Work;shall bear all losses resulting from or on account of the amount or character of the Work. The Contractor shall pay or cause payment to be made for all labor performed or furnished and for all materials used or employed in carrying out this Contract. The Contractor shall assume the defense of,and indemnify and save harmless, the Architect,the Owner,the Department and their officers and agents from all claims relating to:labor performed or furnished and materials used or employed for the Work;inventions,patents and patent rights used in and in doing the Work unless such patent infringement is due to a product or process specified by the Owner;injuries to any person or corporation received or sustained by or from the Contractor and any employees,and Subcontractors and employees,in doing the work,or in consequence of any improper materials,implements or labor used or employed therein;and any act, omission,or neglect of the Contractor and any employees. ARTICLE IS PERFORMANCE AND PAYMENT BONDS 18.1 CONTRACTOR BONDS 18.1.1 The Contractor shall provide the Owner with performance and payment(labor and materials)bonds in the form provided by the Department,executed by a surety licensed by the Commonwealth's Division of Insurance. Each such bond shall be in the amount of the Contract Sutra. 18.1.2 If at any time prior to final payment to the Contractor,the Surety: .1 is adjudged bankrupt or has made a general assignment for the benefit of its creditors; .2 has liquidated all assets and has made a general assignment for the benefit of its creditors; 3 is placed in receivership; * otherwise petitions a state or federal court for protection from its creditors;or .5 allows its license to do business in Massachusetts to lapse or be revoked; the Contractor shall,within 21 days of any such action listed above,provide the Owner with new performance and payment bonds as described in Paragraph 18.1.1. Such bonds shall be provided solely at the Contractor's expense. 18.2 SUBCONTRACTOR BONDS 18.2.1 The Contractor may list in its bid that any or all filed Subcontractors provide the Contractor with payment and performance bonds for the full amount of the Subcontract. The costs for said bonds shall be the responsibility of the Contractor. 18.2.2 In the event the Contractor lists in its bid that filed Subcontractors provide bonds,and.subsequently waives the requirement,the Contractor shall provide the Owner with a certification that they understand if the filed subcontractor defaults or is terminated,the Contractor accepts full responsibility and costs related to said default or termination with a credit change order in an amount equal to the bond premium it would have paid had it required the filed Subcontractor-to provide such bonds. DHCD!Ok-10 Mil GENERAL CONDITIONS c.149 8/2004 28 of 29 r ' r � ARTICLE 19 r ; TERMINATION 19.1 TERMINATION FOR CAUSE 19.1.1 The Owner may terminate this contract for cause if it determines that any of the following circumstances have occurred: 1 The Contractor is adjudged bankrupt or has trade a general assignment for the benefit of its creditors; .2 A receiver has been appointed of the Contractor's property; r .3 All or a part of the Work has been abandoned; .4 The Contractor has sublet or assigned all or any portion of the Work,the Contract,or claims thereunder,without u the prior written consent of the Owner,except as provided in the Contract; .5 The Architect has determined that the rate of progress required on the project is not being met,or 1 .6 The Contractor has substantially violated any provisions of this Contract. 19.1.2 In the event of such termination,the Owner may hold the Contractor and its sureties liable in damages as for a breach of contract,or the Owner may notify the Contractor to discontinue all work,or any part thereof,and the Contractor shall discontinue all work,or any part thereof,as the Owner may designate. u 19.1.3 The Owner may complete the work,or any part thereof,and charge the expense of completing the Work or part thereof,to the Contractor. r 1 19.1.4 The Owner may take possession of and use any materials,machinery,implements and tools found upon the site of said Work. The Owner shall not be liable for any depreciation,loss or damage to said materials,machinery, implements or tools during said use and the Contractor shall be solely responsible for their removal from the Project site after the Owner has no further use for them. r 19.1.5 The Owner may,at its option,require the surety or sureties to complete the Contract. w 19.2 TERMINATION LIABILITIES r1 19.2.1 All expenses charged under Paragraph 19.1 shall be deducted and paid by the Owner out of any moneys then due or to become due the Contractor under this Contract;and in such accounting the Owner shall not be held to obtain the lowest figures,by competitive bid or otherwise,for the completion of the Work or any part thereof. r 1 19.2.2 All sums actually paid by the Owner to complete the Work shall be charged to the Contractor. In case the expenses charged are less than the sum which would have been payable under this Contract if the same had been u completed by the Contractor,the Contractor shall be entitled to receive the difference. In case such expenses shall exceed the said sum,the Contractor shall pay the amount of the excess to the Owner. r 19.2.3 Expenses incurred under subparagraph 19.1 shall also include,but not be limited to,costs for Architectural extra services and Project Representative services required,in the opinion of the Owner,to successfully inspect and administer the construction contract through final completion,as described in Paragraph 9.7. r 1 19.3 TERMINATION-NO FAULT 19.3.1 In the event that this Contract is terminated by the Owner, and termination is not based on a reason listed in Paragraph 19.1,the Contractor shall be compensated for its costs incurred on the Project,including reasonable costs of r de-mobilization,calculated on a percent completion basis as provided in Article 10,covering the period of time between the last periodic payment and the date of termination. LJ 19.3.2 Payment by the Owner pursuant to Subparagraph 19.3.1 shall be considered to fully compensate the Contractor for all claims and expenses and those of any consultants,Subcontractors,and suppliers,directly or indirectly attributable rt to the termination,including any claims for lost profits. '—' 19.4 ADMINISTRATOR'S APPROVAL Termination of the Contract requires the prior approval of the Administrator. n f1 r-� DHCD$100k-10 Mil GENERAL CONDITIONS c.149 8/2004 29 of 29 r � r� U SECTION 01010 SUMMARY OF WORK 1. GENERAL SCOPE OF WORK r A. The Work under the Contract consists of: (1.)The removal of 328 existing windows and storm windows and the installation of 328 new vinyl windows, wrapping all window sills with .030 white aluminum, new painted window stops and the removal of all debris. r� (2.) All Work either shown on the Drawings or included in the specifications unless specifically indicated as not to be done. r , B. In addition, the Work under the Contract includes: u (1.) Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. LJ (2.)The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. (3.) Providing and restoring, where appropriate, all temporary facilities. u 2. TIME OF COMPLETION A. In accordance with Article 9 of the General Conditions, the Work shall start as stated in the Notice to Proceed and shall be complete within 90 consecutive calendar days r � 3. WORK UNDER SEPARATE CONTRACT A. Coordination by Owner w (1.)As provided in Article 7 of the General Conditions, the following items shall be provided by others under a separate agreement with the Owner for which the Owner has coordinating L, responsibility. (NONE) n LJ r� r� lJ lJ DHCD$100K-$10M Summary of Work 01010 049 08/2004 1 of 2 B. Coordination by Contractor (1.) The following items shall be provided by others under a separate agreement with the Owner for which the Contractor has coordinating responsibility. (NONE) 4. ITEMS FURNISHED BY OWNER A. The following items will be furnished and delivered f.o.b.to the Project Site by others at no expense to the Contractor. (NONE) B. The Contractor shall include in the Contract Sum the cost of unloading, uncrating, and permanently installing the above listed items; also removal and proper disposal off the Project Site of all crating and packing materials. 5. SAMPLE APARTMENT A. One apartment, or unit of work, as designated by the Architect, shall be completed with all finishes, fixtures, and trim prior to starting the major finish work in the building. This apartment shall establish the acceptable standard of the Work for the project. END OF SECTION 01010 DHCD$100K-$10M Summary of Work 01010 c149 08/2004 2 of 2 r r SECTION 01040 EXISTING CONDITIONS u r 1. GENERAL PROVISIONS `-' A. The Conditions of the Contract and other Sections of Division I, General Requirements apply to this section. 2. EXISTING CONDITIONS r, A. Before submitting a bid, the Contractor shall make a thorough examination of the conditions at the site, checking the requirements of the Plans and Specifications with the existing conditions. r B. No claim for extra compensation or extension of time will be allowed on account of the Contractor's failure to estimate properly the quantities, locations, and measurements of all items required to complete the work which could be discerned from visiting the site. C. The Contractor shall report any discrepancies to the Architect and request an interpretation. r � r + r� u r ' END OF SECTION 01040 r � iJ r7 u r1 u 1 u r-1 u �l r DHCD$100K-$10M Existing Conditions 01040 c149 08/2004 1 of 1 v Cl u r, SECTION 01045 CUTTING AND PATCHING r 1. RELATED DOCUMENTS r A. This section supplements the General Conditions. B. Consult the individual sections of the specifications for specific items required under those sections. n 2. WORK INCLUDED n A. Unless specified elsewhere, the Contractor shall be responsible for: 1. All cutting and patching required for the project construction. c 2. Products and installation for patching and extending Work. 3. Transition and adjustments. r 4. Repair of damaged surfaces, finishes, and cleaning 4J B. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore r-1 surfaces to their original condition. u 3. EXAMINATION A. Examine surfaces to be cut and patched and conditions under which cutting and patching L-Jis to be performed before cutting, including elements subject to damage or movement during cutting and patching. If unsafe or unsatisfactory conditions are encountered, take corrective action before proceeding. �J B. o not cut and patch construction exposed on the exterior or in occupied spaces in a r manner that would, in the Architect's opinion, reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting `J and patching. Remove and replace construction cut and patched in a visually unsatisfactory manner. C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. r D. Beginning of cutting or patching means acceptance of existing conditions. E. After uncovering existing Work, assess conditions affecting performance of work. V `J 4. PREPARATION A. Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay. B. Before proceeding, meet at the Project Site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding. C. Provide temporary supports to ensure structural integrity of the Work. Provide devices and methods to protect other portions of Project from damage. 11 DHCD$100K-$10M Cutting and Patching 01045 r � c149 08/2004 D. Close openings in exterior surfaces to protect existing work [and salvage items] from weather and extremes of temperature and humidity. Insulate duct work and piping to prevent condensation in exposed areas. E. Cut, move, or remove items as necessary for access to alterations and renovation Work. Replace and restore at completion. F. Remove unsuitable material not marked for salvage, such as rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished Work. G. Remove debris and abandoned items from area and from concealed spaces. H. Prepare surface and remove surface finishes to provide for proper installation of new work and finishes. 5. CUTTING A. Execute all cutting and fitting necessary to complete the Work. B. Where services are required to be remove, relocated, or abandoned, by-pass utility services, such as pipe or conduit, before cutting. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting. C. Uncover work to install improperly sequenced work. D. Remove and replace defective or non-conforming work. a ; E. Provide openings in the Work for penetration of mechanical and electrical work. Cut holes and slots as small as possible, nearly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover opening when not in use. F. Employ skilled and experienced workers to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces. G. Cut rigid materials using power saw or core drill. Cut through concrete and masonry using a cutting machine, such as a Carborundum saw or a diamond-core drill. Pneumatic tools shall not be allowed without prior approval. H. Cut existing construction using methods least likely to damage elements retained or adjoining construction. Where possible, review proposed procedures with the original Installer; comply with the original Installer's recommendations. I. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces. J. Comply with requirements of applicable Division 2 Sections where cutting and patching requires excavating and backfilling. K. Do not cut structural elements in a manner that would change their load-carving capacity or load-deflection ratio. L. Do not cut operating elements or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut operating elements or related components in a manner that would result in increased maintenance or decreased operational life or safety. 22DHCD$100K-$10M Cutting and Patching 01045 c149 0812004 r� u r 6. PATCHING ` A. Execute patching to complement adjacent, undisturbed finishes. r , B. Fit products together to integrate with other Work. C. Execute work by methods to avoid damage to other Work, and which will provide appropriate surfaces to receive patching and finishing. r-, D. Restore work with new products in accordance with requirements of Contract Documents. E. Fit work tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. F. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal L_, voids with appropriate material to full thickness of the penetrated element as necessary to maintain the required rating. r � G. Where new work abuts or aligns with existing, perform a smooth and even transition. Patch work to match existing adjacent work in texture and appearance. Refinish surfaces r , to match adjacent finish. For continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit. H. Use materials identical to existing materials. For exposed surfaces, use materials that r I visually match existing adjacent surfaces to the fullest extent possible if identical materials are unavailable or cannot be used. Use materials whose installed performance will equal or surpass that of existing materials. n I. Patch with durable seams that re as invisible as possible. Comply with specified tolerances. J. Where feasible, inspect and test patched areas to demonstrate integrity of the installation. r� K. Restore exposed finishes of patched areas and extend finish restoration into retained LJ adjoining construction in a manner that will eliminate evidence of patching and refinishing. L. Where walls or partitions are to be removed, patch and repair voids left in floor, wall and r ceiling surfaces where the existing construction is removed. Provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance. M. Where patching occurs in a smooth painted surface, extend final paint coat over entire �J unbroken surface containing the patch after the area has received primer and second coat. N. Patch, repair, or re-hang existing ceilings as necessary to provide an even-plane surface of uniform appearance. ri 7. CLEANING r A. In addition to cleaning specified in Section 01520, clean all areas affected by the work of this Section. B. Completely remove paint, mortar, oils, putty, and similar items. r_1 C. Thoroughly clean piping, conduit, and similar features before applying paint or other LJ finishing materials. Restore damaged pipe covering to its original condition. (-I LJ END OF SECTION 01045 33DHCD$100K-$10M Cutting and Patching 01045 c149 08/2004 ri r , f� u r SECTION 01050 CONDUCT OF THE WORK r ' 1. GENERAL PROVISIONS A. The Conditions of the Contract and other Sections of Division I,General Requirements apply to this r section. f� 2. PROJECT MANAGEMENT A. The Contractor's attention is directed to Paragraph 4.3 of the General Conditions. r' B. All dwelling units will be occupied during construction. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants during construction. C. The work must be completed in a continuous uninterrupted operation. The Contractor must use r sufficient personnel and adequate equipment to complete all the necessary work requirements within u a minimum period of time. r D. Unless specifically authorized by the Owner, in writing, the work must be conducted between the hours of 8:00 a.m. and 4:30 p.m. on Monday through Friday. No work is to be done on holidays, `—' Saturdays, or Sundays other than for emergencies. r E. The Contractor is responsible for the security of partially completed work until the project is accepted Li by the Owner. r i F. There shall be no storage of materials, tools, and/or equipment within any of the occupied dwelling units. Any storage within unoccupied dwelling units must be authorized by the Owner, in writing. G. Only materials and/or equipment intended and necessary for immediate use shall be brought into the r-1 dwelling units. At the end of each work day and at the completion of each phase of work, equipment and leftover or unused materials shall be removed from each dwelling unit. H. Workers shall refrain from smoking any while performing work inside dwelling units, including basement areas. The Contractor shall remove from the project workers who consistently violate this �' provision. r 3. SHUTDOWN OF SERVICES LJ A. The Contractor's attention is especially called to the fact that the continuous operation of services for f this housing development is mandatory. If the development is to be left without heat, hot water, domestic water, electricity,gas,sanitary facilities or any other services for more than an eight hour ' period,the Contractor shall submit a letter and obtain written approval from the Owner before proceeding. If the Owner will not allow this shutdown, but wants instead a temporary means of r supplying said services,the Contractor shall supply all labor, materials or whatever may be required to supply said temporary services at no extra cost to the Owner and in accordance with the state and local regulations on health and safety. 4. COORDINATION A. The Contractor shall submit for approval to the Owner a detailed operational plan showing the r� sequence of operations prior to commencement of any work at the site. The Owner must approve any DHCD$100K-$10M Conduct of Work 01050 c149 08/2004 1 of 2 r-� changes to this operational plan. B. The Contractor must retain on the Work during its progress a competent full time representative, satisfactory to the Owner. This representative shall not be changed, except with the consent of the Owner. The representative shall be in full charge of the work and all instructions given to this person by the Architect shall be binding. C. The Contractor must supply to the Owner the home telephone number of a responsible person who may be contacted during non-work-hours for emergencies on the Project. 5. OWNER'S COOPERATION A. The Owner shall assist the Contractor to perform the Work in accordance with the approved operational plan by removing obstructions that may be in the Contractor's way, upon proper notice from the Contractor. B. The Owner may provide a Resident Coordinator to act as liaison with residents and to assist the Contractor in fulfilling the following: (1.) Notifying all residents two (2)weeks before any work is scheduled in their apartments. (2.) Notifying each resident in writing forty-eight(48) hours before work is scheduled in his or her particular apartment. (3.)Obtaining signed permission to enter the apartment, if the resident will not be at home. (4.) Obtain from the Owner the keys for any vacant apartment(s) or any apartment(s)where the resident is not at home. The Resident Coordinator will be responsible for the safekeeping of such keys and shall return them at the end of the workday to the Owner. (5.) Notify the Owner of any resident who refuses to cooperate with the proposed operational plan. 6. RETAINED ITEMS A. The following items which are to be removed and are in good condition shall be retained by the Owner (at the discretion of the Owner)and shall be stored at a location directed by the Owner. END OF SECTION 01050 DHCD$100K-$10M Conduct of Work 01050 c149 08/2004 2 of 2 r r-, SECTION 01100 LABOR REGULATIONS r1 1. MINIMUM MINORITY PERCENTAGES A. The following minimum minority percentages are applicable as per Article 14 of the General Conditions. Location Not Less than Boston Impact Area r' Jamaica Plain (part), Mattapan, South Cove, Chinatown, Bay Village, Roxbury, Dorchester, South End):.-------------------------------------------------- 30% r' Boston: Other Areas: ------------------------------------------------- 10% '-' Cambridge: 12% NewBedford: ---------------------------------------------------------------- 18% Springfield: ------------------------------------------------------------------ 10% �J All other cities and towns:---------------------------------------------------5% r B. These percentages shall apply to the Contractor and to all Subcontractors, regardless of tier, for all on-site Work. r � 2. WAGE RATES r i A. The rate per hour to be paid to mechanics, apprentices, teamsters, chauffeurs, and laborers employed on the Work shall not be less than the rate of wages in the attached "Minimum Wage Rates" as determined by the Director of the Department of Labor and Work Force Development. This schedule shall continue to be the minimum rate of wages for said employees during the life r 1 of this Contract. Any questions relative to the applicability of any wage rate shall be directed to the Department of Labor and Workforce Development. B. Keep posted on the site a legible copy of said schedule. Provide the Owner, on a weekly basis, ` and keep an on-site file of the wage rates and classifications of labor employed on this Work in order that they may be available for inspection by the Owner, Department, Architect, or any other agency having jurisdiction. . C. Apprentices employed pursuant to this determination of wage rates must be registered and approved by the State Apprenticeship Council wherever rates for journeymen or apprentices are not listed. D. Pay reserve police officers employed on the Work the prevailing rate of wages paid to regular police officers as required by MGL c149§34B, as amended. Such police officers shall be covered by Worker's Compensation Insurance and Employers Liability Insurance provided by r ' the Contractor. E. The Contractor and all subcontractors shall provide certified payroll affidavits verifying compliance with MGL c.149§§26-27H. rl F. The Contractor and all subcontractors shall provide a Statement of Compliance within 15 days of the completion of its portion of the work. This statement shall be submitted to the Owner on the form found elsewhere in this section. r END OF SECTION 01100 r � r� DHCD$100K-$10M Labor Regulations 01100 J ^laa nAnnnd 9 of 1) .� THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF LABOR m ( �> == „ ` i � r ;�1 `4 DIVISION OF OCCUPATIONAL SAFETY 14v Prevailing Wage Rates MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director _ KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor Commissioner Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET Classification Effective Dates and Total Rates (2 AXLE)DRIVER-EQUIPMENT 6/1/2005 $36.230 8/1/2005 $36.630 12/1/2005 $37.330 6/1/2006 $37.830 8/1/2006 $38.230 12/1/2006 $38.930 6/1/2007 $39.430 8/1/2007 $39.930 12/1/2007 $40.630 6/1/2008 $41.130 8/1/2008 $41.630 12/1/2008 $42.330 (3 AXLE)DRIVER-EQUIPMENT 6/1/2005 $36.300 8/1/2005 $36.700 12/1/2005 $37.400 6/1/2006 $37.900 8/1/2006 $38.300 12/1/2006 $39.000 6/1/2007 $39.500 8/1/2007 $40.000 12/1/2007 $40.700 6/1/2008 $41.200 8/1/2008 $41.700 12/1/2008 $42.400 (4&5 AXLE)DRIVER-EQUIPMENT 6/1/2005 $36.420 8/1/2005 $36.820 12/1/2005 $37.520 6/1/2006 $38.020 8/1/2006 $38.420 12/1/2006 $39.120 6/1/2007 $39.620 8/1/2007 $40.120 12/1/2007 $40.820 6/1/2008 $41.320 8/1/2008 $41.820 12/1/2008 $42.520 AIRTRACK OPERATOR 6/1/2005 $34.750 12/1/2005 $35.850 6/1/2006 $37.000 12/1/2006 $38.100 6/1/2007 $39.250 12/1/2007 $40.350 5/31/2008 $40.850 ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 6/1/2004 $29.250 ASPHALT RAKER 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 BACKHOE/FRONT-END LOADER 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 BARCO-TYPE JUMPING TAMPER 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 BLOCK PAVER,RAMMER/CURB SETTER 6/1/2005 $34.750 12/1/2005 $35.850 6/1/2006 $37.000 12/1/2006 $38.100 6/1/2007 $39.250 12/1/2007 $40.350 5/31/2008 $40.850 BOILERMAKER 10/1/2004 $47.170 10/1/2005 $48.170 BRICK/STONE/ARTIFICIAL MASONRY(INCL. 2/1/2005 $53.510 8/1/2005 $55.460 2/1/2006 $56.980 8/1/2006 $59.040 MASONRY WATERPROOFING) 2/1/2007 $60.690 BULLDOZER/GRADER/SCRAPER 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 CAISSON&UNDERPINNING BOTTOM MAN 6/1/2005 $38.300 12/1/2005 $39.400 6/1/2006 $40.550 12/1/2006 $41.650 6/1/2007 $42.800 12/1/2007 $43.900 5/31/2008 $44.400 CAISSON&UNDERPINNING LABORER 6/1/2005 $37.350 12/1/2005 $38.450 6/1/2006 $39.600 12/1/2006 $40.700 6/1/2007 $41.850 12/1/2007 $42.950 5/31/2008 $43.450 CAISSON&UNDERPINNING TOP MAN 6/1/2005 $37.350 12/1/2005 $38.450 6/1/2006 $39.600 12/1/2006 $40.700 6/1/2007 $41.850 12/1/2007 $42.950 5/31/2008 $43.450 CARBIDE CORE DRILL OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 CARPENTER 4/1/2005 $43.520 CEMENT MASONRY/PLASTERING 7/1/2005 $53.320 8/1/2005 $54.830 1/1/2006 $55.120 2/1/2006 $56.290 8/1/2006 $57.890 2/1/2007 $59.160 CHAIN SAW OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 This wage schedule must be posted at the work site in accordance with M.G.L.ch. 149,sec.27 Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works projects is a violation of M.G.L.ch. 149,sec.27B. Employees not receiving such rates should report the violation to the Office of Fair Labor and Business Practices, 100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ED: 98123 Page: 1 r' THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF LABOR .LI r ? DIVISION OF OCCUPATIONAL SAFETYr ;r �i Prevailing Wage Rates ` f MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA _J Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor n Commissioner L__J Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER r Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET -. Classification Effective Dates and Total Rates CLAM SHELLS/SLURRY BUCKETS/HEADING 6/1/2005 $49.790 12/1/2005 $50.990 6/1/2006 $51.990 12/1/2006 $53.390 MACHINES 6/1/2007 $54.390 12/1/2007 $55.790 COMPRESSOR OPERATOR 6/1/2005 $40.690 12/1/2005 $41.600 6/1/2006 $42.360 12/1/2006 $43.430 r 6/1/2007 $44.180 12/1/2007 $45.250 DELEADER(BRIDGE) 7/1/2005 $53.130 1/1/2006 $54.560 DEMO:ADZEMAN 6/1/2005 $37.450 12/1/2005 $38.550 6/1/2006 $39.700 12/1/2006 $40.800 6/1/2007 $41.950 12/1/2007 $43.050 5/31/2008 $43.550 DEMO:BACKHOE/LOADER/HAMMER OPERATOR 6/1/2005 $38.450 12/1/2005 $39.550 6/1/2006 $40.950 12/1/2006 $42.050 6/1/2007 $43.200 12/1/2007 $44.300 5/31/2008 $44.800 r-I DEMO:BURNERS 6/1/2005 $38.200 12/1/2005 $39.300 6/1/2006 $40.700 12/1/2006 $41.800 6/1/2007 $42.950 12/1/2007 $44.050 5/31/2008 $44.550 DEMO:CONCRETE CUTTER/SAWYER 6/1/2005 $38.450 12/1/2005 $39.550 6/1/2006 $40.950 12/1/2006 $42.050 6/1/2007 $43.200 12/1/2007 $44.300 5/31/2008 $44.800 rl DEMO:JACKHAMMER OPERATOR 6/1/2005 $38.200 12/1/2005 $39.300 6/1/2006 $40.700 12/1/2006 $41.800 k._J 6/1/2007 $42.950 12/1/2007 $44.050 5/31/2008 $44.550 DEMO:WRECKING LABORER 6/1/2005 $37.450 12/1/2005 $38.550 6/1/2006 $39.700 12/1/2006 $40.800 f 1 6/1/2007 $41.950 12/1/2007 $43.050 5/31/2008 $43.550 DIRECTIONAL DRILL MACHINE OPERATOR 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 u 6/1/2007 $53.100 12/1/2007 $54.490 DIVER 8/1/2004 $55.340 8/1/2005 $57.650 8/1/2006 $59.960 8/1/2007 $62.270 1 DIVER TENDER 8/1/2004 $44.370 8/1/2005 $46.020 8/1/2006 $47.670 8/1/2007 $49.320 DIVER TENDER(EFFLUENT) 8/1/2004 $58.090 8/1/2005 $59.740 8/1/2006 $61.390 8/1/2007 $63.040 DIVER/SLURRY(EFFLUENT) 8/1/2004 $74.540 8/1/2005 $76.190 8/1/2006 $77.840 8/1/2007 $79.490 ' 1 ELECTRICIAN 3/1/2005 $55.600 9/1/2005 $57.080 3/1/2006 $58.570 u ELEVATOR CONSTRUCTOR 1/1/2005 $52.790 1/1/2006 $55.760 1/1/2007 $58.730 ELEVATOR CONSTRUCTOR HELPER 1/1/2005 $40.250 1/1/2006 $42.620 1/1/2007 $44.990 f1 FENCE&GUARD RAIL ERECTOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 FIELD ENG.-INST.PERSON(BLDG,SITE,HVY CONST) 5/1/2005 $46.130 FIELD ENG.-ROD PERSON(BLDG,SITE,HVY CONST) 5/1/2005 $34.880 r FIELD ENG.-CHIEF OF PARTY(BLDG,SITE,HVY 5/1/2005 $47.400 CONST) FIRE ALARM INSTALLER 3/1/2005 $55.600 9/1/2005 $57.080 3/1/2006 $58.570 r_1 FIRE ALARM REPAIR/MAINTENANCE 3/1/2005 $43.350 9/1/2005 $44.440 3/1/2006 $45.930 FIREMAN(ASST.ENGINEER) 6/1/2005 $44.390 12/1/2005 $45.430 6/1/2006 $46.300 12/1/2006 $47.520 `� 6/1/2007 $48.390 12/1/2007 $49.600 f1 FLAGGER&SIGNALER 6/1/2005 $28.050 12/1/2005 $29.150 6/1/2006 $30.300 12/1/2006 $31.400 6/1/2007 $32.550 12/1/2007 $33.650 5/31/2008 $34.150 -J FLOORCOVERER 4/1/2005 $49.210 rl This wage schedule must be posted at the work site in accordance with M.G.L.ch. 149,sec.27 " Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works projects is a violation of M.G.L.ch. 149,sec.27B. Employees not receiving such rates should report the violation to the r 1 Office of Fair Labor and Business Practices, 100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 Page: 2 THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF LABOR DIVISION OF OCCUPATIONAL SAFETY ''• ,BIW4 �•` �5• t'�4 (` �' Prevailing Wage Ratess �y MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor Commissioner Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET Classification Effective Dates and Total Rates FORK LIFT/CHERRY PICKER 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 GENERATOR/LIGHTIM PLANTMEATERS 6/1/2005 $40.690 12/1/2005 $41.600 6/1/2006 $42.360 12/1/2006 $43.430 6/1/2007 $44.180 12/1/2007 $45.250 GLAZIER(GLASS PLANUAIR BARRIERANTERIOR 7/1/2005 $42.880 1/1/2006 $44.060 SYSTEMS) HOISTING ENGINEER/CRANES/GRADALLS 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 HVAC(DUCTWORK) 2/1/2005 $53.390 HVAC(ELECTRICAL CONTROLS) 3/1/2005 $55.600 9/1/2005 $57.080 3/1/2006 $58.570 HVAC(PIPE) 3/1/2005 $48.410 HVAC(TESTING AND BALANCING-AIR) 2/1/2005 $53.390 HVAC(TESTING AND BALANCING-WATER) 3/1/2005 $48.410 HYDRAULIC DRILLS 6/1/2005 $34.750 12/1/2005 $35.850 6/1/2006 $37.000 12/1/2006 $38.100 6/1/2007 $39.250 12/1/2007 $40.350 5/31/2008 $40.850 INSULATOR(PIPES&TANKS) 9/1/2004 $48.130 9/1/2005 $50.630 IRONWORKER/WELDER 3/16/2005 $43.610 JACKHAMMER&PAVING BREAKER OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 LABORER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LABORER:CARPENTER TENDER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LABORER:CEMENT FINISHER TENDER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LABORER:MASON TENDER 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 LABORER:MULTI-TRADE TENDER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LABORER:TREE REMOVER 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 LASER BEAM OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 MARBLE&TILE FINISIERS 5/1/2005 $45.350 10/1/2005 $46.910 4/1/2006 $48.130 9/1/2006 $49.780 3/1/2007 $51.100 MARBLE MASONS,TILELAYERS&TERRAZZO MECH 5/1/2005 $53.550 10/1/2005 $55.500 4/1/2006 $57.020 9/1/2006 $59.080 3/1/2007 $60.730 MECH.SWEEPER OPERATOR(NON-CONSTRUCTION) 7/1/2005 $25.070 7/1/2006 $25.570 This wage schedule must be posted at the work site in accordance with M.G.L. ch. 149,sec.27 Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works projects is a violation of M.G.L.ch. 149,sec.27B. Employees not receiving such rates should report the violation to the Office of Fair Labor and Business Practices, 100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 Page: 3 n THE COMMONWEALTH OF MASSACHUSETTS '* DEPARTMENT OF LABOR �Y I ` DIVISION OF OCCUPATIONAL SAFETY ;�1 Prevailing Wage Rates MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA [J Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor !