Loading...
HomeMy WebLinkAboutMiscellaneous - 1423 SALEM STREET 4/30/2018 (89) V7. TKIT1 SCC Engineering Associates j 235 Newbury Street Danvers,MA 01923 (978)777-3050 Fax (978)774-7816 Bolton, MA (978)779-6767 Boston,MA (617)350-7906 #9302 TOWN OF NORTH ANDOVER/ April 30, 2002 BOARD OF HEALTH North Andover Board of Health ['MAY 2002 27 Charles Street North Andover, MA 01845 Attn: Ms. Sandra Starr Re: 1423 Salem Street North Andover, MA Dear Ms. Starr: We have revised the Sewage Disposal System design plan for 1423 Salem Street based on the written comments of John Noonan in a letter dated March 28, 2002. Specifically, we have changed the plans as listed below. 1. We propose to convert the existing D-Box to a DMH. We propose the installation of a manhole riser to the surface with a water tight connection. 2. The breakout requirements of 310 CMR 15.211(l)[4], specifically 15' to a 3:1 slope, can be achieved on this site. However,this would require an additional 800+ square feet of disturbance in the buffer zone to nearby wetlands. The conservation commission preferred and recommends that we reduce the amount of this disturbance, therefore we proposed the impervious barrier. We are proposing a plastic membrane barrier. This barrier material meets DEP's Guidelines for Installation of Impervious Barriers and Slope Stabilization for Title 5 Systems dated March 1, 200 attached. 3. no e ias en added to the plan view as well as the profile stating that the outlet pipes from the distribution box shall be set level for the first two feet. Additionally, the profile has been graphically changed to demonstrate this. 4. Buoyancy calculations were provided with the original submittal on 1/15/02. We are resubmitting them along with this revision set. 5. The vent detail has been revised to show an elbow up at the end of the distribution pipes. 6. Spot grades of 102.4 have been added to the downhill side over the leaching area. 7. Minimum pipe slopes have been provided on the profile. Division of Hancock Survey Associates,Inc.