To: Electrical Inspector May 6, 2003
Town of North Andover
RE: Colonnade on Great Pond Road
Jim, on the following pages you will rind a copy of the proposal we
have sent to the Colonnade for approval. l believe that the will be giving
approval in the next 24 hours for Stateline to proceed. if you have any
questions or are In need of additional Information please feel free to call at
anytime.
Thank you,
Philip J. lannazzi
r
fl
- F
05/06/2003 08:22 9786828563 PAGE 01
r--
Stateline Electrical, INC
110 Jackson Street - Rear
Methuen, MA 01844
Telephone: 978-682-5395
978-686-5819
Fax: 978-682-8563
To: Electrical Inspector May 6. 2003
Town of North Andover
RE: Colonnade on Great Pond Road
Jim, on the following pages you will find a copy of the proposal we
have sent to the Colonnade for approval. I believe that the will be giving
approval in the next 24 hours for Stateline to proceed. if you have any
questions or are in need of additional Information please feel free to call at
anytime.
Thank you,
Philip J. lannazzi
0.5/06/2003 08:22 9786828563 PAGE 02
STATELINE ELECTRICAL, INC.
Designers • COnaactots
110 Jackson Street
Methuen, Massachusetts 01844
978-682.5395 FAX 978.682-8563
Colonnade Condo Association May 5, 2003
Mail Box 19
1401 Great Pond Road
North Andover, MA 01845
Attention: Mr. John Kinsky
RE: High Voltage Cable -..Repairs
Dear John,
After numerous telephone conversations with the involved parties,
i.e.J.W.Watson, the excavating contractor, Power Line Contractors the
high voltage company; Mass Electric,the utility company,the Town of
North Andovees Electrical Inspector and atter removing the existing cables
from the duct bank, we have arrived at the best and most cost effective
means of completing the project.
Statellne has concluded upon inspection of the damaged cable,that
In fact not only the failure that occurred this winter,but the previous fault
was do to ice within the duct bank constricting the cable at a stressed point
causing the cable to fail.The duct bank did in fact prove to be intact from
the driveway elevation down to the telephone pole; however the conduits
were full of water.
The method of repair chosen is as follows;
• Excavate at the base of the telephone pole and cut Into the existing
duct bank and remove the 4" short radius Ws at the pole base. Once
the duct bank has been cut back a concrete vault will be Installed
and 4" long radius go's will be installed up the telephone pole. Doing
this will serve two purposes,as a means of pulling the cable with
minimum stress and providing a means for the water to drain from
the duct bank and not build up within the conduits.
• At the driveway elevation a second vault will also be installed, this
will allow access to the duct bank where the conduits were exposed
and also the new armored cable.This vault will be Installed in such a
manner that the armored cable currently installed will feed through
the bottom or side until the shutdown occurs.
• The day of the change over the following will occur, Stateline will
drop all load off the padmount transformer and then Mass Electric
will disconnect the high voltage cables from the overhead fuses.
Once this has happened, the cable will be lowered to the ground, the
pole top terminations will be cut off and the cable dragged back up
the hill.The cable will then be feed into 1 of the 4"conduits In the
05/06/2003 08:22 9786628563 PAGE 03
duct bank in the upper vault, through the lower vault and be fed up
the new long radius 90 degree sweep on the telephone pole. New
pole top high voltage terminations will then have to be done and the
utility company must rack the cable up, and power can be restored.
After the cable has been installed In the conduit,the vault tops will
be put on with the proper manhole covers,and the area soli graded.
• The shutdown work will take a minimum of a full work day:all other
work will have to be completed before the shutdown could occur.
This method of installation will meet all code requirements, use the
existing conduit, reuse armored high voltage cable already in service, and
provided access for the future, as well as providing proper long radius
sweeps for the cable to prevent damage.
Qu a Cost Not to Exceed Amount of
If you have any questions with regard to this proposal please feel
at me to review. It should be noted that once approval Is
tree to call anytime
vaults will take between 10 to 15 working days to
avert the concrete
receive for installation.We will schedule to complete this work as soon as
possible upon approval.
Thank you,
tine Ejectrical,INC.
'Phil . lannazzi
Cc. Mr.Jim Decoia, Electrical inspector, Town of North Andover