-i Lt. Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER ' Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET r, Classification Effective Dates and Total Rates MECH.SWEEPER OPERATOR(ON CONST.SITES) 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 MECHANICS MAINTENANCE 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 u MILLWRIGHT 4/1/2005 $45.700 10/1/2005 $46.550 4/1/2006 $47.550 MORTAR MIXER 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 !� 6%1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 u OILER(OTHER THAN TRUCKS,CRANES,GRADALLS) 6/1/2005 $36.010 12/1/2005 $36.760 6/1/2006 $37.380 12/1/2006 $38.250 6/1/2007 $38.870 12/1/2007 $39.740 ! OILER(TRUCKS,CRANES,GRADALLS) 6/1/2005 $38.280 12/1/2005 $39.110 6/1/2006 $39.790 12/1/2006 $40.760 6/1/2007 $41.450 12/1/2007 $42.410 OTHER POWER DRIVEN EQUIPMENT-CLASS II 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 PAINTER(BRIDGES/TANKS) 7/1/2005 $53.130 1/1/2006 $54.560 PAINTER(SPRAY OR SANDBLAST,NEW)* 7/1/2005 $43.880 1/1/2006 $45.060 PAINTER(SPRAY OR SANDBLAST,REPAINT) 7/1/2005 $41.940 1/1/2006 $43.120 ! PAINTER(TRAFFIC MARKINGS) 6/1/2005 $34.000 12/1/2005 $35.100 6/1/2006 $36.250 12/1/2006 $37.350 6/1/2007 $38.500 12/1/2007 $39.600 5/31/2008 $40.100 PAINTER/TAPER(BRUSH,NEW)* 7/1/2005 $42.880 1/1/2006 $44.060 !� PAINTER/TAPER(BRUSH,REPAINT) 7/1/2005 $40.940 1/1/2006 $42.120 PANEL&PICKUP TRUCKS DRIVER 6/1/2005 $36.060 8/1/2005 $36.460 12/1/2005 $37.160 6/1/2006 $37.660 8/1/2006 $38.060 12/1/2006 $38.760 6/1/2007 $39.260 8/1/2007 $39.760 12/1/2007 $40.460 6/1/2008 $40.960 8/1/2008 $41.460 12/1/2008 $42.160 !i PIER AND DOCK CONSTRUCTOR(UNDERPINNING 8/1/2004 $44.370 8/1/2005 $46.020 8/1/2006 $47.670 8/1/2007 $49.320 AND DECK) u PILE DRIVER 8/1/2004 $44.370 8/1/2005 $46.020 8/1/2006 $47.670 8/1/2007 $49.320 r 1 PIPELAYER 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 L-J PLUMBER&PIPEFITTER 3/1/2005 $48.410 PNEUMATIC CONTROLS(TEMP.) 3/1/2005 $48.410 f7 PNEUMATIC DRILL/TOOL OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 u 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 POWDERMEN&BLASTER 6/1/2005 $35.000 12/1/2005 $36.100 6/1/2006 $37.250 12/1/2006 $38.350 f1 6/1/2007 $39.500 12/1/2007 $40.600 5/31/2008 $41.100 POWER SHOVEL/DERRICK/TRENCHING MACHINE 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52,390 u 6/1/2007 $53.390 12/1/2007 $54.790 r, PUMP OPERATOR(CONCRETE) 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 PUMP OPERATOR(DEWATERING,OTHER) 6/1/2005 $40.690 12/1/2005 $41.600 6/1/2006 $42.360 12/1/2006 $43.430 6/1/2007 $44.180 12/1/2007 $45.250 ! ' This wage schedule must be posted at the work site in accordance with M.G.L. ch. 149,sec.27 Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works I 1 projects is a violation of M.G.L. ch. 149,sec.27B. Employees not receiving such rates should report the violation to the Office of Fair Labor and Business Practices, 100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. 4� Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 Page: 4 `++ THE COMMONWEALTH OF MASSACHUSETTS • +. DEPARTMENT OF LABOR DIVISION OF OCCUPATIONAL SAFETYr f! Prevailing Wage Rates ' ' MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor Commissimer Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET Classification Effective Dates and Total Rates READY-MIX CONCRETE DRIVER 5/1/2005 $33.640 8/1/2005 $33.740 11/1/2005 $33.790 5/1/2006 $34.440 8/1/2006 $34.540 11/1/2006 $34.610 5/1/2007 $35.290 11/1/2007 $35.340 4/30/2008 $35.520 5/1/2008 $35.770 4/30/2009 $36.070 RECLAIMERS 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 RESIDENTIAL WOOD FRAME CARPENTER** 4/1/2005 $30.920 RIDE-ON MOTORIZED BUGGY OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 ROLLER/SPREADER/MULCHING MACHINE 6/1/2005 $48.530 12/1/2005 $49.730 6/1/2006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 ROOFER(Inc.Roofer Waterproofng&Roofer Damproofg) 2/1/2005 $43.360 8/1/2005 $44.860 2/1/2006 $46.360 SHEETMETAL WORKER 2/1/2005 $53.390 SIGN ERECTOR 6/1/2005 $29.070 SLATE/TILE/PRECAST CCNCRETE ROOFER 2/1/2005 $43.610 8/1/2005 $45.110 2/1/2006 $46.610 SPECIALIZED EARTHMOVING EQUIP<35 TONS 6/1/2005 $36.520 8/1/2005 $36.920 12/1/2005 $37.620 6/1/2006 $38.120 8/1/2006 $38.520 12/1/2006 $39.220 6/1/2007 $39.720 8/1/2007 $40.750 12/1/2007 $40.920 6/1/2008 $41.420 8/1/2008 $41.920 12/1/2008 $42.620 SPECIALIZED EARTHMOVING EQUIP>35 TONS 6/1/2005 $36.810 8/1/2005 $37.210 12/1/2005 $37.910 6/1/2006 $38.410 8/1/2006 $38.810 12/1/2006 $39.510 6/12007 $40.010 8/1/2007 $40.510 12/1/2007 $41.210 6/1/2008 $41.710 8/12008 $42.210 12/1/2008 $42.910 SPRINKLER FITTER 3/16/2005 $55.750 9/16/2005 $57.750 3/16/2006 $58.750 STEAM BOILER OPERATOR 6/1/2005 $48.530 12/1/2005 $49.730 6/12006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 6/1/2005 $48.530 12/1/2005 $49.730 6/12006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 TELECOMMUNICATION TECHNICIAN 3/1/2005 $43.350 9/1/2005 $44.440 3/1/2006 $45.930 TERRAZZO FINISHERS 5/1/2005 $52.450 10/1/2005 $54.400 4/12006 $55.920 9/1/2006 $57.980 3/1/2007 $59.630 TEST BORING DRILLER 6/1/2005 $38.250 12/1/2005 $39.350 6/12006 $40.500 12/1/2006 $41.600 6/1/2007 $42.750 12/1/2007 $43.850 5/31/2008 $44.350 TEST BORING DRILLER HELPER 6/1/2005 $36.970 12/1/2005 $38.070 6/12006 $39.220 12/1/2006 $40.320 6/1/2007 $41.470 12/1/2007 $42.570 5/31/2008 $43.070 TEST BORING LABORER 6/1/2005 $37.350 12/1/2005 $38.450 6/12006 $39.600 12/1/2006 $40.700 6/1/2007 $41.850 12/1/2007 $42.950 5/31/2008 $43.450 TRACTORS/PORTABLE STEAM GENERATORS 6/1/2005 $48.530 12/1/2005 $49.730 6/12006 $50.720 12/1/2006 $52.110 6/1/2007 $53.100 12/1/2007 $54.490 TRAILERS FOR EARTHMOVING EQUIPMENT 6/1/2005 $37.100 8/1/2005 $37.500 12/1/2005 $38.200 6/1/2006 $38.700 8/1/2006 $39.100 12/1/2006 $39.800 6/12007 $40.300 8/1/2007 $40.800 12/1/2007 $41.500 6/1/2008 $42.000 8/12008 $42.500 12/1/2008 $43.200 This wage schedule must be posted at the work site in accordance with M.G.L. ch. 149,sec.27 Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works projects is a violation of M.G.L. ch. 149,sec.27B. Employees not receiving such rates should report the violation to the Office of Fair Labor.and Business Practices,100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ED: 98123 Page: 5 THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF LABOR 17 DIVISION OF OCCUPATIONAL SAFETY M Prevailing Wage Rates "lli'i Y, MITT ROMNEY As determined by the Commissioner under the provisions of the JOHN S.ZIEMBA Govenor Massachusetts General Laws,Chapter 149,Sections 26 to 27H Director KERRY HEALEY ROBERT J.PREZIOSO Lt.Govenor Commissimer Awarding Authority: NORTH ANDOVER HOUSING AUTHORITY Contract Number: City/Town: NORTH ANDOVER r I Description Of Work: 200-1 VETERANS HOUSING WINDOW REPLACEMENT WORKS Job Location: BALDWIN&FRANCIS STRET Classification Effective Dates and Total Rates TUNNEL WORK(COMP.AIR HAZ.WASTE) 6/1/2005 $50.480 12/1/2005 $51.730 6/1/2006 $53.130 12/1/2006 $54.380 6/1/2007 $55.780 12/1/2007 $57.530 TUNNEL WORK(COMPRESSED AIR) 6/1/2005 $48.480 12/1/2005 $49.730 6/1/2006 $51.130 12/1/2006 $52.380 6/1/2007 $53.780 12/1/2007 $55.530 TUNNEL WORK(FREE AIRHAZ.WASTE) 6/1/2005 $42.550 12/1/2005 $43.800 6/1/2006 $45.290 12/1/2006 $46.450 6/1/2007 $47.850 12/1/2007 $49.600 r TUNNEL WORK(FREE AIR) 6/1/2005 $40.550 12/1/2005 $41.800 6/1/2006 $43.200 12/1/2006 $44.450 6/1/2007 $45.850 12/1/2007 $47.600 VAC-HAUL 6/1/2005 $36.520 8/1/2005 $36.920 12/1/2005 $37.620 6/1/2006 $38.120 (-1 8/1/2006 $38.520 12/1/2006 $39.220 6/1/2007 $39.720 8/1/2007 $40.220 12/1/2007 $40.920 6/1/2008 $41.420 8/1/2008 $41.920 12/1/2008 $42.620 WAGON DRILL OPERATOR 6/1/2005 $34.250 12/1/2005 $35.350 6/1/2006 $36.500 12/1/2006 $37.600 6/1/2007 $38.750 12/1/2007 $39.850 5/31/2008 $40.350 WASTE WATER PUMP OPERATOR 6/1/2005 $48.790 12/1/2005 $49.990 6/1/2006 $50.990 12/1/2006 $52.390 6/1/2007 $53.390 12/1/2007 $54.790 WATER METER INSTALLER 3/1/2005 $48.410 If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used. The Residential Wood Frame Carpenter classification applies only to the construction of new,wood frame residences that do not exceed four stories including the basement. r, I Li r i This wage schedule must be posted at the work site in accordance with M.G.L. ch. 149,sec.27 Failure of the employer to pay "prevailing wage rates," which are the minimum wage rates listed above,on public works projects is a violation of M.G.L.ch. 149,see.27B. Employees not receiving such rates should report the violation to the Office of Fair Labor and Business Practices,100 Cambridge Street,Boston,MA 02108; Tel: (617)727-3465. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 Page: 6 COMMONWEALTH OF MASSACHUSETTS Division of Occupational Safety Minimum wage rates for apprentices employed on public works projects are listed below as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the Massachusetts General Laws, Chapter 149,Sections 26 through 27D,as ammended All apprentices must be registered with the Division of Apprentice Training in accordance with M.G.L. Chapter . 23,Sections 11 E-11 L City/Town: NORTH ANDOVER All steps are 6 months(1000 Hours)unless otherwise specified— Classification Ratio* 1 2 3 4 5 6 7 8 9 10 ASBESTOS INSULATOR(Pipes& 1:4 50 60 70 80 Tanks) Steps are 1 year BOILERMAKER 1:5 65 65 70 75 80 85 90 95 BRICK/PLASTER/CEMENT MASON 1:5 50 60 70 80 90 CARPENTER 1:5 50 60 70 75 80 80 90 90 CARPENTER(Residential Wood 1:5 60 60 65 70 75 80 85 90 Frame) ELECTRICIAN 2:3*** 30 35 40 45 50 55 65 70 75 80 App.Start 2003+:40/40/45/45/50/55/60/65/70/75 ELEVATOR CONSTRUCTOR 1:1 50 55 65 70 80 Steps 1-2 are 6 mos.;Steps 3-5 are 1 year FLOORCOVERER 1:1 50 55 60 65 70 75 80 85 Steps are 950 hrs. GLAZIER 1:1 50 55 60 65 70 75 80 90 Steps are 750 hrs. HOIST/PORT.ENG. 1:5 55 60 65 70 75 80 85 90 IRONWORKER 60 70 75 80 85 90 Structural 1:6;Ornamental 1:4 LABORER 1:5 60 70 80 90 MARBLE-TILE-TERRAZZO 1:3 50 60 70 80 90 FINISHER Steps are 800 hrs. MARBLE-TILE-TERRAZZO 1:3 50 60 70 80 90 MECHANIC MILLWRIGHT 1:5 50 55 60 65 70 75 80 85 * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. * Multiple ratios are listed in comment field. ***The job site ratio of 2 apprentices for every 3 journeymen is allowed as follows: 1 journeyman may supervise not more than 1 apprentice;2 to 3 journeymen may supervise not more than 2 apprentices;4 to 6 journeymen may supervise not more than 4 apprentices;7 to 9 journeymen may supervise not more than 6 apprentices; 10 to 12 journeymen may supervise not more than 8 apprentices; 13 to 15 journeymen may supervise not more than 10 apprentices;etc. Not more than 50%of the apprentices on a job site may have standing as a 1 st year apprentice. All other apprentices must have 2nd,3rd,4th,or 5th year standing. Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 r � L� r , COMMONWEALTH OF MASSACHUSETTS U Division of Occupational Safety Minimum wage rates for apprentices employed on public works projects are listed below as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the Massachusetts General Laws,Chapter 149,Sections 26 through 27D,as ammended u All apprentices must be registered with the Division of Apprentice Training in accordance with M.G.L.Chapter 23,Sections 11 E-11 L City/Town: NORTH ANDOVER All steps are 6 months(1000 Hours)unless otherwise specified— PAINTER 1:1 50 55 60 65 70 75 80 90 Steps are 750 hrs. `—' PILE DRIVER 1:3 60 65 70 75 80 85 90 95 r1 PLUMBER/PIPEFITTER 1:5 38 40 45 50 55 60 65 70 75 80 ROOFER — 50 60 65 75 85 * 1:5,2:6-10 thereafter 1:10(or portion thereof) Step 1 is 2000 hrs.;Steps 2-5 are 1000 hrs. ROOFER(REROOFING) ** 50 60 65 75 85 **1:4;Thereafter 1:1 Step 1 is 2000 hrs.;Steps 2-5 are 1000 hrs. SHEET METAL WORKER 1:4 40 • 45 50 60 65 75 85 Steps 1-3 are 1 year;Steps 4-7 are 6 mos. SIGN ERECTOR 1:1 50 55 60 65 70 75 80 85 90 Steps are 4 mos. `J SPRINKLER FITTER 1:1 40 45 50 55 60 65 70 75 80 85 TELECOMMUNICATION 1:1 40 45 50 55 60 65 75 80 TECHNICIAN u u r u u r'• u n v * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in comment field. u **The job site ratio of 2 apprentices for every 3 journeymen is allowed as follows: 1 journeyman may supervise not more than 1 apprentice;2 to 3 journeymen may supervise not more than 2 apprentices;4 to 6 journeymen may supervise not more than 4 apprentices;7 to 9 journeymen may supervise not more than 6 r' apprentices; 10 to 12 journeymen may supervise not more than 8 apprentices; 13 to 15 journeymen may supervise not more than 10 apprentices;etc. Not more than 50%of the apprentices on a job site may have standing as a 1 st year apprentice. All other apprentices must have 2nd,3rd,4th,or 5th year standing. f1 Issue Date: 7/28/2005 Rate Sheet: NORTH ANDOVER Job ID: 98123 u r7 THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENTS OF LABOR AND WORKFORCE DEVELOPMENT W DIVISION OF OCCUPATIONAL SAFETY y PREVAILING WAGE PROGRAM r www.mass.gov/dos/pw MITT ROMNEY JOHN S. ZIEMBA Governor Director,DOL KERRY HEALEY ROBERT J. PREZIOSO rLieutenant Governor Commissioner � The Massachusetts Prevailing Wage Law r 1 M.G.L. c. 149, §§26-27 — -- -- --- _ NOTICE TO AWARDING AUTHORITIES - -- r ➢ The enclosed wage schedule applies only to the specific project listed at the top of the schedule, and these rates will remain in effect for the duration of the project. f� ➢ You should request an updated wage schedule from the Division of Occupational Safety if you have not opened bids or selected a contractor within 90 days of the date of issuance of the enclosed wage schedule. ➢ The wage schedule shall be incorporated in any advertisement or call for bids for the project for which r; it has been issued. ➢ Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part n of the contract for that project. NOTICE TO CONTRACTORS r � ➢ The enclosed wage schedule must be posted in a conspicuous place at the work site during the life of the project. r� ,�➢ The wages listed on the enclosed wage schedule must be paid to employees on public works projects regardless of whether they are employed by the prime contractor, a filed sub-bidder, or any sub- contractor. ➢ The enclosed wage schedule applies to all phases of the project, including the final clean-up. r ' Contractors whose only role is to perform final clean-up must pay their employees according to this wage schedule. r ➢ All apprentices must be registered with the Massachusetts Division of Apprenticeship Training (DAT) in order to be paid at the lower apprentice rates. All apprentices must keep his/her apprentice identification card on his/her person during all work hours. If a worker is not registered with DAT, they must be paid the "total rate" listed on the wage schedule regardless of experience or skill level. For further information,please call (617) 626-5409, or write to DAT, 19 Staniford Street, Floor 1, P.O. r � Box 146759,Boston, MA 02114. �' 399 Washington Street - 50'Floor - Boston,Massachusetts 02108 - Tel: 617-727-3492 - Fax: 617-727-0726 lJ r SECTION 01110 u EEO and MBENVBE PROCESSING REQUIREMENTS r� u 1. RELATED DOCUMENTS A. This section supplements Articles 14 and 15 of the General Conditions. r-� B. Consult the individual sections of the specifications for the specific requirements of this Contract. rl 2. MBE/WBE REPORTING PROCEDURES A. The Contractor shall provide, an executed Contractor's Affidavit of Payment to Minority Business Enterprises on a copy of the form found at the end of this Section. r� (1.) The Department or Owner may request copies of canceled checks to confirm compliance. U (2.) This affidavit shall be submitted by the Contractor as payments are made to MBE/WBEs for Work r, completed on this project. (3.) Affidavits shall be sent to: r MBE/WBE Coordinator Department of Housing and Community Development 100 Cambridge Street-3rd Floor Boston, MA 02114 r ' Attn: Legal Department (4.) Failure to submit by these reports shall result in sanctions per Article 15 of the General Conditions. _ r 3. EEO WORK FORCE REPORTING PROCEDURES r� A. The Contractor shall provide the following information to the Owner on copies of the forms found at w the end of this Section. (1.) Quarterly Projected Work Force Reports: The Contractor shall prepare projected work force r- tables on a quarterly basis. These reports shall be broken done into projections by week of workers required in each trade. (a.) Updated copies shall be furnished to the Owner's EEO Officer one week in advance of the r commencement of work and for each quarter thereafter. `-' (b.) Quarters shall begin on January 1,April 1,July 1, and October 1. r� (c.) No work shall begin until projected work force tables are received by the Owner's EEO v Officer. (2.)Weekly Manpower Reports: The Contractor shall prepare a report after each week of activity, n reflecting the actual working hours of all personnel identified as minority or non-minority. (a.) This report shall be received by the Owner no later than the Friday following the week r , reported. (b.) Failure to provide information shall result in sanctions as provided in Article 14 of the General Conditions r� r � DHCD$100K-$10M EEO and MBENVBE Reporting Procedures 01110 �1ea nAl)MA 9 of r, i . Massachusetts Department of - -Housing Housing and Community Development QUARTERLY PROJECTED WORK FORCE Name of Contractor Address: Telephone: Fax Trades to be Utilized Estimated Total Hours to Complete Work Total Contract Dollar Value: Name of Project Quarter: ❑ Jan 1 -Mar 31 ❑ Apr 1 -Jun 30 ❑ Jul 1 -Sep 30 ❑ Oct 1 -Dec 31, 200 Week Ending Projected Total Hours Projected Total of All Trades Used this Week of all Personnel Minority Hours i ; Note : A revised table must be submitted if any changes on projections occur. Prepared by: Title: Date; DHCD$100K-$10M EEO and MBE/WBE Reporting Procedures 01110 rIAa nwinnd 7 of F C C CC C C J C C C �3 C C C C C C 3 C C Massachusetts Department of Housing and Community Development CONTRACTOR'S WEEKLY MANPOWER REPORT Development Housing Authority No. Contract Amount$ General Contractor: Minority Goal Name of Contractor Filing Report: Trade(s): Check Here if you are a non-filed Subcontractor Week Ending: Report No.: ❑ Check Here if this is a Final Report Date Work Began: Date Work Completed Job Category # Weekly Total #Min Weekly Total Weekly% Total Manhours Total Minority %of Minority Employees Manhours Minority Minonty to Date Manhours to Manhours to Manhours Manhours Date Date Mail Reports to: Department of Housing and Community Development Prepared by: 100 Cambridge St Ste 300 Boston,MA 02114 Title: Attn: Legal Office Date: 200 DHCD$100K-$10M EEO and MBENI/BE Reporting Procedures 01110 049 08/2004 3 of 5 Massachusetts Department of , e Housing and Community Development CONTRACTOR'S AFFIDAVIT OF PAYMENTS TO MINORITY BUSINESS ENTERPRISES (GC FORM) Date: TO: Department of Housing&Community Development From: Candace Tempesta, MBENVBE Coordinator Name of Contractor 100 Cambridge St Ste 300 i Boston , MA 02202 Address Phone (617) 573-1507 Fax: (617)573-1515 City, State,Zip RE: Contract for Housing Authority Project No Original Contract Amount Recording Period Ending KNOW ALL MEN BY THESE PRESENTS: The undersigned certifies that they have met the Minority Business Enterprise(MBE)and Women Owned Business Enterprises (WBE)requirements for the above named contract which states in part that the General Contractor: 1. Shall submit this form quarterly or at any time requested by DHCD,completing the information below, 2. Have subcontracted with the following MANBEs in the dollar amounts enumerated in the Participation Schedule and Letters of Intent in effect at the time of contract execution.; and 3. Have made the following payments to each of the W/MBEs for work performed on this project. MBE/WBE Work Performed Subcontract Total Payments Payments this Amount to Date Quarter In WITNESS WHEREOF,the undersigned has signed and sealed this instrument under the pain and penalty of perjury. This Day of 200 Name of General Contractor Signed and Sealed On this_day of 200_,before me,the undersigned Notary Public,personally appeared duly designated by the board of directors and proved to me,through satisfactory evidence of idenfrfication,which was that s/he is the person whose name is signed on the foregoing documents,and acknowledged to me that s/he signed it voluntarily for its stated purpose and that it was her/his free act and deed. DHCD$104K-$10M MBE WBE Requirements 01110 c149 08/2004 1 of 2 n U n Notary Public My Commission Expires: C1 r� L, r � r� u r ] r- u r+ u i] u r1 u r- r � u C] DHCD$100K-$10M MBE WBE Requirements 01110 c149 0812004 2 of 2 r � LJ r � SECTION 01300 SUBMITTALS - SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 1. RELATED DOCUMENTS r-I �, A. This Section supplements Subparagraphs 4.6.3 and 5.3.5 and Paragraphs 4.7, 4.8, and 4.15 of the General Conditions. r B. Consult the individual sections of the specifications for the specific submittals required under those sections and for further details and descriptions of the requirements. r� 2. GENERAL PROCEDURES FOR SUBMITTALS r ' A. Timeliness-The Contractor shall transmit each submittal to the Architect sufficiently in advance of performing related Work or other applicable activities so that the installation is not delayed by processing times, including disapproval and resubmittal (if required), coordination r with other submittals, testing, purchasing, fabrication, delivery, and similar sequenced activities. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Architect in advance of the Work. ` B. Sequence-The Contractor shall transmit each submittal in a sequence which will not result in the Architect's approval having to be later modified or rescinded by reason of subsequent submittals which should have been processed earlier or concurrently for coordination. C. Contractor's Review and Approval -Only submittals received from and bearing the stamp of approval of the Contractor will be considered for review by the Architect. Submittals shall be accompanied by a transmittal notice stating name of Project, date of submittal, 'To", "From" (Contractor, Subcontractor, Installer, Manufacturer, Supplier), Specification Section, or Drawing No. to which the submittal refers, purpose(first submittal, resubmittal), description, remarks, distribution record, and signature of transmitter. r D. Architect's Action -The Architect will review the Contractor's submittals and return them with one of the following actions recorded thereon by appropriate markings: r 1 (1.)Final Unrestricted Release: Where marked "Approved"the Work covered by the submittal may proceed provided it complies with the requirements of the Contract Documents. (2.)Final-But-Restricted Release: When marked "Approved as Noted" the Work may proceed provided it complies with the Architect's notations or corrections on the submittal and complies with the requirements of the Contract Documents. Acceptance of the Work will depend on these compliances. (3.)Returned for Resubmittal: When marked "Revise and Resubmit"or"Disapproved"the Work covered by the submittal (such as purchasing, fabrication, delivery, or other activity) should not proceed. The submittal should be revised or a new submittal resubmitted without delay, in accordance with the Architect's notations stating the reasons for returning the submittal. E. Processing-All costs for printing, preparing, packaging, submitting, resubmitting, and mailing, or delivering submittals required by this contract shall be included in the Contract Sum. \J DHCD$100K-$10M Submittal s 01300 f I c149 08/2004 1 of 2 L J 3. OR EQUALS A. Definition -Whenever a specification section names one or more brands for a given item, and the Contractor wishes to submit, for consideration, another brand, the submission shall be considered an "or-equal"or a "material substitution". For the purposes of this Contract, the terms"or-equal'and "material substitution" shall be considered synonymous. B. In no case may an item be furnished on the Work other than the item named or described, unless the Architect,with the Administrator's written concurrence, shall consider the item equal to the Item so named or described, as provided by M.G.L. c.30§39M. C. The equality of items offered as"equal'to items named or described shall be proved to the satisfaction of the Architect at the expense of the Contractor submitting the substitution. D. The Architect and/or the Department may require that full size samples of both the specified and proposed products be submitted for review and evaluation. The Contractor shall bear full cost for providing, delivering, and disposal of all such samples. E. The Contractor shall assume full responsibility for the performance of any item submitted as an "Or-Equal' and assume the costs of any changes in any Work that may be caused by such substitution. F. Or Equal Approval Process-On the transmittal, or on a separate sheet attached to the submission, the Contractor shall direct attention to any deviations, including minor limitations and variations, from the Contract Documents. (1.)The Contractor shall submit to the Architect for consideration of any or-equal substitution a written point-by-point comparison containing the name and full particulars of the proposed product and the product named or described in the Contract Documents. (2.)Such submittal shall in no event be made later than 120 calendar days prior to the incorporation of the item into the Work. In any case in which the time period specified in the Contract Documents from the Notice to Proceed to Substantial Completion is less than 120 days, this requirement can be waived by the Architect. (3.)Upon receipt of a written request for approval of an or-equal substitution, the Architect shall investigate whether the proposed item shall be considered equal to the item named or described in the Contract Documents. Upon conclusion of the investigation, the Architect shall promptly advise the Contractor that the item is, or is not, considered acceptable as on Or-Equal substitution. Such written notice must have the concurrence of the Administrator. 4. SUBMISSION OF PRODUCT DATA A. The Contractor shall submit 7 copies of Product Data to the Architect. All such data shall be specific and identification of material or equipment submitted shall be clearly marked in ink. Data of general nature will not be accepted. B. Product Data shall be accompanied by a transmittal notice. The Contractor's stamp of approval shall appear on the printed information itself, in a location which will not impair legibility. C. Product Data returned by the Architect as "Disapproved"shall be resubmitted in 7 copies until the Architects approval is obtained. D. When the Product Data are acceptable, the Architect will stamp them "Approved"or"Approved as Corrected", retain 3 copies, and return 4 copies to the Contractor. The Contractor shall provide and distribute additional copies as may be required to complete the Work. E. The Contractor shall maintain one full set of approved, original, Product Data at the site. DHCD$100K-$10M Submittal s 01300 c149 08/2004 2 of 2 r � L J ri 5. SUBMISSION OF SHOP DRAWINGS A. Shop Drawings shall be complete, giving all information necessary or requested in the r I individual section of the specifications. They shall also show adjoining Work and details of connection thereto. r7 B. Shop Drawings shall be for whole systems. Partial submissions will not be accepted. C. The Architect reserves the right to review and approve shop drawings only after approval of related product data and samples. r D. Shop drawings shall be properly identified and contain the name of the project, name of the firm submitting the shop drawings, shop drawing number, date of shop drawings and revisions, Contractor's stamp of approval, and sufficient spaces near the title block for the r ; Architect's stamp. E. The Contractor shall submit to the Architect one legible, reproducible transparency and two black line prints of each shop drawing. Transparency and prints shall be mailed or delivered f in roll form. Each submittal shall be accompanied by a transmittal notice. F. When the Architect returns a transparency with the stamp "Revise and Resubmit" or "Disapproved", the Contractor shall correct the original drawing or prepare a new drawing and resubmit a transparency and two prints thereof to the Architect for approval. This procedure shall be repeated until the Architect's approval is obtained. r G. When the Architect returns a transparency with the stamp"Approved" or"Approved as Corrected", the Contractor shall provide and distribute the prints for all Contractor and Subcontractors use, and in addition submit, within 10 calendar days after approval, 4 prints to the Architect. H. The Contractor shall maintain one full set of approved shop drawings at the site. 6. SUBMISSION OF SAMPLES A. Unless otherwise specified in the individual section, the Contractor shall submit two specimens of each sample. B. Samples shall be of adequate size to permit proper evaluation of materials. Where variations in color or in other characteristics are to be expected, samples shall show the maximum range of variation. Materials exceeding the variation of approved samples will not be approved on the Work. LJ C. Samples of items of interior finishes shall be submitted all at once to permit a coordinated selection of colors and finishes. D. Samples that can be conveniently mailed shall be sent directly to the Architect, accompanied by a transmittal notice. All transmittals shall be stamped with the Contractor's approval stamp of the material submitted. E. All other samples shall be delivered at the field office of the Project Representative with sample identification tag attached and properly filled in. Transmittal notice of samples so delivered with the Contractor's stamp of approval shall be mailed to the Architect. t J F. If a sample is rejected by the Architect, a new sample shall be resubmitted in the specified manner. This procedure shall be repeated until the Architect approves the sample r' G. Samples will not be returned unless return is requested at the time of submission. The right L-, is reserved to require submission of samples whether or not particular mention is made in the specifications, at no additional cost to the Owner. r� END OF SECTION 01300 k J DHCD$100K-$10M Submittal s 01300 c149 08/2004 3 of 2 ( r L-J FI SECTION 01500 TEMPORARY FACILITIES r � u 1. GENERAL REQUIREMENTS r A. The Contractor shall be responsible for providing and maintaining all temporary facilities until Substantial Completion. Removal of such prior to Substantial Completion must be with the concurrence of the Architect. The Contractor bears full responsibility for reproviding any facility r, removed prior to Substantial Completion L, B. Removal of all temporary facilities shall be a condition precedent to Substantial Completion unless directed otherwise by the Architect or specifically noted in the specifications. f � C. The Contractor must comply with all safety laws and regulations of the Commonwealth of `-' Massachusetts,the United States Government, and local government agencies applicable to Work under this contract. The Contractor's attention is directed to the Commonwealth of Massachusetts, f Department of Labor and Workforce Development Regulations. 4J r 2. FIELD OFFICES N/A V r � 3. TEMPORARY TELEPHONES N/A 4. TEMPORARY TOILETS N/A 5. TEMPORARY CONSTRUCTION FENCE N/A J 6. TEMPORARY STRUCTURES AND MATERIAL HANDLING r A. The Contractor shall provide such storage sheds,temporary buildings, or trailers as required for the performance of the Contract. Subcontractors shall provide their own temporary buildings and trailers. B. Materials shall be handled,stored, installed, cleaned, and protected in accordance with the best practice in the industry and, except where otherwise specified in the Contract Documents, in accordance with manufacturer's specifications and directions. r � C. The Contractor must obtain the permission of the Owner for the use of any storage facilities available on site, but the Owner assumes no responsibility for articles stored. J 7. TEMPORARY STAGING,STAIRS, CHUTES A. Except as otherwise specified,the Contractor shall furnish, install, maintain in safe condition, and �J remove all scaffolds, staging, and planking over 8 ft.in height, as required for the use of all trades for proper execution of the Work. r � `J B. The Contractor shall furnish, install, maintain in safe condition, and remove all temporary ramps, stairs,ladders, and similar items as required for the use of all trades for the proper execution of the Work. C. Permanent stairs shall be erected as soon as possible,for which the Contractor shall provide r DHCD$100K-$10M Temporary Facilities 01500 c149 08/2004 1 of 2 temporary protective treads, risers, handrails, and shaft protection. D. The Contractor shall fumish, install, maintain,and remove covered chutes from openings in the exterior walls of upper floors. Such shall be in convenient locations and permit disposal of rubbish directly into trucks or disposal units. E. Debris shall not be allowed to fall freely from upper levels of the building. Materials shall not be dropped from open windows. 