Loading...
HomeMy WebLinkAboutMiscellaneous - 1423 SALEM STREET 4/30/2018 (82) INSTALLER PROJECT MANAGEMENT OBLIGATIONS As the North Andover licensed installer for the construction of the septic system for the property at /� � Q,y, relative to the application dated for plans by IgA,�oc4 a, and dated 1— /D rU q with revisions dated E-/ ©-0 I understand the following obligations for management of this project: 1. As the installer I am obligated to obtain,all permits and Board of Health approved plans prior to performing any work on a site. I must have the approved plans and the permit on site when any work is being done. 2. As the installer I must call for any and all inspections. If homeowner, contractor, project manger, or any other person not associated with company schedules ales an inspection mP nY and the system is not ready then item three shall be aP P licabl e. 3. As the installer I am required to have the necessary work completed prior to the applicable inspections as indicated below. I understand that requesting an inspection, without completion of the items in accordance with Tile 5 and the Board of Health Regulations may result in a 350:00 fine being levied against my,company.. a) Bottom.of Bed-generally first inspection unless there is a retaining wall which should be done first. Installer must request,the inspection but does not have to be present. b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or verbal OK from engineer must be submitted to Board of Health,,after-which installer calls for inspection time. Installer must be present for this inspection. With pump system all electrical work must be ready.and able to cause pump to work and alarm to function. c) Final Grade-Installer must requestinspection when all Wading.is on site. complete. Does not have to be 4. As the installer I understand that only.I may perform the work(other than simple excavation) required to complete the installation of the system identified in the-attached application for installation. I further understand that work by others unlicensed to install septic systems.in North Andover can constitute reasons for denial of the system, and/or revocation or suspension of my license to operate in the Town .of North Andover; significant fines'to all persons involved are also possible. 5. As the Installer I understand that I must be on site during the performance of the following construction steps: a) . Determination that the proper elevation of the excavation has been reached. b) Inspection of the sand and stone to be used c) Final inspection by Board of Health staff or consultant. d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other components. 6. As the installer I understand that I am solely responsible for the installation of the system as Per the approved plans. No instructions by the homeowner, general contractor, or any other Persons shall absolve me of this obligation. Undersi Licensed S i Installer ©L( Date: �^ !? Dispo al Works Constr ction Pere # A` �—`