8. HOISTING FACILITIES A. Except as otherwise specified,the Contractor shall provide, operate, and remove material hoists, cranes, and other hoisting as required for the performance of the Work by all trades. All such hoisting service shall be without cost to the Subcontractors. 9. TEMPORARY USE OF ELEVATOR N/A 10. TEMPORARY WATER A. The Contractor may make use of the available water supply at the site for construction purposes, provided the permission of the Owner is obtained beforehand and only as long as the water is not used wastefully. B. The Contractor shall provide all necessary piping and hoses to utilize the available sources of water. C. The Contractor shall provide an adequate supply of cool drinking water with individual drinking cups for personnel on the job. 11. TEMPORARY ELECTRICITY A. The Contractor may make use of the electricity available at the site, metered and paid for by the Owner, provided that the Contractor shall supply proper adapters and extension cords. (1.)Where heavy duty electric equipment drawing current in excess of 15 amperes is involved, the Contractor shall provide temporary service to supply the power. (2.)The temporary electric service shall include, but not be limited to labor, materials, and equipment necessary to supply temporary power of adequate capacity for the project. (3.)Transformers and meters, when required by the power company, will be furnished by the power company and the contractor shall pay the costs therefore. D. Temporary electrical Work shall be performed under the direct supervision of at least one master electrician, who will be present on the project at all times when such work is being performed. E. The Contractor shall furnish, install, and maintain lamps in operating condition. The Contractor, and each Subcontractor, shall furnish their own extension cords and additional DHCD$100K-$10M Temporary Facilities 01500 049 08/2004 2 of 2 ri Lj r ' lamps as may be required for their work. Temporary work of a special nature, not otherwise specified hereunder, shall be provided, maintained, and paid for the trade requiring same. r i F. All lamps installed in permanent lighting fixtures and used as temporary lights during the construction period shall be removed and replaced shortly before Substantial Completion by the set of lamps required to be provided under the Electrical section of the r , specifications. G. All temporary work shall be provided in conformity with the National Electric Code, State r ; laws, and requirements of the power company. Particular attention is called to Commonwealth of Massachusetts, Department of Labor and Workforce Devlopment Regulations. S ' 12. WEATHER PROTECTION U A. The Contractor shall provide temporary enclosures and heat to permit work to be carried on during r the months of November through March in compliance with MGL c.149§44G (d). These specifications are not to be construed as requiring enclosures or heat for operations that are not economically feasible in the opinion of the Owner. Without limitation this includes such items as excavation, pile driving,steel erection,erection of certain exterior wall panels, roofing,and similar r ' operations. B. 'Weather Protection"means the temporary protection of that Work adversely affected by moisture, e , wind, and cold by covering, enclosing, and/or heating. This protection shall provide adequate working areas during the months of November through March as determined by the Owner and consistent with the construction schedule to permit the continuous progress of all Work necessary to maintain an orderly and efficient sequence of construction operations. The Contractor shall furnish and install'Weather Protection"material and be responsible for all costs, including heating required to maintain a minimum of 40 degrees F. at the working surface. This provision does not supersede any specific requirements for methods of construction, curing of materials, or the applicable conditions set forth in the Contract Documents with added regard to performance obligations of the Contractor. C. Within 30 calendar days after award of the Contract,the Contractor shall submit in writing,to the Architect for approval,three(3)copies of the proposed methods for"Weather Protection". LJ D. The Contractor shall assume the entire responsibility for weather protection during construction (until Substantial Completion), and shall be liable for any damage to any Work caused by failure to supply proper weather protection and proper ventilation. LJ E. Work damaged by frost shall be removed and replaced by and at the Contractor's expense and as directed by the Architect. `J F. It is to be specifically understood that the Contractor shall do no work under any conditions deemed unsuitable by the Contractor to the execution of the Work. This provision shall not constitute any waiver, release,or lessening of the Contractor's obligation to bring the Work to Substantial Completion within the period of time set forth in the Contract Documents. 13. TEMPORARY HEAT N/A lJ ,- END OF SECTION 01500 LJ r' LJ DHCD$100K-$10M Temporary Facilities 01500 c149 08/2004 3 of 2 r LJ r . SECTION 01510 PROTECTION n u 1. PROTECTION OF PERSONS& PROPERTIES r ' A. All dwelling units will be occupied during construction. The Contractor shall take all necessary precautions to ensure the public safety and convenience of the occupants r during construction. B. Any damage to buildings, roads, (public and private), bituminous concrete areas, fences, r ; lawn areas, trees, shrubbery, poles, underground utilities, etc. shall be made good by and at the Contractor's own expense, all to the satisfaction of the Owner. r . C. The Contractor shall patch, repair and/or replace all adjacent materials and surfaces damaged after the installation of new work at no expense to the Owner. All repair and �J replacement work shall match the existing in kind and appearance. J 2. TEMPORARY PROTECTION • A. The Contractor shall: (1.)Protect excavations, trenches, buildings, and materials at all times from rain water, ground water, backing-up, or leakage of sewers, drains, or other piping, or from water damage of any origin. Provide all pumps, piping, coverings, and other materials and equipment as required by job conditions to accomplish this requirement. r ' (2.)In addition to the weather protection during the months of November to March specifie elsewhere, provide temporary watertight enclosures for openings in exterior walls and in roof decks when and as required to protect the Work from damage by inclement r ' weather. Temporary enclosures shall be provided with adequate means of ventilation to prevent accumulation of moisture in the buildings. (3.)Provide temporary wood doors for exterior entrances and elsewhere as required. Permanent door enclosures shall not be used as temporary enclosures. \J (4.)Protect sills,jambs, and heads of openings through which materials are handled. `J (5.)Protect decks and slabs to receive work by other trades from any soiling which will r. prevent proper adhesion of subsequent Work. Decks and slabs shall be left clean and free of blemishes at the time other trades begin the application of their work. (6.) Protect concrete slabs to remain exposed and finished floors against mechanical r damage, plaster droppings, oil, grease, paint, or other material which will stain the floor LJ finish. Install and maintain adequate strips of building paper or other protection on finished floors in rooms where other trades will do future Work. r� ,_J (7.)Protect all surfaces to receive work by other trades from any soiling which will prevent proper execution of subsequent work ri DHCD$100K-$10M Protection 01510 c149 08/2004 1 of 3 L� (8.)Protect other areas, furniture, and private property of the resident and the Owner. Any areas damaged by the Contractor shall be restored to the original condition or compensated at the Contractor's expense. B. Roof surfaces and waterproofed surfaces shall not be subjected to traffic nor shall they be used for storage of materials. Where some activity must take place in order to carry out the Work, adequate protection must be provided. C. After the installation of the Work by any Subcontractor is completed, the Contractor shall be responsible for its protection and for repairing, replacing, or cleaning any such Work which has been damaged by other trades or by any other cause, so that all Work is in first class condition at the time of Substantial Completion. 3. ACCESS The Contractor shall, at all times, leave an unobstructed way along walks and roadways, and shall maintain barriers and lights for the protection of all persons and property in all locations where materials are stored or work is in progress. 4. SECURITY A. The Contractor shall be responsible for providing all security precautions necessary to protect the Contractor's and Owner's interests. B. Where excavation is involved, the Contractor shall be responsible for providing continuous watchmen service as necessary, to insure adequate protection of the general public. 5. NOISE AND DUST CONTROL A. The Contractor shall take special measures to protect the residents, neighbors, and general public from noise, dust, and other disturbances by: (I.) Keeping common pedestrian and vehicular circulation areas clean and unobstructed; (2.)Insulating work area from occupied portions as far as possible; and (3.)Sealing dust and fumes from contaminating occupied spaces. 6. FIRE PROTECTION A. The Contractor shall take necessary precautions to insure against fire during construction. The Contractor shall be responsible to insure that the area within contract limits is kept orderly and clean and that combustible rubbish and construction debris is promptly removed from the site. B. Installation of equipment suitable for fire protection shall be done as soon as possible after commencement of the Work. The Contractor's attention is directed to the requirements of the Commonwealth of Massachusetts, Department of Labor and Workforce Development Regulation 454 CMR. DHCD$100K-$10M Protection 01510 c149 08/2004 2 of 3 r r 7. WIND PROTECTION Should high wind warnings be issued by the U.S. Weather Bureau, the Contractor shall take every precaution to minimize danger to persons, to the Work, and to the adjacent property. r 8. WEATHER PROTECTION The Contractor shall provide Weather Protection as required by Specification Section 01500 r ; Temporary Facilities and any other specific requirements of the Contract Documents. END OF SECTION 01510 r � u r r • r, r r, r� J r� U r� U U r U •-i lJ r� lJ DHCD$100K-$10M Protection 01510 c149 08/2004 3 of 3 UI r ' SECTION 01520 CLEANING UP r 1. RELATED DOCUMENTS r� A. This section supplements Article 4.17 of the General Conditions. B. Consult the individual sections of the specifications for cleaning of Work installed under those sections. r i 2. CLEANING DURING CONSTRUCTION A. Conduct cleaning and disposal operations to comply with local ordinances and anti-pollution laws. r 1. Do not burn or bury rubbish and waste materials on the site. 2. Do not dispose of volatile wastes such as mineral spirits, oil, or paint thinner in storm or sanitary r _ drains. 3. Do not dispose of wastes into streams or waterways. B. Wet down dry materials and rubbish to lay dust and prevent blowing dust. r C. Do not allow materials and rubbish to drop free or be thrown from upper floors, but remove by use of a material hoist or rubbish chutes. D. Maintain the Site free from accumulations of waste,debris, and rubbish. r� E. Provide on-site containers for collection of waste materials and rubbish. F. At the end of each day, remove and legally dispose waste materials and rubbish from site. G. Vacuum clean interior building areas when ready to receive finish painting, and continue vacuum L, cleaning on an as-needed basis until Substantial Completion. H. Schedule cleaning operations so that dust and other contaminants resulting from cleaning process will not fall on wet, newly painted surfaces. `_J 1. Disposal of materials shall be in compliance with all applicable laws, ordinances, codes, and by- laws. r, 3. FINAL CLEANING r i A. Prior to submitting a request to the Architect to certify Substantial Completion of the Work,the �, Contractor shall inspect all interior and exterior spaces and verify that all waste materials, rubbish, tools, equipment, machinery, and surplus materials have been removed, and that all sight-exposed r; surfaces are clean. Leave the Project clean and ready for occupancy. B. Unless otherwise specified under other sections of the Specifications,the Contractor shall perform final cleaning operations as herein specified prior to final inspection. C. Cleaning shall include all surfaces, interior and exterior,which the Contractor has had access to, whether new or existing. D. Employ experienced workmen or professional cleaners for final cleaning. E. Use only cleaning materials recommended by the manufacturer of the surface to be cleaned. F. Use cleaning materials which will not create a hazard to health or property and which will not damage surfaces. G. All broken or defective glass caused by the Contractor's Work shall be replaced at the expense of the Contractor. H. Remove grease, mastic, adhesive, dust, dirt, stains, labels,fingerprints, and other foreign materials .� from sight-exposed interior and exterior surfaces. This includes cleaning of the Work of all finishing DHCD$100K-$10M Cleaning Up 01520 c149 08/2004 1 of 2 L J trades where needed,whether or not cleaning by such trades is included in their respective specifications. I. Clean and polish all new and existing glass and plastic glazing (f any)throughout the building(s), on both sides. Clean plastic glazing in accordance with the manufacturer's directions. This cleaning shall be completed by qualified window cleaners at the expense of the Contractor just prior to acceptance of the Work. J. Wash and polish all mirrors. K. Repair, patch, and touch up marred surfaces to the specified finish,to match adjacent surfaces. L. Polish glossy surfaces to a clear shine. M. Do the final cleaning of resilient floors and wood floors as specified under the respective sections of the Specifications. N. Leave all architectural metals, hardware, and fixtures in undamaged, polished conditions. O. Leave pipe and duct spaces, plenums,furred spaces and the like clean of debris and decayable materials. P. In cleaning items with manufacturer's finish or items previously finished by a Subcontractor, care shall be taken not to damage such manufacturer's or Subcontractor's finish. In cleaning glass and finish surfaces, care shall be taken not to use detergents or other cleaning agents which may stain adjoining finish surfaces. Any damage to finishes caused by cleaning operations shall be repaired at the Contractor's expense. Q. Broom clean exposed concrete surfaces and paved surfaces. Rake clean other surfaces of grounds. R. Ventilating systems-Replace filters and clean ducts, blowers, and coils if units were operated during construction. S. Owner's responsibility for cleaning commences at Substantial Completion. END OF SECTION 01520 DHCD$100K-$10M Cleaning Up 01520 c149 08/2004 2 of 2 r � r � SECTION 01700 PROJECT CLOSEOUT 1. RELATED DOCUMENTS A. This section supplements the General Conditions. r • B. Consult the individual sections of the specifications for specific items required under those sections. r 2. OCCUPANCY PERMIT A. The Contractor shall coordinate the efforts of all Subcontractors and obtain the Occupancy Permit from the local Building Department. The Owner shall pay any Building Department fee associated with the Occupancy Permit. 2 LETTERS OF COMPLIANCE r � A. The Contractor shall coordinate the efforts of all Subcontractors and obtain any required Letters of ' Compliance or Certificate of Reoccupancy from the Owner's lead consultant. The Owner shall pay any fee associated with these letters. r B. The Contractor shall reimburse the Owner for any costs resulting from failed tests or inspections conducted to obtain a Letter of Compliance or Certificate of Reoccupancy. This reimbursement should be made as part of a credit change order following the procedures spelled out in the Construction Handbook LJ 3 PARTIAL COMPLETION r A. At the completion of Work within a Dwelling Unit the Contractor may notify the Architect that the Work within the unit(s)is Partially Complete. The Architect, or a designee, shall conduct a thorough inspection of the Work. If the Dwelling Unit is actively occupied this inspection shall occur within 24 hours of any written request. The Architect shall prepare a punch list, setting forth in accurate detail any items and additional items that are not acceptable or incomplete inside the dwelling unit. The Contractor shall coordinate all Subcontractors to achieve prompt completion of the punch list. B. Prior to requesting Partial Completion the Contractor shall make a thorough inspection of the Work. During this inspection the Contractor shall prepare a comprehensive list of all items remaining to be completed or corrected. This list shall include all remaining Contractor and Subcontractor items to be r� provided under the Contract Documents. .� C. The Contractor shall not be relieved of the responsibility to provide Contract items left off the Architect's punch list. ri D. If the Architect determines that the Work within the dwelling unit is not Partially CompleteLthe Architect `J shall inform the Contractor of those items that must be completed before the Architect will prepare the punch list. Upon completion of those items,the Contractor shall again request the Architect to prepare a punch list. LJ E. If the Contractor fails to request an inspection that Contractor will be responsible for the condition of the r Work even if the Dwelling Unit is occupied. F. The date of Substantial Completion for the entire contact and the start of all associated warranties shall not occur until work in all units is complete. G. The Architect shall prepare the Certificate of Substantial Completion in accordance with Article 9.6 of the General Conditions after the work in all Dwelling Units is complete. H. Partial Payment of retainage shall not be made until at least 65 days after the effective date of the Certificate of Substantial Completion. DHCD$100K-$10M Project Close Out 01700 c149 0812004 1 of 4 lJ 3. SUBSTANTIAL COMPLETION A. Prior to requesting Substantial Completion as provided in Article 9.6 of the General Conditions the Contractor shall make a thorough inspection of the Work. During this inspection the Contractor shall prepare a comprehensive list of all items remaining to be completed or corrected. This list shall include all remaining Contractor and Subcontractor items to be provided under the Contract Documents. B. Upon completion of the items noted on the Contractor's list the Contractor shall notify the Architect that the Work is Substantially Complete. The Architect shall then conduct a similar thorough inspection. If the Architect agrees that the Work is Substantially Complete,the Architect will promptly make a thorough inspection and prepare a punch list, setting forth in accurate detail any items on the Contractor's list and additional items that are not acceptable or incomplete. The Contractor shall coordinate all Subcontractors to achieve prompt completion of the punch list. C. The Contractor shall not be relieved of the responsibility to provide Contract items left off of the Architect's punch list. D. If the Architect determines that the Work is not Substantially Complete,the Architect shall inform the Contractor of those items that must be completed before the Architect will prepare a punch list. Upon completion of those items,the Contractor shall again request the Architect to prepare a punch list. E. When the punch list has been prepared,the Architect will arrange a meeting with the Contractor and Subcontractors to identify and explain all punch list items and answer questions on work which must be done before final acceptance. F. The Architect may revise the punch list,from time to time,to ensure that all items of Work are properly completed. G. The Architect shall prepare the Certificate of Substantial Completion in accordance with Article 9.6 of the General Conditions. 4. RECORD DRAWINGS A. Consult the individual sections of the Specifications for the specific requirements of those sections. In cases of inconsistency the more stringent requirement, as directed by the Architect, shall be required. B. Prior to final payment and completion the Contractor shall provide all marked up As Built Drawings and Microfilm as required under other sections of the Specifications. 5. OPERATING AND MAINTENANCE INSTRUCTIONS A. Consult the individual sections of the specifications for the specific requirements for those sections and for further details and descriptions of the requirements B. Prior to final payment and completion the Contractor shall provide all Operating Manuals and Maintenance Instructions as required by the Contract Documents. C. OPERATING INSTRUCTIONS AND MANUALS 1. Subcontractors, installers, and suppliers shall furnish to the Contractor two sets of operating and maintenance instructions of all mechanical, electrical, and manually operated equipment furnished and installed by them. Mechanical and electrical subcontractors shall furnish instructions as specified in their respective sections. 2. The Contractor shall collect all of the above instructions, bind them into two complete sets, and submit them to the Architect who will deliver them to the Owner. DHCD$100K-$10M Project Close Out 01700 c149 08/2004 2 of 4 r! rl 3. Submission of operating and maintenance instructions shall be a condition precedent to final payment. r ! D. INSTRUCTION OF OWNER'S PERSONNEL r . 1. Where specified in the individual sections of the specifications,the Contractor and Subcontractor shall instruct the Owner's personnel at the site, in the use and maintenance of equipment installed under the Contract. r 2. Submission to the Architect of a certificate of compliance to this requirement, signed by the Contractor and the Owner's Representative, shall be a condition precedent to final payment. r 6. FINAL COMPLETION LJ A. RELATED REQUIREMENTS r The Contractor's attention is directed to Article 9.7 of the General Conditions and the Construction Handbook. B. FULL RELEASE OF RETAINAGE u 1. Upon completion of all work, and after receipt of all appropriate marked up As Built Drawings, r ' Operating Manuals,Warranties, Guarantees, and Spare Parts required by the Contract Documents,the Architect shall prepare the Certificate of Final Completion. 2. This certificate shall be processed in accordance with the procedures described in the Construction Handbook. 3. The Contractor's signature on this Certificate shall be notarized. r 4. The Contractor shall provide a final Application for Payment to complement the close-out process. C. PARTIAL RELEASE OF RETAINAGE 1. If within 65 days after Substantial Completion, any of the items on the Architect's punch list are not complete or if the Contractor has not provided the appropriate marked up As Built Drawings, ` Operating Manuals,Warranties, Guarantees, or Spare Parts the Architect shall assign a monetary value for each incomplete item as well as any other items as provided by M.G.L. c.30§39K, and r� the Architect shall prepare a Certificate for Partial Release of Retainage LJ 2. If the Architect is required to prepare a Certificate for Partial Release of Retainage the Contractor shall complete all remaining Work in accordance with the provisions of Article 9.7 of the General r Conditions. `J 3. The Contractor's signature on this Certificate shall be notarized. 4. The Contractor may make a request for additional releases of retainage when portions of the Work listed on the Architect's punch list have been satisfactorily completed. Each request shall be accompanied by a new application for payment and a new signed and notarized Certificate for Partial Release of Retainage. 5. The Architect's inspections, required to complete the additional payment applications described in subparagraph C4 above,are subject to provisions of subparagraph 9.7.5 of the General Conditions. LJ DHCD$100K-$10M Project Close Out 01700 c149 08/2004 3 of 4 \J 6. Upon completion of all remaining items, the Final Release of Retainage shall be processed in accordance with paragraph B above. END OF SECTION l : t DHCD$100K-$10M Project Close Out 01700 c149 08/2004 4 of 4 r � r � v DIVISION 6 r SECTION 06100-ROUGH CARPENTRY PART ONE- GENERAL r � A. DESCRIPTION 1. Work included: Install all new wood window stops for new vinyl windows, size of stops to ' be determined in the field. 4J 2. Related work described elsewhere: r � B. QUALITY ASSURANCE �J 1. Qualifications of workmen: Provide sufficient workmen and supervisors who shall be present at all times during execution of this portion of the Work, and who shall be thoroughly familiar with the type of construction involved and the materials and techniques specified. r � 2. Rejection: In the acceptance or rejection of rough carpentry,the Architect will make no allowance for lack of skill on the part of workmen. f C. PRODUCT HANDLING 1. Protection: a) Store all materials in such a manner as to ensure proper ventilation and drainage, and to protect against damage and the weather. b) Keep all materials clearly identified with all grade marks legible. Keep all damaged material clearly identified as damaged, and store separately to prevent its inadvertent use. ri c) Do not allow installation of damaged or otherwise non-complying material. r, d) Use all means necessary to protect the installed work and materials of all other trades. `-' 2. Replacements: In the event of damage,immediately make all repairs and replacements necessary to the approval of the Architect and at no additional cost to the Owner. PART TWO-PRODUCTS A. LUMBER, GENERAL 1. Lumber Stamdards: Manufacture lumber to comply with PS 20"American Softwood Lumber ' Standard"and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee's (ALSC)Board of Review. r � 2. Inspection Agencies: Inspection agencies and the abbreviations used to reference with �J Section 06100 lumber grades and species include the following: RIS Redwood Inspection Service NLGA National Lumber Grades Authority SPIB Southern Pine Inspection Bureau WCLIB West Cost Lumber Inspection Bureau WWPA Western Wood Productions Association 3. Grade Stamps: Factory-mark each piece of lumber with grade stamp of inspection agency evidencing compliance with grading rules requirements and identifying grading agency, grade, species,moisture content at time of surfacing, and mill. a) For exposed lumber apply grade stamps to ends of back of each piece, or omit grade stamps entirely and issue certificate of grade compliance from inspection agency in lieu of grading stamp. 4. Nominal Sizes: are indicated, except as shown by detail dimensions. Provide actual sizes as required by PS 20, for moisture content specified for each use. a) Provide dressed lumber, S4S,unless otherwise indicated. z b) Provide lumber with 15%maximum moisture content at time of dressing and shipment for sizes 2" or less in nominal thickness,unless otherwise indicated. 5. Dimension Lumber a) For light framing provide"stud"or"standard"grade lumber for stud framing(2"to 4" thick, 2"to 6"wide, 10' and shorter) and"standard"grade for other light framing (2" to 4"thick,2"to 4"wide), any species,unless otherwise noted. b) For structural framing(2"to 4"thick, 5"and wider),provide the following grade& species: 1) Any species and grade which meets or exceeds the following values unless otherwise noted: 2) Fb (minimum extreme fiber stress is bending); 1500 psi 3) E(minimum modulus of elasticity); 1,500,000 psi c) For exposed framing lumber provide material complying with the following requirements: w 1) Definition: Exposed framing refers to dimension lumber which is not concealed by other work and is indicated to receive a stained or natural finish. 2) Grading: Hand select a material at factory from lumber of species and grade indicated below for compliance with"Appearance"grade requirements of ALSC National Grading Rule; issue inspection certificate of inspection agency for selected material. Section 06100 ri rt 3) Same species and grade as indicated for structural framing. f'1 PART THREE-EXECUTION r, A. INSPECTION 1. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to the proper and timely completion of the Work. Do not r proceed until unsatisfactory conditions have been corrected. v B. WORKMANSHIP f . 1. General: All rough carpentry shall produce joints true,tight, and well nailed,with all members assembled in accordance with the Drawings and with all pertinent codes and regulations. 2. Selection of lumber pieces: r a) Carefully select all members. Select individual pieces so that knots and obvious defects will not interfere with placing bolts or proper nailing or making connections. f ' b) Cut out and discard all defects which will render a piece unable to serve its intended function. Lumber may be rejected by the Architect, whether or not it has been installed, for excessive warp,twist,bow, crook,mildew, fungus, or mold, as well as for improper cutting and fitting. a 3. Shimming: Do not shim sills,joists, short studs,trimmers,headers,lintels, or other framing components. C. TREATED LUMBER 1. General: Use only treated lumber for all wood bucks and nailing grounds in, or in contact with, concrete. 2. Treatment: a) Treat all wood less than two feet above finished grade by spraying with the preservative specified in Section 06010 of these Specifications,to a minimum distance of six inches from v the ends, or otherwise treat as approved in advance by the Architect. r b) Perform all treatment in strict accordance with the published recommendations of the manufacturer of the treatment preservative. D. GENERAL FRAMING 1. General: , ) a) In addition to all framing operations normal to fabrication and erection indicated on the Drawings, install all backing required for work of other trades. b) Set all horizontal or sloped members with crown up. lJ Section 06100 L.J c) Do not notch,bore, or cut members for pipes, ducts,conduits, or other reasons except as shown on the Drawings or as specifically approved in advance by the Architect. 2. Bearings: a) Make all bearings full unless otherwise indicated on the Drawings. b) Finish all bearing surfaces on which structural members are to rest so as to give sure and even support. Where framing members slope, cut or notch the ends as required to give uniform bearing surface. E. BLOCKING AND BRIDGING 1. Blocking: a) Install all blocking required to support all items of finish and to cut off all concealed draft openings,both vertical and horizontal,between ceiling and floor areas. b) Fire-blocks,when of wood, shall be two inches(nominal)in thickness by the full width of the opening being blocked. c) Fire-block in the following specific locations: 1) In all stud walls at ceiling and floor levels; 2) In all stud walls,including furred spaces, so that the maximum dimension of each concealed space is not more than eight feet.; 3) All other locations where openings could afford passage for rodents or flames. 2. Bridging: a) Install wood cross bridging of not less than one inch by three inches nominal,metal cross bridging of equal strength,or solid blocking between joists where the span exceeds eight feet. b) The distance between a line of bridging and a bearing shall not exceed eight feet. c) Cross bridging may be omitted for roof and ceiling joists eight inches nominal in depth where the omission is permitted by Code,except where otherwise indicated on the Drawings. d) Install solid blocking between joists at all points of support and wherever sheathing or flooring is discontinuous. e) Blocking may be omitted where joists rest on ribbons and are nailed to studs, and where joists are supported on metal hangers. F. BUILT-UP BEAMS Section 06100 r � I. Use no less than two joists spiked together to support partitions running parallel to the joists, r Provided however that where necessary to permit passage of pipes such joists may be separated by solid blocking spaced at no more than four inches on centers. G. STUD WALLS AND PARTITIONS 1. Studs: Make all studs single length,unspliced, and platform framed. 2. Comers and intersections: Unless otherwise indicated on the Drawings, frame all corners and intersections with three or more studs and all required bearing for wall finish. c v H. ALIGNMENT f - 1. On all framing members to receive a finished wall or ceiling, align the finish subsurface to vary not more than 1/8 inch from the plane of surfaces of adjacent framing and furring members. I. INSTALLATION OF PLYWOOD SHEATHING 1. Placement: a) Place all plywood with face grain perpendicular to supports and continuously over at least `. two supports, except where otherwise specifically indicated on the Drawings. b) Center joints accurately over supports. Unless otherwise specifically shown on the Drawings, stagger the end joints of plywood panels to achieve a minimum of continuity of joints. c) Protection of plywood: Protect all plywood from moisture by use of all required waterproof coverings until the plywood has in turn been covered with the next succeeding component or finish. '—' J. FASTENING r'• 1. Nailing: U a) Use only common wire nails or spikes of the dimensions shown on the Nailing Schedule, r i except where otherwise called for on the Drawings. LJ b) For conditions not covered in the Nailing Schedule,provide penetration into the piece r receiving the point of not less than 1/2 the length of the nail or spike provided, however,that 16d nails may be used to connect two pieces of two inch nominal thickness. c) Do all nailing without splitting wood.Pre-bore as required. Replace all split members. 2. Bolting: Drill holes 1/16 inch larger in diameter than the bolts being used. Drill straight and true from one side only. Bolt threads shall not bear on wood. Use washers under head and nut where both bear on wood;use washers under all nuts. r 1 3. Screws: For lag screws and wood screws,pre-bore holes same diameter as root of thread; enlarge holes to shank diameter for length of shank. Screw, do not drive, all lag screws and wood screws. lJ Section 06100 �J K. NAILING SCHEDULE 1. Unless otherwise indicated on the Drawings or required by pertinent codes and regulations,provide at least the following nailing: a) Blocking to joist bearing: Two IOd toe-nailed each side b) Blocking to joist or stud: Two IOd toe-nailed each side c) One inch brace to stud: Two 8d face nailed d) Two inch brace to stud: Two 16d face nailed e) Bridging to joist: Two 8d toe-nailed f) Built-up beams eight inches: 16d @ twelve inches on or less in depth: centers, staggered g) Joists and rafters:to support: Two IOd toe-nailed each side at laps(12"minimum): Four 16d face nailed multiple joists: 16d @ twelve inches on centers, staggered h) Joists to sill or girder: Two 16d toe-nailed One inch furring to underside Two 8d(one straight; one of joists: slanted) i) Two inch furring to underside Two 16d(one straight; of joists: slanted) j) Studs toe-nailed to plate: Two IOd each side k) Studs end nailed to plate: Two 20d 1) Studs nailed together: 16d @ twelve inches on centers, staggered Plates: Upper to lower: 16d @ twelve inches on centers, staggered At splices: Two 16d face nailed Plate lap at corners: Two 16d face nailed L. INSTALLATION OF BUILDING PAPER 1. Install the specified building paper over all exterior framing members where plywood siding is indicated to be installed, lapping all joints to prevent penetration of water into the stud spaces, and securely fastening the paper in place in accordance with the manufacturer's published recommendations as approved by the Architect. M. CLEANING UP 1. General: Keep the premises in a neat, safe, and orderly condition at all times during execution of this portion of the Work, free from accumulation of sawdust, cut ends,and debris. 2. Sweeping: a) At the end of each working day, and more often if necessary,thoroughly sweep all surfaces where refuse from this portion of the Work has settled. b) Remove the refuse to the area of the job site set aside for its storage. c) Upon completion of this portion of the Work,thoroughly broom clean all surfaces. End of Section Section 06100 u ri DIVISION 6—WOOD &PLASTICS SECTION 06400,ARCHITECTURAL WOODWORK PART ONE-GENERAL r � A. DESCRIPTION 1. Work included: Install all new window stops for new vinyl windows, size of stops to be determined in the field. v Provide all architectural woodwork shown on the Drawings, complete,in place, as r specified herein. B. RELATED WORK DESCRIBED ELSEWHERE r ' C. QUALITY ASSURANCE r, 1. Standards: Comply with standards specified herein as listed in Section 01085. 2. Qualifications of manufacturer: Products used in the work of this Section shall be produced by manufacturers regularly engaged in manufacture of similar items and with a history of successful production acceptable to the Architect. 3. Qualifications of installers: Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. 4. Certification: In addition to complying with all pertinent codes and regulations, comply with the Architectural Woodwork Quality Standards and Guide Specifications of the Architectural Woodwork Institute for the grades specified,and provide certification on �J Shop Drawings and on each item of architectural woodwork signifying such compliance. r- D. SUBMITTALS `J 1. General: Comply with the provisions of Section 01300. r) 2. Product data: submit: v F a) Complete materials list of all items proposed to be furnished and installed under this Section. b) Sufficient other data to demonstrate compliance with the specified requirements. c) Shop Drawings showing each of the items to be provided under this Section, r� completely detailing joinery and other construction, including anchorage, and displaying the"Certificate of Compliance" of the Woodwork Institute for the grades specified. r d) Samples of the proposed woods to be used. 4� e) Manufacturer's recommended installation procedures.The manufacturer's recommended installation procedures, as approved by the Architect,will become the basis for inspecting and accepting or rejecting actual installation procedures actually used on the Work. \J 1 Section 06400 E. PRODUCT HANDLING 1. Protection: Use all means necessary to protect materials of this Section before, during, and after installation and to protect the installed work and materials of all other trades. 2. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Architect and at no additional cost to the Owner. PART TWO-PRODUCTS A. WINDOW STOPS 1. New window stops at head and jamb,painted(typ.) size to be determined in the field by G.C. PART THREE-EXECUTION A. FABRICATION 1. Fabricate the work of this Section in strict accordance with the original design and the approved Shop Drawings. B. INSTALLATION 1. Inspection: Examine the areas and conditions under which work of this Section will be installed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions have been corrected. 2. Installation: Install all components in strict accordance with the original design and the approved Shop Drawings,anchoring all items firmly into position for long life under hard use. C. CLEANING AND ADJUSTMENT 1. Upon completion of the installation,visually inspect each installed item,thoroughly clean all surfaces by using the cleaning material recommended by the manufacturer of the finish being cleaned, and carefully adjust all operating components for optimum , operation. END OF SECTION Section 06400 r� r � DIVISION 7—THERMAL&MOISTURE PROTECTION r � SECTION 07200-FLASHING AND SHEET METAL r . PART 1 —GENERAL A. DESCRIPTION: r � 1. The scope of work, without limiting the generality thereof, shall consist of furnishing all labor, plant,materials, and operations necessary to complete the work of the Section, including the following: 2. Fabricate and install all sheet metal work as specified and shown on the r , Contract Drawings. Match existing profile of sill 3. Related Requirements in Other Sections: B. SUBMITTALS r , 1. Samples shall be submitted for the following: r a) Nails, staples, fasteners L, b) Sample of all sheet metal types 2. Latest edition of manufacturer's specification for gutters and flashing. 3. Furnish shop drawings for approval for fabricated sheet metal items in Accordance with provisions set forth under the General Conditions. v PART 2—PRODUCTS A. MATERIALS r- 1. Fabricated Sheet Metal. a) Sheet metal shall be .030 White aluminum, as noted on the Contract Drawings. b) Nails and fasteners shall be non-ferrous alloy. Nails shall be "Stronghold" r type of size and type suitable for the particular materials in which they are to be used. r; PART 3—EXECUTION lJ A. INSTALLATION: LJ l./ 1. Flashings: 2. Drain Flashings: a) Remove all aggregate, dirt, dust and debris from roof drains and surrounding areas. b) All drains shall receive new 20 oz. copper flashing; a minimum of 30 sq. inches. Flashings shall be installed in strict accordance with practices as set forth in the NRCA Roofing Manual. 3. Sheet Metal: a) Surfaces to which sheet metal is to be applied shall be even, smooth, sound, thoroughly clean and dry, and free from all defects that might affect the application. All cutting, fitting, drilling and other operations in connection with sheet metal required to accommodate the work of other trades shall be performed as indicated on the drawings, or as directed by the Architect. All accessories essential to the completeness of the sheet metal installation shall be provided and such accessories shall be of the same kind and compatible with the item to which applied; the type best suited for the intended use. b) Fabrication and Fastenings -All flashing and sheet metal work shall be fabricated and placed in accordance with the best practices as specified in the "Modern Applications of Sheet Copper in Building Construction Handbook". c) Generally, flashings and sheet metal work shall be in lengths not exceeding 8 feet and free from longitudinal joints. All flashing in contact with dissimilar metal shall be coated with asphalt paint. d) Dissimilar metals shall not be placed in contact nor in position where drainage across them will occur. e) All sheet metal work shall be water and weather tight,with lines, arises, and angles sharp and true and plain surfaces free from waves and buckles. f) Workmanship shall be best quality, strictly in accordance with the best practices and the directions and recommendations of the sheet metal manufacturers. B. CLEAN-UP AND TOUCH-UP: 1. Repair or replace damage work. r1 2. Leave work clean, free from stains, scrap and debris. fl 3. Remove excess debris from project site. v r 4. Rubbish and debris shall be removed daily from the site and disposed of by the Contractor. No debris shall be left to accumulate on the roofs. r ; v r *END OF SECTION* r , r � v r r r � v 1J r v r� v r � u u -I u r' '_J LJ Cl fl �J DIVISION 7—THERMAL&MOISTURE PROTECTION SECTION 07900-SEALANTS AND CAULKING v PART 1-GENERAL r � A. DESCRIPTION 1. The scope of work,without limiting the generality thereof,includes furnishing all labor,plant, L_J materials,and operations required to complete the work of this Section,and as indicated on the Construction Documents. r v 2. Related Requirements in Other Sections: a) Section 07200, Sheet Metal r � B. SUBMITTALS u 1. Samples of all exposed sealant are required for Architect's approval of colors. Unless r otherwise directed,apply samples in 6 inch runs in actual joints at the job site. �J C. PRODUCT HANDLING r , 1. Deliver caulking and sealant and related accessories to the job site in factory sealed,unopened containers bearing manufacturer's name and product designation. r-) D. ENVIRONMENTAL CONDITIONS u 1. Apply materials within manufacturer's recommended surface and ambient temperature ranges. r' PART TWO PRODUCTS v A. MATERIALS: r� 1. All caulking,sealant and accessories shall be non-staining to adjacent exposed materials. `J Products having similar application and usage shall be of the same manufacturer and type. Unless r, otherwise specified,colors shall be selected from approved manufacturer's standard range. Use gun consistency compounds unless otherwise required by job conditions. u 2. Sealant Compounds: a) Acrylic Sealant: One component,non-sag,acrylic latex polymer sealant-Pecora AC-20 or approved equal. \J b) Polysulfide Sealant: One component,non-sag,polysulfide-based sealant-Pecora - r l or approved equal. c) Polyurethane Sealant: One component,non-sag,polyurethane-based sealant-Pecora Dynatrol I or approved equal. d) Silicone Sealant: One component,non-sag,architectural silicone sealant-Pecora 864 or approved equal. 3. Primers,if required,shall be the products of the same manufacturer as sealant used,and shall be `J used as recommended by the manufacturer. r u r1 07400/1 \_J r"1 �l 4. Back-up Materials,Fillers,and Joint Packing: As recommended for and compatible with each sealant used. In general,use closed cell,bead or rope shaped,expanded polyethylene or polyurethane foam except that glass fiber or untreated jute may be used for non-working joints. In general,width or diameter of pre-formed back-up material shall be 1-1/3 to 1-1/2 times the width of the joint to be sealed. 5. Release Material: Polyethylene Film. PART THREE EXECUTION A. CONDITION OF SURFACES: 1. Inspect all surfaces to receive caulking and sealant materials and report all defects. Starting work implies acceptance of surfaces as satisfactory. 2. Verify that joints and spaces to be caulked or sealed are of proper width. 3. Concrete,and masonry surfaces shall be thoroughly cured. 4. Apply no caulking or sealant materials in contact with surfaces contaminated with oil,grease, bituminous materials,form release agents,bond breakers,deleterious curing compound,water repellents,and other special surface treatments. Aluminum surfaces shall be free of lacquer. 5. Wood surfaces to receive oil base caulking compound shall have been primed with an oil base paint. B. PREPARATION: 1. Thoroughly clean all joints,removing all foreign matter such as dirt,dust,moisture,frost, rust,mill scale,paint,lacquer,and protective coatings. Blow all joints free of loose Particles. 2. Use no cleaning solvents which leave residue. Wipe joints free of solvent using clean,dry white cloths or white lintless paper. Do not permit solvent to air dry. 3. Follow manufacturer's directions for products and surfaces. C. INSTALLATION: 1. Unless otherwise required by these specifications,install materials in strict accordance with manufacturer's specifications and recommendations using approved equipment. 2. Usage: a) Acrylic sealant shall be used for general purpose sealant,and for interior window and door buck perimeters. b) Polusulfide sealant shall be used for joints subject to structural movement. c) Polyurethane sealant shall be used for expansion and control joints,and window and door perimeters. d) Exterior Walls-Seal everywhere two different materials adjoin and all areas indicated to be sealed on the contract documents. 07900/2 r � f 1 3. Prime surfaces as recommended by manufacturer immediately prior to sealing. Make preliminary tests to ensure that primers will not stain exposed materials or deteriorate back-up r material. v 4. Unless otherwise required by caulking and sealant manufacturer's specifications and r ; recommendations,use back-up material to control sealant depths as follows(depths measured at bond face). a) Acrylic Sealant: For joints 1/2 inch wide and less,make depth equal to width but not less than 1/4 inch. Joints over 1/2 inch wide shall be 3/8 inches deep. ' b) Polyurethane and Polysulfide Sealants: 1) For joints 1/2 inch wide,make depth equal to width but not less than 1/4 inch. 2) For joints 1/2 inch wide to 1 inch wide,make depth 1/2 inch. c) Install backing material in joints using a blunt instrument to avoid puncturing. Do not twist or stretch performed bead or rope type back-up material during installation. r 5. At joints subject to movement,where required by the nature of the back-up material used or where sealant contacts back of joint,use release materials between back-up material or back of joint and sealant to confine adhesion to surfaces of materials being joined. Follow manufacturer's r recommendations exactly. `J 6. Neatly tool joints to slightly concave surface using tooling age recommended by sealant manufacturer. Repair any air pockets exposed by tooling. Tool so as to compress material and C ! improve adhesion to surface joined. VJ D. PATCHING: r� 1. Patch and/or replace new work that is found to be defective or damaged,as directed by the Architect. Be responsible for damage to adjacent surfaces caused by caulking and sealant operations. r E. CLEANING 1. Remove excess materials from adjacent surfaces soiled by sealing operation. a) Follow manufacturer's recommendations for cleaning procedures. b) Remove wet material before it"sets". 2. Cleaning agents shall not stain or be injurious to exposed surfaces. 3. Leave finished work in neat clean condition with no evidence of spillage or damage to adjacent surfaces. END OF SECTION r � U L__1 07900/3 r� r-J iJ U L J ry DIVISION 8—DOORS &WINDOWS SECTION 08520—VINYL WINDOWS RELATED DOCUMENTS r Attention is called to the drawings, general and supplementary conditions of the Contract and Division 1 General Requirements apply to the work of this Section. r i This Section of the Specifications is hereby made a part of the Contract,and includes the requirements of the General Conditions and Supplementary Conditions as is fully written herein. r � The Contractor shall coordinate the work so that the entire project will proceed in a orderly manner,with the work under this Section progressing properly together with the ' body of the work under the other Sections. Proper performance of the Contract requires the Contractor,vendors, and materialmen to r examine carefully and thoroughly all the"Contract Documents"and the site of work. The work done under this Section shall provide necessary accommodation for work furnished or installed under other Sections,or work done in connection with the project r , by other contractors or the Owner. PART 1 - GENERAL r A.DESCRIPTION 1.Work Included The scope of the work,without limiting the generality thereof, consists of furnishing all labor, plant,materials, and performing all operations in connection with the following: a) The complete installation of new double-hung windows to replace existing windows at locations shown on the drawings. b) The scope of the work consists of the installation of materials to be furnished under this Section, and without limiting the generality thereof, includes all welded double hung vinyl replacement windows,necessary mullions,covers, anchors, caps,and half-screens with aluminum(not plastic)locking clips. c) The work to be done under this Section is shown on the Contract Drawings. d) All scaffolding,planks,ladders, and hoists,including maintenance and removal of these items when no longer needed shall be provided by the Contractor. ' e) Caulk around windows shall be under Section 07900 Caulking, of these specifications. 1. Related Work in the other Section. B. QUALITY ASSURANCE 1. Standard Reference a) Compliance with ANSUAAMA 307.9-1977. r 08520 VINYL WINDOWS lJ 2. Provide at least one person who shall be present at all times during execution of the work of the Section and who shall be thoroughly familiar with manufacturing recommended methods of installation as well as the requirements of this Work, and who shall direct installation performed under this Section. C. SUBMITTALS 1. Materials List: a) Within 35 days after award of Contract, and before any windows are delivered to the job site, submit to the Architect a complete list of all vinyl window materials proposed to be furnished and installed under this Section; make all submittals and resubmittals in accordance with the provisions of Section ID of these Specifications. 2. Samples: a) Submit one complete glazed window with screen. After review by Architect, approved sample window may be installed in-the finished work, and used standard for the project. b) Samples of extrusions or rolled sections to demonstrate the range of colors. c) Submit sealant samples as per Section 7H. 3. Shop Drawings: a) Submit shop drawings in accordance with applicable requirements under Division 1. b) Shop drawings shall show sizes,details,methods of installation hardware locations and all other pertinent data for approval before commencement of fabrication. c) Show construction of all parts,metal thicknesses, installation, and erection details, including connections, anchorage, fastening and sealing. d) Sections of typical members, dimensioned elevations, frame sizes, spacing of anchors and fastenings, and details of accessories. 4. Manufacturer's Product Data: a) Recommended installation procedures b) Maintenance procedures c) Test Reports-Copies of reports of source quality control tests. 5. Certificates (Manufacturers') a) At the time of delivery all windows shall have attached an AAMA Certification Program gold label indicating conformance with ANSUAAMA 1021 specified performance standards. b) Sealant test as per Section 7H. c) GENERAL: All replacement windows shall be referred to as"Double-Hung" windows and furnished with all necessary hardware,anchors and miscellaneous equipment. Windows to meet or surpass specifications for AAMA101-V91 08520 VINYL WINDOWS r r � and/or ASTM D4099-87 (Grade 60). Replacement windows to meet or exceed r DHCD's performance requirements. d) TEST SUMMARY `J For vinyl double hung windows all welded sash and frame with 3/"thick r_, thermopane glass. Air Filtration @ 15 MPH, MIN 0.375 CFM/FT. Water Penetration MIN 7.5 PSF. Uniform Loads MIN 90.0 PSF. U Value MIN .51 Clear glass R Value MIN 1.96 D. PRODUCT DELIVERY,STORAGE,AND HANDLING 1. All shall be delivered to the job site in manufacturer's protective packaging, and identified as to location 2. All materials shall be stored in an upright position,off the ground on suitable blocking,and protected from the weather and damage. 3. Any windows scratched, dented, damaged or with improper connections delivered to the job site shall be removed immediately and replaced with new proper material. Dented windows may not be job repaired by filling and grinding. r PART 2 PRODUCTS A. MATERIALS 1. VINYL WINDOWS a) General: Windows shall be doubled hung,vinyl windows with a thermal break in both the master frame and the sash panels. The windows shall conform to AAMA performance requirements both thermally and structurally, and shall carry AAMA structural rating of A 2.5-HP. Labeled windows,nailing fm installation, .080" extrusion thickness,reinforced interlocking sash with 2 cam locks and 2 spring loaded sash releases each are required.Block&tackle balances are preferred. `J Windows are to have half-screens with aluminum(not plastic)locking clips. b) Materials: Rigid vinyl shall be exterior weather-stripping type supported by at least five(5)years of historical weathering data including but not limited to, impact resistance and color drift testing. All main members will be extruded hollow rigid r , vinyl. J B. ACCEPTABLE MANUFACTURER'S ' a) HARVEY INDUSTRIES SIGNATURE b) PARADIGM SOCIETY c) ALSIDE 0601 SERIES d) APPROVED EQUAL—Architect must see sample prior to equal approval. WINDOW WARRANTY r 20/10 Limited Warranty 20 years on Glass l J 08520 VINYL WINDOWS lJ 10 years on all other Components. PART 3 EXECUTION A. INSPECTION 1. Field measure for all windows to be installed in existing construction. 2. Existing window,storm window removal and opening preparation. 3. Examine all openings and surfaces scheduled to receive new windows to conditions that will adversely affect execution,permanence,or quality of work.Notify the General Contractor and Architect in writing of all unsatisfactory conditions. 4. Commencement of work shall be construed as unqualified approval and acceptance of surfaces shall be corrected by the General Contractor at his own expense. B. INSTALLATION 1. All windows shall be erected in prepared existing openings by an experienced window erection contractor.Windows shall be set plumb and true,properly aligned and securely anchored with all members correctly adjusted.Joints at mullions between connecting windows shall be caulked with a compound,Caulking,by the Contractor as required per their work. 2. Materials shall be stored at the site in an upright position on wood pallets in a manner, which will prevent injury to materials or to any other protective coating. 3. All work included in this Section shall be installed in a timely manner.Include any cutting, drilling,tapping and fitting as required for proper installation of work. 4. All vinyl windows included in this Section shall be erected and left clean in strict accordance with instructions published by the NWWDA. Any subsequent cleaning of materials after initial installation shall be by the Contractor. 5. CLEANING AND PROTECTION: The Contractor shall protect all windows from misuse or damage after installation, and clean all foreign materials from the windows immediately prior to the completion of his contract. 6. GUARANTEE: The Contractor shall guarantee in writing and in accordance with the General and Supplementary General Conditions that all work executed under this Section shall be free from defects of materials and workmanship for a period of one(1)year from date of final certificate of payment.Defective work shall be replaced as directed by the Architect at no additional cost to the owner. 7. Comply with approved manufacturer's installation instructions and approved shop drawings. 8. Set units plumb, level,and true to line,without warp or wreck of frames. 9. Anchor firmly to construction. 08520 VINYL WINDOWS 17 05 03: 58p Design Partnership 978-373-6779 p. 1 August 17,2005 North Andover Housing Authority One Morkeski Meadows North Andover,MA,01845 Attn: Joanne Comerford RE: North Andover Housing Authority Window Replacement for Veteran's Housing Design Partnership Arch.,Inc.Proj.No.ROS-02-106 Addendum Number 1 to the Contract Documents Addendum No.l to Contract Documents All those corresponding to General Bids for the Proposed Window Replacement to the Veteran's Housing, Located on Baldwin and Francis Street,North Andover, Massachusetts,are hereby informed that this Addendum No.1 shall supplement,modify amend and become part of the above-named Contract Documents and that all General Bids shall include therein the terms of this Addendum. Addendum No. 1 Supplements,Modifies and Amends the Contract Documents as follows: A pre-bid site inspection was held on Tuesday,August 16,2005 at 10:00 a.m. Present at the meeting were: Design Partnership Architects,Inc. North Andover Housing Authority 85 Brockton Ave.on Pentucket Lake One Morkeski Meadows Haverhill,MA 01830 North Andover,MA 01845 Angelo Petrozzelli 978-372-9400 Joanne Comerford 978-682-3932 Item No.1 Windows within 12"to entry doors do not have to be tempered glass.This only pertains to commercial buildings.For Residential building if the window sill height is below 18"from the finished floor it has to be tempered glass.G.C.can use tempered glass if they wish. Item No.2: Remove existing aluminum wrap at all window sills. Item No.3: Wrap all existing sills with New coil stock aluminum(030)color to be white. 4 r � r 10. Apply caulking and sealants in all joint areas to provide positive barrier against water and an infiltration and approved by window manufacturer. L J r 11. Adjust hardware for smooth operation and tight closure. 12. Clean vinyl surfaces and remove excess sealants. f 1 13. Exterior window sills to be wrapped with coil stock aluminum(.030) color to be white. LJ C. GUARANTEE n 1. The Contractor shall guarantee in writing that all work executed under this Section shall be free from defects of materials or workmanship,to include excessive air infiltration or leakage, excessive deflection, faulty operation of sash,deterioration of finish in excess of normal weathering,defects in insulation glass shall run for five years.Defective work shall be replaced as directed by the Architect at `J no additional cost to the Owner for labor or materials. r : L J End of Section r � L J : J l J r L J �J r � LJ r-� L J r-t LJ 1 LrJ LJ 08$20 VINYL WINDOWS \J North Andover Housing Authority Veteran's Housing r North Andover, MA. 01845 Storrow St o r ' 'L Tr 0 o, G ! i I? 0 4� 495 Exit r / r ) ---'' orth Andov Fire Departme t r a 0 C Qr u � N � O r r Unio u of 0C M�dd� ex " O � tE r a •c m -495 Exit 3 Dew nNort do r r. do A ra r ' ^o e�6 ` asf�eet a s,9 ke R Shaiy c �o�Q-a •po�0 r_t q u 0 yds 200 400 600 Des. P-artnc).--.-Ar- shi Architectsim 85 Brockton Ave.on Pentucket Ialm•Haverhill,MA 01830.978*372*9400•Fax:978*373*6779 9 E-Mail:designpartnership@verizon.ne rr r r -1r r .. r r , . r r .r r r r -, F R A'.'N 'C; 1 s S T R E E T _ R --- ----------- O C --- --- PROPE T'. LIME LI i^.1 T, P COI'I''0.a ? 90 of l9 1 90' 3 t:it O' � - 1 3' - -j A _ g PLAY _ PLAY _ )'' i ) U • + 1• C.i I AKEA r' I t•O AREA i u,o l d s`' 56-6° c n.:u -i 4 K f3 V. fl NOTE n - RE r::ic --- ,oY-- - �o^�a•:•r L1KEyoy _Q -- -- - • ; FROiv: 3r',L��n IN BOa.U;i's'�.5 A-3;F1'I,B'2 :1!?F A7US�';3_::• L —rr— - i - - -- Lt !1!T OF �• -------- I I I I I 1 ! �. FRONI, Fr -ICI:i :c•0'-0" (;.•b l•11 ikACT -- _1L----.JJ-----11-�_-i _ G I L- 6 !T S T R E E. T Lt Location Plan Scale: 1" = 40' Design PartnershipArchitects 85 Brockton Ave.on Pentucket Lake•Haverhill,AZA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:ctesignpartnership@verizon.net � f r r f r . - . C C t _ NORTH ANDOVER HOUSING AUTHORITY WINDOW REPLACMENT FOR THE VETERAN'S HOUSING NORTH ANDOVER, MA. 01845 WINDOW COUNT BUILDING A-1 A-2 A-3 B-1 B-2 C WINDOW TYPE APPROX. SIZE +- TOTAL # A 2'-9" X 5'-0" +- 10 10 10 10 10 8 58 B 2'-0" X 5'-0" +- 4 4 4 8 8 8 36 C 2'-9" X 4'-9" +- 14 14 14 16 16 14 88 D 2'-01.' X 4'-9" +- 8 8 8 24 E 2'-6" X 4'-0" +- 8 8 8 4 4 32 F 2'-0" X 4'-0" +- 4 4 4 4 4 4 24 G 2'-9" X 1'-3" +- 3 3 6 10 10 8 40 H 2'-0" X 1'-3" +- 1 2 1 4 2'-6" X 4'-9" +- 4 4 4 12 J 2'-6" X 3'-9" +- 10 10 4k ALL WINDOW SIZES ARE APPROX. G.C. TO VERIFY ALL WINDOW SIZES (TYP.) 34za ALL WINDOWS ARE TO BE MECHANICAL FRAME, WELDED SASH WITH LOW-E /ARGON GLAZING (TYP.) ALL WINDOW SILLS TO BE WRAPPED WITH COIL STOCK ALUMINUM (.030) COLOR TO BE WHITE WINDOW TYPES A, B, C, D, E, F, I, J, ARE TO BE HARVEY SIGNATURE VINYL DH WINDOWS (TYP.) WINDOW TYPES G, H, (BASEMENT WINDOWS) ARE TO BE HARVEY VINYL HOPPER WINDOWS (TYP.) Desl9l.& Partnership Architects 85 Brockton Ave.on Pentu&a Lake*Haverhill,MA 01830.978;372*9400 9 Faz 978*373*6779 •E-Mail:desWpartnership®verizon net C C C C C C C C r -; C C r C 7 C C C C ) C 1 l - C.GAP_,,! .. _ A1cY..p;INU E:Y� - ctlu -1 _�.._. " -�;.... .._..._. r. . _..�-__..._. 'iD1..Yti�1'lYslLIILSfttYllYftlilL21T1 •••••.�•.�_•, ••�'••••—,•_••�•••`••••� "' - - �'�� � � — _ - _ . . 4 I .ECo::C FLM;L-. i 11 L —'--.--_._ S H I N G L E 5: . _FLLASHING Il. Itl —_ o r IL PO J ib 71 ILti! METAL I L _ I_—'LSI - - COUD F17.S' F:001-. I I{�l'I I J — rFLU SH PGAR71i,�1G _ 11 �LlL�1._I. Gz.7zz-: � _ 11II _ 7:7 �yR - .I ----- cGv..7a. O 1 L -----i I --- 1 Building A-1 Front ILIA ion Scale: 1/8" = V-0" Design PartnershipArchitects inc. 85 Brockton Ave.on Pentucket Lake•Haverhill,MA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpai tnership@verizon.net r r 1 S.H � IN[I 5 . . :.6 \� . ! !•bL_0 O.0. . v -Let- 1 j_ ® 'd 1 r t dab 1 occa?x+ I t to Io . l 1 �'4 CSX I , li 4.0 t z_ — - { I FLOOR ._4R Z'L.,Z. _ T- F 71 _it 4R44ry .: I .., 1 1-Qc1�-1-,• � a�I'' 1 } i � ., I �� � i _ -' . Building A-1 Side �1evations Scale: 1/8" = 1%0" Design Partnership Architects 85 Brockton Ave.on Pentucket Lake•Haverhill,NIA 01830.978*372*9400•Fax:978*373*6779 •E-Mail:designpartnership@veiizon.net C C C C C J C C S C C C C C CAP7 `:.�R1CK�.CNI:AUEY Z.. . . 11 - - : 13 Le •� T�._CD n I . • i /r .5 {S HFLT .•RO � I.�U. VOO't :r�G�t KETAL col n ' % I --71 � t 1 GR.77.1 I •.,..• I ;rGR.75.2 �Ga.75.2t . •I'.. .75.' —.�--- I r ] { 1 I 7:, J. Building A-1 Rear ]"LlAteuation Scale: 1/8" = 1'-0" Design PartnershipArchitects Ine 85 Brockton Ave.on Pentucket Lake•Haverhill,NIA 01830 9 978*372*9400•Fam 978*373*6779 •E-Mail:designpartnership<ahrei-izon.net I t t , vo -hi ................. 77 . f ' ;1 ' �- �•�h '' s lt s}__ I r .7 0 s all s=44 2 w N ! _ 1 i rl/mrt ra 1 y �.,loh1 oEEF f. 1 • I / ,�.. i- I��41. + is s ��• _ � 'F .I' -1 i�'-, — j-1 .' ; ill. exe w.a�__ ,;r i_. � � -I 1 "� • el 61 Ve- F UI' 1w'ILINDE; 7.{OIVG QNL �� - :: .. - .. - - - - �_ ,: r , E7: Building A-1 Basement Plan Scale: 1/8"=1'-0" Design Partnership ArchitectsInc. 85 Brockton Ave.on Pentucltet Lake • Haverliill,1•IA 01830.• 978*372*9400 • Fas:978*373*6779 • E-T'Iail:designpartnership®veiizon.net C L L L L C "-- ro- 1 s ! s / I Is. . f__ _�_ /' 1' J___ 1 1 _ �-- -�- /{ � is ---• --� II L1:JO L EV" F•L O7211J G.'. ) t .L'INO L-CUM FL'O GAING 1. L'NGl'ELM F OG @ING R J IF'i I,L IN'OLEUN' i1OO¢ING .. I ®��� •--per i � : �C-f'•' ,�E R � P 1 _:Mr _F 1 r ��o Iz oiz IF1. J t ; FYI � �� •'J � I - _ a 1 \ - I U 13 UI& I• Im II L - wilding A-1 First door Plan ( Scale: 1/8"=1'-0" � Des1� Partnership Architects ,., 85 Brockton Ave.on PentuclEet Lake • Haverhill,NIA 01830 • 978*372*9400 • Fam 978*373*6779 • E-Mail:designpartnershipOverizon.net Cr _ L _ 7a J J 1 If 8 t; M b 1 ct v4 bO m. * f Oi3 ":D13 I - OL. .: L u k lu GL OL L111J — 'LIN �L 117-1 K - f A7 KI i Building A-1 Second Floor Plan Scale: 1/8"=1'-0" Desion Partnership 85 Brockton Ave.on Pentacket Lake • Haverlidl,MA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpartnershipgveiizon.net 1 i ,.fixln�^,rttah ------------------ Mgwr!li 0111, �, 11 TP t �I M` a i wy ' �� Iwb yti��y dl II I � w 11� rci - �;Yfr^ ..�4 M M�Fq,LV, k. Y& Tr ,^ a + - bd Wk'FdW F 'l !A . V N ,Mrkv.J•< c BI ILDING A-1 FRONIC ELEVATION •ti �t. t` ion � q v. • .. a r O 17.. , v r' Tja _ � O Ai rlT Q i I AN f r� L J I� LJ a -Ts. w Pr' � 'F�� �li i I � iii " di�Vh l'"i ut� ��YIIIxFY,ii PZ N y" BUILDING- A-1 LEFT SIDE ELEVATION C , C C C C C. C C C C t _ CAP- EY' .. ._._h... ..._.._ .I.. _...____ illCiCtLl:ilit"11}?1111'f'1Tx:Ylt}'.'TIf,;]-('f[j�"'"'�'-"�•"~'� �� _ - . FLASHING JECO:tC FLCCX•. 8 H N G L E' St• `I � I t .� .1 •I I _ }• Drx � I.V I !EFA6 IJ GI7.$T ::ODz-. �' !7 I •} - ii7�'PiOARD v¢. --- - L Il r. ,z q — —'T LGa7i7 ..I 47 i . .Ll, 1 IC P.Ik7 — — . lI Building A-2 Front elevation Scale: 1/8" = l'-0" Desiyn Partnership Architects hic.85 Brockton Ave.on Pentucket Lake•Haverhill,NIA 01830.978*372*9400•Fam 978*373*6779 •E-Mail:designpartnership@-,-erizon.net C C -i r C J C7 C C C J C C C J C J C C J �>✓c5.ti'tcP_�jam\ A5 P N'A L'T:".: S:N rVJ L.6S- ti l F. L61L c L � 1 L FV 1.F10n>Z t . 1 1 0 la •. II � i . I--� Til UL I. 3— �.Lactic: i.�',.; sX'S 'f !•r. 1. 1. _ ._ 1, Cr 44.'14'7 �' : L -- - - — - — — — - -- -- - - - - --- - .. l..: .. .. ..::�..,. r... .,,rte-..•.S, ....�_r..�.l' 1 C�- Building A-2 Side IFlevations Scale: 1/8" = V-0" Design Partnership Architects inc. 85 Brockton Ave.on Pentucket bake•Haverhill,NIA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpartnership@verizon.net C C 2 C - � r _ r CC_ .� C C � C C � C C � C � _ C r 5 ti �.N a L'. E_ = .. - W- L If r • K ` �1�_• 1 — } -w.77 T M CO- '41Ettu.coon _ o r , METAL i ' L L,-E O 1 7 i 1. ; ,axST FLOOx H F _ �G..�Lc5.7�Gz�Sx yti., 75.2 - ---1 �' ------i: . T r Building A-2 Rear -1evati.on Scale: 1/8" = 1'-0" Design Partnership Architects 85 Brockton Ave.on Pentucket Lake•Haverhill,bIA 01830.978*372*9400•Fax:978*373*6779 •E-Mail:designpartnership@verizon.net b.. --L _ -� _ = _ J. L. �r vl • - _ -4i . L. �• 3 0.9h I y- S 5 S 161i S r'Cd}UMN. 'FOOTtN61 1- + 12 Deep I . . r Ip "r--!--T 4-0 - .1L me I 1 r L I.. Y 1 I I i® l I t 4 151=t:cAL { +1` , roOTluG Uiz U18 T=a. �I: 1 I UII ; U12 I.'. GINOQ0. ONc - 1{I 5 ocN vwa�rlr I ,.a•- 14 4� r I rl. I . I Building A-2 Basement Plan Scale: 1/8"=1'-0" Design Partnership Architects ic. 85 Brockton Ave. on Pentueket Lake • Haverhill,MA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpartnership@veiizon.net 1 -1j. —_' — - _ 7.77-_ { 1' L::JO LEL•tA' �1 O72tNG \ .LINOLEUM -'cL OO21NC �,� L4N Ol>CVMI oO RI PIG "+ h�_� PIINOLEUNflOOR1uG 1 F. lk i -- — LR. -- ---I Q LR. U13 18,•� c� i IL 1 � ,f i • Building A-2 -first Floor Plan Scale: 1/8"=1'-0" Design PartnershipArchitects in, 85 Brockton Ave.on Pent-ticket Lake • Haverhill,AIA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpartnership@verizon.net J _ J _ 1 I I . 1 R t. � � 5 a 1 t 013 -.013, � oia D 1 j.� GL. .. Liu CL � GL Lu1� �L1N GL Zm- i V ill 2A:S:D FC. nl I I r i Building A-2 Second -AMA.00r Plan Scale: 1/8"=1'-0" Desi � PartnershipArchitects ,., 85 Brockton Ave.on Pentucket bake • Haverhill,NIA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpartnershil:)@verizon.net t, s i W, f iAlu �•� Yawin.�sn+mew.,a,a�+u4•�.r >�, ^h•.e,Y,r^�rr r;Ms.,t�.am�,�,n Mw, ,. ., T sun _. f• Lo . z BUILDING A-2 FRO NT- ELEVATI0N • trP& ,�. fnx,�7ganGc�.ix�. — � .� r:...r-w�,9,-.t;;;... �,, c n� L ` � I ,,,�•:� «'�xl�{�',( � o�i Yi,tihtA�m n i 1Mri°ah ,awn:I uil i�C I'. r it«Yi U� n� wJi I L .� � I�pfiyl � a � G�Ta��J���W hli4muq rw�u�Pn'!I� �, w64�isrw�rrh��yl II � ., � � '�,�m,y.�� �� I a I �,N4Yuh�h'Up uO'G"dP�P kill ����pJ�p ltit llrll GU�k el �ii 11 n 'm fad n w W GI a ✓71 IINM N� x 1 Pry hH1 v+ d ter u.f ��� GIMa'Fs y S BUILING A-2 RIGHT SIDE ELEVATION �� .F .414• Y F7 4 ti, Y �. +s. �w`4, a '"�.'" R..3,',. � �� '�'�'r _ r � •, '--,�.r �•�a°, yt�y,t.��. � � �"e ..a � �1{, J�JJA�, ✓ry r�i"•,�,Y"r Yf,- ,..i.•Y`'�w[• `� ��,}J+^ '.'.�•.� BTALDING A-2 REAR ELEVATION YI: .M R , ,�, � -tea•-� .�.� „� Alf rrr r / C C C C CC C C C - C C _ C C i C C C C C • •..:CLNSC.CAP•,f . :<,t}KICK.;CHIMN@Y=';>� •...::k':? S Y{�"1 A. L:.:T 5 H 1 N G.,.L E — r—n— I Lo 15 •� I 1 . h I pi ISI- Fi .j _ (�_ !• i I OI 1 ' ..DECO:':C FLCUA•. , 1 -,�_._�__;—._..___�,�•. _— —_ .. I .: Li-._:;`rA5P N.::�'C Y•, 5 N i NCL E" 5 •.. . 71 Ir META:. Rzs: F:oox-. ilfW !. I '� Y�t7ni toAQOIn _:. -- jZGK.4aa :. ;'r: GRii— --- 304.7.. - - j~cGn..7a.'. I i 2. j 1 i... Building A-3 Front legation Scale: 1/8" = V-0" Desi, n Part�n•ershi Architects 85 Brockton Ave.on Pentucket Labe•Haverhill,NIA 01830 111978*372*9400•Fa_m 978*373*6779 •E-Mail-designpartnersl►ip@verizon.net - C ? C C ' C C C C C C C C �AA.r 14-A L'7`.": S'N'f 1a'q LE'S: , a y t It . I L Ln r:6.t5.1ti tRO- la c ! I i I I rF J !' xkttr'!°�rsc17L` ' 31aS lal q 11'5 . as t.Laoh ¢ 1L.Z c iiFI a* r I rig '01 1 � C.-4 ILA 4. ref a 4 eI S I e M E-.VAS r — — -- — — -- — — — Building A-3 Side -Elevations Scale: 1/8" = V-0" Deslg-JL.JL Partnership Architects Inc. 85 Brockton Ave.on Pentucket Lake.Haverhill,NIA 01830.978*372*9400•Fam 978*373*6779 •E-Mail:designparhiership@verizon.net ' r _ r C C C C- � ' C-- 7 C r -i r C R C r . .CC.NG LAP'J <,L 5.. N . N 6 L. E_ Es -...� .. - \000 GutR 12 q FC I I I U U LTn_CO,R +\ i tNETAL fAl R P H-L LT .A}o--- '-M .. .. / -.� - r—��'—g��� I� , , — t�.--=�— __ c•i.l it ---- —_— � �_,,...:t_� � --T { �. _.� � : �`_ '� �—_� -�.� � i 'i —;•�; �a. •�I i ;ill ib ..�,E3T F.cCE I l ';i I r..' li •I; i i 1. ��� I •i j i ! _1�'-_ I .GR.7Z�2 s�:.`. �i I - J.�� I I. � , � !i i 7 t i I 771" _..._E_..._ '.,I,,c' '_._._� I —�_ .�.... a ': !.'•.. lea.._ — _----... ----- - - ---._.._ _._...._ �.�:_ I j I_Li_e�l.J� _ t tGe75 _75.7. Y i• _. _-Jt 1 G-.7s7 .�,,�.,�. 2 7L AREA. , I I 10 i L --:L I- ---i Building A-3 Rear _E"1evation Scale: 1/8" = 1'-0" Deslgl.,L Partnership Architects i.. 85 Broeldoll Ave.on Pentacket bake•Haverhill,NIA 01830•978*372*9400 9 Fax:978*373*6779 •E-Mail:designpai-tnership@vel-izon.net INp. Ti T. .sa A -. L' _!�_ —___'.. - --•----- 'i�—^J I E l •.�. ------ . �! / rQCs. ' yah _;�_•s s} 1 r'-o X. 411 s-4i . ._ ._� r !• _1 2110.2 Z "yt '- r.fI1 OEEP- 1:• I 'AT IF r ' GNDER Cots 1 . •' . i8 � 'r�-i��-�-..--- ���—I I �r �,7 awc>,c way_ 1 TOOThlG I L' U lG U l u 12 U 12 -. 1 I_—__.__-_. - ' 1 "1►'� I� z 6 UNDER: ON[RET[� 1. f ' •,I �• 8 OtN PA'p TIT ICN ! rl t6 Building A-3 Basement Plan Scale: 1/8"=1'-0" Design PartnershipArchitectsnc. 85 Brockton Ave. on Pentucket Lake • Haverhill,MA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpartnership@verizon.net t !s. __ �i 1 _ I, I I Li:IOLLL A' F'L OO'LIN H\` RI NO L:CUM FL 002{NG �I LINOi LUM P'L OOL ug : ' R' j I�� Ii MOLE UM FLOOLING ' i 1 ! �A 1 A - --- - U13 ! I U6 CIL i I i Building A-3 -first Floor Plan Scale: 1/8"=1'-0" Design PartnershipArchitects �,. 85 Brockton Ave.on Pentucket Lake • Haverhill,DIA 01830 • 978*372*9400 • Fax:978*373*6779 E-Mail:designpaitnership@ve>izon.net L KAN vL .T g _ :. 1 b o +r e.F. x R �` �,.. I . t - o. ( (4 t 'D13 D13 .:I. fL F : I e, U'W.. L CL Liu 1 Lln CL UtF� IN — _li J n• ^_ d. c V i b.. ._11..__2 `2AfR DVFT� 3' 6 3 $ I1�-.�•.,.__._ ��t...�.. c Building A-3 Second floor Plan Scale: 1/8"=1'-0" Design PartnershipArchitectsne. 85 Brockton Ave.on Pentacket Lake • Haverhill,NIA 01830 • 978*372*9400 • Fam 978*373*6779 • E-Mail:designpartnership@veiizon-net m! _ b —AP7 f i t s �' �axaatssaasu■ae�� , u i er��sn wNw"�Yn..$ to a� YMi i rvm n '. 14•i iii 7 M. r��r,u.; i a � +ru �-u ve yp���xs✓w c�++> +�k+'�'P�'!`ri ,�, 1 I� '^ V+ixYSu"CJf++ Y�p iY Ar'"GN"4y'rY6' 1. '.'"Ci wp I•Jp, �; t d . F � f � 8.+ HSt Y M 24 a `��r�r!� � � t le,� i i �' r�i��4y _•�� ,qf�u � I � y a p�y� y ito INS I I dl t r I rf y"�i. fi 1 �l ��iNy"°i...+ ,G-�"""",!�y" ,,n:� �7 a4yl�+�rvro..`.i•.�,.,r..m J _ L_;,] Dump � �'" .. r w �yrr• �,,X�..2,�t y-'GY 'M .7 i �t r �',� r � k '�.,„ �v .�5 {.,�'"? i, t"wl}t �, fiia5'Y'trt ani��yr � "°,'t• �.'x Y3 � . y - jjT r BM- -LDING A-3 DEFT SIDE ELEVATION :Ro7F_ BRteK+:CHIMedt.'.. - rI 1 517:F.FL(,L;'C.S 1 01 57. .. _._..._�.___ ._.•__.__.. :_�— _ ....r..mow+.:...-^•+ ^� 1. Bonelliv�C FLbOe,� ;i + SNIU lECLa 7.;b0 fi'GPS DPr�lr N.IKY--Cj L.-ES' t - ''-- .•- � .FLA a', L '" ._. ,;' s � I - tJ }t L ti III aer1L D,�o tST ' FLaet� s —__ gE_1g• .. _ 1 I —I r 9 Di 1 __ - GE.75.7 Building B-1 frontelevation Scale: 1/8" = V-0" n Desi gPartnership Architects. 85 Brockton Ave..on Pentucket.Lake•Haverhill,NIA 01830•978*372*9400 9 Fax:978*373*6779 •E-Mail:desig77partnership(iDx erizou.net � r ' " � "':`� .G EM GNT GAP--•� :• f CN IM UEy US f t X if r :� �A-SP N A C7-- P{CF N.7}-Lf4r f T•oLV Ew � 1 r 2 3 14 - -�..G Tall. � -..�+_.�♦--",�.r^,Tscat'�� fZ�y�. — _ z x IF _ i A 3 /f 5 l._i S`$•.§y{ :C_E LL 3 V- 'GLI1.fRD ... :2.HD .F.Lm-CC.._�. .K., �' 4 1'M its`.r t. -.1 �L y,I R I -s`�1D �1.G6G'-.•, r fes_ ��j_'i_ . 4' d I f rr a i t j f ----------- , - IST.: EL'an� r �• - c a; - . ,�.: .�,:: � ... 1.. 11y_-_+,p1 I ;,..6e7P1 ., :., y RI-' •�1`z...4.-,I!.-CK 7To` G'16.1 _ �: 1111 r Ile 6i9E.M-ENT_ 1` Building B-1 Side elevations Scale: 1/8" = 1'-0" a DesimnP rtnershi Architects 85 Brockton Ave.on Pentucket Lake•Haverhill,DTA.01830.978*372*9400•Pax 978*373*6779 •E-Mail:designpartnership@verizon.net r ` r r r r r wnou 4Ut-r r_L= - - .91 tuI FL �` �' ,IlNernLlcoe�u :.i'vcnrulc KooF - - - I _. —_...f S i f i - ? L — — — ISL FL. 4, C t j- . Ge. .7 %7.o. r G 0'cc F 7c �• Q8. 6.1 ... �,- •.— - ' ---... ce.1s.7 --——---t -- _._ . y.OTTOM of IN.A ed. Building B-1 Rear1evation Scale: 1/8" = V-0" Design Partnership Architects 85 Brocldon Ave.on Pentucket Lake•Haverhill,MA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpat-Uiership@vei-izon.net - - -, C 2 C C 1 J C C I. f I � a' SIT — ' 0 I Ut DE PRnES E M j,Z mot Ut �41TCH -:E_ SE GTIo A•4 10, t ID` I 77( UP 11R. �� I I i i I .� �- _ a � i'_I .(-- 'x':122'. I e• — I� -'I I L.i i � �' ' � 1 i �' k I -�� + �. f � - - OOTIYG.i ' G'8 fin[a q� NN t yy��tt I I � C� I, J i P6 1lEEP 1 1 2Yf� � .. - � '1 ,- 1 - :1.bf'F.:dt�1� I�. I•:.. ` - I11 f .- _ .. ob .2_ ;rt rooT:uG I+o'vPlvH 4}r - . 1 ! BC7s:DFR b o . ) I. ......_...._-- --......... "o 'i s. Building B-1 Basement Plan Scale: 1/8"=1'-0" DesIgn Partnership ArchitectsInc. 85 Brockton Ave.on Pentucket Lake • Haverhill,MA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpai-biersliip@veiizon.net C i C J l L L L C C J C J 4 CEAMELLWF ;:. 1... Cu." c '.'.... .. E.R. 1 F. IIi11I11 v.R. - — - L:NO_EVI.1..F1O0E1 NC l"N OL Ey. 'µLOORING LINOLEUM GIOORING I j IWOLEVM LLOOE VG 1 1: "oip 61 DGo .I_... sem- C DO. :12a 1 ! y - -•. 1 : � i ..:3 1 � � 7:11_. � /6'2 48 7 II �' � 3 4._ { LR } � 'pi: I 1 Bu ldm-e y B-1 virst "`loor Plan Scale: 1/8"=1'-0" n PartnershipDes1 85 Brockton Ave.on Pentncket Lake • Haverhill,NIA 01830 • 978*372*9400 • Fa_m 978*373*6779 • E-Mail:designpartnersliip@verizon.net _ II IiG LIU F.�. I V i uN1Uug I r L n I cAewct B.R. "' ^` B.R.6.R. Oma, P,.R �J FLIT9 \: 3a'�I l 55.:. 111 - :moi ` i I -ITI - F �.. �r•1' _I CL .CL. I F � DN. Du I L.I cul— i L I i f GL y O` ji BF `iF L r:R: \ F 1 F - Building B-1 Second �1oor Plan Scale: 1/8"=1'-0" nPartnershipDes1gArchitects ,.. 85 Brockton Ave.on Pentueket Lake • Haverhill,NIA.01830 • 978*372*9400 • Fam 978*373*6779 • E-Mail:designparhiershil3@verizon.net p�.w :� & 1 S`j3 �.� a ''ie-„"y„ i i.r7t'NH k � ' k � lry ''�• � � vf,�� r ,y f ✓ 'Y 1ro�r � Ir ^ Ift r 1 >tir mk'w.N fl Wi"w; Y✓F t I a 4 I �; � f ,� irltJul,4'vl�..., }t. i•� f'— T .,' .w�-0� 1 9q- t 1 1 1 r n, ' Y f• ry qq a, RM . iYtYlrr� (i., 1� a'aWrk4:R� A u:i�yM w! p�. 1t MOM r • t_ r � ! 1 tJ U r � r� _, -_- - :_ F+i M t J eu ri Moir _ Lg- r'l r, r� tit'dr wiVvpi iMN Is a �I K h9 ti+Crud t, I § aiw.,, �� Y r�H rM: �r g4jbiwNlpu �G�� " Ih� " d4l.dll. a �'•� alk r 6� .�.yi '• '� '�d'� �rW �. �.��,S eP a oq ti k� ��-u+p" r- r • r - f r r - .y r r r -+ r r r r -� ( �r r J\� .- •�_ 'T._ .. CE MENS IJ• A 00 F- i I �'h S P R k CT SR'�FI-4-Ci3 - GESl4 .�� .� - � i y r'• � 'f t' FFJtr BoaWN4 � 1`, '.A4Y Ftn�i � .•• r. . .� •� l � �� Is. FLoo2.� �. �`'• S"K);t. S JLA F•i 1 w - �+ i _ iii I 7 :1 r4E- 6 r .'7 r; 01-17 2'''��. I'Ge.79.7 CZP7E1 i s'r 7 4 :WAA. � 1.. • :. .i; —_ _._ _. _ _ — . .L! B1.t1� C1n1n B-2 Front �-Levation Scale: 1/8" = 1'-0" Design PartnershipArchitects 85 Brockton Ave.on Pentucket Lake•Haverhill,1vTA 01830 111978*372*9400 111 Fax:978*373*6779 •E-Nlail:designpartnership@verizon.net .00MEAT CAP. : �3 t x db y,. at r r { - 1, 1 r: q ... .. a .W ) 0 f 1 t t� - i . a r L � : -�i.5.. ,> r: ^ij. F i r}, � to r r,�.: F t: .•l;` t" T`s i,C :[" ..I�'-` •Jl ata .'1'`� ?nfr � .c. s•:� :1 n..�v F777" S•. n. F fs 4JY ?'' ,:�il�r ,:!JS;;.;1 \ p v `I', t,+. ��. ! i4 •;Y:J< {$' N � i,..N it t1�G' t r 1.- a F P r{ J J 1 .1• e - i 1 Al.._ AFF- • i tar - .f - •Y .7 r-� 1 i ..:FLt�B.�.' .f ,, .,�,Fl..o o iL.yCz:1B.A .. ..:. ,..;.. ', -t �.•4,.:;r,�•�rri f�., r,. { it�i y • . 1 1�Z,.J 1 y...6YTlI { it y.��{ s^.R's2TA\�.'2. GIC"1Gy, t4� 1.. ,n1 �+ 1 -c� .•C.7.7/I ,cm •�` I 1 1 Gi 757 _ I 1 1 G • t k' Building B-� Side elevations Scale: 1/8" = V-0" Design Partnership Architects 85 Brockton Ave.on Pentueket Lake•Haverhill,MA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpartnershil)@Verizon.net Co 11vu /. ,Noon Gbrrets .� :' .Y,:•.e.vr r..%7.-a�x•�.+�'-er..e`+-n. ,•�•=2�r-- - yea — :i ._.___.. •--- .lila' i^:Lil:�.�_.�,ult�—.___. — -- y ' n — • ��-'_ _ �'' MI J.CKAL:fUt46'Lt•: FL'A.Su rj.. 1 J �I _..— . • � -� .F�ASM S. _ .•r •1 _ ..._.....f._ ___. f• i t I ` do .d,2 1 TFL — — 6—NG. STCMFZ- Gc.77.o , c_Y`r— •I- - .1.•• `G .., �. I �' I: - -- i I 41L7G1 Ge.75-7 l I r {I' i- IF- - - L_-- -J I -- .l E M F—�— _ I___ � �1 �� v^1 ISPs S EAi�� : l• I—._ — 7 77 lien Building B-2 Rear ]"Hileuation Scale: 1/8" = 1'-0" Design Partnership Architects 85 Brockton Ave.on Pentucket Lake•Haverhill,ATA 01830•978*372*9400 9 Fam 978*373*6779 •E-Mail:designpartnership@veiizon.net r j - - -� I 1 " I Df PP.Lz Eo y. g.Z l'.I3(OER anLOGC �`N W L r �RE OIIOR ON C54f LT 9...., ' Fv QI �. f 1 f rr. I 9 -T--�.__a ,., �f. �___I� I" .. .' 1,,. I T-l-.r�—•L •�. -,<-,:. ' J'.'f.. t:. •�� 1:•,I .r.. , m='. -:,:=i..�-z-,. h _ � I �.1 791 25I'. tI` 21Z� A. I L�sfT.L � rl i 1 6'D6HD -lie ° r 1. 4 I - voon�c Yo WISE i Pv. 21 r, lfops�:.. 1 � • — i i I' 6Guoez.a.oc � I 1k, .. .. - n I r77777 7 777 Building B-2 Basement Plan Scale: 1/8"=1'-0" Des *1PartnershipArchitects ic. n 85 Brockton Ave.on Pentacket Lake • Haverhill,1IA 01830 • 978*372*9400 • Fax:978*373*6779 • E-AZail:designpartnership@veiizon.net C C C C CC C C i C C ^ L C •I _ r...._.,..�y., r tFt t� , PREF ( 37. S.R. I. c h IC s 61 o.R. I Q -_ _ 1::NO Cub LOC lN4' LkN O{.EUMI FLOG LINGLtNOI[VM fCOORtNG I LINOLEUM FCO R K!G'•' I _ f _ .. I .\ •r 1;8, 12 o I I iJ• I L .E� E �- i _.bv___m•I _ Cr.':; p, �' Up .`: _:U' l oei..:;. ncl I ---•.r;"-, I •.,y .a `y..,I'C 13R ;30. `12R 12R +%"I.I 19R .�.� -.L -_; Aj t.•`• 13C I y i • �L�., ..,f �... 3`l` .. , I -c ._. .... .. ...:...... 16 8 _ I. a. L 1 I. r ' T - .n. IIF _{ Building B-2 FF 177 First door Plan Scale: 1/8"=1'-0" Design Partnershi Architects inc.p 85 Brockton Ave.on Pentucket Lake • Haverhill,NIA 01830 • 978*372*9400 • Fax:978*373*6779 • E-Mail:designpaitnership(O%,eiizon.net C C . C- r � _I J ✓ _I i J J J M{NG LIMP--5�I ' i- G L., C t .lIEBICIUE I �_. c Ir. R 21. I o J u 8.' B:Fi 6 R DO B.R .. 5�2' I� LINA. ��— t CL.' ._,a,_ .. - � D^. �f� 1 ,� (,. CL. ! i 13R .13F I.I.. ° 1 ► � f I c 'i l E' / L o I R. I ! 9 F • � I ,� t I v -- - — a` �I Building B-2 IM Second floor Plan Scale: 1/8"=1'-0" Des * gPartnership n Architectsine. 85 Brockton Ave.on Pentacket Lake • Haverhill,NIA 01830 • 978*372*9400 • Fat:978*373*6779 • E-Mail:designpartnersliip@verizon.net r 'wr !f 4 , tl e_ 1 too . • r kk i i 9M41 u ,y a L �i li ay...wn.' i T � M w' �hr �14� I^71Y Ix"IFI i "� J y�ti,iag�r n ' lip.11.11.1,� I � { 1 yup u BtJILDIlNG B-2 RIGHT SIDE ELEVATION a r` to r�•:G a ..I+I epi l 4 nTm�'� rig y misyP o' iey a' AJ �d'� � 04 �tt1 e f,r 9'tJ+i"�^Gp�lt'kHk stic i _�rr^�'f sd�y t',Ii.,��P i�u"i��4dxs`�J�iW' . Ali,"'. r A".yt ,y �F 47_. t J"II I i I �al�til 11 'fir Ipl INW�i,�,q��l�lhr{Ilyd vji;µ��d� d lu�...;y I I t uG'�r�l'G,IL� rr9,�� � Iqw' I •�.p� 9,ra,;. ., �I'Ip7T I.n,aw. , I `f 'i s.�. �amT�umWayly-", - � �rv•,^r*rnmx� Aey�y. 7 :.'flM1iCTh.'IXTIS.nK�,RP t.. G I RAO 646WIMAM BTJILDING B-2 LEFT SIDE ELEVATION 1 cet i h+ ua i.Sx mytss' . Ca r r e o n.c_.v 6C'. S'4 rr�SLE S _ --- _ M,rnL CcNo - �.. t i4- 77 H t , m .. IN el rT , --.... TI I� ,.: ...'. .noc •. ',. ' � ."yC9A.n .~..- ___ -'52.14.0 'i.' 4e'146 i 4 c. 1_ ._ VAO TrGM op W 4�t.J Build* C Front JL JL tion Scale: 1/8" = V-0" Des * nP r tnership Architects i.. 85 Broeldon Ave.on Pentucket Lake•Haverhill,MA 01830.978*372*9400 9 Fax:978*373*6779 •E-Mail:designpartnershipCa mizon.net L C C , C C C C C ` C r ; C r r r C , ' LE M'E IJT GAC:...-i•�.' 1 LT M 1 tJ C,LES 'Waon- Qurrem; - - ------- - - - —.. -- _.---... . -- ---=-- _ T ay1 i iL — I Iw. CL Uh Or- SH 11 ,. .... .... 1 - j f �. 1 1Na FLoo 1c__}. .. _ �, - - FLA 1'.c D w- 6 r_� 14. ­Jj Building C side Elevations Scale: 1/8" = V-0" Design Partnership Architects 85 Brockton Ave.on Pentucket bake•Haverhill,NIA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpartuership@verizon.net r -... .. r. .. r. J r _ J r r. �. C r E w oo rTe 1 - -__ -- - — — -fir'- II1 I1 R..U.`a-.k..R:D I'_:'�.:::'S`H.!u rt'l'.els I I i P I .s - TIT doLi `II' „I 1: ! 1. I'•I .. .._. I I r t C1R•,q,v n� _I2 !�, ' _ :__?�,1y'19.3 ..9e.i•4.1_}i i i � � f _ .J �_,_ �--� 1 i I i L- -- .�; I 'I , I I--- 1 1 y¢•13.� .,._•I— i�l'13.6 Rearleuation Scale: 1/8" = V-0" Design Partnership Architects 85 Brockton Ave.on Pentucket Lake•Haverhill,SIA 01830•978*372*9400•Fax:978*373*6779 •E-Mail:designpartnership Overizon.net CC C _ L r L 4 I77 FT `METAL dHEAWAYSr - i t B I I , - I ___... ..._. �.. j.a ' N J ll COa �• o 1-o - 71 ��� 1 1� _ 'oL r 1z. COLS � '�t' .e � Ul"(I Y- ' -r I'll j_a•Z J/X` tC Il r r blxA I I ,-L ., , I t i i - —^f *�_ r— I P _ '•I I d/A LL L.TGS 8p4EP r i •�� �f3 i�. I N !•` _.. 12 WISE � ! : BtOCL wril.� __N!.i YQ � . JJ 1 ! a .. .�.'.�.�t 1. -. rib 8— 18l - --- "--/_4 L1---------'— dI L 0 I ZI 2 I + Building C Basement Plan Scale: 1/8"=1'-0" P rtnershi Architects Ing. Des * p 1 �1 a, 85 Brockton Ave.on Pentneket Labe • Haverhill,NIA 01830 • 978*372*9400 • Fax 978*373*6779 • E-Mail:designpartnership@�eiYzon.net C C C C C C C C C C I 1 I1 v ? r Z - - t _ — -- 1 .f 8 .. - i ' oil O '.:� ---•t il'I+i•L`.?"n�1i1N:L$T,�r tint FCC1nRtlac•.,•{., r. 'j-UN°LE'U r+1 FLOO RftJ6. ,_t NO L'-tJ:M -F CQ6CING LINOLEUM.FLO RING S t I v r n r 4T. U13 � n1J., A r'1 L R 1 �L R tj L R {: L t r. - A t, r .,,�-U13 .:y f w t •� rc .. [ t I G L: �9 . CLCxy hl mq -- .. P r f t i Building C first door Plan Scale: 1/8"=1'-0" Architects Inc. Design P 85 Brockton Ave.on Pentueket bake • Haverhill,IIA 01830 • 978*372*9400 • Fax:978*373*6779 • $-1\1ail:desigupartuership©verizon.net C 3 { C ' C C J C 7 C r C r O . � B B R . a s' 4 't s F . o G F.i. ryl 013 ! CL r CL. t ti14 M t n� CL. BR B.R { � �1 rt B R I-----� I a , CL. Y' z '(IJv,•lJ ti Building C Second Moor Plan Scale: 1/8"=1'-0" Desin PartnershipArchitects Inc. artnershi n Qverizo .net 85 Brockton Ave.on Pentucket bake • Haverhill,MA 01830 978*37�*9400 • Fax:978*373*6779 E-Mail:desigi i p p r, r, r, aJ _ o I!; 7.0 w aJ Jill r• .. �'� ILII ;u I amu_. r � r + i ! ri iti,.7 Id t ii y .r i�Nn �dli+Po vWr-nia h i •.�.T"`e*m;nTmmmm ���NI�nVI�Wd mF ryi rrl h u� .�iB 16 I i,dr: �i X� .. � h— 6 +Mman�X { n M p RXItPA® 0 T s� JKTMDING C RIGHT SIDE ELEVATION � T1 t r 4 y 1 1 } 41 41 ix fz ,"+ s fir Y n.�MAMyXhMnarw.�.mu+YnMMaMwnwnr ..... ga 1 j. Wed "ilk. _ i� r}rM"V l { h � t f 1, F%. Y � abJt'I BTJILDING C DEFT SIDE ELEVATION THE FOLLOWING SPECS . DETAILS AND PROFILES SHOWN ARE BASED ON THE HARVEY SIGNATURE WINDOW. THE OTHER NAMED OR EQUAL PRODUCTS MEETING THE SPECIFICATIONS WILL ALSO BE CONSIDERED . TURws UP QJSULAT!OW EIL. .1011T ro 14) i 1 / �DRaPt D 4T2.T -(L.: .. f ILE S roT.` ! I :L X 6. 3G�ST t q"xk' SILL --�mr�7 r-r -aeatees _ $A 'r.- F1, 3" THIO, c ' o v •; . moi .. SE C- IION THRU WAIT Scale: 1/2»_1s_0" r � Design Partnership Arelikeets Inc. 85 Brockton Ave.on Pentacket Lake-Haverhill,MA 01830978*372*9400-Fam:978*373*6779•E-Mail:designpatinership(it�verizon net rt't .�K.gv'D-•--- �" TURN UP'WSUi_ATIOu A r COILM I CE. s .2X:f.•.C.£IG. 201.57 _ 1 a- ,1 too. z �n� - - -(/ko - LX9 70157 - 4•'It 6" wOfftp. n In _HLA .ry� 1I . . - .. { f IRE -__—.•..•_.__--.- ld" t . I • IjaN GIIOCR.9 Acraari x_ r'yy, o, Li 3" T H 1 c. i --�COMPACIE•a: GAA{CI: SECTION THRU WALL Scale: 1/2"=l'-O", Li Desi n PartnerslApArchitects Inc 78*372*9400-F=5378*373*6779°E-Mail:desi artnershiPOveriz0n-net • 85 Brockton Ave.on Pentucket Lake Haverhill,MA 01830.9 �P � J r, 1/8"shall have aluminum reinforcements at the meeting rails. Opening widths from 36 1/4" and greater shall have �- reinforcements at all sash horizontals. Opening heights 72 3/8"and above shall have reinforcements at all sash verticals. Screen Construction:Standard screen shall be a half screen with 18 x 16 mesh non-glare charcoal finished aluminum wire. ' Screen frame shall be of hollow extruded design. Woolpile strip shall be applied to the top rail to provide an effective Vinyl Double Hung Window insect seal. The screen shall be installed from the inside with a zinc die cast swivel in on each to Model: 'Melded Sash/ p p corner and release latches at each bottom comer. `-' Mechanical Frame Applications: Residential Available Finishes: Shall be solid vinyl throughout in white. Commercial Weatherstripping: Two courses of solid barrier fin-type Distinguishing Features weatherstripping shall be applied to the sash stiles. The Custom Manufactured to Size bottom sash rail shall include one course of non-rigid bulb Tilt-in Sash type weatherstripping, which shall compress onto the sill Locking half screen when the sash is in the closed position. Back wall of sill frame and head shall have one course of fin-type weatherseal. `-' Size Limitations(Rough Opening) Glazing: Insulating glass shall have an overall thickness of Residential- Min. Width: 18 1/4" Height: 30" 7/8"with a minimum 5/8"air space. Insulating glass sandwich Max. Width: 52" Height: 80" shall utilized a one piece steel Uchannel design glass spacer, Max. United Inches: 128 and shall have a desiccant matrix extruded into the base of the Uchannel. A butyl sealant shall be extruded around the Commercial- Min. Width: 18 1/4" Height: 30" entire perimeter of the spacer to achieve a seal. Standard r- Max. Width: 56" Height: 90" glass shall be single strength domestic type B float glass. Max. United Inches: 146 hardware: Sash balances shall be factory calibrated block ` and tackle. Balance cords shall be anchored to glass filled nylon terminal housings, which lock in place once sash is tilted in. The locking terminal and pivot bar system shall be ARCHITECTURAL SPECIFICATIONS designed to positively interlock, providing accurate alignment of the sash and the frame during installation and operation. General: Sash locks shall be cam type and finished to match the vinyl Operation: Sash Shan be counterbalanced to remain in place extrusion color. Locks shall be securely anchored with color r matched screws driven through the sash rail and into an during window operation. Both sashes shall tilt in for cleaning extruded aluminum reinforcing bar. Double locks shall be exterior glass surface. The top sash stiles shall be fitted with standard on opening widths 30 1/4"andreater. two sash limits latches which, when extended, shall prevent the bottom sash from being opened more than three inches. Options: Grids - Colonial contoured aluminum in- las , in- Sash locks shall function to both secure the opening and to glass flat diamon gn s, is-glass gr once amuntin grids, and u draw the meeting rails together for a tight seal. exterior grids are available. Special gri e Materials: All vinyl mainframe and sash extrusions shall be available. Glazing - Obscure, Low-E Argon filled Low-E, tinted, double strength and special tempere a1 ae. �. rigid virgin PVC and have a nominal wall thickness of 0.080"".. Field mulled or factory mulled units, oriel windows and full The jamb shall have eight tubular hollows for screens are available. A steep slope sill angle can be used maximum strength and thermal efficiency. The sill shall be on sills that drop over 3/4". Three style nail fins are available: sloped design, and contain six hollows. The head section 3/4"'J' or traditional 'L' in vinyl or traditional 'L' in aluminum. r, shall contain four tubular hollows. Receiver and extension jamb package available. Frame Construction: Frame profile shall be designed to Commercial Applications: All frame and sash members either accept a snap-on nail fin or be fitted with a head shall be reinforced with aluminum that is fastened securely in expander and sill angle as job conditions require. Frame place. depth for replacement installation shall be 3 1/4". Window main frame corners shall be fitted with a closed cell foam Installation: Installation shall be in accordance with the sealing pad, butt joined and mechanically fastened with three manufacturer's printed instructions. tJ stainless steel screws per comer anchored into integral extrusion screw bosses.Two Jamb alignment screws shall be Warranty Information: Standard residential Warranty shall • be Lifetime on all extruded vinyl members and mechanical at the center of each jamb. r� parts and a 20 Year Glass Warranty which is pro-rated after Sash Construction:Sash frame shall be miter cut and fusion 10 years. welded at the comers. Sash profiles shall be designed to receive a triple fin flexible glazing gasket and a snap in glazing bead. Lift rails shall be integral to the sash glazing - bead extrusion. Sash meeting rails shall include a snap on iJ interlock extrusion, which shall provide an integral positive rneeting rail interlock in the assembled unit. Each welded sash top rail shall conceal a spring-loaded sash release latch. Each welded sash shall have recessed, zinc die-cast pivot bars fastened in place at the bottom sash comers. Glazing Pocket shall include a triple fin flexible glazing gasket at the outside wall of the sash rail and one soft durometer leg on the interior snap-in glazing bead. Opening widths 30 1/4" to 36 ' 1 REV 11/01 tJ r Double Hung Welded Sash 1 1/2 Scale a_J o O J 9/16 0 r1 0 C=31 ❑ 2" r � 0 0 4 r � 3 r 0 ❑ r ❑ O 3 1/2„ LJ �❑ ❑ r ' o U r , 3 1/4" 4" ° �l ❑ 0 0 r 000 3 114" o o ❑ 000000 0 Do REV. 12199 �3 112" AS 115 r � 2 11 r r ' v LJ Typical Installation Detail x x r, 114 Scale r� DOUBLE HUNG REPLACEMENT INSTALLATION 2 x 4 CONSTRUCTION 5/8" SHEATHING r� �© 1/2" DRYWALL n U o uuu 0 r, u U r1 = SILL DETAIL ri \J t_J r, STEEP SLOPE INSTALLATION n ._� r� 0 0 r� D o O REV. 4/96 AS 138 r� 5 \J r� Weatherstripping: Weatherstripping shall be one soft durometer legs applied to the perimeter of the interior face of the sash. The second piece of weatherstripping shall be one course of fin type weatherseal applied to the perimeter of the sash exterior. U Glazing: Insulated glass shall have an overall thickness of Vinyl Hopper Window 7/8" and a minimum of 5/8" air space. Sash shall be glazed with four co-extruded non-rigid PVC legs in the glazing pocket. Insulating glass sandwich shall utilize a u Model: Hopper one piece steel U-channel design glass spacer, and shall Applications: Residential have a desiccant matrix extruded into the base of the U- Light Commercial channel. A butyl sealant shall be extruded around the entire perimeter of the spacer to achieve a seal. Standard Distinguishing Features glass shall be single strength domestic type B float glass. Custom Manufactured to Size r , Welded Frame Hardware: Two piece cam turn handle lock with striker. 90-degree rotation of the handle unlocks the vent. The Size Limitations(Rough Opening) handle lock and striker shall be white on white windows or Min. Width:12 1/4" Height: 16 1/2"or silver on almond windows. Locks shall be securely 16 1/4" 12 1/2" anchored with screws driven through the sash rail and into Max. Width:421/4" Height: 42 114" an extruded aluminum reinforcement bar. Double locks Max. United Inches: 76 shall be standard on opening widths 30 1/4"and greater. New Construction Window: To adapt this window for new construction, an L-fin or J-fin shall be added to the ARCHITECTURAL SPECIFICATIONS exterior of the frame. An interior receiver for sheetrock applications or an extension jamb package is available. n General: _ - Refer to accessory detail section for further information. Operation: Window shall open in from the frame top by Options:Srids--Colonial contoured aluminum in-glas or means of a cam handle assembly. Sash shall pivot at the in-glass at diarriond grids are available. penal grid r, bottom on two corrosion resistant hinges located at each a available. Glazing - Obscure, Low-E, main frame jamb. The cam handle shall be the locking r on-filled Low-E tinted, double strength, and special ._, device located at the top sash rail and shall ensure tight tempere is available. Field mulled or factory mulled units sash to jamb weatherseal compression. are available. A stee lope sill angle can be used on sills r that drop over 3/4". A dryer ven o e can ecu m o Materials: All vinyl extrusions shall be rigid, 100% virgin acrylic glass PVC. Main frame profiles shall have a nominal wall thickness of .065" and shall have five tubular hollows for Installation: Installation shall be in accordance with the maximum strength, thermal efficiency and welded comer manufacturer's printed instructions. integrity. Warranty Information: Lifetime Warranty on all Frame Construction: Frame profile shall be designed to extruded vinyl members and mechanical parts. 20 year either accept a snap-on nail fin or be fitted with a one- glass Warranty which is pro-rated after 10 years. ' piece head expander and sill angle as job conditions require. Frame depth for installation shall be 3 1/4". Main �J frame corners shall be mitered and fusion welded for maximum strength and leak resistance. The main frame jambs shall contain an extruded aluminum reinforcing bar to provide a secure anchor for the hinge screws. Sash Construction: Frame shall be miter cut and joined r ' with heavy duty glass filled nylon corner keys, mechanically fastened and sealed with a siliconized latex sealant. r Screen Construction: Frame shall be hollow extruded design and the wire shall be 18 x 16 mesh non-glare ` charcoal finished aluminum. There will be an overlap on the edge of screen frame. Spring clips shall be installed r on both jamb sides to keep screen tight to window frame. Available Finishes: Shall be solid vinyl throughout in white or almond. 27 REV 12/00 r, r� r � Vinyl Hopper 1/2 Scale r� r �.: ,• C 1 u LJ ........ . . . ...... . vs, ...;�.::,.:::..:.�:..•.....'.��,tom. .................... ri I LJ r� 28 r-- Vinyl Window Accessories Full Scale f 114- 1 7/16" r --� 11/16 I-- 6/8" �-- STANDARD VINYL SILL EXTENDER STEEP SLOPE VINYL SILL EXTENDER -T r � F 1.. 1 3/8" 13/16" 7/16"I-- �J STANDARD ALUMINUM SILL ANGLE STEEP SLOPE ALUMINUM SILL ANGLE r ; r 1 3/4" 3/4" F 3/8" r-; VINYL "J" CHANNEL VINYL NAIL FIN VINYL RECEIVER r � 23/16" � � 43/16" I I 21/32 21/32" L 1 !-1 PRIMED EXTENSION WOOD FOR 4 9/16" WALL r PRIMED EXTENSION WOOD FOR 6 9/16" WALL REV. 10/00 AS 126 r � 1 r i r� r , t_i Vinyl Window Accessories Full Scale r, r 1 3/4- L.j r , LARGE VINYL "H" MULLION --{ 3/4" ` r, �J r, VINYL HEAD EXPANDER r� �J r, LJ l l SMALL VINYL "H" MULLION VINYL UNIVERSAL MULLION (FOR USE WITH CA SEMEN T) r' * ALL VINYL MULLIONS & EXPANDERS ACCOMMODATE 3 1/4" FRAME WINDOWS. REV. 2/00 AS 148 r 2 l J VINYL WINDOW 5A ; HEAD REPLACEMENT INSTALLATION INSTRUCTIONS These Parting / 1.) Remove inside trim/stops at sides and top. 9.) Square windows in opening by installing wood shims Stops Must Be Inside The top trim may need to be cut down when replacing. where necessary. Placing a carpenters square on the Removed Before Trim Window Is Care in removing the trim may allow you to reuse it master frame and sill corners will aid in the process. On Installed (Refer to either Figure 5A or 5B). DH's and rolling units, slightly opening the sashes will FOR: a.) Cut pulley cords and remove lower sash. give a"sight line", to help square the window. On other o CLASSIC ALL b.) Remove parting beads at sides and top. products, verify that the margin between sash and Adjustable DOUBLE c.) Cut pulley cords and remove top sash. master frame perimeters is equal on all 4 sides. Sill Expander HUNG d.) Remove pulleys,weight cavity covers, and the NOTE: Vinyl DH's only: Tilt in both sash and remove WINDOWS weights. Fill this top to bottom cavity with balance covers. Turn adjustment screws located in side fiberglass insulation. If desired, replace jambs clockwise until they are firmly seated against covers or cover holes with wood opening. This will help ensure frame members remain NOTE: If original windows have vinyl eland stop parallel and plumb. CASEMENTS: crank open sash in or aluminum jamb liners, use a flat pry —� -\\ order to seat adjustment screws in each side jamb. _>; i�, \ stool bar to remove liners. Must nave IMPORTANT-ROLLING ONLY: The sill must be SILL 2.)Jamb depth of Harvey 31/4°here ''� p Y vin I Y t .=`':- . ... supported in a flat and level position along its entire replacement windows is 3 1/4". If the length to ensure alignment of sash locks and keepers opening amb depth is greater, nail lnteriortrsm p g l p 9 and proper operation. HEAD Inside furring strips to inside of blind stops. If opening jamb 10.) Complete fastening the unit by screwing frame to �, �, / Trim depth is less than 3 1/4", trim back the stool cap. 5 ;"= opening through prepunched holes at top and bottom of 3.)Completely clean opening and proceed with both sides of master frame, using screws provided. Do installation. not over tighten. NOTE: Casement/Awning units Stops Must Be These Pasting 4.) Check the prime sill for level. Compensate for Out need 1/8"holes drilled in each jamb at latch and hinge Removed Before of level conditions by installing wood shims tightly locations. Shim behind these locations and secure Window Is against outside edge of stool cap. using screws provided. These holes should be located Installed 5a.) Sill Expander: Measure the distance between along groove on inside frame. o FOR: the blind stops at the sill and cut the sill extender to fit. 11.) Insulate between window frame and rough ALL Install sill expander to proper position in the window Opening on all sides. Be careful not to overpack OTHER unit. See detail drawing 5A. , and bowjambs. 5b.) Sill Angle: Install sill angle with long leg up, 1/8' jSill Angle VINYL back from inside edge of blind stop using three 1/2" 12.)Verify window is plumb, level and square. Check to be mounted *WINDOWS screws provided. Caulk along entire length for operation of unit and make necessary adjustments. before window weathertight seal. See detail drawing 5B 13.)Tap head expander up to head and fasten with self is installed \ IMPORTANT: If this is a flat sill installation, the sill tapping screws provided or use white pop rivets. R. '!I extender or angle should be removed and discarded. 14.)Tap down sill expander and caulk along entire stool 6.) Run a heavy bead of caulk along the inside of the length SILL blindstops at the jambs and head. intended • provide _, . 7.) Fill space under head expander with insulation. 15•) Replace wood interior trim. insect control - • are not •'• to provided or Also lay insulation along sill of opening and staple for the retentionof persons or objects fr•m the interior. in place. FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN THIS WINDOW UNIT NOT PERFORMING UP TO HARVEY `It is recommended that the hardware on, casements 8.)Tilt window into opening. Center the window and INDUSTRIES SPECIFICATIONS FOR ITS INTENDED USE. &awning windows be lubricated twice a year or as needed push it tightly against the blindstops. ALL WARRANTIES MAY ALSO BE VOIDED. with a light oil for years of trouble-free operation. 9/00 Date. ./���1� ".O R-r:'tio TOWN OF NORTH ANDOVER o PERMIT FOR PLUMBING 49 �SS�cMusE� ' 1 This certifies that . . . . . . . . ;,.�.�,�9 has permission to perform plumbing in the buildings of . . . ... at. ,F .C(. . . . .1 . . /. . . . . . . . . . . . . North Andover, Mass. Fee j .4�.Lic. No..� . PLUMBING INSPECTOR 9 Check # �` 5892 M , MASSACHUSETTS UNIFORM APPLIC ION FOR PERMIT TO DO PLUMBING (Type or print) NORTH ANDOVER,MASSACHUSETTS ' Date Building Location Jf�&41� Owners Name Permit#�S 9�- Amount � Type of Occupancy New ri Renovation ri Replacement 13 Plans Submitted Yes ❑ No FIXTURES -- w Cn O z z U � a o w W w z z a a <C cx H z O z Q SMBM RASEVINr M RDM M rix 3M MOM 4IH HAOCR SIH 6M F)< M 7MHAOM gm (Print or type) / Check one: Certificate Installing Company Name_E, ,d, ;;V`;1 ,'A) ;1 ,r[,:77, Corp. _7Address , //�rT,f e l �. Partner. _ Business Te ep one -- "� Firm/Co. Name of Licensed Plumber: a Insurance Coverage: Indicate the type of insurance coverage by checking the appropriate box: Liability insurance policy re" Other type of indemnity ❑ Bond Q Insurance Waiver: I,the undersigned,have been made aware that the licensee of this application does not have any one of the above three insurance signature Owner ❑ Agent I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts State Plum&g Code and Chapter 142 of the General Laws. By: S"gia'i a oc�ea`riumber Title Type of Plumbing License City/Town icense INUMDer Master Journeyman APPROVED(OFFICE USE ONLY El .,y Date. . HOR7M• o TOWN OF NORTH ANDOVER 3? ��.r .• of PERMIT FOR PLUMBING ,SSACHUSE� This certifies that . . . . . / 1r . . . . . . . . . has permission to perform plumbing in the bu&�4n.g.,s of . . !r': 1� . :/��--f . . . . . . . . . . . . . . f f at.f ✓ . . . . . . .. North Andover, Mass. Fee,; .a .Lic. No.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PLUMBING INSPECTOR Check # 5891 r. MASSACHUSETTS UNIFORM APPLICATION FOR PERMIT TO DO PLUMBING (Type or print) NORTH ANDOVER,MASSACHUSETTS BuildingLocation �' 1, , (J;�� R Date I��, Owners Name ? Permit# Amount _,fid, Type of Occupancy — New Renovation ri Replacement Plans Submitted Yes No FIXTURES p z _ G x W z w z Cr N V > CIO � z O � z T H O U Q ��v;avr ISr FLOOR ZD MOM eau rvo 4M HJOOR 5MHfm 6M MOOR M RDM 91HHfM (Print or type) Check one: Certificate Installing Company Name_ 1',!i(2 _j Corp. Address � � : �• r ��"' Partner. t, ALA 4 Busmess Telephone � , a Firm/Co. M Name of Licensed Plumber: Insurance Coverage: Indicate the type of insurance coverage by checking the appropriate box: 'Liability insurance policy rm, Other type of indemnity ❑ Bond ❑ Insurance Waiver: I,the undersigned,have been made aware that the licensee of this application does not have any one of the above three insurance tgnature Owner Agent ❑ I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts St to Plumbing ode�and Chapter 142 of the General Laws. By: igna ure 5179venseu Plurnour Title Type of Plumbing License ,_•,��, � City/Town �ase um er �' Master Journeyman APPROVED(OFFICE USE ONLY �•�' LJ Date. . . . l.. .... .. 4O NORTH 1 TOWN OF NORTH ANDOVER FO � D t - PERMIT FOR GAS INSTALLATION 9 . 9 SACHUSESt This certifies that . . . . . . . .{ .' . . K... . . . . . . . . . . . . . . has permission for gas installatiort ��'�1 .� . . . . . . . . . in the buildings,.of . . . . .. . . . . . . . . . . . . . . . . . . at .�`1".� ./ '1C , North Andover, Mass. FeeLic. No. GAS INSPECTOR y Check# � i 4631 MASSACHUSE ISS UNIMRM APPUCATON FOR P TO DO GAS FTrnNG (Type or print) Date NORTH ANDOVER,MASSACHUSETTS y`L /Building Locations J� •�'f'i �` `� Permit# Amount$ v�Z` Owner's Name . � /. New Renovation ❑ Replacement ❑ Plans Submitted ❑ xc0i U z avi Cn x w a w o U x z z a w a o o z H w � E+ c w OF a cG Q w � z al .; C7 H z H z F F. W O O '>- O w U Fes• W z �W > F�� z a, ¢ ¢ O O W O W Ex x O x w G] c7 a U 9 > A a. E- O SUB -BASEM ENT BASEMENT 1ST . FLOOR 2 N D . F L O O R 3RD . FLOOR 4 T H . F L O O R 5 T H . F L O O R 6 T H . F L O O R ' 7T H . F L O O R 8 T H . F L O O R (Print or type) ©� Check one: Certificate Installing Company Name iL' �1`//A.) e- 5, ❑ Corp" Address �� - < ' ❑ Partner. P Firm/Co. Business Te ep one ?,,/d- <y " 9 Name of Licensed Plumber or Gas FitterY INSURANCE COVERAGE Check 0 e: I have a current liability Insurance policy or it's substantial equivalent. Yes No If you have checked yes,please indicate the type coverage by checking the appropriate box" Liability insurance policy Other type of indemnity ❑ Bond ❑ i Owner's Insurance Waiver: I am aware that the licensee does not have the Insurance coverage required by Chapter 142 of the Mass" General Laws, and that my signature on this permit application waives this requirement. Check one: Signature of Owner or Owner's Agent Owner ❑ Agent ❑ I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts State Gas Code and Chapter 142 of the General Laws" Signature of Licensed Plumber Or Gas Fitter Title ❑ Plumber City/Town ❑ Gas Fitter tcense Number Master APPROVED(OFFICE USE ONLY) 30umeyman Y Date. . . .. ./.Gl!!.!..... .. r � � NORTH TOWN OF NORTH ANDOVER ...�. n - PERMIT FOR GAS INSTALLATION - 9 �9SSACMUSES( + This certifies that . ` i>� . . . . . . . . . . . . . . . has permission for gas installation . . . . . . . in the/buildings of . . . . . . . . . . . . . . . . . . . . . . . . at �. .� 11t . . . . . . . ., North Andover, Mass. Fee. ..,90 Lic. Z. ,7 GAS INSPECTOR It Check# 4630 MASSACHIISET 1S UNIFORM APPUCTO 'FOR PERMIT TO DO GAS FTITING (Type or print) Date - •� `m `C` NORTH ANDOVER,MASSACHUSETTS A Building Locations ! ° �� 7��.��f.+.��� Permit y # Amount$ Owner's Name �� ! New Renovation Replacement Plans Submitted 0 � W z a a O a cn x F W W W O U C7 x zO W 0 z F GC7 H 7 E z �W,, W O O > w H GU.= F W z -14 LQ-1 W z a O O W a O x x O x w A A t7 a U W A 00. H O SUB -BASEM ENT BASEMENT 1ST. FLOOR 2ND . F L O OR 3RD . F L O O R 4TH . FLOOR 5TH . F L O O R 6TH . FLOOR 7TH F L O OR STH . F L O O R (Print or type) j��,,✓� Check one: Certificate Installing Company Name 1 /rU`r fr [ Corp. Address * / n ��f�� `— S FlPartner. Business Telep one 13-Firm/Co. Name of Licensed Plumber or Gas Fitter <1-4J INSURANCE COVERAGE Check one: I have a current liability Insurance policy or it's substantial equivalent. Yes ® No E If you have checked yes,please indicate the type coverage by checking the appropriate box. Liability insurance policy Other type of indemnity Bond �. Owner's Insurance Waiver: I am aware that the licensee does not have the Insurance coverage required by Chapter 142 of the .4. Mass. General Laws,and that my signature on this permit application waives this requirement. Check one: f Owner or Owner's Agent Owner F-1 Agent Signature o g g I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts State G s Code and Chapter 142 of the General Laws. Signature of Licensed Plumber Or Gas Fitter By: ❑Title Plumber City/Town Gas Fitter =eum er Master APPROVED(OFFICE USE ONLY) Journeyman - Date. . . .. ... . NORT1y TOWN OF NORTH ANDOVER � F PERMIT FOR GAS INSTALLATION �9SSACHU5E� Tlis certifies that . . . has permission for gas installation0..1. . . . . . . . . . . . . . . . . in the buildings of . . o. . . . . . . . . . . . . . . . . . . . . . at . . .. .. .... .0 : . . . .rt✓. . . . . . , North Andover, Mass. Fee-. Lic. No���d. . . . . . . . . . . . . . . . . . . . . . . . . . . GASINSPECTOR Check# �� -:, 462 9 MASSACHUSETTS UNIFORM APPUCATON FO ERMIT TO DO GAS FTrrING i° j (Type or print) Date �� d NORTH ANDOVER,MASSACHUSETTS t Building Locations C, a`F Permit# Amount$ Z4 LIr� C19 Owner's Name v New Renovation ❑ Replacement ❑ Plans Submitted ❑ Ln z a w W W ° o Cn x x z o W a a o � $ z H w a z o a w W Cn Q ` W w o W U � F F F z W > W a z a d �6 O O W rr O W F x O x w D A c7 a U SUB -BASEM ENT BASEMENT 1ST . FLOOR 2 N D . F L O O R 3 R D . FLOOR 4 T H F L O O R 5 T H . F L O O R 6 T H F L O O R 7 T H . F L O O R 8TH . F L O O R (Print or type) , Check one: Certificate Installing Company Name 'til C%..- Cone, 5 El Corp. Address ..f (� �' � ❑ Partner. Business Telephone — Y-7? E] Firm/Co. I� Name of Licensed Plumber or Gas Fitter v'� ��2.t rroJ INSURANCE COVERAGE Check one: I have a current liability Insurance policy or it's substantial equivalent. Yes ❑ No❑ If you have checked yes,please indicate the type coverage by checking the appropriate box. Liability insurance policy M, Other type of indemnity ❑ Bond ❑. Owner's Insurance Waiver: I am aware that the licensee does not have the Insurance coverage required by Chapter 142 of the Mass. General Laws,and that my signature on this permit application waives this requirement. Check one: Signature of Owner or Owner's Agent Owner ❑ Agent ❑ i hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the application will �n installations performed under Permit Issued for thisbe in best of my knowledge and that all plumbing work and� s p j compliance with all pertinent provisions of the Massachusett State Gas Code and Chapter 142 of the General Laws. Signature of Licensed Plumber Or Gas Fitter By: Plumber Title Pl ❑❑ fr �.0 ;ter �.�G, .3 City/Town Gas Fitter tcense um er Master El FEICE USE ONLY) JOUtI]eyTllan ROVED o APP c ❑ r Date. .. ,1 NOR T1y 0* TOWN ,.•o MMOL TOWN OF NORTH ANDOVER *000 t - X PERMIT FOR GAS INSTALLATION y �9SSAC NUSEt� - �� � This certifies that . .�. . . . . . . . . . . . �. -4.1 .�: . . . . has permission for gas installation % . in the buildings o . . . . . .' . . . . . . . . . . . . . . . . . . . . . . at . .� � . . . ., North Andover, Mass. Fee. •.& Lic. No.J `FIQ . . . . . . . . . . . . . . . . . . . . . . . . . . GAS INSPECTOR Check# Y 4628 00`' MASSACHUSETTS UNIFORM APPLICATON R PERMIT TO DO GAS FTI TING (Type or print) Date NORTH ANDOVER,MASSACHUSETTS Building Locations Permit# Amount$ 7j C-D Owner's Name ) New F- Renovation ❑ Replacement ❑ Plans Submitted ❑ x �za Uz a Lei CIOx F a a w ° U x a o w a z z o z w W O O F Q x z � o a Q G zw w z x a a w a w F W x C7 F z F z F Ew. y cn aoi z o z O c'n z 9 x O x w p A c7 a a � a 1- O SUB -BASEMENT BASEMENT . 1ST . FLOOR 2 N D F L O O R 3 R D . F L O O R 14 T H . FLOOR 5 T H F L O O R 6 T H F L O O R 7 T H F L O O R 8TH . FLOOR (Print or type)[),` 1 � Check one: Certificate Installing Company Name ,.j��6�s f\. �1 ct�� ❑ Corp. Address ❑ Partner. b, /cam Business Telep one [Z-Firm/Co. Name of Licensed Plumber or Gas Fitter INSURANCE COVERAGE Check one: E I have a current liability Insurance policy or it's substantial equivalent. Yes No❑ If you have checked yes,please indicate the type coverage by checking the appropriate box. Liability insurance policy Other type of indemnity ❑ Bond ❑. Owner's Insurance Waiver: I am aware that the licensee does not have the Insurance coverage required by Chapter 142 of the Mass. General Laws,and that my signature on this permit application waives this requirement. Check one: Signature of Owner or Owner's Agent Owner ❑ Agent ❑ 1 hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts Atate Gas Code and Chapter 142 of the General Laws. Signature of Licensed Plumber Or Gas Fitter Title ❑ Plumber 1l,�e`7 City/Town ❑ Gas Fitter License .Number Master APPROVED(OFFICE USE ONLY) ❑ Journeyman 1 Date. �r „OR,„ TOWN OF NORTH ANDOVER CC 3? •�t�`• �• OC PERMIT FOR PLUMBING f i M ,SSACMU`�� This certifies that . . . . . . . . . . . . . . . has permission to perform . y. . . . . : . . . . . . . . plumbing in the buildings of , . at.mo `lf.� . . . . . . . . . . . . . . . . . . . . . . .. North Andover, Mass. ` ! ]'�l / / Fee. .. . . . .Lic. N9/151//. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PLUMBING INSPECTOR Check H 45890 MASSACHUSETTS UNIFORM APPLICATION FOR PERMIT TO DO PLUMBING (Type or print) NORTH ANDOVER,MASSACHUSETTS E� , f 1 Date Building Location ;` `i 1l 6�J Owners Na e `1 %' i :. Permit# Amount Type of Occupancy New Eo Renovation Replacement F-1 Plans Submitted Yes No FIXTURES x F y+ O z W o W F W U Cn U O w WZA zcc a ao a x > z 4 w �" O U x d a a s o d H SLIXERM BASEvENr IST HJOM 3MHAOM —41H HIM M HJ" 6TH HA" 7Hi FLOCIR 91H FLOM (Print or type) Check one: Certificate Installing Company Name •� i :ry ,���",Ic►,y �!`,` Corp. Address 5Y7 Partner. 6'. Business Teleplione 7F1 — 777-7773775- Firm/Co. Name of Licensed Plumber: �� ./ �'t-A-�� i Insurance Coverage: Indicate the type of insurance coverage by checking the appropriate box: Liability insurance policy 0 Other type of indemnity El Bond ❑ ' Insurance Waiver: I,the undersigned,have been made aware that the licensee of this application does not have any one of the above three insurance Signature Owner Agent g � g ❑ I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the MassachusAtts State Plumbing Code'and Chapter 142 of the General Laws. BY Signature 1.df icense PlumDer Type of Plumbing License � Title -, City/Townicense Numoer Master Journeyman ❑ APPROVED(OFFICE USE ONLY Date.'WAY. "1 oTM�� TOWN OF NORTH ANDOVER .....;. °oma PERMIT FOR PLUMBING ,SSACows E� 1' , This certifies that . . . . .(/ .�! . . .. . . . . . . . . . . . . . . . . . . has permission to perform . . 1. !.,l . . . . . . . . . . . . . . . . . . . . . . . . plumbing in th buildings-of . . . . . �. 1.G� . �-''. . . . . . . . . . . . . . . . .... . . . . . . . . . . . . North Andover, Mass. Fee-�. �. . . .Lic. No../ PLUMBING INSPECTOR Check H 1'! 5889 MASSACHUSETTS UNIFORM APPLICATe ON FOR PERMIT TO DO PLUMBING (Type or print) NORTH ANDOVER,MASSACHUSETTS ' � Date t) C7b. Building Location : !. `i. K/ Owners Name ! Permit# Amount �� a - Type of Occupancy. New Renovation Replacement Plans Submitted Yes No a FIXTURES w a F z o � w x o z a, x c W w �" w Z A 96z a a a w x H h A 3 a w A a A w -etx � x N w 3 .41 s a s 3 x H A Q a aAw>wr >S:FLOOR za11fm IMILOCR 4MHjOCIR 5MHJOCIR 6M rAoCR 7MH gm FIOCR (Print or type) Check one: Certificate Installing Company Name P r.;A�dwd/000 AIN4 513Corp. t (L1,0660���_ 1:1Partner. Address R Business Telephoneei— 3'h -- J � Firm/Co. Name of Licensed Plumber: Insurance Coverage: Indicate t zltype of insurance coverage by checking theappropriate box: Liability insurance policy Other type of indemnity [3 Bond ❑ S Insurance Waiver: 1,the undersigned,have been made aware that the licensee of this application does not have any one of the above s three insurance Signature Owner ❑ Agent E I hereby certify that all of the details and information I have submitted(or entered)in above application are true and accurate to the best of my knowledge and that all plumbing work and installations performed under Permit Issued for this application will be in compliance with all pertinent provisions of the Massachusetts State Plumbin Code and-Chapter 142 of the General Laws. By: Signa re icenseu rium'ner Title Type of Plumbing License City/Town A�4 4a ?icense NumDer Master Journeyman t APPROVED(OFFICE USE ONLY �j 316 � � Date...... t 40RTH 1 ' ``.°.;° "oo� TOWN OF NORTH ANDOVER PERMIT FOR WIRING ,SSACNUSE� This certifies that ........ r. `. ............1..U!.............. ............................... Has permission to perform ........1.�... ............., .............................................. ,wiring in the building of...../ �....�lf ..1 -............................................ .... .. ......................................... Q........................................ ..�ELEcrRICAL rth Andov , ads., (/v l %�j Fee../.......!..:.... Lic.No. I PECTO Check # — Official Use O I Permit No. 3 ateKs°��" Sa�etg Occupancy&Fee Checked BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 12:00 APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code 527 CMR 12:00 (Please Print in ink or type all information) Date To the Inspector of Wires: Town of North Andover The undersigned applies for a permit to perform the electrical work described below. Location(Street&Number ,] � �c� ld'wiY► .S Owner or TenantY f Y ('•r ��/"�� e( Owner's Address ,, a -•. L � S 11 KJ�v Is this permit in conjunction with a building permit ` Yes L9' No ❑ (Check Appropriate Box) Purpose of Building ')4 r Ufility Authorization No. E Asting Service —Amps —ILOVoits Overhead LU/ Undgmd ❑ No.of Meters r New Service Amps Voits Overhead ❑ Undgmd ❑ No.of Meters Nuniiber of Feeders and Ampacity Location and Nature of Proposed Electrical Work i Total No.of Lighting Outlets No.of Hot fuse No.of Transformers KVA Above 0 In ❑ No.of Lighting Fixtures Swimming Pool gmd ❑ grnd ❑ Generators KVA No.of Emergency Lighting No.of Receptacles Outlets No.of Oil Burners Battery Units No.or Switch Outlets No of Gas BumersFIRE ALARMS No.of Zone y Total No.of Detection and No.of Ranges No of Air Cond Tons Initiating Devices Heat Total Total No.^f Di sal No. Pumps Tons KW No.of Sounding Devices --- No./of Sell Contained No.of Dishwashers Space/Area Heating KW Detection/Sounding Devices ❑ Municipal ❑ Other No.of Dryers Heatino Devices KW Local Connection No.of No.of Low Voltage No.of Water Heaters KW Si ns Bailases Wiring No.Hydro Massage Tuds No.of Motors Total HP i OTHER: 47 ` INSURANCE CO\(ERfGE. Purs ant to the requiremen6ts of Massachusetts Gen4.Ao,\J I have a current Lia Insurance Policy including Completed Operations Coverage or its substantial equivalen ES= NO = have submitted valid proof of same to the Office YES= NO = If you have checked YES please indicate the type of coverage by checking the appropriate box INSURANCE = BOND = OTHER (Please Specify) D© (Expiration Date) Estimated Value of Electrical Work$ Work to Start `2 —/ u nInspection Date Resquested Rough Final Signed underthe Penalties of perjury: FIRM NAME LIC.NO. Lkensee Pet lac- J ©l- Gr✓", Signature LIC.NO. /1 �., / i i s Bus.Tel No. Address o � AR Tel.No. OWNER'S INSURANCE WAIVER: t am aware that the Licenses does not have the insurance coverage or its substantial equivalent as required by Massachusetts General Laws.And that rn signature o is permit application waives this requirement Owner Agent (Please Check one) C'Ci�'(iG�t/ t ts-- Telephone No. $ v ( ignature of Owner or A e ) i 3030 Date........ .... ...... .. /.. �f a i NORT►{ TOWN OF NORTH ANDOVER p PERMIT FOR WIRING �,SSACNUS� This certifies that ......f> �� J U��c�q ..... ...... ... .....�.....:...................... has permission to perform ....... ..... ................................. T Y� .. .� wiring in the building of.,.................. ............................................................ -1 at......./.7... ...............4North Andover, Fee... S� Lic.No.�.^ �1 ..... �'r� ,� �.� ELECTRICAL INSPECT6R Check # _L__L— Official Use Only Permit No. Deext oa�udlte Sa�et�y Occupancy&Fee Checked BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 12:00 APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK Ail work to be performed in accordance with the Massachusetts Electrical Code 527 CMR 11j2:00 (Please Print in ink or type all information) Date To the Inspector of Wires: Town of North Andover The undersigned applies for a permit to perform the electrical work described below Location(Street&Number 5r J Owner or Tenant cJ OG Owner's Address Is this permit in conjunction with a building permit Yes No ❑ (Check Appropriate Box) Purpose of Building pUtility Authorization No. Existing Service V /Amps ���O / twitss� Overhead Undgrnd EJ No.of Meters New Service ` ®V Amps ( 2OOr� 9,its NJ0r 4 t"R(Overhead ❑ Undgrnd ❑ No.of Meters Number of Feeders and Ampacity La.ation and Nature of Proposed Electrical Work_ —� Total No.of Lighting Outlets No.of Hot fuse No.of Transformers INA Above ❑ In ❑ No.of Lighting Fixtures Swimming Pool grnd ❑ grnd ❑ Generators KVA No.of Emergency Lighting ; No.of Receptacles Outlets No.of Oil Burners Battery Units No.of Switch Outlets O No of Gas Burners FIRE ALARMS No.of Zone Total No.of Detection and No.of Ranges ✓ No of Air Cond Tons Initiating Devices Heat Total Total No.of Di osal / No. Pumps Tons KW No.of Sounding Devices _ No./of Self Contained f No.of Dishwashers Space/Area Heating KW Detection/Sounding Devices ❑ Municipal ❑ Other 'No.of D rs Heating Devices KW Local Connection No.of No.of Low Voltage No.of Water Heaters KVN Signs Bailases i Wiring No.Hydro Massage Tuds No.of Motors Total HP y OTHER: INSURANCE COVERAGE. Pursuant to the requiremen6ts of Massachusetts General Laws I have a current Liability Insurance Policy including Completed Operations Coverage or its substantial equivalent YES= NO = have submitted valid proof of se Office YES= NO = u have checked YES please indicate the type of coverage by checking the appropriate box. INSURANCE = BOND = THER = (Please Specify) e YM f- t.c - hh` (Expiration Date) Estimated Value of Electric 1 Work$ o6 Work to Start 0�- Inspection Date Resquested �-�-� Rough Final Signed under the Penalties of perjury: FIRM NAME LIC.NO. Licensee C 1~ Signature Q LIC.NO. Bus.Tel No. Address acs Alt Tel.No. OWNER'S INSURANCE WAI ER: I amaway hat the Licenses does not have the insurance coverage or its substantial equivalent as required by Massachusetts General Laws. d that my signature o s permit application waives this requirement. Owner Agent (Please Check one) Telephone No..?Z /5 r75�MIT FEE $ Signature of Owner or en Location �• No. Date �� y NORTIy TOWN OF NORTH ANDOVER F w • y Certificate of Occupancy $ Building/Frame/Frame Permit Fee $ S cMusE 9 Foundation Permit Fee $ Other Permit Fee $ //,, f TOTAL $ 7�� 3 d Check #,5-,O/ 1874 Building Inspector TO" OF NORTH ANDOVER BUILDING DEPARTMENT APPLICATION TO CONSTRUCT WA RENOVAT I, OR DEMOLISH A ONE OR TWO FAMILY DWELLING BUII,DING PERNIIT NUMBER: DATE ISSUED: 3 SIGNATURE. Building Commissioner/I r of Buildings Date Z SECTION 1-SITE INFORMATION O It1.1 Property p � Assessors Map and Parcel Number: Map Number Parcel Numb 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area Fronto ft 1.6 BUILDING SETBACKS ft Front Yard Side Yard Rear Yard ReqWred Provide Reqlfired Provided ReqWred Provided - v 1.7 Water Supply M.C.L.C.40. 54) 1.5. Flood Zone Information: 1.8 Sewerage Disposal System: Public ❑ Private ❑ Zone Outside Flood Zone ❑ Municipal ❑ On Site Disposal System ❑ SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT Historic-District: Yes No rn 2.1 Owner of Record r� 4 IQ "Name(Print) dress for Service: Signature Telephone 2.2 Owner of Record: Nime Print Address for Service: ,4 M Signature Telephone SECTION 3-CONSTRUCTION SERVICES 90 3.1 Licensed Construction Supervisor: Not Applicable 0 Licensed Construcfion-Supenikr O — ��V�/t. License Number two Aq Expiration Date Signature Telephone 3.2 Registbred Home Imvement Contractor Not Applicable ❑ 44, Company Name rn Registration Number r Address r usual Expiration Date z Signature Telephone G) SECTION 4-WORKERS COMPENSATION(XG.L C 152 § 25c(6) Workers Compensation Insurance affidavit must be completed and submitted with this application. Fail a to provide this affidavit will result in the denial of the issuance of the buildingpermit. Signed affidavit Attached Yes.......0 No.......0 SECTIONS Descri tion of Proposed Work check all applicable) New Construction ❑ Existing Building ❑ Repair(s) ❑ Alterations(s) ❑ Addition ❑ Accessory Bldg. 0 Demolition 0 Other ❑ Specify Brief Description of Proposed Work: SECTION 6-ESTIMATED CONSTRUCTION COSTS ItemEstimated Cost(Dollar)to be OFF�CIA DISE�'"M Completed b permit a licant �. # 1. Building �� (a) Building Permit Fee / Multiplier__ 2 Electrical (b) Estimated Total Cost of Construction 3 Plumbing Building Permit fee(a)X (b) 4 Mechanical HVAC 5 Fire Protection 6 Total 1+2+3+4+5 Check Number G SECTION 7a OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUII.DING PERMIT I, as Owner/Authorized Agent of subject property Hereby authorize to act on My behalf,in all matters relative to work authorized by this building permit application. Signature of Owner Date SECTION 7b OWNER/AUTHORIZED AGENT DECLARATION 1, ,as Owner/Authorized Agent of subject property Hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief Print Name Signature of Owner/Agent Date NO.OF STORIES SIZE BASEMENT OR SLAB SIZE OF FLOOR TIMBERS 1 ST 2 ND 3FD SPAN ! DIMENSIONS OF SILLS DIMENSIONS OF POSTS DIMENSIONS OF GIRDERS HEIGHT OF FOUNDATION THICKNESS SIZE OF FOOTING X MATERIAL OF CHIlVINEY IS BUILDING ON SOLID OR FILLED LAND IS BUILDING CONNECTED TO NATURAL GAS LINE to `* BOARD' OAD ��_ ✓ j O F m B UI Lice L cense: CD►NG RE ONSTRUCTION SUPERVISOR ' Number: CS ERVISOR Birthdate: 10/i 0594311 3/1968 j yI Expires: j _10/13/2006 ALEX R Restricted: 00 7r, 10: 4385.0 95 GATELY MED ORD R RD i MA 02185.. G— j Commissioner DATE CERTIFICATE OF LIABILITY INSURANCE 09/13/2005) PRODUCER (617)484-4114 FAX (617)484-5155 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Sico & Wal-sh Insbrance •Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 106 Concord Ave. HOLDER.THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O.Box 136 Belmont, MA 02478 INSURERS AFFORDING,COVERAGE NAIC# INSURED L & H Construction,Inc. INSURERA: OneBeacon Insurance Co. 0017 99 Grover Road INSURERB: Renaissance Ins. Agency, Inc. Medford, MA 02155 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR D TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ CLAIMS MADE a OCCUR MED EXP(Any one person) $ A PERSONAL 8 ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS•COMP/OP AGG $ POLICY PRO• JECT LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ ANY AUTO CBXB24525 12/01/2004 12/01/2005 (Ea accident) ALL OWNED AUTOS BODILY INJURY $ X SCHEDULED AUTOS (Per person) 1,000,000 X HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) 1,000,000 X PROPERTY DAMAGE (Per accident) $ P _ 1,000,000 GARAGE LIABILITY AUTO ONLY•EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $ OCCUR Q CLAIMS MADE AGGREGATE $ $ DEDUCTIBLE $ RETENTION $ 8 ATLIWORKERS COMPENSATION AND WC STIMIT OTH- S FR EMPLOYERS'LIABILITY WC000822 05%09/2005 05/09/2006 E.L.EACH ACCIDENT Is 500,000 B ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E.L.DISEASE•EA EMPLOYE $ 500,000 M yes,describe under SPECIAL PROVISIONS below E.L.DISEASE•POLICY LIMIT 1$ 500,000 1FALLATION FLOATER QBR770122 05/15/2005 05/1S/2006 LIMIT $50,000 A DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS Project: Window Replacement Project #196017 DPA ]OB #R05-02-106, Veteran's Housing, North Andover,MA CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, NORTH ANDOVER HOUSING AUTHORITY BUT FAILURE TO MAIL CH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY ONE MORKESKI MEADOWS OF ANY UPO HE INSU ER,ITS ENTS O EPRESENTATIVES. NORTH ANDOVER, MA 01845 AUTHO ED RE ATIV ACORD 25(2001/08) CACORD CO TION 1988 OP ID CERTIFICATE OF LIABILITY INSURANCE DATE(MM1DD/YY L&HCO- 5 1 09 12 05 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE DeSanctis Insurance Agcy, Inc. HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 36 Cummings Park ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Woburn MA 01801 Phone: 781-935-8480 Fax:781-933-5645 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A: Harleysville Worcester Ins Co INSURER B: L & H Construction, Inc. INSURER C: 99 Grover Road INSURER D: Medford MA 02155 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LPOLICY EFFECTIVE POLICY EXPIRATION TR NSIRC TYPE OF INSURANCE POLICY NUMBER DATE MM/DD/Yl DATE MM1DD/YY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 rRtu A X COMMERCIALGENERAL LIABILITY GL9G3213 05/15/05 05/15/06 PREESocc MIS (Eaurence) $ 100,000 CLAIMS MADE a OCCUR MED EXP(Any one person) $ 5,000 X XCU EXcl deleted PERSONAL&ADV INJURY $ 1,000,000 X Broad Form Prop GENERAL AGGREGATE s2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG s2,000,000 POLICY PRO• ]j POLICY7 LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT ANY AUTO (Ea accident) $ ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $2,0001,000 A X OCCUR 7 CLAIMS MADE BE9G3212 05/15/05 05/15/06 AGGREGATE s2,000,000 DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND TORY LIMITS ER EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYEE $ K describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ OTHER DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS "ADDITIONAL INSUREDS LIMITS ARE NO GREATER THAN THOSE REQUIRED BY WRITTEN CONTRACT". Additional Insured as respects GL: North Andover Housing Authority and Department of Community Affairs. PROJECT: Window Replacement Project #196017, DPA Job #R05-02-106, Veteran's Housing, N.Andover, MA CERTIFICATE HOLDER CANCELLATION NORIA-8 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRAT DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITT& North Andover Housing NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHAI Authority IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR One Morkeski Meadows North Andover MA 01845 REPRESENTATIVES. AUTHORIZED R ESENTATIVE ACORD 25(2001/08) © RD CORPORATION 1S ti OWNER-CONTRACTOR AGREEMENT Commonwealth of Massachusetts Department of Housing and Community Development This agreement made the 1 2iay of Sept 2005by and betweenN.Andover Housing Authority hereinafter called the"Owner', and L & H Construction Inc. hereinafter called the"Contractor Name of Contractor Mitnesseth,that the Owner and the Contractor, for the consideration hereinunder named,agree as follows: Article 1. Scope of Work: The Contractor shall perform all Work required by the Contract Documents for Window Replacement #196017 referred to in the Contract Documents prepared by Description of Project Design Partnership Architects, Inc♦ l; acting as and referred to as the"Architect" Architect/Engineer i Article 2. Time of Completion: The Contractor shall commence work under this Contract on the date specified in the written Notice to Proceed"and shall bring the Work to Substantial Completion within 9 0 calendar days of said date Days. Damages for delays in the performance of the Work shall be in accordance with Article 9 of the General Conditions of the Contract. Article 3. Contract Sum: The Owner shall pay the Contractor, in current funds, for the performance of the Work, One Hundred Forty One Thousand 'Eight hundred Dollars$ 141,830 .00 Contract Amount in Words lr y Contract Amount in Dollars The Contract Sum is divided.as follows: Item 1: The Work of the Contractor, being all Work other than that covered by Item 2 $ 141,8,3 0 . 0 0 Item 2: Subcontractors as follows Section-Trade Subcontractor Amount 1 2 $ 3 $ 4 $ 5 $ 6 $ 7 $ $ $ 9 $ Fax: 781-396-2576 781-395-1788 $ J � x � W L & H Construcifio 1 Inc. Ilowing, together with this Agreement, form the Contract and all are General Contractor D this Agreement or repeated herein: The Advertisement, Bidding the Contract, and Specifications as enumerated in the Table of e List of Contract Drawings, DHCD g publication known as the 99 Grover Road Liliane Gately issued after execution.of the Contract. Terms used in this Medford,MA 02155 President ns of the Contract shall have the meanings designated in those DHCD$100K-$10M Owner Contractor Agreement c149 08/2004 1 of 2 Article 5. Alternates: The following Alternates have been accepted and their costs are included in the Contract Sum stated in Article 3 of this Agreement: Alternate No(s): and Article 6. REAP Certification: Pursuant to M.G.L. c.62(c), .sec.49(a), the individual signing this Contract on behalf of the Contractor, hereby certifies, under the penalties of perjury, that to the best of their knowledge and belief the Contractor has complied with all laws of the Commonwealth relating to taxes, reporting of employees and contractors,and withholding and remitting child support. Article 7.Validation: This Contract will not be valid until signed by the Director of the Massachusetts Department of Housing and Community Development. In Witness Whereof, the Parties Hereto Have Caused This Instrument to be Executed Under Seal. ' CONTRACTOR ­AWARDING AUTHORITY L & H Construction Inc. North Andover Hous ' ng Authority Name of Contractor Name of Ho i Authority 99 Grover Road, Medford, MA Address Si nature d I By: Signatu and S Title Witness Attest: If a Corp ation,attach a arize copy of the Z If signed by someone other than a Housing Authority Corporate Vote authorizing signatory to sign Contract. Board member attach a copy of Certified Board Vote authorizing the signatory to sign Contract. DEPARTMENdOF SIN UNITY DEVELOPMENT In ac M.G.L. 71B, and Revisions thereto. irector Date DHCD$100K-$10M Owner Contractor Agreement c149 08/2004 2 of 2 North Andover Housing Authority Joanne M. Comerford, Executive Director One Morkeski Meadows (978)682-3932 North Andover,MA 01845 (978)794-1142 FAX (800)545-1833 Ext.378 TDD j comerford(c�nortliandoverha.com October 11,2005 Ms.Liliane Gately,President L&H Construction,Inc. 99 Grover Road Medford,MA 02155 RE:State Aided Project: 200-1;Window Replacement;DHCD Fish#196017 NOTICE TO PROCEED Ms.Liliane Gately: Pursuant to the terms of the Contract dated September 12,2005,for the Window Replacement for this Authority,at Project 200-1,you are hereby notified to commence work at the start of the business day on November 8,2005. The time for the completion of said work,as set forth in the Contract is ninety(90) consecutive calendar days,including the starting date which establishes February 6,2006 as the Contract Completion Date. You are informed that Ms.Joanne Comerford has been appointed Contract Officer and is duly authorized to administer your Contract for and in the name of this Authority. In case of her inability to act in this capacity at any time,Ms.Linda Donovan has been designated as an alternative. You are instructed to submit,without delay,your Construction Progress Schedule and a breakdown of your Construction Price on a copy of the Application for Payment continuation sheet. A copy of the continuation sheet can be found at Appendix C-24 of the CONSTRUCTION HANDBOOK. You will receive under separate cover one(1)executed set of Contract Documents,Specifications,and Drawings. Please acknowledge receipt of this correspondence by executing and dating the original and three(3)copies of this Notice and returning the noted three(3)copies to this Authority. Our tax-exempt number is 04-2427248. Sincerel , ;/anne M.Comerford,PHM Executive Director Accepted: L&H CcqstructionA Inc. By: Date: Equal Housing Opportunity NORTH Town of : _ 4Andover No. Y _ - - o =_ A dover, Mass., COCMICMEWICK ADRATED V?�\ �C:) `S BOARD OF HEALTH PERMIT T D Food/Kitchen Septic System • THIS CERTIFIES THAT. .......... a�:'�� BUILDING BUI INSPECTOR . ..... f ... . """' Foundation has permission to erect.... .............................. buildings on ........... ..., � ..�.....�.. ��� Rough to be occupied as......... Chimney provided that the erso ac tiR phi ermshall in eve respect conform thr of�he acatio n i P P P g P every P PP Final this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTION TS Rough .............. ...... .. Service..... ... .... .... BUI D G INSP Final Occupancy' Permit Required to Occupy Building GAS INSPECTOR Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. IF SEE REVERSE SIDE Smoke Det. Town of North Andover r Office ®f the Zoning Bard ®f Appeals �g , Community Development and Services Division h V 27 Charles Street NorthAndover,Massachusetts 0".81.5. HE �vLiV�Ss � ►+ 4. 2 c D. Robert Nicetta Telephone (978)688-9541 Building Commissioner Fax(978) 688-9542 This is.to certify that twenty(20)days hive elapsed from date of decision,filed without filing of an a peal. Date Joyco k BfadehaW Any appeal shall be filed Notice of Decision Town Clef within(20)days after the Year 2002 date of filing of this notice in the office of the Town Clerk. Property at: 14-16 Baldwin Street NAME: Peter G.Jordan HEARING(S): November 12,2002 ADDRESS: 14-16 Baldwin Street I PETITION: 2002-046 North Andover,MA 01845 TYPING DATE: 11/14/02 The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,November 12,2002 at 7:30 PM upon the application of Peter G.Jordan,14-16 Baldwin Street,North Andover,requesting a dimensional Variance from Section 7,Paragraph 7.3,and Table 2, for relief of front setback and left side setback in order to add a garage,and a Variance from Section 8,Paragraph S.i for relief of requirements for off street parking; and for a Special Permit from Section 9,Paragraph 9.2 to allow for the extension of an existing 2 dwelling unit structure on.a pre-existing non-conforming lot in order to add 2 more dwelling units on a proposed second floor. y m Said premise affected is property with frontage on the West side of Baldwin Street within the R-4 zoning district. y+a The following members were present: William J. Sullivan,Walter F. Soule,Robert P.Ford,John M. Pallone, Scott A. Karpinski,Ellen P.McIntyre,George M.Earley,and Joseph D.LaGrasse. Upon a motion by Scott A.Karpinski and 2nd by Ellen P.McIntyre,the Board voted to GRANT a dimensional Variance from Section 7,Paragraph 7.3,and Table 2 for relief of 2.2' from the front setback,and 8.8' from the south side setbiavk per Plvt 1.3 yr Propased Add'*on im Morµ':Ando-,1`,xa ssac iusetts,v y e ober 29,20002,Yj eY'u c' 'by Edward J.Farrell,Professional Land Surveyor#34613, 110 Winn Street,Suite 203,Woburn,MA_ (781)933- 9012, [parking]Option 4;and to GRANT the Special Permit for relief from Section 9,Paragraph 92 to allow for the extension of an existing 2 dwelling unit structure on a pre-existing,noxi-conforming lot in order to add 2 more dwelling units on a proposed second floor,per Peter L. Sandorse,Phoenix Collaborative Architects,9 Foster Street, Wakefield, MA 01880,781-246-0988,dated 6-19-02,rev 11-21-02, on the condition that the petitioner supply a Mylar of Plot Plan, Option 4.. The Board finds that the Plot Plan, [parking]Option 4 meets the requirements of Section 8,Paragraph 8.1 for off street parking. Voting in favor: Walter F. Soule,Robert P.Ford,John M. Pallone, Scott A. Karpinski,and Ellen P.McIntyre. The Board finds that the applicant has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning Bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the Zoning Bylaw and that the applicant has satisfied the provisions of Section 9,Paragraph 9.1 &9.2 of the zoning bylaw and that such change,extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood ATTEST: A True Copy Pagel oft `=own Clerk. Board of Appeals 688-9541 Building 6RR-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 .... { - Town of 1Wo14h Andover � � "ORTH O tt�eo ,6'�y Office of the Zoning Board of Appeal;: Community Development and Sere `' i4 � 27 Charles StreetNORDOVER North Andover,Massachusetts 01845 SS�cHuSEs D. Robert Nicetta zJ1 NOV Leoiq978) 688-9541 Building Commissioner Fax(978)688-9542 Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the grant,it shall-lapse,and may be reestablished only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)year period from the date on which the Special Pear it was granted unless substantial use or construction has commenced, it shall lapse and may be re-established only after notice,and a new hearing. Town.of North Andover Board of Appe Is, A ! - 1 William J. Sull�an,Chairman i L Plot Plan [parking]Option 4 attached. Decision 2002-046. Page 2 of 2 Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 120.03 EXI;gTING CHAIN LINK FENCE EXISTING STOCKADE FENCE I 5 Proposed ASSESSOR'S MAP 9 LOT 5 Shrubs © 0 O N F. O ASSESSOR'S MAP 9 JAMES C. & TAMARM L. O va LOT 3 EXIS77NG TREES ERB rn Bituminous & FENCE Bituminous 36' m 24' 1.17!_& 2nd 6.4' Fpr Deck 4 #6_#8 Proposed Garage i — 15' /24 i #14–#16 Q rn 2 Spaces With Proposed 2nd y y Story Addition' n 0 6.2 Q ° ' , � a 28.9' Proposed ASSESSOR'S MAP 9 LOT 74 Note: � � Proposed Park/ng Spaces Drive N N/F to be 9 X18' KURT & LAURIE l BURZLAFF W ! P� 120.00' ZONING DISTRICT – R4 BALD YY IN ^7� f REEr(PUBLIC – 50' WIDE) EXISTING/ l TEM REQUIRED PROPOSED 4 EXISTING SEWER LOT AREA: 12,500 S.F. 11,780 S F. TOWN OF NORTH ANDOVER LOT FRONTAGE.- 100' 120' EXISTING WATER BOARD OF APPEALS FRONT YARD: 30' 27.8' EXISTING 29.4' PROPOSED PLOT PLAN SIDE YARD: 15' 28 9 EX/ST/NG MR viAR 6.2 PROPOSED PROPOSED Co �d. ADDITION FARRELL REAR YARD: 30' 45.5' EXIS77NGN edo.34e13� j 33.4' PROPOSED NORTHAND-.OIAER, MASSACHUSETTS � !a yFFg5t0'P RECORD OWNER_ SCALE 1 =20' SEPTEMBER 2-9,2002 SaR PREPARED BY PETER JORDAN EDWARD JFARRELL . ^� BOOK 1178 PAGE 433 PROFES$1ONAL LAND SURVEYOR ( ' PLAN NUMBER 4337 110 WINN STREET-SUITE 203-WoBURN,MA. OPTION 4 (781)933.9012 DA 1E? a E NORTH REGISTRY OF DEED MASS.a� A TRUE COF'Y: ATTEST: ..P sscc `i O FZEGiSTER OF DEED t i I i Registry of heeds Northern District of Essex County Lawrence, IIA 01840 1?l19l02 UP Re,-_.- I— 10.0' rInst f COP ie-.. 1,Oct A. i 7u+Ji,at; P. 2.0.00 Total 'IHI'i:i IOU' lilUfiti7C T. i The Commonwealth of Massachusetts Office Use Only Lt-=1- /� / -• r; Permit No.;ri Department of Public Safety BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 12:00 Occupancy & Fee Checked 3190 (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL ORI( All work to be performed in accordance with the Massachusetts Electrical Code,527 CMR 12:00 (PLEASE PRINT IN INK OR TYP L INFO ATIO Date City or Town of To the Inspector of Wires: The undersigned applies for Wrmit to for he a trical w described below. Location (Street & Number) Owner or Tenant Owner's Address Is this permit in conjunction with a buildigmit yes no ❑ (Ch=* pp t Purpose of Building Utility Authorization No. �_� Existing Service mpsVolts Overhead ❑ Undgrd ❑ No. of Meters New Service AMPS / �Volts�. Overhead X'Undgrd 17, No. of Meters Number of Feeders and Ampacity Location and Nat;!+'e of Proposed Electrical Work TOTAL No. of lighting Outlets No. of Hot Tubs No. of Transformers KVA Above In No. of Lighting Fixtures Swimming Pool grnd.❑ rnd❑ Generators KVA No. of Emergency Lighting No. of Receptacle Outlets No. of Oil Burners Battery Units No. of Switch Outlets No. of Gas Burners FIRE ALARMS No. of Zones TOTAL No. of Detection and No. of Ranges No. of Air Conditioners TONS Initiating Devices HEAT TOTAL TOTAL No. of Sounding Devices No. of Disposals No. of Pumps TONS KW No. of Self Contained No. of Dishwashers Space/Area Heating KW Detection/Sounding Devices Municipal No. of Dryers HeatingDevices KW Local ❑ Connection ❑Other No. of No. of Low Voltage No. of Water Heaters KW Signs. Ballasts Wiring No. of Hydro Massae Tubs No. of Motors Total HP OTHER: INSURANCE COVERAGE: Pursuant to the requirements of Massachusetts General Laws I have a current Liability Insurance Polic including Completed Operations Coverage or its substantial equivalent. YES ❑ I heave submitted valid proof of same to this office. YES - NO If you have chc k d YES, please indi a the type of coverage by checkin a ppropriate box. INSURANCE\.., BOND ❑ OTHER ❑ (Please Specify) ✓ (Expiration Date) Estimated Value of Electrical Work $ Work to Start Inspection Date Requested: Rough Final Signed under th e all f perjury FIRM NAMELIC. NO Lice6nse Signatu LIC. NO. Y AddBus. tel. No.'-5JAlt. Tel. No.OW 'S INSURANCE WAIVER: I am aware that the Licensee does not have the insurance coverage or its substantial equivalent as required by Massachusetts General Laws.. and that my signature on this application waives this requirement. Owner Agent (Please check one) Telephone No. PERMIT FEE (Signature of Owner or Agent) / 1242 4, TOWNOF NORTH ANDOVER '0 ' aQ PERMIT FOR WIRING SSACHU This certifies that ........ ..... .. .. .......... .......a ............. ... ... ....... ........ . . CU has permission to perform .... .... ..... ... ......... ...................... w'i ng m ...... . .... ................................................. I ng in the building of.4��... ... . ...;....... p CU at.. . X ..... ....................... .North Andover,Mass. <'> a 7,7 Fe .... .... Lic. .........—lif .. ............................................................ # ELECTRICAL INSPECTOR WHITE:Applicant CANARY: Building Dept. PINK:Treasurer �h .� `�s � .. _ -�.Vic., '�: � - ... .. _ .. .. .- ... .. ... _ i nze� The Commonwealth of Massachusetts Office Use Only Permit No. 7 Department of Public Safety � BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 12:00 Occupancy & Fee Checked_� 9' ^� /. 3/90 (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code,527 CMR 12:00 (PLEASE PRINT IN ORT E ALL INF MATION Date 10y,17 / •/ City or Town of To the Inspector of Wires: ?he undersigned a ies for permit top form the ele ical wo 'described below. Location (Street & Number) Owner or Tenant Owner's Address Is this permit in conjunction with a buildin ermit�J yes no ❑ (Ch- k Appro riat 0 Purpose of Building 01 Utility Authorization No. Existing Service Amps i Volts Overhead ❑ Undgrd ❑ No. of Meters C New Service mps Volts Overhead ❑ UndgrdWj No. of Meters Number of Feeders and Ampacity Location and Nat-:e of Proposed Electrical Work 44 ,�j TOTAL No. of lighting Outlets !,_ No. of Hot Tubs U No. of Transformers KVA Above In No. of Lighting Fixtures Swimming Pool grind.❑grnd❑ Generators KVA No. of Emergency Lighting No. of Receptacle Outlets No. of Oil Burners Battery Units No. of Switch Outlets No. of Gas Burners /.1� FIRE ALARMS No. of Zones TOTAL No. of Detection and No. of Ranges ® No. of Air Conditioners TONS Initiating Devices HEAT TOTAL TOTAL No. of Sounding Devices No. of Disposals No. of Pumps TONS KW No. of Self Contained No. of Dishwashers � Space/Area Heating KW Detection/Sounding Devices ❑No. of Dryers HeatingDevices KW Local Municipal Connection ❑Other No. of No. of Low Voltage No. of Water Heaters KW Signs Ballasts Wiring No. of Hydro Massae Tubs No. of Motors Total HP OTHER: INSURANCE COVERAGE: Pursuant to the requirements of Massachusetts General Laws I have a current Liability Insurance Policy including Completed Operations Coverage or its substantial equivalent. YE S> NO C1I haave submitted valid proof of same to this office. YES NO '_ If you have checked YES, please indicate the type of coverage by checki� the appropriate box. INSURANCE BOND El OTHER ❑ (Please Specify) _ (Expiration Date) Estimated Value of Electrical Work $ Work to Start Inspection Date Requested: Rough Final Signed under the alti of _ FIRM NAME LIC. NO. Licensee Signatur LIC. NO. Address Bus. tel. No. 4o � P� Alt. Tel. No. _ OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the insurance coverage or its substantial equivalent as required by Massachusetts General Laws, and that my signature on this application waives this requirement. Owner Agent (Please check one) _ - ___Telephone No. PEHMIT FEE $ (Signature of Owner or Agent) t: Date fig - .:. 11243 ... � ' k f NORTH, "ao� TOWN OF NORTH ANDOVER A p PERMIT FOR WIRING ,SSwCMUSE� a M II � . This certifies that � -1 ,..................................................................... . .................. ... has permission to perform wiring in the building of.... ............ !................. ......... ` o, at....... .. .� ............................... ............... ,North Andover,Mass. Fee�!� 1.......... Lic.No.�! ?�7............................................................. p /JELECTRICAL INSPECTOR � WHITE:Applicant CANARY: Building Dept. PINK:Treasurer . . _. .. n� ., r .. . ,.. � pOHTN Zoning Bylaw Denial Town Of North Andover Building Department 27 Charles St. North Andover, MA. 01845 s1H°5g Phone 978488-9545 Faz978488-9542 ...-Street: .. Ma /Lot: ,3 Applicant: Re uest: Nef Floor, a 6dj AcP i taa,a / 1 -elb" Uur i Date: S3 /3 d ca- Please be advised that after review of your Application and Plans that your Application is DENIED for the following Zoning Bylaw reasons: Zoning Item Notes Item Notes A Lot Area F Frontage 1 Lot area Insufficient y es 1 Frontage Insufficient 2 Lot Area Preexisting - H s 2 Frontage Complies 3 Lot Area Complies 3 Preexisting frontage Lf 4 Insufficient Information 4 Insufficient Information B Use 5 No access over Frontage 1 Allowed G Contiguous Building Area N/A 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 Special Permit Required y e-5 3 Preexisting CBA 5 Insufficient Information 4 Insufficient Information C Setback H Building Height 1 All setbacks comply 1 Height'Exceeds Maximum 2 Front Insufficient `2 CoriTS'plies e 3 Left Side Insufficient 3 Preexisting Height 4 Right Side Insufficient 4 Insufficient Information 5 Rear Insufficient I Building Coverage r1 a 6 Preexisting setback(s) 1 Coverage exceeds maximum 7 Insufficient Information 2 Coverage Complies D Watershed 3 Coverage Preexisting 1 Not in Watershed ,e,5 4 Insufficient Information 2 In Watershed j Sign N 14 3 Lot prior to 10/24/94 1 Sign not allowed 4 Zone to be Determined 2 Sign Complies 5 Insufficient Information 3 Insufficient Information E Historic District K Parking 1 In District review required 1 More Parking Required 5 2 Not in district 2 1 Parking Complies 3 Insufficient Information 3 1 Insufficient Information 4 —Pre-existing Parkin Remedy for the above is checked below. Item # I Special Permits Planning Board Item # Variance Site Plan Review Special Permit C 3 Setback Variance Access other than Frontage Special Permit A-' Parking Variance Frontage Exception Lot Special Permit Lot Area Variance Common Driveway Special Permit Height Variance . Congregate Housing Special Permit Variance for Sign Continuing Care Retirement Special Permit Special Permits Zoning Board Independent Elderly Housing Special Permit Special Permit Non-Conforming Use ZBA Large Estate Condo Special Permit Earth Removal Special Permit ZBA Planned Development District Special Permit Special Permit Use not Listed but Similar Planned Residential Special Permit Special Permit for Sign R-6 Density Special Permit Special Permit preexistinq nonconforming Watershed Special Permit The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies,misleading information,or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department.The attached document titled"Plan Review Narrative"shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file.You must file a new building permit application form and begin the permitting process. Building Department Official Signature Application Received Application Denied Denial Sent: If Faxed Phone Number/Date: :1 Plan Review Narrative $#. The following narrative is provided to further explain the reasons for denial for the application'l. permit for the property indicated on the reverse side: £m [ 3 N 1 � MM S -ecia � I,Mr �2r 7h�e 0 - 3 v4RiaNcc v ,� Qt ' Sir�.� S'-cIiAc /� o� C-0 a� �nJ e -ec ra U.42i8r dr.e Referred To: Fire Health Police ,!� Zonin Board Conservation De artment of Public Works Planning Historical Commission Other BUILDING DEPT TOWN OF NORTH ANDOVER BUILDING DEPARTMENT APPLICATION TO CONSTRUCT REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING k: •casri+' ,y"m£ ,,,s til - - V - r.-4• '~ This Section for Official Use Onl '_ �ry5ic BUILDING PERMIT NUMBER: DATE ISSUED: Z O SIGNATURE: Buildin Commissioner/I or of Buildings Date 1.1 Property Address: 1.2 Assessors Map and Parcel Number: 14-16 Baldwin Street North Andofte A Map Number / Parcel Number j1.3Zoning Information: 1.4 Property Dimensions:P3A Zonin District a Lot Area Frortta e ft 1.6 BUILDING SETBACKS(ft) m Front Yard Side Yard Rear Yard Required Provide Required J (� (Provided U +Required Provided 1.7 Water Supply M.G.L.C.40. 54) 1.5. Flood Zane Information: t 1.8 Sewerage Disposal System: Public 0 Private ❑ ZOIIe Outside Flood Zone ❑ Municipal On Site Disposal System ❑ 2.1 Owner of Record Peter Jordan 14-16 Baldwin St. , North Andover,MA O Name(P t) Address for Service: ( 978) 658-0709 m Signature Telephone X 2.2 Authorized Agent Name Print Address for Service: Z O Signature Telephone z m tO 7 uH 1A OUR 90 3.1 Licensed Construction Supervisor Not Applicable ❑ Address License Number O Licensed Construction Supervisor: Expiration Date ic Signature Telephone r< 3.2 Registered Home Improvement Contractor Not Applicable ❑ 0 Company Name- Registration Number m r Address r Expiration Date Z Signature Telephone i i i i s1rtC?�rbly ►1ec>,» � Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. E Signed affidavit Attached Yea.......❑ No.......❑ SECTIOAt 5 PROFI SIONAL 1bESI�A 06 W"NSrRUVICI�S Ft��B ANGS ANlEt" '>Cons CONS IRUCTI®N C 0 1" >�1TR�UL t1Rx TJ►X89 '1R +t7�1Nfl+ STD 35,E C F.41 C1D: 'AC 5.1 Registered Architect: Peter Sandose, Pheonix Collaborative Architects Name: 9 Foster Street, Wakefield, MA Address (781 ) 24690988 Signature Telephone 5.2 Regised ProYessi►�a� 3r{x>< , >j,�..-��' . Muth "t Ares' kibil *� " 1 Name: . t Registration Number Address: Expiration Date Signature Total Not applicable ❑ Name: Registration Number , Address Signature Telephone Expiration Date I p Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date I - Name Area of Responsibility Address Registration Number 1 Signature Telephone Expiration Date Q. Not Applicable ❑ Company Name: Responsible in Charge of Construction f ,'�,• J�7,�� ��_.�F�i.# � �,E1.}iY�W.4GSYk�1!'���bRVl�r� + New Construction )] Existing Building Repair(s) ❑ Alterations(s) ❑- Addition 1 Accessory Bldg. ❑ Demolition 'Other ❑ Specify Brief Description of Proposed Work: Removal of existing roof, Addition of second floor, garage and back deck USE GROUP Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ IA ❑ A4 ❑ A-5 ❑ 1 B � ❑ B Business ❑ 2A ❑ C Educational ❑ 2B ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ IInstitutional ❑ 1-1 ❑ I-2 ❑ I-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND OR CHANGE IN USE Existing Use Group: / Proposed Use Group: Existing Hazard Index 780 CMR 34: V Proposed Hazard Index 780 CMR 34: ` , BUILDING AREA EXISTING if applicable) PROPOSED Number of Floors or Stories Include Basement levels Floor Area per Floorsf) N)Y \ T- 4 ceN e- Total Areas Total Height ft ✓ ?21-255 _ .. w Independent Structural Engineering Structural Peer Review Required Yes ❑ No , SECTION 10a Owner Authorization- TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I Peter Jordan as Owner of the subject property > p luny Hereby authorize to act on I' ,I My behalf 'n all iters Tela ' two w rk authorized by this building permit application ` Si tune of Owner/ Date i � a - S I, Peter Jordan ,as Owner/Ai9¢orkad Hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury Peter Jordan Print N e Signature of Owner/ Date Item Estimated Cost(Dollars),to be � � " f S Completed bypenrut applicant � 1. Building /,+ (a) Building Permit Fee Multiplier 2 Electrical (b) Estimated Total Cost of Construction from(6) 3 Plumbing Building Permit fee (a) x(b) 4 Mechanical(HVAC) , t 5 Fire Protection 6 Total (1+2+3+4+5) Check Number a(.rY: �.....,�,� 1 n� ��t.^V� zS � �Y..:y�L3 #i 1!.:s s.��wr �t1� �s't^';r'y y�,�ft•W�' .�¢�Y� :�. �r� e rs��L.:.:. �„tk. .X k ti '` "�'� v �ry �...- �f x`Y.,ti�.3h..�� NO:OF STORIES SIZE / C BASEMENT OR SLAB SIZE OF FLOOR TIMBERS 1 ST� � :� , 2 ° i 3� L/ SPAN DEMENSIONS OF SILLS DEMENSIONS OF POSTS DIMENSIONS OF GIRDERS �� HEIGHT OF FOUNDATION �� THICKNESS SIZE OF FOOTING .rJ X . MATERIAL OF CHIMNEY n/a IS BUILDING ON SOLID OR FILLED LAND SOG�� IS BUILDING CONNECTED TO NATURAL GAS LINE eS ., •a, .,_#�,� 5 �� x- s 't.�,K� ���}R', � .���� �;'� �s`z'f� .t��Sex,'r �s.;'.. c ��.� �- z' r c.. ?s .;.:.g F I� �1 1 . yl .4fF1ALT ROOF 5NIN6LE5 --- --- - - ----- 3'X5"A H Wr ER 4 D5 FYPON GM G&W FYPON LAP ------------------------- ------- ---------------------- ----- ---------------------- - ---------------------- ----- P - - E t I [t IN 0a t 2 t 2 y 910x1'0 OHD. 9'0xT0 OND. �a _ ----------------------- _______________ ______________________ FFM RM APOR_ PROPOSED FRONT ELEVATION SCALE: 1/4'-1'_0' BA1H BATH BEDROOM KITCHEN ki EN BEDROOM CLO a0 a0 a0 m BEDROOM12 LIVING ROOM LMNG ROOM - BMWOMa I I I I I I I I I I I ► I I I i I i I I I I I i �4a V401 eo ra re eo• 6W era PROPOSED FIRST FLOOR PLAN SCALE: 1/4'-1•-0' 1111111111T- BATH BATH BEDROOM KITCHEN CO [J KITCHEN BEDROOM SPACE ABOVE GARAGE m CLO CLD CLO ao Ul BEDROOM12 LIVING ROOM IIwNG ROOM BEDROOM/2 I I I I I j I I I I I I a'-a� ao• ra• r-�• a'a a•-lo• w'a PROPOSED SECOND FLOOR PLAN SCAIF: 1/1•=1•-0' U) 4 _ 'z4- 0 / z40 -1�- 14 - Itc', U G.2 N 2 N N 77 120. o 13ALOW ► P ��O�OSE D GsA�AGE_ L o-r p L A f-2 14- 16 RAI-O W IN 6#E.E� [10p-"E-1 APGOvE V MA-. Lo F, A6E I L H E��(?�Y c_..�..��►'i�� --t'1—Ifs—7"__I""H i S ,, pL-Ar-1 wAs E.?A CC` FOM AV -rvAL 1�5 OM 1 rl-r EDWORD FARRELL PROFESSIONAL LAND SURVEYOR 110 Winn Street Suite 207 Phone:(781)933-901 Woburn,MA 01801 Fax:(781)932-117 NORTH Zoning Bylaw Denial 1°- p Town Of North Andover Building Department ,°., 27 Charles St. North Andover, MA. 01845 s `"°5a Phone 979=688=945 Faz 978=688-9842 _-Street: .. . Ma /Lot: 3 Applicant: a.v . 7777 Request: Date: Please be advised that after review of your Application and Plans that your Application is DENIED for the following Zoning Bylaw-reasons: Zoning Item Notes Item Notes A Lot Area F Frontage 1 Lot area Insufficient 4,e S 1 Frontage Insufficient 2 Lot Area Preexisting -W'� H e- S 2 Frontage Complies 3 Lot Area Complies 3 Preexisting frontage 4 Insufficient Information 4 Insufficient Information B Use 5 No access over Frontage 1 Allowed G Contiguous Building Area N A 2 Not Allowed 1 Insufficient Area 3 Use Preexisting 2 Complies 4 Special Permit Required 4 e-5 3 Preexisting CBA 5 Insufficient Information 4 Insufficient Information C Setback H Building Height 1 All setbacks comply 1 Height Exceeds Maximum 2 Front Insufficient 2 Co ' plies y e 3 Left Side Insufficient yes 3 1 Preexisting Height 4 Right Side Insufficient 4 Insufficient Information 5 Rear Insufficient I Building Coverage �1 A 6 Preexisting setback(s) 1 Coverage exceeds maximum 7 Insufficient Information 2 Coverage Complies D Watershed 3 Coverage Preexisting 1 Not in Watershed K s 4 Insufficient Information 2 In Watershed j Sign N JA 3 Lot prior to 10/24/94 1 Sign not allowed 4 Zone to be Determined 2 Sign Complies 5 Insufficient Information 3 Insufficient Information E Historic District K Parking 1 In District review required F More Parking Required 2 Not in district �_(-e s 2 Parking Complies 3 Insufficient Information 3 Insufficient Information 4 Pre-existing Parkin Remedy for the above is checked below. Item # Special Permits Planning Board Item # Variance Site Plan Review Special Permit C 3 Setback Variance Access other than Frontage Special Permit e- Parking Variance Frontage Exception Lot Special Permit Lot.Area Variance Common Driveway Special Permit Height Variance Congregate Housing Special Permit Variance for Sign Continuing Care Retirement Special Permit Special Permits Zoning Board Inde endent Elderly Housing Special Permit S ecial Permit Non-Conforming Use ZBA Large Estate Condo Special Permit Earth Removal Special Permit ZBA Planned Development District Special Permit Special Permit Use not Listed but Similar Planned Residential Special Permit Special Permit for Sign R-6 Density Special Permit Special Permit Preexisting nonconforming -- Watershed Special Permit The above review and attached explanation of such is based on the plans and information submitted. No definitive review and or advice shall be based on verbal explanations by the applicant nor shall such verbal explanations by the applicant serve to provide definitive answers to the above reasons for DENIAL. Any inaccuracies,misleading information,or other subsequent changes to the information submitted by the applicant shall be grounds for this review to be voided at the discretion of the Building Department.The attached document titled"Plan Review Narrative"shall be attached hereto and incorporated herein by reference. The building department will retain all plans and documentation for the above file.You must file a new building permit application form and begin the permitting process. Building Department Official Signature Application Received Application Denied Denial Sent: If Faxed Phone Number/Date: Plan Review Narrative :. The following narrative is provided to further explain the reasong for`denial for the applicationt permit for the property indicated on the reverse side: �Z Arf Ar T, y �r` S ecra � -ef-M,^ /2r Jhse e y�v5 fo--) o d A.,C, CL,N rw,,,V el CO ,5-c I bAc 0u/^e MAd UNG T S 7'0 4 .. /rC` U4/2ia�vre— ,(ter- ar u 1✓' Referred To: Fire Health Police ,(`i Zonina Board Conservation PlanningDepartment of Pub Other lic Works Historical Commission Other BUILDING DEPT Town of North Andover _jtORT/1 Office of the Zoning Board of Appeals p Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 �' "'�° D. Robert Nicetta Telephone(978)688-9541 Building Commissioner Fax(978)688-9542 Any appeal shall be filed Notice of Decision within(20)days after the Year 2002 date of filing of this notice in the office of the Town Clerk. Property at: 14-16 Baldwin Street NAME: Peter G.Jordan HEARING(S): November 12,2002 ADDRESS: 14-16 Baldwin Street PETITION: 2002-046 North Andover,MA 01845 TYPING DATE: 11/14/02 The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,November 12,2002 at 7:30 PM upon the application of Peter G.Jordan,14-16 Baldwin Street,North Andover,requesting a dimensional Variance from Section 7,Paragraph 7.3,and Table 2,for relief of front setback and left side setback in order to add a garage,and a Variance from Section 8,Paragraph 8.1 for relief of requirements for off street parking; and for a Special Permit from Section 9,Paragraph 9.2 to allow for the extension of an existing 2 dwelling unit structure on.a pre-existing non-conforming lot in order to add 2 more dwelling units on a proposed second floor. Said premise affected is property with frontage on the West side of Baldwin Street within the R-4 zoning district. The following members were present: William J. Sullivan,Walter F. Soule,Robert P.Ford,John M.Pallone, Scott A.Karpinski,Ellen P.McIntyre,George M.Earley,and Joseph D.LaGrasse. Upon a motion by Scott A.Karpinski and 2°a by Ellen P.McIntyre,the Board voted to GRANT a dimensional Variance from Section 7,Paragraph 7.3,and Table 2 for relief of 2.2' from the front setback,and 8.8' from.the.south.... , side setback per Plot Plan for Proposed Addition in North Andover,Massachusetts,September 29,2002,prepared by Edward J.Farrell,Professional Land Surveyor#34613, 110 Winn Street,Suite 203,Woburn,MA. (781)933- 9012,[parking]Option 4;and to GRANT the Special Permit for relief from Section 9,Paragraph 92 to allow for the extension of an existing 2 dwelling unit structure on a pre-existing,non-conforming lot in order to add 2 more dwelling units on a proposed second floor,per Peter L.Sandorse,Phoenix Collaborative Architects,9 Foster Street, Wakefield,MA 01880,781-246-0988,dated 6-19-02,rev 11-21-02,on the condition that the petitioner supply a Mylar of Plot Plan,Option 4.. The Board finds that the Plot Plan,[parking]Option 4 meets the requirements of Section 8,Paragraph 8.1 for off street parking. Voting in favor: Walter F.Soule,Robert P.Ford,John M.Pallone, Scott A-Karpinski,and Ellen P.McIntyre. The Board finds that the applicant has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning Bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the Zoning Bylaw and that the applicant has satisfied the provisions of Section 9,Paragraph 9.1 &9.2 of the zoning bylaw and that such change,extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood Pagel of 2 Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 � Town of forth Andover f „ORT►, Office of the Zoning Board of Appeals-; i,`,_u ` ° >Community Development and Service`)MM, 27 Charles Street `- E R North Andover,Massachusetts 01845 Ss'cNusEs D. Robert Nicetta 2091 NOV 25 i�leli#ioag978)688-9541 978 Building Commissioner Fax( )688-9542 Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the grant,it shall lapse,and may be re-established only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)year period from the date on which the Special Permit was granted unless substantial use or construction has commenced,it shall lapse and may be re-established only after notice,and a new hearing. Town of North Andover Board of Appe.ls, i William I Sull an,Chairman Plot Plan [parking]Option 4 attached. Decision 2002-046. Page 2 of 2 Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 Town of North Andover JkORT/, Office of the Zoning Board of Appeals Y p Community Development and Services Division 27 Charles Street - North Andover,Massachusetts 01845 Lu10Z i 10 M (1: 29 D. Robert Nicetta Telephone(978)688-9541 Building Commissioner Fax(978)688-9542 Any appeal shall be filed Notice of Decision within(20)days after the Year 2002 date of filing of this notice in the office of the Town Clerk. Property at: 14-16 Baldwin Street NAME: Peter G.Jordan HEARING(S): November 12,2002 ADDRESS: 14-16 Baldwin Street PETITION: 2002-046 North Andover,MA 01845 TYPING DATE: 11/14/02 The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,November 12,2002 at 7:30 PM upon the application of Peter G.Jordan,14-16 Baldwin Street,North Andover,requesting a dimensional Variance from Section 7,Paragraph 7.3,and Table 2, for relief of front setback and left side setback in order to add a garage,and a Variance from Section 8,Paragraph 8.1 for relief of requirements for off street;parking; and for a Special Permit from Section 9,Paragraph 9.2 to allow for the extension of an existing 2 dwelling unit structure on.a pre-existing non-conforming lot in order to add 2 more dwelling units on a proposed second floor. Said premise affected is property with frontage on the West side of Baldwin Street within the R-4 zoning district. The following members were present: William J. Sullivan,Walter F.Soule,Robert P.Ford,John M.Pallone, Scott A.Karpinski,Ellen P.McIntyre,George M.Earley,and Joseph D.LaGrasse. Upon a motion by Scott A.Karpinski and 2d by Ellen P.McIntyre,the Board voted to GRANT a dimensional Variance from Section 7,Paragraph 7.3,and Table 2 for relief of 2.2' from the front setback,and 8.8' from,the south.,_, . side setback per Plot Plan for Proposed Addition in North Andover,Massachusetts,September 29,2002,prepared by Edward J.Farrell,Professional Land Surveyor#34613, 110 Winn Street,Suite 203,Woburn,MA. (781)933- 9012,[parking]Option 4,and to GRANT the Special Permit for relief from Section 9,Paragraph 92 to allow for the extension of an existing 2 dwelling unit structure on a pre-existing,non-conforming lot in order to add 2 more dwelling units on a proposed second floor,per Peter L.Sandorse,Phoenix Collaborative Architects,9 Foster Street, Wakefield,MA 01880,781-246-0988,dated 6-19-02,rev 11-21-02,on the condition that the petitioner supply a Mylar of Plot Plan,Option 4.. The Board finds that the Plot Plan,[parking]Option 4 meets the requirements of Section 8,Paragraph 8.1 for off street parking. Voting in favor: Walter F.Soule,Robert P.Ford,John M. Pallone, Scott A. Karpinski,and Ellen P.McIntyre. The Board finds that the applicant has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning Bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the Zoning Bylaw and that the applicant has satisfied the provisions of Section 9,Paragraph 9.1 &9.2 of the zoning bylaw and that such change,extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood Pagel of 2 Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 4-- Town of North Andover f „ORT„ OOffice of the Zoning Board of Appeals;f_ u O QIWCommunity Development and Serviced F t'�V 27 Charles StreetNORTH ANIDOVELER North Andover,Massachusetts 01845 9sS4 CHUSE< D. Robert Nicetta Z09Z NOV 25 QejI#oag978)688-9541 978 Building Commissioner Fax( )688-9542 Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the grant,it shall lapse,and may be re-established only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)year period from the date on which the Special Permit was granted unless substantial use or construction has commenced,it shall lapse and may be re-established only after notice,and a new hearing. Town of North Andover Board of App [Is, William I Sull an,Chairman Plot Plan [parking]Option 4 attached. Decision 2002-046. Page 2 of 2 Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 Date..................................0 3 a f- NORTp TOWN OF NORTH ANDOVER 3r �i^• ..'° OL F p PERMIT FOR WIRING o ,SSACMUS� This certifies that .....p,e �......................j v r-J .. has permission to perform �` `�' wiring in the building of �� r .......................................... ..................................... at.... . .................f .a.�..... .�. .... ,North Andover,Mass. 597 Ae...8 ..... Lic.No.�J..b........... ............................................................... ELECTRICAL INSPECTOR t C'�e'ck # 47 '10 Official Use Only Permit No. /(2 DE C05"09VWEUWOT sAGWV.SE97S Department of kPubix Safety Occupancy&Fee Checked BOARD OF FIRE PREVENTION REGULATIONS 527 CMR 12:00 APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code 527 CMR 12:00 (Please Print in ink or type all information) Date To the Inspector of Wires: Town of North Andover The undersigned applies for a permit to perform the electricjal work described below. �, S f Location(Street&Number 1 t v Owner or Tenant PIP ' T' nJ Owner's Address Is this permit in conjunction w/ith/a building permit Yes No 0 (Check Appropriate Box) Purpose of Building /7 <I d�` O '�, Utility Authorization No. Existing Service .� Ar3ps lAqo Voits OverheadVUndgmd 0 No.of Meters New Service Amps Voits Overhead II/ Undgmd 0 No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work Total No.of Ughting LightingOutlets No.of Hot fuse No.of Transformers KVA / Above 0 In 0 No.of Lighting Fixtures Swimming Pool gmd 0 gmd 0 Generators KVA c No.of Emergency'Lighting No.of Receptacles Outlets J No.of Oil Burners Battery Units No.of Switch Outlets No of Gas Burners 4 FIRE ALARMS No.of.Zone Total No.of Detection and No.of Ranges No of Air Cond Tons Initiating Devices Heat Total Total No.of Diposal No. Pumps Tons KW No.of Sounding Devices No./of Self Contained No.of Dishwashers Space/Area Heating KW Detection/Sounding Devices 0 Municipal 0 Other No.of Dryers Heating Devices KW Local Connection No.of No.of Low Voltage N%.of Water Heaters KW Signs Bailases Wiring N * Hydro Massa a Tuds No.of Motors Total HP O'.HER: INSURANCE COVERAGE. Pursuant to the requiremen6ts of Massachusetts General Laws have a current Liability Insurance Policy including Completed Operations Coverage or its substantial equivalent YES C% NO,0 have submitted valid proof of same to the Office YES C% NO 0 if you have checked YES please indicate the type of coverage by checking the appropriate box INSURANCE o BOND 0 OTHER n (Please Specify) Estimated Value,9f Electrical Work$ O V Q (Expiration Date) Work to Start4 1 1)—t23 Inspection Date Resquested Rough Final Signed under the Penalties of perjury: FIRM NAME 4 LIC.NO._ Licensee '� `r Signature LIC.NO.�Q e � E— r Bus.Tel No. Address G,L1 W r A AR Tel.No. OWNER16INSURANCE WAIVER:_j am aware thirt the Licenses does not have the insurance coverage or its substantial equivalent as required by Massachusetts IGeneral L .And rthmy si ure on this ermit application waives this requirement. Owner Agent (Please Check one) Telephone N 7�,� a aPERMIT FEE $ J �. r (signature of or Agent) S m ci } 120.03' MAP 9'S ` ASSESSORS MAP 9 LOT 5 ASSESSOR- � © 5'(Min) LOT - N/P o M 3 &I FENCE TREES JAMES C. & TAMARM L. ro ERB -- 36.' m 1st & 2nd N o` 6 4 24' Floor Deck Proposed 15' 124 16-18 Garage 114—Iff16 '0 2 Spaces With Proposed 2nd o i O p Story Addition a N 01 Q2 a o 6.2' 28.9' z i ASSESSORS MAP 9 LOT 74 W Proposed a0 Drive KURT & LAURIE Proposed Parking Spaces N -- - --BURZLAFF to be 9'X18' 12a 00' / j�j ZONING DISTRICT — R4 BA.c._,D WIN _ SIr REST(PUBLIC — 50' WIDE) EXIS77NGI ITEM REQUIRED PROPOSED EAIS77NG SEWER TOWN OF NORTH ANDOVER ` LOT AREA: 12,500 S.F. 11,780 S F. BOARD OF APPEALS LOT FRONTAGE.• 100' 120' E)0S77NG WATER FRONT YARD: 30' 2Z8' EXIS77NG 29.4' PROPOSED PLOT PLAN 57DE"RO: 75' 28:9'EXIS77NG 6.2' PROPOSED PROPOSED ADDITION r REAR YARD: 30' 45.5' EXISTING FARFUML� NORTHANDOVER~MASSACHUSETTS 33.4 PROPOSED ft 24618 ' SCALE.,1"=20' SF_P7EmBER 29,2002 RECORD OWNER: 9NOV M !4 EDWARD J. FARRELL PETER JORDAN 9 PROFESSIONAL LAND SURVEYOR BOOK 1178 PAGE 433 y 2 20 02 1 1 O WINN STREET-SURE 203-WOBURN.MA. `1PLAN NUMBER 4337 (781)933-9012 DATE• F APPEALS 120.03' ` / ASSESSORS MAP 9 LOT 5 ® ASSESSOR'S MAP 9 5'(M/n) LOTS N/P- u5 `t EXIS77NG 7REES M JAMES C. & TAMARM L. & FENCE� ERB 36' ' i 1st & 2nd6.4 o 24floor Deck Proposed 15, #24 16-18 Garage X14—P6 2 Spaces With Proposed 2nd o i Story Addition o ol 0 6.2p ' 2&9' ro � y ASSESSORS MAP 9 LOT 74 Note: Proposed 00 N� Proposed Parking Spaces Drive N KURT & LAURIE to be 9'X18' CO R BURZLAFF 120.00' _ BALD WIN 3 ,�J TREET(PUBLIC — 50' WIDE) ZONING DISTRICT R4 EXIS77NGI ITEM REQUIRED PROPOSED EXIS77NG SEWER TOWN OF NOR77-1 ANDOVER LOT AREA: 12,500 S.F. 11,780 S.F. BOARD OF APPEALS LOT FRONTAGE. 100' 120' EXIS77NG WA 7ER FRONT YARD: 30' 27.8' EXIS77NG 29.4' PROPOSED PLOT PLAN SIDE YARD: 15' 28 g°E3057IiVG °f •"'� 6.2' PROPOSED PROPOSED ADDITION REAR YARD: 30' 45.5' EXIS77NG MFMFUn.L NORTH ANDOVER~MASSACHUSETTS 33.4 PROPOSED Ha 34813 SCALE'1"=20' SEPTEMBER 29.2002 RECORD OWNER. !,q AWPARM 6Y EDWARD J. FARRELL PETER JORDAN PROFESSIONAL LAND SURVEYOR• BOOK 1178 PAGE 433 110 W/NN STREETSUITE 203 SUI203-WOBURN;MA. PLAN NUMBER 4337 (781)9339012 DA 7F: S , 120.03' ASSESSORS MAP 9 LOT 5j ASSESS O S MAP 9 ® 5'(Min) LOT 3to EXIS77NG TREES N� m do FENCE JAMES C. do TAMARM L. ERB 36' 1st & 2nd ~o` 6.4' 24 Floor Deck Proposed15, #24 #6-18 Garage o, 114-116 � 2Spaces Nth Proposed 2nd o Story Addition o O1 O2 a 2a9 ro i . ASSESSORS MAP 9 LOT 74 0 Note: Proposed 00 NII- Z Proposed Parking Spaces RIE Drive N KURBT T && AFF LAURIE ,v to be 9'X18' \ 120.00' ZONING DISTRICT - R4 BALDWIN STREET(PUBLIC — 50' MDE) 2 EXISTING/ 17EM REQUIRED PROPEXIS77NG SEWER TOWN OF NORTH ANDOVER . LOT AREA: 12,500 S.F. 11,780 S.F. BOARD OF APPEALS LOT FRONTAGE: 100' 120' EXIS77NG WA7ER FRONT YARD: 30' 27.8' EXIS77NG 29.4' PROPOSED PLOT PLAN 28.9' FX/SVNG SIDE YARD. 15' 6.2' PROPOSED PROPOSED ADDITION REAR YARD: 30' 45.5' EXIS77NG �aaeu NORTH ANDOVER~MASSACHUSETTS 33.4' PROPOSED tb 3MMI SCALE.•1"=20' SEPTEMBER 29,2002 RECORD OWNER: tq PREPARED 6Y b` PETER JORDAN EDWARD J. FARRELL A BOOK 1178 PAGE 433 PROFESSIONAL. LAND SURVEYOR • PLAN NUMBER 4337 1 1 O WiNN STREET-SULTE 203-WOBuRN,MA. DATE 781 a ( )933-9012 120.03' / ASSESSORS MAP 9 LOT 5 ASSESSOR'S MAP 9- 5'(Min) ` � LOT 3- � r to EXIS77NG TREES Nl*r ro & FENCE JAMES C. & TAMARM L. M ERB QAA 36' § 24' 6.4floor Deck A ' Proposed #24 16-18 Proposed 15 114-116 2 Spaces With Proposed 2nd y i Story Addition o Q a � 6.2' 28.9' - 0 ASSESSOR'S MAP 9 LOT 74 'b H Note: Proposed H ib N O Proposed Parking Spaces Dove c KURT &LAURIE Z to be�9'X18' __ BURZLAFF 120.00' ZONING DISTRICT — R4 SAL,DWIN .SrREET(PUBLIC – 5o' w,DE) Z EXISTING/ ITEM REQUIRED PROPOSED EXIS77NG SEWER TOWN OF NORTH ANDOVER L LOT AREA: 12,500 S F. 11,780 S.F. BOARD OF APPEALS c LOT FRONTAGE. 100' 120' EXIS77NG WA7E•R FRONT YARD: 30' 27.8' EXIS77NG 29.4' PROPOSED PLOT PLAN "S1DLr"YARD: '"75' 26.9' EXISTING 6.2' PROPOSED PROPOSED ADDITION REAR YARD: 30' 45.5' EXlS71NG 33.4' PROPOSED A34813 NORTH ANDOVER, MASSACHUSETTS SCALE.•1"--20' SEPTEMBER 29,2002 RECORD OWNER: !q PROIARM 9Y •PETER JORDAN EDWARD J. FARRELL PROFESSIONAL LAND SURVEYOR BOOK 1178 PAGE 433 I 10 WINN STREET-SUITE 203-WOBURN.MA. PLAN NUMBER 4337 (781)933-9012 DA 7E. h o Location L/— eb 3�Q /c/U' No. O3Z Date 5r_ NORTH TOWN OF NORTH ANDOVER f R 9 ' Certificate of Occupancy $ Building/Frame Permit Fee $ o29 -� s�CHust Foundation Permit Fee $ Other Permit Fee $ TOTAL $ a a Check # c2l eg 16 6 7 US / Building Inspector 120.03' ASSESSOR'S MAP 9 LOT 5 tn NIF h EXISTING TREES JAMES C. & TAMARM L. ASSESSOR'S MAP 9 & FENCE ERB o; LOT 3 o� LOT AREA:=12,500--L-S.F. 1st & 2nd 6.4!— 24' Floor Deck #24 #6—#8 #14—#16 Existing With Existing 2nd , Garage Story Addition 6.2' 28.9' • ASSESSOR'S MAP 9 L 0 T 74 Note: 00 NIF Proposed Parking Spaces N KURT & LAURIE to be 9'X18' BURZLAFF 120.00' i ZONING DISTRICT - R4 BALD1rllll�l (PUBLIC — 50' WIDE) STREET 0 FARRELL ANo U613 AS BUIL T e,�ti SSS PLOT PLAN FOR PROPOSED ADDITION IN NORTH ANDOVER, MASSACHUSETTS SCALE.'1"=20' AUGUST27, 2003 R ORD OWNER: PREPARM 8Y EDWARD J. FARRELL PETER JORDAN PROFESSIONAL LAND SURVEYOR BOOK 1178 PA GE 433 110 WINN STREET-SUITE 203- WOBURN, MA. PLAN NUMBER 4337 (781)9339012 f � i ,1 , N' �. ,/� S Y' � k Location No. � Date � 3 HQRTIy TOWN OF NORTH ANDOVER Of+t. o ,�,tiQ 4 ; ; Certificate of Occupancy $ �7s CH++ usEta' Building/Frame Permit Fee $ s�cM Foundation Permit Fee $ Other Permit Fee $ TOTAL $ I a Check # I I b `J Building Inspector �i TOWN OF NORTH ANDOVER BUILDING DEPARTMENT APPLICATION TO CONSTRUCT REPAIR,RENOVATE, OR DEMOLISH A ONE OR TWO FAMILY DWELLING .';. x k'^?`S ,✓s,�,, "rt:7�, ,,.,��ii71C �7�"l'3'�"il#ii .z.:- ,..., .::.. .�a'vi.,1s ..�., ':...� >.�,...4�". .C'�. BUILDING PERMIT NUMBER Q3 DATE ISSUED. ic SIGNATURE: Building Commissioner/Insp6tor of Buildings Date z SECTION 1-SITE INFORMATION 1.1 Property Address: Q 1.2 Assessors Map and Parcel Number: Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Areas Frontage ft 1.6 BUILDING SETBACKS ft Front Yard Side Yard Rear Yard Required Provide Required Provided Required Provided 1.7 Water Supply M.G.L.CAWO.1 54) 1.5. Flood Zone Information: 1.8 Sewerage Disposal System: Public ❑ Private ❑ Zone Outside Flood Zone 0 Municipal 0 On Site Disposal System 0 _I SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT _7 2.1 Owner of R rd call-, Na Print Address for Service/: /T \ 4 2 9 Z i ature . Telephone J 2.2 Owner of Record: Name Print Address for Service: O z M Signature Tele hone 90 SECTION 3-CONSTRUCTION SERVICES 3.1 Incensed Construction Supervisor: Not Applicable ❑ ��b .4',* r -1.11A f Lice nse•d=Zuction Supervisor: 0 12 fi�, Z - { a License Number ExpirationDate tg lure Telephone r 3.2 Registered Home Improvement Contractor Not Applicable ❑ Company Name &CLA/`l/s L d Registration Number r T r" Adr s —® Expiration Date Si lure Tee hone `a' L` 41 SECTION 4-WORKERS COMPENSATION(M.G.L. C 152 § 25c(6) y t Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed affidavit Attached Yes.......❑ No.......❑ , SECTION 5 Description of Proposed Work(check all applicable) New Construction 0 Existing Building ❑ Repair(s) ❑ Alterations(s) ❑ Addition ❑ Accessory Bldg. 0 Demolition ❑ Other ❑ Specify Brief Description of Proposed Work: 'ec® V)co e_yd Adc6uu r9 L l u t u v S Jo tE�Y_c. m SECTION 6-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollar)to be OFFICIAL USE"QNLY .: Completed by permit applicant 1. Building r� (a) Building Permit Fee '�"'0®® .0 Multiplier 2 Electrical (b) Estimated Total Cost of p' Construction 3 Plumbing Building Permit fee tel x(b) 4 Mechanical HVAC 5 Fire Protection 6 Total 1+2+3+4+5 Check Number SECTION 7a OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT it as Owner/Authorized Agent of subject property Hereby auth e to act on My behalf; n 11 matters reh ve to work authorized by this building permit applicattiipn. Si nat e Owner Date SECTPON 7b OWNER/AUTHORIZED AGENT DECLARATION 1, as Owner/Authorized Agent of subject property Hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief Print Name i -Signature of Owner/A ent Date NO. OF STORIES SIZE BASEMENT OR SLAB SIZE OF FLOOR TIMBERS IST 2 3 SPAN DIMENSIONS OF SILLS DIMENSIONS OF POSTS Di"ME'NSIONS OF GIRDERS HEIGHT OF FOUNDATION THICKNESS SIZE OF FOOTING X MATERIAL OF CHIMNEY I IS BUILDING ON SOLID OR FILLED LAND IS BUILDING CONNECTED TO NATURAL GAS LINE —_ ��ie -C�Jamvmai2cu o��/UGad6a<>`ect0eU t BOARD=OF BUILDING REGULATIONS 'License:CONSTRUCTION SUPERVISOR I Number: CS 054293 irthdite: 05M 7/1,943 Expires.05!17/2004 Tr.no: 23455 j E Restricted t)0 ROBERT. JORDAN i I 153 BURLINGTON WILMINGTON,VA 018$T Administeator a ✓fieanv�rco�zcuccc%�.o�� saac/zuae Board of Buiiding Regulations and Standards HOME IMPROVEMENT CONTRACTOR Regrstrgtion -114007 Explratioh:7/27/2003 Type =Individual f ROBERT WJORDAN- ROBERT JORDAN=,,, - 153.8URLINGTON AVE.. WILMIGTON,-MA 01887 Administrator t FORM U - —_ LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all necessary.approvals/permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and/or landowner from compliance with any applicable or requirements. *APPLICANT FILLS OUT THIS SECTION r���/ APPLICANT �/� �/O/' a 9 � PHONE LOCATION: Assessor's Map Number d PARCEL Q©00 C ©naCf SUBDIVISION LOT(S) STREET Sl8 ��s�ti33 ST.NUMBER_/� `OFFICIAL USE ONLY **** *** * RECO NDATIONS OF T N AGENTS: CONS RVATION ADMINISTR R DATE APPROVED DATE REJECTED aa COMMENTS s� TOWN PLANNER DATE APPROVED DATE REJECTED COMMENTS FOOD INSPECTOR-HEALTH DATE APPROVED DATE REJECTED SEPTIC INSPECTOR-HEALTH DATE APPROVED DATE REJECTED COMMENTS PUBLIC WORKS-SEWER/WATER CONNECTIONS DRIVEWAY PERMIT /FIRE DEPARTMENT O . RECEIVED BY BUILDING INSPECTOR DATE_ Revised 9W jm 2 , Town of forth Andover „ORT►, Office of the Zoning Board of Appes;�_ , .� �,�� Community Development and Service's - 27 Charles Street 00TH A'N'D,0VrE North Andover,Massachusetts 171845 CH D. Robert Nicetta 1001 NOV 25 fRejkio&g978) 688-9541 Building Commissioner Fax(978) 688-9542 Furthermore,if the rights authorized by the Variance are not exercised within one(1)year of the date of the grant,it shall lapse,and may be re-established only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2)year period from the date on which the Special Permit was granted unless substantial use or construction has commenced,it shall lapse and may be re-established only after notice,and a new hearing. Town of North Andover Board of Appe.Is, William J. Sullivan.Chairman c Plot Plan[parking]Option 4 attached. Decision 2002-046. 8aaistry of Deeds Northern District of Essex County Lawrence, NA 01640 i 12/19/0 i;i(?n hl u F; Inst 66068 Cp C , {_ h:p..c' Type CERT 10A0 Page 2 of 2 T±.., r•. F'. '-io. =t iiuQ y, ± t:�i:ij., '11_11,1. I':'i•n Aist'� J. But'!=.s. Board of Appeals 688-9541 Building 688-9545 Consemation 688-9530 F. RaF�i b y , Town of forth Andover ORT"., Office of the Zoning Board of Appeals - Community Development and Services Division 27 Charles Street North Andover,Massachusetts01845 �� LUR H 4: 29 D. Robert Nicetta Telephone(978) 688-9541 Building Commissioner _ Fax(978) 688-9542 This is to certify that twenty(20)days hive elapsed from date of decision,filed without filing of an a peal. -� Date / =%Cl ..... JoyrA A,Bradshaw Any appeal shall be filed Notice of Decision Tom Clara within(20)days after the Year 2002 - date of filing of this.noticeC'411W in the office of the Town Clerk. Property at: 14-1.6 Baldwin Street NAME: Peter G.Jordan BEARING(S): November 12,2002 ADDRESS: 14-16 Baldwin Street PETITION: 2002-046 North Andover,MA 01845 TYPING DATE: 11/14/02 The North Andover Board of Appeals held a public hearing at its regular meeting on Tuesday,November 12,2002 at 7:30 PM upon the application of Peter G.Jordan, 14-16 Baldwin Street,North Andover,requesting a dimensional Variance from Section 7,Paragraph 7.3,and Table 2, for relief of front setback and left side setback in order to add a garage,and a Variance from Section 8,Paragraph 8.1 for relief of requirements for off street parking, and for a Special Permit from Section 9,Paragraph 9.2 to allow for the extension of an existing 2 dwelling unit structure on.a pre-existing non-conforming lot in order to add 2 more dwelling units on a proposed second floor. Said premise affected is property with frontage on the West side of Baldwin Street within the R-4 zoning district. { �r The following members were present: William J. Sullivan,Walter F. Soule,Robert P.Ford,John M. Pallone, Scott x' A.,Karpinski,Ellen P-McIntyre,George M.Earley,and Joseph D.LaGrasse. Upon a motion by Scott A.Karpinski and 2°a by Ellen P.McIntyre,the Board voted to GRANT a dimensional Variance from Section 7,Paragraph 7.3,and Table 2 for relief of 2.2' from the front setback,and 8.8' from.the south . side setback per Plvt Piar.for Proposed Addition u-.Ncrth Puidm er,Massachusetts,S ytem.ber 29,21002, prepared by Edward J.Farrell,Professional Land Surveyor#34613, 110 Winn Street,Suite 203,Woburn,MA. (781)933- 9012, [parking] Option 4;and to GRANT the Special Permit for relief from Section 9,Paragraph 92 to allow for the extension of an existing 2 dwelling unit structure on a pre-existing,non-conforming lot in order to add 2 more dwelling units on a proposed second floor,per Peter L. Sandorse,Phoenix Collaborative Architects,9 Foster Street, Wakefield, MA 01880,781-246-0988,dated 6-19-02,rev 11-21-02,on the condition that the petitioner supply a Mylar.of Plot Plan, Option 4.. The Board finds that the Plot Plan, [parking]Option 4 meets the requirements of Section 8,Paragraph 8.1 for off street parking. Voting in favor: Walter F. Soule,Robert P.Ford,John M. Pallone, Scott A Karpinski,and Ellen P.McIntyre. rrcv -19 The Board finds that the applicant has satisfied the provisions of Section 10,paragraph 10.4 of the Zoning Bylaw and that the granting of this variance will not adversely affect the neighborhood or derogate from the intent and purpose of the Zoning Bylaw and that the applicant has satisfied the provisions of Section 9,Paragraph 9.1 &9.2 of the zoning bylaw and that such change,extension or alteration shall not be substantially more detrimental than the existing structure to the neighborhood r ATTEST: A True Copy le Y'l�. Page 1 of 2 rL^©�v �i Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 a Town of North Andover A Building Departments b "d 27 Charles Street x North Andover, Massachusetts 01845 _ (978) 688-9545 Fax(978) 688-9542 coca c iwK. . ATID APPLICATION FOR CERTIFICATE OF OCCUPANCY/INSPECTION ADDRESS L,0 f LOT NUMBER] SUBDIVISION DATE REQUEST FILED_ DATE READY FOR INSPECTION TEN (10)DAYS NOTICE PRIOR TO CLOSING DATE IS REQUIRED ALL WORK AND SIGN-OFF'S MUST BE COMPLETED WITHIN THIS TIME FRAME. A RE-INSPECTION FEE OF TWENTY-FIVE($25.)DOLLARS WILL BE CHARGED IFTRUCTURE D ES NOT MEET ALL APPLICABLE CODES. SIGNATURE �� OFFICIAL USE ONLY ROUTING D.P.W. —WATER METER DATE D.P.W. MUST INDICATE THAT THE WATER METER HAS BEEN INSTALLED PRIOR TO THE INSPECTION REQUEST DATE. SIGNATURE I DPW AUTHORIZATION North Andover Building Department Tel: 978-688-9545 DEBRIS DISPOSAL FORM In accordance with the provision of MGL c 40 S 54, a condition of Building Permit Number is that..the debris resulting from this work shall be disposed of in a properly licensed solid waste disposal facility as defined by MGL c11, S150A.. The debris will be disposed of in: (Loc tion of Facility) Si nature of Permit Applicant Date NOTE: Demolition permit from the Town of North Andover must be obtained for this project through.the Office of the Building Inspector ',I a The Commonwealth of Massachusetts >' Department of Industrial Accidents d W Office of Investigations Boston, Mass. 02111 Workers'Compensation Insurance Affidavit Name Please Print Name: -I- Sa Location: Ci " `t Phone-# I am a homeown r performing all work myself. I am a sole proprietor and have no one working in any capacity I am an employer providing workers'compensation for my employees working on this job. Company name: Address City: Phone#. Insurance.Co. Policv# Company name: Address Citi Phone#: Insurance Co. Policv# Failure to secure coverage as required under Section 25A or MGL 152 can lead to the imposition of criminal penalties of.a fine up to$1.500.00 andfor one years'imprisonment.asyell_as_ciyil.penaltiesinlhelorm-f-a.STOP WORKORDER md_afine_o 01.00.00)-ajday-gaiiast-me- I understand that a c of this statement may be forwarded to the Office of Investigations of the DIA for coverage verification. t do hereby certify the pains and pe ties of penury that the informatiwr provided above is true and correct. Signature Date Print name !s``'a°'t Phone Official use only do not write in this area to be completed by city or town official' City or Town Permit/Ucensing El Building Dept []Check if immediate response is required 0 Licensing Boatel p Selectman's Office Contact person: Phone* E] Health Department Ei Other f � 'Qi C0497LY1L0721UCu���'.�f/faaacu,�euaelta ` .. z ` sd:.`a % F-lBbard ofIguddmg Regulations and Standards rfHOM.E IMPROVEMENT CONTRACTOR ek ,,Registration ;129627, !.' Ezp ratlonw-10/6/03- t a ,� y' Type Individual. L� Jame Evans,. 3�" James �x '50,Lowell �� •,, Wilmington Mk01887xx dminW Iftr _ c 1 It c. V 120.03' EXISTING CHAIN LINK FENCE EXISTING STOCKADE FENCE_\ Q 5'(Min) Proposed ASSESSOR'S MAP 9 LOT 5 ® Shrubs © 0 ASSESSOR'S MAP 9 N/F to �' LOT 3 EXISTING TREES JAMES C. & TAMARM L. Bituminous & FENCE ERB Q; rn Bituminous 36' 1st & 2nd :v o 6 4' 24Floor Deck Proposed 0 #24 #6—#8 Garage i #14—#16 2 Spaces With Proposed 2nd H y Story Addition as 6.2" °p a 28.9' ASSESSOR'S MAP 9 LOT 74 Proposed i0 Note: N/F Proposed Parking Spaces Drive ClKURT & LAURIE to be 9'X18' BURZLAFF �• W ! 12.0.00' r ZONING DISTRICT — R4 BRLDUWWIN 3 S RE 7~(PUBLIC — 50' W10E) EXISTING/ ITEM REQUIRED PROPOSED W EXISTING SEWER TOWN OF NORTH ANDOVER LOT AREA: 12,500 S.F. 11,780 S.F. BOARD OF APPEALS LOT FRONTAGE. 100' 120' EXISTING WATER FRONT YARD: 30' 27.8' EXISTING i 29.4' PROPOSED PLOT PLAN b ;E SIDE YARD: 15' 28.9' EXISTING f04 LOMARa+. '•_ 6.2' PROPOSED PROPOSED ADDITION FARRELL '" � Mo34M REAR YARD: 30' 45.5' EXISTING I�IOF,THAIIIDOVER,R 1'✓IAS.SACHUSETTS • 33..4' PROPOSED , SCALE.1"=20' SEPTEMBER 29,2002SW RECORD OWNER: PREPARED RY EDWARD J. FARRELL PETER JORDAN PROFESSIONAL LAND SURVEYOR BOOK 1178 PAGE 433 1 10 WINN STREET-SUITE 203-WOBURN,MA. PLAN NUMBER 4337 OPTION 4 (781)9339012 DATE: 1MQ 11120 002 F..SSEX NORTH REGISTRY OF DEEDS LAWRENCE, MASS._ A TRUE COPY: ATTEST: W REGISTER OF DEED Town of North AndoverNORT/, OF�ttieo °'�qr • Office of the Zoning Board of Appeals Fr Community Development and Services Division 27 Charles Street - '+ North Andover, Massachusetts 01845 9SSACHUSEtt D. Robert Nicetta Telephone (978)688-9541 Building Commissioner Fax (978)688-9542 Date: Dear: As you know,the Zoning Board of Appeals has granted a Variance and/or Special Permit or Finding for premises located at: Your 20-day appeal period will have passed on the following date: Once the appeal period has passed, please pick up your certified copy of the Zoning Board of Appeals decision, and your signed mylar (if a mylar was required) from the Town Clerk's office located at 120 Main Street,North Andover, MA 01845 (978-688- 9501) Please bring the Town Clerk certified copy of the decision&the signed mylar to the North Essex Registry of Deeds, 381 Common Street, Lawrence,MA 01840 (978-683-2745), as the decision and mylar must be filed at the Registry of Deeds as soon as possible. +i� f l de vt(,t Aor" sf�1 M[e) Once this is completed, please bring the copy of the certified decision& the Registry of Deeds receipt to the Building Department, which is located at 27 Charles Street, North Andover, MA 01845. Failure to file the decision and mylar with the Registry of Deeds will result in your inability to exercise your variance and/or special permit and your inability to obtain a building permit with the Building Department. Furthermore,if the rights authorized by the variance are not exercised within one(1)year of the date of the grant,they shall lapse,and may be re-established only after notice,and a new hearing. Furthermore,if a Special Permit granted under the provisions contained herein shall be deemed to have lapsed after a two(2) year period from the date on which the Special Permit was granted unless substantial use or construction has commenced,they shall lapse and may be re-established only after notice and a new hearing. If you have any questions, please feel free to call (978-688-9541)or fax(978-688-9542), Monday through Thursday, 9:00 AM to 2:00 PM. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 ORTH own o : Andover 030 ~ ;. No. o �=+ LAKE dover, Mass., COCMIC ME WICK ADRATED PI? C5 S�ACHU$ FOR EXCAVATION AND FOUNDATION we��- j THIS CERTIFIES THAT ... ................. ................................................................................................ ... a.A.!A&!!9has permission to excavate and pour foundation at 6. for the purpose of.4.� �; �; ra,r r. '� O�111 .......... ................... ...................�t.... ^ ...�4e1of.... °or .a....�4�P.. .� ions The person accepting this permit must return to the office of the Building Inspector a certified plot plan show w� fI 1A'r of building thereon before Foundation will be inspected. ��� 12 91 5 1+ S 1�eyv�M�s �� �� bP�il�Kl+�r 8ys�ew� �I�o►w� aoves per, +o wa caftO . VIOLATION of the Zoning or Building Regulations Voids this Permit. PERMIT EXPOS IN 6 MONTHS The holder of this Foundation Permit proceeds at own risk and without UNLESS CONSTRUCTION STARTS assurance that a permit for entire building structure will be granted. . P 4- V 4r4 6Nt*6 ... ..................... ............. ....... BUILDING INSPECTOR NORTH E Andover Town . of � . . O ; .z VA No. 0410 _ o� COC 'A dover, Mass., ORATED F`Pa��S S BOARD OF HEALTH PER MIT T D Food/Kitchen Septic System BUILDING INSPECTOR r r•...... o ^�Z AI........ THIS CERTIFIES THAT......... ................. ........................................................................... Foundation abiVa5GAr�' has permission to erect...4................................111 buildings on ....... . Rough . .................... 1,,- . to be occupied as.Al�"J/.fir .... li'...�....A...dalt..�ov*1....��w t��.�N�'.... �. .... Chimney provided that the person accepting this permit shall in every respect conform to the terms of the application on file in Final this office, and to the provisions of the Codes andB -Laws relating o the Inspection, Alteration and Construction of Buildings in the Town of North Andover. Y 3 iX� PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough 2 014tkc 100APO ERMIT EXPIRES IN 6 MONTHS Final 11` 14L CP Z UNLESS CONSTRUCTION STARTS ELECTRICAL INSPECTOR 4 -rolaA 140M Dw e l l n Service BUILDING INSPECTOR �epI11 M04 Sy ��r Final t cu a Permit Required to Occupy Building GAS INSPECTOR v -r��•4-ro p � q � g IV SPe e uN # SPrrAvK/e r- X4.OS %- SPrc S 4Pt l2ecicue D Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing or Dry Wall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. SEE REVERSE SIDE smoke Det. 120.03' EXISTING CHAIN LINK FENCE ' Y EX/STING STOCKADE FENCE Q5 5'(Min) Proposed ASSESSOR'S MAP 9 LOT 5 ® ASSESSOR'SSh ShruO O O MAP 9 N/F �' LOT 3 EX/S77NG TREES JAMES C. & TAMARM L. ,°,� Q & FENCE ERBQr= Area Bituminous of o� Bituminous 36' N 1st & 2nd o 6.4' 24 Floor Deck Proposed m 15, #24 #6—#8 Garage #14—#16 Q °' 2 Spaces With t='roposed 2nd Stogy y Addition o 0 0 6.2' 28.9' ASSESSOR'S MAP 9 LOT 74 Note: Proposed c,o NIF Proposed Parking Spaces C 4Drive N KURT & LAURIE to be 9'X18' BURZLAFF 120.00' ZONING DISTR/CT — R4 BALDWIN � STREET(PuBLIc — 50' WIDE)) 2 EXIST/NG/ I TEM REQUIRED PROPOSED W EX/STING SEWER TOWN OF NORTH ANDOVER LOT AREA: 12,500 S.F. 11,780 S F. BOARD OF APPEALS L 0 T FRONTAGE.- 100' 120' EX/ST1NG WA TER fRONT YARD: 30' 27.8' EXISNG 29.4' PROPOSED pL O T PLAN c i �` '3 SIDE YARD: 15' 28.9' EXISTING v ��'�A�� , 6.2 PROPOSED PROPOSED ADDITION FARRELL No 34813 REAR YARD: 30' 45.5' EX/STING , �o'�Fss�o�'Pv NORTH ANDD L ER, MASSACHUSETTS t. �c 33.4 PROPOSED ,r SCALE.*1"=20' . SEPTEMBER 29, 2002 RECORD O WNER: PREPAam BY PETER JORDAN EDWARD J. FARRELL PROFESSIONAL LAND SURVEYOR PLAN NUMBER 4337 PAGE 433 1 10 WiNN S'rREEr-SurrE 203- WoeuRN, MA. PLAN OPTION 4 (780933-9012 DA TF t > ' r